HomeMy WebLinkAbout20190418 Ver 1_Other Agency Correspondence_20190503Strickland, Bev From: King, Melissa Sent: Friday, May 03, 2019 10:50 AM To: Eller, George; Vinson, Toby; Aiken, Stan E Cc: Annino, Amy M Subject: FW: [External] Lady Marion Dam - Interim Plan Attachments: MARION PH 3.pdf Follow Up Flag: Follow up Flag Status: Flagged Everyone As I read the DSO, {"The reservoir shall be maintained in a totally drained condition that prevents discharge of sediment until repair, alteration, reconstruction or breaching is accomplished pursuant to plans and specifications developed by a licensed engineer and approved by Danny Smith, Director, Division of Energy, Mineral, and Land Resources."] this plan must be approved by Dam Safety prior to their work. Therefore, it is being forwarded to you all for review. Please let us know who to send comments to - will it be Sue? Also, recall the DSO includes the following: The dam owners shall within 91 days of the issuance of this order, submit to this office plans, specifications, and supporting data developed by a professional engineer for the necessary maintenance, repair, alteration, or reconstruction to this dam or for the breach of this dam in such a manner that will preclude the washing of sediment downstream. And the 91 days (from January 24th) ended April 25th _ Thanks Melissa ESSE QUAM VIDERI Melissa J. King, PE - Melissa.King@ncdenr.gov North Carolina Dept. of Environmental Quality Asheville Regional Office Division of Energy, Mineral and Land Resources - Land Quality 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties. From: Chris Stahl <cstahl@smeinc.com> Sent: Thursday, May 02, 2019 12:47 PM To: King, Melissa <Melissa.King@ncdenr.gov> Subject: [External] Lady Marion Dam - Interim Plan External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov 1 Melissa, Please find attached an interim plan to develop a dewatering pipe for the Lady Marion reservoir. The reservoir levels are decreasing and we would like to implement the next stage of the dewatering plan. NCDEQ-Water Quality and ACOE have been notified of the fill placement within the reservoir. Please note that the owner is planning to permanently dewater the facility and restore the reservoir to a stream and overflow wetlands. Thank you, Chris Christopher J.L. Stahl, P.E. Principal Engineer/Area Manager This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. S&ME • 9751 Southern Pine Blvd. Charlotte, NC 28273 map 0:704.523.4726 111 E M: 717.329.0529 www.smeinc.com BUILT POR Linkedln I Twitter I Facebook veRSAYItPYr This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. =0 III d d J Q laj EXTEND BLANKET A MINIMUM OF 3'-0" OVER CREST OF SLOPE. TRENCHING NEEDED IF A MINIMUM _ OF T-0" IS NOT AVAILABLE AT THE - _� CREST OF SLOPE FOR SIDE SEAM ABUTMENT SO, � (MiNI Pow TOP OF SLOPE 9751 SOUTHERN PINE BLVD Q , CHARLOTTE. NC 28273 / v 8 Dz/Y NON -WOVEN , FOR END ROLL (704) 523-4726 ENGINEERING FIRM GEOTEXTILE _ 1' (MIN.) _� OVERLAP, 4 -INCHES