HomeMy WebLinkAbout20190653 Ver 1_B-5389 Permit Drawings_20190517Highway hwa North Carolina Department of Transportation
gStormwater
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 46104.1.1 TIP No.: B-5389 County(ies): Yadkin Page 1 of 1
General Project Information
WBS Element:
46104.1.1 ITIP Number: B-5389 Project Type: Bridge Replacement Date: 4/24/2019
NCDOT Contact:
Tierre Peterson Structures Management Unit
Contractor / Desi ner:
Sun ate Design Group, P.A.
Address:
1000 Birch Ridge Drive
Raleigh, NC 27610
Address:
905 Jones Franklin Road
Raleigh, NC 27606
Phone:
919-707-6488
Phone:
919-859-2243
Email:
tr eterson ncdot. ov
Email:
idaltontbD.sungatedesign.com
City/Town:
Lewisville
Count ies :
Yadkin
River Basin(s):
Yadkin -Pee Dee
CAMA County?
No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
0.343 miles Surrounding Land Use: Rural; Agricultural
Proposed Project
Existing Site
Project Built -Upon Area (ac.)
1.7 ac.
1.4 ac.
Typical Cross Section Description:
Two 12' lanes with 4' inside paved shoulder and 10' outside paved shoulder;
4:1 median slopes
2:1 outside slopes
Two 12' lanes with 4' inside paved shoulder and 10' outside paved shoulder;
4:1 median slopes
2:1 outside slopes
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 30,300 Year: 2040
Existing: 25,000 Year: 2020
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
The proposed bridge replacement project will replace Yadkin County bridge #105, on US 421 North Bound over the Yadkin River overflow. The proposed bridge is 4 @ 115' 63"
Modified Bulb Tee bridge. The existing bridge is 9 @ 50' concrete girder on concrete bents. Deck Drains on the proposed structure will not be discharged over open water,
reducing stream pollution associated with roadway runoff. The runoff from deck drains will be discharged onto a class B rip rap dissipator pad. Additional measures implemented
to reduce impacts to the stream and surrounding properties include, maintaining existing drainge patterns, and using rip rap pads at drainage outlets to dissipate energy and
reduce erosion.
Waterbody Information
Surface Water Body (1): Deep Creek
NCDWR Stream Index No.:
12-84
NCDWR Surface Water Classification for Water Body
Primary Classification:
Water Supply IV WS-IV
Supplemental Classification:
None
Other Stream Classification:
None
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body?
iYes
I Deck Drains Discharge Over Buffer? N/A
Dissi ator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body?
IN2
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative) I
W
0
See Sheet /-8 For Convent/onol Symbols
6�5
i PROJECT Y%1%�T
FORSY 4�J
�l SR 1301
ii ,p01 t� Bead
�� S,R l001 Sg
I/
I
VICINITY MAP
STATE OF NORTH CAROLINA
DIR1dSION OF HIGHWAYS
YADKIN COUNTY
PERMIT DRAWING
SHEET 1 OF 6
LOCATION: BRIDGE NO.105 OVER YADKIN RIVER OVERFLOW
ON US 421 NORTHBOUND LANES
TYPE OF WORK: DRAINAGE, GRADING, PAVING, & STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
BEGIN TIP PROJECT B-5389
-LNB- STA. 12 + 88.32
TO YADKINVILLE------a h —__— US>42]NB
_ _--_ _
--_—_--_--- C I — --------------US 421 SB
0
i
Ohl
O 100—YR
H
O
0
5
z
OUTSIDE OF FLOODPLAIN
BEGIN BRIDGE
THIS IS A CONTROLLED -ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES,
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD
END BRIDGE
STATe
SIBBT
N0.
TOTAL
SHEETS
N.�.
B-5389
ATE RROl.N0.
.A.PROJ.N0.
