Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
130001_PERMIT FILE_20171231
wALFA pG r January 7, 2008 Thomas E. Porter Porter Farms 4455 Pleasant Rd S Concord, NC 28025 ichael F. Easley, Governor r William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director Division of Water Quality Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS130001 Porter Farms Animal Waste Management System Cabarrus County Dear Thomas E. Porter: The Division of Water Quality (Division) received your sludge survey information on December 27, 2007. With the survey results, you requested an extension of the sludge survey requirement for the lagoon at the Porter Farms facility not to be required until 2009. Due to the amounts of treatment volume available, the Division agrees that a sludge survey is not needed until 2009. The results of the 2009 sludge survey are to be submitted by March 1, 2010. Thank you for your attention to this matter. If you have any questions, please call me at (919) 715-6937. Sincerely, 7*449� Miressa D. Garoma Soil Scientist cc: Mooresville Regional Office, Aquifer Protection Section Central Files NOnthCaroiina Natlrra!!� Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699.1636 Telephone•, (919) 733-3221 Internet: w"vw.ncwatetaualitv.ors Location: 2728 Capital Boulevard Raleigh, NC 27604 Fax 1: (919) 715-0588 Fax 2: (919)715-6049 An Equal OpportunitylAffinnative Action Employer— 50% Recyciedlt0% Post Consumer Paper Customer Service: (877) 623-6748 Water Resources Environmental Quality July 10, 2017 Thomas E. Porter Porter Farms 4455 Mount Pleasant Road South Concord, NC 28025 F ` ROY COOPER Governor \1 MICHAEL S. REGAN , Secretary S. JAY ZIMMERMAN Director Re: COMPLIANCE INSPECTION Porter Farms/Facility 13-01 General Permit AWS 130001 Cabarrus County Dear Mr. Porter: On July 6, 2017, staff of the North Carolina Division of Water Resources (DWR), Water Quality Regional Operations Section (WQROS), inspected the Porter Farms and the permitted waste disposal system. We wish to thank Jared. C. Portei, who was present and assisted during the inspection. The enclosed report should be self-explanatory; however, should you have any questions concerning this report, please contact me at (704) 663-1699. Sincerely, ames B. Bealle III, Environmental Specialist Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources enclosure: Compliance Inspection Report dated July 6, 2017 IS State of North Carolina I Environmental Quality I Water Resources I Water Quulity Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 4 Mooresville, North Carolina 28115 704-663-1699 Division of Water Resources ❑ Division of Soil and Water Conservation ❑ . Other Agency Facility Number: 130001 Facility Status: Active Permit: AWS130001 Denied Access Inpsection Typo: Compliance Inspection Inactive Or Closed Date: Reason for Visit: Routine County: Cabarrus Region: Mooresville Data of Visit: 07/06/2017 Entry Tim: 03:00 pm Exit Time: 4:30 pm Incident 0 Fans Name: Porter Farms Owner Email: teporter02@aol.com Owner, Thomas E Porter Phone: 704-785-8891 Mailing Address: 4455 Mt Pleasant Rd S Concord NC 280257659 Physical Address: 4603 Mt Pleasant Rd S Concord NC 280257659 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farts: Latitude: 35' 21' 07" Longitude: 80° 26' 40" Five mites south of Mt. Pleasant on Mt. Pleasant Rd. (SR 1006). Farm is on the left across from the intersection with Bost Cut Off Rd. Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application Records and Documents Other Issues Certified Operator: Thomas E Porter Operator Certification Number: 17560 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Thomas E. Porter Phone : 704-785-8891 On -site representative Jared C. Porter Phone: 704-785-8891 Primary Inspector. Inspector Signature: Secondary Inspector(s): Inspection Summary: 05/15/17 > Waste Analysis > N = 2.88 Lbs11000 Gallons 10/03/16 > Waste Analysis > N = 2.16 Lbs/1000 Gallons 04/05/16 > Soil Analysis U. Phone: 70-663-1699 Exi Date: It page: ! Permit: AW5130001 Owner - Facility : Thomas E Porter Facility Number: 130001 Inspection Date: 07/06/17 Inpsection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations - Design Capacity Current promotions Swine Swine -Farrow to Wean 2,000 1,980 Total Design Capacity: 2,000 Total SSLW: 866,000 Waste Structures Disignated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Waste Pond WP1 19.00 28.00 page: 2 Permit: AWS130001 Owner - Facility : Thomas E Porter Facility Number: 130001 Inspection Date: 07/06/17 Inpsection Type: Compliance inspection Reason for Visit: Routine Discharges & Stream Impacts Yea_ No No No ' 1. Is any discharge observed from any part of the operation? ❑ ME] ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ [IN ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ 110 ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ M, ❑ 2. is there evidence of a past discharge from any part of the operation? ❑ M ❑ ❑ 3. Were there any observable adverse impacts or poten6ai adverse impacts to Waters of the ❑ ❑ ❑ State other than from a discharge? Waste Collection, Storage & Treatment Yes No Na No 4. Is storage capacity less than adequate? ❑ .0 ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le] large ❑ � ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ 0 ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ ❑ ❑ to roofed pits, dry stacks andlor wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ M ❑ ❑ maintenance or improvement? Waste Application Yes No Na No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑0 ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ E ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%110 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS130001 Owner - Facility : Thomas E Porter Facility Number. 130001 Inspection Date: 07/06/17 Inppection Type: Compliance Inspection Reason for Visit: Routine ate Aonlication Crop Type 1 Fescue (Hey, Pasture) Crop Type 2 - Matue (Hay) Crop Type 3 small Grain Cover Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ M ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ ❑ ❑ determination? 17, Does the facility lack adequate acreage for land application? ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ MEI ❑ Records and Documents Yea No No He 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ M ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ ❑ ❑ If yes, check the,appropriate box below. WUP? ❑ Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑P Stocking? ❑ page: 4 Permit: AWS130001 Owner - Facility : Thomas E Porter Facility Number: 130001 Inspection Date: 07/06/17 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yea No No No Crop yields?. ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22, Did the facility fail to install and maintain a rain gauge? ❑ 0 _❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ M ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26, Did the facility fail to provide documentation of an actively certified operator in charge? ❑ MCI ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ 0 Cl Other Issues Yea No No No 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ M ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ M ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ 0 ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? ❑ M ❑ ❑ If yes, check the appropriate box below. Application Field ❑ Lagoon / Storage Pond ❑ Other ❑ If Other, please specify 32, Were any additional problems noted which cause non-compliance of the Permit or ❑ ❑ ❑ CAWMP? 33. Did the Reviewer/inspector fail to discuss review/inspection with on -site representative? ❑ ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ M ❑ ❑ page: 5 type of vtstt: w c:ompuance inspecnon U uperation Keview U Structure Evaluation U 'Technical Assistance Reason for Visit: 0 Routine 0 C=Iaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time:. Departure Time: I o,2t0 County: Region: Farm Name: �01�'C �, G] T Owner Email: Owner Name:��s Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: ��;' ►�tf'y� ��C`'� Back-up Operator: Location of Farm: Latitude: Phone: Integrator: t Certification Number: Certification Number: Longitude: �F � � -,�': �{ a iv `�.�'. c12 �..� � Yy � � .':] a' �.: ., ,�Y' '?i' ✓n_r5, t 1 1 '. '�34— 3*,x''�+ � a ,_ 'J:.r •Mt � ,3fu �6iU � F -, � z s 1 � i f: _ i I 't'g 4, .� "ice � � "' r-""^`I..Y" �'_' -` J/l �!•FIJ 11� �:: k v.. ak 4'��� `fir. k �I►,%� t' _�� ,. n - �,,� �. - _ �S �- ■ " 1 ' f 1 1 —� " ydE.3 �,x � ^' � oaf L ��- a Y� �. ■ r -- - 3 Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Y� ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ] Yes ❑ No ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑NotA A ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWQ) [] Yes ❑ No A ❑.NE . 2. Is there evidence of a past discharge from any part of the operation? Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes�o ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continur Facility Number: - Date of Inspection: 1 Waste Collection & Treatment e` 4. Is 'storage capacity {structural plus storm storage plus heavy rainfall) less than adequate? ❑ Ye o F NA ❑ NE • a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No KI NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: �• Spillway?: Designed Freeboard (in): ►'"1 Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yew No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ,.plo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures nced maintenance or improvement? ❑Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes, No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application " 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [] Yes] No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) , ❑ PAN ❑ PAN > 10% or 101bs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window Evidence of Wind Drift OjApplication Outside of Approved Area �- �p�] "� C 12. Crop Type(s): 1 _ W v ` r 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes�Ta ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes'&o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �Zo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes fI �"'/ ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? [] Yes Vo ❑ NA ❑ NE Reguired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes `trio ❑ NA ❑ NE the appropriate box. �s s es�gn Maps [] Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑Yes o ❑ A ❑ NE Was e A r�ekl F •eeboard is aste rans ers ❑ e StockiYie Inspection on L{ and 1" Rainfall Inspections ludg� e Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No �RNA ❑ NE Page 2 of 3 21412011 Continued 9 Facility Number: - Date of Inspection: I Oq(e VAS 24. Did the facility fail to calibrate waste application equipment as required by the permit? C] Ye No [] NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [] Y o ❑ NA ❑ NE the appropriate box(es) below. e to complete annual sludge survey —E:rFailure to develop a POA for sludge levels Non-c ompliantt sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes_J�No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Ye ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Ye ❑ NA ❑ NE and report mortality rates that were higher t i n ormal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emereg ��ns as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE ❑ Ye No ❑ NA ❑ NE ❑ Yes t=12% [DNA [] NE ❑ Yes )EJ�o ❑ NA ❑ NE ❑ Yes " d' o ❑ NA ❑ NE Reviewer/Inspector Name: Phone: Reviewer/Inspector Signature: Date: Page 3 of 3 21412011 Water Resources ENVIRONMENTAL QUALITY January 6, 2016 Thomas E. Porter Porter Farms . 4455 Mount Pleasant Road South Concord, NC 28025 PAT 1Vf� C O R`Y U— r DONALD R. VAN DER VAART ACIVIary S. JAY ZIMMERMAN Re: COMPLIANCE INSPECTION Porter Farms/Facility 13-01 General Permit AWS 130001 Cabarrus County Dear Mr. Porter: Dinxfor On November 18, 2015, staff of the North Carolina Division of Water Resources (DWR), Water Quality Regional Operations Section (WQROS), inspected the Porter Farms and the permitted waste disposal system. We wish to thank you for being present and assisting during the inspection. The enclosed report should be self-explanatory; however, should you have any questions concerning this report, please contact me at (764) 663-1699. Sincerely, 1:� 4 - Bealle Ill, Environmental Specialist Mooresville Regional Office Water Quality Regional Operations Section. Division of Water Resources, NCDEQ enclosure: Compliance Inspection Report dated November 18, 2015 Jb State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations MoonwAlc Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699 N Division of Water Resources Division of Soil and Water Conservation ❑ Other Agency Facility Number: 130001 Facility Status: Active Permit: AWS130001 Inppection Type: Compliance Inspection Inactive Or Closed Date: Reason for Visit: Routine County: Cabarrus pate of visit: 11/1812015 Entry Time: 12:30 pm Exit Time: 2:00 pm P rt F Region: Incident 0 ❑ Denied Access Mooresville Farm Name: o er anus Owner Email: teporter02Uaol,com Owner: Thomas E Porter Phone: 704-785-8891 Mailing Address: 4455 Mt Pleasant Rd S Concord NC 280257659 Physical Address: 4603 Mt Pleasant Rd S Concord NC 280257659 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 35° 21' 07" Longitude: 80' 26' 40" Five miles south of Mt. Pleasent on Mt. Pleasant Rd. (SR 1006). Farm is on the left across from the intersection with Bost Cut Off Rd. Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application Records and Documents Other Issues Certified Operator: Thomas E Porter Operator Certification Number: 17560 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Thomas E. Porter Phone : 704-785-8891 On -site representative Thomas E. Porter Phone: 704-785-8891 Primary Inspector: James Beall Phone:�yy77�0t�4-663-1699 Exf Inspector Signature: Date: a81 Secondary Inspector(a): Inspection Summary: 09/09/15 > Waste Analysis > N = 2.54 Lbs11000 Gallons 06/25/15 > Waste Analysis > N = 2.94 Lbs/1000 Gallons 08/07/14 > Soil Analysis lb page: 1 Permit: AWS130001 Owner- Facility : Thomas E Porter Facility Number: 130001 Inspection Date: 11/18/15 Inspection Type: 'Compliance Inspection Reason for Visit: Routine Regulated Operatlons Design Capacity Current promotions Swine Swine - Farrow to Wean 2,000 1,982 Total Design Capacity: 2,000 Total SSLW: 866,000 Waste Structures Disignated Observed Type Identifier Closed Date Start Date Freeboard. Freeboard Waste Pond WP1 t9.00 29.00 page: 2 Permit: AWS130001 Owner - Facility : Thomas E Porter Facility Number: 130001 Inspection Date: 11/18/15 Inppection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No No No 1. Is any discharge observed from any part of the operation? ❑ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ Cl M ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ ❑ c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ ■ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ M ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ M ❑ ❑ State other than from a discharge? Waste Collection, Storage & Treatment Yes NQ_No No 4. Is storage capacity less than adequate? ❑ 0 ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (I.eJ large ❑ ■ ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ M ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ❑ ❑ B. Do any of the structures lack adequate markers as required by the permit? (Not applicable ❑ ❑ ❑ to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ O ❑ ❑ maintenance or improvement? Waste APRIlicaltion Xes _No No Me 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ M ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ 0 ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ Is PAN > 10%110 lbs.? ❑ Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ page: 3 Permit: AWS130001 Owner - Facility: Thomas E Porter Facility Number: 130001 Inspection Date: 11/18/15 Inssection Type: Compliance Inspection Reason for Visit: ' Routine sate_ gplication Yes No No No Crop Type 1 Fescue (Hay, Pasture) Crop Type 2 Matua (Hay) Crop Type 3 Smaii Grain Cover Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste ❑ 0 ❑ ❑ Management Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑,E ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ 0 ❑ ❑ determination? 17. Does the facility lack adequate acreage for land application? ❑ E ❑ ❑ 1 B. Is there a lack of properly operating waste application equipment? ❑ 0 ❑ ❑ Records and Documents Yes No Ng Ns 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ N ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ N ❑ ❑ If yes, check the appropriate box below. WU P? Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? ❑ Other? ❑ If Other, please specify 1 21. Does record keeping need improvement? ❑E ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ Rainfall? ❑ Stocking? ❑ page: 4 i . Permit: AWS130001 Owner - Facility : Thomas E Porter Facility Number: 130001 Inspection Date: 11/18/15 Inpsection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No Na Na Crop yields? ❑ 120 Minute inspections? ❑ . Monthly and T' Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ❑ ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ E ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ E ❑ Other Issues Yes No Na Ne 28. Did the facility fail to property dispose of dead animals within 24 hours and/or document ❑ 0 ❑ ❑ and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ 0 ❑ ❑ contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? Cl 0 ❑ ❑ (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? ❑ E ❑ ❑ If yes, check the appropriate box below. , Application Field ❑ Lagoon ! Storage Pond ❑ Other ❑ If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or ❑ N Cl ❑ CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ E ❑ ❑ 34. Does the facility require a follow-up visit by same agency? ❑ E ❑ ❑ page: 5 t 4 Water Resources ENVIRONMENTAL QUALITY December 2, 2016 Thomas E. Porter Porter Farms 4455 Mount Pleasant Road South Concord, NC 28025 DONALD R. VAN DER VAART Secretory S. JAY ZIMMERMAN Re: COMPLIANCE INSPECTION Porter Farms/Facility 13-01 General Permit AWS130001 Cabarrus County Dear Mr. Porter: Director On September 29, 2016, staff of the North Carolina Division of. Water Resources (D WR), Water Quality Regional Operations Section (WQROS), inspected the Porter 'Farms and the permitted waste . disposal system. We wish to thank you for being present and assisting during the inspection. The enclosed report should be self-explanatory; however, should you have any questions concerning this report, please contact me at (704) 663-1699. Sincerely, ames B. Bealle III, Environmental Specialist Mooresville Regional Office, Water Quality Regional Operations Section Division of Water Resources enclosure: Compliance Inspection Report dated September 29, 2016 Jb State of North Carolina I EnvuonmenW Quality I Water Reaoorcea I Water Quality Regional Operations. Mooresville Regional Office J 610 Ent Center Avenue, Suite 301 I Mooresville, North Carolina 2811_5 704 663 16" f Division of Water -Resources Division of Soll and Water Conservation ❑ Other Agency Facility Number: 130001 Facility Status: Acute Permit: AWS130001 'Denied Access. Inspection Type:. Compliance Inspection Inactive Or Closed Date: Reason for visit Routine County: Cabamis Region: Mooresville Date of Visit: 09/2912016 Entry Time: 03:00 pm Exit Time: 4:30 pm Incident d t Farm Name: Porter Farms Owner Email: teporter02@aol.com Owner: Thomas E Porter Phone: 704-785-8891 Nulling Address- 4455 Mt Pleasant Rd S Concord NC 280257659 Physical Address: 4603 Mt Pleasant Rd S Concord NC 280257659 Facility Status: Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latltudo: 35° 21' 07" Longitude: 80' 26' 40" Five miles south of Mt. Pleasenl on Mt. Pleasant Rd. (SR 1006). Farm is on the left across from the intersection with Bost Cut Off Rd. Question Areas: Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application Records and Documents Other Issues Certified Operator: Thomas E Porter Operator Certification Number. 17560 Secondary OIC(s): On -Site Represontative(s): Name Title Phone 24 hour contact name Thomas E. Porter Phone: 704-785-8891 On -site representative Thomas E. Porter Phone : 704-785-8891 Primary Inspector. James Phone: 7 4 3 169 Inspector Signature: Date: �• Secondary Inspector(s): V Inspection Summary: 03/31/16 > Waste Analysis > N = 3.17 Lbs/1000 Gallons 09/09/15 > Waste Analysis > N = 2.54 Lbs/1000 Gallons 04/05116 > Soil Analysis U page: 1 Permit AWS130001 Owner - Facility: Thomas E Porter Facility Number. 130001 Inspection Date: 09/29/16 Inpsection Type: ' Compliance Inspection Reason for Vtsit: Routine I Regulated Operations Design Capacity Current promotions Swine Swine - Farrow to Wean 2,600 1,992 -Total Design Capacity: 2,000 Total SSLW: 866,000- Waste Structures Dlslgnated Observed Type Identifier Closed Date Start Date Freeboard Freeboard Waste Pond WP1 19.00i 24.00 Permit: AWS130001 Owner - Facility : Thomas.-E Porter Facility Number: 130001 Inspection Date: 09/29/16 Inpsection'type: Compliance inspection Reason for Visit: Routine Aischaraes & Stream Imdacts Yea No Na me 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ . Other ❑ a. Was conveyance man-made? ❑ ❑ 0 ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ❑ 0 'El . c. What is the estimated volume that reached waters of, the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ❑ M ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ 0 ❑ ❑ 3. Were there any observable adverse impacts or potential adverse impacts to Waters of the ❑ 0 ❑ ❑ . State other than from a discharge? Waste Collection Storavie & Treatment Y" No Net Ne . 4. Is storagecapacity less than adequate? ❑ -M ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (i.e.1 large ❑ 0 ❑ ❑ trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a ❑ 0 ❑ ❑ waste management or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ❑ ❑ B. Do any of the structures lack adequate markers as required by the•permit? (Not applicable ❑ M ❑ ❑ to roofed pits, dry stacks and/or wet stacks) - 9. Does any part of the waste management system other than the waste structures require ❑ ❑ ❑ maintenance or improvement? Waste Aoolicatlon Yes No No No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ M ❑ ❑ maintenance or improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ , Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ PAN? ❑ �..❑ . Is PAN > 10%/10 lbs.? ....•:. Total Phosphorus? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift?.. ❑ Application outside of application area? ❑ page: 3 e Permit: AWS130001 Owner - Facility : Thomas E Porter— Facility Number.. 13D001 inspection Date: ' 09/29/16 Inpsection Type: Compliance Inspection <Reason for Visit: Routine Yes No Na No Waste AnpllcaMon Fescue (HaY, Pasture) Crop Type 1 Crop Type 2; n�afr,a (Hey) Crop Type 3 Small Grain Cover , Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type.4 Soil Type 5 Soil Type 6 14, Do the receiving crops differ from those designated in the Certified Animal Waste ❑ ❑ ❑ Management Plan(CAWMP)? ❑ ❑ ❑ 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre ❑ N❑ ❑ determination? ❑ ❑ ❑ 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ' ❑ ❑ ❑ Records and_Documents 19. Did the facility fail to have Certificate of Coverage and Permit readily available? Yes 'No Na No ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ N ❑ ❑ If yes, check the appropriate box below. ❑ Wup? Checklists? ❑ Design? ❑ Maps? ❑ Lease Agreements? Other? ❑ If Other, please specify 21. Does record keeping need improvement? ❑ N ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ Weekly Freeboard? ❑ Waste Analysis? ❑ ' Soil analysis? ❑ Waste Transfers? ❑ Weather code? ❑ ' Rainfall? ❑ Stocking? ❑.... t page: ' ._ 4 Y r, Permit: AWS130001 Owner - Facility: Thomas E Porter Facility Number: 1300011 Inspection Date: 09/29/16 Inspection type:. Compliance Inspection Reason for Visit Routine Regords and Pocuments Yn No Na No Crop yields? ❑ 120 Minute inspections? ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ 0 Cl ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment ❑ ❑ ❑ (NPDES only)? 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ 00 ❑ 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the ❑ ❑ ❑ appropriate box(es) below: Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon ❑ List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? [IN [] ❑ 27. Did the facility fall to secure a phosphorous foss assessment (PLAT) certification? 1111 ❑ Other Issues 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report mortality rates that exceed normal rates? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. Application Field Lagoon / Storage Pond Other If Other, please specify 32. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? 33. Did the Reviewertinspector fail to discuss reviewfinspection with on -site representative? 34. Does the facility require a follow-up visit by same agency? Yea ❑0❑❑ No Na Na ❑ M ❑ ❑ ❑ M ❑ ❑ ❑ MCI ❑ El [1,0110 ❑■❑❑ ❑ ME] ❑ page: 6 Certified Operator: Back-up Operator: Location of Farm: Type of visit: 09 Compliance Inspection Operation Review 0 Structure Evaluation Q Technical Assistance Reason for Visit: 0 Routine' O Complaint O Follow-up O Referral Q Emergency O Other O Denied Access Date of Visit: 93MM Arrival Time: a Departure Time: County:(:24 °URegion:' ` `(_-) Farm Name: f 1, Owner Email: Owner Name: G , i yr- Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative:7W I:f-- A ) �-!/\j Latitude: Integrator: Certification Number: ( 6 Certification Number: Longitude: JEFDesDesignSwine city Pop. Wet Pouitry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er Dai Cow Wean to Feeder Non -La er Dai Calf EAtdffer to Finish D . Poult , Design Ca aci Current P,o P. Da' Heifer Farrow to Wean arrow to Feeder D Cow Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder - - Boars-, ---- - - -- - _ Other Turkeys Turkey Poults __,Beef Brood Cow_ - --- - - Li—ot-her I 10ther Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ Nojg;LA-❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No A ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Ye❑ VN'o NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [] Y ❑ NA ❑ NE of the State other than -from a discharge? Page 1 of 3 ' 21412011 Continued Facifi Number: - Date of Inspection: 4. Is storage capacity?( plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 rA/ Identifier: JP1017 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate (i.e., large trees, severe erosion, seepage, etc.) Structure 3 Structure 4 ie structures observed? 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? [:]Yes �❑ NA ❑ NE ❑ Yes [:]No C .JJM D NE Structure S Structure 6 ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environme hreat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑Yes o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ YeKE� ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NA ❑ NE maintenance.or-improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes rEpo 0 NA ❑ NE ❑ Excessive Ponding [] Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manurc/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Qqtside of Approved Area 12. Crop Type(s): OV-11 - 13. Soil Type(s): Q 14. Do the receiving crops differ from those designated in the CAWMP? J / Yes ❑ NA ❑ NE 15, Does the receiving crop and/or land application site need improvement? ❑yes No ❑ NA ❑_NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes o NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of property operating waste application equipment? Yes No NA ❑ NE ftuuired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Y NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box. ec ists Design ❑ Maps ❑ Lease AgreementsZaste*�.E3Veather 21. Doe record keeping need improvement? If yes, check ppropriate box below. - ❑ NA ❑ NE Waste Application eekly Freeboard WasteAnalysisTon�ly of alysis Code ainfall tocking ❑ C�Yield Minute Inspections and 1" Rainfall Inspec 'ons' Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NE Page 2 of 3 21412011 Continued - o ]FacilityNumber: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Ye o ❑ N ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ NE the appropriate box(es) below. ❑ Failure to complete annual'sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon 5�� List structure(s) and date of fast survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o N ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT') certification? ❑ Y A ❑ NE Other Issues 28. Did the facil' roperly dispose of d animals with 24 hours and/or document Yes NA ONE and report mortality rates that were higher nonma ? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes o ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. \ 30. Did the facility fail to notify the Regional Office of emergency situations as required by the Yes o ❑ NA [ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [] NA ❑ NE ❑ Application Field ❑ Lagoontstorage Pond ❑ Other: Were the CAWMP? Yes NA NE 32. any additional problems noted which cause non-compliance of permit or ❑ ❑ ❑ 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same, agency? _ _ �_ _.__ __.❑ _ �❑ NA ❑ NE Gents (refer to question.#): Ex61ain any::YES answers rawings of facility to. bettex:eiplain.situations (use adi CC3�3 oq o . �ct /�7 3gym,p"� Reviewer/Inspector Name: . Reviewer/Inspector Signature: Any.'additiopal recommendations or any other't pages as necessary).,:.` , ••, } ::; ZK -I �t� - G� t - I k-v Phone: Date: Page 3 of 3 21412011 Date of Visit: Arrival Time: ��� Departure Time: oil ` County:C . itRegion: Farm Name --mat 1� ► "Ci� �l-�' Owner Email:' Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Opera Back-up Opera L� Location of Farm: Title: Phone: CC }r Integrator: Certification Number: E�=CertiflcationNumberc��i�ll 0 Latitude: Longitude: Design` ' Curreist'� Design. Current Design ,Current Swine Capacity Pap Wet Poultry Capacity Pop Cattle, Capacity > Pap 4 Wean to Finish La er ' Wean to Feeder Non -La er Feeder to Finish F ow to Wean Design ; Current- a. 4 ow to Feeder Farrow to Finish Gilts Boars :Other D , -Pouf Capacity.. Pop. Layers _ Non -Layers Pullets Turkeys Turkey Poults Other Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts �,� 1. Is any discharge observed from any part of the operation? ❑ Yeti! o ❑ NA ❑ NE Discharge originated at: El structure [I Application Field ❑ Other: �� a. Was the conveyance man-made? ❑ Yes [] No A ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? Yeo ❑ N NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes `NA ❑ NE of the State other than from a discharge? 1 Page I of 3 21412011 Continued Facill Number: jDate of Inspection: j Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No A ❑ NE Structure I Structure 2 Structure 3 Structure 4 V.1pdJer Structure 5 Structure 6 tifier:. way?: Designed Freeboard (in): 4tothegrity Observed Freeboard (in): 5. Are there any immediate th of any of the structures observed? ❑ Yes o NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [:]Yes NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t rest, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ]o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑• Yes rNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [] NA ❑ NE maintenance or improvement? Waste ApiRlication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NA ❑ NE maintenance or improvement? 11. is there evidence of incorrect land application? if yes, check the appropriate box below. [] Ye No ❑ NA [] NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN [,] PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evide cc of Wind Drift ❑ Ap ' ation Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): �. ��iIt 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [_ o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes rEl NA r] NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility•fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box. hecklistsLi Design Lj Maps ❑ Lease Agreements 21. Does record keeping need improvement? If yes, check the appropriate box below. re s No ❑ NA ❑ NE Waste Appllii ion �ly Freeboard �te Analysis oil Analysis rans s ❑ Weather Code [&sinfail' j�f Stockin Crop Yield [�] 120 Minute Inspections Monthly and 1" Rainfall Inspec ons Sludge Survey �. 22. Did the facility fail to install and maintain a rain gauge? [] Yest!KNo [DNA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [] No A ❑ NE Page 2 of 21412011 Continued ��� M ., _ FacilityNumber: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? Yes N ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check �❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 29. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher an�f` normal`? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of ernSr&jg&juUations as required by the permit? (i.e., discharge, freeboard problems, over-app ation) 3 I. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yess ❑ Yes�o ❑ NA ❑ NE NA ❑ NE I NA ❑ NE ❑ NA ❑ NE ❑ NA {] NE ❑ Yes EEMo ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any Additional., recommendations or any other,comments. Use drawings of facility, to better explain situations (use additional pakes as necessary).._ � ► � v�� z B 0-2 M ReviewerlInspector Name: Phone: Reviewer/Inspector Signature: Date: Page 3 of 3 21412011 13-01 Nutrient Management Plan For Animal Waste Utilization This plan has been prepared for: Porter Farm Thomas Porter 4455 Mt. Pleasant Road Concord NC 28025 03-23-2005 This plan has been developed by: Daniel McClellan Cabarrus SWCD 715 Cabarrus Ave W Concord, NC 28027 Developer Signature Type of Plan: Nutrient Management with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste. management that are included with this plan. I -,�-os Signature (owner) Date Signature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By:� n Technical Specialist ignature Date _ - _ - - - - _ - 464022 D_ ^ ' - - _ _atabase Version 3.1 D- - _ _ _ - - Date Printed; 03-23-2005 Cover Page 1 RECEIVED / DENR 1 DWQ AQUIFFR'PPnTF(',T1nN SECTION MAR 16 2009 Nutrients applied in accordance with this plan will be supplied from the following source(s)- Commercial Fertilizer is not included in this plan. U3 Test waste generated 7,046,600 galslyear by a 2,200 animal Swine Farrowing Weanling Lagoon Liquid operation. This production facility has waste store a ca acities of p2proximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 12686 Incorporated 21787 Injected 23994 Irrigated 13790 Max. Avail. PAN (lbs) * Actual PAN Applied'(lbs) PAN Surplus/ Deficit(lbs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 d3,790 16008 -2,218 8,180,025 -1,133,425 This plan includes a User Defined Source to determine the total pounds of PAN in lieu of NRCS Standard values. Refer to North Carolina Cooperative Extension Service publication AG-439-42 entitled "Soil Facts: Use of On -Farm Records for Modifying a Certified Animal Waste Management Plan" for guidance on using on -farm records to develop a User Defined Source. ------------------------------------------------------------------------------------ Note: In source ID, S mesas standard source, U means user def-med source. * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this source 464022 Database Version 3.1 Date Printed: 03-23-2005 Source Page 1 of I Narrative Waste Utilization-- Use agricultural waste or other waste on Iand in an environmentally acceptable manner. Refer to waste sample and soil sample results for applying waste. -----------------------------,----------------,-------------- -- --- - --- 464022 Database Vernon 3.1 Date Printed: 03-23-2005 -- Narrative Page 1 -of 1 -1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop, as well as the crop's P205 Removal Rate. The Leaching Index (LI) and the Phosphorous Loss Assessment Tool (PLAT) Rating are also provided for each field, where available. If a field's PLAT Rating is High, any planned manure application is limited to the phosphorous removal rate of the harvested plant biomass forthe crop rotation or multiple years in the crop sequence. Fields with a Very High PLAT Rating should receive no additional applications of manure. Regardless of the PLAT rating, starter fertilizers may be recommended in accordance with North Carolina State University guidelines or recommendations. The quantity of P205 applied to each crop is shown in the following table if the field's PLAT rating is High or Very High. Planned Crops Summary Field Total Acres Useable Airs Plat Reim g � Soil Series Crop Sequence RYE P205 al RanTract 0lQbs1e as/acre) Applied {Ibs(aam) 950 3 10.3C 6.44 Medium NIA Csuldston Fescue Pasture *5.6 Tons 9 NIA 950 1 1 4 1.801 1.5 Medium N/A Goldston Fescue Pasture 3.4 To 5 NIA 950 5 15.5 13.3 Medium NIA Goldston Fescue Pasture *5.6 Ton 9 NIA 950 6 17. 