HomeMy WebLinkAbout20050933 Ver 1_Complete File_20050527MEMORANDUM
TO: John Dorney Regional Contact: Kevin Barnett
Non-Discharge Branch WQ Supervisor: Roger Edwards
Date:
SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS
Facility Name Round Hill Branch EWP 2005-92,177
Project Number 05 0933
Recvd From APP
Received Date 5/27/05 Recvd By Region
Project Type EWP
County Buncombe
County2
Region Asheville
Certificates Stream
Permit Wetland Wetland Wetland Stream Class Acres Feet
Type Type Impact Score Index Prim. Supp. Basin Req. Req.
NW37 Stream O Y O N F- G-84-3 F-c _F__40,302. F- 510.00
-F-PT _0N F_F_F_7_F_F_F_
Mitigation Wetland
MitigationType Type Acres Feet
Is Wetland Rating Sheet Attached? Q Y 0 N Did you request more Info? Q Y N
Have Project Changes/Conditions Been Discussed With Applicant? Q Y 0Q N
Is Mitigation required? Q Y O N Recommendation: Q Issue * Issue/Coed O Deny
Provided by Region: Latitude (ddmmss) 353815 Longitude (ddmmss) 824233
Comments:
Issued - ARO - 06/10/2005 - KHB
cc: Regional Office
Central Office Page Number 1
Triage Check List
Date: 06/08/05 Project Name: Round Hill Branch BWP
2005-92,177
DWQ#: 05-0933
County: Buncombe
Kevin Barnett, Asheville Regional Office
To:
30-day Processing Time: 5/27/05 to 6/27/05
From: Cyndi Karoly Telephone : (919) 733-9721
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
Wetland determination and distance to blue-line surface waters on USFW topo maps
? Minimization/avoidance issues
? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
Is the application consistent with pre-application meetings?
? Cumulative impact concern
Comments: As per our discussion regarding revision of the triage and delegation processes,
please review the attached file. Note that you are the first reviewer, so this file will need to be
reviewed for administrative as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a "second
reviewer" as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!
F@F=Dwr? P
MAY 2 7 2005
Office Use Only: DENR - WATER CIUALinrm Version May 2002
VkEWDS AND STORMWATER Gi< XH
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: John Creighton /Assistant Count Manager/Planning, Director
Mailing Address: 46 Valley Street
Asheville, NC 28801
Telephone Number: 828-250-4835 Fax Number:
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Mike Osborne
Company Affiliation: CH2M HILL
Mailing Address: 4824 Parkway Plaza Blvd.
Suite 200
Charlotte, NC 28217
Telephone Number: 704-329-0073 ext 252 Fax Number: 704-329-0141
E-mail Address: mike.osborne@ch2m.com
Page I of I I
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Round Hill Branch EWP 2005-92, EWP 2005-177
2. T.I.P. Project Number or State Project Number (NCDOT Only): NA
3. Property Identification Number (Tax PIN): SEE TABLE 1
4. Location
County: Buncombe Nearest Town
Subdivision name (include phase/lot number): NA
Directions to site (include road numbers, landmarks, etc.):
Leicester
From I-240, Exit 3 onto US-74 ALT West/US-19 South/US-23 South for approximately 1.5
miles. Turn Right on North Carolina Highway 63 - New Leicester Highway. Stay on New
Leicester Highway for approximately 4.5 miles. Turn left on Newfound Road, proceed 3.0
miles. Turn Sharp Right onto Old Newfound Road for 0.6 miles, then turn left onto Rabbit
Ham Road. The site EWP 2005-92 is located near the intersection of Rabbit Ham Road and
Green Valley Road. The site EWP 2005-177 is located on Green Valley Road (left from
Rabbit Ham Road).
See Attachments 1 and 2 for site vicinity and parcel locations.
5. Site coordinates, if available (UTM or Lat/Long): SEE SITE DESCRIPTIONS
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): SEE TABLE 1
7. Nearest body of water (stream/river/sound/ocean/lake): Round Hill Branch
Page 2 of 11
8. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://112o.enr.state.nc.us/admin/maps/.)
Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application:
The proposed site consists of light residential and agricultural uses. The stream and stream
banks were heavily impacted during Tropical Storms Frances and Ivan. Extensive stream
bank erosion threatens the stability of existing structures.
9. Describe the overall project in detail, including the type of equipment to be used:
This project area includes approximately 510 linear feet of Round Hill Branch in the vicinity
of Rabbit Ham Road and Green Valley Road. High-water flows have severely eroded the
banks (see Exhibit 2). In this section of branch several properties are threatened by these
conditions. Repairs in this reach of stream will involve the following:
-Stabilize the channel in its post flood configuration using organic and rock structure
-Reseeding and planting woody vegetation
EWP 2005-92
This project area includes approximately 350 linear feet of the Round Hill Branch near. The
project area is located at 35°38' 15.2"N 82°42'33.2"W. High-water flows have severely
eroded the right bank. In this section of branch the resulting severe streambank erosion and
scour have threatened pastureland. Attachment 1 contains representative photos of the eroded
area.
Repairs in this reach of stream will involve the following:
- Stabilize the channel in its post flood configuration using organic and rock structure
- Reseeding and planting woody vegetation
EWP 2005-177
This project area includes approximately 160 linear feet of the Round Hill Branch. The
project area is located at 35°37'399"N 82°43'43.4"W. High-water flows have severely
eroded the left bank. In this section of branch the resulting severe streambank erosion and
scour have threatened pastureland near property access and Green Valley Road. Attachment
2 contains representative photos of the eroded area.
Repairs in this reach of stream will involve the following:
- Stabilize the channel in its post flood configuration using organic and rock structure
- Reseeding and planting woody vegetation
The techniques that will be utilized for the proposed repairs at the EWP site listed
above are described below.
Page 3 of 11
Streambank Repair
When possible, excavation equipment will access streambank repair areas from the dry and
will not track into the stream channel. Most of the steep eroded streambanks are opposite or
adjacent to the debris removal areas. At these areas, the rocky material removed from the
floodplain will be used to stabilize the stream bank, with the addition of large boulders along
the toe of the slope as necessary to stabilize and protect the toe. Where suitable material is
available, rock vane and root wads will be installed in the restored bank section to reduce
bank stress and provide stability to the unconsolidated fill.
An existing cross section and site specific design components are included in Attachments 1
and 2 for each of the impacted channel sections requiring stabilization. Drainage areas of
project areas are also included in those attachments. The drainage area is used to determine
the design storm (10-year or 25-year for trout streams) peak flow using USGS Rural
Regression equations for the Blue Ridge-Piedmont. Design storm velocity and shear stress
values were also calculated. This information, in conjunction with the field investigation
analysis, DSR notations, and agency guidance and regulations, are used to develop an
appropriate streambank stabilization design. Additional information on general design
features, erosion control practices and debris removal practices is included in Attachment 3.
Equipment that may be used to accomplish the above listed tasks includes; rubber tired
skidders, 15 ton dump truck, hydraulic track mounted excavator with thumb, and chainsaws.
10. Explain the purpose of the proposed work:
The work addressed in this application is intended to improve post flood hydraulic capacity
of the stream reaches discussed and stabilize severely eroded streambanks that are
threatening structures or other property. The proposed actions are not intended to enhance
existing conditions or restore stream reaches using natural channel design techniques. Such
activities would require detailed engineering evaluation and design, which are beyond the
intent of the EWP program.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Page 4 of 11
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
NO
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts:
Proposed impacts include limited streambed disturbances, debris removal, and streambank
stabilization.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
List each impact separately and tclenuty temporary impacts. impacts include, but are not limited to: mecnantzea clearing, grading, ltu,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year tloodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local lloodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.aov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wctland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: None
Total area of wetland impact proposed: NA
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact Length of Average Width Perennial o
Site Number Type of Impact* Impact Stream Name** of Stream Before Intermittent'.
Page 5 of 11
(indicate on ma) (linear feet) Impact (please secif )
EWP 2005-92 Streambank 160 Round Hill Branch loft Perennial
stabilization
EWP 2005-177 Streambank 350 Round Hill Branch loft Perennial
stabilization
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uscs.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mapqucst.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 510
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact Area of Name of Waterbod
y Type of Waterbody
Site Number Type of Impact* Impact (if applicable) (lake, pond, estuary, sound,
(indicate on ma) (acres) bay, ocean, etc.)
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: 511, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): NA
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): NA
Size of watershed draining to pond: NA Expected pond surface area: NA
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
Page 6 of I 1
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
When at all possible equipment will be kept out of the stream channel, stream crossings will be
minimized, and no excavation will be below the existing channel bed. When at all possible
stream material will be moved from dry areas to banks, minimizing the movement of wet (or
below water line) stream material. Creating wide, shallow channels will be avoided. Temporary
and/or permanent herbaceous vegetation shall be planted on all bare soil within 15 days of
ground disturbing activities. Rocky material shall not be used for bank stabilization above the
normal high water mark. Large rocky material will be brought in to stabilize the toe of impacted
streambanks where necessary.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetiands/strm!Zide.htmi.
I. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Page 7 of I t
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.ne.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): NA
Amount of buffer mitigation requested (square feet): NA
Amount of Riparian wetland mitigation requested (acres): NA
Amount of Non-riparian wetland mitigation requested (acres): NA
Amount of Coastal wetland mitigation requested (acres): NA
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
Page 8 of 11
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 213 .0242 or.0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total
Discuss stormwater controls proposed in order to protect surface
downstream from the property.
Imperviousness will not change.
acreage on the site.
waters and wetlands
Page 9 of 11
Erosion and sedimentation prevention and control will be maintained throughout this project
primarily through: proper water management, construction sequencing, proper staging and
stockpiling of materials, and the maintenance, at all times, of suitable channel capacity for
expected flow events. Equipment, fuels, lubricants, or other potential sources of water pollution
will not be stored in areas that could be flooded during this project.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Portable facilities shall be provided at the work site.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
NA
d-,
At pplicant/Age`nfrs S
(Agent's signature is valid of
Iiature f Date
if an authorization letter from the applicant is provided.)
Page 10 of 11
Table 1.
DSR Map ID PIN Owner Property Owner's Address City State Zip Streambank
Number size stabilization
(acres)
E`VP 2005- DSR92 8790.00-47- Janice Martin 142.96 320 Green Valley Leicester NC 28748 350 ft.
92 1709.000 Buckner Trustee Road
EWP 2005- DSR177 8790.00-16- Vera Gossett 31.31 483 Green Valley Leicester NC 28748 160 ft.
177 4821.000 Road
Page 11 of 11
Attachment 1- DSR 92
Ia. Vicinity Map
lb. Site Map
lc. Site Photos
Id. Cross Section and Site Specific Design Page
le. Drainage Areas
Access Agreements
North
1
9M D-121.. 2156"' o ? • J
.1 \ 1 Alexander
\ \ i" 1 N• 1 Sch
ric Ch
-j '215 -
Sch ) fi
j
,; ?? ?• ?:%. ?-. BM 8 121
x, ? ?"i / ??'? ?• r? BMA 127 '.
v1 i L? r
J 2125 '_`J Yt f / 0M W 127
$0
by - •i 2117 t, 20 O) : fcea
!Ntton
plltmoro 5 `r r ?'•
71DT I \ 1. +. / - j
i
M Y 127
Site 92 .' c 2189-'?
t
CMS-63 m ; f
C C 4953 t
0 1,250 2,500 5,000 Feet Attachment 1a
} t t t l I I I I DSR 92 - Newfound Creek Watershed
Buncombe County, NC
Janica Buckner - Vicinity Map
® GH2MHILL
,G
Attachment 1 b
DSR 92 - Newfound Creek Watershed
Buncombe County, NC
Janice Buckner Parcel 1709
Attachment le
DSR 92 - Newfound Creek Watershed
Buncombe County, NC
Janice Buckner - Photo Log
(1001) g3p!M
6-
I, O E 5 E 0 ?
0
aoejjns jal eM
L - -
Z -
cM
r«
C -
B
D E - - -
e
I ?ue8 jo dol }qbi?
roooo
9 ?ue8 jo do_ L:4,9-1
uoiloes ssojo fiuilsixa jau?one ooiuer
ON `Ajunoo agwooun8
paysja}e/A ?eaao punOJm@N - Z6 2:JSa
p ? Juawyoeuv
Buncombe Co., Newfound Watershed - Round Hill Branch, DSR 92
Design Parameters
Apply to Site Figure Title
X 1 BANK STABILIZATION TYPICAL SECTION
2 BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION
3 STREAM CHANNEL BENCH TYPICAL SECTION
4 TYPICAL J HOOK DETAIL
5 TYPICAL CROSS VANE DETAIL
X 6 SUGGESTED VEGETATION LIST
X 7 STABILIZATION PLANTING PLAN
8 BENCH PLANTING PLAN
X 9 LIVE STAKE DETAIL
X 10 DEAD STOUT STAKE DETAIL
X 11 EC FABRIC INSTALLATION DETAIL
X 12 EC FABRIC ANCHOR DETAIL
X 13 STABILIZATION CONSTRUCTION ENTRANCE DETAIL
X 14 TEMPORARY SILT FENCE DETAIL
X 15 TEMPORARY STREAM CROSSING DETAIL
X 16 LAND QUALITY STOCK PILE LAYOUT
X 17 LAND QUALITY STREAM CROSSING LAYOUT
X 18 LAND QUALITY DEBRIS REMOVAL LAYOUT
Notes and/or Measurements
A=1.8FT.
315 LF of right bank and 35 LF of left bank
EC fabric = 4.51blfe
9
12),,5-
M?
Initials iKSB
Date 51=05 `
Legend
A DSR Project Site
Interstate Highway
Major Road
Major Hydrography
Subwatershed
Municipality
County Boundary
•63
G?e?K
so?`????ke`1
DSR92
Drainage Area 1.97 sq. miles
6
SR92
z
A ?
d7
00
s
Morgan Branch erd?o
h
0 0.25 0.5 1 Miles
Attachment 2e
DSR 92 - Newfound Creek Watershed
N Buncombe County, NC
Janice Buckner - Drainage Area Map
13 a4"Q'j
PERMIT FOR EMERGENCY WATERSHED PROTECTION (EWP)
The undersigned landowners hereby grant permission to Buncombe County and the Buncombe
County Soil and Water Conservation District and/or their agents to enter upon our land for the
purpose of repairing the flood damage of stream channels and stream banks in the
o [.mot., l/ watershed.
This permit includes the right to spread soil, remove and dispose of debris, install needed
measures, seed and mulch, and perform similar emergency watershed protection work
necessitated by the floods of September, 2004.
This permit also includes the right of ingress and egress on the land for the purpose of
maintaining or inspecting maintenance of the emergency works for the period of 1 year from the
date of completion. Work areas covered by this permit are sketched on the reverse of this form
or on an attached sheet.
Signed Date . Signed Date
jai I s-
Attachment 2 - DSR 177
2a. Vicinity Map
2b. Site Map
2c. Site Photos
2d. Cross Section and Site Specific Design Page
2e. Drainage Areas
Access Agreements
' North t ? _ 1 .? ? ? } ?' ••? tz._•
'-? (, - '?-? ?+ ? ?% _ , ?• - ?' ,? ??ti,?? .. is
8M D-127. 2156' a. ?. i
,•
-- 'j' i..