PSCRD"1'[ON
46104.1.1
WA
PE
11
5/7
1 O
END TIP PROJECT B-5389
-LNB- STA. 31 +00.00
END CONSTRUCTIO
-LNB- 3/+00.00
OUTSIDE OF jFLOODPLAIN
US 487 NB
_--------------------- _—
US 421 SB
TO LEWISVILLE
INCOMPLETE PLANS
DO NOT USE POR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
DETAIL 4
DECK DRAIN DISStelIPATOR PAD
(Not to se)
DISSIPATOR P eN
PAD vlPw
'NOTE: CENTER PAD DIRECTLY BELOW DECK DRAINS
GROUND
GEOTE%TILE
PROELILLYIEW
L=358 ft.
Type of Uner=90 TONS CL ill Ripilp
GeoteAe= IBI zy
FROM STA. 18+77 TO STA. 19+05 -LNB- RT
FROM STA. 19+21 TO STA. 22+51 -LNB- RT
MTL
-------=����� MTL
—MTL1 �-
g�ll I
WOODS J
III
�� GRN55 I Ilko�
DETAIL 3 DETAIL 1
RIP RAP AT EMBANKMENT LATERAL 2' BASE DITCH
(Not to $cole) (Not to Scolel
to•mie. -
Na oral
Grade 1.0Ditc'min. 1.5 ft. Ground Z'1 D �,'� 1"h- Slope
d
GE0 1, ,IE Min. D Et Ft.
GEOTEXTILE Max. d=1.5 F. F
Type of Liner- 13 TONS,CL I Rip -Rap 'When B is � 6.0' B=2.0 H.
Georoxiile= YO s Type ofl-i--Cl- B Rip -Rap 8=5.0 Ft.
STA. 19+55 -LNB- LT FROM STA. 15+00 TO STA. 19+55 -LNB- LT
WOODS
v
BILLBOARD
4x4 GRANITE MON
DENOTES FILL IN
WETLAND
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
WILLIAM STEVEN CLODFELTER -
AND WIFE
JESSIE J. CLODFELTER
LATERAL 2' BASE
DITCH W CL B RIPRAP
EST. 255 TON
EST. 6915Y GFD E
SEE DETAIL 1 _
t - 48' WW_ .. .. ..... .. .. / ..
t == MTL F - T
R N
US as NeL 24'esr t, o
W
w N
— O
MTL
— — --- r-----_
--- --- -- —_US 42/SBL 35'BIT
T_----- —_—_ i -------------------
MTL L FLUME
.. RETAIN
WOODS .�. .. .. .. .. .. .. .. -.
ISTT RAP
_ BST EST. TONS -
/ EST. 7 SY GF
GRAVEL
w I
BST 1
I Q ISFMTLBUS o
I ELLEN PARIISH JACKSON AND
W. LOGAN JACKSON, JR.
3
0
W
m /
LEGEND
EIP
_ PAVED SHOULDER
PROJECT REFERENSHEET NO.
B-5389CE NO. 4
RNd SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
QI,
C
INCOMPLE rE PLANS
O DO NOT USE FOR ®W ACQUISITION
l
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PERMIT DRAWING
A Af—, TR.... ... Asso....
SHEET 2 OF 6
AuIT M. �M.eron•Efx„o.�o„
NCBELS LICENSE W F-1049
O1
SEE SHEET 8 FOR PROFILE VIEW
JEFFREY W. DOLE AND SPOUSE
MELISSA B. DOUB AND
DARRELL DOUB AND SPOUSE
LEANN M. DOLE /
�G
e
O
/ / E%ISTING R/W
- 4!
WOODS
i7YT
15" RCPr III rMTL T r T r 2GI'r ---
tEMOOEwm--------------- —_
IEPLACE 2GI
_ T ---
-� -� i -MTL �T MET-� ME 1
MEtAL FLUME �OZTF-N
TS
APPROx. RETAIN DIRECTION
ONLY WOODS "-
WOODS IF—
PGQ
\ ti APPROX.
