Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
730010_PERMIT FILE_20171231
Type of Visit: J2ftompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ArrivalTime:1 q, Departure Time: County: � Region: Farm Name: -T rn QS Fc.1(`M_n T)dPk :Eyre._ Owner Email: How Owner Name: j �my `r h �Q C Phone: 33 G — 3[. y — a (0 3 3 Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Integrator: Phone: Certified Operator: II'mr)+ h V I h o M0--s Certification Number: I (a T$ 9 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design .Current Design Current Design Current Swine Capacity Pop. Wet l'0 1 Capac sty P p. Cattle Capacity Pnp. Wean to Finish La er Dairy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder aci Po , Non -Dairy Farrow to Finish 0 Q La ers Beef Stocker Gilts Non -Lavers Beef Feeder Boars jPullets Beef Brood Cow Turke s Other Turke Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes 17 No ❑ NA ❑ NE ❑ Yes q No ❑ NA ❑ NE ❑Yes qNo ❑NA ❑NE ❑ Yes [4 No ❑ NA ❑ NE ❑ Yes [�] No ❑ NA ❑ NE Page I of 3 21412015 Continued ` Facili Number: Date of Ins ection: c. Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate'? ❑ Yes 4No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes 7No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 19 Observed Freeboard (in): 3 - a 0 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes P No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes (] No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes KNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes P'No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes O-No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 2jNo ❑ NA ❑ NE maintenance or improvement? 11. is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes eNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 7] No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Zf No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Q No ❑ NA ❑ NE acres determination'? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Reauired Records & Documents ❑ Yes Q No ❑ NA ❑ NE ❑ Yes ZrNo ❑ NA ❑ NE 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes E[ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 91No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o RNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment'? ❑ Yes ❑ NA ❑ NE Page 2 of 3 21412015 Continued 1' Facili Number: 9 3 - Date of Inspection: Cf -1 2 Did t ,facility fa�ocalibrate wastep lication equipment as requir d by the per it? ❑Yes ❑No ❑ NA❑ NE 2 s the acility out p lance w perms conditions related t s u ge. If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. oOL O Q ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other. comments. Use drawings of facility'fo better explain sifuations(iise additional pages as necessary).."; L ms-f-P unxA . LO Do o v 8 io- 11 = I a-3 w 0 0 570K Lr-S- 17 N - oa WOW" A-c� — &P"Iq S 15 8 3 1 KAA Ue.� I a /.3 // 1 S' y 6Z t'n.&yr,,,c� I S 9 k_%____..— I LJ—, . —. - ____J I -r— &A V*Nk\b Lj ilin.-I 1 Reviewer/Inspector Name: �I Y\Q.. �;e r(\aC'd- Reviewer/Inspector Signature: Page 3 of 3 Phone: 9 j 1 ? q/ y1 3 Date: 9 7_� a 21412015 tvisionf Wate't•'R se nur�ce's Facility Number r?3 DDtvtston of Sotl dnd Water Conservation 9�Otlier Ag �'� Type of Visit: QkConfpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: outing 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: k!9,0 Region: (R O Farm Name: -Tho t a LaRm s ]ROKv l+ a Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Tj tN\ r7+h J T hn M Lis Certification Number: Back-up Operator: Location of Farm: 3(o- I Y 9 13 CA 3 70 0 0 A0 A D 10)(1509 O Latitude: Certification Number: Longitude: " Design Swine Capacity Pop. " WEt{Poultry es]. gn Current Design Current Capacity P,op. Cattle Capacity pop. �# ,j ' " Wean to Finish La er Dairy Cow Dairy Calf DairyHeifer Wean to Feeder Non -La er Feeder to Finish a � 1 Design Current' It P8o P. Farrow to Wean Dry Cow Farrow to Feeder Non-Dairy Farrow to Finish La ers Beef Stocker Ciits -Layers Beef Feeder Boars Pullets Beef Brood Cow c Ar Other Turke s Turkey Points Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation'? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State'? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge'? ❑ Yes �TNo ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ,?' No ❑ NA ❑ NE ❑ Yes [Zf No ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE Page I of 3 21412015 Continued Facili Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage pius heavy rainfall) less than adequate'? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier; Spiliway?: Designed Freeboard (in): Observed Freeboard (in): 3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes P No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit'? - ❑ Yes �XNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �Z No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes d No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [Z No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [;fl No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 0 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [XNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 4 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [7 No ❑ NA [] NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 0 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall [:]Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 2 No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - Date of Inspection: 24 Di the acilit fay it to calibrate waste application equipment as required by the permit? ❑ YesNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit copditions related to sludge? It'yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. V 't+1' I OL G tS ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes Z No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ,21-No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes J"No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes &No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 9No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ;�7No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �TNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes �ZNo ❑ NA ❑ NE 34, Does the facility require a follow-up visit by the same agency? ❑ Yes [7No ❑ NA ❑ NE Comments (refer.to question.#): Explain any YES answers and/or any additional recommendations or any..other, comments. :. Use drawings of facility to better explain situations (use additional pages as necessary). C CL \ -6 � Cr_v4 dr`} 471 (P 0 1: 'r) � - 1 [ Cp0 `7 Cq 5-UAq2. Jl� 4 -- 3, 3 P = S, -_6 G it 7 J 1 -36 - Ito wooce YOY N t,Sq l - r7 -( 5 LU000167a- 1) 1,35 Ty' m rnY MFf OS & HOOKS c-O fv-r £ D O N O JR eCFCVZF— AmuriuL Foe noigpgTHANN0 r /j q Reviewer/Inspector Name: ` rl w\ 'fir(~ {\���� Phone: Reviewer/Inspector Signature: 1Date: Page 3 of 3 21412015 * . . Type of Visit: ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: J7(�d'`SG(L% Region: _ Farm Name: -rh r nyl a S :Fa c r,n,S P o c k T n C # 2, Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: T_�oLO+ hy hn 4�1 CL Back-up Operator: Location of Farm: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: 3 (cap 14 a Yd I T , v I Ll 13 ti 3 T'c) Ad 26. • 's; *C �ti .`N �: 4+5 y yy. Wean to Feeder "Y Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made'? ❑ Yes 21'No ❑ NA ❑ NE ❑Yes ❑No ❑NA ❑NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes _L317o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes FeNo ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [3"No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes JZ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes FTNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ZNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes P�No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �' o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ;To ❑ NA ❑ NE maintenance or improvement? T Application _Waste 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo ❑ NA ❑ NE maintenance or improvement? I t. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes EjNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? 0 Yes ZNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 0No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes Of No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ONo [] NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes E:rNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ONo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 'dNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 0 No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E/No ❑ NA ❑ NE Page 2 of 3 21412011 Continued [Facility Number: f 13-1Date of Inspection. 24. Did the facility fail to calibrat waste application equipment as required by the permit? ❑ Yes � No ❑ NA ❑ NE 25. is the fac lily o` uut o cco�mp ian e wit Pennitglc�o Id�'n� Alai ed to sludge? If yes, check ❑ Yes ~�21'No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes )fNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes gNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? Reviewer/Inspector Name: Reviewer/Inspector Signatur Page 3 of 3 ❑ Yes Pj"No ❑ NA ❑ NE ❑ Yes dNo ❑ NA [] NE ❑ Yes eNo ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes [ZrNo ❑ NA ❑ NE ❑ Yes ;El"Vo ❑ NA ❑ NE Phone: grl9 7q1 L4 e-),36 Date: L/ L,�v�2 )z zo, 21412015 rype of visit: zzompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: eRoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: I if Arrival Time: Departure Time: County: Farm Name: t1�'YY1�A elA _X1] Ilk-L .t:1 Owner Email: Owner Name:, r �r� Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator: Phone: Region�- Certified Operator: _3 maw hail ,Q Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: .3(o_ 140U10 9 S, q /(-/ a LC) 13g3 To A C1 a — q��x bfm Design Current Design Current Design C►urrent Swine Capacity Pop. Wet Poultry C►apacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow INon-Layer I Dairy Calf Dairy Heifer Wean to Feeder I Feeder to Finish Farrow to Wean Design Current Dry Cow Farrow to Feeder 12 D , P.o_ultr. Ca aei P,o Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes_,&No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [�rNo ❑ NA ❑ NE ❑ Yes ff No ❑ NA ❑ NE Page I of 3 21412011 Cohlinued Facili Number: Q 3 - Date of —Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes _L3'No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �NoE] ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 110 ❑ NA ❑ NE waste management or closure plan? T If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes P�'No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 1EI"No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 12rNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes L2"No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes &No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 21'No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes .❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ZNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 15 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ,E o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ,�:f_No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. []Yes E211CI0 ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes —No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes JZNo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: Date of Inspection: 24. Did tt�hgqa(ilityfai to calibrate waste application equipment as required by the permit? ❑ Yes oNo ❑ NA ❑ NE p� [[25. Is the faty out of Alp iai ith permit conditions related to sludge? If yes, check ❑ Yes El No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 24. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility'? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes PNo ❑ NA ❑ NE ❑ Yes jZ"No ❑ NA ❑ NE ❑ Yes 2No [] NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [ '-No ❑ NA ❑ NE ❑ Yes ErNo ❑ NA ❑ NE ❑ Yes lo ❑ NA ❑ NE ❑ Yes / No ❑ NA ❑ NE []Yes dNo ❑ NA ❑ NE Comments (refer to question #); Explain any YES answers and/or any additional recommendations 'or; any other comments. >" Use drawings'of facility to better explain situations (use additional pages as necessary). urn g a l s0 van ► ?- r I S k0a, CP a�► -ra-)u woo q, (0 3 S y 9 �fl f1 N r �Mp M Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: Date: 21412011 Type of Visit: T Compliance Inspection O Operation Review Q Structure Evaluation Q Technical Assistance '' p p Emergency � Other Q Denied Access Reason for Visit: Routine � Complaint � Follow-up � Referral 0 Emer enc � Date of Visit: Arrival Time: Departure Time: County: Region Farm Name:T1)at'`Cy1_S Fri C rnS Owner Email: Owner Name: Phone: -' Q ^ Jf r T V Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Certified Operator: T I rA-} h.►_ T h o m a Phone: Integrator: Certification Number: I't0 ! % i Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry C•apac�ity� Pop. C►attle Capacity Pop. Wean to Finish La er Dairy Cow Dairy Calf Wean to Feeder Non -La er Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder D , Poultr. '. Ca aci P.o P. Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream lmaacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes 2'NO ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 21412011 Continued r+,; • jFaciliNumber: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Flo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [] No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes,,[2-,5o ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑YesI o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes/ 2 o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) f 9. Does any part of the waste management system other than the waste structures require ❑ Yes �� No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ANo [] NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:]Yes ;3/No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift [] Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes )2�o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 1Vo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes' KNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes FNo Yes ❑ Yes ❑ Yes No []Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZI No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes N ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No F] NA ❑ NE Page 2 of 3 21412011 Continued ❑ NA [] NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE �Ilm • Fatilit Number: I Date of Inspection: 24. id the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes�o ❑ NA ❑ NE 25. Is the facility out of Impliance with permit conditions related to sludge? If yes, check ❑ YesXNo 0 NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT') certification? ElYes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes F(No ❑ Yes No 5 ❑ Yes �No //No Yes 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑NA ❑NE ❑NA ❑NE ❑NA []NE ❑NA ONE lg(No ❑ NA ❑ NE XNo ❑ NA ❑ NE U?fNo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). woe) q to R- U-1 00005.�- r Reviewer/Inspector Name: Rcviewer/Inspector Signature: Page 3 of 3 ('C r� M Lk)OM L{ 5 - 536 - 5 T? I I q_5 Ia-3t-/gC1s d� ao►� cbV\Q_Q. t4ejaAP Phone: QV 67 9� G� Date. L' 2/ /20l type of visit: 1j t_:ompuance inspection V uperation Review U btructure tvaivation U teenmeal Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ival Time: ; Departure Time: County: Farm Name: l ho►'►r15-r PDt)& Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: ' mQ'� U OrKas Title: Regio4a_y_L)_ Phone: t3 3 (n — 50 ~ a 21 a 2 Phone: Integrator: Certification Number: r b7931'%` Back-up Operator: Certification Number: Location of Farm: Latitude: go x bond A)a ' 59 L/ Longitude: Swine Wean to Finish Design C+urrent C*apacity Pop. Design Current Wet Poultry C►apacity Pop. La er rent Design CRro-Ap Cattle Capacity . Dairy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Farrow to Wean Design Current Dr► F,oultr. Ca acity P,o P. Layers Dairy Heifer Dry Cow Farrow to Feeder Farrow to Finish Non -Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other Other Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes J2-<o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ZrIKIo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes eNo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Faci it y Number: - Date of -inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate'? ❑Yes /"2'i o a. If yes, is waste level into the structural freeboard? ❑ Yes a'i o Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in) ❑NA ❑NE ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑Yes ETNo ❑NA ❑NE ❑ Yes�o ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Ye�5 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Rl"No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Z No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): � 3, / 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 21"No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? C] Yes' N o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes/e' No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes �10 ❑Other: ❑ NA ❑ NE ❑ NA ❑ NE [DNA ❑ NE ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes,,En-No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes�N ❑ NA [3 NE ❑ Yes VNo ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facifity Number: 11 1 iD Date of Ins ection: 24. Did the �facicilit fail to calibrate waste application equipment as rel�icLb� �e permit? ❑ Yes �No ❑ NA ❑ NE 25. is the facility ut o comp �an� —ce with perrm on iti s related to'sllge?if yes, check [] Yes ONo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes :�?No o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ONo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ZNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ;;3'*'No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes 0No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes CZ(No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question-.#): Explain any:YES answers and/or any addition al,recommendations onany other comments, h Use drawings of facility to better explain situations use additional pages as necessa (o - as - I a d= '5 �� y,a 11 Reviewer/Inspector Name: �� Phone: qr-r% /- Reviewer/Inspector Signature: Date: `I 19 - 13 Page 3 of 3 21412011 Type of Visit: � Compliance Inspection U Operation Review Q Structure Evaluation 0 Technical Assistance Reason for Vis Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Timer Departure Time: County: Region:R� Farm Name: Thn /Yla S Eacrn s Pe r k ?U:aOwner Email: Owner Name: Phone: 3,3 6 3 /1 v 33 (o - so '-I =T a 9 S a Mailing Address: Physical Address: -TdC1 d ©C d ` ? Facility Contact: Onsite Representative: Title: Phone: Integrator: R MCA' Certified Operator: -T1 mp f 111! Dom,, 51 h Q U Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design EMrrentIII, Swine Capacity Pop. Wet Pou111 ltry Wean to Finish La er Design Current Capacity Pop. C►attle Dairy Cow Design Capacity Current Pop. Wean to Feeder Non -La er Dai Calf Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Layers Design C*urrent Dairy Heifer Dry Cow Non-Dai Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other Other Turkeys Turkey Poults Other Discharges and Stream impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes �No ❑ NA ❑ NE ❑Yes No ❑NA ❑NE ❑Yes No ❑NA ❑NE ❑ Yes No ❑ Yes � No ❑ Yes A No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page I of 3 21412011 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes J'No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? [] Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in)* � Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes �yNo �No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks).,( 9. Does any part of the waste management system other than the waste structures require ❑ Yes V I No ❑ NA ❑ NE maintenance or improvement? i Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes YfNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 91' o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes VJ'No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes XNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes�No ❑ NA ❑ NE acres determination? 1 17. Does the facility lack adequate acreage for land application? ❑ Yes y J No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents ',P'Sio 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes �No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes PNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 'No ❑ NA ❑ NE ❑ Waste Application ❑Weekly Freeboard ❑ Waste Analysis ❑Soil Analysis ❑ Waste T ansfers ❑ Weather Code ❑ Rainfall ❑ Stocking [] Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 14 No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili Number: Date of Inspection 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ) ' -o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes 'No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [] Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 0 No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes Po ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes XNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. .0"No 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. [] Yes o ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes❑ jNoo NA ❑ NE 34. Does the facility require a follow-up visit by the same agency'? ❑ Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES;answers:and/or any additional.recommendations=orauy other comments s, I ' Use drawings o1 facility.ta better explain situations {use additional pages as necessary) '°".fr° .:: . m. a p : t`., `. � a Z) W 0 P r y_0 r -a= 3F .1 1 1 4 -V I I I r7 1V -;zi 1759y v , y ° -3 I�� 1 a 14,d rm a(`�V 0=3, ? -p 1-1, 110" ho0t�s n e-de-6 1 11 ?/A/ // — �Q.L_l aIQn1/, — Reviewer/inspector Name: Reviewedlnspcetor Signature: Page 3 of 3 L/ a-1 Phone: 9 /%r / V / C-1 0,-234 Date 0- 21412011 type of visit R Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: ��,,``2 Departure Time: %- 3 G County: ��f�' Region: Farm Name: — 7 �E�'' ; ��H -T,1, 2 Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: 'Title: Onsite Representative: Integrator: Phone No: Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certifieation Number: Location of Farm: Latitude: e 0 4 =14 Longitude: = ° = 1 = 1{ Yc Seka j..,"*'z§, #Sir` .1.if Sa.`'. ;.? = ti,Aie51 n s CUCterit t r iiDQSI^ n ' CUCCent t ,� :� " 4 iDeSl i[t i -`Current e; SWI,nC" "s, an $ t ai -..i "._ ' } _ �. €`s }As -rtA -., r+ g `€Capactty...Fopulat�ontz n-. 4 W,ct Poultry Capacit Pnpulahon Castle „ " _ •Ca acit 1'o ulatton "JIL] Wean to Finish ❑ Layer ❑ Dairy Cow ❑ Wean to Feeder A❑ Non -Layer I I—❑ Dairy Calf ❑ Feeder to Finish , t _ s': ❑ Dairy Heifer A El Farrow to Weans i ll #i' El D Cow f ❑ Farrow to Feeder ❑ Non -Dairy El Farrow to Finish Z ❑ Beef Stocker ❑ Gilts ❑ Beef Feeder �. ❑Beef Brood Cow Other` R4 Cl Other Other Numbb. of StructuresI All Non -Layers ❑ Boars El Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure El Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes Z No ❑ NA ❑ NE ❑ Yes 12 ONo ❑ NA ❑ NE ❑ Yes ZINo ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ZNo ❑ Yes ,0<0 ❑ NA ❑ NE ❑ Yes O No ❑ NA ❑ NE /28/04 Continued Facility Number: 77 — fG Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ON E a. If yes, is waste level into the structural freeboard? ❑ Yes 21"o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 2`% 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No [DNA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes Ja<0 ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes P<0 ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Ko ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E2'rVo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14, Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 3"No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes P '&o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes L3� No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes KNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes VNo ❑ NA ❑ NE .� ''�l t�' •t Comments�(refer>to;question #) Explain;any YES answers and/or any recommendationVor�anygoiheomments. F :. jz 3' ',.� Vrl' lase drawl" facility to better ex' situahons: (u§e.additional pages as necessary): ,.��� t� wr F.. j. Reviewer/InspectorName ��, �H-PiJ'..' ¢,�`�� Phone: Reviewer/Inspector Signature: Date: 12128104 Continued Facility Number: 7 T — 1U Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes J5 o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes eNo ❑ NA ❑ NE the appropriate box. ❑ WUP El Checklists El Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. [:]Yes .Z'No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ZfNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes XNo ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ONo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes 0No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes 2fNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes P No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ONo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes plq'o ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 2�_No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes 1.72<o ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) ,.,� / 32. Did Reviewer/Inspector fail to discuss review/inspection with 'an on -site representative? ❑ Yes lNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes RrNo ❑ NA ❑ NE Add itionalWom�ents�andlor Drawings: Lfr�3 /G C, �V C_J )e 6,,dl 5, � - 1- Cl /v _ 12128104 Type of Visit QfCompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 6 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: I tfJ$'-/G I Arrival Time: ��,�c' Departure Time: d County: A0121 Region: r Farm Name: ` 4e�6f )L✓ It', C ; ` Z ., Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Phone: Title: Phone No: Onsite Representative: I Integrator: Certified Operator: Back-up Operator: Location of Farm: Operator Certification Number: Back-up Certification Number: Latitude: [= o [= I ❑ Longitude: = c Xt Design y Current . y t y Apesign ' Current 0 a'1'Nkt �*„ . t b'� x i `E i. s-=w k " S L, � ;fix %' •� ..AP, i Swiise.rCapacity�Papulation WetPoaltryq.CapacityPopulation "t- ... - '. t r• • s t _ 4.. z *, r . -; - av� Cattle. 'ice Design Capaety `.n..,gw Current Pop lation tau€..tewrrouaw. ❑ Wean to Finish ❑ La er ❑ Dai Cow ❑ Wean to Feeder ❑ Non -Layer ❑ Dai Calf ❑ Feeder to Finish [] Dairy Heifer ❑ El D Farrow to Weans ix t Dry }.Poultry Cow El Farrow to Feeder ``' &"k` `" <' y '' ❑ Non -Dairy ' ' ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker S. ❑ Gilts ❑ Non -Layers ❑Beef Feeder ❑ Boars ❑ Pullets ❑❑Beef Brood Cow Turke s the1 01 urkey Pou Its ❑ Other ❑Other Number of Structures:.: u ; Discharyes & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ATNo ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ;D No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes E!rNo ❑ Yes 2'�No ❑ NA ❑ NE ❑ Yes La"No ❑ NA ❑ NE Page 1 of 3 12128104 Continued Facility Number- Date of Inspection Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: -1 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ONo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ,j No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes o No ❑ NA FINE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ;ErNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes P-No ❑ NA ❑ NE maintenance or improvement? Waste Ammlieation 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 23-No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes RNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes EI'No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes O'No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes �ZNo (:1 NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 0 No ❑ NA ❑ NE y., .. - -- �� Comments (refer ku.,question,#) Explain any YES. answers and/o any recammendahons oyr%i yN6ther�comments Use p drawings of facility to better exlain situations: {use aildittonal pages as nee, s�'''_ �Y.i'�i;x "4'�1�'� ReviewerlInspector Name '% ;;� �'JGi+ `' 1 '. i ': %" Phone: 919 7�/ y2lfi Reviewer/Inspector Signature: Date: Page 2 of 3 12128104 Continued Facility Number.73 — 1 CG Date of Inspection `Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes 0—No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �allo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps El Other 21, Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes RVo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and' 1" Rain Inspections ❑ Weather Code 22, Did the facility fail to install and maintain a rain gauge? ❑ Yes ff No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes J"No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes EfNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ;D-No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes �2 No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes �3 No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 0 No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes P No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ffNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes [2-No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes P No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ErNo ❑ NA ❑ NE Add�t�onal Co iinmeptskandlor Drawings ` , Cc l•' S er-C e,�U S'r,., / �e 14 - 22 s 1/ C�J �-�°y V �- o - jrtj (yls 3-27H, Page 3 of 3 12128104 .J Type of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit o Routine 0 Complaint O Follow up 0 Referral O Emergency 0 Other ❑ Denied Access 111 Date of Visit: ;' Cl- t7 Arrival Time:: !tif Departure Time: �= GG County: 0Region: Rlb Farm Name: 4el.3 °J / C.,-Af A1,0 T, r #-1 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Phone: Phone No: Integrator• Operator Certification Number: Back-up Certification Number: _ Latitude: = ° = Longitude: = ° 1=11 Design Swine Capacity Currant Population Design Current Wet Poultry Capacity Population Cattle, Design Current Capacity Population ❑ Wean to Finish ❑ La er ❑ Dai` Cow ❑ Wean to Feeder 2 C ❑Non -La er prey Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turke Poults ❑ Other ❑ Dai Calf ❑ Dai' Heifer ❑ D Cow ❑ Non-Dai ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish 26' C ❑ Gilts ❑ Boars Other ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ONo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? [--]Yes ONo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes B No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes o El NA [I NE 2. Is there evidence of a past discharge from any part of the operation? El Yes ,Or 2J No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes �: o ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12128104 Continued ,. Facility Number: -7 ] — / G Date of Inspection U_o9 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate'? ❑ Yes 2"No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes �o ❑ NA ❑ NE Structure i Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes J2"No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes B No [DNA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes RNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ;3No [INA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes UNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > l0% or 10 ]bs [:]Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ZNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes O-No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes Q'No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes FerNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes F4fNo ❑ NA ❑ NE .Sn4'33 Ns'Fi:a� Comments (tefer to gVuestion=#) Explain anyNYES�;answers and/dr,any recomm�e�ndatiionCor any, other comments km tUse drYawmgs of facility t6,better explain situations. r(use addltlonal pages as necessary/,I). sk Reviewerllnspector Name � 10iJ Phone: Reviewer/Inspector Signature: ,f Date: Page 2 of 3 1-7126IU4 c,ontinuear Facility Number: 1 Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ,e No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes qNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes JZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29, Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes J2 No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes JZNo ❑ NA ❑ NE ❑ Yes PNo ❑ NA ❑ NE ❑ Yes �' o ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ZfNo ❑ NA ❑ NE ❑ Yes ;3 No ❑ NA ❑ NE ElYes Z No ❑ NA ❑ NE Additional Comments=:indlor S lvdje 9`2,y-c s 3. C 24 7- c /V_ .2, V Page 3 of 3 12128104 `7/P 3/0-r Type of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 4Routine O Complaint O Follow up O Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: I Departure Time: County: _ JP_ C5Q r1l Region: -"— Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator: Phone No: Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = c =' = Longitude: 0 ° 0 Design Current Design Current Design Current Capacity Population Wet Poultry C►apacity Population Cattle Capacity Population inish ❑ La er ❑ Dai Cow Feeder J!! ❑ Non -Layer ❑ DairyCalf Finish El Dairy Heifer Wean Dry Poultry ❑ D Cow Feeder ❑Non-Dai Farrow to Finish ❑ Layers ❑ Beef Stocker ❑ Gilts ❑ Non -Layers ❑Beef Feeder ❑ Boars El Pullets ❑ Beef Brood Cow ❑ Turkeys Other ❑ Other ❑ Turkey Poults ❑ Other Number of Structures: DImpactsischarses &Stream ,acts 1. is any discharge observed from any part of the operation? El Yes �No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes KNo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes VNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) ❑ Yes -dNo ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ZNo ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes [�No ❑ NA ❑ NE other than from a discharge? Page 1 of 3 12128104 Continued 91 Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a, If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes eNo ❑ NA ❑ NE ❑ Yes �lo ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes ,B—No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ;E No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �o ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes /No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes /No ❑ NA ❑ NE maintenance/improvement? l 1. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes 9<o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ZNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ,!fNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes ZNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ZNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ;;}'N10 ❑ NA ❑ NE ..:�as� t:- v't:��Z$i���tiNi.,a:.�i'i'�.�.. Comments,(refer n gtiest on.#) Expla n any�YES a�ns�wers and/or any recomm �a�tioons�;ar any other comments. Use°drawg7ings,af tacility%%to better expg*lam situations: (us6iadditaonga[ pages as.aecessar¢y):, . 4"si � 4Xsl.i9E :9 ���s< F �� N-4�F`��.����_t 3h�a�A1a�% {��s�1 k_.' Reviewer/[ nspecto r Name Phone: Reviewer/[nspector Signature- Date: p __ I -1' 2 17/7immi I!'n ►i!lN ilOd a— — ft . Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WUp ❑ Checklists ❑ Design ❑ Maps p ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes •e� o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes ,&No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes O<o ❑ NA ❑ NE ❑ Yes 2 No ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes 0No ❑ NA ❑ NE ❑ Yes Q No ❑ NA ❑ NE ❑ Yes F.�(No ❑ NA ❑ NE ❑ Yes Ej<o ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE Page 3 of 3 12128104 i'- Division of Water Quality ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 730010 Facility Status: Active Permit: AWS730010 ❑ Denied Access Inspection Type: Compliance Inspection_ Inactive or Closed Date: Reason for Visit: Other County: PIL§on Region: Raleigh Date of Visit: 09/11/2007 Entry TIme:02:13 PM Exit Time: Farm Name: Thomas Farms Pork Inc. 2 Owner: Jimmy L Thomas Incident #: Owner Email: Mailing Address: 8251 Oxford Rd Timberlake NC 275839116 Physical Address: Facility Status: ❑ Compliant ❑ Not Compliant Location of Farm: Off Todd Rd. from 49 N. SR 1547 Question Areas: W Discharges & Stream Impacts Other Issues Integrator: Latitude:36°25'30" Longitude:78°54'51" Certified Operator: Timothy R Thomas Operator Certification Number: 16789 Secondary OIC(s): On -Site Representative(s): Name Title Phone On -site representative Timmy Thomas Phone: 24 hour contact name Timmy Thomas Phone: Primary Inspector: Joseph Gyamfi Phone: Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: ' Site visit was conducted to collect GPS data to update farm coordinates in BIMS if necessary, and for creating new reliable location maps in the future. Mr. Thomas was not available on site, but.I left a message on phone with his wife about this visit and its intended purpose. Page: 1 Permit: AWS730010 Owner - Facility: Jimmy L Thomas Facility Number: 730010 Inspection Date: 09/11/2007 Inspection Type: Compliance inspection Reason for Visit: Other lAl-6 - 06.,..-6,,....- Type Identifier Closed Date Start Date Designed Freeboard Observed Freeboard agoon PRIMARY 30.00 Discharges & Stream Impacts Yes No NA NE 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ■ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ■ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑ 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Otherlssues Yes No NA ,NE 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those ❑ ■ ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ ❑ Quality representative immediately. 31. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? ❑ ■ ❑ ❑ 32. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ ■ ❑ ❑ 33. Does facility require a follow-up visit by same agency? ❑ ■ ❑ ❑ Page: 2 0 Division of Water Quality Q Division of Soil and Water Conservation ❑ Other Agency Facility Number: 7.,ZQQJQ Facility Status: Active Permit: AWS730010 !_I Denied Access Inspection Type: Inactive or Closed Date: Reason for Visit: Routine County: Person Region: Raleigh Date of Visit: 04/17/2007 Entry Time: AM Exit Time: Incident M Farm Name: Thomas Farms Pork Inc. 2 Owner Email: Owner: Jimmy L Thomas Mailing Address: 8251 Oxford Rd Timberlake NC 275839116 Physical Address: Facility Status: ❑ Compliant ❑ Not Compliant Location of Farm: Off Todd Rd. from 49 N. SR 1547 integrator: Latitude: 36025'30•' Longitude: 78654'51" Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Certified Operator: Timothy R Thomas Secondary OIC(s): Operator Certification Number: 16789 On -Site Representative(s): Name Title Phone 24 hour contact name Timmy Thomas Phone: On -site representative Timmy Thomas Phone: Primary Inspector: Joseph Gyamfi Phone: Inspector Signature: Date: Secondary Inspector(s): Page: 1 Permit: AWS730010 Owner - Facility: Jimmy L Thomas Facility Number: 730010 Inspection Date: 04/17/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Inspection Summary: " WUP dated 718105 " • Waste analysis: 03/23/07 = 2.7 11109/06 = 1.1 . Soil Sample dated 02/06/07 • Stocking, Crop yield records available • Reviewed waste application records - complete and balanced with weather codes and inspection initials * Freeboard levels and rainfall recorded with initials • Changes in waste levels are consistent with pumping records * Irrigation calibration completed 03/30/06, Q 160GPM both reels " Sludge survey completed 07/14/06; Sludge thickness = 2.4% LTZ = 5.3' " Farm and records are well managed * Vegetation on lagoon dike & crops on fields in very good standing Page: 2 r . . fj Permit: AWS730010 Owner - Facility: Jimmy L Thomas Facility Number : 730010 Inspection Date: 04/17/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Regulated Operations Design Capacity Current Population Swine Q Swine - Farrow to Finish 260 241 Total Design Capacity: 260 Total SSLW: 368,420 Waste Structures Type Identifier Closed Date Start Data Designed Freeboard Observed Freeboard kgoon PRIMARY 30.00 :7:8].00 Page: 3 r , , Permit: AWS730010 Owner - Facility: Jimmy L Thomas l Facility Number: 730010 Inspection Date: 04/17/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Discharges & Stream Impacts Yes No NA NE 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? i ❑ ■ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) Cl ■ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? I ❑ m ❑ ❑ 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? i ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Led large trees, severe ❑ ■ ❑ ❑ erosion, seepage, eta)? 6. Are there structures on -site that are not properly addressed and/or managed through a waste management ❑ ■ ❑ ❑ or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ 0 ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ ■ ❑ ❑ improvement? Waste Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ! ❑ ■ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ! ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ Page: 4 . a Permit: AWS730010 Owner - Facility: Jimmy L Thomas Facility Number: 730010 Inspection Date: 04/17/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No NA NE PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total P205? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Corn, Wheat, Soybeans Crop Type 2 Fescue (Nay) Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Appling Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14, Do the receiving crops differ from those designated in the Certified Animal Waste Management ❑ ■ ❑ ❑ Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? ❑ ■ ❑ ❑ 17. Does the facility lack adequate acreage for land application? ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ■ ❑ ❑ Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fall to have all components of the CAWMP readily available? ❑ ■ ❑ ❑ If yes, check the appropriate box below. WU P? ❑ Page: 5 Permit: AWS730010 Owner - Facility: Jimmy L Thomas Facility Number: 730010 Inspection Date: 04/1712007 Inspection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ❑ Rainfall? ❑ Inspections after > 1 inch rainfall & monthly? ❑ Waste Analysis? ❑ i Annual sail analysis? ❑ Crop yields? ❑ Stocking? ❑ Annual Certification Form (NPDES only)? ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? ❑ ❑ ■ ❑ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ■ ❑ Q 25. Did the facility fail to conduct a sludge survey as required by the permit? Q ■ Q ❑ 26. Did the facility fail to have an actively certified operator in charge? ❑ ■ Q Q 27, Did the facility'fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ ❑ ■ Other Issues Yes No NA NE 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those ❑ ■ ❑ ❑ mortality rates that exceed normal rates? i 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ Cl Quality representative immediately. Page: 6 Permit: AWS730010 Owner - Facility: Jimmy L Thomas Inspection Date: 04/17/2007 Inspection Type: Compliance Inspection Other Issues 39. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? 32. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 33. Does facility require a follow-up visit by same agency? Facility Number: 730010 Reason for Visit: Routine Yes No NA NE ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ Page: 7 16 Division of Water Quality Facility Number O Division of Soil and Water Conservation O Other Agency Type of Visit P Compliance Inspection O Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit O Routine O Complaint O Follow up O Referral 0 Emergency O Other ❑ Denied Access Date of Visit: Arrival Time: kpeparture Time: County: rra y'1 Region: 1� Farm Name: -r C 2' Owner Email: rr Owner Name: Yl^ h" L ` _ 'D yr'`_ou Phone: b � 3� �" 6 3- Mailing Address: a1� q t � �cy 0.k-�- N C )_75z3 Physical Address: Facility Contact:Title: Phone No: tOnsite Representative: �0.T Integrator: s ,a Certified Operator: �YY\ � � _{ � �QYri �' Operator Certification Number: [ j � O[; Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = c = Longitude: = ° 0 ` 0 « Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder Farrow to Finish Z v Gilts ❑ Boars Other ❑ Other FLayer Non -La er Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? •f Number of Structures: d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge'? ❑ Yes 1� No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes C*No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued in Facility Number: - (] Date of Inspection 71 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No 7 ElNA [INE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes TNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes M No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptabl Crop Window ❑ Evidence o Wind Drifl ❑ Applicati Outside of Area �� 1 j 12. Crop type(s) r �� t" (171 j r 11�'� " '3 C� 13. Soil type(s) _1 ✓` 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 1;11 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[:] Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes FINo El NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): 06 ��- was CAV'_O-1 Ff • o. v C- k �P Reviewer/Inspecter Name j`� gvYL ` Phone: ? �344 Reviewer/Inspector Signature: Date: o v v 12128104 Continued Facility Number: — Date of Inspection fl' - Reauired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes �No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ElWaste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transferst Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 ° Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes I?No ❑ NA ❑ NE 23, If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA 0 NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No ❑ NA SPIE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes o ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes] No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ONo ❑ NA ❑ NE Additional Comments and/or Drawings: VIN 6J, �� J �p �V`U`Y` R S l r 1'n 1e J P LI-T �• 3 I "�f Ck +�� 1,1 e.hA G V\ -0-1 of S- v v 12128104 ... Division of Water_Quality, .. E..:��' y`'NQ.Division of Soil and Water Conservatioq '1 L FaCtLtumber a ` — — - 0 Other Agency , men I Type of Visit Co ce Inspection O Operation Review O Structure Evaluation Q Technical Assistance Reason for Visi o Routine O Complaint 0 Follow up O Referral o Emergency Q Other ❑ Denied Access Date of Visit: 1 / 1-�1 D!i I Arrival Time: L Departure Time: County: Region: Farm Name: 74'*14-T el -lc " rz*, r" Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator: Certified Operator: Back-up Operator: Location of Farm: IV Latitude: =O Phone No: Operator Certification Number: Back-up Certification Number: Longitude: = ° = a ent 0Desi n:'. CurrDesi n Current DCurrent".` 'Swine Capacity Population Wet Poultry .Capacity Population Cattle Capac�ty,Populat,an'ry ❑ Wean to Finish ❑ Wean to Feeder El Feeder to Finish ❑ Farrow to Wean ❑ Fa Feeder arrow to Finish 2 Gilts ❑ Boars i:r > Other ❑ Layer I ❑ Nan -La er Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co Number of Structures` Discharses & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes In No ❑ NA ❑ NE ❑ NA ❑ Yes yNo ❑ NE El Yes ❑ NA ❑ NE ' ❑ Yes 011 "NA ❑ NE ❑ Yes NA FNo El ❑ Yes NA ❑ NE 12128104 Continued Facility Number:r] Date of Inspection 3 ,� Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): `I 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ;'-No No NA ElNE ElYes ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes N I ❑ NA [INE ElYes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? if yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs [:]Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop El Evidence of Wind Drift El Application Outside of Area 12. /J,Window Crop type(s) (D'C�^ ► t 1 w'ti�'1 SD �r bew H s 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP7 ❑ Yes No ❑ NA ❑ NE t5. Does the receiving crop and/or land application site need improvement? ❑ Yes [—�'/lo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes l 4' INNElNA El NE 17. Does the facility lack adequate acreage for land application? ❑ Yes NA El NE 4��No 18. Is there a lack of properly operating waste application equipment? El Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/inspector Name I Phone: Reviewer/Inspector Signature: Lc Date: 7 31 6 Page 2 oj'3 12128104 Continued Facility Number: 7— f o Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ g Other p 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 90 ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 0 <No❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �<o ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ YesFNo NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No [I NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/]nspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: Page 3 of 3 12128104 ❑ Division of Water Quality Division of Soil and Water Conservation ❑ Other Agency Facility Number: 730010 Facility Status: Active Permit: AW-S73001Q ❑ Denied Access Inspection Type: Ooerations Review Inactive or Closed Date: Reason for Visit: County: Person Region: Raleigh Date of Visit: 05/10/2006 _ Entry Time:11:00 AM Exit Time: 12:00 AM Farm Name: Thomas Farms Pork Inc. 2 Owner: Jimmy L Thomas Incident M Owner Email: Mailing Address: 8251 Oxford Rd Timberlake NC 275839116 Physical Address: Facility Status: 0 Compliant ❑ Not Compliant Location of Farm: Off Todd Rd. from 49 N. SR 1547 Integrator: Latitude: 36°25'30" longitude: 7Q"54'51" Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents © Other Issues Technical Assistance Certified Operator: Timothy R Thomas Operator Certification Number: 16789 Secondary OIC(s): On -Site Representative(s): Name Title Phone On -site representative Timmy Thomas Phone: Primary Inspector: John N Hunt Phone: 919-571-4700 Ext.238 Inspector Signature: Date: Secondary Inspector(s): Inspection Summary: Mr. Thomas has performed calibration and aware that sludge survey due by Oct. 1, 2006. Page: 1 Permit: AWS730010 Owner - Facility: Jimmy L Thomas Facility Number : 730010 Inspection Date: 05/10/2006 Inspection Type: Operations Review Reason for Visit: Routine Waste Structures Type Identifier Closed Date Start Date Designed Freeboard Observed Freeboard Lagoon PRIMARY 30.00 62.00 Page: 2 Permit: AW5730010 Owner -Facility: Jimmy L Thomas Facility Number : 730010 Inspection Date: 05110/2006 Inspection Type: Operations Review Reason for Visit: Routine Dischar es & Stream Impacts ----..---- --------------.-._.-...-..p..----- Yes No NA NE 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ■ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ■ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑ 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Led large trees, severe ❑ ■ ❑ ❑ erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a waste management ❑ ■ ❑ ❑ or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ ■ ❑ ❑ improvement? Waste Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ Page: 3 Permit: AWS730010 Owner - Facility. Jimmy L Thomas Facility Number : 730010 Inspection Date: 05/10/2006 Inspection Type: Operations Review Reason for Visit: Routine Waste Application Yes No NA NE PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total P205? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Corn, Wheat, Soybeans Crop Type 2 Fescue (Hay) Crop Type 3 Forest (Hardwood & Softwood) Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Appling Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management ❑ ■ ❑ ❑ Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? ❑ ■ ❑ ❑ 17. Does the facility lack adequate acreage for land application?. ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ■ ❑ ❑ Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Page: 4 Permit: AWS730010 Owner - Facility: Jimmy L Thomas Facility Number : 730010 Inspection Date: 05/10/2006 inspection Type: Operations Review Reason for Visit: Routine Records and Documents ............................................................................ Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ❑ 0011 If yes, check the appropriate box below. Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ❑ Rainfall? ❑ Inspections after a 1 inch rainfall & monthly? ❑ Waste Analysis? ❑ Annual soil analysis? ❑ Crop yields? ❑ Stocking? ❑ Annual Certification Form (NPDES only)? ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? ❑ ■ ❑ ❑ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ■ ❑ ❑ 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ ■ ❑ ❑ 26. Did the facility fail to have an actively certified operator in charge? ❑ ■ ❑ ❑ 27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ■ ❑ ❑ Other Issues ......................................................... Yes No NA N 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those ❑ ■ ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ ❑ Quality representative immediately. Page: 5 Permit: AWS730010 Owner - Facility: Jimmy L Thomas Inspection Date: 0511012006 Inspection Type: Operations Review Otherlssues 31. Did the facility fail to notify regional DWO of emergency situations as required by Permit? 32. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 33. Does facility require a follow-up visit by same agency? Facility Number : 730010 Reason for Visit- Routine Page: 6 Permit: AWS730010 Owner - Facility: Jimmy L Thomas Facility Number : 730010 Inspection Date: 05/10/2006 Inspection Type: Operations Review Reason for Visit: Routine Technical Assistance Needed Provided ........ _... _................... .............................. I 34. Waste plan revision or amendment ❑ ❑ 35. Waste plan conditional amendment ❑ ❑ 36. Review or evaluate waste plan w/producer ❑ ❑ 37. Forms need (list in comment section) ❑ ❑ 38, Missing components (list in comments) ❑ ❑ 39. 