Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
930034_PERMIT FILE_20171231
21- tS Type of Visit: eO Com ce Inspection U Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: E�Arrival Time: Departure Time: : po County: Farm Name: IV "C- Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: t-4,61 j4/L►Q e- / Title: Phone: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Region: Integrator: a f �y{r ,,_s Certification Number: Certification Number: Longitude: Discharzes and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? I ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes gNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 0 Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesVN❑NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued r Facili Number: 113ate of Inspection: w Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes <No❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes to ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): "', 6 !' 5. Are there any immediate threats to the integrity of any of the structures observed? 0 Yes EZNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) ZOO 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environments rest, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes to ❑ NA ❑ NE maintenance or improvement? Waste Application /No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NA 0 ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding '❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area r^ 12. Crop Type(s):- .f,Q 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes N ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑Yes o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Re uired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 0 Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAW MP readily available? If yes, check ❑Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements [—]Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes V5No ❑ NA 0 NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers C] Weather Code ❑ Rainfall [:]Stocking ❑ Crop Yield ❑ 120 Minute inspections ElMonthly and 1 " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [:]Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili 'Number: - Date of Inspection: r/(� 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ YesgNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑Yes ❑No ❑NA ❑NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [] Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No [3 NA ❑NE ❑NA ❑NE ❑ NA ❑ NE S jti ds elit rt/QY fi- 2'7-(7 aa- wv�i�l 1 1�.r�ar�G.�_s . Q d k ci�xlr Sp rr►�� C41-1112 y Reviewer/inspector Name: Phone: 1 l q-1q( Y 20p Reviewer/Inspector Signature: i3usf-fl.Q (Owl// Date:, Page 3 of 3 .21412015 P -/7 -17 (Type of Visit: PrRoutine pliance Inspection V Operation Review O Structure Evaluation O Technical Assistance sit:Reason for Vi0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 'j 17 . Arrival Time: G ( Departure Time: County: Farm Name: W c- r—A o, #-2-- Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: " /'q-At— L r} 2�1 y Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Region: Design Current Desin. Current Design Current Swine apacgsw C*apacity Pop. Wet Poultry ty Pop. fc. Otid Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder 2-00 00 Non -La er I Dairy Calf Dairy Heifer Feeder to Finish p D S" Farrow to Wean Design Current D Cow Farrow to Feeder Dr. P,aultr, C•a�ac'it P.o La ers Non-Dairyp Farrow to Finish Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets F lBeef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes N ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (Iryes, notify DWR) [:]Yes NA ❑ NE 2. Is there evidence ora past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [] Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 21412015 Continued Facility Humber: jDate of Ins ection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes o NA ❑ NE a. If yes, is waste level into the structural freeboard? + ❑ Yes No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Z �� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Z'No NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat, notify DWR 7. Do any of the structures need maintenance or improvement`? ❑ YesVND ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit`? ❑Yes NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Z <No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area � 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes � ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes WNo❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 2 KNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �No❑ NA ❑ NE Required Records & Documents t9. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes � ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Weather Code ❑ Rainfall ❑Stocking Crop Yield ❑ 120 Minute Inspections ❑Monthly and I" Rainfall InspectioZ/011 Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued (Facility Number: - . C Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check El Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 3 I. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No ❑ Yes [:]No [:]Yes [:]No ❑ NA ❑ NE ❑ NA ❑ NE [DNA ❑NE Comments (refer to question #): Explain any YES answers and/or any`addittonal recomme6dati6ns,0r,any other comments r Use drawings of facility to better explain situationsluse�ad"ditional "pages as necessary). y N1, 6'e SL< y D 7- G << r7, 60 ,, Reviewer/Inspector Name: /d._ 22 --/� Reviewer/Inspector Signature: , (, Page 3 of 3 Phone: Date: r� l 21412014 -q - /G Type of Visit: ,0 Com ante Inspection O Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: Routine O Complaint O Follow-up Q Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time:/ % Departure Time: F.'t County: FarmName: QI1-. Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone. - Onsite Representative: Mfr r �y� qua / r 10+,% Integrator: Certified Operator: Back-up Operator: !Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Region: Swine Wean to Finish Design Capacity Current Pop. Wet Poultry La er Design Current C city Pop. C►attle Dairy Cow Design Current C►flPE y Pop. Wean to Feeder Non -Layer Dairy Calf Feeder to Finish Farrow to Wean Dr, P,oultrF Layers Design C•aacit Current P,o P. Dairy Heifer D Cow Farrow to Feeder Non -Dairy Farrow to Finish Beef Stocker Gilts Non -Layers Beef Feeder Beef Brood Cow Boars Pullets Other Other IF Turkeys TurkeyPoults Other Discharges and Stream Impacts �No I. Is any discharge observed from any part of the operation? ❑ Yes NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes Ef NA ❑ NE 2. is there evidence of a past discharge from any part of the operation'? ❑ YesrNoo NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued f lFacility Number: 9 3t Date of inspection. F Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes o - NA FINE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t t, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit'? ❑ Yes;No Na NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require 0 Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? l l . Is there evidence of incorrect land application? If yes, check the appropriate box below. Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): _('6>-R_ 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crap and/or land application site need improvement? ❑Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application'? ❑ Yes2"o NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required J Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? I ryes, check [] Yes VNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Weather Code ❑ Rainfall ❑ Stocking[] Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑Yes ❑No ❑NA ❑NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer torquestlon'#): Exlam any IYES`answers and/or any additional reeoiriimendations or any other�cottiments Use drawings of facility;to befter explains tua.`tioiis (rise additiogal `ages;as necessary), C5'4 I I 5"/,,t C/y_ 5'cl� rvz '*-/ 10- (9, - /-j- 0 1, OP F41 ( aa /'J� Reviewer/Inspector Name: j Reviewer/Inspector Signature: Phone: %,I E - -( ZO a Date: 21412015 Page 3 of 3 3 - 29 - 1--Ir Iiype or visit: tp gown nce inspection tJ vperacion tceview v 5rrucrure Evamanon v iecnmcai Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: 628 2!, & 7-- Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: 6 �j t I7 i'►') 6 vs Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Wean to Finish ILayer IDairy Cow Wean to Feeder [Non -Layer Dairy Calf Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish 7DNesn Current Dr. P,oultr it P,o La ers Dairy Heifer D Cow Non -Dairy Beef Stocker Gilts 7NO n-La ers Beef Feeder Boars Pullets Beef Brood Cow Poults Other Region: Discharges_ and Stream Impacts I. Is any discharge observed from any part of the operation? ❑ Yes 0 No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify.DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. ' Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ V Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facility Nufmber: a 3-3 jDate of Inspection: r/ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, cheek ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑Yes No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations o=rfany other mme�nts le `? Use=drawings of facility to"better explain situations (use additional ages as necessary). ' Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 7 1 _- Z 219C Date: r? — /Y — 21412011 FaNity Number: - Date of Inspection: r Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? [:]Yes ❑ NA VN ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ZfNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 12 No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environments reat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? /NoO 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 101bs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [] Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o [D NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Rewired Records & Documents 19, Did the facility fail to have the Certificate of Coverage & Permit readily available? [] Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ YesVNo❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [] Yes No NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued q `j-t'y Date of Visit:Arrival Time: D Departure Time: 1La f County: Region: Farm Name: �" iV. Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Swine Capacity Pop. Wean to Finish Design C►urrent Wet Poultry Capacity Pop. La er .Design Current Cattle Capacity Pop. DairyCow Wean to Feeder Non -La er DairyCalf Feeder to Finish DairyHeifer Farrow to Wean Farrow to Feeder Farrow to Finish Design Current Dr, P,oultr. Ca aci P,o Layers D Cow Non-Dai Beef Stacker Gilts Boars Other Other Non -Layers Beef Feeder Puilets Beef Brood Cow Turke s Turkey Pouits Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes Of No ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) [:]Yes P-NO ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes o ❑ NA [] NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes T ❑ NA TTT"' ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes o ❑ NA [] NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facility Number: Date of Inspection: 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes N NA ❑ NE a. if yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in);� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t at, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit'? ❑ Yes�No A ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): tSco .5—& .e 13. Soil Type(s): / . 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ©N ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ YesONo NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Tre ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall InspectiSludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes❑ NA ❑ NE 23. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - Date of Inspection: 12 jZt 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes T No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 25. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No 6 NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 3 L Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32, Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer: to question #): Explain any YES answers and/or any additional recommendations or any other comments.: LTse`_drawzngs,offacility to better explain situations (use additional pages as necessary).' 4P6.2odl r_o2t, Reviewer/Inspector Name: Reviewer/Inspector Signature: Bte .S AAL 7BL,%C--,l Page 3 of 3 Phone: 2 V—(zZ-0 O Date: L 21412011 3 Type of Visit: Q Com cc Inspection U Operation Review O Structure Evaluation p Technical Assistance Reason for Visit: Routine O Complaint Q Follow-up O Referral O Emergency O Other Q Denied Access Date of Visit: G 1 Arrival Time: / Departure Time: _ =County: Farm Name: iV't'yL Owner Email: Owner Name: M.4 ^4 t I✓ �� , Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Region: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er Dai Cow Wean to Feeder Non -La er Dai Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dr, P,o_ultr. C•.a acl P,oINon-Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turke Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZfNo I NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) [3YesVNo❑NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) (—]Yes IAY ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE ere any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE 3. Were th of the State other than from a discharge? Page I of 3 21412011 Continued Facili Number: - Date of Inspection: i Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Structure 5 Structure 6 ❑ Yes No . A ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes �No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) — / 9. Does any part of the waste management system other than the waste structures require ❑ Yes �O ❑ NA ❑ NE maintenance or improvement? Waste Application —I 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes J�NO ❑ NA [3 NE maintenance or improvement? ll�� 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ZfNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): Cie s64e_ L, 13, Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes rNo❑ NA ❑ NE acres determination? , 17. Does the facility lack adequate acreage for land application? ❑ Yes ZNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? []Yes VNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes VN � ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements []Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall InspectiFNo Iudge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes❑ NA ❑ NE Page 2 of 3 21412011 Continued f ' Facilit Nulmber: - .3 jDate of Inspection: / G 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes NVNo ❑ NA [3 NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o A ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No [:]Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations,or;any.other comments -V Use drawings of facility to better exRlain situations (use additional pages as necessary).. , Reviewer/Inspector Name: Reviewer/Inspector Signature: �j(,� 14CA' `rl-„ Page 3 of 3 Phone: rJ�'jal —4/2ya Date: 21412011 Type of Visit .compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access '0 Date of Visit: Arrival Time: ` : iU Departure Time: /2— ,3G County: �w���) Region: Farm Name: AI f u6�X l�i:r�rn�S�. 2 Owner Email: Owner Name: _ 1 4ct-A, En '*/ Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator: Certified Operator: Back-up Operator: Phone No: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: 0 e = d 0 « Longitude: 0 ° = ' 0 Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity Population El Wean to Finish ,T ❑ Dairy Cow ❑ Wean to Feeder Non -La er Discharges &Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑Structure ❑Application Field El Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes FerNo ❑ NA ❑ NE ❑ Yes ❑"No ❑ NA ❑ NE ❑ Yes 2-No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes O-No ❑ Yes ❑'fVo ❑ NA ❑ NE ❑ Yes E"No ❑ NA ❑ NE Page 1 of 3 12/28/04 Continued Facility Number: — 3 Y Date of Inspection i Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes 2rNo ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ONo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ONo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? 2rYes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ZNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes VNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 0No ❑ NA ❑ NE maintenance/improvement? 11, Is there evidence of incorrect application'? If yes, check the appropriate box below. ❑ Yes WNo ❑ NA ❑ NE ❑ Excessive Ponding [:]Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l o lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) �fC �P 44, - 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes gNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? _ZYes ,lo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes g No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes L3-No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 2rNo ❑ NA ❑ NE Comments (refer to guestio.tfi#) Explain any YES xansviers and/or an_y recommendationsor, any,othen comments -i ' Use,deiWin s offacili to:better ezl lain situations., uiCadditional a es as°necessa g. ty P ( p g Y)' 'i ; _1 ii.Ci Yi'.! i..�• d a :-r �N6i:,1 «. i. # Sr n p l ,.n o 7F A-OA 4 srn S A'Pr MY Reviewer/inspector Name � � � > .0 �'� � ` ?fig `*f . Phone: %��% �1— j'1CU !�E �. �� Reviewer/Inspector Signature: Date: 2 — 2 3 —lG Page 2 of 3 12128104 Continued Facility Number: Date of Inspection 2-2,3— 1r' Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes -No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes O No ❑ NA ❑ NE the appropriate box. ❑ WDp ❑ Checklists ❑ Design [I Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes C'No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ONO ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes P No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes _0'No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes O No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes DNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes O-No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ,_No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 3 I. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes E5-No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 2rNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes 21No ❑ NA ❑ NE Additional,Coinmentsa'ndlor,Drawings �. ,` ¢'.°;g'.. il.'V All II # P Z Csa Lr✓of)-e Ape/Y, r rir 2 2, -7�07 _cf3- 2 Page 3 of 3 12128104 e Type of Visit Ja-Compliance Inspection O Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit S2'koutine O Complaint O Follow up 0 Referral O Emergency O Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: /2=3G County: LIc-2�/Region: /—G/ Farm Name:AY,�l!^ �ff2 Owner Email: Owner Name: Mailing Address: Physical Address: _ Facility Contact: , Onsite Representative: Certified Operator: _ Back-up Operator: Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: = o = I ❑ Longitude: = ° = , = N Design Current Design C►urrent Design Current Swine Capacity Population Wet Poultr.,y Capacity Population Cattle Ca-arc�i�ty Population ❑ Wean to Finish ❑ La er ❑ Dairy Cow ❑ Wean to Feeder C J 10 d ❑Non -La er ❑ Dairy Calf ❑ Feeder to Finish 2 3 ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ Dry Cow ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish ❑ La ers ❑ Beef Stocker ❑ Gilts -Layers El Beef Feeder ❑ Boars El Pullets ❑ Beef Brood Cow ❑ Turkeys Other ❑ Other ❑ Turkey Poults ❑ Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes O'No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes allo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes O-No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes Zko ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes P'`No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes JO'No ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12128104 Continued Faci[iy Number: 9Date of Inspection 7-O Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ,0No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ErNo ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes E3No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ZNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ,liJ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ?'&o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ;3No ❑ NA ❑ NE maintenance/improvement? ,,( 11. Is there evidence of incorrect application? if yes, check the appropriate box below. ❑ Yes .fl No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) l�oS[�.P //c 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 2No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Ej No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes eNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 12rNo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): ReviewertInspector Name �GIvP f Phone: /9' 7 9/- `/Z ec Reviewer/inspector Signature: Date: .?7—oS 12128104 Continued Facility Number: 93 -3y Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ,El'No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes P'No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ g Other p 21. Does record keeping need improvement? if yes, check the appropriate box below. ❑ Yes ,ETNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes El"No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [E No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ,EfNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes J'No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ,[allo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes J2'No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ,21'No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes O No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ZNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes L`No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ,2fNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes XNo ❑ NA ❑ NE Additional Coiii'ments and/or Drawin s _ � 4 � ' J gsV 11 �YO„tlyJrf 3 A- 2, 9 Z ;7 Page 3 of 3 12128104 Facility Number Division of Water Quality Yo o-3 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit Z Compl' ce Inspection O Operation Review O Structure Evaluation 0 Technical Assistance Reason for Visit outine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: �� Arrival Time: ��5 D I Departure Time: County: Farm Name: � 4 _ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Title: Phone: Phone No: Integrator• Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Boars Other ❑ Other Region: Latitude: = 0 0 6 Longitude: = ° = t Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer II ❑ Non -La er Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stockei ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes Zf"No NA ElNE Discharge originated at: El ElApplication Field ElOther a. Was the conveyance man-made? ❑ Yes No NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑,NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) A ❑NE 2. Is there evidence of a past discharge from any part of the operation? jYesN ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State o ❑ NA ❑ NE other than from a discharge? 