HomeMy WebLinkAbout20190418 Ver 1_Other Agency Correspondence_20190503Strickland, Bev
From: King, Melissa
Sent: Friday, May 03, 2019 10:50 AM
To: Eller, George; Vinson, Toby; Aiken, Stan E
Cc: Annino, Amy M
Subject: FW: [External] Lady Marion Dam - Interim Plan
Attachments: MARION PH 3.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Everyone
As I read the DSO, {"The reservoir shall be maintained in a totally drained condition that prevents discharge of sediment
until repair, alteration, reconstruction or breaching is accomplished pursuant to plans and specifications developed by a
licensed engineer and approved by Danny Smith, Director, Division of Energy, Mineral, and Land Resources."] this plan
must be approved by Dam Safety prior to their work. Therefore, it is being forwarded to you all for review. Please let us
know who to send comments to - will it be Sue?
Also, recall the DSO includes the following:
The dam owners shall within 91 days of the issuance of this order, submit to this office plans, specifications, and
supporting data developed by a professional engineer for the necessary maintenance, repair, alteration, or
reconstruction to this dam or for the breach of this dam in such a manner that will preclude the washing of sediment
downstream.
And the 91 days (from January 24th) ended April 25th _
Thanks
Melissa
ESSE QUAM VIDERI
Melissa J. King, PE - Melissa.King@ncdenr.gov
North Carolina Dept. of Environmental Quality
Asheville Regional Office
Division of Energy, Mineral and Land Resources - Land Quality
2090 U.S. 70 Highway
Swannanoa, NC 28778
Tel: 828-296-4500
Fax: 828-299-7043
Notice: E-mail correspondence to and from this address may be subject to the North Carolina
Public Records Law and therefore may be disclosed to third parties.
From: Chris Stahl <cstahl@smeinc.com>
Sent: Thursday, May 02, 2019 12:47 PM
To: King, Melissa <Melissa.King@ncdenr.gov>
Subject: [External] Lady Marion Dam - Interim Plan
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
1
Melissa,
Please find attached an interim plan to develop a dewatering pipe for the Lady Marion reservoir. The reservoir levels are
decreasing and we would like to implement the next stage of the dewatering plan. NCDEQ-Water Quality and ACOE
have been notified of the fill placement within the reservoir. Please note that the owner is planning to permanently
dewater the facility and restore the reservoir to a stream and overflow wetlands.
Thank you,
Chris
Christopher J.L. Stahl, P.E.
Principal Engineer/Area Manager
This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender
by reply and delete this electronic message and any attachments. Please consider the environment before printing this email.
S&ME
•
9751 Southern Pine Blvd.
Charlotte, NC 28273 map
0:704.523.4726
111
E
M: 717.329.0529
www.smeinc.com
BUILT POR
Linkedln I Twitter I Facebook
veRSAYItPYr
This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender
by reply and delete this electronic message and any attachments. Please consider the environment before printing this email.
=0
III
d
d
J
Q
laj
EXTEND BLANKET A MINIMUM OF 3'-0"
OVER CREST OF SLOPE.
TRENCHING NEEDED IF A MINIMUM
_ OF T-0" IS NOT AVAILABLE AT THE -
_� CREST OF SLOPE
FOR SIDE SEAM ABUTMENT
SO,
� (MiNI
Pow
TOP OF SLOPE
9751 SOUTHERN PINE BLVD
Q , CHARLOTTE. NC 28273
/ v 8 Dz/Y NON -WOVEN , FOR END ROLL (704) 523-4726
ENGINEERING FIRM
GEOTEXTILE _ 1' (MIN.) _� OVERLAP, 4 -INCHES LICENSE NUMBER: F-0176
OVERLAP SIDE SEAM 4 -INCHES
CULVERT
(IF NEEDED, BASED ON I BLANKET TO EXTEND A
MINIMUM OF 3 FOOT
FIELD CONDITIONS) GRAVEL 6" DEPTH BEYOND TOE OF SLOPE.
SECTION A -A'
2 TO 3 -INCH WASHED STONE UNDERLAIN FOR BOTTOM OF SLOPE
BY 8 °Z/sv NON -WOVEN GEDTEXTILE TERMINATION
TEMPORARY MATTING [SLOPES] NOTES:
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT NOTES: 6. CONSECUTIVE TEMPORARY MATTING SPLICED DOWN THE SLOPE MUST BE
1. PLACE 8 °z/sY NON -WOVEN GEOTEXTILE BENEATH STONE. 1. TEMPORARY MATTING INSTALLED ON SLOPES IN UPLAND AREAS SHALL BE PLACED END OVER END {SHINGLE STYLE] WITH A MINIMUM 4 -INCH
NAG B10NET S150BN OR ENGINEER APPROVED EQUIVALENT. MATTING OVERLAP. STAPLE THROUGH OVERLAPPED AREA PER THE MANUFACTURERS
2, IF ROADSIDE CHANNEL IS PRESENT, CONTRACTOR SHALL INSTALL A TEMPORARY CULVERT SUFFICIENT TO ADEQUATELY CONVEY STORMWATER INSTALLED ON COFFER DAM SLOPE AREA SHALL BE NAG BIONET C70OBN SPECIFICATIONS.