21-1.0200 re -certification ❑ ❑ 40, Five & Thirty day Plans of Action (POA) ❑ ❑ 41. Irrigation record keeping assistance ❑ ❑ 42. Organize/computerization of records ❑ ❑ 43. Sludge evaluation ❑ ❑ 44. Sludge or Closure plan ❑ ❑ 45. Sludge removal/closure procedures ❑ ❑ 46. Waste structure evaluation ❑ ❑ 47. Structure needs improvement ❑ ❑ 48. Operation & maintenance improvements ❑ ❑ 49. Marker check/calibration ❑ ❑ 50. Site evaluation ❑ ❑ 51. Irrigation calibration ❑ ❑ 52. Irrigation system design/installation ❑ ❑ 53. Secure irrigation information (maps, etc.) ❑ ❑ 54. Operating improvements (pull signs, etc.) ❑ ❑ 55. Wettable acre determination ❑ ❑ 56. Evaluate WAD certification/rechecks ❑ ❑ 57. Crop evaluation/recommendations ❑ ❑ 58. Drainage work/evaluation ❑ ❑ 59. Land shaping, subsoiling, aeration, etc. ❑ ❑ 60. Runoff control, stormwater diversion, etc. ❑ ❑ 61. Buffer improvements ❑ ❑ 62, Field measurements (GPS, surveying, etc.) ❑ ❑ 63. Mortality BMPs ❑ ❑ 64. Waste operator education ❑ ❑ 65. Operation & maintenance education ❑ ❑ 66. Record keeping education ❑ ❑ 67. Croplforage management education ❑ ❑ 68. Soil and/or waste sampling education ❑ ❑ 69. PLAT Assessment ❑ ❑ 70. Other ❑ ❑ Page: 7 Permit: AWS730010 Owner - facility: Jimmy L Thomas Facility Number: 730010 Inspection Date: 05/10/2006 Inspection Type: Operations Review Reason for Visit: Routine List Improvements made by Operation Improvement 1 Improvement 2 Improvement 3 Improvement 4 Improvement 5 Improvement 6 Page: 8 10lni'@Hq Facility NutYtber 3 and Water Conservation MENOther Agency Type of Visit &C Tpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit ICJ Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Q Arrival Time: Q/!yl Departure Time; 1 1�� County: � Farm Name: 5 vtk _, - tic. _— Owner Email: Owner Name: 5�1'1�(M1�M �7 1Trrtw4f i µ4, Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator:i}►?S �s Back-up Operator: Location of Farm: Swine Title: Region: �K'V Phone No: Integrator: �J� dtIP• Operator Certification Number: 167g7 Back-up Certification Number: Latitude: [= o = I Longitude: = ° = 4 Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Laver ION n_-La er ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ arrow to Feeder Farrow to Finish ❑ Gilts ❑ Boars Other. ❑ Other Dry Poultry ❑ Layers ❑ Non -Layers i ❑ Pullets l urke s Turke Poults P Other Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation'? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl I Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes O No ❑ NA ❑ NE El Yes �N ❑NA ❑NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes tNo ❑ NA ❑ NE ❑ Yes 2 No ❑ NA ❑ NE 12128104 Continued Facility Number: — I Date of Inspection w-LF_ Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? El Yes No El NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes N ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: YJ , Spillway?: Y Designed Freeboard (in): t Observed Freeboard (in): 36 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Z No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ZNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes �No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes A ❑ NA El NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 4. Does any part of the waste management system other than the waste structures require ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑Yes ?(No El NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes �o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Dritl ❑ Application Outside of Area 12. Crop type(s) 4,--&ctA , o 64t , dati 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ;2fgo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes /No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination%❑ Yes eNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ElYes ❑ NA ❑NE 18. Is there a lack of properly operating waste application equipment? ElYes �/No No ❑ NA ❑ NE b q I d 3 r D`2- loq --Ua�. Z� C� .�P,�?� lZo G L kl- (p r � s. Reviewer/Inspector Name - 'a � � s, . ; Phone: ,S71—q7� 2 Reviewerllnspector Signature: Date: p 12128104 Continued Facility Number: Date of Inspection I l flh0� Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes J2 No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriatebAx belo �a}j ❑ Yes [ Vo v ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ W t a`�sis ❑ Waste ❑ Soil An/Dlis Transfers ❑ Annual Certification f 04 ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 mute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ;?'No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No FZNA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes oNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes eNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ZNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ,dKNo F ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ej' No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes VNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes P?No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ,�' ][J No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ZNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ZN o ❑ NA ❑ NE Additioa"ominetits-and/6r Dra*inQS D ra h �i °E .4 �W,�F.�v.3: ,���l.�, e.4 :�t.,r `�,�.'� w�.•5{_i'f6�i�fE.� 12128104 L Visit <Q Compliance Inspection O Operation Review O Lagoon Evaluation for Visit A? Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: 4 Time: Not Operational Q Below Threshold ermitted Ce ed Conditionally Certified Registered Date Last Operated or Above Threshold: ......................... Farm Name: �. ., .. .... d ;atC.:............. ............................. County:................................................................. .......... .......... .. .......... Owner Name: Phone No: MailingAddress................_......................................................................................................................................................................._.................. .......................... Facility Contact: Title: Phone No: Onsite Representative:..............................................._............_.............................................. Integrator:...................................................... Certified Operator: Location of Farm: Operator Certification Number: .......................................... Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0 ` " Longitude • 1 64 E ; Swiine ; t ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder U'Parrow to Finish Non- t! { EE ❑ Gilts F a N i iE ' h.13Y�i ❑Boars Y 1I„ Nt Q�Q����L1♦T iM Y P q. Discharges & Stream Impacts I . Is any discharge observed from any part of the operation? Discharge originated at: []Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/rain'? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? ❑ Yes 0No ❑ Yes 2�No ❑ Yes �2No ❑ Yes No ❑ Yes 0"NNo 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 7NO o Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 -Structure 6 Identifier: ....Ph,..... ................ ..................... ....................................... .............................................. ............................ ...... Freeboard (inches): o�b 12112103 Continued Facility Npmber: Date of Inspection Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes dNo 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (iel Wi7P, checklists, design, maps, etc.) ❑ Yes VfNo 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ,ErNo ❑ Waste Application ❑Freeboard ❑ e nalys s ❑ Viteflect l Sampling 3fe r 24. Is facility not in compliance with any applica etback criteria at the time of design? El Yes to 25. Did the facility fail to have a actively certifissd On for .char e? ❑ Yes�No 26. Fail to notify regional DWQ of emergency $ tua�fos as requir d by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ,E No 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes No 28. Does facility require a follow-up visit by same agency? ❑ Yes No 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes t" o NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) ❑ Yes �No 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ❑ No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After I" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 10 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. E — — mq4 # zf 73' 2,6127 y zg 4� 4c- (WA) 4 7 C�Mhi) #-,b r "4 21j _ r37Z c - (R71 10" 3 Ck - Z Zn► — 124 cot — I Z J.) - o64 64t - 'Z p a 3 7 N i&5 y �c — 2110 Cw /l(,78 a sy; �% �A►r,�e�,.s� Cu O-W, AW14 12112103 Facility Number: 1 — Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yeso seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes �No closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ,,ZYes ❑ No 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? ❑ Yes X`No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes`No elevation markings? Waste Application 10. Are there any buffers that need maintenancelimprovement? ❑ Yes ,Rj`No 11. Is there evidence of over application? If yes, check the appropriate box below. ,Yes ❑ No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground Copper and/or Zinc 12. Crop type [ A) W "► 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge actor below liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. Reviewer/Inspector Name Reviewer/Inspector Signature: Date: ❑ Yes 2fNo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ONO ❑ Yes 9 No ❑ Yes �o ❑ Yes 00 ❑ Yes k(No ❑ Yes P(No Final Notes 12112103 Continued i Type of Visit ,C.,00mpliance Inspection O Operation Review 0 Lagoon Evaluation Reason for Vlslt Routine O Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number Date of Visit: Time:rO SSA► Not O erational Q Below Threshold 0-Permitted Certified 13Conditionally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name: County: Owner Name: �► ���+� Phone No: Mailing Address: Q Facility Contact: Title: Phone No: Onsite Representative: Integrator: Certified Operator: r Operator Certification Number: A 2B q Location of Farm: wine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 6 11 Longitude 0• 1 66 Design CurrentDesign Current Design ` Current Swine Capacity Population Poultry Capacitv Population Cattle Capseltv Population ❑ Wean to Feeder ❑ Layer I El i El Feeder to Finish ❑Non La er ❑ Non-Dai ❑ Farrow to Wean ❑ F rrow to Feeder ❑Other Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total.SSLW ., N�Y 0.._. ❑Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area Holding'Pands I Solid Traps ``'� ❑ Na Li uid Waste Mgt ement S stem id - iR Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? WasteCollection 8r Treatment 4. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillwav tructure i Structure 2 Structure 3 Structure 4 Structure 5 Identifier: L Freeboard (inches): 05103101 ❑ Yes IVo ❑ Yes No ❑ Yes �No ❑ Yes ❑ Yes 7No ❑ Yes No ❑ Yes /TT �fo Structure 6 Continued Facility Number: — p I Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ❑ No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes El No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ❑ No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ❑ No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes ❑ No Waste- Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes O<o 12. Crop type /,J) J 5ITMk "t 13, Do the receiving crops differ with those designated in the Certified AnimarWaste Management Plan (CAWMP)? ❑ Yes ;2rNo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes 1Vo b) Does the facility need a wettable acre determination? ❑ Yes ONO c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes J2fNo 16. Is there a lack of adequate waste application equipment? ❑ Yes PNo Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes 2TNo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes <c 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes ,_ 0 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? El Yes Y�40 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes XNo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? ❑ Yes ZNo (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 4!:�No 24, Does facility require a follow-up visit by same agency? ❑ Yes No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes;�No 113 No violations or deficiencies were noted during this visit. will receive no furtherg correspondence about this visit. �You @iimments {refer.to question #) I xplain any YESanswers andlorany recommeodations�oranyat r comment w 1t .r yUse drawings�of+fael6ty to betterexplain situattons; {usetaddttlorial°pages asnecessary): Field Copy ❑ Notes w4s:::'.rk:�iE`�F.::.41c...LMBI"Aifrd. 4.::..: .".J a.� �. `F 3... .. '° ..ilk" ... A "..` Vu �(5 - t.� 312403 —zl�jy �, , z — 3.L) .�b��— •� o�0 3 Reviewer/Inspector Name (hdlA� l-,;f:a Reviewer/Inspector Signature: Date: 7 o 05103101 Continued Facility Number: — !d Date of Inspection 03 Odor ss 2& Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ❑ Yes Fe - No ❑ Yes A No ❑ Yes �No ❑ Yes ONo ❑ Yes P No ❑ Yes'No 05103101 r Type of Visit f Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit 9eRoutine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number L Date of Visit: Time:rO t Not Operational OBelowThreshold Permitted Certified ,�D Conditro ally Certified [3 Registered Date Last Operated or Above Threshold: Farm Name: Q)`z5 T1d.t/ws yiCounty: Owner Name: `�1Phone No: Mailing Address: z s� ft Facility Contact: Title: Onsite Representative: Certified Operator: -nio Location of Farm: Phone No: Integrator: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0' ` Longitude 0a ° 011 Design Current Design - Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder ❑ Layer ❑ Dairy ❑ Feeder to Finish JE3 Non -Layer I I Non -Dairy I ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Other Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number"of Lagoons 10 Subsurface Drains Present J10 Lagoon Area ILI Spray Field Area ' Bolding Ponds 1 Solid Traps"; :� ° ❑ No Liquid Waste Management System Discharges & Stream Impacts 1 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gai/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure l Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches); ([ 05103101 I/ ❑ Yes ONO El Yes Ko ElYes ❑ Yes j2<o ❑ Yes 8 No ❑ Yes No []Yes /No Structure 6 Continued FacilityNumber: Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes 10 seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? El Yes No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes TNo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes VO 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes PNo Waste Apnlicatian 10, Are there any buffers that need maintenance/improvement? ❑ Yes ZZINgo 11. is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes � N 12. Crop type-k-5U,6I; , j.A)PW j_ UW 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes , FErNo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes �No 15. Does the receiving crop need improvement? ❑ Yes oNo t6. Is there a lack of adequate waste application equipment? ❑ Yes , o Required Recards_& Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes Feo 18. Does the facility fail to have all components of the Certified Animal W st Management Pl n h�eeadily available? (ie/ WUP, checklists, design, maps, etc.) $ O) , Z ! O� rr�( ❑ Yes N 19. Does record keeping need improvement? (ie/ irrigation, Freeboard, wa to aZ analysis soil samps�rts) i ❑ Yes p�VZN 20, Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 21. Did the facility fail to have a actively certified operator in charge? • ❑ Yes 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes PNo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? El Yes �o 24. Does facility require a follow-up visit by same agency? ❑ Yes o 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes VNo �] No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. —� Y.,�A•,tl�FM^'v`ils'^+KLe'Ti't:N�;_4" . - - . -. Comments {referto qui gtio.n. : Eaplaln any YES answers;and/or any recommendations ar°any oth ' c utments.` rsAP� rtprwk1$nNr adore M, U�sedrawings of facflit}Ito-6elter:expla'lnsttuations.,(use additionei;ages:as n awry): ❑ Field Copy Final Notes t' rum- Reviewer/Inspector Name V:.+. _, 4; ' .,. Reviewer/Inspector Signature: Date: D 05103101 Continued Facility Number: % — Date of Inspection Odor r ss ues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? 05103101 ❑ Yes ZNo ❑ Yes No ❑ Yes � No ❑ Yes A!J"No ❑ Yes .o ❑ Yes 4�N ❑ Yes No Type of Visit 49 Cofnpliance Inspection O Operation Review Q Lagoon Evaluation Reason for Visit Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: � Time: -- Q Not Operational Q Below Threshold 0 Permitted Q Certified © Conditionally Certified 13 Registered Date Last Operated or Above Threshold: Farm Name: ty•.................................................................... ........... ... ........................................................... Coun �j Owner Name:.. V( r.!Lt QMItS Phone No:...� Y — uO ............................,..................33............................ FacilityContact: .. ........................................... ........................... Title:................................................................ Phone No:................................................... MailingAddress:.... Zt r..... .�k '- i....................................................................................... .......................... ............................................................ Onsite Representative:........1tie.wW....�laiti......................................................... Integrator:........ .�e•4!!........................................ Certified Operator:.....7— ............. ' ' .................................... Operator Certification Number: ... `68 7. ................... Location of Farm: [Swine ❑ Poultry ❑ Cattle []Horse Latitude 0 6 66 Longitude • 4 64 Design Current Design Current,'' Design Cnrcentt SwYne Ca ace :Po ulatton Pnnitry Ca aci Po''ulation Cattle Ca aci , I?'o utlitio { [I Wean ❑ Layer ❑ Dairy ❑ Non -Layer ❑Non -Dairy 3 ° ❑ Other Total De>I n Ca cit f. TataISSLW3W. ; Number. of Lagoohs ❑Subsurface Drains Present ❑Lagoon Area ❑ Spray Field Area `Holdin s �� No Li uid Waste Management System ,Poadsl�Sohd_Tra to Fender Feeder to Finish Farrow to Wean °..F; ❑Farrow to Feeder Farrow to Finish �a Gilts ❑Boars Discharees &Stream Impacts 1. Is any discharge observed from any part of the operation? ❑Yes RNo Discharge originated at: ❑Lagoon El Spray Field ❑Other _ a. If discharge is observed, was the conveyance man-made? ❑Yes NO b. if discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes �No c. If discharge; is observed, what is the estimated flaw in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) El Yes 0 No 2. Is there evidence of past discharge from any part of the operation? ❑Yes No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? [I Yes � No Waste Collection &Treatment 4, Is storage capacity (freeboard plus storm storage) less than adequate? ❑Spillway ❑Yes q No Structure 1 Structure 2 Structure 3 Structure 4 Structure; S Structure 6 Identifier: .....�'..�.P:@A...�..................................................................................................:...................................................... .................................... Freeboard (inches): 5100 6 Continued on Lack s. 'Facilty Number: 3 — 1p Date of Inspection Printed on: 1/9/2001 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes �(No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? I BaI6s ❑Yes [NrNo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes �rtj No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes `P No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes foNo Additional !Comments -landlorDrawings- i k'E 6' ' k i T 5100 \ Facility Number: — f D Date of Inspection Printed on: 1/9/2001 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes tJ No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? El Yes KNo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes K No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes �No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes j No 11. Is there evidence, of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload [I Yes [KNo 12. Crop type U�tZ a t` S u. E 1W u.� �o Cj 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes (RNo 14. a) Does thefacility lack adequate acreage for land application? ❑ Yes ® No b) Does the facility need a wettable acre determination? ❑ Yes JP No c) This facility is pended for a wettable acre determination? ❑ Yes [� No 15. Does the receiving crop need itprovement? ❑ Yes No 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Wa e Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) /a t 112,1101 19 Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22, Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? 4 YiQ1a iQ>�js:o iigficient'i" -wt rb )tote#- O(wiog �his'vjtsjt;, :Y60 )va]j•tecgiye 00 flutft. - . • eor'res'porideii e: about; this visit: ...:....::...::........:........... . ents,(refer to question ##) ; Ekpiai i,any YES saswers and/or any a,. ❑ Yes [RNo ❑ Yes RNo ❑ Yes No VfYes ❑ No ❑ Yes No ❑ Yes KNo ❑ Yes R f No ❑ Yes (ALNo [:]Yes RNo ❑ Yes [StNo �e c,*J Mt ([,cwrii'1d i Vjztt Itj sr4 4 iv 4y�o tN3,eec N 003660lNels u ` a[rV5 "AIJ 425-[M Sff6V 2 { Ay 32co — — ors — 1 Q� ,� . Sa�f l 318• ZN--188fo � �� �f z-� za - 7L4, zN -4wtvl IL" 1o7z rH - 11,9 `I Gti _ gl►G CK - 17 s'7 Reviewer/Inspector Name I s a u..r %r P � 71"` Reviewer/Inspector Signature: Date: a/4-�a/ v 5100 Routine O Complaint Q Follow-up of DWQ inspection Q Follow-up of DSWC review O Other Facility Number u Date of Inspection HEN Time of Inspection 24 hr. (hh:mm) /+ermittedAJ�Certified r] Conditionally Certified 0 Registered 113 Not O erational Date Last Operated: Farm Name: ........... µn" .t°r.....f ...ri AI .a�!.. w..Cr................................ County: ...........P� .�r.[............................................. �. . Owner Name: ro .1-J.. �G S'I 6 /. Phone No FacilityContact: .............................................................................. Title:........................................................ Phone No: Mailing Address: OnsiteRepresentative:.....! f!!M �I.....��� d t 1.................................................. Integrator:.........1 ......................... .................................. Certified Operator:..................................:................................:........................................I... Operator Certification Number:.......................................... Location of Farm: A .... ..... ............. Latitude ®� ZS Zy Longitude �g • F r.J` ®" ! Destgn, E i;1Current ,i':°E r�°,i`r,Destgn..-{Current t, Poultr at e + s .!,�1,.�'. �Ca acr Y,°�.Ca aci ;IFPo' ulahon`' �3, !=�Po"""ulahon t� ! y ❑ ... y ❑Dairy Layer E°,';! ❑ Non -Layer ❑Non -Dairy i?> .i,' z 4 f 9rtttta , tr ❑ Other ; 3 'Total Desgn'Capactty,;t f c r'� �� _� ! Total SSLW lt�'t.lfii!]E:, 3 Number of Lagoons' i �3> �, # ❑ 5�ray Feld Area ❑ Subsurface Drains Present ❑Lagoon Area i ! iHoldrng Ponris / Sohd Traps � � 3'iil{ ir4a c p3+N€} ❑ No Liquid Waste Management System r 5 €r Design Current , .-'Po' illation , ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean . ❑ Farrow to Feeder arrow to Finish Z � ❑ Gilts ❑ Boars Discharges &Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑Lagoon ❑Spray Field ❑Other a. If discharge is observed, was the conveyance man-made? b. If discharge is ohserved, did it reach Water of the State'? (II' yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (Il' yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection &Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? El Spillway Structure l Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard(inches) ........ 3.......�............ ................................................... 5. Are there any immediate threats to the integrity of any of the structures observed? (iel trees, severe erosion, seepage, etc.) ❑ Yes ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes •�, NO ❑ Yes �To Structure 6 ❑ Yes Continued on back 3123/99 Facility Number: 73 — Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? . ❑ Yes PI<o (If any of questions 4.6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes Gll�o 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes P'No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes P No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes �No 11. is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes 00 12. Crop type, or -A va tAq._A-tr V-:F_ S%_u F 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes _ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes P-go b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes eNo 16. Is there a lack of adequate waste application equipment? ❑ Yes �To Reuuired Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? /Y�?,R ❑ Yes A,0 No 18. 'Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) l ❑ Yes o 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste4dnalysis & soil sample reports) ❑ Yes jNo 20. Is facility not in compliance with any applicable setback criteria in effect at the time.of design? ❑ Yes/E TINo 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes jZfNo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ZNo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes A No 24. Does facility require a follow-up visit by same agency? ❑ Yes VNo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes eNo ?90•001a 40s'o�r 00006*ki N *'re jtgted- �lojft �hjs;vjsjt! • You will ;ec�iye 06 futthoe 'Corresnoridence' about: this visit.: :......:....................... . R) VS44 1116N� , c�-, !? rot SaM� F�£�o�I�Yvf ors I�'L �4� S, (,, 7,8 A, wr re%70R,4t 227195-3� s.,e,_✓l�E f �N-tiPUcis — Zr.' C�.SG G,a � 5� I�SJ Ivos�-Q A r3 A LA S V_S SN e W Lam, w Z— tr 5 L� ur;TGFtEh' Tn tea-� n[ tlo �PIJ ev f F t7 14-Te.Grok Ljd I.U. tiac-As-r Wi`r*- nfCo/- ,E -Ao i6}g'p"F�S"p ector Name p 3 , Ek-� i►�ra3„ri,t� o Reviewer/Ins.�Es,��`€�'��rssi Reviewer/Inspector Signature. �]��, _ _ .�. Date: 15/111 CZ7 Facility Number: —1 Date of I»spection S f r Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes s, No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 29. Is land intake located Yes No the application spray system not near the liquid surface of the lagoon? ❑ EJ 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes dN0 31, Do the animals feed storage bins fail to have appropriate cover? ❑ Yes PINO 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ,fNo DRAFT Draft - Revised January 20, 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION FacilityNumber .3 - t � O eration is flagged for a wettable �— P Farm Name: >p, a s ram--_ acre determination due to failure of On -Site Representative: E ,w Part 11 eligibility item(s) F9 F2 F3(R) Inspector/Reviewer's Name: Date of site visit: Zft� ti Date of most recent WUP: qZzet % Operation not required to secure WA determination at this time based on exemption E1 E2 E3 E4 Annual farm PAN deficit: '1 7 Z pounds Irrigation Systems)'- circle #:b'hard-hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system wlpermanent pip tationary sprinkler system w/portable pipe; 6. stationary gun system wlpermanent pipe ationary gun system w/portable pipe PART 1. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D21D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an, 1 or PE. E3 Adequate D, irrigation operating parameter sheet, includin_ g map depicting wettable acres, is complete and signed by a WUP. �--- _ E4 75% rule exemption as verified in Part 111. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eligibility checklist, Part II - F1 F2 F3, before completing computational table in Part 111). PART 11. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation records. F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure to deduct required buffer/setback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers or less than 2 acres for stationary sprinklers). �F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part III. DRAFT Draft - Revised January 20, 1999 f_- Facility Number 7 3 _ ,o Part III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER'.' TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES ; FIELD % COMMENTS3 cf L cry Iq NA A—-z. 4 z.y l� - fi��,., t o . �- 7 3Z1O 3 z1 c Z 3 �- 8 -+ Tr _ FIELD NUMBER' - hvdrant. Dull_ zone_ or point numbers may be used in place of field numbers deoendino on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption if possible; otherwise operation will be subject to WA determination. FIELD NUMBER'- must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less.than 50% of its annual PAN as documented in the farm's previous two years' (1997 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. ,,. j k 1, , ?Dlvtsto`n of Sciil and Water �.Conservatjon - Operation ke' vrew E I E; , r �� 1r =E ©IDrvision of,Soil and W.>ter'Conservation - Compliance itispectron r' ! E - ! .)prv�sIon of Water Qu Arty ',' C om lianie Inspection �.�`Qtlter Aglncy - Oper. 1tio12� CV1eW - _ E• � � i i �'� E- n E E� rare'.. rj E , . �.� E .� Routine Q Complaint Q Follow -tip of D\V 7 ins mction Q Follow-up of DSWC review Q Other Facility- Number Malt of Inspection r 11"itile of Inspection ��:: f 24 hr. (hh:mm) )dPermitted Certified 0 Conditionally Certified © Registered 113 Not O eraiional Date Last Operated: Farm Name: �. .Q.!V!.]AS.....FAIZM County .. �...t N ..... ...........................I................. ................ Owner Name: ..................... ;.- ... Phone No: ........................................................................................................................................................................ FacilityContact: ............................................................................. hide:................................................................ Phone No: ................................................... Flailing Address: ....................................... Onsite Representative:....Ti!b+</V`�f....`Ck ?M!P•�...................................................... Integrator:...!!�ID i'E. .`j............................. I............. ..........I. Certified Operator: ................................................... ............................................................. Operator Certification Number:.,...i.671..................... Location of Farm: ..................................................................................................................................... . Latitude 0 4 4 Longitude • ° " Design Current Swine Capacity Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish 2.(; Z6a ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer ❑ Dairy ❑ Nun -Layer ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ( ❑ Subsurface Drains Present ❑ Lagoon Area 10 Spray Field Area Holding Ponds / Solid Traps JEI No Liquid Waste tManagement System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation (If' yes, notify DWQ)? ❑ Yes VNo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other f a. If discharge is observed, was the conveyance roan-rnadc'? ❑ Yes ;gNo h. II' discharge is observed, did it reach: ❑ Surface Waters ❑ Waters of'the State ❑ Yes [�[ No c. If' discharge is observed. what is the estimated flow in gal/min :� j d. Does discharge bypass a lagoon sysicm? 2. Is there evidence of past discharge from any part of the operation'? 3. Were there any adverse impacts to the waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? Identifier: Freeboard (inches): Structure I StrUCLUrc 2 Structure -1 Structure 4 �}. t........................................................................ Structure 5 ❑ Yes 3 No ❑ Yes [:gNo ❑ Yes L2rNo ❑ Yes ONo Structure 6 1/6/99 Continued on back 1 acility Number: •7,3— i Date of Inspection z lh 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, ❑Yes XNo s a etc ) eep ge, 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement'? 8. Does any pact of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum liquid level elevation markings? Waste Application 10. Arc there any buffers that need maintenance/imprnvcnient'? ❑ Yes No ❑ Yes RNO ❑ Yes El No [:]Yes ;?No ❑ Yes 1XNo 1 I . Is them evidence ofover application'? ❑ Ponding ❑Nitrogen ❑ Yes No , 12. Crop type .......... 5i. .:...............lnl.ka -A.` .:Y...:...... LZ ...................................,...........................................I..... 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. Does the facility lack wettable acreage for land application'? (footprint) 15. Does the receiving crop need impi-ovetnent? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to c all components of the Certified Animal Waste Management Plan readily available? (ic/ WUP, checklist: design aps, etc.) 19. Does record keeping need improvement'? (ic/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a certified operator in responsible charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ic/ discharge, freeboard problems, over application) ❑ Yes ZNo ❑ Yes P/No ❑ Yes VNo ❑ Yes INo ❑ Yes &NO ❑ Yes 0No [:]Yes ONO ❑ Yes W(No ❑ Yes No ❑ Yes XNo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative`? ❑ Yes R�No 24. Does facility require a follow-up visit by sarne agency? ❑ Yes ONO N.o.vialations.or. deficiencies .were noted. during thii•visit:.1'ot ' �vill.re�ceive ita t6riliei- .:.:. b6er-4spotidenee;abbut;this;visit.......;•;•;•;•;•;•;•;•;•;•;-;•;•;•:. . . • ;•;• Camtnents (refer to question#): Explain any YES answers and/or any.recommen'&66i s�or any other comments' Use drawings of facility to better explain situations. (use additional pages as necessary): f.) L EAGv n1 Cw_oi,�D tl£.CD C01 CF- C",za£. P(Mj c4,.fTA-(S J;Au 441%, ` 7) ry a TIS 9-CA7-S 1 rtV-4.06c-rJ R-F b a r J-1CZ 7 i A9t*-E 5 S �-OfJoFf ",J'v A,JD C"j—, NJE_ Rv000 UPP Lp„}i Ro;�_ A" v -J o f.Ab0.zA Reviewer/Inspector Name 091f A1_ Add_r `t+,i) S?I y7ac7 Reviewer/Inspector Signature:4.1Date: A I bI iq 11/6/99 FACILITY NUMBER 73 -ice FARM NAME: <,SotAk& REVIEWER:Cal,-,� DATE:-2- r f TYPE NUMBER # ANIMALS LAGOON - PAN POND - PAN Farrow/Wean sow 2.5= 5.4= 19= Farrow/Feeder sow 4= 6.5= 22= Farrow/Finish sow 10= 26= 91= Wean/Feeder head 1= 0.48= 1.6= Feeder/Finish head 1= 2.3= 7.9= Gilt Developer head 1= 2.5= Boar Stud head 1= 3.7= DESIGN/VOLUME CALCULATIONS: Top of dike elevation: Eiev. below structural & storm storage: Normal operating water level elevation: (top of permanent storage): Bottom elevation: Permanent storage volume -7 ft3 Temporary storage volume, '7 _ ft3 IRRIGATION: Operating Pressure (psi) Flow (gpm): Application Rate (in/hr) Nozzle/Ring Size(s): Design Recorded Design Recorded Design, Design Design Design WUP - Days of temporary storage: Calcs - Days of temporary storage:. ft. 15t 25 yr.l24 hr, storm in. ft. 2"d 25 yr.124 hr. storm in. ft. Structural freeboard in. Exceeds required volume? Zw-77-(- L Exceeds required volume?�� L 4 #-r— T- Actual Actual Actual Actual Actual Actual FREEBOARD CK. L 1 L 2 3 4 . 5 Water level reading Top of dike reading Difference Marker reading CAWMP Components Permitted Facility; Date: ��rm; CM Completed Certification Date: Waste Utilization Plan; Date: '�rZz (Q$ z�O Amount of plant available nitrogen produced/used annually Ibs) Dominant soil series: Ar ? Crops to be grown: L Field Maps Usable= } application windows 2/1/93; Based on usable (Total= Present day format w/RYES or actual records; Standard #633 required specifications Emergency Action Plan Odor Control Checklists (effective 1/97) Insect Control Checklist (effective 1/97) Mortality Checklist (effective 1/97) t0—V ( Type of irrigation: �ave[Ving S id - Other (description): '-r 8Q+' Small Gun Center Pivot Linear Move NRCS irrigation parameters usable field size, max. application rate, max. application rate per cycle (effective 9/1/96) or Calibration information or Land application system design information (afterl;9/1/96) including parameters, equipment type, system layout and settings Show design needs (storage & treatment calculation's) Operation & Maintenance Plan Site schematic Site evaluation, after 2/96 (NRCS NC-CPA-17) includes wetlands determination Hazard classification Construction inspection notes, including Liner inspection & observation trench (after 911 /96) Consideration for emergency spillway (after 6/21/96) REQ IRED RECORDS effective 9/1/96 PERMITTED fACILITIES Waste application records (IRR 1 &2) General Permit & COC on site ,`ir° Annual soil sample reports for 1999 weekly lagoon level records (Cu index: (Zn index: ) f oe� l Waste analysis - date last taken is 7% ti PAN Ibs/1000 gals. for stru'ctufe #1 PAN Ibs/1000 gals. for structure #2 Division of Soil and Water Conservation ❑ Other Agency [Division of Water Quality 14YRoutine O Complaint O Follow-up U DWQ inspection O Follow-up of DSWC review O Other J i Facility Dumber Date of lnsp\ olio« � '7 �� Time of Inspection 24 hr. (hh:mm) Registered 0 Certified © Applied for Permit 13 Permitted 113 Not opera Date Last Operated: Farm Name:........: .................... ,L..'3.a^' �5....................�e �^R S County: ................ .►'S,uf....................... ..................... .. ........... OwnerName:..... .'?kn l fi'�`r. ►.c..............: [.,�5.................... Phone No:.................................................................................. �,? x.........�........ ........................ Facility Contact:......:..e.^'4. ............ Title 6� Nlny............................ Phone No: MailingAddress:......... ............ ........... :........... `"............................ r�6i `:.... ............................................ .......................... Onsite Representative: ........... ' ...................................................F................. ..Integrator•...................... Certified Operator;........... `� M ................... Operator Certification Number;.................... Location of Farm: Mc C Latitude �° Longitude �• �SO General 1. Are there any buffers that need maintenance/improvement? ❑ Yes LRNo 2. Is any discharge observed from any part of the operation? ❑ Yes (<o Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes No b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes 2<01 c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? -(If yes, notify DWQ) ❑ Yes L9'110 3. Is there evidence of past discharge from any part of the operation? ❑ Yes !1No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes Lt3"No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes EJ'N0 maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 2<0 7. Did the facility fail to have a certified operator in responsible charge? Cl Yes 01�0 7/25/97 Continued on back 4 Facility tiumber:23 — 1 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes 2 t o Structures (Lagoons,11olding Ponds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes UkKo . Structure I Structure ? Structure 3 Structure 4 Structure 5 Structure 6 Identifier......'? 1.................. .... .............................................................................................. ... Freeboard (ft), ........ . `... '� V 10. Is seepage observed from any of the structures? ❑ Yes 11. Is erosion, or any other threats to the integrity of any of the structures observed'? El Yes ,L��l,'�\0 l�o 12. Do any of the structures need niaiirtenance/improvement'? ❑ Yes dNo (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimwn or maximum liquid level markers? ❑ Yes PI\o Waste Application _/ 14. Is there physical evidence of over application? ❑ Yes i1'No (if in excess of WQMP, or runoff entering waters of the State, notify DWQ) 15. Crop type T.:.scu.t.............F.!'?�iGk�....9r�ia......... ...... fir!!r........................................................................................................................ 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AW'vl )'. ❑ Yes No 17. Does the facility have a lack of adequate acreage for land application? ❑Yes 13 No 18. Does the receiving crop need improvement? ❑ Yes' OjNo 19. Is there a lack of available waste application equipment? ❑Yes` tl_o,` 20. Does facility require a follow-up visit by same agency? ❑ Yes- 13<0 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative'.' ❑ Yes No 22. Does record keeping need improvement? El Yes ,_,_, Oi o For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑'Yes ^�/� Ltif No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes �No "' "''`' '' "" �`�, `❑ 25: W re any additional problems noted which cause noncompliance of theTerrriit? ' Yes No , U No.violations o.r deficiencies were noted•du.6ng this vis`it.- You will receive no further correspondence shout this.visit. : Cnminents (irefer tp question #) Explat�n any YESbanswers and/or any recomtnendanons or any other commentsµ' Use drawings of facility to �etter explain situations.,(,use additions{ pi; e s as necessary)-offlM e G11>5 e.tt �"`11 S fa 7/25197 Reviewer/Ins ector Name P t 3 a►-iGs (NeiAr Reviewer/Inspector Signature: [..&� lle._� Date: DSWC •Animal .Feedlot Q "eration Review, ❑ P MWQ Animal Feedlotp O e'ration Site Inspection rallo O Com laint O Fo llow-up of DWQ inspection O Fiillow-uti of DSWC review O Other Date of Inspection 5 q Facility dumber Time of Inspection eta'. Use 24 hr. time Farm Status:.....„_„.. � � , _ _ Total Time (in hours) Spent ouReview ""—""' or Inspection (includes travel and processing) Farm tiame:.._�!n41N1�1S �Ar1lY� ».»»._.. „ _ ._..._ County:..„..k��?� SdYl.... ....»...__ _ ..". .......... OwnerNan:e:..'.M Phone Mailing Address:.-5 VZC Onsite Representative: . Certified Operator: Location of Farni: o �� Integrator:....."..............................._»..........._............."_ Operator Certification Number: Latitude Longitude ❑ Not O erational Date Last Operated: .. „. ........__ ..." .......„ » ....._".„ ......_...„.."_._....".""_ Type of Operation and Design Capacity 0 Wean to Feeder ❑ Feeder to Finish IV Farrow to Finish 2_(n0 St,WSi `❑ Other Type of Livestock f t;, 49 rv, 0s *,. w'-g .RMl -' ti'kr: , M!.,'�,�'s "'s z"';I h '? X?*•-•�°I .mr er a'' '' t: ." Eo. x- .. ro M";°,'ikn e'ax�,.. a .� ' r,' � Number�otL`agoat s �HoldingYPonds Z �� ❑ Subsurface Drains Present tA, C� 10 Lagoon Area Spray Field Area General y 1. Are there any buffers that need maintenance/improvement? ❑ Yes ER/No 2. Is any discharge observed -from any part of the operation? ❑ Yes !o .. a. If discharge is observed, was the conveyance man-made? ❑ Yes li�'No b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Ye -sr (moo c. If discharge is observed, what is the estimated flow in gal/mite? N pr d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes M��<� 3. Is there evidence of past discharge from any part of the operation? n ❑ Yes M"No 4. Was there anv adverse impacts to the waters of the State other than from a discharge? ❑ Yes i/o 5. Dots any part of the waste management system (other than lagoonsiholding ponds) require ❑ Yes 9I 0 maintenance/improvement? Continued on back 6. Is facility not in compliance with any applicable setback criteria? ❑ Yes- 7. Did the facility fail to have a certified operator in responsible charge (if inspection after I/l/97)? ❑ Yes MKO 8 Are+there lagoons or storage ponds on site which need to be properly closed? GlIes [:]No Structures (Lagoons and/or Iioldinrt 1?onds) W 6�� W SW 9. Is structural fi eeboard less than adequate? ❑ Yes ❑o' Freeboard (ft): La oa�n 1 Lagoon ? Lagoon 3 Lagoon 4�µ . 10. Is seepage observed from any of the structures? CAO CO_ n,y,r �q$ ❑ Yes MWO 11. Is erosion, or any other threats to the integrity of any of the structures observed? cr,;, dike_ cf— o<j Ues ❑ No 12. Do any of the structures need maintenancelimprovement? ?�� ❑Yes W'ivo (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) ,�/ 13. Do any of the structures lack adquate markers to identify start and stop pumping levels? ❑ EerYes No Waste Ayylicatlon 14. Is there physical evidence of over application? ❑ Yes Mli o (If in excess of WMP, or runoff entering waters of the State, notify DWQ) IS. Crop type . CU 16. Do the active crops differ with those designated in the Animal Waste Management Plan? 46 �1(.w�} `" ❑ Yes ❑ No G]-r acreage 17. Does the facility have a lack of adequate for land applicaddh? Q ❑Yes o 18. Does the cover crop need improvement? ❑ Yes ❑ No 19. Is there a lack of available irrigation equipment? ❑ Yes U<O For Certified Facilities Oniv 20. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 21. Does the facility fail to comply with the Animal Waste Management Plan in any way? ❑ Yes ❑ No 22. Does record keeping need improvement? ❑ Yes ❑ No23. Does facility require a follow-up visit by same agency? ❑ Yes Grl o 24. Did Reviewer/Inspector fail to discuss review/inspection with owner or operator in charge? ❑ Yes ERIO Comments (refer taaquestion #} €Iyxplaui any YF.S answers and/or any recommendatioaY or aay other cainments LisC drawings of ;a04W t0 better lam siivauons: 6 se addtttanal a as"neces 4 ' a Reviewer/Inspector Name i , .`., (t W:_ �3 a Revi►ver/Inspector Signature: l Date: Q� cc: Division of Wafer Quality, fZarer Qualir)' ecrion, Facility Assessment Unit 1 1/1.4/96 Facility Number Farm Status: EjlRegistered ❑ Applied for Permit ❑ Certified ❑ Permitted Date of Inspection I If W Time of Inspection /, , .3 el 24 hr. (hh:mm) Total Tirne fin traction otlrours (ex:l.24 for I hr IS mint) Spent on Review or Inspection (includes travel and processing) E3��Not Operational Dat .Last Operated; ..........D.......... .............................................................................................I.............................. Farm Name:..... .rla!r.: •�.)...,,� 'tQr..2.... .�e�c ✓1.'.1 �...LJrf:: Countv__.,.(....,�J................................ ... ........... .r . Owner Nanm:..it .................. ;'lr,C......................................... .................. Phone No:...FaciEit� [ olrt:lct: r~�!fiz�.M; .. �% SerQ.................... Title:... z,�f ................................... Phone No: 1G.., 11-lailingAddress:.......A..�..Li.)..f............�.�CI..;( Y�.,1�.�:�..................................1/J.�s."1::.��1..�......l:�6...............I ..�./�=� �, .r Onsite Rep resentatire:,,.1f . ��,:,...... �....�- .................... Integrator: .........., ............................. Certified Operator ................................................. .............. I.—............................................. Operator Certification Number:..................., Location of harm: , , _ C:a4f..:..I........z f.....1.14�....J_ ?Rix......h�.a....�:'..................................................................................................................................... ...... ...................................................... ............................................. ........... ................. ................................ ................................................................. ..................................... , Latitude .s G' 11 Longitude 0� 1 49 Type of Operation Swine Design Current Design Current Capacity Population .; Poultry Capacity Population ❑ Layer ❑ Non -Layer ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder arrow to Finish ❑ Other Design Current Cattle Capacity Population ❑ Dairy ❑ on -Dairy Total Design CapacityS-- TotaI'Sk*W : Number of Lagoons /Holding Ponds E:1= ❑ ❑ Subsurface Drains Present Lagoon Area 10 SprayField Area - - - W , --IYWr�r rY�WrWr9rYlYYllr 14 W IYWrIY General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ElLagoon ❑ Spray Field ❑ Other a. If dischan-,e is observed, was the conveyance man-made'? b. Ifdischarge is observed, did it reach Sarf�ace Wator? (Ifyes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding pond) require 4/30/47 maintenance/improvement`? ❑ Yes . ,'o ❑ Yes , o ❑ Yes [ -11"o ❑ Yes GKJ ❑ Yes [3T'o ❑ Yes 0<o ❑ Yes 0 ❑ Yes i] 6 Continued on back sr I 1E acility \umber; • — 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes TO 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes 8. Are there lagoons or storage ponds on site which need to be properly closed'? L'Yes ❑ No ,structures (l,aW tins and/or Holding fonds) 9. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes • 'a Freeboard (ft): Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 10. Is seepage observed from any of the structures? ❑ Yes [ 0 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes Leo 12. Do any of the structures need maintenance/improvement? ❑ Yes Li X01 (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? El Yes � 2 o Ni'aste Application 14. Is there physical evidence of over application'? ❑ Yes (If in excess of N or runoff entering waters of the State, notify DWQ) f 15. Crop type .tea r . .........`r .li..4......6.,:�Wzt..................................................... ................................ 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AM'MP)? ❑ Yes i [3 No 17. Does the facility have a lack of adequate acreage for land application? ❑ YesNo.• 18. Does the receiving crop need improvement? ❑ Yes ETNo 19. Is there a lack of available waste application equipment? ❑ Yes ®Na 20. Does facility require a follow-up visit by same agency? ❑ Yes �N/o 21. Did Reviewer/Ingw4.1or fail to discuss review/inspection with on -site representative? ❑ Yes ©i<10 For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 24. Does record keeping need improvement? ❑ Yes ❑ No ,Comments,(rferto qtibn#)Explai'mther�cippments '• `_: ;a .-.-.h.:.k _. :-:. .� -.. �). ,. ..-".t ;' �.. '., .. :..�. - vim. - �}.`.. ..c .. _ „? -� , � J leiC'l as, G _ _�•��/ � ,L s-•-�-- �.z' �: -�, �.�-,, Reviewerllnspoetm Name Reviewer/IaepeMr Signature: cc: Division of Water Quality section, Facility Assessment Unit Date: r. < i 4/30/97 OPERATIONS BRANCH - WO Fax:919-715-6048 Jul 20 '95 17:41 P.12/17 17-aity Nuvat -er= SITE VISrrX110 {RECORD Dn�2: � •�.1�._� 1395 W BR �►r' Owner. •� Tana KBmc:�ro�►, Co=ty. *Lzclo�— AgemI Visiting &its fir rF►onc: .59 - �9� i]jicratof: mm tip.n S_,. _ ... -- ,�J4,.-2rr71 On Shn Rep=cnrxjv*: I'haaa: r1,yjlc.l Addgw: L o rea. ov U, s.:,fw. afi s IC 5 4'7 } A a. ._►� � - . b� 5 R Is 2xn) - / Mailing. Addm--4; J 2- -7 S:a 3 Type at Op4mtian: swine �_. Poultry Cajklc r+:siaq Cappnity; DSO Nunbcr of Animals w girtef: 1,%tir-de: Cam° .2.5 3 a LouslLudo: Type of Insixcuon: Cimund ✓ � Acdal _ Circle Yss ar we Dacs the Aitiss.tid Wosre Lsgoen htvp- xuIIle:eat fx-abaardl of I Fact -- 25 vrir-24 hvus s;otso evcst (approx1mmely I Foot , 7 bcUc) (� or No �i Frx :rand_ .2 !C: IncF> T-er fncilidtm wia, more tka =e,,;tUnm;, PIC=addrsss the eri:cr:agooas, f�C:bamrd enddr tke c:. m1mifs Was any s4up2gc o6ser�ed WeS erc5l1Dn �L ttta dttm?: Y&I a� Is ad'Nuwe Iorid avaBabl= far Lard sppiiwmicm? Ycs or No is :Inc a,ye- crop ad:gaib? Yes or No Ad:.'Wv.,,.al C'ommenm + ta• e� es�� �}�.� 1f1N CA..1e� A� � _ 3�-rr• Pq r i � � � I � 4 FtLc rn C� i °) 735-355h iie�.atur� oi'.a[ Z10'39dd 0w, f•QSa3d UGSI-i W0:33 1 1 : s i SF_. - 07- -ini State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office .fames B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Boyce A. Hudson, Regional Manager James Thomas Route 1, Box 626 Timberlake, N.C. 27583 Subject: Dear Mr. Thomas Division of Environmental Management September 13, 1995 Compliance Inspection Report Weaver Swine Farm Person County On September 6, 1995, Mr. Steve Mitchell, from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is a part of the Division's efforts to determine potential problems associated with liquid waste disposal systems. Mr. Mitchell's site visit determined that wastewater from your facility was not discharging to the surface waters of the state, nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. Please continue to properly manage the waste and wastewater generated by this farm to prevent the possibility of an illegal discharge. Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Steve Mitchell at (919) 571-4700. Sincerely, Ju Garrett Water Quality Supervisor cc: Person County Health Department James Poindexter- Person County Soil and Water Conservation District Sieve Bennett - Regional Coordinator, Division of Soil and Water Conservation RRO and Central Files 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Site Requires Immediate Attention: Facility No. DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: September 6, 1995 Time: Farm Name/Owner: James Thomas Mailing Address: Route 1 Box 626, Timberlake N . C . 27583 County: Person Integrator: On Site Representative: Jimmy Thomas Physical Address/ Location: S . R . 1547 Type of Operation: Swine _XX_ Design Capacity: 250 DEM Certification Number: ACE ACNEW Phone: Phone:264-2971 Poultry Cattle Number of Animals on Site: ^ DEM Certification Number: Latitude: 36° 25' 30" Longitude: 78° 54' 54" Elevation: Feet Circle Yes or No Does the Animal Waste Lagoon have sufficient freeboard of 1 Foot + 25 year 24 hour storm event (approximately 1 Foot + 7 inches) Yes Actual Freeboard: 2. 5_Ft . Was any seepage observed from the lagoon(s)? No Was any erosion observed? No Is adequate land available for spray? Yes/No Is the cover crop adequate? Yes/No Crop (s) being utilized: Does the facility meet SCS minimum setback criteria? Yes 200 Feet from Dwellings? Yes 100 Feet from Wells? Yes Is the animal waste stockpiled within 100 Feet of USGS Blue Line Stream? No Is animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line? No Is animal waste discharged into waters of the state by man-made ditch, flushing system, or other similar man-made devices? No If Yes, Please Explain. Does the facility maintain adequate waste management records (volumes of manure, land applied, spray irrigated on specific acreage with cover crop) ? No Additional Comments : Facility has just been purchased from new owners and most of the animals were lost to disease. Owner has just started with restocking animals. Slight over land seepage from collector box at end house. Inspector Steve Mitchell Signature cc: Facility Assessment Unit Use Attachments if Needed. OPERATIONS BRANCH - WQ Fax:919-715--6048 Jul 20 '95 17:41 P.12/17 3'acility Numt�: 7 3�— Si?E YISITA7'1O� R�C�W3 DATE: Owner. W eJ�,•r Marra Kame: %L,_ b,�►-s co=ty. _ fie _A , .....