Loading...
HomeMy WebLinkAbout20190653 Ver 1_B-5389 Roadway Plans_20190517c 0 a O L N L 0] 0 0 0 U U oo I i o— N O \� _M Ln X� See Sheet 9-B For Conventional Symbols '0101— PV RO ECTi g4 42 SR 1301 tit B na %'+; S'1Q JQo f STZ VICINITY MAP --"9— TO STATE OF NORTH CAROILINA DIVISION OF HIGHWAYS YADKIN COUNTY LOCATION. BRIDGE NO.105 OVER YADKIN RIVER OVERFLOW ON US 421 NORTHBOUND LANES TYPE OF WORK: GRADING, DRAINAGE, PAVING, & STRUCTURE STATE STAIR PR01- RRPRRBNCB NO. NO. TOTAL HHBTS I�o�o B-5389 TATe PROI.NO. .APROI. NO. DBSCRd•]'ION 46104.1.1 WA PE 46104.2.1 WA R/W & UTILITIES 46104.3.1 WA CONSTRUCTION ,4/6 5/7' END TIP PROJECT B-5389 BEGIN TIP PROJECT B-5389 -LNB- STA. 33+00.00 -LNB- STA. I +62.50 of /QC) — YADKIN!?LLE c---------- --------� i US 421 NB — - - __ ___________ ----------- --- US 421 NB ------ -LNB- --- - --- -----—---- -- us az� sB `a US 421 SB -- TO LEWISVILLE THIS IS A CONTROLLED —ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED i Prepared far the North Dpo tment IiYDRAULICS ENGINEER GRAPHIC SCALES DESIGN DATA PROJECT LENGTH nCarolina °f Transportation in the Office 50 25 0 50 100 ADT 2020 = 25,000 LENGTH ROADWAY TIP PROJECT B-5389 = 0.299 MI. A. MORTON Trlauas AND ASSOCIATES, Ih'C'. ��� 6,3,FAoF°"xOTD sunEERu el Ncz 6o L4R'" 2o`04FSS'OLi':; = ADT 2040 = 30,300 K = 10 % D = 65 % LENGTH STRUCTURE TIP PROJECT B-5389 = 0.087 MI. TOTAL LENGTH TIP PROJECT B-5389 = 0.386 MI. NCBELSLICENSE4 F-10 E (919)855-9989Fu:(919)855-568 ENGEE RINGmM =r_ E 26971 i a P.E. SIGNATURE: ®� ®6$� milli 2018 STANDARD SPECIFICATIONS NICK RAMIREZ, PE PLANS 50 25 0 50 100 T = b ° /o V = 70 MPH x PROJECT ENGINEER ROADWAY DESIGN Vdet = 55 MPH * (TTST =3°/D+DUAL=3%) APRIL 2, 2019 JAMES CROUSE, PE ENGINEER ,_o?..•Ess;o:ty op z PROFILE (HORIZONTAL) PROJECT DESIGN ENGINEER l0 5 0 10 20 FUNC CLASS = RURAL FREEWAY REGIONAL TIER LETTING DATE: J U LY 17, 2019 DAVID STUTTS, PE # 'aeSEAL 1. i 40655 .j 1 '•••F��,�EE.•P.E. SIGNATURE: RpN s ���� J NCDOT CONTACT PROFILE (VERTICAL) PROJECT REFERENCE NO. SHEET NO. STATE OF NORTH CARO LINA, DIVISION OF HIGHWAYS 8-5389 B CONVENTIONAL PLAN SHEET SYMBOLS BOUNDARIES AND PROPERTY. RAILROADS.- Note: Not to Scale *S. U.E. = Subsurface Utility Engineering WATER: State Line Water Manhole OO Standard Gauge Line CsX TRANSHedge Water Meter CD RR Signal Milepost MJLERCST 35 Woods Line - - - - Township Line Switch 0 Orchard O � � O Water Valve 0 City Line SWITCH Water Hydrant 0 RR Abandoned — — — — Vineyard a Reservation Line LPG Water Line LOS B (S.U.E*) RR Dismantled - - - - - - - - EXISTING STRUCTURES. Property Li P Yne LPG Water Line LOS C (S.U.E) - -w- - Existing Iron Pin o MAJOR: WG Water Line LOS D (S.U.E*) Computed Property Corner P P Y RIGHT OF WAY & PROJECT CONTROL: Bridge, Tunnel or Box Culvert UNE Above Ground Water Line A,G Water �` Property Monument El ECM Secondary Horiz and Vert Control Point ♦ Bridge Wing Wall, Head Wall and End Wall - coNc ww Parcel/Sequence Number 123 Primary Horiz Control Point 0 MINOR: TV. TV Pedestal O Existing Fence Line -X X X- Primary Horiz and Vert Control Point / Head and End Wall coNc NW TV Tower Proposed Woven Wire Fence e Exist Permanent Easment Pin and Cap 0 Pipe Culvert s New Permanent Easement Pin and Ca P O Footbridge >----------{ U/G TV Cable Hand Hole Proposed Chain Link Fence E3 Vertical Benchmark m ❑CB U/G TV Cable LOS B (S.U.E.