Loading...
HomeMy WebLinkAbout310830_Inspection_20180628_0 Division of Water Resources Facility lumber ©- c3 V 0 Division of Soilland Water Conservation 0 Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: QArrival Time: �'� Departure Time: LFLI�CLI County: Region: Farm Name: y Owner Email: Owner Name: Phone: Mailing Address: Physical Address: 1, Facility Contact: ` L f4"k-(. loved Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to I Wean to I Feederto Farrow to Farrow to Other Other Integrator: Phone: Certification Number: Certification Number: Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er Non -La er Design Current nry Pmdtry Canaelty Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow [—]Yes ®No ❑ NA ❑ NE [—]Yes ❑ No � NA ❑ NE ❑ Yes []No y NA ❑ NE ❑ Yes [—]No ❑ Yes {�No ElYes ;No E� NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page 1 of 3 \ G, 2/4/2015 Continued Facili Number: jDate of Inspection: Waste Collection & Treatment 4 Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 31 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No �b NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier. ftiO.1 Spillway?: Designed Freeboard (in): °I'!� Observed Freeboard (in): ab 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes E�No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes Wo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an Immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes C� No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [0 No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes E4 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �}'jNo ❑ NA ❑ NE maintenance or improvement? 77`"' 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes tStNo ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Windows ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): e r M\+ 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ' ❑ Yes Qj No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement9 Tt Yes W No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes F�yNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes JX No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE , Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. T ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other. ' 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ No ❑ NA ❑ NE El Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis Otte Lftte Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a ram gauge? ❑ Yes ;g No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA V NE Page 2 of 3 21412015 Continued Facie Number: Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a PDA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes Dg�`No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA r\—^E Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA Rr NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes CSVFJo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [)rNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? Ifyes, check the appropriate box below. ❑ Yes W No ❑ NA ❑ NE ElApplication Field ElLagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ZrNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss reviewtinspection with an on -site representative? ❑ Yes V No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [A No ❑ NA ❑ NE Comments (refer to question t/): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional vaees as necessarv). 5�A% sv✓vey d" wA % j t j rr< i t4,o 4l\V , ►.V p `7 = Isis Se► I Owe 101 � Go 1D v aAi Uk. 3-01Z Reviewer/Inspector Name: Reviewer/Inspector Signatur Page 3 of 711CWV yw ^hu�►^^erv'� Phone: 91072L0 Date: (0 2 �a 2/4l2075