�. . Agee t Vtaiting Sit= ;r�A.:� 5 7 - Q7 2.4 71 Oa Site Reprmcnualvo. _ _ Photo' pl�ys{ca1 Add*w, La ewre a . eJ ���.,4� �� _5 [5 4 7 � A e AF e_ Y . . 4_ +� t N,J. s{ Ste -Oa 02d1 Mullin Addre.:s: - l Mmx 926 Type of t7j'rereliou: Swing ✓ Panitty CaLdc rrsign CapDcity: 'NumbcrofAnimals on Sitz:.--- i ltirr�!r Ca..° .ZS , 343 Type of It spc cu: 0re:u0 ✓_ -- Awal, OmIc Ycs or yc Docs the Aitljral Write ].vaen �ivs xoXident ft-eel•oeer: of i Fact t 25 yv- r1-4 hour s;olrn (ripprc:tiarnlcly 1 Foot 47 bobea) (S� or No rp;x cmd: „ Z T-czt 4- Incur - For facititlex wit4 more tki =e Agnott, pinsc addrms the ilia cvIDIIICitLS se 60a. Was any Sw►Psgc obscr:ad i=.:r ti iapat:(s)? Yea ot�'�n: f tha tarn?: Yc oj(� Ix sclx�ua:c larui svafIablc fc�r i3rd appiiruirasz? Y� or Rio Is :�_ G�vL`: crop ��na�? Y� ar Na LPL-1ie�eT�►T� ice?' �ae�S_ �1- ! . Ftux ►O f419) 715-3559 Sieratum ofAo=it 'f. r E 10 ' 39dd O,J HCIS33d H OSt'i wo�Jj T i —:"I s ;-,. Ei_7 1ni Bernard, .lane From: Larick, Keith Sent: Monday, April 15, 2013 3:25 PM To: Bernard, Jane Cc: Bolich, Rick Subject: Complaint - AWS730010 Jane, I got a call from Keith Daye in Person County, and he has an issue with AWS730010 (off of Todd Rd. in Person Co.). He says there are bad odor issues with the farm, etc. Could you give him a call? His number is (919) 627-2754. It may be more of a DAQ issue, but I'll let you make that call. Thanks, Keith Keith Larick Supervisor, Animal Feeding Operations Unit (919) 807-6444 phone (919) 807-6496 fax www.ncwaterquality.org ---------------------------- Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Bernard, Jane From: Larick, Keith Sent: Wednesday, April 24, 2013 11:25 AM To: Bernard, Jane Cc: Joshi, J.R. Subject: RE: Complaint - AWS730010 Thanks for the follow-up. If it's really an odor issue, there isn't much we can do other than forward it to DAQ. Keith ---------------------------- Keith Larick Supervisor, Animal Feeding Operations Unit (919) 807-6444 phone (919) 807-6496 fax www.ncwaterguality.org ---------------------------- Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bernard, Jane Sent: Wednesday, April 24, 2013 11:24 AM To: Larick, Keith Cc: Joshi, J.R. Subject: RE: Complaint - AWS730010 Keith, J.R. and I were at the farm last Friday. They have not had any. applications this year as a result of a clean out they did last fall. There was not an odor issue at the time we were on the farm. Therefore the odor is not from the applications themselves. The creek did appear to be a bit discolored downstream as well as upstream from the farm That could be explained by all the rainfall we have had. We received an identical complaint last year 4/12/12 from a Crystal Brooks whom had identical wording for the complaint. I did try to explain to him (as I did Crystal) that there really wasn't much we could do. I gave Mr. Daye the number for air quality: Last year I asked crystal to log the date and times of the odor and to pass them on to us to see if it was tied to applications but I have not received the info. JANE R. BERNARD Environmental Specialist Aquifer Protection Section 3800 Barrett Drive Raleigh, NC 27609 Office- (919) 791-4200 ext. 4236 Cell- (919) 210-7327 Fax- (919) 571-4718 E-mail- lane.bernardfo�ncdenrgov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: L.arick, Keith Sent: Monday, April 15, 2013 3:25 PM To: Bernard, Jane Cc: Bolich, Rick Subject: Complaint - AWS730010 Jane, I got a call from Keith Daye in Person County, and he has an issue with AWS730010 (off of Todd Rd. in Person Co.). He says there are bad odor issues with the farm, etc. Could you give him a call? His number is (919) 627-2754. It may be more of a DAQ issue, but I'll let you make that call. Thanks, Keith ---------------------------- Keith tarick Supervisor, Animal Feeding Operations Unit (919) 807-6444 phone (919) 807-6496 fax www.ncwaterauality.or, ----------------------- Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 40A* �� ncENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Jimmy Thomas Thomas Farms Pork, Inc #2 8251 Oxford Road Timberlake, NC 27583 Dear Jimmy Thomas: Division of Water Quality Charles Wakild, P. E. Director February 8, 2013 John E. Skvarla, III Secretary Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS730010 Thomas Farms Pork, Inc Animal Waste Management System Person County The Division of Water Quality (Division) received your sludge survey information on January 7, 2013. With the survey results, you requested an extension of the sludge survey requirement for -the lagoon at Thomas Farms Pork, Inc #2 facility. Due to the amount of treatment volume available, the Division agrees that a sludge survey is not needed until 2015. The next sludge survey for the lagoon at this facility should be performed before December 31, 2015. Thank you for your attention to this matter. Please call me at (919) 807-6340 if you have any questions. Sincerely, Miressa D. Garoma Animal Feeding Operations Unit cc: Raleigh Regional Office, Aquifer Protection Section Permit File AWS736010 AQUIFER PROTECTION SECTION 1636 Mail Service Center, Ralelgh, North Carolina 27699.1636 Location: 512 N. Salisbury St Ralegh, North Carolina 27604 Phone: 91H07-W4 FAX: 919-807$4801FAX:91M07.6496 Internet: www.ncwatemualitv.org An Equal Opportunity 1 Affirmative Action Employer One No thCarolina AaturallryI 0(� W A rF9 Michael F. Easley, Governor Q William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources co 7 j [ Alan W. Klimek, P. E., Director '{ Division of Water Quality October 1, 2004 Jimmy & Timmy Thomas Thomas Farms Pork Inc. 8251 Oxford Road Timberlake NC 27583 Subject: Certificate of Coverage No, AWS730010 Thomas Farms Pork Inc. Swine Waste Collection, Treatment, Storage and Application System Person County Dear Jimmy & Timmy Thomas: On June 11, 2004, the North Carolina Division of Water Quality (Division) issued a revised State General Permit for swine facilities. The General Permit was issued in accordance with the directive of Senate Bill 733 (Session Law 2003-28). In accordance with your application received on January 22, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Jimmy & Timmy Thomas, authorizing the operation of the subject animal waste collection, treatment, storage and • land application system in accordance with General Permit AWG100000. The issuance of this COC supercedes and terminates your previous COC Number AWS730010 which expires October 1, 2004. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Thomas Farms Pork Inc., located in Person County, with an animal capacity of no greater than an annual average of 260 Farrow to Finish swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until September 30, 2009. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Since this is a revised State General Permit, it contains new requirements in addition to most of the conditions contained in the previous State General Pcrmit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record kee in and monitoring conditions in this permit. _ , Aquifer Protection Section - Animal Feeding Operations Unit 1636 Mail Service Center, Raleigh, North Carolina 27699-1638 One NofthCarolina Phone: 919-733-3221 1 FAX: 919-715-05881 Internet: h2o.enr.state.nc.us %�����y�jy��� An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper . Y L Ll If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 2H 0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this . process. Unless such a request is made within 30 days, this COC shall be,final and binding. This facility is located in a county covered by our RALEIGH Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700: If you need additional information concerning this COC or the General Permit, please contact Duane Leith at (919) 715 26186. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all ce's) RALEIGH Regional Office, Aquifer Protection Section Person County Health Department Person County Soil and Water Conservation District Permit File AWS730010 APS Central Files • THOMAS FARMS PORK, INC. CERTIFIED MAIL August 6, 2004 S. Jay Zimmerman, L.G. Regional Supervisor NC Department of Environmental & Natural Resources 1628 Mail Service Center Raleigh, NC 27699-1628 Subject: Facility # 73-10 Dear Mr. Zimmerman, 8251 Oxford Road Timberlake, NC 27583 336-364-2971 t r tffi@esinc.net In reference to you letter dated July 28, 2004, regarding the Zinc and Copper Indices, we wish to update you on the situation and procedure we will be implementing. We realize the level of the copper values on samples #27 (2083) and #28 (2110) are excessive, and we are monitoring them closely. We are seeing a great deal of variation in sample levels from year to year. As an example, the previous years sample for #27 was 2800. We have been working with Derek Day, Person County Extension Director in conjunction with NCSU's Agronomy Department. The consensus is that these levels and variations are a result of swine sludge being applied to the soil surface in a continuous no - till conservation program. The recommendation has been made to deep till these fields and thoroughly mix the soil to even out the mineral levels, through out the plant root - growing zone. The soil pH levels also fell below 6 in our last sample, but with a growing crop in the field, we were unable to immediately apply lime. We are in the process now of implementing the recommendations of the NCSU Agronomy Department to deep till and mix the soil and also to apply sufficient lime to raise the pH level back above 6. We will continue to work with our County Extension Office and the NCSU Agronomy Department to monitor the levels of copper. I apologize that I was unable to meet with JD Hester on July 16. 1 had a surgical procedure that had been planned for several months, and could not reschedule. Please know that we are committed to finding the proper solution for the elevated levels of copper. Please contact us if you should have any additional questions. Sincerely, Timmy Thomas NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director July 28, 2004 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Timmy Thomas Thomas Farms Pork, Inc. 8251 Oxford Rd. Timberlake NC, 27583 Subject: Compliance Evaluation Inspection Zinc and Copper Indices Thomas Farms Pork, Inc. Facility # 73-10 Person County Dear Mr. Thomas: On July 16, 2004, Mr. Jarwin (JD) Hester from the Raleigh Regional Office conducted a compliance inspection at the subject facility. A review of the February 2, 2004 soil test report for the following fields indicated Copper indices at or greater than 2000: Sample id# 23 25 27 28 Crop Small Grain/Fescue GL LL cG LL LL LG cc iG LL Conner Value 1971 1776 2083 2110 North Carolina General Statue 143-215.10C(e)(6) states in part "Zinc and Copper levels in the soils shall be monitored, and alternative crop sites shall be used when these metals approach excess levels." The SB 1217 Interagency Group was established by the General Assembly in 1996 to interpret requirements of the animal waste management rules. When elevated levels of Copper and Zinc are reached, Section 1.19 of the Seventh Guidance Memo of the Interagency Group future manure applications. The guidance memo recommends that producer LL must seek Raleigh Regional Office 1628 Mail Service Center, Raleigh, North Carolina 27699-1628 3800 Barrett Drive, Raleigh North Carolina 27699 Phone: 919-571-47001 FAX: 919-571-47181Internet: h2o.enr.state.nc,us An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper Nne orthCarolina ;Vatmally Thomas Farm Pork, Inc. Page-2- cont. alternative site for all crops on f elds with Copper and Zinc indices of greater than 2000" and that a pH be maintained at 6.0 or greater. This office request that all results of any future requires that, a producer should contact a qualified technical specialist to discuss options for future manure applications. Please respond to the Notice, in writing, within 30 days of receipt. This office also requests that you immediately contact a qualified agronomist to discuss proper soil sampling procedures and protocols. If you have any questions regarding this notification, please call Jarwin (JD) Hester at (919) 571-4700. Sincerely, S. mmerman, L.G. Regional Supervisor cc: Person County Soil and Water District Person County Health Department Ms. Betsy Gerwig, DWSC-RRO DWQ Enforcement/Compliance Unit rro file copy . State of North Carolina Department of Environment and Natural Resources Raleigh Regional office Michael F. Easley, Governor William G. (Bill) Ross, Secretary Mr. Thomas 8251 O\#ord Rd. Timberlake, NC 27583 NCDENR NORTH CAROLINA DEPARTMENT OF t=NVIRONMENT AND NATURAL RE50UFRCES Division of Soil and Water Conservation May 14. 2003 SUBJECT: Operation Review Summaries Thomas Farms. Facility #s: 73-2. 73-6, & 73-10 Person County Dear Mr. Thomas. On April 28. 2003. Operation Reviews were conducted on the Thomas family hog farms in Person County'. facilit. numbers: 73-2. 73-6. and 73-10. These Reviews. undertaken in accordance zFith G.S. 143-215.10D. were one of two visits scheduled for all registered livestock operations during the 2003 calendar year. The Division of Water Quality will conduct second site inspections. During the Reviews. it vvas determined that the freeboard level markers were set pith the crests of the lagoon spillways. not the low point on the top of the lagoons. This understates your freeboard as the 12 inches required for the structural freeboard component is present from the crest of the spillways up to the low point on the lagoon tops. The actual distance from the spillway crest to the low points may be greater than 12 inches. but credit is onl%- given for 12 inches. The current markers need to be reset to proper elevations. Until markers are reset with the correct start and stop pumping elevations. 12 inches should be added to even° freeboard level reading to account for the structural freeboard present. The resulting freeboard level readings taken using these markers need to include the additional 12 inches of structural freeboard present. Adding the 12 inches to Your recorded freeboard levels has your farms in compliance with required freeboard levels for the past near. The high freeboard levels reported to DWQ (Division of Water Quality) were actually below the start pumping elevation. At the request of J D Hester(DWQ), a cony of this letter will be sent to DWQ personnel in the Raleigh Rezional Office and Non -Discharge Compiiance Enforcement Unit. Keen a couv of this letter v ith your farm records. The need to update your WUPs(Waste Utilization Plans to reflect the extended Fescue pumping window was noted. Robin Watson- your regional NCDA Agronomist- can provide that service to you. He may be contacted at (336) 570-6850 or via email robin.vimtsonta ncmail_net. The Division of Soil and Water Conservation appreciates your cooperation with this Operation Review. Please do not hesitate to call me at 919/57I-1700 ext. 257 if you have any questions. concerns or needadditional information. Sincerely, / Margaret (03, refe Environmental Engineer I cc: Person Soil and Water Conservation District Ken Schuster, Water Quality Raleigh Regional Supervisor Steve Lewis, Non -Discharge Compliance Enforcement Unit. Division of Water Quality DSWC Regional Files 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919)571-4700 FAX (919)571-4718 An Equal Opportunity Affirmative Action Employer 50% recycledl10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Jimmy & Timmy Thomas Thomas Fanns Pork Inc. 8251 Oxford Road Timberlake NC 27583 Dear Jimmy & Timmy Thomas: E • 1kT1 W'A A �A��42 � NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 30, 1999 Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number 73140 tPerson-County2 This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. . Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, 1RR2, DRY1, DRY2, DRY3, SLURI, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincere) 14 Kerr T. Stevens, Director Division of Water Quality cc: RALEIGH Regional Office Person County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director October 21, 1998 CERTIFIED MAIL RUTUTM I REQUESTED Timmy Thomas Thomas Farms Pork Inc. 8251 Oxford Rd. Timberlake NC 27583 Dear Timmy Thomas: NCDENR NORTH CAROUNA DEPARTMENT OF ENVIRONMENT AND NATURAL RE50URCE5 Subject: Application No. 73-0010 Additional Information Request Thomas Farms Pork Inc. Animal Waste Operation Person County The Non -Discharge Permitting Unit has received additional information regarding the subject application. Further information is required before we can continue our review. Please address and submit the following information by November 20, 1998: 1. Your waste utilization plan appears to be written for a two-year rotation. The summary table on Page 5 and 6 of your revised waste utilization plan shows a huge deficit that is not so if you account for two year's worth of plan available nitrogen produced on the farm. Please revise the summary table and show the actual amount of deficit that occurs over the two-year period. Please note. that all revisions or amendments made to the waste utilization plan (WUP) or a portion thereof are required to be signed and dated by both the landowner and the Technical Specialist before they are submitted for review. Please reference the subject permit application number when providing the requested information: All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter must be submitted on or before November 20, 1998 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 363. cc: Raleigh Regional Office, Water Quality Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 An Equal Opportunity Affirmative Action Employer Sincerely, JR Jo Soil Scientist Non -Discharge Permitting Unit Telephone,919-733-5083 FAX 919-733-0719 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Timmy Thomas Thomas Farms Pork Inc. 8251 Oxford Rd. cn C Timberlake NC 27583 �w � v Dear Timmy Thomas: INK 1741 � • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL REsouRGEs August 31, 1998 Subject: Application No. 73-0010 Additional Information Request Thomas Farms Pork Inc. Animal Waste Operation Person County The Non -Discharge Perm i'lting-Unit has completed a preliminary engineering review of the subject application. Additional information s required before we can continue our review. Please address the following components by September 30, 1998: 1. Please explain in the narrative of operations the two-year crop rotation. Include what will be planted the first and second years (include application periods for each crop). It is difficult to gather this information from Table I of the WUP. 2. The WUP states that corn and wheat will be irrigated during the months of Marchand June and November and March respectively. Why is waste only being applied for these months? The recommended application months for Corn ranges from March - June and for Wheat, October — March. Please explain this information in the narrative. The Waste Utilization Plan (WUP) states that the Realistic Yield Expectations (RYE) for Corn is 110 bushels/acre and for wheat is 55 bushels/acre. Referring to the RYE manual issued by the NCSU Cooperative Extension Service, the yields for Corn and Wheat should be 105 bu/ac. and 50 bu/ac. respectively. Note that actual yields that are higher than the RYE's listed by the NCSU Coop Extension may be used for facilities that can document such yields with records that show the average yield for three out of five years meets or exceeds the actual yield used in the WUP. If this is not the case, please make the appropriate changes to the WUP to reflect the correct RYE's. 4. Tract 111, Field 2 has corn listed twice with two different acreages. Please explain and/or revise this information. 5. Include in the narrative, that an additional 10.8 acres has been cleared and explain why. b. The irrigation parameters listed in your WUP exceed current NRCS recommendations. Irrigation events are to be listed in the WUP as the maximum application allowable for that soil type from the time the pumps are turned on until the time they are shut off. The application events listed in your WUP appear to be out of the Sprinkler Irrigation Guide. The Application Amounts listed in this guide have not been adjusted for the application of animal waste. NRCS currently recommends that total application amounts not exceed one inch in any application event for any soil type. If your application rates need to be adjusted for the application of animal waste, please have your Technical Specialist revise your WUP to reflect the appropriate application amount per event. If the rates will remain as written in the plan, please have your Technical Specialist justify the increased application rate in the narrative of your WUP. 7. Please include a map, pertaining to the irrigation system, illustrating the fields each sprinkler will - irrigate. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Application No. 73-0010 Timmy Thomas Page 2 All revisions 1 amendments are required to be signed and dated by both the landowner and the Technical Specialist before they are submitted for review. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter must be submitted on or before September 30, 1998 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H ,.0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 364. Sincerely, Brian E. Mondschein Environmental Technician Non -Discharge Permitting Unit cc: Raleigfi eiional=Office -Water-Q iality Permit File State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director July 31, 1998 CERTIFIED MAIL RETURN E PT REQUESTED Jiimmy& Timmy Thomas Thomas Farms 8251 Oxford Rd. Timberlake NC 27583 Farm Number: 73 - 10 Dear Jimmy & Timmy Thomas: W'A 4, • -NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES You are hereby notified that Thomas Farms, in accordance with G.S. 143-215.1 OC, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has six 60 days to submit the attached application and all supporting documentation. In accordance with Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification, Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please call Sue Homewood at (919)733-5083 extension 502 or Charles Alvarez with the Raleigh Regional Office at (919) 571-4700. Sincerely, ` es£ -- cc: Permit File (w/o encl.) Raleigh Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary November 13, 1996 Jimmy Thomas Thomas Farms 8251 Oxford Rd. Timberlake NC 27583 SUBJECT: Operator In Charge Designation Facility: Thomas Farms Facility ID#: 73-10 Person County Dear Mr. Thomas: !•o [D[—=HNF;Z RECEP= WASHINGTON OFFICE NOV 19 1996 a IL I& Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator. The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycuttof our staff at 919/733-0026. Sincerely, A. Preston Howard, Jr., P. ., irector Division of Water Quality Enclosure cc: Raleigh Regional Office Water Quality Files P.O. Box 27687, N��O Raleigh, North Carolina 2761 1-7b$7 An Equal Opportunity/Affirmative Action Employer Voice 919-715-4100 5T1. recycled/ I C)ok post -consumer paper I a 0 F RECUVED I DENR I DVWQ AQUjFFR'RRnTFr.TfnN SF710N �, AR 19 2009 Nutrient Management Plan For Animal Waste Utilization This plan has been prepared for: 4-6-.-1" '�-- '7 3 - IV Thomas Farms Ne f k Timmy Thomas 8251 Oxford Rd. Timberlake, NC 27581 336-364-2633 06-14-2005 This plan has been developed by: Kim Woods NCCES-Person County 304 S. Morgan St. Rm 123 Roxboro, NC 2 75 73 336-599-1195 Jai M.1911 Developer Si ature Type of Plan: Nutrient Management with Both Manure and Fertilizer '73 ---rc) Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Si turc (owner) Date ignature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By: Tecbnical Sp ialist Signature Date • 551946 Database Version 3.1 Date Printed: 06-14-2005 Cover Page I ----- -•- ---------•--------------------•---------------------------------------------------------------------------------------------------------- Nutrients applied in accordance with this plan will be supplied from the following source(s): . Commercial Fertilizer is included in this plan. S13 Swine Farrow -Finish Lagoon Liquid waste generated 2,724,280 gals/year by a 260 animal Swine Farrow -Finish Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 6275 Incorporated 10776 Inj ected 11867 hTigated 6820 Max. Avail. PAN (lbs) * Actual PAN Applied (lbs) PAN Surplus/ Deficit (lbs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 6,820 7289 -469 2,911,591 -187,311 Year 2 6,820 7367 -547 2,942,538 -218,258 n --------- �----------------- ---- -- - ---"-..--..-..- -- -------------....------ .._-..-.-..-,-- .-.._...-------------------------------------------- Note: In source ID, S means standard source, U means user defined source. . * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this soi 551946 Database Version 3.1 Date Printed: 06-14-2005 Source Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield 46imates are also provided for each crop, as well as the crop's P205 Removal Rate. The Leaching Index (LI) and the osphorous Loss Assessment 'Tool (PLAT) Rating are also provided for each field, where available. If a field's PLAT Rating is High, any planned manure application is limited to the phosphorous removal rate of the harvested plant biomass for the crop rotation or multiple years in the crop sequence. Fields with a Very High PLAT Rating should receive no additional applications of manure. Regardless of the PLAT rating, starter fertilizers may be recommended in accordance with North Carolina State University guidelines or recommendations. The quantity of P205 applied to each crop is shown in the following table if the field's PLAT rating is High or Very High. Planned Crops Summary Tract Field Tots! Acres Useable Acres Plat Rating Ll Soil Series Crop Sequence RYE P205 Ranoval I (Ibshcre) Appfial (lbs/acre) 111 2 1.50 1,50 Unknown 5.3 Appling Corn, Grain 132 bu. 58 NIA Wheat, Grain 64 bu. 32 NIA Soybeans, Manured, Double Crop 45 bu. 36 NIA 111 4 3.12 3.12 Unknown 4.9 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 65 bu. 33 NIA Soybeans, Manured, Double Crop 46 bu. 37 NIA 111 5 11.09 11.09 Unknown 5.0 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 65 bu. 33 NIA Soybeans, Manured, Double Crop 46 bu. 37 NIA i 11 7 3.95 3.95 Unknown 5.2 Appling Fescue Hay 5.5 Tons 86 NIA 111 8 4.62 4.62 Unknown 4.8 Appling Corn, Grain 135 bu. 59 NIA Wheat,Grain 65 bu. 33 NIA Soybeans, Manured, Double Crop 46 bu. 37 NIA 3210 1 6.50 6.50 Unknown 4.9 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 65 bu. 33 NIA Soybeans, Manured, Double Crop 46 bu. 37 NIA 3210 2 2.34 2.34 Unknown 5.0 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 1 65 bu.1 33 NIA Soybeans, Manured, Double Crop 1 46 bu, 37 1 NIA PLAN TOTALS: 33.12 33.12 • 551946 Database Version 3.1 Date Printed 6/1412005 NOTE: Symbol * means user entered data. PCs Page 1 of 2 LL,, Potential LeachingTechnical Guidance 2 w potential to contribute to soluble None nutrient leaching below the root zone. >= 2 & Moderate potential to contribute to Nutrient Management (590) should be planned. <= 10 soluble nutrient leaching below the root zone. High potential to contribute to Nutrient Management (590) should be planned. Other conservation practices that improve soluble nutrient leaching below the the soils available water holding capacity and improve nutrient use efficiency should be > 10 root zone. considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Ater Strips (393) and Riparian Forest Buffers (391). P Loss Estimate {!bs/acre ear) . P Loss Index Rating P Management Recommendation 0.0 to 1.0 0 - 25 Low No adjustment needed; N based application > 1.0 to 2.0 25 - 50 Medium No adjustment needed; N based application > 2.0 to 4.0 51 - 100 High Application limited to crop P removal > 4.0 > 100 Very. -High Starter P application only r1 U 551946 Database Version 3.1 Date Printed 6/14/2005 NOTE: Symbol * means user entered data. PCS Page 2 of 2 The A Utilization table shown below summarizes the waste utilization* for this operation. This plan provides an estimate of the numb acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year l Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic• period Nitrogen PA Nutrient Req'd (Ibs/A) Canm Fert. Nutrient Applied (1bs/A) Res. ¢bs/A) Applic. Method Manure PA Nutrient Applied (Ibs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (FirId) Solid Manure Applied (Field) N N N N loop gal/A Tons 1000 gals tons 111 2 N/A Appling 1.50 1,50 Corn, Grain 132 bu. 2/15-6/30 147 147 0 N/A 0 0.00 0.00 0.00 0.00 H ] 2 N/A Appling 1.50 1.50 Wheat, Grain 64 bu. 9/1-4/30 129 129 0 N/A 0 0.00 0.00 0.00 0.00 111 4 S13 Appling 3.12 3.12 Com, Grain 135 bu. 2/15-6/30 l50 0 0 brig. 150 59.92 .0.00 186.94 0.00 111 4 S13 Appling 3.12 3.12 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 Irrig. 79 31.40 0.00 97.96 0.00 111 5 S13 Appling 11.09 11.09 Corn, Grain 135 bu. 2/15-6/30 150 0 0 brig. 150 59.92 0.00 664.471 0.00 111 5 S13 Appling 11.09 11.09 Wheat, Grain 65 bu, 9/1-4/30 131 0 0 Inig. 79 31.40 0.00 348A8 0.00 Ill 7 S13 Appling 3.95 3.95 Fescue Hay 5.5 Tons 811-7/31 244 0 0 Irrig. 244 97,46 0.00 384.98 0.00 11 1 8 S13 jAppling 4.62 4.62 Corn, Grain 135 bu. 2/15-6/30 150 0 0 Irrig. 150 59.92 0.00 276.81 0.00 l l l 8 S13 Appling 4.62 4,62 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 brig. 79 31.40 0.00 145.05 0.00 3210 1 S13 Appling 6.50 6.50 Corn, Grain 135 bu. 2/15-6/30 150 0 0 trig. 150 59.92 0.00 389,46 0.00 3210 1 S13 Appling 6.50 6.50 Wheat, Grain 65 bu. 9/14/30 131 0 0 hTig. 79 3L40 0.00 204.07 0.00 3210 2 S13 jAppling 2.34 2.34 Corn, Grain 135 bu. 2/15-6/30 150 0 0 Irrig. l50 59.92 0.00 140.20 0.00 3210 2 S13 Appling 2.34 234 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 brig. 7 31.40 0.00 73,47 0.00 551946 Database Version 3.1 Date Printed: 6/14/2005 WUT Page 1 of 3 Waste U>tion Table .Year 1 . Nitrogen Comm Res, Manure Liquid Solid - Liquid Solid PA Fert. 0bs/A) PA ManurcA Manure Manure Manua: Nutrient Nutrient Nutrient pplied Applied Applied Applied Req'd Applied Applied (acre) (acre) (Field) (Field) Obs/A) Obs/A) Obs/A) 1000 Source Total Use. Applic. Appbc. Tract Field ID Soil Series Acres Acres Crop RYE Period N N N Method N gal/A Tons 1000 gals tons Total Applied, 1000 gallons 2,911.59 - Total Produced, 1000 gallons 2,724.28 Balance, 1000 gallons 187.31 ; Total Applied, tons 0.00 Total Produced, tons Balance, tonsMA Notes: 1. In the tract column, -- symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 551946 Database Version 3.1 Date Printed: 6/14/2005 WUT Page 2 of 3 Waste U4 tion Table -Year 2 s Tract Vow Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA - Nutrient, Req'd (Ibs/A) Cantu Fert, Nutrient Applied (Ibs/A) Res. Obs/A) Applic, Method Manure PA Nutrient I Applied 0bs/A) Liquid ManurcA pplied (acre) Solid Manure Applied (acre) squid Manure Applied (Field) Solid Manure Applied (Field) N N N N 1000 gal/A Tons 1000 gals tons 111 2 N/A Appling 1.50 1.50 Soybeans, Manured, Double Crop 45 bu. 4/1-9/15 175 175 0 N/A 0 0,00 0.00 0.00 0.00 111 4 S13 Appling 3.12 3.12 Wheat, Grain 65 bu- 9/1 4/30 131 0 0 Irrig- 52 20.93 0.00 65.30 0.00 111 4 S13 Appling 3.12 3.12 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 Irrig. 179 71.50 0.00 223.08 0.00 111 5 S13 Appling 11.09 11.09 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 [Trig. 52 20,93 0.00 232.12 0.00 111 5 S13 Appling 11.09 11.09 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 brig. 179 71.50 0.00 792.93 0.00 111 7 S13 Appling 3,95 195 Fescue Hay 5.5 Tons 811-7/31 244 0 0 brig. 244 97.46 0.00 384.98 0.00 111 8 S13 Appling 4.62 4.62 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 brig, 52 20.93 0.00 96.70 0.00 111 8 S13 Appling 4.62 4.62 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 [trig. 179 71.50 0.00 330.33 0.00 3210 1 S13 jAppling 6.50 6.50 Wheat, Grain 65 bu. 911-4130 131 0 0 Irrig. 52 20.93 0.00 136.05 0.00 32I0 1 S13 Appling 6.50 6.50 Soybeans, Manured, Double Crop 46 bu- 4/1-9/15 179 0 0 Irrig. 179 71.50 0.00 464-75 0,00 3210 2 S13 Appling 2.34 2.34 Wheat, Grain 65 bu, 9/1-4130 131 0 p brig. 52 20.93 0-00 48.98 0.00 3210 2 S13 Appling 2.34 2.34 Soybeans, Manured, Double Crop 46 bu, 411-9/15 179 0 0 1 brig. 1 179 71 5 OA0 16731 0.00 Total Applied, 1000 gallons 2,942.54 Total Produced, I000 gallons 2,724.28 Balance, 1000 gallons -218-26 Total Applied, tons w 0.00 Total Produced, tons f 2 0.00 Balance, tons 0.00 Notes: 1. 1n the tract column, - symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 551946 Database Version 3.1 Date Printed: 6/14/2005 WUT Page 3 of 3 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies .with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. • 0 Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 111 4 Appling 0.45 1.0 111 5 Appling 0.45 1.0 111 7 Appling 0.45 1.0 111 8 Appling 0.45 1.0 3210 1 Appling 0.45 1.0 3210 2 Appling 0.45 1.0 551946 Database Version 3.1 Date Printed 6/14/2005 lAF Page 1 of 1 The Nutrient Management Recommendations table shown below provides an annual summary of the nutrient . management plan developed for this operation. This table provides an utrient balance for the listed fields and crops for each year of the plan. Required nutrients are based on the realistic yields of the crops to be grown, their nutrient requirements and soil test results. The quantity of nutrient supplied by each source is also identified. The total quantity of nitrogen applied to each crop should not exceed the required amount. However, the quantity of other nutrients applied may exceed their required amounts. This most commonly occurs when manure or other byproducts are utilized to meet the nitrogen needs of the crop. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. In such situations, additional nitrogen applications from nonorganic sources may be required to supply the recommended amounts of nitrogen. Nutrient Management Recommendations Test YEAR 1 .. N (lbs/A) P205 (lbs/A) K2O (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (Ibs/A) Cu (lbs/A) Lime (tons/A) Tract Fcres Field Ill 2 Req'd Nutrients 147 0 0 0 0 0 0 0 Apr. Period 1,50 2/15-6/30 Supplied By: �A n " , ' < nri } 7'ig ."s;r: , g i u WIVIN CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 141 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 132 bu. 01-31-05 Manure 0 01 0 0 0 0 01 0 P Removal I Rating 58 Ibs/ac. Unknown BALANCE 0 0 0 0 0 0 0 0 act Field 111 2 Req'd Nutrients 129 0 0 0 0 0 0 0 res App. Period 1.50 9/14/30 Supplied By: -..'Ja-+Fi�ri•,i` :7 f. � .+l.w'� ^J�-. m:lu�ti.S� �A .� lAi1s! 3 CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 129 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 64 bu. 01-31-05 Manure 0 0 0 0 0 0 0 0 P Removal LRating 321bslac. Unknown BALANCE 0 0 0 0 0 0 0 0 Tract Field 111 4 Req'd Nutrientsl 131 0 0 0 0 0 0 0 Acres A pp• Period 3.1.2 9/1 4/30 Supplied B pP y t " ` ;zK: "i� f µ0 " .ni:lld Ms "e.r; 4 �. r �„+,' �raaa"k4�.�t .r;95r cr a f , "+ � .t .�� , r":': ir, r:+5.r is ,�1t' u3rr ��t:� '< �t�" CROP Wheat, Grain Starter 0 0 0 0 0 0 0 Commercial Fert, 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 65 bu. 02-02-04 Manure 131 71 179 16 1 31 1 0 P Removal Rating 33 ]bs/ac. Unknown BALANCE 0 71 179 16 1 3 1 0 Tract Field Ill 4 Req'd Nutrients ] so 0 0 0 0 0 0 0 Acres App. Period 3.12 2/15-6130 Supplied $y: 1'�''lK�'�zr� ;, ;$��c�: 1 + .' CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date D5 bu. 02-02-04 Manure 150 82 205 18 1 3 I 0 P Removal I Rating 59 lbs/ac. Unknown BALANCE 0 82 205 18 1 3 l 0 046 Database Version 3.1 Date Printed: 6/14/2005 NMR Page I of 5 Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (lbs1A) K20 (lbs/A) Mg (lbs/A) Mn (lbs1A) Zn (lbs/A) Cu (lbs1A) Lime (tons/A) Tract Field 111 5 Req'd Nutrients 150 0 0 0 0 0 0 0 Acres App. Period 11.09 2115 b/30 Supplied By; � i -. •, �;F' x?..a r } ^ 2 ck t"� -_ * �'iJr w a y ?`r Ew � lkl 4- , 3 t r it m e -a` e .� �,� y . " `� . , , r �' W.._ °" r S CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert, 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 135 bu. 02-02-04 Manure 150 82 205 18 1 3 1 0 P Removal Rating 59 lbslac. Unknown BALANCE 01 82 205 18 1 3 1 0 Tract Field 111. 5 Req'd Nutrients 131 0 0 0 0 0 0 0 Acres App. Period 11.09 9/1-4/30 Supplied By: "+ ; 4r :1 r. Y4 f CROP Wheat; Grain Starter 0 0 0 0 0 0 0 0 Commercial Feat. 0 0 0 0 0 01 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 65 bu. 02-02-04 Manure 131 71 179 161 1 3 1 0 P Removal Rating 33 Ibslac. Unknown BALANCE 0 71 179 161 1 3 1 0 Tract Field Ill 7 Req'd Nutrients 244 0 40 0 0 0 0 0 Acres App, Period 3.95 8lI-7131 Supplied By: �r ,�s7. +r µY a Sr• e.i 'r ..i's> c "> CROP Fescue Hay Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 01 0 0 0 0 RYE Sample Date 5.5 Tons 09-13-04 Manure 244 133 334 30 1 6 1 0 P Removal Rating 86 Ibs/ac. Unknown BALANCE 0 133 294 30 1 6 1 0 Tract Field Ill 8 Req'd Nutrients 150 D SD 0 0 0 0 0 Acres App. Period 4.62 2/15-6/30 Supplied By: �,. - - � ';;t`.. Sz u ; _. ... , v ^.a: _. M:._. ,.. k , CROP Corn, Grain Starter D 0 0 0 0 0 0 0 Comm erci al Fert. 0 0 0 0 0 0i 0 0 Soil Series Appling Residual 01 0 0 0 0 0 0 0 RYE I Sample Date 135 bu. 09-13-04 Manure 150 82 205 16 1 3 1 0 P Removal Rating 59 lbs/ac. Unknown BALANCE 0 82 155 18 1 3 1 0 Tract Field ill 8 Req'd Nutrients 131 0 50 0 0 0 0 0 Acres App. Period 4.62 9/1-4130 Supplied By: '7 e�{.F v�r, ; ; YSvr 1� V�,,,, , �. � ,�x�; ,� h � �?: � � ,; .��',�; �` RONNIE CROP wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 01 0 0 RYE I Sample Date 65 bu. 1 09-13-04 1 Manure 131 71 179 16 1 3 1 0 P Removal Rating 33 Ibslac. Unknown BALANCE 1 0 71 129 16 1 3 1 0 �946 Database Version 3.1 Date Printed: 6/14/2005 NMR Page 2 of 5 Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (lbs/A) K20 (lbs/A) I Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3210 1 Req'd Nutrients 131 0 0 0 0 0 0 0 Acres App. Period 6.50 9/1-4/30 Supplied By: R%MR�2 ,R.-kif CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Feat. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 01 0 0 0 RYE I Sample Date 65 bu. 09-13-04 Manure 131 71 179 16 1 3 1 0 P Removal I Rating 33 lbs/ac. Unknown BALANCE 0 71 179 16 1 3 1 0 Tract I Field 3210 1 Req'd Nutrients 150 0 0 0 0 Acres App. Period 6.50 2/15-6/30 Supplied By:�u:5'r �^. t M°P C J�?•1. ,y 3,eKp �8 Y-` I r y00 4 ti� 1 �'. aid' �1 ',k{ ?� �l�ry0 IZk "'-_IlE•f' r .lYk CROP Corn, Grain I Starter 0 0 0 0 0 0 0 0 Commercial Fert. 01 0 01 0 0 0 0 0 Soil Series APPling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 135 bu. 09-13-04 Manure 150 82 205 18 1 3 1 0 P Removal Rating 59 lbs/ac. Unknown BALANCE 0 82 205 18 1 3 1 0 Tract Field 3210 2 Req'd Nutrients 150 0 0 0 0 0 0 0 Acres A PP� Period 2.34 2/15-6/30 Supplied By: PP CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series APPling Residual 01 0 0 0 0 0 0 0 YE Sample Date 135 bu. 09-13-04 Manure 150 82 205 18 1 3 1 0 P Removal Rating 59 Ibs/ac. Unknown BALANCE 0 82 205 18 1 3 1 0 Tract Field 3210 2 Req'd Nutrients 131 0 0 0 0 0 0 0 Acres App. Period 2.34 9/1 4/30 Supplied BY rti1 J, s'. .fix ♦i MEMO NNE# CROP Wheat, Grain Starter 4 0 0 0 0 0 0 0 Commercial Fert, 0 0 0 0 0 0 0 0 Soil Series APPling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 65 bu. 09-13-04 Manure 131 71 179 16 1 3 1 0 P Removal Rating 33 Ibs/ac, Unknown BALANCE 0 71 179 16 1 3 1 0 NOTE: Symbol * means user entered data, *946 Database Version 3.1 Date Printed: 6/14/2005 NMR Page 3 of 5 Nutrient Management Recommendations Test YEAR 2 N (Ibs/A) P205 (lbs/A) K20 (lbs/A) Mg (ibs/A) Mn (Ibs/A) Zn (Ibs/A) Cu (lbs/A) Lime (tons/A.) Tract Field Ill 2 Req'd Nutrients 175 0 0 0 0 0 0 0 Acre§ A PP� Period 1.50 4/1-9/15 Supplied $ PP Y• '� '], � _i:i r ! i i� 'isNst�!�A1 FIRM iG.� v:ln . d ��i :iSYY i �'�' WN CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 Commercial Fert. 175 0 0 0 0 0 0 Soil Series Appling Residual 0 071 0 0 0 0 0 RYE Sample Date 45 bu. 01-31-05 Manure 0 0 0 0 0 0 0 0 P Removal Rating 36 Ibs/ac. Unknown BALANCE 0 0 0 0 0 0 0 0 Tract Field 111 4 Req'd Nutrients 179 0 0 0 0 0 0 0 Acres IA pp. Period PP 3.12 4/1-9/15 Supplied B PP Y i<,i ►sryr. .c�� ,, , k,g„i 6 a Ex�br �.� , A. �' CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 01 0 0 Commercial Fert, 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 46 bu. 02-02-04 Manure 179 98 245 22 1 4 1 0 Rating 37 Ibs/ac. Unknown BALANCE 0 98 245 22 1 4 1 0 FRemoval Tract Field 111 5 Req'd Nutrients 179 0 0 0 0 0 0 0 Acres App. Period I1.09 4/1-9/15 Supplied By:" ° a}, t,,a dcpx 40142 =�.w� is",ti3 7+ . 1 CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 Sample Date 46 bu, 02-02-04 Manure 179 981 245 22 1 4 1 0 P Removal Rating 37 lbs/ac. Unknown BALANCE 0 98 245 22 1 4 1 0 Tract Field 111 8 Req'd Nutrients 179 0 50 0 0 0 0 0 Acres App. Period 4.62 4/1-9/15 Supplied BY +. t. yrta ti� fink,.' x' ':'jr�TE�a r f h + , CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date - 46 bu, 09-13-04 Manure 179 98 245 22 1 4 1 0 P Removal Rating 37 Ibs/ac. Unknown BALANCE 01 98 195 22 1 41 1 0 Tract Field 3210 1 Req'd Nutrients 179 0 0 0 0 0 0 0 Acres jApp. Period 6.50 4/1-9/15 Supplied By: AO'k f s 4� A. CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 01 0 0 RYE I Sample Date 46 bu. 09-13-04 Manure 179 98 245 22 1 4 1 0 P Removal Rating 37 Ibs/ac. Unknown BALANCE 0 98 245 22 1 4 1 0 046 Database Version 3.1 Date Printed: 6/14/2005 NMR Page 4 of 5 Nutrient Management Recommendations Test YEAR, 2 N (lbs1A) P205 (lbs/A) K20 (]bs/A) Mg (lbs1A) Mn (lbs/A) Zan (1bsIA) Cu (lbs/A) Lime (tons/A) 'tract Field 3210 2 Req'd Nutrients 179 0 0 0 0 0 0 0 Acres App. Period 2.34 4/1-9/15 Supplied By: ?" Mu I WN W x F 4t CROP Soybeans, Martured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert, 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 01 0 01 0 RYE Sample Date 46 bu. 1 09-13-04 Manurel 1791 98 2451 22 1 4 1 0 P Removal Rating 37 lbslac. Unknown BALANCE I _01 981 2451 22 1 1 4 I 0 NOTE: Symbol * means user entered data. L' 046 Database Version 3.1 Date Printed: 611412005 NMR Page 5 of 5 • • Waste Utilization Plan Amendment for Thomas Farms (Allensville Unit) % .3 -- %C' The owners of this animal operation plan to change the cropping system. The updated cropping system will be on a 2-year rotation of Corn, Wheat, and double -cropped Soybeans in all of the fileds in the current plan except for Field 7 on Tract 111. That field will be in fescue hay year-round. A current Nutrient Management Plan was generated on the Nutrient Management Software and is attached. Also, a field addition has been made. Field 10 on Tract 111 is a 3.5 acre field planted in Pines in 1998 on a 7X10 grid to achieve 600-620 trees per acre. Pine trees are not currently in the Nutrient Management Software; therefore, the numbers for that crop are listed in this narrative. Field 10, the pines, will utilize 80 pounds of PAN per acre equalling 280 pounds.per year or 560 pounds of PAN over 2 years. Please see attached correspondance from the NCSU Forestry Department. By adding the amount of PAN utilized by the pines and the cropping system in the Nutrient Management Software, the total PAN applied is 7569 in year 1; and 7647 in year 2 for a total of 15,216 lbs. over a 2 year period. That equals 3,020,031 gallons in year 1; and 3,051,153 in year 2 for a total of 6,071,184 gallons over a 2 year period. The animal operation produces a total of 6820 pounds of PAN each year for a 2-year total of 13,640 lbs. That equals 2,721,180 gallons for each year for a 2-year total of 5,442,360 gallons. This indicates a PAN deficit of 749 lbs for year 1; 827 lbs for year 2; for a 2-year total deficit of 1576. That equals 298,851 gallons for year 1; 329,973 gallons for year 2; for a 2- year total deficit of 628,824 gallons. (Lan wner) Date g a5 (Technic Specilist(s)) to • The Required Soil Test Values shown in the following table provide a summary of recommended actions that should be taken if.soil tests indicate excessive levels of copper or zinc. Fields that receive manure must have an annual soil analysis forthese elements. High levels of zinc and copper can adversely affect plant growth. Alternative crop sites must be used when the concentration of these metals approach excessive levels. Site life can be estimated by dividing the amount of copper and zinc to be applied in lbs/acre by 0.036 and 0.071, respectively and multiplying the result by 0.85. By adding this quantity to the current soil index for copper or zinc, we can predict life of the site for waste disposal. In addition to copper and zinc indices, this table also provides a summary of lime recommendations for each crop based on the most recent soil sample. Application of lime at recommended rates is necessary to maintain soil pH in the optimum range for crop production . Re uired Soil Test Values Tract Field Crop pH Lime Recom. (tons/acre) Cu-1 Copper Recommendation Zn-1 Zinc Recommendation 111 2 Corn, Grain 6.0 0.0 1247 None 857 None 111 2 Wheat, Grain 6.0 0.0 t247 None 857 None 111 2 Soybeans, Manured, Double Crop 6.0 0.0 1247 None 857 None 111 4 Corn, Grain 6.0 0.0 559 None 448 None 111 4 Wheat, Grain 6.0 0.0 559 None 448 None 111 4 Soybeans, Manured, Double Crop 6.0 0.0 559 None 448 None 111 5 Corn, Grain 6.3 0.0 1971 None 1372 None 111 5 Wheat, Grain 6.3 0.0 1971 None 1372 None 111 5 Soybeans, Manured, Double Crop 6.3 0.0 1971 None 1372 None 111 7 Fescue Hay 5.8 0.4 2083 Caution: Seek alternative site where possible. Maintain pH at 6.0. 1606 None 111 8 Corn, Grain 5.8 0.4 2110 Caution: Seek alternative site where possible. Maintain pH at 6.0. 1654 None 111 8 Wheat, Grain 5.8 0.0 2110 Caution: Seek alternative site where possible. Maintain pH at 6.0. 1654 None 111 8 Soybeans, Manured, Double Crop 5.8 0.0 2110 Caution: Seek alternative site where possible. Maintain pH at 6.0. 1654 None 3210 1 Corn, Grain 6.0 0.0 1232 None 1003 None 3210 1 Wheat, Grain 6.0 0.0 1232 None 1003 None 3210 1 Soybeans, Manured, Double Crop 6.0 0.0 1232 None 1003 None 3210 2 Corn, Grain 5.8 0.4 1776 None 1269 None 3210 2 Wheat, Grain 1 5.8 0.01 1776 None 1269 None 3210 2 Soybeans, Manured, Double Crop 1 5.8 1 0.01 1776 None 1269 None -------------------------------------------------------------------------------------------- • -------------------------------------------------------------------------------------------------------------------------------------------------- 551946 Database Version 3.1 Date Printed: 06-14-2005 STV Page 1 of 1 The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for isludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate Ib/ac Maximum Sludge Application Rate 1000 gallac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Farrow -Finish Lagoon Sludge- Standard Com 120 bu 150 13.16 37.73 75,46 113.19 ay 6 ton R.Y.E. 300 26.32 18.87 37.73 56.60 Soybean 40 bu 160 14.04 35.37 70.75 106.12 0 ---551946 Database Version 3.1 Date Printed: 06-14-2005 Sludge Page 1 of 1 • • • The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and Iess than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage Canacitv Source Name I Swine Farrow -Finish Lagoon Liquid Design Storage Capacity (Days) StartDate. 9/1 180 Plan Year Month Available Storage Capacity (Days) 1 1 52 1 2 49 1 3 56 1 4 87 1 5 117 1 6 148 1 7 122 1 8 96 1 9 107 1 10 120 1 11 115 1 12 106 2 1 97 2 2 91 2 3 85 2 4 93 2 5 94 2 6 122 2 7 162 2 8 180 2 9 180 2 10 154 2 11 129 2 12 101 * Available Storage Capacity is calculated as of the end of each month. ..---------------------------------- ••------------------------------ ----------- ----- ---1; 551946 Database Version 3.1 Date Printed: 06-14-2005 Capacity Page 1 of Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding Iess than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). 0 ------551946 Database Version 3.1 Date Printed: 6/14/2005 Specification Pale ] • • 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surfacers frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. --------------------------------------------------------------------------------------------------------------------- 551946 Database Version 3.1 Date Printed: 6/14/2005 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. • 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment Iagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. ---- - -- ---- -- -- - -- --- ---- ---- - ----- -----..---- --- --.... 551946 Database Version 3.1 Date Printed: b114/2005 Specification Page 3 • LJ 0 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. ------------------------------------------------------------------------ --- ------------------------------- ----------- - 551946 Database Version 3.1 Date Printed: 6/14/2005 Specification Page 4 0 Crop Notes The following crop note applies to field(s): 1, 2, 4, 5, 8 Corn Piedmont In the Piedmont, corn is normally planted when soil temperatures reach 52 to 55 degrees fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1-2" deep. Plant populations should be determined by the hybrid being planted. Increase the seeding rate by 10% when planting no -till. Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool, wet soil, banded phosphorus will be more available to the young plants. An accepted practice is to apply 20-30 lbs/acre N and 20-30 lbs/acre phosphorus banded as a starter and the remaining N behind the planter. The total amount of N is dependent on soil type. When including a starter in the fertilizer program, the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn. Timely management of weeds and insects are essential for corn production. The following crop note applies to field(s): 1, 2, 4, 5, 8 Wheat: Piedmont In the Piedmont, wheat should be planted from October 10-November 3. Plant 22 seed/drill row foot at J& 1-1 1/2" deep and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Adequate depth control when planting the wheat is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbslacre N at planting. Increase the N at planting to 40 lbslacre in no -till wheat. Apply phosphorus and potash according to soil test recommendations at this time. The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weeds are essential for profitable wheat production. •------- -- 1-9- --------------------ata----as----- V--- -ersio--n ---3.1-------------D----ate ---Pr--in -----d:---- Q-6-1- --4------00---------•--------r-o-P ---ot--e-----a-ge ----1 ---o--f ---2 ----------- 559Dbe e25 CNP The following crop note applies to field(s): 7 0 Fescue: Piedmont Adaptation: Well -adapted. In the Piedmont, tall fescue can be planted Aug. 20 to Oct. 10 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 lb/ac., for drilled use 15 to 20 ib/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 lb/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% to 50% for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 1, 2, 4, 5, 8 Double -Crop Soybeans, Piedmont Double -crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no -tilling soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 4-6 seed/row foot for 7-8" drills and 6-8 seed/row foot for 15" rows. Seeding depth should be 1-1 . 1/2" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-30 lbs/acre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. 0 -------551946 Database Version 3.1 Date Printed: 06-1412005 Cro Note Pa e 2 of 2 Nutrient Management Plan For Animal Waste Utilization 06-14-2005 This plan has been prepared for: This plan has been developgd:'by: I =3 ` Thomas Farms Timmy Thomas 8251 Oxford Rd. Timberlake, NC 27583 336-364-2633 Kim Woods NCCES-Person County 304 S. Morgan St. Rm 123 Roxboro, NC 2 75 73 336-599-1195 Inj Developer Si afore Type of Plan: Nutrient Management with Both Manure and Fertilizer Own er/Manager/Producer Agreement . I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. Si tore (owner) Date ignature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By: ��p _ - 13-C 5 Technical Sp ialist Signature Date ------------------ ----- .- ._...--------------•---------._._... 