HomeMy WebLinkAboutNC0047384_Annual Report_201905174/1/2018
Deborah Gore
Department of Environmental Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
Mrs. Gore,
RECEIVED/NCDEQ/DVM
MAY 17 2019
Water Quality
Permitting Sectlgn
Attached is the revised annual update for North Buffalo and T.Z. Osborne WWT facilieties for
2018. The City of Greensboro is also in the process of upgrading our T.Z. Osborne WWTP
capacity to 56 MGD with construction associated with WWTP permit number NC0024325. The
North Buffalo fality was decommissioned October 2017 and is only a transfer pump station. I
have forwarded the necessary information to Deborah Gore in Raleigh. If you require any
additional information or have any questions please do not hesitate to contact me at (336) 373-
2055.
Sincerely,
Shane Messer
Engineering Specialist
City of Greensboro
Water Resources Department
sm
Attachment
cc: Jana Stewart, PE
Jason Geary, PE
City of Greensboro
Water Resources Department
Engineering Division
Flow Tracking/Acceptance for Sewer Extension Permit Applications
0 W,-A (COG-FTSE-10/07)
Permit Number: N/A
Project Applicant Name- City of Greensboro
Project Name for which flow is being requested: Annual Flow Allocation & SILT Update
More than one COG-FTSE-10/07 maybe required for a single project rf the owner of the WWTP is not responsible for all pump stations along the route of the
proposed wastewaterflow Flow acceptance is contingent upon City Council approval
The Flow Tracking /Acceptance Permit is valid for a period of one year from the date of issuance Failure to renew the permit prior to the expiration date, by
submission of a revised application, will result in relinquishment of any waste waterflow allocated for the project in question A revised application must be
submitted to Water Resources Department rfJlow conditions or development plans change other than what was stated in the original application.
I. Complete this section only if you are the owner of the wastewater treatment plant
a. WWTP Facility Name: T.Z. Osborne Water Reclamation Facility
b. WWTP Facility Permit Number: NCO047384
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e WWTP facility's actual avg. flow
f. Total flow for this specific request
All flows are in MGD
40.0000
CS- 0.0552 SIU - 26099
2987
g. Total actual and obligated flows to the facility 32.5351
h. Percent of permitted flow used 8134
II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow.
Are there any pump stations affected? 000
List pump stations located between the project connection point and the WWTP
Pump Station Name Approx. Capacity, MGD Approx. Current Avg.
(Finn/Design) Daily Flow, MGD
Not Applicable n/a n/a
Not Applicable n/a n/a
Not Applicable n/a n/a
Not ApDlicable n/a n/a
111. Certification Statement:
I, Shane Messer certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been
evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any
capacity related sanitary sewer overflows or overburden any downstream pump stations enroute to the receiving treatment plant. This analysis
has been performed in accordance with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptance of this
wastewater flow
Signing Official Signature
212812018
Date