Loading...
HomeMy WebLinkAbout20190638 Ver 1_Shoreline Stabilization_20190510State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 1SA NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form 2 0 1 9 0 6 3 8 Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sendin via delivery service (UPS, FedEx, etc.) Karen Higgins s DWR — 401 & Buffer Permitting Branch —�401&ffer Permitting Branch 1617 Mail Service Center Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] 1 Owner Information^ � Name: Mailing Address Telephone Number: E-mail Address: U11 C k `-{ZZIo (fie IKn�Q C'&r Ics(i ► #'J C 0,52-1 k -S'? 25 Fax Number: 2. Agent/ Contact Person Information �ec'cC A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: httD://www.saw.usace.armv.mil/Portals/59/docs/reaulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) I ^_ Name:o� Grr (li�SiCJ(� Ct s Company Affiliation: Mailing Address: 1 519 G4ji'((0006k 0 Telephone Number: Fax Number: E-mail Address: 't &,QZ WincWeafv. • nek- B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Paee 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location oftheproperty (where work is to be conducted) County: / 4"d500" -e y Nearest Town: Lake/ river/ ocean adjacent to property: /7 /< E D, // Property size (acres): ` 2 a c,R c -S ci Subdivision name or site address (include phase/lot number): 1,grW_ oc_x Directions to site - please include road names and numbers, landmarks, etc.: Latitude (in decimal degrees) Longitude (decimal degrees) 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): l 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): }d- t,✓oOaQ So4r../'o'll IPC%%Limit-1kT 7. Will work be conducted from land? 0/ From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 3 .C.1 v/ q r/_ 4/2 D so Temporary impacts (temporary clearing, construction corridor) in square 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 5&V e: kxi 5/++a. / / 11. Sigqgfure / Owner/Agent's Signature` [15A NCAC 02H .0502(f)l Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Paee 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ Normal Water Level Shoreline Plan View La ke (At Full Pond/ Normal Water Level) Ri V ;20.p -3 Full Pond/ Normal Water Lev '-`horeone 2 ft. x 150 ft. additional clearing �. H necessary Plan View / 4e0 IZ¢ Z1.2 o al l -zrn 104 L� n /qtr/ 11 f G( CDN Lake (At Full Pond/ Normal Water Levey Existing Dock /30 ft. 7 f Riprap 3 ftx 150ft ' Below full pond/ NWL 4kx150f, -Above full pond/ NWL FORM: SSGP 02-2017 Paee 3 of 4 V, 1Q La ke (At Full Pond/ Normal Water Leyte © � ttDJJ ! oho o ° Side View 0 0° 5 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing if necessary Existing bank 10 ft. bank `V height D�iz Q�OQ Side Vi LE FORM: SSGP 02-2017 Paee 4 of 4 _. ow r c, ` _ .� 0� 0 , C 0 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing if necessary Existing bank 10 ft. bank `V height D�iz Q�OQ Side Vi LE FORM: SSGP 02-2017 Paee 4 of 4 . 1 6 SAMPLE AGENT AU7, 1-TORIZAT1 ON FORM PROPER -7Y OT — -6 7 -73 (-o INC P',eM-2 U-) I z-e�, ame Y nSL v SSLai-c e a ric �V,p ,n,eret, --wi'''_Av 'Ile • x 4P -Pt* w.. AT ow dw =1"d •mss r._ t ��:: 7b �` Ali •. S *C' _ - r,�� * �,. '� ` �: Jar`-; : -::-e r 14 _ * awlAdr ' 1.