14.2 Low NIA Kirksey Fescue Pasherc *8.0 Ton 13 N/A 950 7 4 3.1 Low NIA Badin Fescue Pasture *7.8 To 12 NIA 950 8 I.1 I. Low NIA Badin Fracuc Pasture 07.8 Toa 12 NIA 950 9A 2.2 2. Low NIA Badin Fescue Pasture *7.8 To 12 NIA 950 913 0. 0. Low NIA Kadin Fescue Pasture 3.9 TO 6 NIA 968 2 57. 40.51 Low NIA Gea viuc Fescue Pasture 4.8 Ta 8 NIA PLAN TOTALS: 110.40 83.10 mNq+f 4 �� tiy�iw f [- �r ..sa'il�lyt��5.,'''P018lt�iQl.dCli1TJTeC�IIICQ�C►flidQltCC _'" �H�M Low potential to contribute to soluble None 2 nutrient leaching below the root zone. Moderate potential to contribute to Nutrient Management (590) should be planned, >_ 2 & soluble nutrient leaching below the <= l0 root Done. High potential to contribute to soluble Nutrient Management (590) should be planned. Other conservation practices that improve nutrient leaching below the root zon& the soils available water holding capacity and improve nutrient use efficiency'should be > 10 considered Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328� Long-TermNo-Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffets (391). �3.7ia . Jack f.T`fndPx Rating add —1 Management Reconunendahon �r ...: :..� •a.. u.e%n"3�w= :.era � .:._ -..f� o-....,.Ei-..;, � ..:.::." n..": y _ ,. 0 - 25 Low No adjustment needed, N based application 25 = 50 Medium No adjustment needed, N based application 51 - 100 High Application limited to crop P removal > 100 Very High Starter P application only 464022 Database version 3.1 Date Printed 3232005 PCs Page 1 or I NOTE: Symbol * means user entered data. The Waste Utilization table shown below sununarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of . cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements;_ and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by inanure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity ofsolid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. 'A balance of the total manure produced and the total manure applied is included in the table to ensule'that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year l Tract Field Some ED soil Series Total Aces Use. Acres Crop RYE Apptie Period Nitrogen PA Nutrient Raq'd pbs/A) COM I Fert. Nutrient Applied (lbs/A) Res. (lbs/A) App6c, Maw Manua: PA Nuuient Applied (Ibs/A) Liquid MmureA ppffcd (acre) solid Manure Applied (acre) Liquid Manure Applied (Field) solid Mariure Apples (Field) Nf Ni IY N I00a gal/A Tons 1000 gals i tons 950 3 U3 t'3oldston 10.30 6.44 Fescue Pasture 05.6 811-7/31 0208 0 0 brig. 20S 106-2 0.00 684.51 0.00 950 4 U3 Goldstion I.80 L,50 Fescue Pasture 3.4 Tons 8/1-7131 1 0128 0 1 0 IMS 128 65.41 0.00 98.11 0.001 950 5 U3 Goldston 15.50 13.39 Fescue Pasture "5.6 8/1-7/31 •208 0 0 IiTig. 208 106.29 _ 0.00 1,423.23 0. 950 6 U3 Kirlrsey 17.00 14.26 Fescue Pasture 08.0 8/1-7131 0260 0 0 brig 132.86 0.00 1,894.63 0. 950 7 U3 Badin 4.20 3.10 Fescue Pasture •7.8 8/1-7/31 '254 0 a brig. 254 129.801. D.00 402.3 .0. 950 8 U3 Bedin 1.10 1.00 Fescue Pasture •7.8 9/1-713 t 0254 0 0 brig. 254 129.90 O.GC 129.8 0. 950 9A U3 Badin 2-20 2.00 Fescue Pasture •7.8 8/1-7131 •254 0 0 Irrig. 254 129. ' 0.00 25939 0.00 950 9B U3 Badin 0.90 0.90 Fescue Pasture 3.9 Tons 811-7131 127 0 0 Irrig. 127 64.90 0.00 58.41 0.00 968 2 U3 Georgevillo =57.40 40.51 Fescue Pasture 4.8 Tons 811-7/31 k 56 0 0 Inig, 156 3,229.37 0.G Total Applied, 1000 gallons 8,180.03 Total Produced, 1000 gallons 7,046.60 i " MOM Balance, 1000 gallons -1,133.43 f IVIR Total Applied, tons `= r"-1_altx 0.00 Total Produced, tons ca 0. Bntance, tons WO 0, Notes: 1. In the tract column, - symbol means leased, otherwise, owned 2. Symbol* means user entered data. 464022 Database Version 3.1 Date Printed: 3/23/2005 WUT Page 1 of 1 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hots that may be applied to each Feld selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one.application event. Irrigation Application Factors Tract Field Soil Series Application Rate (incheAour) Application Amount (inches) 950 3 Goldston *0.36 1.0 950 4 Goldston $0.36 1.0 950 5 Goldston *0.36 1.0 950 6 Kirksey *0.36 1.0 950 7 Badin *0.36 1.0 950 •8 Radin *0.36 1.0 950 9A Badin *0.36 1.0 950 9B Badin *0.36 1.0 968 2 Georgeville *0.36 1.0 464022 Database Version 3.1 ' Date Printed 3/23/2005 IAF Page 1 of 1 NOTE: Symbol * means user entered data. _` The Nutrient Management Recommendations table shown below provides an annual summary of the nutrient management plan developed for this operation. This table provides a nutrient balance for the listed fields and crops for each year of the plan. Required nutrients are based on the realistic yields of the claps to be grown, their nutrient requirements and soil test results. The quantity of nutrient supplied by each source is also identified. The total quantity of nitrogen applied to each crop should not exceed the required amount. However, the quantity of other nutrients applied may exceed their required amounts. This most commonly occurs when manure or other byproducts are utilized to meet the nitrogen needs of the crop. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in afield. In such situations, additional nitrogen applications from nonorganic sources may be required to supply the recommended amounts of nitrogen. Nutrient Management Recommendations Test YEAR I N (IbslA) P205 (lbs/A) K20 (WA) Mg (lbs/A) Mn (Ibs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 950 3 Req'd Nutrients •208 0 0 0 0 0 0 0 Aons App. Period 6.44 8/1-7/31 Supplied By RP7fii: ,,Oj, Q x s� z 4wrI" ; '; R 5" r� t . 7,s a" V p"'e fi.�t ,q CROP Fescue Pasture Starter 0 0 0 0 0 0 0 0 Commercial Pert. 0 0 0 0 0 0 0 0 Soil Series Goldston Residual 0 0 0 0 0 0 0 0 RYE I Sample hate *5.6 Tons 10-22-04 Manure 2081 105 387 501 1 1 0 0 P Removal I Rating 9 Ibs/ac. Medium BALANCE 0 105 387 50 1 1 0 0 Tract Field 4S0 4 Req'd Nutrients *128 0 0 0 0 0 0 0 Acm App. Period 1.50 8/1-7/31 Supplied By: '� N e n�ya c'�r ��" J'%�Y`�X ..,'.'� 4 f °�' aZS�?r..�t�fdiN'Wt K a y yTx CROp Fescue Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 01 0 0 0 0 Soil Series Goltwon Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 3A Tons 10-22-04 Manure 1281 64 238 31 0 1 0 0 P Removal I Rating 5 lbs/oe. Medium BALANCE 0 64 238 31 0 1 0 0 Tract Field 950 5 Req'd Nutrients *208 0 0 0 01 0 0 0 Acres App. Period 13.39 8/1-7/31 Supplied BY "a './iC pry .— ri'3^3 e}S+; f JW ,x;._, Y"r �auf `+ �� ` , CROP Fescue Pasture Starter 0 0 0 0 0 0 0 0 Commensal Fort. 0 0 0 0 0 0 0 0 Soil Series Goldxtoa Residual 0 0 0 0 0 0 0 0 RYE I Sample Date *5.6 Tons 10-22-04 Manure 208 105 387 50 1 1 0 0 P Removal I Ruling 9 ars/ae. Medium BALANCE 0 105 387 50 I 1 0 0 Tract Field 950 6 Req'd Nutrients *260 4 0 0 0 0 0 0 Acres App. Period 14.26 8/1-7/31 Supplied ,,Ir. �� 1�- 1101W, �� I- CROP Fescue Pasture Stllrter o 0 0 0 0 0 0 0 COnunercial Fart. 0 0 0 0 0 0 0 0 Soil Series Kirksey Residual 0 0 0 0: 0 0 0 0 RYE Sample Date *8.0 Tons 1 10-22-04 . Manure 2601 131 484 621 1 1 0 0 P Removal I Ratiag 13 ibs/ac. w $ALANCE 1 01 1311 4841 621 11 1 0 0 464022 Database Version 3.1 Date Printed: 3/23/2005 NMR Page I of 2 Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn Obs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract I Field 950 7 Req'd Nutrients *254 0 0 0 0 0 0 0 Acres A .Period itP 3.10 8/1-7 1 /3 lttxl B y ` "� s' _ .3? y a. ' . � tie ? • r ft, � .' CROP Fescue Pasture Starter 0 0 0 0 D 0- 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Sail Series Badin Residual 0 0 0 0 0 0 0 0 RYE I Samplc Date *7.8 Tons 10-22.04 Manure 254 128 473 61 1 1 0 0 P Removal Rating 1216s/ac. w BALANCE 0 128 473 61 1 1 0 0 Tract I Field 950 8 Req'd Nutrients *254 150 150 10 0 0 0 0 Acres App. Period 1.00 8/1-7/31 Supplied By:WFU i'"•Y''3 J' Vie-• t Ffya'•�:tx c. #rr- CROP Fescue Pasture Starter 0 0 0 0 0 0 01 0 Commercial Fert. 0 0 0 01 0 0 0 0 Soil Series Badin Residual 0 0 0 0 0 0 0 0 RYE Sample pate *7.8 Tons 12-22-04 Manure 254 128 473 61 1 1 0 0 P Removal Rating 1216slac. Low BALANCE 0 -22 323 61 1 1 0 0 Tract Field 950 9A Req'd Nutrients *254 150 150 0 0 0 0 0 Acres App. Period 2.00 8/1-7/31 Supplied By.AWM 09 PRM CROP Fescue Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Badin Residual 0 0 0 0 0 0 01 0 RYE Sample Date *7.8 Tons 12-22-04 Manure .254 128 473 61 I 1 0 0 P Ramova] Rating 12lbs/ac. Low BALANCE 0 22 323 bl 1 1 0 R Tract Field • 950 9B Req'd Nutrients 127 ISO 150 0 0 0 0 0 Acres App. Period 0.90 8/1-7131 Supplied BY ��r � : .: ts. ._ _ r .... .:....:.. cry.. -tic '--5. .3,-e ..r_... CROP Fescue Pasture Starter 0 0 0 0 0 0 0 0 Commercial Fart. 0 0 0 0 0 0 0 0 Soil Series Badin Residual 0 0 0 0 0 0 Oi 0 ple Date 3.9 Tons 12-22-M Manure 127 64 237 30 0 1 0 0 l Rating 6 Ibs/ac. Low BALANCE 0 -86 87 30 0 1 0 0 P Field 968 2 Req'd Nutricnts 156 0 0 0 0 0 0 0 p. Perio&I 40.51 9/1-7/31 Supplied By. CROP Fescue Pasture Starter 0 0 0 01 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Geervvilic Rcsiduall 01 0 0 0 0 0 0 0 RYE Sample Date 4.8 Tons 10-22-04 Manure I56 7$ 291 37 0 I 01 0 PRarwovallRatingl 8 Ibs/ac. w BALANCE 1 01 7$ 291 37 0 1 0 0 NOTE: Symbol * means -user entered data 464022 Database Version 33 Date Printed:' 3/2312005 NMR Page 2 of 2 The Required Soil Test Values shown in the following table provide a summary of recommended actions that should betaken if soil tests indicate excessive levels of copper or zinc. Fields that receive manure must have an annual soil analysis for these elements. High levels of zinc and copper can adversely affect plant growth. Alternative crop sites must be used when the concentration of these metals approach excessive levels. Site life can be estimated bydividing the amount of copper and zinc to be applied in lbs/acre by 0.036 and 0.071, respectively and multiplying the result by 0.85. Sy adding this quantity to the current soil index for copper or zinc, we can predict life of the site for waste disposal. In addition to copper and zinc indices, this table also provides a summary of lime recommendations for each crop based on the most recent soil sample. Application of lime at recommended rates is necessary to maintain soil pH in the optimum range for crop production . Valuesit Test Tenet Field Crop pH lame Recom. (tons/acre) Cu-1 Copper Recommendation Zn-1 Zinc Rocornn=dation 950 3 Fescue Pasture 6.4 0.0 294 None 382 None 950 4 Fescue Pastum 6.1 0.0 132 Nona 329 Nona 950 5 Fescue Pasture 6.0 0.0 232 None 455 None 930 6 Fescue Pasture 6.4 0.0 378 None 488 None 950 7 Fescue Pasture 6.3 0.0 295 None 390 None 950 9 Fescue Pasture .0 0.0 0 None o None 950 9A Fescue Pasture .0 0.0 0 None p None 950 98 Fescue Paslura .0 0.0 0 None 1 0 None 969 2 1 Fescue Pnsture 6.1 0 11 129 None 1 203 1 Nona ------ -- - ------------------------------------------------------ 464022 Database Version 3.1 Date Printed. 03-23-2005 STV Pa 1 of t The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should betaken not to load effiuent,application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate 1000 gavac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres -15 Years Accumulation' Swine Farrowing-Weanling Lagoon Sludge - Standard Com 120 bu ISO 13.16 65.19 130.38 195.57 Hay 6 ton 1ZY.E. 300 26.32 32.59 65.19 97.78 Soybean 40 bu 160 14.04 61.12 122.23 183.35 ------------------------------------------------------------- --- 464022 Database version 3.1 Date Printed: 03-23-2005 Sludge Page I of I The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacityshould be greaterthan or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates thatthe plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storatxe Canacitv Source Name Test Design Storage Capacity (Days) StartDate 9/1 180 Plan Year Month Available Storage Capacity (Days) 1 1 170 1 2 163 1 3 174 1 4. 180 i 5 180 I 6 180 1 7 180 1 8 180 1 9 180 1 I0 180 1 11 171 1 12 161 * Available Storage Capacity is calculated as of the end of each month. 464022 _ Y r ^` _ _ Database Version 3.1 Date Printed: 03-23-2005 Capacity Page1 of 1 Required Specifications For Animal Waste Management I. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must.be documentation in -the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, MRCS Field Office Technical Guide Standard 393 -- Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). -------------------------------------------------------------------- --- 464022 Database Version 3.1 Date Printed: 3/23/2005 Specification Papte ] 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Wastetnutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. - _ -464022 ^' ' {' Database Version'3.1 ^ _ ` - - _ _ _ - - Date Printed: 3/23/2005 T �' ' _ Specification Pate 2 -- 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. ---------------------------------------------------- -------------------------------- 464022 Daubase Version 3.1 Date Printed: 3/23/2005 Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when. these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a,manner that meets North Carolina regulations. r Y r - 464022 Database Version 3.1 Date Printed: 3/23/2005 Specification PaRe 4 Crop Notes Fescue. Piedmont The following crop note applies to field(s): 6 Adaptation: Well -adapted. In the Piedmont, tail fescue can be planted Aug. 20 to Oct. 10 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 lb/ac., for drilled use 15 to 201b/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 601b/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25%' for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 2, 7, 8, 9A, 9B Fescue: Piedmont Adaptation: Well -adapted. In the Piedmont, tall fescue can be planted Aug. 20 to Oct. 10 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 301b/ac., for drilled use 15 to 20 lb/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with. clovers. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 lb/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper Iegume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. The folIowing crop note applies to field(s): 3, 4, 5 Fescue: Piedmont Adaptation: Well -adapted - In the Piedmont, tall fescue can be planted Aug. 20 to Oct. 10 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 lb/ac., for drilled use 15 to 20 lb/ac. seed. Use certified seed to avoid introducing weeds or annual ryegmss. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 lb/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% for grazing. Apply N Feb. I to Mar. 20'and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. 464022 - - - - - -"- _ _ _ Database Version 3.1 Date Printed: 03-23-2005 Crop Note Page 1 of I NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Thomas E. Porter Porter Farms PO Box 796 Salemburg, NC 28385 Dear Thomas E. Porter: Coleen H. Sullins Director October 1, 2009 Dee Freeman I�! OCT - s zoos Subject: Certificate of Coverage No. AWS130001 Porter Farms Swine Waste Collection, Treatment, Storage and Application System Cabarrus County In accordance with your requests for renewal and change of ownership, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Thomas E. Porter, authorizing the operation of the subject animal waste management system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management and land application of animal waste as specified in the facility's Certified Animal Waste Management Plan (CAWMP) for the Porter Farms, located in Cabarrus County, with a swine animal capacity of no greater than the following annual averages: Wean to Finish: Feeder to Finish: Boar/Stud: Wean to Feeder: Farrow to Wean: 2000 Gilts: Farrow to Finish: Farrow to Feeder: Other: If this is a Farrow to Wean or Farrow to Feeder operation, there may be one boar for each 15 sows. Where boars are unnecessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows. The COC shall be effective from the date of issuance until September 30, 2014, and shall hereby void Certificate of Coverage Number AWS130001 that was previously issued to this facility. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Please pay careful attention to the record keening and monitoring conditions in this permit. _ Record keeping form_ s are unchanged with this General Permit. Please continue to use the same record ke=ina forms. 1636 Mail Service Center, Ra fth, North Carolina 27699-1636 Location; 2728 Capital Blvd., Raleio, North Carolina 27604 ne Phone: 919-733-32211 FAX: 919-715-05881 Customer Service:1-877-623-6748 oil ffi Carolliina Internet: www.nanratemuality.org �/��urQf�i� An Equal Opporlunity 1 Affirmalin Action Employer If your Waste Utilization Plan (WUP) has been developed based on site -specific information, careful evaluation of future samples is necessary. Should your records show that the current WUP is inaccurate you will need to have a new WUP developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Per 15AiNCACC'2T .0105(h) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100-foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, then an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements; or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the Animal Feeding Operations Unit for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. In accordance with Condition 111.22 of the General Permit, waste application shall cease within four (4) hours of the time that the National Weather Service issues a Hurricane Warning, Tropical Storm Warning, or a Flood Watch associated with a tropical system for the county in which the facility is located. You may find detailed watch/warning information for your county by calling the Greenville/Spartanburg, SC National Weather Service office at (864) 848-3859, or by visiting their website - at: www.erh.noaa..eov/er/gsli/ This facility is located in a county covered by our Mooresville Regional Office. The Regional Office Aquifer Protection Staff may be reached at (704) 663-1699. If you need additional information concerning this COC or the General Permit, please contact the Animal Feeding Operations Unit staff at (919) 733-3221. Sincerely, for Coleen H. Sullins Enclosure (General Permit AWG100000) cc: (Certificate of Coverage only for all ccs) Mooresville Regional Office, Aquifer Protection Section Cabarrus County Health Department Cabarrus County Soil and Water Conservation District APS Central Files (Permit No. AWS130001) AFO Notebooks Murphy -Brown, LLC ,Bealle, James From: Sent: To: Cc: Subject: Attachments: Sent with Genius Scan for iOS. ltttp: lbit.ly/download-genius-scan Sent from my Wad Tommy Porter <teporter02@aol.com> Monday, September 29, 2014 9:28 AM Bealle, James teporter02@aol.com [Start] 2014-09-28 22:42 2014-09-28 22-42.pdf md:� in lg.*40- .4D.Af� f% C'ning 21 Rl N% VEF sD-.A, Y E%-cran,g Junc Mav 2014 22THt'kSDAY 23FRID,AY E-scning 24S AT U RDAY 25 suNDAY IL Evening lk 0 a. so Alit w2sn4 WMurn Date Paycheok 4712 OE/71/2014 Boon B Blai TOTAL Check TOTAL Cheek TOTAL Check TOTAL Bill Prat -Cho" BNt TOTAL ---�� Check TOTAL �� TOTAL 4713 KII/2914 Cash PorEer Farms, Inc. 1+larrre r ' Check Detail May21-31,2614 twn Account Paid Amount or+Qi�•i Anfou:st checking 40'63 Payroll F.vemes .580.00 580.00 -72.00 Payroll LisbllWas 72.00 35.96 Payroll Expenses •35.95 135.98 Payroll Usb6hiss 35.96 45'96 Payroll Llablut1es 35.90 8.41 Payroll F,xpensa -8.41 43,41 Payroll Liabilities 8.41 .8.41 Payroll Llabilltias 8.41 45.00 Payroll LJabNitles 25.00 2.78 Payroll FVenaes -2.78 -2.78 Payroll Usisibea 2.78 436.63 checidng a,BOO.oc Equ0nent Rental �.r�Q.00 3,500.00 -3.500.00 3-NO-00 4714 98f1A/2014 Capsrrus Courft chscOV - MOO Pmfessiomi Fan -160.00 180.00 -180.00 180.00 4718 0&2V=4 Jared Porter Chile" -21MOO Relrnbume sysassa -2,600.00 2.6W.00 -2,000.00 2,800.00 4716 08/t7J20/4 Crop Production... checldnp -1-79LOO 06f1212014 Fedillxers 4,T96.00 1,79&00 .1.796.00 1,786.00 4717 08/21/2014 NC Oepertrerant of.. ctrscklrrp 4&00 rollsasicnal Faes -16.00 16.00 -MOD MOD 4719 08fi8lI014 EsrgWm L Tyede ched*q a4'r.a4 Payroll Expenses aR00 270.00 Payroll Elrpeates .16.74 1&74 Psyr+DA Llamb" 16.74 -W74 Payroll L}st811UM 16.74 -10.74 PeyroN EAmmee -&92 3.92 Paymu LhbM* 3,22 -3.92 Palma Lis«btiltiee 3.02 A92 Peyror Evans" AM 1.02 Peyrolt Lie ADO 1.02 -1.62 Payroll Llehlir n 2.00 -2.00 ptyroll Expent 11 -1.30 1.30 Psy" Latin 1.30 -1.30 447.24 W^ 247.34 PW 3 5/21/2014 NC Depot nwa of Ag*ubm —16.00 Sbehm and OQMODO-P" -a ---------- — --- NC De putnwd of Aoftftffe 1040 Meal SGFWM C4Kftr RMOO, MC 27MG 1040 NC DepwWwd of AWbA" swinepoultry swrq* 52112014 16.00 16-00 NC Depeftwd of AgricuMm owme poultryUMPIS 602112014 16.00 WOO-% _- Division of Water Quality Facility Number _ � - r0-� O Dlvisibn of Sell and, Wat0 Conservation t _ Q Other Agency 1" Type of Visit: 49 Compliance Inspection Operation Review Q Structure Evaluation 0 Technical Assistance Reason for Visit-.' O Complaint O Follow-up O Referral O Emergency O Other O Denied Access �W �r IIII��IP��11 YIIY_�I11 Ili 1 A• � Date of Visit: �Arrival Time: a Departure Time: =$ County: Region: *4 ��l 1 � _ — Farm Name: � r Owner Email: Owner Name: �,� �°�i Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Integrator: Certification Number: Certification Number: Longitude: _ -Design "Current Design Current Design Current 1 Swine Capacity. Pop. , Wet Poultry Capacity Pop. Cattle Capacity - Pop. Wean to Finish I JLayer Dairy Cow Discharges and Stream Ima_acts 1. Is any discharge observed from any part of the operation? ❑ Yes ' ❑ NA [] NE a Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No A ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Ye NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/1011 Continued Facility Numbeq - - Date of Inspection: Waste Collection &TYestment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑Yes Vo NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No A ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 2 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Y ��_o 0 NA ONE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an Immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes �a ❑ NA ❑ NE 8. Do any of the structures lack.adequate markets as required by the permit? 0 Yes �to ❑ NA ❑ NE (not applicable to roofed pits,•dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes�g No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below, ❑ Yes �NoNA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground [] Heavy Metals (Cu, Zn, etc.) ❑ PAN - ❑ PAN > 10% or 10 lbs. C] Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application utside of Approved Area 12. Crop Type(s): C, 13. Soil Type(s):�-- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes go 0 NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Ip ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Ye o . ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Ye o ❑ NA ❑ NE the appropriate box. ps ease greemen s ❑Other: 21. Does record keeping need improvement? If yes, eck the appropriate box below, es ❑ ❑ NA ❑ NE 2rifiall pplicationeekly Freeboar aste Analysis Soil Analysis to rans ers eather Code king ❑ Cr ieid [:]I e Inspections nthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail'to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No <NMNA ❑ NE Page 2 of 21412011 Continued *1 J Facili Number: IDate of Ins ee' don: ,a l 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [DNA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, chec y1 ❑ Yes ❑ NA ❑ NE the appropriate box(es) below. t ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels [] Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes jrNo ❑ NA ❑ NE Other Issues 2$. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Yegc::M No ❑ NA ❑ NE ❑ Yes �3vo 0 NA ❑ NE es ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other. 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? [:]Yes NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Ye o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. r. Use drawinEs of facility to better explain situations (use additional panes as necessary). LN 2)S2�q:71 3 7-713r--- V\'YC �p : Tf b® C Reviewer/Inspector Name: Phone: Reviewer/Inspector Signature: Date; Page 3 of 3 21412011 Faciiity Number Division of Water Quality ©- - O Division of Soil and Water Conservation O Other Agency _s • . type of Visit: Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance teason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit:. Arrival Time: 3+c � Departure Time: County: Region: Farm Name: owner' Email: Owner Owner Name:"' J �� 1 �r 1Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: 111 1.0 Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: = Design. Current Design Current Design Current Swine' Capacity Pop, Wet Poultry . Capaclty` .Pop. Cattle_` Capacity° Pop.- Wean to Finish Wean to Feeder F eder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gifts Boars Other Other Dischar es and Stream Impacts Layer Non -La er n PClan r�Pnt Dry Poult Layers Non -Layers Pullets Turkeys Turkey Poults Other Dairy Cow DaiLy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow . Is any discharge observed from any part of the operation? ❑ YesNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No �1A ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ;!5�VA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ o A ❑ NE 2. is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [] Yes ❑ NA ❑ NE of the State other than from a discharge? 1 Page I of 3 21412011 Continued Facili Number: - Date of Inspection: Waste Collection & Treatment" 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 1 - o1 ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No �VA ❑ NE .Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ; ��— Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the inT (i.e., large trees, severe erosion, seepage, e iiy of any of the structures observed? } 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure. plan? ❑ Yes��No ❑ NA ❑ NE ❑ Yes �<No ❑ NA [] NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? [] Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ;go o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 12Aio ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �T0 ❑ NA ❑ NE maintenance or improvement? 1 I . Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of�Wind yDrift ❑ App ' ation Outside of Approved Area 12. Crop Type(s): _C"vp' . C 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 4S:0AM Gg(qJ'�,. 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes :EgNo ❑ Yes bio ❑ Yes DKNO ❑ Yes I—! Yes >_�No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE [] NA ❑ NE ❑NA ❑NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [] NA ❑ NE the appropriate box. es�gn Maps ❑ Lease Agreements ❑Other: 21. D es record keeping need im ovement? If yes, check the appropriate box below. ❑ NA ❑ NE W " Applicati n 1�4�eekly Freeboard�Minutc aste Analysis oil Analysisgi�as�teTmnsfers alher Code ainfall Stocking ❑ C Yield ❑ Inspections ❑hly and I" Rainfall Inspections udge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �Io ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No�NA ❑ NE ❑ Yes , o Page 2 of 3 21412011 Continued _--,.' clli Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit. ❑ Yes ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, chec , Yes ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss asses Yes o ❑ NA ❑ NE Other Issu 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes�No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes IQo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergenc si ions as required by the Yefso ❑ NA [3NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains'exist at the facility? If yes, check the appropriate box below. [] Ye❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storagc Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 1i0 ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes to ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). 0 r, 01*�)] Reviewer/Inspector Name: Phone: Reviewer/Inspector Signature: Page 3 of 3 Date: 21412011 7 r' Division of Water Quality �• -� Facility Number Q 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit *Routine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: I L5 t Arrival Time: Departure Time: F r :;OCounty: Farm Name: __. ' WN1_ Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility, Contact: Title: Onsite Representative::-�{ -��,r Certified Operator: VIaS r i �" Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish ,Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Region: "` i _0 Phone No: Integrator: Operator Certification Number:(, -7 Back-up Certification Number: Latitude: 0 0 0 I ❑ Longitude: ❑ ° ❑ ' 0 " Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ DEX Cow' ❑ Non -Dairy ❑ Beef Stockei ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes o [I NA El NE ❑ Yes ❑ No NA ❑ NE ❑ Yes ❑ No ❑ NE ❑ Yes ❑ N><7NA ❑ NE ❑ Yes o NA ❑ NE El Yes o ❑ NA ❑ NE 12128104 Continued Facility Number: -- Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA ❑ NE a. If yes, is waste level into the structural fi•eeboard? ❑ Yes ❑ No ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 cture 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): S. Are there any immediate threats to the integrity of any of the structures observed? ❑ YesNA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 4t� ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes )!�40 ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑'Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift El Application Outside of Area 12. Crop type(s) ��—� 1 a siv�`) - 13. Soil type(s) 1�° C 7�, v 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes )21�No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes qNo ❑ NA ❑ NE 17, Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ElNE ❑ Yes, o ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other Use drawings of facility to better explain situations. (use additional pages as necessary): rL4.'& cry? Qj A�l d' \\ Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: Date: 12128104 Continued W Facility Number: — Date of Inspection Required Records & Documents I9. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yest❑NA ElNE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ YesEl NA [INE the appropirate box. gn Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Y ❑ NA ❑ NE �aste Application �eekly Freeboard Analysis oil Anal sis Waste Transfers Annual Certification Rainfall Stocking rop Yield 20 Minute Inspections Monthly and I" Rain Inspections 0<eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes"�ZNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No '15NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes)go ❑ NA ❑ NE ��'� 26. Did the facility fait to have an actively certified operator in charge? ❑ Yes ❑ NA [I NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ETKo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes o ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report the mortality rates that were higan normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? �, ❑ Yes j,o ❑ NA ElNE If yes, contact a regional Air Quality representative immediately � 31. Did the facility fail to notify the regional office of . ns as required by ❑ Yes ) No ❑ NA ❑ NE General Permit? (W discharge, freeboard problems, ove�plication) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes o ❑ NA ❑ NE Additional Comments and/or Drawings: 12128104 ®-Divislon'orwater Quality , Faciiity.Number. j 3 T 0�Divislon,of Soll.and Water Conservation r 0 Other Agency 1 Type of Visit (9 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Dote of Visit: i t i Arrival Time: �a :Qri � Dep�a(r�ture Time: � t �`�' County: � NS Region: V 1� Farm Name: C) V v_ Owner Email: Owner Name: - Mailing Address: Physical Address: Facility Contact: Phone: Title: Phone No: Onsite Representative: Integrator: Certified Operator: d1�S ` Operator Certification Number: Back-up Operator: Location of Farm: Design Current Swine Capacity Population 10 Wean to Finish ❑ Wean to Feeder ❑ tder to Finish Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Back-up Certification Number: Latitude: 0 0 0 d Q Longitude: •❑ °== Design Current Wet Poultry Capacity Population ❑ Layer ❑ Non-Layet Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys Murkey Puults ❑ Other Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: L\_1 Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ YeSA o — El NA Cl NE ❑ Yes . ❑ No ElNE El Yes' ElNo OtA ❑ NE ❑ Yes ❑ No A ❑ NE, ❑ Yes jD NA ❑ NE ❑ YesV�ro ❑ NA ❑ NE 12128104 Continued Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes—'5 — NA ❑ NE a. If yes, is waste level into the structural freeboard? El Yes ❑ No� ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): ' Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes Vo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment l threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N4LIro ❑ NA ❑ NE t 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑Yes NA ❑ NE maintenance or improvement? Waste Apalication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NA ❑ NE maintenance/improvement? 1 I . Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incoiporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application utside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination' ❑ Yes o ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes &M ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes o ❑ NA ❑ NE SCommeiits'(refer to question #): Eplairt sink YES•answers"and/or any irecvmmendations or any utiter commen#s. Use',dritWin s'ot`faci# to,better.,ex Lain situations.' use additional, a es as necesea } lI tY P ( g . P 4 It t L S [ Jtrfl dye S ReviewerAnspector Name Phone: Reviewer/inspector Signature: Date: 12128104 Continued Facility Number: — Date of inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes NA ❑ NE r 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ yestEJ ❑ NA ❑ NE the appropirate box. ❑ W aps e r 21. Does r rd keeping need improvem t? If yes, check th appropriate box below. ❑ Yes A ❑ NE Waste Application eekly F and Was alysis oil Analysis Waste Transfers �An�ntuification ainfall ❑ ocking rop Yield 20 Minute Inspections n� onthly and I" Rain Inspections Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes � ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain'rainbreakers on irrigation equipment? ❑ Yes ❑ No 1A ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o El NA El NE 25. Did the facility fail to conduct a sludge survey as required by the permit? El Yes a El NA ❑'NE 26. Did the facility fail to have an actively certified operator in charge? El Yes ❑ NA El NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? El yes o ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes o ❑ NA ❑ NE 24. Did the facility fail to properly dispose of �ea thin 24 hours and/or document ❑ yes o ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ yes CNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emer as required by ❑ Yes VEOI ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Ye ❑ NE 33. Does facility require a follow-up visit by same agency? El Yes❑ NE .., - . Additional Comments and/or Drawings -.': u F ,'' 6 4 1 12128104 Division of Water Quality facility Number O Division of Soil and Water Conservation ` O Other Agency fype of Visit Op Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance eason for Visit *Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: Countv: �� Region: Farm Name: Owner Email: Owner Name: Phone: ,Mailing Address: Physical Address: Facility Contact: T Title: _ Onsite Representative: Certified Operator: woi► " T_ Back-up Operator:_ Location of Farm: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: ❑ o = ' Longitude: = ° = ' = " Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish arrow to Wean -Z -YO 2DtD Eff—Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other ❑ a er ❑ Non -La ei Dry Poultry Nc Pu Tu Design Current Capacity Population. ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocket El -Beef Feeder ❑ Beef Brood Cow Number of Structures: 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? • d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? i ❑ Yes o ❑ NA ❑ NE ❑ Yes ❑ N ❑ NE ❑ Yes ❑ No ❑ NE ❑ Yes ❑ No ❑ NE ❑ Yes • ❑ NA ❑ NE ❑ Yes Xo ❑ NA ❑ NE IM8104 Continued Facility Number: Date of Inspection tk> .� Waste Collection &c Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes%o El NA ❑ NE h v �a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NE Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: i llway?: Designed Freeboar Observed freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o ❑ NA ❑ NE (icl large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ❑ NA ❑ NE through a waste management or closure plan? any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmen al threat, notify DWQ 7. Do any ofthe structures need maintenance or improvement'? ❑ Yes o ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ;[0:3 NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application�-O�utsii e of Area 12. Crop type(s) fie. C4,0,� . `tts_ 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE El Yes o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination',[] Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a fo question #)i _ n situations. (rise additional �ssary) i y „• ww• Reviewer/Inspector Name `' �§ A r . ,il Phone: Reviewer/Inspector Signature: Date: N El NA ❑NE ❑ NA ❑ NE E 12128104 Continued �4f Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available2 If yes, check El Yes ❑ NA ❑ NE the appropirate box. ec is s ign Maps they �.�, 2l , Does record keeping need improve;pent? If yes, check the appropriate box below. ❑Yes L Vo A El NE J2<aaste Application eekly Freeboard a-s'te Analysis Soil Analysis aste Transfers/ ❑ Annua Certification ❑ tall ❑ eking ❑ C Yield _0 Minute Inspections ❑ thly and I" Rain inspections Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes--154.,;o ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes, fo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes 5eo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes o ElNA ElNE Other Issues 3�< 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes-Vo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes XVo ❑ NA ❑ NE and report the mortality rates that were hig an normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 12C ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office ofemer enc situations as required by ❑ Yes o ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, o app icatton) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes_i�do ❑ NA ❑ NE Additional C6inmei nts andlar, Drarritigs: 12128104 .0 ' bealle, James From: Daniel McClellan [WDMcClellan@cabarruscounty.us] Sent: Wednesday, June 17, 2009 5:04 PM To: teporter02@aol.com; James.Bealle@ncmail.net Subject: Porter Mutua Fields Attachments: Porter RYE Mutua.pdf Mr. Bealle, Porter Farm maintained records for RYE on his Mutua grass fields for 5 years and we took and average of the best 3 years to determine the Rye for Mutua since the state used the RYE of Fescue. Fields 3,5,6,7,8,9A were all in mutual grass and have RYE records. I have attached the sheet that the records were determined on. on the WUP I may should have used rescue grass rather than fescue for the crop type since mutua isn't on as a crop selection. If you need anymore info let me know. Daniel McClellan Cabarrus Soil and Water Conservation DISCLAIMER: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. WASTE UTILIZATION PLAN AMENDMENT Producer. Porter Farms County: ;Cabarrus Address: 4455 Mt. Pleasant Road South Facility Number: 13-0001 Concord, NC 28025 Permit Number. JAWS130001 Field Acres Actual Yield By Year (Tons) Average 5 Average Field Number Expected(!on s RYE Total Field Acres Wettable Acres Expected Yield 1998 1999 2000 2001 2002 "* Year Yield High 3 Yield 3 5.6 10.30 6.44 36.50 36AO 37.05 37.05 37.75 13.00 32.25 j 37.28 5 5.6 15.50 13.39 74.98 75.40 76.05 75.40 74.10 36.40 67.47 1 75.61 6 8.0 17.00 14.26 114.08 114.40 115.70 ; 113.75 113.75 52.00 101.92 i 114.61 7 7.8 4.20 1 3.10 24.18 24.70 24.05 25.35 25.35 13.00 2-2,49 ; 25.13 8 7.8 1.10 1.00 7.80 7.80 7.80 ; 8.45 j 6.50 2.60 5.63 8.01 9A 7.8 2.20 2.00 15.60 18.20 j 15.60 17.55 14.95 7.80 14.82 17.11 NOTES: I Realistic Yields Expectations (RYE) for Fescue and Matua grass mixture which are used in the Waste Utilization Plan are higher than established USDA-NRCS standard RYE for this crop and soil type. Porter Farms have maintained records of actual yields for each field. The average yield for the highest 3 years is higher than the expected RYE. For this waste utilization plan, the expected yield will continued to be used. "During calendar year 2002, a severe drought affected the yields. Porter Farms will continue to maintain records of actual yields of the Fescue and Matua grass mixture for waste application fields. If the actual yields are less than the listed RYE for (three out of the five years), the RYE for that field and the waste application rate will be adjusted. The adjusted rates will be based on actual yields. Signature of Facility Owner: - I� Thomas E. Parw. Jr. Date I t Signature of Technicial Specialist:�,t., I Watthevn . USDA-NRCs Data f I l I t F j I 1 I Porter Farms 1 of 1 217103 Type of Visit QD Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit ®Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access ' Date of Visit: ® `Arrival Tiene: =✓l Departure Time: drx County; Fat•111 1�71111C: `� C " `"r� �p ��� V�IiCI L', 11Ailli. Owner Name: °T YvV Phone: _ Region: Mailing Address: Physical Address: Facility Contact: Title: Phone No: Onsite Representative: Integrator: Certified Operator: 6 Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: E] e Longitude: 0 ° F—T " DesignCurrent I. Design. Current s t Destgn Current Swine ' `"' Capacity: 1'optilation Wet -Poultry ;,;Capacity Po rulation 4Cattlei '; , Y Capacity Population,., ❑ Wean to Finish ❑ Wean to Feeder ❑ eeder to Finish Farrow to Wean Farrow to Feeder ❑ Farrow to Finish ❑ Oilts ❑ Boars ❑ Layer ❑ Non-Layet a Dry Poultry �nx ❑ Layers { ❑ Non -Layers ❑ Pullets Other,"' ❑ 'l'urke ❑ Other ❑Other rI Puult . Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Dairy Cow ❑ Dairy Calf ❑ Dai Heifej ❑ D Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow ' a Number of 5trui b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that.reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? a ❑ Yeso ❑ NA ❑ NE ❑ Yes ❑ No <6A ❑ NE []Yes ❑ Nd- KA. ❑ NE ❑ Yes ❑ No �NA ❑ NE ❑ Yes o El NA ElNE ClYes o ❑ NA ❑ NE 12128104 Continued Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier:---.`'� Spillway?: Designed Freeboard (in): a7 Observed Freeboard,(in): 5. Are there any immediate threats to the integrity of any of the structures observed? (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed .. through a waste management or closure plan? ❑ Yes ❑ NA ❑ NE ❑ Yes ❑ No ❑ NE Structure 5 Structure 6 ❑ Yes � o" ❑ NA ❑ NE ❑ Yes 1@1C ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ yes �o ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes CONA ❑ NE maintenance or improvement? `'���\ Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NA ❑ NE maintenance/improvement? 11. Is. there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes o, ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Cro Window El Evidence of Wind Drifi ❑ A lication Outside of Area 12. Crop type(s) T, 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? Yes o ElNA ElNE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination: ❑ Yes o ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes XO ❑ NA ❑ NE '�*a1 �t 'tea"8is s�:, s k`�� g'� C° nts (efer to question #)tA Expla anygE answers!autl/or' ny comet fans ar anCher. otnments: C]se.tlrawings o�f�faclility tt►}better• explya�iyn esitupatl�ons: (use,addiyt)ion_altpag�essias n5etces�s�ayry): h C(F 4. �'�{�,..PCc'Ti'�k�T+Y S�F`�?'-4w�'is�° � Zirixn�l�-a�ck��/�' +NL'.43.�5h��_ O-Zo 16' bid Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: Date: I2128104 Continued 'i Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Pen -nit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components o he CAWMP re ily available? If yes, check ❑ Yes NA El the approprrate box. ❑ P ❑ ecklists esign aps er 21. Does rec rd keeping nee improvement? If yes, check the appropriate box below. ❑ Yes '�lo ❑ NA ❑ NE 4 Yi1Jll: 11tl tJll LilLkWl `rr ccniy CCCOOZUG ' 4 - e Anaiy'si5 ri oJii n�iuiy.�ia r1 ` Slls i C1cC5 t.Uktudl %r C1kj lilaAtiuli �� fLJ Rainfall �ocking ❑ C field CCCCute Inspections and 1" Rain Inspections Bather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes]J' ❑ NA ❑ NE ❑ Yes ❑`No�RVA ❑ NE ❑ Yes' Vo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NQPNE4 ElYes Rio [IN ❑ Yes ❑ No �fA ❑ NE ❑ Yes all o ❑ NA ❑ NE ❑ Yes �o ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE ❑ Yes &o ❑ NA ❑ NE ❑ Yes t�NA ElNE ElYes❑ NA ❑ NE Adesditior ' -.mment•._sandLorDrawin, r ,gs,.� W ` + '' -4s 1 •s y. -ij-' '� l a V a J , c's. {� n A l;i M t ^;N+Srn j3 nal Co� 12128104 r Division of Water Quality n Division of Soil and Water Conservation ❑ Other Agency Facility Number: 130001 Facility Status: Aplive Permit: AWS130001 n Denied Access Inspection Type: Compliance Inspection Inactive or Closed Date: Reason for Visit: Routine County: Cabarrus Region: Mooresville Date of Visit: 09/26/2008 Entry Time:12!30 PM Exit Time: 01:30 PM Incident #: Farm Name: Porter Farms Owner Email: Owner: Thomas E Porter Phone: 704-785-8891 Mailing Address: 4455 Mt Pleasant Rd S _ Concord NC 280257659 Physical Address: Facility Status: 0 Compliant n Not Compliant Integrator: Cargill Location of Farm: Latitude: 35°21'07" Longitude: 80°26'40" Five miles south of Mt. Pleasent on Mt. Pleasant Rd. (SR 1006). Farm is on the left across from the intersection with Bost Cut Off Rd. Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Certified Operator: Thomas E Porter Operator Certification Number: 17560 Secondary OIC(s): On -Site Representative(s): Name Title Phone 24 hour contact name Thomas E. Porter Phone: 704-785-8891 -On-site representative Thomas E. Porter Phone: 704-785-8891 Primary Inspector: Jame ealle Phone: 704-663-1699 Ex.12, Inspector Signature: Date: Secondary Inspector( k I Inspection Summary: 06/16/08 > Waste Analysis > N = 3.0 Lbs/1000 Gallons 03/20/08 > Waste Analysis > N = 3.3 Lbs/1000 Gallons D1/24/08 > Soil Analysis Jb Page: 1 Permit: AWS130001 Owner - Facility: Thomas E.Porter Facility Number: 130001 1 Inspection Date: 09/26/2008 Inspection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current Population Swine Swine - Farrow to Wean 2,000 2,085 - ---- ----- - --_ - - — - - - ... _ -- - - Total Design Capacity:_ _... —---'2,000---- - Total SSLW: 866,000 Waste Structures Type Identifier Closed Date Start Date Designed Freeboard Observed Freeboard kaste Pond WP1 T 19100 39.00 I --- __ Page: 2 Permit: AVVS130001 Owner - Facility: Thomas E Porter Facility Number: 130001 Inspection Date: 09/26/2008 Inspection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Innacts Yes No NA NE 1. Is any discharge observed from any part of the operation? n ■ 0 n Discharge originated at: Structure rl Application Field Other n a. Was conveyance man-made? n 0 ■ 0 b. Did discharge reach Waters of the State? (if yes, notify DWQ) n n ■ n c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (it yes, notify DWQ) n n ■ n 2. Is there evidence of a past discharge from any part of the operation? n ■ n n 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a n ■ n 0 discharge? Waste Collection Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? 0 ■ 0 0 If yes, is waste level into structural freeboard? n 5. Are there any immediate threats to the integrity of any of the structures observed (I.eJ large trees, severe 0 ■ 0 0 erosion, seepage, etc.)? 6. Are there structures on -site that, are not properly addressed and/or managed through a waste management 0 ■ 0 0 or closure plan? 7. Do any of the structures need maintenance or improvement? 0 ■ 0 0 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, 0 ■ n 0 dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or 0 ■ 0 ❑ improvement? Waste Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or 0 ■ 0 0 improvement? 11. Is there evidence of incorrect application? 0 ■ 0 0 If yes, check the appropriate box below, Excessive Ponding? n Hydraulic Overload? Q Frozen Ground? n Heavy metals (Cu, Zn, etc)? n Page: 3 Permit: AWS130001 Owner- Facility: Thomas E Porter Inspection Date: 09/26/2008 Inspection Type: Compliance Inspection Facility Number: 130001 Reason for Visit: Routine Waste Application Yes No NA NE PAN? n Is PAN > 10%110 lbs.? n Total P205? fl Failure to incorporate manurelsludge into bare soil? ❑ Outside of acceptable crop window? In Evidence of wind drift? Application outside of application area? ❑ Crop Type 1 Fescue (Hay, Pasture) Crop Type 2 Matua (Hay) Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Sail Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management n ■ n n Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? n ■ n n 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? n . ■ n n 17. Does the facility lack adequate acreage for land application? n ■ n n 18. Is there a lack of properly operating waste application equipment? n ■ n n Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? n ■ n n 20. Does the facility fail to have all components of the CAWMP readily available? n n If yes, check the appropriate box below. WUP? In 0 Page: 4 r Permit: AWS130001 Owner - Facility: Thomas f Porter Facility Number: 130001 Inspection Date: 0912612008 Inspection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No NA NE Checklists? n Design? n Maps? n Other? n 21. Does record keeping need improvement? DODO If yes, check the appropriate box below Waste Application? n 120 Minute inspections? ❑ Weather code? rl Weekly Freeboard? rl Transfers? n Rainfall? n Inspections after n 1 inch rainfall & monthly? n Waste Analysis? n Annual soil analysis? n Crop yields? n Stocking? f-I Annual Certification Form (NPDES only)? n 22. Did the facility fail to install and maintain a rain gauge? n ■' n n 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? 0 0 ■ 0 24. Did the facility fail to calibrate waste application equipment as required by the permit? n ■ n n 25. Did the facility fail to conduct a sludge survey as required by the permit? n 0 D ■ 26, Did the facility fail to have an actively certified operator in charge? D ■ n n 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ fl ■ n Other Issues Yes No NA NE 2& Were an additional roblems noted which cause non-comP liance of the Permit or CAWMP? n ■ n n Y P 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those 0 ■ n ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air n ■ Q ❑ Quality representative immediately. Page: 5 Permit: AWS130001 Owner -Facility: Thomas E Porter Facility Number: 130001 ► Inspection Date: 09/26/2008 Inspection Type: Compliance Inspection Reason for Visit: Routine Other Issues Yes No NA NE 34, Did the facility fail to notify regional DWQ of emergency situations as required by Permit? n ■ Do 32. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 0 ■ El 0. 33. Does facility require a follow-up visit by same agency? 0 ■ ❑ Q Page: 6 �� r E Division of Water Quality ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 130001 Facility Status: Activ2. Permit: AWS130041 ❑ Denied Access Inspection Type: GomplmanQg Inspectioa Inactive or Closed Date: Reason for Visit: Routine County: Cabarrus �- Region: Mgoresville Date of Visit: Q5/1612007 Entry Time:03-00 PM Exit Time: 04-QO PM Incident #: Farm Name: PPo ter E rm�. Owner Email: Owner: Thomas E Porter Phone: 704-785-8891 Mailing Address: 4455 Mt Pleasant Rd S _ _ Concord NC 280257659 Physical Address: Facility Status: ■ Compliant Location of Farm: Not Compliant Integrator: Latitude: 35°21'07" _ — Longitude: 80°26'40" Five miles south of Mt. Pleasent on Mt. Pleasant Rd. (SR 1006). Farm is on the left across from the intersection with Bost Cut Off Rd Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Certified Operator: Thomas E Porter Operator Certification Number: 17560 Secondary OIC(s): On -Site Representative(s): Name Title Phone On -site representative Thomas E. Porter Phone: 704-785-8891 24 hour contact name Thomas E. Porter Phone: 704-785-8891 Primary Inspector: James Bealle Phone: Inspector Signature: Date: 'vli ti i Secondary Inspector(s): �_) Inspection Summary: 03/27/07 > Waste Analysis > N = 3.0 Lbs11000 Gallons 09/07/06 > Waste Analysis > N = 2.2 Lbs11000 Gallons 08/29/06 > Soil Analysis lb Page: 1 Permit: AVVS130001 Owner - Facility: Thomas E Porter Facility Number; 130001 Inspection Date: 05/1612007 Inspection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current Population Swine O Swine - Farrow to Wean 2,000 2,180 Total Design Capacity: 2,000 Total SSLW: 866,000 Waste Structures Type Identifier Closed Date Start Date Designed Freeboard Observed Freeboard kaste Pond WP1 19.00 40.00 Page: 2 i Permit: AWS130001 Owner • Facility: Thomas E Porter Facility Number: 130001 Inspection Date: 0511612007 Inspection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No NA NE 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ ■ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ Cl ■ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) 00.00 2. is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ Q 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? ❑ WOO If yes, is waste level into structural freeboard? ❑ 5, Are there any immediate threats to the integrity of any of the structures observed (I.e./ large trees, severe ❑ ■ ❑ ❑ erosion, seepage, etc.)? 6. Are there structures on -site that are not property addressed and/or managed through a waste management ❑ ■ ❑ ❑ or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ ■ ❑ ❑ improvement? Waste Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? Q Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ Page: 3 Permit: AWS130001 Owner -Facility: Thomas E Porter Inspection Date: 05/16/2007 Inspection Type: Compliance Inspection Facility Number: 130001 Reason for Visit: Routine Waste Application Yes No NA NE PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total P205? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Fescue (Hay, Pasture) Crop Type 2 Matua (Hay) Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type_4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management ❑ ■ ❑ ❑ Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? Q ■ ❑ Cl 17. Does the facility lack adequate acreage for land application? ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ■ ❑ ❑ Records and Documents Yes No NA NE 19. bid the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? Q ■ ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Page: 4 9 0 Permit: AWS130001 Owner - Facility: Thomas E Porter Facility Number: 130001 Inspection Date: 0511612007 Inspection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ❑ ■ ❑ ❑ If yes, check the appropriate box below Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ' ❑ Rainfall? ❑ Inspections after> 1 inch rainfall & monthly? ❑ Waste Analysis? In Annual soil analysis? Q Crop yields? ❑ Stocking? ❑ Annual Certification Form (NPDES only)? ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? n ❑ ■ ❑ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ■ ❑ ❑ 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ ■ ❑ ❑ 26. Did the facility fail to have an actively certified operator in charge? ❑ ■ ❑ ❑ 27. Did the facility fait to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ ■ ❑ Other Issues Yes No NA NE 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those n ■ ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ ❑ Quality representative immediately. Page: 5 Permit: AWS130001 Owner - Facility: Thomas E Porter Facility Number: 130001 i ` t r Inspection Date: 05/16/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Other Issues Yes No NA NE 31. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? Q m ❑ Q 32, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 33. Does facility require a follow-up visit by same agency? Q ■ Cl ■ Q D Page: 6 Type of Visit Q Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit O Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: �p� Arrival Time: :,at7 Departure Time: C� County: Region Farm Name: c�i ./-.. _/t!��,_.:. Owner Email: - Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone No: Onsite Representative: a% lrc Integrator: r� Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: o l ll Longitude: o ❑ l� ref 7:,,� r � �L nr, yw f }Y ,l, is-,.v:�'., i =, ' i' " e + t 5' y}--.," 5 Ff .�,. �s v v n t �* CurrentDesign:..*. MCurrent t _ 4 Design .a; Current,` Capacity Population ;Y k^Wet Foultry C pactty,'Fopulatlon Cattle h , a4 ,�'Capacity���Poptilatioti v, .. ❑ Wean to Finish ❑ Layer ❑ Dairy Cow ElWean to Feeder ❑ Non La er h" El -Dairy Calf L' _ ElFeeder to Finish z _ El Dairy Heifei. ❑ Farrow to Wean ❑ D Cow , ,���Dry Poultry, - �„'�< El Farrow to Feeder " ❑ Non-Dai ❑ La ers - ElFarrow to Finish :� < ❑ Beef Stockei; ❑ Nan -La ers f' t ❑ Gilts 0-Beef Feeder fiY, ❑ Boars ❑Pullets El Beef Brood Cow Turkeys 4•T ti"t f Y l� --Pc� "'w �. n 1t�.,. c�.rl;-'''.w `�.f�•o-r�^wi'� Ak ��'y Other yap T�ay�� FrSi u:� ❑Tu 4 rkey Poults I y ❑ Other v ❑ Other I INumber of Structures 1 �� r .'4"fi. r t- :.��4...�'--�r . �.Y a,rk,. 4.. �:. .� , i .wi f_ 5..�. ,�y �... �,d� 1, ,d ., l� b +�"� x •�! .�; � � _ jh".k� +'7.;',sP,? Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes )&No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ElYes ElNo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify bWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes K No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes QNo ❑ NA ❑ NE other than from a discharge? 12128104 Continued Facility Number: — " Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 nim ❑ Yes No ❑ NA ❑ NE`y ❑ Yes �No ❑ NA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): L 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2,No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes .&No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 9No- ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes [rl�b ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Q,,No ❑ NA ❑ NE maintenance or improvement? Waste Ap lication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes y No ❑ NA ❑ NE maintenance/improvement? It. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes f�] No Cl NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 4—f. r, e , I 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes tM No ❑ NA [I NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes g] No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination%❑.Yes Z.No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes E9 No ❑ NA ❑ NE 18, Is there a lack of properly operating waste application equipment? ❑ Yes 4!3.No ❑ NA ❑ NE ReviewerAns ector Name c �Phone: p ` Reviewer/Inspector Signature: �� *� . J Date: 2 to 12128104 Continued 0 Facility Number: — Date of Inspection Re;Juired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WUP ❑Checklists ❑Design ❑Maps El Other ❑Yes '�jNo ❑NA. ❑NE ❑ Yes 14No El NA ❑NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes k(No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the -facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT).certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No NNA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes ,&'No ❑ NA ❑ NE ❑ Yes of No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ONE ❑ Yes �DNo ❑ NA ❑ NE ❑ Yes kNo ❑ NA ❑ NE ❑ Yes 9No ElNA ElNE ❑ Yes No ❑ NA ❑ NE ❑ Yes �RNo ❑ NA ❑ NE 12128104 Thomas E. Porter Porter Farms 4455 Mt. Pleasant Road South Concord NC 28025 Dear Thomas E. Porter: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources NC DEPT. OF ENVIRONMENT AND NATURAL_ RESOURCES Alan W. Klimek, P. E., Director RECEIVED Division of Water Quality 090erll ,ko 4 MOORESVILLE REGIONAL OFFICE M-GROUNDWATER SECTION Subject: Certificate of Coverage No. AWS 130001 Porter Farms Swine Waste Collection, Treatment, Storage and Application System Cabarrus County On June 11, 2004, the North Carolina Division of Water Quality (Division) issued a revised State General Permit for swine facilities. The General Permit was issued in accordance with the directive of Senate Bill 733 (Session Law 2003-28). In accordance with your application received on February 10, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Thomas E. Porter, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supercedes and terminates your previous COC Number AWS 130001 which expires October 1, 2004, This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Porter Farms, located in Cabarrus County, with an animal capacity of no greater than an annual average of 2000 Farrow to Wean swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until September 30, 2009. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Since this is a revised State General Permit, it contains new requirements in addition to most of the conditions contained in the previous State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record kee in and monitoring conditions in this permit. Aquifer Protection Section —Animal Feeding Operations Unit 1636 Mail Service Center, Raleigh, North Carolina 27699-1638 One < NorthCarolina Phone; 919-733-3221 1 FAX: 919-71M5881 Internet: h2o.enr,state,nc.us Natmrjallff An Equal OpportunitylAffirmative Action Employer — 60% Recycled110% Post Consumer Paper If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 2H .0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Mooresville Regional Office. The Regional Office Water Quality Staff may be reached at (704) 663-1699. If you need additional information concerning this COC or the General Permit, please contact Duane Leith at (919) 715-6186. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Mooresville Regional Office, Aquifer Protection Section Cabarrus County Health Department Cabarrus County Soil and Water Conservation District Permit File AWS130001 APS Central Files Type of Visit P Compliance Inspection Q Operation Review O Structure Evaluation O Technical Assistance Reason for Visit A Routine O Complaint Q Follow up Q Referral O Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: ��] County: (,e ,4o'r 4 Region: A ') Farm Name: POCZ try FAIL-tA Owner Email: Owner Name: lrom C 5 vtlgrR _- _ n Phone: Mailing Address: y y SS MI P11-ASrN E A\ Physical Address: r Facility Contact: ^ Title: Phone No: Onsite Representative:-rk'm4� _ RQIr'r Integrator: Certified Operator: Back-up Operator: Location of Farm: Swine Operator Certification Number: Back-up Certification Number: �o Latitude: Design Current Design Current Capacity Population Wet Poultry Capacity Population [--]Layer ❑ Non -La er ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ® Farrow to Wean v 14770 ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Po Its ❑ Other Longitude: = ° 0 ' 0 Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: El Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ® No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ® No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE 12128104 Continued ' -. - — �- H• F,.., �M.r�.. a .r. , '�,,; —. f.� ... ,.... Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes BNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 identifier: L.- I wa Spillway?: Y r -5 Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes © No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes E1 No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 191 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ,® No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) s 9. Does any part of the waste management system other than the waste structures require ❑ Yes IN No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ® No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes •® No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12, Crop type(s) AA4k q Fc5["e 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16, Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination; ❑ Yes © No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes 0 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes © No ❑ NA ❑ NE • Ree owe PS d- rAer,M A/)pr,qr r '. WP.►I 0047 N<w pnRM, Rtci�:MRN LeF{ Reviewer/Ins ector Name '''"'` p rAy � � �. e���: � ::s:,MMRhone: Reviewer/Inspector Signature: !i A-t4 Date: �L D. 6 - o S 12128104 Continued Facility Number: Date of Inspection Required Records & Documents I9. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes R) No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 0 No ❑ NA ❑ NE the appropiiate box, ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge'? []Yes Z No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ® No ❑ NA ❑ NE 24, Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes © No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ❑y No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes © No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes © No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes © No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes © No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ® No ❑ NA ❑ NE Addition' al.Comments and/or Drawings: 12128104 t a Facility Number Date of Visit: 7- 33 ' Time: O Not O erationa . O Below Threshold I&Permitted O Certified [3Conditionally Certified 0 Registered Date Last Operated or Above Threshold: ......................... tn FarmName: ........ [, Zi SJ.4iX........i atri M.f............ ............................................. I..... County:... . CAVL69 .................................................. OwnerName:..Tbmsp ......................... ..1.1F�..M ............................................... - Phone No:...................................................................................... MailingAddress:............................................................._._............................................................................................... »........... ............................ .......................... Facility Contact: .............. PQk.*M...... _....... ..... Title: ....... 0_&.11.AMX................................. Phone No:................................................... Onsite Representative: ...................................................................... Integrator:...................................................................................... Certified Operator:................................................................................................................ Operator Certification Number: Location of Farm: IRSwine []Poultry ❑ Cattle []Horse Latitude • 4 44 Longitude • 4 « r DesigDl�"Currents'`' `Design Current' '" a °Design ` Curent- Swine Ca aci ' „Po elation. " Poultry.<,.<t, s Ca "aci ° s P.o iilation:E ;Cattle ° .Ca""acityPopulatian ,4 ❑ Wean to Feeder ❑ Feeder to Finish 10 Farrow to Wean p o 0 ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars ❑ Layer ❑Dairy ❑ Non -Layer Non -Dairy i ❑ Other I Tota1 Designs Opacity,,', C c9€?, 9 o AI'.SE _; °Number o€:Lagoons u h Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ,:L000 p ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes �X No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes JQ No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes RI No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: .......... ... I ..... .............. ................................... .................. .................. ................................... ...................................................................... Freeboard (inches): 12112103 Continued Facility Number: — Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes M No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or [] Yes Qj No closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ® No B. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ® No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes No elevation markings? Waste AnDlication 10. Are there any buffers that need maintenance/improvement? ❑ Yes ® No 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes ® No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type / Atk,d Ae_,c t 13, Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ® No 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. 1s there a lack of adequate waste application equipment? Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 1$. Are there any dead animals not disposed of properly within 24 hours? 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. ❑ Yes ]a No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes R No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes 2 No 6 =Comments (refer to questaon #) Explain any YESaaswecs andlor any recommendatzoasEoranyotber comments ean��s ,IT ; 'use drangs otfacility toibetterezplamsitpadoas{nse additional,pages.as:neery):' . [I Field Copy Q Final Notes 3 s rAmm swoteeroA ds well K,�Pt . Reviewer/Inspector Name ;1W Reviewer/Inspector Signature: Date: 17' ;J 0 4/ 12112103 Continued A 1~acility Number: ,. Date of Inspection FT--5T--A Renuired Records & Document~ 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes [& No 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (iet WUP, checklists, design, maps, etc.) ❑ Yes [W No 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Q1 No ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ® No 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes No 26. FaiI to notify regional DWQ of emergency situations as required by General Permit? (ie1 discharge, freeboard problems, over application) ❑ Yes No 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes MNo 28. Does facility require a follow-up visit by same agency? ❑ Yes ® No 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes N No NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) ❑ Yes In No 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes Cl No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After I" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 Michael F ( ; 4J Easley, Governor William G. Ross, Jr.,Secretary North Carolina Department of Environment and Nalural Resources WATER QUALITY SECTION July 24, 2003 Mr. Tom Porter 4455 Mt. Pleasant Rd. S. Concord, NC 28025 Subject: Porter Farms, Site Inspection Certificate of Coverage AWS 130001 Cabarrus County, NC Dear Mr. Porter: Alan W. Klimek, P.E., Director Division of Water 0uafity Coieen Sullins, Deputy Director Division of Water Quaiity Mr. AIan Johnson of this Office conducted a site inspection of your facility on July 23, 2003. Based on his observations, the records were found to be complete and the facility appeared to be well operated and maintained. Enclosed please find a copy of the inspection report, which should be self-explanatory. If you have any questions concerning this matter, please do not hesitate to contact Mr. Johnson or me at (704) 663-1699. Sincerely, D. Rex Gleason, P.E. Water Quality Regional Supervisor cc: File AM 1vCOENR Customer Service Mooresville Regional Office. 