LICENSE NUMBER: F-0176 OVERLAP SIDE SEAM 4 -INCHES CULVERT (IF NEEDED, BASED ON I BLANKET TO EXTEND A MINIMUM OF 3 FOOT FIELD CONDITIONS) GRAVEL 6" DEPTH BEYOND TOE OF SLOPE. SECTION A -A' 2 TO 3 -INCH WASHED STONE UNDERLAIN FOR BOTTOM OF SLOPE BY 8 °Z/sv NON -WOVEN GEDTEXTILE TERMINATION TEMPORARY MATTING [SLOPES] NOTES: TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT NOTES: 6. CONSECUTIVE TEMPORARY MATTING SPLICED DOWN THE SLOPE MUST BE 1. PLACE 8 °z/sY NON -WOVEN GEOTEXTILE BENEATH STONE. 1. TEMPORARY MATTING INSTALLED ON SLOPES IN UPLAND AREAS SHALL BE PLACED END OVER END {SHINGLE STYLE] WITH A MINIMUM 4 -INCH NAG B10NET S150BN OR ENGINEER APPROVED EQUIVALENT. MATTING OVERLAP. STAPLE THROUGH OVERLAPPED AREA PER THE MANUFACTURERS 2, IF ROADSIDE CHANNEL IS PRESENT, CONTRACTOR SHALL INSTALL A TEMPORARY CULVERT SUFFICIENT TO ADEQUATELY CONVEY STORMWATER INSTALLED ON COFFER DAM SLOPE AREA SHALL BE NAG BIONET C70OBN SPECIFICATIONS. FLOW. CONTRACTOR SHALL FIELD VERIFY AND DETERMINE APPROPRIATE CULVERT TO BE USED. CONTRACTOR SHALL INSTALL WATTLES WITHIN OR ENGINEER APPROVED EQUIVALENT. ROADSIDE CHANNEL AT THE DOWNSTREAM PORTION OF THE DISTURBED AREA. BASED ON CONDITIONS IN THE FIELD, AN ENERGY DISSIPATER 7, IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS MAY BE INSTALLED AT THE DOWNSTREAM PORTION OF THE CULVERT, AS WARRANTED. 2. PREPARE SOIL BEFORE INSTALLING TEMPORARY MATTING, INCLUDING ANY GREATER THAN 6 -INCH MAY BE NECESSARY TO PROPERLY SECURE THE NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. TEMPORARY MATTING. 3. DIMENSIONS OF CONSTRUCTION ENTRANCE MAY HAVE TO BE ALTERED BASED ON CONDITIONS IN THE FIELD. 3, BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE TEMPORARY *TEMPORARY MATTING {SLOPES} MAINTENANCE NOTES: TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT MAINTENANCE NOTES: MATTING IN A 6 -INCH DEEP X 6 -INCH WIDE TRENCH WITH APPROXIMATELY 1. INSPECT TEMPORARY MATTING AT LEAST WEEKLY AND AFTER EACH 1. INSPECT CONSTRUCTION ENTRANCES AT LEAST WEEKLY AND AFTER EACH RAINFALL EVENT THAT EXCEEDS 0.5 INCHES WITHIN A 24 HOUR 12 -INCH OF TEMPORARY MATTING EXTENDED BEYOND THE UP-SLOPE RAINFALL EVENT THAT EXCEEDS 0.5 INCHES WITHIN A 24 HOUR PERIOD. PERIOD AND MAKE ANY REQUIRED REPAIRS IMMEDIATELY. DURING PERIODS OF HEAVY USE THE CONSTRUCTION ENTRANCE SHOULD BE PORTION OF THE TRENCH. ANCHOR THE TEMPORARY MATTING WITH A INSPECTED MORE FREQUENTLY. ROW OF STAPLES/STAKES AS PER THE MANUFACTURERS SPECIFICATIONS. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION BACKFILL THE TRENCH AFTER STAPLING. APPLY SEED TO SURFACE AND MUST NOT OCCUR BENEATH THE TEMPORARY MATTING. 2. THE ENTRANCE WILL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO EXISTING ROADWAYS. FOLD REMAINING 12 -INCH PORTION OF TEMPORARY MATTING BACK OVER SEDIMENT TRACKED, SPILLED, DROPPED OR OTHERWISE DEPOSITED ONTO ROADWAYS WILL BE SWEPT UP AS SOON AS PRACTICAL AND PLACED SEED AND COMPACTED SOIL. SECURE TEMPORARY MATTING OVER 3. ANY AREAS OF THE TEMPORARY MATTING THAT ARE DAMAGED OR NOT IN BACK WITHIN THE APPROVED DISTURBED AREA. COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED PER THE CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. MANUFACTURERS SPECIFICATIONS.. 