.. Alexand
{ Sch
rick Ch_
'0M-C 27, J '
` -215
'' .
\ 1 Leiceoter
".,y CJ ti iri . )' \ BM E] 12i•x' ?• ?r %/!\r'?L• t BM A1
CR 691 2125-?_' ?'?• ! ~? ?._
?`•a_ C, . S
•; •.. J f'. 2090
f. J
r
I
r
!?? l
ttor,
?o'Blltmor•
1 i
- r V 1.
43, IN
Site 177 ,
i I ??OY / ' S BM Y 127 ' • ?'
i`Gt00n H ?ti l ?' 2189 ,?'G1 p'
} C
r`
0 1,250 2,500 5,000 Feet Attachment 2a
,,` ,_ I t t t t t DSR 177 - Newfound Creek Watershed
''?"''? ' ?--- Buncombe County, NC
Keith Gussett - Vicinity Map
® CF42MHILL
Ow
Attachment 2b
DSR 177 - Newfound Creek Watershed
Buncombe County, NC
Keith Gossett Parcel 4821
Attachment 2c
DSR 177 - Newfound Creek Watershed
Buncombe County, NC
Keith Gossett - Photo Log
I IM
1 ?• d F ?jyy„1
d
F
31': I
Attachment 2d
DSR 177 - Newfound Creek Watershed
Buncombe County, NC
Keith Gossett existing cross section
Right Top of Bank
-- - Left Top of Bank
Water Surface
45 40 3 5 30 0 1' 1
-8
-7
-6
-5
a?
- 4 w'
-3
S
_2
-1
-0
- -1
Width (feet)
Buncombe Co., Newfound Watershed - Round Hill Branch, DSR 177
Design Parameters
Apply to Site Figure Title
X 1 BANK STABILIZATION TYPICAL SECTION
X 2 BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION
3 STREAM CHANNEL BENCH TYPICAL SECTION
4 TYPICAL J HOOK DETAIL
5 TYPICAL CROSS VANE DETAIL
X 6 SUGGESTED VEGETATION LIST
X 7 STABILIZATION PLANTING PLAN
8 BENCH PLANTING PLAN
X 9 LIVE STAKE DETAIL
X 10 DEAD STOUT STAKE DETAIL
X 11 EC FABRIC INSTALLATION DETAIL
X 12 EC FABRIC ANCHOR DETAIL
X 13 STABILIZATION CONSTRUCTION ENTRANCE DETAIL
X 14 TEMPORARY SILT FENCE DETAIL
X 15 TEMPORARY STREAM CROSSING DETAIL
X 16 LAND QUALITY STOCK PILE LAYOUT
X 17 LAND QUALITY STREAM CROSSING LAYOUT
X 18 LAND QUALITY DEBRIS REMOVAL LAYOUT
Notes and'or Measurements
A= 1.5 FT.
100 LF of Icft bank
(Downstream of Rock Toe Installation)
A= 1.5 FT.
60 LF of left bank
Note 1
EC fabric = 4.5 Ib/ft2
NOTE 1: ROCK TOE REQUIRED IN AREA ADJACENT TO WHERE LEFT BANK EROSION STARTS TO REALIGN CHANNEL
2b, 2,io4 7
Initials KSB .
Date :5(9/2005.`
Legend
A DSR Project Site
Interstate Highway
Major Road
Major Hydrography
Subwatershed
Municipality
County Boundary
63
"ode-
e`J
Soo?h ? utY, t0c
C?
Jam
Gr
?a
0
7
DSR177
Drainage Area 0.87 sq. miles
z
A
d roe?°? n
m
9,.
00,E
s
Morgan Branch
h
0 0.25 0.5 1 Miles
I , , , I Attachment 2e
N DSR 177 - Newfound Creek Watershed
ILI Buncombe County, NC
Keith Gossett - Drainage Area Map
r\u V, (nosser
PERMIT FOR EMERGENCY WATERSHED PROTECTION (EWP)
The undersigned landowners hereby grant permission to Buncombe County and the Buncombe
County Soil and Water Conservation District and/or their agents to enter upon our land for the
purpose of repairing the flood damage of stream channels and stream banks in the
- New"Ot L+" 'l watershed.
This permit includes the right to spread soil, remove and dispose of debris, install needed
measures, seed and mulch, and perform similar emergency watershed protection work
necessitated by the floods of September, 2004.
This permit also includes the right of ingress and egress on the land for the purpose of
maintaining or inspecting maintenance of the emergency works for the period of 1 year from the
date of completion. Work areas covered by this permit are sketched on the reverse of this form
or on an attached sheet.
Signed Date Signed Date
/-2? OS
Attachment 3
General Design Notes
Typical Design Drawings
Debris Removal SOP
General Notes
The Contractor shall make his own determination of the
existing subsurface conditions. In areas where proposed
construction may conflict with existing utilities, the Contractor
shall take all necessary precautions to avoid damage to the
utilities. Notify and locate all impacted utilities at least 48
hours prior to excavation. Any damage sustained to utilities
shall be repaired by or under the direction of the utility owner
at the Contractor's expense.
All existing facilities, including but not limited to sidewalks,
roads, lawns, landscape vegetation, etc., inside and outside of
construction limits that are disturbed under this contract shall
be reestablished and/or reconstructed to the original condition
at the Contractor's expense.
Construction Sequence
1. Begin work at the upstream end of the project reach.
2. Construct proposed structures according to the plans and
specifications.
3. Grade stream banks to proposed grade, and tie into
existing banks upstream and downstream.
4. Overbank areas (beyond top of bank) adjacent to the
project reach shall be graded for positive drainage toward
the stream.
5. Apply temporary stabilization to the disturbed areas at the
end of each work day.
6. Repeat steps 1 through 5 for each segment of the project
reach, working downstream.
Site Stabilization
1. Conduct soil test to confirm necessary lime and fertilizer
amendments. Appropriate lime and fertilizer shall be
applied prior to seeding and incorporated to a depth 3 to 5
inches below the surface.
2. Temporary stabilization will be applied to all disturbed
areas on a daily basis. Areas shall be seeded with rye
grass at a rate of 15 lbs./ac. and long straw or hay
mulched. Straw shall consist of thoroughly threshed wheat,
rye or oat straw, reasonably bright in color, and shall not
be musty, moldy, caked, decayed, or excessively dusty
and shall be free of noxious weed seeds.
3. Permanent soil stabilization shall be completed within 7
calendar days of initial soil disturbance or re-disturbance.
Planting and seeding shall be incorporated into the subsoil
at the rates prescribed on Figures 6, 7, and 8. Contractor
shall follow NCDWQ Guidelines for Riparian Restoration,
http://h2o.enr.state.nc.us/wrp/pdf/buffers.pdf
4. All earth fill in excess of 1 ft depth should be installed in
lifts of maximum 6-inches and mechanically compacted.
5. All rock used for bank stabilization and in-stream structures
shall be 3 ft to 4 ft angular rock.
6. Erosion Control (EC) Fabric shall be woven coir mat,
secured with dead stout stakes, and shall meet the
following standards:
50% open area (maximum)
0.5 inch maximum opening size
4.5 lbs. per sq. foot maximum sheer stress
10 fps minimum velocity
CLT/GENERAL NOTES_NF.DOC
USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO
THE RESTRICTION ON THE TITLE PAGE OF THIS PROPOSAL.
7. Filter fabric shall be Amoco Propex 2002 woven geotextile
or equivalent. Cut excess filter fabric so no fabric is visible
after installation.
8. Seeded areas not specified for coir fabric, shall be
mulched with long straw or hay mulch immediately after
seeding areas at a rate of 2 tons/acre (uniform loose depth
of 1" to 2"). Straw shall consist of thoroughly threshed
wheat, rye or oat straw, reasonably bright in color, and
shall not be musty, moldy, caked, decayed, or excessively
dusty and shall be free of noxious weed seeds. Mulch
shall be secured with biodegradable netting (Robex Super
Flow or Equal).
9. The Contractor shall be responsible for maintaining seeded
areas until 95% vegetative cover is established. Should
any seeded area fail to germinate, or washing of any areas
occur requiring re-establishment of seeding, the Contractor
shall replace any lost soil material and re-seed and
re-mulch such areas at Contractor's expense.
Standard Erosion and Sediment Control Notes
1. The Contractor shall protect all points of construction
ingress and egress by installing a temporary construction
entrance as shown in details to prevent the deposition of
materials onto public roads. All materials deposited onto
public roads shall be removed immediately.
2. The Contractor shall re-vegetate or restore access roads
(including construction entrance) to match pre-construction
conditions.
3. The Contractor shall inspect daily and maintain
continuously in an effective operating condition all erosion
and sediment control measures until such times as they
are removed with prior permission from Engineer or
agency inspector.
4. The Contractor shall protect trees and landscaping not
marked for disposal from damage. Any damage that
occurs shall be repaired at the Contractor's expense.
5. Fencing shall be maintained for animal containment. The
Contractor shall provide temporary fencing to allow for
execution of the work. The Contractor shall keep
construction equipment away from livestock and take all
precautions to prevent injury to animals.
CLT/GENERAL NOTES_NF.DOC
USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO
THE RESTRICTION ON THE TITLE PAGE OF THIS PROPOSAL
PROPOSED GF
FLOW
NOTE:
HEIGHT "A" IS MEASURED
FROM DEEPEST POINT IN
CHANNEL CROSS-SECTION
DRAWN: GMH
TITLE
FIGURE
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
BANK STABILIZATION
TYPICAL SECTION
NTS
1
EXISTING TOP OF BANK r"'^T"'^ ^^ ^r
/__ EXISTING TOP OF BANK
PROPOSED GRADE
NOTES:
1. HEIGHT "A" IS MEASURED FROM
DEEPEST POINT IN CHANNEL
CROSS-SECTION.
2. FILTER FABRIC SHALL BE AMOCO PROPEX 2002
WOVEN GEOTEXTILE OR EQUIVALENT.
LAY FILTER FABRIC UNDER TRENCH ROCK
AND UP BEHIND ROCKS. CUT EXCESS
FILTER FABRIC SO NO FABRIC IS VISIBLE
AFTER INSTALLATION. BACKFILL WITH WELL-DRAINING
SOIL (USE NATIVE MATERIAL WHENEVER POSSIBLE).
MIN. OVERLAP OF COIR OVER FILTER FABRIC OF 12".
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
H2ILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, INC 28217
TITLE
BANK STABILIZATION
WITH ROCK TOE
TYPICAL SECTION
N TS
FIGURE
2
;'
BUT
,
2' MIN. OF
EXPOSED
?
t f?? ROCK
1 ? % ?
3 MIN. ???? ROCK TOE
(NOT STEEPER) / 2' MIN. OF ROCK
EMBEDDED IN BANK
EC FABRIC
SEE FIGURE 7
BASE FLOW A
1
2
FILTER FABRIC
EXISTING STREAMBED
KEY IN ROCK TOE
ONE ROCK DIAMETER
4' MIN.
EXISTING TOP OF BANK
- x -n-?-t - .
PROPOSED GRADE
NOTES:
3 MIN.
(NOT STEEPER)
EC FABRIC
SEE FIGURE 7
1. HEIGHT "A" IS MEASURED FROM
DEEPEST POINT IN CHANNEL
CROSS-SECTION.
2. FILTER FABRIC SHALL BE AMOCO PROPEX 2002
WOVEN GEOTEXTILE OR EQUIVALENT.
LAY FILTER FABRIC UNDER TRENCH ROCK
AND UP BEHIND ROCKS. CUT EXCESS
FILTER FABRIC SO NO FABRIC IS VISIBLE
AFTER INSTALLATION. BACKFILL WITH WELL-DRAINING
SOIL (USE NATIVE MATERIAL WHENEVER POSSIBLE).
MIN. OVERLAP OF COIR OVER FILTER FABRIC OF 12".
U
EXISTING GRADE
GRADE TO DRAIN
(1% MAX.) i
I FILL
STREAM CHANNEL BENCH
EXISTING STREAMBED `
FILTER FABRIC
KEY IN ROCK TOE
ONE ROCK DIAMETER
4' MIN.
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH2 HILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
TITLE
2
71
STREAM CHANNEL
BENCH
TYPICAL SECTION
NTS
T
BASE FLOW A
FIGURE
3
BANKFULL ELEVATION
09
FLOW
DIRECTION ll?
x.11
CROSS SECTION VIEW
-II, le jlll
BOULDERS
BOULDER
FOOTER J
PROFILE VIEW
NOTES:
1. BOULDER SIZE IS C MINIMUM OR AS
SPECIFIED ON PLANS.
FOOTER
BANKFULL ELEVATION
CHANNEL BED
GAPS
(1/4-1/3 ROCK DIA.)
O?(a 2
M.
1
SCOUR POOL I
PLAN VIEW
W
SOURCE: APPLIED ECOLOGICAL SERVICES. INC
TITLE FIGURE
2. WRAP FILTER FABRIC AROUND FOOTER STONES
AND 13ACKFILL WITH TYPE 3 RIPRAP OR EQUIVALENT
(ON SITE COBBLE WHEN AVAILABLE).
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
TYPICAL J HOOK DETAIL
4
NOT TO SCALE
-.1 5'MIN. BANKFULL WIDTH
..-.
---v ..... ......
BOULDERS
BANKFULL
'ELEVnTiOrv ? -
- 1
5'MIN. J
CROSS SECTION VIEW
BANKFULL ELEVATION
FLOW
2-77 DIRECTION
r-BOULDERS /-CHANNEL BED
? ?= POQL
F
PROFILE VIEW
NOTES:
1. BOULDER SIZE IS 4' MINIMUM OR AS
SPECIFIED ON PLANS.
2. WRAP FILTER FABRIC AROUND FOOTER STONES
AND BACKFILL WITH TYPE 3 RIPRAP OR EQUIVALENT
(ON SITE COBBLE WHEN AVAILABLE).
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH21l HIL®L
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
FLOW
J DIRECTION j
Y Y
Q Q
m m
20'
2
213 W
1 O
SCOUR POOL
PLAN VIEW
ERS
TRENCHED IN 3' MIN.
