Loading...
HomeMy WebLinkAbout20190432 Ver 1_More Info Received_20190515Homewood, Sue From: Mularski, Eric <Eric.Mularski@hdrinc.com> Sent: Wednesday, May 15, 2019 2:49 PM To: Homewood, Sue; David.E.Bailey2@usace.army.mil Cc: Vena, Dave; DePalma, Alicia (Alicia.DePalma@duke-energy.com); Rogers, Carl; Teresa Andrews Subject: RE: [External] RE: Request for Additional Information; PNG Pleasant Garden Looping Project, Guilford Co.; SAW -2018-02075 (UNCLASSIFIED) Attachments: C -330-0001041-C-330-0001041 REVISED.PDF External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Sue, We appreciate your review and comments. Please see our responses below. NCDWR Comment 1.: The application document indicated that the permanent maintained easement is proposed as 50 feet wide, however Condition 1.5 of Water Quality General Certification #4133 states that permanent maintained corridor for gas utility lines shall not exceed 30 feet wide. I do not see that you have specifically requested an exemption to this Condition, so if that is your intent, please clarify that in the response to this request. Please not the PNG has previously requested and been approved for 30 -foot permanent easement on multiple projects, therefore we would need clear justification for why a greater maintenance corridor through wetlands and streams is required for this specific line. PNG Response: PNG will comply with Condition 1.5 of Water Quality General Certification #4133. The 50 -foot permanent easement shown on the construction plans illustrates the land easement obtained, not the permanently maintained ROW. PNG attempts to acquire a minimum of 50 -foot of permanent easement for each pipeline to ensure adequate land space for future maintenance without having to obtain land rights at a later date. NCDWR Comment 2. The plan view of the culvert replacement of AR -005 indicated that the proposed new culvert alignment may have the potential to cause downstream erosion and water quality concerns as the outlet appears to be within a sharp channel meander and out let velocity would be directed towards a stream bank. Please review this alignment in more detail and provide additional information to support the correct alignment, or realign the culvert out to better match the natural stream channel. PNG Response: The stream line on the culvert plans in the PCN submittal was based from GPS points collected in the field. The centerline of stream was re -digitized using contours and elevations collected during the land survey which provides a more accurate depiction of the existing stream channel. The downstream flared end section will be oriented to discharge flow in the channel thalweg to promote flow and to prevent the potential for stream bank erosion. Attached is the revised plan sheet that illustrates the existing stream and proposed culvert replacement (see attached C-330-0001041). After your review, please don't hesitate to contact me should you require additional information to process the Section 401 Water Quality Certification for this project. Thank you, Eric Mularski, Pws D 704-973-6878 M 704-806-1521 