551946 Database Version 3.1 Date Printed: 06-14-2005 Cover Page 1 0 0 Waste Utilization Plan Amendment for Thomas Farms (Allensville Unit) The owners of this animal operation plan to change the cropping system"'The updated cropping system will be on a 2-year rotation of Corn, Wheat, and double-cro0ped- Soybeans in all of the fileds in the current plan except for Field 7 on Tract 111. That field"-��, will be in fescue hay year-round. A current Nutrient Management Plan was generated on the Nutrient Management Software and is attached. Also, a field addition has been made. Field 10 on Tract 111 is a 3.5 acre field planted in Pines in 1998 on a 7XI0 grid to achieve 600-620 trees per acre. Pine trees are not currently in the Nutrient Management Software; therefore, the numbers for that crop are listed in this narrative. Field 10, the pines, will utilize 80 pounds of PAN per acre equalling 280 pounds per year or 560 pounds of PAN over 2 years. Please see attached correspondance from the NCSU Forestry Department. By adding the amount of PAN utilized by the pines and the cropping system in the Nutrient Management Software, the'total PAN applied is 7569 in year 1; and 7647 in year 2 for a total of 15,216 lbs. over a 2 year period. That equals 3,020,031 gallons in year 1; and 3,051,153 in year 2 for a total of 6,071,184 gallons over a 2 year period. The animal operation produces a total of 6820 pounds of PAN each year for a 2-year total of 13,640 lbs. That equals 2,721,180 gallons for each year for a 2-year total of 5,442,360 gallons. This indicates a PAN deficit of 749 lbs for year 1; 827 lbs for year 2; for a 2-year total deficit of 1576. That equals 298,851 gallons for year 1; 329,973 gallons for year 2; for a 2- year total deficit of 628,824 gallons. (Land,Kwner) Date -7 (TechnicaOSpecilist(s)) 'bate Subject: Re: Pine Trees From: Doug Frederick <doug_frederick@nesu.edu> •Date: Mon, 18 Apr 2005 09:37:38 -0400 To: rick_hamilton@ncsu.edu CC: Kimberly D Woods <kim_woods@ncsu.edu> • • Kim - Sorry it has taken me a long time to provide some input to your questions. I agree with Rick and his comments. I have found from experience that young hardwood trees cannot tolerate hog -waste spraying at high rates. I have not sprayed pines with hog waste but 100 pounds of PAN on trees less that 10 years old may cause some burn. I too would suggest you ask Dr. Lee Allen since he has done a great deal of work with nutrition of loblolly pine. His email is: lee allen@ncsu.edu Doug Rick Hamilton wrote: Hello Kim An Appling soil is well -drained and aerated, so we won't see accelerated denitrification like we see on poorly drained sites. My recommendation would be to not exceed 100 pounds PAN per year. Preferably, I'd like to see the site rest every third or fourth year, especially until these trees get a little more age and size. The few folks I know that are applying to forests are applying to pastures and fields in the growing season and are using the woods as a dormant season backup. It is OK legally to apply to forest land year around.... By copy to Doug, I'm asking him to weigh in and give feedback if he has other inclinations. Best, rick Kimberly D Woods wrote: 1 Rick Hamilton wrote: Hello Kim I tried to reply to you the other day, but was on wireless and don;t know if it went out. Doug Frederick is the guru here on hog waste application to trees. It would be helpful if we knew some information like the age of the trees, soil type, frequency of application, number of trees per acre. From that information, we can try to settle on a PAN application rate. Best, rick Kimberly D Woods wrote: I Dr. Hamilton, I am the livestock agent in Person Co. I have a swine producer that wants to add a field of Pine Trees to their Waste Utilization Plan, to spray swine effluent on these Pines. I have not been able to get in touch with anyone in the Forestry Dept that can give me an idea of how much and when the effluent can be applied. Dr. Deanna Osmond in the Soil Science Dept suggested I contact Dr. Lee Allen, but I have not been able to reach him. Any help you could provide would be greatly appreciated. Thanks, Kim ir. Hamilton, The trees were planted in 1998. They were planted on a 7X10 plan so there should be somewhere around 600-620 trees per acre. The soil type is Appling. The owners would like to apply as often as possible throughout the year. That would help maintain a low level in their lagoon. I realize that application only once a year may be as much as Pine Trees can tolerate. Any help you can give me would be greatly appreciated. Thanks, Kim Nutrients applied in accordance with this plan will be supplied from the 10 following source(s): Commercial Fertilizer is included in this plan. S13 Swine Farrow -Finish Lagoon Liquid waste generated 2,724,280 gals/year by a 260 animal Swine Farrow -Finish Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 6275 Incorporated 10776 Injected 11867 Irrigated 6820 Max. Avail. PAN (Ibs) * Actual PAN Applied Obs) FAN Surplus/ Deficit (lbs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 6,820 7289 -469 2,911,591 -187,311 Year 2 6,820 7367 -547 2,942,538 -218,258 • . Note: In source iD, S means standard source, U means user defined source. * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this sot 551946 Database Version 3.1 Date .Printed: 06-14-2005 Source Page 1 of I The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield ®stimates are also provided for each crop, as well as the crop's P205 Removal Rate. The Leaching Index (LI) and the Phosphorous Loss Assessment Tool (PLAT) Rating are also provided for each Feld, where available. 4 If field's PLAT Rating is High, any planned manure application is limited to the phosphorous removal rate of the harvested plant biomass for the crop rotation or multiple years in the crop sequence. Fields with a Very High PLAT Rating should receive no additional applications of manure. Regardless of the PLAT rating, starter fertilizers may be recommended in accordance with North Carolina State University guidelines or recommendations. The quantity of P205 applied to each crop is shown in the following table if the field's PLAT rating is High or Very High. Planned Crops Summary Tract Field Total Acres Useable Acres Plat Rating Ll Soil Series Crop Sequence RYE P mo Reval obstacre) A Applied (Ibs/acre) 111 2 1.50 1.50 Unknown 5.3 Appling Corn, Grain 132 bu. 58 NIA Wheat, Grain 64 bu. 32 NIA Soybeans, Manured, Double Crop 45 bu. 36 NIA Ili 4 3.12 3.12 Unknown 4.9 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 65 bu, 33 NIA Soybeans, Manured, Double Crop 46 bu. 37 NIA 111 5 11.09 11.0 Unknown 5.0 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 65 bu. 33 NIA Soybeans, Manured, Double Crop 46 bu. 37 NIA 111 7 3.95 3.95 Unknown 5.2 Appling Fescue Hay 5.5 Tons 86 NIA 111 8 4,62 4,62 Unknown 4.8 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 65 bu. 33 NIA Soybeans, Manured, Double Crop 46 bu. 37 NIA 3210 1 6.50 6.50 Unknown 4.9 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 65 bu, 33 NIA Soybeans, Manured, Double Crop 46 bu. 37 NIA 3210 2 2.34, 2.34 Unknown 5.0 Appling Corn, Grain 135 bu, 59 N/A Wheat, Grain 65 bu. 33 N/A Soybeans, Manured, Double Crop 46 bu. 37 N/A PLAN TOTALS: 33.12 33,12 • 551946 Database Version 3A Date Printed 6/14/2005 NOTE: Symbol * means user entered data. PCs Page 1 of 2 4 LI Potential Leaching Technical Guidance Low potential to contribute to soluble None < 2 nutrient leaching below the root zone. >= 2 & Moderate potential to contribute to Nutrient Management (590) should be planned. <= 10 soluble nutrient leaching below the root zone. High potential to contribute to Nutrient Management (590) shoal d be planned. Other conservation practices that improve soluble nutrient leaching below the the soils available water holding capacity and improve nutrient use efficiency should be > 10 root zone. considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). P Loss Estimate gbs/acrelwar) P Loss Index Rating P Management Recommendation 0.0 to 1.0 0 - 25 Low No adjustment needed; N based application > 1.0 to 2.0 25 - 50 Medium No adjustment needed; N based application > 2.0 to 4.0 1 51 - 100 1 High Application limited to crop P removal > 4.0 1 > 100 1 Very High Starter P application only • r 1 U 551946 Database Version 3.1 Date Printed 6/14/2005 PCS Page 2 of 2 NOTE: Symbol * means user entered data. ! 0 The WIPUtilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year 1 Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Req'd (Ibs1A) Comm Fert. Nutrient Applied (lbs/A) Res. (lbs/A) Applic. Method Manure PA Nutrient Applied (Ibs1A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) solid Manure Applied (Field) N N N N 1000 gal/A Tons 1000 gals tons 111 2 NIA Appling 1.50 1.50 Com, Grain 132 bu. 2/15-6/30 147 147 0 NIA 0 0.00 0.00 0.00 0.00 111 2 NIA Appling 1.50 1.50 Wheat, Grain 64 bu. 1 9/14/30 129 129 0 NIA 0 0.00 0.00 0.00 0.00 111 4 S13 Appling 3.12 3.12 Corn, Grain 135 bu. 2/15-6/30 150 0 0 brig. 150 59.92 0.00 186.94 0.00 111 4 S13 Appling 3.12 3.12 Wheat, Grain 65 bu. 9/1-4130 131 0 0 Irrig. 79 31.40 0.00 97.96 0.00 111 5 S13 Appling 11.09 11.09 Com, Grain 135 bu. 2/15-6/30 150 0 0 Inig. 150 59.92 0.00 664.47 0.00 111 5 S13 Appling 11.09 11.09 Wheat, Grain 65 bu. 9/14/30 131 0 0 brig. 79 31.40 0.00 348.18 0.00 111 7 S13 Appling 3.95 3.95 Fescue Hay 5,5 Tons 811-7/31 244 0 0 Irrig. 244 97.46 0.00 384.98 0.00 111 8 S13 Appling 4.62 4.62 Com, Grain 135 bu. 2/15-6/30 ISO 0 0 Irrig. 150 59.92 0.00 276.81 0.00 ill 8 S13 Appling 4.62 4.62 Wheat, Grain 65 bu. 9/14/30 131 0 0 Irrig. 79 31.40 OX 145.05 0.00 3210 1 S13 Appling 6.50 6.50 Com, Grain 135 bu. 2115-6/30 150 0 0 brig. 150 59.92 0.00 389.46 0.00 3210 1 S13 Appling 6.50 6.50 Wheat, Grain 65 bu. 9/14/30 131 0 0 brig. 79 31.40 000 204.07 0.00 3210 2 S13 Appling 2,34 2.34 Corn, Grain 135 bu. 2/15-6/30 150 0 0 Irrig. 150 59.92 0.00 140.20 0.00 3210 2 S13 Appling 2,34 2.34 1Wheat, Grain 65 bu. 9/1-4130 131 0 0 Irrig. 74 31.40 0.00 73.47 0.00 551946 Database Version 3,1 Date Printed: 6/14/2005 WUT Page 1 of 3 Waste Util n Table ear l 9 Nitrogen Comm Res. Manure Liquid Solid Liquid Solid PA Fert. (Ibs/A) PA ManureA Manure Manure Manure Nutrient Nutrient Nutrient pplied Applied Applied Applied Req'd Applied Applied (acre) (acre) (Field) (Field) (ibs/A) (Ibs/A) (lbs/A) 1000 Source Total Use. Applic. Applic. Tract Field ID Soil Series Acres Acres Crop RYE Period N N N Method N gal/A Tons 1000 gals tons Total A" Applied, 1000 gallons PP g 2,911.5 "'"^'� Total Produced, 1000 gallons 2,724.28 �,^ Balance, 1000 gallons -187.31 -1F-'1 --rNj Total Applied, tons ..t-sty=,fit 0.00 Total Produced, tons sus '--_ 0.00 Balance, tons ri 0.00 Notes: 1. In the tract column, symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 551946 Database Version 3.1 Date Printed: 6/14/2005 WUT Page 2 of 3 Waste Utilgan Tahle Ward 0 Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE APpbc. Period Nitrogen PA Nutrient Raid (Ibs/A) Comm Fert. Nutrient Applied pbs/A) Res. (lbs/A) Applic. Method Manure PA Nutrient Applied (lbs/A) Liquid ManumA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N N IOOD I gal/A Tons 1 1000 gals tons 111 2 NIA Appling 1.50 1.50 Soybeans, Manured, Double Crop 45 bu. 4/1-9/15 175 175 0 NIA 0 0.00 0.00 0.00 0.00 111 4 S13 Appling 3.12 3.12 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 Irrig. 52 20.93 0.00 65.30 0.00 111 4 S13 Appling 3.12 3.12 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 I79 0 0 brig. 179 71.50 0.00 223.08 0-00 111 5 S13 Appling 11.09 11.09 Wheat, Grain 65 bu. 9/14/30 131 0 0 Irrig, 52 20.93 0.00 232,12 0.00 111 5 SI3 Appling 11.09 11.09 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 Irrig. 179 71.50 0.00 792.93 0.00 i l t 7 S13 Appling 3.95 3,95 Fescue Hay 5.5 Tons 8/1-7/31 244 0 0 ]nig. 244 97,46 0,00 384,98 0.00 111 8 S13 Appling 4.62 4.62 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 Irrig. 52 20.93 0.0 96.70 0.00 III 8 S13 Appling 4.62 4.62 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 Irrig. 179 71,50 0.00 330.33 0.00 3210 1 S13 Appling 6,50 6.50 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 Irrig. 52 20.93 0.00 136.05 0.00 3210 1 S13 Appling 6.50 6.50 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 Irrig, 179 71.50 0.00 464.75 0.00 3210 2 S 13 ppling 2.34 2.34 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 Irrig. 52 20.93 0.00 48.98 0.00 3210 2 SI3 Appling 2.34 2.34 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 =Irng-179 7I.50 0.00 167.31 0.00 Total Applied, 1000 gallons 2,942.54 Total Produced, 1000 gallons 2,724.28',`=s )'sw Balance, 1000 gallons -218.26 ,+„z Total Applied, tons 0.00 Total Produced, tons 0.00 Balance, tons 0.00 Notes: 1. In the tract column, -- symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 551946 Database Version 3.1 Date Printed: 6/14/2005 WUT Page 3 of 3 • • The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 111 4 Appling 0.45 1.0 111 5 Appling 0.45 1.0 111 7 Appling 0.45 1.0 111 8 Appling 0.45 1.0 3210 1 Appling 0.45 1.0 3210 1 2 jAppling 0.45 1.0 551946 Database Version 3.1 Date Printed 6/14/2005 1AF Page 1 of 1 NOTE: Symbol * means user entered data. The Nutrient Management Recommendations table shown below provides an annual summary of the nutrient management plan developed for this operation. This table provides a nutrient balance for the listed fields and crops for each year of the plan. Required nutrients are based on the realistic yields of the crops to be grown, their nutrient requirements and soil test results. The quantity of nutrient supplied by each source is also identified. The total quantity of nitrogen applied to each crop should not exceed the required amount. However, the quantity of other nutrients applied may exceed their'required amounts. This most commonly occurs when manure or other byproducts are utilized to meet the nitrogen needs of the crop. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. In such situations, additional nitrogen applications from nonorganic sources may be required to supply the recommended amounts of nitrogen. Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) - Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract I Field 111 2 Req'd Nutrients 147 0 0 0 0 0 0 0 Acres App. Period 1.50 2115 6/30 Supplied By: �r�fAY 4' -?, i �t rt __'M[hi• l �t ,, �E ♦ ,, r'F } �, r' �, f l4t<-:.; irkY J aC. *f'' w 3 t n 71 CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Comm erci al Fert. 147 0 0 0 0 0 0 0 Soil Series APPling Residual 0 0 0 0 0 0 0 0 RYE Sample Date 132 bu. 01-31-05 Manure 0 0 0 0 0 0 0 0 P Removal Rating 58 lbs/ac, Unknown BALANCE 0 0 0 0 0 0 0 0 Tract Field 111 2 Req'd Nutrients 129 0 U 0 0 0 0 0 Acres A PP- Period I,50 9/1-4/30 Supplied PP y 3' '.rz� ,t, r'Eh 4.'_r" <` �. , r, `t; '¢i l,.r.F . r } ti si=' , tt., �" t°rS, ;t ,x �,.l. i s Y'" 1�.SO CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Comm erci a] Fero. 129 0 0 0 0 0 0 0 Soil Series APPling Residual 0 0 0 0 0 0 0 0 RYE Sample Date 64 bu. 01-31-05 Manure 0 0 0 0 0 0 0 0 P Removal Rating 32 lbs/ac. Unknown BALANCE 0 0 0 0 0 0 0 0 Tract , Field 111 4 Req'd Nutrients 131 0 0 0 0 0 0 0 Acres App. Period 3.12 9/1-4/30 Supplied By: 3^ r{` ' y' �+r °, f � 't 1 CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 te 65 bu. 02-02-04 Manure 131 71 179 16 1 3 1 0g33 F lbs/ac. Unknown BALANCE 0 71 179 16 1 3 1 0 111 4 Req'd Nutrients 150 0 0 0 0 0 0 0 od 3.12 2/15-6/30 Supplied By: Lary`. CROP Corn, Grain Starter 0 0 0 01 0 0 0 0 Commercial Fert. 01 0 0 0 0 0 0 0 Soil Series APPling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 135 bu. 02-02-04 Manure 150 82 205 18 1 31 1 0 P Removal IRating 159 lbslac. lunknown BALANCE 1 01 821 205 I8 1 3 1 0 49946 Database Version 3.1 Date Printed: 6/14/2005 NMR Page I of 5 D i Nutrient Management Recommendations Test YEAR I N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 111 5 Req'd Nutrients 150 0 0 0 0 0 0 0 Acres lApp. Period 11.09 2/15-6/30 Supplied By: CROP Corn, Grain Starter 0 01 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 'U 135 bu. 02-02-04 Manure 150 82 205 18 11 3 1 0 P Removal I Rating 59 lbs/ac. Unknown BALANCE 0 82 205 18 1 3 1 0 Tract I Field 0 111 5 Req'd Nutrients 1311 0 0 0 0 0 0 0 Acres jApp. Period 11.09 9/1-4/30 Supplied By: rdS CROP Wheat, Grain Starter 0 a 0 0 0 0 0 0 Commercial Fert. 0 0 0 01 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 65 bu. 02-02-04 Manure 131 71 179 16 1 3 1 0 P Removal 1 Rating 33 lbs/ac, Unknown BALANCE 0 71 179 16 1 3 1 0 Tract I Field 111 7 Req'd Nutrients 244 0 40 0 0 0 0 0 Acres App. Period 3.95 8/1-7/31 Supplied By: o —.5 . CROP Fescue Hay Starter 01 0 0 0 0 0 0 0 Commercial Fert. 0i 0 0 0 0 0 0 0 Soil Series APPling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 5.5 Tons 09-13-04 Manure 244 133 334 30 1 61 1 0 P Removal I Rating 86 lbs/ac. Unknown BALANCE 0 133 294 30 1 6 1 0 Tract I Field 111 8 Req'd Nutrients 150 0 50 0. 0 0 0 0 Acres [App. Period 4.62 2/15-6/30 Supplied By: CROP Corn, Grain Starter 0 0 0 0 01 0 01 0 Comm erci al Fert. 0 0 0 0 01 0 0 0 Soil Series Appling Residual 0 0 01 0 0 0 0 0 RYE I Sample Date 135 bu. 09-13-.04 Manure 150 82 205 18 1 3 1 0 P Removal I Rating 59 lbs/ac. Unknown BALANCE 0, 82 155 18 1 3 1 0 Tract I Field 111 8 Req'd Nutrients 131 0 50 0 0 0. 0 0 Acres jApp. Period 4.62 911-4/30 Supplied By: R CROP Wheat Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 ol 01 ol 01 oi RYE I Sample Date 65 bu. I 09-13-04 Manure 1311 71 1 179 161 11 31 1 1 P Removal I Rating 33 lbs/ac. Unknown I BALANCE - 0 711 129 161 1 1 31 1 1 046 Database Version 3.1 Date Printed: 6/14/2005 NMR Page 2 of 5 10 Nutrient Management Recommendations Test r- L YEAR I N (lbs/A) P205 (lbs/A) K20 (Ibs/A) Mg (lbs/A) Mn (Ibs/A) zn (IWA) Cu (lbs/A) Lime (tons/A) Tract T77e I d 3210 1 Req'd Nutrients 131 0 0 0 0 0 0 0 �AcmsApp. Period 6.50 911-4/30 Supplied By: CROP Wheat, Grain Starter G 0 0 0 0 0 0 0 Comm erci a] Fert. 1 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample RYE Date 65 bu. 09-13-04 Manure 131 71 179 16 1 31 1 0 P Removal Rating - mo 33 lbs/ac. Unknown BALANCE 0 71 179 16 1 3 1 0 Tract T Tract I Field 3210 1 Req'd Nutrients 150 0 0 0 0 0 0 0 App. Period 6.50 2/15-6/30 Supplied By: CROP Corn, Grain Starter 0, 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample RYE Date 135 bu. 09-13-04 Manure 150 82 205 is 1 3 1 0 P I Rating 59 lbs/ac. Unknown BALANCE 0 92 205 18 1 3 1 Q, T t Tract I Field 3210 2 Req'd Nutrients 150 0 0 0 01 0 App. Period 2,34 2115-6130 Supplied By: CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 01 0 0 01 0 RYE I Sample Date 135 bu. 09-13-04 Manure 150 82 205 is 1 3 1 0 P Removal I Rating 59 lbs/ac. Unknown BALANCE 0 821 205 18 1 3 1 0 Tract I Field 3210 2 Req'd Nutrients 131 0 0 0 0 0 0 0 Acres App. Period 234 9/1-4/30 Supplied By: CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 G 0 0 0 0 0 RYE I Sample Date 65 bu. lUnknown 09-13-04 Manure 131 71, 179, 161 1 31 1 P Removal I Rating 33 lbs/ac. I BALANCE 0 711 1791 161 11 31 1 1 0 NOTE: Symbol * means user entered data. 101946 Database Version 3,1 Date Printed: 6/14/2005 NMR Page 3 of 5 r- L Nutrient Management Recommendations Test 2 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) zn (lbs/A) Cu (lbs/A) Lime (tonslA) Tract Tract Field 111 2 Req'd Nutrients 175 0 0 0 0 0 0 0 AcresApp. Period 1.50 L4/1-9/15 Supplied By: �rl.�,��,�ll,�,'�l.i-�'.�-..-.,..",l";i��, V -A" CROP Soybeans, Manured, Double Crop Starter 0 ol 0 0 0 0 0 0 Commercial Fert. 175 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE j Sample Date 45 bu. 01-31-05 Manure 0 0 0 0 0. 0 0 01 Removal r P Removal I Rating 36 lbs/ac. Unknown BALANCE 0 0 0 0 0 0 0 0 Tract Tract Field MMMMMMM 111 4 Req'd Nutrients 1791 0 - 0 0 0 0 0 0 A Acres .s Acres App. Period 3.12 4/1-9/15 Supplied By: Ro5 7 E CROP Soybeans, Manured, Double Crop Starter 0 0 0 0- 0 0 01 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 E RYE I Sample Date RY 46 bu. 02-02-04 Manure 179 98 245 22 1 4 1 0 P Removal I Rating 37 lbs/ac, Unknown BALANCE 0 98 245 22 1 4 1 0 Tract I Field 111 5 Req'd Nutrients 179 0: 0 ol 0 0 01 0 Acres JApp, Period 1 1.09 4/1-9115 Supplied By: .j YZ CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 Commercial Fert, 01 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 46 bu. 02-02-04 Manure 179 981 245 22 1 4 1 0 P Removal I Rating 37 lbs/ac. Unknown BALANCE 0 981 245 22 1 4 1 0 Tract I Field M 111 8 Req'd Nutrients 179 0 50 0 0 0 0 Acres App. Period 4.62 4/1-9/15 Supplied By: CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 Sample RYE RYE I Sample Date 46 bu. 09-13-04 Manure 179 98 245. 22 1 1 4 1 01 Remov P Removal I Rating 37 lbs/ac. Unknown BALANCE 1 0 98 195 22 11 4 1 0 Tract Tract I Field 3210 1 Req'd Nutrients 179 0 0 0 0 0 01 0 A App. Period 6.50 4/1-9/15 Supplied By: CROP Soybeans, Manured, Double Crop Starter 0 01 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series lAppling Residual 0 0 0 0 0 0 0 0 RYE Sample Date 46 bu. 09-13-04 Manure 179 98 245 22 1 4 1 PR.,,val I Ratingl 37 lbs/ac. lUnknown I BALANCE - 01 98 245 22 11 4 11 •946 Database Version 3.1 Date Printed: 6/14/2005 NMR Page 4 of .5 CJ Nutrient Management Recommendations Test YEAR R FTract 2 N (lbs/A) P2O5 (lbs/A) K2O (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Field 3210 2 Req'd Nutrients 179 0 0 0 0 0 0 0 Acres lApp. Period 2.34 1 4/1-9/15 Supplied By: CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series [Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 1 46 bu. 09-13-04 Manure l 1791 981 245 22 1 4 1 01 P Removal I Rating[ 37lbs/ac. lUnknown I BALANCE 1 01 981 2451 22 l 4 1 0 1 NOTE: Symbol * means user entered data. 0 046 Database Version 3.1 Date Printed: 6/14/2005 NMR Page 5 of 5 • The Required Soil Test Values shown in the following table provide a summary of recommended actions that should be taken if soil tests indicate excessive levels of copper or zinc. Fields that receive manure must have an annual soil analysis for these elements. High levels of zinc and copper can adversely affect plant growth. Alternative crop sites must be used when the concentration of these metals approach excessive levels. Site life can be estimated by dividing the amount of copper and zinc to be applied in Ibs/acre by 0.036 and 0.071, respectively and multiplying the result by 0.85. By adding this quantity to the current soil index for copper or zinc, we can predict life of the site for waste disposal. In addition to copper and zinc indices, this table also provides a summary of lime recommendations for each crop based on the most recent soi I sample. Application of lime at recommended rates is necessary to maintain soil pH in the optimum range for crop production . Re uired Soil Test Value Tract Field Crop pH Lime Recom. (tonslacre) Cu-1 Copper Recommendation Zn-1 Zinc Recommendation 111 2 Com, Grain 6.0 0.0 1247 None 857 None 111 2 Wheat, Grain 6.0 0.0 1247 None S57 None 111 2 Soybeans, Manured, Double Crop 6.0 0.0 1247 None 857 None 111 4 Corn, Grain 6.0 0.0 559 None 448 None 111 4 Wheat, Grain 6.0 0.0 559 None 448 None 111 4 Soybeans, Manured, Double Crop 6.0 0.0 559 None 448 None 11 5 Com, Grain 6.3 0.0 1971 None 1372 None 111 5 Wheat, Grain 6.3 0.0 1971 None 1372 None 111 5 Soybeans, Manured, Double Crop 6.3 0.0 1971 None 1372 None 111 7 Fescue Hay 5.8 OA 2083 Caution. Seek alternative site where possible. Maintain pH at 6.0. 1606 None 111 8 Com, Grain 5.8 0.4 2110 Caution: Seek alternative site where possible. Maintain pH at 6.0, 1654 None 111 8 Wheat, Grain 5.8 0.0 2110 Caution: Seek alternative site where possible. Maintain EH at 6.0. 1654 None 111 8 Soybeans, Manured, Double Crop 5.8 0.0 2110 Caution: Seek alternative site where possible, Maintain pH at 6.0. 1654 None 3210 1 Com, Grain 6.0 0.0 1232 None 1003 None 3210 1 Wheat, Grain 6.0 0.0 1232 None 1003 None 3210 1 Soybeans, Manured, Double Crop 6.0 0.0 1232 None 1003 None 3210 2 Corn, Grain 5.8 0.4 1776 None 1269 None 3210 2 Wheat, Grain 5.8 0.01 1776 None 1269 None 3210 2 Soybeans, Manured, Double Crop 5.8 0.01 1776 1 None 1269 1 None ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ---- --- ---- 551946 Database Version 3.1 Date Printed: 06-14-2005 STV Page 1 of 1 r The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated fortheir suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is notpossible, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PAN Rate lb/ac Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Farrow -Finish Lagoon Sludge'- Standard Corn 120 bu 150 13.16 37.73 75.46 113.19 Hay 6 ton R.Y.B. 300 26.32 18.87 37.73 56.60 Soybean 40 bu 160 14.04 35.37 70.75 106.12 -- -------------------------------••------...-------..-..--------•-----------...----------------------------•------ -----•------------•---------------------- 551946 Database Version 3.1 Date Printed: 06-14-2005 Sludge Page I of 1 • The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is'defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. • Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage Canacitv Source Name I Swine Farrow -Finish Lagoon Liquid Design Storage Capacity (Days) Start Date 9/1 180 Plan Year Month Available Storage Capacity (Days) 1 1 52 1 2 49 1 3 56 1 4 87 I 5 117 1 6 148 1 7 122 1 8 96 1 9 107 1 10 120 1 11 115 1 12 106 2 1 97 2 2 91 2 3 85 2 4 93 2 5 94 2 6 122 2 7 162 2 8 180 2 9 180 2 10 154 2 11 129 2 12 101 * Available Storage Capacity is calculated as of the end of each month. •-------------------------------- -------------------------------------------------------------------------------------------------------------------- 551946 Database Version 3.1 Date Printed: 06-14-2005 Capacity Page I of I i Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate Iand to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical • data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, MRCS Field Office Technical Guide Standard 393 - Filter Strips). 0 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). ------------------------------------------------------ ---......-----------------------------.-- 551946 Database Version 3.1 Date Printed. 6/14/2005 Specification Page 1 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with • the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. ------------------------------------------------------------------------------- --- ---------------------- - - -- -- --------------------------------------------- 551946 Database Version 3.1 Date Printed: 6/14/2005 Specification Page'2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, Ieakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. -------------------------------------------------------------- I ---------------------------------------------------------------------------------------------------- 551946 Database Version 3.1 Date Printed: 6/14/2005 Specification Page 3 0 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. ------------- - ------ ------------ ----------------------- ------------ ----------- I ------------ ----------------------------------- ----- 551946 Database Version 3.1 Date Printed: 6/14/2005 Specification Page 4 n Crop Notes The following crop note applies to field(s): 1, 23 41 5, 8 Corn Piedmont In the Piedmont, corn is normally planted when soil temperatures reach 52 to 55 degrees fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1-2" deep. Plant populations should be determined by the hybrid being planted. Increase the seeding rate by 10% when planting no -till. Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool, wet soil, banded phosphorus will be more available to the young plants. An accepted practice is to apply 20-30 lbs/acre N and 20-30 lbs/acre phosphorus banded as a starter and the remaining N behind the planter. The total amount of N is dependent on soil type. When including a starter in the fertilizer program, the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn. Timely management of weeds and insects are essential for corn production. The following crop note applies to field(s): I, 2, 4, 5, 8 Wheat; Piedmont In the Piedmont, wheat should be planted from October 10-November 3. Plant 22 seed/drill row foot at M 1-1 1/2" deep and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Adequate depth control when planting the wheat is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Increase the N at planting to 40 lbs/acre in no -till wheat. Apply phosphorus and potash according to soil test recommendations at this time. The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weeds are essential for profitable wheat production. ---------------------------------------------------------------.-------------------------------------------------------- -----.-------------------------------- 551946 Database Version 3.1 Date Printed: 06-14-2005 CropNote Page I of 2 0 The following crop note applies to field(s): 7 Fescue: Piedmont Adaptation: Well -adapted. In the Piedmont, tall fescue can be planted Aug. 20 to Oct. 10 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 lb/ac., for drilled use 15 to 20 Ib/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 Ib/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% to 50% for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 1, 2, 4, 5, 8 Double -Crop Soybeans, Piedmont Double -crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no -tilling soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 4-6 seed/row foot for 7-8" drills and 6-8 seed/row foot for 15" rows. Seeding depth should be 1-1 . 1/2" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-30 Ibs/acre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. -------------------------•----------------------------------------------------------------------------------------- ---------------------------------- 551946 Database Version 3.1 Date Printed: 06-14-2005 Crop Note Page 2 of 2 • NUTRIENT MANAGEMENT and WASTE UTILIZATION PLAN SUPPLEMENTAL INFORMATION N.C. Practice Job Sheet: NC-590-633 Prepared for: By: Farm ; Tract: WHAT IS NUTRIENT MANAGEMENT? The conservation practice, Nutrient Management, is managing the amount, source, placement, form and timing of the application of nutrients and soil amendments to achieve realistic production goals, while minimizing nutrient movement to surface or ground waters. The practice, Waste Utilization, is using agricultural waste such as manure or wastewater in an environmentally sound manner. These practices are jointly accomplished through the development of a Nutrient Management/Waste Utilization Plan, which is normally part of a broader Conservation Plan that addresses multiple natural resource concerns on the land. PURPOSE OF NUTRIENT MANAGEMENT and WASTE UTILIZATION PRACTICES Your nutrient management/waste utilization plan is intended to accomplish one or more of the following objectives: • To budget nutrients for plant production. • To properly utilize manure or organic by- products as a plant nutrient source. • To minimize the delivery of agricultural nutrients to surface and ground water resources. • To maintain or improve the physical, chemical, and biological condition of the soil. Date:--_f;_ l_ To utilize agricultural wastes for livestock feed or as an energy source. CONTENTS OF THE NUTRIENT MANAGEMENT / WASTE UTILIZATION PLAN The information provided in this Job Sheet and the attachments meet the minimum requirements for a Nutrient Management Plan for USDA-NRCS purposes. This Nutrient Management Plan includes: 1 A plan map and soils map for the area planned (these may be part of the overall Conservation Plan). 2. Location of designated sensitive areas or resources (streams, wells, sinkholes, etc.) and any associated nutrient application setbacks, etc. 3. Your planned crop rotation. 4. Results of soil, plant, water tests. 5. Results from Phosphorus Loss Assessment Tool (PLAT) or Leaching Index (LI) as required. 6. Realistic yield expectations for the crops in the rotation, and their source if other than default values approved for N.C. 7. Recommended nutrient application rates for nitrogen, phosphorus, and potassium, as well as timing, form, NC Practice .lob Sheet: NC-590 (August, 2003) Page 1 • • F and method of application and incorporation, if applicable. This Job Sheet (or comparable information), that provides the following: • General requirements of this practice, as well as additional requirements to meet the natural resource protection purposes listed above. • Additional considerations specific to this plan. • Operation and maintenance information associated with this practice. Because this Nutrient Management Plan includes agricultural organic sources, additional items are required in the plan to ensure proper waste utilization: Waste Utilization Agreement (if applicable) Waste Utilization Third Party Agreement (if applicable) • Additional engineering design and operating information for waste storage structures, transport, and application system, as applicable. These designs, and the instructions for operating these structures, is an integral component of your overall Nutrient Management/ Waste Utilization Plan. • Emergency Action Plan to prevent overtopping or other discharges from storage structures or facilities, as applicable. This plan was developed based on the current NRCS 590 and 633 standards and Federal, state, or local regulations or policies. Changes in laws or regulations may necessitate a revision of the plan. BASIC REQUIREMENTS FOR WASTE UTILIZATION General All manure and organic residues must be applied according to a nutrient management • plan (see the following section, "BASIC NC Practice Job Sheet: NC-590 (August, 2003) REQUIREMENTS FOR NUTRIENT MANAGEMENT") You are required to acquire and comply with all federal, state, or local permit requirements related to the handling and application of manure or organic materials. The nutrient management/waste utilization plan must address all organic waste generated at or brought to the facility. A Waste Utilization Third Party Agreement must exist to address all organic waste not handled by the nutrient management/waste utilization plan. Manure or organic wastes will not be applied to the following areas: • surface waters, • wetlands, unless constructed as a component in a waste treatment system, • soils subject to frequent flooding during the period when flooding is expected, • : frozen, snow-covered, or saturated soils, • within 200 feet of a dwelling other than those owned by the producer, • within 100 feet of a well, • within 25 feet of surface waters, or • within any other setbacks as identified by federal, state, or local laws or regulations (e.g. NC General Statute prevents swine lagoon effluent from being applied within 75 feet of a residential property boundary or perennial stream or river if the facility was sited on or after October 1995.) Manure or organic wastes will be applied in a manner not to reach surface waters, wetlands (unless constructed as a component in a waste treatment system), property owned by others, or public right- of-way. Siudge.that accumulates in waste storage structures must be analyzed prior to land Page 2 application. Adequate provisions (available The realistic yield expectations (RYES) in land and/or third party manure agreements) this plan are based on one or more of the . must exist to ensure sludge is applied in following: adherence to all nutrient application Default values approved by the N.C. requirements. All federal and state guidance Interagency Nutrient Management regarding the proper testing, handling, Committee that incorporate soil planning, and application of sludge must be productivity information, yield data, followed for regulated operations. and research with North Carolina soils, and cropping systems. Since compliance with all applicable North Additional information on the default Carolina laws is the responsibility of the values may be found at: producer, you should consult the most current version of the Guidance Memo for www,soil.ncsu.edu/nmWncnmwalindex.htm implementing the Environmental Management Commission's Regulations for Animal Waste -• Documented actual yield data from Management for questions. the site, determined by the average of the highest three yields of the last five ADDITIONAL REQUIREMENTS FOR consecutive specific crop harvests. PROVIDING LIVESTOCK FEED (For forage crops, determine the average of the highest three years of If applicable, all agricultural wastes or other the last five years.) organic residues used for feedstock must be 4 A fertilization rate recommended by handled in a manner to minimize North Carolina State University may contamination and preserve its feed value. be used in cases where no yield data Chicken litter stored for this purpose must be or approved RYE values exist for a covered. A qualified animal nutritionist shall crop. • develop rations that utilize animal wastes. . An RYE inferred from a similar crop on a soil with similar physical and ADDITIONAL REQUIREMENTS FOR chemical features may be used for PROVIDING A SOURCE OF ENERGY new crops or in the absence of other RYE data. This inferred RYE may If your facility is to be used for energy ONLY be specified by a certified production, all energy producing components Nutrient Management planner. of the system are included in the Nutrient Management/Waste Utilization Plan and Erosion, runoff, and water management provisions for the utilization of residues of controls have been planned, as needed, energy production identified. Your Nutrient on fields that receive nutrients. Management Plan includes the use of these residues, if applicable. Soil Testing BASIC REQUIREMENTS FOR NUTRIENT This nutrient management plan has been MANAGEMENT developed based on current soil test results (no older than three years). General Soil samples must be -collected and Application of nutrients must comply with all prepared in accordance with North applicable Federal, state, and local laws and Carolina State University or the North regulations. Carolina Department of Agriculture and Consumer Services (NCDA&CS) Agronomic Division standards or recommendations. NC Practice Job Sheen NC-590 (August, 2003) Page 3 Soil test analyses can be performed by any laboratory or program that is certified by the North Carolina Department of Environment and Natural Resources (NCDENR), Division of Water Quality, Laboratory Section. NCDA&CS Agronomic Division uses the Mehlich-3 extractant process for soil testing. Growers who utilize other laboratories must request the use of the Mehlich-3 methodology to ensure the test results are compatible with North Carolina's nutrient management planning and assessment tools. For statewide consistency, all laboratories used must provide fertilization recommendations using guidelines and methodologies as referenced at the NCDA&CS website: www.ncagr.cornla-gronomilobook.htm Growers are encouraged to use a laboratory that is supported by field research within the state. Soil testing shall include analysis for all nutrients for which specific information is • needed to develop the nutrient plan. Plant Tissue Testing Tissue sampling and testing, when used, shall be done in accordance with North Carolina State University or NCDA&CS standards or recommendations. Manure Testing Nutrient values of manure and organic by- products shall be established for planning purposes based on laboratory analysis, acceptable default values, or historic records for the operation. When determining actual application rates, a laboratory analysis is required. State regulations require that waste be tested within 60 days of utilization for some operations. In the case of daily spreading, the waste must be sampled and analyzed at least once a year. Acceptable laboratories include the NCDA&CS Agronomic Division, or others certified by the NCDENR. Field Risk Assessment A field -specific assessment of the potential for phosphorus transport from each field (or groups of similar fields) have been conducted, using the North Carolina Phosphorus Loss Assessment Tool (PLAT) PLAT assesses the potential for phosphorus (P) to be transported from the site to surface water through each of the four primary loss pathways: • sediment -bound P transported through erosion, • soluble P transported through surface runoff, • soluble P leached through the soil profile, and • non -incorporated source P transported through surface runoff. Based on the assessment of each loss pathway, PLAT produces a single rating for each field. As shown below, this rating will identify whether nitrogen or phosphorus shall be the rate -determining element in developing the planned application rate for manure. PLAT Rating I Nutrient Application Criteria LOW Nitrogen -based manure application, MEDIUM Nitrogen -based manure application. HIGH Manure application limited to - phosphorus removal from site in harvested plant biomass. VERY HIGH No additional manure application to be specified in plan for the site. On all sites, regardless of the PLAT rating, starter fertilizers may be recommended in accordance with NCSU guidelines or recommendations. Page 4 NC Practice Job Sheet: NC-590 (August, 2003) In some cases, specific conservation practices that reduce the potential for phosphorus • transport have been incorporated. into PLAT. Examples include buffers or filter strips, ponds, water table management, and residue management and conservation tillage. Similarly, soil erosion rates, either existing or planned, have been incorporated into your PLAT analysis. This information is shown on the PLAT results enclosed. Because the management of the site actually affects the PLAT rating, all practices identified on the PLAT analysis (including any required to achieve the specified erosion rate) must be either already installed or included in a Conservation Plan for the Nutrient Management Plan to be approved. Nutrient Application Rates Recommended nutrient application rates are based on North Carolina State University or NCDA&CS recommendations that consider current soil test results, RYEs, and management. • Liming material shall be applied as needed to adjust soil pH to the specific range required by the crop or crops in the rotation for optimum availability and utilization of nutrients. • The application amount and rate (inlhr) for liquid wastes (e.g. applied through irrigation) shall not result in runoff from the site. The application shall not exceed the field capacity of the soil. The planned rates of nutrient application are shown on the attached sheets. These rates have been computed as follows: Nitrogen Application - When the plan is nitrogen -based (a PLAT rating of Low or Medium), the application rate of manure or organic by-products shall be based on the recommended nitrogen rate using the RYE for the site (or a rate recommended by NCSU or NCDA in the case of crops without established RYEs). This may result in an application rate for other nutrients that exceeds the soil test recommendation. When the plan is being implemented on a phosphorus standard (a PLAT rating of High or Very High), manure or other organic by-products shall be applied at rates consistent with the phosphorus application guidance below. In such situations, an additional nitrogen application from non -organic sources may be required to supply nitrogen at the rate recommended by the RYE. • Within the limits allowed by PLAT, manure or other organic by-products may be applied on soybeans at rates equal to the estimated removal of nitrogen in harvested plant biomass. All nitrogen rates for hay production are for pure grass stands. Due to the nutrient recycling by grazing animals, the planned nitrogen rate per unit yield for hay crops shall be reduced by 25% for the portion of the expected yield that is removed through grazing. Phosphorus Application — When manure or other organic by-products are used, the planned rates of phosphorus application shall be based on the PLAT rating for the site, as follows: Low or Medium Rating — The planned manure or organic by- product application rate is based on the nitrogen needs of the crop. High Rating_ — The planned manure or organic by-product application rate is limited to the phosphorus removal rate of the harvested plant biomass. VM-High Rating — No additional manure or organic by-product application is specified in the plan. NC Practice Job Sheet: NC-590 (August, 2003) Page 5 0 • • • On all sites, regardless of the PLAT rating, starter fertilizers containing nitrogen, phosphorus, and potassium may be recommended in accordance with North Carolina State University guidelines or recommendations. A single application of phosphorus applied as manure or organic by-product may be made at a rate equal to the recommended phosphorus application or estimated phosphorus removal in harvested plant biomass for the crop rotation or multiple years in the crop sequence. • When such single applications are made, the rate shall: ♦ not exceed the recommended nitrogen application rate during the year of application, or ♦ not exceed the estimated nitrogen removal in harvested plant bio- mass during the year of application when there is no recommended nitrogen application, or ♦ not be made on sites with a Very High PLAT risk rating. Potassium Application — Planned potassium application rates should match the soil test recommended rates as closely as possible. (This is particularly critical in situations where a potentially harmful nutrient imbalance in crops or forages may occur, such as grass tetany). When using manure or other organic sources, the addition of potassium from non -organic sources may be required. Other Plant Nutrients - The planned rates of application of other nutrients if applicable are consistent with North Carolina State University or the NCDA&CS guidelines or recommendations. Nutrient Application Timing Timing of nutrient application shall correspond as closely as possible with plant nutrient uptake characteristics, while considering cropping system limitations, weather and climatic conditions, and field accessibility. Nutrients shall not be applied to frozen, snow-covered, or saturated soil. Manure or organic by-products shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. For nutrients applied through irrigation systems, application equipment should be properly calibrated to ensure uniform distribution of material at planned rates. Plan Review and Revision Period A thorough review and revision (if needed) of the nutrient management plan shall be conducted on a regular cycle, not to exceed five years. Heavy Metals Monitoring For animal waste, including sludge, zinc and copper concentrations shall be monitored and alternative crop sites for application shall be sought when these metals approach excessive concentrations. The following criteria and actions are provided: Mehlich-3Index Action zn-1 300 (21 Ibs/ac) Peanuts are very sensitive to zinc, and application on peanuts should be limited. Seek alternative sites when possible. The risk of zinc toxicity is greater with low soil pH and has been seen at Zn-I as low as 300. ' 600 (35 Ibs/ac) Critical toxic level for peanuts. Cease application on peanuts. ' 2,000 (142 Caution: Seek alternative sites lbs/ac) when possible for all crops. ' 3,000 (213 Critical toxic level for all crops. NC Practice Job Sheet: NC-590 (August, 2003) Page 6 • • Mehlich-3Index Action LgL-u 2,000 (72 Ibs/ac) Caution: Seek alternative sites when possible for,all crops.' 3,000 (108 Critical toxic level for all crops. Ibs/ac) Cease application on all crops.' ' Maintain pH at 6.0 on these When sewage sludge is applied, the accumulation of potential pollutants (including arsenic, cadmium, copper, lead, selenium, and zinc) in the soil shall be monitored in accordance with the US Code, Reference 40 CFR, Parts 403 and 503, and applicable state and local laws or regulations. Additional information on heavy metal criteria for sewage sludge may be found in Land Application of Sewage Sludge, EPA/831-B-93-002b publication number at: hi`ta://www.epa. qov/t:npdes/pubalsludgejo ADDITIONAL REQUIREMENTS FOR MINIMIZING DELIVERY OF NUTRIENTS TO SURFACE AND GROUND WATER In areas that have been identified as impaired with agricultural nutrients being a likely source, an assessment shall be completed of the potential for nitrogen or phosphorus transport from the site. (The streams/water bodies in this category are listed in the USDA- NRCS Field Office Technical Guide, Section 1.) ❑ NO This nutrient management plan IS NOT in an area where surface waters are impaired, with agricultural nutrients identified as a likely source. The Leaching Index (LI) is not required. ❑ YES This nutrient management plan IS in an area where surface waters are impaired, with agricultural nutrients identified as a likely source. The Leaching Index (LI) is included in this plan. While the results of the LI does not affect your planned nutrient application rates, some additional conservation practices may be specified in the plan to reduce the risk of nutrient movement from the field, if applicable. IMPORTANCE OF MANAGING NUTRIENTS Nitrogen and phosphorus are water soluble elements and either or both may be components of organic and inorganic fertilizers. In soluble forms, both can move with water as leachate down through the soil, or over the soil surface as runoff after rainfall. While nitrogen and phosphorus exist in different forms and may move through different transport processes on the same site, they both can have detrimental effects on both surface and shallow ground water quality. As an example, excess nutrients can result in accelerated eutrophication with severe algal blooms and fish kills. Because of the topography, hydrology, and other factors in the state, the environmental problems from excess nutrients reaching surface water may not be exhibited near the contributing source, but rather create water quality problems far downstream. Consequently, the Neuse River Basin, Tar -Pamlico Basin, the Chowan River, the watershed of the B. Everett Jordan Reservoir, and the watershed of the New River in Onslow County are listed as Nutrient Sensitive waters in North Carolina. Nitrogen. Nitrogen applied as fertilizer or organic material is transformed into nitrate and can move with the water moving downward into the shallow ground water and eventually to surface waters. (Relatively small amounts of nitrogen reach our surface waters through rainfall runoff. ) The Leaching Index (LI) is a NC Practice Job Sheet: NC-590 (August, 2003) Page 7 required part of the nutrient management plan are needed. (The S.B. 1217 in some areas of the state with surface water interagency group guidelines . impairments. The LI uses soils information accepted by the N.C. Division of and local climate data to assess the potential Water Quality for .0200 operations hazard from leaching of nutrients. The results specify a plan revision when there are of the LI analysis and recommended actions changes in crops or cropping pattems are included in your nutrient management that utilize more than 25 percent of plan, if applicable. the nitrogen generated by the operation.) As a minimum, nutrient Phosphorus: Research in recent decades management plans shall be indicates that, with high soil phosphorus thoroughly reviewed every five years levels, phosphorus has more potential to be and revised if necessary. The next transported off -site than recognized in the review will be performed in past. Phosphorus can be transported in several ways: (1) attached to soil particles leaving the field through erosion, (2) in soluble 2. Protect fertilizer and organic by - form leaving the field in surface runoff, and (3) product storage facilities from weather in soluble form leaching downward through and accidental leakage or spillage. the soil profile, and eventually into surface water. Unlike nitrogen, the most likely 3. Ensure proper calibration of transport pathway for phosphorus varies by application equipment to ensure site, and depends upon such factors as soil uniform distribution of material at erosion rate, soil phosphorus levels, texture of planned rates. soils, existence of buffers, and other factors, In N.C., PLAT is the tool used to assess 4. Inspect and maintain the equipment potential excessive phosphorus losses. The results of the PLAT analysis and and facilities used to implement the Nutrient Management/Waste recommended actions are included in your Utilization Plan regularly. Any needed nutrient management plan, if applicable. repairs should be made in a timely manner. If a site receives a PLAT rating of Low or Medium, then applying manure at rates based 5. Review the Emergency Action Plan, if on the nitrogen needs of the crop is allowed. applicable, annually. It is important to realize that this may result in phosphorus being applied at rates that 6. Records should be maintained for five significantly exceed the crop's phosphorus years, or for a period as required by removal rate. In these cases, the planned other Federal, state, or local nutrient application rate is not sustainable, ordinances, or program or contract and eventually a PLAT rating of High may be requirements. To ensure adequate reached. information exists to support sound nutrient management, NRCS recommends the following records be OPERATION & MAINTENANCE included: You are responsible for safe operation and • Soil test results and recommendations for nutrient maintenance of this practice, including all application, equipment. The following Operation & Quantities, analyses and sources Maintenance should be conducted: of nutrients applied (When the 1 Review the plan annually to determine if actual rates used exceed the recommended and planned rates • adjustments or modifications to the plan on inorganic fertilizer plans, NC Practice Job Sheet: NC-590 (August, 2003) Page 8 records should indicate the reasons for the differences, e.g. inability to acquire custom blended fertilizer.) • Dates and method of nutrient applications, • Crops planted, planting and harvest dates, yields, and crop residues removed, • Results of water, plant, and organic by- product analyses, and • Dates of review and person performing the review, and recommendations that resulted from the review. NOTE: State laws or regulations may define record -keeping requirements for some operations. 7. Ensure that workers are protected from and avoid unnecessary contact with inorganic fertilizers and organic by- products. Protection should include the use of protective clothing when working with plant nutrients. Extra caution must be taken when handling ammonia sources of • nutrients, or when dealing with organic wastes stored in poorly ventilated enclosures. 0 8. Properly dispose of material generated by the cleaning of nutrient application equipment. Excess material should be collected and stored or field applied in an appropriate manner. Excess material should not be applied on areas of high potential risk for runoff or leaching. 9. Properly dispose of or recycle nutrient containers according to state and local guidelines or regulations. NC Practice Job Sheet: NC-590 (August, 2003) Page 9 ANIMAL '.WASTE .,UTILIZATION' 'PLAN. Producer: Jimmy &Timmy,Thomas Location: 8251-Oxford , Rd. Timberlake, ;-NC :27581 ;R �,srtafi Telephone; -364 -2 633i'':v��171 Type Operation: Existing Farrow,,to- Finish" Swine:.. ; � a - 5 Number - of Animals: F 2 60.0.0..• sows {Design capacity} STORAGE STRUCTURE: Anaerobic Waste Treatment Lagoon APPLICATION METHOD: ;Irrigation The waste from your animal facility must be 1and.applied at a specified rate to,prevent pollution,of surface water and/or groundwater. The plant4nutrients,,.in the animal waste should,be -used to reduce, the �:amounti,of� commerc; .a1 ,fer;til'izer ,requi red -for the crops in{ the , fields;,where -,�thec,,was,te is 1 o be LaPpliedG This waste utilization plan uses nitrogen as the limiting nutTien Wast"e',�should"hbe�,anal� ,zed before��each ap lication,,,c ,cle'.,..,,,Annual_ soil . Y - V s _ p ,,.«ate `" a . '.t 4 ,4, .A , «, r L:x -8 Y.7 �:. '{ tests '''areC strohg1y. encouraged,so.s.that all pklant, nutra�entsF cansFbe balanced for realistic yields of the crop to &e_x.grv,wn.,,,o Several'factors.are important in,implementing,;:your�wa,ste;utilization plan in order to maximize the fertilizer value of th,e waste and to ensure that it is applied in an environmentally sa€e.manner: ,, 1.'