3. IF EXCESS SEDIMENT HAS CLOGGED THE PAD, THE ENTRANCE WILL BE TOPDRESSED WITH NEW STONEAS NEEDED. REPLACEMENT OF THE 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE ENTIRE PAD MAY BECOME NECESSARY WHEN THE PAD BECOMES ENTIRELY FILLED WITH SEDIMENT AND MUD. 4. ROLL THE TEMPORARY MATTING DOWN OR HORIZONTALLY ACROSS THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. SLOPE. TEMPORARY MATTING WILL UNROLL WITH APPROPRIATE SIDE 4. THE CONSTRUCTION ENTRANCE AND CULVERT (IF PRESENT), WILL BE REMOVED WHEN CONSTRUCTION ACTIVITIES CEASE ON THE PROJECT. THE AGAINST THE SOIL SURFACE. ALL TEMPORARY MATTING MUST BE SECURELY 5. MONITOR AND REPAIR THE TEMPORARY MATTING AS NECESSARY UNTIL REMOVED STONE AND SEDIMENT FROM THE ENTRANCE WILL BE HAULED OFF-SITE AND DISPOSED OF PROPERLY. FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE GROUND COVER IS ESTABLISHED. LOCATIONS AS PER THE MANUFACTURERS SPECIFICATIONS. 5. UPON REMOVAL OF THE CONSTRUCTION ENTRANCE, THE CONTRACTOR SHALL BRING THE AREA TO ORIGINAL GRADE AND STABILIZE IT. IF A *REF: NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN TEMPORARY CULVERT WAS UTILIZED IN CONJUNCTION WITH THE CONSTRUCTION ENTRANCE, THE CONTRACTOR SHALL INSTALL TEMPORARY S. THE EDGES OF PARALLEL TEMPORARY MATTING MUST BE STAPLED WITH A MANUAL, CHAPTERS 6 AND 8 REVISED, MAY 2013 MATTING AND/OR WATTLES WITHIN ROADSIDE CHANNEL UPON REMOVAL OF THE CULVERT, AS NEEDED, BASED ON CONDITIONS IN THE FIELD. MINIMUM 4 -INCH OVERLAP. 1 CONSTRUCTION ENTRANCE 2 TYPICAL SLOPES MATTING 2 SCALE: N.TS. 2 SCALE: N.T.S. > a Q Y 2 u INSTALLATION SEDIMENT TRAP, ALONG SEAMS, AND WITHIN VOID SPACES; THEREBY FILLING 1. SEDIMENT TRAPS SHALL MEET COMPOST FILTER SOCK (CFS) MATERIAL THE SEAM BETWEEN THE SOIL SURFACE AND THE SED I M ENT TRAP, IMPROVING DISPOSAL/RECYCLING SPECIFICATIONS, SEDIMENT CONTAINMENT, AND REDUCING UNDERCUTTING POTENTIAL. FILTERMEDIA IS A COMPOSTED ORGANIC PRODUCT RECYCLED AND MANUFACTURED °0 FROM LOCALLY GENERATED ORGANIC, NATURAL, AND BIOLOGICALLY BASED MATERIALS. 2. CONTRACTOR IS REQUIRED TO BE A CERTIFIED INSTALLER AS DETERMINED BY 17. IF THE SEDIMENT TRAP IS TO BE LEFT AS A PERMANENT FILTER OR PART OF THE ONCE ALL SOIL HAS BEEN STABILIZED AND CONSTRUCTION ACTIVITY HAS BEEN MANUFACTURER. SEDIMENT TRAPS WILL BE PLACED AT LOCATIONS INDICATED NATURAL LANDSCAPE, IT MAY BE SEEDED AT TIME OF INSTALLATION FOR COMPLETED, THE FILTERMEDIA MAY BE DISPERSED WITH A LOADER, RAKE, BULLDOZER OR ON PLANS AS DIRECTED BY THE ENGINEER. ESTABLISHMENT OF PERMANENT VEGETATION. THE ENGINEER WILL SPECIFY SIMILAR DEVICE AND MAY BE INCORPORATED INTO THE SOIL AS AN AMENDMENT OR SEED REQUIREMENTS. LEFT ON THE SOIL SURFACE TO AID IN PERMANENT SEEDING OR LANDSCAPING. LEAVING 3. SEDIMENT TRAPS SHALL NOT BE PLACED ON SLOPES, SOFT, OR UNEVEN THE FILTE RMEDIA ON SITE REDUCES REMOVAL AND DISPOSAL COSTS COMPARED TO GROUND. 