*) Proposed Barbed Wire Fence P Drainage Box: Catch Basin, DI or JB U/G TV Cable LOS C (S.U.E.*) - - Existing Wetland Boundary - - - -wEa- - - - ExistingRight of Way Marker g Y � Paved Ditch Gutter Existing Right of Way Line Storm Sewer Manhole OO U/G TV Cable LOS D (S.U.E.*) Proposed Wetland Boundary a R U/G Fiber Optic Cable LOS B (S.U.E. ) Existing Endangered Animal Boundary EAa New Right of Way Line Storm Sewer * U/G Fiber Optic Cable LOS C (S.U.E.*) - -,� TO - Existing Endangered Plant Boundary a New Right of Way Line with Pin and Cap R �� UTILITIES: LJ/G Fiber Optic Cable LOS D (S.U.E. ) -TV Fo Existing Historic Property Boundary a New Right of Way Line with POWER: GAS: Known Contamination Area: Soil �-s-�-s-X Concrete or Granite WW Marker Existing Power Pole y Potential Contamination Area: Soil -X, -s MM New Control of Access Line with Concrete C/A Marker Proposed Power Pole b Gas Valve Gas Meter 0 Known Contamination Area: Water -w--w- ExistingControl of Access Existing Joint Use Pole * LUG Gas Line LOS B (S.U.E.) - - - - - - - Potential Contamination Area: Water i�-w-�-w- New Control of Access .a, Proposed Joint Use Pole * LUG Gas Line LOS C (S.U.E.) - - - - Contaminated Site: Known or Potential% Existing Easement Line E Power Manhole U/G Gas Line L05 D (S.U.E.*) - BUILDINGS AND OTHER CULTURE: New Temporary Construction Easement - E Power Line Tower ❑ Above Ground Gas Line A/c Ge Gas Pump Vent or U/G Tank Cap O New Temporary Drainage Easement TDE Power Transformer _ Sign O 5 New Permanent Drainage Easement PDE U/G Power Cable Hand Hole SANITARY SEWER: Well ° New Permanent Drainage / Utility Easement DUE H-Frame Pole �� Sanitary Sewer Manhole OO Small Mine New Permanent Utility Easement PUE U/G Power Line LOS B (S.U.E.*) - - - -P- - - - Sanitary Sewer Cleanout O m Foundation F New Temporary Utility Easement TUE U/G Power Line LOS C (S.U.E.*) --p-- U/G Sanitary Sewer Line o Area Outline 0 New Aerial Utility Easement AUE U/G Power Line LOS D (S.U.E.*) Above Ground Sanitary Sewer Cemetery 0 SS Forced Main Line LOS B (S.U.E.) - - - - o Building ROADS AND RELATED FEATURES. TELEPHONE: SS Forced Main Line LOS C (S.U.E.*) - -- - - School Existing Telephone Pole • SS Forced Main Line LOS D (S.U.E.*) Existing Edge of Pavement Church Proposed Telephone Pole � O Q Existing Curb — Telephone Manhole O MISCELLANEOUS: Dam Proposed Slope Stakes Cut - - - - - Telephone Pedestal ❑ Utility Pole • Y. HYDROLOGY.- Proposed Slope Stakes Fill - - F - - - - Telephone Cell Tower - Utility Pole with Base o Stream or Body of Water Proposed Curb Ramp cR U/G Telephone Cable Hand Hole Utility Located Object Hydro, Pool or Reservoir J Existing Metal Guardrail Utility Traffic Signal Box C o Jurisdictional Stream U/G Telephone Cable LOS B (S.U.E.*) - - - - - - - - Buffer Zone 1 �s BZ Proposed Guardrail U/G Telephone Cable LOS C (S.U.E.*) - -E- - Utility Unknown U/G Line LOS B (S.U.E.*) Buffer Zone 2 BZ z Existing Cable Guiderail I n nU/G U/G Telephone Cable LOS D (S.U.E.