Loading...
HomeMy WebLinkAbout20050965 Ver 1_Complete File_20050606 . ,# ~" ~~~~'<'-.~""'Xo<<<~~X~~~X--X~~~~:::::::r:->>:<<~"'C?'.-:~>?X-."'>>:<<~<<~~~;,<} Graham Whitehurst Permit # 130-05 Page 2 of3 ADDITIONAL CONDITIONS 4) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation or other land disturbing activities is permitted except for that which shall be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment without permit modification. ~ 5) The backfill material shall be clean and free of any pollutants except in trace quantities. 6) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. x ~ * ~ Sedimentation and Erosion Control ~, t. i 7) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ~ f ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e,g, silt fence, { t. diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately l f landward of the bulkhead cap immediately following completion of backfilling activities, j :} * J 8) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion * I within thirty days of project completion, I: ~ Pier ~ ~ :t,' 9) This permit authorizes only the 6 ft. x 48 ft. pier, the 16 ft. x 16 ft. platform, the two 3 ft. x 16 ft. f ;' stepdowns, the single pile supported jet-ski lift, and other structures and uses located in or over the water 1 :~ that are expressly and specifically set forth in the permit application dated 5/19/05 and attached ~ ~ workplan drawings dated 5/19/05. No other structure, whether floating or stationary, shall become a * *' ~,: permanent part of this pier without permit modification, No non-water dependent uses of structures I':,': ,~ shall be conducted on, in or over public trust waters without permit modification. ): ,. ,e {. .> ~ 10) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts ~ ~ of the structure and the adjacent property owner's riparian access cOlTidor, which is determined by ~ ~ drawing a line parallel to the channel or deep water, then drawing a line perpendicular to the channel ::: ~ line that intersects with the shore at the point where the upland property line meets the water's edge. :; .~ )( ',( ~ -} X * 11) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable ;, ~ waters at or adjacent to the authorized work. $ )' g J * :~ 12) The authorized structure and associated activity shall not cause an unacceptable interference with ~ * navioaation, ~ :i ::: " x " ::: ~,: 13) The permittee shall maintain the authorized work in good condition and in conformance with the terms i ,; and conditions of this permit. The permittee is not relieved of this requirement if he abandons the l 1 permitted activity without having it trans felTed to a third party, 1 ~f :1 x ~ x ~ I :}.:.:"'r:-;"'-"':-X";-:-x.y.~:~:...;..;..x>->-:,*,;..t...;..:..x-?:.......:-;-..x~....:<<<-:..:~:....",-;-:,*,;-:-:->>:..;...'<<""-->>:.y.;-x-:.:...x-:-:-:-=--:-:-.....,..:...;...x.....~.....-:y:-:-:-x....-x-:--;..:..;.<"...:..;..>>:~:-:~.-:-x....'-:.......~..;~..:...;..>>:-;...:-;.:-:..:-:-:-:-:...""X-:-:-:...""..;..:......x-;-x..;..;.:...;_:_:'*'X..;~:~:-'''')o r~~~:::~>>~~:~~;:::~<<*~v>>~--~~~~x<<~-~~v~>>-'x<<-~~-~~~~~~~:J~~:~'~'~;::~~;~~_ Page 3 of 3 ADDITIONAL CONDITIONS ~ 14) * }. ~ ::: ~ } This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 15) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. . Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. " }. ~ 16) This permit does not authorize the creation of any permanent boat slips other than the approved jet-ski ,< lift. The addition of tic-downs, pilings, or boat slips shall require modification of this permit. Contact a f. 