18. SEDIMENT TRAPS ARE NOT TO BE USED IN PERENNIAL, EPHEMERAL, OR OTHER SEDIMENT CONTROL DEVICES. THE MESH NETTING MATERIAL WILL BE EXTRACTED INTERMITTENT STREAMS. FROM THE FILTERMEDIAAND DISPOSED OF PROPERLY BY THE CONTRACTOR. THE z 4, SEDIMENT TRAPS MUST BE INSTALLED ON LEVEL CONTOURS. FIELD PHOTODEGRADABLE MESH NETTING MATERIAL (SOCK) WILL DEGRADE IN 2 TO 5 YEARS IF 0 VERIFICATION WITH LASER LEVEL IS STRONGLY RECOMMENDED. 19. REFER TO INC DEQ EROSION AND SEDIMENT CONTROL MANUAL FIGURE 6.66b LEFT ON SITE. BIODEGRADABLE SOXX MATERIAL IS AVAILABLE AND DOES NOT REQUIRE a COMPOST SOCK INSTALLATION FOR GUIDANCE. EXTRACTION AND DISPOSAL; IT WILL COMPLETELY DECOMPOSE IN APPROXIMATELY 6 TO 5. SEDIMENT TRAPS SHOULD BE INSTALLED AT THE BASE OF THE DRAINAGE AREA. 12 MONTHS. USING BIODEGRADABLE SOCK COMPLETELY ELIMINATES THE NEED AND W COST OF REMOVAL AND DISPOSAL. 6. CONCENTRATED FLOWS, CHANNELS, OR DITCHES DIRECTING FLOW INTO COMPOST FILTER SOCK MATERIAL SPECIFICATIONS SEDIMENT TRAPS SHALL EMPLOY ENERGY FLOW DISSIPATERS PRIOR TO FLOW THE COMPOST MEDIA SHALL BE DERIVED FROM WELL -DECOMPOSED ORGANIC MATTER CONTACT WITH SOCK OR ENTRY INTO THE SEDIMENT TRAP SYSTEM. SOURCE PRODUCED BY CONTROLLED AEROBIC (BIOLOGICAL) DECOMPOSITION THAT HAS DISSIPATERS SHALL BE PLACED AT A MINIMUM DISTANCE OF 20 FT (6 M) FROM BEEN SANITIZED THROUGH THE GENERATION OF HEAT AND STABILIZED TO THE POINT THE BASE COURSE OF THE SEDIMENT TRAP. THAT IT IS APPROPRIATE FOR THIS PARTICULAR APPLICATION. COMPOST MATERIAL SHALL BE PROCESSED THROUGH PROPER THERMOPHILIC COMPOSTING, MEETING THE US 7, SEDIMENT TRAPS SHALL BE INSTALLED SO THE EFFECTIVE HEIGHT IS AT LEAST 3 ENVIRONMENTAL AGENCY'S DEFINITION FOR A PROCESS TO FURTHER REDUCE FT (90 CM). PATHOGENS' (PFRP), AS DEFINED UNDER 40 CFR PART 503. Lu 8. ENDS OF SEDIMENT TRAPS SHALL BE AT LEAST 1 FT (30CM) HIGHER IN PARTI CAL SIZE DISTRIBUTION FOR COMPOST FILTER MATERIAL Q ELEVATION THAN THE MID-SECTION. THE MID-SECTION SHALL BE THE LOWEST SIEVE SIZE PERCENT PASSING SELECTED SIEVE MESH SIZE, DRY WEIGHT BASIS POINT OF THE TRAP. 2 -INCH 99% (3 MAXIMUM PARTICLE SIZE) 9, SEDIMENT TRAPS SHALL BE CONSTRUCTED SO THE HORIZONTAL BASE WIDTH IS 3/8 -INCH 30-50%z AT LEAST EQUIVALENT TO THE EFFECTIVE HEIGHT (1 H:1 V}. S EDI M ENT TRAPS (2) 2"X2"X48+" HARDWOOD STAKES, WRAPPED SHALL BE INSTALLED SO THAT THE HEIGHT IS MEASURED VERTICALLY NOT TOGETHER WITH 16 GUAGE WIRE, 10' O.C. ACROSS THE PLANE OF THE SEDIMENT TRAP FACE. INSPECTION z 10. ADDITIONAL RUNOFF -SEDIMENT STORAGE AREA CAN BE CREATED BY OVER ROUTINE INSPECTION SHOULD BE CONDUCTED WITHIN 24 HRS OF A RUNOFF EVENT OR 2"X2"x36" HARDWOOD STAKE, 10'0.C., STARTING S' Q EXCAVATING THE AREA IMMEDIATELY UPSLOPE OF THE SEDIMENT TRAP. AS DESIGNATED BY THE REGULATING AUTHORITY. SEDIMENT TRAPS SHOULD BE FROM ANGLED STAKES a REGULARLY INSPECTED TO MAKE SURE THEY MAINTAIN THEIR SHAPE AND ARE P-+ 11. SOCKS THAT ARE