ADDITIONAL CONDITIONS
4)
The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other
suitable materials approved by department personnel. No excavation or other land disturbing activities
is permitted except for that which shall be required for the construction of the bulkhead wall, riprap,
deadmen cables, etc. This permit does not authorize any excavation waterward of the approved
alignment without permit modification.
~
5) The backfill material shall be clean and free of any pollutants except in trace quantities.
6)
All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
x
~
*
~ Sedimentation and Erosion Control
~, t.
i 7) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ~
f ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e,g, silt fence, {
t. diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately l
f landward of the bulkhead cap immediately following completion of backfilling activities, j
:} *
J 8) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion *
I within thirty days of project completion, I:
~ Pier
~ ~
:t,' 9) This permit authorizes only the 6 ft. x 48 ft. pier, the 16 ft. x 16 ft. platform, the two 3 ft. x 16 ft. f
;' stepdowns, the single pile supported jet-ski lift, and other structures and uses located in or over the water 1
:~ that are expressly and specifically set forth in the permit application dated 5/19/05 and attached ~
~ workplan drawings dated 5/19/05. No other structure, whether floating or stationary, shall become a *
*'
~,: permanent part of this pier without permit modification, No non-water dependent uses of structures I':,':
,~ shall be conducted on, in or over public trust waters without permit modification.
):
,.
,e
{. .>
~ 10) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts ~
~ of the structure and the adjacent property owner's riparian access cOlTidor, which is determined by ~
~ drawing a line parallel to the channel or deep water, then drawing a line perpendicular to the channel :::
~ line that intersects with the shore at the point where the upland property line meets the water's edge. :;
.~ )(
',( ~
-} X
* 11) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable ;,
~ waters at or adjacent to the authorized work. $
)' g
J *
:~ 12) The authorized structure and associated activity shall not cause an unacceptable interference with ~
* navioaation, ~
:i :::
" x
" :::
~,: 13) The permittee shall maintain the authorized work in good condition and in conformance with the terms i
,; and conditions of this permit. The permittee is not relieved of this requirement if he abandons the l
1 permitted activity without having it trans felTed to a third party, 1
~f
:1 x
~ x
~ I
:}.:.:"'r:-;"'-"':-X";-:-x.y.~:~:...;..;..x>->-:,*,;..t...;..:..x-?:.......:-;-..x~....:<<<-:..:~:....",-;-:,*,;-:-:->>:..;...'<<""-->>:.y.;-x-:.:...x-:-:-:-=--:-:-.....,..:...;...x.....~.....-:y:-:-:-x....-x-:--;..:..;.<"...:..;..>>:~:-:~.-:-x....'-:.......~..;~..:...;..>>:-;...:-;.:-:..:-:-:-:-:...""X-:-:-:...""..;..:......x-;-x..;..;.:...;_:_:'*'X..;~:~:-'''')o
r~~~:::~>>~~:~~;:::~<<*~v>>~--~~~~x<<~-~~v~>>-'x<<-~~-~~~~~~~:J~~:~'~'~;::~~;~~_
Page 3 of 3
ADDITIONAL CONDITIONS
~ 14)
*
}.
~
:::
~
}
This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
15)
The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. .
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
"
}.
~ 16) This permit does not authorize the creation of any permanent boat slips other than the approved jet-ski
,< lift. The addition of tic-downs, pilings, or boat slips shall require modification of this permit. Contact a
f.
'I DCM representative at (252) 946-6481 to request this authorization.
* I',
:i
} General
::: :::
'~17) The permittee understands and agrees that, if future operations by the United States requires the ~
:i removal, relocation, or other alteration of the structure or \vork authorized by this permit, or if in the t
:1 opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause !,
:i. unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, ~
~ upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or 1
::: obstructions caused thereby, without expense to the United States or the state of North Carolina, No *
.1 claim shall be made against the United States or the state of North Carolina on account of any such ~
y removal or alteration. ;.
::: *
{ }
:i. ~
:l 18) No vegetated wetlands shall be excavated or filled, even temporarily, without permit modification. *
" :(
~: y
O( or
:;: i\'OTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, *
I approvals or authorizations that may be required, I,:
" NOTE: Future development of the permittee's property may require a modification of this permit. t
:1 Contact a representative of the Division at (252) 946-6481 prior to the commencement of any f
,; such activity for this determination. The pennittee is further advised that many non-water 1
;. dependent activities are not authorized within 30 feet of the normal water level. 1
:~ :~
:i. :::
,,':::~~~,:,' i\'OTE: The N.C. Division of Water Quality has authorized the proposed project under General Water~ ~::.~,,',
. Quality Certification No. 3400 (DWQ Project No. 05-0965), which was issued on 7/13/05.
*
:i l\;OTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No. *
:~ 1980000291 (COE Action Id. No. 200511219) which was issued on 8/2/05. ~
" :i."
:1 :::
Y" *
:~
1 *
* i,
y :~
i ~
"
:~
:: .
