Loading...
HomeMy WebLinkAbout20190418 Ver 1_More Info Received email_20190517Strickland, Bev From: Chris Stahl <cstahl@smeinc.com> Sent: Friday, May 17, 2019 3:18 PM To: Annino, Amy M; Price, Zan (George); Eller, George Cc: 'Gbphillips'; King, Melissa; Joey Lawler Subject: RE: [External] Lady Marion Dam - Interim Dewatering - Repair Plan External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Amy, This sounds reasonable and we will implement it during construction. We will adjust once the site becomes stabilize and agreed upon by DEQ. Thank you, Chris Christopher J.L. Stahl, P.E. Principal Engineer/Area Manager This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. From: Annino, Amy M [mailto:amy.annino@ncdenr.gov] Sent: Friday, May 17, 2019 3:14 PM To: Chris Stahl <cstahl@smeinc.com>; Price, Zan (George) <Zan.Price@ncdenr.gov>; Eller, George <george.eller@ncdenr.gov> Cc: 'Gbphillips' <gbphillips@bellsouth.net>; King, Melissa <Melissa.King@ncdenr.gov>; Joey Lawler <J Lawler@smei nc.com> Subject: RE: [External] Lady Marion Dam - Interim Dewatering - Repair Plan Chris, The Division requests that turbidity levels in Garden Creek continue to be monitored on a weekly basis during construction. The frequency of monitoring can be adjusted as the site becomes stabilized. Thanks, Amy Annino Environmental Specialist —Asheville Regional Office 1 S&ME © 9751 Southern Pine Blvd. a� Charlotte, NC 28273 map 0: 704.523.4726 M: 717 329 0529 wvvw.smeinc.com BUILT FOR Linkedln I Twitter I Facebook VERSATILITY This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. From: Annino, Amy M [mailto:amy.annino@ncdenr.gov] Sent: Friday, May 17, 2019 3:14 PM To: Chris Stahl <cstahl@smeinc.com>; Price, Zan (George) <Zan.Price@ncdenr.gov>; Eller, George <george.eller@ncdenr.gov> Cc: 'Gbphillips' <gbphillips@bellsouth.net>; King, Melissa <Melissa.King@ncdenr.gov>; Joey Lawler <J Lawler@smei nc.com> Subject: RE: [External] Lady Marion Dam - Interim Dewatering - Repair Plan Chris, The Division requests that turbidity levels in Garden Creek continue to be monitored on a weekly basis during construction. The frequency of monitoring can be adjusted as the site becomes stabilized. Thanks, Amy Annino Environmental Specialist —Asheville Regional Office 1 Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4656 office amy.annino(cDncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 Nothing Compares._ s.v Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Chris Stahl <cstahl@smeinc.com> Sent: Friday, May 17, 2019 2:22 PM To: Price, Zan (George) <Zan.Price@ncdenr.gov>; Eller, George <george.eller@ncdenr.gov> Cc: 'GbphiIli ps' <gbphiIli ps@bel lsouth.net>; King, Melissa <Melissa.King@ncdenr.gov>; Annino, Amy M <amy.annino@ncdenr.gov>; Joey Lawler <JLawler@smeinc.com> Subject: RE: [External] Lady Marion Dam - Interim Dewatering - Repair Plan External email. Do not click links or open attachments unless you verify. Senuspicious email as an attachment to report.spam@nc.gov Za n, Sorry for the delay on this response. Joey had forward but I was out of town, and I unfortunately did not catch it. Regarding turbidity monitoring, we will continue monitoring during the interim dewatering- repair plan construction. However, we may not continue on a daily basis, just when we are site during construction activities. One other item that we discussed with Amy was the increase in culvert size from 12 -in to 18 -in diameter. This change is based on actual base flow measurements versus assumptions during the EAP development. Let me know if you have any more questions. Thank you, Chris Christopher J.L. Stahl, P.E. Principal Engineer/Area Manager S&ME 9751 Southern Pine Blvd. Charlotte, NC 28273 map 0: 704.523.4726 M: 7117.329 0529 www.smeinc.com eu I t t Fou Linkedln I Twitter I Facebook VERSATILITY This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. From: Price, Zan (George) [mailto:Zan.Price@ncdenr.gov] Sent: Friday, May 17, 2019 1:52 PM To: Chris Stahl <cstahl@smeinc.com>; Eller, George <george.eller@ncdenr.gov> Cc: 'Gbphillips' <gbphillips@bellsouth.net>; King, Melissa <Melissa.King@ncdenr.gov>; Annino, Amy M <amy.annino@ncdenr.gov> Subject: RE: [External] Lady Marion Dam - Interim Dewatering - Repair Plan Chris, We are prepared to issue the 401 Water Quality Certification. Amy Annino was waiting from a response to a question she sent to Joey Lawler (S&ME) on Tuesday, May 14. See below. From: Annino, Amy M Sent: Tuesday, May 14, 2019 9:46 AM To: Joey Lawler <JLawler@smeinc.com> Subject: RE: [External] Marion Lake Dam Joey, Thank you for providing the information below. Will S&ME continue to monitor for turbidity? If so, please provide information as to the frequency and location(s). Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources Zan Price, P.E. Assistant Regional Supervisor — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4662 office 828 231 9634 mobile zan.price(a)ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Chris Stahl <cstahl@smeinc.com> Sent: Friday, May 17, 2019 11:32 AM To: Eller, George <george.eller@ncdenr.gov>; Price, Zan (George) <Zan.Price@ncdenr.gov> Cc:'Gbphillips' <gbphillips@bel lsouth.net>; King, Melissa <Melissa.King@ncdenr.gov> Subject: [External] Lady Marion Dam - Interim Dewatering - Repair Plan 11 We ternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to e George and Zan, The Lady Marion Dam dewatering is almost complete and we are at the point of fully implementing the Interim Dewatering —Repair Plan to provide passive dewatering of the facility. We have received ACOE approval to place the proposed coffer dam and pipe for dewatering. Our client would like to implement this plan as soon as possible since the reservoir level is very low and to minimize the use of the pumps. Please let us know if you have any concerns or questions on the interim dewatering repair plan. I have attached a copy of the plan submitted for your reference. Thank you, Chris Christopher J.L. Stahl, P.E. Principal Engineer/Area Manager This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. S&ME • 9751 Southern Pine Blvd. Charlotte, NC 28273 map 0:704.523.4726 111 E M: 717.329.0529 www.smeinc.com BUILT F O R Linkedln I Twitter I Facebook VERSRTItPYY This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. =0 III =0 III