SLEEVED TO CREATE LONGER LENGTHS SHALL NOT BE PLACED PRODUCING ADEQUATE HYDRAULIC FLOW THROUGH. IF PONDING BECOMES EXCESSIVE, 24" COMPOST FILTER SOCK (FILTEREXX OR ENGINEER 1:4 IN AREAS OF CONCENTRATED FLOW, AT THE BASE OF CHANNELS/DITCHES, OR ADDITIONAL SEDIMENT TRAPS MAY BE REQUIRED TO REDUCE EFFECTIVE DRAINAGE AREA APPROVED EQUIVALENT) 0-+ AT THE LOW POINT WITH THE SEDIMENT TRAP SYSTEM. OR SEDIMENT REMOVAL MAY BE NECESSARY. SEDIMENT TRAPS SHALL BE INSPECTED 12" ABOVE CFS MAX WATER LEVEL P-+ W Z UNTIL AREA ABOVE HAS BEEN PERMANENTLY STABILIZED AND CONSTRUCTION ACTIVITY W _ 12. SOCKS THAT ARE SLEEVED TO CREATE LONGER LENGTHS SHALL BE OVERLAPPED HAS CEASED. -i' -i -i J BY A MINIMUM OF 4 FT (120 CM) AND SHALL BE STAKED WHERE MATERIAL ~ OVER LAPS USING 2 STAKES 2 FT (60 CM) APART. MAINTENANCE 1 1. THE CONTRACTOR SHALL MAINTAIN THE SEDIMENT TRAP IN A FUNCTIONALD W z 13. STAKES SHALL BE INSTALLED THROUGH THE MIDDLE OF THE CFS USING 2 IN CONDITION AT ALL TIMES AND IT SHALL BE ROUTINELY INSPECTED. Z W4 (SO MM) BY 2 IN (SOMM) BY 3 FT {1 M) WOODEN HARDWOOD STAKES ON 10 FT 2. IF THE SEDIMENT TRAP HAS BEEN DAMAGED, IT SHALL BE REPAIRED, OR WLn O (3M) CENTERS; 5 FT (1.5 M) ON CENTER STAKING MAY BE USED TO INCREASE REPLACED IF BEYOND REPAIR. STABILITY. STAKES SHALL BE PLACED IN A PYRAMID CONFIGURATION 3. THE CONTRACTOR SHALL REMOVE SEDIMENT AT THE BASE OF THE UPSLOPE a z PERPENDICULAR TO SOCKS WHERE STAKES CROSS AT THE APEX OF THE SIDE OF THE SEDIMENT TRAP WHEN ACCUMULATION HAS REACHED 1/2 OF THE Q 0 SEDIMENT TRAP. STAKES SHALL BE 101NED AND SECURED WITH WIRE WRAPPING EFFECTIVE HEIGHT OF THE SEDIMENT TRAP, OR AS DIRECTED BY THE ENGINEER. 12" MIN. W AT APEX USING 16 GAUGE OR MULTI -STRAND 20 GAUGE WIRE ALLOWING 12 IN ALTERNATIVELY, A NEW SOCK CAN BE PLACED ON TOP OF THE ORIGINAL (30CM) OF STAKE ABOVE THE SOCK. ALL BASE LAYERS SHALL BE STAKED ON S FT STRUCTURE CREATING MORE SEDIMENT STORAGE CAPACITY WITHOUT SOIL Q W (1.5 M) CENTERS. ALL BASE LAYERS SHALL BE STAKED ON 5 FT (1.5 M) CENTERS; DISTURBANCE. " Q PLACED OPPOSITE THE PYRAMID STAKING; WHERE STAKING IS PRESENT EVERY 4. SEDIMENT TRAPS SHALL BE MAINTAINED UNTIL DISTURBED AREA ABOVE THE � 2.5 FT (0.75 M). HALF INCH (12.5 MM) REBAR MAY ALSO BE USED WHEN DEVICE HAS BEEN PERMANENTLY STABILIZED AND CONSTRUCTION ACTIVITY W GROUND IS FROZEN OR EXTREMELY COMPACTED. HAS CEASED. H 5. THE FILTER MEDIA WILL BE DISPERSED ON SITE ONCE DISTURBED AREA HAS 14. STAKING DEPTH FOR ALL SOIL TYPES SHALL BE MINIMUM 12 IN (300MM) INTO BEEN PERMANENTLY STABILIZED, CONSTRUCTION ACTIVITY HAS CEASED, ORAS �--i NATIVE SOIL. DETERMINED BY THE ENGINEER. 