hdrinc.com/follow-us From: Homewood, Sue [mailto:sue.homewood@ncdenr.gov] Sent: Wednesday, May 8, 2019 11:20 AM To: Mularski, Eric <Eric.Mularski @hdrinc.com>; David. E.Bailey2@usace.army.miI Cc: Vena, Dave <Dave.Vena@duke-energy.com>; DePalma, Alicia (Alicia. DePalma@duke-energy.com) <Alicia.DePalma@duke-energy.com>; Rogers, Carl <Carl.Rogers@hdrinc.com>; Teresa Andrews <tandrews@guilfordcountync.gov> Subject: RE: [External] RE: Request for Additional Information; PNG Pleasant Garden Looping Project, Guilford Co.; SAW - 2018 -02075 (UNCLASSIFIED) Eric, Thank you for copying me on your response to the USACE. I reviewed the project and have a couple other items that will need to be addressed before I can issue a 401 approval. Please see the attached letter requesting more information. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Mularski, Eric <Eric.Mularski @hdrinc.com> Sent: Tuesday, May 7, 2019 2:40 PM To: David. E.Bailey2@usace.army.mil; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Vena, Dave <Dave.Vena@duke-energy.com>; DePalma, Alicia (Alicia. DePalma@duke-energy.com) <Alicia.DePalma@duke-energy.com>; Rogers, Carl <Carl.Rogers@hdrinc.com> Subject: [External] RE: Request for Additional Information; PNG Pleasant Garden Looping Project, Guilford Co.; SAW - 2018 -02075 (UNCLASSIFIED) HYDROLOGIC & HYDRAULIC SUMMARY REFERENCE DATA WATERSHED SCALE TOPOGRAPHY OBTAINED FROM NORTH CAROLINA SPATIAL DATA DOWNLOAD, 2015. DATA IS QUALITY LEVEL 2 (QL2). DETAILED FIELD TOPOGRAPHY PROVIDED BY ENCOMPASS SERVICES PLLC, 2018. IDRAINAGE AREA 9.10 AC COVER TYPE 50% FOREST, GOOD (CN=0.25) 50% MEADOW, GOOD (CN=0.45) COMPOSITE CN=0.35 ■►[O7_1_V_lIIWTATaEl:Lll0ly_1Iwez,Ia [oil]:1 2-YR=3.43 IN 10-YR=4.94 IN 25-YR=5.83 IN 50-YR=6.54 IN 100-YR=7.26 IN SOILS TABLE NRCS SYMBOL HSG EnB C EnC C EnD C PEAK RATIONAL RATE 2-YR=5.46 CFS 10-YR=7.87 CFS 25-YR=9.28CFS 50-YR=10.41 CFS 100-YR=11.56 CFS PIPE DATA 41 LF 30" HDPE @ 6.91 % EMBEDMENT DEPTH=12-18" HYDRAULIC DATA DRAINAGE AREA MAP SCALE IN FEET 0 200 400 Culvert Discharge (cfs) Headwater Elevation (ft) Inlet Control Depth(ft) Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) 5.46 819.23 0.73 0.40 0.54 0.40 0.23 5.34 4.72 6.07 819.29 0.79 0.43 0.57 0.42 0.25 5.63 4.91 6.68 819.36 0.86 0.46 0.61 0.46 0.26 5.74 5.09 7.29 819.42 0.92 0.49 0.65 0.49 0.28 5.92 5.26 7.90 819.48 0.98 0.51 0.68 0.51 0.29 6.08 5.43 8.51 819.54 1.04 0.54 0.71 0.54 0.31 6.24 5.58 9.12 819.59 1.09 0.56 0.74 0.56 0.32 6.40 5.72 9.28 819.61 1.11 0.57 0.75 0.57 0.32 6.43 5.76 10.34 819.71 1.21 0.61 0.80 0.63 0.34 6.52 6.00 10.95 819.77 1.27 0.64 0.83 0.65 0.36 6.64 6.12 11.56 819.83 1.33 0.66 0.86 0.68 0.37 6.73 6.25 16' WIDE ROADWAY I� VARIABLE SLOPE VARIABLE SLOPE CROSS PIPE ROADWAY CROSS PIPE TYPICAL SECTION REINFORCED - EDGE FULL LENGTH OF END SECTION AND TOE PLATE 4" 6" MAX 41 TOE D 6" PLATE L SIDE VIEW SLOPE R V AIABLE PIPE W D PIPE L TOE PLATE NRCS SOILS BOUNDARY AND TYPE ROPOSED TEMPORARY CCESS ROAD AR -005 XISTING 18" CMP CULVERT ROPOSED FOR REPLACEMENT ✓ITH 30" HDPE CULVERT END TREATMENT DIMENSIONS D L W THICK. GAUGE 30" 6'-8" 3'-0" 16 MIN. ISOMETRIC