*) Tank; Water, Gas, Oil m Flow Arrow Proposed Cable Guiderail U/G Telephone Conduit LOS B (S.U.E.*) - - - -TC- - - - Underground Storage Tank, Approx. Loc. (,1,C ) z Disappearing Stream Equality Symbol U/G Telephone Conduit LOS C S.U.E.* P ( ) --r"-- A/G Tank; Water, Gas, Oil C Sprin-_.,_ ring g Pavement Removal U/G Telephone Conduit LOS D (S.U.E.*) -EC Geoenvironmental Boring Wetland hEGETATION. U/G Fiber Optics Cable LOS B (S.U.E.*) _ _ _ _r Fo_ _ _ U/G Test Hole LOS A (S.U.E.*) m Proposed p d Lateral, Tail, Head Ditch Single Tree U/G Fiber Optics Cable LOS C (S.U.E.*) _r Fo_ Abandoned According to Utility Records AATUR False Sum p Single Shrub a U/G Fiber Optics Cable LOS D (S.U.E.*) o End of Infti Information E.O.I. SURVEY CONTROL SHEET PROJECT REFERENCE NO. SHEEP NO. B--5389 1 C-1 Location and Survevs Z ro Yaorrivvi� DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "B5389-2" WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF NORTHING: 860803.8339(ft) EASTING: 1552017.9400(ft) ELEVATION: 734.55(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.99995370 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "B5389-2" TO -L- STATION 10+00.00 IS N 64' 00' 09.42" W 2237.39' ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 .............................. BM-1 ELEVATION = 719.23' N 861043 E 1551007 EL STATION 22,26.00 146' RIGHT RR SPIKE SET IN 13" TREE BM-2 ELEVATION = 708.96' N 861147 E 1552258 EL STATION 33,59.00 398' LEFT RR SPIKE SET IN 18" SYCAMORE ........................................ B-5389 1 B'b389-1 8611bb .2/62 1'b5I08/.JbbO /32.54 22,49.88 2 B5389-2 860803.8339 1552017.9400 734.55 32-44.75 3 BL-3 860559.0402 1552715.4620 733.66 39-83.97 4 BL-4 860297.6316 1553471.2020 733.75 47,83.65 LEWISVKLE �16 '20 5' 8.90 RT 4.81 RT 7.84 RT 7.52 RT BY1 POINT DESC. NORTH EAST ELEVATION EL STATION OFFSET -------------------------------------------------------------------------------------------- ---------------- 5 BY-5 860778.1172 1551133.2610 749.67 24-41.00 335.07 RT 6 BY-6 861495.2052 1551432.0730 763.68 24-31.95 441.73 LT NOTES- 1. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM, 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATIOr AND SURVEYS UNIT. -LNB- GFPl 1. MIN. v MN! \� MIN. �i( Tl 3" MIN. DETAIL Wl SHOWING METHOD OF WEDGING MILL NOTCH CI TO KEY IN II L------------------------ 3,.---------------+---I MILL 75' O AS DIRECTED BY ENGINEER � INCIDENTAL MILLING DETAIL AT PAVEMENT TIE-INS NOTE: OVERLAY 3" USING DETAIL -LNB- STA. 12+62.50 TO STA. 13+37.50 -LNB- STA. 32+25.00 TO STA. 33+00.00 ORIGINAL GROUND ORIGINAL GROUND FINAL PAVEMENT DESIGN SCHEDULE G.1 PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, J 2 PROP. 7" AGGREGATE BASE COURSE. AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. IN EACH OF TWO LAYERS. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, C2 AT AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH. TO M MILLED RUMBLE STRIPS (STD 665.01) BE PLACED IN LAYERS NOT TO EXCEED 2" IN DEPTH. D1 PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, PRIME COAT GAL/SY) TYPE I19.00, AT AN AVERAGE RATE OF 456 LBS. PER SO. YD. P (0.35 PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, DZ TYPE I19.00, AT AN AVERAGE RATE OF 114 LBS. PER SO. YD. PER 1" EARTH MATERIAL DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 212" IN DEPTH OR T GREATER THAN 4" IN DEPTH. E1 AROAN EXISTING PAVEMENT AVERAGE RATESOFALT 399CONCRETE LES. PERBASE SO. YD. IN EACHEOF2TWOCLAYERS U PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.00, ErL AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO VARIABLE DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAIL W7) BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER W THAN 51'2" IN DEPTH. NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE J 1 PROP. 10" AGGREGATE BASE COURSE. PROJECT REFERENCE IN SHEET NO. B-5389 2A-1 ROADWAY DESIGN PAVEMENT DESIGN ENNMEER ENGINEER ;9 SEAL 40655 .ckGR..... DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INC A�T a .MuroRroN o.�,As ,woc,.,rEs. ��r�`�T� so�Oo anss_s�"sH":�6� rsr sss�es F�.c.n,rr �,.� NCBELS LICENSE N F-1049 MEDIAN -LNB- 12' MATCH EXIST. MATCH EXIST. 9' 4' 4' 2' 3' �6(m PS FDPS U Cl CROWN POINT M Cl Dl 0.04 EXIST. EXIST. 0`08 0.08 -------------------------------------------------------------14„ ---- --- I�2:1 ORIGINAL GROUND 14^ T cl El Dl El USE TYPICAL SECTION NO. 1 GRADE TO THIS LINE GRADE TO THIS LINE -LN B- STA. 12 + 62.50 TO STA. 16 + 00.00 TYPICAL SECTION NO. 1 -LNB- STA. 30+00.00 TO STA. 33+00.00 SEE INCIDENTAL MILLING DETAIL FOR PAVEMENT TIE-INS MEDIAN -LNB- _3' 12' 12' 12' 9' 4' 4' 2' 3' FDPS FDPS Cl M U W GRADE POINT cl M C1 Dl 0.04 0.02 0.02 0`OB 0.08 2.1 EXIST.- _ —ORIGINAL GROUND 0.5' 14" 14" TYP. An T J2 El Dl El T —GRADE TO THIS LINE GRADE TO THIS LINE TYPICAL SECTION NO. 2 USE TYPICAL SECTION NO. 2 -LNB- STA. 16 + 00.00 TO STA. 17 + 94.00 -LNB- STA. 27 + 00.00 TO STA. 30 + 00.00 ORIGINAL GROUI ORIGINAL GROUN T SH -LN STA CL MEDIAN -LNB- ORIGINAL GROUND USE TYPICAL SECTION NO. 3 STA. 17 + 94.00 TO STA. 18 + 34.54 (BEG. BRIDGE) STA. 22 + 96.46 (END BRIDGE) TO STA. 27 + 00.00 ORIGINAL GROUND O HIS LINE I rlla LINt TYPICAL SECTION NO. 3A TYPICAL SECTION NO. 3B ULDER BERM GUTTER SECTION SHOULDER BERM GUTTER SECTION B- STA. 17 + 94.00 TO -LN B- -LN B- STA. 17 + 94.00 TO -LN B- .18+10.54 (BEGIN APPROACH SLAB) STA.18+10.54 (BEGIN APPROACH SLAB) -DETNB- 7' 12' 12' 4' F PS P GRADE POINT � VAR VAR � OS' TYP. T Jl Cl 13" Cl J1 GRADE TO THIS LINE TYPICAL SECTION NO. 4 7' VARIES m - -- ---� -DETNB- STA. 11 +86.96 TO STA. 15+50.58 (BEG. TEMP. BRIDGE) ORIGINAL GROUND -DETNB- STA. 20+10.58 (END TEMP. BRIDGE) TO STA. 28+76.22 ORIGINAL GROUND PROJECT REFERENCE IN SHEET NO. B-5389 2A-2 ROADWAY DESIGN PAVEMENT DESIGN ENNNEER, ENGINEER % SEAL 40655 GRAW DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED A�T a .MuroRroN rHss,wOoa nssoc,.,rEs. INC ���To,�,A� o���asHo:�s� rsr sss�es F�.c.nrr �,.� NCBELS LICENSE N F-1049 FINAL PAVEMENT DESIGN SCHEDULE Cl 3" S9.5C C2 VAR. S9.5C D1 4" I19.00 D2 VAR. I19.00 E1 7" B25.00 E2 VAR. B25.00 J1 10" ABC J2 7" ABC P PRIME COAT T EARTH MATERIAL U EXISTING PAVEMENT W VAR. WEDGE NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE DETAIL 4 DECK DRAIN DISSIPATOR PAD ( Not to Scolel DISSIPATOR PAD PI eN v1 w 'NOTE: CENTER PAD DIRECTLY BELOW DECK DRAINS GROUND � L y GEOTEKTILE =358 k. p Type of U--90 TO GeoCL a Ri,Rg sy -ROM STA. 18+77 TO STA. 19+05 -LNB- RT FROM STA. 19+21 TO STA. 22+51 -LNB- RT I'll tit � j 7. 