'I DCM representative at (252) 946-6481 to request this authorization. * I', :i } General ::: ::: '~17) The permittee understands and agrees that, if future operations by the United States requires the ~ :i removal, relocation, or other alteration of the structure or \vork authorized by this permit, or if in the t :1 opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause !, :i. unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, ~ ~ upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or 1 ::: obstructions caused thereby, without expense to the United States or the state of North Carolina, No * .1 claim shall be made against the United States or the state of North Carolina on account of any such ~ y removal or alteration. ;. ::: * { } :i. ~ :l 18) No vegetated wetlands shall be excavated or filled, even temporarily, without permit modification. * " :( ~: y O( or :;: i\'OTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, * I approvals or authorizations that may be required, I,: " NOTE: Future development of the permittee's property may require a modification of this permit. t :1 Contact a representative of the Division at (252) 946-6481 prior to the commencement of any f ,; such activity for this determination. The pennittee is further advised that many non-water 1 ;. dependent activities are not authorized within 30 feet of the normal water level. 1 :~ :~ :i. ::: ,,':::~~~,:,' i\'OTE: The N.C. Division of Water Quality has authorized the proposed project under General Water~ ~::.~,,', . Quality Certification No. 3400 (DWQ Project No. 05-0965), which was issued on 7/13/05. * :i l\;OTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No. * :~ 1980000291 (COE Action Id. No. 200511219) which was issued on 8/2/05. ~ " :i." :1 ::: Y" * :~ 1 * * i, y :~ i ~ " :~ :: . ~~;.;.-:..........;-;~....:_;-:_:.:...:..:..~..:..._:..;..;..:_;_:........-;-:_;-;-;...:_;..:.y.,:_:--;.:_;_:_;-;_:_:..:..:_:-;_;..:_:_:_:_;-:_:_:_:_:_;_:..:..:_;..;..;..;_;_:_;-;-;_;...;_:-....;_;.....;......;_;_...:_:..;..;..;.....;-;-;-:..;_:_:..;..;..:..:......;_:-:..:_..:..;..:....""'..;......:~;..:t;..:~:t:..:~:..;....:..;-:_...:_:..:_:..;..;_;..:_x..:..;.....:....;.;......:-.........:-;-...:..;t:..;-:.:......:-:-:-x~..:...:-;-"..x~:-:~J o'f WATI2,ty o~~c.. 05 DllG)"J7 - I" > - '0 ___~S;:::-:-l ~ ,~ Michael F, Easley, Governor William G, Ross Jr" Secretary North Carolina Department of Environment and Natural Resources Alan W, Klimek, P,E, Director Division of Water Quality July 13, 2005 DWQ Project # 05-0965 Washington County Graham Whitehurst 4500 Norman Rd. Portsmouth, VA 23703 Subject Property: Graham Whitehurst Property SR 1344 Roper, NC Approval of 401 Water Quality Certification (GC3400) with Additional Conditions Dear Mr. Whitehurst: You have our approval, in accordance with the attached conditions, to place fill material within or otherwise impact 0.089 acres of waters to construct a bulkhead and pier, as described in your application received by the Division of Water Quality (DWQ) Wetlands/401 Unit on June 1,2005. After reviewing \ your application, we have determined that the Division ofWate~ Quality (DWQ) General Water Quality Certification Number 3400 covers these water impacts. This Cenification allows you to General Permit No. 198000291 when issued by the US Army Corps of Engineers (USACE). In addition, you should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations and CAMA. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application, If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Plan Location or Reference (Units) 404/CAMA Wetlands 0.089 (acres) DCM-MP-l One , NorthCarohna /Va/llmll!! 401 WeUands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919.733.1786/ FAX 919.733-6893/lntemet hltp:/lh2o,enr,state,nc,uslncwetlands An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Graham Whitehurst Property Page 2 of2 July 13, 2005 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 3. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification (GC) 3400. ' Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions\are final and binding unless you ask for a hearing. \ \ This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919- 733-9721 or Tom Steffens in the DWQ Washington Regional Office at 252-946-6481. AWKJijm Sincerely, r~~:!:fJ Enclosures: GC 3400 Certification of Completion cc: Doug Huggett, DCM USACE Washington Regulatory Field Office DWQ Washington Regional Office File Copy Central Files Filename: 050965Graham Whitehurst(W ashington)40 1 CAMA e ~- ~ z, ~ North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F, Easley, Governor Charles S. Jones, Director William G, Ross, Jr., Secretary MEMORANDUM TO: Ms. Cyndi Karoly Env. Biological Supervisor Division of Water Quality, Wetlands Unit FROM: Doug Huggett Major Permits Processing Coordinator DATE: 27 May 2005 W~ CAMA and Dredge & Fill Application ReVii@@ @U 5 ~ JUI~ 1 ~ 200S SUBJECT: APPLICANT: Graham Whitehurst PROJECT LOCATION: Washington County " "" ." U : .' ",,' O;:Ni\' ~"01:'~..~'.-:, ,;'hiH ,,';E1l1J:G'.l/; ,.l) ~Ie;;", 1/1'\" ,',' PROPOSED PROJECT: Applicant proposes to bulkhead and backfill ::l:l71' of shoreline. The applicant also proposes to construct a ::l:6' by ::l:48' pier with 2-::l:3' by ::l: 16' step-down platforms with a ::l:16' by::l:16' T-head platform at the terminal end of the pier. A single pile supported jet ski lift is also proposed to be located adjacent the bulkhead. Please indicate below your position or viewpoint on the proposed project and return this form by 17 June 2005. Please contact R. Kelly Spivey, at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments, Signed Date 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-6481 \ FAX: 252-948-0478 \ Intemet www,nccoastalmanagement.neV One , NorthCaroltna ;Vat/lm//y An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper DIVISION OF COASTAL MANAGEMENT APPLICATION TRANS MITT AL AND PROCESSING RECORD A) APPLICANT: Graham Whitehurst County: Washington LOCATION OF PROJECT: Washington County, off SR 1344, at Newberry Landing, on the south side of Albemarle Sound near Roper, North Carolina DATE APPLICATION RECEIVED COMPLETE BY FIELD: 23 May 2005 FIELD RECOMMENDATION: ATTACHED CONSISTENCY DETERMINATION: FIELD REPRESENTATIVE: R. Kelly Spivey DISTRICT OFFICE: Washington DISTRICT MANAGER REVIEW: "7 ~1cJ-tl~ - B) DATE APPLICATION RECEIVED IN RALEIGH: PUBLIC NOTICE REC'D: ADJ. RIP. PROP NOTICES REC'D: APPLICATION ASSIGNED TO: C) 75 DAY DEADLINE: MAIL OUT DATE: FEDERAL DUE DATE: PERMIT FINAL ACTION: ISSUE FEE REC'D: $400 END OF NOTICE DATE: DEED REC'D: ON: 150 DAY DEADLINE: STATE DUE DATE: FED COMMENTS REC'D: DENY DRAFT ON AGENCY DATE OBJECTIONS: NOTES COMMENTS YES NO RETURNED Coastal Management - Regional representative Coastal Management - LUP Consistency Determination Division of Community Assistance Land Quality Section Division of Water Quality Storm Water Management (DWQ) State Property Office Division of Archives & History Division of Environmental Health Division of Highways Wildlife Resources Commission Division. of Water Resources Division of Marine Fisheries Submerged Lands (DMF) DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Graham Whitehurst 2. LOCATION OF PROJECT SITE: Washington County, off SR 1344, at Newberry Landing, on the south side of Albemarle Sound near Roper, North Carolina Photo Index-1989, 1-64(25), H-4 1995,133-1412, F-4 2000,133-1559, U-3 State Plane Coordinates - X: 2,751,200 Y: 816,300 Leonards Point Quadrangle - Upper Left Corner 3, INVESTIGATION TYPE: CAMA & Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 11 May 2005 Was Applicant Present - Yes 