919 North Main Street, Mooresville, NC 28115 PHONE (704) 663-1699 1 877-623-6748 FAX (704) 663-6040 ! 7rr,�, a i?i;;, :`yt •w '_ Division of Water Quality , 10 Division of Soil and Water Conservation O Other Agency Type of Visit © Compliance Inspection O Operation Review O Lagoon Evaluation IReason for Visit O Routine Q Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Oak. of Visit: 07/23/2003 Time: hacilit, Number 13 O1 ! Q Not Operational 0 Ilelotir Threshold ® Permitted ® Certifier! [3 Conditionally Certified ❑ Registered I)atc 1.-ast Operated or .above Threshold: . __ .......... Farm :Name: Ractex.Farms ............................... ..... County: Caba,rr-tts.............. ll'I1 Q...... Owner game: Thmnas-h,__.___-------- - --------•_-__ Phone :No: Meiling Address: 445..1Ya1-.R1�asa�nik.iieaci. A.l�t� ..................................................... CQlns.vrll..t�.C............................. R .............. Facility Contact: ........................................................... Title: ........ Phone No: Onsite licprescntatiye:'>_OM�QRT�R_._._____•-------------------•____-- Intcgrator:C,argill--•-----------•---------.------_--.. Cet'titicd operator:jjjQxus.hr........................... jrVlrtet•................................................ Opermor Certit'icatinn \'rltilbel':l C11}. Location of Farm: Five miles south of Mt. Pleasent on Mt. Pleasant Rd. (SR 1006). Farm is on the left across from the intersection with Bost Eut Off Rd. ® Swine ❑ Poultry ❑ Cattle ❑ Horse latitude F35 ` 21 07 L,on;;itudc 80 • 2b 40 Design Current. Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder I JE1 Layer I ❑ Dairy ❑ Feeder to Finish JCI Non -Layer I Non -Dairy ® Farrow to Wean 2000 1925 ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity 2,000 ❑ Gilts Total SSLW 866,000 ❑ Boars Number of Lagoons JE1 Subsurface Drains Present ❑ Lagoon Are ❑ Spray Field Area Holding Ponds 1 Solid Traps 10 No Liquid Waste Management System Discharees S Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes i8 No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed. was the conveyance than -made? ❑ Yes ❑ No b. if discharge is observed, did it reach Water ot'tlie State`? (li'ves, notify DWQ) [j Yes ❑ No c. if discharge is observed. what is the estimated flow in 1plhnin? d. Does discharge bypass a lagoon system! (If yes. notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? El Yes ®No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ® No Waste Collection & TI-eattilent 4. is storage capacity (freeboard plus storm storage) less than adequate? ® Spillway ❑ Yes ❑ No Structure I I Structure ? Structure 3 Structure 4 StRiCtUre Structure 0 Identitier:........................... ............ ............... .......................... ........................... ........................... ........................... Freeboard ( inches): 15 neinarnr r'�»•+»•��•+ UJ/UJ/UA Facility Number: 13-01 Date of Inspection 07/23/2003 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Applicalion 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? . ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload �i/nei+iKfN ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ® No ❑ Yes ® No 12. Crop type Fescue (Hay) Matua 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ® No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ® No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ® No ❑ Yes ® No Cl Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No [j No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. .. � a ..a. .. T.�. - i`�Y •^ a! �I ..i�Ji . •%Y!'',n FP f..i n. y; V. ��F l'+.. �'t '� .� ^. �'answers Camtnents�(re�fer`to qut o E.plaln any YES answesaudlor any recotunnendationsor�any otheco.mmeats,�f Use dra ngs oc�ff facilityy, to better explaintsituations',(usi additional pages aVs tiece�;6yj..I)�"❑ Field Copy ❑ Final Notes 4,0'��" .4ir.5�'•lY.i`. h;4 FACILITY WAS WELL MAINTAINED. THE RECORDS APPEARED TO BE COMPLETE. wer/Inspector Name Alan Johson E wer/Inspector Signature: J �� Date: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality May 1, 2003 Thomas E. Porter Porter Farms 4455 Mt. Pleasant Road South Concord NC 28025 Subject: Certificate of Coverage No. AWS130001 Porter Farms Swine Waste Collection; Treatment, Storage and Application System Cabarrus County Dear Thomas E. Porter: On April 28, 2003, the North Carolina General Assembly ratified Senate Bill 733 which directs the Division of Water Quality (Division) to extend the expiration date of the Swine Waste Operation General Permit AWG100000. Therefore, the General Permit has been re -issued by the Division to extend the expiration date to October 1, 2004. During the period of this extension the Division will be working with all interested parties on the development of a new version of the Non -Discharge General Permit. In accordance with your application received on February 10, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Thomas E. Porter, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supercedes and terminates your previous COC Number AWS130001 which expired on April 30, 2003. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Porter Farms, located in Cabarrus County, with an animal capacity of no greater than an annual average of 2000 Farrow to Wean swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until October 1, 2004. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. AMW Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 Customer Service Center An Equal Opportunity Action Employer Internet httpJ/h2o.enr.state.nc.us/ndpu Telephone (919) 733-5083 Fax (919)715-6048 Telephone 1-877-623-6748 50% recycled110% post -consumer paper Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS•standards are met prior to restocking of the facility. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the.activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership, If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Mooresville Regional Office. The Regional Office Water Quality Staff may be reached at (704) 663-1699. If you need additional information concerning this COC or the General Permit, please contact Sue Homewood at (919) 733-5083 ext. 502. Sincerely, v for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Mooresville Regional Office, Water Quality Section Cabarrus County Health Department Cabarrus County Soil and Water Conservation District Permit File AWS130001 NDPU Files E l WASTE UTILIZATION PLAN Producer: PORTER FARMS Address: 4455 Mt. Pleasant Rd. S. Concord, NC 28025 Type of Operation: SWINE County: CABARRUS HU CODE: 03040105020060 Number of Animals: 2000 Your animal waste management facility had been designed for a given storage capacity. When the waste reaches the designed level, it must be land applied at a specified rate to prevent pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil . tests are encouraged so that all plant nutrients can be balanced for realistic yields of the crops to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates and leaching potential. Waste shall not be applied to land eroding at greater than 5 tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production, the waste should be applied to a growing crop or not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste are based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find infon-riation on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Amount of Waste Produced Per Year: (gallons) 2000 animals X 3,203 gal waste/animal/yr = 6,406,000 gal waste/year Amount of Nitrogen Produced Per Year (lbs) 2000 animals X 5.4 lbs N/animal/yr = 10,800 lbs N/year produced Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. Your facility is designed for 180 days of storage. Therefore, it will need to be emptied every 6 months. The following acreage for waste application will be needed based on the crop to be grown and the surface application: (ACRES OWNED BY PRODUCER) Field Soil Crop Rye Lbs Actual Wettable Lbs N Months to Numbers Type Tons N/ac Acres Acres Used Apply 3 GoC Fescue/ 5.6 275 10.3 6.44 1771 March -October Matua 4 GoC Fescue 2.8 125 1.8 1.5 187.5 March -October 5 GoC Fescue/ 5.6 -275 15.5 13.39 3682.25 March -October Matua 6 KkB Fescue/ 8.0 330 17.0 14.26 4705.80 March -October Matua 7 BaB Fescue/ 7.8 345 4.2 3.1 1069.5 March -October Matua 8 BaB Fescue/ T8 345 L I 1.0 345 March -October Matua 9a BaB Fescue/ 7.8 345 2.2 2.0 690 March -October Matua 9b BaB Fescue 3.9 200 .9 .9 180 March -October 9c BaB Fescue 3.9 200 1.4 1 1.0 200 March -October -Total Amount of N Produced Surplus or Deficit 43.59 12831 -10800 2031.05 *This N is from animal waste only. if nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management plan that addresses all nutrients . See the attached map showing the fields to be used for the utilization of wastewater. r APPLICATION OF WASTE BY IRRIGATION Field Numbers Soil Type Crop Soil Permeability (in/hr) Application Amount (In/application) (In/yr) 3 GoC Fescue/Matua 2.0-6.0 - .36 6.0 4 GoC Fescue 2.0-6.0 .36 2.7 5 GoC Fescue/Matua 2.0-6.0 .36 6.0 6 KkB Fescue/Matua 0.6-2.0 .36 7.2 7 BaB Fescue/Matua 0.6-2.0 .36 7.5 8 BaB Fescue/Matua 0.6-2.0 .36 7.5 9a BaB Fescue/Matua 0.6-2.0 .36 7.5 9b BaB Fescue 0.6-2.0 .36 4.3 9c BaB Fescue 0.6-2.0 .36 4.3 Your lagoon is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of waste being stored in your structure exceed Elevation 91.8' and the level should not be pumped below 88.9' to allow adequate permanent storage for treatment of waste. Call the Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. THE CLEAN WATER ACT OF 1977 PROHIBITS THE DISCHARGE OF POLLUTANTS INTO THE WATERS OF THE UNITED STATES. THE DEPARTMENT OF ,ENVIRONMENT, HEALTH, AND NATURAL RESOURCES, DIVISION OF ENVIRONMENTAL MANAGEMENT, HAS THE RESPONSIBILTY FOR INFORCING THIS LAW. NARRATIVE OF OPERATION: This swine operation (farrow to weaning) consist of 2000 sows. Breeding, gestation, and farrowing buildings are flushed with recycled water from the lagoon. Liquid effluent will be pumped onto adjacent pasture and hayland. Waste is to be applied to 40.19 acres of fescue overseeded with matua and 3.4 acres of fescue. The lagoon is designed with 180-day storage. (Total capacity 1,112,831 cu.ft.) Therefore it will require pumping down to permanent storage level every 6 months. Waste is to be applied to fescue/Matua during March -October. Waste may be applied during the season when needed for nitrogen benefits or pumped as needed for irrigation water as long as nutrient limits and infiltration rates are not exceeded (and waste is applied to actively growing crop). NOTE: The waste in the lagoon must be maintained at or below the maximum liquid elevation of 91.8'. Also, the lagoon level must not be pumped below elevation 88.9' to maintain adequate permanent storage for treatment of waste by bacterial activity. The volume of estimated waste produced per year is 6,406,000 gal = 235.9 acre inches. (6,406,000 gal / 27,152 gal/ac inch. = 235.9 ac inches) With the system applying .36 ac inches/hr, the system will require 655.3 hrs/yr to apply waste. The system will apply .36 inches per application to area under gun of approximately 16.6 lb N per acre per application. (5.4 lb.N/animal/yr / 3,203 gal waste/animal/yr x 1000 = 1.68 lb N/1000 gal 1.68 lb N/I000 gal x 27.152 1000gals/ac in x .36 ac in/application = 16.6 lbs. N/application). Nitrogen applications should be split over the growing season during the period of March -October. Application rates must be adjusted to waste analysis reports when received. The irrigation system specifications indicate using a Kifco E30A Slurry Reel with 1000' of3: ID PE hose, with hydraulic drive, and a Nelson SR150 Gun. The Nelson SR150 Gun is intended to operate with maximum ring orifice of 1.08 at 70 PSI, 197 GPM, with a diameter of 310' (lane spacing of 230' or 75% of 310'). System pressure required is 123 PSI A 197 GPM. The system's Kifco NT120S engine driven pump is capable of pumping flows up to 500 GPM at pressures up to 150 PSI. The application rate will be a maximum of .36 inches per hour with gun cart travel speed of 3.83 ft/min. The lagoon will be pumped down prior to December to -allow for storage during the winter months when the ground may be saturated or frozen and crops are not actively growing to take up nutrients. The lagoon will be pumped as needed to provide adequate waste storage during the times listed in the chart on page 2. Adequate land is available for proper disposal and utilization of waste produced. Refer also to attached Waste Utilization Plan Required Specifications and information provided on waste sampling for additional specifications and recommendations. 4 WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Porter Farms Owner/Manager Agreement I (we) understand and will follow and implement the specification and the operation and maintenance procedures established in the approve animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system of construction of new facilities will require a new certification to be submitted to the Division of Environment Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner: IF. Fr'-,,+C lease print) Signature: Date: 49 ' 3 Name of Manager (If different from owner): Signature: Date: Prepared by:. -Di Sr1L4 Cvos'Wo► vilf - 07-aW3 N e Title Date uSo a - H LCS WASTE UTILIZATION PLAN AMENDMENT Producer: Porter Farms County: Cabarrus Address: 4455 Mt. Pleasant Road South Facility Number: 13-0001 Concord, NC 28025 Permit Number: AWS130001 Field Acres Actual Yield By Year (Tons) Average 5 Average Field dumber Expe o s RYE Total Field Acres Wettable Acres Expected Yield 1998 1999 2000 2001 2002 - Year Yield High 3 Yield 3 5.6 10.30 6.44 36.50 36.40 37.05 37.05 37.75 13.00 32.25 37.28 5 5.6 15.50 13.39 74.98 75.40 76.05 75.40 74,10 36.40 67.47 75.51 6 8.0 17.00 14.26 114A8 114.40 115.70 113.75 113.75 52.00 101.92 114.51 7 77.8 1 4.20 3.10 24.18 24.70 24.05 25.35 25.35 1 13.00 22.49 25.13 8 7.8 1.10 1.00 7.80 7.80 7.80 8.45 6.50 2.60 6.63 8.01 9A 7.8 2.20 2.00 15.60 18.20 15.60 17.55 14,95 7.80 14.82 17.11 NOTES: Realistic Yields Expectations (RYE) for Fescue and Matua grass mixture which are used in the Waste Utilization Plan are higher than established USDA-NRCS standard RYE for this crop and soil type. Porter Farms have maintained records of actual yields for each field. The average yield for the highest 3 years is higher than the expected RYE. For this waste utilization plan, the expected yield will continued to be used. **During calendar year 2002, a severe drought affected the yields. Porter Farms will continue to maintain records of actual yields of the Fescue and Matua grass mixture for waste application fields. If the actual yields are less than the listed RYE for (three out of the five years), the RYE for that field and the waste application rate will be adjusted. The adjusted rates will be based on actual yields. Signature of Facility Owner: Thomas E. Porter, Jr. Dale Signature of Technicial Specialist: _ _ - - - - Watth J. 'nane, DA-NRcs - - - - -Dale -- ---- 1 1 Porter Farms 1 of 1 2l7103 R - N.C. DEPT. On ENVIRC;NMENT, 1 }% & NAR) AL RESOF ' ',_'ES AUG 23 2000 Amauot• 0f_ W�4.�F'l+- far I (gallons) l►-+ns) ETMOF Eta1�U6,:..�..! ;-a114BIT MaRES','.UL OMICE 2000 animals X 3,203 gal waste/animal/yr W 6,406,000 gal waste/year aML t o_ .r�9@.�4_R+'.. � @... �'er____Y' .:.r (lbs) 2000 animals X 5.4 lbs N/animal./yr = 14,800 lbs N/year produced Applying the above amount of waste is a big .lob. You should plan time and have appropriate equipment to apply the waste in a timely manner. Your facility is designed for 180 days of storage. Therefore, it will need to be emptied every 6 months. The fallowing acreage for waste application will be needed based an the crap to be grown and surface applications(ACRES OWNED BY PRODUCER) Field 1 Sail Crop Lbs N 1 Ac Lbs N Months to 'Numbers! type Per Ac 1 1 Used I Apply ; ' T1 3 1 soc 1 Fescue/1 275 1 10.31 2,830 Mahrch-October ; 1 1 1 Matua 1 1 1 _.__ *V(9oC- _.�_--_....125-..._..'._i.-,8.,.,._..._.,..225 �� �_.__--.__.._..,e1---•--._-__.___-_-;. 41._Fescue „ rt5- w8aCr�+-Fescue/,'..._....275W._-.*15.5 1 f *.__.4,263..._.,...'�___._.-,,,.___,......11__..,...._......._._.__-1 1 1 1 Matua 1 1 1 , to ' 6 1 hk3 1 Fescue/1 33o 117.0,' 5,6lo 1 1 1 Matus 1 1 1 1 1 1 7 1 Ba8 1 Fe6cue/1 345 1 4.21 1,449 1 i e r Matua ; 1 8 1 BaB 1 Fescue/1 345 1 1.1; 380 1" Is ' Matus 1 9a 1 Ba8 1 Fescue/' 34S 1 2.21 759 1 1 Matua 1 1 1 1 1 1 9b 1 SaB 1 Fescue / 1 200 1 .91 190 1 "is ; 1 9c 1 Sa8 1 Fescue/1 200 1 1.41 280 ------------ 'ro t•a l 1 54.41 15,976 1 Amount of N Produced 1 1 0 0i'i 1 Surplus or PjLUrLt 1 1 .5.17E 1 *This N is from animal waste only. if nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on realistic yield expectation. NOTES The applicator is cautioned that F and K may be over applied while meeting the N requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management- plan that addresses all nutrients. This plan only addresses Nitrogen. Landowner/Operator Name: Address: Telephone: TABLE 1 - Field Specifications Wettable Acres IRRIGATION SYSTEM DESIGN PARAMETERS Thomas E. Porter Jr 4455 Mt Pleasant Ltd S Concord NC 28025 704-786-9551 County: Date: Cabarrus 1-31-96 (Revisers 9--9-99) EXHO D-1 Fleidt Number .AFproshnate JvainOm► Useable Stu of Fkld2 (acres) Sol! Type Slope C.P s) Mash— Application IGte3 (Inlhr) Maximum Applkatton per Irigation Cy'k3 Comntesets 3 6.44 GoC FescuelMatua .35 .75 5 1 .ga GoC Fesuce Matua .35 .75 A Sriall Part of Field #4 is jn(-luded with im Gi 14.26 UB Fescue/matlja1 Pa p d .S is included with pull. #7 & #8 10 8 {'/ Ma l See allached map. 2Total field acreage minus required buffer areas_ 3Refer to N. C. Irrigation Guide, Field Office Technical Guide, Section lI G. Annual application must not exceed the agronomic rates for the soil and crop used_ MRCS, NC JUNE, 1996 TABLE 2 - Traveling Irrigation Gan Settings Make, Model and Type of Equipment: Ufco Model E30A w/ 1000' of 3.0" 7n PE hose and a Nelson SR150 (fin w/ 1. 08" Ring Held Not ud Hydrant Nat Tm,,d Speed jpU ) AWkgian Rite (idtu) TRAVEL LANE Effective Effective Width (tt) Len (A) Wetted Diameter (fed EQUIPMENT SETMOOS Nozzk Operating Opting Diameter Pressure Presswa Are Cmdrer Cron i) Red 7 Pattae3 Cow 3.1 2.8 210 310 1.08 70 1.1 3,2 2.8 .35 255 500 1 310 1.08 70 112 315 5,3 2.8 .35 255 660 310 1.08 70 112 315 5.4 2.8 .35 230 580 310 1.03 70 112 315 5.5 2.8 .35 230 760 310 1.08 70 112 315 5,6 2•.8 .35 255 790 310 1.08 70 112 315 6.7 2.8 .35 255 91Q 310 1.08 70 112 31 6.8 2.8 35 255 860 310 1.08 70 112 31. 6.9 40 -4-0-0 1.03 70 112 -115 Malke aurp. LQ rapmle t 10,10 2.8 .35 290 560 310 1.08 70 112 31.5 10.11 2.8 .35 280 380 310 1.08 70 112 315 I Sec attached reap. 2Show separnte entries for each hydrant localiat in each Geld. 3Use the following abbreviations for various arc patterns: l~ (full circle), TQ (throe quarters), TT (two thirds), H (half circle), T (one third), Q (one quarter). May also use degrees ofarc. NRCS, NC JUNE, 1996 4.9 EXHMBIT D-3 TABLE 3 - Solid Set Irrigation Gun Settings Make, Model and Type of Equipment: Field Nal and Line No,2 Number of Hydrants Wetted Diameter feet Hydrant Sparing (ft) Along Between Pipeline P[ eltnes Application Rate (lnlhr) OPERATING PARAMETERS Nozzle Operating Operating Diameter Pressure Time (inches) Q Gun ( rant r Comueeats ISee attached map. 2Show separate entries for each pipeline with hydrants in each field. NRCS, NC NNE, 1996 TABLE 4 - I rigation System SpaiBcatim Traveling ][Eftatlon Gun Sotld Set I atlon Flow Rate of SprhtUer (gprn) 197 xxx persting Pressure at Pump (psQ 123 xxx Design Precipitation Rate (ldhr) .35 Base Length (fat) 1000 xxxxxxxx Type of Speed CompcnssUou Mech. xxxxxxxx Pump Type (PTO, Engine, Electric) Dn zne xxx Pump Power Requirement (hp) 40 BHP TABLES - Thrust Block Specifications Deslener may Dravida thrust block details en senarate sheet LOCATION THRUST BLOCK AREA (sq. ft.) W Bend 9 Iliad End 9 Tee Drains Gmind Fattvr Z—Pio 9 IS= USDA-NRCS Field Office Technical Guide, Section IV, Practice Code 430-DD. tv t MRCS, NC 7UNE, -19% EXHOIT D-5 IRRIGATION SYSTEM DESIGNER Name: David %Yearn Company: Gra—Mac Distributing Compan�r� Address: 2310 NC Hwv 801 N Mocksville NC 27028 Phone: 336-998-3232 REQUIRED DOCUMENTATION The following details of design and materials must accompany all irrigation designs: l . A scale drawing of the proposed irrigation system which includes hydrant locations, travel lanes, pipeline routes. thrust block locations and buffer areas where applicable. 2. Assumptions and computations for determining total dynamic head and horsepower requirements. 3. Computations used to determine all mainline and lateral pipe sizes. 4. Sou es and/or calculations used for determining application rates. S. Computations used to determine We size of thrust blocks and illustrations of all thrust block configurations required in the system. 6. Manufacturer's specifications for the irrigation pump. traveler and sprinldegs). 7. Manufacturer's specifications for the irrigation pipe and/or USDA -MRCS standard for Irrigation Water Conveyance, N.C. Field Office Technical Guide, Section IV. Practice Code 430-DD S. The information required by this form arse the minimum requirements. It is the responsibility of the designer to consider all relevant factors at a particular site and address them as appropriate. 9. Irrigation pipes should not he installed in lagoon or storage pond embankments without the approval of the designer. NOTE: A buffer strip 7 5 feel wide or wider must be maintained between the limits of the irrigation system and all perennial streams and surface waters per NC Statutes. 'a NRCS, NC TUNE, 1996 EX IBTr D-G Narrative of Irrigation System Operation Describe the operation of the system in the space provided below or on a similar sheet most convinient to the designer/supplier. Include procedures such as start up, shutAown. winterizatiam and regular maintemame of all equipmzent. 1 See attached sheets for additional operation and sDecificati.on information. I MRCS, NC JUNE, 1996 E' Wettable Acres For P697 ER F-AIZM5 i �,:'• ; ;..'Tiraval 'lane space 7 $^ New orExisting Tt Start Stop Total i Md Table L. X W/43560 Total End Table Acres $o �� 3 rs EE 7S a� s's .43 . q8 6E75 1.07 p� 930 44...EFE'7S $Cap- &GO g p^ _ � 55 ^ a '3 0 ?30 �.s`s� 3. �� 3 . (% q 8 EC , y 3 Er 7 � q . O9 .2..$�._ r: ' . (� ►EL 7 5- CPU FT- -7 S 5 aSo. 0 ET 757 760 y.0� . y3 �=�S .� 5.01 _ . qS� EF�s 5,7(o EE7s �Ro y.G;L S. 33 aao 3 EE7 S sS . y $ EE -rs G . y 7 75 SlaO _a�SS $.03 $ EE75 . 17 _ EF- 73 yoO 1 y 0 1. aq f a o 6F7 sir E.._.. _ ego �57. 'E90+ 3So P8b a.y4 • V3 C90 r 3: �� � .ram_—..' •_ �.-..—...r-.. _-_ _ .:� • . Jf� � t � ' r ._-..err•.. -�.�r _..� - ��^ f, r ! GRA-MAC DISTRIBUTING COMPANY Design — Sales -- Service COMPLETE IRRIGATION SYSTEMS TELEPHONE* ADVANCE EXCHANGE 13361 998-3232 (336) 998.3800 NC TOLL FREE 1.800.422-3560 Porter rants Specification Sheet 1. Wettable acres under traveler coverage is ± 48.63 Acres. 2310 NC HWY, 801 N MOCKSVILLE, N. C, 27028 2. System Traveler_ is a Kifco E30A w/ 1000' of 3.0" ID PE hose and a Nelson SR150 Ginn with a 1.08" ring nozzle, 3. Nelson SR150 gun performance with a 1.08" ring nozzle at 70 PSI is 197 GPM, and a dimeter of 310'. 4. Lane spacing is 2301. 5. Friction loss in 6" SDR21 PR200 200# pressure rated gasketed PVC pipe at 197 GPM is .11/100' . 6. Liquid velocity in 6" SDR21 Gasketed PVC pipe is 2.25 FT/Sec. 7. Pressure loss in 1000' of 3.0" ILA PE hose at 1.97 GPM is ± 42 PSI. S. SyGtem pressure requirements are as follows: Gun 70 PSI 1000' of 3.0" ID PE hose 42 PSI Elevation ± 20' 8 PSI ± 2100' of 6" PVC pipe 3 PSI 123 PSI 284 Head Feet 9. .Application Efate is as follows: 96.3 X GPM 360 3.1 X . 9 rad i.us X ARC 96.3 X 197 360 3�!W —X .9 155� X 315 18971 61105 x 1.14 = .35 In/IIr. for 315 .Deg Arc 1�105 .31 x { 0 _ .62 In/Hr for 180 Deg Arc GRAPMAC DISTRIBUTING COMPANY Design — Sales — Service COMPLETE IRRIGATION SYSTEMS TELEPHONE: ADVANCE EXCHANGE 200 NC HWY, GOt N f336Y 998.3232 MOCKSVILLE, N. C. 2702E t336i 998-3800 NC TOLL FREE 1-000-422.3560 Porter Farms Specification Sheet. 10. Travel Speed is as follows: 19.3 X GP1.1 Lane Spacing X Appl.icatign Depth 19.3 X 197 _ 3802 = J3 Ire/Min 230 X— 115 2.8 Ft/Min = 1-68 Ft/1Tr For 1801 Arc 315 = 1.75 2.8 Ft/Miry X 1.75 = 4.9 Ft/Min 180 - 288 Ft /H7- 11. System pump is a Kifco NC120S Frame Mount on a John Deere 4045D Power Unit. 12. NT120S Frame Mount Pump is capable of pressures to 150 PSI and flows up to 500 GPM. 1.3. Horsepower requirement For 197 GPM at 123 PSI is ± 40 .B1 P. The John Deere 4045D Power Unit_ is rated at 80 BHP @ 2200 RPM. Design — Sales -- Service COMPLETE IRRIGATION SYSTEMS TELEPHONE.' ADVANCE EXCHANGE 10101 090-3232 19101 E9a-3800 NC TOLL FREE 1.800.422-3560 System Operation Porter Farms System Start -Up 2310 NC HWY. 801 N MOCKSVILLE. N. C. 27020 1. Attach traveler to hydrant and pull out hose. 2. Move pump to lagoon. 3. Prime pump. 4. Start engine. 5. Leave engine at idle speed until all air is evacuated from system lines. 6. Raise engine speed to meet require pump pressure. (123 psi) i. Start traveler motor. 8. Adjust traveler motor speed to reach required hose speed. (4 ft/min) System Shut -Down 1. Lower engine speed to idle. 2. Shut off engine. 3. Move traveler to next location or to storage. 4. Move engine to storage after pumping. Winterization 1. Open all drains in the system. (pipelines, pumps, traveler, etc.) 2. Open pump discharge gate valve and leave open. 3. Spray lubricant into pump suction and rotate shaft to help prevent rust. 4. Open ground entry gate valve and pour in a small amount of anti -freeze.. 5. Leave ground entry gate valve slightly open. 6. After water has been evacuated, close pipeline drains. Maintenance 1. Follow all manuals supplied with the system. 2. Grease hydrant stems annually. 3. Replace any wore or damaged parts as soon as possible. ,A ,AAA . �- NCDENR JAMES B. HUNT JR.- GOVERNORr.'c:' `x= BILL HOLMAN SECRETARY 7. E,t L J'i '�. ^r>— f' ? �.A NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES MOORESVILLE REGIONAL OFFICE WATER QUALITY SECTION August 28, 2000 Tom Porter 4455 Mt. Pleasant Rd. S. Concord, NC 28025 Subject: DWQ Animal Operation Inspection Porter Farms, Facility #: 13-01 Cabarrus County, NC Dear Mr. Porter: Mr. Alan Johnson of this Office conducted a site inspection of your facility on August 22, 2000. Based on his observations, the records were found to be complete and the facility appeared to be well operated and maintained. Your waste plan indicated that approximately six million gallons of waste are generated annually. However, your records indicated that approximately two million gallons of waste have been applied annually for the past two years. Please submit in writing an explanation for this discrepancy. You may want to contact your technical specialist. Enclosed please find the inspection report, which should be self-explanatory. If you have any questions concerning this matter, please do not hesitate to contact Mr. Johnson or me at (704) 663-1699. cc: File Sincerely, D - '2 4-� D. Rex Gleason, P.E. Water Quality Regional Supervisor 919 NORTH MAIN STRHET, M00RESVILLE, NORTH CAROL INA 26115 PHONE 704-663.1699 FAX 704-663-6040 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST -CONSUMER PAPER Q Division of Water Quality Q Division of Soil and Water Conservation Q Other .Agency Type of Visit 34 ompliance Inspection O Operation Review Q Lagoon Evaluation Reason for visit +Routine Q Complaint O Follow up O Emergency Notification Q Other ❑ Denied Access Date or visk: Facility Number 11 h t—1 1 r Pr•inied on: 7/21/2000 t o Not Operational O Below Threshold © Permitted ❑Certified ❑ Conditionally Certified ❑Registered Date Last Operated or Above Threshold: .................. Farm Name: `.�1 L County: ....... j C'.� ................................... ........... ...... ................................... ............... ........ ..... Owner Name i.1:.S �O Phone No: .......... ]� �.....-.....� �c FacilitcContact: ..............................................................................Title:.......................................................... Phone No: Mailing.Address:........... .-.......(. V......... Lra.ti. .�4.'L. ....+5. .. ...............�c)t1...Lsd�'i .�...�... .................................... Onsile Representative:...........f.C.? z........ ..... C.+.e.. ................ Iniegrator:......_................................................. Certified Operator:. ... j5tr✓t,.................. [ ........ Operator Certification Number:.....f.2.,�( Lpe-Stion of Farm: I _ . _I,T f5i(Swine ❑ Poultry ❑ Cattle ❑ Horse I-' a �• �` �'` Longitude • 4 « Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle capacity Population 10 Wean to Feeder j❑ Layer ❑D—airy ❑ Feeder to Finish j❑ Non -Layer 1777�7:d❑ Non -Dairy ❑ Farrow to Wean '? ,-', ❑ Farrow to Feeder ❑Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number of Lagoons JE3 Subsurface Drains Present ❑ Lags -n Area ❑ Spray Field Area Holding Ponds I Solid Traps ❑ No Liquid Waste Management System Dischar_s,es S Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 6M No Discharge oriuinaied at: ❑ Lagoon ❑ Spray Field ❑ Other a. If di;chur,c is observed, was the conveyance man-made? ❑ Yes ❑ No h. If discharge is observed. did it reach Water of the State? (If yes, notify DWQ) ❑Yes ❑ No c. If dischan c is observed. what is the estimated now in gal/thin? d. Does cischarge hvpass a lagfoon system? (If ves, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑Yes ,kNo 3. Were there any adverse impacts or potential adverse impacts to the Waters 4 the State other than from a discharge? ❑ Yes No Waste Collection S Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? 9Spillway ❑ Yes 4kNo Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure b Identif icr:.................................:...................................... ................................... .................................... .................................... .................................... Freeboard (inches): 5100 Continued on back lFacility Number: — l):,te 44f Inspectimi Printed ()n: 7/21/2000 5. Arc there any immediate threats to the intc�_,rity of any of the structures observed! (ic/ trees. severe erosion. ❑ Yes IKNo scepat*e. etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan'? El Yes 7-*0 (if any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need main ten ance/improvement? ❑ Yes >NO S. Does any pan of the waste management system other than waste structures require maintenance/improvement? ❑ Yes 1;No 9. Do any stuctures lack adequate. gauged markers with required maximum and minimum liquid level elevation markings`? ❑ Yes E),1Vb NVnNte Application lb. Are there anv buffers that need maintcnancehmprovement'? ❑ Yes,[j_No 11. Is there evidence of e w applicati^n•? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑Yes No 12. Crop type A�C, C' S ,_.:. 13. Do the receiving crops differ µ;ih those designated i'n the Certified Animal <Vaste Management Plan (CAWMP)'? ❑ Yes ❑ No 14. a) Does the facility lack adequate acreage-ibr land application'? ❑ Yes No b) Does the facility need a wettable acre determination'? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement" ❑ Yes PaNo 16. Is there a lack of adequate waste application equipment? ❑ Yes ,RNo Required Records S Documeims 17. Fail to have Certificate of Coverage & General Permit readily available'? ❑Yes �kNo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available'? (ie/ WUR checklists. design. maps, etc.) ❑ Yes P!�No 19. Does record keeping need improvement'? Oe/ irrigation. freeboard. waste analysis & soil sample reports) ❑ Yes No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes - No 21. Did the facility fail to have a actively certified operator in charge'? ❑ Yes /V] No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? !/ (ie/ discharge, freeboard problems, over application) ❑ Yes � No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative'? ❑ Yes ABoL[o 24. Does facility require a follow-up visit by same agency? ❑ Yes ERNo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Ye�No 13; Nb-violatiflris'or. deft,ciendes •mere noted• dit•fi-ft fii'tis:visit: • Y:oi} .will-t"&00i iio fufrther ctirres' bride' e: about: this :visit: ' Comments (refer to question #l:): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Iluy /J•. yLe- Icictri 4ic<s� �nc�ltJ[sis n� �["J,-isI •; c.s �to��ca �o.rl,1� `l- � ���(D+cS ` r rl �f�i't�� 4Yi. 1�e _'LA� cs.nCt IYS � �.,: Vr� CL c,CJ( _ Lo r,5 01\ �rL�C ��►'aX UV�� ro Lin �1tD�t SGIS, t..vcp�.:ST�-USG '(� `'�' O.t.G� a-hv��G�l l _ �csw^eu�.+�r `�Qz�� C ta��l ��nDc�.: �{-Q1c��— i'�S5 t �^�✓l Z 4'hC � ~b r- roc (:e— (it ' � (► c � t°"�_ l R Reviewer/Inspector Name Reviewer/Inspector Signature: 10 _ Date: Z 5/00 Facility Number: — Date of Inspection Printed on: 7/21/2000 'odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge aUor below ❑.Yes AANo liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes �9(No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes RNo roads, building structure, and/or public property) 29. is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes/ No 30, Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes t5wo 31. Do the animals feed storage bins fail to have appropriate cover? ❑ YesP9.No 32. Do the flush tanks lack a submerged fill pipe or a permanenUtemporary cover? ❑ Yes 'I3o 5/00 VIP, Z4 F WAT V '-0 'J E9QG Michael F. >=ashy Governor III William G. Ross, Jr.,Secretary North Carolina Department of Environment and Natural Resources D' 'C ,Alan W: Qlrnek, Director .Division of Water Quality WATER QUALITY SECTION August 6, 2002 Tom Porter 4455 Mt. Pleasant Rd. S. Concord, NC 28025 Subject: Porter Farms, Site Inspection Certificate of Coverage AWS 130001 Cabamzs County, NC Dear Mr. Porter: Mr..Alan.Johnson of this Office conducted a site inspection of your facility on August 5, 2002. Based on his observations, the records were found to be complete and the facility appeared to be well operated and maintained. Enclosed.please find a copy of the inspection report, which should be self-explanatory. If you have any questions concerning this matter, please do not hesitate to contact Mr. Johnson or me at (704) 663-1699. cc: File AM N AR Customer:Service 1 800 623-7748 Sincerely, D. Rex Gl ason, P.E. Water Quality Regional Supervisor 'Mooresville Regional Dffioe,.919 'North Main Street, Mooresville, NC 28115 -PHONE t704) 663-1699 FAX (704) 663-6040 Type of Visit O Compliance inspection Q Operation Review Q Lagoon Evaluation Reason for Visit O Routine Q Complaint O Follow up O Emergency Notification Q Other ❑ Denied Access FFacility Number 13 1 Date of Visit: 9I5/2002 Time- Q Not Operational Q Below Threshold ® Permitted ® Certified [3 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: _ __ __ __ __ __ __ Farm Name: Parter.Forms......................................................................... County: Cab us...._- -- -- -- -- -- �. ma ........ Owner Name: Thames._.------_-_-- P.otter.----------------------_-_--- Phone No:{7R4).7-2LsLLJ.85=$�i.2L�--------•--- Mailing Address: �k9 �. ..�itrnstttat.Raid. �autkt..................................................... cajac r.LM......................................................... 7.8925 .............. Facility Contact: ........................................................... Title: ............................................... Phone No: Integrator:�gill------------------_�__�_-------- Certified Operator: Tltitliil al. ........................... Fater ............................................... Operator Certification Number: 175.6Q....... ...................... Location of Farm: Five miles south of Mt. Pleasent on Mt. Pleasant Rd. (SR 1006). Farm is on the'left across from the intersection with Bost Cut Off Rd. ® Swine ❑ Poultry ❑ Cattle ❑Horse Latitude 35 21 07 Longitude 80Of 26 40 u ,Design (Current ..;Swine -icapacity -Population - '`Poultry . 