6. FOR LONG-TERM SEDIMENT AND POLLUTION CONTROL APPLICATIONS, 15. CFS TO RECEIVE ADDITIONAL LAYERS SHALL BE SLIGHTLY COMPACTED AND SEDIMENT TRAPS CAN BE SEEDED AT THE TIME OF INSTALLATION TO CREATE A PROJECT NUMBER LEVELED. VEGETATIVE FILTERING SYSTEM FOR PROLONGED AND INCREASED FILTRATION OF SEDIMENT AND SOLUBLE POLLUTANTS (CONTAINED VEGETATIVE FILTER 7335-19-008 16. LOOSE FILTERMEDIA SHALL BE BACKFILLED ALONG THE UPSLOPE SIDE OF THE STRIP). THE APPROPRIATE SEED MIX SHALL BE DETERMINED BY THE ENGINEER. DRAWING NUMBER 3 CFS SEDIMENT TRAP A z SCALE:N.T.S. L GENERAL SEEDING SPECIFICATIONS DEFINITION CONTROLLING RUNOFF AND EROSION ON DISTURBED AREAS BY ESTABLISHING PERENNIAL VEGETATIVE COVER WITH SEED. PURPOSE TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS, AND TO PERMANENTLY STABILIZE SUCH AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTS TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. SPECIFICATIONS SEEDBED REQUIREMENTS ESTABLISHMENT OF VEGETATION SHOULD NOT BE ATTEMPTED ON SITES THAT ARE UNSUITABLE DUE TO EXCESSIVE SOIL COMPACTION, INAPPROPRIATE SOIL TEXTURE, POOR DRAINAGE, CONCENTRATED OVERLAND FLOW, OR STEEPNESS OF SLOPE UNTIL MEASURES HAVE BEEN TAKEN TO CORRECT THESE PROBLEMS. TO MAINTAIN A GOOD STAND OF VEGETATION, THE SOIL MUST MEET CERTAIN MINIMUM REQUIREMENTS AS A GROWTH MEDIUM. THE EXISTING SOIL SHOULD HAVE THESE CRITERIA: • ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST .05 INCHES WATER TO 1 INCH OF SOIL). ■ SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION. • SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE DEPTH TO ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE 12 INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2.1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE. ■ A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0 - 6.5. • FREE FROM LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR TRASH OF ANY KIND. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY ARE TO BE HYDRO SEEDED. IF ANY OF THE ABOVE CRITERIA ARE NOT MET - I.E., IF EXISTING SOIL IS TOO COARSE, DENSE, SHALLOW OR ACIDIC TO FOSTER VEGETATION - SPECIAL AMENDMENTS ARE REQUIRED. THE SOIL CONDITIONERS DESCRIBED BELOW MAY BE BENEFICIAL OR, PREFERABLY, TOPSOIL MAY BE APPLIED. SEEDBED PREPARATION INSTALL NECESSARY MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED PLAN. LIME AND FERTILIZER NEEDS SHOULD BE DETERMINED BY SOIL TESTS. DIRECTIONS, SAMPLE CARTONS, AND INFORMATION SHEETS ARE AVAILABLE THROUGH COUNTY AGRICULTURAL EXTENSION OFFICES. TESTING IS ALSO DONE BY COMMERCIAL LABORATORIES. WHEN SOIL TESTS RESULTS ARE NOT AVAILABLE, FOLLOW RATES SUGGESTED IN THE SEEDING SPECIFICATIONS SHOWN BELOW. APPLICATION RATES USUALLY FALL INTO THE FOLLOWING RANGES: • GROUND AGRICULTURAL LIMESTONE: LIGHT -TEXTURED, SANDY SOILS: 1 TO 1-112 TONSIACRE HEAVY -TEXTURED. CLAYEY SOILS: 2-3 TONS/ACRE ■ FERTILIZER: GRASSES: 800-1200 LB/ACRE OF 10-10-10 (OR THE EQUIVALENT) GRASS -LEGUME MIXTURES: 800-1200 LB/ACRE OF 5-10-10 (OR THE EQUIVALENT) APPLY LIME AND FERTILIZER EVENLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE CONTOUR. WHEN USING A HYDRO SEEDER, APPLY LIME AND FERTILIZER TO A ROUGH, LOOSE SURFACE. :1f111e3:I:1ii6ill;;UUT41:92uVisl i[6)6y:1 =19]LLei COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH, UNIFORM SURFACE (SLOPES LESS THAN 3:1). FILL IN OR LEVEL DEPRESSIONS THAT CAN COLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL. SEEDING SEEDING DATES GIVEN IN THE SEEDING MIXTURE SPECIFICATIONS ARE DESIGNATED AS "BEST" OR "POSSIBLE". SEEDINGS PROPERLY CARRIED OUT WITHIN THE "BEST" DATES HAVE A HIGH PROBABILITY OF SUCCESS. IT IS ALSO POSSIBLE TO HAVE SATISFACTORY ESTABLISHMENT WHEN SEEDING OUTSIDE THESE DATES. HOWEVER, AS YOU DEVIATE FROM THEM, THE PROBABILITY OF FAILURE INCREASES RAPIDLY. SEEDING ON THE LAST DATE SHOWN UNDER "POSSIBLE" MAY REDUCE CHANGES OF SUCCESS BY 30-50%. ALWAYS TAKE THIS INTO ACCOUNT IN SCHEDULING LAND -DISTURBING ACTIVITIES. USE CERTIFIED SEED FOR PERMANENT SEEDING WHENEVER POSSIBLE. LABELING OF NON -CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAIN IMPORTANT INFORMATION ON SEED PURITY, GERMINATION, AND PRESENCE OF WOOD SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUS WEEDS. DO NO ACCEPT SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED. INOCULATE LEGUME SEED WITH THE RHIZOBIUM BACTERIA APPROPRIATE TO THE SPECIES OF LEGUME. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, DRILL, CULTIPACKER SEEDER, OR HYDRO SEEDER ON A FIRM, FRIABLE SEEDBED. WHEN USING A DRILL OR CULTIPACKER SEEDER, PLANT SMALL GRAINS NO MORE THAN 1 INCH DEEP, GRASSES AND LEGUMES NO MORE THAN 112 INCH. EQUIPMENT SHOULD BE CALIBRATED IN THE FIELD FOR THE DESIRED SEEDING RATE. WHEN USING BROADCAST -SEEDING METHODS, SUBDIVIDE THE AREA INTO WORKABLE SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY ONE-HALF THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA, MAKING A UNIFORM PATTERN: THEN APPLY THE SECOND HALF IN THE SAME WAY, BUT MOVING AT RIGHT ANGLES TO THE FIRST PASS. MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING. HYDRO SEEDING SURFACE ROUGHENING IS PARTICULARLY IMPORTANT WHEN HYDRO SEEDING, AS A ROUGHENED SLOPE WILL PROVIDE SOME NATURAL COVERAGE FOR LIME, FERTILIZER, AND SEED. THE SURFACE SHOULD NOT BE COMPACTED OR SMOOTH. FINE SEEDBED PREPARATION IS NOT NECESSARY FOR HYDRO SEEDING OPERATIONS: LARGE CLODS, STONES, AND IRREGULARITIES PROVIDE CAVITIES IN WHICH SEEDS CAN LODGE. RATE OF WOOD FIBER (CELLULOSE) APPLICATION SHOULD BE AT LEAST 4,000 LBIACRE. APPLY LEGUME INOCULANTS AT FOUR TIMES THE RECOMMENDED RATE WHEN ADDING INOCULANT TO A HYDRO SEEDER SLURRY. IF A MACHINERY BREAKDOWN OF 112 TO 2 HOURS OCCURS, ADD 50% MORE SEED TO THE TANK, BASED ON THE PROPORTION OF THE SLURRY REMAINING. THIS SHOULD COMPENSATE FOR DAMAGE TO SEED. BEYOND 2 HOURS, A FULL RATE OF NEW SEED MAY BE NECESSARY. LIME IS NOT NORMALLY APPLIED WITH A HYDRAULIC SEEDER BECAUSE IT IS ABRASIVE. IT CAN BE BLOWN ONTO STEEP SLOPES IN DRY FORM. IF, Fill I'Llri:RlFill r.l:� GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. RESEEDING --IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER- SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. IF VEGETATION FAILS TO GROW, SOIL MUST BE TESTED TO DETERMINE IF ACIDITY OR NUTRIENT IMBALANCE IS RESPONSIBLE. FERTILIZATION --ON THE TYPICAL DISTURBED SITE, FULL ESTABLISHMENT