° Always apply waste.based:on.the.needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the=crop can utilize.. , 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water;'holdi.ng capacities. , 3. Normally waste shall be applied to land eroding"at°le'ssSthan 5 tons:per acre:per year. Waste may belapplied,to,land eroding at 5 or•.,,more tons per acre annually,, _but: �.Zess than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed ` . under DWQ regulations. Page: 1 'ANIMAL -WASTE UTILIZATION PLAN, 0) 5.- wind conditions should also be considered`z,to avoid drift and : downwind odor problems'::_ T L 6. To maximize the value`'dfE,�,the` nutrients .for crop production and to reduce-tkepotent"ial`for,'pollution, the waste should be applied, toy a .growing „crop or': applied , not more than 30 days prorro'� planting=a'crop' ar::.forages breaking dormancy. Injecting -the waste or disking will conserve nutrients and reduce''"odor:.problernsa, ; c .; ., e4 This plan is based on the waste application method:shown.,�above_;._,If you choose to change methods in the future, you need tor:reyise-.this plan. Nutrient levels for different application methods are not the same. k The estimated acres needed to apply,the'animal waste.is,,based,.on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility.- In some cases you -may want to have.plant analysis made, ' whidh- could -allow additional •waste ;to be applied. Provisions shall' be, made for the �area,receivinga.waste to be flexible so as to accommodate changing 'waste analysis content and crop type. Lime must be applied to mai:ntaim pH in the optimum range for specific crop production,.. This' waste' utilization plan,- :1f carried out, meets the ,requirements, for compliance with 15A NCAC 12H `: 0217 adopted Tby the sEnvironmental Management Commiss`ion . AMOUNT OF -WASTE"` PRODUCED`` PER YEAR (gallons; , ft3, ,tons, etc. ) 260 sows 'x 19.'9 tons'waste/sows/year,;= 5174' tons- AMOUNT OF PLANT AVAILASLE'NITROGEN (PAN) PRODUCED PER YEAR 260 sows x 26 labs PAN/sows/year = 6760 lbs. PAN/year Applying the above amount of waste is a big job: You -should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop'to•be'grown, soil type and surface application.. • .� ."'. .;:Gad; .. t. oil Page: 2 • CAMP WC:ubic Arne Tm+ cling Gvn C—Putzl�--21 LL -kshcc 2-20-99 Hard Hose Traveling Gun S; stem COMPUTATIONAL V0RKSHEET 11 1. Farm Number (Identification) .r 73_ o Field Number (Identification) 1 2 -3 2. Irrigation System Designation ✓ Existing Irrigation System New/ Expanded Irrigation System 3. Number of Travel Lanes # Interior Lanes _ m Exterior Lanes �lfeet] Length of puU(LI) P, Interior Lanes Exterior Lanes � [feet) Length of puil(L2) Interior Lanes # Exterior Lanes _____—ifeet] Length of pull(L3) 4. Wetted Diameter -3 0-0 -f feet] Frorn field data sheet 5. Spacing ;2g =Hydrant Spacing [feet] 4!77.. [as percent of wetted diameter3 6. Hydrant Layout Multiple Hydrants Single Hydrant Excessively spaced Hydrants 7. Read the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on nattern_ soacin2. and travel lane location. 1 sA, �a sf�, F�a !�� d�lrc Pori, en E�7 T. II 4 c". ,��� �X/ f�n4 ia}�b2 14r�ex LLP��-rh�CW�d ��+)�y�Sbo.-/9rrps f�c�cs i 3, �I [aga)(;L00)1y.?sL.O = A /613 14 SL 0, / 7 3 L—��. 0. 5'B (79J(� ooJ�lf3.�6o ` 3. �aZ T. (O-� E 90 0. Y3 �76-1062.*)kJ�- � ssY o,3� �P ��-6S 0 7 y�(.zWSJfy3S�� = �,.�s as a.s� 0. a$ p00) C/ 7s) lv�;s� o Z 0.4-� (3 �C 13,3 67 (1 aso)Y- r, = 1 /0 O..5-f ' z-7 13, oo I L/, t, �w { �c r-es i U V Your waste utilization plan appears to be written for a two-year rotation. The summary table on Page 5 and 6 of your revised waste utilization plan shows a. hugh deficit that is not so if you account for two year's worth of plan available nitrogen produced on the farm. Please revise the' mmary table and show the actual amount of deficit that occurs over the two-year period. As you can see from the tables below, calculations were made for the total amount of PAN produced according to RYE. The tables show the two year rotation with the various crops (corn -wheat -fescue hay in that order) being planted. Actual volume planned to be pumped equals 222,776 cu. ft. and the required volume to be pumped is 201,209 cu. ft. Therefore, 201,209 cu. ft. x 7.48 gal/cu. ft. = 1,505,043.32 gallons. According to the NCDA waste analysis report (VW1043 W) a total of 2.1 lbs. of nitrogen per 1000 gallons of swine lagoon liquid pumped. Therefore, 1,505 x 2.1 lbs./1000 gallons = 3,160.50 lbs. PAN for six months storage. For one year storage 3,160,50 x 2 = 6,321 Ibs.tyr. Therefore, 6,321 lbs. of nitrogen produced per year for this facility according to the current waste analysis report. Therefore, 6760 lbs. of actual PAN needed is more than the 6, 321 lbs. of nitrogen actually applied from the waste analysis data. Also, once a vegetation is established on the additional 8,149 acres cleared, this will be amended to the WUP as available crop land for waste application. I hope this helps explain your question concerning the Thomas Farms (Allensville Unit) swine operation. If you have any questions contact Joey Knight with NCCES or Jim Huey with NRCS. Thanks. Thomas Farms Allensville Unit Amendment to WUP Application No. 73-0010 Total PANIyr - 6760 CORN - March - June (1st Year Spring) Tract Field # / PAN T111 " 605 4 399 5 1499 7 756 8 701 T3210 1 866 2 454 3 110 Additional acreage that was cleared that was not included in calculations TOTAL 5390 5390 # (PAN used on Spring Corn crop) + 1370 # (PAN! used on Fall Wheat crop) = 6760 # (1st year PAN) WHEAT - October - March (use 1370 in Fall) (1st year Fall) (use remainder 3806 in next Spring) (2nd year Sprin6l), Tract Field # / PAN T111 2 581 4 383 5 1439 7 726 8 673 T3210 1 832 2 436 3 106 Additional acreage that was cleared that was not included in calculations Total 5176 FHH - August - October (use in Fail after Wheat) (2nd Year Fall) Tract Field # 1 PAN T111 2 440 4 290 . 5 1090 7 550 8 510 T3210 1 630 2 330 3 80 Additional acreage that was cleared that was not included in calculations TOTAL 3920 Used in Fall after Wheat 3920 # PAN therefore, 6760 # - 6726 # = 34 # short (Lando er) Achnicalpecialist) (s) (Date) n ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME ill 2 ApB C 110 137.5 1.5 467.5 I MAR-JUN 111 14 jApB IC 1110 1137.5 111 5 ApB IC T 1110 1137.5 ill 7 ApB IC T 1110 1137.5 8 ApB IC 4 I 1110 1137.5 3210 1 ApB IC I 1110 1137.5 3210 2 ApB IC 1110 1137.5 I ill ApB 1-2 JW I 155 1132 ill ApB FHH 2 1-2 I 1100 ill ApB 1-4 JW T 155 1132 ill ApB FHH 1-4 I 12.0 1100 ill ApB 1-5 JW T 155 1132 ill "5 ApB FHH I �2.0 Too iqri 1-7 ApB I W 155 1132 I C 13.12 1398.75 MAR-JUN 11.09 1498.75 MAR-JUN 3.95 1756.25 MAR-JUN 4.62 701.25 1M.A.R-JUN 6.5 �852.5 MAR-JUN 2.34 1 453.75 MAR-JUN 1.5 1448.8 OCT-MAR 2.9 1340 AUG-OCT 3.12 1382.8 OCT-MAR 3.12 1290 AUG-OCT 11.09 1438.8 OCT-MAR 11.09 1090 AUG-OCT - 3.95 1726 OCT-MAR ANIMAL WASTE UTILIZATION PLAN • 111 1-7 1ApB FHH 12. 6 1.100 I 3.95 I 1550 AUGOCT 111 ApB 4.62 673.2 1-8 1 jW I 155- 1132 1 OCT-MAR 111 1-8 1 ApB FHH 12.0 1100 14-62 1510 I AUG-OCT 32'10 ApB W 1-1 I I 155 1132 1 16.5 1818.4 OCT-MAR 3210 ApB FHH 2 620 1-1 1 I 1100 1 16.5 AUG-OCT 3210 ApB W 55 5.6 1-2 1 I I 1132 1 12.34 143 OCT-MAR 3210 ApB FHH 2.34 1-2 1 I 12.0 1100 1330 AUG-OCT .4 ApB FHH 4 200 12a I I 1 1 11.5 1300 AUG- OCT, Mid FE IEND I= I I I f TOTALI14082.3 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to'have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. • ANIMAL WASTE UTILIZATION PLAN • TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL 10 .- Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. r ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT C CORN BU 1.25 FHH FESCUE - HAY TONS 50 W WHEAT BU 2.4 TOTALS FROM TABLES 1 AND 2 ACRES LES AW N USED TABLE 1 34.62 14082.35 ANIMAL WASTE UTILIZATION FLAN • TABLE 2 0 TOTAL 34.62 *** BALANCE 0 14082.35 -7322.35 ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. U • • • 6. The irrigation parameters listed in your WUP exceed current NRCS recommendations. The application events listed in your,WUP appear to be out of the Sprinkler Irrigation Guide. The Application Amounts listed in this guide have not been adjusted for the application of animal rn�aste, NRCS currently recommends that total application amounts not exceed one inch in any application event for any soil type. If your application rates need to be adjusted for the application of animal waste, please have your Technical Specialist revise your WUP to reflect the appropriate application amount per event. If the rates will remain as written in the plan, please have your Technical Specialist justify the increased application rate in the narrative of your WUP. All changes have been made in the newly revised WUP. WUP is attached. (Landowner) (Date) NcCES) nieal Speciali t)(s) I (Date) -s$ �'-22 S6 5. Include in the narrative, that an additional 10.8 acres has been cleared and explain why. This additional acreage was cleared in order to make waste applications more efficient and easier for the traveling irrigation system. To be exact, all fields were remeasured by the Extension Agent with the acreage wheel and a total of 39.349 acres can be used for waste applications. This allows an additional 8.149 acres for waste application. Refer to the new map drawn instead of the old ASCS map for new field acreages and boundaries. look at the dimensions of the fields on . the irrigation layouts on each field. The new field maps are attached. Note the new field boundaries because of the clearing of trees. This clearing has given the farm this additional crop land to apply their swine waste. • hinic Specialist}(s) (Lan owner) (Date) (Date) ANIMAL WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) I, , hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Date: Waste Producer: Date: Technical Representative: Date: SWCD Representative: Date: Term of Agreement: ,19_ to (minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) W Page: 13 ANIMAL WASTE UTILIZATION -PLAN',;,! ,5 l *** This number must be less than or equal to 0 in'order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1118 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 5590 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 18.6333333333 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 44.72 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. �. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 7 ANIMAL WASTE UTILIZATION•PLAN-- amounts of nitrogen shown in the tables may make thit plan invalid. The following table is provided as a guide for establishing application rates and amounts. Application Rate Tract Field Soil Type Crop (in/-hr) ill 2 ApB C .45 ill 4 ApB C .45 ill 5 ApB C .45 ill 7 ApB C .45 ill S ApB C .45 111 "2 ApB FHH .45 ill "2 ApB W .45 111 "4 ApB FHH .45 ill "4 ApB W .45 111 . 7 S ApB FHH .45 i 111 ApB W .45 ill �7 ApB FHH .45 ill ApB W .45 111 "8 ApB FHH .45 ill ApB W .45 3210 1 ApB C .45 3210 2 ApB C .45 3210 3 ApB C .45 3210 "1 ApB FHH .45 3210 ApB W .45 3210 2 ApB FHH .45 Applic. Amount (inches) *1.0 *1.0 . * 1 ..o *1.0 *1.0 *1.0 *1.0 *l.o *1.0 *1.0 *1.0 *1.0 *1.0 *1.0 *1.0 *1.0 *1.0 *1.0 *1.0 *1.0 *1.0 Page: 8 ANIMAL WASTE UTILIZATION PLAN 3210 I "2 3210 1 "3 3210 -3 d.: ApB APB W FHH R, t 1 . .45 .45 .45 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for I80.00 days of temporary storage and'the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables I and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION This operation consists of 1 retrofitted lagoon designed for a 260 sow farrow to finish operation. There is one abandoned lagoon on site that is planned to be closed out in 1998. Cost -share has been approved for the closure and a waste utilization plan will be followed. Until the lagoon is closed, the operator must maintain the water level from going above the 25 year/1 day storm pump stake. The operator should also never allow the water level in the retrofitted lagoon to go above the start pmp stake. Also, always stop waste application immediately should runoff occur. During construction of retrofitted lagoon, a small underground stream was hit when cutting the core. A 4" perforated plastic pipe (with gravel & geotextile cloth) was laid starting at the core and extending beyond the back toe of the dam. The outlet of this pipe should be protected from clogging to prevent water from backing up into pipe. The.fields receiving waste are under a 2 year rotation of 1 year no -Milled corn followed by 2nd year of *t interseeded with fescue. WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS; 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. 'Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 1.0 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393-Filter'Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively, growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 10 WASTE UTILIZATION PLAN .'; REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in -fall 6r winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be.applied closer than 20.0 feet of dwellings other than those owned by the landowner. t 14. Waste shall be applied in a.manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a -manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17.. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 11 ..WASTE-, UTILIZATION PLAN REQUIRED SPECIFICATIONS i� ti 18. If animal production at the facility is to be' suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 1.9. Waste handling structures, piping, pumps, reels, etc., should Pe inspected an a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used ina rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 50 days of utilization and soil N shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall.be used.when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. waste application records for all other waste shall be maintained for. five ( 5 ) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. • Page: 12 ANIMAL WASTE UTILIZATION PLAN 0 WASTE UTILIZATION PLAN AGREEMENT Name of Farm:Thomas Farms Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Jimmy & Timmy Thomas (Please print) Signature:� ate: Name of Manager(If different from owner): Signature: Date: Name of Person Preparing Plan: (Please print)Jim Huey Affiliation:NRCS Phone No. 919-597-2973 Address (Agency): 304 S. Morgan St. Rm 126 Roxboro NC 27573 Signature: Date: 7 • Page: 15 �G 73 - /a i�� says Add-k -�,c- ly 5 OceJ.v�r� 1Y C. 0 f. Pr..LO RaOe•4. „♦+•a J I —w W.W.D ■. W q mmo •. aor,♦. PLAT OF SURVEY I JIMMY THOMA5 I �.�,:,.� ' �.�. •.� M �. I-.� I 1 TIMMY THOMAS- 17r.7.• .� ALLENSVILLE TITP. , PERSON COUNTY. N-C. ,�c;5 — !` NOVEWBER 1994. HAULETT-JENNINGS A ASSOCIATES JOHN J. JENNINGS L-3052DO + I I • t'! � �, v� �'1 icei`,, - I P!-ve. /.Aw K f i 1 ti L. J. DWYIY .ffffS-4A •0 �J -- -- � 1, n I lM 0•. ip. r. W Z vrcrr+rrY MAP V kOD•!t .. .OIT" V tr I f. DP•aD sew►♦w �, � . 1 f .. ` I,oe•n's.•! Iu Hl.I]' •pr•,i•. �! 107. 19 ACRES ! { I 11ulYr Y. f r *JN IF / 0 1� 1 b 4f sl. ar 1 m•y•71.9 I f1~1 Y '.� ' r 113.76• _ ti I w, nalY,e taw % _•1• f IF 3 ` •. ` — y Ir I „0n•tt'i7.1 ol.1rl,D . r.ai, L[O f J f;'t '�r7 • —, / — rf • NAIL FOUNDr . Y L NS0 NAIL SET 1i o IRON WET S 7. vs,r IIPORY, J.. W 0 WA In(YATICAL d - 31 1 .> r n _ - 1]i1,7�• 1aal7A 1, IYwA. fJ.W ro WXQ0K Tf„1 f/ . �✓ Is 1 lOj 1 ♦ i/ 011 'Cb1Y[TAYCa.'• ~'7 NI tLV01tI W. 4iti fv Yc.r. r.a. YtEPSYEM LAM wfM>ufe CR��k MACKTIC 717 S-L.N.✓< ST. - r_0.001 17AA R=PoN0 ,btM CAACl114 IT03 (110) 7i0-4743 PLAT OF SURVEY J- DW.Lft movs.0 I mas I; r if1� ] o'W°i iof[.r sM a g01f're7sr JIMMY THOMAS TIMMY THOMAS rlf in.n• Au.[ .,s• ALLENSVILLE TnP.• PERSON COUNTY. N.C. NOVEMBER 1994. HAWLETT-JENNINGS A ASSOCIATES J. JENNINGS L-3052--- Ft ��JOHN � a+rw, r-.. r7r r1. Ml V I �flf I i n1. xY•A 40 isle g111 If{7 VICINITY MAP wr Lv) 1-u _A. t a rio.iA7m � � 1 �. on.aLo PAO!!f QIF - - - - - - - - a >ttx LL F. .Dli[r \ (� 7f.100, r. W 11 rr 7. ! ! bl•�f oaf,[ If _ RD04L F. amtor Co. Is*. F-04 ' ` - - { .` ,Q t] ' ,[ - u +r .I,• . it ,r IY 1 r I l s.a 107 19 1ACRES0' - o ' 7,7•„•. � � � � �•, � s � I nur�u g. l f r J Lz) � / f 7 y � J I A or�a.wA if"fisr I o[.IM' i►we..,s r � 1 If W.Tf' � T F' �' t v . � .- r✓ M � I IF 1 40 Fj' �Q1�.f cn _-- - ' 1F IF I x. Nrrif ley LEKND W • NAIL FOUND • I 0 NA I SET r 0.133. r'.1 • 1, m"Iw "MT. A. 00. 177. P. 1.6 o • rc.1, r. [, MAGNETIC Ns L IF • IRON FOUND IS O ]RON SET Ip o IIA THE-T 3CAL FOINf umm 11040, t[Al0 AM aim. twig is a r,mlfrwAWf RAf. WT 7TR 7000,QLr1Ox, f40 ON 1nx?rARms. amo np R[G61l7,ED tA1r0 SURVEYORS 717 S.LAMAR ST. - ►.0.809 177f l�dt6 xOrtM 17577 (910) 7 �',2 `, y} n,.F a ' \ t N, �• S A 11 4 tf .�;. "�•ir'. r * k �.. -y `4 •� V J l � f I a s � - ��� j, CAI s 1!�}f � , � �' � 1 �i x � - t �. � � v fti -fr , s , d � ,• s +,'� •.w a '. 1�M s• zi fn „ �yi+:ws 1.�; -+" t� L � r �� �1 �Yyir h a�N•..• rR>w � tf {Ji �� � {,. .� "� 'r ryvc �' S}' ! wI r 7r re {{ . s 7+ • y y{rt,t'"( 41.i. ,. aRi�1�r Z1F�`�•7 ?A'•y� — `. r- _Y. I , -L_ (ix _ ' p}+ r r • - • 1_ FlyA3�4FMa '- r?r ti ;� aj*n so o x3 i +0 +'"1;1 y; cam;,/v',. } •-;= vl>s; aT'.•t ,�. "� may a' `y ' 1n �'/r „� .\ • --' '•. � � ►f'! i; t � .x `''!q r k � 1;yv, .i�('�1�.:ti : �• r�' •'J� • �F �� z ' I I � � •t,.,42 t` {,IiY_ 4 (� .•...� •.'q ',[ f., .', ;rY:,�1 tzi 00 ��,.�..`;�tT�,� #rY � •� ��, t'.?'t � k � �,� �'��•s"i �,pfti4� {rN' `;� !� �.4! .��i��'� � ''`><�l `r+ a .r, •[ 141 i S C"'}rtf�7; k} •� x 'j �Ll7 fit:, �fr�,y " � S ��'�^.r �kv�{f,. •. �ro �A; �!"�•i^� � {{ll �iIA)� �s ���j �,pr ...•-. ��. �L. � ry �^� ���`..� O £f•ti.a'1'r'�k,.� - t,_ �b 4 _ �„ff t+l"`r r '1R �. _ �y Q r F�L r•' / h �q +f 't r4 t+r ,� M'.s_. �� h r i,�(yt µ� s �.+ v r tl iss `. ♦ `_,:. �Y. + i x �t^i''L4Yr11 AL r1- .{ t tF f, C'1 6r. ';j{ �• ►t `T�y ram' - *,{S; r':` I yet tl�i ,Y .7�' �`{� p•�SaS �t"•V '. h-` Tif� � �.' �� � i{.F� b I 2D,• A rUFA u��sr#�vC'SI'`i 519� �' ��{s., �.�..��. { l � § rl�� � "+' `•�'..ti���� . j,. r+` t9 t Sf,� .�y �. - •r.a.,�: ..y {S.'�'�4F��1` }��iq'� 1 S .t� {� f �� 5��1 f .L- �'•�` t.��Y�l i �{ ?' � t.•i � ��.1� ��''zi' r - •k'+' # 1 ` ,r � +�tdY, �> L) �,. �k' q ,1'~}kt'*'F {-�'_- h': i °t t' Nu + (I �!_ .z '�.a;, Y f' i/'' (�. " I '4�._. ...Fpa• ii: t , k '$ :.....�.- ,-r•L. �a'r7 is J'•��• '_" 4 ., S_ I � ' �'�'" j �� -r •d�,t- � • J. '.• � ; �1{ + t<- • ! , w �t+!' {r `� i --,1 Afar- x 4- •r. `/. -+ ( �, •ir'y.- it '+'•r L •'/!' <'1t 't41:?ns+? kF ) ""rJh�1iF{'IsCL is.. it/ilttilC jtii t' - f. jr`,(� I 'yam. ��•� ,"an.'.`� �J k) _ t i�TJ'ri+� r _ � t.1` '{., �yJJ`�,RS���J�/,�t4 tF,r`�_�,a't•C p�Y�.4�,� ^+�4*y�, 1 '� Y � ��+ l � C1' 1. + {"" .b �G 1. _.k, d,14 ' '•�Y��,� b'� i{'*F i. pi71� �7T' h� 'G' � ��t TE-•Ti �. � _ y ���^�T,rr ",�rA �5 r s- -. S, Li .r ;, � �� I�� � y� ,t,s "��,�, �5'1,� �SiY �J-� rir , Wr,o- k�• �r qz-��',���' _ rt�`�,,,��5 i4'& '-r f�,��t{fir "W,s -" '�.. .1 i. i � Tt �•�� �rt''�Jt� ! t -�j, � s {.• .y�r�� �4.r r�y �} t ��;� is �•7�it }�C y� .SV��.: fir'*} .�.. J .. ttr ✓ �j.� 4•ij�h;;1� .,` yi lt� J� z: �x r r E►' rr:'�`_*.tT ,,�1,� -t? F f + f �1 T._;�!,�yr, +, t ••`a .s±7 e• �1 r ,.:.ti [���►►}.�.a t• �v ; •t. i'$xr,; c r. },+-�•y�": - -vl �..w *, r I, [i�Y �f ?•�,i Y ..� _.xt..'K",r `&`.rt !4 ;<,.� - ','�" 'L A� _ } { ?!i' $a . t, .tCr '�'�� .Y� yy jj't'ti :''•, �it't e �, y,K:Lr � � `n '' S•-`•.. •% �i:ai�'` �k, � ���{y'',y '�".' 1 y�.,Xwr �✓-ril. r �5r--' ``"Z ;s �• .r�l�-� TL:E• � tr'i+!#°.r)�'t�. `! +a,� 7 _r�y rr,: �t�,,,,yf\, � ��Z.° �+t-.l t; �'r a,-r'1 - ''ir ' mc! .r,r h?; a•art��ilr, r4'1}ii� f �� s i+x% tV".�-• �rsi7,�t �1rf'R,`' ^fit ��'? ,,:j` r � .. jyft, £t it+�, ,� s, is�`,.Y��' ,,,�rnr• ,. ,.: ? if' ':4,�)' � r''� k" � "�ii$f r t¢r � � � t 1: on ;:a� fi b, i 6 i 4 l f I K? ir3kFk'+f. * %r,-'1 r f • z s T s �; �t�q riF r pthk" 3 �•ga't�")r. q c ?r`F ! -7 h1rl:'ra r>;'i•l tf, t•a 3-� ,� ilk, 'tr i '� ,��t,,� y d r s. i f - ;Y. fr y ,i`"'L.lot^h�•N �-!` V,�i aaq t7" ,-���� 4�r*F `� Nti` ��;seS+�• f�Fu �i,� 2r;�tilk'� „'� s};5+}ti;`�+ik�4�Pst yid �hr`5�i }i�s...`y' r� •'M`eL,{' 'x i5 " M. i+d �'t�ra x+r, t_i') ._ �1 `= p r ;�r':W i;,,�,, d, 5 i. k'PJ•. TSav d i#'Nr �l_�.F =,tk...S. !'r�yw., 1.::.:,, ...L.. �Y t iy I fit, aj,}{y*,'r+f`i� 1' r a r �yl:r•�€ "rN+ A :+r9�xt e fwi'`' t�, h�"'-r e:' r o- - V;r *:•••'.x • t,-.I ;s �. y.. 'l �C'.•M r?.l .-r�:i:.{`'s' .i, i,I •`w_..� tF 11 i-.1F�C�• `� ,si i� A�A ��tit1 i;}'`si l3�!`7.�� � � bi : S F #:?: �•.'�;:':,. r;Sl� to *n + � �y�'i�fi iti+�q';�r�+. �t��aiCi•','r :�rf tit�`��r?i4 � 4t' "� of '� "33,r," 4r.:.'c;,�•�t' s t.�„�'t�:� i°+. �-..�'.{� ...< 1 �,),ir'#'!•�a ,_ �'a EY 4f tali tAj' d3, LaA 7;�fft 'J''.•• /.S�p, .r;, ct "t;•,, I v. +�, y sl !,(w.."F qt`. '.S#.�.y _ i r t;•'^ v'S Y } : Y K,,f r Xi ; f 1 �1 i i�1•' p4bs �°.. RIM' r. a '^' '�'t f,� 'S r y'� � i -'r" r r•. �x� t � � � , �'r•"h. S'� , t�•:. Ks,'ji $'r' „�.� e3' �' t i� is� •� rn r ' y �.Y t � `r. b7�,lti:`�ui'�; �-s"'ri t��y�l�jnyyTT, _ r � s�.,ri.•.� �'L°#�i �.j:;l; \: �„ c!o ,L 1 i; � ,it� ram; t, Crt.a� t ? j� ' 1 1•'^ 'i °�a�r�r�t...'���i+..�•,��������;. , t .�...•t�._:1��,: ���r: �.i.� 1 � I ,��r- a y yl � ���' .1 +r `_3, !•` � •'''.. �' ?.; �� •�a'z ��r��,}?�� � !� I °" -'•� rl I � +,.4' r �+1;�1,�'i, 4�rr�i`,y�e�� �.`�p�" t�r.��t5 .y�t� 4,;; ,_�t �t'��..3' i f. �"` p � •� 'f � I7rl��"� s 4ra 1..,_ ,•k, t 3 IFwJ�"y t..y.''rNvl 5'�L,+�i.:if:�,r.•tFx�i����+�.� •1'(�, ��„��1„ ., `. ��try Xf:r' I*r'3M• y.f11'-aY1 [T.•`+ i .i a _ �,n{�,. w.,•JG �.n _ �' ` A+ t 7 S �F y9 a t L l 11 "k ."•r •7 n ., r`,F,r N• nti Y dry♦t T 9 :1; gg [ `St s �+ F +.- rn s•b �y� j -S,F� � , � ;1� � .'1 a,J• , �.�' r� �i•Z5 � i � F �,+ sC11�1�'�++��r¢ i:�Jt,.. l� .yr. ����� ` ��r r�' � ��:rr'� �" °"' �� �', - • �{n ,,, } SCty r t vn s: 12 r�, ,_'dY�t + ,� _ iy+d�..,i3 Kr 8;� i�rl` i iiiJ��'�t�l. �.y' r ",• ! �' �,2{` l al j'irl'{' •P g,�ry'+�J RI �t♦�k' ..'A. '''' Eli �`'t' F{r5",i?` r 7 I i. 'i r' r 7.]S` rt :i�' 't�,f f. i I'- �i:rr�• r`. L.y '�',-Y' • _ "'':' - zFiy� dN�IrtyF 7 ) ��T� l;tif��, i y�4' �r '�. �l• i � �i t, Ir rA'�.dt . ,• , { "'�� 3fi� � � ?i� { AE •t?{�}i,� �� ■�) v,•��t.��^.y'jq�(f,J,i+y':} a • (`` � -h; r"'• pig 1 {yl ''•� ) ry�y((.� �. ' S ` lA e A'• +u Nf•�SS1i..7- �qA j�e7"Vr`l(pj'�� 5�`S'�ii �gV �■ �[+Pr'��g4 }' ,,e t 1.:,;yt f%i !•l„1 41, ,� `�.F+•t 4m +`,'�' �;r" �1l`/•'+;,�;`,�ff� ••➢�`•, +"��`-..,, /.F[��� yr`� +'!'At � � � [�•tF' a °{.`9a T:ri�+' .'as}S �•'' i� r t FtS •4. 1! 4 7 i !-is. 5 N , i S7faf� • ',iaf c.? r,.LS +a', t. d� T ,. i �w1f+�,n ��, �• t + !g+�� + a'_ � �fn�� �•� ,�Q rt'F' t •Rl" F j�: `` ��:� ./'t�'r. %,. : � r •. � • i4r+ '��` . I� � .1' �tl� M. :TF:i. .� t iI y+ [~ 4_ •�f •Rr • _ , �A. 4 "`���" � ' t;,� zJ•� ! ' �Y � p � , G�`h �'r..�(S r �,;�� �. ' �Le .A�a1i � �r• �'w � � s�' Ste, � i ,fir• r+1 "` ��. '��:' J •"6.Mr'3 r 1 SI, g!� �� � I „�r t ,.,f s s r^ • Irasy, �� t'�'..7o-?• ",,• �r �,��`. �j . t. `� .ti_ f'f, i(r�j• �i ii %`�`r�'l"', ���fY7 Y ,�%E�i��,t{;��� fl i' � �' :i r� w• +f<+"'�' i�. ta4SL„`f��iL yts �, `#��t� ri�lP,'r � 'va gray �.i•t i#.i.- 1 F' i„� i' _ .. ^ y S ' . Y.-- µ r9L r t r ? ii•r'Ij,' >,K.?� h �`tI'd i ♦ art" rz, . �,11 t i!C ,rr! 1 •�{4[� .w t .S{ Tyj4 r. �' �yI'r1J.i4 ri'�•Yh�f tt�1,* ��rV•r'afC yi �►•��f lJr t , �1j ��_`s f�Y �'.`^.L°r�1`R�t'�t ST?,^,{S� r��'y Y,f� 5�+~r rlT+ tii 1-..4 '? .. �.! +1ct'.NirLr .v'r�+rlifiW i?^+4•.q� 7�;' tp f,, }•� '`' •'++i F +'�`�._y�i .f• p � • 1t r7 'd .r � 2 I a•ti ,N r! r r k r � a< �hz, +�C ��i lx.• �a f {,. ,� r7r �r '4r` 6 ,� r1yT}il}�'' `��� :'I x>,p�La� T'.f r � �: `r � ��'� r �� d t� ..'a � � '�E�. + ., ;F��i44�,�.5 �i i rid+ '� �ir` 1k `�•`� ., l'�.•.:?. h�..�5'i::r11 �. +',G!1 !. .rP�'i tJ i v:': fr.l: �Z �,y,.'I�+�,r,'r.}.Y��J[,'�.'i�� pis; •.r i'�`<:1#f.i J�.+.:,�' �k�vn".. �-±�r�: ytf�'... ?~5�::�' ra._. �4'yXi ��"T•y� ;t C( S yYYYf''4Y S�� V� EK sure f r. 7 kxx�Y r �ffiF}1"Z8 11'1 of Farm s 1 p o V i ji Ju fv ��a� i 1 .7 D � -- LLei f - -- 0 nq 33f7 ,7i1J�r d7��a ►° — N ►�' l , o-o �`� ry a i foil& i fa D 'Ai e AOL' 7' �j U'r 0.47"'. -9 r 6p )Lt —44 lit 44, Ol ali 4 cm TI T . . . . . . . ... oil 'Ir %AM .328 S i sRr 3&L rrIC-1 1 i�►a inR> yew. Fnend , Oav,s .5211rienrMlis 50 np • �. �\ 1 Cerrfa - V �• r_•t� 9,` _ `' `���� J (/ � --��r Jill it-j" ) l; ,I� ��'��+`�r Y �'� 1 /�` ��� �!• � t� __ter _ "'_ ; � IS b � � � ..��• s�� ; r}r•` IQQ., ( . / Q� _, • �. �/ SSSS f -dig � }. •,'�, � J/f �� � �.�, . it �� � � ,. i s`��� � �55' �� 1 (,/1. 7x S•�. d .j ` �• Yf •U� N ~ la Li I ��1� V lam' � 4• :, J �� `� 1�,'� � � f �' ~;� �. ✓J � ��''f�'� �' ,��_, ` T. •��,� 1 ^ I% � l.l'` � `� �^ ,,^�..`. �� 'gyp :'Teellni.c¢llnsrtuCe 33 CD r j c:: ^Rock,Gr • AlM11UJ w naiiU Shin n i Y t z i � ... .. :...�* af. ........ _ _ _ F a •°7 3 RV NtIX KI1• 7 41rY + �ti ` 1Cl RY .X�a yO� J rill t,,r�l 1n,i1, Yr ej � a; fK Y Y111INOXyt ° ••y � Y47 O O °+ f � � M!1 YNOIYI+• �/3A! fn+ � S V 4YVa LS r i I)k t ,"0 • rr °• � XI t { 4Ooi •�,,_ ttti 1f70S all il,rltr or AMIckv �� H NVIaa 04, 4r, w1,aM al • ylof • rooltY7NISv") V ` O• K/l °` T O 41Y LYYsl • S• • (y a rpol It„ aY R,sllYslll Yall 1 RY t)i rnnN +t1+ S asl� Hyzul w =r!I 3WH3 BWil L7,Yrp • y 1,.M a•+l� aO1! Y v A! vkll. ` 1tl0 tltr � r 1 w -i�bV oY °,71itr4M.. Itli �` aY hits °+r�°r! - it 1 11Y , loolcul k'i ^.� •}, o I : a7 rill ; Mr /{ .p rye ° 1Fi1,7N r OY • aNal �!, Str 1- AOr S A am. MIL n uit V + R ^ o rt° 1 i otrT v I E a+• O))r a ? °°+- Y73v:Ivva12 02°},i]ly a+j7VL ltll ° ' R• tt!! C .= i a° MDypY •'+aA,a s,,+"" 171Y., ' R4 111rr0 ya4!hlI aY ° ++ a• A O • 2 w 11't 6 )I�r °Y Y77 Y4J " h H1�ON •)e {Ja or o d =ll+ w t vo 13A31 . ° c � = y o ;ar lu F `ir W. °Y ar°pw ° aY J�` Y ` A •�• ` °Y 17Nsnol • err, °Y4Y roswo nl, MY7Nfvi. • '� •C!I • °� a 8 Na+ 11)YYYa t '� Na3htl1 Oy, rcrl R a • °1 85 l aY Ilk S 3 NA HIS I • a+ • Ty �°, � �T• a v'ti� ai .• arrN LIMY _ � � AY i .i 1 w � l� ��d • !A 2 1 a o o+ 5+t�`Nr1l1M♦ •Y S94t l,Nrtna M''rfit, o� 31V0$�00a8 Nally b a R4 or r ,ti _ o 2t ° o n ° OuMIS d4pi °• it ANN30 o 6b ° � aY N7YRN° 1kaYa C b l,ll�i Nlllr t44+ E E 4 O E aY ) a am + ° tltl n K41 311aASN311Y °ga 41YjX ° , •E R OHOU • AY[Ni0 � y ° a • t 7 R pY ))�� or 1 N•sMl,'+ tr5� y�1 l/ • j 111� r. °4 1 ' OYE4=r 1 + lhil aaol 1111►L` ��. a4 a ,1 f4f'M Ca � i4� r NY4Y � 1 R O !KI He Y• pSl I r + ° 1lINXRMYIA MOiMY1 r raa a °Y iwonrlt Y9oOYr 61' �A S� it SXff d{ aY XanV .'r am Sloorr' S M�+)•t t °� )lgYOinr, °j sxaoi aYl • r` °: ; ♦ ooN owsw*oN s: �� _ 3AI3 S r` '�► �7 .' +, a � - � 5 v Dec � s •y41 °�+ U � '4 P llrrNa : - - • Y a My HOIS 1iJ 3 aY a�la °r4 '� SAUIN39 ^ 111YtN7 CilY 1'left a 44 � tSl +lMt4d'f +�F,WWi[�,.viLSA.j.iff_'j y„�...,j y IIV IN —d Ir I „ rt� / „ r p� / 31TASN311V 1 y I /49 • ffirl =s o2So I BPS ppn� IAn e! r J f f / f -------------------------- 33� �~ @ Ir t, r`}Acc Inc. n t FGr,,� CAWMP WcmLblc A:'re Traveling Gun Caanpuli-ior-I WOrk:hec 2-20.99 Hard Hose Traveling Gun System COMTUTATZONAL WORKSHEET 1. Farm Number (Identification) .r 737 o Field Number (Identification) 1 2,11, 2. Irrigation System Designation ✓ Eiisting Irrigation System New/ Expand ed Irrigation System 3. Number of Travel Lanes 4 Interior Lanes g Exterior Lanes -----[feet] Length of pull(L 1) n Interior Lanes 9 Exterior Lanes [feet] Length of pull(L2) n Interior Lanes _ # Exterior Lanes _�lfeet] Length of pull(L3) 4. Wetted Diameter -30-0•-[feet] From field data sheet 5. Spacing o? oo Hydrant Spacing [feet] _ o 2 %-- [as percent of wetted diameter] 5. Hydrant Layout Multiple Hydrants Single Hydrant Excessively spaced Hydrants 7. Read the irrigated area per travel pull for the given wetted diameter from the appropriate table and column based on natttern_ snacin2- and travel lane location. II / _ f4 I s7-N I � F� a m . ,4J I' Port ; a , s�oP E.,.r T. rT,�n�#� FAf 1&4% 1,}je igr�es L�P�y��)Cw�d1R)�y�sb0^ APrPS �ie�cs Aces 7rcve� LAn� S O. 6 7 (3 9 y.sJ 5`2 3 �} A �a . 3 �7 .3 (79J(� S D . -:<8 ���CaO a)/9� SG o = 3. �3 O, �%� 174, S � 0. H3 ?&sJ62XC-OkJ�o ss 0.3(" 3. o, 7 y �C� sus)/y ��o 3.S 0. Js a . s 7 Fe - y o 0. a $ (.goo) l 7s� f y3si o = /. a o /• 3.3 o. 6-7 t7- 1,36 0. 10-3 fir- �r 6 7 Sfl� CaS�)/�� s6 0 -3 0 . ��, a i� r �w. 3&•$7. K �• C � c ems` ti _ � � — — — — • � � � 'i X -rni' •� `� p i0 Orn i i 6 r' Zn •[ a Y' 0N,a a o. z (n (/LM N Z O r .an'LLr r ! Y � 51 ifl V ono• 60, 15sl — �L7. Sep I a3 a i • A PFQSS AWFIqATP IN UTTH V§-- qRQqNpl S , ?,P MOP14 wj., N,��§qR ff RINP Npl?, 4-�,5 084 50 70 so 100 170 58 108 180 so 90 66 17b 190 75 124 190 loo 110 63: t30 200 92 1 . 37 206 70 53 1.32 iso fi0 260 40, 90 143 -J-02- M- 83 168 210 120 91 176 220 108 80 90 53 168 200 59 180 210 loo 110 66 191 210 73 200 220 120 79 210 220 W 93 227 230 1.18 90 100 51 206 210 56 215 220 110 120 ¢2 229 220 68 240 230 130 140 74 250 230 80 260 240 150 86 269 240 1 26 110 120 51 257 230 56 267 230 00 140 62 278 240 67 287 240 150 72 299 250 1 34. 130 140 50 302 230 55 312 240 150 58 327 240 8-8. 4..41 2.9 2.2 l,Q 1.5. 1.3 1.1 1.0 0.9 9,0 4.5 3.0 2.2 1,8 i. s 1.3 1.1 1.0 09 iii i5 . 3.-o' 23 i.8 1.1 to 0 0 9J A .9 3.2 2.4 1 I.A. 1..2 1.1 10 32 24 ..9 1.9 1.6 1.4 1.2 I'l 1.0 10.1 5.1. 314 2.5 2.0 I-T 1.4 1.3 1.1 10 10.4 5.2 3-5 26 21 17 1.5 1.3 1.2 1.0 10:6 5 A 15 2.7 21 1.8 1.5 1.3 1,2 1.1 1 1 1.2. 5.6 3.7 2.8 2.2 1.2 1 1 11.3 3.8 _.LO_ 2.3 tB. 1.5 1.4 1.3 1.1 11.8 59 3,9 3.0 24 10 11 1.5 1.3 1.2 lt8 59 39 29 j io 13 12 12.5 62 4.2 31 2.5 21 1.8 . 1.6 14 1 2 1.2,7 6.3 4.2 3 2 M il 1 .8 1.6 1A, 1.3 13.4 6,7 45 3 4 2.7 2.2 1.9 1.7 1.5 13 13,4 6 7 45 3.3 2.7 21 1.9 1 7 1,5 1.3 141. 7.0, 4 7 3 5 2.8 2.3 I a 1 6 4 1 69 46 35 2.8 -io 2.0 1.7 1.5 71 'A 45 72 46 3.6 29 J.3' 4 il l.8 16 1. 145 7.2 4.8 3.6 2.9 24 2.1 t8 1.6 1.4 146 7 3 4.9 36 2.9 2.4.. 2.1 1-18 1.6 1-5 153 7 7 51 38 31 2.6 2.2 ta 13 15 153 77 51 38 31 6 2.2 1.9 1.7 15 159 80 5.3 40 32 2.7 2.3 20 la 16 158 79 5.3 40 32 26 2.3 20 1.8 1.6 164 82 5,5 .41 33 27 2.3 2.0 1.8 1 6 164 82 5,5' 41 33 27 2.3 2.0 1.8 1.6 17.0 8.5 57 43 34. 2.8 jA 2.l 1,9 1.7 16.9. 8.5. 56 42 34 28 2,4 2.1 1.9 1 7 17.5 8.7 5.8 4.4 35 2.9 2.5 2,2 1,9 1.7 17.4 87 5.8 44 35 2.9 2.5 22 1.9 1 7 19.3 96 64 4.8 39 32 7.8 2.4 21 19 19.0 9.5 63 48 38 3.2 2.7 2.4. 21 19 199 10.0 6.6 50 40 li ze 25 2.2 20 -am ENGINE SPEED SETTINGS FOR THE. C1030IRRIGATOR SPEED�GEARRAN$GE ENGINE SPED GEAR RANGE ENGINE FPM ,,x.r...Ps , ^��"> i; .- :..:�., ^��: , ;;;:, +- --.. ...:,�,:.�.,.,--a�.: :. -.� a+w5>.•x�:a T sir,.: . t'�'- .�"{A :.. w .:.a' ,. - � � ,. „ ,., . 1,00 1 LOW 2430 1.25 1 LOW 3040 1.50 2 LOW 2160 € 1.75 2 LOW 2520 2.00 2 LOW 2880 2,25 2 LOW 3240 2.50 2 LOW 3600 2.75 1 HIGH 2710, 3,00 1 HIGH 2960 3.25 1 HIGH 3200 3.50 3 LOW 2640 3.75 3 LOW 2830 4.00 3 LOW 3020 4.25 2 HIGH 2480 4.50 2 HIGH 2630 4.75 2 HIGH 2770 5.00 2 HIGH 2920 5.50 2 HIGH 3210 6.00 2 HIGH. 3500r 6.50 3 HIGH 1990 7.00 3 HIGH 2140 7.50 3 HIGH 2290 8.00 3 HIGH 2440 8,50 3 HIGH 2600 9.00 3 HIGH 2750 9.50 3 HIGH 2900 10.00 3 HIGH 3050 10.50 3 HIGH 3210 11.00 3 HIGH 3360 11.50 3 HIGH 3510 12.00 3 HIGH 3660 • CERTIFICATION CHECK LIST FOR EXISTING IRRIGATION SYSTEMS Waste Utilization Plan Operator has acceptable waste utilization plan Planned irrigation system is compatible with type of waste storage facility, soils, crops and pumping schedule shown in the waste utilization plan Field Specifications (Use USDA-NRCS Table 1 or Similar Table) cl�r Legible„FSA photo copies and county tax maps of effluent disposal fields Maximum useable acreage of each field shown excluding buffer or restricted irrigation areas. The designer will decide usable irrigation area of each field. Soil types of each field Average slope of each field `Crops to receive animal waste are shown for each field `Recommended maximum average precipitation rate in each field (where there is more than one soil/crop combination that results in a different recommended precipitation rate, show the recommended maximum average precipitation rate for each combination) Recommended maximum application amount per irrigation cycle in each field (where there is more than one soil/crop combination that results in a different recommended application amount, indicate the recommended maximum application amount for each combination) 3. Working Map or Sketch Ditches, perennial streams, wetland areas, and other bodies of water are identified along with the size of each. /Surrounding water wells are located Surrounding dwellings, schools, hospitals and other important structure locations are shown l 10/14/97 M CERTIFICATION CHECK LIST FOR �. EXISTING IRRIGATION SYSTEMS Highway right-of-way locations are indicated Location of farm roads, fences and other obstructions are shown to scale on map Critical property boundaries are shown Critical el �atinshat are used in total d nam'c h computations are shown r� ocation of irrigation mains and laterals s nnkler or ;gu:n:h:y�drants thrust blocks, etc. are shown with the design spacing of hydrants anpipes recorded on the map or sketch. This will be accomplished by the irrigation systems designer. (If Possible) 4. Irrigation Design Parameters (Use USDA-NRCS Irrigation Design Parameter Worksheets or Similar Worksheets) A. Traveling Gun Parameters (USDA-NRCS Table 2 or Other) Type of speed compensation (USDA-NRCS Table 4 or Other) t Design travel speed for each pull Design precipitation rate for each pull Design application amount shown for each travel speed Effective width (lane spacing) and effective length for each pull Operating pressure at the reel and the gun for each pull Nozzle diameter in inches, indicate type of nozzle (taper bore or ring) Wetted diameter at specified operating pressure Arc pattern for each pull Hose length and inside diameter Make, model and type of traveler and gun with manufacturer specifications included 2 101I 4197 CERTIFICATION CHECK LIST FOR EXISTING IRRIGATION SYSTEMS Gene al Irrigation specifications should include a pumping schedule for each field giving the number of pumping hours required to meet the crop PAN requirements. This schedule should indicate the gallons or acre -inches to be applied per acre, the S amount of each application and the total number of applications. The schedule / should also give some idea of the timing of the applications. The Plan should discuss application record keeping, need for sample analysis, need for soil sampling and length of time to maintain records The Plan should mention the need for an Emergency Action Plan (EAP). The Plan is the responsibility of the grower. . he Plan should include information on annual system evaluation The Plan should discuss soil type(s), soil(s) maximum infiltration rate, total PAN generation to include sludge, loading rate(s) based on Realistic Yield Expectations (RYE), and maximum loading rates both during summer months and wetter winter months J� 4 10/14/97 If TABLE 4- Irrigation System Specifications Traveling Irrigation Gun Solid Set Irrigation Flow Rate of Sprinkler (gpm) Aerating Pressure at Pump (psi) Design Precipitation Rate (Inlltr) Hose Length (feet) XXXXXXXX Type of Speed Compensation XXXXXXXX Pump Type (PTO, Engine, Electric) Pump Power Requirement .(hp) ALE Thrust Block Spcciiica ionss t7esBlvner 5 - nrnvidn thrust hlnAlr rinlaile nn arnaratn thpwt ' LOCATIO THRUSTBLOC ft. 90o Bend Dead End Tee See USDA -MRCS Field Office Technical Guide, Section IV. Practice Cod tl-DD. NRCS, NC IRRIGATION SYSTEM DESIGNER Name: -Joe Company; 's 11 ` 1 Address: D q S. m or ,� 64 • % 23 o.CCJOra l rV C eZ 7�7,� Phone: REQUIRED DOCUMENTATION lie following -details of design and. materials must accompany all.ii igation designs:: ..A scale. drawing of the proposed irrigation system'which tnciudcs hydri m.loenttonti-"trayelYlanes, pipeline routes, Ilinist block localions and buffer areas where applicable_ . ._ Assu nptiorr's and cot�npir lions fgC dettcti 0. ng total � arnic hcacl�and hor4sepowcr rcquircmcnls.3 Co{nputations used to determine ull mainline and`Iater pipe sizes:= ,- 5onrces and/or calculations user! fordclennining applicatioii"ratcs:' " Computatians,used to de(ermine'the size of lhrust,blocks and illustrations_brali.tlynist block configurations required in (he system. Mafiufactufr?s specifications for. the irrigation pump,'traveler-and spriiilder(s).- Manufacturer's specifications for the irrigation pipe and/or. USDA -MRCS standard for Irrigation Water Conveyance, N.C' Field Mice Teclunical Guide, Section IV; Practice .Code 430-DD. . The information required by this form are (he mmimuj&icquir6ncnts. It is (he responsibility of the designer to consider all relevant factors at a particular site and address (Item as appropriate. Irrigalion pipes should not be installed in lagoon or storage pondembankmcnts without the approval of llic designer. OTE: A buffer strip � v feel wide or wider must be maintained between the limits of [lie irrigation sysacm and all perelutial streams and surface waters per NC Stalules. " hfRCS� .TUPJE, BIG GUN® PERFORMANCE TABLES U.S. UNITS 100 SERIES I9IG GUNS --- 24" TRAJECTORY" 100 T TAPER .� BORE NOZZLES Nile Nczzh Not21e Na12,e HDzxte N0724 Nozzw Noule Np[xh =13 QPM DIA. GPM 41A, GPM D/1 GPM CIA. GPM ".. GPM DtA. OPM DIA, GPM DIA. QPM 01A. s0 50 -vs sa na' 74 zzs 87 z36 too tab' 115 23a 130 266' 150 273 165 260• 2tN 300' 70 6o z23 l6 238 e6 2s6 t03 M.17p 2T5' t36 2e3 155 295' In 302 197 310• 203 33a• 30 66 245, e9 256' 100 270, till- 263' 136 206, 156 300' 175 315• 201 326' 223 33527a 392, Ila 76 265' 92 270' tt1 290' 12@ 30J' t!0 31!' 171 32a• 105 335' 222 3aa' 2a7 35S' 30a 3a0' 'Ava'IeO+e q ly WTM FIOv a sAlpo. OQ_R'R1MQ,1'1Q.Z2 _ `t, ' i�:' 100 ON DIFFUSEA NOZZLES • •-PSI , ..'7t AMVQ •77 RING AING ,98 141N0 HA'Q" gING f .93 AINO �;�G .% RIHG 0.3 DN 0.0 DIN NG 0.70N 0.0 ON GPM DIA GPM DL1 0PM Dµ GPM DIA 0PM DIA GP4 GPM OIA GPM Dµ OPM DIA GPM 0,A .0 6a 208 70 212 1 91 216 103 224 ej-118 256 13a 2aa t52 242 45 Im a6 168 pl In 1Ip 1p6 60 at 236 9e Z40 110 245 125 260 141 270 194 27 —18,1 2e0 V Oil 20113 60 pa 256 $11 2% 127 275 1 146 265 167 Wo 109 305 211 315 . t00 IM 270 17a 280 tat 2?5 j ,62 306 le: 320 212 325 236 335 — " 1Te d.arnplar u! I-- Is auPol. imat*Iy 3ti: lead 'or Ina 211 Irnieci0ry anew. e4 la" br Ia : 150 SERIES BIG GUNS - 240 TRAJECTORY" ISO T TAPIER.60RE NO2ZLES NO;rI. NDCxIe Horde Nozxla Joule Nc¢Zle NDulq 1. P,g I. CPUDIA. GPM D A GPM DIA. GPM NA, ()PM OIA. GPM OW GPM D+A, 60 ' 110 265' la3 Z65' 182 305' 225 325' 275 3A6' 330 366, 366 380, a0 126 790' 160 310' 210 33S' 200 353' 715 371- 1 3a0 386' dab 410' 100 143 310' 18S 330' 235 36b' 290 375 355 aa6' 425 420• 600 a40' ,20 t57 330 Z0a 360' 266 375' 320 395' 365 a20' •65 e40' 5-5 a60' R RING NOZZLES ratJe c1in4 •-'r;::: �. i"B- r.. , , ' ae• ;'.�m-';�•.:: 4 InQ R�nfl 1.0a 1aa- A26 Qinp ti.2e 1.3<' AInQ t e1 I PS.I. GPM Olk, ;iaGpM•"•'4.'DIA,- �'* 6PM qu. GPM DIA In Elm OVM DIA, GPM OIA. GPM 01A. I 60 110 260' 1 143 2e0' lop W 102 300' 225 ,u15• 275 3351 330 350' 305 386' a6 125 250' t-165 .- '"300' 1 210 320 260 34a 315 3a0' 360 390' «s 396• 100 ' tdi 3oa• ?05:4aw,320 , 236 UTZa0 380• 366 300' a25 a00' SAlk 00 12u 157 TS' 20a ]35 266 380' 320 aa0' 386 400' a65 4Y' Say a36 ' ••Try a:ame— 01 Ih'0 V aPoredma,q+y 3% ha. la. the 21• Iryermrl' angle 200 SERIES BIG GUNS -- 270 TRAJECTORY" 2040 T TAPER BORE NOZZLES NOZlk NOW Nozzl6 NDi 21e LN�ylo Naxxle Nnxx4 SI. QPM DIA, QPM DIA.OPM DIA. QPM D,A.G1A. 8P4 DIA CiPM DIA GPM DIA. GPM DIA, 70 27=013N 0' 310 3e0' 355 396• e15 a,D' •00 a30' 555 150' 030 405' 7!6 495' 690 $18' i 90 31C 3g0' 390 •f0' aa3' Say a66' 025 ae6' r15 506' 853 535' 4006 SS5' t 110 3a0 qt0' 350 a30' a70' 605 aph' t"6:450' =-I 095 516, 7p0 S36' aa3 503' 1110 3p0' 37C i:5' 425 A.$- 485�1 J616- I 56i a6fi' 655 515' 755 5a0' asa 560• 1025 Sao, 12,n 420' �200 R RIIN S T �fT t Ping I ng I :1' Ring 1 %+' Ring 1 'n' Aing 2' Rle,g .49 acl.al) 5a ecl�arJ7 ,.6c' "'.Aw I .x equal 11A]' .c+ualF QPM GPM D1A. (1.83' equal GP4 0,� P.SJ. GPM OIR { QPM OIA pvM O+A,' GPM 01l. D1A. AO 250 9a0 330 370' 386 390• -6 a10' a16 ate• 506 aa0• I aaa +s3' I 00 290 370 390 100• 445 a20' Sty aa0 Soo a66' 075 470' Vs 400• 1a0 326 390- AZs a25' S00 445' 375 4a5' 1 600 41101 755 500• 900 520• I t20 I 355 a10' 165 «6' 545 a36' 6im-M30 ass' 72S SOW US 520' e$ 545' 7na 2emelel cl 110 i6 g00r0.'mce,y 2% tep Ior d•e 244 ❑"CWy angle_ SO% 16M 10, IN 21• Waleew•y a," The BIG GUNL pall rm O dele Au Seen ODleingd under .deal me COn6min6 v'C met he ad,e Me'y M1eCted by —Ind, Poor hyd'Wlc enlMnCe CflnnVl'C".i Or Olntl' IallOM NMson lrt1ga1Ion GoroOrmlan makes no rnpr9.enW'en mge'd:.yq droplet c c!44n, un.lenn+y. 01 .PPHCO IOn •.I.. '/. 0 a1/0.1X 0 j Nutrient Management Plan For Animal Waste Utilizati" n -- � This plan has been prepared for: Thomas Farms Timmy Thomas 8251 Oxford Rd. Timberlake, NC 27583 336-364-2633 06-14-2005 This plan has Kim Woods C been developgd' �y: N �� ;� co NCCES Person County 304 S. Morgan St. Rm 123 Roxboro, NC 2 75 73 336-599-1195 Developer Si atwe Type of Plan: Nutrient Management with Both Manure and Fertilizer Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. %-� 3 Si tore (owner) Date ? -/3 05- 19nature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By: J4�1D. ��� _ 13-O S Technical Sp ialist Signature Date ----------------------------------------- ------------------------- ------------ 551946 Database Version 3.1 Date Printed: 06-14-2005 Cover Page 1 5 J i Waste Utilization Plan Amendment for Thomas Farms (Allensville Unit) The owners of this animal operation plan to change the cropping system:"'The updated cropping system will be on a 2-year rotation of Corn, Wheat, and double-cropped=-.��� Soybeans in all of the fileds in the current plan except for Field 7 on Tract 111. That field' will be in fescue hay year-round. A current Nutrient Management Plan was generated on the Nutrient Management Software and is attached. Also, a field addition has been made. Field 10 on Tract 111 is a 3.5 acre field planted in Pines in 1998 on a 7X10 grid to achieve 600-620 trees per acre. Pine trees are not currently in the Nutrient Management Software; therefore, the numbers for that crop are listed in this narrative. Field 10, the pines, will utilize 80 pounds of PAN per acre equalling 280 pounds per year or 560 pounds of PAN over 2 years. Please see attached conrespondance from the NCSU Forestry Department. By adding the amount of PAN utilized by the pines and the cropping system in the Nutrient Management Software, the total PAN applied is 7569 in year 1; and 7647 in year 2 for a total of 15,216 lbs. over a 2 year period. That equals 3,020,031 gallons in year 1; and 3,051,153 in year 2 for a total of 6,071,184 gallons over a 2 year period. The animal operation produces a total of 6820 pounds of PAN each year for a 2-year total of 13,640 lbs. That equals 2,721,180 gallons for each year for a 2-year total of 5,442,360 gallons. This indicates a PAN deficit of 749 lbs for year 1; 827 lbs for year 2; for a 2-year total deficit of 1576. That equals 298,851 gallons for year 1; 329,973 gallons for year 2; for a 2- year total deficit of 628,824 gallons. (Lan wner) Date � 05 (Technic Specilist(s)) ate Subject: Re: Pine Trees From: Doug Frederick <doug_frederick@ncsu.edu> Date: Mon, 18 Apr 2005 09:37:38 -0400 To: rick_hamilton@ncsu.edu CC: Kimberly D Woods <kim_woods@ncsu.edu> Kim - Sorry it has taken me a long time to provide some input to your questions. I agree with Rick and his comments. I have found from experience that young hardwood trees cannot tolerate hog -waste spraying at high rates. I have not sprayed pines with hog waste but 100 pounds of PAN on trees less that 1D years old may cause some burn. I too would suggest you ask Dr. Lee Allen since he has done a great deal of work with nutrition of loblolly pine. His email is: 1_e_ea11en@ncsu.edu Doug Rick Hamilton wrote: Hello Kim An Appling soil is well -drained and aerated, so we won't see accelerated denitrification like we see on poorly drained sites. My recommendation would be to not exceed 100 pounds PAN per year. Preferably, I'd like to see the site rest every third or fourth year, especially until these trees get a little more age and size. The few folks I know that are applying to forests are applying to pastures and fields in the growing season and are using the woods as a dormant season backup. It is OK legally to apply to forest land year around.... By copy to Doug, I'm asking him to weigh in and give feedback if he has other inclinations. Best, rick Kimberly D Woods wrote: / Rick Hamilton wrote: Hello Kim I tried to reply to you the other day, but was on wireless and don;t know if it went out. Doug Frederick is the guru here on hog waste application to trees. It would be helpful if we knew some information like the age of the trees, soil type, frequency of application, number of trees per acre. From that information, we can try to settle on a PAN application rate. Best, rick Kimberly D Woods wrote: Dr. Hamilton, I am the livestock agent in Person Co. I have a swine producer that wants to add a field of Pine Trees to their Waste Utilization Plan, to spray swine effluent on these Pines. I have not been able to get in touch with anyone in the Forestry Dept that can give me an idea of how much and when the effluent can be applied. Dr. Deanna Osmond in the Soil Science Dept suggested I contact Dr. Lee Allen, but I have not been able to reach him. Any help you could provide would be greatly appreciated. Thanks, Kim . Hamilton, The trees were planted in 1998. They were planted on a 7X10 plan so there should be somewhere around 600--620 trees per acre. The soil type is Appling. The owners would like to apply as often as possible throughout the year. That would help maintain a low level in their lagoon. I realize that application only once a year may be as much as Pine Trees can tolerate. Any help you can give me would be greatly appreciated. Thanks, Kim Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is included in this plan. S 13 Swine Farrow -Finish Lagoon Liquid waste generated 2,724,280 gals/year by a 260 animal Swine Farrow -Finish Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 6275 Incorporated 10776 Injected 11867 Irrigated 6820 Max. Avail. PAN (Ibs) * Actual PAN Applied 0bs) PAN Surplus/ Deficit (Ibs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 6,820 7289 -469 2,911,591 -187,311 Year 2 6,820 7367 -547 2,942,538 -218,258 --- -- - - -- - - -- - -------_---- ------ -- - -- -- -- -- -- -- -- --- - -- - - Note: In source ID, S means standard source, U means user defined source. * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this sot 551946 Database Version 3.1 Date Printed: 06-14-2005 Source Page 1 of 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop, as we] 1 as the crop's P205 Removal Rate. The Leaching Index (LI) and the Phosphorous Loss Assessment Tool (PLAT) Rating are also provided for each field, where available. If field's PLAT Rating is High, any planned manure application is limited to the phosphorous removal rate of the harvested plant biomass for the crop rotation or multiple years in the crop sequence. Fields with a Very High PLAT Rating should receive no additional applications of manure. Regardless of the PLAT rating, starter fertilizers may be recommended in accordance with North Carolina State University guidelines or recommendations. The quantity of P205 applied to each crop is shown in the following table if the field's PLAT rating is High or Very High. Planned Crops Summary Tract Field Total Acres Useable Acres Plat Rat in B L1 Soil Series Crop Sequence RYE P205 Restacr (tb/acre} Applied (lbs/acre) 1111 2 1.50 1.5c Unknown 5.3 Appling Corn, Grain 132 bu 58 NIA Wheat, Grain 64 bu. 32 NIA Soybeans, Manured, Double Crop 45 bu. 36 NIA 111 4 3.12 3.12 Unknown 4.9 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 65 bu. 33 NIA Soybeans, Manured, Double Crop 46 bu. 37 N/A 111 5 11.09 11.09 Unknown 5.0 Appling Corn, Grain 135 bu. 59 NIA Wheat, Grain 65 bu. 33 N/A Soybeans, Manured, Double Crop 46 bu. 37 NIA 111 7 1 3,95 3.951 Unknown 5.2 Appling Fescue Hay 5.5 Tons 86 NIA 111 8 4,62 4.62 Unknown 4.8 Appling Corn, Grain 135 bu. 59 N/A Wheat, Grain 65 bu. 33 N/A Soybeans, Manured, Double Crop 46 bu. 37 N/A 3210 l 6,50 6.501 Unknown 4.9 Appling Corn, Grain 135 hu, 59 NIA Wheat, Grain 65 bu, 33 N/A Soybeans, Manured, Double Crop 46 bu. 37 NIA 3210 2 2.34 2,34 Unknown 5.0 Appling Corn, Grain 135 bu. 59 N/A Wheat, Grain 65 bu. 33 N/A I ------- t I I I Soybeans, Manured, Double Crop 46 bu. 37 NIA PLAN TOTALS: 33.12 33.12 551946 Database Version 3.1 Date Printed 6/14/2005 PCS Page 1 of 2 NOTE: Symbol * means user entered data. LI Potential Leaching Technical Guidance Low potential to contribute to soluble None <2 nutrient leaching below the root zone. >= 2 & Moderate potential to contribute to Nutrient Management (590) should be planned. <= 10 soluble nutrient leaching below the root zone. High potential to contribute to Nutrient Management (590) should be planned. Other conservation practices that improve soluble nutrient leaching below the the soils available water holding capacity and improve nutrient use efficiency should be > 10 root zone. considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). P Loss Estimate 6bs/acm1war) P Loss Index Rating P Management Recommendation 0.0 to 1.0 0 - 25 Low No adjustment needed; N based application > 1.0 to 2.0 25 - 50 Medium No adjustment needed; N based application > 2.0 to 4.0 51 - 100 High Application limited to crop P removal > 4.0 > 100 Very High Starter P application only 551946 Database Version 3A Date Printed 6/14/2005 PCS Page 2 of 2 NOTE: Symbol * means user entered data. The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements_, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year 1 Tract I Field Source 0) Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Regd (1bs/A) Comm Fen. Nutrient Applied Qbs/A) Res. (lbs1A) Applic. Method Manure PA Nutrient Applied (lbs1A) Liquid ManureA pphed (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N N 1000 gal/A Tons 1000 gals tons 111 2 N/A Appling 1,50 1.50 Corn, Grain 132 bu. 2115-6/30 147 147 0 1 N/A 0 0.00 0.00 0.00 0.00 111 2 N/A Appling 1.50 1.50 Wheat, Grain 64 bu. 9/1-4/30 129 129 0 N/A 0 0.00 0.00 0.00 0.00 111 4 S13 Appling 3.12 3.12 Corn, Grain 135 bu. 2/15-6/30 150 0 0 brig. 150 59.92 0.00 186.94 0.00 Ill 4 S13 Appling 3.12 3.12 Wheat, Grain 65 bu. 911-4I30 131 0 0 brig. 79 31AD 0.00 97.96 0.00 111 5 S13 Appling 11.09 11.09 Com, Grain 135 bu. 2/15-6130 150 0 0 Irrig. 150 59.92 0.00 664.47 0.00 111 5 S13 Appling 11.09 11.09 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 brig. 79 31.40 0.00 348.18 0.00 111 7 S13 Appling 3.95 3.95 Fescue Hay 5.5 Tons 811-7/31 244 0 0 Irrig. 244 97.46 0.00 384.98 0.00 111 8 S13 Appling 4.62 4.62 Cum, Grain 135 bu. 2115-6/30 150 0 0 Irrig. 150 59.92 0.00 276.81 0.00 111 8 S13 Appling 4.62 4.62 Wheat, Grain 65 bu. 9/lA/30 131 0 0 Irrig. 79 31.40 0.00 145.05 0.00 3210 1 S13 Appling 6.50 6.50 Com, Grain 135 bu. 2/15-6/30 150 0 0 Irrig, 150 59.92 0.00 389.461 0.00 3210 1 S13 Appling 6.50 6.50 Wheat, Grain 65 bu. 911-4/30 131 0 0 brig. 79 3 L40 0.00 204.07 0.00 3210 2 S13 Appling 2.34 2.34 Corn, Grain 135 bu. 2115-6/30 150 0 0 brig. 150 59.92 0.00 140.20 0.00 3210 2 S13 Appling 2.34 2.34 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 Irrig, 79 31.40 0.00 73.47 0.00 551946 Database Version 3.1 Date Printed: 6/14/2005 WUT Page I of 3 Waste Utilization Table Year 1 Tract Field Source U) Soil Series Total Acres Use. Acres Crop RYE Applic, Period Nitrogen PA Nutrient Req'd (Ibs/A) Comm Fen. Nutrient Applied (1bs/A) Res. pbs/A) Applic. Melhad Manure PA Nutrient Applied (Ibs1A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid 1 Manure Applied (Field) Solid Manure Applied' (Field) N N N N 1000 gal/A Tons 1000 gals tons Total Applied, 1000 gallons 2,911,59 qg Total Produced, 1000 gallons 2,72428 Balance, 1090 gallons -187.31 Total Applied, tons 0.00 Total Produced, tons +- _ r 0.00 Balance, tons 0.00 Notes: 1. In the tract column, — symbol means ]eased, otherwise, owned. 2. Symbol * means user entered data. 551946 Database Version 3.1 Date Printed: 6/14/2005 WUT Page 2 of 3 Waste Utilization Table Year 2 Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Regd (lbs/A) Canm Fert. iutrient Applied (Ibs/A) Res. pbs/A) Applic. Method Manure PA Nutrient Applied (lbs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied' (Field) N N N N 1000 ga1/A Tons 1000 gals tons 111 2 N/A Appling 1.50 1.50 Soybeans, Manured, Double Crop 45 bu. 4/1-9/15 175 175 0 N/A 0 0.00 0.00 0.00 0.00 111 4 S13 Appling 3.12 3.12 Wheat, Grain 65 bu. 9/1-4/30 131 0 0 brig. 52 20.93 0.00 65.30 0.00 111 4 S13 Appling 3.12 3.12 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 Irrig. 179 71.50 4.00 223.08 0.00 111 5 S13 Appling 1 109 11,09 Wheat, Grain 65 bu. 9/1-4130 131 0 0 trig. 52 20,931 0.00 232.121 0.00 111 5 S13 Appling 11.09 11.09 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 Irrig. 179 71.50 0.00 792.93 0.00 111 7 S13 Appling 3.95 3.95 Fescue Flay 5.5 Tons 9/1-7/31 244 0 0 Irrig. 244 97.46 0.00 384.98 0.00 111 8 S13 Appling 4.62 4.62 Wheat, Grain 65 bu. 911-4/30 131 0 0 ]Trig. 52 20.93 0.00 96.70 0.00 111 8 S13 Appling 4.62 4.62 Soybeans, Manured, Double Crop 46 bu. 411-9/15 179 0 0 Irrig. !79 71.54 0.00 330.33 0.00 3210 1 S13 Appling 6.50 6,50 Wheat, Grain 65 bu. 911-4130 131 0 0 Irrig. 52 20.93 0.00 136.05 0.00 3210 1 S13 Appling 6.50 6.50 Soybeans, Manured, Double Crop 46 bu. 4/1-9115 179 0 0 Irrig. 179 71.50 0.0 464.75 0.00 3210 2 S13 Appling 2.34 2.34 Wheat, Grain 65 bu. 911-4/30 131 0 0 Irrig. 52 20.93 0.00 48.98 0.00 3210 2 S13 Appling 2.34 2.34 Soybeans, Manured, Double Crop 46 bu. 4/1-9/15 179 0 0 ]Trig. 179 71.50 0.00 167.31 0.00 Total Applied, 1000 gallons 2,942.54 x Total Produced, 1000 gallons 2,724.28 i Balance, 1000 gallons -218.26 Total Applied, tons `�-t 0.00 Total Produced, tons '- 0.00 Balance, tons s- 4.44 Notes: 1. 1n the tract column, -- symbol means leased, otherwise, awned. 