HomeMy WebLinkAbout310828_Plan of Action_20180803w:
,Arc., 4 2o1be[9-(S
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-828 County. Duplin
Facility Name D & B Nursery, Site #2 (5-8)
Certified Operator Name Gregory Bret Brown Operator Number. 1001512
1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways
Lagoon Name/ID:
Spillway(Y or N)
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
N
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dales for depopulation
V animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3 Earliest possible dale to begin land application of waste,
8/5/18
I hereby certify that I have reviewed the Information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Ronald Greg Brown Phone: 910-271-2522
Facility Owner/Manager (print)
Date* 8/3118
Facility Owner/Manager (signature)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/Identifier (ID):
Lagoon #1
2 Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard
a. current liquid level according to marker 16.0 inches
b. designed 25 yr./24 hr storm & structural freeboard 19.0 inches
c line b - line a (inches in red zone) = 3.0 inches
d, top of dike surface area according to design
(area at below structural freeboard elevation) 28200 fe
e. line c/12 x line d x 7.48 gallons/fO 52734 gallons
3 Projected volume of waste liquid produced during draw down penod
f. temporary storage period according to structural design 180 days
g volume of waste produced according to structural design 26022.7 ft3
h. current herd # F 3234 certified herd # 3552
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k (Imes h + i + j) x 7.48 x 30 days/hne f=
4 Total PAN to be land applied during draw down penod
I. current waste analysis dated 6/21/18
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21100
23693 ft3
1708 6 fe
17850 Ire
53920 gallons
2.10 Ibs/1000 gal.
224.0 Ibs. PAN
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR /24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1
Structure ID Lagoon #1
line m = 224.0
lb PAN
2
Structure ID
line m =
lb PAN
3.
Structure ID.
line in =
lb PAN
4
Structure ID,
line m =
lb PAN
5
Structure ID
line m =
lb PAN
6
Structure ID:
line in =
lb PAN
n. linesl+2+3+4+5+6= 2240 lb PAN
III TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD
o. tract # p field # q. crop r acres s mwmng IRR- L TOTAL PAN ju appfimwn window'
PAN balance BALANCE FOR
Qb/am) FIELD (Ibs )
column r x s
T5280 I 1 bermuda 1 3 `181 128001 407.0 1 Mar -Sept
'Stale current crop endino application date or next fND application beginning date for available
recemng crops during 30 day draw down period
v. Total PAN available for all fields (sum of column t) =
407 0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
224.0 lb. PAN
x. Crop's remaining PAN balance (line v from section III) =
407.0 lb. PAN
y. Overall PAN balance (w - x) =
-183 lb PAN
no y must show as a deficit If line y does not show as a deficit list course of action here including pump and haul,
)population, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new
formation If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
PoA (30 Day) 2/21100
and recalculate the overall PAN balance It animal waste Is to be named to another permitted facility, provide
cation regarding the herd population and lagoon freeboard levels at the receiving facility
onto existing spray fields will continue as weather and field conditions permit
PoA (30 Day) 2/21/00