USUALLY REQUIRES RE -FERTILIZATION IN THE SECOND GROWING SEASON. FINE TURF REQUIRES ANNUAL MAINTENANCE FERTILIZATION. USE SOIL TESTS IF POSSIBLE OR FOLLOW THE GUIDELINES GIVEN FOR THE SPECIFIC SEEDING MIXTURE. REFERENCE: 6.11 NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, AUGUST 2011. TEMPORARY UPLAND SEEDING SPECIFICATIONS SEEDING MIXTURE SEEDING MIXTURE COMMON NAME APPLICATION RATE SEEDING DATES (SPECIES) (LBS/ACRE) FALL RYE GRAIN 125 (AUG. 15 to DEC. 30) (SECALE CEREALE) RYE GRAIN EARLY SPRING RYE GRAIN NURSE CROPS (JAN. 11 TO MAY 1) (SECALE CEREALE) 125 SEEDING DATES ANNUAL RYE 50 SUMMER GERMAN MILLET (MAY 1 TO AUG. 15) (SETARIA ITALICA) 50 SOIL AMENDMENTS SUDAN GRASS APPLICATION RATE NOTE AMENDMENT (LBS/ACRE) FOLLOW RECOMMENDATIONS OF GROUND AGRICULTURAL 2,000 SOIL TESTS OR APPLY BOTH. LIMESTONE AFTER AUG. 15 (SECALE CEREALE) 10-10-10 FERTILIZER 1,000 LIMESTONE APPLIED AT A MINIMUM OF 2 TONS/ACRE WITH 3 TON SIACRE IN CLAY SOILS OR PER SOILS TEST. MULCH NOTE AMENDMENT APPLICATION RATE NOTE MULCH (LBS/ACRE) APPLY BY ROVING, NETTING, OR GRAIN STRAW 4,000 ASPHALT TACKING AT 400 GAL/AC. 10-10-10 FERTILIZER 1,000 MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. GROUND STABILIZATION SHALL BE PERFORMED PER "STABILIZATION TIME FRAMES" CHART OR AS OTHERWISE SPECIFIED FOR SAFETY REASONS. PERMANENT UPLAND SEEDING SPECIFICATIONS SEEDING MIXTURE APPLICATION RATE SEEDING DATES COMMON NAME (LBS/ACRE) SEP. 1 TO APR. 15 KY 31 TALL FESCUE 150 SEP, 1 TO APR. 15 RYE GRAIN 50 NURSE CROPS COMMON NAME APPLICATION RATE SEEDING DATES (SPECIES) (LBS /ACRE ) GERMAN MILLET MAY 1 TO AUG. 15 (SETARIA ITALICA) 50 SUDAN GRASS MAY 1 TO AUG. 15 (SORGHUM SACCHARATUM) 15 (S. BICOLOR SSP. DRUMMONDI) PRIOR TO MAY 1 OR RYE GRAIN 40 AFTER AUG. 15 (SECALE CEREALE) SOIL AMENDMENTS APPLICATION RATE NOTE AMENDMENT (LBS/ACRE) FOLLOW RECOMMENDATIONS OF GROUND AGRICULTURAL 2,000 SOIL TESTS OR APPLY BOTH. LIMESTONE 10-10-10 FERTILIZER 1,000 MULCH APPLICATION RATE NOTE MULCH (LBS/ACRE) APPLY BY ROVING, NETTING, OR ASPHALT TACKING AT 400 GRAIN STRAW 4,000 GALIAC, MAINTENANCE RE -FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BE MOWED ONCE OR TWICE A YEAR, BUT MOWING IS NOT NECESSARY. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. GROUND STABILIZATION SHALL BE PERFORMED PER "STABILIZATION TIME FRAMES" CHART OR AS OTHERWISE SPECIFIED FOR SAFETY REASONS. STABILIZATION TIME FRAMES (EFFECTIVE AUG. 3, 2011) SITE AREA STABILIZATION TIMEFRAME EXCEPTIONS DESCRIPTION PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS NONE HIGH QUALITY WATER (HOW)ZONES 7 DAYS NONE IF SLOPES ARE 10' OR LESS IN SLOPES STEEPER THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1,14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER AREAS WITH 14 DAYS NONE, EXCEPT FOR PERIMETERS SLOPES FLATTER THAN 4:1 AND HQW ZONES. 9751 SOUTHERN PINE BLVD CHARLOTTE, NC 28273 (704)523-4726 ENGINEERING FIRM LICENSE NUMBER: F-0176 i� PROJECT NUMBER 7335-19-008 DRAWING NUMBER 3 3 x u co m a UP W a W 0 d z