AND COVERED
SILL MUST BE TIED IN TO
BANKFULL ELEVATION
SOURCE: APPLIED ECOLOGICAL SERVICES, INC
TITLE FIGURE
TYPICAL CROSS VANE
DETAIL 5
NOT TO SCALE
iMountaIn Reglon Suggested Vegetation List I
l I I l i 1
TREES S P F SMALL TREES/SHRUBS S P F HERBACEOUS VEGETATION FOR SEED MIX
Betula lenta
cherry birch
x
x Alnus serrulata
tag alder
x
x
x Arisaema triphyllum
jack-in-the-pulpit Scirpus validus
soft stem bulrush
Betula nigra
river birch
x
x Amelanchierarborea
serviceberry
x
x Asclepias incarnata
swamp milkweed Sparganium americanum
bur-reed
Carya cordiformis
bitternut hickory
x
x
x Aronia arbutifolia
red chokeberry
x
x Carex crinata
fringed sedge Thelypteris palustris
marsh fern
Carya ovata
shagbark hickory
x
x
x Asimina triloba
common pawpaw
x
x Carex intumescens
bladder sedge Uniola latifolia
river oats
Diospyros virginiana
persimmon
x
x
x Calycanthus floridus
sweet-shrub
x
x Carex lupulina
hop sedge Vernonia noveboracensh
ironweed
Fraxinus pennsylvanica
green ash
x
x Carpinus caroliniana
ironwood
x
x Carex lurida
lurid sedge Leersia oryzoides
rice cutgrass
Halesia caroliniana
silverbell
x
x Cornus alternifolia
alternate leaf dogwood
x
x Carex scoparia
broom sedge Lobelia cardinalis
cardinal flower
Nyssa sylvatica
blackgum
x
x
x Cornus amomum
silky dogwood
x
x Carex stricta
tussock sedge Lobelia siphilitica
great blue lobelia
Platanus occidentalis
sycamore
x
x Corylus americana hazel-
nut
x
x Carex vulpinoidea
fox sedge Ludwigia alternifolia
bushy seedbox
Prunus serotina
black cherry
x
x
x Hamamelis virginiana
witch-hazel
x
x Chelone glabra
turtlehead Panicum virgatum
switchgrass
Salix nigra
black willow
x
x Ilex verticillata
winter berry
x
x
x Cyperus strigosus
umbrella sedge Polygonum sagittatum
tearthumb
Tilia heterophylla
white basswood
x
x Leucothoe axillaris
doghobble
x Elymus hystrix
bottlebrush grass Scirpus atrovirens
green bulrush
Lindera benzoin Eupatorium fistulosum Scirpus cyperinus
S =Shade 1 spicebush x Joe-pye-weed woolgrass
P = Partial Sun
- 1 Lyonia ligustrina x Eupatorium perfoliatum Juncus effusus
F = Full
Sun I I Lyonia ligustrina boneset soft rush
Magnolia tripetala
umbrella tree x Impatiens capensis
jewel-weed
I ( Physocarpus opulifolius
ninebark
x
x
x
?? Rhododendron
periclymenoides
- - - -
-
-
1 - wild azalea x x
Rhododendron viscosum _
-
swamp azalea x x
Rosa palustris
swamp rose x x
I Salix sericea
- I silky willow x x I _
_- - -_ -? -_ Spirea latifolia - --- - I _-_
meadowsweet x i
I Symplocos tinctoria
-- -_
I sweet leaf x x
J Viburnum cassinoides
W ithe-rod x x x
j Xanthorhiza simplicissima
yellow-root
x
i
- ---
I
- - - -
-T - I
TITLE
SUGGESTED VEGETATION LIST DRAWN: GMH
DATE; MANAGER: 5JMO
/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217 FIGURE
6
ZONE2 I ZONE1
APPRox.
WIDTH Or CHANNEL
T
LIVE STARE ZONE
TO EDGE OF WATER
PLANTING WIDTH WILL VARY TO
LANDOWNER COMPLIANCE AND
PROJECT SPECIFICATIONS.
EXISTING SURFACE
ELEVATION
ZONE I ZONE 2
SYMBOL HERBACEOUS SEEDING DESCRIPTION SYMBOL WOODY VEGETATION DESCRIPTION
NATIVE TREE AND SHRUB SPECIES TO BE PLANTED AT
-TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS A DENSITY OF 436 TREES/ACRE, WHICH IS
AT 15 LBS/ACRE SEEDING RATE. SUFFICIENT TO PROVIDE 320 TREES/ACRE
-FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH
A NATIVE, PERMANENT GRASS/HERB MIXTURE AT
15-20 LBS/ACRE SEEDING RATE.
® AT MATURITY. FOLLOW NCDWQ GUIDELINES
FOR RIPARIAN BUFFER RESTORATION.
-SHRUB SPECIES INCLUDE BUT ARE NOT LIMITED TO:
-HERB/GRASS SPECIES INCLUDE BUT ARE NOT LIMITED TO: Alnus serratula, Cephalanthus occidentalls,
Agrostis alba
Carex spp.
Dactylis glomerate Cornus stricta, Rhododendron maximum, salix
,
,
,
Panicum spp., Pennisetum g/aucum, Secale ceroale, serecla, Sambucus canadensts, etc.
-TREE SPECIES INCLUDE BUT ARE NOT LIMITED TO:
ETC.
LIVE STAKES TO INCLUDE Cornus spA and Acerspp., Betula spp., Fraxinus spp., Juglands
Sallx serica Nigra, Ltriodendron Tullpitera., Pinus strobus.,
LIVE STAKES SPACED ON 2' CENTERS Platanus occldentalis., Robinia Pseudoacacia., etc.
-TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS.
-FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH
A NATIVE, PERMANENT GRASS/HERB MIXTURE AT
15-20 LBS/ACRE SEEDING RATE.
AT LEAST 3 SPECIES OF TREES AND 5 SPECIES OF
•Nnrrc• SHRUBS SHOULD BE USED.
-TREE/SHRUB/GRASS SPECIES LISTED ARE SUBJECT TO CHANGE DUE TO AVAILABILITY FROM LOCAL NURSERIES AND
FORESTRY SUPPLY STATIONS.
SUBSTITUTION MUST BE APPROVED BY ENGINEER.
SOURCE: ALTAMONT ENVIRONMENTAL, INC.
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
C3l"H2MHlLL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
\or?`
EXISTING STREAMBED
TITLE
STABILIZATION
PLANTING PLAN
FIGURE
7
APPROX.
WIDTH OF CHANNEL
S'
LIVE STAKE ZONE
TO EDGE OF WATER
PUNTING WIDTH WILL VARY TO
LANDOWNER COMPLIANCE AND
PROJECT SPECIFICATIONS.
ZONE I ZONE 2
SYMBOL HERBACEOUS SEEDING DESCRIPTION SYMBOL WOODY VEGETATION DESCRIPTION
NATIVE TREE AND SHRUB SPECIES TO BE PLANTED AT
-TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS A DENSITY OF 436 TREES/ACRE, WHICH
AT 15 LBS/ACRE SEEDING RATE. SUFFICIENT TO PROVIDE 320 TREES/ACRE
-FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH
A NATIVE
PERMANENT GRASS/HERB MIXTURE AT AT MATURITY. FOLLOW NCDWQ GUIDELINES
FOR RIPARIAN BUFFER RESTORATION.
,
15-20 LBS/ACRE SEEDING RATE ® -SHRUB SPECIES INCLUDE BUT ARE NOT LIMITED TO:
.
-HERB/GRASS SPECIES INCLUDE BUT ARE NOT LIMITED TO Alnus serratula, Cepha/anthus occidental/s,
:
Carex spp
Agrostis alba
Dactylis glomerata Comus stricta, Rhododendron maximum, salix
,
.,
, serecla, Sambucus canadensis, etc.
Panicum spp., Pennisetum glaucum, Seca/e cereale, -TREE SPECIES INCLUDE BUT ARE NOT LIMITED TO:
ETC.
LIVE STAKES TO INCLUDE Comus spp. and Acerspp., Betula spp., Fraxinus app., Juglands
Salix serica Nigra, Urlodendron Tulipifera., Pinus strobus.,
LIVE STAKES SPACED ON 2' CENTERS Platanus occidenWis., Robinia Pseudoacacla., etc.
-TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS.
-FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH
A NATIVE, PERMANENT GRASS/HERB MIXTURE AT
15-20 LBS/ACRE SEEDING RATE.
AT LEAST 3 SPECIES OF TREES AND 5 SPECIES OF
SHRUBS SHOULD BE USED.
'NOTES:
-TREE/SHRUB/GRASS SPECIES LISTED ARE SUBJECT TO CHANGE DUE TO AVAILABILITY FROM LOCAL NURSERIES AND
FORESTRY SUPPLY STATIONS.
PLANT ZONE I TO EDGE OF WATER
SUBTITUTION MUST BE APPROVED BY ENGINEER
SOURCE: ALTAMONT ENVIRONMENTAL, INC.
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
H HILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
SEFLOW
'<Z14
EXISTING STREAMBED J
TITLE I FIGURE
BENCH
PLANTING PLAN I 8
EC FABRIC
2' MAX
SPACING
0 .
4
30" LIVE CUTTING
(DORMANT) - TYP
DEAD STOUT STAKE
TYP, SEE FIGURE 10
NOTE:
INSTALL LIVE STAKE SO
2/3 LENGTH IS (MIN. 20")
BELOW GROUND
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CHZMHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
NTS
ESTABLISHED PLANT SHOWN
FOR INFORMATION ONLY
GROUND
TITLE
LIVE STAKE DETAIL
FIGURE
9
NOTES:
18" STANDARD (30" IF
USED AT TOE OF SLOPE)
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
1. DEAD STOUT STAKES SHALL BE FASHIONED FROM
UNTREATED 2" BY 4" (NOMINAL) BOARDS.
2. DEAD STOUT STAKES TO BE USED IN LIEU OF METAL
OR OTHER STAPLES OR FASTENERS FOR SECURING
EC FABRIC IN PLACE.
3. THE CONTRACTOR MAY USE'ECOSTAKE" 12" LENGTH
OR APPROVED EQUAL IN LIEU OF DEAD STOUT STAKES
FOR INSTALLATION IN THE CENTER OF THE EC FABRIC
"FIELD".
4. INSTALL EC FABRIC PER MANUFACTURER'S
INSTRUCTIONS.
TITLE
DEAD STOUT STAKE
DETAIL
NTS
FIGURE
10
SOIL BIOENGINEERING
DEAD STOU
TIE TO TYPICAL SECTION
NOTES:
1. INSTALL ON ALL CUT AND FILL SLOPES
AND NEAR BANK DISTURBED AREAS.
2. INSTALL PER MANUFACTURER'S
INSTRUCTIONS.
3. EC FABRIC SHALL BE WOVEN COIR
MAT WITH 50% OPEN AREA (max.), 0.5 INCH
MAX. OPENING SIZE, 4.5Ibs/sq. ft. MAX.
SHEER STRESS, 10 fps MIN. VELOCITY.
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
OF BANK ANC OR, TYP
SEE FIGURE 12
TITLE
JNO, TYP
'P.
EC FABRIC INSTALLATION
DETAIL
NTS
FIGURE
11
=:\CAD\NRCS\Cad-Details\Fig11.dwg, 05/12/2005 03:52:00 PM, PDF995 (temporary).pc3
OF BANK
EC FABRIC
BASE FLOW
DEAD SEE P GUREE 10 --- OR STREAM BOTTOM
MAT WRAPS OVER
TOP OF STAKE Q TOE
TOP OF BANK ANCHOR
NOTES:
1. CLEAN SOIL BACKFILL SHALL BE USED TO SECURE DEAD STOUT STAKES AND
FABRIC INTO THE SOIL
2. FOR TOE OF SLOPE APPLICATIONS, FABRIC SHALL BE INSTALLED AS TO
OVERLAP TRENCH 6 DEAD STOUT STAKE TO POSITION THE FABRIC FOR
INSTALLATION UP THE BANKS.
3. START INSTALLATION OF EC FABRIC AT TOE OF SLOPE. WRAP FABRIC
OVER TOE OF BANK ANCHOR AND PROCEED UP THE BANK TO THE
TOP OF BANK ANCHOR.
4. FOR END OF GRADING APPLICATIONS, FABRIC SHALL BE INSTALLED
PERPENDICULAR TO BANK AND ANCHORED PERTOP OF BANK DETAIL,
WITH THE EXCEPTION THAT FABRIC DOES NOT EXTEND OUTSIDE OF
TRENCH 6 FABRIC IS NOT EXPOSED.
TOE OF BANK ANCHOR
DRAWN: GMH I TITLE I FIGURE
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
NTS
EC FABRIC ANCHOR
DETAIL 12
50' MIN.
PUBLIC STREET
EXISTING GROUND Z
i
o
SOIL STABILIZATION FABRIC
UNDER 2"•3" WASHED STONE
50' MIN.'
p
UJI
OR AS SPECIFIED ccl
F
ON PLAN SHEETS
y
U
J
CD
A"
CL
NOTES:
1. A STABILIZED ENTRANCE PAD OF 2" - 3' WASHED STONE OR RAILROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL
ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET.
2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE MAY BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE.
3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO
PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS
CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
4. ANY SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY.
5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN
WASHING IS REQUIRED, R SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE.
DRAWN: GMH TITLE FIGURE
PROJ. MANAGER: JMO
DATE: 5/2005
STABILIZED CONSTRUCTION
CH2MHIL
L ENTRANCE DETAIL
.
v 13
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217 N.T.S.
A _
B
STEEL POST I 8' MAX.
WIRE FENCING
WOVEN FILTER FABRIC
N
A
e
• STEEL POST
WIRE FENCING
i FILTER FABRIC
ME
W U
J_ K
n 6" ?y
FT '
ANCHOR SKIRT 6' MINIMUM
IN LIEU OF BURYING SKIRT, 6. OF
/5 WASHED STONE MAY BE USED
OVER TURNDOWN. SEE SECTION B-B.
SECTION A-A
STEEL POST
GENERAL NOTES:
1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32' IN WIDTH AND
SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING.
2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN
FOR A PERIOD OF MORE THAN 14 DAYS.
3. STEEL POSTS SHALL BE 5'-0' IN HEIGHT AND BE OF THE
SELF-FASTENER ANGLE STEEL TYPE.
4. WIRE FENCING SHALL BE AT LEAST #10 GAGE WITH A MINIMUM OF
6 LINE WIRES WITH 12' STAY SPACING.
5. TURN SILT FENCE UP SLOPE AT ENDS.
6. WIRE MESH SHALL BE MIN. 13 GAGE WITH MAXIMUM 12' OPENINGS.
7. WIRE AND WASHED STONE WILL BE REQUIRED WHEN:
AT TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE)
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
MAINTENANCE NOTES:
1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY
RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH
RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL.
ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY.
2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END
OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE
FABRIC SHALL BE REPLACED PROMPTLY.
3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX.
HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN
PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM
TO THE EXISTING GRADE, PREPARED AND SEEDED.
4. REMOVE SILT FENCE 1 YEAR PAST CONSTRUCTION.
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
N.T.S.
TITLE
TEMPORARY SILT
FENCE DETAIL
WIRE FENCING
FIGURE
14
z FILTER FABRIC
w u WASHED STONE
?T
ANCHOR SKIRT
6" MINIMUM
SECTION 8-8
5' MAX.
BANK HEIGHT
/ STREAM CHANNEL
J
SURFACE FLOW
DIVERSION
1. USE #57 WASHED STONE
2. OMIT #57 WASHED STONE ON
CHANNEL BOTTOM IF CROSSING
A COBBLED BED STREAM.
STONE OVER
FILTER FABRIC
(SEE NOTE 2)
STONE APPROACH SECTION
5:1 MAX. SLOPE ON ROAD
ORIGINAL STREAMBANK
r
STONE OVER '
FILTER FABRIC
6" MIN
r "
TEMPORARY ACCESS
AS SPECIFIED BY
ENGINEER
FILTER FABRIC
3. REMOVE STONE AND FILTER
FABRIC AFTER CONSTRUCTION
AND TIE INTO EXISTING GRADE.