~~;.;.-:..........;-;~....:_;-:_:.:...:..:..~..:..._:..;..;..:_;_:........-;-:_;-;-;...:_;..:.y.,:_:--;.:_;_:_;-;_:_:..:..:_:-;_;..:_:_:_:_;-:_:_:_:_:_;_:..:..:_;..;..;..;_;_:_;-;-;_;...;_:-....;_;.....;......;_;_...:_:..;..;..;.....;-;-;-:..;_:_:..;..;..:..:......;_:-:..:_..:..;..:....""'..;......:~;..:t;..:~:t:..:~:..;....:..;-:_...:_:..:_:..;..;_;..:_x..:..;.....:....;.;......:-.........:-;-...:..;t:..;-:.:......:-:-:-x~..:...:-;-"..x~:-:~J
o'f WATI2,ty
o~~c..
05 DllG)"J7
- I"
> -
'0 ___~S;:::-:-l ~
,~
Michael F, Easley, Governor
William G, Ross Jr" Secretary
North Carolina Department of Environment and Natural Resources
Alan W, Klimek, P,E, Director
Division of Water Quality
July 13, 2005
DWQ Project # 05-0965
Washington County
Graham Whitehurst
4500 Norman Rd.
Portsmouth, VA 23703
Subject Property:
Graham Whitehurst Property
SR 1344
Roper, NC
Approval of 401 Water Quality Certification (GC3400) with Additional Conditions
Dear Mr. Whitehurst:
You have our approval, in accordance with the attached conditions, to place fill material within or
otherwise impact 0.089 acres of waters to construct a bulkhead and pier, as described in your application
received by the Division of Water Quality (DWQ) Wetlands/401 Unit on June 1,2005. After reviewing
\
your application, we have determined that the Division ofWate~ Quality (DWQ) General Water Quality
Certification Number 3400 covers these water impacts. This Cenification allows you to General Permit
No. 198000291 when issued by the US Army Corps of Engineers (USACE). In addition, you should get
or otherwise comply with any other federal, state and local requirements before you go ahead with your
project including (but not limited to) erosion and sediment control regulations and CAMA. Also, this
approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in
your application shall expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application, If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount Approved Plan Location or Reference
(Units)
404/CAMA Wetlands 0.089 (acres) DCM-MP-l
One ,
NorthCarohna
/Va/llmll!!
401 WeUands Certification Unit
1650 Mail Service Center, Raleigh, North Carolina 27699.1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919.733.1786/ FAX 919.733-6893/lntemet hltp:/lh2o,enr,state,nc,uslncwetlands
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Graham Whitehurst Property
Page 2 of2
July 13, 2005
2. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality,
1650 Mail Service Center, Raleigh, NC, 27699-1650.
3. Water Quality Certification
The proposed project must comply with all of the conditions of General Water Quality
Certification (GC) 3400. '
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved water
impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you
receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the
North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions\are final and binding unless you ask for a
hearing. \
\
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-
733-9721 or Tom Steffens in the DWQ Washington Regional Office at 252-946-6481.
AWKJijm
Sincerely,
r~~:!:fJ
Enclosures:
GC 3400
Certification of Completion
cc: Doug Huggett, DCM
USACE Washington Regulatory Field Office
DWQ Washington Regional Office
File Copy
Central Files
Filename: 050965Graham Whitehurst(W ashington)40 1 CAMA
e
~- ~
z, ~
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F, Easley, Governor Charles S. Jones, Director William G, Ross, Jr., Secretary
MEMORANDUM
TO:
Ms. Cyndi Karoly
Env. Biological Supervisor
Division of Water Quality, Wetlands Unit
FROM:
Doug Huggett
Major Permits Processing Coordinator
DATE:
27 May 2005 W~
CAMA and Dredge & Fill Application ReVii@@ @U 5 ~
JUI~ 1 ~ 200S
SUBJECT:
APPLICANT:
Graham Whitehurst
PROJECT LOCATION:
Washington County
" "" ." U : .' ",,'
O;:Ni\' ~"01:'~..~'.-:, ,;'hiH
,,';E1l1J:G'.l/; ,.l) ~Ie;;", 1/1'\" ,','
PROPOSED PROJECT: Applicant proposes to bulkhead and backfill ::l:l71' of shoreline.
The applicant also proposes to construct a ::l:6' by ::l:48' pier with 2-::l:3' by ::l: 16' step-down
platforms with a ::l:16' by::l:16' T-head platform at the terminal end of the pier. A single
pile supported jet ski lift is also proposed to be located adjacent the bulkhead.
Please indicate below your position or viewpoint on the proposed project and return this form by
17 June 2005. Please contact R. Kelly Spivey, at 252-948-3853, if you have any questions
regarding the proposed project. When appropriate, in depth comments with supporting data are
requested.
REPLY
This office has no objection to the project as proposed.