7+87.2914 7 II alI °l �I4 \\�\ f ill MTL ~ TU Y40k/ ~LE - I r -� M?L-r- -B5389-1 -- -- - _� I BM•1 ELEVATION • 719.23 N 861043 E 1551007 Ill RR SPIKE SET IN 13' TREE ........................... Ill WOODS 7 BY-5 DETAIL 3 DETAIL 1 RIP RAP AT EMBANKMENT LATERAL 2' BASE DITCH I Netro Scalel (Nat.. Scolel 10'min. 6 Na oral Ditch 1.0'min. 1.5 0. Gmand 7., ♦ ~- Fill Grade a D T' I'H. slope GEDTEXTI.E B Min. D=1.5 Ft. GEOTEXTILE Max. -1.5 Fl. Type of Liner= 13 TONS,CL I Rip -Rap 'when B is < 6.0' B=2.0 H. Geolextile= 20 s Type of Liner=Class B Rip -Rap h=5.0 Ft. STA. 19+55 -LNB- LT FROM STA.15+00 TO STA.19+55 -LNB- LT BEGIN TIP PROJECT -LNB- STA. 12 + 62.50 BEGIN 3" OVERLAY -I ' PROJECT REFERENCE NO. SHEET NO. -LNB- B-5389 4 PI Stc 10+3797 PIS Sto 13+88.33 W SHEET NO. = 5' 02' 10B' (LT) 6s = )'30' 28.0e ROADWAY DESIGN HYDRAULICS EN��NEER, ENGINEER D = P 00' 18.7a Ls = 300.00, I EE L = 50/03' LT = 2000/' ••• N CARS'•., �N Apo,"',, T = 25068' ST = 100.0/' ;=OF`�oFESSio� G'•; °�Q, SS o�;y R = 5,700.00' 9 = 'oF y =9 SE = SEE PLANS SEAL = =a SEAL �= 40655 = = 26971 = ....It II DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1 WILLIAM STEVEN CLODFELTER A. Al--THo�ss�ons"-- spy O AND WIFE BM•2 ELEVATION - 708.96 ���s,srrucuu a„uNvio m%eNcm�Ws i9:n�assses, JESSIE J. CLODFELTER N 961147 E 155225a c,44�T�,onrWMo.rnN JE SIE J. LO RR BPI KE =SET IN=l8- SYCAMORE NCBELS LICENSE p El 049 N 341 O SEE SHEET 8 FOR PROFILE VIEW =`o JEFFREY W. DOUB AND SPOUSE _ o MELISSA B. DOUB AND DARRELL DOUB AND SPOUSE BEGIN GRADE LEANN M. 1DOUB 29 / O DB 891 PG 129 V/ -LN B- STA. 16 + 00.00 END 3" OVERLAY O BEGIN BRIDGE / / 0 -LN B- STA. 18 + 34.54 1a°.00' LT +00'0° 0 -LNB- ST Sta. /5+88.32 155.00' LT is+o.00 L o iao:00' LT 555.00' LT E 155:00' 95.00' LT 1ao.00' Lr E � END WOVEN WIRE FE CE CV BILLBOARD /E LNB STA. 19+58 .4 F 'I WOODS '1 Z" IATERAL 2'BASE • DITCH CL B RIPRAP E F P U Fs EST. 255 TON EST. 691 SY GFD SEE DETAIL 1 +40.00 RIPRAP AT 9y. CL II RIP RAP TO EMBANKMENT 7 EXRW SHOULDER POINT SEE DETAIL L N. EXISTING /W EXISTING R/W / I LNB-$ :1 +85 BEG J _ .. .. TO REMOVED 48' 1? WOODS SB+ FROM STA. I EGIN WOVEN WIRE FENCE ___----- -- - 17+94 -LNB- TO ' 41 z LNB STA. 14+40 APER IT APP. SLAB LT & RT 0401 WOODS - z'-i--- _ 0.1 GREU TL-3 '^ TO BE REMOVED CAT-1 L F ^ d TM TB 2 . CA 9T� O N .. .. .. ' ^ _ •� I 1 IS 42/NBL 24'B57 ---air- - ---- -- -- Qk. Iro I li -LNB-I Y'--- - --- W x _ r- Z- ------ \ O p �--- r--.r---z--r---z----r---z-- CAT- F -- ------ -s- -w -- --- -- -- _z _ selde�A9Ee-0rT� - -------------=---- --- _ 2 'I _z___s. i __i___s__i___s____n___sMTL _�• 15"Lu RCP -III :a __ ------___ AM ------------LDECK7� ____z___i___ _-`---z---iL ---REMOVE &REPLACE m---- ZI 1iEMOVE 7.-ND- ------ -- --- � ---T- /I -III REPLACE 2GI <Dls-- N US 42/SBL 35'B5T- - - - - - - - - - --------- + 100'TAPER LT 8 RT1 SEE DETAIL 4 r------------------------------ _--------- _ -- z---=---------_------------ ----- ------------------ mlo----.