VEGETATE SITE ACCORDING TO
PLANTING PLAN.
DRAWN: GMH TITLE FIGURE
PROJ. MANAGER: JMO
DATE: 5/2005 TEMPORARY STREAM
CH2MHILL CROSSING DETAIL 15
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217 NTS
Vsrm TIER® No- 937 811 E
Engineer's Computation Pad
/<aad
,
i 4-,C?f
L Wc%.5 yr ,
Sto br ?eC/
Co,lsti..o,,;.,
n i-ebAee-
? 5 ?OLIG?;Jr?L°.
50!
t
t
r 1
.
1
Co.ts???y? ?a{ci'' ?a rs as
neGe s54-y 7`-o d -Orx r4i no
FI-1-7 ?/ouJ roa% See
• /"?^'o ti. o% S?e?i ?i'Le? AcGe.s S /bc7 % .
.??r't?Q•?1 r J eG ?-G•n?0/7wr y s' fiBit.?7
K es ? YG s' J?i'ca ..r ?4r1??/G? G/>of Uk T'1' Pr-
r In/?On Co?+`r1?C?.?? O r ?oNJG,/.
,
Stub;I:sA?/ F??l " s` 13h frer.
N07- to SSG/L
Source: NC Land Quality Section Figure 16
4/trlur
i)aT4Em.ILER® No. 937 811 E
Engineer's Computation Pad
50' -
5A, fl2eer
Co,JsJFrK
Ei? Jt/o..ce-
? ?f/0J0[? /- IAin
! !t L° K1Ofiti
l
/'?a w ? /QdG [?
AO/
?IC6
/QreeY
_ Orr r//e de&;.5 re-yova l
/'.°54411J 1/7 Q ?o5s p 7C
i A/'ocrnc? eover'? ss?;..•+?..ICgf%nM
1 /vrO ?I p1,C rd ?i'4 / CG/ 7?nG
t S7,-eam
GI+ 0/x? r rG??
Arrr
( iS G? ?1ti? ?K? ST/?iM
41
i Lt!/j ](/.,'+,,f
`7C-,geIS SAC.W,-P Ze 1I 1 / eG?
/ rloOa /"Ian=? .OBdr,S Ot,./ aT" 6 c. ei' h??i?°Nfvei'
? ? u 3 R Se6vr? O?l?'b^
/ ??;s?k,-Gto? vireos ?.:fkt•i 7`k
Source: NC Land Quality Section Figure 17 4?? r??
VsrAFDT FR® No. 937 811 E
Engineer's Computation Pad
CGtiJ7?Mc??oi
` ? L?PTe/
i { 13-1-
/7eGC5sGi,
Tl'0 r11 A4,.] /^D4lr SCe-
/'C I?jrJR? fJ7'? K/G,f .C/j v?•'f•?4/? d/GTGr
! /fro .., ?e /^ S ?p ?; J: _? e 9 ?..:/?..• r:. ?'`.
? Z $irr+ililr ?o !.U,.137?r...?'`r•V? ?..J?/c..?C.
r ? /•?•S/O?? .?i ?/e.•'vrt ,(?G.1? GAG( ??I`7'?M
44
r- 0
t
re•s,a?? J
? r
11 eect f
t
r
O?Jei.?G
ova o 6Q-?k d'pr:5/AZ r j??f 69Nr?,?i,r?/'?i?il BSI ;g&,4 ffe,Zo19C
IC 13 a ?? - - - -- --- - - - - - -
-,4GQ ?- Sf/'CaM
?? - .._ - J ? L.. .. - .? - .._ rte.-__-• - ? .-. .
/Vb? ?n 5Cale-
Source: NC Land Quality Section Figure 18
4f.slos
Organic Debris Removal
Standard Operation Procedures (SOP)
Emergency Watershed Protection (EWP) Stream Repair Projects
Buncombe County, North Carolina
SCOPE OF WORK
The work shall consist of the cleanup of designated stream areas by the removal and
disposal of trees, logs, stumps, brush, tops, rubbish, and other debris deposited in the
stream channel and floodplain by the storms of September 8 and 16, 2004.
CLEARING AND DEBRIS REMOVAL
Debris removal crews shall remove only that material which has been clearly marked by a
representative of Buncombe County and/or CH2M HILL, INC (Representative) as indicated
by flagging and/or orange/red spray paint. ONLY marked debris is to be removed.
Representative cannot authorize additional work. Any work that will result in an increase in
cost must be submitted to CH2M HILL for approval prior to starting such work. In the event
that the contractor uses on-site chipping, the chipper may follow the clean-up crew along the
length of the project reach. The Contractor is responsible to properly dispose of chips.
Proper disposal may include spreading on site or removing off-site. On-site disposal requires
written approval by the property owner. Unless specifically requested to leave the chips in a
pile by a property owner the chipper shall make reasonable efforts to spread the chips as
chipping progresses.
Chippers and other heavy equipment will be staged and used at least 30-feet from the top of
the streambank or on existing paved or graveled areas prepared in accordance with standard
details described in Figure 18 (see Typical Design Drawings).
Repair of any property damage resulting from debris removal is the sole responsibility of the
Contractor.
All debris removal shall be within the included sites as identified in this solicitation and as
directed by the Representative. For bid preparation purposes, the Representative has
marked and identified debris to be removed. Removed debris shall be placed only in
those areas as directed by the Representative. For Bid purposes, debris staging areas are
assumed to be within 300 feet of top of bank. On-site burning is not allowed. Fallen
trees, limbs and dislodged brush within the cross section of the existing or original
channel up to and including the debris line of the subject storm shall be removed. Any
foreign (man-made) debris washed in from upstream, shall be removed. Marked trees
severely undercut by stream bank erosion and trees severely leaning over the channel
whose near term fall is apparent shall be removed.
In general, Contractor clearing will be limited to the cutting of severely damaged trees
leaning across the channel, and other trees as needed to gain access for equipment to points
of channel blockage.
P:\BuncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attachments\Design
Attachments\Buncombe Debris Removal SOP.doc
Disturbance of the channel bottom and banks, and equipment access areas shall be held
to the minimum necessary to allow the construction equipment to remove the debris and
shall be consistent with all state and federal permits. All areas disturbed due to debris
removal or equipment access shall be reshaped and reseeded in accordance with
standard details described in Figures 7-18 (see Typical Design Drawings).
Access to the channel will generally be perpendicular to the channel so cutting of trees is
held to a minimum with precaution taken to protect mast producing and stream canopy
trees. Un-marked dead trees that provide den habitat and are determined to pose no
hazard to the channel shall be protected. As such, the contractor will only remove marked
debris. The contractor will exercise care in the areas of existing crops to minimize
damages.
PROVIDED EQUIPMENT & FACILITIES
The Contractor shall provide adequate sanitary facilities for equipment operators and
work crews. Portable facilities shall be provided at the worksite and arrangements made
for proper servicing. A portable facility will be provided within 1,000 feet of the
equipment and/or work crews at all times.
COMMUNICATIONS
Each mechanized piece of equipment and each work crew shall be equipped with a two
way, battery operated radio. Radios shall be FM, have a minimum range of 5 miles.
Radios shall be maintained "on" and in the receive mode at all times while the operator is
at the site. Batteries shall be recharged overnight or as needed. An extra set of fully
charged batteries shall be maintained on board the equipment at all times. Radios shall
be equipped with clip-on hand mikes or headsets. Radios shall be maintained in goad
operating condition and equipment operators shall be knowledgeable in the use and care
of the radios. Each Contractor site supervisor shall also maintain a secondary
communication system compatible with the Representative's system.
Brush Removal Guidelines
• Small diameter brush and limbs (less than four inches in diameter) that will not
cause damage if remobilized by high water will be cut into short lengths (five feet
long or less) and left in place.
All marked, dislodged or uprooted larger diameter brush will be removed from
the channel or streambank and chipped in designated areas greater than 30-feet
from the top of the bank.
• Saplings and shrubs with an intact root system are not to be removed.
P:\BuncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attachments\Design
Attachments\Buncombe Debris Removal SOP.doc
Tree Removal Guidelines
• Trees will be chipped in designated areas greater than 30-feet from the top of the
streambank. Chippers and/or tub grinders may be staged on-site with written
consent from the property owner or at a central location approved by the County.
• Larger diameter trees may be pulled to the chipper using a mechanized winch
provided the process does not create excess disturbance to the streambank.
• Marked trees whose near term fall is apparent should be cut at the marked
location, which will be indicated by a painted ring around the trunk at least three-
feet above the ground surface. The root system shall not be removed from the
streambank.
• As approved by the Representative, larger diameter trees that cannot be moved
using hand equipment will be cut to manageable lengths and removed.
• The sale of chips or firewood is not allowed.
Foreign Debris and Trash Removal Guidelines
• Foreign (manmade) debris and trash will be bagged in orange trash bags where
possible.
• Filled trash bags will be removed from the channel and transported directly
offsite by the Contractor to a local landfill.
• Large debris must be loaded into a dump truck or roll-off container and
transported to a local landfill for disposal.
• Tipping fees for disposal shall be paid by the Contractor.
Stream bed and Bank Repair Guidelines
• All temporary stream crossings shall be installed as described in Figures 15 -18
(see Typical Design Drawings).
• All Stream embankments disturbed by Contractor activities, denuded, or left bare
as a result of debris removal shall be regraded, planted, and erosion control fabric
installed as described in Figures 6, 7, and 9 -12 (see Typical Design Drawings).
Temporary staging, chipping, and work access points shall be regraded and
grassed using a native grass/herb mix as outlined in Figures 6, 7, and 16 - 18 (see
Typical Design Drawings).
P:\BuncombeCountyNc\328275\Permits\Newfound PCNsTinal PCNs and Attach ments\Design
Attach ments\Buncombe Debris Removal SOP.doc
• Contractor shall install erosion control measures as outlined in Figures 10-18.
SUPERINTENDENCE OF EQUIPMENT AND WORK CREWS
Any contractor providing three (3) or more pieces of equipment or five (5) or more work
crew or equipment operators shall provide a non-working crew superintendent in
addition to the required laborers and operators. The contractor shall designate in writing
the names of the crew superintendent and an alternate prior to award of the contract. The
crew superintendent shall provide on-site supervision of work crews and equipment
operators. The crew superintendent shall be responsible for the safety of work crews and
for the location and servicing of portable sanitary facilities. He/she shall be equipped
with a portable communication as specified above.
The crew superintendent shall communicate with the Representative to assure that work
crews and equipment are performing at a satisfactory level. The crew Superintendent
shall coordinate with the Representative to schedule equipment and operators for each
days work and as far in advance as possible. The superintendent shall be responsible for
keeping up with the daily operating times of all work crews and equipment and shall
maintain a log of daily equipment and work crew operations. He/she shall coordinate
daily with the Representative to concur on actual footage of streambank cleared.
WORK DIRECTION
Contractors and equipment operators will not perform activities requested or instructed
by landowners or others at the worksite, except as confirmed by the assigned
Representative.
ENVIRONMENTAL CONSIDERATIONS
Earth moving equipment will cross and operate in the stream flow only when necessary
and only when directed to do so by the Representative. Equipment shall be maintained
to prevent fuel, oil and lubricant spills in the vicinity of the stream. Refueling, repairs
and lubrication will be performed at safe distances from the stream and only at locations
approved by the Representative.
Should fuel leaks, oil leakages or hydraulic pipe rupture occur during construction, the
operators will immediately remove the equipment to a "safe" area and proceed with
repairs. The Representative will direct operators to remove equipment from the stream
whenever a leak is observed or suspected.
PABuncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attachments\Design
Attachments\Buncombe Debris Removal SOP.doc
SAFETY
Contractor shall be responsible for the safe execution of this work and conform to all
applicable state and federal regulations. Additionally, at work sites, where equipment
will be operating on public roads, flagmen shall be stationed to warn oncoming traffic of
congestion, construction road signs shall be in place and a means of removing sediment,
mud or rocks from roadways shall be established. Residue deposited on roadways may
be removed by sweep machine, manual sweeping methods or pressurized water. The
contractor will be responsible for the implementation of these measures.
Chain saw operators will be expected to perform debris removal operations during
periods of extreme weather conditions and in areas of deep and fast moving water. The
contractor is responsible for providing the necessary equipment, clothing and other gear
to insure that laborers can perform effectively and safely under these conditions. The
Contractor shall determine if working conditions are hazardous and/or of sufficient
extreme to prevent efficient and effective operation. When such conditions exist, the
Contractor shall shut down work crews until conditions improve.
EQUIPMENT
Equipment selection to complete the work is the Contractor's responsibility. The
following list of equipment has been utilized on similar debris removal projects and is
provided as a courtesy to the Contractor. This is not a requirement.
Item No.1
Hydraulic Track Mounted Excavator with Experienced Operator
Min. Weight 48,000 lbs
Min. Reach 26 feet
Min. Digging depth 22 feet
Equipped with thumb
Min. Bucket size 1.0 cu yds.
Equipped with two-way radio
Min Horse Power 140 HP
Item No. 2
Skidder with Experienced Operator and Two Helpers
Rubber Tired with Winch and Blade
Min Horse Power 80HP
Min. Winch Cable Wire Rope -150 ft and 5/8 inch diameter
Min Chokers: 4 with 2 Chain saws
Min. 20-inch bars with daily supply of sharpened chains (min. 3 chains)
Equipped with two-way radio
Item No. 3
Dump Truck with Experienced Driver
Rear dump haul truck tandem axle min. Capacity -15 tons equipped with
two-way radio
PABuncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attachments\Design
Attachments\Buncombe Debris Removal SOP.doc
Item No. 4
Chipper
14-inch capacity
Tub Grinder
8-foot interior tub diameter
PABuncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attachments\Design
Attachments\Buncombe Debris Removal SOP.doc
R@MWE
Office Use Only:
MAY 2 7 2005
Form Version May 2002
USACE Action ID No.
DW N?JRA,WATERPQUALITY
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
Owner/Applicant Information
Name: John Creighton /Assistant County Manager/Planning Director
Mailing Address: 46 Valley Street
Asheville, NC 28801
Telephone Number: 828-250-4835 Fax Number:
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Mike Osborne
Company Affiliation: CH2M HILL
Mailing Address: 4824 Parkway Plaza Blvd.
Suite 200
Charlotte, NC 28217
Telephone Number: 704-329-0073 ext 252 Fax Number: 704-329-0141
E-mail Address: mike.osbome@ch2m.com
Page Iof II
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Round Hill Branch EWP 2005-92. EWP 2005-177
2. T.I.P. Project Number or State Project Number (NCDOT Only): NA
3. Property Identification Number (Tax PIN): SEE TABLE 1
4. Location
County: Buncombe Nearest Town: Leicester
Subdivision name (include phase/lot number): NA
Directions to site (include road numbers, landmarks, etc.):
From I-240, Exit 3 onto US-74 ALT West/US-19 South/US-23 South for approximately 1.5
miles. Turn Right on North Carolina Highway 63 - New Leicester Highway. Stay on New
Leicester Highway for approximately 4.5 miles. Turn left on Newfound Road, proceed 3.0
miles. Turn Sharp Right onto Old Newfound Road for 0.6 miles, then turn left onto Rabbit
Ham Road. The site EWP 2005-92 is located near the intersection of Rabbit Ham Road and
Green Valley Road. The site EWP 2005-177 is located on Green Valley Road (left from
Rabbit Ham Road).
