Loading...
HomeMy WebLinkAboutWQ0040779_Application (FTSE)_20190516Central Files- APS SVVP 4/9/2019 PermitNumberW00040779 Permit Triacking Slip Program Category Status Project Type Non -discharge In review New Project PermitType Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions A Individual Primary Reviewer Permit Contact Affiliation dean.hunkele Coastal SWRulle Permitted Flow Facility Owner Owner Name Ghk Cape Fear Development LLC Dates/Events Facility Contact Affiliation Owner Type Non -Government Owner Affiliation William W. Schoettelkotte 1051 Military Cutoff Rd Wilmington NC 28403 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 4/8/2019 Reaulaced Activities Requested lReceived Events Additional information requested T +..111 �NTPARA�Mo E., E N G i N E E R i N G, i N C. 1 2 2 CINEMA DRIVE W I L M I N G T O N, N C 2 8 4 0 3 9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 9 1- 6 7 6 0 ( F) L E T T E R O F TRANS M ITTAL .._......._ To: NCDEQ —Division of Water Resources Date Aril 3, 2019 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Woodlands at Echo Farms —Tract 3A Fast Track Sewer System Ext.'- Application Attu: To Whom It MayConcern Pro'ect No 18252.PE Z Originals Z Prints ❑ Shop Drawings ❑ Calculations ❑ Correspondence Z Plans ❑ Specifications Z Other as listed below . 2 Cover Letters 2 Fast Track Sewer App. & Supporting Docs. — Public Sewer (Orig. & Copy) 1 Application Fee - $480 (Check 11684) 2 Fast Track Sewer App. & Supporting Docs. — Private Sewer (Orig. & Copy) 1 Application Fee - $480 (Check 11685) 1 03/21 /19 CFPUA Approved Sewer Flow Letter Issue Status: Z For Approval ❑ As Requested ❑ Construction ❑Bid ❑ For Your Use El For Review and Comment ❑ Approved as Noted ❑ See�RemarksPWft%- Thank you for your attention to this matter. If you have any questions, please contact Rob Balland at 910-791-6707 or rballand aramounte-en .com. - , -IF 1- Cc; Signed....... . ....... : .., Ayden Chung . . P.ARAMOUNTE E N G 1 N E E F2 i N G, I N C. March 8, 2019 NCDEQ — DWR 127 Cardinal Dr. Ext Wilmington, NC 28405 RE: Woodlands Landing at Echo Farms — Tract 3A NCAC 02T.0300 Fast Track Sewer System Extension Cape Fear Public Utility Authority, New Hanover County, NC To Whom It May Concern, Enclosed is sewer extension application with supporting documentation for the proposed residential development in the City of Wilmington. There are private sewer main .extensions proposed as part of this project that will be submitted under a separate application. The proposed project will serve 176 new apartment homes (154 one- and two -bedroom apartments and 22 three -bedroom apartments), which will drain to an existing gravity sewer network. The enclosed documents include the following items: • Check in the amount of $480.00 • Fast Track Sewer System Extension Application • Flow Tracking for Sewer Extension Applications • Site Map On behalf of Cape Fear Public Utility Authority and the developer, Cape Fear Commercial, we request that you grant a permit for construction of this sewer system. 1 2 2 C I N E M A D R I V E, WILM I N G T O N, NC 2 8 4 0 3 P H( 9 1 O) 7 9 1 - 6 7 0 7 F A X: (9 1 O) 7 9 1 - 6 7 6 0 DocuSig.n Envelope ID: 459A8757-2BF4-4EO7-A431-2DgD1C784266 State of North Carolin.a Department of Environmental Quality Division of Water 'Resources .............. 15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION I ber..Application Num (to be completed t�N� DWR) All items must be Completed or the -application w'111 be returned L APPLICANT INFORMATION: 1. Applicant's name: GHK Ca Fear Development., LLC (company., municipality, HOA., utility. etc.) 2. Applicant type: Individual Z Corporation El General Partnership E] Privately -Owned Public Utility M Federal El State/County Municipal Other 3 Signature authoritys per I 5A I name: Calvin Wei -NCACO2'1�.0,106tb) Title- Member 4, Applicant's mailing address.- 10-5.1 Military, Cutoff Road. Suite 200 City.. Wilminglon State.: NC dip: 28403- 5, Applicant's contact lnformatlon., AL Phone number: (210) 344- 1000 Email Address: vinawca efearcommercial.com MIR D uam Ih II. PROJECT INFOR.M.ATION: fh Nf � 1. Projectname: Woodlands Landing at Echo Farms' - Tract 3A 2. Application/Project status: Z Proposed (New Permit) E] Existing Permit/Project provide the existj ii nurnberWQQO an $ If a modi.fication, j ng. pern it d. issued date4 If new construction but part of a in -aster plan, provide the existing permit nunibe.r-. WQ.00 County. where pro je et is located- New Hanover 4. Approximate Coordinates (Decimal Degrees): Latitude: .3'4,1661 •- Longitude: -77.922-9,' 5, Parcel ID (if applicable):. R07006-002-054-000 (or Parcel ID to closest downstrearn sewer) 111. CONS, ULTANT INFORMI ATION.- 1 Professional Engineer:.Rob Balland License Number: Firm.: Paramounte Engineering, In I c. mailing address: _122 Cinema Drive Ctt. Wfl. 4 n y: i inington State: NC Zi 2.8403- Phone number; (210) 791-6707 Emai .1 Ad-dress.