12128104 Continued Facility Number: — Date of Inspection Required Records & Documents Records & Documents _ ► 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WUp ❑ Checklists Mn . ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. LiYes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I " Rain Inspections G Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? El Yes o NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YesPNo[:] A ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ YesA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ YesA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ YesA ❑ NE Other Issues 28, Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE i ❑ Yes No� NA ❑ NE ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments and/or Drawings: P.rZ C'4 P !i,z— 4-o S C_ L 1= r 4 ce4 ., v-lz . (b 947 ��k� r��/�� �P ��►re r� c= �css -�-�n y�, !-! W- U 11 l C ., o �= �k rya w �- pe .,1, 12128104 Facility Number: — L Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. if yes, is waste level into the structural freeboard'? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):� 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes VNo NA El NE ❑ Yes ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No NA ElNE [IYes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �El NA El NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require El Yes No NA [I NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ❑ NE maintenance/improvement? 1 l . Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > l 0% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Driii ❑ Application Outside of Area 12. Crop type(s) r� 13. Soil type(s) l' 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ;/N�NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination'?❑ YesVNoNA A ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ YesA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name G e7„-.j � Phone; Reviewer/Inspector Signature: Date: 12128104 Continued Facility Nuinber I q E�—�j ip Division of Water Quality f�`FGrc� 0 Division of Soil and Water Conservation O Other Agency Type of Visit 45 Comp' ce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine O Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: �nArrival Time: Departure Time: County: Region: Farm Name: it19 /r f� „•_ Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: r- Certified Operator: M P` rt n_ Title: Phone No: Integrator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Latitude: = 0 = = « Longitude: 0 ° 0 g = f4 Design Current Design Current Capacity Population Wet Poultry Capacity Population I! I❑ Layer D Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turke Poults ❑ Other Discharges & Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dair Calf ❑ Dairy Heifej ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system`? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ,❑ No ❑ NA ❑ NE ❑ Yes koEIN,A A ❑ NE ❑ Yes ❑ NE ❑ Yes VNA ❑ NE El Yes N ❑ NE El Yes No ❑ NA ❑ NE 12128104 Continued Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Na NA El NE a. If yes, is waste level into the structural freeboard? ❑ Yes;No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE Oe/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ldNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threa -notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA [I NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes ❑ NA ElNE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �5oC] NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes X NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area r 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? [--]Yes 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[:] Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes N ❑ NA ❑ NE !CJ N ❑ NA ❑ NE NV' ❑NA [I NE El NA El NE No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): AL Reviewer/Inspector Name Phone: /" - Reviewer/Inspector Signature: Date: 12128104 Continued Facility Number: 3 — ! Date of Inspection Re uired Records & Documents t9. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes eNo NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑ Other 21. Does record keeping need improvement? If yes, clieck the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V 'ather Rain Inspectio;�o Code 22. Did the facility fail to install and maintain a rain gauge? ❑ YesVNo:4 NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ YetTN A ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YeA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit'? ❑ YeA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ YeA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ YeA ❑ NE Other lssues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments and/or 12128104 Type of Visit compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit WRoutine 0 complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: a` S Departure Time: �7 County: wA�_ Region: Farm Name: AC, FAAw-- iLk Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: &&PPR.Frva Certified Operator: Back-up Operator: Phone: Phone No: Integrator: Operator Certification Number: i I Z s' Back-up Certification Number: Location of Farm: Latitude: = e = 1 = Longitude: 0 0 ❑ 1 = � �' Current Design Current , ^ : �uesJgstl ,di,�Design o��n Current Capacity Population Wet Poultry S apa ty PoMDUI on C+attlery Popullanon ❑ Dairy Cow ❑ Wean to Finish ❑ La er ❑ Wean to Feeder ❑Non -La et ' ❑ Dairy Calf ❑ Feeder to Finish "` ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultr�y� ``' ❑ D Cow ❑ Farrow to Feeder El Non -Dairy ❑ Farrow to Finish vwmo tvvqAtP ❑ La ers Z,,65- ❑ Non -Layers �` ❑ Pullets ❑ Beef Stocker ❑ Gilts El Beef Feeder ❑ Boars ❑ Beef Brood Cow ❑ Turkeys Other ❑ TurkeyPoults Number of Structures: ❑ Other ❑ Other Discharges & Stream Impacts I. Is any discharge observed from any part of the operation? ❑ Yes 0 No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ No �NA ❑ NE b. Did the discharge reach waters of the State'? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El Yes 7 No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes No ❑ NA ❑ NE other than from a discharge? J0 12128104 Continued Facility Number: Cf — Date of Inspection / i7 Waste Collection &'Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): ❑ YesoNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes oNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ;!fNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No //To ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes,2�No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ONo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application'? If yes, check the appropriate box below. ❑ Yes gNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop type(s) FE Cu 13. Soil type(s) RC o L,C't` 3-Av+ VA jC C- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 21 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination' ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ONo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 1PNo ❑ NA 1:1 NE Reviewer/Inspector Name �:T�tr► Jeri.H Phone: �5 i�Z `f a Reviewer/Inspector Signature: Date: t i 12128104 Continued s . Facility Number: 3 — Date of Inspection t t -0 Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 5�►VS 20. Does the facility fail to have all components of the CA P readily available? If yes, check the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps El Other 21. Does record keeping need improvement? If es, check the appropri a box below. 1- qtj 7.' a 16" El Waste Ap cation ❑ W ly Freeboard Waste Analysi b Soil Analysis ❑ Yes No ❑ NA ❑ NE ❑ YeszNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Waste Transfers ❑ Annual Certification ❑ Ra' 11 ❑ �ing ❑ Crop Yield El120 Minu� Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ;eNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ElYes ZNo 24. Did the facility fail to A`Kratkltwaste application equipment as required by the permit? ❑ Yes ZNo { 25. Did the facility fail to conduct a sludge survey as required by the permit? i�1b��6 -1 ❑ Yes ONo 26. Did the facility fail to have an actively certified operator in charge`? ❑ Yes YNo 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 3 l . Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ NA ❑ NE El NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes 7No ❑ NA ❑ NE ❑ Yes VNo ❑ NA ❑ NE ❑ Yes 7No ❑ NA ❑ NE ❑ Yes ?'No ❑ NA ❑ NE ❑ Yes FNo ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE ❑ Yes 9"No ❑ NA ❑ NE Additional Conment`,s;'arid/o'rrDrarvin s ' �` ' A' 12128104 Type of Visit fd'Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: l 7 Arrival Time: t f a S Departure Time: County: Farm Name: ICJOwner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: __ OAA2.-y-A t_G�� „.. Certified Operator: Back-up Operator: Phone: Phone No: Integrator: Region: Viez Operator Certification Number: lr gC2 - Back-up Certification Number: Location of Farm: Latitude: = e = 6 = f4 Longitude: = e = 1 ff� I Swine I FIDign Current`- Wet Poultry Design';Current �� Desin Current cit Po ula Y P R �u Ca ac Po ulahon 1? �.�.,..RpF� Cattle Ca acity Population. ... ❑ Wean to Finish Ia 7 ❑ La er ❑ Daipt Cow ❑ Wean to Feeder ❑Non -La er r ❑ Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry =�; ❑ Dry Cow ❑ Farrow to Feeder" ` Non-DaiEX ❑ Farrow to Finish ❑ ers ❑ Beef Stocker ❑ Gilts Non -Layers ElNN ❑ Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Cow El Turkeys Qther ❑ Turkey Poults ❑ Other ❑Other Ell] Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. is there evidence of a past discharge from any part of the operation? 41 3. Were there any adverse impacts or potential adverse impacts to the Waters of the.State' other than from a discharge? ❑ Yes ❑ No A NA ❑ NE ❑ Yes ❑ No [;�'VA ❑ NE ❑ Yes ❑ No Ef NA ❑ NE 5�NA ❑ NE ❑ Yes, ❑ No ..;' 1 El ❑ No VN I""" R' ❑-NE, ❑'Yes ❑ No NA ❑ NE 12128104 Continued Facility Number: 2 = Date of Inspection aS Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Z 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No ❑ NA ❑ NE ❑ Yes [�No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes (2fNo ❑ NA ❑ NE ❑ Yes PNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes gfNo ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes FTNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ElNA ElNE maintenance or improvement? e vi Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes PNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes dNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) F I_ S c:.. "'C -A A. 13. Soil type(s) �j $ 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �ZNo ❑ NA ElNE 15. Does the receiving crop and/or land application site need improvement? ElYes [� No El NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination, yes /�No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes RNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes P No ❑ NA ❑ NE Comments {refer to question #) Explain any YES�answers�andlor,anyRecommendations or any other comments. Use dre nffif facali `to better ex liilh situations use additional a des°as necessar h'S i p� `p g w.I ector Name •:]c tI1:' ,�"�ti' "' t Phone: S� i 4�'7"sa Reviewer/Ins P s ;s= Reviewer/Inspector Signature: Date: S 12128104 Cnirtinued y � Facility Number: Date of Inspection Required Records &_Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes [�kNo ❑ NA ❑ NE � a3 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ANo ❑ NA [I NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improve'went? Ifyes,;heck the appropriate box bellow El Yes � No El NA ❑ NE El Waste Application ElWeekly Freeboard,. ❑ Was I, nalysis ❑ Soil Ahalylsis ❑ Waste Transfers ❑ Ann _ ofcation ❑ Ra fall ❑ Sto m ip yk' g El Crop Yield ❑ 120 Minute inspections El Monthly and 1"Rain Inspections ❑ W aher Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [7No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes VrNo ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes VNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes � No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No rr-3 [INA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ElYes No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ElNA ElNE If yes, contact a regional Air Quality representative immediately 7 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes �/] No ElNA El NE General Permit? (ic/ discharge, freeboard problems, over application) / 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE A'dditaonalFCoinmentsand/nrDrawitgs V wf1` r '. �1,' s k . 4 i+ �� L_; 12128104 (Type of Visit OF Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: L o Time: Zo Q Not Operational Q Below Threshold ;34'ermitted MCertifiied [3 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: ......................... FarmName: .............................................................................................................................. County:......W.A.(4.L:� ................................................. Owner Name: Phone No: MailingAddress: ............................................. ............................................................................................................................................................. .......................... Facility Contact: Title: Onsite Representative: _ . A.P.'.;. T r' ( rc ............ Integrator: Certified Operator: Location of Farm: Phone No: Operator Certification Number: .......................................... ❑ Swine ❑ poultry ❑ Cattle ❑ Horse Latitude • t 46 Longitude • 1 « C� •fT � Design Curren •••,•. t:r: ry uiauvu4t��„.:a�.w��.,ts,.�,i�u:,-vn ac[[ °,rry uianvn: ❑ Wean to Feeder e[s� i! ❑ Layer ❑ Feeder to Finish Z,�O , ❑ Non Layer ❑ Farrow to Wean ❑ Farrow to Feeder eiE ❑ Other El Farrow to Finish 3aa� 3 IE� fF13s� {E,i�..: " 3 4 ' Total Desilj s b a sil.Z ❑ Gilts ❑ Boars Discharges & Stream ImRacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? ❑ Yes C/No ❑ Yes QNo ❑ Yes 0 ❑ Yes No ❑ es o 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Y No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes No Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure Identifier: ............................................................................................. Freeboard (inches): 2 12112103 Continued Facii!ity Nutr4ber: c -- 3 Date of Inspection Z a' 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes �No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes �No closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes j2�No 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? ❑ Yes ;RIKO 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes]�N0 elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes �No 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes p "o ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type Jr —_CS j 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ZI No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes [ rNo 16. Is there a lack of adequate waste application equipment? ❑ Yes �ZNO Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑/Yes ❑ No liquid level of lagoon or storage pond with no agitation? / 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes o roads, building structure, and/or public property) / 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes No Air Quality representative immediately. Field Copy ❑ Final Notes Reviewer/Inspector Name t a �" t"u1 i; f, i�"` i€i its filf aU `�9 : �r�" `/ !ai `Hiles / t,. ?L h � t !' N°=N " }:.�'�s .Wl �P Reviewer/Inspector Signature: Date: -7 2 12112103 Continued l~adHty Ntimber: — Date of Inspection 7 -b Required Records & Document.~ 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes No 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? ZNo (ie/ WUP, checklists, design, maps, etc.) ❑ Yes 23. Does record keeping need improvement? If yes, check the appropriate box be ❑ Yes �(No ❑ Waste AppPAtion ElFreebp�d [I Wastenalysis ❑ Soil S ing l 24. Is facility not in compliance with any appli b7e setback criteria in effect at the time of design? ❑ Yes o 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes YNo 26. Fail to notify regional DWQ of emergency situations as required by General Permit? discharge, freeboard ❑ Yes (ie/ problems, over application) 'E�No 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes [�To 28. Does facility require a follow-up visit by same agency? ❑ YesVNo 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes P31No NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 3I-35) ❑ Yes/No 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Ye 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ❑ No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After V Rain r 1 120 Minute Insnections r'! Annual Certification Form 12112103 ayU Type of Visit JOC`ompliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit �:7 Routine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access FFacility Number Date of Visit: O Time: t �� .../ Not O erational Below Threshold ermitted �ertified 0 Cond(ittiionally Certified 0 Registered Date Last Operated or Above reshold: Farm Name: j C ff +" y P'�" ° S' ` �' County: Owner Name: Mailing Address: Facility Contact: Title: On site Representative:.,ci�l,aus'-1G[�� Certified Operator: Location of Farm: Phone No: Phone No: Integrator: Operator Certification Number: ❑ swine ❑ Poultry ❑Cattle ❑ Horse Latitude Longitude J Design Current Design Current Design Current Swine Capacity Population PouItr Capacity Population Cattle Capacity Population El Wean to Feeder z© ❑ La er ❑Dairy ❑ Feeder to Finish 8 ; ` ❑Non -La er ❑Non-Dai Farrow to Wean ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity.. ❑ Gilts ❑ Boars Total SSLW w �. Number of.Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area Easpray Field Area t -. _.. Holding Ponds 1 Solid Traps 10 No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 1P No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes VNo b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes ❑Ao c. if discharge is observed, what is the estimated flow in gal/min? 7/ d, Does discharge bypass a lagoon system? (lf yes, notify DWQ) ❑ Yes [ INo 2. Is there evidence of past discharge from any part of the operation? El Yes /9 No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes PNo Waste I k •tin R& Treatment 4. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes .7No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard (inches): 3 05103101 Continued Facility Number: c3 — 3 Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed,? ({ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Pending ❑ PAN ❑ Hydraulic Overload 12. Crop type _ f`C_EC_0 . d-A y 13. Do the receiving crops differ with those designated Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal W_ g,e� anagement Plan readily available? (ie/ WUP, checklists, design, maps, etc.) l rr3��Z,f'z!! F 19. Does record keeping need improvement? (ie/ irrig�n, freelfoard, watt analysts &soil same a rep rts) 20. is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes W(No ❑ Yes ONo ❑ Yes A No ❑ Yes ANo ❑ Yes JNo ❑ Yes �o ❑ Yes 7No ❑ Yes ,"No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes El 9�x No ❑ Yes No ❑ Yes 4a 1VO ❑ Yes No ❑ Yes ��fo ❑ Yes �No ❑ Yes 4I No ❑ Yes 1No ,2 El Yes L� IN,"(' El Yes fff///j2No 10 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. I Reviewer/Inspector Name Ln Reviewer/Inspector Signature: Field Conv ❑ Final Notes Date: 05103101 I Continued Facility Number: 3 —3 Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below Yes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 29. is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes PNo 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes P"No 31, Do the animals feed storage bins fail to have appropriate cover? ❑ Yes E� No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? /P"Yes ❑ No Additional Comments and/or Drawings:-., 05103101 '7IN6 I� Type of Visit 0 Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit O Routine O Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number Date of Visit: �% to Time: Not O erationall 0 Below Threshold ;l6rmitted Oertified 0 Conditionally Certified E3 Registered Date Last Operated or Above Threshold• Farm Name: okL f a�S �`* P Ij -2-County: 61 A-"6" Owner Name: Mailing Address: Facility Contact: I Title: Onsite Representative: _�` °" E�J6�.L� Integrator: Phone No: Phone No: Certified Operator: Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Morse Latitude 0 & Lf Longitude • 4 Dµ Swine Current`', Pnnnistinn' ❑ Wean to Feeder 9 ❑ Feeder to Finish El Farrow to Wean ❑ Farrow to Feeder El Farrow to Finish ❑ Gilts ❑ Boars 7 fiber -4 Current -:. Design Current Pnnr�latinn CHttle:� ... .,, f'nriarity Pnni`ilntinn�"'` 1LJ Non -Layer I 1 I, lIJ Non -Dairy I I I' ' 3� -- k.°i ❑Other � " ,�a Total Design Capacity .. i Total SSLW :ILJ Subsurface Drains ❑ No Liquid Waste 11 Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. if discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): 05103101 ❑ Yes L j.Pd'o � ❑ Yes �Io ❑ Yes ><10 ❑ Yes Po ❑ Yes PNo ❑ Yes H No ❑ Yes ZNo Structure 6 Continued r] Facility Number: 93 — 341 Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes �No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑Yes ZNo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes �NO 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ZNo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes �NO Waste Annlication 10. Are there any buffers that need maintenance/improvement? ❑ Yes Z�No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes id No 12. Crop type ✓4_S v6"C_ N 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes EXNO 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ZNo 15. Does the receiving crop need improvement? ❑Yes 16. Is there a lack of adequate waste application equipment? ❑ Yes ;3"No Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or oth r Permit readily available? ❑ Yes No 7� zs� �j= 18. Does the facility fail to have all components of the Ce ified r►�i al Waste Management Plan readily available? (iel WUP, checklists, design, maps, etc.) ❑ Yes 6No [C. LY 1 19. Does record keeping need improvement? (ie/ irri tion, fre�rd, waste analysis & soil sam�—plle reports) �� ❑ Yes �VNO 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ElYes o 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes Y!rNo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ONO 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ONO 24. Does facility require a follow-up visit by same agency? ❑ Yes Ia No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes LQ No No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. U5/03/Ul c.onrrnuea Facility Number: 9 -3— pi Date of Inspection 3 D Printed on: 1/9/2001 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below /Yes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes Wo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes 5AP 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes �No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes /No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? dy es ❑ No Additional ornments 'an or ra n s: ce J 5/00 76 i.k. It Type of Vlslt 46 Compliance Inspection Q Operation Review O Lagoon Evaluation Reason for Vielt Routine O Complaint O Fonow up Q Emergency Notification O Other ❑ Denied Access Facility Number Date of visit: PONot c� Time: Operational Q Below Threshold PIrmitted E116ertifeed [3 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name: ...1 .... ...1 ......................................... County: ........... V, -A1i2 Fjt........................... Owner Name:.......... .. Phone No: FacilityContact:.............................................................................. Title:................................................................ Phone No:................................................... MailingAddress:................................................................................ Onsite Representative: GW AP-r-rj ��c.:S ............................................................. Certified Operator: ........................... Location of Farm: .......................................................................p....................................... Integrator:....C-r �a ) aQ •qu—S-4 ................................................................ Operator Certification Number: .......................................... ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude Longitude �• �� �« Design,. Current Design Current Design Curren! ;Ca aci :Population Poultry Ca aci Po ulaflo" ; Cattle Ca ac>i Po 'elation ..; ❑ Wean to Feeder a ❑ Feeder to Finish V%ft ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars ❑ Layer ;.' ❑ Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other 14 , , Total'Desigin'Capacity` ` Total s— i Number,of Lagoons i• ; ❑ Subsurface Drains Present ❑ Lagoon Area - ❑ Spray Field Area Holding Ponds I SoIidETraps.' ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes YNo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes E!rNo b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ] Yes �' o c. If discharge is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) ❑ Yes B'Nio 2. Is there evidence of past discharge from any part of the operation? ❑ Yes ;2No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 1110 Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 ❑ Yes Structure 6 Identifier: ........................................ Freeboard (inches): Js 5/00 I Continued on hack Facility Number: — 3 Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes )eNo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ,QNo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes KNo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes XNo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes PNo _Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes 2N0 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes ONo 12. Crop type r2, 3 C , F_ I.A wa.. Z'2. r 13, Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes F`NO 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ElYes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes 210 15. Does the receiving crop need improvement? ❑ Yes PIR0 16. Is there a lack of adequate waste application equipment? ❑ Yes J2<0 Re uired Records & Documents 17, Fail to have Certificate of Coverage & General Permit readily availabl ? ❑ Yes hTo I8. Does the facility fail to have all components of the Certified � /mffVaalte Management Plan readily available? lNNo (ie/ WUP, checklists, design, maps, etc.) ❑ Yes 19. Does record keeping need improvement? (ie/ irn lion, reeXard, wasll alal§sis & soil sampld reports) ❑ Yes 0 /WNo 20, Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes 0190 22. Fail to notify regional DWQ of emergency situations as required by General Permit? �(No (ic/ discharge, freeboard problems, over application) ❑ Yes 23. Did Reviewer/Inspector fail to discuss reviewlinspection with on -site representative? ❑ Yes 0<o 24. Does facility require a follow-up visit by same agency? ❑ Yes i 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No Q YiQ1 iQ�s.a# ref��e ei ire � eS� �1 `t4 {�1s;v�s�t; Yoh will ireeeiyit 1) fP�h$t' . . 6 resaosidence: abvuti this .visitr ........... • . • ............ • ........ . ReVlewer/InSpeCtOrName t a1.4 ¢3(�I���.'I„�::{� �lr, ¢ r:rii�o- Reviewer/Inspector Signature: C._ Date:Z D a l 5/00 Facility Number: 9 — 3 i Date of Inspection 3b � Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below gYes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes WRO 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes WNo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes �'No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes J'No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes PNo 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ❑'�lo Addidona omments an or, .. .... .:. 5/00 �, / zz %-- Routine O Com laint O Follow-up of DWQ inspection O Follow -qp of DSWC review (:)Other Facility Number Date of Inspection f= , E>a t Time of Inspection 24 hr. (hh:mm) ermittedxdCertified © Conditionally Certified [3Registered E3 Not O erational Date Last Operated: ...... Farm Name: .......... c...A `.. f' tax �Ep-� $i ......................... County: ......... ...W..la� OwnerName:.Ql! ............... r�.�Z}....t' ............................................................. Phone No:....................................................................................... FacilityContact: .............................................Title:................................................................ Phone No:................................................... MailingAddress: ..................................................... Onsite Representative:......%�'}ta . f .. `p GZ!...................................................... Integrator:.. ...... ! ``........................................... Certified Operator: ................................................... ............................................................. Operator Certification Number:.......................................... Location of Farm: t.......................... ........ ............... ..................... .............................. 0......... ............... � Latitude 36 SZ Longitude a Design Current Design Current Design Current e )E?oultry -, 'aci °ulahon'- Cattle ° '{ 'aci `ulation wane .. Ca"acrty _rPo" ulat_ion <`Ca Po , Ca , I?o 4. ❑ Wean tofeeder' �a [] Layer `` ❑ Dairy ❑ Feeder to Finish[ ❑ Non -Layer ❑ Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑Other , Farrow to Finish Total DeslgngCapaC><ty Gilts ❑ Boars Total SSLWt= sNu 10 Subsurface Drains Present .............. ❑ Lagoon Area 10 Spray Field Area -_.. ,-... •...... ... .... ... ... _.-. ,. ..--. ❑ No Liquid Waste Management System 3 y „i� �i�Ci",� 1 , x {3; Holding Ponds / Salicl TraI1S ;o- Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system►? (Il` yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 ❑ Yes ZINO ❑ Yes ,JNo ❑ Yes dNo ❑ Yes ZNo ❑ Yes �o ❑ Yes ��o ❑ Yes I�Ino Structure 6 Identifier: Freeboard (inches): .........................:.................................................................. 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes P'Ko seepage, etc.) 3/23/99 Continued on back + Facility Number: 3 — 3 Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes �No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? ❑ Yes(No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes eNo elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes E No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes ;2(No 12. Crop type GuL>r N . 13. Do the receiving crops differ with those designated in the Certified Animal Waste na em nt Plan (CAWMP)? �� ❑ Yes No 14. a) Does the facility lack adequate acreage for land application? ,ter' ❑ Yes 2 rro b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes 0 No 15. Does the receiving crop need improvement? ❑ Yes ,( No 16. Is there a lack of adequate waste application equipment? ❑ Yes O'No Required Records & Documents 17.. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes P`No 18. 'Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUF, checklists, design, maps, etc.) nalysis ❑ Yes P.N0 rNNo 19. Does record keeping need improvement? (ie/ irri ion, frect%�ard, wast an & soil sample reports) ❑ Yes 20_� Is facility not in compliance with any applicable setback criteria in effect at the time.of design? ❑ Yeses] No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes A�No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? ❑ Yes No (ie/ discharge, freeboard problems, over application) ,j 23, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 2No 24. Does facility require a follow-up visit by same agency? ❑ Yes ETNo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes o yiolal�iQgs o dtf de am ,Wire ho ea• Ootiog 4Ms'vts1t; • Y:oo wilt•teeeiye 46 futftr' /o ctirresuorideike: aNaut this visit: ..........::.............::........ . 5) la 4Pti: RrDP.T�Sc1��hs�at_. 1A6 On fA-"G S AuG .14 _ Aif L- 1--v1 Reviewer/Inspector Name Reviewer/Inspector Signature: ,/�� 1_ { 4" Date: Facility Number: Ij�F -- 3 Date of ILtspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below -Q-'�es ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ZNO 28. is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes -01No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes 0 No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑Yes No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes �o 32. Do the flush tanks lack a submerged till pipe or a permanent/temporary cover? ❑ Yes E,PK-01 .,�� GBJrG p7P PC A i .. .. i 3 , � � � ' � '; . f'€i, 'Division of Soil and Water' Gonservahbn `O eration Review I I • 1 .0 Division of Soil aiid Wat&r Conservation ,< ivision of Water Quality Compltance'Inspection ,;' ' a ' ',+ ru )s a g Other Agency :- Uperahbil RevyeW f .._�- -: ;r.; ,. .a.l.iM:c Routine Q Com laint Q Follow-up of DWQ inspection Q Follow -tip of DSWC review Q Other Facility Number Date of Inspection Time of Inspecliou E=24 hr. (hh:mm) XpermittedxCertified (] Conditionally Certified (] Registered 113 Not O erational Date Last Operated: .......................... Farm Name WC, IZAe� P�t.�.. County:......' ?.p � R-E� �. ........... .......................................................... ................................................................................................ Owner Name: ................................................... . Phone No: FacilityContact:.............................................................................. Title:................................................................ Phone No:................................................... MailingAddress: ...........................................................,.,..,................................................................. .......................... Onsite Representative:... 1. ,` ....F..�rfG.E..�f..r Integrator:........................................................................................ Certified Operator:............................................................. ... Operator Certification Number: Location of Farm: i ................................................. ................. ......................................I... ............. 1 Latitude ���° ��� Longitude �• �' �" Design Current; Design. Current' Design Cur�e'nt Swine.. Capacity Population Poultry -Capacity Po irlation Cattle Capacity Population! ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts, ❑ Boars ❑ Layer ❑ Dairy �E! +: ❑ Non -Layer Non -Dairy ❑ Other t i 4OAarss W ❑ Spray Field Area Number of Lagoons,., ❑ Subsurface Drains Present 110L.goon Area Holdtng'Ponds / Solid Traps -"3 fE i . ` ❑ No Liquid Waste Management System Dischart*es & Stream Impacts 1, Is any discharge observed from any part of the operation? ❑ Yes a Discharge originated at: ❑ Lagoon ❑ Spray Field []Other a. If discharge is observed, was the conveyance man-made? ❑ Yes b, If discharge is observed, did it reach Water of the State? (II ycs, notify DWQ) �Ixo El11N Yes O % c. If discharge is observed, what is the estimated flow in gal/tnin`? d. Docs discharge: bypass a lagoon system? (If ycs, noti ry DWQ) ❑ Yes Ej No `!�No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes -6No Waste Collection & Treatment 4, Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes eNo Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard (inches): .......... ........................................................................................................................................................... ........... .............. I.................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes Io seepage, etc.) 3/23/99 Continued on back acility Number: �]� �� % Date of Inspection t� � 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ONO (If any of questions 4-5 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement'? ❑ Yes ❑'*No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes VNo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes Z. Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes JZ(No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes 2<0 12, Crop type 42 £ S t-u.r_ F� 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ZNo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes � o 16, Is there a lack of adequate waste application equipment? El Yes 7No Required Records & Documents 17, Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes ZNo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes JQ No 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) V�es ❑ No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ;3 No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ElYes K 24. Does facility require a follow-up visit by same agency? ❑ Yes No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑.Yes o /// Nb-yiolatidtis:or• dc#ic!e;ncies •were note�3• d(Wing phis:visit: • Y:ou ;wi-1.t- 'C. . Rio; #'u>i•... • . • : 6 res�oridence: abnrui this :visit: :::: : �ii� i�' iE 11 -E Commentsi(t efer tt►R,gnestton #} "EExplain any'YEES answers and/or any recommendations or any other comments i j� E I - �,.:.,:; `k' ! 6,. .: .. i .t3s _', ?z ^". i.3 `..': ...E '.li>..>.;l E.E {� . �:.'� E1FrE -• is{' € , � 1 i¢ i ... dip f .. .—. s.¢:tr E i>i ;r i3! i } ,_.j ;ff.�E E �.3 Jill []se,drawin(" s of faciltt to better, explatrr;sEtuattons:l(use; add hpnal3.. a es as recessa : } t,i, ', t 4 �r !i; r !+ d,lt a. t s, L"l.. E !jjELF 77 .:' A E r t Li } ri sy! 3>- 19 p of ores Aa 'r 7S t P Y A rTr rt •vs P Gac./.44vr Reviewer/inspector Name 7i f, ;i u Reviewer/Inspector Signature: 0 Date: t o 3/23/99 Facility Number: Date of Inspection 5 t Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below Q�Yes ElNo liquid level of lagoon or storage pond with no agitation? / 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes �NO 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes IPINo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or / or broken fan blade(s), inoperable shutters, etc.) ❑ Yes No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes /19No 3/23/99 ti Ivision of Soil and Water Conservation - Operation Review Division of'Soil and Water Conservation - Compliance Inspection 13 Division of Water Quality - Compliance Inspection -.. 0 Other Agency - Operation Review Routine O Com laint O FolloNi•-u) or I)1VQ ins ection O Other Facility Number Date of InspectionVz6 I'inle of Inspection 24 hr. (hh:mm) © Permitted ❑ Certified © Conditionally Certified ❑ Registered JE3 Not OperationalOperationall Date Last Operated: .......................... Farm Name: ....................................................... Cuunty:...�� �h. ti OwnerName: ................................................... .... Phone No:....................................................................................... Facility Contact: ........7.itle :............................. .. I'hune No: Mailing; Addres,s:.............................................,.............................................. Onsite Representative:/....f.�"/S�lli...........l..L!:.E.................................. Intelrator:...................................................................................... Certified Operator: ................................................... ............................................................. Operator Certification Number:........................ ....... Location of Farm: .................................................................................................................................................................................................................................................... W-71— Latitude 0 6 .1 Longitude 0 9 i0 Design nwinc Capacity Population Wean to Feeder 23 Feeder to Finish / Cl Farrow to Wean ❑ Farrnw.to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle ,,,Capacity Population ❑ Laver ❑ Dairy ❑ Nan Laver IM Nun -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area JCI Spray Field Area Holding Ponds / Solid Traps JE1 No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation (If yes, notify DWQ)'? ❑ Yes ?No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. II' discharge is observed, w'as the conveyance uatn-oracle"' ❑ Yes /11 No 1). ]f dischan,c is observed. did it roach: ❑ Surface Waters ❑ Waters of the State ❑ Yes ❑ No c. [f dischargc; is observed. wlwt is the estimated Ilow in tallutin? d. Does discharge hypass a la,00n systcm? ❑ Yes VNo 2. Is there evidence of past discharge from any part of the operation'? ❑Yes 0No 3. Were there any adverse impacts to the waters of the State other- than from a discharge? ❑ Yes F�,Vo Waste Collection & ri-entnient 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes No Structure I Structure 2 Structur; 3 Sirw:ture 4 Structure 5 Siructure 6 Identifier: Frcehoard (inches): ........... 7 1/6/99 Continued on back Facility Number Datc of Inspection �5. Are there any immediate threats to.thc integrity of any 01'the structures observed'? (ic/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addt'csscd and/or managed through a waste management or closure plan'? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any pact of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum liquid level elevation markings? Waste Application 10, Are there any buffers that need maintenance/imprnvelnenI? 1 1. Is there evidence of oover application'? ❑ Ponding ❑ Nitrog*cn 12. Crop type ........ '' II 1.3. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. Does the facility lack wettable acreage for land application? (Footprint) 15. Does the receiving crop need improvement'? 16. Is there a lack of adequate waste application equipment? lleguired llecords & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement'? (ic/ irrigation. freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a certified operator in responsible charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector Fail to discuss review/inspection with on -site representative'? 24. Does facility require a Follow-up visit by same agency? 13: M)'viola'dons:or. dehkie' nk es .wvere rioted. during .tl is.visit:. You will.re�ceive no further .: . co3rresporideitce. ... .this visit.: .....:.......:.:.:. : .:... ; . ; ...... ....... ; ,.......:...:. ...:...:. ❑' cs PINo ❑ Yes ( No V(Yes ❑ No ❑ Yes No ❑ Yes ❑/I�I0 ❑ Yes 0 ................................ Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): ❑ Yes�No El Yes; �No ❑ Yes ;�TNo ❑ Yes No 'i N 42CZ& +,4 ? &, t 7 LIGi�} W � 1 �c�QG� b �',�lr} ��/ v51/v we VrIh(e- 411c;rc 5.�1`1 +t i, titer ke�� v,✓� c { •� l46�r % . < r s ril C te,,�6 S Reviewer/inspector Name ❑ Yes gNo ❑ Yes Z No ❑ Yes ZrNo ❑ Yes ;�rNo ❑ Yes le,No ❑ Yes ONo ❑ Yes 7NO o ❑ Yes Reviewer/Inspector Signature: �`��G�� / /6 1. �1 Date: " ! & 12 7 I 1 /6/99 KY Routine O Complaint O Follow-up of DWO inspection O Follow-up of DSW C review O Other I IFacility Number Date of Inspection Time of Inspection E= 24 hr. (hh:mm) 0 Registered 13 Certified 13 Applied for Permit [3 Permitted 113 Not Operational Date Last Operated: p / Farm Name:.......................................�..... ...........f ........... County: ... ................... ....................... OwnerName• ..,,l ..,C...... 1 ,�r!}....� .... L,�� .... r. r .._ ....... Phone No: ........................................................................................ FacilityContact: .............................................................................. Title:................................................................ Phone No:................................................... MailingAddress: .................................................................................................................................................................................... .......................... Onsite Representative:.,/ l �irj,,.V...... !%�(,r .�..,�. Integrator*. ...................:. Certified Operator: .................................................. Location of Farm: Operator Certification Number ;..................... C ME Latitude =*=, =« Longitude =' =' " ear s Design r. Carrent , Design �CUrrent " a�"illrrent Swine `CupacityPopuYation�.Poultry Capacity Fopulation Cattle Capactyrl?nprylationf Wean to Feeder ❑Layer ❑Dairy91 h ❑ Feeder to Finish ❑ Non -Layer ❑ Non-DairyMi "�}. ❑ Farrow to Wean M• _: . 25 ❑Farrow to FeederE ❑Other{ i,* ❑Farrow to FinishDesignYCapac�ty �T e° ; ❑ Gilts v k x € , ❑ Soars r x `2�a', Tt}tal'SSL��; Ntr oaf.a$oot;S! Holding Ponds ❑ Subsurface Drains Presen!J10 Lagoon Area ❑ Spray Field rea ....... ❑ No Liquid Waste Management Lystem. General 1. Are there any buffers that need maintenancelimprovement? ❑ Yes F No 2. Is any discharge observed from any part of the operation? ❑ Yes ❑"No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other / a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑d<io b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes, ((PNo c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ' I No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes . VNo 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes ,No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes No maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ro No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes No 7/25/97 Continueln back ' FaciUty Number: 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lap-oonsZolding Ponds FAush Pits, etc,) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: ,........�..�.r....................................................................... Freeboard(ft): ...»..................................................................... 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenancelimprovement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) ❑ Yes [ No ❑ Yes [�No' Structure 5 Struc /tore 6 ❑ Yes No ❑ Yes )yNo ❑ Yes Pl�o 13. -Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes UTo Waste Application 1 14. Is there physical evidence of over application? ❑ Yes ❑ No (If in excess of WMP, or runoff entering waters of the State, notify DWQ) I5. Crop type',_ .Gv.�.............................................................................................................................................................................. .......... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes #No No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes 18. Does the receiving crop need improvement? ❑ Yes %o 19. Is there a lack of available waste application equipment? ❑ Yes o 20. Does facility require a follow-up visit by same agency? ❑ Yes PVNo 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes No 22. Does record keeping need improvement? ❑ Yes No For Certified or Permitted FacilitipQ Only / 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit? ❑ Yes PrNo ❑ Yes No ❑ Yes ❑ No No.violations:or de icieneies. were: noted -during this: visit.: You'4ill. receive•no-f&thei . ; correspQdde 6,, fiWit this. VIA �. • : ; : .....::.:... ... ::... ' a 1 ] s tier Jot/m promo YYT 77frs V , 7/25/97,., Reviewer/Inspector Name Reviewer/Inspector Signature: Date: �.f..r� � ,rt _—'4tP'4�� ,.,_' �iri�.a�lxr��r^• - N.r �.. QrivIision 'ision of Soil and Water Conservation [3Other Agency of Water Quality Lqn outine O Complaint O Follow-up of DIVQ inspecti Facility Number Follow,up of DSWC review O Other Date of Inspection 17j Time of Inspection E� 24 hr. (hh:mm) © Registered 0. Certified © Applied for Permit ©/Permitted [3 .Not Operational . Date Last Operated: ........... ......... Farm Name: .,,,, //� G • d.. �%r4/7/i� 2.