See Attachments 1 and 2 for site vicinity and parcel locations.
5. Site coordinates, if available (UTM or Lat/Long): SEE SITE DESCRIPTIONS
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): SEE TABLE 1
7. Nearest body of water (stream/river/sound/ocean/lake): Round Hill Branch
Page 2 of 11
8. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://l12o.enr.state.nc.us/admin/maps/.)
Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application:
The proposed site consists of light residential and agricultural uses. The stream and stream
banks were heavily impacted during Tropical Storms Frances and Ivan. Extensive stream
bank erosion threatens the stability of existing structures.
9. Describe the overall project in detail, including the type of equipment to be used:
This project area includes approximately 510 linear feet of Round Hill Branch in the vicinity
of Rabbit Ham Road and Green Valley Road. High-water flows have severely eroded the
banks (see Exhibit 2). In this section of branch several properties are threatened by these
conditions. Repairs in this reach of stream will involve the following:
-Stabilize the channel in its post flood configuration using organic and rock structure
-Reseeding and planting woody vegetation
EWP 2005-92
This project area includes approximately 350 linear feet of the Round Hill Branch near. The
project area is located at 35°38' 15.2"N 82°42'33.2"W. High-water flows have severely
eroded the right bank. In this section of branch the resulting severe streambank erosion and
scour have threatened pastureland. Attachment 1 contains representative photos of the eroded
area.
Repairs in this reach of stream will involve the following:
- Stabilize the channel in its post flood configuration using organic and rock structure
- Reseeding and planting woody vegetation
EWP 2005-177
This project area includes approximately 160 linear feet of the Round Hill Branch. The
project area is located at 35°37'39.9"N 82°43'43.4"W. High-water flows have severely
eroded the left bank. In this section of branch the resulting severe streambank erosion and
scour have threatened pastureland near property access and Green Valley Road. Attachment
2 contains representative photos of the eroded area.
Repairs in this reach of stream will involve the following:
- Stabilize the channel in its post flood configuration using organic and rock structure
- Reseeding and planting woody vegetation
The techniques that will be utilized for the proposed repairs at the EWP site listed
above are described below.
Page 3 of 11
Streambank Repair
When possible, excavation equipment will access streambank repair areas from the dry and
will not track into the stream channel. Most of the steep eroded streambanks are opposite or
adjacent to the debris removal areas. At these areas, the rocky material removed from the
floodplain will be used to stabilize the stream bank, with the addition of large boulders along
the toe of the slope as necessary to stabilize and protect the toe. Where suitable material is
available, rock vane and root wads will be installed in the restored bank section to reduce
bank stress and provide stability to the unconsolidated fill.
An existing cross section and site specific design components are included in Attachments 1
and 2 for each of the impacted channel sections requiring stabilization. Drainage areas of
project areas are also included in those attachments. The drainage area is used to determine
the design storm (10-year or 25-year for trout streams) peak flow using USGS Rural
Regression equations for the Blue Ridge-Piedmont. Design storm velocity and shear stress
values were also calculated. This information, in conjunction with the field investigation
analysis, DSR notations, and agency guidance and regulations, are used to develop an
appropriate streambank stabilization design. Additional information on general design
features, erosion control practices and debris removal practices is included in Attachment 3.
Equipment that may be used to accomplish the above listed tasks includes; rubber tired
skidders, 15 ton dump truck, hydraulic track mounted excavator with thumb, and chainsaws.
10. Explain the purpose of the proposed work:
The work addressed in this application is intended to improve post flood hydraulic capacity
of the stream reaches discussed and stabilize severely eroded streambanks that are
threatening structures or other property. The proposed actions are not intended to enhance
existing conditions or restore stream reaches using natural channel design techniques. Such
activities would require detailed engineering evaluation and design, which are beyond the
intent of the EWP program.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
NA
Page 4 of 11
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
NO
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts:
Proposed impacts include limited streambed disturbances, debris removal, and streambank
stabilization.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http:/hvww.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: None
Total area of wetland impact proposed: NA
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact Length of Average Width Perennial or
Site Number Type of Impact* Impact Stream Name** of Stream Before Intermittent'.
Page 5 of 11
(indicate on ma) (linear feet) Impact (please secif )
EWP 2005-92 Streambank 160 Round Hill Branch loft Perennial
stabilization
EWP 2005-177 Streambank 350 Round Hill Branch loft Perennial
stabilization
* List each impact separately and identify temporary impacts. Impacts include, but arc not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.tisgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.m"lp(luest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 510
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact Area of
Name Wat Type of Waterbody
Site Number Type of Impact* Impact )
(if applicable) (lake, pond, estuary, sound,
(indicate on ma) (acres) bay, ocean, etc.)
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): NA
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): NA
Size of watershed draining to pond: NA Expected pond surface area: NA
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
Page 6 of 11
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
When at all possible equipment will be kept out of the stream channel, stream crossings will be
minimized, and no excavation will be below the existing channel bed. When at all possible
stream material will be moved from dry areas to banks, minimizing the movement of wet (or
below water line) stream material. Creating wide, shallow channels will be avoided. Temporary
and/or permanent herbaceous vegetation shall be planted on all bare soil within 15 days of
ground disturbing activities. Rocky material shall not be used for bank stabilization above the
normal high water mark. Large rocky material will be brought in to stabilize the toe of impacted
streambanks where necessary.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strm?,,ide.htmi.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Page 7 of 11
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): NA
Amount of buffer mitigation requested (square feet): NA
Amount of Riparian wetland mitigation requested (acres): NA
Amount of Non-riparian wetland mitigation requested (acres): NA
Amount of Coastal wetland mitigation requested (acres): NA
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
Page 8 of 11
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 213 .0242 or.0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Imperviousness will not change.
Page 9 of 11
Erosion and sedimentation prevention and control will be maintained throughout this project
primarily through: proper water management, construction sequencing, proper staging and
stockpiling of materials, and the maintenance, at all times, of suitable channel capacity for
expected flow events. Equipment, fuels, lubricants, or other potential sources of water pollution
will not be stored in areas that could be flooded during this project.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Portable facilities shall be provided at the work site.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
NA
/applicant/Age"us SKlylif aturc I)(atc
(Agent's signature is valid o an authorization letter from the applicant is provided.)
4lvo-?r
Pagc 10 of I 1
Table 1.
DSR Map ID PIN Owner Property Owner's Address City State Zip Streambank
Number size stabilization
(acres)
EWP 2005- DSR92 8790.00-47- Janice Martin 14296 320 Green Valley Leicester NC 28748 350 ft.
92 1709.000 Buckner Trustee Road
E`VP 2005- DSR177 8790.00-16- Vera Gossett 31.31 483 Green Valley Leicester NC 28748 160 ft.
177 4821.000 Road
Page 11 of 11
Attachment 1- DSR 92
la. Vicinity Map
lb. Site Map
lc. Site Photos
Id. Cross Section and Site Specific Design Page
le. Drainage Areas
Access Agreements
North `• 1 \?' J .14 L
?. G r
?` e`111-
6 *M Q 127
2156" s' o
Alexander
?•?? ?? Sch
OM-C 27,
j 215
I .. Leicester.
Sch )
i
BM 8121•>X`- - ???'? ,r \T • BMA 121 '.•
?/ ?( ?i yh r 2125 `-' ft gM w 27V? f , •?a ?,
? s ab 2147' ? ` .
t 2090 CCb
60
r? LR 662 ?0
-p41tto,
?O
I
3Iltmort 9 f? ,? ••?
3197 I J ,?• 1 e I
a 1 1 L ?.
.Y i
Site 92 , . 2189 ., f , , s
1 J >'.
J.
633
0 1,250 2,500 5,000 Feet Attachment la
DSR 92 - Newfound Creek Watershed
Buncombe County, NC
Janica Buckner - Vicinity Map
0 CH2MHILL
Attachment lb
DSR 92 - Newfound Creek Watershed
Buncombe County, NC
Janice Buckner Parcel 1709
Attachment lc
DSR 92 - Newfound Creek Watershed
Buncombe County, NC
Janice Buckner — Photo Log
Attachment ld
DSR 92 - Newfound Creek Watershed
Buncombe County, NC
Janice Buckner existing cross section
Left Top of Bank 6
5
4
w
3 ?
a?
a?
1
0
.77
-1
Width (feet)
Right Top of Bank
Wa ter Surface
?5 4 3 5 3 0 2 0 1 1 0 4
Buncombe Co., Newfound Watershed - Round Hill Branch, DSR 92
Design Parameters
Apply to Site Figure Title
X 1 BANK STABILIZATION TYPICAL SECTION
2 BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION
3 STREAM CHANNEL BENCH TYPICAL SECTION
4 TYPICALJ HOOK DETAIL
5 TYPICAL CROSS VANE DETAIL
X 6 SUGGESTED VEGETATION LIST
X 7 STABILIZATION PLANTING PLAN
8 BENCH PLANTING PLAN
X 9 LIVE STAKE DETAIL
X 10 DEAD STOUT STAKE DETAIL
X 11 EC FABRIC INSTALLATION DETAIL
X 12 EC FABRIC ANCHOR DETAIL
X 13 STABILIZATION CONSTRUCTION ENTRANCE DETAIL
X 14 TEMPORARY SILT FENCE DETAIL
X 15 TEMPORARY STREAM CROSSING DETAIL
X 16 LAND QUALITY STOCK PILE LAYOUT
X 17 LAND QUALITY STREAM CROSSING LAYOUT
X is LAND QUALITY DEBRIS REMOVAL LAYOUT
Notes andlor Measurements
A= 1.5 FT.
315 LF of right bank and 35 LF of left bank
EC fabric = 4.5 Ib/fe
9
01 C.1 Initials' KSB
Vp- y?ro?
Date'5/612005' ''
Legend
A DSR Project Site
Interstate Highway
Major Road
Major Hydrography
Subwatershed
U Municipality
County Boundary
'63
jU`Koy G(eeK
DSR92
Drainage Area 1.97 sq. miles
cr
0?0
SR92
z
A
a?oe? a
a?
B
s
Morgan Branch
h
0 0.25 0.5 1 Miles
Attachment 2e
DSR 92 - Newfound Creek Watershed
?- N Buncombe County, NC
Janice Buckner - Drainage Area Map
n SaC?'y? 1?3. afe.?
PERMIT FOR EMERGENCY WATERSHED PROTECTION (EWP)
The undersigned landowners hereby grant percussion to Buncombe County and the Buncombe
County Soil and Water Conservation District and/or their agents to enter upon our land for the
purpose of repairing the flood damage of stream channels and stream banks in the
(20 watershed
This permit includes the right to spread soil, remove and dispose of debris, install needed
measures, seed and mulch, and perform similar emergency watershed protection work
necessitated by the floods of September, 2004.
This permit also includes the right of ingress and egress on the land for the purpose of
maintaining or inspecting maintenance of the emergency works for the period of 1 year from the
date of completion. Work areas covered by this permit are sketched on the reverse of this form
or on an attached sheet.
Signed Date Signed Date
X21 S
Attachment 2 - DSR 177
2a. Vicinity Map
2b. Site Map
2c. Site Photos
2d. Cross Section and Site Specific Design Page
2e. Drainage Areas
Access Agreements
?? ^ '`? `} :---J .> > l,, ? I" f'"? `wry •' f " ??
BM D-1 7, 2156" o - -
\ `, r \ AlexxRd
` ? i - ? 1 ? Sch '?e}
lick Ch . )
215 ?? ??
L '( Sch i
F. I
•`?? a . j l .) am a 121• BMA I
lR 691 . ... / )i! 6r l 2125 ^ a=• ' l BMW w?• • ?-
?270e ?•? ( ' o? _ 127 •,, •'.:.
???;- ? 5 ; _ i 2147
???? ZY ., +'.. 2090•
LR 662 ?0
o. - ,l.
?676 f.
? . / ?' ?,
c o r?
Ito
i
r ?-
°' Site 177
BM Y 127 ' . •..? "? ?????
n `) ti } c 1 2119 !%! / ) ..,, .
J > )'
0 1,250 2,500 5,000 Feet Attachment 2a
DSR 177 - Newfound Creek Watershed
Buncombe County, NC
Keith Gussett - Vicinity Map
NG {. ••-. - r-t
0 CIi2MHILL
DSR 177 -
Attachment 2b
Creek Watershed
Dmbe County, NC
ssett Parcel 4821
Attachment 2c
DSR 177 - Newfound Creek Watershed
Buncombe County, NC
Keith Gossett - Photo Log
j ?.
hit•
q
i?
e-rw
4
Attachment 2d
DSR 177 - Newfound Creek Watershed
Buncombe County, NC
Keith Gossett existing cross section
8
Right Top of Ban k
Left Top of Bank
I
i
d
m
- -- -- 4
t
-- - 3 p
Water Surface X2
0
4 5
1
1
1
-
Width (feet)
Buncombe Co., Newfound Watershed - Round HIII Branch, DSR 177
Design Parameters
Apply to Site Figure Title
X 1 BANK STABILIZATION TYPICAL SECTION
X 2 BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION
3 STREAM CHANNEL BENCH TYPICAL SECTION
4 TYPICAL J HOOK DETAIL
6 TYPICAL CROSS VANE DETAIL
X 6 SUGGESTED VEGETATION LIST
X 7 STABILIZATION PLANTING PLAN
8 BENCH PLANTING PLAN
X B LIVE STAKE DETAIL
X 10 DEAD STOUT STAKE DETAIL
X 11 EC FABRIC INSTALLATION DETAIL
X 12 EC FABRIC ANCHOR DETAIL
X 13 STABILIZATION CONSTRUCTION ENTRANCE DETAIL
X 14 TEMPORARY SILT FENCE DETAIL
X 15 TEMPORARY STREAM CROSSING DETAIL
X 18 LAND QUALITY STOCK PILE LAYOUT
X 17 LAND QUALITY STREAM CROSSING LAYOUT
X 18 LAND QUALITY DEBRIS REMOVAL LAYOUT
Notes and/or Measurements
A - 1.5 FT.
100 LF of left bank
(Downstream of Rock Toe Installation)
A - 1.5 FT.
60 LF of left bank
Note 1
EC fabric = 4.5 IbRe
NOTE 1: ROCK TOE REQUIRED IN AREA ADJACENT TO WHERE LEFT BANK EROSION STARTS TO REALIGN CHANNEL.
Z4= )4 2?4'
ln??ial$i?$B ?
t38iA?i1Q05,
Legend
DSR Project Site
Interstate Highway
Major Road
Major Hydrography
r7 Subwatershed
Municipality
County Boundary
'63
?v ey GjeeK
Sov?r Ica
a0?
a?