5 ❑ Wean to Feeder ❑ Feeder to Finish ® Farrow to Wean 2000 1923 ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current - DDesign ;Current ;a aci d'a ulatian J Cattle CspacityPopulation U layer I I JL_j Dairy ❑ Non -Layer " ❑ Nan -Dairy , ❑ Other `TotalaDeftn-4Capaeity`y 2,000 L: ToW..SSLW'. 866,000 _t Subsurface Drains Present EJ❑ Lagoon Area J❑ Spray Field Area No Liquid Waste Discharges 8 Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. is there evidence of past discharge from any part of the operation? ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes [-]No ❑ Yes ® No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ® No Waste Collection S Treatment 4. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes ® No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: --•--•--•--.......--•--•-- Freeboard (inches): 18 ncAn2/ni �wwfirr •. w.f Facility Number: i3-1 Date of Inspection 9/5/2002 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Aonlication �.wsurueeu ❑Yes ®No [] Yes IN No ❑ Yes ® No ❑ Yes ® No ❑ Yes ®No 10. Are there any buffers that need maintenance/improvement? ❑ Yes ® No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes ® No 12. -Crop type Fescue (Graze) matua 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ® No 14. a) Does the facility lack adequate acreage for land.application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ® No 16. Is there a lack of adequate waste application equipment? ❑ Yes ❑ No Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes ® No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes ®No 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes ® No 20. is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ® No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes ®No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ®No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ®No 24. Does facility require.a follow-up visit by same agency? ❑ Yes ® No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ® No 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about.this visit. r'98MEM F[0:3Fie!1d !Cop!yOFinal Notes FACILITY AND RECORDS ARE WELL MAINTAINED. Reviewer/Inspector NameO_ Reviewer/Inspector Signature: f _ Date: 05103101 Facility Number: 23_I Date oi'inspection 9/5/2002 Confinued Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below ❑ Yes ❑ No liquid level of lagoon or storage pond with no agitation? 27, Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ® No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes ®No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes ❑ No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes ®No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes IN No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ❑ No PORTER FARMS, INC. 4455 Mt. Pleasant Rd. s. Concord, NC 28025 �tP4P1T. ie� s� r : HtAL7-lt r4 L�t+I Anna r,+ Phone 704-785-8891 Fax 704-785-8891 Home Phone 704-786-9551 Ci�rl::'till r3� 7i'� 1-,'11;,'.rj;,"r!, 1 AR145F11®j At 9Fii$F Alan Johnston 919 N Main St. Mooresville, NC 28115 November 19, 2000 Subject: DWQ Animal Operation Insp. Porter Farms, Facility #:13-01 Cabarrus County, NC Waste Water Applied Dear Mr. Johnston, Responding to your request on the amount of waste watcr applied over the past two years. Additional records on form IRR-2 were in the back of our spray records which were not calculated in your figures. The total volume pumped in 1999 was 3,229,400 gallons and the total volume puniped as of 10-31-00 was 3,580,000 gallons. In addition talking with Matt Kinane (resource conservation specialist) he indicated that figures were added for normal rainfall. Annual rainfall for our area for the past three years has been far below average. We also monitor water usage very closely to conserve water. 1 have also attended some seminars which indicate that sows probably do not generate the amount of waste as was used to figure most waste plans in North Carolina. Please let me know if you need any additional information. Sincerely, Tonuny Po er ASTA?' NORTH CAROL.INA DEPARTMENT OF s ENVIRONMENT AND NATURAL RESOURCES 1 .. r NCDENR MOORESVILLE REGIONAL OFFICE WATER QUALITY SECTION JAMES.H. HUNT JR. -GOVERNOR < August 31, 2000 +_N f1: Certified Mail �.. Return ReceiQt Requested BILL HOLMAN z SECRETARY Tom Porter 4455 Mt. Pleasant Rd. - Concord, NC 28025 Subject: Wettable Acres Determination Status & Notification Facility #: 13-1 „ 'fv Dear Mr. Porter: You were sent a letter requesting that you provide me with the necessary -R,._ 7. information to complete the evaluation of your facility with respect to a Wettable Acres Determination. The result of this evaluation and the required action to be taken by you is indicated below. v �'� µ"7. • Based upon the new information your facility is exempt at this time from undergoing a Wettable Acres Determination. No further action is necessary at I this time. rl If you have any questions concerning this matter, please do not hesitate to I j}•.- contact me at (704) 663-1699. Sincerely --. Alan Johnson Environmental Specialist II—` cc: Non -Discharge Compliance Unit two-c.3L, _-.n'ri-"\.:'-�•i_ i•. �-�� 919 NORTH MAIN BTRCET� MOORESVILLE. NORTH CAROLINA 2811E PHONE 704-869-1899 FA 7C 704-063-8040 ' AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - SO% RECYCLER/10% POET -CONSUMER PAPER oF wArFgQG to o c Thomas E. Porter 4455 Mt. Pleasant Rd. S. Concord, NC 28025 Dear Mr. Porter: Michael F. Easley Governor William G. Ross, Jr.,Secretary North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D.; Acting Director Division of Water Quality WATER QUALITY SECTION January 9, 2002 Subject: Operation Review/Compliance Porter Farms, Facility #: 13-1 Cabarrus County, NC The year 2002 is the beginning of the fifth year of the animal operation inspection program. Given this, there should be no misunderstanding as to what is required. However, as a reminder, the following information is a partial list of what is required: • A copy of the Permit, Certified Farm Plan, and Certification form(s) must be lvailable for review. The certified farm plan must be followed (application rates, fields used for waste application, and crops grown to receive waste must be adhered to). You are in violation if you do not comply with any aspect of your farm plan or permit. • Annual soil analysis (properly documented) is required. The soils lab states that the preferred time (for efficiency) to process samples for analysis is between May and September. • Waste analyses must be conducted within 60 days of the waste application date. If the results are irregular, this should give adequate time to collect/analyze a new sample. • Waste application.records. The records should be complete and legible. Errors should not be erased, but marked through and the correct information written on the following line. Remember, although the information may be dear to you or the operator, the information must be understandable to the person(s) performing the review. • Weekly freeboard records must be maintained. The "pump marker" must be clearly marked and visible at all times. There should be no question as to what is the pump marker during an inspection. • A certified operator must be designated. By completing a form and mailing to DWQ. • The facility must be maintained and operated according to the operation and maintenance information enclosed in the farm plan. This includes maintaining the area (mowing) around buildings and the lagoon/storage pond embankments. The list above comprises the majority, but certainly not all, of the requirements that must be followed. If permitted, the conditions of your permit should be review by you and your operator. Failure to have the necessary information available for inspection or to comply with the conditions of your permit could result in a Notice of Violation or further enforcement actions, if there is any uncertainty on your part regarding compliance with the permit, please feel free to contact Rocky Durham with the Division of Soil and Water or me at (704) 663-1699. Sincerely, 1 Alan D.Johnson Environmental'Speciaiist II Customer Service Mooresville Regional Office, 919 North Main Street; Mooresville, NC 28115 PHONE (704) 663-1699 1 800 623-7748 FAX (704) 663-6040 J+ + am] oF w A rF9QG Micha . Easjley LLL,,,JJI - Governor r William G. Ross, Jr.,Secretary North Carolina Department of Environment and Natural Resources Kerr T. Stevens, Director Division of Water Quality WATER QUALITY SECTION March 20, 2001 Tom Porter 4455 Mt. Pleasant Rd. S. Concord, NC 28025 Subject: DWQ Animal Operation Inspection Porter Farms Certificate of Coverage AWS 130001 Cabarrus County, NC Dear Mr. Porter: Mr. Alan Johnson of this Office conducted a site inspection of your facility on March 16, 2001. Based on his observations, the records were found to be complete and the facility appeared to be well operated and maintained. It is suggested that when taking the weekly freeboard measurement that the reading be made from the crest of the spillway rather than from the maximum liquid level mark. . Enclosed please find the inspection report, which should be self-explanatory. If you have any questions concerning this matter, please do not hesitate to contact Mr. Johnson or me at (704) 663-1699. Sincerely, D. Rex Gleason, P.E. Water Quality Regional Supervisor cc: File ?`bEN ustomer Service Mooresville Regional Office, 919 North Main Street, Mooresville, NC 28115 PHONE (704) 663-1699 800 623-7748 FAX (704) 663.6040 .Y. .:r:%: ii M.s.:`r..-.r.:,,.-'F � �-: ..-.Y�`1r' �%`�•s1: �,T••..y%F�� -:; ..,t �.. _ - - .,� .�. ..�, •.i•. ��'.:i,'•1.:i�.����,.j}��r}ti• �;x..+r�•=a-_ DRYLSeoti;of, .BtCl: L Fih:�+^r'' �+-, :�: _`-•��*�.'•,��:.' �-y1�f^��, .�il��3•�.:.- •.f7'F'.t,,+-•�_ '.7: J'��-;�!`n- •,ry.w.;..,..�. y,y;f+�^�..�ii'".,s...�zw�.;_ � _ A��,p Divisien'of Sub and: Ater. ooservation„� „_z :w �trtr,zt • ' �^';; -''S •�F! .mow �.p-.,�.�' �,,,r..,-.> �y�_.A• x?'l. � Yr�-�i�i 7"'''T'�iV ■ . ' l7 t: fi a zr� tll$CA tiYy¢ t j.. ,t• ,�I �f. r�..� .f �� ._,,•w ti. Wt+;ra: •.�J.i+ CL�-C•'..•x• �:�}F�7'�rta`:%:f;-1.5i!r��..: st•=�. `tom � :fr :tt:�:6i'�+!tr „•�.:�:*f::��t� Type of Visit- Compliance Inspection O Operation Review O Lagoon Evaluation Reason. for Visit 0111outine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number I Date or Visit: Time: i O Not Operational O Bciow Threshold Permitted ❑ Certified ❑ Conditionally Certified 0 Registered Date Last Operated or Above Threshold:........... Farm Name: ................. _..�1s.:. t` !�..... Ct Sc:..!l1r1...............-- Owner Name:,••c� cy►� •, >C'� ..................... �.._................._.......G......X:t........................._............ County-�i•� -Y1� ........... Phone No: ................ ...... ............. ............................................... FacilityContact: ...............................................................................Title:........................ Phone No: •. Bailing Address. _..'4 Y-! - :..............af Onsite Representative:......... L�.�...-.....��� Certified Operator:........... vF ............................�& ....?. .a-54 E_ ....... .... ......................... _.... . Cr�t� ........�''� integrator: _....:.... ........... ................... Operator Certification Number:......................................... Location of Farm: + Swine 4 it ❑ Cattle ❑ Norse Latitude • Longitude �` ��• �•• t Design Current Swine Canaciri• Population ❑ Wean to Feeder ❑ Feeder to Finish Farrow to Wean i v ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer I ❑ Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area JE1 Spray Field Are - Holding Ponds /Solid Traps ID No Liquid Waste Management System Discharges A Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ElOther a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of Elie State'? (If yes, notify DWQ) ❑ Yes No - ❑ Yes ❑ No ❑ Yes ❑ No c. If discharge is observed. what is the estimated flow in gal/min'? d. Does discharge hvpass a lagoon system? Elf yes, notify DWQ) ❑ Yes ❑ No 3. Is there evidence of past discharge from any part of the operation? ❑Yes [No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes [3,No 01/01/01 Continued Facility Number: _� Date of InspeCtiori""" `C ' - Waste Collection & Treatment 4. Is storage capacity (freeboard:plus storm storage) less than adequate? �5piilway ❑Yes ��No Strui:iure 1 - 5tructurc 2Structure 3 Structure 4 ' Structure 5 Structure fi Identifier: Freeboard (inches): .-_.>T ........ 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ,�] No _ \ seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑Yes +� Na (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes allo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum -liquid level elevation markings? ❑ Yes qNo W2.9te Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes ANo 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑Yes Z No 12. Crop type-- 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAW1ViP)? ❑ Yes t No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No t:) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes qNo 16. Is there a lack of adequate waste application equipment? ❑ Yes jLNo 17. ock outcrops present? ❑ Yes ❑ No 1 iE:;s there a water supply well within 250 feet of the sprayfield boundary? ❑ Unknown ❑ Yes ❑ No ❑ On -site ❑ Off -site Required Records & Documents 19. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes No 20. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? Oc/ WUP, checklists, design, maps, etc.) ❑ Yes XNo 21. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes JkNo 22. Is facility not in compliance with any applicabla setback criteria in effect at the time of design? ❑ Yes No 23. Did the facility fail to have a actively certified operator in charge? ❑ Yes ®No 24. Fail to notify regional DWQ of emergency.situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ,� No 25. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes is( No 26. Does facility require a follow-up visit by same agency? ❑ Yes 6No 27, Were any additional problems noted which cause noncompliance of the Certified AW1ViP? ❑ Yes No Odor Issues 28. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ;Cl No liquid level of lagoon or storage pond with no agitation? 29. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 01/01/01 Continued �- Facility Number:=-- - - -. Date of Inspection 4 �� 30. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) , __31. Is the land application spray system intake not located near the liquid surface of the lagoon? 32. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters,.etc.) -. 33. Do the animals feed storage bins fail to have appropriate cover? 34. I)o the flush tanks lack a submerged fill pipe or a permanentltemporary cover? Printed on: 1/17/2001 ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes KNo ❑ Yes ANo ❑ Yes ❑ No -M No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. 1 Reviewer/Inspector Name - Reviewer/luspector Signature: Date: .311t`le / 01/01/01 r-cwjl ty I'JurnuUS — Lagoon tvumder - Lagoon Identifier O Active O Inactive , n Latitude Longitude ❑ By GIPS or, Map? ❑ GPS ❑ Map GPS file number: 35. Surface Area (acres): 36. Embankment Height (feet): 37. Distance to Stream: 38. Water supply well within 250 ft of the lagoon? ❑ On -site ❑ Off -site 39. Distance to WS or HOW (miles): 40. Overtopping from Outside Waters? 41. Constructed before 1993 NRCS Standards? 42. No verification of adherence to 1993 or subsequent NRCS Standards? 43. Was groundwater encountered during ,construction? 44. Depth to Groundwater: 45. Spillway? 46. Adequate Marker? 47. Immediate threat to the integrity of the structure? 48. Freeboard & Storm Storage Requirement (inches): O less than 300 ft O 300 ft - 1000 ft O greater than 1000 ft 0 Yes 0 No 0<5 05-10 0>10 O Yes O No O Unknown O Yes O No O Unknown O Yes O No 0 Unknown O Yes 0 No O Unknown O Unknown O Yes O No O Yes O No O Yes O No I .State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill! Holman, Secretary Kerr T. Stevens, Director Thomas E. Porter Porter Farms 4455 Mt. Pleasant Road South Concord NC 28025 Dear Thomas E. Porter: IIkT?W'A IT 1 • NCDENR NORTH CAROUNA DEPARTMENT OF ENviRONMENT AND NATURAL- RESOURCES December 30, 1999 Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number 13-1 Cabarrus County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, IRR2, DRY1, DRY2, DRY3, SLUR1, SLUR2, SLDI, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. S in cer , Kerr T. Stevens, Director Division of Water Quality cc: Mooresville Regional Office Cabarrus County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699.1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Y'~ i R State of North Carolina Department of Environment :and Natural Resources Mooresville Regional Office James B. Hunt, Jr., Governor William E. Holman, Secretary Thomas E. Porter 4455 Mr. Pleasant Rd. S. Concord, NC 28025 Dear Mr. Porter: A IT • • NCDFN'R NORTH CARouu^ Dm%m:rrMEKr or- EN%nRcm . ew ANo NRCURAL REsouft= DIVISION OF WATER QUALITY September 3, 1999 Subject: DWQ Animal Waste Operations Site Inspection Report 'Porter Farms, Facility #: 13-1 Cabarrus County, NC Mr. Alan Johnson of this Office conducted a site inspection of your facility on August 31, 1999. In general the facility was in good shape. However, you need to ensure that the weeds in your waste application fields are kept under control. Also, a current waste analysis is needed for your files. Please note that during many of Mr. Johnson's inspections he has noted that some farms are often missing one or more components of the farm plan that should be available for review. The following items must be available for review by the inspector during the inspection: • Certification forms. • Site Diagram, which shows fencing, streams, buffer zones, and feed areas. • Waste Application records, with accompanying waste analyses. • Maps of acreage and irrigated fields. • Waste Utilization plan, tract/field number, usabletwettable acres (not necessarily total acreage), list of crops, PAN required, and amount of waste produced by livestock. • Waste and Soil analysis information. Must have three years of data. Itis suggested that this be maintained in a single folder. • Emergency Action Plan which must be posted. • -Insect, Odor Control, and Mortality Checklists must,be completed. • Certified Operator renewal card. Failure to have the above components available and complete could result in a Notice of Violation or other enforcement actions. Also, remember that waste applications should be made during.the time the crop can utilize the nutrients in the waste. In general, waste should be applied no earlier than 30 days prior to planting. 919 North Main Street, Mooresville, North-Carohna 28115 Telephone 704-663-1699 FAX 704-663-6040 An Equal Opportunity Affirmative Action Employer 50% recyeieW10%-post-consumer paper Page 2 If you have any questions concerning this matter, please do not hesitate to contact Mr. Johnson or me at (704) 663-1699. Sincerely, ,� D. Rex Gleason, P. E. Water Quality Regional Supervisor cc: File Division of Soil and Water -Conservation - Operation Review Division of Soil and Water Conservation - Compliance Inspection Division of Water Quality - Compliance Inspection' Other Agency - Operation Review Routine Q Complaint Q Follow-up of DWQ inspection O Follow -tip of DSWC review Q Other Facility Number Date of Inspection Time of Inspection r 24 hr. (hh:inm) Permitted Certified © Conditionally Certified 13 Registered 0 Not Operational Date Last Operated: � County: Farm Name: ............. ._c 1 �7 .1 ...............4 ✓'.it4�. ..............................County:..........4.-�..�:1�1.1��1/1..3.............................. OwnerName:...................................._T7G............... ............ Phone No:....................................................................................... Facility Contact; .............................................................................. Title:.............. Phone No Mailing Address: ..... ���`"E�.:,?.,.../i..T............ r�1....� k...ed. .�r..............�....................... ............ 02..©�.. Onsite Representative:........ 6 �o.1.... Integrator:........................................................ Certified Operator: .......... :,>74 A"4•6;,,,,,,, ,, w Y , Operator Certification Number:1. Loca--ti—on of Farm: —1 atitude Longitude Design Current ' Design -Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population' ❑ Wean to Feeder ❑ Layer ❑ Dairy ❑ Feeder to Finish ❑ Non -Layer ❑ Non -Dairy Farrow to Wean ❑ Farrow to Feeder ❑Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑Boars Total SSLW , Lagoon Area Spray Field Area . surface Drains Present ❑ '.INumber of Lagoons .. 0 ❑Sub ❑ t; P Y Holding Ponds / Solid Traps ID No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated ac [:]Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? ❑Yes ❑ No h. If discharge is observed, did it reach Water of the Suite? (If yes, notify DWQ) ❑ Yes ❑ No c. If discharge is observed. what is the estimated flow in gal/min? d. Dees discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes ' ❑ No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 1Z No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ASpillway ❑ Yes 4N0 Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard(inches): .......'T..Ll........I.................................................................................................................................................................................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes No seepage, etc.) 3/23/99 Continued on b ck Facility Number: — Date of Inspection 0 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Ya [J No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes )Vl No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes /tM 12. Crop type t'11��vtip` 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes pivo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes X-No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? WYes ❑ No 15. Does the receiving crop need improvement? ❑ Yes 10 No 16. Is there a lack of adequate waste application equipment? ❑ Yes ,t.No Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes ANo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? Yes &o (ie/ WUP, checklists, design, maps, etc.) ❑ 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) A Yes ❑ No 20, Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes JKNo 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes Jj No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes V No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 5d-No 24. Does facility require a follow-up visit by same agency? ❑ Yes X.No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes qNo �Vo yitjl'a i0ris:0r.dg a enctes iv�re jagtetl dt;�t'i>tag phis"visit; Yoh will �ecgiye o fU t�gr ctirrt s�ondeni & about: this visit: �y ixt€ tflF'1 ttxaaP k3[€�6rv'9 €�4q pnYRs+ tnl P ,I Comments{refer to, quest #) Explain 'any YES,answers andlor'"a'uy recommendations orrany�ott er�eomments.` Use drawings of facility totettec`explain situainoas (use'additlo'nahpages as necessary) }<€';,, �; ; • ; ;�. S %.5 5"cwl� e , c�a �. P1NM�� 6� --ia w �-{ 1:► v� lad aka IS Ne.e� � .[:1.:5�Y-we�•I-�.I�r ey��a� �� �.�e�s �.1"�. v.�u��e- � i�� c u _iz_:`eA4, Reviewer/Inspector Name Reviewer/Inspector Signature: Date: �(✓� r- 3/23/99 Facility Number: — Date of I11spection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes f No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Ycs ^No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes NJ 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes *0 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes P�Vo 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? AY es ❑ Nu Additional Comments and/orDrawings: w 3/23/99 Revised April 20, 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION Facility Number; -- . -1 Operation is flagged for a wettable Farm Name: acre determination due to failure of On -Site Representative: n - Part 11 eligibility item(s) F1 F2 F3 F4 Inspector/Reviewer's Name: Ao-o Operation not required to secure WA determination at this time based on Date of site visit ,3111 exemption E1 E2 E3 E4 Date of most recent WUP: .2 . Operation pended for w !e acre determination based on 1 P2 P3 Annual farm PAN deficit: fv a pounds Irrigation System(s) - circle #: 1. hard -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system w/permanent pipe; 5. stationary sprinkler system wlportable pipe; 6. stationary gun system w/permanent pipe; 7. stationary gun system wlportable pipe PART I. WA Determination Exemptions (Eligibility failure, Part II, overrides Part I exemption,) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an 1 or PE. E2 Adequate D, and D2/D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part 111. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eligibility checklist, Part 11 - F1 F2 F3, before completing computational table in Part III). PART 11. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails _one of the .eligibility requirements listed below: F1 Lack of acreage which resulted in overapplication of wastewater (PAN) on spray field(s) according #ofarm's-last two years -of irrigationTecords.-.. F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous.ditches;failure to.deduct required. buffer/setback acreage; or 25% of total acreage .identifiied.in-CAWMP includes small, irregularly shaped fields -fields less than-5-acres fortravelers-orless than 2 acres for stationary sprinklers). F4 WA determination.required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part 111. Revised April 20, 1999 Facility Number Part III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER' Z TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS3 l� and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption; otherwise operation will be subject to WA determination. FIELD NUMBERS - must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres -and having -received less -then 50% of its annual PAN as documented in the•farm's previous two years' (1997 S '1998) of irrigation records,zannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in -the comment section and must be -accessible by irrigation system. Part IV. Pending WA Determinations P1 Plan lacks foil win information: a c� P2 Plan revision may satisfy 75% rule based on adequate overall PAN deficit and by adjusting all field acreage to -below 75% use rate P3 Other (ielin process of installing new irrigation system): JAMES S. HUNT JR.; GOVERNOR -• WAYNEirICDEViZ7«-, ;, IF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES MOORESVILLE REGIONAL OFFICE DIVISION OF WATER QUALITY November 19, 1998 Thomas E. Porter 4455 Mr. Pleasant Rd. S Concord, NC 28025 Subject: Site Inspection Porter Farms, Facility #: 13-1 Cabarrus County, NC Dear Mr. Porter: Mr. Alan Johnson of this office has been asked on several occasions about the appropriate time and proper method to take soil and waste samples. Also, during his inspections, he has noticed that while the storage capacity may be adequate in the storage pond/lagoon, in some cases it was not at the level set forth in the waste utilization plan. Mr. Johnson has also noted that some animal operations using hay/pasture systems do not appear to be properly managing the hay crop in the waste application fields. This letter is to highlight some concerns and provide some general guidance for the animal facilities regarding the management of the storage pond/lagoon and waste application fields. For more specific/detailed information, please contact your technical specialist or your local agricultural extension service. Be advised that should a farm be found violating its farm plan and/or have an unpermitted discharge, besides facing civil penalties, the facility could be required to apply for an individual permit. Currently, most farms are operating under a general permit. Waste applications Just as you manage the animals at your facility, proper management of the waste (lagoon/storage pond level) is important. The waste must be pumped from the ponds at the correct time and provide for maximum utilization of the nutrients by the crop. Remember, waste application rates in your farm plan are based on agronomic principles, and assumes the waste will be applied when the nutrients are required (e.g., applying waste to corn at tasseling or bermuda grass in November is of little use for the uptake of nitrogen). Also, the established application rate assumes that the previous crop has been removed from the field. 919 NORTH MAIN STREET, MOORESVILLE, NORTH CAROLINA 281 15 PHONE 704-663-7 GOP FAX 704-663-6040 AN EQUAL OPPORTUNITY / APFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST -CONSUMER PAPER i a Page 2 Grass and small grain crops grown for hay should be harvested in a timely manner. To maximize nutrient uptake, as indicated in the waste utilization plan, and for highest quality, the crop should be harvested at early boot stage (generally every 4 to 5 weeks). Small grain for silage can be harvested in the soft dough stage when direct cut. Contact your agricultural extension agent or technical specialist for proper guidance. General Recommendations for Nitrogen pplication for CommonCrops: • Small Grains: One-third (1/3) N at planting and remainder in late February or early March. • Corn/Sorgbum: For facilities that pump and haul, N should be applied prior to planting. For those facilities that irrigate, a split application with half at planting and the remainder when the corn is 18 inches high. • r Fescue/Orchardgrass: Apply one-half (1/2) of the N in mid -February to March and one- half (1/2) in mid -August to September. • Bermuda grass: Establishing: 30 to 40 lbs N/ac at planting and 30 to 60 lbs N/ac when runners appear (6 -8 wk. after planting). Maintaining: 50 to 60 lbs N/ac in April and the remainder of the recommended amount in equal increments in June and July or after each cutting. Finally, there have been instances where the amount of waste pumped (as shown in the waste application records) from the lagoon/storage pond does not appear to agree with the amount of waste produced by the animals. One would expect on an annual basis that the amount pumped would be approximately equal to the amount being produced. For example, if a dairy is generating 453,000 gal/yr in waste, then approximately 453,000 gallons of waste should be accounted for in the waste application records over a year. However, there may be some difference due to how low the storage pond was pumped, the number of cows being held in the facility, or the amount of rainfall. Soil analysis (FREE) Fifteen to twenty (15 to 20) soil samples per field (20 acres or less) is desirable. The samples should be thoroughly mixed and sent in as one sample. Each sample should be pulled 4 inches deep for pastures and no -till systems and 8 inches deep for conventional tillage systems. Taking samples during the fall is advisable. The state lab is not as busy at that time and can provide a more timely turn around with the results. This is also a good time to apply lime if recommended by the soil test. When liming is necessary, it is important that it be applied as suggested. Maintaining proper soil pH is as important (if not more so) than fertilizing to maximize crop production. Page 3 Waste samples/analysis ($4/sample) The state lab now has the capability to conduct analyses and provide the results within two working days via the internet. Through the US Postal service allow seven days. Take samples in a timely manner such that waste application rates can be based on the most recent sample results. Six to eight (6 to 8) samples should be taken around the edge of the lagoon/storage pond, approximately 6 feet from the edge and 12 inches below the surface. These can be mixed to make one sample. The sample should be refrigerated if it is not going to be shipped the same day. Always mail waste samples in plastic containers. For farmers who do not have to agitate the lagoon/storage pond prior to application, it is strongly suggested that waste samples be taken prior to waste application. This will prevent the prdaucer from having to go back and complete the waste application record at a later date. For farmers who apply waste to hay fields and pastures, it is strongly suggested that waste samples be taken quarterly if the waste is applied anytime during the growing season. If you have questions concerning this matter, please do not hesitate to contact Mr. Johnson or me at (704) 663-1699. Sincerely, D. Rex Gleason, P. E. Water Quality Regional Supervisor cc: Cabarrus SWCD Non -Discharge Compliance Unit Regional Coordinator [3 Division of Soil and Water Conservation [3 Other Agency 46 6 gr i"ivision of Water Quality L k HP%outine 0 Coninlaint 0 Follow-ut)of DAVO instiection 0 Follow -no of DSWC review 0 Other I - 1�4 — --- - ------- Date of Inspection I 11tZ4 Facility Number I Time of Inspection E&nZ124 hr. (hh:mm) 0 Registered, fkCe_rtifiedJ3 Applied for Permit [3 Permitted JE3 Not Operational . I Date Last Operated ........................... Farm Name: .............P...C. �: .......i.-VVV...S ..............-........................County:........ �z ................................ OwnerName: ......... y r6h. h-.? z 1.5........... ................. P& .. ........................... Phone No: ....................................................................................... FacilityContact: ............................ ................................... I ............. Title: ................................................................ Phone No: ............................ 7 ... * ............. . ..... 5A ... ....... ............................................ Mailing Address: ........ 14fj_5 . . ........ ..... PrI Onsite Representative: ............ 7Xdm,a,:F ................... 1, PIC ....................... Integrator: ............ I ................. .... ................... ................. Certified Operator ......... 74!a.4-7 A . ...... ..................... . ................... Operator Certification Number,...... —6.0 .......... Location of Farm: L t L I' ...... C".kok ...... rzk'*\� ............ I ---....(!IA..-.-- . -....Rd:... _..........0 Latitude Longitude P trepe, 5a, f- Design,' ,,,Curreint E I Deisign Current Design Current ,Swine CapacityCapacity .Population Poultry "Capacio Population Cattle ci 'Population U Wean to Feeder Io Layer I ❑ Dairy I I ❑ Feeder to Finish I0 Non -Layer I 1 10 Non-DairyL I RjEow to Wean J El I Farrow to Feeder Q Other El Farrow to Finish Total Design Capacity 0 Gilts El Boars Total SSLW Number pf Lpgioons: Ponds ❑ Subsurface Drains Present 1'1[j Lagoon Area I0 Spray Field Area Holding No Liquid Waste Management System 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: [I Lagoon [I Spray Field 0 Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) 0 c. If discharge is observed, what is the estimated flow in gal/min? d. Does discha.'rge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenancelimprovement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 7/25/97 ❑ Yes k., No ❑ Yes �No 0 Yes 0 No 0 Yes [] No 0 Yes El No 0 Yes PI.No 0 Yes Wo • Yes 2NNo • Yes ;.No • Yes XNo Continued on back Facility Number: — 8. Are there lagoons or storage ponds on site which need to be properly closed'? Structures (Lagoons,Holding Ponds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Structure I Structure. 2 Structure 3 . Structure 4 ❑ Yes No ❑ Yes J�No Structure 5 Structure 6 Identifier: Freeboard(ft).......