�.5�i % ou Z-t7 ITV ............. r�..........L....:.................................�.......Z"'�".� C nty:.............................I—' ....................... Owner Name ,.........!....k. .... Phone No: ZS Z y... .......'�3.......................... Facility Contact: 51t!--.Z� ................... Title Phone No: ........ ..................................................................................................................... Mailing Address:...a.4....1............6..{. X ,10 f7i' li rvq ..:. ........�-—:......... �.7..'S -3................. .......................... ...............................................................I................. ,.- / rn Onsite Representative: W rt�1 G n ... Integrator:.....(Y...'..1................................................................... Certified Operator.......... ?..''. .�, L `` .. Operator Certification Number;.................... ......................................... Location of Farm: Latitude Longitude �• �� ��� Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance inan-made? ❑ Yes No Y b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) Cl Yes o c. If discharge is observed, what is the estimated flow in gaUmin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 7/25/97 ❑ YesZINX, ❑ Yes ❑Cl YesyNo Yes ❑ Yes ❑ Yes Continued on back Facility \umber: �— j1,/ 8. Are there lagoons or storage ponds on site which need to be properly closed'? ❑ Yes 10 Structures (LaLoons,HoldinL fonds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Yes N0 Structure I Structure 2 Structure 3 Structure 4 Strucmre 5 Structure 6 Identifier: 2 Freeboard(ft):......� .......................... .................................................................................................................................................................................. 10. Is seepage observed from any of the structures? ❑ Yes No 11. Is erosion, or any uthcr threats to the integrity of any of the structures observed'? ❑ Yes o 12. Do any of the structures need m:iintcnancelimltia'ovement'? ❑ Yes No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maxintum liquid level markers? ❑ Yes No Waste Application � ~ 14. Is there physical evidence of over application'? ❑ Yes �. o (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type e.S 16..Do the -receiving crops differ with those designated in the....................................................................................'..........,.............. ..,... p g Animal Waste Management Plan (AWrNIr)? ❑ Yes ;No 17. Does the facility have a lack of adequate acreage for land application) ❑zYes .1 1Vo 18. Does the receiving crop need improvement? ❑ Yet 19. ,Is there a lack of available waste application equipment? ]+Ye's7�N stir" 20. Does facility require a follow-up visit by same agency? ❑'Yes' 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes o 22. Does record keeping need improvement? f El Yes;N/ i'o ForCertitied_orPermitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? - ❑ Yes 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes „l 25-,Wer yadditional`pr0bieiiis noted which cause noncoinpliarie'e'of the Perrrrit' *� s "1f❑'aYe; No , o.violations or deficiencies were noted during this:visit..Y,ou.will receive' further correspondence alioitt this:visit:: .: 0):-'Explain'any.YES'ansm ter:ezplain situations (use f yN d Reviewer/Inspector Name "CGS"' , Reviewer/Inspector Signature: rs and./or any recoi any,urther-comments'. z fi i J n 7/25/97 Date: fi. DSWC Animal Feedlot Operation Review '�" DWQ Animal Feedlot Operation ction perat Site Inspe h av Fa . a utine 0 Complaint laint 0 Follow-up of MV _) inspection 0 Foil ow- uof DSNVC review 0 Other Date of Inspection Facility Number LM Time of'Inspection 24 hr. (hh:mm) Total Tirne fin fraction ot'hours Farm Status: [3 Registered (3 Applied for Permit (ex:.L25 for l hr I min)) Spent on Review ❑ Certified ❑ Permitted or Inspection (includes travel and processing) 10 Not Operational I Date Last Operated: ................................................................................................................................................ FarmName:............................................................................................................................... County: ...... L-Ox.a.a/.{........................................ OwnerName: ................................................... ........................................................................ Phone No:.............................,.......,..........,...................................... Facility Contact: .......................................... ... Title:........,....... . Phone No: MarlingAddress: ..........................,....n.,.............,................................................................................................................ ,.................. I.......................... ............ ,............. Onsile Representative:... .tT./.L1.................E. E.. Al. .:.,............... Integrator:..,................................................................................... I Certified Operator:............................................................. ..... Operator Certification Number:.................... Location of Farm: Latitude • '_r--- 44 Longitude • 4 " General 1. Are there any buffers that need maintenance/improvement? 2. is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water'? (if yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/nun? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 4/30/47 ❑ Yes VNo ❑ Yes VNO ❑ Yes L�No ❑ Yes ONO ❑ Yes 0 No ❑ Yes �eNo a ❑ Yes J v ❑ Yes �No Continued on back r Facility Number. 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons and/or Molding Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft); Structu I Structure Structure 3 Structure 4 .�............................................'............................................. ............ 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) ❑ Yes [] No ❑ Yes r� No ❑ Yes No ❑ Yes 7 No Structure 5 Structure 6 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) A r ! 15. Crop type �..(�r. ,............................................................................................................................................. . 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? ❑ Yes VNo ❑ Yes E6 No )ZYes ❑ Yes 9No ❑ Yes 116No ....................................... ❑ Yes 1 y1 0 ❑ Yes 61NO ❑ Yes o ❑ Yes No ❑ Yes �No ❑ Yes [jNo ❑ Yes 'No ❑ Yes ,E�No Yes ❑ No j2. psi �- tl uE.,--arn-ndIJ «.o ©N Reviewer/Inspector Name cis .?-071 Reviewer/Inspector Signatu Date: cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 ❑ Division of Soil and Water Conservation ❑ Other Agency ivision of Water Quality 14"Routine O Complaint O Follow-up of DNVO inspcvtion O Fnilow•up of DSWC.' 1•eviVW O Other _ I Number Date of Inspection �3 Facility Time of Inspection tS: 24 hr. (hh:mm) 13 Registered � ,,,,,,,__r/certified © Applied for Permit [3 Permitted © Not O erational Date Last Operated: Farm Nantes ..... '....Yi .)Cl!1... 1� r1...... 1[.th.P.... ... ,........ County: . ........................................... Owner Name:.. .. � ,. ���`�'f U� , . Phone No-.C: J ,.�.. ................... „...................................................... ... Facility Contact: .... IYA .:V..... ...... .................... Title:.....Y1!.....�................... Phone No:... .... ................. MailingAddress: ....'.,.....k.......Cx .............{'11..11Vu3......,....... 2...........:..................... .......................... Onsite Representative...... !(': i ..... .. ........ Integrator: ............................... .................................................................................. Certified Operator �' Op VIA.-?.V.k.......G-:-��!........................................ Operator Certification Number ......................................... Location of Farm: 5t.94, �2 Vt1t �Q ti\ ct ........................................................................................................................................................................................................................................................................1 . E Latitude Longitude �• �' �" llestgn Current w`, Design Current Desgnurrelrtt twine Capacity Populafaon �.. , Poultry Capacity Popuhhan Cattle �apacrty)Prulatiox�, Wean to Feeder '� © ❑ Layer ❑ Dairy ED Veeder to Finish Q ❑ Non -Layer ❑Non -Dairy ❑ Farrow to Wean rr ❑ Farrow to Feeder ❑ Other UFMOM Finish d $ Tote Design Capacity Gilts R {] Boars Total.. LW' � '� �' � u t i�tutxtber`f Lagoons / Holding Ptritds 1 I `` ❑Subsurface Drams Present ❑ Lagoon Area ❑ Spray Field Area .. r . i a 9 - _— ❑ t Sy g No Liquid Waste Management . R YC F General 1. Are there any buffers that need maintenance/improvement? ❑ Yes i. KO 2. Is any discharge observed from any part of the operation? ❑ Yes M-Ko Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes 1 b. If dischame is observed, dill it reach Surface Water? (If yes, notify DWQ) ❑ Yes [Pro c. If discharge is observed, what is the estimated flow in gaVmin? .d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ' 3. Is there evidence of past discharge from any part of the operation? ❑ Yes _ O o 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes 1©<0 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes M o maintenance/i mprovement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes [ N�o 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes Lt�'Ivo 7/25I97 Continued on back 1 k Facility Number: Q3 — -" 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons,11olding Ponds Flush flits etc. 9. Is storage capacity (freeboard plus storm storage) less than adequate? Structure I Structure 2 Identifier: Freeboard (ft) ............................. ................. 10. Is seepage observed from any of the structures`! Structure 3 Structure 4 Structure 5 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-I2 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type 5`C ��'�.......................................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit? No.vialitioits-or deficiencies:were noted -during this;visit.-:Youdwill re'ceive•noStirther-: : correspondence about this:visit::': ❑ Yes P<o ❑,Yes RIN-o Structure 6 ❑ Yes [9-I5ro— ❑ Yes Leo ❑ Yes GKO ❑ Yes M<O ❑ Yes 011'6 ...................................... ❑ Yes 5140� ❑ Yes oa !�O ❑ Yes l�o ❑ Yes jD-Wo ❑ Yes U-No ❑ Yes ®-10 ❑ Yes ❑ No ❑ Yes 01'to ❑ Yes [�No ❑ Yes ❑ No Ctit timents Qwr d'.4iU 90 i #) ;;`1:xplatn any YES ans vers acid/nr ariy i�ecoYt ntenilattortx gr;uny other catn�niten s : ; M k n" ,, w' ,, ,� -Yx r' s Y a �, 'ti Use drAivf tgsgof facthty to better explain>sttttations, (use ( Ittona pages�as n&c Wtry)i M 'W P„5.-':S��A �' add x+''w",,I+'P x F 1 7/25/97 Reviewer/Inspector Name ,, Reviewer/Inspector Signature: Date: L� �.TA NCDEEIR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary September 14, 2009 North Carolina Farm Partnership N C Farm Partnership 42 973 Kerr Lake Cole Bridge Rd. Norlina, NC 27563 Subject: Additional Information Re- quest ---Application No. AWS930034 N C Farm Partnership #2 Warren County Dear North Carolina Farm Partnership: The Animal Feeding Operation Unit of Division of Water Quality's Aquifer Protection Section has completed a preliminary review of your renewal permit application package. Additional information is required before we may continue our review. Please address the following items by September 25, 2009 Waste Utilization Plan: The animal numbers in the Nutrient Management Plan (NMP) submitted with your permit application renewal package do not match the animal numbers on you application, or your latest Certificate of Coverage. Please submit two copies of your NMP that includes the 1200 Wean to Feeder Swine combined with the 2300 Feeder to Finish swine. Please be aware that you are responsible for meeting all requirements set forth in North Carolina rules and regulations. Any oversights that occurred in the review of the subject application package are still the responsibility of the applicant. In addition, any omissions made in responding to the above items shall result in future requests for additional information. Please reference the subject application number when providing the requested information. All revised and/ additional documentation shall be signed, sealed and dated, with two (2) copies submitted to my attention at the Mail Service Center address below. Please note that failure to provide this additional information on or before the above requested date may result in your application being returned as incomplete. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. Aquifer Protection Section 1636 Mail Service Center Internet: www.ncwatergtiality.org Location: 2728 Capital Boulevard An Equal OpportunitylAihrmative Action Employer— 50% Recycled110% Post Consumer Paper 1Vg_ .tlne;thCarolina UMAY Raleigh, NC 27699-1636 Telephone: (919) 733-3221 Raleigh, NC 27604 Fax I : (919) 715-0588 Fax 2: (919) 715-6048 Customer Service: (877) 623-6748 If you have any questions -regarding this letter, please feel free to contact me at (919) 715-6185. Sincerely, f Larry W. Wade PE Animal Feeding Operations Unit cc: Raleigh Regional Office, Aquifer Protection Section Warren County Soil and Water Conservation District APS Files- AWS930034 r� • Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality October 1, 2004 North Carolina Farm Partnership NC Farm Partnership #2 Route 1, Box 105 Norlina NC 27563 Subject: Certificate of Coverage No. AWS930034 NC Farm Partnership #2 Swine Waste Collection, Treatment, Storage and Application System Warren County Dear North Carolina Farm Partnership: On June 11, 2004, the North Carolina Division of Water Quality (Division) issued a revised State General Permit for swine facilities. The General Permit was issued in accordance with the directive of Senate Bill 733 (Session Law 2003-28). In accordance with your application received on March 13, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to North Carolina Farm Partnership, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supersedes and terminates your previous COC Number AWS930034 which expires October 1, 2004. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the NC Farm Partnership #2, located in Warren County, with an animal capacity of no greater than an annual average of 1200 Wean to Feeder, 2300 Feeder to Finish swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15. sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until September 30, 2009. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Since this is a revised State General Permit, it contains new requirements in addition to most of the conditions contained in the previous State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record keeping and monitoring conditions in this permit. • Aquifer Protection Section - Animal Feeding Operations Unit 1636 Mail Service Center, Raleigh, North Carolina 27699-1638 One NorthCarolina Phone: 919-733-3221 I FAX: 919-715-0588 I Internet: h2o.en r. state. nc. us Natmally An Equal OpporlunitylAffirmative Action Employer — 50% Recycfed110% Post Consumer Paper If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization. Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 2H .0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office, The Regional Office Water . Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Paul Sherman at (919) 715-6697. Sincerely, v , for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Raleigh Regional Office, Aquifer Protection Section Warren County Health Department Warren County Soil and Water Conservation District Permit File AWS930034 APS Central Files • ANIMAL WASTE UTILIZATION PLAN • 6- i Producer: . MARTIN ENGEL Location: RT. 1 BOX 105 NORLINA NC 27563 Telephone: (252)456--2437 Type Operation: Existing -Combination Swine Farm Number of Animals: swine (Design Capacity) STORAGE STRUCTURE: APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 1.0 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 hd eh .po 0 WORKSHEET FOR CALCULATING PAN AND TONS OF WASTE FROM COMBINATION SWINE OPERATIONS Operation Code: 6 Combination Swine Farm APPLICATION METHOD: I Irrigation Type Operation Number Tons Waste PAN Animals per Animal per an. NUMBER OF WEAN TO FEEDER PIGS: 1200 .40 .48 NUMBER OF FEEDER TO FINISH HOGS: 2300 1.9 2.3 NUMBER OF FARROW TO WEAN SOWS: 6.1 5.4 NUMBER OF FARROW TO FEEDER SOWS: 7.3 6.5 NUMBER OF FARROW TO FINISH SOWS: 19.9 26 TOTAL NUMBER ANIMALS: 3500 TONS OF WASTE PRODUCED PER YEAR: WEAN TO FEEDER 480 tons FEEDER TO FINISH: 4370 tons FARROW TO WEAN: 0 tons FARROW TO FEEDER: 0 tons FARROW TO FINISH: 0 tons . TOTAL WASTE:. 4850 tons PAN PRODUCED PER YEAR: WEAN TO FEEDER: 576 lbs FEEDER TO FINISH: 5290 lbs FARROW TO WEAN: 0 lbs FARROW TO FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL PAN: 5866 AVERAGE TONS OF WASTE PER ANIMAL PER YEAR: AVERAGE PAN PRODUCED PER ANIMAL PER YEAR: SLUDGE PAN PRODUCED PER YEAR: BROADCAST WEAN TO FEEDER: 91.2 lbs FEEDER TO FINISH: 851 lbs FARROW TO WEAN: 0 lbs FARROW TO FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL SLUDGE PAN: 942.2 lbs AVERAGE SLUDGE PAN PER ANIMAL PER YEAR: 0.2692 1.38571428571 1.676 ANIMAL WASTE UTILIZATION PLAN Producer: MARTIN ENGEL Location: RT 1 BOX 105 NORLINA NC 27563 Telephone: (252)456-2437 Type Operation.: Existing Combination Swine Farm Number of Animals: 3500.00 swine (Design Capacity) STORAGE STRUCTURE: APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil •tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. • Page: 1 ANIMAL WASTE UTILIZATION PLAN 05. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, f t3, tons, etc.) 3500 swine x 1.38571428571 tons waste/swine/year = 4849.99999998 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 3500 swine x 1.676 lbs PAN/swine/year = 5866 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME 452 23 36B FHH 4.5 225 0 47.8 10755 I MAR- JUNE,AUG-N END I TOTAL110755 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. E: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN • TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL10 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT FHH FESCUE HAY - HAY TONS 50 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 47.8 10755 • TABLE 2 0 0 Page: 4 ANIMAL WASTE UTILIZATION PLAN TOTAL 1 47.8 1 10755 *** BALANCE 1 -4889 1 ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 5 ANIMAL WASTE UTILIZATION PLAN 1`• *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Appl,ic. Amount (inches) 452 23 36B FHH 0.40 *0.75 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Page: 6 ANIMAL WASTE UTILIZATION PLAN Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2_ Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Page: 7 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS r L. 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. when animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that • would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 8 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS • 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal'waste other than swine waste from facilities sited on or after October 1, 1.995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property • and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. • Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS ( 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -- determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 10 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:NC FARM PARTNERSHIP ##2 Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Faciq-- yOwner: MARTIN ENGEL (Please print) 4* w Signature: 4,_ � Date: Name of Manager(If different from owner) : Signature: Date: Name of Person Preparing Plan: (please print)Bruce Perkinson Affiliation:Warren Soil and Water SWCD Phone No. 919-257- 3836 Address (Agency): 133 1/2 South Main St. Warrenton NC 27589 q Signature: t.L. r Date: 3 1 Page: 11 4048 _ yl. ,` � ..f 1��1}i11�"r�l ' �itll' (` 'il,t. ;i! `,c�=• Jil �• •l� 1, i,�l \. ; .1 `:CKILIN'y� RT f�{ 4 T ( `':11 } I lR\ 32'30 ,J i 1 1 I � ��' �� � I� i I� t' '• i I�•� � � �� �� 1 'i, 'J ' 7 r l) l�'i' � 1 (� _ �� { �� ( �`•���� ���� i� 11��� �� � { � l �� I �71,�� --'�) \�� jj },, 4047 li ', (('f' � l��`, f. i ,\ y 1l 4 !i ('':r��1�1�• S�S1�}�-a,-' \`' �'`I-`\_ __.' r _���1 l�<� `l ,1lll,/9;- s i .,� 0 000 FEET (VA NN 5--�.71' (ro Pin �Ir ,f• r� � \ v ' ,, - � 1]f i ��� �� ��. �,�� �` �� l �� ,�1� 4045 111�rf 1�111 - l I`� '}`( \ ,` 1(r `�f ✓ \ �\ / � II , r l (1 Cb _.Rest'A[e l 4044 r �) ,� r � ! f ` \ . � , .', 4 I ', L � I, � 1 I �'• I I �,L -'' � .. ��",•-_ r7 - 1 �1 J1 5 _ '�� I � � \ r �\ sir°�%, � i l l -`` � } � I/. r ..• i I/,]) J(i l t `� ' , (f � t c ' F. !!d"N.'-INI� �' ��•1il }18�1 [.. 4� �. - 'r�"`�'V '1�`-�GY, ��� }�-., ��~'h4� ji` r � ��r� �1 .�..• .,- �i+', �, try,% } 1 ..-., ,,]r� ]�. '� !,1� _ t'��—`_ a043 tir30, 78° 15, 141 748 12080000 F1- FT (VA 11 y r fl rru,. r ,. r',nr 1 4,11 1.2r30n �6, Mapped, edited, and published by the Geological Survey Control by USGS and USC&GS Mn* Topography by photogrammetric methods from aerial photographs 1 cN taken 1967. Field checked 1968 Polyconic projection. 1927 North American datum 'h 9a MILS t'AI' 10,000-toot grids based on Virginia coordinate system, south zone, i��soMrfs and North Carolina coordinate system �,! - 1 ' °1j pie•- ,c���l +M r'?'a;'r, r}�II' ' �,�� 7t 1_+ f� r' r , 1 �, r` i 1_"� j. v +.k, �;�•. ��� xllti IR ®rY r`trr:' rkY �r(1iv r : 1 +rti r t ti �; •SFr /i � 1,�h, i.`�l, �1 � ,u' rY• ��:r �,fr' ,° �j,un � -9ir ��.{� I -7 �-e I J r t Pf 41 . • �A ,q l , r t r' n 7A ".4"4t, L •i NIS, ie Sr yy•- A• rr�,:� � -.� \r-rr ?11 •tug' uA .}i. �.' ' 4 r f/41 Y 1�Iw _'`r Alm � �. vy „241;«i r w!1�,'t;;•i,�;.•r'.::fi -,a;;r' �� tiir- l' .�'•''" , ,'I LrJ1}',{,�,s..'�+..fit }.., •C ,.r 11 NAY = 7 20M 1141 t cl� Nutrient Management Plan For Animal Waste � Uri UtIiori =i�lf,�C 04-29-2003 This plan has been prepared for: I This plan has been developed by: North Carolina Farm #2 Martin Engel Rt. 1 Box 105 Norlina, NC 27563 (252)-456-2437 Larry West Warren SWCD RR 1 Box 486 D Warrenton, NC 27589 (252) 257-3836 Developer Si Type of Plan: Nitrogen Only with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. A,— Lj S--1 -Zod� Signature (owner) Date Signature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved` Technical s-/-6-3 Date --------------------------------------------------------------------------------. 355044 Database Version 2.0 Date Printed: 04-29-2003 Cover Page 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. Ul North Carolina Farm #2 waste generated 2,361,295 gals/year by a 2,300 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 5439 Incorporated 9340 Injected 10286 Irrigated 5911 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 10,006.22 3,996,894 -1,635,599 This plan includes a User Defined Source to determine the total pounds of PAN in lieu of NRCS Standard values. Refer to North Carolina Cooperative Extension Service publication AG-439-42 entitled "Soil Facts: Use of On -Farm Records for Modifying a Certified Animal Waste Management Plan" for guidance on using on -farm records to develop a User Defined Source. ----------- Note: Insou-- rce --ID-,-S--means -------standa---rd-sour---ce-,-U--me---ans---user------deimed s--ource.