This office has no comment on the proposed project.
This office approves of the proposed project only if the recommended
changes are incorporated. See attached.
This office objects to the proposed project for reasons described in the
attached comments,
Signed
Date
943 Washington Square Mall, Washington, North Carolina 27889
Phone: 252-946-6481 \ FAX: 252-948-0478 \ Intemet www,nccoastalmanagement.neV
One ,
NorthCaroltna
;Vat/lm//y
An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANS MITT AL AND PROCESSING RECORD
A) APPLICANT: Graham Whitehurst County: Washington
LOCATION OF PROJECT: Washington County, off SR 1344, at Newberry Landing, on the
south side of Albemarle Sound near Roper, North Carolina
DATE APPLICATION RECEIVED COMPLETE BY FIELD: 23 May 2005
FIELD RECOMMENDATION: ATTACHED
CONSISTENCY DETERMINATION:
FIELD REPRESENTATIVE: R. Kelly Spivey DISTRICT OFFICE: Washington
DISTRICT MANAGER REVIEW: "7 ~1cJ-tl~ -
B) DATE APPLICATION RECEIVED IN RALEIGH:
PUBLIC NOTICE REC'D:
ADJ. RIP. PROP NOTICES REC'D:
APPLICATION ASSIGNED TO:
C) 75 DAY DEADLINE:
MAIL OUT DATE:
FEDERAL DUE DATE:
PERMIT FINAL ACTION: ISSUE
FEE REC'D: $400
END OF NOTICE DATE:
DEED REC'D:
ON:
150 DAY DEADLINE:
STATE DUE DATE:
FED COMMENTS REC'D:
DENY DRAFT ON
AGENCY DATE OBJECTIONS: NOTES
COMMENTS YES NO
RETURNED
Coastal Management - Regional representative
Coastal Management - LUP Consistency
Determination
Division of Community Assistance
Land Quality Section
Division of Water Quality
Storm Water Management (DWQ)
State Property Office
Division of Archives & History
Division of Environmental Health
Division of Highways
Wildlife Resources Commission
Division. of Water Resources
Division of Marine Fisheries
Submerged Lands (DMF)
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Graham Whitehurst
2. LOCATION OF PROJECT SITE: Washington County, off SR 1344, at Newberry Landing, on the south
side of Albemarle Sound near Roper, North Carolina
Photo Index-1989, 1-64(25), H-4 1995,133-1412, F-4 2000,133-1559, U-3
State Plane Coordinates - X: 2,751,200 Y: 816,300
Leonards Point Quadrangle - Upper Left Corner
3, INVESTIGATION TYPE: CAMA & Dredge and Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 11 May 2005
Was Applicant Present - Yes
5, PROCESSING PROCEDURE: Application Received - 23 May 2005
Office - Washington
6, SITE DESCRIPTION:
(A) Local Land Use Plan - 1994 Washington County Land Use Plan
Land Classification From LUP - Conservation (water), Rural (land)
(B) AEC(s) Involved: Estuarine Water, Public Tmst Area and Coastal Shoreline
(C) Water Dependent: Yes
(D) Intended Use: private.
(E) Wastewater Treatment: Existing - Septic Tank
Planned - N/A
(F) Type of Stmctures: Existing - house, renmants of bulkhead and pier
Planned -bulkhead, pier, 2-finger pier, jet ski lift
(G) Estimated Annual Rate of Erosion: :1:2' to :1:4'excluding catastrophic event such as Hurricane Isabel
Source - Applicant
------ --,------ ~ . ~ -- - -.. -.-- -----
.-_ . _n_ _... . . -. --- '-
(A) Vegetated Wetlands
(404 )
(B) Non-Vegetated Wetlands :1: 3,250 ft2 :1:640 ft2
River Bottom Shaded
(C) Other (Uplands)
Slope/Grade/Seed
DREDGED
[AREA]
FILLED
OTHER
7.
HABITAT DESCRIPTION:
(D) Total Area Disturbed: :1:3890ft2
(E) Primary Nursery Area: No
(F) Water Classification: SB Open: No
8. PROJECT SUMMARY: The applicant proposes to bulkhead and backfill :1:171' of shoreline, The applicant
also proposes to constmct a :1:6' by :1:48' pier with 2-:1:3' by:1: 16' step-down platforms with a:1: 16' by:1: 16' T-
head platform at the terminal end of the pier. A single pile supportedjet ski lift is also proposed to be located
adjacent the bulkhead.
Graham Whitehurst
Washington County
Proiect setting
The project site is located off SR 1344 at Newberry Landing on the south side of the
Albemarle Sound near Roper in Washington County, North Carolina. The site is a .5-acre residential
lot. Historically, there has been a bulkhead at the project site, but it has virtually been destroyed by
natural elements. Since the time the bulkhead was damaged the shoreline has experienced severe
erosion. The average erosion escarpment is :1:19' landward of the previous bulkhead.