-.rballand Cmgaramounte-eng.coo I.V. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION*, I. Facility Name: Southside WWTP Permit Number: O *wner m Nae.: Cape Fear Public Utility Auffiority V. RECEIVING DOWNSTREAM SEWER IN FORM ATION(lif different. than WWTF): 1. Pei-m'ttNumber(s):WQO6LiOlrl6*"". Down -stream (Receiving) SeNver Size: inch System Wide Coll,ectio.n....system Pet-111it Nuitiber(s). (ij, app.] i , c ble): WQCS Owner Name(s): H L-SW�<. FORM: FTA 04-16 Page I of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ONo ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/PropeM Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities X Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home [:] Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No ➢ If Yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(W Daily Design Flow a,b No. of Units Flow 1- & 2-Bedroom Apartments 3-Bedroom Apartments General Office Catering Space (clubroom and reception) 240 gal/connection 154 365960 GPD 360 gal/connection 14 5,040 GPD 25 gal/employee/shift 6 150 GPD 50 gal/100 sq. ft. 1732 866 GPD gal/ GPD gal/ GPD Total 435016 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 43,016 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 21046 C-900 PVC 8 40 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 Ix. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ® Yes [-]No � 1 G A ATO A 0 OlrP (1211CM eanaratinnc that cbnll 'kp nrnvirlPri fnr cPwPr cvctPmq' Setback Parameter* Separation Re uired Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet "Any Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305() contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ "Stream Stream classifications can be identified using the Division's NC Surface Water Classifications webpa�e ➢ If noncompliance with 02T.0305(D-or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? Z Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? Z Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes Z No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 DocuSign Envelope ID: 459A8757-2BF4-4EO7-A431-2D9DlC784266 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 021", the IMiniMUM Deli an,C riterifafor.the Permitting o.[.Pump.Stations and Force Main,s latest version), and the Gravity Sewer Niiiiij-11-Uni Desigii Criteria datest versiqn as applicable, Z Yes 0 No IfN complete and submit the Variance/Alternative Design Request application (VADC 10-14)(and supporting documents for review, Approval of the re nest is re aired prior to submittal of the Fast Track Application and- supporting documents. I 1 1, 1 Professional Engineer's Certification:, 00, 2 11 attest that this'appi ication for (Professfonal Engineer's name . from AppUcation Item 11.1. 1.) has been reviewed by me and is accurate. complete and consistent with the information supplied in the plans., specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of try knowledge the proposed design has been prepared in accordance witb the applicable regulations, Gravity Sewer Minimum Design Criteria.for Gravity Sewers.latest version), and the Mitilinum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest :versione. Although other professionals may have developed certain portions of this Submittal. package, inclusion of these materials under my signature and seal signIfies that I have reviewed this material and have judged it to be consistent With the proposed. desian. NOTE — In accordance with General Statutes 1.43-215.6A and 143-215-613, any person. who knowingly makes any false staternent, re.pre-sentation, or certification in any application. package shall be gruilty of a Class 2misdemeanor, which may include a fine not to exceed $101000, as wel-Fas civil penalties up to $25,000per violation. A. North Carolina Professional En gl incer's seal, signature and date- 3. A ppl icant"s: Certification cation per 15A NCAC 02T.,01. 06(b): cal vin F. Wells L attest that this application for .(Signature. Authority7s. name.& title from Application Item 1.3.) has been review e*d by Me and Js.-accurat. J e and complete to t I he best of my knowledge. I understand that if All required parts of this application are not completed and that if all required :supporting documentation and: attachrnents are not included.. this application package is subject to being returned as incomplete. I understand that. any. discharge of wastex-eaterfroni this non- disch4rge system to surface waters or the � land will, result ih an immed.ilate enforcernent action that niay include lude -civil penalties., C. it juncture relief, and/or criminal prosecution. I Will makenoclaim against inst the of Water Resources should:a condition ina pr I ion of this permit be violated. I also understand that if 'all required parts of this applic ation. package are not completed and that If a I W1 all ,required supporting infort-nation and attachments, ai,.