2. Symbol * means user entered data. 551946 Database Version 3.1 Date Printed: 6/14/2005 WUT Page 3 of 3 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 111 4 Appling 0.45 1.0 111 5 Appling 0.45 1.0 111 7 Appling 0.45 1.0 111 8 Appling 0.45 1.0 3210 1 Appling 0.45 1.0 3210 2 Appling 0.45 1.0 551946 Database Version 3.1 Date Printed 6/14/2005 IAi± Page I of 1 NOTE: Symbol *'means user entered data. The Nutrient Management Recommendations table shown below provides an annual summary of the nutrient management plan developed for this operation. This table provides a nutrient balance for the listed fields and crops for each year of the plan. Required nutrients are based on the realistic yields of the crops to be grown, their nutrient requirements and soil test results. The quantity of nutrient supplied by each source is also identified. The total quantity of nitrogen applied to each crop should not exceed the required amount. However, the quantity of other nutrients applied may exceed their required amounts. This most commonly occurs when manure or other byproducts are utilized to meet the nitrogen needs of the crop. Nutrient management plans may require that the application of animal waste be limited so as to prevent over application of phosphorous when excessive levels of this nutrient are detected in a field. In such situations, additional nitrogen applications from nonorganic sources may be required to supply the recommended amounts of nitrogen. Nutrient Management Recommendations Test YEAR 1 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (]bs/A) Mn (]bs/A) Zn (Ibs/A) Cu (lbs/A) Lime (tons(A) Tract Field 111 2 Req'd Nutrients 147 0 0 0 0 0 0 0 Acrep. s Ap Period 1.50 2/]5 6/30 Supplied By: C' ti ` ri, �3?J rin; u?�� f a +fir rz� +? , r� :'t i, CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Comm ercia] Fert. 147 0 0 0 0 0 0 0 Soil Series Appling Residual D 0 0 0 0 0 0 0 RYE I Sample Date 132 bu. 01-31-05 Manure 0 0 0 0 0 0 0 0 P Removal I Rating 58 Ibs/ac. Unknown BALANCE 0 0 D 0 0 0 0 0 Tract Field 11 t 2 Req'd Nutrients 129 0 0 0 0 0 0 0 Acres App. Period 1.50 9/1-4/30 Supplied By: �.ry�r V _' t 1 ..'l.: i'✓.. �T'�_ 'rid a r�,sY; � � * �'M. .�.r�t� 11 t 'i• � i �nr� S' •, «..�Y..',}`.-�- � � �y � � �Jnr +� :.y`S �,e..._i , � f {r, p, i� .14'S �.1 R "� r�F " ' � � L _Vil��i�tii '° wi -. � �k �,"' H. , :wS.rY. M. CROP Wheat, Grain Starter 0 0 0 Q 0 01 0 0 Commercia] Fert. 129 0 D 01 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 64 bu. 01-31-05 Manure 0 0 0 0 0 0 0 0 P Removal I Rating 32 Ibslac. Unknown BALANCE 0 0 0 0 0 0 0 0 'tract Field 1 l 1 4 Req'd Nutrients 131 0 0 0 0 0 0 0 Acres ]App. Period 3.12 9/1-4/30 Supplied By: CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. D 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 Q 0 0 0 0 mple Date 65 bu. 02-02-04 Manure 131 71 179 16 1 3 1 0 al Rating 33 lbslac. Unknown BALANCE 0 7] 179 16 1 3 1 0 Field E 111 4 Req'd Nutrients 1500 0 0 0 0 00 pp. Period 3.12 2/15-6/30 Supplied By: CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 Q 0 RYE Sample Date 135 bu. 02-02-04 Manurel 150 82 205 18 1 3 1 0 P Removal Rating 59 Ibs/ac. Unknown BALANCE 0 82 205 18 1 3 1 0 551946 Database Version 3.1 Date Printed: 6/14/2005 NMR Page 1 of 5 Nutrient Management Recommendations Test YEAR I N (lbs/A) P2O5 Obs/A) K2O (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract I Field 111 5 Req'd Nutrients 150 0 0 0 0 0 0 0 Acres lApp. Period 11-09 2/15-6/30 Supplied By: CROP Corn, Grain Starter ol 0 0 01 0 0 0 0 Commercial Fert. 0 0 O 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYESample RYE Sample Date 135 bu. 02-02-04 Manure 150 82 205 19 1 3 1 01 P Rating 59 lbs/ac. Unknown BALANCE 0 82 205 18 1 3 1 0 Tract T", Field ill 5 Req'd Nutrients 131 0 0 0 0 0 0 0 App. Period 11,09 911-4130 Supplied By: ;W� 49 �Wm NM '6W M. MB44 12 CROP Wheat, Grain Starter ;1 0 0 0 0 0 01 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE Sample Date 65 bu. 1 02-02-04 Manure 131 71 179 16 1 3 1 0 P Rating 33 lbs/ac. Unknown BALANCE 0 711 179 16 1 3 11, 0 ERemovall Tract I Field Ili 7 Req'd Nutrients 244 0 40 0 0 0 0 0 App. Period 3.95 8/1-7/3 1 Supplied By: ,Vllk ".x ' " -17,11'11'� " l!"I 7�.-?--I I " `IKNI-�"- MR19-0611 CROP Fescue Hay Starter 00 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE RYE Sample Date 5.5 Tons 09-13-04 Manure 244 133 3341 30 1 6 1 0 P I Rating 86 lbstac. Unknown BALANCE 0 133 294 30 6 1 0 Tract I Field ill 8 Req'd Nutrients 150 50 0 0 0 0 0 A pp. Period 1 4.62 2/15-6/30 Su v CAM CROP Corn, Grain Starter 0 0 0 01 0 0 0 0 Commercial Fert, 0 0 0 0 0 0 0 0 Soil SerieS Appling Residual 0 0 0 0 0 0 0 0 RYE Sample Date 135 bu. 09-13-04 Manure 150 82 205 18 1 3 1 01 P Removal I Rating 59 lbs/ac. Unknown BALANCE 0 82 155 18 1 3 1 0 Tract I Field ill 8 Req'd Nutrients 131 0 50 0 0 0 0 0 Acres ]App. Period 4.62 911-4/30 Supplied By: --w- - gy, CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0; 0 0 0 0 0 Soil Series Appling Residual 01 01 01 0 0 0 0 0 RYE I Sample Date 65 bu. 1 09-13-04 Manure, 1311 71j 1791 16 1 3 1 0 P Removal I Rating 33 lbs/ac. Unknown BALANCE 0[ 711 1291 A 11 3 1 0 551946 Database Version 3,1 Date Printed: 6/1412005 NMR Page 2 of 5 Nutrient Management Recommendations Test YEAR I N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (Ibs/A) Cu (lbs/A) Lime (tons/A) Tract I Field 3210 I Req'd Nutrients 131 0 0 0 0 0 0 0 AcresApp. Period 6.50 9/1-4/30 Supplied By: 11;11'�' WW wwlw;�M Mm' r CROP Wheat, Grain Starter 0 0 0 01 0 0 01 0 Comm erci al Fert. 0 0 0 0' 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 65 bu. 09-13-04 Manure 131 71 179 16 1 3 1 01 P Removal I Rating 33 lbs/ac. Unknown BALANCE 0 71 179 16 1 3 1 0 Tract I Field 3210 1 Req'd Nutrients 150 0 0 0 0 0 0 f) Acres IApp. Period 6.50 2/15-6/30 Supplied By: 090 U-11 CROP Corn, Grain Starter 0 U 0 0 0 0 01 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYESample RYE Sample Date 135 bu. 09-13-04 Manure 150 82 205 18 1 3 1 0 P o' Rating 59 lWac. Unknown BALANCE 0 82 205 18 1 3 1 0 ract t Tract I Field 3210 2 Req'd Nutrients ]so 0 0 0 0 0 ol 0 App, Period 2.34 2/15-6/30 Supplied By:it- �IIWAMU RIM N" t0wm CROP Corn, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0- 0 0 0 Soil Series Appling Residua! 01 0 0 01 0 0 0 0 RYE I Sample Date 135 bu. I 09-t3-04 Manure 150 82 205 18 1 3 1 0 P Removal I Rating 59 lbs/ac. Unknown BALANCE 0 82 205 18 1 3 1 0 Tract Field 3210 2 Re - q'd Nutrients 131 0 0 0 0 0 0 0 Acres IApp. Period 2.34 9/1-4130 Supplied By-, -A' P"I., . �, -, P 5 ME, W. -', ME= CROP Wheat, Grain Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series. Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 65 bu. 09-13-04 Manure 131 711 1791 16 ! 1 3 1 0 P Removal I Rating Unknown I BALANCE ()1 711 1791 161 1 1 31 11 0 NOTE! Symbol * means user entered data. 551946 Database Version 11 Date Printed: 6/14/2005 NMR Page 3 of 5 Nutrient Management Recommendations Test YEAR 2 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) Zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract I Field 111 2 Req'd Nutrients 175 0 0 0 0 0 0 0 Acres App. Period 1.50 1 411-9/15 Supplied By: �tm 09mlaw OMWME sm NM19M CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 01 0, Commercial Fert. 175 0 0 0 0 0 01 () Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date RYE 45 bu. 01-31-05 Manure 0 0 0 0 0 0 0 P v I Rating 36 lbs/ac. Unknown BALANCE 0 0 0 01 0 0 0 0 Tract I Field 111 4 Req'd Nutrients 179 0 0 0 0 0 0 0 App. Period 3.12 4/1-9/15 Supplied By: 'VM7 NNW 441i&R� 6111111.te"MA 0-1i'm CROP Soybeans, Manured, Double Crop Starter 01 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 RYE Sample Date 46 bu. 02-02-04 Manure 179 98 245 22 1 4 1 0 P Removal I Rating 37 Ibs/ac. Unknown BALANCE 0 98 245 22 1 4 1 0 Tract I Field 111 5 Req'd Nutrients 1791 0 0 0 0 0 0 0 Acres lApp. Period 11.09 411-9/15 Supplied By: VAI yq 1� NOMIRIH R111 CROP Soybeans, Manured, Double Crop Starter 0 0 0 ol 0 0 01 0 Commercial Fert. 0 0 0 0 0 0 01 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE I Sample Date 46 bu. 02-02-04 Manure 1791 98 245 22 1 4 1 0 P Removal I Rating 3 7 lbs/ac. Unknown BALANCE 0 98 245 22 1 4 1 0 Tract I Field 111 8 Req'd Nutrients 179 0 so 0 0 0 0 0 Acres App. I Period 4.62 4/1-9/15 Supplied By: g MT77; —J. a—f`, y,� N .x , i EAENRE CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Comm erci a] Fert, 0 0 0 0 0 0 0 0 Soil Series Appling Residual 0 0 0 0 0 0 0 0 RYE Sample Date 46 bu. 09.13-04 Manure 179 98 245 22 1 4 1 0 P Removal Rating 37 Ibs/ac, Unknown BALANCE 0 98 195 22 1 4 1 0 1 Tract I Field 3210 1 Req'd Nutrients, 179 0 0 0 0 0 0 0 Acres App. Period 6.50 4/1-9/15 Supplied By: 1 - A" CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 0 0 Soil Series Appling Residual 01 0 0 0 0 0 0 0� RYE I Sample Date 46 bu. 09-13-04 Manure 179 98 2451 221 1 41 11 01 P Removal Rating, 37 Ibs/ac. Unknown I BALANCE' ol— 981 245 22 1 1 41 1 1 0 551946 Database Version 33 Date Printed: 6/14/2005 NMR Page 4 of 5 Nutrient Management Recommendations Test YEAR 2 N (lbs/A) P205 (lbs/A) K20 (lbs/A) Mg (lbs/A) Mn (lbs/A) zn (lbs/A) Cu (lbs/A) Lime (tons/A) Tract Field 3210 2 Req'd Nutrients 179 0 0 0 0 0 0 0 Acres IApp. Period 2.34 1 411-9115 SuppliedBy: CROP Soybeans, Manured, Double Crop Starter 0 0 0 0 0 0 0 0 Commercial Fert. 0 0 0 0 0 0 01 0 Soil Series Appling Residual 0 a 0 0 0 0 0 0 RYE I Sample Date 46 bu, 09-13-04 Manure j 1791 981 245 221 1 41 1 01 IP Removal I Ratingl 37lbs/ac. jUnknown I BALANCE I "1 911 2451 221 11 41 11 0 NOTE: Symbol * means user entered data. 551946 Database Version 3.1 Date Printed: 6114/2005 NMR Page 5 of 5 The Required Soil Test Values shown in the following table provide a summary of recommended actions that should betaken if soil tests indicate excessive levels of copper or zinc. Fields that receive manure must have an annual soil analysis for these elements. High levels of zinc and copper can adversely affect plant growth. Alternative crop sites must be used when the concentration of these metals approach excessive levels. Site life can be estimated by dividing the amount of copper and zinc to be applied in lbs/acre by 0.036 and 0.071, respectively and multiplying the result by 0.85. By adding this quantity to the current soil index for copper or zinc, we can predict life of the site for waste disposal. In addition to copper and zinc indices, this table also provides a summary of lime recommendations for each crop based on the most recent soil sample. Application of lime at recommended rates is necessary to maintain soil pH in the optimum range for crop production . ReQuired Soil Test Values Tract Field Crop pH Lime Recom. (tons/acre) Cu-1 Copper Recommendation Zn-1 Zinc Recommendation 111 2 Corn, Grain 6.0 0.0 1247 None 857 None 111 2 Wheat, Grain 6.0 0.0 1247 None $57 None 111 2 Soybeans, Manured, Double Crop 6.0 OA 1247 None 857 None 111 4 Cam, Grain 6.0 0.0 559 None 448 None 111 4 Wheat, Grain 6.0 0.0 559 None 448 None 111 4 Soybeans, Manured, Double Crop 6.0 0.0 559 None 448 None 111 5 Corn, Grain 6.3 0.0 1971 None 1372 None 111 5 Wheat, Grain 6.3 0.0 1971 None 1372 None 111 5 Soybeans, Manured, Double Crop 6.3 0.0 1971 None 1372 None 111 7 Fescue Hay 5.8 0.4 2083 Caution: Seek alternative site where possible. Maintain pH al 6.0. 1606 None 111 8 Corn, Grain 5.8 0.4 2110 Caution: Seek alternative site where possible. Maintain pH at 6.0. 1654 None 11 8 Wheat, Grain 5.8 0.0 2110 Caution: Seek alternative site where possible. Maintain pH at 6.0. 1654 None 111 8 Soybeans, Manured, Double Crop 5.8 0.0 2110 Caution: Seek alternative site where possible. Maintain pH at 6.0. 1654 None 3210 1 Cam, Grain &0 O.0 1232 None 1003 None 3210 1 Wheat, Grain 6-0 0.0 1232 None i003 None 3210 1 Soybeans, Manured, Double Crop 6.0 0.0 1232 None 1003 None 3210 2 Cam, Grain 5.8 0.4 1776 None 1269 ]None 3210 2 Wheat, Grain 5.8 0.0 1776 None 1269 None 3210 2 1 Soybeans, Manured, Double Crop 5.8 0.0 1 1776 1 None 1269 None - ------ ------------- -------------- ---------------------------------------------------------------------------------------------------------- ---------- 551946 Database Version 3.1 Date Printed: 06-14-2005 STV Page 1 of 1 The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In mast cases, the priority nutrient is nitrogen but'other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should betaken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lblac Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Farrow -Finish Lagoon Sludge - Standard Corn 120 bu 150 13.16 37.73 75.46 113.19 !-fay 6 ton R.Y.E. 300 26.32 18.87 37.73 56.60 Soybean 40 bu 160 14.04 35.37 70.75 106.12 ---------------- •---------------------------------------------------------------------•--------------------------------------------------------------------------------------- 551946 Database Version 3.1 Date Printed: 06-14-2005 Sludge Page i of 1 The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage Canacitv Source Name Swine Farrow -Finish Lagoon Liquid Design Stora a Ca aeit (Da s Start Date ign 180 Plan Year Month Available Storage Capacity (Days) 1 1 52 1 2 49 1 3 56 1 4 87 1 5 117 1 6 148 1 7 122 1 8 96 1 9 107 1 10 120 1 11 115 1 12 106 2 1 97 2 2 91 2 3 85 2 4 93 2 5 94 2 6 122 2 7 162 2 8 180 2 9 180 2 10 154 2 11 129 2 12 101 " Available Storage Capacity is calculated as of the end of each month. - ---- --------------------- ...------------- ----- g 551946 Database Version 3.1 Date Printed: 06-14-2005 CapacityPa e 1 of 1 Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). ---------------- -- ------------------------------------------------------- ....--------------- - 551946 Database Version 3.1 Date Printed: 6/14/2005 Specification Page 1 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. ------------------------------------------------------------------------------------------------------------------------------- - ----- ---------_.---- 551946 Database Version 3.1 Date Printed: 6/14/2005 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. -.. ------------------------------------------------------------------.-...--------------...--------------------------------- - 551946 Database Version 3.1 Date Printed: 6/W2005 Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. 551946 Database Version 3.1 Date Printed: 6/14/2005 Specification Page 4 Crop Notes The following crop note applies to field(s): 1, 2, 4, 5, 8 Corn Piedmont In the Piedmont, corn is normally planted when soil temperatures reach 52 to 55 degrees fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1-2" deep. Plant populations should be determined by the hybrid being planted. Increase the seeding rate by 10% when planting no -till. Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool, wet soil, banded phosphorus will be more available to the young plants. An accepted practice is to apply 20-30 lbs/acre N and 20-30 lbs/acre phosphorus banded as a starter and the remaining N behind the planter. The total amount of N is dependent on soil type. When including a starter in the fertilizer program, the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn. Timely management of weeds and insects are essential for corn production. The following crop note applies to field(s): 1, 2, 4, 5, 8 Wheat: Piedmont In the Piedmont, wheat should be planted from October 10-November 3. Plant 22 seed/drill row foot at 1-1 1/2" deep and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Adequate depth control when planting the wheat is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 ibs/acre N at planting. Increase the N at planting to 40 ]bslacre in no -till wheat. Apply phosphorus and potash according to soil test recommendations at this time. The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weeds are essential for profitable wheat production. 551946 Database Version 3.1 Date Printed: 06-14-2005 Crop Note Page I of 2 The following crop note applies to field(s): 7 Fescue: Piedmont Adaptation: Well -adapted. In the Piedmont, tall fescue can be planted Aug. 20 to Oct. 10 (best) and Feb. 15 to Mar. 20. For pure -stand broadcast seedings use 20 to 30 Ib/ac., for drilled use 15 to 20 lb/ac. seed. Use certified seed to avoid introducing weeds or annual ryegrass. Plant seed 0.25" to 0.5" deep for pure stands, 0.25" in mixture with clovers. Soil test for preplant and maintenance lime, phosphorus, and potassium recommendations. Apply 40 to 60 lb/ac nitrogen at planting for pure stands only. Do not apply N for mixtures with clovers but use proper legume inoculation techniques. Apply 150 to 200 lb/ac. N to pure -stand fescue for hay production; reduce N rates by 25% to 50% for grazing. Apply N Feb. 1 to Mar. 20 and Aug. 20 to Sept. 30, with equal amounts in each window. Refer to NCSU Technical Bulletin 305 Production and Utilization of Pastures and Forages in North Carolina for additional information or consult your regional agronomist or extension agent for assistance. The following crop note applies to field(s): 1, 2, 4, 5, 8 Double -Crop Soybeans, Piedmont Double -crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no -tilling soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 4-6 seed/row foot for 7-8" drills and 6-8 seed/row foot for 15" rows. Seeding depth should be 1-1 1/2" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-30 Ibs/acre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. ------------------------ -•-------------------------------------------------------------------------------------------------- ----------- 551946 Database Version 3.1 Date Printed: 06-14-2005 Crop Note Page 2 of 2 NUTRIENT MANAGEMENT and WASTE UTILIZATION PLAN SUPPLEMENTAL INFORMATION N.C. Practice Job Sheet: NC-590-633 Prepared for: By, Farm: Tract: Date:_ _/_J_ • To utilize agricultural wastes for WHAT IS NUTRIENT MANAGEMENT? livestock feed or as an energy source. The conservation practice, Nutrient Management, is managing the amount, source, placement, form and timing of the application of nutrients and soil amendments to achieve realistic production goals, while minimizing nutrient movement to surface or ground waters. The practice, Waste Utilization, is using agricultural waste such as manure or wastewater in an environmentally sound manner. These practices are jointly accomplished through the development of a Nutrient Management/waste Utilization Plan, which is normally part of a broader Conservation Plan that addresses multiple natural resource concerns on the land. PURPOSE OF NUTRIENT MANAGEMENT and WASTE UTILIZATION PRACTICES Your nutrient management/waste utilization plan is intended to accomplish one or more of the following objectives: • To budget nutrients for plant production. • To properly utilize manure or organic by- products as a plant nutrient source. • To minimize the delivery of agricultural nutrients to surface and ground water resources. • To maintain or improve the physical, chemical, and biological condition of the soil. CONTENTS OF THE NUTRIENT MANAGEMENT 1 WASTE UTILIZATION PLAN The information provided in this Job Sheet and the attachments meet the minimum requirements for a Nutrient Management Plan for USDA-NRCS purposes. This Nutrient Management Plan includes: I A plan map and soils map for the area planned (these may be part of the overall Conservation Plan). 2. Location of designated sensitive areas or resources (streams, wells, sinkholes, etc.) and any associated nutrient application setbacks, etc. 3. Your planned crop rotation. 4. Results of soil, plant, water tests. 5. Results from Phosphorus Loss Assessment Tool (PLAT) or Leaching Index (LI) as required. 6. Realistic yield expectations for the crops in the rotation, and their source if other than default values approved for N.C. 7. Recommended nutrient application rates for nitrogen, phosphorus, and potassium, as well as timing, form, NC Practice Job Sheet: NC-590 (August, 2003) Page E and method of application and incorporation, if applicable. 8. This Job Sheet (or comparable information), that provides the following: • General requirements of this practice, as well as additional requirements to meet the natural resource protection purposes listed above. • Additional considerations specific to this plan. • Operation and maintenance information associated with this practice. Because this Nutrient Management Plan includes agricultural organic sources, additional items are required in the plan to ensure proper waste utilization: • Waste Utilization Agreement (if applicable) • Waste Utilization Third Party Agreement (if applicable) • Additional engineering design and operating information for waste storage structures, transport, and application system, as applicable. These designs, and the instructions for operating these structures, is an integral component of your overall Nutrient Management/ Waste Utilization Plan. • Emergency Action Plan to prevent overtopping or other discharges from storage structures or facilities, as applicable. This plan was developed based on the current NRCS 590 and 633 standards and Federal, state, or local regulations or policies. Changes in laws or regulations may necessitate a revision of the plan. BASIC REQUIREMENTS FOR WASTE UTILIZATION General All manure and organic residues must be applied according to a nutrient management plan (see the following section, "BASIC REQUIREMENTS FOR NUTRIENT MANAGEMENT") You are required to acquire and comply with all federal, state, or local permit requirements related to the handling and application of manure or organic materials. The nutrient management/waste utilization plan must address all organic waste generated at or brought to the facility. A Waste Utilization Third Party Agreement must exist to address all organic waste not handled by the nutrient management/waste utilization plan. Manure or organic wastes will not be applied to the following areas: • surface waters, • wetlands, unless constructed as a component in a waste treatment system, • soils subject to frequent flooding during the period when flooding is expected, • frozen, snow-covered, or saturated soils, • within 200 feet of a dwelling other than those owned by the producer, • within 100 feet of a well, • within 25 feet of surface waters, or • within any other setbacks as identified by federal, state, or local laws or regulations (e.g. NC General Statute prevents swine lagoon effluent from being applied within 75 feet of a residential property boundary or perennial stream or river if the facility was sited on or after October 1995.) Manure or organic wastes will be applied in a manner not to reach surface waters, wetlands (unless constructed as a component in a waste treatment system), property owned by others, or public right- of-way. Sludge.that accumulates in waste storage structures must be analyzed prior to land NC Practice Job Sheet: NC-590 (August, 2003) Page 2 application. Adequate provisions (available land and/or third party manure agreements) must exist to ensure sludge is applied in adherence to all nutrient application requirements. All federal and state guidance regarding the proper testing, handling, planning, and application of sludge must be followed for regulated operations. Since compliance with all applicable North Carolina laws is the responsibility of the producer, you should consult the most current version of the Guidance Memo for Implementing the Environmental Management Commission's Regulations for Animal Waste Management for questions. ADDITIONAL REQUIREMENTS FOR PROVIDING LIVESTOCK FEED if applicable, all agricultural wastes or other organic residues used for feedstock must be handled in a manner to minimize contamination and preserve its feed value. Chicken litter stored for this purpose must be covered. A qualified animal nutritionist shall develop rations that utilize animal wastes. ADDITIONAL REQUIREMENTS FOR PROVIDING A SOURCE OF ENERGY If your facility is to be used for energy production, all energy producing components of the system are included in the Nutrient Management/Waste Utilization Plan and provisions for the utilization of residues of energy production identified. Your Nutrient Management Plan includes the use of these residues, if applicable. BASIC REQUIREMENTS FOR NUTRIENT MANAGEMENT General Application of nutrients must comply with all applicable Federal, state, and local laws and regulations. The realistic yield expectations (RYES) in this plan are based on one or more of the following: • Default values approved by the N.C. Interagency Nutrient Management Committee that incorporate soil productivity information, yield data, and research with North Carolina soils, and cropping systems. Additional information on the default values may be found at: www.soil.ncsu.edulnmpincnmwafindex.htm Documented actual yield data from the site, determined by the average of the highest three yields of the last five consecutive specific crop harvests. (For forage crops, determine the average of the highest three years of the last five years.) • A fertilization rate recommended by North Carolina State University may be used in cases where no yield data or approved RYE values exist for a crop. • An RYE inferred from a similar crop on a soil with similar physical and chemical features may be used for new crops or in the absence of other RYE data. This inferred RYE may ONLY be specified by a certified Nutrient Management planner. Erosion, runoff, and water management controls have been planned, as needed, on fields that receive nutrients. Soil Testing This nutrient management plan has been developed based on current soil test results (no older than three years). Soil samples must be -collected and prepared in accordance with North Carolina State University or the North Carolina Department of Agriculture and Consumer Services (NCDA&CS) Agronomic Division standards or recommendations. NC Practice Job Sheet: NC-590 (August, 2003) Page 3 Soil test analyses can be performed by any laboratory or program that is certified by the North Carolina Department of Environment and Natural Resources (NCDENR), Division of Water Quality, Laboratory Section, NCDA&CS Agronomic Division uses the Mehlich-3 extractant process for soil testing. Growers who utilize other laboratories must request the use of the Mehlich-3 methodology to ensure the test results are compatible with North Carolina's nutrient management planning and assessment tools. For statewide consistency, all laboratories used must provide fertilization recommendations using guidelines and methodologies as referenced at the NCDA&CS website: www.ncagr.com/agronomy/obook.htm Growers are encouraged to use a laboratory that is supported by field research within the state. Soil testing shall include analysis for all nutrients for which specific information is needed to develop the nutrient plan. Plant Tissue Testing Tissue sampling and testing, when used, shall be done in accordance with North Carolina State University or NCDA&CS standards or recommendations. Manure Testing Nutrient values of manure and organic by- products shall be established for planning purposes based on laboratory analysis, acceptable default values, or historic records for the operation. When determining actual application rates, a laboratory analysis is required. State regulations require that waste be tested within 60 days of utilization for some operations. In the case of daily spreading, the waste must be sampled and analyzed at least once a year. Acceptable laboratories include the NCDA&CS Agronomic Division, or others certified by the NCDENR. Field Risk Assessment A field -specific assessment of the potential for phosphorus transport from each field (or groups of similar fields) have been conducted, using the North Carolina Phosphorus Loss Assessment Tool (PLAT) PLAT assesses the potential for phosphorus (P) to be transported from the site to surface water through each of the four primary loss pathways: • sediment -bound P transported through erosion, • soluble P transported through surface runoff, • soluble P leached through the soil profile, and • non -incorporated source P transported through surface runoff. Based on the assessment of each loss pathway, PLAT produces a single rating for each field. As shown below, this rating will identify whether nitrogen or phosphorus shall be the rate -determining element in developing the planned application rate for manure. PLAT Rating Nutrient lication Criteria LOW Nitrogen -based manure application. MEDIUM Nitrogen -based manure application. HIGH Manure application limited to phosphorus removal from site in harvested plant biomass. VERY HIGH No additional manure application to be specified in plan for the site. On all sites, regardless of the PLAT rating, starter fertilizers may be recommended in accordance with NCSU guidelines or recommendations. NC Practice Job Sheet: NC-590 (August, 2003) Page 4 In some cases, specific conservation practices that reduce the potential for phosphorus transport have been incorporated into PLAT. Examples include buffers or filter strips, ponds, water table management, and residue management and conservation tillage. Similarly, soil erosion rates, either existing or planned, have been incorporated into your PLAT analysis. This information is shown on the PLAT results enclosed. Because the management of the site actually affects the PLAT rating, all practices identified on the PLAT analysis (including any required to achieve the specified erosion rate) must be either already installed or included in a Conservation Plan for the Nutrient Management Plan to be approved. Nutrient Application Rates Recommended nutrient application rates are based on North Carolina State University or NCDA&CS recommendations that consider current soil test results, RYEs, and management. Liming material shall be applied as needed to adjust soil pH to the specific range required by the crop or crops in the rotation for optimum availability and utilization of nutrients. The application amount and rate (in/hr) for liquid wastes (e.g. applied through irrigation) shall not result in runoff from the site. The application shall not exceed the field capacity of the soil. The planned rates of nutrient application are shown on the attached sheets. These rates have been computed as follows: Nitrogen Application - When the plan is nitrogen -based (a PLAT rating of Low or Medium), the application rate of manure or organic by-products shall be based on the recommended nitrogen rate using the RYE for the site (or a rate recommended by NCSU or NCDA in the case of crops without established RYEs). This may result in an application rate for other nutrients that exceeds the soil test recommendation. When the plan is being implemented on a phosphorus standard (a PLAT rating of High or Very High), manure or other organic by-products shall be applied at rates consistent with the phosphorus application guidance below. In such situations, an additional nitrogen application from non -organic sources may be required to supply nitrogen at the rate recommended by the RYE. • Within the limits allowed by PLAT, manure or other organic by-products may be applied on soybeans at rates equal to the estimated removal of nitrogen in harvested plant biomass. All nitrogen rates for hay production are for pure grass stands. Due to the nutrient recycling by grazing animals, the planned nitrogen rate per unit yield for hay crops shall be reduced by 25% for the portion of the expected yield that is removed through grazing. Phosphorus Application — When manure or other organic by-products are used, the planned rates of phosphorus application shall be based on the PLAT rating for the site, as follows: Low or Medium Rating — The planned manure or organic by- product application rate is based on the nitrogen needs of the crop. High — The planned manure or organic by-product application rate is limited to the phosphorus removal rate of the harvested plant biomass. Very High Rating — No additional manure or organic by-product application is specified in the plan. NC Practice Job Sheet: NC-590 (August, 2003) Page 5 On all sites, regardless of the PLAT rating, starter fertilizers containing nitrogen, phosphorus, and potassium may be recommended in accordance with North Carolina State University guidelines or recommendations. A single application of phosphorus applied as manure or organic by-product may be made at a rate equal to the recommended phosphorus application or estimated phosphorus removal in harvested plant biomass for the crop rotation or multiple years in the crop sequence. • When such single applications are made, the rate shall: ♦ not exceed the recommended nitrogen application rate during the year of application, or ♦ not exceed the estimated nitrogen removal in harvested plant bio- mass during the year of application when there is no recommended nitrogen application, or • not be made on sites with a Very High PLAT risk rating. • Potassium Application — Punned potassium application rates should match the soil test recommended rates as closely as possible. (This is particularly critical in situations where a potentially harmful nutrient imbalance in crops or forages may occur, such as grass tetany). When using manure or other organic sources, the addition of potassium from non -organic sources may be required. • Other Plant Nutrients - The planned rates of application of other nutrients if applicable are consistent with North Carolina State University or the NCDA&CS guidelines or recommendations. Nutrient Application Timing Timing of nutrient application shall correspond as closely as possible with plant nutrient uptake characteristics, while considering cropping system limitations, weather and climatic conditions, and field accessibility. Nutrients shall not be applied to frozen, snow-covered, or saturated soil. Manure or organic by-products shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. For nutrients applied through irrigation systems, application equipment should be properly calibrated to ensure uniform distribution of material at planned rates. Plan Review and Revision Period A thorough review and revision (if needed) of the nutrient management plan shall be conducted on a regular cycle, not to exceed five years. Heavy Metals Monitoring For animal waste, including sludge, zinc and copper concentrations shall be monitored and alternative crop sites for application shall be sought when these metals approach excessive concentrations. The following criteria and actions are provided: Mehlich-3Index Action Zn-I 300 (21 Ibslac) Peanuts are very sensitive to zinc, and application on peanuts should be limited. Seek alternative sites when possible. The risk of zinc toxicity is greater with low soil pH and has been seen at Zn-I as low as 300. ' 500 (35 Ibslac) Critical toxic level for peanuts. Cease application on peanuts.' 2,000 (142 Caution: Seek alternative sites Ibslac) when possible for all crops. ' 3,000 (213 Critical toxic level for all crops. ibstac) Cease application for all crops.'_ NC Practice Job Sheet: NC-590 (August, 2003) Page 6 Mehlich-3Index Action Cu-I 2,000 (72 Ibs/ac) Caution: Seek alternative sites when possible for all crops. ` 3,000 (908 Critical toxic level for all crops. Ibslac) Cease application on all crops. ` Maintain pH at 6.0 on these sites. When sewage sludge is applied, the accumulation of potential pollutants (including arsenic, cadmium, copper, lead, selenium, and zinc) in the soil shall be monitored in accordance with the US Code, Reference 40 CFR, Parts 403 and 503, and applicable state and local laws or regulations. Additional information'on heavy metal criteria for sewage sludge may be found in Land Application of Sewage Sludge, EPA1831-B-93-002b publication number at: htfp.-11www.gpa. aovInpdeslaubslsludge.ndf ADDITIONAL REQUIREMENTS FOR MINIMIZING DELIVERY OF NUTRIENTS TO SURFACE AND GROUND WATER In areas that have been identified as impaired with agricultural nutrients being a likely source, an assessment shall be completed of the potential for nitrogen or phosphorus transport from the site. (The streams/water bodies in this category are listed in the USDA- NRCS Field Office Technical Guide, Section I.) •W This nutrient management plan IS NOT in an area where surface waters are impaired, with agricultural nutrients identified as a likely source. The Leaching index (LI) is not required, ❑ YES This nutrient management plan IS in an area where surface waters are impaired, with agricultural nutrients identified as a likely source. The Leaching Index (LI) is included in this plan. While the results of the LI does not affect your planned nutrient application rates, some additional conservation practices may be specified in the plan to reduce the risk of nutrient movement from the field, if applicable. IMPORTANCE OF MANAGING NUTRIENTS Nitrogen and phosphorus are water soluble elements and either or both may be components of organic and inorganic fertilizers. In soluble forms, both can move with water as leachate down through the soil, or over the soil surface as runoff after rainfall. While nitrogen and phosphorus exist in different forms and may move through different transport processes on the same site, they both can have detrimental effects on both surface and shallow ground water quality. As an example, excess nutrients can result in accelerated eutrophication with severe algal blooms and fish kills. Because of the topography, hydrology, and other factors in the state, the environmental problems from excess nutrients reaching surface water may not be exhibited near the contributing source, but rather create water quality problems far downstream. Consequently, the Neuse River Basin, Tar -Pamlico Basin, the Chowan River, the watershed of the B. Everett Jordan Reservoir, and the watershed of the New River in Onslow County are listed as Nutrient Sensitive waters in North Carolina. Nitrogen: Nitrogen applied as fertilizer or organic material is transformed into nitrate and can move with the water moving downward into the shallow ground water and eventually to surface waters. (Relatively small amounts of nitrogen reach our surface waters through rainfall runoff. ) The Leaching Index (LI) is a NC Practice Job Sheet: NC-590 (August, 2003) Page 7 required part of the nutrient management plan in some areas of the state with surface water impairments. The LI uses soils information and local climate data to assess the potential hazard from leaching of nutrients. The results of the LI analysis and recommended actions are included in your nutrient management plan, if applicable. Phosphorus: Research in recent decades indicates that, with high soil phosphorus levels, phosphorus has more potential to be transported off -site than recognized in the past. Phosphorus can be transported in several ways: (1) attached to soil particles leaving the field through erosion, (2) in soluble form leaving the field in surface runoff, and (3) in soluble form leaching downward through the soil profile, and eventually into surface water. Unlike nitrogen, the most likely transport pathway for phosphorus varies by site, and depends upon such factors as soil erosion rate, soil phosphorus levels, texture of soils, existence of buffers, and other factors. In N.C., PLAT is the tool used to assess potential excessive phosphorus losses. The results of the PLAT analysis and recommended actions are included in your nutrient management plan, if applicable. If a site receives a PLAT rating of Low or Medium, then applying manure at rates based on the nitrogen needs of the crop is allowed. It is important to realize that this may result in phosphorus being applied at rates that significantly exceed the crop's phosphorus removal rate. In these cases, the planned nutrient application rate is not sustainable, and eventually a PLAT rating of High may be reached. OPERATION & MAINTENANCE You are responsible for safe operation and maintenance of this practice, including all equipment. The following Operation & Maintenance should be conducted: 1 Review the plan annually to determine if adjustments or modifications to the plan are needed. (The S.B. 1217 interagency group guidelines accepted by the N.C. Division of Water Quality for .0200 operations specify a plan revision when there are changes in crops or cropping patterns that utilize more than 25 percent of the nitrogen generated by the operation.) As a minimum, nutrient management plans shall be thoroughly reviewed every five years and revised if necessary, The next review will be performed in 2. Protect fertilizer and organic by- product storage facilities from weather and accidental leakage or spillage. 3. Ensure proper, calibration of application equipment to ensure uniform distribution of material at planned rates. 4, inspect and maintain the equipment and facilities used to implement the Nutrient Management/Waste Utilization Plan regularly. Any needed repairs should be made in a timely manner. 5. Review the Emergency Action Plan, if applicable, annually. 6. Records should be maintained for five years, or for a period as required by other Federal, state, or local ordinances, or program or contract requirements. To ensure adequate information exists to support sound nutrient management, NRCS recommends the following records be included: • Soil test results and recommendations for nutrient application, • Quantities, analyses and sources of nutrients applied (When the actual rates used exceed the recommended and planned rates on inorganic fertilizer plans, NC Practice Job Sheet: NC-590 (August, 2003) Page 8 records should indicate the reasons for the differences, e.g. inability to acquire custom blended fertilizer.) • Dates and method of nutrient applications, + Crops planted, planting and harvest dates, yields, and crop residues removed, + Results of water, plant, and organic by- product analyses, and • Dates of review and person performing the review, and recommendations that resulted from the review. NOTE; State laws or regulations may define record -keeping requirements for some operations. 7. Ensure that workers are protected from and avoid unnecessary contact with inorganic fertilizers and organic by- products. Protection should include the use of protective clothing when working with plant nutrients. Extra caution must be taken when handling ammonia sources of nutrients, or when dealing with organic wastes stored in poorly ventilated enclosures. 8. Properly dispose of material generated by the cleaning of nutrient application equipment. Excess material should be collected and stored or field applied in an appropriate manner, Excess material should not be applied on areas of high potential' risk for runoff or leaching. 9. Properly dispose of or recycle nutrient containers according to state and local guidelines or regulations. NC Practice .fob Sheet: NC-590 (August, 2003) Page 9 Waste Structure Cleanout Plan 09-14-2012 This plan has been prepared for: Thomas Family Farms Timmy Thomas 8251 Oxford Rd. Timberlake, NC 27574 336-364-2633 This plan has been developed by. - Kim Woods NCCES- Person County 304 S. Morgan St. Rm 123 Roxboro, NC 27573 336-599-1195 Developer Si&Vture Type of Plan: Waste Structure Cleanout Plan Owner/Manager/Producer Agreement Y (we) understand and agree to the specifications and the operation and maintenance procedures established in this cleanout plan. ,:::;� Signature (owner) Date Signature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By: Technical S iaiist Signature Date RMENGYIDBO SEP 17 2012 AgArPm*cjwSecfi " ------- 18884$ --------- Database Version 3.1-------"".___"" ---- -Date Printed: 09-1420f2 """ """"Cover Page -L"________."._ Waste Storage Cleanout Source Description . I SOURCE: Allensville Lagoon Date Measured: 06-22-2012 Lagoon Dimensions: TOP - 600 X 148; BOTTOM - 540 X 88; SIDE SLOPES - 3:1 Liquid Depth: 7.90ft.; Liquid Volume: 2,246,641 gallons. Waste Sample #: W000056 Total Depth: 7.90 ft.; Total Volume: 2,246,641 gallons Estimated Pounds of Plant Available Nitrogen Broadcast 7233 Incorporated 11644 Injected 13761 Irrigated 5998 Maximum PAN Available (lbs.) Actual PAN Applied (1bs) PANSuxplus/ Deficit (Ibs) I Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) 11,644 12,987 -1,343 2,505,.821 -259,180 .9k ........ WN-A --- Nisfi..—Iigi rii.N.- ,mum Val is of the application 'i i i a �d 6:� i n ft - w @eiidon W6"s fie lss6ai Database Version 3.1 Date Printed; 09-14-2012 Desc. 1 The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop, as well as the crop's P205 Removal Rate. The Leaching Index (LI) and the Phosphorous Loss Assessment Tool (PLAT) Rating are also provided for each Feld, where available. Ifa field's PLAT Rating is High, any planned manure application is limited to the phosphorous removal rate of the harvested plant biomass for the crop rotation or multiple years in the crop sequence. Fields with a Very High PLAT Rating should receive no additional applications of manure. Regardless of the PLAT rating, starter fertilizers may be recommended in accordance with North Carolina State University guidelines or recommendations. The quantity of P205 applied to each crop is shown in the following table if the field's PLAT rating is High or Very High. Planned Crops Summary Tract Field Total Acres Useable Acres Flat Rating LI Soil Series Crop Sequence RYE P2O5 Ranoval 10bs&crc)l(1bs/acre) Applied 111 7 4.62 3.70 Unknown N/A Appling Wheat, Grain 64 bu. 32 N/A 1 I 1 8 3.94 3.20, Unknown N/A Appling Wheat, Grain 64 bu. 32 N/A 872 4 Unknown NIA Geor eville Wheat, Grain 59 bu. 30 N/A 872 572 Unknown N/A Geo eville Wheat, Grain 59 bu. 30 N/A 872 573 Unknown N/A Geor eville Wheat, Grain 59 bu. 30 NIA 872 574 M5.54A0 Unknown N/A Georgeville Wheat, Grain 59 bu. 30 NIA 872 575 Unknown N/A Geo evilie Wheat, Grain 59 bu. 30 N/A 872 576 unknown N/A Gear ville Wheat, Grain 59 bu. 30 N/A .872 578 Unknown N/A Geor eville Wheat, Grain 59 bu. 30 N/A 872 574 Unknown NIA Hemdon Wheat, Grain 59 bu. 30 NIA 872 580 11-70, 9.4 Unknown NIA Up= Wheat, Grain 49 bu. 25 N/A 872 581 9.0 7.20 Unknown N/A Lignum wheat, Grain 49 bu. 25 N/A 872 582 2.3 1.8 Unknown NIA Geo eville Wheal. Grain 59 bu. 30 NIA PLAN TOTALS: 135.93 115.78 188848 Database Version 3.1 Date Printed 9/14/2012 PCs Page 1 of 2 NOTE. Symbol i means user entered data. Li Potential Leaching Technical Guidance Low potential to contribute to soluble None < 2 nutrient leaching below the root zone. >_ 2 & Moderate potential to contribute to Nutrient Management (590) should be planned. <=10 solublenutrient leaching below the root Zone. High potential to contribute to soluble Nutrient Management (590) should be planned. Other conservation practices that improve nutrient leaching below the root zone. the soils available water holding rapacity and improve nutrient use efficiency should be > 10 considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No-T111(778), and edge -of -field practices such as Filter Strips (393) and Riparian forest Buffers (391). ! Lass &-ft ate (7bs/a2ek,7) P Loss Index Rating P Management Recommendation 0.0 to 1.0 0 - 25 Low No adjustment needed; N based application > 1.0 to 2.0 25 - 50 Medium No adjustment needed; N based application > 2.0 to 4.0 1 51 - 100 High I Application Iimited to crop P removal > 4.0 1 > 100 Very High I Starter P application only 188849 Database Version 3. t Date Printed 9/14/2012 PCS Page 2 of 2 NOTE: Symbol * means user entered data. The Closure/Cleanout Waste Utilization table shown below summarizes the application of animal waste planned as a result of the closure or cleanout of one or more animal waste storage structures on this farm. The waste applications shown in this table are planned to occur prior to implementing the overall Nutrient Management Plan beginning in Year 1. The waste applications described in this table are also documented in the closure/cleanout plan that was developed as part of this Nutrient Management plan. Closure/Cleanout Waste Utilization Table Year 0 Tract Field Source ID soil series Total Acres I Use. Acres crop RYE APpliG Period Nitrogen PA Nutrient Rcq'd (Ibs/A) Comm Fen. Nutrient Applied OWA) Res. (Ibs/A) Applic. Method Mangy PA Nutrient Applied (tbs/A) Liquid ManurrA pphed (acre) Solid Manure Applied I (acre) Liquid Manure Applied (Feld) Solid Mann: Appiicd (Field) N N N N 1000 gal/q Tons 1000 gals tons 111 7 U1 Appling 4.62 3.70 Wheat, Grain 64 bu. 91I-4/30 129 0 0 Incor. 129 24.8 0. 92.09 0. 111 8 Ul Appling 3.95 3.20 Wheat, Grain 64 bu_ 9/14130 129 0 0 Inter. 129 24.8 0.0 79.65 0.0 872 4 UI ille 73.66 65.80 Wheat, Grain 59 bu. 9/1-4/30 114 0 0 lnoor. 114 22.0(.0. 1.447.34.0. 872 572 U! Georgeville 8.70 7.00 Wheat, Grain 59 bu. 9/14130 114 0 0 Incor. 114 22, 0.01 153.97 0.0 872 573 U1 Georgeville 4.10 3.30 Wheat, Grain 59 bu. 911-4130 114 0 0 Inoor. 114 22.0 0. 72.5 0. 872 574 U I rgevillc 2.30 1.8 Wheat, Grain 59 bu. 9/1.450 114 0 0 Incor. 114- 22. 0. 39.5 0.0 972 575 U1 Georgeville 2.20 1.80 Wheat, Grain 59 bu: 9/1-4/30 114 0 0 inter. 114 22.0 0.0 39.5 0. 872 1 576 U 1 Goorgewillc 3.30 2.64 Wheat, Grain 59 bu. 9/1-450 114 0 0 Incor. 114 22. 0.0C 58. 0.0 872 576 U1 G,orgcville 4.60 3.70 Wheat Grain 59 bu. 9/1 4130 114 0 0 moor. 11 22.II 0.0 8I.3 0. 872 579 U1 Handon 5.5 4.40 Wheat, Grain 59 bu. 9/14130 114 0 0 Incor. 114 22. 0. 96.7 0. 872 590 Ul Lignum 11-70 9.4 Wheai, Grain 49 bu. 9/1-4/30 95 0 0 lncor. 95 18.33 0.0 172.30 0.0 872 581 U1 Lignum 9.00 7.20 Wheat, Grain 49bu. 1 9/14130 95 0 0 Incor. 95 19-33 0. 131.98 0. 872 582 UI -rill, 2.30 L94 Wheat, Grain 59bu. 9/1-4f30 II4 0 0 In,or. ]l 22. 0. 40.4 0.0 Total Applied, 1000 gallons 2,505.81 Total Produced, 1000 gallons 2,246. Balance, 1000 gallons -259.17 � = " Total Applied, tons ^;� a ' 0. Total Produced, lions-'• : 0- Balance. tons `^`'��'$-" 0.00 188948 Database Version 3.1 Date Printed: 9/14/2012 CWUT Page 1 of 1 Land Application Table: Allensville Lagoon Source Type: Cleanout Tract Field Source ID Soil Series Total Acres Use. Acres PLAT Rating Crop RYE Crop APPuc. Period PAN Qbs/A) 1�N APB io Liquid Manure APF Od 1000 gal/Acre A ppli c. Amount (Inches) Applic Method N N 111 7 Ul Appling 4.62 3.74 NIA Wheat, Grain 64 bu_ 9/1-4/30 Incor. 129 i29 24.89 0.92 111 8 Ul APPlinB 3.95 3.20 NIA Wheat, Grain 64 bu. 9/1-4/30 Incor. 129 129 24.89 0.92 872 4 Ul Georgeville 1 73.66 65.80 N/A Wheat, Grain 59 bu. 9/1-4/30 Incur. 114 114 22.00 0.81 872 572 U1 Georgeville 8.70 7.00 NIA Wheat; Grain 59 bu. 9/1-4/30 Incor. 1141 114 22.00 0.81 872 573 Ul Georgeville 4.10 3.30 NIA Wheat, Grain 59 bu. 9/1-4/30 Incor. 114 114 22.00 0.81 872 574 Ul Georgeville 1 2.30 1.80 NIA Wheat, Grain 59 bu. 9/1-4/30 Incor. 114 114 22.00 0.81 872 575 Ul Georgeville 2.20 1.80 N/A Whcat, Grain 59 bu. 9/1-4/30 Incor. 114 114 22.00 0.91 872 576 U1 Georgeville 3 30 2.64 NIA Wheat, Grain 59 bu. 9/1-4/30 Incor. 114 114 22.00 0.81 872 578 U1 Georgeville 4.60 3.70 NIA Wheat, Grain 59 bu. 9/1-4/30 Incor. 1141 114 22.00 0.81 872 579 Ul Herndon 5.50 4.40 N/A Wheat, Grain 59 bu. 9114130 Incor. 114 1141 22.00 0.91 872 580 U1 Lignurn 11.70 9.40 N/A Wheat, Grain 49 bu. 9/1-4130 Incor. 95 95 18.33 0.68 581 U1 Lignurn 9.00 7.20 NIA Wheat, Grain 49 bu. 9/1-4/30 Incor. 95 95 18.33 0.68 M872 872 582 1 U I GeorVville 1 2.30 1.84 NIA Wheat, Grain 59 bu. 9/1-4/30 Incor. 114 114 22.00 0.81 NOTE: * indicates user defined value 198848 Database Version 3.1 Date Printed: 9/14/2012 Allensville La oon Summary; Source Volume Available: 2,246,641 gals. Source Volume Applied: 2,505,821 gals. Excess Application Capacity: 1.1.5 % LAT Page 1 of 1 Lagoon sludge often contains high concentrations of zinc and copper. high levels of these mewls in soils can adversely affect plant growth. The following table provides a conservative (maximum potential) estimate for increase in soil index values.*, Due to inherit variability of waste and soil sampling, it is recommended that conservative soil target levels be set for copper (e.g. Cu-1 < 700-1000) and zinc (e.g. Zn I < 300 for land where peanuts may be grown; for other cropland Zn-1 < 700-1000). Alternative application sites should be selected ifthe Ulowing table indicates that concentrations of these metals may approach excessive levels. For maximum copper and zinc soil index limits, see the NRCS Nutrient Management Standard (Code 590). Estimated Soil Metal Concentrations Tract Field Soil Sato a Crop Source ID Applic. Inches Waste Cu PPm Waste 7n ppm Soil Test Cu-1 Soil Test 7n-I Cu-1 Adj. Zn-1 Adj. Estimated New Number ire Soil Cu-1 Soil Zn-1 111 7 SL022028 o2-2o-12 Wheat, Grain Ul 0.92 9 t8 766 412 54 52 820 464 111 8 SLO22029 02-20-12 wheat, Grain Ul 0.92 9 18 695 411 54 52 749 463 872 4 SLO22028 02-20-12 Wheat, Grain Ul 0.81 9 18 31 34 47 46 78 80 872 572 SLO22028 02-20-12 Wheat, Grain Ul 0.81 9 is 35 23 47 46 82 69 872 573 SLO22028 02-20-12 Why, Grain Ul 0.81 9 18 25 It 47 46 72 62 872 574 SLO22028 02-20-12 Why, Grain U1 0.81 9 18 25 116 47 46 72 62 872 575 SLO22028 02-20-12 . Wheat, Grain Ul 0.81 9 18 33 20 47 46 80 66 872 576 Si.Q22028 02-20-12 Wheat, Grain UI 0.81 9 18 2 1 47 46 69 60 872 578 SLO22028 02-20-12 Wheat, Grain Ul 0.81 9 18 35 21 47 46 82 67 872 579 SLO22028 02-20-12 Wheat, Crain Ul 0.81 9 1$ 42 47 46 89 72 872 590 S1022028 02-20-12 Wheat, Grain Ul 0.68 9 18 43 23 40 39 83 62 872 581 SLO22028 02-20-12 Wheat, Crain Ul 0.68 9 18 31 1 40 39 71 57 872 592 SLO22029 02-20-12 Wheat, Grain U1 0.81 9 18 11 1 47 46 64 62 * NOTE: The equilibrated post application soil index may be less than the projected maximum value. Practical methodology for more precise estimation is not available. 188948 Database Version 3.1 Date Printed: 09-14-2012 Metals Page l of 1 GENERAL LAGOON CLEANOUT INFORMATION: Cleanout Start Date: 09-15-2012 Cleanout End Date: 10-31-2012 This plan has been written in the Fall of 2012 in order for Thomas Family Farms (Timmy Thomas) to remove sludge from the lagoon at the AllensviIle farm. Nutrient source numbers were derived from the waste analysis of the sludge sample taken. Wheat will be the crop to which the sludge is applied. Buffers and setbacks are as follows: 100' from water well supply 200' from residence 50' from public ROW 75' from property line not owned by producer or lessor 75' from blue-Iine stream 750' from public areas; such as park or church --------- -- ....................................................... ----------•---------...--------------.------.-----------•---------............ Preview Date Printed: 09-14-2012 Info Page 1 - f�` t �•rry7°.•r-.r�-!-S.t.,��`� I +- j t+' - also � W �.� �.L k .•�:h - , � �t y �`_5�,k�� % J` �, �1 - �,� f � �Y�y4n l � � Y Of - a M ST+. ,� _ '. �i � /�� '.,� -., ��••�`�,Tx'''W'„�1 _1-�.sS r. �i se•µ Y - • f,,cj .. - + f �- ? j Y 'r ✓1 .