�i:... �....................................................................................................................................................................................... 10. Is seepage observed from any of the structures? ❑ Yes No IL Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes ,� No 12, Do any of the structures need maintenance/improvement? ❑ Yes A No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers'? ❑ Yes No Waste Application 14. Is there physical evidence of over application? ❑ Yes No (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type d.SG.. ................... xs....GEC............................ ..................... .............. ............. ............................................ ............................. 16. Do the receiving crops differ with those designated in the Animal Waste Management ['],in (AWM13)? ❑ Yes No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes No 18. Does the receiving crop need improvement? ❑ Yes �[ No 19. Is there a lack of available waste application equipment? ❑ Yes ( No 20. Does facility require a follow-up visit by same agency? Cl Yes 91 No 21. Did Reviewer/inspector fail to discuss review/inspection with on -site representative? ❑ Yes V No 22. Does record keeping need improvement? ❑ Yes tA No For Certirigd or Permitted FacilitiesOnl y N J 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 24. Were any additional problems noted which cause noncompliance of the Certified AW,MP? ,❑ Yes ❑ No 25. Were any additional problems noted which cause noncompliance of the Permit'? ❑ Yes ❑ No No.violations or defieier c'ie's were,noted:during this:visit.- You.will receive no further .�:�correspbtidenceab"out this'.v�sit:•:•�.�:��.. �.•��.- '.� �:�'.•;.::�. .�. :.•,�..�..,�.:.�.,:�.�• , Com ments (refer'to question #), I:xplam any.YES answers andlor any rrcomimendattons or any"other comments.,.,,.,, Zt Use=drawings of facility tti:better explain situati6ns,juse additional pages as necessary} yP, 7/25/97 Reviewer/inspector Name Reviewer/Inspector Signature: Date: V State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Govemor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Thomas E. Porter 4455 Mt. Pleasant Rd. South Concord NC 28025 Dear Thomas E. Porter: AX? ' •• 0,� N C D EN.,cR 0� }*A"tVV AL A'tv-�OUFtt3D;;i June $,1998 JUN 12 194$ Subject: Additional Information Request Porter Farms Facility Number 13-0001 Animal Waste Operation Permit Application Cabarrus County The Non -Discharge Permitting Unit has completed a preliminary review of the subject permit application. Additional information is required before we can continue our review. Your WUP lists crop yields for fescue and matua grass that exceed NRCS Standard Realistic Yield Expectations (RYE) for your soil type. Please contact your Technical Specialist and have your WUP amended to include a condition that allows you to use this increased application rate as long as your actual yields meet or - exceed this increased crop yield rate for three out of five years. Additionally, please include within the condition that if these yields are not met for at least three of the next five years, your application rate will be adjusted to reflect actual yields produced on these waste application fields. All amendments to WUPs must be signed and dated by both the landowner and the Technical Specialist before they are submitted for review. All revisions / amendments are required to be signed and dated by both the landowner and the Technical Specialist before they are submitted for review. PIease reference the subject facility number when providing the requested information. All information should be signed and submitted in duplicate to my attention at the address below. The information requested by this letter must be submitted on or before July 8,1998, or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 533. . Sincerely, Katharine Keaton Soil Scientist Non -Discharge Permitting Unit cc: Mooresville Regional Office, Water Quality Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper MAY--09-99 FRI 04:37 PM CABARRUS SWCD _ 6432 P.Oa 1998 CONSERVATION FARM FAMILY CA$A.RRUS SOIL & WATER CONSFRVATION DISTRICT Address:4455 Mj, PJLeas X Rd-,-5, CaAQgvL.. --CAbAMQQoMW State N& - ZjR 28925 — PhRim 74 78Ot2551 Name aroma to qpw on awudcwMe to off Nations, Offlces Held and Manors Received: Watershed Improvement Commission, "nun Cabarrus Chamber of Commerce Agri -business Committee, member Cabamis County Cattleman's Association, member and past president 1992 Concord Rotary Club Farm Family Southern States, past member of the board of direetors Mt, pleasant Middle School Parent-Teochtr Orgaiiization (PTO), past president & vice- presidcnt couple St. Thomas Aquinas Catholic Church, member Conui ONly In ormadon: Livestock %formadon: Acres Major crop(s) Type *Read Haylaiid 25 Dairy.......,. Hogs......... 1900+ Rar%dpastare 450 Beef cattle.— Woodland/forest 195 Cow/calf ...... 200/200 Other Sheep.......... Poultry, ....... 25,000 TOTAL. 5�g MAY-08-98 FRI 04:37 PM CABARRUS SWCD 1 jai 793 6432 P.04 .M#Jor Sot! &later Consavadox Tuchniquay; The home place was in row crops when it was purchased, All fields have now been converted to pasture. Some of the rental land was also used for row crops before converting all fields to pasture. Animal waste plans are followed for frog and poulryy operations. Pastures are maintained in excellent condition by fertilizing and liming according to aoll tests, rotating livestock. and interseediWoverweding as needed. CompostcM critical area treatments, heavy use areas, waste storage structures, have all been used to conserve natural resources. x Conaery don rechWques (30 points) Idet d* the wit and waW mourw Managa n t problabs found on your Am. Descu ibe tlu inwvatiw aP wall u to dittoW oonm vadon teehpl" you have need to add ss these omblemt. Managing hog and poultry animal wastes has been the primary conservation challenge. Managing runofi"from fium buildings and roads, and heavy use areas has also required conservation measures. All the fields at the home place were converted Rota cropland to pasture and are used for land application of animal wastes. Fifty-five acres are irrigated using liquid animal wastes. Matua grass has been introduced into fescudclover stands to provide better m&ient utilization while providing better grazing for livestock. Small grain is ovcrseeded in the fall for the saute reasons. A heavy use axes was installed next to the barn so ,pastures would not be damaged by traffic during wet periods. R' Consenwdon Education (20pol mV Tell how your Arm hu boas wad In alder to OedwaMato to other■ la the oommUt ity the problems and aotutiona In .aricuMwW toomm CMAMV14ioa. ZhVWn O bw wVS that you pubucito YM MawVagon t4Cht U$$ aid omepta. The Cabanas County Cattleman's Association has toured the £arm in the past and a tour is scheduled this spring for the St, John's Grange. Community leaders and farmers were invited to anti► open house and tours of the new hog operation. Cargill Company literature has featured the farm. We participate in career days at Mt. Pleasant Elementary School, and the school has brought classes out to our farm to study agricultur% sea how food is produced, and learn about natural resource constsrvittion, 1 70`t 72g _r P. 0S MAY--08-98 FR I 04 :38 PM CABARRUS SWCD _ r*� CHI CoMM*eMsive cons" Systems (30p0in4 DUar& the woe is whA yvu luvd gGn%W "maWj?Z P atMUV for an or&o agtiauibual and lhrcrsry ad 411a cn yF t &m In accordance with an animal waste management plan, animal wastes are composted and/or stored before being used to meet the nutrient needs of the pastures. As mentioned earlier, matua grass and &:Hall grain ere used to increase nutrient uptake. The pastures on one of the rental farms provide 100°!o of the food supply for the oattle on that farm. Rotational grazing and stockpiled forages have eliminated the need for feeding hay. A water system supplies clean water to all pastures. The N.0 Forest Service has worked with us to develop a forest management plan for our 135 wes of trees. The forests an the fhm provide shelter £or wildlife including deer and wild turkeys, while the pastures with clover provide a source of food. IV. In4Nvtdaa11n1dadHe (Zopofnts) Explain to what dMcat your M hoer, initiadva and eqWymeid an used in developing stud bmplgnant►a& yqu vaum- tloq ►srhrri 0M bwimu what ways in WOO you lave ands you aolb< Mtka ayrtew coat effediv'a Tell haw you gas alul.d in mwvatioa. We were atnong the first farmers in Cabamus County to take advantage of the N. C. Agriculture Cost Share Program to help us solve canservation problems on the firm. We Were also the first farm to register w required by the state _0200 aWmal waste regulations. We want to stay one step ahead ofall rules and regulations. We are presently reviewing the existing waste ,management plan for our 25,000-breeder replacement poultry operation to be sure we are in voluntary compliance with pending new legislation. Ilse areas surrounding the poultry houses and hog lagoon are fenced so that Cows can be used to selective grace the grass, reducing tha ncod for mowing. We treat our leased land the same as our own farm. ,At our own expense, we drilled a well and laid over a mile of pipe on one of the farms we rent to provide a clean source of water for our cattle. We also sub -divided the pastures (also at our own vl pense) to improve grazing efficiency. By using rotational grazing and stockpiled forages, we have eliminated the need to feed out hay, saving us time and money by eliminating trips to and Horn this farm that is across the county. v Dewy** *AY You hwelce Coruervadotic (May be used for news purposes) We want eveiythiag to look nowt and nice when folks drive into the farm. We also cut the Wass weekly for the neighboring church for the same reason. I try to maintain our driveways so they don't wash during rainstorm. i don't litre to see the ground in my pasture. Conservation is the right thing to do, and protects my firm as well as the rest of the environment. I'm drinking the water. Everywhere I have anunals, I have wells, and I live right in the middle. MAY-08-98 PRI 04.39 PM CABARRUS SWGJP 795 6432 P.06 Thtw generations of the Porter &wily live on the fw-m. This is is 1411 ttme, Airnlly farm, providing 100% of the income. Their pastures are among the best -maintained pastures in the county. Their immediate neighbors include a childoare facility and a chw-ch. State inspectors monitoring compliance with animal waste regulations give consistently high evaluations ibr this Arm. Farmer Division of Soil and Water Conservation employee Todd St. John noted on one evaluation report, "This arm is immaculate and is kept in excellent condition. This fhrm could be a model of oxoellent management." State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN IPT REQUESTED Thomas . Porter Porter Farms 4455 Mt. Pleasant Rd. South Concord NC 28025 Farm Number: 13 -1 Dear Thomas E. Porter: March 20, 1998 MNYI ON"i19"rr, t:F:,c:rt' MAR 23 1998 VISION of NVIRDtMINTA! 'V:A"rVJENT IRMUME RV4111 iAi OFFICE You are hereby notified that Porter Farms, in accordance with G.S. 143-215.10C, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has sixty (60) days to submit the attached application and all supporting documentation. In accordance with Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please.call J R Joshi at (919)733-5083 extension 363 or Alan Johnson with the Mooresville Regional Office at (704) 663-1699. Sincerely, A. ar , r., . . cc: Permit File (w/o encl.) Mooresville Regional Office (w/o encl.) P.O. Box 29535, Raleigh, Norm Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary November 13, 1996 Thomas E. Porter Porter Farms 4455 Mt. Pleasant Rd, South Concord NC 28025 SUBJECT: Operator In Charge Designation Facility: Porter Farms Facility ID#: 13-1 Cabarrus County Dear Mr. Porter: 81'4VC. F31,>,r. Oar NATVR�i , r: "'IPA [ ,1,I,� 2� eso�`IZC S NOV g 1996 ifl�lSlDf! OF [Fil OfllffNrAt l.,'AN4CfnfNT uOCBfSVfttf RLSIOMA! OFFICE Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator. The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycutt of our staff at 91gn33-0026. Sincerely, A. Preston Howard, Jr., , Director Division of Water Quality Enclosure cc: Mooresville Regional Office Water Quality Files P.O. Box 27687, K 14C FAX 919-715-3060 Raleigh, North Carolina 2761 1-7687 An Equal opportunity/Affirmative Action Employer Voice 919-715-4100 50% recycled/10% post -consumer paper State of North Carolina Department of Environment, A_-- Health and Natural Resources `° � • � Mooresville Regional Office A James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary EDIEHNF:Z DIVISION OF WATER QUALITY MARCH 19, 1997 Thomas Porter 4155 Mt. Pleasant Rd. S. Concord, NC 28025 Subject: DWQ Animal Waste Operations Site Inspection Report Porter Farm, Facility #: 13-1 Cabamus County, NC Dear Mr. Porter: Enclosed is a copy of the site inspection report for the inspection conducted on March 7, 1997 by Alan Johnson of this Office. The report should be self-explanatory. If problems or deficiencies are indicated in the report, please take the necessary action to address the problems as soon as possible. Your facility appeared to be in good condition. Please continue to work with your local Soil and Water District concerning your farm certification. Any further correspondence related to the subject inspection will be sent under separate cover. Also, please be advised that North Carolina General Statutes provide for penalties of up to $10,000 per, day per violation as well as criminal penalties for violation of state environmental laws and regulations. If you have any questions concerning this report, please do not hesitate to contact Mr. Johnson or me at (704) 663-1699. Sincerely, D. Rex Gl ason, P. E. Water Quality Regional Supervisor Enclosure cc: Cabamrs SWCD Facility Assessment Unit q4t'onal Coordinator "i 919 North Main Street, ! �y�C FAX 704-663-6040 Mooresville, North Carolina 28115 An Equal FAX Action Employer Voice 704-663-1699 ; . 50% recycled/10% post -consumer paper z t� ❑ DSWC Animal Feedlot Operation Review iR pA} j q _; k-jg-DWQ�Anlmal Feedlot OperatiJon'Site Inspection routine O Cam faint O Follow-up of MV2 inspection O Follow-up of DSWC review O Other Facility Number Farm Status:— .........» ......._..... .... Date of Inspection 13/?/7119 Time of Inspection 0 Use 24 hr. time Total Time (in hours) Spent onReview or Inspection (includes travel and processing) Farm h'ame:.,l.�L� .... ...Z �I!'Ci?..... _......_.».�.. r.... Couary.__�f'i!GeS............_.................. Owner Nante:Plione No:._ 7 ��.L' _ES.,L............. _... __..._.. Mailing Address: Onsite Representative: _...... ._..... ....._......_..... Integrator:..-...-.. . . ..... . ..... ._.....» ......_...... Certified Operator: Operator Certification Number: _ .. ..........f Location of Farm: Latitude Longitude �• �° ��� ❑ Not U eratianal Date Last Operated:.. .....!C __........_ . ......_ ..._�.................. ..... r ....__.... Type of Operation and Design Capacity Swene >'' .. `: Number ,y ` 7:= Poultry . Number Cattle - Number , . ❑ Wean_ . Layer sj ❑ Dairy N [) Feeder to Finish ❑ Non -Laver ❑ Seef Farrow to Wean Y QX x Farrow to Feeder , , Farrow to Finish ❑Other Type of Livestock 1 Number of Lagoons l Holding Ponds I0Subsurface Drains Present - t r 3� ' „z�t'�`y x .. ` ` , ❑ Lagoon Area ❑ Spray Field Area General 1. Are there any buffers that need maintenance/improvement? ❑ Yes ljl� No 2. Is any discharge observed from any part of the operation? ❑ Yes Wo a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is•observcd, did it reach Surface Water? (If yes, notify DWQ) ❑ -Yes ❑ No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes R. 4. Was there any adverse impacts to the waters of the State other than from a discharge? Cl Yes 0No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes VNo maintenance/improvement? Continued on back V. AO aww+uJ uv% u► �,VHLJJI II" wiuj auy alijim auic acwa4A %,IILUIlat 7. Did the facility fail to have a certified operator in responsible charge (if inspection after l/l/97)? 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons and/or Holding Ponds 9. Is structural freeboard less than adequate? Frceboard (ft): Lagooq.l Lagoon 2 Lagoon 3 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adquate markers to identify start and stop pumping levels? Waste_ Application /V//�_ 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type >rr )4 !!YL ........,,�tpf ��..>� :.. .........._ . _ �... 16. Do the active crops differ with those designated in the Animal Waste Management Plan? 17. Does the facility have a lack of adequate acreage for land application? 7 7GGf`-ej PG 3 � ,•� 18. Does the cover crop need improvement? 19. Is there a lack of available irrigation equipment? For Certified Facilities Only //`- 20. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 21. Does the facility fail to comply with the Animal Waste Management Plan in any way? 22. Does record keeping need improvement? 23. Does facility require a follow-up visit by same agency? 24. Did Reviewer/Inspector fail to discuss review/inspection with owner or operator in charge? u asa ,q1,.V ❑ Yes A Na 1 i ❑ Yes ❑ No ❑ Yes ❑ No Lagoon 4 Comments (refer to question #): Explain any YES ansvVets and/or -any recommendations or any.other.comments:.. Use drawings :of faoi] 4-to' better explain situations: (use additional,pages as necesFsary) ❑ Yes ONo ❑ Yes 4�No ❑ Yes T" ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes No ❑ Yes ,RNo ❑ Yes A No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Resdew•er/lnspectorName Reviwer/InspectorSignature: Date: 3LAI ec: Division of Water Quality; Water Quality Section, Facility Assessment Unit 11/14/96 State of North Carolina r Department of Environment, Health and Natural Resources Mooresvllle Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Mr. Tommy Porter Porter Farms 4455 Mt. Pleasant Road, South Concord, North Carolina 28025 1DEi.HNFZ DIVISION OF WATER QUALITY July 26, 1996 Subject: DWQ Animal Waste Lagoon Inspection Report Porter Farms Cabarrus County, North Carolina Dear Mr. Porter: Enclosed is a copy of the inspection report for the inspection of the animal waste storage structure(s) conducted on duly 25, 1996 by Ms. Linda Vernon of this Office. The report should be self-explanatory. If any problems or inadequacies are indicated in the report, please take the necessary actions to address the problems as soon as possible. Also, please be advised that North Carolina General Statutes provide for penalties of up to $10,000 per day per violation as well as criminal penalties for violation of State environmental laws and regulations. If technical assistance or financial assistance is needed, please contact your local Soil and Water. Conservation District. Any further correspondence related to the subject inspection will be sent under separate cover. -If you have questions regarding this matter, please feel free to contact Ms. Vernon or me at (704) 663-1699. Sincerely, D. Rex Gleason, P. E. Water Quality Regional Supervisor cc: Cabarrus SWCD w/attachment Facility Assessment Unit w/attachment Regional Coordinator LV 919 North Main Street, NV��C FAX 704-663-6040 Mooresville, North Carolina 28115 An Equal Opportunity/Affirmative Action Employer Voice 704-663-1699 50% recycled/10% post -consumer paper On Site Representative: Physical Address/Location: n Mailing Address: Vftyli c �a S County: C aNac,r uS Integrator: Phone: 78Y 48�1(F.".V) Site Requires Immediate Attention: tS6 Facility No. 13-1 DIVISION OF WATER QUALITY ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE:141A X. 1996 Time: a:30 ft Farm Name/Owner: Phone: 764 - 2 f, e of Operation: Poul rao soaoso� Type p try_Cattle_Design Capacity: Number of Animals on Site: a000 fJ+eo. SO'Cahs Latitude:39 ° al ' 01" Longitude: Fa ° c'.b' y0" Elevation:r(ol) Feet Circle Yes or No Does the Animal Waste Lagoon have sufficient freeboard of 1 Foot + 25 year 24 h ur storm vent APf-ox. 91, F'.s ''I/ - (approximately I Foot + 7 inches) eor No-,4eta} Freeboard: Ft. Inches Was any seepage observed from the lagoon(s)? Yes o No Was any erosion observed? Yes o N® Is adequate land available for spray? Ye or No Is the cover crop adequate. Ye or No Crop(s) being utilized: 'F45C114.16 s_ Does the facility meet SCS minimum setback criteria 200 eet from Dwellings? Oor No 100 eet from Wells? e�r No Is the animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes o(No Is animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes de Is animal waste discharged into waters of the state by man-made ditch, flushing system, or other similar man-made devices? Yes o No If Yes, Please Explain. Does the facility maintain adequate waste management records (volumes of manure, land applied, spray irrigated on specific acreage with cover crop)? YesIor No Additional Comments: be I'n) de,,a-Ior*d 1J Torkw fMPrci3frQ. b�f?r�t*On Inspector Name ., f-rxl&- • K rolco cc: Facility Assessment Unit VQry Signature _64V L, • ve'� L r' State of North Carolina Department of Environment, Health and Natural Resources Moor esville Regional Office James' B. Hunt, Jr., Governor Wayne McDevitt, Secretary Thomas E. Porter 4455 Mr. Pleasant Rd. S. Concord, NC 28025 Dear Mr. Porter: QZIW 6�_& OEHNR DIVISION OF WATER QUALITY September 15, 1997 Subject: Certification/Notice of Violations Porter Farms, Facility #f: 13-1 Cabarrus County, NC The deadline for the certified waste management plan to be implemented is December 31, 1997, and there will be no extension of the deadline. With this in mind, this letter will touch on some of the general components and issues that are of concern during an inspection. As a certified, or soon to be certified, farm your files at a minimum must contain the following information, and need to be available for review during the inspection: Certification forms Site diagram - showing fencing, streams, buffer zones Waste application records/forms Maps of acreage and irrigated fields Waste utilization plan Waste and soil analysis records Emergency action plan and mortality & odor control checklist Regarding waste application records, all information should be recorded. This includes (but is not limited to) the field used, total minutes waste was applied (if required), the amount of waste irrigated/ hauled, the amount of nitrogen applied and the crop nitrogen balance. The crops and fields that are being utilized for waste application must be specified in the certified waste management plan. For those facilities that grow hay, the date when the hay is harvested should be recorded. If you feel the plan does not allow you the flexibility you need, contact a technical specialist to have the farm plan modified. For lagoons/storage ponds, remember that a freeboard of 12 inches plus an additional 5 - 9 inches (depending on location) for a 25 year/24 hour rain event must be maintained from the top of the storage pond/lagoon. If there is an emergency spillway/pipe, then the level must be maintained to compensate for a 25 yr/24 hr storm. A pumping marker must also be installed. This may be a pipe or other structure that is already in the lagoon. Whatever the marker is, it must be prominently identified. 919 North Main 5tree=, N%ICAn FAX 704-663-6040 Mooresville, !North Carolinc 28115 Eclucl Opportunity/Affirmative Action Employer Voice 704-663-1699 509a recycled/104; post -consumer paper Page 2 The question often comes up as to what warrants a Notice of Violation (NOV). An NOV may be issued for the following instances, among others: a) inadequate freeboard, b) inadequate land for waste application, c) application on an unapproved crop/acreage, d) discharge of waste from lagoon/facility, e) excessive vegetation on the sideslopes of a lagoon/pond, or f) other minor deficiencies. Examples of a deficiency would be the waste or soil analysis forms not being up to date or the application records not being filled out properly. Please note, failure to submit the certification form by December 31, 1997, does not exclude you from the responsibility of maintaining your storage pond/lagoon levels and waste application records. Also, please be advised that North Carolina General Statutes provide for penalties of up to $10,000 per day per violation as well as criminal penalties for violations of state environmental laws and regulations. If you have any questions concerning this letter, please do not hesitate to contact Mr. Alan Johnson or me at (704) 663-1699. Sincerely, l � � C)t�so .)�' Water Quali egional Supervisor cc: Cabarrus SWCD Facility Assessment Unit Regional Coordinator GJ State of North Carolina Department of Environment, Health and Natural Resources Mooresville Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Mr. Tommy Porter Porter Farms 4455 Mt. Pleasant Road, South Concord, North Carolina 28025 .. r-in 1DEF.HNFZ DIVISION OF WATER QUALITY July 26, 1996 Subject: DWQ Animal Waste Lagoon Inspection Report Porter Farms Cabarrus County, North Carolina Dear Mr. Porter: Enclosed is a copy of the inspection report for the inspection of the animal waste storage structure(s) conducted on July 25, 1996 by Ms. Linda Vernon of this Office. The report should be self-explanatory. If any problems or inadequacies are indicated in the report, please take the necessary actions to address the problems as soon as possible. Also, please be advised that North Carolina General Statutes provide for penalties of up to $10,000 per day per violation as well as criminal penalties for violation of State environmental laws and regulations. If technical assistance or financial assistance is needed, please contact your local Soil and Water. Conservation District. Any further correspondence related to the subject inspection will be sent under separate cover. .If you have questions regarding this matter, please feel free to contact Ms. Vernon or me at (704) 663-1699 . Sincerely, D. Rex Gleason, P. E. Water Quality Regional Supervisor cc: Cabarrus SWCD w/attachment Facility Assessment Unit w/attachment Regional Coordinator LV 919 North Moln Street, Nil FAX 704-663-6040 Mooresville, North Carolino 26115 CAn Equal Opportunity/Affirmotive Action Employer Voice 704-663-1699 50% recycled/IC% post -consumer paper Site Requires immediate Attention: Facility No. 13-,1 DIVISION OF WATER QUALITY ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD .DATE:3k�X, 1996 Time: c9'W2.(W- Farm Name/Owner: te r r rn Mailing Address: q4.0 M+ • �t iva^ _ _ d S . erv..' f nc1__. County:_ CaNrfus Integrators _ Phone: On Site Representative:"Ton%Mr A %P-NE*V(- Phone: - - 94 1 �#13 70 79S Physical Address/Location: Sr W A Type of Operation: Poul ��� yp p try CattIe� Design Capacity s Number of Animals on Site: a000 wa..w ks Latitude 3S ° aA ' 01" Longitude: Fa ° -d-' qa" Elevation:�Feet Circle Yes or No Does the Animal Waste Lagoon have sufficient freeboarr4 of I Foot + 25 year 24 h9ur storm Fvent (approximately 1 Foot + 7 inches) Yee or No -Act Freeboard: Ft,_- hest 1 Was any seepage observed from the lagoon(s)? Yes o No Was any erosion observed? Yes o ND Is adequate land available for spray? Ye or No Is the cover crop adequate. Ye or No Crop(s) being utilized: Fesc t.. Does the facility meet SCS minimum setback criteria 200 eet from Dwellings? 'e�or No 100 eet from Wells? ?9br No Is the animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes o(No Is animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes No Is animal waste discharged into waters of the state by man-made ditch, flushing system, or other similar man-made devices? Yes o No If Yes, Please Explain. Does the facility maintain adequate waste management records (volumes of manure, land applied, spray irrigated on specific acreage with cover crop)? es or No Additional Comments: be'A.� d4vILI"prd fMPrei3Iv9. I V MY* y Inspector Name LI� 1, • V r0lan cc: Facility Assessment Unit very Signature_6�l�A r']r. L .4 WASTE UTILIZAT[O;`; PLA;`, Producer: PORTER FARMS Address: 4455 Mt. Pleasant Rd. S. Concord, NIC 28025 Type of Operation: SWFNTE County: CABARRUS HU CODE: 03040105020060 Number of Animals: 2000 Your animal waste managcment facility had been designed for a given storage capacity. When the waste reaches the designed level, it must be land applied at a specified rate to prevent pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are encouraged so that all plant nutrients can be balanced for realistic•yields of the crops to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates and leaching .potential. Waste shall not be applied to land eroding at greater than 5 tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production, the waste should be applied to a growin+or crop or not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste are based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find infonnation on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. amount of Waste Produced Per Year: (gallnns) 2000 animals 1 3.203 C7al waste/animal/yr = 6.406,000 gal , , to/,Tear Amount of Nitrogen Produced Per Year: (lbs) 2000 animals X 5.4 lbs N/animal/yr = 10,800 lbs N/year produced Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. Your facility is designed for ISO days of storage. Therefore, it will need to be emptied every 6 months. The following acreage for waste application will be needed based on the crop to be grmvn and the surface application: (ACP`ES OWNED BY PRODUCER) Field Soil Crop Rye Lbs Actual Wettable Lbs N Months to Numbers Type Tons N/ac Acres Acres Used Apply 3 GoC Fescue/ 5.6 '275 10.3 6.44 1771 March -October Matua I 4 GoC Fescue 2.8 125 1.8 1.5 187.5 March -October 5 GoC Fescue/ 5.6 275 I5.5 13.39 3682.25 March -October Matua 6 KkB Fescue/ 8.0 330 17.0 T4.26 I 4705.80 March -October Matua 7 BaB Fescue/ T8 345 4.2 3.I 1069.5 March -October Matua I 8 BaB Fescue/ 7.8 345 1.] 1.0 4 345 March -October Matua 1 9a BaB Fescue/ 7.8 345 2.2 2.0 690 March -October Matua 9b BaB Fescue 19 200 9 .9 180 March -October 9c BaB Fescue 3.9 200 1.4 1.0 200 March -October Total 43.59 12831 Amount of N Produced -10800 Surplus or Deficit 2031.05 "This N is from animal waste only. if nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is cautioned that P and K maybe over applied while meeting the N'requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management plan that addresses all nutrients . See the attached rnap showing the fields to be used for the utilization of ivastewater. APPLICATION OF WASTE BY IRRIGATION Field Numbers Soil Type Crop Soil Permeability (in/hr) Application Amount (In/application) (In/yr) 3 GoC. Fescue/Matua 2.0-6.0 .36 6.0 4 GoC Fescue 2.0-6.0 .36 2.7 5 GoC Fescue/Matua. 2.0-6.0 .36 6.0 6 KJ B Fescue/Matua 0.6-2.0 36 7.2 7 BaB Fescue/Matua 0.6-2.0 .36 7.5 8 BaB Fescue/Matua 0.6-2.0 .36 7.5 9a BaB Fescue/Matua 0.6-2.0 .36 7.5 9b BaB Fescue 0.6-2.0 .36 4.3 9c• BaB Fescue 0.6-2.0 .36 4.3 Your lagoon is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every-6-months. In no instance should the volume of waste being stored in your structure exceed Elevation 91.8' and the level should not be pumped below 88.9' to allow adequate permanent storage For treatment of waste. Call the Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. THE CLEAN WATER ACT OF 1977 PROHIBITS THE DISCHARGE OF POLLUTANTS INTO THE WATERS OF THE UNITED STATES. ' THE DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES, DIVISION OF ENVIRONMENTAL MANAGEMENT, HAS THE RESPONSIBILTY FOR IN'FORCING THIS LAW. NARRATIVE OF OPERATION: This swine operation (faiTow to �veaning) consist of 2000 SoNvs. Breeding, gestation, and farrowin ,buildings are flushedwith recycled water from tN, lagoon. Liquid effluent «-i11 be pumped onto adjacent pasture and ha}Hand. 1.��aste is to be applied to 40.19 acres of fescue overseeded with matua and 3.4 acres of fescue. The Ia(,00n is designed with 180-day storage. (Total capacity 1.112,831 cu.ft.) Therefore it will require pumping down to permanent storage level every 6 months. Waste is to be applied to fescue/Matua during March -October. Waste may be applied during the season when needed for nitrogen benefits or pumped as needed for in-ivation water as long as nutrient limits and infiltration rates are not exceeded (arid waste is applied to actively growing crop). NOTE: The waste in the lagoon must be maintained at or below the maximum liquid elevation of 91.8'. Also, the lagoon level must not be pumped below elevation 88.9' to maintain adequate permanent storage for treatment of waste by bacterial activity. The volume of estimated waste produced per year is 6,406,000 gal = 235.9 acre inches. (6,406,000 gal / 27,152 gal/ac inch. = 235.9 ac inches) With the system applying .36 ac inches/hr, the system will require 655.3 hrs/yr to apply waste. The system will apply .36 inches per application to area under gun of approximately 16.6 lb N per acre per application. (5.4 lb N/animal/yr / 3,203 gal �vaste/ariimal/yr x 1000 = 1.68 lb N7/1000 gal 1.68 Ib N/1000 gal x 27.152 I000,als/ac in x .36 ac in/application = 16.6 lbs N/appli cation). Nitrogen applications should be split over the ;rowing season during the period of March -October. Application rates must be adjusted to waste analysis reports when received. The irrigation system specifications indicate using a Kifco E30A Slurry Reel with 1000' of 3: ID PE hose, with hydraulic drive, and a Nelson SR150 Gun. The Nelson SR150 Gun is intended to operate with maximum ring orifice of 1.08 at 70 PSI, 197 GPM, with a diameter of 310' (lane spacing of 230' or 75% of 310'). System pressure required is 123 PSI A 197 GPM. The system's Kifco NT120S engine driven purnp is capable of pumping flows up to 500 GPM at pressures up to 150 PSI. The application rate will be a maximum of .36 inches per hour with gun cart travel speed of 3.83 ft/min. The lagoon will be pumped down prior to December to allow for storage during the winter months w-hen the ground may be saturated or frozen and crops are not actively ,growing to take up nutrients. The lagoon will be pumped as needed to provide adequate :waste storage dining the tines lasted in the chart on page 2. Adequate land is available for proper disposal and utilization of waste produced. Refer also to attached Waste Utilization Plan Required Specifications and infonrlation provided on waste sarnpling for additional specifications and recommendations. WASTE UTILTZATfONT PLAN, AGREEMENT \game of Farm: Porter Farms Owner/Mana(zer Agreement I (we) understand and will follow and implement the specification and the operation and maintenance procedures established in the approve animal waste utilization plan for the faun named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system of construction of new facilities will require a new certification to be submitted to the Division of Environment Management (DEN) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state frorn a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner: Rr (please print) Signature: Jjc�7,�, bate: Name of Manager (If different from owner): Signature: Date: Prepared by: 'T��t�x«� rl LA -,3 ca -n74j NanQ Title Date k-iS DA - HISS WASTE UTILIZATION PLAN AMENDMENT Producer: Porter Farms County: Cabarrus Address: 4455 Mt. Pleasant Road South Facility Number. _ 13-0001 Concord, NC 28025 Permit Number: AWS130001 Field Acres Actual Yield By Year (Tons) Average 5 Average Field Number Expected RYE (Tons) Total Field Acres Wettable Acres Expected Yield 1998 1999 2000 2001 2042 .