FLOW. CONTRACTOR SHALL FIELD VERIFY AND DETERMINE APPROPRIATE CULVERT TO BE USED. CONTRACTOR SHALL INSTALL WATTLES WITHIN OR ENGINEER APPROVED EQUIVALENT.
ROADSIDE CHANNEL AT THE DOWNSTREAM PORTION OF THE DISTURBED AREA. BASED ON CONDITIONS IN THE FIELD, AN ENERGY DISSIPATER 7, IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS
MAY BE INSTALLED AT THE DOWNSTREAM PORTION OF THE CULVERT, AS WARRANTED. 2. PREPARE SOIL BEFORE INSTALLING TEMPORARY MATTING, INCLUDING ANY GREATER THAN 6 -INCH MAY BE NECESSARY TO PROPERLY SECURE THE
NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. TEMPORARY MATTING.
3. DIMENSIONS OF CONSTRUCTION ENTRANCE MAY HAVE TO BE ALTERED BASED ON CONDITIONS IN THE FIELD.
3, BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE TEMPORARY *TEMPORARY MATTING {SLOPES} MAINTENANCE NOTES:
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT MAINTENANCE NOTES: MATTING IN A 6 -INCH DEEP X 6 -INCH WIDE TRENCH WITH APPROXIMATELY 1. INSPECT TEMPORARY MATTING AT LEAST WEEKLY AND AFTER EACH
1. INSPECT CONSTRUCTION ENTRANCES AT LEAST WEEKLY AND AFTER EACH RAINFALL EVENT THAT EXCEEDS 0.5 INCHES WITHIN A 24 HOUR 12 -INCH OF TEMPORARY MATTING EXTENDED BEYOND THE UP-SLOPE RAINFALL EVENT THAT EXCEEDS 0.5 INCHES WITHIN A 24 HOUR PERIOD.
PERIOD AND MAKE ANY REQUIRED REPAIRS IMMEDIATELY. DURING PERIODS OF HEAVY USE THE CONSTRUCTION ENTRANCE SHOULD BE PORTION OF THE TRENCH. ANCHOR THE TEMPORARY MATTING WITH A
INSPECTED MORE FREQUENTLY. ROW OF STAPLES/STAKES AS PER THE MANUFACTURERS SPECIFICATIONS. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION
BACKFILL THE TRENCH AFTER STAPLING. APPLY SEED TO SURFACE AND MUST NOT OCCUR BENEATH THE TEMPORARY MATTING.
2. THE ENTRANCE WILL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO EXISTING ROADWAYS. FOLD REMAINING 12 -INCH PORTION OF TEMPORARY MATTING BACK OVER
SEDIMENT TRACKED, SPILLED, DROPPED OR OTHERWISE DEPOSITED ONTO ROADWAYS WILL BE SWEPT UP AS SOON AS PRACTICAL AND PLACED SEED AND COMPACTED SOIL. SECURE TEMPORARY MATTING OVER 3. ANY AREAS OF THE TEMPORARY MATTING THAT ARE DAMAGED OR NOT IN
BACK WITHIN THE APPROVED DISTURBED AREA. COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED PER THE CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED.
MANUFACTURERS SPECIFICATIONS..
3. IF EXCESS SEDIMENT HAS CLOGGED THE PAD, THE ENTRANCE WILL BE TOPDRESSED WITH NEW STONEAS NEEDED. REPLACEMENT OF THE 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE
ENTIRE PAD MAY BECOME NECESSARY WHEN THE PAD BECOMES ENTIRELY FILLED WITH SEDIMENT AND MUD. 4. ROLL THE TEMPORARY MATTING DOWN OR HORIZONTALLY ACROSS THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED.
SLOPE. TEMPORARY MATTING WILL UNROLL WITH APPROPRIATE SIDE
4. THE CONSTRUCTION ENTRANCE AND CULVERT (IF PRESENT), WILL BE REMOVED WHEN CONSTRUCTION ACTIVITIES CEASE ON THE PROJECT. THE AGAINST THE SOIL SURFACE. ALL TEMPORARY MATTING MUST BE SECURELY 5. MONITOR AND REPAIR THE TEMPORARY MATTING AS NECESSARY UNTIL
REMOVED STONE AND SEDIMENT FROM THE ENTRANCE WILL BE HAULED OFF-SITE AND DISPOSED OF PROPERLY. FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE GROUND COVER IS ESTABLISHED.