5, PROCESSING PROCEDURE: Application Received - 23 May 2005 Office - Washington 6, SITE DESCRIPTION: (A) Local Land Use Plan - 1994 Washington County Land Use Plan Land Classification From LUP - Conservation (water), Rural (land) (B) AEC(s) Involved: Estuarine Water, Public Tmst Area and Coastal Shoreline (C) Water Dependent: Yes (D) Intended Use: private. (E) Wastewater Treatment: Existing - Septic Tank Planned - N/A (F) Type of Stmctures: Existing - house, renmants of bulkhead and pier Planned -bulkhead, pier, 2-finger pier, jet ski lift (G) Estimated Annual Rate of Erosion: :1:2' to :1:4'excluding catastrophic event such as Hurricane Isabel Source - Applicant ------ --,------ ~ . ~ -- - -.. -.-- ----- .-_ . _n_ _... . . -. --- '- (A) Vegetated Wetlands (404 ) (B) Non-Vegetated Wetlands :1: 3,250 ft2 :1:640 ft2 River Bottom Shaded (C) Other (Uplands) Slope/Grade/Seed DREDGED [AREA] FILLED OTHER 7. HABITAT DESCRIPTION: (D) Total Area Disturbed: :1:3890ft2 (E) Primary Nursery Area: No (F) Water Classification: SB Open: No 8. PROJECT SUMMARY: The applicant proposes to bulkhead and backfill :1:171' of shoreline, The applicant also proposes to constmct a :1:6' by :1:48' pier with 2-:1:3' by:1: 16' step-down platforms with a:1: 16' by:1: 16' T- head platform at the terminal end of the pier. A single pile supportedjet ski lift is also proposed to be located adjacent the bulkhead. Graham Whitehurst Washington County Proiect setting The project site is located off SR 1344 at Newberry Landing on the south side of the Albemarle Sound near Roper in Washington County, North Carolina. The site is a .5-acre residential lot. Historically, there has been a bulkhead at the project site, but it has virtually been destroyed by natural elements. Since the time the bulkhead was damaged the shoreline has experienced severe erosion. The average erosion escarpment is :1:19' landward of the previous bulkhead. Man-made features on the lot consist of a house, remnants of a bulkhead and pier. The lot is mostly vegetated with lawn grasses, ornamental shrubs, loblolly pines and various hardwoods, Both adjacent properties on the downstream (east) side and upstream (west) side are developed lots. A residence and bulkheaded shoreline are located on both properties. The project site is approximately 4 feet above normal water level. The Albemarle Sound is classified as SB by the Environmental Management Conunission at the project site. The Albemarle Sound is Coastal waters and is not open to shell fishing. Proiect description The applicant proposes to bulkhead and backfill :1: 171 ' of shoreline on the same alignment as the upstream and downstream bulkheads. This aligrunent will place the bulkhead on average :1: 19' waterward and a maximum distance of :1:26' wuterward of the normal water level. The applicant also proposes to construct a =6' by :1:48' pier with 2-:1:3' by =16' step-down platforms with a :I: 16' by:l: 16' T -head platform at the terminal end of the pier. Also proposed is a single pile supported jet ski lift, which is to be located adjacent the bulkhead. Anticipated impacts The construction of the bulkhead and installation of backfill as proposed will result in the filling of approximately 3,250 ft2 of sound bottom. The construction of the pier, finger piers, and platforms will result in the shading of :l:640ft2 of sound bottom. The project will result in localized turbidity as a result of the construction of the bulkhead and pier structures. Kelly Spivey - 23 May 2005 5/19/05 GRAHAM WHITEHURST 4500 NORMAN ROAD PORTSMOUTH, VA. 23703 MR. ~~UROW[LL i<~J/'l ~P;..lfY 943 \V ASHINGTON SQUARE MALL WASHINGTON, N.C. 27889 DEARMR. TRi,,,;r;u.: 5pivf.'I ENCLOSED PLEASE FIND MY APPLICATION FOR A MAJOR PERMIT FOR THE