Man-made features on the lot consist of a house, remnants of a bulkhead and pier. The lot is
mostly vegetated with lawn grasses, ornamental shrubs, loblolly pines and various hardwoods, Both
adjacent properties on the downstream (east) side and upstream (west) side are developed lots. A
residence and bulkheaded shoreline are located on both properties. The project site is approximately
4 feet above normal water level.
The Albemarle Sound is classified as SB by the Environmental Management Conunission at
the project site. The Albemarle Sound is Coastal waters and is not open to shell fishing.
Proiect description
The applicant proposes to bulkhead and backfill :1: 171 ' of shoreline on the same alignment as
the upstream and downstream bulkheads. This aligrunent will place the bulkhead on average :1: 19'
waterward and a maximum distance of :1:26' wuterward of the normal water level. The applicant also
proposes to construct a =6' by :1:48' pier with 2-:1:3' by =16' step-down platforms with a :I: 16' by:l: 16'
T -head platform at the terminal end of the pier. Also proposed is a single pile supported jet ski lift,
which is to be located adjacent the bulkhead.
Anticipated impacts
The construction of the bulkhead and installation of backfill as proposed will result in the
filling of approximately 3,250 ft2 of sound bottom. The construction of the pier, finger piers, and
platforms will result in the shading of :l:640ft2 of sound bottom. The project will result in localized
turbidity as a result of the construction of the bulkhead and pier structures.
Kelly Spivey - 23 May 2005
5/19/05
GRAHAM WHITEHURST
4500 NORMAN ROAD
PORTSMOUTH, VA. 23703
MR. ~~UROW[LL i<~J/'l ~P;..lfY
943 \V ASHINGTON SQUARE MALL
WASHINGTON, N.C. 27889
DEARMR. TRi,,,;r;u.: 5pivf.'I
ENCLOSED PLEASE FIND MY APPLICATION FOR A MAJOR PERMIT FOR THE
RECONSTRUCTION OF A BULKHESD AND PIER. THIS PROPERTY IS THE FOURTH
HOUSE ON LEFT GOING DOWN NEWBERRY LANDING WHICH IS THE LAST ROAD
TO RIGHT AT THE END OF SR 1344, COMMUNITY OF PEA RIDGE, WASHINGTON COUNTY.
THE PURPOSE OF THIS PROJECT IS TO REPLACE AN EXISTING BULKHEAD AND
PIER. THIS PROPERTY HAS EXPERCIENCED SEVERE HURICANE DAMAGE AND
MOST RECENTLY WINDS MEASURED AT 70 MPH. CONTUINIOUS HIGH \VINDS ARE
FUTHER ERODING AWAY LAND IN THE BACK YARD. THE AJOINING PROPERTY
OWNERS ARE EXPERIENCING DAMAGE NOW TO THEIR BULKHEADS,
THE PROPOSED BULKHEAD WOULD TIE-IN TO MY NEIGHBORS BULKHEADS, THUS
SAVING THE REPLACEMENT OF MORE BULKHEAD AND SAND OR SOIL BY THEM.
THE BULKHEAD WILL BE BUILT USING 6 X 6 POST X 12' LONG AND (2) 4 X 6
STRINGERS. THE STRINGERS WILL BE 2' APART FOR THE LENGTH OF THE BULKHEAD.
TWO COATS OF 1 X 8 ROUGH BOARDS X 10' LONG WITH A 2 X 12 CAP BOARD. THE POST
WILL BE EVERY 4' APART, BOLTED WND TIED BACK AT EVERY POST WITH 3/8"
GAL V ANIZED CABLE TO A 4 X 6 DEADMAN POST, THERE WILL BE A 7' WIDE FILTER CLOTH
BEHIND THE BULKHEAD. ALL LUMBER EXCEPT FOR THE 2 X 12 WILL BE 2.5 TREADED.
THE 2 X 12 WILL BE ABOVE GROUND TREADED.
THE PIER WILL BE 5'7" X 48', PLUS A 16' X 16' PLATFORM AND (2) 3' X 16' STEPDOWNS.
MATERIAL WILL BE 6 X 6 PILING X 16' AND 2 X 8 STRINGERS AND DECKING. EVERY PILING
DOUBLE BOLTED.
WHITE SAND WILL BE USED TO BACKFILL AND STABILIZE AFTER THE BULKHEAD IS
BUILT.
IF THERE ARE ANY QUESTIONS REGUARDING THIS PROPOSAL, I CAN BE REACHED BY
PHONE AT 757-285-8811. THANK YOU FOR ANY ASSISTANCE IN THIS MATTER.
SINCEREL Y,
~~
".FQrm DCM-M:P.l
APPLICATION
(fa be co.mpleted by all applicants) ,
c. Will the proj,ect be for public, private or commerci2.i
-Pf~-'-' ----, , -,_....._~e..'l..-f2 R' vA-tE. .
d. Give a brief description of purpose, use, methods 0
constrUction and daily operations of propos~
project., If more space is needed, please attacl
additional pages,
CO~ 5+t;l..\.I.,* b"" \ ,,~C{ Ad ""rod. pit~
b1 \).)A~~OO~N mfC.-H\QcI. QA-ct<,.+,'U
'~dW"'A.cl o~ bw~h~d w,H..