-------------------------- 355044 Database Version 2.0 Date Printed: 04-29-2003 Source Page 1 of 1 Narrative This swine operation is a combination of 1200 wean-feeder/2300 feeder -finish. The waste generated by this operation will be irrigated on existining fescue hayland by an underground hydrant system and/or temporary pipe laid on top of ground. ------------------------------------------------------------------------------- 355044 Database Version 2.0 Date Printed: 04-29-2003 Narrative Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown, where available. Planned Crops Summar Tract Field Total Acres Useable Acres Leaching Index (U) Soil Series Crop Sequence RYE 452 15A 3.50 3.50 N/A Vance Fescue Hay 4.4 Tons 452 16 3.90 3.90 N/A Vance Fescue Hay 4.4 Tons 452 23A 57.20 43.67 N/A JVance lFescue Hay 4.4 Tons PLAN TOTALS: 64.6o 51.07 LI Potential Leaching Technical Guidance Low potential to contribute to None 2 soluble nutrient leaching below the root zone. > = 2 & Moderate potential to contribute to Nutrient Management (590) should be planned. < —10 soluble nutrient leaching below the root zone. High potential to contribute to Nutrient Management (590) should be planned. Other conservation practices that improve the soluble nutrient leaching below the soils available water holding capacity and improve nutrientuse efficiency should be > 10 root zone. considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). ---------------------- ---------------------------------------------------------------------------- 355044 Database Version 2.0 Date Printed: 04-29-2003 PCS Page i of 1 NOTE: Symbol * means user entered data. The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Depending on the requirements of the crop and the nutrient content of the waste, some nutrients will likely be over or under applied if animal waste is being utilized. Waste should be analyzed before each application cycle and annual soil tests are required if animal waste is being applied. Soil tests should be used to balance the nutrient application amounts with the realistic yields of the crop to be grown. Nutrient management plates may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. Waste Utilization Table Year Tract Field Source t.D. Soil Series Total Acre Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd Comm. Fert. Nutrient Applied Res. (Ibs/A) Applic. Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N IWA 1000 gal/A I tons 1000 gals tons 452 15A U1 Vance 3.50 3,50 Fescue Hay 4.4Tom 811-7/31 195 0 0 Irrig. 195 7T89 0 272.62 0.00 452 16 U l Vance 3,90 3.90 Fescue Hay 4.4 Tons 8/1-7/31 61 0 0 Irrig. 196 78.29 0 305,33 0.00 452 23A Ul Vance 57.20 43,67 Fescue Hay 4.4Tons 8/t-7/31 f *196 0 0 Irrig. 196 78.29 0 3,418.94 0.00 Total Applied, 1000 gallons 3.996.89 Lagoon Liquids Total Produced, 1000 gallons 2,361,30 Balance, 1000 gallons 1,635.60 Total Applied, tons " ` `' 0.00 Manure Solids Total Produced, tons 0.00 Balance, tons - 0.00 Notes: 1. In the tract column, symbol —means leased, otherwise, owned. 2. Symbol * means user entered data. --- -- -------------------------------- ---------------------- 355044 Database Version 2.0 Date Printed: 4/29/03 WUT Page 1 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not resul t in runoff. This table provides the maximum, application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irritation ADDlication Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 452 15A Vance 0.35 1.00 452 16 Vance 0.35 1.00 452 23A Vance 0.35 1 1.00 --------------------------------------------------------------------------------- 355044 Database Version 2.0 Date Printed: 04-29-2003 IAF Page 1 of 1 The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumuiation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant avail able nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should betaken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac 1 Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu 150 13.16 28.83 57.67 86.50 Hay 6 ton R.Y.E. 300 26.32 14.42 28.83 43.25 Soybean 40 bu 160 14.04 27.03 54.06 81.09 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 355044 Database Version 2.0 Date Printed: 04-29-2003 Sludge Page 1 of 1 The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage Capacity Source Name I North Carolina Farm #2 Design Storage Ca acit (Days) Start Date 9/01 180 Plan Year Month Available Storage Capacity (Days) 1 1 149 1 2 180 1 3 180 1 4 180 1 5 180 1 b 180 1 7 149 1 8 118 I 9 180 I 10 180 1 11 180 1 12 149 * Available Storage Capacity is calculated as of the end of each month. ---------------------------------------------------------------------------------- 355044 Database Version 2.0 Date Printed: 04-29-2003 Capacity Page 1 of 1 Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). ---------------------------------------...___-___------__-----, 355044 Database Version 2.0 Date Printed: 4/29/03 Specification Page 1 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. ---------------------------------------------------------------------------------- 355044 Database Version 2.0 Date Printed: 4/29/03 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. ---------------------------------------------------------------------------------- 355044 Database Version 2.0 Date Printed: 4/29/03 Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. ---------------------------------------------------------------------------------- 355044 Database Version 2.0 Date Printed: 4/29/03 Specification Page 4 Crop Notes The following crop note applies to field(s): 15A, 16, 23A Fescue: Piedmont Adaptation: Well -adapted. In the Piedmont, tall fescue can be planted Aug. 20 to Oct. 10 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 lblac., for drilled use 15 to 20 lb/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Soil test for preplant and maintenance time, phosphorus, and potassium recommendations. Apply 40 to 60 lb1ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% to 50% for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. ------------------------------------------------------------------ 355044 Database Version 2.0 Date Printed: 04-29-2003 CropNote Page 1 of l N / C °N NR:R CQ �J5h4 I ,CAL u 41 Il �II II �1 I; III 411 Y, � 5l 50 .:t-- a � � •II /ice O use LV Y1, COP-OEOIp ICAL SVRVE RES pN, yIAOINIA� p♦1�1 I 741 J 12080000 FEET {VA.} -�49 HENDERSON r5 � h;t k• WI, fr]�'4fs�j✓`d' �,,� race ROAD CLASSIFICATION �c•� ate/ Mapped, edited, and published by the Geological Survey Light -duty road, hard or , Control by USGS and USC&GS MN Improved surface......... -Topography by photogrammetric methods from aerial photographs 1 cH r. taken 1967, Field checked 1968 }y 1 Unimproved road .....a=-===-==P ,., e �, 10'�17,,,, *k A....,.,..__ I_..._ 51,• I f Y-7T� Ob CAWMP We Lable Acre ,A/C �A/e aJ . Traveling Gun Field Dau sheet, 2720199 21 Hard Hose Traveling Gun System FIELD DATA SHEET I. Make and model number i.g�.r a n 3 Mo- ![ L 3ZSo Lt%,d � c 4 �,�`,�- _ 2. 1 25o 97S Hose length [feet] and hose inside diameter (16t 7S� 3. Z5, [inch] 3. Gun make and model number Melfc"q /5D 4. Gun nozzle size / [inch], ring orifice, ✓ taper bore orifice. 5. Gun arc angle �_ [degrees] 6. Travel lane spacing 50 j4,1,1. [feet]. Indicate whether uniform, random. Number of exterior hydrants Number of interior hydrants 7. Gun wetted diameter 3 ,4-5_ [feet], measured, based on gun chart. 8. Gun pressure ! (e 0 [psi]. -:?7s `Ail observed at working gauge, ✓ determined from gun charts, calculated (show calculations) **9. Operating pressure at hose reel [psi]. observed at working gauge, provided by owner. * * 10. Supply line size (,a [inch] (from pump to last hydrant). * * 11. Supply line length feet (maximum pumping distance). * * 12. Supply line type PVC, aluminum. * * 13. Pump make and model number ems,__ -- **14. Pump capacity, [gpm]. * * 15. Engine make and model number or ** 16. Electric motor horsepower and rpm [hp] [rpm] Note; It is strongly recommended that operating pressure at the reel and gun wetted diameter be field determined. - Locate each hydrant on a copy of the map. Indicate the start and stop of the sprinkler cart for each travel lane and show distance traveled. Show the location of the supply line. Irrigated acres will be determined by travel lane *" Optional data, furnish where possible. *** Information furnished by and/or_ Signature of Owner or Fac ty Representative Signature of Technical Specialist -A?nt / n EA /e Printed Name of 0,vmer or Facility Representative Date �S - I - Z.© o"41 a.1�L-- e5z1�.S- - Printed name of Technical Specialist Date Z --2 6 - 0 Z. 1� *** Only the person or.persons collecting the data should sign the data sheet. L./74-f OPI CAWMP Wettable Acra Traveling Gun Camputa ional Woriahcr 2-20-99 Hard Hose Traveling Gun System COMPUTATIONAL WORKSHEET 1. Farm Number (Identification) Y,C . rm_-' Z Field Number (Identification) 2. Irrigation System Designation Existing Irrigation System New/ Expanded Irrigation System 3. Number of Travel Lanes # Interior Lanes # Exterior Lanes [feet] Length of pull(Li) Interior Lanes # Exterior Lanes _Meet] Length of pull(L2) n Interior Lanes # Exterior Lanes [feet] Length of pull(L3) 4. Wetted Diameter 3q5 [feet] From field data sheet y 5. Spacing 2.5-o" Hydrant Spacing [feet] -7Z [as percent of wetted diameter] 6. Hydrant Layout Multiple Hydrants Single Hydrant Excessively spaced Hydrants 7. Read the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on pattern, spacing, and travel lane location. AR • a ' ;I • 0 Me MUM I I I , S♦ I / ♦ 1 v. I EXH BTF D-2 TABLE 2 - Traveling Irrigation Gun Settings Model Field N-1 and Hydrant N.2 i Application Rate (in/hr) TRAVELLANE Effective Effective Width (ft) Length (P)_: • (feet) EQLfIPMENT SETTINGS Nozzle Operating Operating (in - 6e-) @ Gun (psi) @ Reel (psi) Patte.3 I See attached map. 2Show separate entries for each hydrant location in each field. 3Use the following abbreviations for various arc patterns: F (full circle), TQ (three quarters), TT (two thirds), H (half circle), T (one third), Q (one quarter). May also use degrees of arc. NRCS, NC .TUNE, I996 t Table E90+. Area Allowances for Existing Hard Hose Traveler Systems Field with Single Pull or Multiple pulls and' Hydrant Spacing Greater than 90 percent of ytdfic ,wetted diameter, (Areas shown are acreage outside starting/stopping gun location) wetted start end Stop end wetted area, acres diameter wetted d area arc angle arc angle arc angle arc angle arc angle (feet) (acres) 180 degrees 225 degrees 270 degrees 315 degrees 330 degrees (A) A (C) (D) (E) (F) (G) 150 0.16 0.00 0.04 0.08 0.12 0.14 160 0.19 0.00 0.05 0.09 0.14 0.16 170 0.21 0.00 0.05 0.11 0.16 0.18 180 0.24 0.00 0.06 0.12 0.18 0.20 190 0.26 0.00 0.07 0.13 0.20 0.22 200 0.29 0.00. 0.07 0.15 0.22 0.24 210 0.32 0.00 0.08 0.16 0.24 0.27 220 0.35 0.00 0.09 0.18 0.27 0.29 230 0.39 0.00 0.10 0.19 0.29 0.32 240 0.42 0.00 0.11 0.21 0.32 0.35 250 0.46 0.00 0.11 0.23 0.34 0.3B 260 0.49 0.00 0.12 0.25 0.37 0.41 270 0.53 0.00 0.13 0.27 0.40 0.44 280 0.57 0.00 0.14 0.29 0.43 0.48 290 0.61 0.00 0.15 0.31 0.46 0.51 300 0.66 0.00 0.16 0.33 0.49 0.55 310 .0.70 0.00 0.18 0.35 0.53 0.58 320 0.75 0.00 0.19 0.37 0.56 0.62 330 0.80 0.00 0.20 0.40 0.60 0.66 �--� 340 0.84 0.00 0.21 0.42 0.63 0.70 350 0.89 0.00 0.22 0.45 0.67 0.75 360 0.95 0.00 0.24 0.47 0.71 0.79 370 1.00 0.00 0.25 0.50 0.75 0.83 380 1.05 0.00 0.26 0.53 0.79 0.88 390 1.11 0.00 0.28 0.56 0.83 0.93 400 1.17 0.00 0.29 0.58 0.88 0.97 410 1.23 0.00 0.31 0.61 0.92 1.02 420 1.29 0.00 0.32 0.64 0.97 1.07 430 1.35 0.00 0.34 0.68 1.01 1.13 440 1.41 0.00 0.35 0.71 1.06 1.18 450 1.48 0.00 0.37 0.74 1.11 1.23 460 1.55 0.00 0.39 0.77 1.16 1.29 470 1.61 0.00 0.40 0.81 1.21 1.34 480 1.68 0.00 0.42 0.84 1.26 1.40 490 1.75 0.00 0.44 0.88 1.32 1.46 500 1.83 0.00 0.46 0.91 1.37 1.52 CAWMP Wettable Acre Traveling Gun System Page 29 EBAE-99, 2/20199 p Table EE70. Area Allowances for Existing Hard Hose Traveler Systems Exterior lane - in field with multiple overlapping lanes: Hydrant Spacing based on 70 percent of mif d .wetted diameter, (Areas shown are acreage outside starting/stopping gun location) wetted start end Stop end wetted area, acres diameter wetted d area arc angle arc angle arc angle arc angle are angle (feet) (acres) 180 degrees 225 degrees 270 degrees 315 degrees 330 degrees (A) (B) (C) (D) (E) (F) (G) 150 0.18 0.00 0.04 0.08 0.13 0.15 160 0.21 0.00 0.04 0.09 0.15 0.17 170 0.24 0.00 0.05 0.11 0.17 0.19 180 0.26 0.00 0.06 0.12 0.19 0.22 190 0.29 0.00 0.06 0.13 0.21 0.24 200 0.33 0.00 0.07 0.15 0.24 0.27 210 0.36 0.00 0.08 0.16 0.26 0.29 220 0.40 0.00 0.08 0.18 0.29 0.32 230 0.43 0.00 0.09 0.19 0.31 0.35 240 0.47 0.00 0.10 0.21 0.34 0.38 250 0.51 0.00 0.11 0.23 0.37 0.42 260 0.55 0.00 0.12 0.25 0.40 0.45 270 0.60 0.00 0.12 0.27 0.43 0.49 280 0.64 0.00 0.13 0.29 0.46 0.52 .290 0.69 0.00 0.14 0.31 0.50 0.56 300 0.74 0.00 0.15 0.33 0.53 0.60 310 0.78 0.00 0.16 0.35 0.57 0.64 320 0.84 0.00 0.18 0.37 0.61 0.68 330 0.89 0.00 0.19 0.40 0.64 0.73 --->-340 0.94 0.00 0.20 0.42 0.68 0.77 350 1.00 0.00 0.21 0.45 0.72 0,82 360 1.06 0.00 0.22 0.47 0.77 0.86 370 1.12 0.00 0.23 ..0.50 0.81 0.91 380 1.18 0.00 0.25 0.53 0.85 0.96 390 1.24 0.00 0.26 0.56 0.90 1.01 400 1.31 0.00 0.27 0.59 0.95 1.07 410 1.37 0.00 0.29 0.62 0.99 1.12 420 1.44 0.00 0.30 0.65 1.04 1.18 430 1.51 0.00 0.32 0.68 1.09 1.23 440 1.58 0.00 0.33 0.71 1.14 1.29 450 1.65 0.00 0.35 0.74 1.20 1.35 460 1.73 0.00 0.36 0.77 1.25 1.41 470 1.80 0.00 0.38 0.81 1.31 1.47 480 1.88 0.00 0.39 0.84 1.36 1.54 490 1.96 0.00 0.41 0.88 1.42 1.60 500 2.04 0.00 0.43 0.91 1.48 1.67 CAWMP Wettable Acre Traveling Gun System Page 17 EBAE-217-99, 2J20I99 Table EI70_ Area Allowances for Existing Hard Hose Traveler Systems Interior lane - in field with multiple overlapping lanes: Hydrant Spacing based on 70 percent of ud led wetted diameter, (Areas shown are acreage outside starting/stopping gun location) wetted start end Stop end wetted area, acres diameter wetted d area arc angle arc angle arc angle arc angle arc angle (feet) (acres) 180 degrees 225 degrees 270 degrees 315 degrees 330.degrees (A) (B) (C) (D) (E) (F) (G) 150 0.16 0.00 0.03 0.06 0.11 0.13 160 0.19 0.00 0.03 0.07 0.13 0.15 170 0.21 0.00 0.03 0.08 0.15 0.17 180 0.24 0.00 0.04 0.09 0.16 0.19 190 0.26 0.00 0.04 0.10 0.18 0.21 200 0.29 0.00 0.05 0.11 0.20 0.23 210 0.32 0.00 0.05 0.12 0.22 0.26 220 0.35 0.00 0.06 0.14 0.25 0.28 230 0.39 0.00 0.06 0.15 0.27 0.31 240 0,42 0.00 0.07 _ 0.16 _ _ 0.29 0.34 250 0.46� 0.00 0.07 0.18 0.32 0.36 260 0.49 0.00 0.08 0.19 0.34 0.39 270 0.53 0.00 0.08 0.20 0.37 0.42 280 0.57 0.00 0.09 0.22 0.40 0.46 290 0.62 0.00 0.10 0.24 0.43 0.49 300 0.66 0.00 0.10 0.25 0.46 0.52 310 0.70 0.00 0.11 0.27 0.49 0.56 320 0.76 0.00 0.12 0.29 0.52 0.60 330 0.80 0.00 0.13 0.31 0.55 0.63 340 0.85 0.00 0.13 0.32 0.59 0.67 350 0.90 0.00 0.14 0.34 0.62 0.71 360 0.95 0.00 0.15 0.36 0.66 0.75 370 1.00 0.00 0.16 _ 0.38 0.69 0.80 380 1.06 0.00 0.17 0.41 0.73 0.84 390 1.11 0.00 0.18 0.43 0.77 0.88 400 1.17 0.00 0.19 0.45 0.81 0.93 410 1.23 0.00 0.20 0.47 0.85 0.98 420 1.29 0.00 0.21 0.50 0.89 1.03 430 1.35 0.00 0.22 0.52 0.94 1.08 440 1.42 0.00 0.23 0.54 0.98 1.13 450 1.48 0.00 0.24 0.57 1.03 1.18 460 1.55 0.00 0.25 0.59 1.07 1.23 470 1.62 0.00 0.26 0.62 1.12 1.28 480 1.69 0.00 0.27 0.65 1.17 1.34 490 1.76 0.00 0.28 0.68 1.22 1.40 500 1.83 0.00 0.29 0.70 1.27 1.45 CAWMP Wettable Acre Traveling Gun System Page 24 EBAE-217-99, 2/20199 Om 75 - 3 4s �' �� ��s^ /7Z- -31th��b•� X 17zS 33e 7F7-- Of , ?s �I Ali a1,Js gs oe>3 4 0 • Nutrient Management Plan For Animal Waste Utilization' . This plan has been prepared for: North Carolina Farm #2 Martin Engel Rt. I Box 105 Norlina, NC 27563 (252)-456-2437 This plan has been developed by: Larry West Warren SWCD RR I Box 486 D Warrenton, NC 27589 (252) 257-3836 Developer S Type of Plan: Nitrogen Only with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. 9 A,— Ej s--I -?- oo: Signature (owner) rQ Date Signature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Cominission. Plan A Technical Spechdist s` ' �3 Date i-------------------------------------------------------------------------------. - 355044 Database Version 2.0 Date Printed: 04-29-2003 Cover Page 1 RECEIVED I DENR I DWQ Agirifer protection Sectjorl APR 0 2 2009 Nutrients applied in accordance with this plan will be supplied from the following source(s): . Commercial Fertilizer is not included in this plan. U1 North Carolina Farm #2 waste generated 2,361,295 gals/year by a 2,300 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 5439 Incorporated 9340 Injected 10286 Irrigated 5911 Actual PAN Applied (Pounds) Actual Volume Applied (Gallons) Volume Surplus/Deficit (Gallons) Year 1 10,006.22 3,996,894 -1,635,599 This plan includes a User Defined Source to determine the total pounds of PAN in lieu of NRCS Standard values. Refer to North Carolina Cooperative Extension Service publication AG-439-42 entitled "Soil Facts: Use of On -Farm Records for Modifying a Certified Animal Waste Management Plan" for guidance on using on -farm records to develop a User Defined Source. • •--___--------------------------------------------------------------------------- Note: In source ID, S means standard source, U means user defined source. 355044 Database Version 2.0 Date Printed: 04-29-2003 Source Page 1 of 1 . Narrative This swine operation is a combination of 1200 wean-feederl2300 feeder -finish. The waste generated by this operation will be irrigated on existining fescue hayland by an underground hydrant system and/or temporary pipe laid on top of ground. • 0 - - - 355044 Database Version 2.0 Date Printed: 04-29-2003 Narrative Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. . Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown, where available. Planned Crops Summary Tract Field Total Acres Useable Acres Leaching Index (U) Soil Series Crop S22uence RYE 452 15A 3.50 3.50 N/A Vance Fescue Hay 4.4 Tons 452 36 3.90 3.90 NIA Vance Fescue Hay 4.4 Tons 452 23AI 57.20 43.67 NIA Vance jFescuc Hay 1 4.4 Tons PLAN TOTALS: 64.60 51.07 LI Potential Leaching Technical Guidance Low potential to contribute to None 2 soluble nutrient leaching below the root zone. > _ 2 & Moderate potential to contribute to Nutrient Management (590) should be planned. < = 10 soluble nutrient leaching below the root zone. High potential to contribute to Nutrient Management (590) should be planned. Other conservation practices that improve the soluble nutrient leaching below the soils available water holding capacity and improve nutrient use efficiency should be > 10 root zone. considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). • -------------------------------------------------------___-_----------------------------------------- 355044 Database Version 2.0 Date Printed: 04-29-2003 PCS Page e I of I WOTE: Svmbol * means user entered data. 0 0 0 The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Depending on the requirements of the crop and the nutrient content of the waste, some nutrients will likely be over or under applied if animal waste is being utilized. Waste should be analyzed before each application cycle and annual soil tests are required if animal waste is being applied. Soil tests should be used to balance the nutrient application amounts with the realistic yields of the crop to be grown. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. Waste Utilization Table Year l Tract Field Source I.D. Soil Series Total Acre Use. Acres Crop RYE Applic. Period Nitrogen PA [Nutrient Req'd Comm. Fert. Nutrient Applied Res. (lbs1A) 1 Applic- Method Manure PA Nutrient Applied Liquid Manure Applied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N lbs/A 1000 gal/A tons 1000 gals tons 452 15A U 1 Vance 3.50 3.50 Fescue Hay 4.4 Tons 8/1-7131 195 0 0 Irrig. 195 77.89 0 272.62 0.00 452 16 U1 Vance 3.90 3,90 Fescue Hay 4.4Tons 811-7/31 *196 0 0 Irrig. 196 78.29 0 305.33 0.00 452 23A U1 Vance 57,20 43.67 Fescue Hay 4.4Tons 811-7/31 *196 0 0 brig. 1 196 78.29 0 3,418.94 0.00 Total Applied, 1000 gallons 3,496.89 Lagoon Liquids Total Produced, 1000 gallons 2,361.30� =: Balance, 1000 gallons -1,635.60' Total Applied, tons r= ' ='=` 0.00 Manure Solids Total Produced, tons `"' `_ ' Y :: O.OD Balance, tons - "- 0.00 Notes: 1. In the tract column, symbol - means leased, otherwise, owned. 2. Symbol * means user entered data. -------- ----------------------------------------------- 355044 Database Version 2.0 Date Printed: 4/29103 M UT Page 1 The Irrigation Application Factors for each field in this plan are shown in the following table. . Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not resul t in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 452 15A Vance 0.35 1.00 452 16 Vance 0.35 1.00 452 1 23A Vance 0,351 1.00 • 0 --- 355044 Database Version 2.0 Date Printed: 04-29-2003 IAF Pa e t of 1 The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. if this is not possible, care should betaken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate 1000 gallac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu 150 13.16 28.83 57.67 86.50 Hay 6 ton R.Y.E. 300 26.32 14.42 28.83 43.25 Soybean 40 bu 160 14.04 27.03 54.06 81.09 W-355044 Database Version 2.0 Date Printed: 04-29-2003 Sludge Page- 1-of 1 The Available Waste Storage Capacity table provides an estimate of the number of days of storage . capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. • Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage Canacity Source Name INorth Carolina Farm #2 Design Stora a Capacity (Days) Start Date 9/01 180 Plan Year Month Available Storage Capacity (Days) " 1 1 149 1 2 180 1 3 180 1 4 180 1 5 180 1 b 180 1 7 149 1 8 118 1 9 180 1 10 180 1 11 180 1 12 149 * Available Storage Capacity is calculated as of the end of each month. 0 --- 355044 Database Version 2.0 Date Printed: 04-29-2003 Capacity Page 1 of 1 Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). ------------------------ 7. Liquid waste shall be applied at rates not to exceed the soil infiltration . rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fail or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with • the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. is 355044 Database Version 2.0 Date Printed: 4/29/03 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, • or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 0 --- 355044 Database Version 2.0 Date Printed: 4/29103 Specification Pale 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested . at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. -------------------- ------------------------------------------------------------- 355044 Database Version 2.0 Date Printed: 4/29/03 Specification Page 4 0 Crop Notes The following crop note applies to field(s): 15A, 16, 23A Fescue: Piedmont Adaptation: Well -adapted. In the Piedmont, tall fescue can be planted Aug. 20 to Oct. 10 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 lb/ac., for drilled use 15 to 20 lb/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 lb/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% to 50% for grazing. Apply N Feb. I to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. is 355044 Database Version 2.0 Date Printed: 04-29-2003 Crop Note Page 1 of 1 z ,. 1-7 II 714 ABM LE RG_ ♦y� =ter •Chzt,e� ,. P as rtt Grov _ ��57 ti Nj b 4 � �� � J n � % � �.� ._,mil � �� � v � .• j— - ,_ � _ I 0 11 �o '•ti7> O \ \ � 1 �\ }! o _A, CYO .0 1 Ce v j 1210 II c'85 . 749 HE"DERSON 75 OLOGIOAL �IJRVEi,RES�iN, VIRGIN IA pBl w 147 12 OSO 000 FEET (VA.) %k1% R• IBC r�46° r+ti 79` 15 YBCC y Qci d ROAD CLASSIFICATION Chu .3 Mapped, edited, and published by the Geological Survey Light -duty road, hard or Control by USGS and USC&GS MN* improved surface_..... Topography by photogrammetric methods from aerial photographs y, taken 1967. Field checked 1968 ` f --- -- - I Inimnrnmorl rnnrl ------- - _ - .. .,.,.