0
DSR177
Drainage Area 0.87 sq. miles
z
A
drQ??d a
BCD
N
?S
Morgan Branch
0 0.25 0.5 1 Miles
, , , , , , , , , Attachment 2e
N DSR 177 - Newfound Creek Watershed
10 CH2MHILL Buncombe County, NC
?II? Keith Gossett - Drainage Area Map
_? KGi fh bosse'v
PERMIT FOR EMERGENCY WATERSHED PROTECTION (EWP)
The undersigned landowners hereby grant permission to Buncombe Count and the Buncombe
County Soil and Water Conservation District and/or their agents to enter upon our land for the
purpose of repairing the flood damage of stream channels and stream banks in the
New"d CY _e k watershed
This permit includes the right to spread soil, remove and dispose of debris, install needed
measures, seed and mulch, and perform similar emergency watershed protection work
necessitated by the floods of September, 2004.
This permit also includes the right of ingress and egress on the land for the purpose of
maintaining or inspecting maintenance of the emergency works for the period of 1 year from the
date of completion. Work areas covered by this permit are sketched on the reverse of this form
or on an attached sheet.
Signed
Date
Signed
Date
Attachment 3
General Design Notes
Typical Design Drawings
Debris Removal SOP
General Notes
The Contractor shall make his own determination of the
existing subsurface conditions. In areas where proposed
construction may conflict with existing utilities, the Contractor
shall take all necessary precautions to avoid damage to the
utilities. Notify and locate all impacted utilities at least 48
hours prior to excavation. Any damage sustained to utilities
shall be repaired by or under the direction of the utility owner
at the Contractor's expense.
All existing facilities, including but not limited to sidewalks,
roads, lawns, landscape vegetation, etc., inside and outside of
construction limits that are disturbed under this contract shall
be reestablished and/or reconstructed to the original condition
at the Contractor's expense.
Construction Sequence
1. Begin work at the upstream end of the project reach.
2. Construct proposed structures according to the plans and
specifications.
3. Grade stream banks to proposed grade, and tie into
existing banks upstream and downstream.
4. Overbank areas (beyond top of bank) adjacent to the
project reach shall be graded for positive drainage toward
the stream.
5. Apply temporary stabilization to the disturbed areas at the
end of each work day.
6. Repeat steps 1 through 5 for each segment of the project
reach, working downstream.
Site Stabilization
1. Conduct soil test to confirm necessary lime and fertilizer
amendments. Appropriate lime and fertilizer shall be
applied prior to seeding and incorporated to a depth 3 to 5
inches below the surface.
2. Temporary stabilization will be applied to all disturbed
areas on a daily basis. Areas shall be seeded with rye
grass at a rate of 15 lbs./ac. and long straw or hay
mulched. Straw shall consist of thoroughly threshed wheat,
rye or oat straw, reasonably bright in color, and shall not
be musty, moldy, caked, decayed, or excessively dusty
and shall be free of noxious weed seeds.
3. Permanent soil stabilization shall be completed within 7
calendar days of initial soil disturbance or re-disturbance.
Planting and seeding shall be incorporated into the subsoil
at the rates prescribed on Figures 6, 7, and 8. Contractor
shall follow NCDWQ Guidelines for Riparian Restoration,
http://h2o.enr.state.nc.us/wrp/pdf/buffers.pdf
4. All earth fill in excess of 1 ft depth should be installed in
lifts of maximum 6-inches and mechanically compacted.
5. All rock used for bank stabilization and in-stream structures
shall be 3 ft to 4 ft angular rock.
6. Erosion Control (EC) Fabric shall be woven coir mat,
secured with dead stout stakes, and shall meet the
following standards:
50% open area (maximum)
0.5 inch maximum opening size
4.5 lbs. per sq. foot maximum sheer stress
10 fps minimum velocity
CLT/GENERAL NOTES_NF.DOC
USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO
THE RESTRICTION ON THE TITLE PAGE OF THIS PROPOSAL.
7. Filter fabric shall be Amoco Propex 2002 woven geotextile
or equivalent. Cut excess filter fabric so no fabric is visible
after installation.
8. Seeded areas not specified for coir fabric, shall be
mulched with long straw or hay mulch immediately after
seeding areas at a rate of 2 tons/acre (uniform loose depth
of 1" to 2"). Straw shall consist of thoroughly threshed
wheat, rye or oat straw, reasonably bright in color, and
shall not be musty, moldy, caked, decayed, or excessively
dusty and shall be free of noxious weed seeds. Mulch
shall be secured with biodegradable netting (Robex Super
Flow or Equal).
9. The Contractor shall be responsible for maintaining seeded
areas until 95% vegetative cover is established. Should
any seeded area fail to germinate, or washing of any areas
occur requiring re-establishment of seeding, the Contractor
shall replace any lost soil material and re-seed and
re-mulch such areas at Contractor's expense.
Standard Erosion and Sediment Control Notes
1. The Contractor shall protect all points of construction
ingress and egress by installing a temporary construction
entrance as shown in details to prevent the deposition of
materials onto public roads. All materials deposited onto
public roads shall be removed immediately.
2. The Contractor shall re-vegetate or restore access roads
(including construction entrance) to match pre-construction
conditions.
3. The Contractor shall inspect daily and maintain
continuously in an effective operating condition all erosion
and sediment control measures until such times as they
are removed with prior permission from Engineer or
agency inspector.
4. The Contractor shall protect trees and landscaping not
marked for disposal from damage. Any damage that
occurs shall be repaired at the Contractor's expense.
5. Fencing shall be maintained for animal containment. The
Contractor shall provide temporary fencing to allow for
execution of the work. The Contractor shall keep
construction equipment away from livestock and take all
precautions to prevent injury to animals.
CLT/GENERAL NOTES NF.DOC
USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO
THE RESTRICTION ON THE TITLE PAGE OF THIS PROPOSAL
PROPOSED GF
FLOW
NOTE:
HEIGHT "A" IS MEASURED
FROM DEEPEST POINT IN
CHANNEL CROSS-SECTION
DRAWN: GMH
TITLE
FIGURE
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
BANK STABILIZATION
TYPICAL SECTION
N TS
1
EXISTING TOP OF BANK
EXISTING GRADE
EXISTING TOP OF BANK
A 2' MIN. OF
EXPOSED
PROPOSED GRADE ROCK
3 MIN. r?i' ROCK TOE
(NOT STEEPER) }. 2' MIN. OF ROCK
EMBEDDED IN BANK
EC FABRIC
SEE FIGURE 7
17 BASE FLOW A
1
NOTES:
2
1. HEIGHT "A" IS MEASURED FROM
DEEPEST POINT IN CHANNEL
CROSS-SECTION. FILTER FABRIC
2. FILTER FABRIC SHALL BE AMOCO PROPEX 2002
WOVEN GEOTEXTILE OR EQUIVALENT.
LAY FILTER FABRIC UNDER TRENCH ROCK
AND UP BEHIND ROCKS. CUT EXCESS
FILTER FABRIC SO NO FABRIC IS VISIBLE
AFTER INSTALLATION. BACKFILL WITH WELL-DRAINING
SOIL (USE NATIVE MATERIAL WHENEVER POSSIBLE).
MIN. OVERLAP OF COIR OVER FILTER FABRIC OF 12".
DRAWN: GMH
PROJ.MANAGER: JMO
DATE: 512005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
KEY IN ROCK TOE
ONE ROCK DIAMETER
4' MIN.
EXISTING STREAMBED
TITLE I FIGURE
BANK STABILIZATION
WITH ROCK TOE
TYPICAL SECTION 2
N TS
EXISTING TOP OF BANK EXISTING GRADE
PROPOSED GRADE
3 MIN.
(NOT STEEPER) ??`C?•. B-?
EC FABRIC
SEE FIGURE 7 GRADE TO DA
RAIN
(1% MAX.)
I FILL
STREAM CHANNEL BENCH
NOTES:
1. HEIGHT "A" IS MEASURED FROM
DEEPEST POINT IN CHANNEL
CROSS-SECTION.
2. FILTER FABRIC SHALL BE AMOCO PROPEX 2002
WOVEN GEOTEXTILE OR EQUIVALENT.
LAY FILTER FABRIC UNDER TRENCH ROCK
AND UP BEHIND ROCKS. CUT EXCESS
FILTER FABRIC SO NO FABRIC IS VISIBLE
AFTER INSTALLATION. BACKFILL WITH WELL-DRAINING
SOIL (USE NATIVE MATERIAL WHENEVER POSSIBLE).
MIN. OVERLAP OF COIR OVER FILTER FABRIC OF 12".
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
EXISTING STREAMBED
FILTER FABRIC
KEY IN ROCK TOE
ONE ROCK DIAMETER
4' MIN.
TITLE
2
71
STREAM CHANNEL
BENCH
TYPICAL SECTION
NTS
T
BASE FLOW A
'-x I
FIGURE
3
FLOW L
DIRECTION i!\
' - FOOTER
CROSS SECTION VIEW CAPS
(1/4-1/3 ROCK DIA.)
BOULDER
FLOW
DIRECTION
_._._. _.4._ _._._._
?.s• ?2-?x - -
z
FOOTER
NOTES: PROFILE VIEW
1. BOULDER SIZE IS 4' MINIMUM OR AS
SPECIFIED ON PLANS.
2. WRAP FILTER FABRIC AROUND FOOTER STONES
AND BACKFILL WITH TYPE 3 RIPRAP OR EQUIVALENT
(ON SITE COBBLE WHEN AVAILABLE).
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
BANKFULL ELEVATION
CHANNEL BED
O.
SCOUR
PLAN VIEW
rl
BOULDERS
W
SOURCE: APPLIED ECOLOGICAL SERVICES. INC
TITLE FIGURE
TYPICAL J HOOK DETAIL
4
NOT TO SCALE
FLOW
DIRECTION J
Y Y
Z Z
Q Q
m m
FOOT
VIVIIN. ---J
CROSS SECTION VIEW
BANKFULL ELEVATION
IANNEL BED
20'
BOULDERS
213 W TRENCHED IN 3' MIN.
- AND COVERED
1 O
SILL MUST BE TIED IN TO
BANKFULL ELEVATION
SCOUR POOL
PLAN VIEW
NOTES:
1. BOULDER SIZE IS 4' MINIMUM OR AS
SPECIFIED ON PLANS.
PROFILE VIEW
2. WRAP FILTER FABRIC AROUND FOOTER STONES
AND BACKFILL WITH TYPE 3 RIPRAP OR EQUIVALENT
(ON SITE COBBLE WHEN AVAILABLE}
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
SOURCE: APPLIED ECOLOGICAL SERVICES, INC
TITLE FIGURE
TYPICAL CROSS VANE
DETAIL
NOT TO SCALE
----- ------- - - - -
iMountaln Re ion Suggested Vegetation Llst i
TREES S P F SMALL TREES/SHRUBS S P F HERBACEOUS VEGETATION FOR SEED MIX
Betula lenta
cherry birch
x
x Alnus serrulata
tag alder
x
x
x Arisaema triphyllum
jack -in-the-pulpit Scirpus validus
soft stem bulrush
Betula nigra
river birch
x
x Amelanchierarborea
serviceberry
x
x Asclepias incarnate
swamp milkweed Sparganium americanum
bur-reed
Carya corditormis
bitternut hickory
x
x
x Aronia arbutitolia
red chokeberry
x
x Carex crinata
fringed sedge Thelypteris palustris
marsh fern
Carya ovata
shagbark hickory
x
x
x Asimina triloba
common pawpaw
x
x Carex intumescens
bladder sedge Uniola latitolia
river oats
Diospyros virginiana
persimmon
x
x
x Calycanthus tloridus
sweet-shrub
x
x Carex lupulina
hop sedge Vernonia noveboracensi.
ironweed
Fraxinus pennsylvanica
green ash
x
x Carpinus caroliniana
ironwood
x
x Carex lurida
lurid sedge Leersia oryzoides
rice cutgrass
Halesia caroliniana
silverbell
x
x Cornus alternitolia
alternate leaf dogwood
x
x Carex scoparia
broom sedge Lobelia cardinalis
cardinal flower
Nyssa sylvatica
blackgum
x
x
x Cornus amomum
silky dogwood
x
x Carex stricta
tussock sedge Lobelia siphilitica
great blue lobelia
Platanus occidentalis
sycamore
x
x Corylus americana hazel-
nut
x
x Carex vulpinoidea
fox sedge Ludwigia alternitolia
bushy seedbox
Prunus serotina
black cherry
x
x
x Hamamelis virginiana
witch-hazel
x
x Chelone glabra
turtlehead Panicum virgatum
switchgrass
Salix nigra
black willow
x
x Ilex verticillata
winter berry
x
x
x Cyperus strigosus
umbrella sedge Polygonum sagittatum
tearthumb
Tilia heterophylla
white basswood
x
x Leucothoe axillaris
doghobble
x Elymus hystrix
bottlebrush grass Scirpus atrovirens
green bulrush
Lindera benzoin Eupatorium tistu/osum Scirpus cyperinus
S - Shade _ spicebush x Joe-pye-weed woolgrass
P - Partial Sun
F =Full Sun
_
_ Lyonia ligustrina
Lyonia ligustrina x Eupatorium pertoliatum
boneset Juncus ettusus
soft rush
_ Magnolia tripetala
umbrella tree x Impatiens capensis
jewel-weed
- Physocarpus opulitolius
ninebark
x
x
x -
j
?
Rhododendron
periclymenoides ___ _
-
j - j- wild azalea x x ----
1 Rhododendron viscosum
swamp azalea x
Rosa palustris
swamp rose
z
x ---
Salix sericea -------
silky willow x x
Spirea latitolia -- --
meadowsweet x
_
j I Symplocos tinctoria
sweet leaf x x
Viburnum cassinoides
W ithe-rod
x
x
x _
Xanthorhiza simplicissima
yellow-root
x
----- -- - - ---- - --
TITLE
SUGGESTED VEGETATION LIST DRAWN: GMH
D
PROJ.
ATE: MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217 FIGURE
APPROX.
WIDTH OF CHANNEL
LIVE STARE ZONE
TO EDGE OF WATER
PLANTING WIDTH WILL VARY TO
LANDOWNER COMPLIANCE AND
PROJECT SPECIFICATIONS.
EXISTING SURFA
ELEVATI
ZONE I ZONE 2
SYMBOL HERBACEOUS SEEDING DESCRIPTION SYMBOL WOODY VEGETATION DESCRIPTION
-TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS NATIVE TREE AND SHRUB SPECIES TO BE PLANTED AT
A DENSITY OF 436 TREES/ACRE, WHICH IS
AT 15 LBS/ACRE SEEDING RATE. SUFFICIENT TO PROVIDE 320 TREES/ACRE
-FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH
A NATIVE, PERMANENT GRASS/HERB MIXTURE AT
15-20 LBS/ACRE SEEDING RATE.
® AT MATURITY. FOLLOW NCDWO GUIDELINES
FOR RIPARIAN BUFFER RESTORATION.
-SHRUB SPECIES INCLUDE BUT ARE NOT LIMITED TO:
-HERB/GRASS SPECIES INCLUDE BUT ARE NOT LIMITED TO: Alnus serratula, Cephalanthus occldentalls,
Agro st/s aiba
Carex spp.