„will zqs �lisnai. �' 1 ', � i .� ii Y1r2 kaV! l�1 "5=' t��!'S�- '�. i y r i�✓, f �`,rII :li�r :-� 5 �,. 5,1��:s?1.,?'��ri.YS �}� ^` ��cr i�a. r�� .S' '+' r, ,q,,,vLss� - F no yam! 1, MFn. .; + y , ��r Sy.'y` r ` r, �Y* =t7. +}. .: 1� (� '--..r. i•y"�P� l [ � °'itf � it 40 � J�n� 1, AM ARE P l y v4r r Ic 1 r.. 7 t. ti 4 rr. K!'.f{sii �it'44'Fie lr l �`e"4h y r y r. 3 r5. ^+ •'' y r j � L �E` t� { � r 7""ti !� 5 ��� �, i'{,r � rj , .c� h � ti �„ � - a ,� r t 5i ti �J• '. �L �w, -Jq oar WS ra �' R{ C .� -•rK 3Fr � 3 � •yF f r � s i}+ � ^{h, r h � y i � v if r� R7�i,� � ��tt k. 3X�h•4 + ���t - _ / ., t t -� � '� f n'f�-} vYY �7a.r ♦rd � .� �4lF � {1` IA e�y% �1t r { •C` r , ' b � 1 - 3 ' s?- �' t� � 'f � n we r • r ,1 - ♦! ( ! �w�'� ' � ti� '•,���-� r e r ' ' r s' "5 ti t'4 , � s l x '� �� �, y ; a 1"wtir tu,,, � i�. •, a r 5' ��..�`� ��� t� '. t I^ � �.. -. •t-��i��s t �` a Qy k t � �r • �(s W r rrr N .a x :, F , �H i a [ .f sr ,�.>. r y, t _ ln'•Z ` }•� ;= rrl'�"7 f s"-!` r�x f ` F'fffi ".+. ,r� d'`�'�`c c L �.� -) a ; F � �,.s>«y �.% Ups 1•', J13 ?s,� r �s �' x, Lt�..+ak�3�,a�.�,riy'�1,�¢��_�,,-t�ty9 ° F >, `� � e• a �.7' yam. MASS 4.•. , ±r ty h r k ijei� s5i _ ,r••,• •sr r?i3 - sy, -r r. t. ; a t^Li�vktt - v r r�-MA ( tij �', r +h C - r _ rh st:" �+ et ,{ s i lt� r � "�F � t h •k i '�S+e� �v> _ vaa�r�f�. - '` #Rs•�u,�.f;'Y iS 4s s fi r' J avq_� r` t -. of �. _ : m r•3 'rr'�_a-. V r �} lam y ;� ''t + ;1 W. Y K: 'Xud i t rr1 '�t ?�H�L s j 91 t-i» l i r'. 1 ,.,_, ,:,71. �v �w-r 4 y r'..' -'•y `r%+, vi.,p�trr � � i �5 , a.W ' f '- 7 ., I �. t r� '•� f�- �?11.5�.���./- rr- �C- �+ ���f_t�f.�� R� -'iSt ` yx�rlS i �'4+ � i - r F �`�ti �5 +3 h a t .1 1 � � - L � � ♦ 5 � � ; E n�i t� r � F-•�e e r r -. �< ,, ��r�� �'S!�;�:r�` �''r e �t � yr ,�; ,�� ►. r "�", u�v' v•� .�, 5°F� t�..•�r � ? _.. n � "J$. ; .s. F ~ z 1 �' _�� �r �ryj K3� 'f � 1 �, . �T'`� I ,itn t �� l�1 F � E ,. • 4 s� y �� i i± � �, � §>' a �•'�1 •7�. dR :a '� r;! � �t'kE � ��ri r �5 -' Q i -'=� : ka�j. 1� �. r� r ��-, fi,•} w L . s�+ } , �3y 4 '�,s' y t}t t.�' '�'T'�t �l � • I, _ t fr+ f y � s }' � Z `�, 11 �; - � r ,"'•Cti4` Z�t,� c�,' e , `ti�y�f � 2. k p 1 T � j i ,s 9 1 -s.- r,. ssr t �; r� 3Y C 1 �+5� �� xl ✓ 1 .S � �� • h .� ��� 1J M + � ,. 14fNi•5 yb 3 ,�..�. i M� . ,rk r i tl� �' �f�-R' �"?'�s'� c, r 4 �r3�. �.�r y��' t -�;�•t _Ir L' f _ �y,�^ 9 1�'+' 'i. ;i1 y��'4 - rF. ! .fi• �.+ s - -t � .�5� r� = x f J� t y, i- - �+L . `— -'�' Mr + �'f�`rs ,3 �F7 : ? `:f�y,�i 't c ;r is ✓y,.nj r' :.� e tt -a t3 r e '� _ S� ` j is -�i_ f1,. iOcs, , law cA ? t�� �•T1`' ._w.-.'tti. . ` - -,, - ; 4,t y t F !Y. "/ ; r i i' ,bC ,.I••��r� r it 'c. t i = t i *'y? f �,�•,'3a�j.; yp, r k - i"4 �t r r>+ ' ' �': tr ,n. ���'��1• p.:�,s rr.•'Y# e�'�f 'T`+tw, �L� pry• .s"L,7'a.a t � �'.r, aF �� cs • `��• `• � � ls�y � dry+ i ,t �7Ae � �•F� _ c, al l r' �'��uJ'n " i �,i'e i a i '��- G»,j fir" tl,� � + f 'p cl � F� r y .� T�. .w..��..,�^il �L.cl._.t._.ytt.„yn• : �_ - +� �.�r� - -�,•x ke;;s,,. �3>w•Y��'_. fii•�v.•.. .ti�`�t-y:�'.�_`�'r E.. ^.s'� - •t On ' .' `��� ;�. ..: . r, *. ;. ,,, r i .� . � ,�: �� 1 J 4�i. �:.. � �� , '�:.. -� . i,,�r ... ., .. _ �/ �� . .' \ _ '1 .. �: T. �.� �_ I .. f� r/ ''. .� �' !r'' .fw'J. . -,R - '� �� rr . � ��:����.- _:� � s� �' � � " Njj�.r �. NCDA&CS Agronomic Division Phone: (919) 733 2656 Website: www.ncagr.govlagronomil Report No. FY13-WMW56 «L, Client: Timothy (Timmy) Thomas Advisor. Predictive 8181 Oxford Rd. Timberlake, NC 275B3 Waste Report Counly. Person Un[cs to Helpful Infommation — Sampled: 06/25/2012 rs-akrad: 07/02/2012 Comph ted: 07/03/2012 Farm: Sample information Nutrient and Other Measurements Nitrogen (N) (ppm) P (Awo K &pm) Ca (ppm) Mg) (amm) S (ppm) Fe (ppm) Mn (ppm) Zn (vpm) Cu (ppm) B (ppm) Na (ppm) C (apm) Sample 1D: 736L5D Total N 34.9 1050 142 58A 400 2.60 D.16 0.79 0.81 1.58 1 B7 Waste Code: ALS Desadptfon. Total Kjs/dah1N 312 ---------------------- •--------------------------------- Shrine Lagoon Liq. pH DM (%) SS (104s/c n) EC (mS/cm) CCE (%) ALE(1000 gal.) C:N 1> eruc N NH" 7.74 Comments: NOs N :. --------------------------------------------------•----•.-..-....-....-------------.---------------------...- Otganic N N) (ppm) Cd (ppm) Pb (vp►n) At (Awn) Se (ppm) L) (ppm) As(Awn) Cr (vpm) C0 (ppm) Cl (ppm) M0 (Ppm) Urea Estimate of Nutrients Available- for First Crop (lb 11 DDO gal) Other Elements (lb 11000 gal.) Appttcation Method N P205 K20 Ca Mg S Fe Mn Zn Cu B Mo Cl Na Ni Cd Pb Se Li Broadcast 1.30 0.47 8.40 0,83 0.34 2.33 0.01 0.00 0.00 0.00 0.00 1.56 Irrigation 1.3D 0.47 8.40 0.83 0.34 2.33 0.01 0.00 0.00 0.0D 0.00 1.56 Agronomists Comments: Completed: July 16, 2012 North Carolina ��lucau iru�t Frmd CtMlrsriw�+a Reprogramming of the laboratory4n1ormation{managament system that makes this report possible is being funded through a grant from the North Carolina Tobacco Trust Fund Commission. Thank youfor using agronomic services to manage nutrients and safeguard environmental quality. - Steve D-oxler, Commissioner of Agriculture. < 461 &CS Agronomic Division Phone: (919) 733-26W Webaite: www.ncagr.govlagronomif ReportNo.FY1344=056 Timothy (Timmy) Thomw Page 2 of 3 Sample Information Nutrient and Other Measurements Nitrogen (N) (ppm) P (ppm) K (ppm) Ca (ppm) Mg (ppm) S (ppm) Fe (ppm) Mn (ppm) Zn (ppm) Cu (ppm) B (ppm) Na (ppm) C (ppm) Sample ID: 731 LSD Total N 37.3 992 184 54.0 25.3 3.46 0.26 .1.58 1.23 1.35 246 Waste Code. ALS Description: Total ifeldahlN 470 ............. ------------------- ........................... SvAne- Lagoon Liq. pH OM (%) SS (10-scorn) EC (mSJc►n) CCE (%) ALE(1000 gal.) C:N Inorganic N NH4-N 8.00 Comments: NO3-N Organic N Ni (ppm) Cd (ppm) Pb (ppm) Al (ppm) Se (ppm) Li (ppm) As (ppm) Cr (ppm) Co (ppm) Cl (ppm) MO (ppm) Urea _ Estimate of Nutrients Available for First Crop (ib / 1000 gal.) Other Elements (lb / 1000 gal.) Appikation Method N P205 K20 Ca Mg S Fe Mn Zn Cu B Mo C1 Na Ni Cd Pb Se Li Broadcast 1.96 0.50 7.94 1.07 0.32 0.15 0.02 0.00 0.01 0.00 0.00 2.05 Irrigation 1.96 0.50 7.94 1.07 0.32 0.15 0.02 0.00 0.01 0.00 0.00 2.05 Sample Information Nutrient and Other Measurements Nitrogen (N) (ppm) P (ppm) K (ppm) Ca (ppm) Mg (ppm) S (plan) Fe (ppm) Mn (ppm) Zn (ppm) Cu (ppm) B (ppm) Na (ppm) C (pprn) Sample tD: 731LSS Total N 289 981 414 194 120 172 6.20 17.8 9.31 1.99 242 Waste Code: ALS Description: Total Kjeldahl N 941 ............................. ................. --.............................--.. Swine Lagoon Liq. Inorganic N pH DM (%) SS (10-55/cm) EC (mS/cm) CCE (%) ALE(I000 gal.) C.N NH¢•N 7.60 Comments: NO3-N Organic N Ni (ppm) Cd (ppm) Pb (ppm) At (ppm) Se (ppm) Li (ppm) As (ppm) Cr (pprm) Co ft m) Cl fppm) Mo wpm) Urea Estimate of Nutrients Available for First Crop (lb 11000 gal.) Other Elements (Ib 11000 gal.) Appikatton Method N P20s, K20 Ca Mg S Fe Mn Zn Cu B Mo Cl Na Ni Cd Pb Se Li Broadcast 3.92 3.86 7.85 2.41 1.13 0.70 1.00 0.03 0.12 0.06 0.01 2.02 Irrigation 3.92 3.86 7.85 2.41 1.13 0.70 1.00 0.03 0.12 0.06 0.01 2.02 NCDA&CS Agronomic Division Phone: (919) 733.2655 Website: www.ncagr.govlagronomil Report No. FY12SLO22028 Thomas Family Farms Inc./Jimmy Page 2 of 60 Sample ID: 13 Recommendations: Lime Nutrients (Wacre) More Crop (tonstacre) N P206 K20 Mg S Nn Zn Cu B Information Lime History: 1- Fes1OGITim,M 0.0 120-200 0 0 0 0 0 0 0 0 Note: 12 2-Fes/OGITim,M 0.0 120-200 0 0 0 0 0 0 0 12 Test Results [units - WN in gkm?; CEC and Na in meq/100 cd; NO3-N in mgldrn): Soil Class: Mineral HM% WN CEC BS% , Ac pH P4 K4 Ca% Mg% S4 Mn-I Mn-All Mn-Al2 Zn4 Zn-Ai Cu-I Na ESP SS4 NO3-N 0.60 1.91 A 86 1.1 6.2 280 159 59 18 37 211 141 141 524 524 647 Sample ID • 14 Recommendations: Line Nutrients (Ib/acre) More Crop (tonslaere) N P205 Kea Mg S Mn Zn Cu S Information Lima History: 1 -Com Grain 0.0 120-160 0. 50-70 0 0 0 0 0 0 Note:_3 2-SG/SB- DC 0.0 80-100 0 9D-110 0 0 0 0 0 of Test Results [units - WN in glom;; CEC and Na in meg1100 wir ; NO3-N in mgldnf]: Soil Class: Mineral HM% WN CEC BS% Ac pH P4 K4 Ca% Mg% S4 tttn-I Mn-All Mn-Al2 Zn4 Zn4U Cu-1 Na ESP SS -I NO3-N 0.51 1.0 .9 84 1.3 6.0 234 37 63 18 39 1922 132 125 411 411 695 Sample I 15 Recommendations: Lime Nutrients (lb/acre) More Crop (tonslacre) N P206 - K2O Mg S Mn Zn Cu B Information Lime History: 1 -Com Grain 0.0 120-100 0. 50-70 0 0 0 0 0 0 Note: 3 2-SG/SEl: DC 0.0 90-100 0 90-110 0 0 0 0 0 Test Results [units - WN in gfemf; CEC and No in meg1100 an'; NO3-N in mgldrm?]: Soil Class: Mineral HIVI% WN CEC BS% Ac pH P-1 K4 Ca% Mg% S4 ' Mn4 Mn4U1 Mn-Al2 Zn4 Zn-Al Cu-I Na ESP SS-1 NO3-N 0.60 0.94 6.7 82 1.2 5.9 252 38 62 17 39 _ 164 117 110 412 412 766 Sample ID: 16 Recommendations: Lime Nutrients (Ib/acra) More Crop (tonsfacre) N P206 Iw ' Mg S Mn Zn Cu B Information Lime History: 1-SG/SB- DC 0.0 BO-100 0-20 i00-120 0 0 0 0 0 0 Nobw3 2- 5aybearrs 0.0 0 0-20 6GM 0 0 0 0 0 Note: 3 Test Results [units - WN In qfw?; GEC and Na In megM00 cmt; No" in mg/dnf]: Soil Class: Mineral HM% WN CEC BS% Ac pH P-1 K4 Ca% Mg% 84 Mn4 Mn4ki1 Mn-Al2 Zn4 Zn-Al Cu4 Na ESP SS -I NO3-N 0.56 0.97 8.1 88 1.0 6.1 64 35 63 23 37 94 65 65 39 39 55 MCDA&CS Agronomic Division Phans: (919) 733.26M Website: www.neagr.gov/agranomY Report No. FY12-SLO22028 Thomas Family Farms Ina/Jimmy Page 39 of 60 Sample 10: 570 Recommendations: Lime Nutrients (blacre) More Crop (tonstacre) N P206 K20 Mg S Mn Zn Cu B Information Lima History: 1 -Cam Grain 0.0 120-160 0 30-60 0 0 0 0 0 0 iNgta: 3 2-SG/SB- DC 0.0 80-100 0 50-70 0 0 0 0 0 Mote-_3 Test Results (units - WN in glom;; CEC and Na In meg1100 cnr3; NO3-N in mgldmr : Soil Class. Mineral HM% W/V CEC 136% " Ac pH P4 K-1 Ca% Mg% S4 Mn4 Mn4U1 MnAl2 Zn4 Zn4U Cu-I Na ESP SS4 M03-N 0.41 1.06 7.0 84 1.1 6.1 72 49 61 20 37 182 125 118 30 30 31 Sample 10: 671 Recommendations: Lime Nutrients (lb/acre) More Crop (tonalacre) N P20a K20 Mg S Mn Zn Cu B Information Lime History: - 1 -Corn Grain -0.0- - 120-160_ 20-40 _ 30-50 0 0 0 0 0 0 Note: 3 2-SGISB- DC 0.0 80-100 40-60 50-70 0 0 0 0 -0 - - Nate-3 Test Results [units - WN in glcnf; CEC and Na In mW00 cO; NO3-N in mgldni?]: Soil Class: Mineral HM% WN CEC BS% Ac pH P4 K4 Ca% Mg% 34 Mn4 Mn4U1 MnAI2 Zn4 ZnAI Cue Na ESP SS -I NO3-N 0.60 0.93 7.4 78 1.6 6.0 46 50 55 20 43 298 196 189 29 29 49 Sample ID: 572 Recommendations: Lime Nutrients (lbI1000 sq ft) More Crop (lbf1000 sq ft) N P205 K20 Mg S Mn Zn Cu B Information Lime History: 1-Tobacoo GH 0.0 Note 9 .5M 1.5M 0 0 0 $ 0 0 �9 Daft: 2-SG/SB- DC 0.0 80-100 10-36 70-90 0 0 6 0 0 Daft: 3 Teat Results [units - WN In glca?; CEC and Na In meW100 cd; NO3-N in mgldnfl: Soil Class: Mineral HM% W/V CEC BS% Ac pH P4 K-I Ca% Mg% S4 - Mn4 Mn4U1 Inn Al2 Zn4 Zn4U Cu4 Na ESP SS-1 NO3-N 0.32 1.11 6.1 87 0.8 6.4 599 44 58 26 31 121 84 77 23 23 35 Sample ID: 573 Recommendations: Lime Nutrients (Iblacre) More Crop (tonsfacre) N P205 K20 ' Mg S Mn Zn Cu B Information Lime History: 1 -Com Grain 0.0 120-160 30-50 50-70 0 0 0 6 2 0 Note: 3 2 - SG/SB- DC 0.0 80-100 50-70 90-110 0 0 $ $ 0 NgIE 3 Note: Test Results [units . WN in Bled; CEC. and Na in meg1100 CO; NO3-N In mgldr#): Soil Class: Mineral HM% WN CEC BS% Ac pH Pd K4 Ca% Mg% S4 Mn4 Mn-All Mn-AI2 Zn4 Zn4U Cu4 Na ESP SS-1 K03-N 0.41 0.98 7.5 85 1.1 6.2 42 38 59 24 36 110 80 73 16 16 25 NCDABCS Agronomic Division Phone: (919) 733.2655 Websits: www.ncagr-govlagronomV Report No. FY12-SLO22028 Thomas Family Farms IncJJimmy Page 40 of 60 Sample ID: 574 Recommendations: Lime Nutrients Iblacre) More Crop (tonsfacre) N P206 KzO Mg S Mn Zn Cu 8 Infomration Lime History: 1-Com Grain 0.0 120-160 80-100 90-110 0 0 0 6 2 0 Note: 2-SG/SB- DC 0.0 80-100 120-140 150-170 0 0 $ $ 0 Notes 3 Test Results (units - WN In glad; CEC and Na In meg1100 crna; NO3-N in mgfdrr?]: Soil Class: Mineral HM% WN CEC BS% At pH Pd K4 Ca% Mg% 94 Mna Mn-All Mn Al2 Zn4 Zn4U Cwl Na ESP S&I NO2-N 0.46 0.99 &0 88 1.0 6.4 19 22 60 28 35 294 187 180 16 16 25 Sample ID: 575 Recommendations: Lime Nutrients jib/acre) Mors Crop (tonslacre) N P206 K20 Mg S Mn Zn Cu 13 Information Lime History: 1-Corn Grain 0.0 120-160 40-60 80-100 0 0 0 6 0 0 Note: 3 2 - SG/SB- DC 0.0 80-10D 60-80 130-16D 0 0 $ 0 0 tl�ia � 3 Test Results [units - WN In glow?; CEC and Na in meg1100 cd; NO3-N In mgfdrr?]: Soil Class: Mineral HM% WN CEC BS% At pH P4 K4 Ca% Mg% S-1 Mn4 Mn All Mn-Al2 Zn4 Zn-AI Cu4 Na ESP SS -I NO3-N 0.46 0.99 8.3 88 1.0 6.4 37 25 62 25 33 335 212 205 20 20 33 Sample it); 576 Recommendations: Lime Nutrients (iblacre) More Crop (tonslacre) N P205 KzO Mg S Mn Zn Cu B Information Lime History: 1 -Corn Grain 0.0 120-160 60-80 90-110 0 0 0 6 2 0Note:-3 2-SG/SB- DC 0.0 W10o 90-11U 160-180 0 0 $ $ 0 Note: 3 Nate: Test Results junits - WN In glcrr?; CEC and Na in meg1100 ems; NO3-N in mgldrr]: Soil Class: Mineral HM% WN CEC BS% At pH P-1 K4 Ca% Mg% S4 Mn4 Mn WS Mn-Al2 Zn4 Zn-Al Cud Na ESP SS4 NO" 0.46 0.97 7.0 86 1.0 6.2 27 19 61 23 28 172 117 110 14 14 22 Sample ID: 578 Recommendations: lime Nutrients (iblacre) Mora Crop (tonsiacre) N P20s K20 > Mg S Mn Zn Cu B Information Lime history: 1 -Corn Grain 0.0 120-160 60-80 70-90 0 0 0 6 0 0 Noteg3 2-SG/SB- DC 0.0 80-100 80-100 110-130 0 0 $ 0 0 Nabe: Note: $ Test Results [units - WN in gfcnf; CEC and Na in megfl00 cap; NO3-N in mgfdm;]: Soil Class: Mineral HM% WN CEC BS% At pH P4 K4 Ca% Mg% S4 Mnd Mn-JU1 WAR Zn4 Zn-AI Cu4 Na ESP SS-1 NO3-M 0.32 LOD 8.3 88 1.0 6.4 30 31 62 24 36 202 132 125 21 21 35 NCDABCS Agronomic Division Phone: (919) 733-2655 Website: www.neagr.gov/agmnomU Report No. FY12-SLO22028 Thomas Family Farms Inc./Jimmy Page 41 of 60 Sample ID: 679 Recommendations: Lime Nutrients (lb/acre) More Crop (tonslacre) N PtOs K20 Mg S Mn Zn Cu S Information Lime History; 1 -Cam Grain 0.0 120-160 30-50 20-40 0 0 0 0 0 0 Note: 3 2-SG/SB- DC 0.0 80-100 50-70 20-40 0 0 0 0 0 Nate: 3 Test Results [units - WN In glcnf; CEC and Na in meq/100 cm'; NO3-N in mgldnf]: Soil Class Mineral HM% WN CEC BS% Ac pH P4 K-1 Ca% Mg% S4 Mn4 Mln4U1 Mn-Al2 Zn4 Zn-Al Cu-I Na ESP SS-1 NO3-H 0.32 0.96 7.6 87 1.0 6.1 40 6 i 60 . 24 33 134 96 89 26 26 42 Sample 1D: 580 Recommendations: Lime Nutrients (blacre) More Crop (tons/acre) N P205 K20 Mg S Mn Zn Cu B Information Lime History: -1 -Tobacco FC - 0.0 50-80 - - 50-70 _ 10-30 0 0 0 6 0 0Note: 1 2 -SG/SB- DC 0.0 80-100 80-100 0 0 0 $ -0 - 0 Nglw3 Ng" - Test Results [units - WN in gled; CEC and Na in meg1100 cm�; NO3-N in mg/duft Soil Class: Mineral HM% WN CEC BS% Ac PH P4 K4 Ca% Ug% 94 Mn4 Mn All Mn4W Zn4 Zn AI Cu-1 Na ESP SS4 NO3-N 0.22 1.04 7.2 85 1.1 6.2 32 104 52 25 33 98 66 66 23 . 23 43 Sample ID: 581 Recommendations: Line Nutrients (Iblacre) More Crop (tonslacre) N P105 KzO Mg S Mn Zn Cu B Information Lime History: 1 -Com Grain 0.0 120-160 W100 40-60 0 0 0 6 0 0 Nate: 3 2-SG/SB- DC 0.0 80-100 110-130 60-80 0 0 $ 0 0 Note: 3 ate: Test Results [units - WN in glcd; CEC and Na In meg1100 cnO; NO3-N in mgldnil]: Soil Class: Mineral HM% WN CEC 133% At pH P-1 K4 Ca% Mg% Ss, • Mn4 Mn-All Mn-AI2 Zn-I Zn-Al Cu-I Na ESP S84 NO3-N 0.66 0.90 7.8 87 1.0 6.2 21 46 64 21 39 129 91 84 18 18 31 Sample 10: 582 Recommendations: Lime Nutrients (lblacre) More - Crop (tonslacre) N P205 K20: Md S Mn Zn Cu B Information Lime History: 1 -Com Grain 0.0 120-160 50-70 90-110 0 15-20 0 6 2 0 Note: 3 2 - SG/SB- DC 0.0 80-100 70-M 160-180 0 0 $ $ 0 Note: 3 N._ qte: $ Test Results [units, - WN in glcd; CEC and Na In megl100 arm; NO3-N in mgldmt]: Soil Class: Mineral HM% WN CEC BS% Ac pH P4 K4 Ca% Mg% S4 Mn4 Mn-All MnAl2 Zn4 Zn-Al Cu4 Na ESP SS -I NO3-N 0.46 1.03 6.3 81 1.2 6.0 35 19 58 22 25 140 101 94 16 16 17 NCDASCS Agronomic Division Phone: (919) 733 2655 Website: www.ncagr.gov/agronomi/ Report No. F1113-SL00D353 7AYlAl,Client: Thomas Family Farms Inc./Jimmy Advisor: M e �• Predictive 8251 Oxford Rd T Timberlake, NC 27583 x Soil Report Mehlich-3 Extraction Couniy. Person senqad: 06272012 a completed:07l022012 Farm. Links to Helpful information07/022012 Sample ID. 01 Recommendations: Lime Nutrients )alacre) More Crop (Wnslacre) N P205 K20 Mg S Mn Zn Cu B Information Lime History: 1-Sud/Sorg Sil 0.0 18D-220 '100 100 0 0 0 0 0 0 Note: 12 2.00 tons/acre. 4.00/2,W2 2-SG1SB- DC 0.0 80-100 120 60 0 0 0 0 0 0 flute: 3 Test Results [units - WN 1n g1m?; CEC and Na in meg1100 cnrr; NO3-N in mgldms]: "Soil Class: Mineral HM% W!V CEC BS% Ac pH P4 K4 Ca% Mg% S4 Mn4 Mn-All Mn-Al2 Zn4 Zn-AI Cu-i Na ESP SS -I NO3-N 0.41 0.94 6.6 79 1 A 5.3 22 49 57 19 63 202 138 131 34 34 31 0.1 2 Sample ID: 02 Recommendations: Lime Nutrients (lislacre) More Crop (tonslacre) N P206 K20 Mg S Mn Zn Cu B Information Lime History: 1 -Sud/Sorg Sil 0.0 180-220 110 90 0 0 0 0 0 0Note: 12 2.00 tonslacre; 4.002,012 2-SG/SB- DC 0.0 80-100 140 60 0 0 0 0 0 0 Nola: 3 Test Results [units - W!V in glcni; CEC and Na in meg1100 cn?; NO3-N in mgldnf ): Soil Class: Mineral HM% WN CEC BS% Ac pH P-1 K4 Ca% Mg% ' S4 Mn4 Mn-All Mn-Al2 Zn-I Zn-Al Cu4 Na ESP SS4 NO3-N 0.51 0.99 6.3 71 1.8 5.0 16 52 52 15 73 208 142 135 51 51 33 0.1 2 Sample ID: 03 Recommendations: Lime Nutrients (iWacre) More Crop (tonslacne) N P205 K20 Mg S Mn Zn Cu B Information Lime History: 1 -Sud/Sorg Sil 0.0 180-220 140 110 0 0 0 0 0 0Note: 12 2.0D tonsiacr+e; 4.002,01; 2-SG/SB- DC 0.0 80-10D 180 90ti . 0 0 0 0- 0 0 N. ote: 3 Test Results [units - WN in glcn?; CEC and Na in meg1100 crr?; NO3-N In mg/daft Soil Class: Mineral HM% WN CEC 138% Ac pH P4 K4 Ca% Mg% S-1 Mn4 Mn4U1 Mn-Al2 Zna Zn4U Cu-I Na ESP SS-1 NO3-N 0.36 0.95 5.7 79 1.2 5.3 5 41 57 18 70 160 113 106 40 40 29 0.1 2 North -Carol Ina imam« TIUM FUw cm1w%AW Reprogramming of the laboratory -information -management system that makes this report possible is being funded through a grant from the North Carolina Tobacco Trust Fund Commission. Thank you for using agronomic services to manage nutrients and safeguard environmental quality. - Steve Troxfer, Commissioner of Agriculture fflta6ia, Agronomic Division Phone: (919) 733-2655 Website: www.ncagr.govlagronomll Report No. FY13-SL000353 Thomas Family Farms Inc./Jimmy € age 2 of 3 Sample ID: 04 Recommendations: Lima Nutrients OWacre) More Crop (tonstacre) N P20S KzO Mg S Mn • Zn Cu B Information Lime History: 1-SudlSorg Sil 0.8 IM220 130 110 0 0 0 0 0 0 Note: 12 2- SGIS B- DC 0.0 80-100 170 90 0 0 0 0 0 0 Note: 3 Test Results [units - WN in glcrr?; CEC and Na In meg1100 cd; NO3-N in mgldn?]: Soil Class% Mineral HM% WN CEC BS% Ac pH P4 K-1 Ca% Mg% 84 Mn4 Mn-AN Mn-Al2 Zn4 Zn-AI Cu-1 Na ESP SS-1 NO3-N 0.41 0.94 6.0 76 1.4 5.2 7 42 55 18 71 198 136 129 37 37 28 0.1 2 Sample ID: 05 Recommendations: Lima Nutrients (Ihlacre) More Crop (tonslacre) N Paoa K20 Mg S Mn Zn Cu B Information Lime History: 1-SudlSorg Sil 1.3 180-220 120 100 0 0 0 0 0 0 Note, 12 - 2 - SGISB- DC -- 0.0 80-100 160. .60 --0 0 _ 0 _.. _ 0 0- 0 -Note; 3 Test Results [units - WN in giant; CEC and Na in meg1100 cd; NO3-N in mgldnol-. Soil Class: Mineral HM% WN CEC BS% Ac pH P4 K-1 Ca% AAg% S4 Mn4 Mn-All Mn-Al2 Zn4 Zn-Al Cu-1 Na ESP SS-1 NO3-N 0.51 0.98 6.1 67 2.0 5.0 10 49 48 15 61 427 273 266 54 54 34 0.1 "2 Sample ID: 06 Recommendations: Lime Nutrients bJacre) More Crop (tonsiacre) N P203 K20 Mg S Mn Zn Cu B Information Lima History: 1-Sud/Sorg Sit 0.8 180-220 120 90 0 0 0 0 0 0 Note: 12 2- SGISB- DC 0.0 80-100 160 - 60 0 0 0 0 0 0 Note: 3 Test Results [units - WN In glcd-, CEC and Na in meg1100 cn?; M03-N in mg/drift Soil Class: Mineral HM% WN CEC BS% Ac pH P4 K4 Ca% Mg% Sd Mn4 Mn-AI7 Mn AI2 Zn4 Zn-AI Cu-1 Na ESP SSd NO3-N 0.60 0.92 8.9 81 1.7 5.5 10 51 56 22 45 1187 729 722 104 104 98 0.1 1 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director November 23, 1998 Timmy Thomas Thomas Farms Pork Inc. 8251 Oxford Rd. Timberlake NC 27583 ffl.1?W,A . IT 0 0 NCDENR NORTH C,AROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Certificate of Coverage No. AWS730010 Thomas Farms Pork Inc. Swine Waste Collection, Treatment, Storage and Application System Person County Dear Timmy Thomas: In accordance with your application received on August 6, 1998, we are forwarding this Certificate of Coverage (COC) issued to Jimmy & Timmy Thomas, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG 100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Thomas Farms Pork Inc., located in Person County, with an animal capacity of no greater than 260 Farrow to Finis_ h and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC. and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS730010 Thomas Farms Pork Inc. 2 Page information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact JR Joshi at (919) 733-5083 ext. 363. Sinc rely, .• Cam- ��� A. Preston Howard, Jr., P.E. cc: (Certificate of Coverage only for all cc's) Person County Health Department Raleigh Regional Office, Water Quality Section Person County Soil and Water Conservation District Permit File -Central Files Permit File-NDPU State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director October 21, 1998 CERTIFIED MAIL RETURNIP REQUESTED Timmy Thomas Thomas Farms Pork Inc. 8251 Oxford Rd. Timberlake NC 27583 ITi �lkfW,A � NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Application No. �7�."aSo�ON AdditionallnfsFi Vgnlkequest Thomas Far stl'ork inc. Animal WaA�FOperatiT .r ) Person County Dear Timmy Thomas: hat90ps��i�� The Non -Discharge Permitting Unit has received additional information regaitAii g the subject application. Further information is required before we can continue our review. Please address and submit the following information by November 20, 1998: 1. Your waste utilization plan appears to be written for a two-year rotation. The summary table on Page 5 and 6 of your revised waste utilization plan shows a huge deficit that is not so if you account for two year's worth of plan available nitrogen produced on the farm. Please revise the summary table and show the actual amount of deficit that occurs over the two-year period. Please note that all revisions or amendments made to the waste utilization plan (WUP) or a portion thereof are required to be signed and dated by both the landowner and the Technical Specialist before they are submitted for review. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter must be submitted on or before November 20, 1998 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 363. Sincerely, JR Joshi. Soil Scientist Non -Discharge Permitting Unit cc: Raleigh Regional Office, Water Quality Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper i� 1. Your waste utilization plan appears to be written for a two-year rotation. The summary table on Page 5 and 6 of your revised waste utilization plan shows a hugh deficit that is not so if you account for two year's worth of plan available nitrogen produced on the farm. Please revise the summary table and show the actual amount of deficit that occurs over the two-year period. As you can see from the tables below, calculations were made for the total amount of PAN produced according to RYE. The tables show the two year rotation with the various crops (corn -wheat -fescue hay in that order) being planted. Actual volume planned to be pumped equals 222,776 cu. ft. and the required volume to be pumped is 201,209 cu. ft. Therefore, 201,209 cu. ft. x 7.48 gal/cu- ft. = 1,505,043.32 gallons. According to the NCDA waste analysis report (W01043 W) a total of 2.1 lbs. of nitrogen per 1000 gallons of swine lagoon liquid pumped. Therefore, 1,505 x 2.1 Ibs.11000 gallons = 3,160.50 lbs. PAN for six months storage. For one year storage 3,160.50 x 2 = 6,321 lbs./yr. Therefore, 6,321 lbs. of nitrogen produced per year for this facility according to the current waste analysis report. Therefore, 6760 lbs. of actual PAN needed is more than the 6, 321 lbs. of nitrogen actually applied from the waste analysis data. Also, once a vegetation is established on the additional 8.149 acres cleared, this will be amended to the WUP as available crop land for waste application. I hope this helps explain your question concerning the Thomas Farms (Allensville Unit) swine operation. If you have any questions contact Joey Knight with NCCES or Jim Huey with NRCS. Thanks. Thomas Farms Allensville Unit Amendment to WUP Application No. 73-0010 Total PAN/yr - 6760 CORN - March - June (1st Year Spring) Tract Field # / PAN T111 2 605 4 399 5 1499 7 756 8 701 T3210 1 866 2 454 3 110 Additional acreage that was cleared that was not included in calculations TOTAL 5390 5390 # (PAN used on Spring Com crop) + 1370 # (PAN used on Fall Wheat crop) = 6760 # (1st year PAN) N WHEAT - October - March (use 1370 in Fall) (1st year Fall) (use remainder 3806 in next Spring) (2nd year Spring) Tract Field # I PAN T111 2 581 4 383 5 1439 7 726 8 673 T3210 1 832 2 436 3 106 Additional acreage that was cleared that was not included in calculations Total 5176 FHH - August - October (use in Fall after Wheat) (2nd Year Fall) Tract Field # 1 PAN T111 2 440 4 290 5 1090 7 550 8 510 T3210 1 630 2 330 3 80 Additional acreage that was cleared that was not Included in calculations TOTAL 3920 * Used in Fall after Wheat 3920 # PAN therefore, 6760 # - 6726 # = 34 # short we ee5 (Land ner) Achpicalpecialist) (s) (Date) i.� 1, 3.1 General Permit coy, r OF p7y ,1 3. 2.3 Acreage cleared and available fora plic ion (ex uding all required buffers and areas of covered by the application S / /�/O �: �i L � l�r C1.0 .� G' r {_,1! �. ! Cj; r t?rA.:if. ✓ ti K'� �S� ,J Wriry ti✓ i'i i system): Required Acreage (as liste� in the AWMP): <24.30 2.4 Number of lagoons/ storage ponds (circle which is applicable): �^ 2.5 Are subsurface drains present within 100' of any of the application fields? YES or J0 (please circle one) 2.6 Are subsurface drains present in the vicinity or under the lagoon(s)? ES or NO (please circle one) 2.7 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS Standards, etc.) (Swine Only) S . E jor NO (please circle one) 1 a ., ���� � T f�1C, j� �" i.+ % 1 9 i l7" ; J lsi:?G' J What waste e that t �s facility s swore houses an lagoon were sited . �u : W What was the date that this facility's land application areas were sited? ReE,%;A i' 1 REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 33.5 The crops grown on every land application field. 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.39 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.I 1 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.). Please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 3.3.16 Operation and Maintenance Plan. If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. FORM: AWO-G-E 5/28/98 Page 2 of 4 73 -10 Applicants Initials Facility Number: 73 - 10 Facility Name: Thomas Farms WAU F v cO S�GJr�N G 1996 Non. � •„� 4. APPLICANT'S CERTIFICATION: —� (Land Owner's name listed in question 1.2), attest that this application for (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be ret med to me as i complete. Signature /fyjfx%r-) k 50�77.0� Date 1� & 5. MANAGTR'S CERTIFICATION: (complete only if different from the Land Owner) I, (Manager's name listed in question 1.6), attest that this application for (Facility name listed in question 1.1) has been reviewed by me and is accarate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 5/28/98 Page 3 of 4 73 -10 � 1 1'VOIt'1115��tr-n�►s -�mE'W Ifr � IYn.+,u 1 h6rng5 R a T 75-10 V� p4lif~Ilpw . „ ; y GENTRYS 'O t■ -AiniE STORE s 404 Ja,D y, ° 40 w `3 �. IF Poo ,[[,. 4 'y [ C � r -LAK fir" TRp►Tes n E i ^ 1,C �= � f � ' tnA►E4 ^cmu area ` a 40 +r ti FIV I1011TN[N0 - i ./a{S / 'r' . da ISId �: o o ''+y, 'roaL 4p RD FORKS ... ■LACE ► �, o o=bupNRp L +.y r LONG w RKS �'v 49 3�,Q rAppclr aAupNr Ap 4n 'o ' 4•'+. �p t1,L111Gn to p, 1aN36 Y[IikOMNllI SM � iiM 0 ' L' 4q 4 z >V , ♦ C4 I� �" t� � tAlt[r tom° ° �r � ♦ rih +° x • �.� ° b rL All661 y fA p F% p 4r 40 XBORO 4 GENTRY p NT N ALLENSVILLE Ta1N R = y t ° F •LLt,,S",LLr. t rc ` DENNY Cf aK 640v[ CN°RCN r Y � STORE p O �Eph fads b p� °° p BROOKSOALE OLD Autn,vl4LE C ? nM`t nuF1z w =rOde + P 157 i Vetop = ,snn4tn C .� g .,N.UAk" a f,0 A. i rjr+ � et • o r o t = MIT HaKp E N - '14LEr ' JW �twn Rb I'Os SU R yR x �.FEEDS �STORE o J .° 158YNES r ° TAVERN �* 'o o41i■rrT � . � ,itµ � � 14 e . n5 N Ap '. nu Op[aA e s O•• 4jTLTr AD ipyrnYE AO ` _ T t -r* ,Td 4pOAf �O h y f 'ryi +'4lll Yi W es .EVEL NOAn oav'f "O'• '; • 'rf : 4p CN4Np u M1 f Hokr ° ifR Pic % F p N °M,f # Y SPIT IP CN 00 r0 1rV c oa[ltT R �Nw° '� !yawo = °° r E c4r[r Nit? �fi p+r Srtl frVi '[[ III �V° t ■r�*° AI'C#i *OpyO CLOAII-CIIE[li �Op q, p z boy �4 ■° 5T 7 n p i i u m e GC rl�l �40 t` t "apw lwps = u LO00 RO t 4b NEL[NA •r° �r PIE A°F �} 4�(i p•`•C 4 Iri• COVlIN Ap t 4 `� p +� jWw ECHOM NO 7 oe� w''p a'NI TFIELO A �•p l e A,, ORT • ■[TNANY r Q l,�,tL Irtl NWALIEl llb , T TI EERLAKE ° U r,,MrTiRZAH k ,a } t0,1 OAKLEY „b qp Y •I 0 AD w0 w tpM REAFIELD Rp 111 f ■ 0 ii1• � L�y� Lpo► ��� L�i�' 'p ■ r �t'fFPFIp qM1 1fE1 [ °A i �1 . 5 TEA RO .L RAC[ 11yj 1p ENA■MIGAIL000 rk O OWE LW 1d0�t w 4p +., ORIAN Cc dNDRiw 4b M if rOO�r C v u ' p ►fn4ty 11b ,gO�TH ,lot ° - # "Ar rr ` SG1 RrF1014 l ,ts40 N[LfN4. CEAY E p r q ■JRTOn IT■■ : ,y ° i ■rpA/, [ .a4lt NINCn(fTEIIR IY W1441E t,36 I I10 ° T' p iT = [w4AT F . �� T M1pad1 • i 51 1tl :� ►� 7 Ai ff1E ITS IVIrN 4p ' p ' O jl ASTAEE 1 9 +,. .... ..... .'� ........ i W o r....... .14 O • ......... .... ....... 2 sc i n i i A tie n n it M T V �� 41 ,f 1 \ S.R. 1598 5R. IS47 549 ;' — h ! 11 a It I !r I if �4 ,4 4t �� 4` 44 K 11 zw 73 - O '�' ^a-r ��2•• •r N_Y.�i .F ��s;.. a �w� ;q-.3=�,, e 1 "�rs• y -k� �+'�'dh.•i?'.a �� ''- -.•t lC�`+G-ti � t^•� J -1 ir.^�• `�•.. �,'., �A �•r'f• fi l "la,•'�': � "�'T" ��'''•� r�r��}^a :.�� � t •M''"�t`"5i'-:h,wr.� •+' r `'y.r J 7�. �.. t [ J� •� l''� 5��� �yx:: �P ;�p�jy.",���, _ �'���,sy'�.,.Kr+,.'4� �..�•��'�ii /; .Q� �'?r rr h•Z,'� � Ir?'7�v► `.-` "� i �• . `�3i_- I D 't t r� t ,e} �; �jJ ` � ` � .e,.: r• . Rom,: t-�C`,:'� 4 ��.'� ��`aa.�j "` � � aK.ti a' �,�� . , � �y r� „� � ..,�vt.l .�,z�y�,�„�„y.�� y���•�! �� ! �� �.+ �� / "�tr ;r(J',%Y�/..... .�,�y. .%y:hc ..r►�fi i" � � ,•.RFf�w? €1"�A;' _� �?,v t �>• ,�:� ,,,►,r.%p�i� �[ ''��-. 'yx `:*+"�E . -- •v ���� ��ad�^^ 4:M�,,,�,,�� yy�~��}_:,1'w✓L�r�}(a�"� kSa� •;',�"•`yyt �,"^.� ��,. ��,- � �'t.,F../�. .� ��•1'•�'�wir�� ..k ••,} j���.:i••'{•••' sx: r :�Y < j`!�fi�'�':i R*it'�k..y,, [ '�.r+�, rs.,�{_ yr r. .•fie Yf� { � t�L •� � ra`a.•F� � �J �Af'""+ y�� y ' .x' �ryt S`r r CL.TT�"+�'i"N a,• _. � �:. w i t /1 -H. ih•r. 1r� ••` ` tt11( v LSI'Cl-�`•�, r_ '7�, r- < nkL �,{: r ..ir°•i : - 4,e.y �"3 r'�. '],�i °'�.;r f •. ' 1 • C� � ��. •M .-.+` ��,;� ..� �-}``''�fl� s- ,. '�;tt'"• ''- ;�, Z� 1 - r,•.,'r'.x ,;;A'`-i' 'b� •'�—r;�: t `` � gr � �� • � �": r ♦411ft'�t�^�..��it r•5t�}r+ $p" r ��rc1.5� �f r .il .� s q'-t�/4 r,• ��!+t� '.1 4R ^�; "1 .r •ki" [i., "•�' �:r•.;,R tr` .4� y„".C? 't'i - ` r f�yi .6`�•' - r. �+s� /•. �. �7'.•. - 1 S � ""!r'" �`..:`»g4 far '�'..q� r, t .r �,�.�? a� ° r- s, t �r�c Arc R,;,, ii f ;ar l2h''> f r ''`�$ryy '•1rx , v at,". 'P'"F" ,�' $`�dr'(y•" Ya f . �4 ...; _ ....,.1, • ti'�Cli.l ` l"V- V.,", ,r .t "j'` �•/..�; +wrap r } 'tyYh°FfxF .•�s-.'fr., T•'•4t:.� _.-....'... •��� �Q'?". 1 z�.c" » a+�k ,�,�^'.yr t'� ��"Y°+a"�4 t •y € eT"„�c���` wre,.r :ir'�tt Y•v •'-,1 { • V' �a$. �^.C.r • tt ,ram, t '<°o".'..,_rrr'r 'r .,•' z .. '•f' ���/// '^43 _ -A -` 1aGf t , µ� r`� � e. •%! 't+,�'.tL�' �.";-E.� -�Z�i° s :..- 4rt.c*,�,;,. �,.. ! i4r �� �. •*� •r'R::' i � � ���. S'd� a' .Sy_�s 'r r r r rr a ter _ � '>� Ao--.,;� �.�ti: �.�' '�� ie•h�. ,/•_ •.t. �•"'e.•, sC• a, ti.a•*•5. eESr tL .A r. t�.L� W 1- 1 t •�is� r;.IiJ`i 1.. ,l l•. xrg�ri z s °,''� �r��/ .d -s r+�,`.�r,. ' 2 L!i•,��t .�-• it�r� 1,9 T.�4� ,�A ids T i' ., t;, ti+ 54X / y✓.,�0.' `p Ya. _ �� `' ;� 1 �tin:� r' � �• �^' t - •i'u�;F;�.+'�,,�'- ��� ti � ������° n�', • j4r-Ma"",# d'r n x'�t,::� '�' ,.,r.• " t��• �'�"�f'"1 ,� w r ..�. i'r•. - ti -.=i ✓�"QG x F�1 •• j�.La;"•€i c. ..,,"; .'� f�.•, � f:• � ... _,:v-a -. ' .�"„ '� -c• � � t� pit =: �..'� � w.,"P.r fir. .�. _ _ _ ''�`!'+.; ••� ;1 i Aµ.+ � a��'s. !.� . � ��.'S j}` � f '��.1�+f. � •,:s � � • �(C • ` y• ; 1' Q ,•1•r,'t.,� � 77. 'ter•- ^� �`�•"--a• a"a'� .�rr.?� R`4'�. �+ •.. �'�• '� � •� �'y�'�C1j�•�•+.r'�' -' _ r .� (.�'+ r >4 r _ ` �, "�' ` ,� ' 1 •�� f�}iJJ'' R ro�f:� • .r r � +� j � z;. .� r L5."� S r t 'it• v ,.� 4•„F+'a .r { $�' .T ✓ :4 : *:�. '3� b�:. � sF a q, t w a• �y �'yr."* a y�- sZ- I r'`• k 5 `� ¢ ,%t 1 - t~y".- i •.� _aS:i "•p:. e`�.+iy '^'["�•:`[["i,!�.ii4++.�• f�ff�•. t jCr \'• ci rp ty, r , e6ryt tv r' + ' : n-3 wj �•, f rlT $?i Ar '3'aa.��. A , q =`• ��; � i-� "'i ^ f• �''' aR i'{irc•,..n "'�irt' i^" �}'-",�,�p�;fJ.. }�� r'Y. i;�^' �* � c?�•'/���. .'�,.. .'i.- .•:•.-t`� * 'fit,.y .! • }} �y Sys, iJ„j r"• /�� f`�- .� AAi ` j• �. frr,t, w � Y dTfr : r r �1�,/-• ., t � ^'T ,h.�"; Ft •:iiC'�'%'r'" `r.i / � #�z^.ti "`1..' ��*•ri / "r 1.. + ''•g.�J, �1� ` � t !�•^�„�n �� }��•r .-.r I }� y. x., �ts•+� 0.#!i ` ,- � .' �- 1... s3:` •y.i.� 9, _F3srp. '3T.^ ',l__vi_%:7'""" �. .. �t": 5�-} 13•w / '��' � �.' • '*�i`rs";,•>x Wg'�."~/ !� `vf�•,t: �����s��f�'� ' t���ft �Y.WR :;I �•wr ��C �>$- Y.�_ 4R, •`. •^"1-.w9P-'+'�8t7.taE llt >.•� f '` �s .,r 4'�!'�Mt� Y r 'Now, qi n �. �-'•, j% V �Irr' •..5.'�' �� dry�ryY^t r r rWa -1 4r-f �a, lie ?',gr1 a� �'R'¢�''• ' r i` ,��'�t+�`. t'' �" � ,i':7'. ��� � � a �r�'r+�` M w l"�' 'g` te/ r „�"r ' ''•'w'**'' �.Py��..rt` � `'-; r, '�, ��S y�`{„. «,�y "�, f 'a; 1��.� 119r •• t ,.� ,J� '�e.t i4t �" t ,:.���- er�f+ � f�t a�,,x, R- � • •"` • �•�" � °fir` ��r '" •,.�- ��w./t -r�" sf �. w`r a r"a - `;,.'r ',ci�� irF�o • • �' 'r-' 31 � •�_� '•"'�'v. �t +w. 7 ", �./ n+.yv L ,• "',r LArJd oqDpl e-AT"o[J "'.+•a . *:� .St,. _ raj-! , ��,. •7^1.� t ,. 1 ! i � YNf•• Y 1•� �.: w4"'•y.f: 'yv � ,I� � .` � ^_ 'a« P T'f'• y /�V ,t,; s�'..� i'syr,ry. ^ if°y 1 l l I I•--� 111MA5 �R I'n•.S �FPtd"� A4I'L�f i'•,r' a _• .� �! ry r w •'s 's �y t y r �"'' �`� "s + �1 � ^ N Y ' � �� ��t.���.w.s.'""r�,,�¢ �;,'S�.�� �/d. � � �OO 1. Y"7 • ®�• 3 � a D, r� i4 a - r � ..�. � ,�}}���� '�r:, -! .. - -fit f�A :t��'.:t�a ` � fir' �;, R'� � But,�•e�rs .✓erdaW�[.J - Y � .. f •i 'p• �� Y./ �id/. ;' S ;i T 3 .Z 1 O , !� a n+ R , rArrr,rY'aa- t;�c:lst: I•, • `s�f) Y 'a ?t r1 d. +2 - Is a C • �!'. .Z 5 , .:.. zs. �..••- i'T'` l''\ r • • rr,r"7 ;`;/r' pM",, - .. ND 34cgilrr lVee-Jed [AJ qo T3�i° 0 . r �La. T� lei Ai, Animal Waste L'VIanaaement Plan Certification tPlease tyot or print all information that doe; not require a si�i. ature) E.istinQ : or Y;iVe�ti::=�'pX ..Ended ''(please circie:orte)' General Information: Name of Farm` -I �o tit p� s _ FArrn5 A(l P 6)sQ, �e � -� L. - - Facility No: 7a - I C Owner(s) Name::S,mm u Phone No: I10 4X 4-,z4. 33 Mailing Farm Location: County_ Farm is located • Latitude and Longitude: 3f 2I's 0-0 I �86 .54` :24" Intenratar: Please attach a copy of a county road map with location. identified and describe below (Be specific: road names, directions, milepost, etc.): Operation Description: Type of Sivine Na. of:tnitnals :� wean to Feeder Ct Feeder to Finish 0 Farrow to Wean D Farrow to Feeder -M Farrow to Finish a(go .TaL' ❑ GiIts * Boars Type of Pou ry D Laver J Pullets Wo_ 7'Afibnais Type of Cartle No. bf Animals Dairy D Beef Other Type of Livestock:, Munher of Animals: '•'•>�. .,,.s}- <:r..�:2k::rEy. _ }_, -ti':�c :': r:; r.. ;,-krc ., r£:..��^::?:_=:i.:.:.;. -r;h ,� �' _ S.. ?. S r � � J�tlt+a w��i k' a.. x i �_- '>T Sw- t'�Ya k �-�%'k'#:ffi'fi � Y✓ a�"P�>4ia ' - ,r � � Pre.7ous•Desr`zn.Cc`taactr..:. �:V<N..-••.xFrlddstrdisat.Desrea:Ca�araty.. ToraI':Desrun�C�7nacin.. $�:� Acreage Available for Application: Required Acreage: LAVA; AB"F Ac. - Ko : �� Number of Lagoons 1 Storage Ponds: % Total Capacity: 6T&— 3&4 Cubic Feet (ft3) Are subsurface drains present on the farm: 'ES or NO (please circle one) $Prow, L'all¢t�ca,.� If YES: are subsurface drains present in the area of the L #GOOL r SPRAY FIELD (please circle one) �k ak ilex i1t ie ht as atMMyc a!t fk tt*kia X�at ar iµ jt i�st ie is is iii i,+a;�i,�Mit sa rc i.. i,. ia, ra ya aeya as ai.i.r.as,.t,�i,<istsea;�ri�[fe[;eicraiate ai is i,�ais�;aim as is ie�i�Y,e as s,. a,ia in :a Owner I Manager A;reement I (we) verify that all the above information is correct and will be updated upon changin'7. I (we) understand the operation ' and maintenance procedures established in the approved anirtial waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the esistins design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental N•lanagement before the new animals are stocked. I understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state tither directly through a man-made convevance or from a storm event less severe than the 2-5--year. 24-hour storm and there must not be run-off from die application of animal waste. i (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using. technical standards developed by the Natural Resources Consmadon Service. The approved plan will be tiled at the farm and at the office of the local Soil and eater Conservation District. I (we) know that any modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to implementadon. A change in land ownership requires written notification to DELI or a new certification (if the approved plan is changed) within 60 days of a tide transfer. tiTame of Land Owner: Signature: Date: `lame of Nlana;er(i[ different tr m own_): i Signature: _ ,.� ?ram _ Date: a1t'C -- August 1. 1997• 62 l Aft Technical Specialist Certification I. As a technical specialist designated by the ;north Carolina Soil and Water Conservation Commission pursuant to 15A NCAC bF .0005. 1 certify that the animal waste rrianaeement system for the farm nutted above has aft animal waste management plan that meets or exceeds standards and•specitications of the Division of -Environmental Management (DE NI) as specified in 15A NCAC 2H.0217 and the USDA -Natural Resources Conservation Service (NRCS) and/or the `forth Carolina Soil and Water Conservation Commission -pursuant to 15A NCAC 2H.0217 and 15A NCAC 5F .0001- .0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, 51, WUP, RC. I), the technical specialist should only certify parts for which they are technically competent. IL Certification of Design A) Collection. Storane. Treatment Svstem_ Check rite appropriate box : 1 Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity: storage capability consistent with waste utilization requirements. New. expanded or retrofitted facility (SD) A4^- i Animal waste storage and treatment structures, such as but nut limited to collection syscems. aJA ns and ponds. have been designed to meet or exceed the minimum standards and specifications. Natne of Technical Specialist (Please Print): RA,t3-r_ vi4AJS Affiliation UJ PA - Rc- Date Work Completed: 8 -/ Address (Agency):!eoor D CARIrA ,DR, Ai•F&AI /d L 276ro _Phone No.:!2Z x6 Signature: Date: 1/-AP- F7 B) Land Application Site (WUP) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management; hydraulic and nutrient loading rates. dame of Technical Specialist (Please Print): U� Affiliation � N M55 Date Work Completed: -/ 9 3c't s. ►rto�yR,. ;t - R-��ys�r17 Address (Agency): � �C_, - ���r��rt/s.,xs13 _Phone No.: V-s4�-���� Signature: Q Runoff Controls from Exterior Lots Check the appropriate bo.r �E Facility without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. Date: -/ - f 7 Facility with exterior lots (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by MRCS. Name of Technical Specialist (Please Print): Affiliatio Address ( Agency):, Signature: A%VC .- Au st 1. t997 ate Work Completed: Phone No.:9io --y7-a973 Date: &,III-9�-9�- D). Apolication and Handling Equipment 0wck the appropriate box Existing nr s a ding facility with existing waste.inolicodon equirmen (W P or I) Animal waste application equipment sptc:ified in the plan has been zither field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can corer the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates. a schedule for timing of applications has been established: required buffers can be maintained and calibration and adjustment guidance are c.-ntained as part of :he plan). D Nety, extanded, or existing facility without exi5iing waste application equipment for snrav irrigndon. (I) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan. (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates: a schedule for timing of applications has been established: required buffers can be maintained: caiibrttion and adjustment guidance are contained as part of the plan). -:) New. expanded- nr existing facility without existing waste-,molicnticm eauinnient for lnnd snre_aciina not usinu spay irrigntism. (WUP or I) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan. (proposed application equipment can, cover the area required- by the — plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained: calibration and adjustment guidance are comained as part of the plan). rarne,of Technical Specialist (Please Print): 01E4 Affiliation Al C C es Date Wort Completed:_ _ / -- a 6' 97 3. /»o/y•r 5l n,. /Ia t; Address (Agency): Kob Ara lllC_ ".7S73 _Phone No.: 33(o Signature: Date:1��/f� �97 E) Odor Control. insect Control. 'Mortality ytana�Zernent and Emeraenev Action Plan (SD Si. WUP. RC or D The waste management plan for this facility includes a Waste Management Odor Control Checklist. an Insect Control Checklist, a Mortality Management Checklist and an Emergency :fiction Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Nlom-dity Manaetment. Plan and the Emergency Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print): Vey t,rQ Affiliation /1/CC'4�-5—I e%So co, 25 Sewl Date Work Completed:_ l/~a 6-- Z7 Co, d7l.T.,ce- ���. Address (Aeencti- cr�io�n ivc_ ��rs� Phone No.: /cD Si�_nature: _ ', Date: %)-S— 97 F) Written Notice of New or Exp2ndiml Swine Farm The fofIoving signature block is only to be used for new or expanding swine farms that begin construction after June 21, 1996. If the facility was built before June 31. 1996, when was it constructed or last expanded I (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and all property owners wbo own property located across a pu tic road. sweet- Or highway from this new or expanding swine farm- The notice was in compliance with the requirements f N' �GS 106-305. A copy of the notice and a list of the property owners nodfied is attached. �l Name of Land Owner: Signature: Name of'Mann-er f owner): Date: Siznature: ' _-'4 l ' Date: AWC -- Au-ust 1. 1997 3 w I. I. Certification of Installation A) Collection. Storaf7e. Treatment Installation , New. exnanded or retrofitted facility (SO Animal waste storage and treatment structures, such as but not limited to lagoons and ponds. have been installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits, no certification is necessary. Name of Technical Specialist (Please Print): F�Aa)K E4,AJs Affiliation >A=—/u9c.S Date Work Completed: V Address (Agency): 4.aal p C4,VM D2. _AI_t.�1eAJ_. 4JL 2941Q_ Phone �+o.:_%r4-2.so Signature: .rz,. Date:_/t—/8-P'7 B) Land application Site (tiYL"P) Check-theappropriate. box- 1 The cropping system is in place on all land as specified in the animal waste management plan. J Conditional Approval: all required land as specified in the plan is cleared for planting; the cropping system as specified in the waste utilization plan has not been established and the owner has committed to establish the vesetadon as specified in the plan by (montblday/}•ear); the proposed cover crop is appropriate for compliance with the wasteutilization plan. Also check this box if appropriate if the cropping system as specified in the plan can not be established on newly cleared land within 34 days of this certification, the owner has committed to establish an interim crop for erosion control; Marne of Technical Specialist (Please Print):ILI-5__ nev , , a li t Affiliation kols_ c�gDate Work Completed:./� /9- 9*7 y 304 5. r I t2� g&A-Aae2 r� A St I j 1 h Address (Agent ): � �,�.�;�o u C. � _,��, �Phane 1\10.: 9/0 - s9 - Signature This following signature block is only to be used when the box for conditional approval in III. B above has been checked. i (we) certify that I (we) have committed to establish the cropping system as specified in my (our) waste utilization plan. and if appropriate to establish the interim crop for erosion control. and will submit to DENT a verification of completion from a Technical Specialist within 13 calendar days followitis the date specified in the conditional certification. I (we) realize that Wiure to submit this verification is a violation of tits waste management plan and will subject me (us) to an enforcement action from DENI. Name of Land Owner: Signature: Name of Nianager (if diffe Signature: A%VC august 1. 1997 Date: Date: C) Runoff Controls frorn Exterior Lots Facilitv with exterior lots Methods to minimize the run off of p 1 in the plan_ /' For facilities dame of Technical Specialist Affiliatio Address (agency): SignaEUre: (RC) cants front lounging and heavy use areas have been installed as specified lots, no certification is necessary. Date Work Completed: Phone No.: Date: D) Apolication and HandlinZ Eguiament Installation (WUP or I) Check the ❑opropriare block `''E Animal waste application and handling equipment. specified in the plan is o:: site and ready for use: calibration and adjustment materials have been provided to the owners and are contained'as part of the plan. J ,animal waste application and handling equipment specified in the plan has not been installed but the wvncr has proposed leasing or third party application and has provided a signed contract: equipment specified in the contract agrees with the requirements of the plan: required buffers can- be maintained: calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. J Conditional approval: Animal waste application and handling equipment specified in die plan has been purchased and will be on site and installed by (month/day/year); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): Affiliation f^ CES Date Work Completed: Address (Agency): o,rh�,.� Phone N 334 SiLmature: Date: /�2--/8 r97 The following signature block is only to be used when the box for conditional approval in III D above has been checked. I (we) certify that I (we) have committed to purchase the animal waste application and handling equipment as specified in my (our) waste management plan and will submit to DELI a verification of delivery and installation from a Technical Specialist within I5 calendar days following the date specified in die conditional certification. I (we} realize that failure to submit this verification is a violation or the waste management plats and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Marne of Manager (if different from owner): Signature: Date: E) Odor Control. Insect Control and_Mortality Mana`ement (SD. St. WUP. RC or 1) ttitethods to control odors and insects as specified in the Plan have been installed and are operational. Tne mortality management system as specified in the Plan has also been installed and is operational. Name of Technical Specialist (Please Print):_ U�-'v n� Affiliation NCCz�s n.CoService Date Work Comnleted: //�a�—� PrSo n Co . O �' 'GG g . 3 Sr .S. Md J4-. Address (agency): aP�,kb, o �• _NC— ,��s - Phone �fo-: Signature: atvC -- .kugust 1. 1997 Date: .I- —S = 7 Please return the completed form to the Division of Water Quality at the following address: Department of Environment, Health, and Natural Resources Division Of Water Quality Water Quality Section, Compliance Group P.O. Box 29535 Raleigh, NC 27626-0535 Please also remember to submit a copy of this form along with the complete Animal Waste Nl;anagement Plan to the local Soil and Water Conservation District Office and to keep a copy in your files with vour Animal Waste Management Plan. a. AIVC -- August 1. 1997 6 1 ANIMAL WASTE UTILIZATION PLAN- A LewNso c For- 2 cir. rotin+_ ;aN of j `lr. for FWH z 2.o4ro,JS/�. f eY 41 Producer: Jimmy & Timmy Thomas Location: Telephone: Type Operation: Number of Animals: (Design Capacity) STORAGE STRUCTURE: APPLICATION METHOD: 8251 Oxford Rd. Timberlake NC 27581 910-364-2633 Existing Farrow to Finish 260.00 sows ,Now G 1996 Sw�.rie� �� Anaerobic Waste Treatment Lagoon Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 ' days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 260 sows x 19.9 tons waste/sows/year = 5174 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 260 sows x 26 lbs PAN/sows/year = 6760 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN _w TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- • APPLY RESID. APPLIC METH N TIME 111 2 ApB C 110 137.5 1.4 192.5 I MAR, JUN ll.l ApB IS jI 1110 1137.5 I 10.9 1123MA.75 R, JUN 111 4 ApB IC I 1110 1137.5 1 11.1 1151.25 MAR, JUN 111 ApB 1-5 IC I 1110 1137.5 1 11.4 1192.5 MAR, JUN ill ApB Ill IC I 1110 1137.5 1 13.2 1440 MAR, JUN 111 7 ApB IC I 1110 1137.5 1 13.5. 1481.25 MAR, JUN 111 8 ApB I-C I 1110 1137-5 1 14.1 1563.75 MAR, JUN 111 9 ApB IC I 1110 1137.5 1 11.6 1220 MAR, JUN 3210 1 ApB 1 I-C I 1110 1137.5 14.9 1673.75 MAR, JUN 111 2 ApB IC I 1110 1137.5 1 11.6 1220 MAR, JUN 3210 3 ApB IC I 1110 1137.5 1 10.6 182.5 MAR, JUN 111 ApB 1-2 JW I 155132 1 11.4 11-84.8 NOV,MAR 111 �2 ApB FHH 2.0 I 1100 11.4 1140 AUG-OCT 1 ApB 1-3 JW I 155 1132 1 10.9 1118.8 NOV,MAR Page: 3 • ANIMAL WASTE UTILIZATION PLAN lbj LQOIP �� u5 yiClg -�� ill FHH 90 1-3 JApB I 12.0 [100 1 10.9 AUG-OCT .111 ApB 1-4 JW I 155 1132 1 11.1 1145.2 NOV,MAR r111 ApB FHH 1-4 T 12.0 1100 1 11.1 1110 AUG-OCT ill ApB 1-5 JW I 155 1132 1 11.4 1184.8 NOV,MAR ill ApB FHH 1-5 T 12.0 �100 11.4 1140 AUG-OCT ill ApB 1-6 JW I 155 1132 1 13.2 1422.4 NOV,MAR ill ApB FHH 1-6 T 12.0 1100 1 13.2 1320 AUG-OCT ill 7, ApB F JW I 155 1132 1 13.5 1462 NOV,MAR 111 ApB FHH 1-7 1 I 12.0 1100 1 13.5 1350 AUG-OCT ill ApB 1-8 JW I 155 1132 1 14.1 1541.2 NOV , MAR ill ApB FHH 1-8 I 12.0 1100 1 14.1 1410 AUG-OCT ill ApB 1.6 1-9 JW I 155 1132 1 1211.2 NOV,MAR ill ApB FHH 1.6 1-9 T 12.0 1100 1 1160 AUG-OCT 3210 1-1 ApB JW 155 1132 1 14.9 1646.8 I NOV,MAR 3210 ApB FHH 4.9 490 I �2.0 1100 1 AUG-OCT 3210 ApB 1.6 211.2 1-2 JW I �55 1132 NOV, MAR 10 ApB FHH �2.b_ Iloo I 1.6 I 1160 1-2 I AUG-OCT Page: 4 ANIMAL WASTE UTILIZATION PLAN 3210 1-3 1ApB fZ �55 �132 3210 1-3 jApB FHH 12.0 1100 I END I 0.6 179.2 NOV, MAR 0.6 160 AUG-OCT TOTAL18978.85 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 5 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS ■ DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL 10 -- Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT C CORN BU 1.25 FHH FESCUE - HAY TONS 50 W WHEAT BU 2.4 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 24.3 8978.85 Page: 6 ANIMAL WASTE UTILIZATION PLAN TABLE 2 TOTAL O 24.3 C 8978.85 *** BALANCE 1-2218.85 j ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 7 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1118 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 5590 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 18.6333333333 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 44.72 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 8 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) ill 2 ApB C .45 *2.65 ill 2 ApB C .45 *2.65 111 3 ApB C .45 *2.65 ill 4 ApB C .45 *2.65 ill 5 ApB C .45 *2.65 ill 6 ApB C .45 *2.65 ill 111 7 ApB C .45 *2.65 ApB C .45 *2.65 9 ApB C .45 *2.65 ill �2 ApB FHH .45 *1.6 111 �2 ApB W .45 *2.15 ill y3 ApB FHH .45 *1.6 111 �3 ApB W .45 *2.15 111 �4 ApB FHH .45 *2.15 111 M4 ApB W .45 *2.15 ill X5 ApB FHH .45 *1.6 ill �5 ApB W .45 *2.15 111 �6 ApB FHH .45 *1.6 111 �6 ApB W .45 *2.15 111 �7 ApB FHH .45 *1.6 1 �7 ApB W .45 *2.14 Page: 9 ANIMAL WASTE UTILIZATION PLAN ill -8 ApB FHH .45 ill "8 ApB W .45 111 9 ApB FHH .45 ill "9 ApB W .45 3210 1 ApB C .45 3210 3 ApB C .45 3210 "1 ApB FHH .45 3210 `1 ApB W .45 3210 �2 ApB FHH .45 3210 �2 ApB W .45 3210 ApB FHH .45 3210 -3 ApB W .45 *1.6 *2.15 *1.6 *2.15 *2.65 *2.65 *1.6 *2.15 *1.6 *2.15 *1.6 *2.15 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of'the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. Page: 10 ANIMAL WASTE UTILIZATION PLAN NARRATIVE OF OPERATION This operation consists of 1 retrofitted lagoon designed for a 260 sow farrow tc finish operation. There is one abandoned lagoon on site that is planned to be closed out in 1998. Cost -share has been approved for the closure and a waste utilization plan will be followed. Until the lagoon is closed, the operator must maintain the waste level from going above the 25 year/1 day storm pump stake. The operator should also never allow the water level in the retrofitted lagoon to go above the start pump stake. Always stop waste application immediately should runoff occur. -During construction of retrofitted lagoon, a small underground spring was hit when cutting the core. A 411 perforated plastic pipe (with gravel & geotextile cloth) was laid starting at the core and extending beyond the back toe of the dam. The outlet of this pipe should be protected fron obstructions to prevent water from backing up into pipe. If there are any changes planned for the operation that affect the Animal Waste Management Plan, the operator should contact a technical specialist or the Person SWCD beforehand. Page: 11 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) S. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 12 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to -areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 13 WASTE UTILUATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 14 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:Thomas Farms Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Jimmy & Timmy Thomas (Please print) Signature- 12,1�4j,,eAte: Name of Manager (I f different from owner) : Signature: Date: Name of Person Preparing Plan: (Please print)Jim Huey Affiliation:NRCS Phone No. 919-597-2973 Address (Agency): 304 S. Morgan St. Rm 126 Roxboro NC 27573 Signature: Date: /g 19-97 Page: 15 ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF , a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of 19 My commission expires Notary Public. (SEAL) Page: 17 Attachment B Page 1 of 3 North Carolina Agricultural Extension Service Agri -Waste Mmnagement Biologi=l mid F. O=ring Ivor Ca=I&= Sty univ ty LTP£S= W= SAt9=G, AbiAI=1 AND CALCUr�=17 4F IAM A2_"1rZC =21 BA .lames C. Barker* .tf a 31r*-!