---- -r-- I-=__ --_ -_-r r---z----r---z----r---z----r--- - .. -------r--- z----r---=�Lu --- - n--- r' -�--_ ♦ MTL METAL FLUME }IlM MTL _r RETAIN �1ETAL 7LUME '� Ea METAL FLUME Uri -RETAIN I uj .. \ .I WOODS „•� .. .. .. .. .. .. .. .. .. .. .. .. .. .. .j _. ro _. .. RETAIN a \ I lE ISTING R/W-/ - E TING R/W WOODS slcNo B5389-2 • Lu - w000s \ ,,. J w000s w� I l _ CL 'B' P RAP EXISTING R/W '48"WW �A - ,I "___� BST 8 _ "" E$T\. 2RITON$ . - .. E%ISTING R/W EST. 7/$Y GF " __ 1 Ig- �_ GRAVEL / /" y \ LDEANNLM.DDOUB D WIFE _ - ----�� � l r-�_------- GRAVEL DB 1139 PG 533 A RETAIN I •• am " - QQ 4 � � '�- I�A BST I [} ISFMTLBUS S ELLEN PARISH JACKSON AND s W. PI JACKSON, JR. DEI B 964 964 PG 129 < Q u, Ln I- I J Ib oaN w �n U M p / S g4°22'39" E g42.86' - LEGEND EIP _ PAVED SHOULDER SKETCH SHOWING BRIDGHAVEMENT RELATIONSHIP BEGIN BRIDGE -LNB- STA. 18+34.54 END BRIDGE 25' -LNB- STA. 22+96.46 TYP. o 1 C o i 50:1 TYPE B-77 / TYPE B-77 f 501 O O ou I -LNB- o o m S 70' 53' 48.2e E o w 50:1 TYP 77 ` J TYPE B-77 50:1 Qa >W BEGIN AP P SLAB q END APP SLAB -LNB- STA. 18+10.54 -LNB- STA. 23+20.46 Z 0 N w O O O O +65.00 155.00: LT � 140.00LT CN E E E TIE r BASE DITCH 115.00' LT TO EX. DITCH 95.00' LT DDE = 16 CY Z JEXISTING R/W AVA TO NG EXISTIN R GE TO BE REMOVED O W0 W — — — — — — — — — ------- N --DECK DRAIN —_ — V I p1551perna ven SEE DETAIL 4 W-----------------I--- Lu Lu 0 o Z 0 0 rc — G, ___-__________________----------------------------------------- d SOIL RD 0 UU F_ C9 6 W m 0 a o m F 0 0 U m L „ m0 B— STA. 22 + LAT. T BASE DITCH I EST 127 CY DDE SEE DETAIL 2 END WOVEN WIRE FENCI G LNB STA 24+63.50 CL II RIP RAP TO WOODS z` SHOULDER POINT I +70.00 E E I35.00' LT 15.00' LT 95.00' LT BEGIN WOVEN WI o � % ___________MTL__ _______ -10E' TT LT 8. RT------- --- z____r___-____r QI _ WOODS ww CL 'B' RIP RAP EST.2 TONS EST.7 SY GF PROJECT REFERENCE NO. SHEET NO. B-5389 5 RAY SHEET NO. DETAIL 2 ROADWAY DESIGN HYDRAULICS LATERAL 2' BASE DITCH INw to S.W) EN VEER ENGINEER ., 1111111/�,,/' b `,♦ ,,. `"� .-(N CARp •,. �.�`,�y{ CARD �. cro�od17A. ZO OFESS%O,j /9•'•q �`�Oes��SS%Q''(/'t'q: FIII Min. D=2.0 F1. Z L = =0 SEAL ,_ 8=2.0 H. b=5.0 Ff. 40655 = = 26971 FROM STA. 21+75 TO STA. 24+58 -LNB- IT ••••': �•' �'�' F'e` \ �"k RAM�R�' nnml DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED AMTcAirruco oriveuseuonnsstmmErA xusrax, rvcz eas uuu' �,>,wrsU�un�sN-cm�am�c�rom NCBELS LICENSE W F-1049 SEE SHEET 8 FOR PROFILE VIEW 0 END GRADE —LNB— STA. 30 + 00.00 W. DOUB AND SPOUSE BEGIN 3" OVERLAY —LNB— POT Sta.34+00.00 OJEFFREY MELISSA B. DOUB AND DARRELL DOUB AND SPOUSE LEANN M. DOUB 155.0U' LT DB 891 PG 129 END TIP PROJECT B-5389 —LNB— STA. 33 + 00.00 E E E E END 3" OVERLAY e E FENCE 8.50 +50.00 95.00' LT F\ +" 00 EXRW C END WOVEN WIRE FENCE EX4tW on LNB STA. 29+48.50 ex c F N EI WOODS 64' TAPER LT TIE TO EXISTING GUARDRAIL (LT) MT _-__-------_ TL US 42/ NBL 24S'BSi IQ —LNB— o 53' 48.2" E o x W ---_ ---- PA D DI CH ----v-r---=----r--- ---- _ ___ _ y L - ------ ___ -- ------ ---------_ ____z___s__ _t___ _s____z___s____- 1____t___s____t____s____z__—_iJG eFn TIE TO EXISTING ------ ---- -------- —------_ ----US GUARDRAIL RT- II RETAIN 4215BL 25'BST 11 1I5M_0ViTND REPLACE EXISTING—GUARDRAIL------ __ -� ---------JL---TO LEWISVILLE�—------_ - �----r--- ----z---------- -.