~bA<:.'t..."'l)~Jlf)~tp. ·
e>lA.W..h'c.A& -n, b~ l.tc;.u9. AS f~~
bA~ti\'t ~~"'"" ceRoS.rQ~, '
~ 17~n. (t,. dQ~~h1 ~l(. ~ 'S\i.'\J
~W\~M-h~1 ) ~h fo,) 1 J c(tAbj;~ I w,
1. APPLICANT
'-
a, Landowner:
Name GR.A ~A\'Y\ Wh'\-1-l:. h \,\ ~ s+-
._",Ag.df.~S; ~,?OO. _~9_~~~~ ...Kei.
C~ty ~o~"'S~o,^,4-'~ State-- \)A-~ -- .--.
Zip ~~"1o~ Day Phone -r.S1- ~gS. ggl/
Fax LS1-LtRL\' -8'\1(0
b. , Authorized Agent: ^ IJ '
Name ~ A
Address
City
State,
Zip
Day Phone
Fax
c. Ptoj ect name (if any.)
o..r N~uJ b
NOTE:
Permit will b: twu.d' roam.: oJlar.&Jwr~r(s), CN1lor
projea ",ame.
2. LOCATION OF PROPOSED
PROJECT
a. County vJPr~\;\t\.l(;Tt)N
Revised 03/~
.
b. City, town, community or landmark
, , "'Rofy.R l I~' C.
c. Street address or secon~arY. road number
Q...f-r5~ ~31f!t /J~l.JbtflRI LANcJlnj 'Rd.
d. Is proposed work within city limits or planning
jurisdiction?, ~ Yes, x No
_ __ _~~}~~e of body of water nearest project (e.g, river,
. creek~ -scl\.1nd;- bay)~.:f\\ bttr\ A-f\ \ to-SOlA ~d - .
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose (e.g.
building a bome, motel t marina, bulkhead, pier, and
,excavation and/or filling activities.
LONstRlAct b\'\\~h~Ad 11" t \AI ,'or", Af'l ~
o.f I q t wl'\'tttC,.'-"Aa.& cf- NWL.) -ro
~t.c.+ -\"0 co a.~ It!: c.{: 'C:~i ~+In 'ol4l'4lw1
t ~. c:loc:~. Co~st~"c.f s'7"uid l/-8' ·
1?Jl.4.~ /(, '.'l-Il. ~ ~1~tfo.(f.th,J tt-Sl\i Lif
b. Is &.~p(t;~~~ aefi~'ffia!nt~nance of an existing
project, new work, or both? Bt>+J, ,
i. Is the proposed project consistent with the applicable
zoning? ~ Yes _ No
(Ar.ac:h zaml1! ~mp/l:;r.d" =:r:ific::::, if cppUr:ahLt) 0 An accurate, dated work plat (including plan view
. ___~___and-crcss-secticia!-dr-awiDgs).draw!l-to-sc21e. in black
j, Has a professional archaeological assessment been ink ,on an 8 1/2'" by 11" white paper.' (Refer to
done for the tract7 _ Yes , -L No Coastal Resources C.ommission Rule 71.0203 for a
, , ~f )'~~ E~ ~~~n:7, . _ ,_ ,_ ' detailed description,)
. Form DCM-MP-l
4. LAND AND WATER
CHARACTERIS~ICS
a. Size of entir~ tract · SAc. ~ E.
. .
h. Size of indlviduallot(s) .$A<n~' A''S A-bcl\l cc.
c. Approximate elevation of tract above MHW or
NWL ! 3.;' - '! 4-.'0
,- d.-' sou,type(s);and texture(s)_oUracL - - - - - - ,
. SAJ'.1d~ w\~ Sam~ c:..\A~
e. Vegetation on tract p;~~ t~6G~1 l AuJN
~ ~A~Seh t D ~~ A-mct~ t-tr'l :So ~ ~u.h.,5. :'
f. Man-made features now on tract 'R G.S>>~ 6J'l GE.
g. \\'bat is the CAMA Land Use Plan land
classification of the site? (Car..su!::he lad la;-.d we pIal.)
,../" Conservation _ Transitional
, 'Developed ~ Community
Rural ~ Other
h. How is thetIacfzonedby,local. government?
"RE.S '
k. Is' the project located in a. National Registered
Histod~ . District or' dqes. it involve a National
, .' Register 1 isted or eligibl,e prope;ty7 '
~ t '
Yes _~o
1. Are there wetlands on the site? _ Yes ' / No
. Coastal (marsh) Other
If yes, bas a delineation been conducted?