-. .. - >nu• 1 i ,ph' n • • CA%k'MP WaL-jhic Acre I/L �jrR Al. f ? 0 Traveling Gun Field Dale shcc, 2.'24199 /Hard Hose Traveling Gun System FIELD DATA SHEET I. Make and model number So L. e 32-S0 G' d 01 � c `'�•'�� ys 2. Hose length1250 9 [feet] and hose inside diameter (ID)_[Inch] [inch] 3. Gun make and model number lellar� /50 4. Gun nozzle size [inch], ring orifice, ✓ taper bore orifice. 5. Gun arc angle p [degrees] 6. Travel lane spacing 5D - . [feet]. Indicate whether uniform, random. Number of exterior hydrants Number of interior hydrants 7. Gun wetted diameter 3.45 [feet]. measured, based on gun chart. 8. Gun pressure D[psi]. �7s ICAW observed at working gauge, ✓ determined from gun charts, calculated (show calculations) **9. Operating pressure at hose reel [psi], observed at working gauge, provided by owner. * * 10. Supply line size [inch] (from pump to last hydrant). * * 11. Supply line length feet (maximum pumping distance). * * 12. Supply line type f PVC, aluminum. * * 13. Pump make and model number e.,,/ **14. Pump capacity, [gpm]. _ * * 15. Engine make and model number •- or * * 16. Electric motor horsepower and rpm [hp] [rpm] Note: It is strongly recommended that operating pressure at the reel and gun wetted diameter be field determined. - * Locate each hydrant on a copy of the map. Indicate the start and stop of the sprinkler cart for each travel lane and show distance traveled. Show the location of the supply line. Irritrated acres will be determined by travel lane *" Optional data, furnish where possible. *** Information fumished by and/or Signature of Owner or Fac Xty Representative Signature of Technical Specialist cn g I,,� Printed Name of gamer or Facility Representative Dates„ - I - Z,O On ra •I k-- e5jy s Printed name of Technical Specialist Date -. - 2- 6 - 0 2— *** Only the person or persons collecting the data should sign the data sheet. A---- - ----- 0 • CAWMP Wettable Acre Traveling Gun Ccrnpuwional Workshcr, 2-20-99 Hard Hose Traveling Gun System COMPUTATIONAL WORKSHEET 1. Farm Number (Identification) C rm 2 Field Number (Identification) 2. Irrigation System Designation Existing Irrigation System New/ Expanded Irrigation System 3. Number of Travel Lanes # Interior Lanes # Exterior Lanes [feet) Length of pull(LI) # Interior Lanes # Exterior Lanes Meet] Length of puU(L2) n Interior Lanes # Exterior Lanes [feet] Length of pull(L3 ) 4. Wetted Diameter 3q5 [feet] From field data sheet S. Spacing 2.So` Hydrant Spacing [feet] '7Z [as percent of wetted diameter] b. Hydrant Layout -_,KMultiple Hydrants Single Hydrant Excessively spaced Hydrants 7. Read the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on pattern, spacing, and travel lane location. �c�draY\4-I CX71.-ivT. - 5+z?,+ End M,dd/e Poi --/-/an -s4f 5rd - lQI-.s, 0, R(oo x 2 8b - 6 .1 -7 O Z E-7a S x - . / 0 3 CC-7o 0 - .8 •7 `7 /o -E- a x z µ /o S E 7 0 9 �f �a JC Z8a = 9 4 • -7 . b0 D c -�0 beo x Zoo - -3`7 D -7- .oe$ 07 F Z 060 x 20= Z 0,70 3, �cld 5A O's lot E State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director April 9, 1999 North Carolina Farm Partnership NC Farm Partnership #2 Rt 1 Box 105 Norlina NC 27563 Attn: Martin Engel NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Certificate of Coverage No. AWS930034 NC Farm Partnership #2 Swine Waste Collection, Treatment, Storage and Application System Warren County Dear Martin Engel: T. -_ Gap _. In accordance with your application received on February 11, 1999, we are forwarding this Certificate of Coverage (COC) issued to North Carolina Farm Partnership, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG 100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the NC Farm Partnership #2, located in Warren County, with an animal capacity of no greater than 1200 Wean to Feeder and 2300 Feeder to Finish and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). :n The COCshall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC. will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's.expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 . FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS930034 NC Farm Partnership #2 Page 2 This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Susan Cauley at (919) 733-5083 ext. 546. Sincerely, Kerr T. Stevens cc: (Certificate of Coverage only for all cc's) Warren County Health Department Raleigh Regional Office, Water Quality Section Warren County Soil and Water Conservation District Permit File NDPU Files dui APR � f 4 [999 1 RC`G101d,gC OFFICE! State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director North Carolina Farm Partnership NC Farm Partnership #2 Route 1, Box 105 Norlina NC 27563 Dear North Carolina Farm Partnership: 1 � • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND•NATURAL RESOURCES i December 30, 1999 1 f Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number93-34-:� Warren County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRRI, IRR2, DRY1, DRY2, DRY3, SLUR], SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should. be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or pernvtting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincerel , Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Warren County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10%a post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Steve W. Tedder, Chairman North Carolina Farm Partnership NC Farm Partnership #2 RtIBox 105 Norlina NC 27563 Dear Farm Owner: � E N R 1. 3tl-fV Subject: Classification of Animal Waste Management Systems Facility: NC Farm Partnership #2 Facility ID #: 93-34 County: Warren Senate Bill 1217, An Act to Implement Recommendations of the Blue. Ribbon Study Commission on Agricultural Waste, was enacted by the North Carolina General Assembly on June 21, 1996. This bill requires that a certified operator be designated as the Operator in Charge (OIC) by January 1, 1997, for each animal waste management system that serves 250 or more swine, 100 or more confined cattle, 75 or more horses, 1,000 or more sheep, or 30,000 or more confined poultry with a liquid animal waste management system. Our records indicate that your facility is registered with the Division of Water Quality and meets the requirements for designating an OIC. A training and certification program is available for animal waste management system operators. For information on the training programs please contact your local Cooperative Extension Agent. Operator certifications are issued by the Water Pollution Control Systems Operators Certification Commission (WPCSOCC). For information on the certification process, please contact the Technical Assistance and _...Certification Unit at (919) 733-0026. The type of -training and certification required for the operator of each . system.is.based on the nature of the wastes to be treated and the treatment process(es) primarily used to treat the animal waste. There are two types of animal waste management systems, type A and type B. Type A animal waste management systems are generally used to treat waste generated by monogastric animals which produce a low -fiber waste. Type B animal waste management systems are generally used to treat waste generated by ruminants and other animals which produce a high -fiber waste. The type of training and certification an operator receives should correspond with the type of system(s) they intend to operate. For more information on the classification of your system please contact the Technical Assistance and Certification Unit. As the owner of an animal operation with an animal waste management system, you must designate an Operator in Charge and must submit the enclosed designation form to the WPCSOCC. If you do not intend to operate your animal waste management system yourself, you must designate an employee or engage a contract operator to be the Operator in Charge. The person designated as the Operator in Charge, whether yourself or another person, must possess a currently valid certificate of the appropriate type. Sincerely, Joseph B. McMinn, Supervisor Technical Assistance and Certification Unit cd/AW OIC Designation Enclosure cc: Raleigh Regional Office Water Quality Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-0026 Fax 919-733-1338 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director February 22, 1999 North Carolina Farm Partnership NC Farm Partnership #2 Rt 1 Box 105 Norlina NC 27563 Attn: Martin Engel 1 IT "lk_ • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 7 R ? 3 lgmg Subject: Application No. AWS930034 Additional Information Request NC Farm Partnership #2 Animal Waste Operation Warren County Dear Martin Engel: The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review, Please address the following by March 24, 1999: Please provide the date the facility originally began operation. 2. Your Waste Utilization Plan (WUP) lists the Yield for Fescue Hay on Tract 452, field 23 as 4.8 tons per acre. This is higher than currently recommended. Please contact your technical specialist to revise the Waste Utilization Plan or provide justi rication that supports the increased yield as shown in the current WUP. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below, The information requested by this letter must be submitted on or before March 24, 1999 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 546. Sincerely, %j Susa" n CauIe��rl/ Y Environmental Engineer Non -Discharge Permitting Unit cc:1.Ral6igh Regional Office, Water Quality Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper SrA �t State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Division of Soil and Water Conservation Wayne McDevitt, Secretary September 12, 1997 Martin Engel Rt 1 Box 105 Norlina, NC 27563 I SUBJECT: Operation Review Summaries and Corrective Action endations Spring Valley Farms Facility Nos. 93-6 an 93-34 fic Farm Partnership Facility No. 93-1 Warren County Dear Mr. Engel, On September 9, Operation Reviews were conducted of the Spring Valley Farms, facility nos. 93-6 and 93-34, and INC Farm Partnership, facility no. 93-1. These Reviews, undertaken in accordance with G.S. 143-215.1 OD, are one of two visits scheduled for all registered livestock operations during the 1997 calendar year. The Division of Water Quality will conduct a second site inspection. During the Review, it was determined that waste was not being discharged to the waters of the State,' and the animal waste collection, treatment, storage and disposal systems were properly-- maintained and operated under the responsible charge of a certified operator. The following observances were discovered and noted for corrective action or response: 1. Vegetation needs to be established on all bare areas on the lagoons and on the rainwater diversion pathway. The vegetation should prevent erosion from occurring in the future. 2. The Waste Utilization Plans(WUPs) need to be adjusted to show proper nitrogen loading levels for both your soybeans and Fescue crops. Please contact your technical specialist, Bruce Perkinson, to remedy this situation. After the WUP crop nitrogen loading rates are changed, you will need to do the nitrogen balance sheets for your records. 3. The 3 seeps discovered by the back base of the primary lagoon at facility no. 93-1 have been reported to both the Division of Water Quality and the Warren District office. When I spoke with Bruce Perkinson of the Warren office, he stated that your farm manager had been in to discuss the problem with him and that an appointment with an engineer from PIC was set for September 11. 1 would like to commend you for the rapid response to the potential threat that the seeps present. Water Quality personal plan to take samples to determine if the seeps are from the lagoon or another source. 4. Facility no. 93-34 has no designated operator in charge of the waste system. I have enclosed the form to be fill out and sent to the Division of Water Quality to correct this oversight. The Division of Soil and Water Conservation appreciates your cooperation with this Operation Review. Please do not hesitate to call me at 919/571-4700 ext. 208 if you have any questions, concerns or need additional information. Sincerely, MOar gar rKeefe, Environmental Engineer I cc: Warren Soil and Water Conservation District Judy Garrett, Water Quality Regional Supervisor DSWC Regional Files 3800 Barrett Drive, Suite 101 " Raleigh. NC 27609 Voice (919)5714700 • FAN (919)5714718 An Equal Opportunity Affirmative Action Employer 30%recycled/ 10"10 post -consumer paper State of North Carolina RECElVEQ OT Department of Environment and Natural ResourgmERQUPbNSr- ' Division of Water Quality Non -Discharge Permit Application Form ��B t t��9 (THIS FORM MA Y BE PHOTOCOPIED FOR USE AS AN ORIGINAL) P®omitting General Permit - Existing Liquid Animal Waste OpoadlibM The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best its possible. Do not leave any question unanswered. 1. GENERAL INFORMATION: 1.1 Facility Name: NC Farm Partnership #2 1.2 Print Land Owner's name: North Carolina Farm Partnersh 1.3 Mailing address: Rt I Box 105 City, State: Norlina NC Telephone Number (include area code): 919-456-2437 Zip: 27563 1.4 County where facility is located: Warren 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): SR 1311, hlwy I Fast 0.5 miles on 1311. 1.6 Print Farm Manager's name (if different from Land Owner): Martin Engel 1.7 Lessee's I Integrator's name (if applicable; please circle which type is listed): 1.8 Date Facility Originally Began Operation: 1.9 Date(s) of Facility Expansion(s) (if applicable): 2. OPERATION INFORMATION: 2.1 Facility No.: _93_ (county number); 34 (facility number). 2.2 Operation Description: Swine operation Wean to Feeder Feeder to Finish 3500- Certified Design Capacity Is the above information correct? [Oyes; =no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum num er or which the waste management structures were designed. Type of Swine 0 Wean to Feeder 0 Feeder to Finish 0 Farrow to Wean (# sow) 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) No. of Animals Type of Poultry No. of Animals 0 Layer Other Type of Livestock on the farm: 0 Non -Layer 0 Turkey FORM: AWO-G-E 5/28/98 Page 1 of 4 93 - 34 Type of Cattle No. of Animals 0 Dairy 0 Beef No. of Animals: 2.3 Acreage cleared and available for application (excluding all required buffers and are •not covered by the application 5�� system): ;Required Acreage (as listed ira the AWMP): -� �� LO (4 2.4 Nttmbero lagoons storage ponds (circle which is applicable): 1 2.5 Are subsurface drains present within 100' of any of the application fields? YES or NO (please circle one) 2.6 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or NO (please circle one) 2.7 Does this facility meet all applicable siting requirements? (Swine farm Siting Act, NRCS Standards, etc.) (Swine Only) ES or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? T — What was the date that this facility's land application areas were sited? 3. REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. Applicants Initials 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. E The CAWMP must include the following components: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.1 1 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.). Please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 3.3.16 Operation and Maintenance Plan. If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. FORM: AWO-G-E 5/28/98 Page 2 of 4 93 - 34 Facility Number: 93 - 34 Facility Name: NC Farm Partnership #2 4. APPLICANT'S CERTIFICATION: RECEIVED PMER QUALITYSFC-noN FFB ' I r 1999 N017-Mcha yy'' (Land Owner's name listed in q estiorMn l "��, attest that this application for G - (Facility name listed in question 1.1)' has been reviewed by me and is accurate and complete to the Kst of n y knowledge. i understand that if all required parts of this application are not c mpleted and that if all required supporting information and attachments are not included, this application package will be ret rn d to me ps inconfMft. !i Signature Date �_ q 5. MANAGER'S CERTIFICATION: (coinpletc only if dif'fcrent liom the Land Owner) Manager's name listed in question 1.6), attest that this application liar G}-zs r_m �s;tt ,�#�_ (Facility name listed in question 1.1) has been reviewed by me and is accurate and comp ete to the e best of my knowledge. lendersTand that if all required parts of this application are not completed and that if all required supporting inforinalion and attachments are not included, this application package will be re irned as incotrfri to A Signature Date ;--3 — Q 9 THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 5/28/98 Page 3 of 4 93 - 34 i 1 1 n MEC Kl ! rlRURG � � F. C O� U H T Y � r, a3 - m C 't 1741 ;+ l1�S U .. _..a.., .. 174E - Imi ? Gee! Sm1th .� u u 120 1144 t7-l! :� b lt9i l741 fall lag '� x nsa Ir]s 1 £lU L4! y "°° lahl LtJ t �ti 1142 rr ^errs amw Ali 1214 2.] Li _ _lu12- y it 1210 CD 1DA DuDu�h y r14 ? y� •s ' _ 1x t llal t ,r14 a R—ro�" __4 S iroo �* 1210 h ter #S xr f 3 Q 1 134P p s 3i � •tali � l7a! Ina M1 _ I7 2 .0 1 a. Ixe0 _. _ +3>f __... _ _ _ Jlt__ � . 1i43. _ _ , __ _ Ifxs 11\aa1 � -7 ; Wamn r� 1tQa r �Jlr S IfN ill S r:.. "{ litL 11u Irt4 y 7 `-+ , !7� .: f fall ..; 1t:1 laal 1]]Z 7 �s+' '+' "' LW ? v r 1� UV l7 G. Lil FIJ avr. a Lffi 'b 1MCOH ® _ y faa! t A .3 —Y W►a 901 Cfo t r !sa' 134i� Isa n 1 pr. 153 17x 314! s t.e as l Hoaolla lln a v ra 7 1 76'93' 1 :A lilt R 1.1 :t: �y �,j 1325 I_.I. t� ` p. Wafh m luz la y / I 11411.1 SmA .7 13a �a ]t41 Ise I CRY lLL7. � t 1 1' t 1 - .:. "a L9� s a Its F'fshlro ,y-l_ll'_ ^: • >� tfy WARRENTON x1 * FOF. 905 .7 1 7 Itis '':ti2:i t '�J 1441 1144 <v b lit a7 36 1!J! 1JJ1'WF ,1,F �2 UN b Embro �4 11�. rilj ;• � :� in'1' 1441 L9L v F •ills A01 .4 :0 397 r.d r ltsE lekrr� yf } (3? n I.a AtFren. �. l.] 17 1441 INA Fbs ll44. P bFs 1121 Bred& y .e y I O 1.e ; �4L C24 11i ' 1d ,64s 1 1e 1_ e] a11i L1t \y 7 rwidroc4 R�'hh'4 :±lr Marmodut. r. 04 o J Ch.k i F 1123._, - � � 11! 1�x7' Alvan 14t4 Sa l ?lEZ 36-0' y' iepa •br .5 1.r 7 YT. a ' Itri lam. 14LI v 442 1 � 1-K5- 11 7 .3 im b '' ,Y !1 16PI �.9 - Parkto" v x D 1SL Sbr t b t •� lei 3.4 1#4L M1 i3i vkk4ba `s lsyl +>� ra^ah Cr44k IDA lerr N1i11 1t�'P F �P 't' �a Iels I s%mm e . LLiu f _ Broacd 2p. ♦ y Lm b 14• L 113A 11 { f � 141a i r.3 � le M1 P 11614 �7 �T '�• - ;S' Im U3t Lag - Lim Slit •r lily 1134 2 s , �v .6 114a ,•p it. Aattiv a 14a3 sp +r 1, e01 1 \ � La4_ lidukin4F � , 7 471 1 rti 1 111! t F.F$ ' l,lltla Saco � ` •]d'13' . � � `ram � 1 �' NORTH CAROLiNA FARM waER0�j RT.1 BOX 105 � 41999 NORLINA,NC 27563 0119 FAX :252-456-3948 NQ� pisct�a�BB pgm` TEL: 252-456-2437 NORLINA 3-22-99 SUBJECT:APPLICATION NO.AWS930034 ADD.INFO.REQUEST NC PARTNERSHIP#2 ANIMAL WASTE OPERATION WARREN CO. DEAR SUSAN CAULEY, THIS LETTER IS TO RESPOND TO YOUR REQUEST DATED 2-22-99. TO I. START OPERATION ON 6-30-94 TO 2. REVISED WASTE UTILISATION PLAN IS ENCLOSED. HOPEFULLY THE INFORMATION PROVIDED WILL BE SUFFICIENT. REGARDS, MARTIN ENGEL ANIMAL WASTE UTILIZATION PLAN Producer: . MARTIN ENGEL Location: RT. 1 BOX 105 NORLINA NC 27563 Telephone: (252)456-2437 Type Operation: Existing Combination Swine Farm Number of Animals: swine (Design Capacity) STORAGE STRUCTURE: APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) swine x 1.38571428571 tons waste/swine/year = 0 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR swine x 1.676 lbs PAN/swine/year = 0 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE I: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME 452 23 36B FHH 4.5 225 0 50 11250 I FEB-NOV END I TOTAL111250 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if.operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT FHH FESCUE HAY - HAY TONS 50 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 50 11250 TABLE 2 0. 0 Page: 4 ANIMAL WASTE UTILIZATION PLAN TOTAL 50 11250 *** BALANCE -11250 ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 5 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available -nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) 452 23 36B FHH 0.40 *0.75 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Page: 6 ANIMAL WASTE UTILIZATION PLAN Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Page: 7 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. if the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 8 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21, Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 10 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:NC FARM PARTNERSHIP #2 owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil. and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: MARTIN ENGEL (Please print) Signature: Date: - J ; -� Name of Manager(If different from owner): Signature: Date: Name of Person Preparing Plan: (Please print)Bruce Perkinson Affiliation:Warren Soil and Water SWCD Phone No. 919-257-- 3836 Address (Agency): 133 1/2 South Main St. Warrenton NC 27589 Signature: Date: _ `,�-3 - T � Page: 11 ANIMAL WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only If additional land has to be leased, etc.) , hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Waste Producer: Technical Representative: SWCD Representative: Date: Date: Date. Date. Term of Agreement: ,19_ to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 12 ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF I, Public of said County, do hereby certify that a Notary , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this , 19 My commission expires (SEAL) day of Notary Public. Page: 13 ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Party Receiver Agreement I, generated by hereby agree to apply waste in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division of Water Quality. Third Party Receiver: Date: Term of Agreement: to (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of My commission expires (SEAL) Notary Public. Page: 14 ANIMAL WASTE UTILIZATION PLAN Producer: Location: Telephone: Type Operation: Number of Animals: (Design Capacity) STORAGE STRUCTURE: APPLICATION METHOD: MARTIN ENGEL R e UA iN S "�oN WAS CEP 1 A 'y999 RT . 1 BOX 105 $ Pem►itng NORL INA NC 27563 Nonp'�sCha� (252)456-2437 Existing Combination Swine Farm swine Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) swine x 1.38571428571 tons waste/swine/year = 0 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR swine x 1.676 lbs PAN/swine/year = 0 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIbdAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS— CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME 452 23 35B FHH 4.8 240 0 50 12000 I FEB—NOV IDRUD I TOTAL112000 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN r TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY IRESID. APPLIC METH N TIME END TOTAL Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste.nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT FHH FESCUE HAY -.HAY TONS 50 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 50 12000 TABLE 2 0 0 Page: 4 ANIMAL WASTE UTILIZATION PLAN J TOTAL 1 50 *** BALANCE 12000 -12000 ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 5 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres'in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables I and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) 452 23 36B FHH 0.40 *0.75 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Page: 6 ANIMAL WASTE UTILIZATION PLAN Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Page: 7 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by.injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils,.during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 8 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIgNSS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12.,Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS J 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 10 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATIM PhM AGREEMENT Name of Farm: NC FARM PARTNERSHIP ##2 Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of FaciT Own,er: IN ENGEL (Please print) Signature: Date: Name of Manager(If different from owner): Signature: Date: Name of Person Preparing Plan: (Please print)Bruce Perkinson Affiliation:Warren Soil and Water SWCD Phone No. 919-257- 3835 Address (Agency): 133 1/2 South Main St. Warrenton NC 27589 Signature: ,`LGc-C�_' �� � Date: 3 Page: 11 ANIMAL WASTE UTILIZATION PLAN ANIMAL. WASTE UTILIZATION AGREEMEH (Needed only if additional land has to be leased, etc.) , hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Date: Waste Producer: Date: Technical Representative-c Date: SWCD Representative: Date. Term of Agreement: 0I9_ to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 12 �. ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF I, Public of said County, do hereby certify that a Notary , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of . 19 My commission expires (SEAL) Notary Public. Page: 13 ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Party Receiver Agreement I, generated by hereby agree to apply waste in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division of Water Quality. Third Party Receiver: Date: Term of Agreement: to (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF I, Public of said County, do hereby certify that , a Notary personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of 19 My commission expires (SEAL) Notary Public. Page: 14 J", JO I (W JuQ 4048 1 V I v ce Y1 T r,7 — r V'v 32'30" �J Z' 4047 �30 x tN 4046 70000 A FEET (VA, ?0 4045 \V N-1 -M -66 C- A t 3w )- (('11JJ'1�ii _ {,, �# I �J�'•' f%�-��- I \ % 1_!' -l.� � j(./i ', li �"`.j � •-. /� i �'1 C — 1. 4044 111K 2, k)� ? x, 2U 1' J 4043 36 30' - 10 748 12080000 FEET (VA.) 749 "Y1 ii:fjol- 1'%5(JN I.; Mi 12'30" 78 15' iu 0 Mapped, edited, and published by the Geological Survey C1.1:111 by USGS and OSC&GS 14N Topography by photogrammetric methods from aerial photographs GN taken 1967. Field checked 1968 1927 North American datum Polyconic projection. 'iT 10,000-foot grids based on Virginia coordinate system, south zone, and North Carolina coordinate system I( ., I- n l'� ',�+y�`� ° �'tY'I*'y'! ii'i`! +,�y'`�f"l'1•. �j Fyy��4'af� � ,I`,ild i� I'.41Y "' y' ' ,,, i } 4 s� ri 1• I� y 40, • ' } r+ ,y. I `;s,�'f�� vi •Ilx`, 'r� +�+' 11 fir: �"F � J .'`, i�[y i:�r�iy �.�'� �, ,.I 1 •r • r>�}� � }/ /' �,� .Ili! •+ � } ,t'� ice. ..}ry ,•:. +� 4 .'' 4 l �?"�� �^�'� f ff�e rrlt "• •�'1 . rL �. •y.,1 it +''• `•1 • �, J.,j., IY•4, �1-+ j ' '�'. i`' �.' f• •: �� � _ 4 1".l+,,ram IP 01,1 Ric'. 64, cl P � • L� � . ►; � �' s6•¢� � ' fir,: �+ (� N i...I,+k 40 LIN �"i9� x. ! •ti.l -i.I�r + 1' }' t ,y� ,.� ✓' ' :G ,x,_,,,� � �+''t���.r� + I i rl� ' �•" ''(w' ; „� SQaIJ1 a t••�.f�� �, •�x��:l_-�;:7.. Sir yl: r. �.� � .,6 ... ... a', ,•1� �� .,1yi-4, 4 �I IVT F y L / • } RBI ,� � � 'r �� `� Yy�w s � r •� ii,.�w ti � �3.i Yr k�[i ., '1 �L 1�. ° i I.�;ia ca •�ML�` �1►. ``}{��j[�_�`y��', x�� � � } r..r. � �'..I rrl�.lri/l !f� t F�Srr. j4 p� i ,may �•. � -- hit AP i Lii... ti r , i •, r 'il I .l � I' i. ...Y , •..4. :' rJ. �.- C , i$, f `{►r`�r y; ` Ir 2' sly i s }, r f 'n i 5 r{ I IC 1 1Li i s ':5 .5y� ° , , , . • era' s ' � ` I '� �L� iF, i ''" � �J�rA "/ rV�, •. "�i'�i •1,. ,f ! t iI 4.�.,I •� _511;: l 0 A J \-Iortality Management Methods (check which, method(s) are being? implemented) Burial three feet beneath the surface of the around within 2' hours after Knowledge of the death. The burial must be at least 300 feet from arty Flowing stream or public body of Water. rJ R--ndering at a rendering plant licensed under G.S. 106-168.7 �I Complete incineration In the case of dead poultry only. placing in a disposal pit of a size and design approved by the Depariment of Agriculture J Anv method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endan2erin2 human or animal health. (Written approval of the State Veterinarian must be attached) Insect Control Checklist for Animal Operations SUnr'Cc cuuse BMPS to conlrol lusccts SE: Slrccifir Practices Liquid Systems Flush Clutters Accumulation of solids Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. Remove bridging of accumulaled solids at discharge Lagoons and fits Crusted Solids Maintain lagoons, settling basins and pits where: pest breeding is apparent to minimize the crusting of solids to a deptli of no more than 6 - 8 inches over niore than 30% of surface. l-XCC!'SiVC Vegtaativc • Decaying vegetation k7lAaijitairi vegetative control 'along hanks of tirnrtsth lagoons ind other impoundments to prevent accurnulation of decaying vegetative matter along waters edge on impoundment's perimctcr. I rcdec, I'ecrl Sltill:rge VCCLI StUragc Accumulations of feed residues Dry Systems Design, operrte ,trul nt:cintain feed systems (c.g„ bunkers and troughs) to minimize ultc accunrtdatiun of decaying wastage. Clcan up spillage on a routine basis (e.g., 7 - 10 day interval during smuntcr; 15-30 day interval during winter). Reduce moisture accumulation within and arotnul immedi:nc perimeter of feed storage areas by insuring drainage away l'rurn site: and/or prcividing adequate cowainnrcut (e.g., covered bin for brewer's grain an{I similar ]righ moisture grain products). ]rispect lOr acid rcmnve nr- hrcttk rrlti accctntnl;ncd solids in filter strips:rrnnn,l fcud stolaLc:rs needed. AMIC - N„vcmhcr 11, 1996, I'agc I Source Cause BMPs to Control Insects Site Sttecific Practices Animal Holding Arcas Accumulations ofaninial wastes "19Z, Eliminate low areas that trap moisture along and feed wastage fences and other locations where waste accumulates and disturbance by animals is minimal. bir Maintain fence rows and filler strips around anirnal holding areas to minimize acctnnulations of wastes (i.e., inspect for and remove or break up accunutlaled solids as needed), Dry Manure I landling ACctlntUlalionS of animal waslcs Remove spillage on a routine basis (e.g., 7 - 10 Systcnrs day interval during summer; 15-30 day interval during winter) where manure is loaded for land application or disposal. Provide for adequate drainage around mamtre stockpiles. Inspect for and remove or break up accutnttlated wastes in filter scrips around stockpiles and nt,uutrc liartrl[ing atrcas as needed. For more irtl'tnnation contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State Universiiy, ltaleigh, NC, 27695-7613. AAIII: - Ncivci hot 1 1, 1996, Page 2 Swine Farm Waste Management Odor Control Checklist Source - — Cause JIM1's to Miuilnixe odor - - - — Site Specific Practices l antutead Swine production �W Vegetative or wooded buffers; 19' Recommended best management practices; Good judgment and common sense Animal body surfaces flirty manure -covered animals R Dry floors Floor 5urlaces Wct loanurc-covered floors 1;9� Sloped floors; Walerers located over slotted floors; ❑ Feeders at high end of solid floors; C7 Scrape manure buildup froth floors; ` Cl Underfloor ventilation for drying Miuuue collectiuu hits • . Urine; l' Frecluew manure removal by flusll, flit recharge, • Partial microbial decomposition or scrape;; 0 Underfloor ventilation Vcnlilalion exhallsl f;uls Volatile gases; 0 ball ntaintenarlue; Dust L� Efficient air movement hidullr surfaces 0 Dust _k Washdown between groups of animals; f_-) feed 'additives; O feeder covers; by l-ced delivery downspout extenders it) feeder covers blush I.ulhs Agitation of recycled lagoon Cl I hlsh tank; covers; liquid while tanks are filling p Extend fill lines to near hottoln of [:inks Milt anti -siphon vents l'ltlsh alleys • Agilation during wasinvater © Underfoor*llush with under floor vewilatlelel conveyance Pit lerh;uge points Agitation of recycled lagoon n Extend recharge lines to near Ilunonl ofpits liquid while pits are filling with anti -siphon vents Lift staliull�. Agilaliorl during sump tank Cl Sump tank: Covers filling and drawdown Clrllaidc drain collection • • Agitallotl cfurilig w;Istew;ller 1`3 Ilox covers ur JIIIIclioll buxes cutiveyallce Ahl()(; - Novcitlher 11. 1996, rage ' Source Cause _ _ DMPs to Minimize Odor Site Specific Practices End of drainpipes at • Agitation during wastewater ❑ Extend discharge point of pipes undenleath lagoon conveyance lagoon liquid level I-agoun surfaces 0 Volatile gas emissions; ice- Proper lagoon liquid capacity; • Biological mixing; Correct lagoon startup procedures; • Agitation $ Minimum surface area -to -volume ratio; Pr Minimum agitation when.pumping; ❑ Mechanical aeration; D Proven biological additives Irrigation simiikler 0 high pressure agitation; $X Irrigate on dry days with little: or no wind; nozzles a Wind drift a Minimum recommended operating pressure; 0 Ptimp intake near lagoon liquid sllrfaCe, ❑ Pump from second -stage lagoon Storage tank or basic • Partial microbial decomposition; ❑ 130ltOm or Illidlevel loading; sllrta�c: \ • Mixing while filling; ❑ Tank covers; • Agitation when emptying ❑ Basin surface mats Of solids; Cl Proven biological additives or oxidants Seating haslrl Surface Partial niicrobial dccoinposimion: ❑ Extend drainpipe outlets tmdcnlcalh liquid • Mixing while filling; level; • Agitation when emptying O Remove settled solids regularly h1mitirc, slurry or sludge • Agilalion when spreading; ❑ Soil injection of slurry/sludges; sprcudcr outlets 6 Volatile gas emissions Cl Wash residual manure from spreader after use; ❑ Proven biological additives or oxidants I lncovcred manure, Volatile gas emissions while ❑ Suil injection of slurrylsludgcs slurry or sludge till licit drying ❑ Soil incorporation within 4b ors.; surtu�rs (J Spread in thin tmiform layers For rapid drying; ❑ Proven biological additives or modants I)eatl animals Carcass decomposition IW Proper disposition of carcasscs Dead animal disllnsal Carcass decomposition ❑ Complete covering of CUC.IsSCS in hrrrial.fliu; . pits ❑ Proper loealion/consirticlion ofclispusal pits 11lclriCraturs T • Inconitllcle colllillisllotl Cl Sccnndary stack lmniers ANIO(: - Novemllcr 11. 1994, Page 4 Source CUuSC BMPs to Minimize 041or Site Specific Practices Staltding water around &Improper drainage; Grade and landscape such that water drains facilities 6 Microbial decomposition of away from facilities organic matter 1t'1a11urC tracked onto: Poorly maintained access roads 7)1, Faun access road maintenance public roads from farm access Additional Information : Available From : Swine Manure Managctnew ; 0200 Ru1cfBMP Packet NCSII, Cuunty Exlensiva Ccntcr Swine PCudnCtioti Darn► Potential Odor Sources and ltemedles ; EBAE Fact Sheet Swine Production facility Manure Nf:mabement: Pit Recilarge - Lagoon Treatment ; EBAE 128-88 Swine Production Facility Manure Management; Underfloor Flush - Lagoon Treatment ; EBAE 129-88 Lagoon Dcsign and Nlanagemcm for Livestock Manure Treatment and Storage ; E13AE' 103-83 Calibration of Manure and Wastewater Arplication Equipment ; E13AE Tract Sheet Cnntrulling Odors from Swine 13uildittgs ; 11111-33 Environmental Assurance Program ; NPPC Manual Options for Managing Odor; a report frorn the Swine Odor Task Force Nuisanec Conccnts in Animal Manure Management: Odors anti Flies ; PRO107, 1995 Conference Proceedings NCSII - BAE, NCSIJ - BAE NCSII - BAE NCSII -11A1_ NCSiJ - BAE- NCSU - Swine Extension NC Pork Producers Assoc NCSU Agri Communications Florida Coo jxratlVe I.xtension Ahl()C: - N,wcnilicr t I, 1996, P;q;c 5 EA 1ER GEN CY ACTION PEAK PHONE NUMBERS DWQ a 19,- 9-1 1 4100 ENfERGENCY i41.k1NAGEN- MNT YSTENl t - SWCD MRCS This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave vour property to consider that you have a problem. You should make ever,. effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b, pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately, d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes end sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D: Leakage from flush systems. houses. solid separator_ -action include: a. Stop recycle pump. b. Stop irrigation pump. C. Nkike sure no siphon occur-. d. Stop all howl to (lie house. flush systems. or solid separators. e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of la_aoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b. if holes are caused by burrowing animals. trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f.. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone - - After hours, emergency number: 919-733-3942. Four phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number c. Instruct EMS to contact local Health Department. d. Contact CES, phone number - - , local SWCD office phone number - - and local NRCS office for advice/technical assistance phone number - - 4: If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask th'at person to contact the proper agencies for you. Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: b. Contractors address: VA c. Contractors Phone: - l..'4 nil?Cr I J, 11-96 6: Contact the technical specialist who certified the lagoon (MRCS, Consulting Engineer. etc.) a. Name: .e ' b. Phone: 7: Implement procedures as advised bY MVQ and technical assistance agencies to re�tifL the damage, repair the system, and reassess the waste management plan to };e4p problerns with release of wastes from happening again. Dt�_.lnher 1:3. 19Y6 hd o- .eh .po 0 WORKSHEET FOR CALCULATING PAN AND TONS OF WASTE FROM COMBINATION SWINE OPERATIONS Operation Code: 6 Combination Swine Farm APPLICATION METHOD: I Irrigation Type Operation Number Tons Waste PAN . Animals per Animal per an. NUMBER OF WEAN TO FEEDER PIGS: 1200 .40 .48 NUMBER OF FEEDER TO FINISH HOGS: 2300 1.9 2.3 NUMBER OF FARROW TO WEAN SOWS: 6.1 5.4 NUMBER OF FARROW TO FEEDER SOWS: 7.3 6.5 NUMBER OF FARROW TO FINISH SOWS: 19.9 26 TOTAL NUMBER ANIMALS: 3500 TONS OF WASTE PRODUCED PER YEAR: WEAN TO FEEDER: 480 tons FEEDER TO FINISH: 4370 tons FARROW TO WEAN: 0 tons FARROW TO FEEDER: 0 tons FARROW TO FINISH: 0 tons TOTAL WASTE: 4850 tons PAN PRODUCED PER YEAR: WEAN TO FEEDER: 576 lbs FEEDER TO FINISH: 5290 lbs FARROW TO WEAN: 0 lbs FARROW TO FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL PAN: 5866 AVERAGE TONS OF WASTE PER ANIMAL PER YEAR: 1.38571428571 AVERAGE PAN PRODUCED PER ANIMAL PER YEAR: 1.676 SLUDGE PAN PRODUCED PER YEAR: BROADCAST WEAN TO FEEDER: 91.2 lbs FEEDER TO FINISH: 851 lbs FARROW TO WEAN: 0 lbs FARROW TO FEEDER: 0 lbs FARROW TO FINISH: 0 lbs TOTAL SLUDGE PAN: 942.2 lbs AVERAGE SLUDGE PAN PER ANIMAL PER YEAR: 0.2692 '3W A11nML W"TE R"TAGM? a= PLAN CSRTT.FIChTION POR NSW OR =VAHV3D FE=LOTS " .' Pleas return the Completed form to the Division of Environmental HanaQemant at the addraas on the reveX'n4 si d& of thl.e Zoz=. Name of farm Rlease_print) : T _._ 67 Address : _ _ ft� a .-_ __ _. Phone No.• - Zid 7r rjuntX: Farm location: Latitude and Longitudes Z1 / _ (required). Also, please attach a copy of a county goad map with location identified. - Type of operation (swine, layer, dairy etc.): �- Design capacity (number of animals) s / 00 Pri- f�.Sr'�w, „�77: � Average size of opexatiori (12 month population avg.): Average acreage needed for land application of waste (scares)s era aassxxcaatmaaa�aasasasatsumsaaainssnacx�=eaaaaaQaaaanexaavavasamaa��m�xaa7raa-=�a�asa sts��a Technical Specialist Cdrtiiication As a technical specialist designated by the North Carolina Soil and water Conservation Commission pursuant to 15A NCAC 6F .0005, I certify that the new or expanded animal waste management system as installed for the farm named above has an animal waste management plan that sheets the design, construction, operation and ma-intenance standards and specifications of the Division of Environmental Management and the USDA -Soil Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001-.0005. The following elements and their corresponding minimum criteria-hava-bee-n_yerified by me or other designated technical specialists and are included in the plan as applicable: minimum separations (buffers); liners or equivalent for lagoons or waste storage ponds; waste storage capacity; adequate quantity and amount of land for waste utilization (or use of third party); access or ownership of proper waste application equipment; schedule for timing of applications; application rates; loading rates; and the control of the discharge of pollutants from stormwater runoff events less severe than the 25-year, 24-hour storm. Name of Technical Specialist (Please. Print)- Jd h ^ U • Ta re: S h Affiliation: .%C' { Address (Agency) - !' C Phone No. ZA _•- 3Z :ZX Signature.- 140 w Dates � AS- sars�s�aaa- �mLtraav a�aa aarmaaaa�aaaaa:aaamvaeaaaaa��-ma:aa==�as7ri�sa'.C'a ownex/No= yer Agreeawant Z (we) Understand the operation and maintenance -procedures established in the approved animal waste management plats for the farm named above and will implement these procedures. I (we) know, that any additional expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental 'Management before the 'new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state either through a mean -made conveyance or through runoff from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District, pp.������`` Name of LandE (please int) 0,�7�(� �/IJ!w�.,��i4 ;4�J�1 f��I�t�?�3j}s� Signature- ^M Date: Ct_. Hama of Maaa if "if fe nt Er owner (Please print)c Signature: �. Date: ote: A change-5 in land ownersh rer�cires notiEi.catian or a new certification (if the approved'-p'lari is changed) to be suhmitted to the Division of Environmental Management within 60 d s of a title transfer. =. . RECEIVEDtransfer.pEM USE QNLY:ACNkinT# JUN 13 1997 FACwTiES ASSESSMENT UNIT RECEIVED VIATER QUr_ITY SECTION 1 LAGOON DES I GN � 1999 CHECK LIST //���,� Non -Discharge Permitting Producer : __ hj,1 2p7?t!2 A/,6 eF e— _ County: iA� Are 2 EAJ _ ®q 1. Obtain required permits (026, 401, 404, dam safety, etc.) 2. Hazard Classification Sheet (NC-ENG-34) - a. geodetic map showing lagoon location, distance to nearest residence, and breach route 2- 3. Soil Investigation Sheet (SCS-ENG-538) - a. Investigation made by soil scientist and\or engineer with backhoe on class III or IV lagoons, as well as other questionable sites. Investigation to be correlated with State Engineer's office on class V lagoons. b. pits 1.0 '- 2.0 feet below designed bottom of lagoon C. seasonal and permanent high water table depths 4. Grid Sheet - a, location and dimensions of lagoon and buildings b. location and elevation of soil pits C. surface water removal (diversions, pipe outlets, etc.) d . north arrow e. bar scale f. pay dirt program must have a scale of 1" = 50' a S. Storage Volumes (prelude spreadsheet) - a. designed volume exceeds needs b. all temporary storage stored above seasonal high water table c. minimum 6 ft. depth and 1 cu.ft. per -pound of steady live weight of treatment volume (]� 6. Excavation and Fill.Calculations (include building pad fill) 7. Typical cross-section (area form) 8. Construction Specifications (area form) 9. Waste Management Plan (area form) - a. soil survey sheets showing all fields and suitability of crops b. signatures of producer and person preparing plan C. agreement sheet signed by adjoining landowner (if needed) d. include attachment "H" on sampling procedure ®A 10. Transfer Pump and Sump Design (if needed) 11. Operation and Maintenance Plan (area form) Designed by • — ! -= ._ Date: i7:V Approved by: e�.✓...►- - G° ET,_� Date: U. S. Department of Agriculture Soil Conservation Service NC-ENG-34 September 1980 HAZARD CLASSIFICATION DATA SHEET FOR DAMS Landowner / A97./A)=,iVlk- gff(„ County ('4jkeff&Z Community or Group No. Conservation Plan No. Estimated Depth of Water to Top of Dam__).oFt. Length of Flood pool 3 fo Ft. Date of Field Hazard Investigation 3 -.3i-9 3 _ Evaluation by reach of flood plain downstream to the point of estimated minor effect from sudden dam failure. Est. Elev. :Est. Elevall'on Kind of :Improvements: of Breach Reach: Length: Width: Slope: Land Use Improvements Above :Floodwater. Above Flood Plain: Flood Plain Ft. Ft. Ft. Ft. • f,Jnee c 1 logo 3s0 . ,p � ---- --- - --- GVOo:D 2 13oo lsv EN7Ed j '4MFW' n'6 Al C R rek _ G�!� b � • $'/Ye �Tt1 Gee C"�.� 3 Z70D tom • 0,5 ._..S Describe potential for loss of life and damage to existing or probable future downstream improvements from a sudden breach Ale) s e&,eed-r PCn=s yzed L. F-.le L c rs a p �L I FCA 71 ESc1IJ;e,.1x orC PO-U.-BA_r3c,A =i),ragc D6Wr,urr&eogAA Hazard Classification of Dam (a, b, c) (see NEM-Part 520.21) 'a Dam Classification (I, II, III, IV, V) .7 _ �A6rn Gc-oars L-'' Concurred By e name r tzxzle NOTE: 1. Instructions on reverse side. 2. Attach additional sheets as needed. Date Z-Z9-93 Date e:' ;Tel - SCS-ENG-538 U. S. DEPARTMENT OF AGRICULTURE Re, Wo SOIL CONSERVATION SERVICE SOIL INVESTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE FARMER'S NAME. to e. DISTRICT W r e DATE 3-� 7- - - Coumly a S. C. S. PHOTO SI EE!" Nil. WORK uNrr raa r.-er, WATERSliEI; AREA MEASUREMENTS CROPLAND ACRES PASTURE ACRES WOODLAND ACRES TOTAL ACHES POND CLASS WORK UNIT CONSERVAT1U.tiIST SKETCH OF PROPOSED POND SHOWING WEiF RE 110fi1NC;S WERE MADE (Appro:, scale L" feet) t-fh JtK rvleren[e point in Ceritrr Aar of dam and identity on iAetc A, I �—Lj i—- LS E k' SHOW DE' ffll SCALF. MJtir ICuntin-4 arof Let dam -we wi ba.:A and where spillway nec.usutyl BORING bormaj ffrif SAuw Wafer • then fable NLJMLLE txmded .irwtrnns R vie. AND and wi darn L'LiC7F barrow -we UX pit burrnpi, 6rfrn7yj - setntrate with cvrftw; r.a line. — ~I'r IbiMI L a' +1 — PL4 — v ML — -7- — d —r— — — — y—,•L7_r' 19C1ItING-S NIAPY. L1Y �v�M1S_ I,I� — SWNNAT(IItl �. � L. [V ' i� 'M U��4i�, ,i •!�f, �; r,� ;i��`� F'�f� r'.Y�''i,'.�.. °7 .;�, s�' eft. •{�+, �r� "` �, r. I � ��.��yl?�,. ��g'}{��,�'��r. ur tj QC%' AS �•.,;. ��,� t� � L tt.w 1,� . '� �1 Lv1,'w ►i. :j �iL ' ,� � t ' 15. � !4i � �^` �}�'� r(r j sy .� l �`" , ` � _ �r ti./'r ._' 1 r(��a'�:. I ` '• # �. a -a..�3 7�. 1�'I ,� ' - . •^ � • 1 f �,.'��•�i' ,�• � r• �i'l iy��� • Lr:.�.'' �� (�,1' 'i S �. i' 11 •ti' k •1 � 3 �y�[• •-4 � ,1� i•i w}ti' a�r ,. `r-' � 1:� ,,• :� �::'TA�j;r. ,;'l�••,1�•"' "��'`"•�:. .'' Y1•F� , . .;, •� ' � � ' '+. �11a� j � � I�� - � � �. f( �� � t r. �( � _ u� ./ � I } 1� a �, ]Q7 � • /� I) ) �•� •.�, _ Aso ��lL = �� t=Ce 48 1� r7 T �-._w_--� JJrr J �= 1�1' `1 '�/ NIc � f �'J? 1;`` 1 .I � � J'1 ,,� � �, -1 1 /,,.,, (` . 1 `���. �_ �..1 �`��-_ 1, '• = 32'30",� 1047 1,3 4046 70 000 FEET VSS rcj 4045 :1, 1 f. •�36._ :�'.:i. „� ��� :.�• ;� � � �', 53�� FatAft! Jj aso � �• . -- { r -�� ' ) : 4044 I (/'/-::fit �� ` -. ;� • a°°. - . ,�; :1.� 1_ � -� � _ ,..�— Z-7) 36 3d r ;141 r48 !080000 FEET (VA.) r49 ;�M:NULNS4N r:> M. 12,301, 78 15 ix0 Mapped, edited, and published by the Geological Survey eP,O Control by USGS and USUGS 00 � Topography by photogrammetric methods from aerial photographs ` off c ��' b? taken 1967. Field checked 1968 Polyconic projectlon. 1927 North American datum 10.!--- 98 MILS 1.41' 10,000doot grids baead on Vlrginla coordinate system; south :ono, JOWLS end North Caroline coordinate system 1 r1Ar1.mwlrw Ilniaarawl Trwnwr.wr�n M."'J'r 0,18 IIr64 -�-r --Vyr P-P-? --- �, �, c) r' -7 r") -7 ss- Qj 8 us�S-a-P (--7 7 sS s%� oo v "07+ o = r-� > ss rye o o o % r s9l 0, 'y o o r"*�7S5' s 005org- - r9� S'cy -x 00�' <�b-.Lf-g 'TA bLfi q so� r„°.Vd7 "7 7Id fXL v tlg Lh 8 S Q.-v® fi s b 1*81 ry 190,9 d7 : fv9f,L vtl-VJ>G A"Wwns -y-ypm PYLyv,,? YEAR &6144) ..5'6rffAW B (3jov-rA G T t o W M EAJ Vo u ARC A-v &Wa Y T'o S Ee A `ra tlOWP + r Pew Mix 7'V,V T'p 4rP. SEEDING RECOMMENDATIONS ----------------------- AREA TO BE SEEDED; Appw, Z,O ACRES USE THE SEED -MIXTURE INDICATED: 12.0 LOS. FESCUE GRASS C 60 LOS./ACRE (VEST SUITED ON CLAYEY OR WET SOIL CONDITIONS) SEEDING DATES: SEPTEMBER 15 TO NOVEMLER 30 12-0 LBS. *PENSACOLA' BAHIA GRASS C 60 LBS./ACRE (SEE FOOTNOTE NO. 1) !