----r--- --- -------- --- ---z----r---z----r---z----r---z--z--1j-r---z----r---z-- ------- �a �----r--- z-r--- z- � r--- z---- MTL r Zu woods - a lw � u_ BL-4 II WOODS II � ��4a•W .. 4a'ww �� .. .. � - .. .. DARRELL DOUB AND WIFE LEANN M. DOUB DB 1139 PG 533 LEGEND _ PAVED SHOULDER SKETCH SHOWING BRIDGHAVEMENT RELATIONSHIP BEGIN BRIDGE —LNB— STA. 18+34.54 END BRIDGE 2s' —LNB— STA.22+96.46 TYP. o � o d 50:1 TYPE B-77 I TYPE B-77 501 o T I o o I �I -LNB- o o °' S 70. 53' 48Z E N o N 50:1 TYP 77 TYPE B-77 soa BEGIN APP SLAB g q END APP SLAB -LNB- STA. 18+10.54 -LNB- STA. 23+20.46 ��I 0 a 0 = TO=AOk/ ilz _ I;I o MTL --Z----i'-- —� MTL r-- z--,J'- -_--- ---- =_MTL MTL -B5389-1 ra BM-1 ELEVATION • 719.23• F N 861043 E 1551007 RR SPIKE SET IN 13TREE i1 ........................... DETAIL 7 RIP RAP AT EMBANKMENT INofro Scalel 10'mia. Ditch e 1.0'mi. 1.5 B. Grad GEOTMILE Typa of Li,— 13 TONS,CL I Np-Rap Geofaxlile= 20 _ STA. 16+96 -DETNB- LT I II BY-6 WOODS PROJECT REFERENCE NO. SHEET NO. B- 6 DETOUR -DETNB- -DETNB- DESIGN SPEED 55 MPH P1 Sto //+46.99 P1 Sto 14+20.69 L = 13'58'02.2°(LT) A = 12'11'59.9"(RT) W SH RhV SHEET NO. ROADWAY DESIGN EVVEER HYDRAULICS ENGINEER I. D = 4 46' 33.7x D = 4' 46' 33.7' L = 29245' L = 25544' " ,'��� O...... "III . DAR04,''. T = 14699 T = 128.24' ;=oQ�oFess/Oj9l 9•; �cY\ ��,,�ESSi�',y-v R = 1,200.00' R = 1,200.00' SEAL = 'a SEAL �= SE = 0.04 SE = 0.04 40655 _ = 26971 ROFF = 154' ROFF = 154' DS = 55 MPH DS = 55 MPH FN e�•:' ;FNCINE�?:' —DETNB— STA. 11 + 86.96 = —NBL— STA. 14+49.08 11.90' LT O - POC Stc.12+62.50 9� 48' WW I US 42/NBL 24'BST — ---------- .__-—_r___i____r_—Z____ r CONC PAVED DITCfi— �{j___ I ___s____x—_s___s_—__ -- -- I--- I US 42/SBL 35'BST-- T----------- ----- ---------------- ---_r --------------------- 1 ds r---�----r---�-a--r---�----r - _ a �r�� Z� woo05 Nry i Illll ' �/III /I BY-5 I I ICI I � BST I'I, -------- __ �1 r GRAVEL \ / /�- L> U o \\ / BST GRAVEL I ISFMTLBUS Z 1 / ELLEN PARISH JACKSON AND W. LOGAN JACKSON, JR. PIN DB 964 PG 129 JN �I Ib 5 � oaN W N U mo¢ / S g4°22'39" E AA2.86' - LEGEND EIP _ PAVED SHOULDER 1 WILLIAM STEVEN CLODFELTER AND WIFE JESSIE J. CLODFELTER DB 291 PG 341 IN. to SmI b N-rol Fit Sl GEGTEXTILE B Min. D=1.5 F. Max. d=1.5 Ft. 'When B iz , 6.0' B=2.0 Ft. Typo of Lim— Clow B Rip-Rop b=5.0 Ft. FROM STA. 12+38 TO STA-1A+96 -DETNB- LT a� - II it--r--- i ---r a+ a I 1 - - APPROX. \ DIRECTION ONLY ra- t\ EXISTING R/W Q P� ti APPROX. DIRECTION / ONLY •�•,)YiCkrRAM�RI�.�t•`o'' . Siy�Ql GI�p�,� . DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED A. M-- T—AS A— Assoc — I- BM»2•"ELEVAT ION 708. 96 AMT rrAusLr �xs�nxry 9iass ax,racncas N 861147 E 1552258 c ,�un�cmurvurom � RR SPIKE SET IN 18. SYCAMORE NCBELS LICENSE W F-1049 ........................... N N O SEE SHEET 9 FOR PROFILE VIEW o JEFFREY W. DOUB AND SPOUSE _ P MELISSA B. DOUB AND DARRELL DOUB AND SPOUSE LS 891 PI 129 / O DB 891 PG 129 — PT Cfn IF4.d7RQ � —DETNB— STA. 15+76 LAT. 2' BASE DITCH v✓CL B RIPRAP 140.00' LT E EST 254 TONS ODE = 374 CY EST 689 SY GFD E SEE DETAIL 5 E EA S _,..EXISTING R/wT TEMP. lY W/EL ----- — ___z__r_MTL____r___z___ s----z---s----.L- - 1 SEAT=729. L--- ------------- r---r— r MTL z____r___z_ I DARRELL DOUB AND WIFE LEANN M. DOUB DB 1139 PG 533 I APPROX. DIRECTION ONLY J �o m oo'u I 95.00' LT O O 00 WF0 CON W CO Lu W Lu rr , WOODS v Lu EXISTING R/W SKETCH SHOWING BRIDGHAVEMENT RELATIONSHIP IRIDGE STA. 15+76.6 �°� ENDBRIDGE IDSTA. 