Loading...
HomeMy WebLinkAbout20190640 Ver 1_Shoreline Stabilization_20190513State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee s$u lbe enter to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Heal' Mailing Address: 20190640 Telephone Number: 7bLi-Zg0j-948A Fax Number: E-mail Address: K i e.0 lAn v- a) ama►1. cc>rrn 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: MV o• 1XHIII CJ]A0I'fi111111111:E:f1L. Telephone Number: "lou- LD6O - 5 (l I Fax Number: `T044 -1 oto() - 54 hq E-mail Address: ChC�',eaLX)0J1Sa_)10'in84rec n'M- 1e: - Person to receive the Certification Approval: __T0_n'IC e E34-10� II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Trp dp-II Nearest Town: YY)00re5,JJItr Subdivision name or site address (include phase/lot number): Sba Icl7,endr . Ind CYlooresv�LlP Nc aBlt-1 ��* j ?jne IAnoU C'ovr+ S�bri� ,�sinh Directions to site - please include road names and numbers, landmarks, etc.: se'e- 0,-4a A-, P rjl Latitude (in decimal degrees)_ 35 � 55�5 Longitude (decimal degrees) _ RO_ g5D X59 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): J�e_-,LAe_n+ir L 6. Property size (acres): 7. Lake/ river/ ocean adjacent to property: or rn0-ri 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary):p -a L P_r Ll 9. Will work be conducted from land? [✓] From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: I c hnpVP 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Qr(IT 6oip der e-�, L- k tt, lA 1, q12.9/3,) Owner/Agent's Signature' [15A NCAC 02H .0502(f)] Date "Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Lake (At Full Pond/ Normal Water Level) 31 �elou� Full Pond/ Normal Water Level� Shoreline No -k'reeS removed I' Igbove ` fn,, n', mak d 45' length house I O � ACC£55 Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors Halfback Enterprise 808 McKendree Rd. Mooresville,NC 28117 FORM: SSGP 10-2013 Page 3 of 3 5/912019 610 East Center Avenue, Mooresville, NC to 808 McKendree Rd, Mooresville, NC 28117- Google Maps Go gle Maps 610 East Center Avenue, Mooresville, NC to 808 Drive 10.5 miles, 24 min McKendree Rd, Mooresville, NC 28117 610 E Center Ave Mooresville, NC 28115 t 1. Head south on Evergreen St toward E Center Ave 197 ft r . 2. Turn right onto E Center Ave 41 3. Turn left onto S Church St r► 4. Turn right onto E Wilson Ave t 5. Continue onto NC-1100/Brawley School Rd r► 6. Turn right onto McKendree Rd 8 Destination will be on the right 808 McKendree Rd Mooresville, NC 28117 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. 0.5 mi 0.4 mi 1.5 mi 5.2 mi 2.8 mi https:/M&%w.g oog le.corWmaps/dir/610+East+Center+Avenue,+Mooresville,+NC/808+McKendreL+Rd,+Mooresville,+N C+28117/@35.5687961,-80.9120341,145... 1/1 NOTES • PROPERTY MAY BE SUBJECT TO RECORDED OR LEGEND FOUNDATION SURVEY Nin OBS RVED ECODED cars of WAYS OR EASEMENTS Curve RadiuS Length I Chord I Chord Bear. FOR • OWNER TO VERIFY ALL sETeacKs AND ZONING REGULATIONS PRIOR TO ANY PLANNING OR RIGHTEDGE OF �� CENTERUNE Cl 480.00' 63.02' 62.97' S 00°3169 E MAIN DEVELOPMENT CONSTRUCTION. • DMENSIONS OF ALL IMPROVEMENTS SHOWN ON PDE PERMANENT DPAOUGE FASWENT UTRRY POLE COUree Bearing DSStanCe THIS PLAT SHOULD NOT BESCALEDTIOR RELIED tt LIGHT POS L1 S 75'20E 4°4' 76' 10. UPON FOR