(,.{ t".a Cis de CW'7'.:1'.J.cJi all/if av::Uab!.e)
Revised 03/~
..
rn. Describe exIsting wastewater treatment facilities.
6'Z. pt I c. :.r p."..W" '
n. Describe location and type of discharges to waters
of the state. (For exampI e, surface runoff, sanitary
wastewater, industrial/commercial effluent. .wash
downll and r~idential discharges.)
S l.\ ~ fPK tl. ~\..\,,J ~ of
0'. Describe existing drinking water supply source,
~-C-~ u-~+\{,'.vdA-T~~- -~~~-~F'Y- u'
s. ADDITIONAL INFORMATION
In addition to the completed application form, the
following ite~ must be submitted:
. 0 A copy or the deed (with state application only) or
other instrUment under which the applicant claims title
to the affected properties, If the applicant is DOt
claiming to be the owner of said property, then
forward a copy of the deed or ather instrument under
,which the owner claims title, plus written permission
from the owner to carry out the project. .
. - ." ...._- _.- .. - .... .....
Please note that original drawings are, preferred and
anly high quality copies will be accepted. Blue-line
prints or other larger plats are ~cceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings,) A site or location map is a part of plat
requirements and it must be sufficiently det.ailed toiguide agency persoone~ unfamltiar with the area to t~e
, .
. : fo'rm I?CM-:MP-l
site. . Includ'e highway or secondary road (SR)
numbers, landmarks, and the like.
" A Stormwater Cenifica.tlon, if one is necessary.
" A list of the names and complete addresses of the
adjacent waterfront '(riparIan) landowners and
signed return receipts as prooF that such owners
have received a copy or the application and plats
by certified mall. Such landowners must be advised
that they have 30 days in which. to submit comments
on the proposed project to the Division of Coastal
~~agement. Upon signing this form, the applicant
fuJ:!l::ler-certifiefthat such notice has been provided...
.. , .
Name 0"" L/1 . t=~cc.q,MAA
Address u.) bcc-tz. R. I-A- ""
Phone 0 f'ctlZ.., I fU. c. ';\' 9io.
Name Ml!)Q..to~ -b :s"~~ ~~pdt'l\ A,J
. Address t~~1J..1 -+>:~~~ b\4.~ $+.
PhGM G _e.s~__ \IA-. ~ ~g3\
Name
Address
Phone
o A list of previous state or federal permits issued for
w9rk on the project tract. Include permit numbers,
permittee, and issuing dates.
,.~ tJ / 11
.
. A check for $25064~.Q)$475 made
payable to the Department of Environment &
Natural Resources (NCDENR) to cover the
costs of processing the application.
o A signed ABC hazard notice for projects in
oceanfront and inlet areas.
.6. CERTIFICATION AND PERMISSION
TO ENTERON LAND
1 understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditiollS
and restrictions contained if} the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
~_ ~~~u~~ i.n.'a ~~er ~nsist~n~ w~~ su~h progr~.
I certify that 1 am authorized to grant, and do in fact,
grant permission to representatives of state and federa
review agencies to eI)ter on the aforementioned lands in
connection with evaluating information related to thi:
pen;rnt application and ,follow-up monitoring of thl
proJect.
I further certify that the infonnation 'provided in thi
application is truthful to the best of my knowledge.
This the'~ day of MA\.\
, 2ooj.5
Print Name G~Prl-TA~ Wh:-r~hL4.~---t-
~
Signature
. wru:r or l.U!hariz~d Agrnl
_. _..}l~~.. indicat~ ~chmeE~ pertaining to your propos:
proJect. --..-.-. n... .-.-'
./ DeM MP-2 Excavation and Fill Information
_ DCM M.P.3 Upland Development
..L OCM MP-4 Structures Information
_ OCM MP.5 Bridges and Culverts
_ OCM M:P-6 Marina Development
NOTE: Please sIgn and date each attachmen.t in
space provf.ded a1 the bottom of each form.
o A st..atemer:tt of compliance with the N,C.
Environmental Policy Act eN.C.G.S. 113A . lto
10) If the project involves the expenditure or public
funds or use of public lands, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
400 copies oftbis public document were printed at a total cost of $52.48 or $ .13 per copy.
Revised 0319'5
Attach this form to Joint Application for CAMA Major
Permit. Fonn DCM.MP-1. Be sure to complete all
o.ther sections of the Ioint Application that relate to this
. - - -proposed-proJect. - - - - - - -- - -. - - - - - - --- - - - --- - -
a. AmouIiC o1-Triaterral-to-be-excavatoo-from-b~low-' - -
Describe below the purpose of proposed excavation or MHW or NWL in cubic yards
till activities. All values to be given In feet.
