HomeMy WebLinkAbout310816_Inspection_20181113V •Division of Water Resources
Facility Number FTF-1 - & 0 Division of soil andMater Conservation
O.Other Agency
Ii ype of visit. ty t,ompuance Inspection V Operation Review U Structure Evaluation U Technical Assistance I
Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: 0 Arrival Time: /S Departure Time: County: Region:
Farm Name: va
&Qd %A I—wY4 S (/ 4-.G Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
to Finish
to Feeder
-to Finish
v to Wean
Other
Other
Phone:
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
r
Design •Current Design Current
Capacity 'Pop. Wet Poultry Capacity 'Pop.
Layer
Non--
La er
Design Current
Dry Pmdtry Canacity Pnn_
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)9
d Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Design Current
Cattle, Capacity ''Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
f
❑ Yes ®No ❑ NA ❑ NE
[—]Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No
❑ Yes tM No
❑ Yes M No
❑NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
Page 1 of 3 21412015 Continued
Facility Number: Date of Inspection: 11—IS—
$
Waste Collection & Treatment
4. INromgEcapacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
[ VNo
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA
❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier: 1
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): -L
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc )
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental
threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
[20 No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
[�g No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes]
No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
Yes
❑ No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge
into Bare Soil
Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
Q No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
[0 No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
Vj No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
10 No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
Q0 No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
]Yes
[VV No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
[jNo
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes JUNo ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [Q No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA NNE
Page 2 of 3 21412015 Continued
Facill Number:
Date of Inspection
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25 is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ Noncompliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes P No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No %NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes JV No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
MNo
❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
T
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
1*o
❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA PrNE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
[ No
❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
E No
❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
E�No
❑ NA ❑ NE
Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
S;ywIMz3
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
OR Rl'vOr/ii- 6,
Phone: ?10"Nc—e3�0
Date: U `3'/ L';�
21412015