• Year Yield High 3 Yield 3 5.6 10.30 6.44 36.50 36.40 37.05 37.05 37.75 13.00 32.25 37.28 5 5.6 15.50 13,39--1 74.98 75.40 76.05 75.40 74.10 36.40 67.47 75.61 6 8.0 17.00 14.26 114.08 114.40 115.70 113.75 113.75 52.00 101.S2 114.61 7 7.8 4.20 3.10 24.18 24.70 24.05 25.35 25.35 13.00 22.49 25.13 8 7.8 1.10 1.00 7.80 7.80 7.80 8.45 6.50 2.60 6.63 8.01 9A 7.8 2.20 2.00 15.60 18.20 15.60 17.55 14.95 7.80 14.82 17.11 NOTES: Realistic Yields Expectations (RYE) for Fescue and Matua grass mixture which are used in the Waste Utilization Plan are higher than established USDA-NRCS standard RYE for this crop and soil type. Porter Farms have maintained records of actual yields for each field. The average yield for the highest 3 years is higher than the expected RYE. For this waste utilization plan, the expected yield will continued to be used. "During calendar year 2002, a severe drought affected the yields. - Porter Farms will continue to maintain records of actual yields of the Fescue and Matua grass mixture for waste application fields. If the actual yields are less than the listed RYE for (three out of the five years), the RYE for that field and the waste application rate will be adjusted. The adjusted rates will be based on actual yields. Signature of Facility Owner: 7rrr.� .-� R - - &3 Thomas E. Paler. Jr. pate Signature of Technicial Specialist:-,np,.�, - p -- - - . - Matthew ne. USpA-NRCS pale Porter Farms 1 of 1 217103 State of North Carolina Department of Environment and Natural Resources Division of Water Quality 15 James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director July 20, 1998 Thomas E. Porter Porter Farms 4455 Mt. Pleasant Rd. South Concord NC 28025 1 • � NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND N/QuRAL REsouRces JU.t 23 194j Subject: Certificate of Coverage No. AWS130001 Porter Farms Swine Waste Collection, Treatment, Storage and Application System Cabarrus County Dear Thomas E. Porter: In accordance with your application received on May 11, 1998, we are forwarding this Certificate of Coverage (COC) issued to Thomas E. Porter, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Porter Farms, located in Cabarrus County, with an animal capacity of no greater than 2000 Farrow to Wean and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. P.O. Sox 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS 130001 Porter Farms Page 2 This COC is not automatically transferable. -.A namelownership change application must be submitted to the DWQ prior to a name change or change.in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Mooresville Regional Office. The Regional Office Water Quality Staff may be reached at (704) 663-1699. If you need additional information concerning this COC or the General Permit, please contact Katharine Keaton at (919) 733-5083 ext. 533. Sincerely, t A. Preston Howard, Jr., P.E. cc: . (Certificate of Coverage only for all cc's) Cabarrus County Health Department Mooresville Regional Office, Water QualitySection .' Cabarrus County Soil and Water Conservation District Permit File f State of North Carolina Department of Environment and Natural Resour sQ9Cff Division of Water Qualityiril!u_�,gaN Non -Discharge Permit Application Form y (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAl�i..,... 1 1998 General Permit - Existing Liquid Animal Waste O t*To Trmitrrnq The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. 1. GENERAL INFORMATION: 1.1 Facility Name: Porter Farms 1.2 Print Land Owner's name: Thomas E. Porter 1.3 Mailing address: 4455 Mt, Pleasant Rd. South J City, State: Concord NC Zip: 28025 Telephone Number (include area code): (704) 786-9551 or 785-8891.- 1.4 County. where facility is located: Cabarrus 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): Mt. Pleasent Rd. South 1006 5 miles south of Mt. Pleasent. 112 mi. north of Miami Church Rd. Across from intersection of Bost cut off Rd. and Mt, Pleasent Rd. South 1.6 Print Farm Manager's name (if different from Land Owner): 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): C A-9 r i 0- iz K _ 1.8 Date Facility Originally Began Operation: 01/01/93 1.9 Date(s) of Facility Expansion(s) (if applicable): 2. OPERATION INFORMATION: 2.1 Facility No.: 13 (county number); __I_ (facility number). 2.2 Operation Description- Swine operation -Fa ow to Wean 2000- Certified Design Capacity Is the above information correct? TYyes; no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum nuinbU for which the waste management structures were designed. Type of Swine No, of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) 0 Turkey 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) _ Other Type of Livestock on the farm: No. of Animals: FORM: AWO-G-E 1/26/98 . Page 1 of 4 A 3. 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): _ 54.4 ; Required Acreage (as listed in the AWMP): 37 2.4 Are subsurface drains present within 100' of any of the application fields? YES or a (please circle one) 2.5 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or(please circle one) 2.6 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRC Standards, etc.) (Swine Only) E or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? �4 What was the date that this facility's land application areas were sited? [ " REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your -initials in the space provided next to each item. 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.11 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.) If your CAWMP includes components not shown on this list, such as an irrigation design, or site evaluation, please include the additional components with your submittal. FORM: AWO-G-E 1/28/98 Page 2 of 4 Applicants Initials p Facility Number: 13 - I Facility Name: Porter Farms 4. APPLICANT'S CERTIFICATION: I, OzTM MK (Land Owner's name listed in question 1.2), attest that this application for O g Teiz Fa-m 1�_ (Facility name listed in question 1.1) has been reviewed by rre and is accurate an complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will bf r turned to me as incompl Signature Date 5. MANAGER'S CERTIFICATION: (complete only if different from the Land Owner) I, __ (Manager's name listed in question 1.6), attest that this application for (Facility name listed in question 1.1) has been reviewed y me and is accurate and complete tote best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 1/28/98 Page 3 of 4 WASTE UTILIZATION PLAN AMENDMENT: 1.0 Producer: Porter Farms County: Cabamas Address: 4455 Mt. Pleasant Rd., S. Concord, NC 28025 RECEIVED Facility: 13-0001 WATER 90AIJTY SECT110N JUN 1 91998 NIm-0 scharge permitting Realistic Yield Expectations (RYE) for Fescue and Matua grass mixture which are used in the Waste Utilization Plan (signed and dated January 17, 1996) are higher than established NRCS standard RYE for this crop and soil type. The application rates listed may be used as long -as actual yields for the farm meet -or exceedthe-RVE rates listed -in the WUP for at least three out of five years. Porter Farms will maintain records of actual yields for waste application fields. If the actual yields are less than the listed RYE (for three out of five years), the RYE for that field and the waste application rate will be adjusted. The adjusted rates will be based on actual yields. Signature of Facility Owner: - ' p Thomas E. Porter, Jr. Signature of Technical Specialist: Rich4d Taylor, Caba�4VIVater Conservation District cAWMP Wdtahale Acre 11-30-" CAWMP WETTABLE ACRE COMPUTATIONAL WORKSHEET 1. Farm Number (Identification) 2. Irrigation System Designation 3. Type of Irrigation System Field Number (Identification) Existing Irrigation System New / Expanded Irrigation System Stationary Sprinkler Hard -Hose Traveler Center Pivot Linear -move System 4. Number of Stationary Sprinklers # Interior sprinklers # Exterior sprinklers Number of Travel Lanes # Interior Lanes # Exterior Lanes 5. Wetted Diameter a I Q [feet] From field data sheet yev Length of pull [feet] 6. Spacing 2 3 0 Lateral / Hydrant Spacing [feet] [as percentage of wetted diameter] Sprinkler spacing along lateral [feet] [as percentage of wetted diameter] 7. Sprinkler or Hydrant Layout Multiple Laterals/Hydrants Single Lateral/Hydrant Excessively spaced Sprinklers/Hydrants 8. Read the irrigated area per sprinkler/travel pull for the given wetted diameter from the appropriate tabale and column based on pattern, spacing, and sprinkler/travel lane location. Stationary Sprinklers Acres per Interior sprinkler from Table Column Acres per Exterior sprinkler from Table Column Traveler: Interior Hydrant (travel lane) S (a) Acres start end of pull from Table Column (b) Acres middle portion of pull (Pull Length [feet] X Wetted Width [feet]) / 43,560 • 31 (c) Acres stop end of pull from Table Column Total acres for Interior pull (Sum: a + b + c) Traveler: Exterior Hydrant (travel lane) e QN (a) Acres start end of pull from Table Column (b) Acres middle portion of pull {Pull Length [feet] X Wetted Width [feet] }/ 43,560 (c) Acres stop end of pull from Table Column Total acres for Exterior pull (Sum: a + b + c) 9. Multiply the tabulated irrigated acreage value per sprinkler or travel pull by the number of sprinklers or pulls of each category in the field. Sum all of these and this is the total irrigated acreage for the field. (a) Acres per Interior Sprinkler or Pull X # Sprinklers or Pulls = Acres (b) Acres per Exterior Sprinkler or Pull X # Sprinklers or Pulls = Acres Total Wettable Acre for field (Sum: 9a + 9b) Wettable Acre Computational Worksheet Completed by: Date: Np S AllIR1 31� 5100HOS 0� �y �09 �ybnti by kDROk \ r� PUQIp1 ; n No •Oti �s r 0'a �''r^;v y1 NI _O ryb� s odd �y ONalOIW f �eoako ,36 e ��" \ M N7 13ti°� d w vZ 109 N35 i/ yYc m a ow a �x Z3NI3 y° ti' om 3y ya61� a -do fiH IbWK v 3X tl }ya � ` J a b VHSTA �M - �` 3 3fS4ttl mil} 7S5 I S)ko a dv - - ti SRd A eg b 1Soe NIrW.-, o S� IV13 018'0o� 7tln j .f G'lH J JS! OIN ! 'J 00a < V b` J It � " BJO�S rr '' z rn atzld SI1dvB a�� 4 3 8$g1SCO Sv7M c � D 1 �y ' 3Nv1 `' ei bAGWO 4u3pADp a wf � � Pi. O - 0 •N 7 n � r fiV"'yV3 aOOZ r, ay n >sq S13`J918 �� �' WO x03 0 g 7 ryb Ir 5��` o Od r M3rl m' "� 6 7io 30dy` �r�dWrg r,",� N 1Qiy9Fv �•`a 111W ,�i•, °H l�t'A Yd - °y m o y °j 'k'q,' 4�tl""bbar m r �.h baA I9 ' � . .i. oa x I g od a �,4• UI °' �3� 109 Vd AbO d 3n� dt 3b�1S SJ Iwaiw �\'Ga y m z a a d, I09 � £1 �• Y �a s�N' �o� 3?�r 6b w No 1 zn C. + J CA km o �• a awd3a b�� �asw r o R 0 ti6t! 1119�W oar day �h d 109 oaf & o� �� N t4 o p 0auj ° N�ypp 'oa 3sna� Itl a a 1 • `�'° °� r eb ss I yH�� dam} ° 1 O7 ''i�� t`r yo a o 1 I jdm 'MO Qy \ �: -i�: rx "s ti J S LU;Ob S� ri tl35iK Mai '�Jd �/ ? C: f✓ y� 0, � � 5 ti. :50J,y .^. � 3. ! �/ d• Od s i .,, ,/ . J �k18RlN� Oil J' ^yr ,4DJT4 Oa v},y ctlj0�21 11„ ro �. J b�, � ^ 10tlnHa� 1. w dlf1� g aA3 A JaUJI lai VA 0 s } 'y.- mU4' Aby39 Nb 4/ di t11� / 'tea aa+ ��e �v� f•� .off' s w. (lid .- �,���-a 4.- ? F f Na 11n�' WASTE UTILIZATION FLAN Producer: PORTER FARMS Address: 4455 Mt. Pleasant Rd. S. Concord, NC 28025 Type of Operation: SWINE County: CA6ARRUS HU CODE: 03040105020060 Number of Animals: 2000 Your animal waste management facility had been designed for a given storage capacity. When the waste reaches the designed level. it must be land applied at a specified rate to prevent pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are encouraged so that all plant nutrients can be balanced for realistic yields of the crops to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer- value of the waste and to ensure that is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates and leaching potential. Waste shall not be applied to land eroding at greater than 5 tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production, the waste should be applied to a growing crap or not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. i Amount of Waste Produced Per Year: (gallons) 2000 animals X 3,203 gal waste/animal/yr = 6,406,000 gal waste/year- Amount of Nitrogen Produced Per Year.• (lbs) 2000 animals X 5.4 lbs N/animal/yr = 10,800 lbs N/year produced Applying the above amount of waste is a big jab. You should plan time and have appropriate equipment to apply the waste in a timely manner. Your - facility is designed for IeO days of storage. Therefore, it will need to be emptied every 6 months. The following acreage for waste application will be needed based on the crop to be grown and surface application:(ACRES OWNED BY PRODUCER) f--------------------_--------_--_--------_----------------------------------------- Field :'Soil Crop :RYE : Lbs 1 Ac L.bs N 1 Months to .Numbers! type (tons.' N/acl Used 11 Apply -------+-_----+-----_--------+---------__----------+------------------------ 3 GoC Fescuel�5.6 275 �10.3 2,B33 March -October f Matua 1 i i -------+------+---------+-----+-----+---_-+-----_---+-------------------------- ! 4 GoC Fescue :2.8 ; 125 : 1.8 f 225 " " ---------+____--+--------+-----r-------+------r----------+-------------------------! 5 GoC I Fescue/15.6 275 '15.5 4,263 ' Matua I i 1 -----_...,-------+--------+__--------_----------------+----------------------- 6 KkB Fescue/f8.0 330 :17.0 5,610 1 " Matua f -------+-------+----------+----+-----+----------------a------------------------- f 7 1 BaB Fescue/:7.8 345 1 4.2 1,449 l Matua -------+-------+------_--------------+------------------------------------------ 8 ! BaB t Fescue/:7.8 1 345 1.1 ! 380 It It Matua ------_+------+---------------------+-------+---------a--------------_---------_-- ' 9a I BaB : Fescue/.7.8 345 2.2 1 759 It" Matua f -------+------+___-----+----+-_--_--+-----+------_----+--------------------------- ' 9b BaB Fescue/:3.9 : 200 .9 180 " -_-------------r---------+----------+-----_---------__+----------------------- ' 9c : BaB ; Fescue/:3.9 : 200 1 1.4 : 280 [ +.....---__--------__------------------------------------------------------------------ Total 154.4 15,979 Amount of N Produced 10.800 Surplus or Deficit 5.179 *This N is from animal waste only. If nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. S&e attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION +--------------------------___--_-__-____---_____-----_---------__-----_--_+ Field 1 Soil Crop :Soil permeability; Application Amount 1 1Numbersl Type 1 (in/hr) : (In/application) (In/yr) _____-_+--___-+---_-------+------------------------------__ 3 GoC Fescue/ 2.0-6.0 .36 6.0 Matua .-_---_+----_-+-----__--_-------------------+----_---__-----_----_----_---; 4 GoC Fescue 2.0-6.0 .36 2.7 -------+------+------------+-----------------+---_---------------------------1 5 1 GoC 1 Fescue/ 1 2.0-6.0 .36 6.0 1 1 Matua 1 1 ---------+------+------------+-----------------+--------------------------------1 1 6 1 KkB 1 Fescue/ 1 0.6-2.0 1 .36 7.2 1 1 1 Matua 1 -------+------+---------_--+-------_--------_--+---------------_ 1 7 1 BaB 1 Fescue/ 0.6-2.0 1 .36 7.5 1 1 ! Matua 1 ---..............-----.........-+---.........-------...----...........---------+-.....,.,---.....,....---._...----._...__---........,.__.... - ; 8 1 BaB 1 Fescue/ 1 0.6-2.0 1 .36 7.5 1 1 1 1 Matua 1 1 -------+------+-----------+------------------+----------------w---------------; 1 9a 1 BaB 1 Fescue/ 1 0.6--2.0 1 .36 7.5 1 Matua 1 1 1 -------------------- 1 9b 1 Bab 1 Fescue 1 0.6-2.0 1 .36 4.3 1 _-_----+--_---+---_-------+-----------_-----+---------------------------- 9c 1 BaB 1 Fescue 1 0.6-2.0 1 .36 4.3 1 +---------------------.------------------.--_------------_-----_--____-___-_-- Your lagoon is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of waste being stored in your structure exceed Elevation 91.8' and the level should not be pumped below 88.9' to allow adequate permanent storage for treatment of waste. Call the Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. THE CLEAN WATER ACT OF 1977 PROHIBITS THE DISCHARGE OF POLLUTANTS INTO THE WATERS OF THE UNITED STATES. THE DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES, DIVISION OF ENVIRONMENTAL MANAGEMENT, HAS THE RESPONSIBILITY FOR INFORCING THIS LAW. NARRATXVE OF OPERATION; This swine operation (farrow to weanling) consist of 2000 sows. Breeding, gestation, and farrowing buildings are flushed with recycled water from the lagoon. Liquid effluent will be pumped onto adjacent pasture and hayland. Waste is to be applied to 50.3 acres of fescue overseeded with Matua and 4.1 acres of fescue. The lagoon is designed with 180 day storage. (Total capacity 1,112,831 cu.ft.) Therefore it will require pumping down to permanent storage level every 6 months. Waste is to be applied to fescue/Matua during March - October. Waste may be applied during the season when needed for nitrogen benefits or pumped as needed for irrigation water as long as nutrient limits and infiltration rates are not exceeded (and waste is applied to actively growing crop). NOTE: The waste in the lagoon must be maintained at or below the maximum liquid elevation of 91.8'. Also, the lagoon level must not be pumped below elevation 88.9' to maintain adequate permanent storage for treatment of waste by bacterial activity. The volume of estimated waste produced per year is 6,406,000 gal = 235.9 ac inches. (6,406,000 gal / 27,152 gal/ac inch. = 235.9 ac inches) With the system applying .36 ac inches/hr, the system will require 655.3 hrs/yr to apply waste. The system will apply .36 inches per application to area under gun or approximately 16.6 lb N per acre per application. (5.4 lb N/animal/yr / 3,203 gal waste/animal/yr x 1000 = 1.68 lb N/1000 gal 1.68 lb N/1000 gal x 27.152 1000gals/ac in x .36 ac in/application = 16.6 lbs N/application). Nitrogen applications should be split over the growing season during the period of March -October. Application rates must be adjusted to waste analysis reports when received. The irrigation system specifications indicate using a Kifco E30A Slurry Reel with 1000' of 3" ID PE hose, with hydraulic drive, and a Nelson SR150 Gun. The Nelson SR150 Gun is intended to operate with maximum ring orifice of 1.08 at 70 PSI, 197 GPM, with a diameter of 310' (lane spacing of 230' or 75% of 310'). System pressure required is 123 PSI ;D 197 GPM. The system's Kifco NT120S engine driven pump is capable of pumping flows up to 500 GPM at pressures up to 150 PSI. The application rate will be a maximum of .36 inches per hour with gun cart travel speed of 3.83 ft/min. The lagoon will be pumped down prior to December to allow for storage during the winter months when the ground may be saturated of frozen and crops are not actively growing to take up nutrients. The lagoon will be pumped as needed to provide adequate waste storage during the times listed in the chart on page 2. Adequate land is available for proper disposal and utilization of waste produced. Refer also to attached Waste Utilization Plan Required Specifications and information provided on waste sampling for additional specifications and recommendations. WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Porter Farms Owner/Manager Agreement I (we) understand and will follow and implement the specification and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system of construction of new facilities will require a new certification to be submitted to the Division of Environment Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24- hour- storm. The approved plan will be filed on --site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner: :no rn)gf _S �E. ORT erg -5'g� (please print.) .-. -- Signature: Date: Name of Manager (If different from owner) : Signature: Date: Prepared by: Name Title Date U.S. Department of Agriculture Page ] Natural ReSC,UI-ces Conservation Service ------------------------------------------------------------ PORTER FARMS Field Listinq Tract NUrmber: 9.50 ------------------------------------------------------------ Field Fiel❑ Number Acres LandUse ------------------------------------------------------------ 1 5.3 Pasture 2 6.6 Pasture 3 10.3 PastLlFe 4 6.4 Pasture/POUT try Facility 5 15.5 Pasture 6 17.0 Pasture 7 4.2 Pasture s 1.1 PaStur-e 9 11.3 PastUl-e/Swine Facility [ � l r ' � �� � �v3l ate, � �' • � �i �' i. Lam, _y.� 1'/� • Y- �\ t �• M'! .ill Y +,11V w,r .� ' .1 a1 ..�..•1'•\.. •r.u13 ^far .•• 4.' 14 IL ��ar '` .�'. �' ti.l s+'�i. _` � j.• .5IL'.a: •'<' .1.�• � y �;r : `; , k .. j,� _ ,� 'ice.= .. ��'�,r '�.IJ•~•�.t•.•• ��. a.3.,:�\•+'~ •�. r �r�].i,-..'s�. .l:!,'"e'_.' ;Cti'�:'::r-;L� JF Y 1t • � '_l.«: r, . yt'• '..:.�. y �:_ .r Li: ".1I rir•�.r. _ rt.:'+�.':�{ ;':'• •• v'. i,•- # «: .:\-, ;:f. •..,i' •'Z. ~ ;�a ' •mob'• �'` `:�\:? \mod, 1. .•`•• � .� 'i�•, \ �:' '.' l � Yam. ••l• •� J •.��•`:: +- �'�•"M_�'yc�,--� � ,h,t, -.G'� 't 4i. _,. � •~,• ,4. �; +�; ,..' �• 1'1• -.�". y3tl.ti,\•ram. +�'„". 1}. \.`. �.,• .� a. i ;1L• ?. . ate_ , * \ f�, �''��' * l''`'`:i'i� f. •. ic; �'a 1i41.:..�•,, ;�[• . 5.: ;.r 4 -�15,- - i3♦C•s •.ti. .:' '�•�•t -.'Y L\ ''-. r: r` .i�= O 't';. . A , 4�`•1'• a,n y �� ��k� :4• � ':;'�:��_•�...�.:t..?�,"`�,:t*jam t��:4; .•., .�.. F i 1 4 • 4�ia•,if:. t.� r• . s . fi . � _} •. L .,a1 Z - , r • :4• i`�;-( '�_ •' .ii••'�`� ""*�, ( '•ti:a.•. t� �,.f a .�Yi': t _t" to"-�S•E'�.5.�7 .5 '= i `y.' r` l''a'�"• a. - r`. , 9.. '. �'.� ., Ya �.T -' .-♦ • Tt Y"' • � : � St'♦w-%'♦ . � , i'. ', .'':. as-. �' �:J '", :1� , .. +1 •'' . `.y�j!. •� � , .i \ Via. 1•: - .. - -✓. 'r� , =;' •. �� 1. •�•••� ., ' + l�. .. ' '.,,' � �-f. ,•{ THOMAS E PORTER JR - PORTER, THOMAS E , JR Rlap ' mbo 1 BaB , , , GeB2 h , GoC Soil name and description Badin channery silt loam, 2 to 8 percent slopes These gently sloping, moderately deep, well drained soils are on upland. They farmed in residuum from Carolina slates and other fine grained racks. The surface layer is loamy with a significant amount of channery mixed in. The subsoil is clayey. Permeability is moderate. Shrink -swell potential is moderate. Soft bedrock is within a depth of 20 to 40 inches. Seasonal high water table is below 6.0 feet. Georgeville silty clay loam, 2 to 8 percent slopes, eroded These gently sloping, very deep, well drained, eroded soils are on uplands. They formed in residuum from Carolina slates and other fine grained rocks. They have a loamy surface layer and a clayey subsoil. Permeability is moderate. Shrink -swell potential is low. Seasonal high water table is below 6.0 feet. Goldston very channery silt loam, 4 to 15 percent slopes These gently sloping to strongly sloping, shallow, well drained to excessively drained soils are on uplands. They formed in residuum from Carolina slates. They have a loamy surface layer and subsoil with a significant amount of channers. Permeability is moderately rapid and shrink -swell potential is low. Soft bedrock is within a depth of 10 to 20 inches. Seasonal high water table is below 6.0 feet. TaP 1 Tatum silt loam, 2 to 8 percent slopes These gently sloping, deep, well drained sails are on uplands. They formed in residuum from Carolina slates and other fine grained racks. They have a loamy surface layer and a clayey subsoil. Permeability is moderate and shrink -swell potential is.moderate. Soft bedrock is within a depth of 40 to 60 inches. Seasonal high water table is below 6.0 feet. it �l:.lir• { �� yr � ���. '�� �• � - ;�� 1 �'Y'�':� r 'i 77 IV- jw Val Q L� AD �i "t... 5 ii' s=• n 1j1 c, l t s. ` � _'• :mil - ,' ';r... � • 'ti. ',� lJi�. _ •'�1 ;. . i:J' rS •'iJ '"�• ,.i� � �` / ,,((Cl�!'J4 .�"'�' ; ^• �� � ,'`.�,C/ � `��a T�l�+i ^j �'^7 .. ✓ -eA 1'Ty�� T y:,• �' r 1•. ■ T::1: i'/`s � � - r _y• -ltA ot'. '�tjf.-' .� �Y,V': ' .�'� ,1 .'. .Y• .-�rl s�•• � � ryi�`D 4�rj L/� ti.41Rtit��1 ��' :.>�. � .rr' •!�'� ;;�� ...,� �. •�•:>.'ffir',;'t'� ..i '• �7 � i:�4r"-�i:i�4 �%r'J� r �,,,r ,r „ ,`e� .i rR: \'� J �� •v �•!INS i ti"ftiCe '" �• n m ��..,wyti' :�► �: � �,�:t.l.'��a•'�\.fa_ :�,i�e '; :��' 15e !b .•��i5� - 4't'1'•���,�,~ •� �• �'�a:;��R• . r� �� v�1•,,�l��i��'`i ��1 i ��, � r �. �1 'j, -. .'�4i7'i'n t'• `•� � �� '� Ow��' ��r� I h t�%`���� •, .� \`�s�y\• I *.�'�' "` �r�t`�pJ J/�. .. !, _ i y Y� 's "F yet-,. t f3x.� i' °�:ti�,.� �� �.' _, � � '•`��`,v l r i� ..�'EIVIF � t �''� � \'•fir `l, r .�,( .�� .:�. , ' ',, t' 1 ., 1!P . r. ; 't: ,' ti I i! I j rfr�, •'�I 'c R 77 van IZ lr�, •�•�� t, „�5;�1\! .�i '�a Q��a;, �` a`!� �, f`: �• ! �•''^`•...r.�J'r�" �` u�„ •�-•r F w Ufa\ w�.. ,�'i�, ,!. :/ �'V4� / •'�J � '�� �.✓, /� .. ;.��.�� ••. ice', `� � .: /� :1•�� I r 1 / � •'��i� �ID fir'''. �• i:,,�r.� �-. t b F I. • i ' Ri ��-�;'"..%� `err'', ..� ,., .�"`�' � , *, � iifjj � i � / � V � + • may✓/' _ gaol O i - ; I •tip i i ` 1 ✓ - ��e e ' 'I%7-4 • �� °4 s f 9• 1 J �l r� �� - • � �V rid' P �' �� i. �� r'i p . . "_V �.n1 t .\ �� ,L9 1' i 1 ' `...I � ' �" "'� � \ A � '�/\� f ' U may\ '4y+ ✓� •fill En or 0 ' 'A I~ I} }'-'Y r:..:.. ....--.. �. .. .... ... .. -.:'-. .:.:...-.. ... .r... ... n. ..5. ..... .. .n. .. e.....v ..r ..r ... ...f .r.tr REQUIRED 52ECIFICATTQNS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to the assessment of civil penalties of $10,000 per day by the Division of Environmental. Management for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement (sample enclosed) with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource ylanage men t System (RtiFS) or an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no 4reater than 10 tons per acre per year and appropriate ftlter•strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DENT. 5. Odors can be reduced by injecting the waste or disking after waste application, Waste should not be applied when the wind is blowing. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and provide uniformity of application. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not camased by burning or smothering of the plant. This is an important consideration vhe;e ;will:. poultry or other ammonia rich waste is being surface applied. Surface broadcast solids or sluries may damage crops if leaf surfaces ax! matted. Generally waste should be applied such that no more than =0 to =5 percent of the leas area is covered. This should not normally be a concern where diluted, low nutrient waste is irrigated or surface broadcast from a liquids holding structure. Where crops are severely damaged due to RE 'TRED SPECTFTCATION5 waste application, the plants cannot assimilate the nutrients and discharge of pollutants to surface waters is likely to occur. 10. Waste nutrients shall not be applied in fail or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop on bare soil. 11. Animal waste shall not be applied closer than 25 feet to surface water. This distance may be reduced for waters that are not perennial provided adequate vegetative filter strips are present. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted wetlands provided thev have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, and only then at agronomic rates provided the application causes no runoff or drift from the site. 15. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. Lagoons and other uncovered waste containment structures must maintain a maximum operating level to provide adequate storage for a 25-year, 24-hour storm event in addition to the one ( 1) foot mandatory freeboard. I8. A protective cover of appropriate vegetation will be established on all disturbed areas {lagoon embankments, berms. pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary. to protect the vegetation. Vegetation such as trees, shrubs, and other woody species. etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 19. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 20. Waste 'handling structures, piping, pumps. reels. etc., should be inspected on a regular basis .o prevent breakdowns, leaks, and spills. A regular ma incenance checUist should be kept on site. EMERGENCY ACTION PLAN PHO'N'E NUMBERS DWQ r704-1y(Q3- 109 E'.Iv[ERGEvCY y[AvNAGE'vIE�T SYSTEM 70-q l792-0411 � SWCD =4 z l B 2105' MRCS - a This plan will be imolemenced in the event that wastes from your operation are leaking, overflowing, or running oft site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The foilowing are some action items you should take. 1. Stop the release of wastes. Depending on the situation. this may or may not be possible. Suzaesced responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm co increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. S: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application races for the fields where runoff occurred. C: Leakaae from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D: Leakage from flush -systems. houses, solld separators -action include: a. Scot) recycle pump. b. Scop irrigation pump. Make sure ho siphon oczurs. d. Stoo all tiows in the ?rouse. t1USh ;Vstems. Qr ialid ;epurators. Du__:ttii�z 13. 1110.6 e. Repair all leaks prior to restarting* Trumps. E: L_akage from base or side -.%-all of lagoon. Often this is sz_oage as opposed to flowing_ leaks- possible acrion: a. Dig a small sum or ditch away from the embankment to catch all seepage. Put in a submersible pump. and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and Fill holes and compact with a cfay type soil. c. Have a proressional evaluate the condition of the side walls and lagoon bottom as soon as possible. ?. assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters' b. Approximately how much was released and for what duration'? c. Anv damage noted, such as employee injury, fish Tails. or property damage? d. Did the spill leave the property'? e. Does the spill have the potential to reach surface waters' f. Could a future rain event cause the spill to reach surface waters? tr. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal. business hours, call your DWQ (Division of Water Quality) regional office; Phone - - After hours, emergency number: 919-7j3-3942. Your phone call should include: your name. facility. telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill. weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EvIS Phone number - c. Instruct EMS to contact local Health Department. d. Contact CES. phone number - - , local SWCD off ce phone number and local MRCS office for advice!technical assistance phone number - - If none of the above works call 9 i l or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for ,you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name:. 5• J' FLOVJ6 6RA-D1A ; b. Contractors .address: WDLAr D 1 N -�. � _ c. Contractors Phone-: l 6: Contact the cechnicui specialist who eercitied the laI_oon (NR(;S. Con�ulcin_ Enginezm etc.) r a. Name: RWArW—I+ gL00- CAAWAUS 5v&O 4pikot i NRGS b. Phone: 04- 4 -'Igg- AIOU 7: Implement procedures as advised by DWQ and technical :ssisrance agencies to rectify the dama;e. repair the system. and reassess the waste management plan to keep probiems with release of wasces from happening again. Swine Farm Waste Management Odor Control Checklist Suul i-e Cause IJRII's lu mil linlizc Udor Site Specilic Pl aclicec I':IIII1SICad • Swil1C ploductiol1 @I Vegetative or wooded buffers; lt( Rectlmineuded best minig mellt practices; lit Good Judgment and common sense Ammal body s places • hilly limmllc-Coveled allilll,'ll5 Ef Dry flours --- ---. .- il��n slfilacrt —1i;�t mclniur cuvclttl llurns iF Sluticd Iluurs; - IY Waterers located over skilled Iloms; Ef Fecticrs at high end ofsukid Iluels; f/ Scrape manure buildup firom Iloors; wUnderfloor venlilalion for drying -A—Milk n111cctitnl Ails • Wile; Fr Frequent manure removal by flush, pit recharge, - --- • hillial miclubial dectlmpositiull OF scrape; wUnderlluur ventilation %Te11t11:1tioll exhatist fails • Vulalde gases; Ef Fall lunintellince; Dust Efficient air momilellt -Illdl1pl till Iacet • Dust _ wasildown bcllvccll groups orallimals; - - ❑ Feed additives; ❑ feeder covers; Red delivery downspout extenders to feeder - covers _ 1=tu�h laukt Agoaiiou urlecycled Iagoun ❑ Flush lank covers; - liquid while tanks are tilling ❑ E.-Mend fill lints to near bollom urtanks with anti -siphon mils -f loch Aleys a Agitation during ►vaslcwalcr &F Underfloor Iush with underfloor vcntilaliun cun►cyance I'll iechal ge puillls 0 Agitation of tecyclell lagoon Cl ExIcud recharge lines to near bultom of Ails liquid while Ails ilrc lilling wills anti -siphon vcnls 1-01 claliuns • Agitation durhig sump lank ❑ Sump tank covers - ~ filling and drawdown Utllsidc thain Colicclion • Agitation during wastewater ❑ flux covers ur jlmcliun huxes conveyance AAlrlt ►cnlbcl 11. 1996, Page 3 A.-r+'s to Miuiruize Odur� site Specific I'I ncliccc C:anse TT Iald of thainpipes al • Agitalitnl dill ing wastewater ❑ liMend discharge point of pipes undeincalli --- larvolt Culiveyallce lagoon liquid level I.agtlull sill hlCcs 0Volatile gas emissions; Proper taguon liquid capacity; • Itlultigical Illlalllg; I( Correct lagoon startup procedures; • Agilalion f( Minimum surface area -to -volume ratio; Minimum agilalion when pumping; tjbpd CJ Mechanical aeration; ❑ Proven biological additives Ilsigatiull splillOcr 0 high plessutc agii.11iuu; Irrigate on dry days with little or no wind; llor.zles 0 Wind drill Minimum recommended operating pressme; Q Pump intake near lagoon liquid surface; ❑ Pump from second -singe lagoon Storage lank of basin Primal microbial decomposition; Cl Boltoul or midlevel loading; sill lace • Mixing while filling; ❑ 'yank covers; • Agilaliun when emptying ❑ Basin surface mats of solids; ❑ Proven biological additives or oxidatils Sdtling Il;isin sin lace • Patiial microbial decomposition; ❑ Extend drainpipe outlets undemealh liquid • Mixing while fillilig; level; • Agilaliun when eugllying CI Remove settled solids regularly Maimic. slurry of sledge • Agilaliun when spreading; ❑ Soil injection of slurry/sludges; wicadct uullcls 0 Volatile gas emissions ❑ Wash residual manure from spreader aRcr use; ❑ Proven biological additives or oxidants l lllcuvcicd illalullc, Volatile gas cmissiulls while ❑ Soil injection of slurry/sludges sluuy or sludge on field drying 0 Soil incorporation within 48 hrs.; sw laces O Spread in lhiu uriiform layers fur rapid drying; O Proven biological additives or oxidauls Dead animals • C'nicass dccompusiliolt G1 Proper dispositiun of carcasses Dead animal disposal C:alcass decumpusilioll ❑ Complete covering of carcasses in burial Ails; 1'il` ❑ I'rol:er'localioli/consliruetiou of disposal pits Inciucialuls Incolnplele conihuslion ❑ Secondary stack burucrs AAIt1C: - lluvembei 11, 1996, Page 4 Suurce Cause BR-li's lu Minimize Odor Silt 51100 Practices Slanding walcr around 9 1111ploilcr lllainage; (;rack and landscape such that waler drains lacilO& Microbial decomposition of awry flum flcililics inganic I nllcr f+lalrule Uarkcel l+nk1 I'uulY nlaintahw(l access ruad5 Karol access road wnhaenancc - — public 111.1115 fllllll latlll Addilimud I111 linalioll : _ _ Available from . <<ti IIIC Minnie Mana'�--cinvnt 11211t} itulelliMl' Packet NCSU, County I Mension Ccnlcl Swiuc I'luduclion FalIn Polenlial Odor Sources and Remedies ; EBAG I-acl Sheet NCSU- IlAI; Swine I'luduetinn lWlily Mamllc Munngcmtllt: Pit Recharge - Uguun Tmahucnl ; EIJAE 12848 NCSU- "A1, Swiuc t'lodlsclion Facilily Manulc Managcnlcnl: Underllonr F ush - lAgoun Trcalment ; FBAi: 129-83 NCSU - HAF- I..rc= Design and MaImgnnem for l.ivcslock Mute Ifenin col and Skanc ; EBAG W343 NCSU - HAI: U.Ililnalion of N1:r111ac aml Waslewaler Applicalion liquipincal ; EIJA1; Fact Sheet NCSU - 11A1; (oamlling (Mms h nl Swine [buildings ; PUN33 NCSU - Swine Exiensian Ia1Yi1nI1111e111a1 Asslnance I'1ogranl ; NVPC Manual NC Pwk 1'rodueas Assn r llllions Or Rlauaging Odor ; a IgmI lion the Swhw Odur •[•ask Force NCSU Agri Coununuicaliuns Moisance Concclns in Anirllal hlmn is MaMaganenl: Mrs and Pries; PROW, 1995 Conference Proceedings FlotkM Cu"malive Extension ANIO( cinbet 11, 19116, Page Insect Control Checklist for Animal Operations call« unIl►s �o Control Insects — Site sllccitie III IdIce's Liquid Systems Flush (4111cls Accunmialion of solids el Mush system is designed and operated sufficiently to remove accummlaled solids from / glitters as designed. L/l Remove bi-idging of accumulated solids at discharge Lm-oulls and 1'ils • ci listed Solids In Maintain lagoolls, .icllling basins and pits witcle — pest breeding is apparent to minimize the ciusting of solids to a depili of no more than G - 8 inches over more tbau AM of surface. I,.Cccssivc Vegel-Illve • Decaying vegetaliull Maintain vegetative control almig battles of ( IUNVIII lagoons and other impoundments to prevent accumuimion of decaying vegetative maller along waters edge oil iiupoundinclit's perimeter. Dry Systems feeders • Deed Spillage CI Design, operate and niniulain feed systems (e.g., bunkers and troughs) to minimize (lie +accumulation of decaying wastage. Clean up spillage on a routine basis (e.g., 7 - 10 Jay interval during summer; 15-30 day interval during winter). Feed Sloiage ACCLI111tIIaliUdis of feed icsiducsM Reduce moisture accunrulalion within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bill for brewer's grain and similar high moisture grain products). Inspect for and reinove or break up accumulated solids in lihcr strips around feed storage as needed. AMIC - November 11, 1996. Page I S,1Iii'CC Cause 11Ml's to COMM Insects Site Specific Pracfices Aninial I lidding Aicas • Acciminhilions o1 animal ►vasles Elinihiate to►v areas [fiat trap moisluie along - a1111 teed %vistage fences and other locations where waste accumulates and disliubance by animals is /minimal. Maintain fence rows and filter strips around animal holding areas to inininiize accumulalions of wastes (i.e., insliccl for and reinove or break up accumulated solids as _ needed). DI I NhumC I Iandlimg Accultmh iuns of minial ►vaslcs Cl Rcinove spillage on a iouliric basis (e.g., 7 - 10 SYSIClns day interval during summer; 15-30 day interval during win(er) wheic manure is loaded fur land applicaliun or disposal. O Provide IUr adequate dminage mound manulc stockpiles. O Inspect for mid remove or break up accumulated wastes in filler strips around stockpiles and nlmmre handling areas as needed. I-m 111ule infuinialiall colilact I11C Cooperative EXIC11sion Service, Ucpailincnl of Enlomology, Box 7613, With Carolina Slate Univcrsily, Ralcigh. NC, 27695-7613. AMIC *nibcr 11, 1996, Page 2 Mortality Manacement Methods (check which method(s) are bein_, implemente:i) G Burial three feet beneath the surface of the :round within 24 hours after knowledge of the death. The burial must be at least 300 feet from anv tZowinv stream or public body of water. Renderine at a renderinz plant licensed under G.S. 106-165.