Form DCM-MP-2
EXCA VATION
AND .FILL
(Except bridges and culverts)
Avtragt
Em&;
Le~ Width Depth
flJ:W
ProJtc&
Dep th
Access
channel
(MLW) or (NVIL)
Canal
Boat
basin
Boat
ramp
Rock
groin
Rock
breakwater
Other
(Ex~luding
thoreUr.c
Il4b iltuLion)
Re\'ised 03/95
.1. EXCAVATION
NIl}
b. Type of materiaJ to be excavated
c. Does the area to be excavated include coastal
wetlands (marsh), submerged aquatic vegetation
(SAVs) or other wetlands? ~ Yes _ No
d. Highground excavation in cubic yards
2.. DISPOSAL OF EXCAVATED
l\IATERIAL ;V / fJ
a. Location of disposal area.
b. Dimensions of disposal area
c. 1;>0 you claim title to disposal area'?
_Yes_No
If. no. attach a letter granting permission from th~
owner.
d. Wilt a disposal area be available for future
.maintenance? _ Yes _ No
If yes, where?
F~rm DC1tI-MP-2
e. Does the disposal area include any coastal wetlands
(marsh), SA Vs Cl other wetlands?
_Yes _No
f. Does the disposal include any area In the water?
_Yes ,--:"No
3. SHORELINE STABILIZATION
a. Type of shoreline stabilization
:.:L Bulkhead Riprap
! 1711
b. Length
c. Average distance waterward of MHW or NWL
/9'
d. Maximum distance waterward of MHW or NWL
~~/ .
e. Shoreline erosion during preceding 12 months
:!' ;;>. , +0 ~ .:5' .
(SOv.rrt ollnjormation) -fE.~SON AoI 0 bSE~VA-t"'t),.J
f. Type of bulkhead or rip rap material
vJoodSN ,blNl~ h~A-cI
g. Amount of fill in cubic yards ~ be placed below
water level ,}
(1) Riprap Jowl/If
(2) Bulkhead backfill: If 8/. '3 yd 3
h. Type of fill material SAN d
...
i. Source of fill material <!:l ~ f' S" I n
~o~~C~
4. OTHER FILL ACTMTIES N J if
(Excluding Shoreline Stabilization)
a. Will fill material be brought to site?
_Yes _No
Rf'l'~d 03/9'5
If yes,
(1)
(2)
(3)
Amount of ~aterlal to' be placed in the
water
Dimensions of fill area
Purpose of flII
b. Will fill material be placed In coastal wetlands
(marsh), SA Vs or other wetlands?
_Yes _No
If yes,
(1) Dlmenslons of fill area
(2) Purpose of fill
5. GENERAL
b. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic'
dr~e)7
It>Ad\<.. hotf. WOAd tt.1l..
_ LA "'" f _ p. u. c~
c. Will wetlands be cr~ssed. in transporting equipment'
to project site? _ Yes ~ No
If yes, explain steps that will be taken to lessen
environmentallrnpacts. '
6 RPrt-\ArY\ \..tJ h~t'e.h ~~ ~ -r-
AppUcant or PnJea ru..De
^~
/ S~~tun .
6-l't-05
Dale
Form DCM.MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-l. Be sure to complete all
other sections of the Joint Application which relate to
this proposed project.
a. Dock(s) and/or Pier(s)
(1') _ Commercial _Community /Private
(2) Number I .
-~~~--~i~~ -- - ~~~I'- - - - - -- - - - - -
(5) Finger Piers ..L Yes No
(i) Number ::t.
(i i) Length I ~ I
(Hi) Width :3 I
(6) Platform(s) ../ Yes No
(i) Number I
(ii) Length I" '
(Hi) Width lIP'
(7) Number of slips proposed I
(8) Proximity of structure to adjacent rirarian
property lines "!9o' )< t go
(9) Width of water body :t 3 t'n t \ E:-.r;
(10) Water depth at waterward end of pier at
MLW or NWL :r 3.5 I
b, Boathouse (including covered lifts) IV /11
(1) Commercial Private
(2) Length
(3) Width
c. Groin (e.g. wood, sheetpile, etc.) N 1ft
(1) Number ,/4
(2) Length(s)
d, Breakwater (e.g. wood, sheetpile, etc.) IV / ff .
(1) Length
(2) Average distance from MHW, r-,T'WL or
wetlands
(3) Maximum distance beyond MHW, NWL or
wetlands .
Re\ised 03t95
e. Mooring buoys IV /11
(1) _ Commercial _Community _ Private
(2) Number
(3) Description of buoy
(Color, inscription, size, anchor, etc.)
f.
(4) Width of water body
- -(5)- t5"iitance- bu6y(s) - ro - bi- -placed - . beyond
shoreline
:s~tSKi lift
Mooring structure (boatlift, mooring ilings, tc.)
(1) _ Commercial _Conununity rivat;
(2) r\umber I
(3) Length . :t .;20 I
(4) Width I D " Rol..t~c/
a
O'
~A-\4Ath Wh:tE.h~~~;-
Applk.a.Dt or Project Name
~
/Signature
.5'''-1 C; - OS
Date
'FRo",",
PI~('t10v. -l-~
-b ~o~~(2. N'C.