Dactylis glomerata Cornus stricta, Rhododendron maximum, sallx
,
,
, serecla, Sambucus canadensis, etc.
Panlcum spp., Pennlsetum glaucum, Seca/e cereals,
ETC. -TREE SPECIES INCLUDE BUT ARE NOT LIMITED T0:
LIVE STAKES TO INCLUDE Cornus app. and Acerspp., Betula spp., Frax/nus spp., Juglands
Salfx serica Nigra, Liriodendron Tullpitera., Pinus strobus.,
LIVE STAKES SPACED ON 2' CENTERS Platanus occldentalls., Robin/a Pseudcacac/a., etc.
-TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS.
-FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH
A NATIVE, PERMANENT GRASS/HERB MIXTURE AT
I5-20 LBS/ACRE SEEDING RATE.
AT LEAST 3 SPECIES OF TREES AND 5 SPECIES OF
SHRUBS SHOULD BE USED.
•nlllTFf•
-TREE/SHRUB/GRASS SPECIES LISTED ARE SUBJECT TO CHANGE DUE TO AVAILABILITY FROM LOCAL NURSERIES AND
FORESTRY SUPPLY STATIONS.
SUBSTITUTION MUST BE APPROVED BY ENGINEER.
SOURCE: ALTAMONT ENVIRONMENTAL, INC.
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
EXISTING STREAMBED
TITLE
STABILIZATION
PLANTING PLAN
FIGURE
7
APPRO%.
WIDTH OF CHANNEL
3
T
LIVE STARE ZONE
TO EDGE OF WATER
PLANTING WIDTH WILL VARY TO
LANDOWNER COMPLIANCE AND
PROJECT SPECIFICATIONS.
ZONE I ZONE 2
SYMBOL HERBACEOUS SEEDING DESCRIPTION SYMBOL WOODY VEGETATION DESCRIPTION
NATIVE TREE AND SHRUB SPECIES TO BE PLANTED AT
-TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS A DENSITY OF 436 TREES/ACRE, WHICH
AT 15 LBS/ACRE SEEDING RATE. SUFFICIENT TO PROVIDE 320 TREES/ACRE
-FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH
A NATIVE, PERMANENT GRASS/HERB MIXTURE AT
15-20 LBS/ACRE SEEDING RATE. AT MATURITY. FOLLOW NCDWO GUIDELINES
FOR RIPARIAN BUFFER RESTORATION.
-SHRUB SPECIES INCLUDE BUT ARE NOT LIMITED
-HERB/GRASS SPECIES INCLUDE BUT ARE NOT LIMITED TO: Alnus serratula, Cephalanthus occid6ntalls,
Agrostls albs
Carer spp.
Dactyls g/omerata Comus sWcta, Rhododendron maximum, salix
,
,
,
Panicum app., Penn/setum glaucum, Seca/e cereale senacla, Sambucus canadens/s, etc.
,
ETC. -TREE SPECIES INCLUDE BUT ARE NOT LIMITED TO:
LIVE STAKES TO INCLUDE Cornus spp. and Acerspp., Betula spp., Fraxlnus app., Jug/ands
Salix ser/ca Nlgra, Urlodendron Tullp/fera., Pinus strobus.,
LIVE STAKES SPACED ON 2' CENTERS Platanus occldentalls., Robinla Pseudoacacia., etc.
-TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS.
-FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH
A NATIVE, PERMANENT GRASS/HERB MIXTURE AT
15-20 LOS/ACRE SEEDING RATE.
AT LEAST 3 SPECIES OF TREES AND 5 SPECIES OF
SHRUBS SHOULD BE USED.
NOTES:
-TREE/SHRUB/GRASS SPECIES LISTED ARE SUBJECT TO CHANGE DUE TO AVAILABILITY FROM LOCAL NURSERIES AND
FORESTRY SUPPLY STATIONS.
- PLANT ZONE I TO EDGE OF WATER
- SUDTITUTION MUST BE APPROVED BY ENGINEER
SOURCE: ALTAMONT ENVIRONMENTAL, INC.
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 512005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
TITLE
BENCH
PLANTING PLAN
FIGURE
8
EC FABRIC
2' MAX
SPACING
'O <; .
30" LIVE CUTTING
(DORMANT) - TYP
DEAD STOUT STAKE
TYP, SEE FIGURE 10
NOTE:
INSTALL LIVE STAKE SO
73 LENGTH IS (MIN. 20")
BELOW GROUND
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
c
NTS
ESTABLISHED PLANT SHOWN
FOR INFORMATION ONLY
GROUND
TITLE
LIVE STAKE DETAIL
FIGURE
9
NOTES:
18" STANDARD (30" IF
USED AT TOE OF SLOPE)
1. DEAD STOUT STAKES SHALL BE FASHIONED FROM
UNTREATED 2' BY 4- (NOMINAL) BOARDS.
2. DEAD STOUT STAKES TO BE USED IN LIEU OF METAL
OR OTHER STAPLES OR FASTENERS FOR SECURING
EC FABRIC IN PLACE.
3. THE CONTRACTOR MAY USE'ECO-STAKE" 12" LENGTH
OR APPROVED EQUAL IN LIEU OF DEAD STOUT STAKES
FOR INSTALLATION IN THE CENTER OF THE EC FABRIC
"FIELD".
4. INSTALL EC FABRIC PER MANUFACTURER'S
INSTRUCTIONS.
DRAWN: GMH I TITLE I FIGURE
PROJ. MANAGER: JMO
DATE: 512005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
DEAD STOUT STAKE
DETAIL 10
NTS
SOIL BIOENGINEERING
DEAD STOL
TIE TO TYPICAL SECTION
NOTES:
1. INSTALL ON ALL CUT AND FILL SLOPES
AND NEAR BANK DISTURBED AREAS.
2. INSTALL PER MANUFACTURER'S
INSTRUCTIONS.
3. EC FABRIC SHALL BE WOVEN COIR
MAT WITH 50% OPEN AREA (max.), 0.5 INCH
MAX. OPENING SIZE, 4.5 Ibs/sq. ft. MAX.
SHEER STRESS, 10 fps MIN. VELOCITY.
OF BANK ANCHOR, TYP
SEE FIGURE 12
JND, TYP
P.
DRAWN: GMH I TITLE I FIGURE
PROJ.MANAGER: JMO
DATE: 512005
CH211/ HIL.L®
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
EC FABRIC INSTALLATION
DETAIL 11
NTS
::\CAD\NRCS\Cad-Details\Fig11.dwg, 05/12/2005 03:52:00 PM, PDF995 (temporary).pc3
0
?
o
a?
o w
D
CD
LL (V
T?
U.
W LL r J
N
m N co U
m N F
N U
Z
p
0k io- Q
If
?
° Q
o Z =
U
° LL Z
p Q _I
W
W <
•? OL
r 1..t...
m 0
/ O
Q W
°
O
a F 1 LL
° LL ?.??°L
Y U
hpW
N 0
N -0
f-Wy F
N
Z J
O
W
W
p S
z Z ul ? m O p (/1
O
2' m0 oW
-a{pN NF ;d{µ+z 0
S
F-
Z
U
N S d ??
WW
U? V Ww 0
?aZ
Or W
mY OO
Q ?00
-
fW
j N U d
LL
Z ?j K O cn
Z U U O
0 za W
W
m zz
?O ?Q 60Q0
u1
h
Up
W S
(x?
J
y
Q
N nn,,
Wd? 0?S ?OON
Y UW OVj 'w R
p m0
Z
O u."0 SOY
0 N W LL?°?CLL
O
W
d
CL
0
N-
9 °
W` J Z
J f W
o
r-
O
$
-
O
Z 0
Ww
I-- U J?
LL ?
Q
o>~
U. 0? NOr- 0U
?
W ` N ci V
i? W
N
N O N
m
tv jW
OF 0
O oU
N Z
n N C7
p w
W
o w U }moo
Y
z a
Q `A
N
M
W
O = O
O C7 1 N
Y
U
zv m W
? C)
Q
°N Z
Z
? a Q
?
50' MIN.
PUBLIC STREET
EXISTING GROUND ?
W
F
o
SOIL STABILIZATION FABRIC
UNDER 2'-3' WASHED STONE
5D' MIN'
r
t7j
• OR AS SPECIFIED
ON PLAN SHEETS
U
J
m
a
NOTES:
1. A STABILIZED ENTRANCE PAD OF 2'- 3' WASHED STONE OR RAILROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL
ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET.
2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE MAY BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE.
3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO
PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS
CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
4. ANY SEDIMENT SPILLED. DROPPED. WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY.
5. WHEN APPROPRIATE. WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN
WASHING IS REQUIRED, R SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE.
DRAWN: GMH TITLE FIGURE
PROJ. MANAGER: JMO
DATE: 512005 STABILIZED CONSTRUCTION
CH2MH'LL ENTRANCE DETAIL
13
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217 N.T.S.
A _
B
STEEL POST I 6 MAX.
WIRE FENCING
WOVEN FILTER FABRIC
?. :riJ??n'?}r5,? :r't.?J?^...'kS`.?i:j??*,iti?a:CiY?},?ti"70*?.?74's? vC'??`?-}*Sn ?c.'C???t,CG`..S ' ''?'1 ?'?:?1 ?".
I T-
III
I I j;=ri
T
B
• STEEL POST
WIRE FENCING
i FILTER FABRIC
3 ?
? U
n o ? ??OQQ'
N 6'
II `ANCHOR SKIRT 6* MINIMUM
u IN LIEU OF BURYING SKIRT, 6. OF
15 WASHED STONE MAY BE USED
OVER TURNDOWN. SEE SECTION B-B.
SECTION A-A
STEEL POST
WIRE FENCING
w? FILTER FABRIC
#5 TONE
WASHED
GENERAL NOTES:
1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32' IN WIDTH AND
SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING.
2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN
FOR A PERIOD OF MORE THAN 14 DAYS.
3. STEEL POSTS SHALL BE 5'-0' IN HEIGHT AND BE OF THE
SELF-FASTENER ANGLE STEEL TYPE.
4. WIRE FENCING SHALL BE AT LEAST #10 CAGE WITH A MINIMUM OF
6 LINE WIRES WITH 12" STAY SPACING.
5. TURN SILT FENCE UP SLOPE AT ENDS.
6. WIRE MESH SHALL BEE MIN. 13 CAGE WITH MAXIMUM 12' OPENINGS.
7. WIRE AND WASHED STONE WILL BE REQUIRED WHEN:
AT TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE)
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 5/2005
MAINTENANCE NOTES:
1. FILTER BARRIERS SWILL BE INSPECTED BY THE FINANCIALLY
RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH
RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL.
ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY.
2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END
OF THE EXPECTED USABLE LIFE AND THE BARRIER TILL IS NECESSARY, THE
FABRIC SHALL BE REPLACED PROMPTLY.
3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX.
HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN
PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM
TO THE EXITING GRADE, PREPARED AND SEEDED.
4. REMOVE SILT FENCE 1 YEAR PAST CONSTRUCTION.
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
N.T.S.
TITLE
TEMPORARY SILT
FENCE DETAIL
ANCHOR SKIRT
6" MINIMUM
SECTION B-B
FIGURE
14
5' MAX.
BANK HEIGHT
v1O a ?.I.
\?? ?,? ,,, ,?• ???? °,i Q. ? PQ's.
\
\«11 \??II
STONE OVER
FILTER FABRIC
(SEE NOTE 2)
STREAM CHANNEL
SURFACE FLOW
?I DIVERSION
? Ala
c? o ,.d. 0
C) o
??1 ?JJI\I v O ` v O v0
\l J) \\b\ C .? _ d 1. USE #57 WASHED STONE
O
2. OMIT #57 WASHED STONE ON
\1J) \?? CHANNEL BOTTOM IF CROSSING
A COBBLED BED STREAM.
STONE APPROACH SECTION
5:1 MAX. SLOPE ON ROAD 3. REMOVE STONE AND FILTER
FABRIC AFTER CONSTRUCTION
AND TIE INTO EXISTING GRADE.
VEGETATE SITE ACCORDING TO
PLANTING PLAN.
ORIGINAL STREAMBANK
r
STONE OVER - "';..?, ,., ..?..
FILTER FABRIC -"-''O
6" M I I
DRAWN: GMH
PROJ. MANAGER: JMO
DATE: 512005
CH2MHILL
4824 PARKWAY PLAZA BOULEVARD
SUITE 200
CHARLOTTE, NC 28217
TEMPORARY ACCESS
AS SPECIFIED BY
ENGINEER
FILTER FABRIC
TITLE FIGURE
TEMPORARY STREAM
CROSSING DETAIL 15
NTS
VSTAEDTLER9
No. 937 $11 E
Engineer's Computation Pad
/< Oa d.
I,
.601 St4G;/;z??!
t ?
t ?
t ?
J '
? - - - - _. _ `
11141
? 5 ?OGIG/:lr?t' ?
4 „Gl f
L CO c/,-.
Co.ts?.-koY` L?4?ci'' ?e r,S a3
rJeGesss-? fo al?verx s'a 014D
??bwr ?iou/ road, See
/?rov,o% S???i??kc? pcceSS /bdv?
.S/'r"SQ?'1 ? J l°G ?"G^+?40/7wr? .S' fiQit.y
Cross%?3 cue. f•.: ?. ' .
?es ?z, re S ?.ep »? ?O;n?/GG??Uk T'r ?r-
? C O /•?Y1?C A,-c. ? O T 6ON??Pr
wg ?'
? Seol%?r.., ?
' ? ? Con?r+o/'
,
$fab;/iZHt? F??/" WSJ ?h ffe.-•
-- - - - Rcn? S'.,to
sc?/G
/vo f- to
Source: NC Land Quality Section Figure 16
4/s. r-/,,.r
. ?STi4El31'LER° No. 937 81 i E •
:+ Engineer's Computation Pad
50f 1
Co?s7t?.ot??? _2F ??e ?ed?: s re?ova
r !'eSal?.S in A ?oSs o
. ? 9/'aana? Co?rr? Ss?%.?e..f4f%vM
?loo[? /?/a:n ?C/G?j?.s curl oral Al 04 rWC3 sin // l G
! we .h ovu ( /9iQCi ? 1lOr'o v? C1,C1 ro Oro I`«? tie
c'
c
wa ?? Seahemr.+7'c'/IloaSa,ee
/`?Aw ? /Pd00
?7?•N/ /BOG ?_
A., fK
/off OT"/.?onC
OCOO?
??E..rONa? ?YL°G / /?OSSi??L°? W?f? Lt/iiG1t%r?
u3 R SeGuN? Opft'b^•
Source: NC Land Quality Section Figure 17 itrzr?oi
VsrAEDTLER® No. 937 811 E
Engineer's Computation Pad
fPC7 4 C,(
co"d e- 4l e o i
? L?a?er
' ['leGeSSa.// ?o Clivei?' /4.+oT7'
•' ??'t j+f?d? K/G? ?j ??•'S•?4 elf ?(/G TGv
' A10 v?[.re %51- y%l: zec/ e 9 ?..:/??« r:f -/-
e l $?rs+i /i!./' / O ?i?l/7.9 ?r... l?+I?U^ l°.i?IQ.?[C
1 ? ,/ ?J m
? ?? ?' / OIG .s f?eA'rr! ?G it / G?i( ?G (TM
C o.r?,V/e
t
t /'e r+rv ?-?.
elect
+
4?e/w/G AG• fY' 94t;0M[rf?/-PII ?S,/JNrTCrZOHL'
7! 0? o 6Q ' ??? Top o IC 134 ,? IC - - -- -- ---- - - - - --
?oM .