LOCATIONS AS PER THE MANUFACTURERS SPECIFICATIONS.
5. UPON REMOVAL OF THE CONSTRUCTION ENTRANCE, THE CONTRACTOR SHALL BRING THE AREA TO ORIGINAL GRADE AND STABILIZE IT. IF A *REF: NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN
TEMPORARY CULVERT WAS UTILIZED IN CONJUNCTION WITH THE CONSTRUCTION ENTRANCE, THE CONTRACTOR SHALL INSTALL TEMPORARY S. THE EDGES OF PARALLEL TEMPORARY MATTING MUST BE STAPLED WITH A MANUAL, CHAPTERS 6 AND 8 REVISED, MAY 2013
MATTING AND/OR WATTLES WITHIN ROADSIDE CHANNEL UPON REMOVAL OF THE CULVERT, AS NEEDED, BASED ON CONDITIONS IN THE FIELD. MINIMUM 4 -INCH OVERLAP.
1 CONSTRUCTION ENTRANCE 2 TYPICAL SLOPES MATTING
2 SCALE: N.TS.
2 SCALE: N.T.S. >
a
Q
Y
2
u
INSTALLATION SEDIMENT TRAP, ALONG SEAMS, AND WITHIN VOID SPACES; THEREBY FILLING
1. SEDIMENT TRAPS SHALL MEET COMPOST FILTER SOCK (CFS) MATERIAL THE SEAM BETWEEN THE SOIL SURFACE AND THE SED I M ENT TRAP, IMPROVING DISPOSAL/RECYCLING
SPECIFICATIONS, SEDIMENT CONTAINMENT, AND REDUCING UNDERCUTTING POTENTIAL. FILTERMEDIA IS A COMPOSTED ORGANIC PRODUCT RECYCLED AND MANUFACTURED °0
FROM LOCALLY GENERATED ORGANIC, NATURAL, AND BIOLOGICALLY BASED MATERIALS.
2. CONTRACTOR IS REQUIRED TO BE A CERTIFIED INSTALLER AS DETERMINED BY 17. IF THE SEDIMENT TRAP IS TO BE LEFT AS A PERMANENT FILTER OR PART OF THE ONCE ALL SOIL HAS BEEN STABILIZED AND CONSTRUCTION ACTIVITY HAS BEEN
MANUFACTURER. SEDIMENT TRAPS WILL BE PLACED AT LOCATIONS INDICATED NATURAL LANDSCAPE, IT MAY BE SEEDED AT TIME OF INSTALLATION FOR COMPLETED, THE FILTERMEDIA MAY BE DISPERSED WITH A LOADER, RAKE, BULLDOZER OR
ON PLANS AS DIRECTED BY THE ENGINEER. ESTABLISHMENT OF PERMANENT VEGETATION. THE ENGINEER WILL SPECIFY SIMILAR DEVICE AND MAY BE INCORPORATED INTO THE SOIL AS AN AMENDMENT OR
SEED REQUIREMENTS. LEFT ON THE SOIL SURFACE TO AID IN PERMANENT SEEDING OR LANDSCAPING. LEAVING
3. SEDIMENT TRAPS SHALL NOT BE PLACED ON SLOPES, SOFT, OR UNEVEN THE FILTE RMEDIA ON SITE REDUCES REMOVAL AND DISPOSAL COSTS COMPARED TO
GROUND. 18. SEDIMENT TRAPS ARE NOT TO BE USED IN PERENNIAL, EPHEMERAL, OR OTHER SEDIMENT CONTROL DEVICES. THE MESH NETTING MATERIAL WILL BE EXTRACTED
INTERMITTENT STREAMS. FROM THE FILTERMEDIAAND DISPOSED OF PROPERLY BY THE CONTRACTOR. THE z
4, SEDIMENT TRAPS MUST BE INSTALLED ON LEVEL CONTOURS. FIELD PHOTODEGRADABLE MESH NETTING MATERIAL (SOCK) WILL DEGRADE IN 2 TO 5 YEARS IF 0
VERIFICATION WITH LASER LEVEL IS STRONGLY RECOMMENDED. 19. REFER TO INC DEQ EROSION AND SEDIMENT CONTROL MANUAL FIGURE 6.66b LEFT ON SITE. BIODEGRADABLE SOXX MATERIAL IS AVAILABLE AND DOES NOT REQUIRE a
COMPOST SOCK INSTALLATION FOR GUIDANCE. EXTRACTION AND DISPOSAL; IT WILL COMPLETELY DECOMPOSE IN APPROXIMATELY 6 TO
5. SEDIMENT TRAPS SHOULD BE INSTALLED AT THE BASE OF THE DRAINAGE AREA. 12 MONTHS. USING BIODEGRADABLE SOCK COMPLETELY ELIMINATES THE NEED AND W
COST OF REMOVAL AND DISPOSAL.
6. CONCENTRATED FLOWS, CHANNELS, OR DITCHES DIRECTING FLOW INTO COMPOST FILTER SOCK MATERIAL SPECIFICATIONS
SEDIMENT TRAPS SHALL EMPLOY ENERGY FLOW DISSIPATERS PRIOR TO FLOW THE COMPOST MEDIA SHALL BE DERIVED FROM WELL -DECOMPOSED ORGANIC MATTER
CONTACT WITH SOCK OR ENTRY INTO THE SEDIMENT TRAP SYSTEM. SOURCE PRODUCED BY CONTROLLED AEROBIC (BIOLOGICAL) DECOMPOSITION THAT HAS
DISSIPATERS SHALL BE PLACED AT A MINIMUM DISTANCE OF 20 FT (6 M) FROM BEEN SANITIZED THROUGH THE GENERATION OF HEAT AND STABILIZED TO THE POINT
THE BASE COURSE OF THE SEDIMENT TRAP. THAT IT IS APPROPRIATE FOR THIS PARTICULAR APPLICATION. COMPOST MATERIAL
SHALL BE PROCESSED THROUGH PROPER THERMOPHILIC COMPOSTING, MEETING THE US
7, SEDIMENT TRAPS SHALL BE INSTALLED SO THE EFFECTIVE HEIGHT IS AT LEAST 3 ENVIRONMENTAL AGENCY'S DEFINITION FOR A PROCESS TO FURTHER REDUCE
FT (90 CM). PATHOGENS' (PFRP), AS DEFINED UNDER 40 CFR PART 503.
Lu
8. ENDS OF SEDIMENT TRAPS SHALL BE AT LEAST 1 FT (30CM) HIGHER IN PARTI CAL SIZE DISTRIBUTION FOR COMPOST FILTER MATERIAL Q
ELEVATION THAN THE MID-SECTION. THE MID-SECTION SHALL BE THE LOWEST SIEVE SIZE PERCENT PASSING SELECTED SIEVE MESH SIZE, DRY WEIGHT BASIS
POINT OF THE TRAP.
2 -INCH 99% (3 MAXIMUM PARTICLE SIZE)
9, SEDIMENT TRAPS SHALL BE CONSTRUCTED SO THE HORIZONTAL BASE WIDTH IS 3/8 -INCH 30-50%z
AT LEAST EQUIVALENT TO THE EFFECTIVE HEIGHT (1 H:1 V}. S EDI M ENT TRAPS (2) 2"X2"X48+" HARDWOOD STAKES, WRAPPED
SHALL BE INSTALLED SO THAT THE HEIGHT IS MEASURED VERTICALLY NOT TOGETHER WITH 16 GUAGE WIRE, 10' O.C.
ACROSS THE PLANE OF THE SEDIMENT TRAP FACE.