~ {Y\A{\'+cr.o
~..
r
~~-
(}
.....~
'1>~'
qt,
-J"
~i" ! i
l"Ei 1 ~ ~. if.
G.i _sklrme~i1:='==~~",~! f//
. rffi64 ">;~=o, -"""\. i.~/
... 1 I . .-,j' I
,,"-;p/'~>\--- ~I\'ie lO '\,,' ~/
'\'O"'O"=.:,J""'/ ("
--.":~
'\,
\,
00. '\\~h
"',
"(;(~.
....~..
..'t
'\,
~\.
,
"\.
,)
:\...
'\,
.....
'\..
~-'~"=~=I.6;j\,=~~
\::",.,,/ --~="~"l
I \
'I'\le.\~~ ~d
,. NOIlY\~n~~."
i~
~,Q .
. ~.,<.!. .
~O;
~!>.
Lo.cP. .
0'
::-
.~.,.
,":!. I
, CJ]:
~i
'3
;' '\1
, I
.....
t..
c( .
~q
..
Q
'BeasleY'
o
fotf E ru LE ,=, O/J f/v.; Y 3:1-
R L.C:J /.1"1 0.-0 R~Ae,cJG(z -;<d.
L-~.f+-orJ &tJd'i(L 72c1"(-:;~
J~ I c? 14T o,.w J\J Cc. vJ b 't. {Z.R Y L (\-,.J c..
~'"
:'j..
f'1'\ .
"
(t..'
~.
q;:.
,!l.~.'
~.
'. <Q'"
':>.v"
,'1>'
V'{'.
p
(Jilt.
'0-
~(t
.~
.Q'
.j;-t.
0.
~~EmAN
'RtiEAn'
...
r-
...a
-
1-,
1
r
C:>f~A~Arn \\\~'lte Hu R.~ I
PIAN Vt'r;.W Df Pl\Dt>8\"'~
5-IQ"05 N~wb~R~~ LANdiN{;
U~)( \6
P \l\\" f D (1.0'\
A Iben'\ Aa.lli. ~~u. ~d
fRoPoS~d J~t:SK; Lj.pr
(10 ;Wir-JG 0 Il~Lf\t.1 0
f
----=--T==----~-=----=-
~ Old ""BU.L..K.I-\~t\D 5'
.........../~ I
-- _. ~O' /-- ....5
- --- N\ A I I~' ~E.i\D~ lDN ::;......
VV-C .- fill
[1~e.P\
P~DPDSEd BlLL.KlieAD
.:t l"1\ I
.
.
t-
\l1
S"rJ91~
5te>t2..y
1+0 v.. s E.
1L
t
I::- 115 ~
_1"
<<)
-
~
DRAwiNG N~-r TD ..sCA(f..
N
f
f:...iJ5ritJ6
~LKl1eAD ~
BRtt1mA~
r Rt:> Pe.~T ~
~(.Z~~~ wh(r~hlAR~ t
PIAN \/iEW
-+
~~w0E~rz.'i LrrwdirJ6
5-\Q-OS
13u. L"'HE.A-D
I X. B 0E~h"GAI BDAAd~
Pi IhRCfbth
b'IJD
Jt~t; CAl
PoSt
~ 7Z /. GA~ft~i11.cl
CAb\l
L.\- 'f..~ H~i7..orl-;t1l
#(2..\'(\ ~Eft.
if"' ON CEf-JT'i.R. Typ.
o
[Nd \f i r:. w
L(-X~
JtRtiCA/
D r3ItJ tnltfi ~t
J-
d. X. I J. C fl P 13DAi\d
()Zg Ve~hdl{
l~" GA\\l1 C Ahl i. LJ- 'f,..la HDRor1.DNt~ stttiA&u<..
If-~fo Yf;t<t,'C/t {
AJ ;<-V:t FiltiRl.fDth
"D?:HCJr11AJ.! rOS-r
I
AVWG'i.. Iq -I
PRDF ill. of Bt.LLI<' ~Ad i BAct+it\
b~{-\\~PrT\\. \A,^lh1Lt~~-r- L- NiIJhf.tz..({ r LA-Ndl-V\9
? t-i,R L{{D>)-5tC..c)1~
5 -fC(- 05
;). ~~ D6C~~~
). K '8 ~-t(Z.~'i'i.tt-
l'
.;:2 'i 8 ~ Oi>f ~
L- ~4" fl-
3'0
Co 'i-~ .po:;,.T
\NeA-1-t(. rz.
L I{. " Ii. \
t
3'
8D"ffOM < ~
S~\
L t;f- -r
.--'-_ 1. t \ A J, .
'--' ~
-r"" ,..' 1-
-t7"-:> .J.
"0 f~ r-
IV I\Q"'~J\ro~
G~[)4J'1d L6.\Ixl.
(.) tJ L~ Jl'1. 4'1