VIEW PIPE 4„ D 6" MAX. ` J 6" TOE PLATE I- W -I END VIEW NOTE: PREFABRICATED STEEL END SECTION AND ALL PARTS WILL MEET THE REQUIREMENTS OF AASHTO M-218 PIPE FITTING REQUIRED TO SECURELY HOLD SECTION PLAN VIEW 1 STEEL END SECTION SCALE: NTS 830 M EXISTING GRADE 18" CM CULVE PROPOSED 30" HDPE CENTERLINE OF PROPOSED ROADWAY CROSS SECTION SECTION AR005-AR005 HORIZ. SCALE: 1" = 20.00' VERT. SCALE" 1" = 5.00' LO CV 00Qj`Z� _ \ 30"O 7E IE 817.! CP �s � 0 --�,29 830 STREAM 20 837 --- 83 `-- -- 834 836 1 \ EXISTING UNIMPROVED ROADWAY 830 823 827 1 pT1+76 � 1 i 1 eb�825 1 � 82S 826 ��g25 A LF " HDPE (PROPOSED) 823 822 RO .2 0+53.17 30" 1 W) IE = 814.75 821 820 820-i INSTALL FLARED END 2.1- "� SECTION PER DETAIL g19� 1, THIS SHEET (TYP). 820 CONTRACTOR SHALL ^818 21 LF XI ORIENTATE n - STRUCTURE TO 61 U/S NV: 817.33 DISCHARGE INTO THE S INV: 816.19 EXISTING DEFINED 2 60 41 STREAM THALWEG. 8 879 d, o `\ 823 001 v 8 AR -005 CULVERT REPLACEMENT PLAN VIEW 830 830 820 820 SCALE IN FEET 0 20 40 0 ti II STA +38.95, EL 824.62 - Ln M U DATE r r o0 000 w DESCRIPTION APPROVALS CV � Z + �'� DUKE � Piedmont � ENERGY.:: Natural Gas COPYRIGHT 2018 0 2Q- STA 0+22.66, EL 8 24.62C) A 10/16/2018 30% SUBMITTAL DRG 30- CXR % 2331 DATE - INITIALS N/A REGIONAL ENGINEER B 12/10/2018 60% SUBMITTAL DRG EH M0 ACCOUNT NUMBER Cfl (D 00 0+00 PROFILE HORIZ. SCALE: 1" = 20.00' VERT. SCALE" 1" = 5.00' 0+50 830 820 CONSTRUCTION NOTES 1. WORK SHALL INCLUDE THE REPLACEMENT OF AN EXISTING 18" CMP CULVERT WITH ANEW 30" ADS N12 HDPE (O.A.E.) CULVERT. 2. PRIOR TO REMOVAL OF EXISTING CULVERT, INSTALL COFFER DAM AND PUMP AROUND PER DETAIL ES -2 SHEET C-330-0001034. 3. LIMIT DISTURBANCE OF EXISTING STREAM TO FIFTEEN (15) FEET UPSTREAM AND DOWNSTREAM OF THE PROPOSED GRADING LIMITS DEPICTED HEREON. 4. PROPOSED CULVERT SHALL BE EMBEDDED 12-18" BELOW THE EXISTING STREAM THALWEG AS SHOWN HEREON. 5. CONTRACTOR SHALL PROVIDE ANCILLARY LINEAR EROSION AND SEDIMENT CONTROL DEVICES SUCH AS SILT FENCE OR COMPOST FILTER SOCK AT THE STREAM TOP OF BANKS TO PRECLUDE THE DEPOSITION OF ANY SEDIMENT INTO THE EXISTING STREAM DURING CONSTRUCTION. z - PROPRIETARY &CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095) *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS &INFO. MANAGEMENT (RIM) POLICY 1001 - - - �' a PROFESSIONALENG/ARCHSTAMP NO. DATE REVISIONS) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS �'� DUKE � Piedmont � ENERGY.:: Natural Gas COPYRIGHT 2018 PLEASANT GARDEN ROAD 12" L00 P I N G PROJECT AR -005 DETAILS TOWN OF PLEASANT GARDEN NORTH CAROLINA � GREENSBORO RESOURCE CENTER, NORTH CAROLINA SHEETS DWG SCALE AS SHOWN � ) DWG DATE 10/1612018 SUPERSEDED A 10/16/2018 30% SUBMITTAL DRG EH CXR AREA CODE 2331 DATE - INITIALS N/A REGIONAL ENGINEER B 12/10/2018 60% SUBMITTAL DRG EH CXR ACCOUNT NUMBER 10700 C 02/01/2019 90% SUBMITTAL DRG KAO CXR PROJECT NUMBER 0214646 DATE INITIALS N/A MGR TECH REC&STD DRAWING NUMBER PNG C-330-0001041 REVISION D D 05/17/2019 ISSUE FOR BID DRG JSW CXR DRAWING BY DRG STATION ID 2-TR-GBO-6118 DATE INITIALS N/A PRINCIPAL ENGINEER CHECKER INITIALS JSW CIVIL /GREENSBORO /LINE 330 EXTENSION