RECONSTRUCTION OF A BULKHESD AND PIER. THIS PROPERTY IS THE FOURTH HOUSE ON LEFT GOING DOWN NEWBERRY LANDING WHICH IS THE LAST ROAD TO RIGHT AT THE END OF SR 1344, COMMUNITY OF PEA RIDGE, WASHINGTON COUNTY. THE PURPOSE OF THIS PROJECT IS TO REPLACE AN EXISTING BULKHEAD AND PIER. THIS PROPERTY HAS EXPERCIENCED SEVERE HURICANE DAMAGE AND MOST RECENTLY WINDS MEASURED AT 70 MPH. CONTUINIOUS HIGH \VINDS ARE FUTHER ERODING AWAY LAND IN THE BACK YARD. THE AJOINING PROPERTY OWNERS ARE EXPERIENCING DAMAGE NOW TO THEIR BULKHEADS, THE PROPOSED BULKHEAD WOULD TIE-IN TO MY NEIGHBORS BULKHEADS, THUS SAVING THE REPLACEMENT OF MORE BULKHEAD AND SAND OR SOIL BY THEM. THE BULKHEAD WILL BE BUILT USING 6 X 6 POST X 12' LONG AND (2) 4 X 6 STRINGERS. THE STRINGERS WILL BE 2' APART FOR THE LENGTH OF THE BULKHEAD. TWO COATS OF 1 X 8 ROUGH BOARDS X 10' LONG WITH A 2 X 12 CAP BOARD. THE POST WILL BE EVERY 4' APART, BOLTED WND TIED BACK AT EVERY POST WITH 3/8" GAL V ANIZED CABLE TO A 4 X 6 DEADMAN POST, THERE WILL BE A 7' WIDE FILTER CLOTH BEHIND THE BULKHEAD. ALL LUMBER EXCEPT FOR THE 2 X 12 WILL BE 2.5 TREADED. THE 2 X 12 WILL BE ABOVE GROUND TREADED. THE PIER WILL BE 5'7" X 48', PLUS A 16' X 16' PLATFORM AND (2) 3' X 16' STEPDOWNS. MATERIAL WILL BE 6 X 6 PILING X 16' AND 2 X 8 STRINGERS AND DECKING. EVERY PILING DOUBLE BOLTED. WHITE SAND WILL BE USED TO BACKFILL AND STABILIZE AFTER THE BULKHEAD IS BUILT. IF THERE ARE ANY QUESTIONS REGUARDING THIS PROPOSAL, I CAN BE REACHED BY PHONE AT 757-285-8811. THANK YOU FOR ANY ASSISTANCE IN THIS MATTER. SINCEREL Y, ~~ ".FQrm DCM-M:P.l APPLICATION (fa be co.mpleted by all applicants) , c. Will the proj,ect be for public, private or commerci2.i -Pf~-'-' ----, , -,_....._~e..'l..-f2 R' vA-tE. . d. Give a brief description of purpose, use, methods 0 constrUction and daily operations of propos~ project., If more space is needed, please attacl additional pages, CO~ 5+t;l..\.I.,* b"" \ ,,~C{ Ad ""rod. pit~ b1 \).)A~~OO~N mfC.-H\QcI. QA-ct<,.+,'U '~dW"'A.cl o~ bw~h~d w,H.. ~bA<:.'t..."'l)~Jlf)~tp. · e>lA.W..h'c.A& -n, b~ l.tc;.u9. AS f~~ bA~ti\'t ~~"'"" ceRoS.rQ~, ' ~ 17~n. (t,. dQ~~h1 ~l(. ~ 'S\i.'\J ~W\~M-h~1 ) ~h fo,) 1 J c(tAbj;~ I w, 1. APPLICANT '- a, Landowner: Name GR.A ~A\'Y\ Wh'\-1-l:. h \,\ ~ s+- ._",Ag.df.~S; ~,?OO. _~9_~~~~ ...Kei. C~ty ~o~"'S~o,^,4-'~ State-- \)A-~ -- .--. Zip ~~"1o~ Day Phone -r.S1- ~gS. ggl/ Fax LS1-LtRL\' -8'\1(0 b. , Authorized Agent: ^ IJ ' Name ~ A Address City State, Zip Day Phone Fax c. Ptoj ect name (if any.) o..r N~uJ b NOTE: Permit will b: twu.d' roam.: oJlar.&Jwr~r(s), CN1lor projea ",ame. 2. LOCATION OF PROPOSED PROJECT a. County vJPr~\;\t\.l(;Tt)N Revised 03/~ . b. City, town, community or landmark , , "'Rofy.R l I~' C. c. Street address or secon~arY. road number Q...f-r5~ ~31f!t /J~l.JbtflRI LANcJlnj 'Rd. d. Is proposed work within city limits or planning jurisdiction?, ~ Yes, x No _ __ _~~}~~e of body of water nearest project (e.g, river, . creek~ -scl\.1nd;- bay)~.:f\\ bttr\ A-f\ \ to-SOlA ~d - . 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a bome, motel t marina, bulkhead, pier, and ,excavation and/or filling activities. LONstRlAct b\'\\~h~Ad 11" t \AI ,'or", Af'l ~ o.f I q t wl'\'tttC,.'-"Aa.& cf- NWL.) -ro ~t.c.+ -\"0 co a.~ It!: c.{: 'C:~i ~+In 'ol4l'4lw1 t ~. c:loc:~. Co~st~"c.f s'7"uid l/-8' · 1?Jl.4.~ /(, '.'l-Il. ~ ~1~tfo.(f.th,J tt-Sl\i Lif b. Is &.~p(t;~~~ aefi~'ffia!nt~nance of an existing project, new work, or both? Bt>+J, , i. Is the proposed project consistent with the applicable zoning? ~ Yes _ No (Ar.ac:h zaml1! ~mp/l:;r.d" =:r:ific::::, if cppUr:ahLt) 0 An accurate, dated work plat (including plan view . ___~___and-crcss-secticia!