DARRELL DOUB AND WIFE
\ DIRECTIECTI ON -
ONLY LEANN M. DOUB RE AIN -�
VEL
/ TEMP STREAM
' CROSSING
O
RIPRAP AT
EMBANKMENT
SEE DETAIL 3
SITE 1
I
m
S
Z
S
SITE 3
w
L^
LNB
L LIII
F SITE 2
Vi
F
Lu_------
��� SITE 4
LIu
V)
F
LIu
WOODS
SITE 5
Z
EXISTING R/W
Ip RETAIN - ---- - - - - --
- -
T
V�I
J /
I
Q
�I I
DETAIL 4
DECK DRAIN DISStelIPATOR PAD
(Not to se)
DISSIPATOR P eN
PAD vlPw
'NOTE: CENTER PAD DIRECTLY BELOW DECK DRAINS
GROUND
GEOTEKTILE
L=358 ft.
Type of Uner=90 TONS CL B RipJlapp
GeoteAile= IBI zy
FROM STA. 18+77 TO STA. 19+05 -LNB- RT
FROM STA. 19+21 TO STA. 22+51 -LNB- RT
— m ,-:�7-. — —_I_ G—,
DETAIL 3 DETAIL 1
RIP RAP AT EMBANKMENT LATERAL 2' BASE DITCH
(Not to Scolel (Not to Scole)I
to•mie. bDitc.{
Natural
Grade 1.0'min. 1.5 N. Ground Z'1 D �,'� l ht. Slope
d
GE0 i, ,IE Min. D= t. Ft.
GEOTEXTILE Max. d=1.5 F1. F
Type of Liner- 13 TONS,CL I Rip -Rap 'When B is � 6.0' B=2.0 F.
Georoxiile= YO s Type di ----Class B Rip -Rap 6=5.0 F.
STA. 19+55 -LNB- LT FROM STA. 15+00 TO STA. 19+55 -LNB- LT
4x4 GRANITE MON
DENOTES FILL IN
WETLAND
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
WILLIAM STEVEN CLODFELTER \
AND WIFE
JESSIE J. CLODFELTER
PROJECT REFERENSHEET NO.
B-5389CE NO. 4
RNd SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
QI,
C
INCOMPLE rE PLANS
O DO NOT USE FOR ®W ACQUISITION
l
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PERMIT DRAWING AuIT A Af-11 T11111 III Asso11-1,
SHEET 3 OF 6
M. �M.erorEfx„o.�oa
NCEELS LICENSE p F-1049
Oj SEE SHEET 8 FOR PROFILE VIEW
I JEFFREY W. DOUBANDSPOUSE
MELISSA B. DOUB AND K D
ln
a
LIu
Lu
Lu
LIu
V)
Z
J
V
F—
Q
►0
_ _ PAVED SHOULDER
d
hl
�\ I
MTL
MTLi�=
MTL 1
J
WOODS F
�� GRN55 I Ilko�
DETAIL 7 DETOUR-DETNB-
RIP RAP AT EMBANKMENT
°�°I
to, DESIGN SPEED 55 MPH
roin. I
Ddah l.oroi . Ts n.
Grade
GE 13 TOLEJ1
Type °f Liner= 13 TONB,CL Rip-Rop F
Geofa ille= 20
WSTA. 16+96-DETNB- LT
WOODS
N
n
v
BILLBOARD
4x4 GRANITE MON
DENOTES FILL IN
WETLAND
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
WILLIAM STEVEN CLODFELTER -
AND WIFE
JESSIE J. CLODFELTER
I Nol fo Scole
b
N.—I
Ground 7/ 1 t— Fill
BIoPe
d
GE —LE
Min, D=1.5 H.
Max. d=1.5 Ft.
m'hen B i, < 6,0' B-2.0 Ff.