- Zi Complete incineration J In the case of dead poultry only. placing in a disposal pit of a size and design approved by the Department of Agriculture Y J Anv method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering Duman or animal health. (Written approval of the Stare Veterinarian must be attached) Dece:nbe,- I ,). 1 yea(, REVISIIIN DATES DATE 5/04/93 p 09-02-93 06 - 23 - 93 DRAVN BY Csu 05 - 27 - 93 FILE NUNS€ 21693 05 - 05 - 93 CAC)PRODUCTS CABARRUS COUNTY, NORTH CAROLINA PORTER FARMS 2000 SOWS (FARROW TO WEAN) SCALE V a so, SHEET 0 2 Operator. Wayne Griffin County: CABARRUS Date: 05/25/93 Distance to nearest residence (other than owner): 750.0 feet (plus) 1. STEADY STATE LIVE WEIGHT I 0 tows farrow to finish) x 1417 Ibs. 0 lbs. 0 sows farrow to feeder) x 522 Ibe. 0 lbs. 0 head flnlshin only) x 135 Ibe. 0 [be. 2000 sows farrow to wean) x 433 Ibe. a 868000 Ibs. 3 0 hood wean to feeder) x 30 lbs. .. 0 (be. TOTAL STEADY STATE LIVE WEIGHT (SSLW) s 866000 Ibs. 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume - 866000 tbs. SSLW x Treatment Volume(CF)/Ib. SSLW Treatment Volume(CF)/lb. SSLW 1 CF/lb_ SSLW Volume - 868000 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume 0.0 cubic feet 4. TOTAL DESIGN VOLUME Inside top length 450.0 feet : Inside top width 245.0 feet Top of dike at elevation 101.0 feet Freeboard 1.0 feet : Side slopes 2.0 : 1 (inside lagoon) Total design lagoon liquid level at elevation 100.00 feet Bottom of lagoon elevatlon 87.0 feet Total design volume using prismoldol formula SS/ENDI SS/ENO2 SS/SIDE1 SS/SIDE2 'LENGTH WIDTH DEPTH 2.0 2.0 2.0 2.0 446.0 241.0 13.00 AREA OF TOP LENGTH s WIDTH e 446.0 241.0 107,486 (AREA OF TOP) AREA OF 130TTOIA LENGTH * WIDTH 394.0 189.0 74,466 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH • WIDTH • 4 420.0 215.0 361,200 (AREA OF MIDSECTION • 4) CU. FT. [AREA TOP + (4.AREA MIDSECTION) + AREA BOTTOM] • DEPTH/6 107.486 361,200 74,466 2.2 VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL w 1,176.829 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA. Lagoon (top of dike) Length • Width e 450.0 245.0 110.250 square feet Buildings (roof and lot water) Length • Width 0.0 0.0 0.0 square feet TOTAL DA I10,250 square feet Design temporary storage period to be 180 days. _ 1)3 0 lbs. 0 lbs. 0 lbs. 000 lbs. 0 lbs. .000 lbs. 1DTH DEPTH 1.0 13.00 4) • DEPTH/6 2.2 29 CU. FT. 5A. Volume of waste produced Approximate daily production of manure In CF/LB SSLW 0.00136 Volume - 886000 Lbs. SSLW a CF of Waits/lb./Day • 180 days Volume + 211997 cubic feet 58. Volume of wash water This In the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for In Sk Volume - 0.0 gallons/day • 180 days storage/7.48 gallons per CF Volume - 0.0 cubic feet 5C. Volume of rainfall In axes" of evaporation Use period of time when rainfall exceeds evaporation by largest amount 180 days excess rainfall — 4.5 Inches Volume — 4.5 in • DA / 12 Inches per foot Volume - 41.344 cubic feet 5D. Volume of 25 year — 24 hour storm Volume = 6.0 inches / 12 Inches per foot • DA Volume d 55,125 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 211997 cubic feet 59. 0 cubic feet 5C. 41344 cubic feet 5D. 55125 cubic feet TOTAL 308,466 cubic feet 6. SUMMARY Total required volume 1,174,466 cubic feet Total design volume avail. 1,176.829 cubic feet Min. req. treatment volume plus sludge accumulation 886000 cubic fact tr� At elev. ' 93 feet; Volume is 866,593 cubic feet (end pumping) Total design v olume less 25yr-24hr storm is 1,121,704 cubic feet 9 ell ( 1- 6-,Xt elev. -�B;t�eet; Volume Is1 m i s] cubic feet (start pumping). (�VAT i 7. DESIGNED BY: Wayn Griffin APPROVED 9Y. DATE.�jr3 GATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN OPERATION AND MAINTENANCE PLAN II This lagoon Is designed for waste treatment (permanent storage) with min. odor I ALL SURFACE OF control. The time required for the planned fluid level to be reached AREA IMMEDIATE, (permanent + temporary storage) may vary due to soil conditions flushing DISK TO PREPAR 10138 operations, and the amount of fresh water added to the system. The designed •6 months temporary storage is an estimated volume based on: A CULTPACKER C I BO days 1) waste from animals•. 2) excess rainfall after evaporation; and 3) the largest AREA TO BE SE 24 hour (one day) rainfall that occurs on the average of once every 25 years. The volume of waste generated from a given number of animals will be fairly SEED MIXTURE; constant throughout the year and from year to year. This estimate Is based on Diume excess rainfall which is equal to or exceeds the highest 6 months APPLY THE POLL circulate excess in a yyear. The 25 year rainfall will not be a factor to consider In an annual pumpping cycle, but this storage volume must always be available. A ; maximum elevation is determined in each design to begin pumping and this is CF usually the outlet Invert of pipe(s) from bullding(e). If the ouUot pipe is �r not Installed an this elevation to indicate when Pumping should begin. SPECIFICATIONS elevation must be established to stop pumping to maintain minimum treatment Pumping can be started or stopped at any time between these Clearing: two elevations for operating convenience as site conditions permit. such as weather. soils. crop. and equipment in order to apply waste without runoff or All trees and br. amount. leaching. excavating or fii. Land application of waste water is recognized as an acceptable method of PP 9 P foundation of th stumps and roa: disposal. Methods of application include solid not, center pivot. guns, and minimum depth I traveling gun irrigation. Care should be taken when applying waste to prevent debris. The fou damage to crops and runoff. I embankment ma Il topsoil (3') and The following Items are to be carried out: 1. It is strongly recommended that the treatment lagoon be pre --charged to 1/2 Cut—off Trench: Its capacity to prevent excessive odors during start—up. Pre —charging reduces Cut—off trench the concentration of the Initial waste entering the lagoon thereby reducing removing an uns odor*. Solids should be covered with liquid at all times. When preehar ing cut—off trench. Is complete, flush buildings with recycled lagoon liquid. Fresh water should not to be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan Constructlon: recommends sampling and testing of waste (see attachment) before land. Construction of application• yyI lines and grades 3. Begin um out of the lagoon when level reaches elevation 9R4 as pump—outg of the SCS. Ec standing water. marked by marker. Stop pump —out when the fluid level roaches ahseps—foot roll, sievatlan 7:t3 thlagi Installed using t* prevents the loafs of fa�rable bacteria). The design temporary storage. less shall Include 25 year storm is 253.341 cubic feet or 1.894,987 gallons. As stated before of . when areas of L thisvolumewill wry considerably from year to year. excavated a mlr 4. The recommended maximum amount to apply per irrigation is one (1) inch and with a SCS appr information In tF cubic feet the recommended maximum application rate is 0.3 Inch per hour. taken during ccr ,ing) 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous Vegetation: feet stand. 6. Re air an eroded areas or areas damaged b rodents and established in p Y g Y All exposed erne planned type of 9)• vegetation. seeding specificc 7. Ail surface runoff is to be diverted from the lagoon to stable outlets. S. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Woes will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 fee of a well. 9. Ail permeable areas in the proposed lagoon area should be over excavated and back filled with 1 foot of clay that is compacted in two-6 inch hits to insure seepage does not occur. These areas should be compacted with a sheepsfoot roller. ' 10, Waste is to be removed and applied to acres of fescue (astablished) and eight acres of costal bermuda (to be established). 11. The Clean Water Act of 1977 prohlbtts the discharge of pollutants into waters of the United States. The Department of Envlronment, Health, and Natural Resources, Division of Environmental Management, ham the responsibillty for enforcing this low. SEEDING SCHEDULE ,dor ALL SURFACE DRAINS SHOULD BE INSTALLED PRIOR TO SEEDING. SHAPE ALL DISTURBED AREA IMMEDIATELY AFTER EARTH MOVING IS COMPLETED. APPLY UME FERTILIZER THEN DISK TO PREPARE A 3 TO 4 INCH SMOOTH SEEDBED. APPLY SEED AND FIRM SEEDBED WITH A CULTPACKER OR SIMILAR EQUIPMENT. 5st AREA TO BE SEEDED: 15.3 Acres ire. y SEED MIXTURE. 122.4 LBS. HULLED BERMUDA GRASS o B LBS./ACRE an APPLY 11iE FOLLOWING: 15.3007 LBS. OF OF 10-10-1 OM10 UFERTIU ETR0NS000 L S./ACRE) is nt SPECIFICATIONS FOR CONSTRUCTION OF WASTE TREATMENT LAGOONS Clearing: r All trues and brush shall be removed from the construction area before any excavating or fill Is started. Stumps will be removed within the area of the foundation of the embankment and fill areas and all excavated areas. All stumps and roots exceeding one (1) Inch in diameter shall be removed to a �t !J minimum depth on one (1) foot. Satisfactory disposition, wQI be made of all debris. The foundation area shall be loosened thoroughly before placement of embankment material. Lagoon site (and pad site Is needed) to be stripped of 1` topsail (T) and stockpiled for use on dike and pad slopes (2-3•). 1 /2 I Cut—off Trench: °s Cut—off trench shall be Installed as shown. Foundation to be prepared by removing all unsuitable materials down to stable molls before excavating for cut—off trench. Construction: Construction of excavated and earthfill areas shall be performed to the neat lines and Ssrodeo as planned. Deviations from this will require prior approval of the SCS. Earthfill shall be placed in max. of 6" lifts and not placed in standing water. Compaction shall be performed by the construction equipment or mheepe -foot roller during placement. The embankment of the lagoon shall be i Installed using the more Impervious materials. Construction of fill heights shall Include FIVE (5) percent for settlement To protect against seepage. ° when areas of unsuitable material are encountered, they will need to be excavated a minimum of one 1) foot below grade and backfilled and compacted ech and with a SCS approved material Us—CL.SC.CH). Refer to the Moll Investigation information In the plans for special considerations. Precautions should be taken during constructon to prevent excessive erosion and sedimentation. mowed Vegetation: All exposed embankment and other bare constructed areas shall be seeded to the in planned type of vegetation as soon as possible after construction according to seeding specifications sheet Mt of :ad I i d j � Ity � i 1®111! L GOON,1111 B OTT" E V . _ � 87. � T6P OF QIKE=(\ �g;y 13�,►�m r-rFw (VARIES IN FILL S CTIONS AS SHO N HERE N) lo \ \ 4500 0 \ \ 4 LL 106 TD ' f f I f I" i� -ri •r.nrn�..� - - �� i '': , i.14 --1 G RA -MAC DISTRIBUTING COMPANY T ►r^rrr1N tinlr r Sort.;,", COMPLETE IRRIGATION SYSTEMS TELEPHONE: ADVANCE EXCHANGE ROUTE 2. 80X 212 1919) 908.3232 MOCKSVILLE, N. C. 27028 19191 908.3800 PORTER FARMS CONCORD, NC S2ecification Sheet 1. Acreage under traveler coverage ± 56 acres. 2. System is designed using a Kifco E30A Slurry Reel w/1000' of 3" ID PE hose, hydraulic drive, and a Nelson SR150 Gun. 3. The Nelson SR150 Gun is intended to operate with maxir= ring orifice of 1.08 at 70 PSI, 197 GPM, with a diameter of 310'. 4. Lane spacing will be 230' (310' x 75%). 5. System pressure requirements: Gun 1000' of 3" ID PE Hose 20' Elevation 2T00' 6" PVC Pipe (.11/100') 70 PSI 42 PSI 8.6 `PSI 2.31 PSI 122.91 PSI Pump Pressure 284 Head Feet 6. Friction loss in 6" PVC @ 197 GPM is .11 PSI loss per 100 feet. 7. Liquid velocity in 6" PVC Pipe is 2.25 feet per second. 8. The application rate will be a maximum of .36 inches per hour. 9. Gun Cart Travel Speed ( in/min.) = u 19.26 x GPM Lane Spacing (ft.) x Depth of Application (in) Travel Speed ( in/min.) = 19.26 x 197 230 x .36 Travel Speed ( in/min.) = 46 in/min. 3,83 ft/min. GRA-MAC DISTRIBUTING COMPANY COMPLETC IRRIGATION SYSTEMS TELEPHONE: ADVANCE EXCHANGE ROUTE 2. BOX 212 19191 098.3232 MOCKSVILLE, N. C. 27028 f919! 998-3800 10. The Kifco E30A Slurry Reel is capable of return speeds of 1 to 6.3 ft/min. 11. System pressure required is 123 PST @ 197 GPM. The Kifco NT120S engine driven pump is capable of pumping flowes up to 500 GPM at pressures up - to 150 PST. t 12. Brake horsepower required to operate pump is 40 Brake HP. The John Deere 4045D is rated at SO Brake HP @ 2200 RPM. f r IRRIGATION SYSTEM DESIGN PARAMETERS Landowner/Operator Name: _Thomas E. Porter, Jr. Address: 4455 Mt. Pleasant Rd S Concord NC 28025 Telephone: 704--786-9551 TABLE I -Field Specifications county: Cabarrus Date: 1-31--96 Field Numbcr1 Approximate Maximum Useable Size or Field3 (acres) Soil Type Slope (%j Crop(s) Maximum Application Rate 4 (inlhr) !Maximum Application per Irrigation Cycle4 (inches) Comments o 1 u I .35 i 1 5 15.5 I GoC I I Fescue I .35 I .95 6 I 17.0 I x B I IFescue .40 I 1.6 I I I I I 7 I 4.2 I BaB I I Fescue I .40 1.6 I I I I I I I 8 I 1.1 I BaB I Fescue I .40 1.6 10 I 8.0 BaB I Bermuda_ I .40 I 1.6 I I I I I I I 'Table to be completed in its entirety by Field Office personnel and forwarded to the irrigation system designer. 'See attached map provided by the Field Office for field location(s). 'Total field acreage minus required buffer areas. 'Refer to N. C. Irrigation Guide, Field Office Technical Guide, Section II G. Annual application must not exceed the agronomic rates for the soil and crop used. Irrigation Parameters October 1995 11 page-1 USDA -MRCS North Carolina TABLE 2 - Traveling Irrigation Gun Settings Make, Model and Type of Equipment: Kifco Model E30A w/ Nelson SR150 Gun (1.08 ring nozzle) Field No and Hydrant Nos Travel Speed (fvmin) Application Rate (inlhr) TRAVEL LANE Effective Effective Width (ft) Length (ft) Wetted Diameter (feet) EQUIPMENT SETTINGS Nozzle Operating operating Diameter Pressure Pressure Arc (inches) @ Gun (psi) @ Reel (psi) Patterns Comments 3,1 4 1 .35 230 480 310 1.08 70 112 270 3,2 4 .35 230 790 310 1.08 70 112 270 5,1 4 .35 230 860 310 1.08 70 112 270 5,2 4 .35 230 745 310 1.08 70 112 270 5,3 4 .35 230 940 310 1.08 70 112 270 5,4 4 .35 230 960 310 1.08 70 112 270 6.1 3.4 .40 230 1090 310 1.08 70 105 270 6,2 3.4 .40 230 1020 310 1.08 70 105 270 6,3 3.4 .40 120 660 180 1.08 70 105 270 10 lA 3.4 .40 230 745 310 1.08 70 105 270 10 1B 3.4 .40 230 545 310 1.08 70 105 270 eL L r f'n2 a 'See attached map provided by the Field Office for field location(s). 2Show separate entries for each hydrant location in each field. 'tJse the following abbreviations for various arc patterns: F (full circle), TQ (three quarters), TT (two thirds), H (half circle), T (one third), Q (one quarter). May also use degree of arc in degrees. Irrigation Parameters USDA -MRCS October 1996 page-2 North Carolina TABLE 3 - Solid Set Irrigation Gun Settings Make, Model and Type of Equipment: Field No' and Line Noe Number or Hydrants Wetted Diameter (feet) Hydrant Spacing (ft) Along Between - Pipeline Pipelines Application Rate (inlhr) OPERATING PARAMETERS Nozzle Operating Operating Diameter Pressure Time (inches) @ Gun (psi) @ Hydrant (hr) Comments 'See attached map provided by the Field Office for field location(s). =Show separate entries for each pipeline with hydrants in each field. Irrigation Pararneters USDA -MRCS October 1995 page-3 North Carolina TABLE 4 - Irrigation System Specifications Traveling Irrigation Gun Solid Set Irrigation Flow Rate of Sprinkler (gpm) 197 Operating Pressure at Pump (psi) 123 Design Precipitation Rate (inlhr) . 35 / . 40 Hose Length (feet) 1000 xxxxxxxx Type of Speed Compensation Mech. xxxxxxxx Prune Type (PTO, Englne. Electric) Engine Pump Power Regnirement (hp) 40 BPH TABLE 5 - Thrust Block Specifications' Desioner may Drovide thrust block details on separate sheet. LOCATION THRUST BLOCK AREA (sq. fL) 90' Bend Dead F.nd 6 Tee 9 Hydrants 9 Drains 9 Ground Ent Z-Pi 'See USDA-NRCS Field Office Technical Guide, Section IV, Practice Code 430-1313, Irrigation Parameters USDA -MRCS October 1995 page-4 Forth Carolina IRRIGATION SYSTEM DESIGNER Name: David _ Company: Gra—Mac Distributing Company Address: 2310 NC Hwy 801 N Mocksville NC 27028 Phone: 910-998-3232 REQUIRED DOCUMENTATION The following details of design and materials must accompany all irrigation designs: 1. A scale drawing of the proposed irrigation system which includes hydrant locations, travel lanes, pipeline routes, thrust block locations and buffer areas where applicable. 2. Assumptions and computations for determining total dynamic head and horsepower requirements. 3. Computations used to determine all mainline and lateral pipe sizes. 4. Sources and/or calculations used for determining application rates. 5. Computations used to determine the size of thrust blocks and illustrations of all thrust block configurations required in the system. b. Manufacturer's specifications for the irrigation pump, traveler and sprinkler(s). 7. Manufacturer's specifications for the irrigation pipe and/or USDA -MRCS standard for Irrigation Water Conveyance, N.C. Field Office Technical Guide, Section IV, Practice Code 430-DD, 8. The information required by this form are the minimum requirements. It is the responsibility of the designer to consider all relevant factors at a particular site and address them as appropriate. 9. Irrigation pipes should not be installed in lagoon or storage pond embankments without the approval of the designer. NOTE: A buffer strip 25 feet wide or wider must be maintained between the limits of the irrigation system and all perennial streams and surface waters per DEHNR-DEM Code Section 15A NCAC 2B .0200 - Waste Not Discharged to Surface Waters. Irrigation Parameters USDA-NRCS October 1995 Page-6 North Carolina Narrative of Irrigation System Operation Describe the operation of the system in the space provided below or on a similar sheet most convinient to the designer/supplier. Include procedures such as start-up, shut -down, winterization and regular maintenance of all equipment. Irrigation Parameters USDA -MRCS October 1996 page-6 North Carolina GRA-MAC DISTRIBUTING COMPANY Design — Sales — Service COMPLETE IRRIGATION SYSTEMS TELEPHONE: ADVANCE EXCHANGE 2310 NC HWY. 801 N Mob 990-3232 MOCKSVILLE. N. C. 27028 19101 998.3300 NC TOLL FREE 1.600-422-3560 System Operation Porter Farms System Start -Up 1. Attach traveler to hydrant and pull out hose. 2. Move pump to lagoon. 3. Prime pump. 4. Start engine. 5. Leave engine at idle speed until all air is evacuated from system lines. 6. Raise engine speed to meet require pump pressure. (123 psi) 7. Start traveler motor. 8. Adjust traveler motor speed to reach required hose speed. (4 ft/min) System Shut -Down 1. Lower engine speed to idle. 2. Shut off engine. 3. Move traveler to next location or to storage. 4. Move engine to storage after pumping. Winterization 1. Open all drains in the system. (pipelines, pumps, traveler, etc.) 2. Open pump discharge gate valve and leave open. 3. Spray lubricant into pump suction and rotate shaft to help prevent rust. 4. Open ground entry gate valve and pour in a small amount of anti -freeze. 5. Leave ground entry gate valve slightly open. 6. After water has been evacuated, close pipeline drains. Maintenance 1. Follow all manuals supplied with the system. 2. Grease hydrant stems annually. 3. Replace any wore or damaged parts as soon as possible. 4045D Performance Rating Rated Gross Power ........... 85 bhp (63 kVV) @ 2400 rpm Peak Torque ............. 217 lb.-ft. (295 N-m) ® 1200 rpm Fuel Economy (BSFC) .. 0.345 lb/hp hr. (210 g/kW h) @ 1600 rpm Continuous Rating Gross Power ................ 78 bhp (58 kVV) p 2400 rpm Peak Torque ............. 200Ib.-ft. (271 N-m) @ 1200rpm RATED BHP is the0wer rating for variable speed and load applica- tions where full power is required intermittently. CONTINUOUS BHP is the power rating For applications operating undera constant load and speed For long periods of time. POWER OUTPUT is within + or - 5% at standard SAE J 1349 conditions. PHOTOGRAPHS MAY SHOW NON-STANDARD EQUIPMENT POWER BrDEERE. Performance Curve Will 10 12 14 IG 10 20 22 24 25 En6me S peca—rpm's in S 00's rt 4- .50 100 150 200 250 300 350 400 450 500 550 600 650 GPM Performance and HP at full speed and full impeller dia. (Input speeds = 540, 1000, 2000 depending on the gearbox ratio) Increasing the speed on the angina driven pump to 2200rpm will increase the pressure by 40 psi. Contact your local dealer or Kifco for details of horsepower and performance changes. FRT94/53 Pump Performance 300 250 PSI 200 150 100 20C 15C HP i00 50 0 50 100 150 200 250 300 350 400 450 -500 550 600 650 GPM Curve A = Performanco and HP at full speed and full impeller dia. (Input speeds = 540, 1000, 2000 depending an the gearbox ratio) Curvo B = Performance and HP at 90% of full speed or at full speed with trimmed impeller. ■■■■■■■■■■■■■ I 600 S. Schrader Ave., P.O. Box 367, Havana, IL 62644 Phone 3091543-4425 Fax 3091543-4945 sevuue al aanwan pww frnpanmom phatm al machrm in Nix lu6at may not be -idenbcal to oaronlprod=on. The porlormamo nlarmation in : six teallet u bued on usn candWod urda a parMW !el al can&dww. ACWW field puttmance wr rarr rrom dda data deponOV on YWUUI draanatanaes or pme, plus, waatnu. hvnan iAllmenl and a7sar taclen. Speafcaeau aN p-CAS are UAVC to drupe M Met naoce. GK9502K5P Printed in USA 1IQGUN° PERFORMANCE TABLES U.S. UNITS 100 SERIES BIG GUNS -- 24° TRAJECTORY" 100 T TAPER DORE NOZZLES P.S.I, Nozzle I GPM DIA, NaiS21e" 'S GPM DIA. Nozzle .8• GPM DIA. Nazrle .65' GPM DIA. Nottlo GPM ,7" OIA. Nozzle .75" GPM OIA, Nozzle A" GPM DIA. Nozzle GPM.BS" DIA. Nozzle GPM.9' OIA, No;tle 1,0" GPM DIA. 401;.'-47rsis:t411B.L'3 6 {t 7 S• 230'.,;^'1A3' z �0:�:,1S85a.,,;250.� Its 256' 4.t O.iF 't52' 6, rr 50 . 50 205, 64 215, 74 225' 07 235' 100 245' 130 265' 150 273' 165 200' 204 300' 70 ,BO.. 60 225' zii.-L 23?I�"ac 75 238' 80 250' 103 263' rvLT6 y�"`.�2234v 120 275' 136 283' 155 295' 177 302' l97 310, 243 338' 90 68 245' 03 258' 100 270' 117 283' 135 295' 115 306' 175 315' 201 316' 223 335' 274 362, 7 00� . u 72-.=b-S `I �SG1"a. Erb — r� y' ;;;1.4�';;ti�'y305 i`3,16� „g 76 265 7 92 276 111 290, 129 303, 150 315' L , 71 324 195 335' 222 344' 247 355' 304 360, Avadable only with 1`100 a -SR100. 100 R RING NOZZLES 100 DN DIFFUSER NOZZLES PSI .71 RING GPM DIA .77 RING GPM DIA .81 RING GPM DIA .06 RING GPM DIA .89 RING GPM DIA .93 RING GPM OIA .96 RING GAM DIA 0.5 ON GPM OSA 0.6 ON GPM DIA 0.7 ON GPM DIA 0.8ON GPM OtA .,�.Y. 40 T60ii 60 ,'7o,�,: 80 790'w 100 1:10 `= -.�:y+�:G+�'� a,'ti t 66 208 'e Z,r7A,s Z = _01_235 ,r89:6246'"r 94 255 79,:.�"'S.11. 105 270 1'10i 17 :ilwie"' 70 212 : A-M=.' 96 240 M—LiVZ-z-0 -111 265 27S i;SaS 124 280 30 '• 91 215` 32 A0�230 110 245 5715 60M 127 275 r 142 295 ! . 3U, ,1;'.3�Y.J�.��i'aTii: 103 224 uWs1;15�,�2A0 125 260 M1.a5Z764�".=NO-j9U 145 285 of aai�5 162 305 6,M 51.7^10 y1r+'+aw�i►.e�:u".w 118 235 ,129 i�250 141 270 w.1'E7—Tf 163 300 "..�7asaio 182 320 325 i ii:t:.rer ry 134 238 731 180,y255 " 164 275 .,1295 189 305 2oi 315 2,2 125 222 r 335 l:ii':.� 152 242' i—s87- -eb = 103 280 211 315 224 5a 236 335 tom, W44 s345 :r:•�' • 45 154 =60 0S:X .1�1 ..:u. 66 168 179: a`i:L�►'/.fiml% � � 91 182 } lie 198 tMUjr0 -a= 110 200 t43 218 — ,r` "The dlemotor 01 throw Is approylmslsly 3%1e83,or the 21' trajoetory, angle, 6% 1035 ror to 150 SERIES BIG.GUNS — 240 TRAJECTORY" 150 T TAPER BORE NOZZLES P.S.I. Nozzle ,7" GPM DIA. Nozzle .8' GPM DIA, Nozzle '9" GPM OIA. Nozzle 1.0" GPM DIA. Nozzle 1.1" GPM DIA. Nozzle 1.2" GPM DIA, Nozzle 1.3' GPM DIA. I.. ,: 60 '.70.� ''1 ` 0 . '; . - . AO.i .a25 Ito 265' r rt� .r}v O n ' i�s3Y. - 7 w 143 285' :ia",*'185J ti'� -+' .t_1�i�.'...29015- 182 305, * 205 37D;,. i,t ri:..4 .,.:ia X5',rs. 225 325' t:.255 k� '330'•s S ,'.';:.,►� S,.wL'. .w.:.,a.. 275 345' "�,.;3004 .,r; &`i +4F:w35 Wi 380' 330 365' J 80 7 aaT 100 �,,o� 126 290' a:,,:ufasZ oti` a 143 3t0' x ;�u,iSD�M_t3ffQd'iw 165 310' 210 335' 260 355' �5' r 290 375' 315 375' i:a53 93' ,w.4 355 400' 70�{1a: 380 395' 445 410' 3 2a3F 165 330' ua •" 222,u 45 r�.r: 235 355' 2a78� Z 4G. 425 420' 500 440' , g .3gs 120 t57 330' 204 350' 250 375' 320 395' 385 a20' 465 440' 545 460' 150 R RING NOZZLES P.S.I. Ring .8G GPM DIA. Ring .97' G�PPM� DIA. Ring 1.08' GPM 31A. Ring 1.18" GPM OIA. Ring I 1.26" GPM DIA. Ring 1.34' GPM OIA. Rini 1,41 GPM DIA, r.60.,- 60 0 --"!100.Uir 224 J'S 110 260, :. 20'tL7'2i 1101=1 t .Mra 265.A�wiM 143 250, I=i356""'y`290.r.KlcL Y}i Ma1e1.6S'. A' ./1. �;aeaes:,:�..,�:s,;zos3oo. 182 300, fx7Ei afl ..-Tt'3Ta',.',�.`r''' JI'"' h 225 315' =75 X ,,.:�' �iIR iw.r.V' :.�,.a5s..:,:r,,.32a,t„i 275 335' �a 29 a 33a" z S7' 4: i7.iR!�..ri"I� l �300,_..� 330 350, i. r.,3� 1�#��'- 7:, r .:..L,ia 385 365' - 'o 00 128 280, f MEZ?aa ffi 165 300, 210 320' 260 340' 315 360, 300 380' 445 395' I 143 300' :fsa ►3a� 185 320' 235 340' 290 360, 355 390, 425 400' too -120� 500 415' {oa c� • +7�So , 20 =ro 120 157 315' 204 335 250 360, 380, 320 360' 305 400' 465 420' 545 435' 'The diamotor of throw is approximatoly 3% lass for the 21' trajectory angle. 200 SERIES BIG GUNS — 270 TRAJECTORY" 200 T TAPER BORE NOZZLES Nozzle Nozzle Nozzle Nozzle Nozzlo Nozzle Nozzle Nozzle Nozzle 1.05" 1,1' 1,2' 1.3" 1,4" 1,5' 1.6. 1,75" 1.9. PS.1. GPM pIA. r GPM DIA. GPM DIA. GPM DIA. GPM OIA. GPM OW GPM DIA, GPM OIA, GPM pIA, :a OOZ -250 1�.345:{it , `.i3a:.13Q;:f:376' 355 395' ;365 :380': 415 410'.. 'MS:u:.:4lO � 480 430' , d515� r`:430''" 555 450' •755 70 270 360, 310 3", 630 465' 495, 990 515' -Iita Z =90`7 S8o7g=Xo - - "=. W4s 430.,= =$] 5=450. M 77690'l. j. 70 r ."'r.',825 =4W= = ' • 1 :I 5 90 310 390' 350 410' 405 425' 475 445' $ay 465' 625 485' 715 505, 855 535' 1005 555' :f00„ 3 {! • 5s�"A40 .„ ' 00"I .,�, r.=675+'s'..48G' : «` .860 " SOGT : "r.. 7G d�,;,fi 90C. h� S4Y. 110 340 410' 390 430' 4a5 450' 525 470' $05 495, 605 515' 790 535' 945 565' 1110 590' ut20 �a.T355"t i k+d' ;�.4eo' ,' W.7,4 1i e3b: sos �i5 rsoo:s .::c625�i48',?i': ,*'LABS eg'�£ 1a-6 Box= 130 370 425' 425 445' 4B5 465' $65 485' 655 515' 755 540' 860 560' t025 590' t2t0 620' 200 R RING NOZZLES , 'G' Ring 0.29• actual) PSI. GPM OIA, 1 ,A, Ring 0.46' actual) GPM DIA, 141 Ring 1 %" Ring 1 jA' Ring 1 'A' Ring (1.56' actuai) (1.66, actual) (1.74' actual) 083' actual) GPM OIA. GPM DIA. GPM GIA. GPM DIA, 2" Ring �1.93' actual) PM DIA. =1:s50'': r� 230 1 r " 4R0. •. 43 , 60• 250 340' 330 370' 385 390' 445 410' Sty a25' S05 440' 695 455' r 70;ts�4Y,�27ar�3�5,.3'i�"'1a7,.a05��60;'i'.iZSSw'.`w"i+355;4�G'"�'� Gz'nr�ab$5. d$id17 00 290 370' 380 400' a45 a20' 515 440' 590 455' B75 470' wrk426 �2 5' W! .'i ii::. a 545 r� 55 S: �� 925: 470�, �• "i="•^'=,,,,7,11S6 005 490, CBS S too 325 399' M{0IS. COOu 'i',dffS4 425 425' 39`:�i,"=626=455; Boo a45' 575 465' 660 400' 755 500' 16076 900 520' 120 355 4!0' 130+'S:070?�{3.h.+43dU2665 545 465' 630 485' 725 500' 825 520, 985 545' 465 445' "Trio diameter of thraw is approximately 2% loss loz the 24' trajectory angle, 546 less for trio 21' trajectory angle. The CIIG GUN' performance data has boon oblainod undar idual Sa91 conditions and may bo adversely altotlud by wind, poor hydraulic onbanco conditions or other ,attars. Nelson Irrigation Corporation maxos no rOprosenlaticn regarding droplet condition, uniformity, or application rate. WOO I I I 11 J Ag-Rain Slurry -Reels are specifically designed for the land application of wastewater. These machines provide a fast, economical way to spread liquid waste. They are simple to operate, require minimal labor and are easy to adjust to the required depth of applica- tion. Slur Reel Advantages and Benefits Slurry -Reels are quick and easy to set up and operate unattended. They can apply liquid waste with superior unifor- mity- to stationary gun systems. Depending on the machine size, they can spread the liquid over swaths up to 1/4 mile in length at a single setting. The machines almost totally eliminate the soil compaction problems associat- ed with tank wagons. Slurry -Reels are very portable and can easily be towed from one location to another. In addition to wastewater disposal, the machines do an excellent job of irriga- tion which makes it possible to turn wastewater into a valuable asset. Engine Drive Unit Two styles of engine drive are used on Ag-Raln Slurry -Reels. Both use a Honda 5 HP OHV engine complete with a large capacity fuel tank. If the wastewater is free of solids, such as partially treated or secondary lagoon water, a turbine drive Water -Reel will operate very efficiently. In these cases a turbine is usually preferred for its sim- plicity and reduced maintenance requirement. Slurry Pumps A line of PTO Slurry Pumps are avail- able for pumping wastewater. The pumps have either an open or closed vane impeller which is not easily plugged by solids. A pedestal mounted version is also available. Contact Ag- Rain for more information. Engine Drive Slurry -Reels Model E40A Slurry -Reel Model E30A Slurry -Reel Model E21A Slurry -Reel > "'Economical Wastewater Disposal Machines E40A & E37A Hydraulic Drive E30A, E25A & E21A Mechanical Drive Low Profile Gun Cart.(GaIvan ized Body) Crank -down Pressure Gauge & Stabilizer Leg Protector Hydraulic Drive The E40A and E37A models are fitted with an engine powered, variable displacement hydraulic transmission. To avoid over- heating, the transmission is air cooled by a high capacity fan. Through the transmission, the speed range is infinitely adjustable and also speed compensated during operation. A speed indicator displays the ground speed of the gun cart. The speed is simple to adjust using Ag-Rain's unique system. Mechanical Drive The E30A, E25A and E21A models are fitted with a mechanical drive. The speed is infinitely adjustable and speed compensated during operation. A unique speed indicator displays the ground speed of the gun cart and is simple to adjust. Polyethylene Tube The medium density polyethylene tube has a thick wall and is especially made for the Slurry -Reel. It's built to resist wear, to withstand repeated coiling and to resist the brittling effect of ultra violet rays. It can be repaired with a screw -in mender or by weld- ing. The tubing is backed with a 5-year pro -rated warranty. Special Features Ag-Rain Slurry -Reels include all the regular features you would expect from a well designed traveler. A few of the special fea- tures that makes Ag-Rain stand out from the crowd are: 4 A Fall Safe Shut -down System ' 6 A Unique Anti -coast Brake 4 Retraction Speed Indicator 4 Speed Compensation on all models. 4 Eaton Variable Displacement Hydraulic Transmission (E40A & E37A only.) J Crank -down Stabilizer Legs (Except E21A) Optional Low Profile Gun Cart reduces stream height and wind drift. 4Turntable. - Rotates on heavy duty Ball bearing. 6 Pressure Gauge Protector Regular Features Include: Automatic Engine Shutdown Miswrap Safety Stop Infinitely Adjustable Speeds Gun Cart Lift Non -Ferrous Swivel Seal Foolproof Clutch Supply Hose Honda 5 HP OHV Engine Gun Cart Large Fuel Tank Hose Guide Medium Density Polyethylene Heavy Duty Chassis Tube Nelson Slow Reverse Gun ,—a . 5 Models to choose from: E40A. 4.0" IID x 1250' E37A. 3.7" IID x 1050' E30A 3.0" IID x 1000' E25A. 2.5" IID x 800' E21 A. 2.1 " IID x 660' Extra tube can be added to most models. Ask your representative for details. Row Crop Gun Cart with galvanized body is standard equipment. An optional Low Profile Gun Cart Is also available. Nelson 150 Gun spraying dairy wastewater Optional Equipment Low Profile Gun Cart. Recommended to reduce stream height and wind drift. (For illustration see inside back cover.) Pressure Sensitive Drive Shutoff. Automatically stops the engine when the supply pump is stopped. PTO Shaft. To dry rewind the tube by means other than the engine. Performance Informatlon Flow M; ;ire SPRINKLER AREA COVERED Model GPM P Psi f° `�h Pressure PSI et d IwL°i nn 'n. E40A 300 97 70 371 316 1408 with 350 106 70 393 334 1417 NELSON 400 116 70 407 346 1423 SR2110R 450 138 80 429 364 1432 Sprinkler 500 150 80 443 376 1438 E37A 200 86 70 314 267 1184 250 94 70 329 279 1190 with 300 103 70 350 298 1199 . NELSON SR16oR 350 115 70 357 304 1202 Sprinkler 400 127 70 364 310 1205 450 141 70 371 316 1208 E30A 18o 94 50 300 255 1128 200 102 60 307 261 1131 with 220 120 70 321 273 1137 RNELSON R1 OD S00R 240 129 70 329 279 1140 Sprinkler 260 138 70 336 285 1143 ". 280 148 70 336 285 1143 E25A 80 75 60 229 194 897 100 82 60 243 206 903 with 120 92 60 257 219 . 909, NELSON SR100R 140 112 70 271 231 915 Sprinkler 160 124 70 286 243 921'' 180 137 70 300 255 920 E21 A 60 67 50 214 182 751 70 82 60 221 188 754 with 80 89 60 229 194 757. NELSON SR100R 90 96 60 236 200 760'x. Sprinkler 100 103 60 243 206 763 110 112 60 250 213 766._ CA�QVdb=4=2 600 S. Schrader Ave., P.Q. Box 290, Havana, IL 62644 Phone 3091543-4425 Fax 3091543-4945 Performance shown in the above tables are based on clean water. Actual performance may vary depending on the solids content of the wastewater being applied. 'Recommended width Is based on 85% of the wetted diameter. This width reduces the possibility of excess application in the overlap areas. When using the machine for irrigation the recommended width Is 70% of the wetted Me. Specifications E40A E37A E30A E25A 4.0 3.7 3.0 2.5 1250 1050 1000 800 9240 8240 4310 2500 16520 13120 7280 4200 11 Lx15 12.5Lx15 9.5Lx14 6.70x15 Model PE tube I.D. (in.) PE tube length (ft.) Dry Weight (lbs.) Weight with water (lbs) Tire Size Shipping dim.: (ft. in.) Length Width (8-3" w/o wheels) Height E21A 2.1 660 1780 2700 4.8002 18-0 18-0 13-5 11-8 9.8 '9-10 '9-0 7-5 6-9 5-10 12-8 11-4 10-0 7-11 6-10 Because of 9 product improvements, photos of machines in Ws IeaW may not De identical to current producW. The performance inlamaoDn in ft leaflet is based ant tease eortduCW under a peniadar set of conditions. Ach" net Wormence may vary from dus data depending on vanaphi Cr0.lmStmes of time, dace, weather, human judgement and other faeiais. Speoficahons and prices are subjeq to Charge without notico-. GKMSR-U printed in U.SA.