-dr-awiDgs).draw!l-to-sc21e. in black j, Has a professional archaeological assessment been ink ,on an 8 1/2'" by 11" white paper.' (Refer to done for the tract7 _ Yes , -L No Coastal Resources C.ommission Rule 71.0203 for a , , ~f )'~~ E~ ~~~n:7, . _ ,_ ,_ ' detailed description,) . Form DCM-MP-l 4. LAND AND WATER CHARACTERIS~ICS a. Size of entir~ tract · SAc. ~ E. . . h. Size of indlviduallot(s) .$A<n~' A''S A-bcl\l cc. c. Approximate elevation of tract above MHW or NWL ! 3.;' - '! 4-.'0 ,- d.-' sou,type(s);and texture(s)_oUracL - - - - - - , . SAJ'.1d~ w\~ Sam~ c:..\A~ e. Vegetation on tract p;~~ t~6G~1 l AuJN ~ ~A~Seh t D ~~ A-mct~ t-tr'l :So ~ ~u.h.,5. :' f. Man-made features now on tract 'R G.S>>~ 6J'l GE. g. \\'bat is the CAMA Land Use Plan land classification of the site? (Car..su!::he lad la;-.d we pIal.) ,../" Conservation _ Transitional , 'Developed ~ Community Rural ~ Other h. How is thetIacfzonedby,local. government? "RE.S ' k. Is' the project located in a. National Registered Histod~ . District or' dqes. it involve a National , .' Register 1 isted or eligibl,e prope;ty7 ' ~ t ' Yes _~o 1. Are there wetlands on the site? _ Yes ' / No . Coastal (marsh) Other If yes, bas a delineation been conducted? (,.{ t".a Cis de CW'7'.:1'.J.cJi all/if av::Uab!.e) Revised 03/~ .. rn. Describe exIsting wastewater treatment facilities. 6'Z. pt I c. :.r p."..W" ' n. Describe location and type of discharges to waters of the state. (For exampI e, surface runoff, sanitary wastewater, industrial/commercial effluent. .wash downll and r~idential discharges.) S l.\ ~ fPK tl. ~\..\,,J ~ of 0'. Describe existing drinking water supply source, ~-C-~ u-~+\{,'.vdA-T~~- -~~~-~F'Y- u' s. ADDITIONAL INFORMATION In addition to the completed application form, the following ite~ must be submitted: . 0 A copy or the deed (with state application only) or other instrUment under which the applicant claims title to the affected properties, If the applicant is DOt claiming to be the owner of said property, then forward a copy of the deed or ather instrument under ,which the owner claims title, plus written permission from the owner to carry out the project. . . - ." ...._- _.- .. - .... ..... Please note that original drawings are, preferred and anly high quality copies will be accepted. Blue-line prints or other larger plats are ~cceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings,) A site or location map is a part of plat requirements and it must be sufficiently det.ailed toiguide agency persoone~ unfamltiar with the area to t~e , . . : fo'rm I?CM-:MP-l site. . Includ'e highway or secondary road (SR) numbers, landmarks, and the like. " A Stormwater Cenifica.tlon, if one is necessary. " A list of the names and complete addresses of the adjacent waterfront '(riparIan) landowners and signed return receipts as prooF that such owners have received a copy or the application and plats by certified mall. Such landowners must be advised that they have 30 days in which. to submit comments on the proposed project to the Division of Coastal ~~agement. Upon signing this form, the applicant fuJ:!l::ler-certifiefthat such notice has been provided... .. , . Name 0"" L/1 . t=~cc.q,MAA Address u.) bcc-tz. R. I-A- "" Phone 0 f'ctlZ.., I fU. c. ';\' 9io. Name Ml!)Q..to~ -b :s"~~ ~~pdt'l\ A,J . Address t~~1J..1 -+>:~~~ b\4.~ $+. PhGM G _e.s~__ \IA-. ~ ~g3\ Name Address Phone o A list of previous state or federal permits issued for w9rk on the project tract. Include permit numbers, permittee, and issuing dates. ,.