INSPECTION z
10. ADDITIONAL RUNOFF -SEDIMENT STORAGE AREA CAN BE CREATED BY OVER ROUTINE INSPECTION SHOULD BE CONDUCTED WITHIN 24 HRS OF A RUNOFF EVENT OR 2"X2"x36" HARDWOOD STAKE, 10'0.C., STARTING S' Q
EXCAVATING THE AREA IMMEDIATELY UPSLOPE OF THE SEDIMENT TRAP. AS DESIGNATED BY THE REGULATING AUTHORITY. SEDIMENT TRAPS SHOULD BE FROM ANGLED STAKES a
REGULARLY INSPECTED TO MAKE SURE THEY MAINTAIN THEIR SHAPE AND ARE P-+
11. SOCKS THAT ARE SLEEVED TO CREATE LONGER LENGTHS SHALL NOT BE PLACED PRODUCING ADEQUATE HYDRAULIC FLOW THROUGH. IF PONDING BECOMES EXCESSIVE, 24" COMPOST FILTER SOCK (FILTEREXX OR ENGINEER 1:4
IN AREAS OF CONCENTRATED FLOW, AT THE BASE OF CHANNELS/DITCHES, OR ADDITIONAL SEDIMENT TRAPS MAY BE REQUIRED TO REDUCE EFFECTIVE DRAINAGE AREA APPROVED EQUIVALENT) 0-+
AT THE LOW POINT WITH THE SEDIMENT TRAP SYSTEM. OR SEDIMENT REMOVAL MAY BE NECESSARY. SEDIMENT TRAPS SHALL BE INSPECTED 12" ABOVE CFS
MAX WATER LEVEL P-+ W Z
UNTIL AREA ABOVE HAS BEEN PERMANENTLY STABILIZED AND CONSTRUCTION ACTIVITY W _
12. SOCKS THAT ARE SLEEVED TO CREATE LONGER LENGTHS SHALL BE OVERLAPPED HAS CEASED. -i' -i -i J
BY A MINIMUM OF 4 FT (120 CM) AND SHALL BE STAKED WHERE MATERIAL ~
OVER LAPS USING 2 STAKES 2 FT (60 CM) APART. MAINTENANCE 1
1. THE CONTRACTOR SHALL MAINTAIN THE SEDIMENT TRAP IN A FUNCTIONALD W z
13. STAKES SHALL BE INSTALLED THROUGH THE MIDDLE OF THE CFS USING 2 IN CONDITION AT ALL TIMES AND IT SHALL BE ROUTINELY INSPECTED. Z W4
(SO MM) BY 2 IN (SOMM) BY 3 FT {1 M) WOODEN HARDWOOD STAKES ON 10 FT 2. IF THE SEDIMENT TRAP HAS BEEN DAMAGED, IT SHALL BE REPAIRED, OR WLn O
(3M) CENTERS; 5 FT (1.5 M) ON CENTER STAKING MAY BE USED TO INCREASE REPLACED IF BEYOND REPAIR.
STABILITY. STAKES SHALL BE PLACED IN A PYRAMID CONFIGURATION 3. THE CONTRACTOR SHALL REMOVE SEDIMENT AT THE BASE OF THE UPSLOPE a z
PERPENDICULAR TO SOCKS WHERE STAKES CROSS AT THE APEX OF THE SIDE OF THE SEDIMENT TRAP WHEN ACCUMULATION HAS REACHED 1/2 OF THE Q 0
SEDIMENT TRAP. STAKES SHALL BE 101NED AND SECURED WITH WIRE WRAPPING EFFECTIVE HEIGHT OF THE SEDIMENT TRAP, OR AS DIRECTED BY THE ENGINEER. 12" MIN. W
AT APEX USING 16 GAUGE OR MULTI -STRAND 20 GAUGE WIRE ALLOWING 12 IN ALTERNATIVELY, A NEW SOCK CAN BE PLACED ON TOP OF THE ORIGINAL
(30CM) OF STAKE ABOVE THE SOCK. ALL BASE LAYERS SHALL BE STAKED ON S FT STRUCTURE CREATING MORE SEDIMENT STORAGE CAPACITY WITHOUT SOIL Q W
(1.5 M) CENTERS. ALL BASE LAYERS SHALL BE STAKED ON 5 FT (1.5 M) CENTERS; DISTURBANCE. " Q
PLACED OPPOSITE THE PYRAMID STAKING; WHERE STAKING IS PRESENT EVERY 4. SEDIMENT TRAPS SHALL BE MAINTAINED UNTIL DISTURBED AREA ABOVE THE �
2.5 FT (0.75 M). HALF INCH (12.5 MM) REBAR MAY ALSO BE USED WHEN DEVICE HAS BEEN PERMANENTLY STABILIZED AND CONSTRUCTION ACTIVITY W
GROUND IS FROZEN OR EXTREMELY COMPACTED. HAS CEASED. H
5. THE FILTER MEDIA WILL BE DISPERSED ON SITE ONCE DISTURBED AREA HAS
14. STAKING DEPTH FOR ALL SOIL TYPES SHALL BE MINIMUM 12 IN (300MM) INTO BEEN PERMANENTLY STABILIZED, CONSTRUCTION ACTIVITY HAS CEASED, ORAS �--i
NATIVE SOIL. DETERMINED BY THE ENGINEER.
6. FOR LONG-TERM SEDIMENT AND POLLUTION CONTROL APPLICATIONS,
15. CFS TO RECEIVE ADDITIONAL LAYERS SHALL BE SLIGHTLY COMPACTED AND SEDIMENT TRAPS CAN BE SEEDED AT THE TIME OF INSTALLATION TO CREATE A PROJECT NUMBER
LEVELED. VEGETATIVE FILTERING SYSTEM FOR PROLONGED AND INCREASED FILTRATION
OF SEDIMENT AND SOLUBLE POLLUTANTS (CONTAINED VEGETATIVE FILTER 7335-19-008
16. LOOSE FILTERMEDIA SHALL BE BACKFILLED ALONG THE UPSLOPE SIDE OF THE STRIP). THE APPROPRIATE SEED MIX SHALL BE DETERMINED BY THE ENGINEER. DRAWING NUMBER
3 CFS SEDIMENT TRAP A
z SCALE:N.T.S. L
GENERAL SEEDING SPECIFICATIONS
DEFINITION
CONTROLLING RUNOFF AND EROSION ON DISTURBED AREAS BY ESTABLISHING PERENNIAL
VEGETATIVE COVER WITH SEED.