20+36.69 TEMP TEMP TYPE B-77 TYPE B-77 o -DETNB- o S 70' 53' 48.2" E TEMP / I ^ TEMP TYPE B-77 �a Ln TYPE B-77 �a -LNB- S 70' 53' 48.2x E I � J 2 F— Q I, -DETNB- P1 Sto 26+52.76 P1 Sto 29+14.74 ,L = /2° 30' 43.8' (RT) L = /2" 30' 43.6' (LT) D = 4 46' 33.7' D = 4' 46' 33.7" L = 26198' L = 26198' T = 131.55' T = /3/.55' R = 1,200.00' R = 1,200.00' SE = 0.04 SE = 0.04 ROFF = 154' ROFF = 154' DS = 55 MPH DS = 55 MPH R END TEMP BRIDGE -DETNB- STA. 20+36.69 Zr— mE E DDE = 129 CY E F I—r1 57' <WF DETOUR —DETNB— DESIGN SPEED 55 MPH a DETAIL 6 LATERAL 2' BASE DITCH (Not t. S-Iei b Nat I t— Ground j,L D .(,� lifl. Fill SI., Min. D=2.0 Ft. �»1 8-2.0 H. b=5.0 Ft. FROM STA. 19+16 TO STA. 22+06 -DETNB- LT END —DETNB— GRADE —DETNB— STA. 28+76.22= —NBL— STA. 31 +31.55 11.88' LT LAT.2' BASE DITCH / O JEFFREY W. DOUB AND SPOUSE -DETNB- PRC Sto. 27 SEE DETAIL 6 2 MELISSA B. DOUB AND % DARRELL DOUR AND SPOUSE LEANN M. DOUB + DB 891 PG 129 155.00' LT IT .T E 70.00 E E E E E E ��1135.00' LT TEMP. CL 'B'RIP RAP 00' LT EST.1 TON-DETNB- PC Sta. 25+21.210_LT__--_-- -_--EST-S SY GF \ ______________________ _____ -----___ +5000 i_TL_z___s____ ---------- _-- O_ , i r__ TEMP. CL 'B' RIP RAP EST. 1 TON _ EST. S SY GF — — — _x___1____x___s____x___s____x___s MTL ---------------------- SEAT=729.68' —J--------------- _--------------- __r____r___r___�____ Iml t3 xI w000s 16' SOIL RB R PROJECT REFERENCE NO. SHEET NO. B-5389 7 RAY SHEET NO. ROADWAY DESIGN HYDRAULICS EN��NEER, ENGINEER ulult„q/ �N CA/2•,, qN CARO O Fessio ley`• °off <�L SEAL = zc SEAL 40655 = = 26971 = eQ f 'JvCINFAQ lnnmt DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED AMTcAirruco oriveuseuonnss�mErA xusrax, rvcz eas uuur �,>,wrsU�un�-cm�.Fam�ctrom NCBELS LICENSE # F-1049 SEE SHEET 9 FOR PROFILE VIEW -Ut I Nb- l- / )TG.,)U*4.7.1f = -NBL- POT Sto.33+00.00 US 421 NBL 245BS7 ---- ---- ---- ---- — ------------------- MTL r___ _ --- z_rz__r___z____ ___ _ ___r____r___r__ :ONC PAVED DITCH �NC PA�rED DITCH ice= MTL s___,________z__—_x___s____x___s____x___s____z___s____z___s____z___s____z___s____z___x____•____x___s____ x_____xJL__s____x___s____c _—-------- ---------------------- ---- _—lr------- ----------------------------------- -_�� US 42/SBL 25'BST 11 —r TO LEWISVILLE --4— _— _— _— ____i ______z____ — ------ i____ r— z ----------------- ----- — —x— r---_rrrrz__r___z____r___ z____r___z____r___ z_—z__ � r___z____ ___z_________MTL jr_r___z____r___z__ III w000s u� BL-4 �I1 w000s II II LEGEND DARRELL DOUB AND WIFE LEANN M. DOUB PAVED SHOULDER DB 1139 PG 533 SKETCH SHOWING BRIDGEiPAVEMENT RELATIONSHIP MIDGE STA. 15+76.6 END ID GE TNBSTA. 20+36.69 TEMP TEMP TYPE B-77 TYPE B-77 o -DETNB- o 4— S 70° 53' 48.2' E 4-- 'TEMP / 1 ^ TEMP TYPE 11-77 �1 ;a Lr) TYPE B-77 I� 1 �1 -LNB- j S 79 53' 48.2' E I � J