~ tJ / 11 . . A check for $25064~.Q)$475 made payable to the Department of Environment & Natural Resources (NCDENR) to cover the costs of processing the application. o A signed ABC hazard notice for projects in oceanfront and inlet areas. .6. CERTIFICATION AND PERMISSION TO ENTERON LAND 1 understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditiollS and restrictions contained if} the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be ~_ ~~~u~~ i.n.'a ~~er ~nsist~n~ w~~ su~h progr~. I certify that 1 am authorized to grant, and do in fact, grant permission to representatives of state and federa review agencies to eI)ter on the aforementioned lands in connection with evaluating information related to thi: pen;rnt application and ,follow-up monitoring of thl proJect. I further certify that the infonnation 'provided in thi application is truthful to the best of my knowledge. This the'~ day of MA\.\ , 2ooj.5 Print Name G~Prl-TA~ Wh:-r~hL4.~---t- ~ Signature . wru:r or l.U!hariz~d Agrnl _. _..}l~~.. indicat~ ~chmeE~ pertaining to your propos: proJect. --..-.-. n... .-.-' ./ DeM MP-2 Excavation and Fill Information _ DCM M.P.3 Upland Development ..L OCM MP-4 Structures Information _ OCM MP.5 Bridges and Culverts _ OCM M:P-6 Marina Development NOTE: Please sIgn and date each attachmen.t in space provf.ded a1 the bottom of each form. o A st..atemer:tt of compliance with the N,C. Environmental Policy Act eN.C.G.S. 113A . lto 10) If the project involves the expenditure or public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 400 copies oftbis public document were printed at a total cost of $52.48 or $ .13 per copy. Revised 0319'5 Attach this form to Joint Application for CAMA Major Permit. Fonn DCM.MP-1. Be sure to complete all o.ther sections of the Ioint Application that relate to this . - - -proposed-proJect. - - - - - - -- - -. - - - - - - --- - - - --- - - a. AmouIiC o1-Triaterral-to-be-excavatoo-from-b~low-' - - Describe below the purpose of proposed excavation or MHW or NWL in cubic yards till activities. All values to be given In feet. Form DCM-MP-2 EXCA VATION AND .FILL (Except bridges and culverts) Avtragt Em&; Le~ Width Depth flJ:W ProJtc& Dep th Access channel (MLW) or (NVIL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Ex~luding thoreUr.c Il4b iltuLion) Re\'ised 03/95 .1. EXCAVATION NIl} b. Type of materiaJ to be excavated c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? ~ Yes _ No d. Highground excavation in cubic yards 2.. DISPOSAL OF EXCAVATED l\IATERIAL ;V / fJ a. Location of disposal area. b. Dimensions of disposal area c. 1;>0 you claim title to disposal area'? _Yes_No If. no. attach a letter granting permission from th~ owner. d. Wilt a disposal area be available for future .maintenance? _ Yes _ No If yes, where? F~rm DC1tI-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SA Vs Cl other wetlands? _Yes _No f. Does the disposal include any area In the water? _Yes ,--:"No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization :.:L Bulkhead Riprap ! 1711 b. Length c. Average distance waterward of MHW or NWL /9' d. Maximum distance waterward of MHW or NWL ~~/ . e. Shoreline erosion during preceding 12 months :!' ;;>. , +0 ~ .:5' . (SOv.rrt ollnjormation) -fE.~SON AoI 0 bSE~VA-t"'t),.J f. Type of bulkhead or rip rap material vJoodSN ,blNl~ h~A-cI g. Amount of fill in cubic yards ~ be placed below water level ,} (1) Riprap Jowl/If (2) Bulkhead backfill: If 8/. '3 yd 3 h. Type of fill material SAN d ... i. Source of fill material <!:l ~ f' S" I n ~o~~C~ 4. OTHER FILL ACTMTIES N J if (Excluding Shoreline Stabilization) a. Will fill material be brought to site? _Yes _No Rf'l'~d 03/9'5 If yes, (1) (2) (3) Amount of ~aterlal to' be placed in the water Dimensions of fill area Purpose of flII b. Will fill material be placed In coastal wetlands (marsh), SA Vs or other wetlands? _Yes _No If yes, (1) Dlmenslons of fill area (2) Purpose of fill 5. GENERAL b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic' dr~e)7 It>Ad\<.. hotf. WOAd tt.1l.. _ LA "'" f _ p. u. c~ c. Will wetlands be cr~ssed. in transporting equipment' to project site? _ Yes ~ No If yes, explain steps that will be taken to lessen environmentallrnpacts. ' 6 RPrt-\ArY\ \..tJ h~t'e.h ~~ ~ -r- AppUcant or PnJea ru..De ^~ / S~~tun . 