Loading...
HomeMy WebLinkAbout20190495 Ver 1_Field Notes_20190417Page 1 Site Information Date: * 4/17/2019 Project Name:* Cowford Prepared By:* Mac Haupt Type of Site: * NCDMS Stream and Wetland Site Meeting Type:* Technical Site Review Sponsor/Provider: * NCDMS Stream and Wetland Site USACE AID: County:* Onslow NCDWR ID: 20190495 HUC and Basin:* White Oak - 03020301 NCDWR Version Weather: Coordinates: Attendees Degrees North Degrees West USACE - Todd Tugwell DWR - Mac Haupt, Erin Davis RES - Frasier, Jeremy, David DMS - Jeff Shaffer, Lindsey, Jeremiah George Langford Project Review Checklist (provide additional detail in notes section on next General Site Issues/Concerns: Stream Issues/Concerns: Wetland Issues/Concerns: Vegetation Composition or Density Planted Stem Vigor (due to soil, browsing) Invasive/Exotic Species Beaver/Feral Hogs (management plan) Soil (manipulation, compaction, fertility) Livestock Present/Evidence of Livestock Access Crossings or Utility Lines B M Ps or Alternate Approaches _, Fencing Issues or Fencing Needed Ponds Within Project Area Incised/Entrenched Headcuts Present/Forming Stream Structures Failing/Piping Excess Sediment/Aggradation Cross -Sections Missing/Indicate Problems Bank Instability/Failure Bench Rills/Erosion (constructed bench or P2 valley) Excess Sinuosity (lack of flow) Braided/Anabranch Channel Evidence of Excessive Hydrology L Evidence of Insufficient Hydrology Hydric Soil Indicators/Soil Series Surface Roughness or Bedding Channel Relocation/Riparian Connectivity Hydroperiod Length or Start/Stop Date Inappropriate Credit Ratio Proposed JD Needed to Confirm Approach Continuity/Fragmentation Easement Issues (existing farm, CE, NRCS funding) Easement Encroachments (livestock, clearing) Easement Marking/Signage Insufficient Project Size Adjacent Property Owner T&E Species Section 106 (historic listing/tribal issues) Insufficient Stream Drainage Area Insufficient Hydrology (if raising channel bed) Vegetation in Channel (stream vs wetland) Flow Obstructions (undersized pipes, fords) Substrate Concerns (embeddedness, particle size) Live Stakes Absent/Failing Evidence of Water Quality Issues In -stream Habitat Weak/Missing Stream Buffer Width Inadequate Missing Gauge Data (preconstruction or monitoring) Gauge Location/Placement Gauge Maintenance Drainage Ditches/Swales Present Field Tiles/Subsurface Drainage Continued Ag Use Adjacent to Wetland Page 2 - - Notes and Sketches, etc Current wildlife easement on part of site expires this year- September 2019 Easement plants - some exotic, discuss with WRC about clearing/select removal Discussion on proposed crossing, needed on site this site? Yes. Adjust to limit fragmentation. Drain tile - concern about future ditching outside easement due to wetness if draintile disrupted, extend easement area/include buffer around wetland HWV at top? Three ditches drain to the top. Watershed size and flat slope consideration. Future land use - row crop, no irrigation, organic fertilizers Possibly raise ditches at top, current high point within project channel, top ditches appear stagnant (algae) Survey field and find drainage paths Discussion following walk-through- biggest concern is top end slope and establishing HWV flow, also easement extension/ wetland buffer Credit Release/Site Closeout Information (For monitoring or closeout review only) ............................................................................................................................................................................................................................................................................................................................................................................................................ Stream Credits Requested Approved* Wetland Credits Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal Requested Approved* *The updated credit ledger for the project, which includes this release, must be approved by the Project Manager. Result of Monitoring Report or Closeout ............................................................................................................................................................................................................................................................................................ Credit Release Not Approved Signature* �rn�L Date 4/17/2019