PURPOSE
TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS, AND TO
PERMANENTLY STABILIZE SUCH AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTS TO SITE
CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS.
SPECIFICATIONS
SEEDBED REQUIREMENTS
ESTABLISHMENT OF VEGETATION SHOULD NOT BE ATTEMPTED ON SITES THAT ARE
UNSUITABLE DUE TO EXCESSIVE SOIL COMPACTION, INAPPROPRIATE SOIL TEXTURE, POOR
DRAINAGE, CONCENTRATED OVERLAND FLOW, OR STEEPNESS OF SLOPE UNTIL MEASURES
HAVE BEEN TAKEN TO CORRECT THESE PROBLEMS.
TO MAINTAIN A GOOD STAND OF VEGETATION, THE SOIL MUST MEET CERTAIN MINIMUM
REQUIREMENTS AS A GROWTH MEDIUM. THE EXISTING SOIL SHOULD HAVE THESE CRITERIA:
• ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE
AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST .05 INCHES WATER
TO 1 INCH OF SOIL).
■ SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION.
• SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE DEPTH TO
ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE 12 INCHES OR MORE,
EXCEPT ON SLOPES STEEPER THAN 2.1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE.
■ A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0 - 6.5.
• FREE FROM LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR TRASH OF
ANY KIND. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY
ARE TO BE HYDRO SEEDED.
IF ANY OF THE ABOVE CRITERIA ARE NOT MET - I.E., IF EXISTING SOIL IS TOO COARSE, DENSE,
SHALLOW OR ACIDIC TO FOSTER VEGETATION - SPECIAL AMENDMENTS ARE REQUIRED. THE
SOIL CONDITIONERS DESCRIBED BELOW MAY BE BENEFICIAL OR, PREFERABLY, TOPSOIL MAY
BE APPLIED.
SEEDBED PREPARATION
INSTALL NECESSARY MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES
BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED PLAN.
LIME AND FERTILIZER NEEDS SHOULD BE DETERMINED BY SOIL TESTS. DIRECTIONS, SAMPLE
CARTONS, AND INFORMATION SHEETS ARE AVAILABLE THROUGH COUNTY AGRICULTURAL
EXTENSION OFFICES. TESTING IS ALSO DONE BY COMMERCIAL LABORATORIES.
WHEN SOIL TESTS RESULTS ARE NOT AVAILABLE, FOLLOW RATES SUGGESTED IN THE
SEEDING SPECIFICATIONS SHOWN BELOW. APPLICATION RATES USUALLY FALL INTO THE
FOLLOWING RANGES:
• GROUND AGRICULTURAL LIMESTONE:
LIGHT -TEXTURED, SANDY SOILS: 1 TO 1-112 TONSIACRE
HEAVY -TEXTURED. CLAYEY SOILS: 2-3 TONS/ACRE
■ FERTILIZER:
GRASSES: 800-1200 LB/ACRE OF 10-10-10 (OR THE EQUIVALENT)
GRASS -LEGUME MIXTURES: 800-1200 LB/ACRE OF 5-10-10 (OR THE EQUIVALENT)
APPLY LIME AND FERTILIZER EVENLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL
BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE CONTOUR. WHEN
USING A HYDRO SEEDER, APPLY LIME AND FERTILIZER TO A ROUGH, LOOSE SURFACE.
:1f111e3:I:1ii6ill;;UUT41:92uVisl i[6)6y:1 =19]LLei
COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A
SMOOTH, UNIFORM SURFACE (SLOPES LESS THAN 3:1). FILL IN OR LEVEL DEPRESSIONS
THAT CAN COLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT
HAS NOT BEEN SEALED BY RAINFALL.