6-l't-05 Dale Form DCM.MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1') _ Commercial _Community /Private (2) Number I . -~~~--~i~~ -- - ~~~I'- - - - - -- - - - - - (5) Finger Piers ..L Yes No (i) Number ::t. (i i) Length I ~ I (Hi) Width :3 I (6) Platform(s) ../ Yes No (i) Number I (ii) Length I" ' (Hi) Width lIP' (7) Number of slips proposed I (8) Proximity of structure to adjacent rirarian property lines "!9o' )< t go (9) Width of water body :t 3 t'n t \ E:-.r; (10) Water depth at waterward end of pier at MLW or NWL :r 3.5 I b, Boathouse (including covered lifts) IV /11 (1) Commercial Private (2) Length (3) Width c. Groin (e.g. wood, sheetpile, etc.) N 1ft (1) Number ,/4 (2) Length(s) d, Breakwater (e.g. wood, sheetpile, etc.) IV / ff . (1) Length (2) Average distance from MHW, r-,T'WL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands . Re\ised 03t95 e. Mooring buoys IV /11 (1) _ Commercial _Community _ Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) f. (4) Width of water body - -(5)- t5"iitance- bu6y(s) - ro - bi- -placed - . beyond shoreline :s~tSKi lift Mooring structure (boatlift, mooring ilings, tc.) (1) _ Commercial _Conununity rivat; (2) r\umber I (3) Length . :t .;20 I (4) Width I D " Rol..t~c/ a O' ~A-\4Ath Wh:tE.h~~~;- Applk.a.Dt or Project Name ~ /Signature .5'''-1 C; - OS Date 'FRo",", PI~('t10v. -l-~ -b ~o~~(2. N'C. ~ {Y\A{\'+cr.o ~.. r ~~- (} .....~ '1>~' qt, -J" ~i" ! i l"Ei 1 ~ ~. if. G.i _sklrme~i1:='==~~",~! f// . rffi64 ">;~=o, -"""\. i.~/ ... 1 I . .-,j' I ,,"-;p/'~>\--- ~I\'ie lO '\,,' ~/ '\'O"'O"=.:,J""'/ (" --.":~ '\, \, 00. '\\~h "', "(;(~. ....~.. ..'t '\, ~\. , "\. ,) :\... '\, ..... '\.. ~-'~"=~=I.6;j\,=~~ \::",.,,/ --~="~"l I \ 'I'\le.\~~ ~d ,. NOIlY\~n~~." i~ ~,Q . . ~.,<.!. . ~O; ~!>. Lo.cP. . 0' ::- .~.,. ,":!. I , CJ]: ~i '3 ;' '\1 , I ..... t.. c( . ~q .. Q 'BeasleY' o fotf E ru LE ,=, O/J f/v.; Y 3:1- R L.C:J /.1"1 0.-0 R~Ae,cJG(z -;<d. L-~.f+-orJ &tJd'i(L 72c1"(-:;~ J~ I c? 14T o,.w J\J Cc. vJ b 't. {Z.R Y L (\-,.J c.. ~'" :'j.. f'1'\ . " (t..' ~. q;:. ,!l.~.' ~. '. <Q'" ':>.v" ,'1>' V'{'. p (Jilt. '0- ~(t .~ .Q' .j;-t. 0. ~~EmAN 'RtiEAn' ... r- ...a - 1-, 1 r C:>f~A~Arn \\\~'lte Hu R.~ I PIAN Vt'r;.W Df Pl\Dt>8\"'~ 5-IQ"05 N~wb~R~~ LANdiN{; U~)( \6 P \l\\" f D (1.0'\ A Iben'\ Aa.lli. ~~u. ~d fRoPoS~d J~t:SK; Lj.pr (10 ;Wir-JG 0 Il~Lf\t.1 0 f ----=--T==----~-=----=- ~ Old ""BU.L..K.I-\~t\D 5' .........../~ I -- _. ~O' /-- ....5 - --- N\ A I I~' ~E.i\D~ lDN ::;...... VV-C .- fill [1~e.P\ P~DPDSEd BlLL.KlieAD .:t l"1\ I . . t- \l1 S"rJ91~ 5te>t2..y 1+0 v.. s E. 1L t I::- 115 ~ _1" <<) - ~ DRAwiNG N~-r TD ..sCA(f.. N f f:...iJ5ritJ6 ~LKl1eAD ~ BRtt1mA~ r Rt:> Pe.~T ~ ~(.Z~~~ wh(r~hlAR~ t PIAN \/iEW -+ ~~w0E~rz.'i LrrwdirJ6 5-\Q-OS 13u. L"'HE.A-D I X. B 0E~h"GAI BDAAd~ Pi IhRCfbth b'IJD Jt~t; CAl PoSt ~ 7Z /. GA~ft~i11.cl CAb\l L.\- 'f..~ H~i7..orl-;t1l #(2..\'(\ ~Eft. if"' ON CEf-JT'i.R. Typ. o [Nd \f i r:. w L(-X~ JtRtiCA/ D r3ItJ tnltfi ~t J- d. X. I J. C fl P 13DAi\d ()Zg Ve~hdl{ l~" GA\\l1 C Ahl i. LJ- 'f,..la HDRor1.DNt~ stttiA&u<.. If-~fo Yf;t<t,'C/t { AJ ;<-V:t FiltiRl.fDth "D?:HCJr11AJ.! rOS-r I AVWG'i.. Iq -I PRDF ill. of Bt.LLI<' ~Ad i BAct+it\ b~{-\\~PrT\\. \A,^lh1Lt~~-r- L- NiIJhf.tz..({ r LA-Ndl-V\9 ? t-i,R L{{D>)-5tC..c)1~ 5 -fC(- 05 ;). ~~ D6C~~~ ). K '8 ~-t(Z.~'i'i.tt- l' .;:2 'i 8 ~ Oi>f ~ L- ~4" fl- 3'0 Co 'i-~ .po:;,.T \NeA-1-t(. rz. L I{. " Ii. \ t 3' 8D"ffOM < ~ S~\ L t;f- -r .--'-_ 1. t \ A J, . '--' ~ -r"" ,..' 1- -t7"-:> .J. "0 f~ r- IV I\Q"'~J\ro~ G~[)4J'1d L6.\Ixl. (.) tJ L~ Jl'1. 4'1