T p, f Li,,,- CII,w It Rip
-R p l<b-5.0 Ft.
fr
LAT. 2'BASE
DITCH H✓CL B RIPRAP
EST 254 TONS
EST 689 SY GFD
SEE DETAIL 5
Ira
PROJECT REFERENCE NO. SHEET NO.
B-5389 6
RW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
QI,
C
INCOMPLE rE PLANS
O DO NOT USE FOR ®W ACOWSMON
l
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PERMIT DRAWING AuIT A Af—, Ta...... A .... ...
SHEET 4 OF 6 ,
M. �M.erarEf°„o.�o„
NCBELS LICENSE w F-1049
O1 SEE SHEET 9 FOR PROFILE VIEW
JEFFREY W. DOUB AND SPOUSE
MELISSA B. DOUB AND
DARRELL DOUB AND SPOUSE
LEANN M. DOUB / O
e �G O
O
0 E MM
�/ W
I I RIPRAP AT �
�' GRADE TZS D7t
TEMP. 15" ✓ELBOWS
�— MTL- r� r-i----- �r �. T — MTL7—I—
CONC PAVED DITC
DI
_— -- 7MTL—_------------ a�---------MTL =---— --------------US 421 SBL JFBS7 e
-z— ____ ------ _-------- — —
�— ETAL UME—rTL �T MET- M
MTL �i�----U MEtAL FLUME �
c�
ro
DIRECTION
ONLY WOODS
_ — 777-� BST I
SnrvG R______------'- PPROX.
GRAVEL ��� ONLYIRECTI N
BST ISFMTLBUSELLEN PARIISH JACKSON AND o
W. LOGAN JACKSON, JR.
3
0
W
m /
LEGEND
EIP
F PAVED SHOULDER
DIRECTION
ONLY
WOODS
DARRELL DOUB AND WIFE _ —
LEANN M. DOUB —
/ TEMP STREAM
' CROSSING
I
SITE 4
Lu
.I
W
I
I I I
F
V)
SITE 5 WOODS
uj
EXISTING R/W
`_--- —
--—
-IgI/ --
TJ
'
III
a
MTL
web
j N
DETAIL 7 DETOUR-DETNB-
RIP RAP AT EMBANKMENT
to�m�
N"'°&_) DESIGN SPEED 55 MPH
a I
Ditch 1.0'mi 1.5 X.
Grade
4x4 GRANITE MON
GEOTEnILE J1 DENOTES FILL IN
Type dLiaer= 13 TONS,CL I Mp-flap WETLAND
Geota isle= 20
W STA. 16+96-DETNB- LT
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
WILLIAM STEVEN CLODFELTER O
AND WIFE
JESSIE J. CLODFELTER
PROJECT REFERENCE NO. SHEET NO.
B-5389 6
RW SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
a
C
INCOMPLE rE PLANS
O OO NOT USE FOR ®W ACOWSTION
l
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PERMIT DRAWING AuIT A Af-11 T1a11s III A11,11-1,
SHEET 5 OF 6
M. �M.erarEfR„o.�o„
NCBELS LICENSE M F-1049
Oj SEE SHEET 9 FOR PROFILE VIEW
IJEFFREY W. DOUB^ ANDD SPOUSE
MELIS B.SA DOUB AND
Lu
W
W
N
Z
J
V
H
a
PAVED SHOULDER
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
19+38 to 19+61-L-LT
DITCH (BANK STABILIZATION)
< 0.01
23
2
19+08 to 19+61-L-
BRIDGE
0.02
145
3
19+67 to 19+91-L-
BRIDGE
0.02
4
19+07 to 19+24-L-RT
BRIDGE
0.01
5
18+82 to 19+04-L-RT
STREAM CROSSING
0.01
89
TOTALS*:
0.03
< 0.01
0.03
23
234
0
*Rounded totals are sum of actual impacts
NOTES:
SITES 3 and 4 are a Total Take
2018 Feb