SEEDING
SEEDING DATES GIVEN IN THE SEEDING MIXTURE SPECIFICATIONS ARE DESIGNATED AS
"BEST" OR "POSSIBLE". SEEDINGS PROPERLY CARRIED OUT WITHIN THE "BEST" DATES HAVE
A HIGH PROBABILITY OF SUCCESS. IT IS ALSO POSSIBLE TO HAVE SATISFACTORY
ESTABLISHMENT WHEN SEEDING OUTSIDE THESE DATES. HOWEVER, AS YOU DEVIATE FROM
THEM, THE PROBABILITY OF FAILURE INCREASES RAPIDLY. SEEDING ON THE LAST DATE
SHOWN UNDER "POSSIBLE" MAY REDUCE CHANGES OF SUCCESS BY 30-50%. ALWAYS TAKE
THIS INTO ACCOUNT IN SCHEDULING LAND -DISTURBING ACTIVITIES.
USE CERTIFIED SEED FOR PERMANENT SEEDING WHENEVER POSSIBLE.
LABELING OF NON -CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAIN
IMPORTANT INFORMATION ON SEED PURITY, GERMINATION, AND PRESENCE OF WOOD
SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUS WEEDS. DO NO
ACCEPT SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED.
INOCULATE LEGUME SEED WITH THE RHIZOBIUM BACTERIA APPROPRIATE TO THE SPECIES
OF LEGUME.
APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, DRILL,
CULTIPACKER SEEDER, OR HYDRO SEEDER ON A FIRM, FRIABLE SEEDBED.
WHEN USING A DRILL OR CULTIPACKER SEEDER, PLANT SMALL GRAINS NO MORE THAN 1
INCH DEEP, GRASSES AND LEGUMES NO MORE THAN 112 INCH. EQUIPMENT SHOULD BE
CALIBRATED IN THE FIELD FOR THE DESIRED SEEDING RATE.
WHEN USING BROADCAST -SEEDING METHODS, SUBDIVIDE THE AREA INTO WORKABLE
SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY
ONE-HALF THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA, MAKING A
UNIFORM PATTERN: THEN APPLY THE SECOND HALF IN THE SAME WAY, BUT MOVING AT
RIGHT ANGLES TO THE FIRST PASS.
MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING.
HYDRO SEEDING
SURFACE ROUGHENING IS PARTICULARLY IMPORTANT WHEN HYDRO SEEDING, AS A
ROUGHENED SLOPE WILL PROVIDE SOME NATURAL COVERAGE FOR LIME, FERTILIZER, AND
SEED. THE SURFACE SHOULD NOT BE COMPACTED OR SMOOTH. FINE SEEDBED
PREPARATION IS NOT NECESSARY FOR HYDRO SEEDING OPERATIONS: LARGE CLODS,
STONES, AND IRREGULARITIES PROVIDE CAVITIES IN WHICH SEEDS CAN LODGE.
RATE OF WOOD FIBER (CELLULOSE) APPLICATION SHOULD BE AT LEAST 4,000 LBIACRE.
APPLY LEGUME INOCULANTS AT FOUR TIMES THE RECOMMENDED RATE WHEN ADDING
INOCULANT TO A HYDRO SEEDER SLURRY.
IF A MACHINERY BREAKDOWN OF 112 TO 2 HOURS OCCURS, ADD 50% MORE SEED TO THE
TANK, BASED ON THE PROPORTION OF THE SLURRY REMAINING. THIS SHOULD COMPENSATE
FOR DAMAGE TO SEED. BEYOND 2 HOURS, A FULL RATE OF NEW SEED MAY BE NECESSARY.
LIME IS NOT NORMALLY APPLIED WITH A HYDRAULIC SEEDER BECAUSE IT IS ABRASIVE. IT
CAN BE BLOWN ONTO STEEP SLOPES IN DRY FORM.
IF, Fill I'Llri:RlFill r.l:�
GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED
UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT
SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE
SAME SEASON, IF POSSIBLE.
RESEEDING --IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT
MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER
SEEDBED PREPARATION OR OVER- SEED THE STAND. CONSIDER SEEDING TEMPORARY,
ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING.
IF VEGETATION FAILS TO GROW, SOIL MUST BE TESTED TO DETERMINE IF ACIDITY OR
NUTRIENT IMBALANCE IS RESPONSIBLE.
FERTILIZATION --ON THE TYPICAL DISTURBED SITE, FULL ESTABLISHMENT USUALLY
REQUIRES RE -FERTILIZATION IN THE SECOND GROWING SEASON. FINE TURF REQUIRES
ANNUAL MAINTENANCE FERTILIZATION. USE SOIL TESTS IF POSSIBLE OR FOLLOW THE
GUIDELINES GIVEN FOR THE SPECIFIC SEEDING MIXTURE.
REFERENCE: 6.11 NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL,
AUGUST 2011.