/vcf fv SCufL
,Source: NC Land Quality Section Figure 18
4??-dos
Organic Debris Removal
Standard Operation Procedures (SOP)
Emergency Watershed Protection (EWP) Stream Repair Projects
Buncombe County, North Carolina
SCOPE OF WORK
The work shall consist of the cleanup of designated stream areas by the removal and
disposal of trees, logs, stumps, brush, tops, rubbish, and other debris deposited in the
stream channel and floodplain by the storms of September 8 and 16, 2004.
CLEARING AND DEBRIS REMOVAL
Debris removal crews shall remove only that material which has been clearly marked by a
representative of Buncombe County and/or CH2M HILL, INC (Representative) as indicated
by flagging and/or orange/ red spray paint. ONLY marked debris is to be removed.
Representative cannot authorize additional work. Any work that will result in an increase in
cost must be submitted to CH2M HILL for approval prior to starting such work. In the event
that the contractor uses on-site chipping, the chipper may follow the clean-up crew along the
length of the project reach. The Contractor is responsible to properly dispose of chips.
Proper disposal may include spreading on site or removing off-site. On-site disposal requires
written approval by the property owner. Unless specifically requested to leave the chips in a
pile by a property owner the chipper shall make reasonable efforts to spread the chips as
chipping progresses.
Chippers and other heavy equipment will be staged and used at least 30-feet from the top of
the streambank or on existing paved or graveled areas prepared in accordance with standard
details described in Figure 18 (see Typical Design Drawings).
Repair of any property damage resulting from debris removal is the sole responsibility of the
Contractor.
All debris removal shall be within the included sites as identified in this solicitation and as
directed by the Representative. For bid preparation purposes, the Representative has
marked and identified debris to be removed. Removed debris shall be placed only in
those areas as directed by the Representative. For Bid purposes, debris staging areas are
assumed to be within 300 feet of top of bank. On-site burning is not allowed. Fallen
trees, limbs and dislodged brush within the cross section of the existing or original
channel up to and including the debris line of the subject storm shall be removed. Any
foreign (man-made) debris washed in from upstream, shall be removed. Marked trees
severely undercut by stream bank erosion and trees severely leaning over the channel
whose near term fall is apparent shall be removed.
In general, Contractor clearing will be limited to the cutting of severely damaged trees
leaning across the channel, and other trees as needed to gain access for equipment to points
of channel blockage.
P:\BuncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attach ments\Design
Attach ments\Buncombe Debris Removal SOP.doc
Disturbance of the channel bottom and banks, and equipment access areas shall be held
to the minimum necessary to allow the construction equipment to remove the debris and
shall be consistent with all state and federal permits. All areas disturbed due to debris
removal or equipment access shall be reshaped and reseeded in accordance with
standard details described in Figures 7-18 (see Typical Design Drawings).
Access to the channel will generally be perpendicular to the channel so cutting of trees is
held to a minimum with precaution taken to protect mast producing and stream canopy
trees. Un-marked dead trees that provide den habitat and are determined to pose no
hazard to the channel shall be protected. As such, the contractor will only remove mark d
debris. The contractor will exercise care in the areas of existing crops to minimize
damages.
PROVIDED EQUIPMENT & FACILITIES
The Contractor shall provide adequate sanitary facilities for equipment operators and
work crews. Portable facilities shall be provided at the worksite and arrangements made
for proper servicing. A portable facility will be provided within 1,000 feet of the
equipment and/or work crews at all times.
COMMUNICATIONS
Each mechanized piece of equipment and each work crew shall be equipped with a two
way, battery operated radio. Radios shall be FM, have a minimum range of 5 miles.
Radios shall be maintained "on" and in the receive mode at all times while the operator lis
at the site. Batteries shall be recharged overnight or as needed. An extra set of fully
charged batteries shall be maintained on board the equipment at all times. Radios shall
be equipped with clip-on hand mikes or headsets. Radios shall be maintained in good
operating condition and equipment operators shall be knowledgeable in the use and care
of the radios. Each Contractor site supervisor shall also maintain a secondary
communication system compatible with the Representative's system.
Brush Removal Guidelines
Small diameter brush and limbs (less than four inches in diameter) that will not
cause damage if remobilized by high water will be cut into short lengths (five feet
long or less) and left in place.
All marked, dislodged or uprooted larger diameter brush will be removed from
'I
the channel or streambank and chipped in designated areas greater than 30-feet
from the top of the bank.
• Saplings and shrubs with an intact root system are not to be removed.
P:\13 uncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attachments\Design
Attach ments\Quncombe Debris Removal SOP.doc
Tree Removal Guidelines
• Trees will be chipped in designated areas greater than 30-feet from the top of the
streambank. Chippers and/or tub grinders may be staged on-site with written
consent from the property owner or at a central location approved by the County.
• Larger diameter trees may be pulled to the chipper using a mechanized winch
provided the process does not create excess disturbance to the streambank.
• Marked trees whose near term fall is apparent should be cut at the marked
location, which will be indicated by a painted ring around the trunk at least three-
feet above the ground surface. The root system shall not be removed from the
streambank.
• As approved by the Representative, larger diameter trees that cannot be moved
using hand equipment will be cut to manageable lengths and removed.
• The sale of chips or firewood is not allowed.
Foreign Debris and Trash Removal Guidelines
• Foreign (manmade) debris and trash will be bagged in orange trash bags where
possible.
• Filled trash bags will be removed from the channel and transported directly
offsite by the Contractor to a local landfill.
• Large debris must be loaded into a dump truck or roll-off container and
transported to a local landfill for disposal.
• Tipping fees for disposal shall be paid by the Contractor.
Stream bed and Bank Repair Guidelines
All temporary stream crossings shall be installed as described in Figures 15 -18
(see Typical Design Drawings).
• All Stream embankments disturbed by Contractor activities, denuded, or left bare
as a result of debris removal shall be regraded, planted, and erosion control fabric
installed as described in Figures 6, 7, and 9 -12 (see Typical Design Drawings).
• Temporary staging, chipping, and work access points shall be regraded and
grassed using a native grass/herb mix as outlined in Figures 6, 7, and 16 -18 (see
Typical Design Drawings).
P:\BuncombeCountyNc\328275\Permits\Newfound PCNsTinal PCNs and Attach ments\Design
Attachments\Buncombe Debris Removal SOP.doc
Contractor shall install erosion control measures as outlined in Figures 10 -18.
SUPERINTENDENCE OF EQUIPMENT AND WORK CREWS
Any contractor providing three (3) or more pieces of equipment or five (5) or more work
crew or equipment operators shall provide a non-working crew superintendent in
addition to the required laborers and operators. The contractor shall designate in writing'
the names of the crew superintendent and an alternate prior to award of the contract. The
crew superintendent shall provide on-site supervision of work crews and equipment
operators. The crew superintendent shall be responsible for the safety of work crews and
for the location and servicing of portable sanitary facilities. He/she shall be equipped
with a portable communication as specified above.
The crew superintendent shall communicate with the Representative to assure that work
crews and equipment are performing at a satisfactory level. The crew Superintendent
shall coordinate with the Representative to schedule equipment and operators for each
days work and as far in advance as possible. The superintendent shall be responsible for
keeping up with the daily operating times of all work crews and equipment and shall
maintain a log of daily equipment and work crew operations. He/she shall coordinate
daily with the Representative to concur on actual footage of streambank cleared.
WORK DIRECTION
Contractors and equipment operators will not perform activities requested or instructed
by landowners or others at the worksite, except as confirmed by the assigned
Representative.
ENVIRONMENTAL CONSIDERATIONS
Earth moving equipment will cross and operate in the stream flow only when necessary
and only when directed to do so by the Representative. Equipment shall be maintained
to prevent fuel, oil and lubricant spills in the vicinity of the stream. Refueling, repairs
and lubrication will be performed at safe distances from the stream and only at locations
approved by the Representative.
Should fuel leaks, oil leakages or hydraulic pipe rupture occur during construction, the
operators will immediately remove the equipment to a "safe" area and proceed with
repairs. The Representative will direct operators to remove equipment from the stream
whenever a leak is observed or suspected.
P:\BuncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attachments\Design
Attach ments\Buncombe Debris Removal SOP.doc 14
SAFFTY
Contractor shall be responsible for the safe execution of this work and conform to all
applicable state and federal regulations. Additionally, at work sites, where equipment
will be operating on public roads, flagmen shall be stationed to warn oncoming traffic of
congestion, construction road signs shall be in place and a means of removing sediment,
mud or rocks from roadways shall be established. Residue deposited on roadways may
be removed by sweep machine, manual sweeping methods or pressurized water. The
contractor will be responsible for the implementation of these measures.
Chain saw operators will be expected to perform debris removal operations during
periods of extreme weather conditions and in areas of deep and fast moving water. The
contractor is responsible for providing the necessary equipment, clothing and other gear
to insure that laborers can perform effectively and safely under these conditions. The
Contractor shall determine if working conditions are hazardous and/or of sufficient
extreme to prevent efficient and effective operation. When such conditions exist, the
Contractor shall shut down work crews until conditions improve.
EQUIPMENT
Equipment selection to complete the work is the Contractor's responsibility. The
following list of equipment has been utilized on similar debris removal projects and is
provided as a courtesy to the Contractor. This is not a requirement.
Item No.1
Hydraulic Track Mounted Excavator with Experienced Operator
Min. Weight 48,000 lbs
Min. Reach 26 feet
Min. Digging depth 22 feet
Equipped with thumb
Min. Bucket size 1.0 cu yds.
Equipped with two-way radio
Min Horse Power 140 HP
Item No. 2
Skidder with Experienced Operator and Two Helpers
Rubber Tired with Winch and Blade
Min Horse Power 80HP
Min. Winch Cable Wire Rope -150 ft and 5/8 inch diameter
Min Chokers: 4 with 2 Chain saws
Min. 20-inch bars with daily supply of sharpened chains (min. 3 chains)
Equipped with two-way radio
Item No. 3
Dump Truck with Experienced Driver
Rear dump haul truck tandem axle min. Capacity -15 tons equipped with
two-way radio
P:\BuncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attach ments\Design
Attach ments\Buncombe Debris Removal SOP.doc
Item No. 4
Chipper
14-inch capacity
Tub Grinder
8-foot interior tub diameter
P:\BuncombeCountyNc\328275\Permits\Newfound PCNs\Final PCNs and Attachments\Design
Attachments\Buncombe Debris Removal SOP.doc
[Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
Subject: [Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
From: Cyndi Karoly <cyndi.karoly@ncmail.net>
Date: Wed, 16 Mar 2005 15:58:57 -0500
To: Laurie J Dennison <Laurie.J.Dennisoii@ncmail.net>
fyi - so please note that fees are waived when you create
brief handwritten note in the file jacket, or we can add a
Subject: [Fwd: [Fwd: STream Clearing Activities]]
From: Tom Reeder <tom.reeder@ncmail.net>
Date: Wed, 16 Mar 2005 15:43:18 -0500
To: Cyndi Karoly <cyndi.karoly@ncmail.net>
these files - perhaps a
copy of this message
Cyndi - In answer to your question yesterday it appears that the fees are being
waived for the EWP associated 401s.
Subject: [Fwd: STream Clearing Activities]
From: Alan Klimek <alan.klimek@ncmail.net>
Date: Wed, 16 Mar 2005 15:37:40 -0500
To: Tom Reeder <Tom.Reeder@ncmail.net>
Yes, the fees are being waived. See attachment.
Alan
------- Original Message --------
Subject:STream Clearing Activities
Date:Mon, 28 Feb 2005 09:40:08 -0500
From:"Robin W. Smith" <robin.w.smith(o-),ncmail.net>
Organization:NC DENR
To:Alan Klimek <Alan.Klimek0cncmail.net>, Jim Simons <Jim.Simonsnncmai].net>,
David Vogel <David.VogelPncmail.net>
CC:Johanna Reese <Johanna.ReesePncmail.net>, Nann Guthrie
<Nann.GuthricP,ncmail.net>
LWil: Attached is an electronic copy of the letter and information sheet
sent to the 19 counties and one town that have contracts with NRCS for
stream clearing projects. Those letters went out over the Secretary's
signature on Friday. We will hand-deliver a memo containing the same
basic information to the mountain area legislators tomorrow. We are
also working with the Governor's Office on a news release; I am not sure
how soon that will go out. Give me a call if you have any questions.
Thanks for working toward getting meetings set up. Robin.
1 of 2 3/17/2005 6:46 AM
[Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
Robin W. Smith <robin.w.smith aPncmail.net>
Assistant Secretary of Planning & Policy
Office of the Secretary
NC DENR
'
[Fwd: [Fwd: STream Clearing Activities]] Content-Type: message/rfc822
Content-Encoding: 7bit
Content-Type: message/rfc822
[Fwd: STream Clearing Activities]';
Content-Encoding: 7bit
2 of 2 3/17/2005 6:46 AM
February 25, 2005
Page 1 of 2
February 25, 2005
RE: Emergency Watershed Protection Stream-Clearing Projects
Dear
I know that County experienced stream damage as a result of the fall
hurricanes. Our department would like to work closely with your county to insure that
stream restoration projects receiving state and federal funds under the Emergency
Watershed Protection (EWP) program move as smoothly as possible through the
environmental review and permitting process. I have enclosed for your information a
brief summary of the types of permits and approvals that may be required for these
projects. For projects that involve work directly affecting the streambed, the United
States Army Corps of Engineers will be the primary environmental permitting agency.
For those projects, our staff in the Division of Water Quality and the Division of Land
Resources play a supporting role and issue related state approvals.
I have asked our staff to meet with all of the western counties, either individually or in
small groups, to talk about each county's proposed stream restoration projects and answer
your questions about permit requirements. Our staff will ask the Corps of Engineers and
Soil and Water Conservation staff to join in those meetings in an effort to put together a
plan of action for reviewing and approving stream restoration projects as quickly as
possible. You should receive a telephone call from DENR staff soon to talk about a date
and time that would be convenient to meet and talk about your projects.
I have also directed our staff to waive fees for state water quality certifications (under
Section 401 of the Clean Water Act) and for approval of erosion and sedimentation
February 25, 2005
Page 2 of 2
control plans for stream-clearing projects funded under EWP. Fees will be waived for all
EWP permit s requested by September 1, 2005.
I hope these efforts will ease the burden on county governments already challenged by
the demands of reconstruction and recovery. If we can help you in any other way, please
do not hesitate to call. I have asked Assistant Secretary Robin Smith to be a primary
contact on these projects for DENR; you can reach Ms. Smith at (919) 715-4141. The
enclosed information sheet also provides contact information for DENR staff in both the
Asheville and Winston-Salem Regional Offices and for the Corps of Engineers office in
Asheville.
Sincerely,
William G. Ross, Jr.