Loading...
HomeMy WebLinkAboutNC0089389_More Information (Received)_20190130ROY COOPER MICHAEL S. REGAN LINDA CULPEPPER NORT N CAROLINA Environmental Quality January 9, 2019 CERTIFIED MAIL 7016 2140 0000 4371 0080 RETURN RECEIPT REQUESTED Mr. Scott Buffkin, Town Manager Town of Jonesville 1503 NC Hwy 67 Jonesville, NC 28642 Subject: Request for Additional Information NPDES Renewal Application Jonesville WTP NPDES permit NCO089389 Yadkin County Dear Mr. Buffkin: The Division has reviewed your application, received on April 2, 2018, for renewal of NPDES permit NC0089389. To enable us to complete our review in accordance with N.C.G.S. 143-215.1 and 15A NCAC 02H .0105, we need additional or revised information regarding your discharge: 1. Please confirm the treatment process of raw water, including all additives used for cleaning or disinfection, as required in Section 7 of the permit renewal application. 2. Please confirm the treatment process of wastewater as required in Section 8 of the permit renewal application. The renewal application only indicates that a valve is used to release treated water back to the river. 3. Please confirm the maximum potential discharge (in MGD) of wastewater from Outfall 001 into the unnamed tributary to the Yadkin River [Stream Segment: 12-(52.5)], as the information provided in Section I 1 of the permit renewal application differs from that in the Division's files. 4. Please provide an updated flow schematic. The schematic provided with the permit renewal application does not show flow volumes at all points in the treatment process, where all chemicals used in the treatment processes are added, and where the wastewater is sent, as required in Section 15 of the permit renewal application. This information is required in order to continue reviewing your request for renewal of the Jonesville WTP NPDES Permit NC0089389. �.._� Qom` North Carolina Department of Environmental Quality I Division of Water Resources 1617 Mail Servicc Center, Raleigh, Noith Carolina 27699-1617 919-707-9000 Town of Jonesville WTP 339 Shaw Street Jonesville, NC 28642 Dear Brianna Young: In regard to the email concerning the subject: Request for Additional Information NPDES Renewal Application Jonesville WTP NPDES permit NC0089389 Yadkin County; I will address each topic in the order as received. 1. The Town of Jonesville WTP is an A Surface Water Treatment Plant, with a 1.0 MG maximum rating per day, although the maximum flow each day is only 600 GPM influent and 590 GPM effluent. The source water is drawn from the Yadkin River and pumped up to our 8.0 MG reservoir, directly above the Water Treatment Plant. The first chemical injected into the raw water is Aluminum Sulfate 48% and after this , Caustic Soda 25%. These are injected prior to the pre-treatment of the raw water. Next the water enters the Actiflow Micro -Sand Treatment Unit where a small dose of polymer ( 0.30 mg/I ) is added to help bid the turbidity for settling. The Actiflow process only requires 20 to 30 minutes of treatment time. These are the only chemicals added in the treatment process, prior to the discharge valve. This discharge valve has not been opened since the start up of the new Water Treatment Plant in 2013. 2. The discharge valve is ( as described in prior application ) a gate valve that is to be opened manually, only in the event of a major error in the treatment process ). Since start-up in 2013, this has not had to be used. The gate valve would be closed manually once the error has been corrected. 3. The maximum potential discharge from Outfall 001, to the Yadkin River: would be 0.85 MG. This would be in the unlikely event of not being able to correct the problem within a 24 hour day. 4. Updated schematic included. Please feel free to come and inspect our Water Plant and the discharge valve. I know that this in non - conventional type of discharge and it's application to our needs. Thank You, Billy Wood ORC 3 0 In M m pa -4- �z �z (http://w ww.mesco.com) Municipal Engineering Services Company, P.A. 7nEx nesville Water Treatment Plant f Jonesville Water Treatment Plant-MicroFloc Basins LIO"'I- 1 �1-4- I' Jonesville Water Treatment Plant -Actiflo Control Panels Jonesville Water Treatment Plant-Actiflo Trains Jonesville Water Treatment Plant -Actiflo Sand Recirculation Pumps ETI a