TEMPORARY UPLAND SEEDING SPECIFICATIONS
SEEDING MIXTURE
SEEDING MIXTURE
COMMON NAME
APPLICATION RATE
SEEDING DATES
(SPECIES)
(LBS/ACRE)
FALL
RYE GRAIN
125
(AUG. 15 to DEC. 30)
(SECALE CEREALE)
RYE GRAIN
EARLY SPRING
RYE GRAIN
NURSE CROPS
(JAN. 11 TO MAY 1)
(SECALE CEREALE)
125
SEEDING DATES
ANNUAL RYE
50
SUMMER
GERMAN MILLET
(MAY 1 TO AUG. 15)
(SETARIA ITALICA)
50
SOIL AMENDMENTS
SUDAN GRASS
APPLICATION RATE
NOTE
AMENDMENT
(LBS/ACRE)
FOLLOW RECOMMENDATIONS OF
GROUND AGRICULTURAL
2,000
SOIL TESTS OR APPLY BOTH.
LIMESTONE
AFTER AUG. 15
(SECALE CEREALE)
10-10-10 FERTILIZER
1,000
LIMESTONE APPLIED AT A MINIMUM OF 2 TONS/ACRE WITH 3 TON SIACRE IN CLAY SOILS
OR PER SOILS TEST.
MULCH
NOTE
AMENDMENT
APPLICATION RATE
NOTE
MULCH
(LBS/ACRE)
APPLY BY ROVING, NETTING, OR
GRAIN STRAW
4,000
ASPHALT TACKING AT 400 GAL/AC.
10-10-10 FERTILIZER
1,000
MAINTENANCE
RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH
IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE.
GROUND STABILIZATION SHALL BE PERFORMED PER "STABILIZATION TIME FRAMES"
CHART OR AS OTHERWISE SPECIFIED FOR SAFETY REASONS.
PERMANENT UPLAND SEEDING SPECIFICATIONS
SEEDING MIXTURE
APPLICATION RATE
SEEDING DATES
COMMON NAME
(LBS/ACRE)
SEP. 1 TO APR. 15
KY 31 TALL FESCUE
150
SEP, 1 TO APR. 15
RYE GRAIN
50
NURSE CROPS
COMMON NAME
APPLICATION RATE
SEEDING DATES
(SPECIES)
(LBS /ACRE )
GERMAN MILLET
MAY 1 TO AUG. 15
(SETARIA ITALICA)
50
SUDAN GRASS
MAY 1 TO AUG. 15
(SORGHUM SACCHARATUM)
15
(S. BICOLOR SSP. DRUMMONDI)
PRIOR TO MAY 1 OR
RYE GRAIN
40
AFTER AUG. 15
(SECALE CEREALE)
SOIL AMENDMENTS
APPLICATION RATE
NOTE
AMENDMENT
(LBS/ACRE)
FOLLOW RECOMMENDATIONS OF
GROUND AGRICULTURAL
2,000
SOIL TESTS OR APPLY BOTH.
LIMESTONE
10-10-10 FERTILIZER
1,000
MULCH
APPLICATION RATE
NOTE
MULCH
(LBS/ACRE)
APPLY BY ROVING, NETTING, OR
ASPHALT TACKING AT 400
GRAIN STRAW
4,000
GALIAC,
MAINTENANCE
RE -FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BE
MOWED ONCE OR TWICE A YEAR, BUT MOWING IS NOT NECESSARY. RESEED,
FERTILIZE, AND MULCH DAMAGED
AREAS IMMEDIATELY.
GROUND STABILIZATION SHALL BE PERFORMED PER "STABILIZATION TIME FRAMES"
CHART OR AS OTHERWISE SPECIFIED FOR SAFETY REASONS.
STABILIZATION
TIME FRAMES
(EFFECTIVE
AUG. 3, 2011)
SITE AREA
STABILIZATION
TIMEFRAME EXCEPTIONS
DESCRIPTION
PERIMETER DIKES, SWALES,
DITCHES, SLOPES
7 DAYS
NONE
HIGH QUALITY WATER
(HOW)ZONES
7 DAYS
NONE
IF SLOPES ARE 10' OR LESS IN
SLOPES STEEPER THAN 3:1
7 DAYS
LENGTH AND ARE NOT STEEPER
THAN 2:1,14 DAYS ARE ALLOWED.
SLOPES 3:1 OR FLATTER
14 DAYS
7 DAYS FOR SLOPES GREATER THAN
50' IN LENGTH.
ALL OTHER AREAS WITH
14 DAYS
NONE, EXCEPT FOR PERIMETERS
SLOPES FLATTER THAN 4:1
AND HQW ZONES.
9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704)523-4726
ENGINEERING FIRM
LICENSE NUMBER: F-0176
i�
PROJECT NUMBER
7335-19-008
DRAWING NUMBER
3 3
x
u
co
m
a
UP
W
a
W
0
d
z