*e not included, this pplication package ill be returned to me -as incomplete. NO and 143-1 5.6B. any person who knowh gly makes any false TE — In accordance with. General Statutes. 14 1 '�M statement, representation, or -certification in an lcatio'n package shall be guilty of a Class .2 misdemeanor, which may y . ap pi include a fine not to exceed $1. 0.000 as well as civil penalties .up to $25,000 per violation. DocuSigned by. Signature: Date: 4/8/2019 FORK,FTA. 04-16 Page 5 of 5 State of North Carolina L Department of Environmental Qua lity } Y Division of Water Resources Y J s 1, ,40on of Watty: Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Echo Farms, LLC Project Name for which flow is being requested: Woodlands Landing Echo Farms- Priv More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: M'Kean Maffitt (Southside) WWTP b. WWTP Facility Permit #: NPDES NC 0023973 Allflowsare inMGD c. WWTP facility's permitted flow 12.000 d. Estimated obligated flow not yet tributary to the WWTP 2.079 e. WWTP facility's actual avg. flow 8.044 f. Total flow for this specific request 0.043 016 g. Total actual and obligated flows to the facility 10.167 h. Percent of permitted flow used 84.7% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow* * Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** 27 N/A 0.378 0.151 0.151 0.155 0.305 -0.154 The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Cape Fear Public Utility Authority Downstream Permit Number: N/A Page 1 of 6 FTSE 10-18 • III. Certification Statement: I Matthew Tribett, CFPUA Eng. Mgr certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. NOW' Ar-J g Official Signature Title of Signing Official Date Page 2 of 6 FTSE 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section H where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely PS 26 & 27 Upgrades is in design or under construction with planned completion in 4th qtr 2019 ; and/or d. The following applies: The developer of this Droiect is required by agreement to complete an upgrade of PS 27 and CFPUA is participating in the cost of the upgrade. Capacity created by the upgrade has been obligated to the developer by the agreement. The flow requested for this project is a portion of that obligation. This proj ect's sewer will not be certified and no certificates of occupancy will be approved by CFPUA unitl the upgrade of PS 27 is complete. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature 2-711 Date Page 3 of 6 FTSE 10-18 Hunkele, Dean From: Robert Balland <rballand@paramounte-eng.com> Sent: Monday, April 8, 2019 12:06 PM To: Hunkele, Dean. Cc: Matthew Tribett (Matthew.Tribett@cfpua.org) Subject: [External] RE: Woodlands Landing Apts sewer apps Dean, Good afternoon. The proposed public is connecting to an existing public line. The proposed private is connecting to the proposed public lines. The proposed public and private do not provide any connections to future phases. 5 Thank you, From: Hunkele, Dean <dean.hunkele@ncdenr.gov> Sent: Monday, April 8, 2019 11:52 AM To: Robert Balland <rballand@paramounte-eng.com> Cc: Matthew Tribett (Matthew.Tribett@cfpua.org) <Matthew.Tribett@cfpua.org> Subject: Woodlands Landing Apts sewer apps Importance: High Finally back in the office and trying to process these apps. Is proposed private tying into the proposed public? If not, is it tying into new sewer being installed for other phases/projects? Is the public tying into any new sewer being installed for other phases/projects? Dean Hunkele Environmental Specialist II Water Quality Regional Operations Section Division of Water Resources Department of Environmental Quality 910.796.7215 Reception Desk 910.796.7380 Direct 910.350.2004 Fax Dean.Hunke!e ncden; Wilmington Regional Office 127 Cardinal Drive Ext Wilmington, NC 28405 http://deq.nc.gov/contact/­­­regionaI-offices/wiImington 1 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name GHKCape Fear Development LLC Information Sos1d: 1460350 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 7/27/2015 Registered Agent: Wells, Calvin F., Jr. Addresses Mailing 1051 Military Cutoff Rd Ste 200 Wilmington, NC 28405 Reg Mailing 1051 Military Cutoff Rd Ste 200 Wilmington, NC 28405 Company Officials Principal Office 1051 Military Cutoff, Rd Ste 200 Wilmington, NC 28405 Reg Office 1051 Military Cutoff Rd Ste 200 Wilmington, NC 28405 All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Member Calvin Wells , Jr 1051 Military Cutoff Road, Suite 200 Wilmington NC 28405 Vh: �ik 41*4 t M.M Rrmk Nq N gn -t;,K­ ilk LIM' 3k t ;0V 00, 1z A ract tarnar s reer% Sw L ITE COORDINATES: -1 !> , L4nam r:-.-,340 09'58.4" N 77 *Ile 55' 24.1 W Date 03/08/19 Scale: 1"= 1000' USGS MAP PARAN10 JL A - .' UNTE Drawn: JBS r- jq o i N c r.-- n i N <�- - i N cz. 122 Cinema Drive, Wilmington, NC, 28403 (910)-791-6707 Chk: RPB Woodlands 3A NC license #: C-2846 Proj. No: 18252PE