• .rr1.r:l AL Semi -Solid Lot Mmmare L. Soaped ditectlp from lot into spreadex a. From loaded spreader, collect about 2 lbs of =aaure �am d: Arent locations using nonmetallic collec:.ors. U. From storage a. Collect about 2 lbs of manure mom under the su=f=e crust avoiding bedding carer-als and using ntrmetsllic collec=rs. 2. Liq=$.a wee M==7 i. Unde;-slotted-floor pit a._ E..ead a 1/2' nonmetaLic conduit open on both ends into maat:re to pit floor. b. Seal tamer and of conduit (e.g., by placi: g a hum3b over end of conduit) upping =amara that has entered lover end, remove and empsp sl=--y it r-o plastic bucket or nonmetallic container. c. Take subsamples Mom 5 or more locations or ar. least I quart. d_ His and add about 3/4 pint to nonmetallic sample container. ii_ Exterior storage basin or tactic a. Hake sure mancse has been well miamed frith a liquid +h2==& chopper -agitator pump or propeller agitator. b. Take snbs=ples '--= about 5 pit locations, from agi zor p=p or from manure spreader and place in a plastic bucket. * Professor and =xrension Specialist, Biological and Ag_icultural Engineering Depar=ezur, Nor=h Carolina Sraze Universit-7, :.sleigh, NC. - _.-.....-- -rtae men Page 3 of 3 II. SA121M PREPARATION AND TRANSFER A. Place sample into an expandable container that can be sealed. Rinse residues from container with clean water but do not use disinfectants, soaps, or treat in any other way. B. Pack sample in ice, refrigerate. freeze, or transfer to lab quickly. C. Hand -delivery is most reliable way of sample transfer. D. If mailed, protect sample container with packing material such as newspaper, box or package with wrapping paper, and tape. E. Commercial sample containers and mailers are also available. Contacts: i. A&L Eastern Agricultural Lab. Inc. iii. P017foam Packers Corp. 7621 Ahitepine Road 2320 S. Foster avenue Richmond, VA 23237 'heeling, IL 60090 Ph: (804)743-9401 Ph: (312)398-0110 U. Fisher Scientific Co. iv. NASCO 3335 ninon Road 901 Janesville Avenue Raleigh, NC 27604 Fort Atkisson, AT 53538 Ph: (919)876-2351 Ph: (414)563-2446 F. Private analytical labs are available, but sample analyses are costly. G. The NCDA provides this service for North Carolina residents_ i. Address: North Carolina Department of Agriculture Agronomic Division Plant/Qasze/Solution Advisory Section Blue Badge Road Center P.O. Box 27647 Raleigh, NC 276" Ph: (919)733-2655 Attn: Dr. Bay Campbell U. Forward $4 along with the sample. iii.. Include the following identification information with sample: a. Livestock species (dairy, swine, turkey, etc.) b. Livestock usage (swine -nursery, finishing; turkey -breeders, brooderhouse, grower, m=ber flocks grown on litter; etc.) a. Waste type (dairy -lot scraped manure, liquid slurry; swine -pit slurry, lagoon liquid, sludge; broiler -house litter, stockpile iv. Routine analyses performed on all samples: N, P, R, Ca, Mg, Na, S , Fe, 21n , ?.a, Cu, B v. Additional analyses performed upon request: DX. Mo, Cd, Ni. Pb I�� wv (J�� (�l�i�•M.� CERTIFICATION CHECK LIST FOR EXISTING IRRIGATION SYSTEMS 1. Waste Utilization Plan 11 oZ,ry(o"- 9 7 VI { e . Operator has acceptable waste utilization plan Planned irrigation system is compatible with type of waste storage facilit} sols, crops and pumping schedule shown in the waste utilization plan-. ,...w 2. Field Specifications (Use USDA-NRCS Table 1 or Similar Table) Legible,FSA photo copies and county tax maps of effluent disposal fields v Maximum useable acreage of each field shown excluding buffer or restricted irrigation areas. The designer will decide usable irrigation area of each field. Soil types of each field Average slope of each field 'Crops to receive animal waste are shown for each field `Recommended maximum average precipitation rate in each field (where there is more than one soil/crop combination that results in a different recommended precipitation rate, show the recommended maximum average precipitation rate for each combination) Recommended maximum application amount per irrigation cycle in each field (where there is more than one soil/crop combination that results in a different recommended application amount, indicate the recommended maximum application amount for each combination) 3. Working Map or Sketch Ditches, perennial streams, wetland areas, and other bodies of water are identified /along with the size of each. ✓/ Surrounding water wells are located Surrounding dwellings, schools, hospitals and other important structure locations are shown 10/14/97 M CERTIFICATION CHECK LIST FOR EXISTING IRRIGATION SYSTEMS 0!!!Highway right-of-way locations are indicated Location of farm roads, fences and other obstructions are shown to scale on map Critical property boundaries are shown (15--a�� Critical el ati ns that are used in total d namic heacl computations are shown cation of irrigation mains and laterals s milderLo:rgun hydrants thrust blocks, etc. are shown with the design spacing of hydrants pope Ines recorded on the map or sketch. This will be accomplished by the irrigation systems designer. (If Possible) 4. Irrigation Design Parameters (Use USDA-NRCS irrigation Design Parameter Worksheets or Similar Worksheets) A. Traveling Gun Parameters (USDA-NRCS Table 2 or Other) Type of speed compensation (USDA-NRCS Table 4 or Other) Design travel speed for each pull Design precipitation. rate for each pull Design application amount shown for each travel speed Effective width (lane spacing) and effective length for each pull Operating pressure at the reel and the gun for each pull Nozzle diameter in inches, indicate type of nozzle (taper bore or ring) Wetted diameter at specified operating pressure Arc pattern for each pull Hose length and inside diameter Make, model and type of traveler and gun with manufacturer specifications included J ` 2 10/14/97 CERTIFICATION CHECK LIST FOR EXISTING IRRIGATION SYSTEMS NI Computations of acres receiving uniform coverage Specifications on hydrant. type and construction (n"-� B. Solid Set/Permanent Sprinkler or Gun Parameters (USDA-NRCS Table 3) or other) Design hydrant or g sprinkler spacing and pipeline eline spacing g Y P P P P b Operating pressure at sprinklers or guns Nozzle diameter in inches, indicate type of nozzle for gun sprinkler taper bore or ring) Wetted diameter of sprinkler or gun Are pattern and location of partial circle sprinklers or guns ✓ Design precipitation rate for full and partial circle sprinklers or guns Design operating time for full and partial circle sprinklers or guns V Computations of acreage receiving uniform coverage —Lzmake, model and type of sprinkler or gun is shown with manufacturer specifications C. Parameters of Other Irrigation System Type: Design operating pressure at the sprinklershun Design precipi ati /rate Travel speed r yDesign appl cation ach travel speed Computations of acreage receiving uniform coverage Make, model and type of equipment along with manufacturer's literature J 3 10/ 14/97 CERTIFICATION CHECK LIST FOR EXISTING IRRIGATION SYSTEMS Gene A Irrigation specifications should include a pumping schedule for each Meld giving the number of pumping hours required to meet the crop PAN requirements. This schedule should indicate the gallons or acre -inches to be applied per acre, the S amount of each application and the total number of applications. The schedule / should also give some idea of the timing of the applications. 3 ' The Plan should discuss application record keeping, need for sample analysis, need for soil sampling and length of time to maintain records The Plan should mention the need for an Emergency Action Plan (EAP). / The Plan is the responsibility of the grower. lie Plan should include information on annual system evaluation The Plan should discuss soil type(s), soil(s) maximum infiltration rate, total PAN generation to include sludge, loading rate(s) based on Realistic Yield Expectations (RYE), and maximum loading rates both during summer months and %getter winter months ✓� 4 % 10/14!97 EXHBrr D-I IRRIGATION SYSTEM DESIGN PARAMETERS Latndowncr/OperatorHamel ,.._ M.{ _ 'r► �►,: County: O erSOn Address:',/ er-ic Date: Telephone: 39 2 2 Zi, 33 'ABLE 1 -'Field Specifications Approximate Maximum Maximum Maxlmwn Apptleellon Useable She Application per Irrigation Field' Nufnber orFleld2 (&Cris) SollTyoe Slope,:,. (%) ,a Cron(s) Raid Un/hr) Cycle3 (Inches) Conuner,ts v Sec attached map. Total field acreage minus required buffer areas. Refer to N. C. Irrigation Guide, Field Office Technical Guide, Section H G.- Arumal application must not exceed the agronomic rates for the soil and crop used. NRCS, NC JUNE, V , EXHIBIT' D-2 TABLE Z - Traveling Irrigation Gun Settings Make, Model and Type of Equipment: �r f io a7,4 10 Z;2,3(P-3 EQUIPMENT• .,'Opemting - Ct s See attached map. Show separate entries for each hydrant location in each field. 'Use the'rollowing abbreviations for various arc patterns: F (fuIl circle), TQ (three quarters), TT (two thirds), H (half circle), T (one third), Q (one quarter). May also use degrees of arc. dr —0 L.CL- NRCS, NC JUNE, i " EXHiBR' D-3 ( 64-4 :0 rA') " ,- A Kl efJ TABLE 3 - soli Irrigation.Gan Settings Model find Type of Equiprnent Field Not and -'miber of • Hyd -rant Spacing (A) : OPERATINGMake, Nozzle, Operating Operating •:Time IScc attached map. 2Sliow separate entries for cacti pipeline with hydrants in each field. MRCS, NC JU, 1996 /ram" TABLE 4 - Irrigation System Specifications t 1/ ti/r Traveling . Irrigation Gun Solid Set Irrigation Flow Rate of Sprinkler (gptn) peraling Pressure at Pump (psi) Design Precipitation Rate (inlhr) Hose Length (feet) XXXXXXXX Type of Speed Compensation XXXXXXXX i Pump Type (PTO, Engine, Electric) Pump Power Requirement,(hp) ABLE S -Thrust Block Speciticalionst Designer rovide thrust block details on sc crate sheet. THRUST BL( LOCATIO q. 90o Bend Dend End 'See USDA-NRCS Field Mice Technical Guide, Section 1V. Practice EXHIBrr D4 4� MRCS, NC l� 1996 Narrative of Irrigation System Operation )cscribe Ilia operation of the system in the space provided below or on a similar shect most convenient to Ilse designer/supplier. nelude procedures such as start-up, shut-dow, winterization and regular maintenance of all equipment. L'X1-DBfr D-6 MRCS. '-' C JUKE, ; 1=3414mg)-ye IRRIGATION SYSTEM DESIGNER Name: -Joe Company: --S Address: S, /rt d r " 54 . / t3 ox by ro C a 7's" 7? Phone: 33 iv��.�� //fit REQUIRED DOCUMENTATION lie following details of design and materials'must accompany ulufflgation designs; -A scale drawing of.thc propofed irrigation system`wtirclt iheitrdes liydrani_ locn4ons travel lanes, pipeline routes, flutist block locations and buffer areas whore applicable. A"ssu:nxion`sand copulonafgr�Iiinitng fatal c gjt#rc hcbdarld horsepowcrrcquircments r, 'Cofnput6tions,tt'se'd to dclermmaalLmartilrne and Iutcr1pipe sizes: :. Sourcesan. or 61culaErons uscd:for determining application rates: ` Computations ..used to delenmine the sizeof thrust blocks ,e�ud ill ustratiaris"bf all tluvst block configurations required in lire system. Manuracturer's specifications for the'iriigatiOn pump, -tray' W—and`spH11kler(3)--""-' . ivranufacturces specifications for the irrigation pipe and/or USDA-NRCS standard for Irrigation Water Conveyance, N.C. Field Office Tcclwical Guide, Section iV; Prgctice Code 4 07DD.. ,... . 'rhe information required by this form are the minimuinft quirements. It is the responsibility of (lie designer to consider all relevant factors at a particular site and address them as appropriate. - 6 k Irrigation pipes should not be installed in lagoon or storage pondembankmcnts without the approval of the designer. !OTE: A buffer strip A feet wide or wider must be maintained between (Ile limits of the irrigation system Rod all perennial streams and surface waters per NC Statutes. MRCS, N(, JUKE, " FORM IRR-1 Lagoon Liquid Irrigation Fields Record For Recording Irrigation Events on Different Fields EXHx-xT E-1 Farm Owner Facility Number Irrigation Operator Date Ili •• •• ,- -1 • 11 1 • ••- • BIG GUN® PERFORMANCE TABLES U.S. UNITS 100 SERIES BIG GUNS - 24" TRAJECTORY" 100 T TAPER $OR£ NOZZLES N=a Narzte Nozz,a f4wre Na121e Nozxla NO2z4 NQ4w NOUN Nax,11e Pgl. GPM 01A. GPM OM1, A' GPM 04A. 95' 7' GPM Duk GPM DIA. " GPM DIA, A^ As' GPM OIA. GPM 9' DIA. GPM t.0. DIA. OPM Oul SO 60 295' 44 216' 74 225' 67 23e t00 2416' 115 236' T30 2"' 150 273' 1" 260' 244 am 70 6D 225' >6 236' N 23D' 103 263' 17.0 275' 134 2e3' 1 155 M' 177 302' 1 107 310' 243 336' 3p 66 245• e3 2W j 100 276 12 203' +36 296' 155 3W T15 at5' 207 326' 223 335' 274 362• t1p 76 M' 92 Z7e' 111 290' 129 303" 150 MS.' 171 324' 195 335' 222 344' 2a7 ]55' 30a 360�� • 'Ar2r1,Cb Only wiM F100 i 3A100. �? 109A RING NOZZLES ,: , i ' '• 100 ON DIFFUSEA NOZ_ZLS_S " ."PSI. .7i 1411V0 .77 RING AING ,d6 RING 1� RING .93 RINO .44 RING 0.5 ON 0,6 DN 0.7 ON D.e DN GPM DIA GPM DIA GPM OtA GPM DIA -O GPM DIA GPM OFA GPM DIA GPM DfA GPM OtA OPM DIA 40 60 201 7e 212 91 216 103 224 TIB 236 13A 23e 152 212 a6 IBA 66 160 91 162 1+0 196 60 it 236 86 40 110 245 125 260 41 270 lea 27 __94 260 1119 2pp 113 21e e0 w Ms t1+ M127 275 1a6 z65 103 tog 305 211 315 100 toy 270 124 260 IA2 795 102 306 162 y20 2t2 326 1 M335 - - - - - -- - ••Tate dym9r9r M &Kr M aD"niMataty 3% IMM br 466 21' N'g1ap10r7 Angy, iy Ia64 000 le' 150 SERIES BIG GUNS -- 24- TRAJECTORY" 150 T TAKA BOAS NOZZLES Noah 1110z Naxz+e Hoizte Noazk Nas,tlo Nou1a P$I_ GPM OIA. GPM DIA. GPM D1A. GPM DIAw GPM DIA, GPM Of.. GPM O[A BQ 1t0 M, +43 265' 162 305' 225 325' 275 3416' 330 366' wo 366 psi 300' eD 120 2901 105 30' 21D 335' 2W 3W' 315 37S' 360 395, 1 imp a4b a10' 100 TcT 310. 165 330, 235 399, �J 290 375' 355 400' 4Z5 an' i S00 aa0' 120 157 ax -1704 360' 256 37S' 320 395' 705 a28' aai 440- Say 460' R RINGNOZZLES gave . r150 I i a;•q Ong In8 R�n9 Rlr� 414 R11 I FB' A7• 1.Od "s1. GPM DIA, GAM DIA. GPM ntA, t.ti" GPM DIA 1.29 GPM DIA. t;l<' i GPM DIA, 111 GPM DIA, 1 60 110 200' 143 2e0- 102 300' f 226 315, 275 335' 330 350, 395 366' 60 12B 260' r-•165 . -300' 210 320' 260 3A0 315 360' 360 300' A45 396' tOp t. 11" 300' 105 11120111 236 340' Z90 WO' 5=356 360' a25 aD0' Wo A16' t2D 157 31S' 204 316' 256 39o' J20 360 36G A00. 465 An. 545 A36- ••T/k a+amarsr 04 1nr(1- y appmx4*1NY 3% 4aas for the 21& trapnwy angle 200 SERIES BIG GUNS - 270 TRAJECTORY" 200 T TAPER BORE NOZZLES NaTlk Nozrte Na2x10 Narzla Nau1a Naxrw No2:4 N.uw /iatzi,o PSI. GPM DIA, 1.2' +.7` GPM DtA. prM plA. GYM DIA i.a• opDII, t.s Ie` GPM DIA GPM DIA GPM DIA. GPM DIA 70 t 270 360' 310 360• 355 396' at5 n0' A90 430• 555 450' 830 4135 756 495 ego 61y' 9r1 3+0 )901 360 a10' a06 423 1 475 "5' 545 466' e25 466' 715 506' e55 535' 1006 535' t50 3a0 4t0 390 430' aA6 450• 525 A70' d05 aoh- 4395 5t6' 790 536, 543 505' t+10 690' ry7 1 37C � 5' � 425 a.5 405 +tLS' _i 51 i aB6' 655 515 755 SW' 660 SW' 1075 690' +2t0 d20' J 200 R RIN(` S ` Or mw.� 1 �" Rtr1q t /Ung 1 4 ng I -%-- Ring I %, Rlnp 1 .,,. q al" .nitOff) 2. Rho t1e31 .0,411 II I1,1e tee aI) +5e a Iuat S,.ee- ae,0a17 OU. D11 GPM DIA. I (I.74' .auto GPM DIA. (I GAM DIA. GAM PSI GPM DIII GPM GPu - 60 250 3a0 330 3T0• 366 390' WA AA6 a,0' 614 425, 666 440' 1 696 V7' 60 290 370 360 a00' 4a5 420' S15 dap 500 a64' 675 &To, 605 Ai3D' ,f,p 326 390' 42s 425' 500 145' 315 465' 600 400' 755 SOD' 000 $29' ' 120 355 410' 4e5 845' 545 a86• 6:r0 Ad6" 725 600" 025 520- 965 545' . 7nv :7 amolel o1 In.o.. ,e apprGnms:ery 2% lop ror d"e 24' IFLOCI" "916 514 MM la• 4" 21' 4.40C,0� 1, 9" Tne alG GUNr zn,Wmhnce ame hu roam o0ta,'a urrdor �6sal "..r enhrtltlonr, anC may ee A01-04r ar4Ct60 by Imo, poor hvdiu,.tic nmren a c,f• r,;N_.L O'.mar +atlem 7 Nat— 11ngat,Gr1 COrpo Mian --k1 as n9ra*4rrrm'e- mg4rd�-q e.r> m 00-,Jfl r. w APPlIC6110- •an 163 y.�.e,. 3701 )CIO P.S.r CIL/ �90o6 4M666 0;�,7 , r/, do. r l3. S 7107; wet,& l aoo'=yo .z = loo'x .So(.2oq� �r. �/, foic) p6.3 x 2W .,. rv-x0a, x,�",. ISoRy�is�i /s>6 a" 114 m ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along. ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1118 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 5590 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 18.6333333333 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 44.72 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 8 37 M Fie 73 — 7-7 � f � pp��•' "'.her ��^�_� S �;, ...y � '„ M k:; - � p• � �1 r NtV .01•,jV�. ♦+'[� `4r� �� �•1 1 ,;,. .Ny'i •r,,�, «je �_ 3.. L.ea,.y- r k Ic [,\\ r.,,y. °�..i r r .<,v �•�►, fl . 2 /s '�+� �. ♦. R . v~�i � , !fi /S',��Ts �. �. .�, es d' Y-''iri�w c -,'• .� .1r, X �, _ ., �� '�,�.�" ` ..�' ��`7f>� J � ;��. [ �TeM { k• V Y � J+J ]- �� 4. f F b', �'V��rS �, � -'�- _ts-r' � f •' '.*'V'e'�: 1 r• "Y' '".. -q A v- pm ''- may:-. x 's'+ . l��� .'rc+` � "� • ''� � �. of R � • 8 •'� �, wa' �Y .6f- � �� � `�'i'• � !r .r T �� '.VON �� �' _ c � .�i. �►O � a r. % '.:� '�"�t c , '�h r • � ' :' � � may£ TA iP S ♦ '3. .rye 'i �j�,�at.� ' ♦S? A+ ,..� a} �rT�Fc' �Y•- a Y�-$.., j M ' Ja 1 f _ C x:Yp .. t �y� r � - �'! /% 1 r CRT, o n} 3 .41 O �+am FLs ri., S • $urce�sit�1s� rid. 2 - /SG 4. P/da. /, 2 I ♦ . �! ..I i jY A-R9' ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE C CORN FHH FESCUE - HAY W WHEAT CROP FROM TABLES 1 AND 2 UNITS IPER UNIT BU 1.25 TONS 50 BU 2.4 ACRES LBS AW N USED TABLE 1 24.3 8978.85 I+ 35. Page: 6 r" ANIMAL WASTE UTILIZATION PLAN 7 3-10 TABLE 1: ACRES OWNED BY PRODUCER 3,3. & 3.3.7 3. 2, 9 TRACT FIELD SOIL TYPE & CLASS- CROP �E4 COMM N ** * LBS DETERMINING PHASE CODE PER ACRES AW N AC USED ----- or ------- APPLY RESID. AP L METH N M 111 2 ApB C 110 137.5 1.4 192.5 I MAR, JUN 111 13 jApB IC 1110 1137.5 I ]-0.9 1MA123R.75 JUN Ill 4 ApB IC I 1110 1137.5 11.1 11.51.25 MAR, JUN 1l1 5 ApB IC I 1110 1137.5 1 11.4 1192.5 MAR, JUN 111 6 ApB IC I 1110 1137.5 1 13.2 1440 MAR, JUN 111 7 ApB IC I 1110 1137.5 1 13.5 1481.25 MAR, JUN 111 8 ApB IC I 1110 1137.5 1 14.1 1563.75 MAR, JUN 111 9 ApB 1.6 IC I 1110 1137.5 1 1220 MAR, JUN 3210 1 ApB IC I 1110 1137.5 1 14.9 1673.75 MAR, JUN 111 2 ApB IC I 1110 1137.5 1 11.6 1220 MAR, JUN 3210 3 ApB IC 1110 1137.5 1 10.6 182.5 I MAR, JUN 111 1-2 ApB JW 155 1132 1 11.4 1184.8 I NOV,MAR 111 ApB FHH �-2 I 12.0 1100 1 11.4 1140 AUG-OCT 1 ApB 1-3 JW I 155 1112 1 10.9 1118.8 NOV,MAR Page: 3 l f ANIMAL WASTE UTILIZATION PLAN lb.� Ro,0;cl� L� l�cc U y + 111 -3 ApB FHH 0.9 I 12.0 1100 I I 190 AUG-OCT 111 ApB 1-4 JW I 155 1132 1 11.1 1145.2 NOV,MAR ill ApB FHH 1-4 I 12.0 1100 1 11.1 1110 AUG-OCT 111 ApB 1-5 1 JW I 1-1-5 11-32 1 11-4 1184.8 NOV,MAR 111 ApB FHH 1-5 I 12.0 1100 1 11.4 11-4-0 AUG-OCT 111 ApB 1-15 JW I 155 1132 1 13.2 1422.4 NOV, MAR 111 ApB FHH 2.0 1-6 I I 1100 1 13.2 1320 AUG-OCT 111 ApB 1-7 JW I 155 1132 1 13.5 1462 NOV,MAR ill ApB FHH 1-7 I 12.0 1100 13.5 1350 AUG--OCT 111 ApB 1-8 JW I 155 1132 1 14.1 1541.2 NOV,MAR 111 ApB FHH 1-8 I 12.o Iloo 1 14.1 1410 AUG-OCT 111 ApB 1-9 JW I 155 1132 1 11.6 1211.2 NOV,MAR 111 ApB FHH 1-9 I 12.o Iloo 1 11.6 1160 AUG-OCT 3210 ApB 1646.8 1-1 JW I 155 1132 1 14.9 NOV,MAR 3210 ApB FHH 14.9 14§0 1-1 I 12.0 1100 1 AUG-OCT 3210 ApB 1-2 JW I 155 1132 1 11.6 1211.2 NOV,MAR '10 1-2 ApB FHH 12.0 1100 1 11.6 1160 I AUG-OCT Page: 4 J ANIMAL WASTE UTILIZATION PLAN 3210 1-3 I ApB I W 155 1132 •3210 1-3 1 ApB FHH 12.0 1100 I END I 0.6 179.2 NOV, MAR 0.6 160 AUG-OCT TOTAL18978.85 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North'Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 5 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS ivlq- 1. Animal waste shall not reach surface waters of the state dy runoff, drift, manmade conveyances, direct application, or 19,�6 direct discharge during operation or land application.". ,Any discharge of waste which reaches surface water is prohib`ted.. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to:a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 12 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. .Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 15. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence. of erosion, leakage or discharge. Page: 13 J WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plane which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 14 PLAT OF SURVEY J. u■M.la st*w-ft IFHM" A., ANCI e ( kUMV 4. WWK � I w.7mr,Tea I emir a. amm w.2w, JIMMY THOMAS w.Lu, P.7M � ; ' r..tu , TIMMY THOMAS " "' '' ' ' ' __— __ f7s.7■• A■Aj ALLENSVILLE THP.• PERSON COUNTY, N.C. NOVEMBER 1994• HAMLETT-JENNINGS A ASSOCIATES JOHN J. JENNINGS L-3052 I i 4 jh* w p IM • Wit. \s I _ Co.tra• r.■oa �~4� r ,. II?KL7 ■a.osa � �9 v _ _ W so rK ` I, =� _ - c ,>„ T O..18,eO. ►.1 a8... AQU VICINITY MAP :. 7. I7 NXrt IF rs I J. pPMLP �Ow[R A � - ttW.07.4M•f llr I"I.,1• 107.19 ACRES " ` ��.�.'�;•. I S I ( a „ I rlul.ttt ■. j . • 1 to - - J t IFI ■. vru 1100W, A. I y -- w.t■1. r.s■s ���\ m•ff•it•f I � >R � E �! r IF I , 1+.if Law �. t1'17•e ' ' DO. tfa, F. UI L[Ol74 Nr • NAIL FOUND NS O NAIL SET f ! _ IF • FOUND 111"W 1S o IRON SET f Ci ■, sk"IY soww..f. 1P a YAMEYATICAL d I Of.122. P.fN POINT Il 7e u<m 71010). 2EALO wO DMD, TNIf IS . MUINIw Rai, Wl 7A WXDPMTIQM. MM M 0 It • l7el .70' =r Ile ea VE7r&m f. �.• Ill. • 7■ a tw■•7O'■7Y �1 )Aa'17• •. av 12 3. P.6 M.0. Y!(L �r— CRQ-K Q 1 rl:.i...0 R�ivan iA1c wlnfrna WAGWf1C 217 S.LAIIAR ST. - P.O.802 12f1 FAX9OR0 WCOM IYROUWI 27577 (e1O1 BOO-�7a= EMERGENCY ACTION PLAN PHONE NUMBERS DWQ EMERGENCY MANAGEMENT SYSTEM SWCD 910-592- ,? MRCS jIO - - Nc.CeS 9�v99-1/qs This plan will be implemented in the event that wastes from your operation are Ieaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include. a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and elinnate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump c. Close valves to eliminate further discharge_ d. Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, -solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. December 18, 1996 e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage, put in'a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does.the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone - After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of.the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number - c. Instruct EMS to contact local Health Department. d. Contact CES, phone number - - , local SWCD office phone number and local NRCS office for advice/technical assistance phone number - - 4: If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: MiacAin -r L o b. Contractors Address: c. Contractors Phone: 2 1December 18, 1996 Narrative On The Allensville Unit (Thomas Farms - Timmy & Jimmy) This narrative is attached to the attachment written on April 11, 1997. The majority of the BMP's (Best Management Practices) suggested that day have been installed from the last visit on 11-26-97 at 10:45 a.m. On November 26, 1997, Joey Knight (Person County Agriculture Extension Agent and waste Management Technical Specialist) made a site visitation to the Allensville Unit of the Jimmy & Timmy Thomas Swine Farm. While at the farm, the Insect Control, Odor Control, Mortality Management, and Emergency Action Plan sections of the Waste Management Plan were addressed again. All checklists are completed if appicable. All BMP's (Best Management Practices) are being followed presently. All checklists and other attachments are attached to this narrative. Jimmy & Timmy Thomas have facility with NRCS assistant. will evently be closed out with improvements have been made on have purchased the farm. They and NCCES agencies for several Signature: Address: Phone# : 91/2 J5V' - //9- _ retrofitted their lagoon at this One other lagoon on this facility NRCS assistant. A lot of this farm since both Jimmy & Timmy have worked closely with both NRCS years. -<-% Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Flush Gutters • Accumulation of solids Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. Mr" Remove bridging of accumulated solids at discharge Lagoons and Pits • Crusted Solids Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 - 8 inches'over more than 30% of surface. Excessive Vegetative • Decaying vegetation 2' Maintain vegetative control along banks of Growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along watees edge on impoundment's perimeter. Dry Systems Feeders Feed Spillage 63"'Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage. ff**�Clean up spillage on a routine basis (e.g., 7 - 10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulations of feed residues Reduce moisture accumulation within and AMA _/� around immediate perimeter of feed storage areas by insuring drainage away from site vaZ °,; 094A-1,F,�. and/or providing adequate containment (e.g., covered bin for brewers grain and similar high noisture grain products). Q' Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. AMIC -November 11, 1996, Page 1 r Source Cause BMWs to Control Insects" Site Specific Practices Animal Holding Areas Accumulations of animal wastes O Eliminate low areas that trap moisture along and feed wastage fences and other locations where waste accumulates and disturbance by animals is� minimal. , O Maintain fence rows and filter strips around 464g /3n�l.ttelt- . animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed). Dry Manure Handling • Accumulations of animal wastes 0 Remove spillage on a routine basis (e.g., 7 - 10 Systems_ _ day interval during summer; 15-30 day interval during winter) where manure is loaded for land application or disposal. O Provide for adequate drainage around manure stockpiles. 0 Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC, 27695-7613. AMID vember 11, 1996, Page 2 r 4V Swine Farm Waste Management Odor Control Checklist Source Cause BMRs to Minimize Odor Site Specific Practices Farmstead • Swine production Vegetative or wooded buffers; li,Reconuitended best management practices; B rn f I a,' �'"' � • Good judgment and common sense Animal body surfaces • Dirty manure -covered animals Dry floors Floor surfaces Wet manure -covered floors 61' Slotted floors; fsY Waterers located over slotted floors; 3"'Feeders at high end of solid floors; 91"�Scrape manure buildup from floors; �• 13" Underfloor ventilation for drying Manure collection pits • Urine; Frequent manure removal b flus it recharge, • Partial microbial decomposition 0 scrape; Underfloor ventilation Ventilation exhaust fans • Volatile gases; Fan maintenance; Dust 0""Eflicient air movement Indoor surfaces • Dust t' Washdown between groups of animals; allot! Peed /� �/ additives; Q QJ' ` Feeder covers; Deed delivery downspout extenders to feeder covers Flush tanks • Agitation of recycled lagoon 0 Flush tank covers; liquid while tanks are filling p Extend fill lines to near bottom of tanks with anti -siphon vents alleys Agitation during wastewater 2- Underfloor flush with underfloor ventilation conveyance Pit recharge points • Agitation of recycled lagoon 0 Extend recharge lines to near bottom of pits liquid while pits are filling with anti -siphon vents j Lift stations • Agitation during sump tank E7Sump tank covers �,s[.rn�y / /C4tItl, filling and drawdown 1Gr�m� Outside drain collection Agitation during wastewater orjunction boxes conveyance AM lovember 11, 1996, Page 3 Sox covers ��p� Cdt�v1- B•�v Source Cause 'BMPs to Minimize Odor Site Specific Practices Lift stations Agitation during sump tank ❑ Sump tank covers filling and drawdown End of drainpipes at • Agitation during wastewater ®" Extend discharge point of pipes underneath %u�_ .t._P¢o.1_1 lagoon conveyance lagoon liquid level �yn4za, fie, et,..e., Lagoon surfaces 0 Volatile gas emission; Sk-Properlagoon liquid capacity; • Biological mixing; Ii�Correct lagoon startup procedures; • Agitation Q"�Minimum surface area -to -volume ratio; Minimum agitation when pumping; ❑ Mechanical aeration; ❑ Proven biological additives Irrigation sprinkler • nozzles High pressure agitation; 1_H'Irrigate on dry days with little or no wind; . Wind drift rr'Minimum recommended operating procedure; ff//Pump intake near lagoon liquid surface; � NIQCS O Pump from second -stage lagoon;P.A... } C/99 J. 0 Flush residual manure from pipes at end of slurry/sludge pumpings Dead animals • Carcass decomposition Proper disposition of carcasses Standing water around • Improper drainage; Grade and landscape such that water drains facilities . Microbial decomposition of away from facilities organic matter Mud tracked onto public • Poorly maintained access roads Farm access road maintenance , roads from farm access Additional Information : Available From : Cattle Manure Management; 0200 Rule/BMP Packet NCSU, County Extension Center Dairy Educational Unit Manure Management System - Lake Wheeler Road Field Laboratory; EBAE 209-95 NCSU - BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 NCSU - BAE Management of Dairy Wastewater; EBAE 106-83 NCSU - BAE Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU-BAE Nuisance Concerns in Animal Manure Management: Odors and Flies ; PRO107, 1995 Conference Proceedings Florida Cooperative Extension AMOC - November 11, 1996, Page 2 Source Cause BMWs to Minimize Odor Site Specific Practices End of drainpipes at 0 Agitation during wastewater 119 Extend discharge point of pipes underneath lagoon conveyance lagoon liquid level Lagoon surfaces • Volatile gas emissions; Proper lagoon liquid capacity; • Biological mixing; C9�Correct lagoon startup procedures; • Agitation Minimum surface area -to -volume ratio; . Q,"Minimum agitation when.pumping; O Mechanical aeration; 0 Proven biological additives Irrigation sprinkler • High pressure agitation; G]" Irrigate on dry days with little or no wind; Q nozzles 3�/o Wind drift C>'Minimum recommended operating pressure; Gam* l"Pump intake near lagoon liquid surface; O Pump from second -stage lagoon Storage tank or basin • Partial microbial decomposition; ❑ . Bottom or midlevel loading; surface • Mixing while filling; 0 Tank covers; • Agitation when emptying 0 Basin surface mats of solids; 0 Proven biological additives or oxidants Settling basin surface • Partial microbial decomposition; Extend drai ipe outlets underneath liquid • Mixing while filling; level, • Agitation when emptying CY Remove settled solids regularly Manure, slurry or sludge • Agitation when spreading; Soil injection of slurry/sludges; spreader outlets a Volatile gas emissions 93"' Wash residual manure from spreader after use; 0 Proven biological additives or oxidants Uncovered manure, • Volatile gas emissions while 0 Soil injection of slurry/sludges slurry or sludge on field drying 0 Soil incorporation within 48 hrs.; surfaces Q"'Spread in thin uniform layers for rapid drying; 0 Proven biological additives or oxidants Dead animals • Carcass decomposition Proper disposition of carcasses'`'` _ ' Dead animal disposal • Carcass decomposition 0 Complete covering of carcasses in burial pits; pits fO Proper location/construction of disposal pits ' Incinerators • Incomplete combustion ❑ Secondary stack burners � � gD _ AN 4ovember 11, 1-496, Page 4 Source BMPs to Standing water around 0 Improper drainage; Er Grade and landscape such that water drains facilities . Microbial decomposition of away from facilities organic matter Manure tracked onto • Poorly maintained access roads Farm access road maintenance public roads from farm access ecific Practices Additional Information : Available From: _ Swine Manure Management; 0200 Rule/BMP Packet NCSU, County Extension Center Swine Production Farm Potential Odor Sources and Remedies ; EBAE Fact Sheet NCSU - BAE - - Swine Production Facility Manure Management: Pit Recharge - Lagoon Treatment; EBAE 128-98 NCSU - BAE Swine Production Facility Manure Management: Underfloor Flush - Lagoon Treatment; EBAE 129-88 NCSU - BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 NCSU - BAE Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU - BAE Controlling Odors from Swine Buildings; PIH-33 NCSU - Swine Extension Environmental Assurance Program ; NPPC Manual NC Pork Producers Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communications Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings Florida Cooperative Extension AMOC - November 11, 1996, Page 5 Mortality Management Methods (check which method(s) are being implemented) ❑ Burial three feet beneath the surface of the ground within .24 hours after knowledge of the death. The burial must be at least 300 feet from any flowing stream or public body of water. ❑ Rendering at a rendering plant licensed under G.S. 106-168.7 Cd� Ge t 'incineration ( Up +0 80 HOS,) ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the Department of Agriculture ❑ Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) Per5 on Co--Ai7 kA*1d-P1 11 v,pFea' P�e�mDNt e�ufrc>J�e���I ,ScrYice- 3 a� 36-Y - 3& 99 December 18, 1996 Ooereror`TH0MA5 (WF4VFR FARCouet�y: PERS C;N Date, 07/3l/8� Ji�renue ro neuree� r�ei�ence (o�her �hmn o�ner), � � fee� �. AVFRA (GE LIVF WEI5H.T (ALW) �60 �o*s (farpu� to finieh) ' X I417 lbe. = �6 8420 l�e 0 �owe (farrow ro 0 head [[iniehinonlv) x '3 be. = 0 lbs ^ O emWe (farpmw co weHo} x 43 be. 0 head (weHo co x be. = O lb� -____________________________________. � ____________________________________ Tm�a7 Aver�ge Live Weigh(- 842 10o 2. MINIMUM RFQUlRED TRFATMENT V0LUPflE OF LAGOON V��ume = �68420 loe Al x Tpe��men� Volume(�F}/lh. ALW Tr�a�wen� �olume(�F)/lb. ALV; = ) CF/lb. 4LW �olume = 368420 cubio feet �. GT�RA�E V�LUME F�R 5LU��� AC0UMUL�Tl�N Volume = 0.V cubic �eet 44wIP OW*VmA A10 4. T0T4L DE,75I8NED VOLUME Ineide �o� lh (f- - - - - - - - - - - - - - - - - - - - - Ine�de top w-idth (feet)'---------------------- 0 Tap of dike elevat: Imn {feet)----------------- 9� � Bottmm of la@oun el�v*t Jmn (fee�)------------ O Freeboard (feet)----------------------------- 0 Side slopes. (inside logoon)------------------ g.7 Tural de-elQn voluwe ua10(j prJewoidal 5S/E ND1 -53/EWD2 SS/SIDE1 55/5IDE2 LEN8TH WIPTf) F PTF 2.5 2.5 �.5 2.5 5A0-0 13S.0 1D 0 AREA OF TOP LFNrTH � HIDTH = 5 90� AREA OP ROTT0M LFNGTH * WIDTH = �u0O 88.(1 4�EA �� MT�5ECT�N LENGTH * �IDTH `� 4 81420 A. rR F A 0F T0P} 4752CI {AREA OF 8CjTT0t%il} (4RF4 �� MI05�CTI�N * �} |A�EA TOP + (4*A��� �I�5��T}�N} + �RF4 ��TT;�� * ���TH�� 8�4�O.0 ���38�.0 47�200 l 7 T�ral �ee/�ned V*lume 4"a�lahle = ������ �U FT -ORAk-,F REClUIRFn TFMPiRARY 5! 1) R A I IN A G I' E A 'R' E A -, aoocm (top o� el-ike.' g t Btrildings (1.'oof and lot water) V trYIS u'i c e� TO T A L r) A 88800.0 q r E. r. � e t... Des'ign stov.;.Ige t(-.) 1 .8 0 d S 5A, Vo1unje of w,�ste Idt"OdUcIle.0 F e s & tj I t, (-) ci �_j c o I-) I n 9 a. /,Ja y p e r 15 5 1 b A L W 37 Jri #t.ttloe3'08IL20 I Ls A! W/ 135 1 b A L. 44 37 1 /d 180 day�' vc)]uIlle G 7 2'9 R I (.,);I I S . c) r 8 9 y 7 0 7 (..., u b I e e t 5 F Vo"utlle of water w -1,L,, ()'f t.er used For. ash'ing f1oors 00 VC) I U h"I Wa '.'esh water, u-.'ed' for t r`lush F"lush rec-ir'c'u". i.:e he I i �'( i .IjC)CP') HCCOLA')t-.-od 'ot, in 5A. VOILA010 2470 9 1 o ris/ da y -'J: 180 (Jays sC"or,age./"f 48 (jHl lon',s pei, GF u I;, e -a x c' e Vo ' o f 1 n n k: , S s of e va S e c) {:}f tI I I e w h en t la n e:>,. c; e. e e.!k: e V'9 u e S C) i I C a Y e x c e. s S I .1 t-I D vc)'Iun#e = 51R00.0 ^ � - Volume of 25 year - 24 hour scoro/ Volume = Vl inches / 12 inches per Foot * 0A Volume = 45140.0 cubic fee� TOTAL REQUIRED TEMPORARY 3TORAGE 5A. 89971 cubic fee: 56. SA439 cubic feet 5C 51800 cubic Feet: 30. 46140 cubic feet TOTAL 246349 cubic Feet 6, SUMMARY Temporary storage per!od====================> lRO days Rainfall in excess of evaporarion===========> 74 inches 25 year - 24 hour 6.1 inches 2,0 feet Side slopes =====- 3.5 : l inside top 600.0 feer Inside too 148.0 feer Top of dike 93.0 feet Bottom of lagoon 81.0 feet Total required volume=======================> 614769 cv, fr Actual design 640533 cu ft Seasonal high warertab7e elevation (SHWT)===> 0.0 feet - Stop pumping ======/ 87.5 feet Must be > or = to the 5HWT elev.==========/ 0.0 Pew Must be > on = to min, req, treatment el.-/ 87.0 fee� Required minimum rpeatwenc volume===========> 358420 ou, fr. Volume at stop pumping e7evatiun===========W 377501 ou Q. Start pumping 90.5 fee( Muar be at bottom of freeboard & 25 yr. rainfall Actual volume lees 25 yr- 24 hr. rainfall--` 595399 mu Q. Volume at start pumping elevation===========> B00277 cu. Ft. Required volume co be pumped================> 20120; ou ft Actual volume planned to be pumpeJ==========> 222776 cu, fr. Min, rh1okneee of soil liner when /`oquired==/ 1.8 feek� T, 0E5IG NED RY,a-1w_~-k_ A P P R 0 V F D BY, (J-' I NOTE, SEE ATTACHED WASTE UTILIZATION PLAN COMMEmT5.________________--______--------------------------- K I z os�h $S7+Q cE (am) �- v O o /-7 Y LAGOON SUMMARY SHEET & TYPICAL CROSS --SECTION Settled top of dam: 3.0 "Cop Width rQ� ; �a Construct toga of d4;m Fill Yardage: Z.1 5 Jr //1Slr Natural cjr0Und elev. cut aff meal ---*—'O*� Depth determi nd by Depends on c:��.�iE�n�eitt ��—� --�1. ; yCS on site Start land n)plication Stop land application e�lev. 6.5 ��� _ — — r elev. 87..5— ltane „_ __ T _—_�1'emporary V --- -- ----- ---- ------ -/ Dent support% Traatment Volume Top of sludge elev. S ---------------------------------- ;�v Sludge ZACCLIbUlGi'L'iOn Bottom elev. +0 ra.wIA Lagoon size: Length 'S Wi clth ex Cu. Yds. c:xcavatecj C4 E ENCH NMI'.' DCSCRIE'1'I0I'4: - - - # 2 a.� E,z s e-r. el, Elevation: ✓040•Oo GENERAL INFORMATION J[7E+ CLASS: _ i+agyI r' c I8 11� HAZARD CLASS:L a, ANIMAL TYPE & NUMBER: 2�m KIND OF OPERATION: &,tiyw — 140TE: If constructing ic; not started within one year, this plan is not valid until re- ,-V,X1 .Latit»1 of floc►d plain for safety hAzard is, made. LAGGOIV FOR ANIMAL WASTE (SINGLE STAGE) I- R H COUNTY STATE U. S. DEPAi=;T VENT OF AGRICULTURE SOIL CONSERVATION SERVICE DESIGNED BY: 4-A- AP17'ROVE-D BY: TITLE: DATE: SPECIFICATIONS FOR CONSTRUCTION OF WASTE TREATMENT LAGOCsNS OR HOLDING PONDS Clearing: Al trees and brush shalI be removed from the construction area before any excavating or fill is -.started. Stumps w i I I be removed within the area of the foundation of the embankment and al excavated areas. All stumps and roots exceeding one (1) Inch in diameter shaI1 be removed to a minimum depth of one (1) foot. Satisfactory disposition will tie made of all debris. The foundation area shall tie loosened thoroughly and roughly leveled, with suitable equipment, before placement of any embankment material. Cutoff Trench: A cutoff trench shall tie excavated as shown on the plans. DIMENSIONS SHOWN ARE APPRC iX I MATE . EXACT DIMENSIONS WILL L.E DETERMINED Liy SCS-PERSONNEL WHEN THE SITE IS OPENED UP, DURING CONSTRUCTION. The cutoff trench shaII be backfilled in thin layers, not to exceed eight (`•) inches depth. Ail standing water shall be removed from the trench before backfilling is started. Construction: Construction will consist of excavation to the neat lines and grades as planned. In areas of the lagoon bottom and side slopes where pervious material is encountered, the area shall be overexcavated by 2.6' feet and backfilled with ciayey material. Excavation shall be by pan, drag1ine and/or backhoe. A bulIdozer or other- equipment wiII be used to dress the slopes. FiII material placed in the embankment shall be free of sod, roots, stones over n inches in diameter, and other objectionable materials. The fill material shall tie placed and spread over the entire fill area in layers not to exceed 8 inches in thickness. Construction of the fill shall be undertaken only at such times that the moisture content of the f i I.I material w i I I permit a reasonable degree of compaction. _shal I be accornpl ished with a sheep —foot Corn_acti�an-..of al I_ f i i I material .,_ ��.., ,roller passing sgygral times over the entire surface of each S inch lift. Tr-. rotect a ainst leakage the entire Iagoon bottom and a i I excavated side sIo es shall tie compacted in the same manner- as the -fill material compaction. The primary borrow area will be within the basir, itself. Any other areas will be designated on the plans. Vegetat_ion: Al I exposed embankment, spi I Tway, and borrow areas shal I tie seeded to the planned type of vegetation as Soon as possible after - construction. SPECIAL IINSTRUCTIONS Cut Core Where Fill Exceeds 3' TYPICAL CROSS SECTION 4 . •' OPERATION AND MAINTENANCE PLAN ------------------------------ This lagoon is designed for waste treatment (permanent storage) with min. odor control. The time required for the planned fluid level to be reached (permanent + temporary storage) may vary due to soil conditions flushing operations, and the amount of fresh water added to the system. The designed 6 months temporary storage is an estimated volume based on: 1) waste from animals; 2) excess rainfall after evaporation; and 3) the largest 24 hour (one day) rainfall that occurs on the average of once every 25 years. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year. This estimate is based on 7 inches of excess rainfall which is equal to or exceeds the highest 6 months excess in a year. The average annual excess rainfall is approximately 8 inches. Therefore, an average of 8 inches of excess rainfall will need to be pumped each year. The 25 year rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building(s). If the outlet pipe is not installed on the elevation to begin pumping, a permanent marker must be installed on this elevation to indicate when pumping should begin. An elevation must be established to stop pumping to maintain minimum treatment depth (6 feet). Pumping can be'started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out: 1. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin DumD-out of the lagoon when fluid level reaches eleva- tion 90-s as marked by permanent marker. Stop pump -out when the fluid level reaches elevation S-s or before the fluid depth is less than 6 feet deep (this.prevents the loss of favorable bacteria). The design temporary storage, less 25 year storm is 1.0/I 2,07 cubic feet or 1,5oso43gallons. As stated before, this volume will vary considerably from year to year. 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. Keep a minimum of 25 feet of grass vegetated buffer around . waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. I 1. Please explain in the narrative of operations the two-year crop rotation. Include what will be planted the first and second years (include application periods for each crop). It is difficult to gather this information from Table 1 of the WUP. A narrative of operations for the two-year rotation is included in the revised WUP. The newly revised WUP is attached. (Landowner) (Date) AICN;S -ate - 98 4kMphni al Speciali t) (s) (Date) 2. The WUP states that corn and wheat will be irrigated during the months of March and June and November and March respectively. Why is waste only being applied for these months? The recommended application months for corn ranges from March - June and for wheat, October - March. Please explain this Information in the narrative. Corrections have been made on application months for waste being applied to specific crops on given fields. Refer to revised WUP that is attached. (Landowner) (Date) N3-M 7et i Speciali ) (s) (Date) 3. The Waste Utilization Plan (WUP) states that the Realistic Yield Expectations (RYE) for corn is 110 bushels/acre and for wheat is 55 bushels/acre. Referring to the RYE manual issued by the NCSU Cooperative Extension Service, the yields for corn and wheat should be 105 bu/ac. and 50 bulac. respectively. Note that actual yields that are higher than the RYE's listed by the NCSU Coop Extension may be used for facilities that can document such yields with records that show the average yield for three out of five years meets or exceeds the actual yield used in the WUP. If this is not the case, please make the appropriate changes to the WUP to reflect the correct RYE's. Thomas Farms RYE averages for corn are 110 bushels/acre and wheat at 55 bushels/acre for the last three years. The reason their averages are higher than the Person County average on these particular soils is that they utilize no -till management and crop rotation in their production plan. They have taken bin measurements each year for production data on the wheat and corn crops. (Landowner) d (D t (echn' al Specialist) (s) (Date) 4. Tract 111, Field 2 has corn listed twice with two different acreages. Please explain and/or revise this information. Corrections have been made in the newly revised WUP. 4no �4,e� (Landowner) (Date) �43-ig NCas) f-� -98 "ech(s) (Date) 5. Include in the narrative, that an additional 10.8 acres has been cleared and explain why. This additional acreage was cleared in order to make waste applications more efficient and easier for the traveling irrigation system. To be exact, all fields were remeasured by the Extension Agent with the acreage wheel and a total of 39.349 acres can be used for waste applications. This allows an additional 8.149 acres for waste application. Refer to the new map drawn instead of the old ASCS map for new field acreages and boundaries. Look at the dimensions of the fields on the irrigation layouts on each field. The new field maps are attached. Note the new field boundaries because of the clearing of trees. This clearing has given the farm this additional crop land to apply their swine waste. -4/2 P (Landowner) (Date) fTeffinicaf Specialist)(s) (Date) Y-a3-i 6. The irrigation parameters listed in your WUP exceed current NRCS recommendations. The application events listed in your WUP appear to be out of the Sprinkler Irrigation Guide. The Application Amounts listed in this guide have not been adjusted for the application of animal waste. NRCS currently recommends that total application amounts not exceed one inch in any application event for any soil type. If your application rates need to be adjusted for the application of animal waste, please have your Technical Specialist revise your WUP to reflect the appropriate application amount per event. If the rates will remain as written in the plan, please have your Technical Specialist justify the increased application rate in the narrative of your WUP. All changes have been made in the newly revised WUP. WUP is attached. (Landowner) (Date) -`v5- g8 Ncc'O.$) �'-ems -Aff nifal Speci7t)(s) (Date) �'-.21.5A3 s ANIMAL WASTE UTILIZATION PLAN Producer: Location: Telephone: Type Operation: Number of Animals: (Design Capacity) STORAGE STRUCTURE: APPLICATION METHOD: Jimmy & Timmy Thomas 8251 Oxford Rd. Timberlake NC 27581 910-364-2633 RECEIVED WATER QUALITY SECTION SEP 2 51998 Non -Discharge Permitting Existing Farrow to Finish Swine 260.00 sows Anaerobic Waste Treatment Lagoon Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 260 sows x 19.9 tons waste/sows/year = 5174 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 260 sows x 26 lbs PAN/sows/year = 6760 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME ill 2 ApB C 110 137.5 4.4 605 I MAR-JUN ill 14 IApB I= I110 1137.5 I 12.9 INlAR.7J5 ill 5 110 jApB IC I 1137.5 1 110.9 11498.75 MAR-JUN ill 7 110 jApB IC I 1137.5 1 15.5 1756.25 MAR-JUN ill ApB 110 5.1 Ill I IC x 1137.5 1 1701.25 MAR-JUN 3210 1 110 jAp13 IC T 1137.5 16.3 1866.25 MAR-JUN 3210 2 110 jAp11 IC x 1137.5 1 13.3 1453.75 MAR-JUN 3210 3 jAp11 110 110 IC I 1137.5 1 1.8 IMAR-JUN ill 1-2 jApB JW x 155 1132 1 14.4 1580.8 OCT-MAR ill FHH 1-2 jApB I 12.0 jl00 1 14.4 1440 AUG-OCT ill 1-4 jApB JW 155 1132 1 12.9 1382.8 I OCT-MAR ill FHH 2.0 1-4 jApB I I 1100 1 12.9 1290 AUG-OCT ill 1-5 jAp]3 JW I 155 1132 1 110.9 11438.8 OCT-MAR ill 1-5 jApB FHH 12.0 1100 1 110.9 11090 I AUG-OCT Page: 3 ANIMAL WASTE UTILIZATION PLAN Ill 1-7 IApB 1-17--__ 1 55 1132 111 FHH 1-7 jApB I 12.0 1106 ill $ jApB JW I 155 1132 ill FHH 1-8 jApB I 12.0 �100 3210 1-1 jApB JW 155 1132 I 3210 FHH J-1- jAp11 T 12.0 1100 3210 1-2 jApB JW I 155 1132 3210 FHH 1-2 jApB I 12.0 1100 3210 1-3 jAp11 JW I 155 1132 3210 FHH 1-3 �ApB I 12.0 1100 END T 5.5 1726 OCT-MAR 5.5 1550 AUG-OCT 5.1 1673.2 OCT-MAR 5.1 1510 AUG-OCT 6.3 1831.6 OCT-MAR 6.3 1630 AUG-OCT 3.3 1435.6 OCT-MAR 3.3 1330 AUG-OCT 0.8 105.6 OCT-MAR 0.8 180 AUG-OCT TOTAL114484.4 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 4 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL 10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT C CORN BU 1.25 FHH FESCUE - HAY TONS 50 W WHEAT BU 2.4 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 39.2 14484.4 Page: 5 ANIMAL WASTE UTILIZATION PLAN TABLE 2 0 TOTAL 39.2 *** BALANCE C 14484.4 -7724.4 1 ------------------- *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 6 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1118 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 5590 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 18.6333333333 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 44.72 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25%� depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 7 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) ill 2 ApB C .45 *1.0 ill 4 ApB C .45 *1.0 ill 5 ApB C .45 *1.0 ill 7 ApB C .45 *1.0 111 8 ApB C .45 *1.0 111 �2 ApB FHH .45 *1.0 111 �2 ApB W .45 *1.0 111 �4 ApB FHH .45 *1.0 ill ApB W .45 *1.0 ill ApB FHH .45 *1.0 ill ApB W .45 *1.0 111 y7 ApB FHH .45 *1.0 111 �7 ApB W .45 *1.0 111 �8 ApB FHH .45 *1.0 111 "8 ApB W .45 *1.0 3210 1 ApB C .45 *1.0 3210 2 ApB C .45 *1.0 3210 3 ApB C .45 *1.0 3210 ApB FHH .45 *1.0 3210 ApB W .45 *1.0 3210 ApB FHH .45 *1.0 Page: 8 ANIMAL WASTE UTILIZATION PLAN 3210 -2 3210 -3 3210 "3 * This is ApB ApB ApB the maximu assuming the amoun applied. In many be applied because application amount conditions. W FHH W 45 .45 45 *1.0 *1.0 *1.0 m application amount allowed for the soil t of nitrogen allowed for the crop is not over situations, the application amount shown cannot of the nitrogen limitation. The maximum shown can be applied under optimum soil Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION This operation consists of 1 retrofitted lagoon designed for a 260 sow farrow to finish operation. There is one abandoned lagoon on site that is planned to be closed out in 1998. Cost -share has been approved for the closure and a waste utilization plan will be followed. Until the lagoon is closed, the operator must maintain the water level from going above the 25 year/1 day storm pump stake. The operator should also never allow the water level in the retrofitted lagoon to go above the start pmp stake. Also, always stop waste application immediately should runoff occur. During construction of retrofitted lagoon, a small underground stream was hit when cutting the core. A 41, perforated plastic pipe (with gravel & geotextile cloth) was laid starting at the core and extending beyond the back toe of the dam. The outlet of this pipe should be protected from clogging to prevent water from backing up into pipe. The fields receiving waste are under a 2 year rotation of 1 year no -tilled corn followed by 2nd year of wheat interseeded with fescue. WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. G. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 11 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five ( 5 ) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 12 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Thomas Farms p6A �,✓e. Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Jimmy & Timmy Thomas (Please print) Signature: P61 15�4Date: Name of Manager (If different from owner) : Signature: Date: o6��N°LI ) a - 15� 9 Name of Person Preparing Plan: (Please print)Jim Huey Affiliation:MRCS Phone No. 919-597-2973 Address (Agency): 304 S. Morgan St. Rm. 126 Roxboro NC 27573 Signature: Date: Page: 13 ANIMAL WASTE IITILIZATION PLAN I, ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Date: Waste Producer: Technical Representative: SWCD Representative: Date: Date: Date: Term of Agreement: 119_ to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 14 ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF I, , a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of �J My commission expires (SEAL) Notary Public. Page: 15 ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Party Receiver. Agreement I, hereby agree to apply waste generated by in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division of Water Quality. Third Party Receiver: Date: Term of Agreement: to (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF , a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of 19 My commission expires (SEAL) Notary Public. Page: 16 7. Please include a map, pertaining to the irrigation system, illustrating the fields each sprinkler will irrigate. The drawn irrigation maps are attached with dimensions of each field and irrigation layouts. Stationary and traveling gun irrigation systems are both utilized on this operation. Each map illustrates the system being used on particular fields. (Landowner) (Date) 6VI joz/�� (/vOC65) ^". �a ( ech ical Speciaiist)(s) (Date) � ! `t ! , •�. b •� ••�.' .W_"'r. !yR�,��,,�. t: �: ..••K� �t'S�'ii; arr �'�?4 �`'r' , ,f �� i•, hi,t,`• NMI.' t•j� •�r*�y�tiM� �i - �•" air_ �' f 'r'n'. y� - •.. • �l � � ' w'k,• '1-.. E : tiro j .' E q i �,� "� i 3' ; •iii+,�{6 , p . . k }' 1 P-, f'wi� •y�''. l'., s';i� w'ZI�y, zSiM �{.� s �v� �:1 +� �'1 Y�fr+• f�� r� s� � 1�y� ! `� r41 A ° � r r � •• 'I 14 ..r<.•.•,.• ?GF r , ' ��'�j�t+r�' �:#:,.tip`+..,��'�4v � 1r,,.,ti,• �: �r .71 i k1r." ,\ fry •S" ' .':S�`•.•i' .�..' o''ts'' •' •.�`,• s µ`�y y '+ 'I �� e Y,��a r t 'r` �. ,1} �,•, '{. �,�y� siL+.v- j�F, .ri y. �' .1•� k p� ' p7 fkx 4z k" ao . c-- .q. .w t1 . �' l I - jl,� .� S'�` i -Y •`TSI `��! j� ' 4 i•',y�r �is _ �T,`s ti;,�.. -�..� i � t• � ,:"'�i4tTyd�,6•cr f'ts• a. } i' Ffyyy',fi,'s' � '` �' •�_ {1`, �� k - � =.� ' •r~ � ,1 r�%:�r•1 Ce•ti,' 4�', � � ' � ' 1� 7vi*:' - -.. i ,�ieri � �. �: a f' � +►r ,Ya ' y 't�;�t.,;� _ tN y`°�.; Ir t.e ';��; '�, y¢ r-..r - 'ti .. •i` y ��I► vv '� rA• i - • : �... • : '^ j �*{' „J�f , ,'" : ' 1h �. � 7 •' �.x i . rll�_�• �k r J, AV Oil r s .i .�ty ��A,yn�ri�����AS••f���'�y"S%��' ':.1�h/r Al � �'wrf - Sr1�'.'� �.," TT ir�rs dr ..'ej.:7 A �.,r• +%• � •+ w'� u , 73-1° -TioaGA 11 l S 1uI ir' 1oACc J afa, a0 Q azA feed J�elr r p Cti K-fePs a ri &aTio.l VIC �� e 6Y3 , Lac; ; f AO nn r� 9' .. Far/ oT Fie Id # S� K r" A,4w isa, 1'.3g3' �L� r n 1 , �.1 `M1/ / PT 11 7� row Tave /I CT-L" we 3.3 Fac; 1;1"f �* 13 -/0 Tfr% t„ q- I ' Fie 1o(ft3 S rin k�Pr l� �u�T -300 R� Tel; i-a�c � e� a � � , 150, F r ; /; A, -# I3-1 o /c F, For