Loading...
HomeMy WebLinkAbout310837_Inspection_201810020 Division of Water Resources Facility Number - ® O Division of Soil and Water Conservation O Other Agency Type of Visit: 0 Com nee Inspection Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: © Departure Time: County: Region: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Owner Email: Phone: Title: Ousite Representative: � q n Cl qL-� /1^1 ff Q�— Certified Operator: Back-up Operator: Location of Farm: CY^ir[? Wean to Finish W6an to Feeder Feeder to Finish Farrow to Wean Farrow to Feede Farrow to Finish Other Other Latitude: Phone: Integrator. Certification Number: 19 9 -5'2 iy 9� Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IN Non-- La er Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: _ a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ N ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 21412015 Continued Facility Number: Date of Inspection: D R Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes nNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier. Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t, notify DWR ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other. 21. Does record keeping need improvement? If yes, check the appropriate box below. [—]Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections El Sludge Survey 7. Do any of the structures need maintenance or improvement? NF ❑Yes No NA ❑ NE 8. Do any of the structures lack adequate markers as required by the perms? ❑Yes o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑Yes No_ ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. El Yes �❑ NA ❑ NE ❑ Excessive Ponding ❑Hydraulic Overload ❑Frozen Ground ❑Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑PAN > 10% or 10 lbs. ❑Total Phosphorus ❑Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑Evidence of Wind Drift ❑Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑Yes [�.No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑Yes ❑�o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage For land application? ❑Yes [� No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑Yes [.� No ❑ NA ❑ NE Required Records &Documents 19. Did the facility fad to have the Certificate Coverage &Permit of readily available? ❑Yes [� ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑Yes ❑'No ❑ NA ❑ NE the appropriate box. 22. Did the facility fail to install and maintain a rain gauge? ❑Yes No ❑ NA ❑ 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑Yes ❑ No ❑ NA E Page 2 of 2/4/2015 Continued Facdi Number: Date of Inspection: %7 7 2 lrrn 24. Did thb facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes the appropnate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels Zf_N0 ❑ NA V] NE P- o ❑ NA ❑ NE ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating noncompliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 2 No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other. 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE No ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA M_' ; ❑ Yes ❑ Yes ❑ Yes No ❑ NA ❑ NE No ❑ NA ❑ NE No ❑ NA ❑ NE Use drawings o1 iaeitlty to better explain situations (use additional Daces as necesrecommendatioos or any other comments., Comments (refer o ques on Explain any answers and/or any additional, sarv). p f i- ( n ( ," C o� �3 � � �tr(-CI C a —, s Reviewer/Inspector Name: Reviewer/Inspector Signature: C-C Phone: I i D 796 73v y Date: I D L k Page 3 of 21412015