Loading...
HomeMy WebLinkAbout20190653 Ver 1_PCN Form Submission_20190517DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20190653 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Dave Wanucha:eads\djwanucha Information for Initial Review 1a. Name of project: Replace Bridge 105 over Yadkin River Overflow on US 421 Northbound Lane 1a. Who is the Primary Contact?* NCDOT 1b. Primary Contact Email:* ekcheely@ncdot.gov Date Submitted 5/17/2019 Nearest Body of Water Deep Creek Basin Yadkin-PeeDee Water Classification WS-IV Site Coordinates Version# * 1 Reviewing Office* Winston-Salem Regional Office - (336) 776- 9800 1c. Primary Contact Phone:* (919)707-6108 Latitude: Longitude: 36.105545-80.515655 FA. Processing Information U County (or Counties) where the project is located: Yadkin Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: B-5389 WBS # (?) 46104.1.1 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) F' Regional General Permit (RGP) F' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? f Yes r No Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: rJ 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express F Non-404 Jurisdictional General Permit F Riparian Buffer Authorization F' Individual Permit * le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: r Yes r No For the record only for Corps Permit: r Yes r No 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment B-5389 DIMS Acceptance.pdf 67.76KB 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NC Department of Transportation 2b. Deed book and page no.: 2c. Responsible party: 2d. Address Street Address 1598 Mail Service Center Address Line 2 aty State / Rovince / Region Raleigh NC Fbstal / Zip Code Country 27699 USA 2e. Telephone Number: 2f. Fax Number: (919)707-6108 2g. Email Address:* pharris@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (i appropriate) 1c. Nearest municipality/town: Lewisville 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 Oty Postal / Zip CDde 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Deep Creek 3b. Water Resources Classification of nearest receiving water:* WS-IV 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401011103 4. Project Description and History 2b. Property size: State / Frwince / Pagion O�untry 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Surrounding land use is primarily agricultural land, With a rowof trees along the unnamed tributary. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes 6 No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 0.03 4g. List the total estimated linear feet of all existing streams on the property: 209 4h. Explain the purpose of the proposed project:* The B-5389 project is needed to replace bridge 105 because it is functionally obsolete. Its sufficiency rating is 64.7. The project purpose is to replace the functionally obsolete bridge with one that meets current NCDOT design standards. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The proposed project will replace the eAsting two-lane bridge (Bridge No. 105) with another two-lane bridge in the same location. The proposed replacement structure will be a multi - span structure that is approAmately 455 feet in length, with a 38-foot wide clear deck width. The project's total length is 1,500 feet. The ebsting northbound lane bridge will be replaced with a new structure at the wasting location. Traffic on the northbound lanes will be maintained during construction with an on -site detour located north of the wasting bridge location. Standard road building equipment such as trucks, dozers, and cranes will be used. 4j. Please upload project drawings for the proposed project. B-5389 Permit Drawngs.pdf 2.13MB B-5389 Roadway Plans.pdf 2.27MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r: Yes f No r Unknown Comments: Two small wetland areas and one intermittent stream were identified in the study area. No JD site visit was held. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Carolina Ecosystems, Inc. Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No. CProposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries r Buffers r- Open Waters r Pond Construction 2. Wetland Impacts Reason (?) 2b. Impact type * ('i 2c. Type of W. * 2d. W. name * 2e. Forested* 2f. Type of 29. Impact Jurisdicition*M area*E71 Bridge replacement P Headwater Forest �WA � FP. 0.020 (acres) Bridge replacement JL f�est ��]WB � Corps 0.010 (acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Wetland Impact 0.030 2h. Comments: Both wetlands are a total take. 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.030 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type * Type of 3g. S. width * 3h. Impact ❑ (?) �3f. Jurisdiction* length* S1 Site 1 -Ditch outlet Permanent Bank Stabilization SA Intermittent Both 6 23 protection Average (feet) (linear feet) S2 Site 2 -Bridge Replacement Temporary Dewatering JSA Intermittent Both 6 145 Average (feet) (linearfeet) S3 Site 5 -Temporary s Dewatering �SA Intermittent Both 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 23 31. Total temporary stream impacts: 234 31. Total stream and ditch impacts: 257 3j. Comments: Temporary impacts total 0.03 acre E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The proposed replacement bridge will be on the same alignment as the existing bridge. Deck drains on the proposed structure will not be discharged over open water, reducing stream pollution associated with roadway runoff. The runoff from deck drains will be discharged onto a Class B rip rap dissipator pad. Additional measures implemented to reduce impacts to the stream and surrounding properties include maintaining existing drainage patterns and using rip rap at drainage outlets to dissipate energy and reduce erosion. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT will adhere to Best Management Practices for Construction and Maintenance Activities. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): r DWR V Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank W Payment to in -lieu fee r Permittee Responsible program Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. r Yes r No 4b. Stream mitigation requested: (linear feet) 0 4d. Buffer mitigation requested (DWR only): (square feet) 0 4f. Non -riparian wetland mitigation requested: (acres) 0 4c. If using stream mitigation, what is the stream temperature: 4e. Riparian wetland mitigation requested: (acres) 0.03 4g. Coastal (tidal) wetland mitigation requested: (acres) 0 4h. Comments No mitigation is required for the stream bank stabilization or temporary stream impacts as these impacts do not constitute a loss of waters of the US. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: No buffered resources within project area. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation u 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* r Yes r No NEPAor SEPAFinal Approval Letter 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? r Yes r No r Unknown Sh. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown 5i. Does this project involve (1) blasting, and/or(2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? As of June 27, 2018, the USFWS lists one protected species for Yadkin County, the northern long-eared bat (NLEB). Please see the attached SLOPES memo dated December 11, 2018 for NLEB. While evidence of bat use was found at Bridge 105 during a May 2018 site visit, the neared recorded NLEB hibernacula is 72 miles away and the closest red HUC is appropmately 70 miles away. Consultation Documentation Upload B-5389 NLEB SLOPES Yadkin.pdf 179.74KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* SEPA Documentation 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA designated 100-year floodplain?* r Yes r- No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination?* FEMA Maps Mi lets laneous Comments There will be 0.97 acre of tree clearing on this project. Miscellaneous attachments not previously requested. B-5389 Signed Cover Letter.pdf 1.25MB Signature * P By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark III Signature xO e- �(vIwxq 10 Date 5/17/2019