DESIGN OR CONSTRUCTION A FIELD VERIFICATION OF ALL DIMENSIONS. NS. SWIT�, SEINER MANHOLE 808 McKENDREE RD - MOORESVILLE, NC • COPIES OF THIS FILEM/W1n.OV ARE FOR RHFAD UMRY LINE LOT Hl, PINE KNOLL COURT ONLY ONLY AND MAY NOT BE USED FOR DESIGN WORK. USE DESIGN WORK. DAVIDSON TOWNSHIP, IREDELL COUNTY, NC • A PORTION OF THIS PROPERTY IS LOCATED IN A I I 100 YEAR FLOOD PAN. SCALE: 1"- 40' m I DEDMON SURVEYS I CHUCK POOVEY, PLS #3762 RICHARD GWILT m . ROBERT DEDMON, PLS #3899 3704 NC HIGHWAY #16 NORTH DB 250-1563 I ` P.O. BOX 494 - DENVER, NC 28037 I KEMP PHONE: 704/483/4908 \ \ ROAD FAX: 704/483/2170 \ gs F EBAR NAN1'J.DEDMONSURVEYS.COM �`1�1j�11Ct�!! �%LL \ C7 \ 223.58' 94 RFBAR \ 7'52"E N B3'S O8.%O 2 N aQ•OFE55lO i `4.87 1' PIPE I __ J -- 15,--_-------_ �l N N �' \ SEAL -'o L-3899 = I%0%.4�, r��'�h'lnj a„0"�Ofi I O I rn Z I _ n I 7s. , I 3a N 0.641 AC + I - I 1, ROBERT J. DEDMON, CERTIFY THAT THIS PIAT WAS _ nI I PB 23-43 m I m DRAWN FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION (08 1018• PG 1578)(PS 23, PO 43)' NLAKE ORMAN - O oil I I THAT THE RATIO OF PRECISION AS CALCULATED Z:::ANY DCCN9. POR ~~ C m I �B��LrT I I DICEEDS 1:10,000; THAT THIS PLAT WAS PREPARED IN ACCORDANCE WITH GS 47-30 AS AMENDED. WITNESS MY ORIGINAL SIGNATURE. OCTOBER 30, 2018. i ml ouFlO not I 83.09_ I A. i cVii I uJ 3899 PROFESSIONAL LAND SURVEYOR LICENSE N0. tr R4 REBAR I pb iD 261.82 SURV. BY: JR DRAWN: RD JOB/ JRPKI iD S 83'54 01 I I VIC IlVITY MAP g4 REBAR g g SITE 40 0 40 80 120 LNLJELNL GRAPHIC SCALE — FEET m19 Iredell.ConnectGlS SPCONNECTGIS Iredell 1:112 Feet -T79_ W � 795 d N � 1 n MMaJAredsll.00mls.comMapmpx 111 ♦ 8 B08 Mc(endree toad NO- Ab 7MM mew Google ����: T- TTM 808 McKendree Rd - Google Maps Go gle Maps 808 McKendree Rd i x 1808 McKendree Road n ogle C Kemp Rd Kemp Rd G� p'Pa 4 A6, Map data ©2019Google 50 ft r https:Uwway.google.corrdmaps/place!808+McKendree+Rd,+MooresNlle,+NC+28117/@35.5592149,-80.9505195,19zldata=!4m5!3m4!1S0A38, 6 246fa1572b:Ox4100a1617c9b2c2O!8n2!3d35.5594885!4d-80.9503AFit' to 5/9/2019 MyTopo Map Print A R111 ! 15 1l a y � t • r ��, fir/ i ti.,- J �.-i BoatROMP il ' 800 t 1�Creek 64 00 r a3otrxDAxY _ CATA W BA C�vv t _ l 800 LiNCUEN W 6 Yom, 14 0 0.5 Mi Map provided by MyTopo.com 0 3000 Ft nwpass.cnytopo.corrVmaps/print mytopo.asp?print=20&scale=2.58Jayer=DRG&Iayer=HILLSHADEBJat=35.559488.50000001&Jon=-80.9503866&orient-l&es=144 1/1 Ii_17_irFf,_ IAM ot I ex i .; i4gl or tvP, dt S' air C-4 Win ,I All I a r Google Project Owner: CATAWBA RIPARIAN BUFFER NOTIFICATION FORM 1 n111 rI111L --� wgnature ,, Contractor/agent: Print I` — /IsiRnature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 026.0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B.0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 026.0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non-erosive velocities to the lake. [15A NCAC 02B.0243(5), (6)] Acknowledgement of Notification C"n4eCR r tis hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plan(s) and specification (s), and other supporting materials. Signature (owner): Date: q12 30 State of North Carolina I Environmental Quality I Water Resources 512 N. Salisbury Street 1 1611 Mail Service Center 1 Raleigh. NC 27699-1611 919.707.9000