� SEEDING DATES: MARCH 15 TO JUNE 30 LDS. 11ULLED bERMIIDA GRASS G 8 LBS./AC. (SUITED FOR MOST SOIL CONDITIONS) SEEDING DATES: APRIL 1 TO JULY 31 bo LDS. RYE GRAIN C 30 LOS./ACRE (NURSERY FOR FESCUE) ffD LOS. RYE GRASS G 40 LBS./ACRE (TEMPORARY VEGETATION) SEEDING DATES: DECEMBER 1 TO MARCH 30 LOS. APPLY THE FOLLOWING: ,ZOO* LBS. OF 10--10-10 FERTILIZER (1000 LBS./ACRE) TONS OF DOLOMITIC LIME (2 TONS/ACRE) o1 D D BALES OF SMALL GRAIN STRAW 000 BALES/ACRE ) ALL SURFACE DRAINS SHOULD BE INSTALLED PRIOR TO SEEDING. SHAPE ALL DISTURBED AREA IMMEDIATELY AFTER EARTH MOVING IS COMPLETED. APPLY LIME AND FERTILIZER THEN DISK TO PREPARE A 3 TO 4 INCH SMOOTH SEEDDED. APPLY SEED AND FIRM SEEDDID WITH A CULTIPACKER OR SIMILAR EQUIPMENT. APPLY MULCH AND SECURE WITH A MULCH ANCHORING TOOL OR NETTING. 1. PENSACOLA BAH1AGRASS IS SLOWER TO ESTABLISH THAN COMMON BERMUDA GRASS. WHEN USING BAHIA, IT IS RECOMMENDED THAT B LAS./ACRE OF COMMON BERMUDA 6E INCLUDED TO PROVIDE COVER UNTIL BAHIAGRASS IS ESTABLISHED. +-I%A- S -tea. a� MIX Seca/, Producer; EN 6E L . tr The purpose of this plan is to provide guidelines for carrying out the routine operation and maintenance work needed to keep this swine waste management system functioning as planned. Routine maintenance is considered to be normal good care of the system. Good maintenance adds to beauty, usefulness, and permanence. A. Maintenance The routine maintenance of the lagoon involves the following: 1. Maintenance of a vegetative cover on the embankment top and side slopes: .Tr'E se4-o,&f &56e*-r is being established on these areas. Beginning in 199f and each year thereafter, the embankment should be fertilized with 800 pounds of 10-10-10 per acre to maintain a vigorous stand. 2. Control of brush and trees on the embankment. This may be done by mowing, spraying, or chopping, or a combination of all three. This will need to be done at least once each year and possibly twice in years favorable to heavy growth of vegetation. Maintenance inspections of the lagoon should be made during the initial filling of the lagoon and at least annually. Items to be checked should include, as a minimum, the following: 1. Waste Inlet Pipes, Overflow Pipes a. condition of pipes (1) separation of joints (2) cracks or breaks 2. Pool Area a. undesirable vegetative growth b. floating or lodged debris 3. Embankment a. settlement, cracking or "jug" holes b. side slope stability - slumps or bulges C. erosion and rodent damage 4. Transfer Pump 1 1. STEADY STATE LIVE WEIGHT 0 head weanling to feeder x 30 lbs; - 0 lbs 2880 head feeder to finishing x 135 lbs.. = 388800 lbs 0 sows farrow to weanling x 433 lbs. = 0 lbs 0 sows farrow to feeder x 522 lbs. = 0 lbs 0 sows farrow to finish x 1417 lbs. - 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 388800 lbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.080 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in swine. Years of sludge accumulation in design? 0.0 Sludge Volume = 0.0 cubic feet 3. REQUIRED LIQUID VOLUME OF LAGOON Design for 1.0 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = 388800.0 cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 98.1 feet Construct lagoon bottom elevation 90.0 feet Lagoon size for normal lagoon liquid volume using prismodial formula SS/EN01 SS/EN02 SS/SIDE1 SS/SIDE2 DEPTH 2.5 2.5 2.5 2.5 8.1 AREA OF TOP LENGTH * WIDTH = 330.0 175.0 57750.0 (AREA OF TOP) AREA OF 80TTOM Lb * Wb - 289.5 134.5 38937.8 (AREA OF BOTTOM) AREA OF MIDSECTION (Lm * Wm) = 309.8 154.8 47933.8 (AREA OF MIOSECTION) CU. YD. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM) * DEPTH/6 57750.0 191735.3 38937.8 1.350 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL = 389371.0 CU. FT. VOLUME NEEDED = 388800.0 CU. FT: THE SURFACE DIMENSIONS OF THE LAGOON AT NORMAL LIQUID LEVEL ARE 33D.0 FEET LONG BY 175.0 FEET WIDE 5. DIKE Place spoil as a continuous dike to elevation 102.0 feet. 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 349.5 194.5 67978 square feet Additional Drainage Area 0 square feet TOTAL DA 67978 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 388800 SSLW * 0.01 gallon/lb. SSLW/day * 180 days in the pumping cycle / 7.48 gallons per cu. ft. Volume = 93561.5 cubic feet 68. Volume of wash water This is the amount of. fresh water used for washing floors or volume fresh water used for a flush system. Flush systems that recycle the lagoon water are accounted for in 6A. Volume = 0 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 0.0 cubic feet 6c. Volume of rainfatl in excess of evaporation use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) = 7.0 inches volume = 7.0 inches * DA / 12 inches per foot Volume = 39653.7 cubic feet 6D. Volume of 25 year - 24 hour storm Volume = 6.4 inches * DA / 12 inches per foot Volume = 36254.8 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 93561.5 cubic feet 68. 0.0 cubic feet 6c. 39653.7 cubic feet 6D. 36254.8 cubic feet TOTAL TEMPORARY STORAGE 169470.0 cubic feet 7. DEPTH OF STORAGE REQUIRED (ABOVE NORMAL LIQUID ELEVATION OF LAGOON) Depth required = Volume of temporary storage divided by surface area of lagoon. y Depth required = 169470 cu. ft. / 57750 sq. ft. Depth required = 2.9 feet Normal lagoon liquid elevation = 98.1 feet Depth required - 2.9 feet Freeboard 1.0 feet Top of Dam - 102.0 feet THE DIMENSIONS OF THE INSIDE EDGE OF THE DAM AT ELEVATION 102.0 ARE 349.5 FEET BY 194.5 FEET B. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 6A. 93561.5 cubic feet 68. 93561.5 cubic feet 6C. 93561.5 cubic feet TOTAL PUMPED VOLUME = 133215.2 cubic feet Depth required = Volume of pumped storage divided by surface area of lagoon at normal water level. Depth required = 133215.2 cu. ft. / 57750 sq. ft. Depth required = 2.3 feet DESIGNED BY: ��� � APPROVED BY: DATE: y—,27. y; DATEip� �3 THIS DESIGN IS FOR A SINGLE STAGE LAGOON CLIENTS NAME __________________________> MARTIN ENGEL COUNTY ________________________________> WARREN COUNTY, N. C. TODAYS DATE ___________________________> APRIL 27, 1993 DISTANCE TO NEAREST NONFARM RESIDENCE => 1300 FEET NUMBER OF PIGS WEANLING TO FEEDER =____> 0 NUMBER OF PIGS FEEDER TO FINISH =---===> 2880 NUMBER OF SOWS FARROW TO WEANLING ==-__> 0 NUMBER OF SOWS FARROW TO FEEDER =______> 0 NUMBER OF SOWS FARROW TO FINISH =_--___> 0 DEGREE OF ODOR CONTROL ________________> 1.0 (minimum 1.0 cu. ft. per tb SSLW) (maximum 3.0 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > 0.0 YEARS TOP LENGTH AT NORMAL WATER LEVEL =___=_> 330.0 FEET TOP WIDTH AT NORMAL WATER LEVEL =______> 175.0 FEET NORMAL WATER LEVEL ELEVATION ==========> 98.1 FEET SEASONAL HIGH WATER TABLE ELEVATION =__> 0.0 FEET LAGOON BOTTOM ELEVATION _______________> 90.0 FEET Depth of Permanent Water 8.1 feet (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES 2.5:1 Permanent Volume Required 388800.0 cubic feet Permanent Volume Provided 3B9371.0 cubic feet ADDITIONAL DRAINAGE AREA IN SQUARE FEET> 0 SQUARE FEET (i.e. pumpout pond 8 other outside area) LENGTH OF PUMPING CYCLE ______________> 180 DAYS GALLONS OF FRESH WATER ADDED DAILY ====> 0 GALLONS EXCESS RAINFALL ABOVE EVAPORATION =====> 7.0 INCHES 25YR/24HR STORM RAINFALL =------------> 6.4 INCHES FREEBOARD _____________________________> 1.0 FEET Temporary Storage Volume 169470.0 cubic feet Top of Dam Elevation = 102.0 feet Inside Dimensions of Lagoon at Top of Dam Length = 349.5 feet Width = 194.5 feet Begin Pumping Elevation = 100.4 feet Stop Punping Elevation = 98.1 feet r l.i r A Z z;stxr� 718�, p3 = mr,c A`# - S r - 02042-j; AS G S--t f w LN r ,cis 336'` / 0 z — 10 4b--e-- ru-4- &trz o, ST 3S o x ,z a w 70, waw S� dP . r a �. 3Y y�a� �- 5 b h `F 2 -►- S a + z f ry + LVL r? b �l = 6 C/ 7v 6,2-5" i- BY�o r g 4 4i� s� = / 7 0.8 3 co Ste` , 7S) z '� d �,� ;s �c / 7X- C7S) 1i (/7Z_S�� Z ✓3 ' �, �/G�,r)(7z.S) + (��.2..$)( y S� taC�S��) (s�.7s�� _ ;2880 - i- ,,tA"Mf �-sr aye a d• v Encc�.,, wa, f,-tt = G.5— %ry 3s° Xrsrr 9/ zP6/-416 a•P'Y- e Aoz /- a �,r LAGOON SUMIL' ltY Sidi El- � TYPICAL Ct:OSS-SECTION i Top Width i 1 � 1 Sottivd top .of dam: lo2.Q 1"10 OHL Construct top of doff, Fill Yardal;e: c. �o � cut of4�ka--�-�+�roe Pad - w / 2 3 i- C y rrssRroR .740 ZNZ.ktLk�ral CjrcUn olcv._------------_____ ..-____ "Depth d to mind by Dope 05 an utc4mihrrm:nLt , � t :iCS can site REMouE 71P SOIL 4. 0 S'X4 iitA7E�'NQG 00" 7o CLAM tINp6R �i.1B,QeiKm�.vT CVPrWx. 4.00"So Start land upplicatior�. Stop land 1aiiJ^application - - Lluv. lOb.4 r el::v. 48.r L'uiiiliorary V-luc:rrr---_-_--• W--_-______ -- Sant support-- Troarmunt Volume � 4la ----Top -of -Is 1 u�.trlo el cay.--__-__.__ al udgc �,ccu+uul ��t i air Buttow alky. Re•D .&, Q 2•.r �I i 1y,.r3 r e. r, drii. Z iill � SFB ORAUW w 43 Pei - 5*8Y'7 t-%- Lagoon size: Length .--- Width Cu. Yds. excc vl,t,'-d j8,,4aq ! Y, BENCH I'IARK DE;zCR IF'' !-ION: IQ /I r! / ....c w-r o r% 0 -L.. — 1 tl GENERAL INFORMATION JOB CLASS:--- -7u-- HAZARD CLASS: • a' ANIMAL TYPE 6 NUMBER: 7djjfA acm .--,,.. KIND OF OPERATION: - j5Uu&s&y(&t____.__.___�_--- NOTE: If canatruction i:; not turted within m o year, thi L pl"n is not valid until ro-- evaluit:ion of flood plain ior safety hazard in mado. [-'I vation: - ---loo, o Q LAGOON FOR ANIMAL WASTE (SINGLE STAGE) /4AAZ22 / &A/6dEL, - FARM ��9" a As&TAt e-Ageo ettr-&__ STATE U. S. DEPAfyTHENT OF AGRICULTURC SOIL CONSERVATION E;E.RVICE TITLE; I� sWTNN WASTE hhNAGEMENT SYSTEM B. o eratio Your animal waste management facility was designed for a total of ZUn 44FAp Jddl/1'!� ( FIML391A 'iv* --� ) . The lagoon contains both permanent and temporary storage. The permanent storage is not to be pumped in order to ensure that anaerobic action will occur. The design includes permanent storage of one cubic foot per pound of steady state live weight. The temporary storage portion of the lagoon includes capacity for the volume of waste produced over 180 days, the amount of rainfall in a 25 year 24 hour storm event, and rainfall in excess of evaporation. Your facility is designed for 180 days of temporary storage; therefore, it will need to be pumped every six months. Begin pump - out of the lagoon when fluid level reaches elevation loo. as marked by permanent markers. Stop pump -out when the fluid level reaches elevation ,r The attached waste management plan should be followed. This plan recommends sampling and testing of waste (see Attachment B) before land application. The waste material should be analyzed before each application cycle to determine its nutrient content. A soil test of the area of application should be made annually to insure the waste is applied as reasonably and practically possible to recommended rates. It is strongly recommended that the treatment lagoon be pre -charged to 1/2 its capacity to prevent excessive odors during start-up. Pre - charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors.. Solids should be covered with effluent at all times. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environmental Management, has the responsibility for enforcing this law. 2 ...r nno 1 r. -xjKZATMr fJT LAUUUN loaded equipment traveling in a direction parallel to the main axis of the fill. If pans are not used, construction of the embankment shall be made in layers not to exceed 9 inches in thickness and compacted -with -a sheepsfoot roller with a minimum of �4:passes per unit widffi--of _ f111 : ii.f:t . At any time they embankment surface becomes "slickened" such that the succeeding layer will not bond to the previous layer, scarify the previous layer sufficiently to assure bonding of the surfaces before continuing with the fill operation. Construction of the fill shall be undertaken only at such times that the moisture content of the fill material will permit a reasonable degree of compaction. Construction of the embankment shall allow an additional jo $ for settlement. Stock piled topsoil shall be spread over top of embankment and outside side slopes for the establishment of vegetation. Pollution Control_nuring,Constructio_n_ stripping of embankment and borrow areas shall be done as they are needed in a normal sequence of construction. Use temporary mulch protection on all disturbed areas that are subject to erosion and will not have substantial additional work performed for 30 days. vegetation: Vegetation shall be established on the slopes, embankment top and all other disturbed areas, except the area that will be inundated, as specified in the plans as soon as possible after construction. Necessary steps shall be taken to ensure that a good stand of vegetation is established in a reasonable amount of time. Seeding rates are: SFr: s`i ' 4 C W F D 5CFeP,✓6 ,PECr,M,*t Fz-P 4740� lb. lb. lb. 10-10-10 tons lime tons wheat straw Permanent Stake: A permanent stake (CCA salt treated 41Ix4" post or 1 inch diameter PVC pipe with tee) marked to indicate pumping level elevations, shall be placed in the inside slope at one end of the lagoon. 2 Producer: Clearing: All trees and brush shall, be removed.from the impoundment area before construction is started. The foundation of the lagoon shall be cleared of all trees, stumps, roots, brush, sod, organic soil, and debris. All stumps and all roots exceeding 1 inch in diameter shall be removed to a minimum depth of 1 foot. Satisfactory disposition will be made of all debris. After clearing is completed the foundation area shall be loosened thoroughly and roughly leveled, with suitable equipment, before placement of any embankment material. cutoff Trench: A cutoff trench shall be excavated to a minimum depth of ---- inches under the embankment. The exact depth shall be determined on site by SCS. The trench side slopes shall be 1:1 or flatter and the width will be a minimum of 6 feet, but will depend on the equipment being used. The cutoff trench shall be backfilled with material. The trench shall be backfilled in 9 inch layers and compacted with a sheepsfoot roller with a minimum of 4 passes per unit width of fill lift. If sheepsfoot roller is not used, the trench shall be backfilled in 4 inch layers and compaction shall be equivalent to or better than the routing of the hauling and spreading equipment over the fill in such a manner that every point on the surface of each layer of fill will be traversed by not less than one tread track of the loaded equipment traveling in a direction parallel to the main axis of the fill. All standing water shall be removed from the trench before backfilling is started. /;mac//�+1�-G� 70� .V'uo .S/vit, LA �'G'!� NS L L)pLa .f "!'u C RA`/ li,Up� +Z 6FA'L aAvA: +J4 eA "f l aYP+'iY. (." a,Y�A) _Existing Tile Drains: When tile drains are encountered, the tile will be dug up and removed. The the trench shall be backfilled with a compacted layer of CL or CH material. Excavation: Topsoil shall be stocked piled separately for later use. The bottom of the lagoon shall be excavated as shown on the plans. Where pervious material (SP, quartz veins, etc.) is exposed during excavation, it shall be undercut and backfilled with a compacted layer of highly plastic (CL, CH) material approximately one foot in thickness. Scarify and compact the bottom and, where practicable, the side slopes of the lagoon to decrease the permeability of the soil in the lagoon. Embankment Congtry_c_t won_;- The material placed in the embankment shall be free of sod, roots, stones over six (6) inches in diameter, and other objectionable materials. �t- !1—,AJ <M _ materials shall be used in the embankment. Pervious material shall not be used in the embankment. Construction of the embankment shall be made in layers not to exceed 4 inches in thickness. Compaction shall be equivalent to or better than the routing of the hauling and spreading equipment over the fill in such a manner that every point on the surface of each layer of fill will be traversed by not less than one tread track of the 1 ATTACHMENT A Page I J WASTE UTILIZATION PLAN Producer 64 County WA9a E.S1 Address Kind of Operation 2B96 Ea D Type of Waste Facility . tew,i,y�,t,G Your animal waste management facility has been designed for a given storage capaciy . When the waste reaches the designed level, it must be land applied at a specified rate to prevent pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle and annual soil tests are encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown.. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates and leaching potental. Waste shall not be applied to land eroding at greater than 5 tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Wind conditions should also be considered.to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce -the potential for pollution, the waste should be applied to a growing crop or not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements may be more or less based on the waste analysis report from your waste management facility. The design of your waste management facility is based on the following: Amount of Waste Produced Per Year: F4• 288b animals x_ ,K,?73� waste /animal/yr = total waste produced. A' gr 1-Waste Management Biological and Agricultural Engineering North Carolina State University LIVESTOCK WASTE SAMPLING, ANALYSIS AND CALCULATION OF. LANA APPLICATION RATES James C. Barker* I. SAMPLE COLLECTION A. Semi -Solid Lot Manure i. Scraped directly from lot into spreader a. From loaded spreader, collect about 2 lbs of manure from different"locations 'using nonmetallic collectors. ii'. From storage a. Collect about 2 lbs of manure from under the surface crust avoiding bedd'ing1materials and using nonmetallic collectors. B. Liquid Manure Slurry L. Under -slotted -floor pit a..Extend a 1/2" nonmetallic conduit open on both ends into -- manure Lto. pit .floor. b. Seal upper end of conduit (e.g., by placing, a thumb over end of -conduit) trapping manure that has entered lower end, remove "and empty'slurry into plastic bucket or nonmetallic container. c.Take' subsamples from 5 or more locations or at least 1 quart. d. Mix•and add about 3/4 pine to nonmetallic sample container. ii. Exterior.storage basin or tank a. ;lake sure manure has been well mixed with a liquid manure chopper-'agizacor pump or propeller -agitator. b, Take subsaroles from about 5 pit locations, from agitator pump or from manure: spreader and place in a plastic bucket. * Professor and Extension Specialist, Biological and Agricultural Engineering Department; North Carolina State University, Raleigh, aC. -2- c. Mix and add 3/4 pint to a nonmetallic sample container.. C. Lagoon Liquid i. Collect about 3/4 pint of recycled lagoon liquid from inflow pipe to flush tanks in a nonmetallic sample container. ii. From lagoon a. Place a small bottle (1/2 pint or less) on end of 10-15' pole. b. Extend bottle 10-15' away from bank edge. c. Brush away floating scum or debris. d. Submerge bottle within l' of liquid surface. e. Empty into a plastic bucket, repeat about 5 times around lagoon, mix, and add 3/4 pint to -nonmetallic sample container. A. Broiler or Turkey Litter i. House litter a. Visually inspect litter for areas of varying quality, e.g., areas around feeders and waterers, and estimate percent of floor surface in each area. b. Take about 5 litter subsamples at locations proportionate to item a. E.g., if 20% of litter of similar visual quality is around feeders and waterers, take 1 subsample there and the ocher 4 subsamples from remainder of floor surface. c. At each location, collect litter from a 6" by 6" area down to earth floor and place in a plastic bucket. d. After 5 subsamples have been added to the bucket, mix, and add about-2-3 lbs litter to a nonmetallic sample container such as a 1-gallon freezer bag and seal. ii. From stockpile a. Take subsamples from about 5 locations ac least 18" into pile. b. Mix, add 2-3lbs to nonmetallic sample container and seal. 9i II. SAHZLE PREPARATION AND TRANSFER j A. Place sample into an expandable container that can be sealed. Rinse 1 residues from container with clean water but do not use disinfectants, soaps, or treat iii any other way. B. Pack sample in ice, refrigerate, freeze, or transfer to lab quickly. C. Hand -delivery is most reliable way of sample transfer. D. If mailed, protect sample container with packing material such as newspaper, box or package with wrapping paper, and tape. E. Commercial sample containers and mailers are also available. Contacts: i. A&L Eastern Agricultural Lab, Inc, iii. Polyfoam Packers Corp. 7621 Nhitepine Road 2320 S. Foster Avenue Richmond, VA 23237 Wheeling, IL 60090 Ph: (804)743-9401 Ph: (312)398-0110 ii. Fisher Scientific Co. 3315 Winton Road Raleigh, NC 27604 Ph: (919)876-2351 iv. NASCO 901 Janesville Avenue Fort Atkinson, WI 53538 Ph: (414)563-2446 F. Private analytical labs are available, but sample analyses are costly. C. The NCDA provides this service for North Carolina residents. t i i. Address: North Carolina Department of Agriculture i Agronomic Division Plant/Waste/Solution Advisory Section Blue Ridge Road Center P.O. Box 27647 Raleigh, NC 27611 Ph: (919)733-2655 Attn: Dr. Ray Campbell ii. Forward $4 along with the sample. iii. Include the following identification information with sample: a. Livestock species (dairy, swine, turkey, etc.) b. Livestock usage (swine -nursery, finishing; turkey -breeders, brooderhouse; grower, number flocks grown, on litter; etc.) c. Waste type (dairy -lot scraped manure, liquid slurry; swine -pit slurry, lagoon liquid, sludge; broiler -house litter, stockpile iv. Routine analyses performed on all samples: N, P, K, Ca, Mg. Na, S, Fe, wn. Zn, Cu, B v. Additional analyses performed upon request: DM, Mo, Cd, Ni, Pb i A f r f Sz k 1�,;�. � ' n,I 'iM� a i s Y \ P 5'&ew {�f vev,. - b F,. :1,r •�' vFw z ,.'; r A '.1 - a } 6l �e key Rr�s r 7s '.���xr+' - y�� , ^l A,�''"* y, � '�>� � may`•:, ' , N. pp Ve J� i ✓ ) 1, F{. y I \ i • O Me ppwle X. n . 4 r .� '3r r. f 'i '+" t� r zf S�e r n �► s • �'�;s �� 1 "'ya'h �. a US ti* _} `'�$. i '., � ,y� gi't l fk�:3. � {r�>•�x � E �t �s�t , £ F � ��! y" ..� � • Y � kL a ii ,, ` T♦► ''.> t r+,4 r A s t • �� h z, C♦'sk ate � Sk*# ,���i 3♦�a- ti A � .4 1 r w'� � F ! � 4 R �-� �t S z jt £ ,t: .� is s�•# 4 z �` r `s tw e y' j c r': -: .�� { � . ♦ + i - r , s'� J�i+�tr*�. �.� 'its.' -s,♦,z ''�1 ��:� "� `jr ?> _ yyuQW km=1 of A-,� - `Lo rr y� ;SM' I e, x ♦z O n.1 r ° .. w::%':'•:: .' �::i �y �, a'�: Y`�`KYS '� AC. -r't 'n 5: 4 %. �f 5' 5;3�kr'l;a��'t f CS-: 'rx r3 a . K a r x .-•'«-.' ♦ r S' 'S .�,.✓ ' 3.-.e „�Lf) -z,• p 'v st <? >r':�, l "5 -'-.:.) e . S. Q. 'b • o N. } YR?:' f ♦ ^` 'ks r`�,k�i a • ,� t;r k v r4i 5 9 7 :.fs `w , - f sy.-, �`',<--'Yr? :§ y�r + -r.. f'P.:K ♦.f: .. ,, <r +, •.e ..'Sr �,�;>=rb \71ST' %rS`/", ''aY aM1iiiMr' 'h'e1av�,�'`. 2, '.',�,. ..`�z .k:-: s Fs �" X now - �f� �� r°-r ✓�A�.:'::.. � t {fi ",�y. � i3 ,� {'�;r + �" tt �Pi � f _ Y'k ., ... � s � � Ykc),' �iY'4 �r % 3 V zkr,i }f `� • is r,f. �t i _ � v W: 3 ��T - � :,.,qxs \'•�, si"t, r7�$�`T ::�4 ,rt. ..,� '"s ,r _a M1 £ �. ♦ � � 1��-,, 'P �4�. S ..... �_':..�) S" `.' f`7'' 4e',h' s a5 ♦; *♦ sa - �4 ¢ ' � ,S Se.+ `�an y t'ia ktr St'< s 4# ` j t '' 'r k ! - ,?,,i r f ♦� iY }?�,^¢k o F s cC r r.'. - .. u£} _ fci c f s,£. _ r L ole / U :•{ � - � � 16 �4"' � f cWS ' iSfi.. ^S .^✓'k# v ftls,� .may 4�7.•, f�G �'�'E ^� � �'�''z k - t �; i z � v:. A �' r- 2,-7 t ',4 h fi- 'S '``+. 9h Jk -r�i�\qa-`t ♦ 4 fir/_.: F'i'4q ttl4 w. �_ _° � ♦ Fa - �e � se:' � � , r t Y i_ :%J ^' �}�`- ys < f S.' %. Al W£ r >t'r a ✓.. 2 �. h .a, ) r ti ' -,'t '+� j?��.,7 �P r y-- x51. r� Yi � f s k � �s1 Js •.F>2 Y Jr £�1+i t`F� s .. 'Z♦�Y °�Z ; �i,,(; # k, y+r �'> nk.. a�� ti _ >'ly� q��}' .c. � k S x. -� ♦ 'may " „t.ti F S'� � -�'� :�f'i � �r'� Y r *# k Y r ,� ,,.,y `��f � t. � 1 2 k`S Y ♦ ,: `_? }.y w '� yY +} h f, t ti `' i'� k -;. '--& r Y 4 -; � -.♦ �� i ,� ,1 gr �' 3 s � r. .,. .... ., �,,,. . e..Y 'lJi-'i tk iy, ♦ � �s's`:,• A