Loading...
HomeMy WebLinkAboutNC0081281_BIMS Report_20190102State of North Carolina Division of Water Resources Water Quality Regional Operations Section Staff Report FORM: WQROSSR 04-14 Page 1 of 5 To: NPDES Unit Non-Discharge Unit Application No.: NC0081281 Attn: Wren Thedford Facility name: Richmond County WTP From: Hughie White Fayetteville Regional Office Note: This form has been adapted from the non-discharge facility staff report to document the review of both non- discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? Yes or No a. Date of site visit: 01/02/2019 b. Site visit conducted by: Johnathan Watts c. Inspection report attached? Yes or No d. Person contacted: Lee Butler and their contact information: (910) 417 - 4944 ext. e. Driving directions: Take US 74 Business west out of Rockingham. Go approx. 3miles and turn right onto Old Charlotte Highway. The water plant will be less than ½ mile on the right. 2. Discharge Point(s): 001 Latitude: 34d 58’ 20” Longitude: 79d 50’ 20” Latitude: Longitude: 3. Receiving stream or affected surface waters: UT to Pee Dee River Classification: C River Basin and Subbasin No. Yadkin-Pee Dee River Basin; Sub-basin: 03-07-16 Describe receiving stream features and pertinent downstream uses: Recreation; boating, fishing, swimming II. PROPOSED FACILITIES: NEW APPLICATIONS 1. Facility Classification: (Please attach completed rating sheet to be attached to issued permit) Proposed flow: Current permitted flow: 2. Are the new treatment facilities adequate for the type of waste and disposal system? Yes or No If no, explain: 3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? Yes No N/A If no, please explain: 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? Yes No N/A If no, please explain: 5. Is the proposed residuals management plan adequate? Yes No N/A If no, please explain: FORM: WQROSSR 04-14 Page 2 of 5 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? Yes No N/A If no, please explain: 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 8. Is the proposed or existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? Yes No N/A If yes, attach list of sites with restrictions (Certification B) Describe the residuals handling and utilization scheme: 10. Possible toxic impacts to surface waters: 11. Pretreatment Program (POTWs only): III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? Yes No N/A ORC: Lee Butler Certificate #: 990442 Backup ORC: Matthew Locklear Certificate #:28878 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? Yes or No If no, please explain: Description of existing facilities: Raw water pump station, flash mixer, tapered flocculator, sedimentation basin, filter backwash, thickener tanks and solids belt press. Proposed flow: Current permitted flow: 0.500 MGD Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? Yes or No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? Yes or No If yes, please explain: 5. Is the residuals management plan adequate? Yes or No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? Yes or No N/A If no, please explain: Solids are dewatered through a belt press then loaded and hauled to a landfill for disposal. 7. Is the existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? Yes or No If no, please explain: 10. Were monitoring wells properly constructed and located? Yes No N/A If no, please explain: FORM: WQROSSR 04-14 Page 3 of 5 11. Are the monitoring well coordinates correct in BIMS? Yes No N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ 12. Has a review of all self-monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? Yes or No Please summarize any findings resulting from this review: Facility has had no discharge since issuance of the current NPDES permit. Facility currently reclaims all wastewater generated and it is processed through a secondary clarified water system and the water is then pumped to Duke Energy’s Smith Energy Complex in Hamlet for use as cooling water. Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? Yes or No If yes, please explain: 14. Check all that apply: No compliance issues Current enforcement action(s) Currently under JOC Notice(s) of violation Currently under SOC Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? Yes No N/A If no, please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? Yes No N/A If yes, please explain: 16. Possible toxic impacts to surface waters: 17. Pretreatment Program (POTWs only): FORM: WQROSSR 04-14 Page 4 of 5 IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? Yes or No If yes, please explain: 2. List any items that you would like the NPDES Unit or Non-Discharge Unit Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: Hold, pending receipt and review of additional information by regional office Hold, pending review of draft permit by regional office Issue upon receipt of needed additional information Issue Deny (Please state reasons: ) 6. Signature of report preparer: Signature of regional supervisor: Date: 5/20/2019 FORM: WQROSSR 04-14 Page 5 of 5 V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS