Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
660034_PERMIT FILE_20171231
r 3 Type of Visit: (0 Complnspection U Operation Review U Structure Evaluation Q Technical Assistance Reason for Visit: QrRoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access I II � IIII II�I��I I III IIIII II IIII I � Date of Visit:'�'-�' Arrival Time: 'Departure Time: ® County: Region: Farm Name: %'� ��j A1)2, n 1* ! / Owner Email: Owner Name: Phone: Mailing Address: E Physical Address: Facility Contact: Title: Phone: Onsite Representative: CA%Lt/ 44p—eW Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Certification Number: Certification Number: Longitude: Design CurON rent Design Current Design Current party PuP iWtet Poultry aplace�lyl P°pip G�attleaty PL�oy1�p8.tli€ean to Finish La er Dai Cow ean to Feeder Non -La er Dai Calf rFeeder to Finish Dai Heifer w to Wean Design Current D Cow rrow to Feeder D , P.oult Ca aci 1?0 Non-Dai rrow to Finish La ers Beef Stocker lts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other`, Turkey Poults Other Other I.IMIMIwRePttEtl Fwlwnuu�lQM'wn.wwxa»wtµ�lf.vs[nvinel HehllMllwiNnblw fW€4wwelwww�if yglow.�e.wnylw.pyW,uyNtg5Mlf4'€�FMs�llulywll.�+� Discharges and Stream Impacts O 1. Is any discharge observed from any part of the operation? [] Yes No NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes��Noo NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes N NA 6 ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters [] Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Faeility N6mber: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? r ❑ Yes VN <NN ❑NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concem? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? 6(4C�Q Su.►-I/QY aior>���s Reviewer/Inspector Name: 2 -Lz-08 '�- 27 —t ? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑Yes ❑No ❑NA ❑NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑NA ❑NE []NA ❑NE Phone: 4 11 -M j y2do Reviewer/inspector Signature: j:J Z'5 Page 3 of 3 Date: f D - 2 21412015 Facility Number: - Date of Ins ection: 0-2. — Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes DNA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes rDNA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): J �� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE 'Z waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmen threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ YesFNoE] NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ YesNA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required butlers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 1 1. is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ EvidenceofWind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): % yl >. 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ONo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA gNo ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ A ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Na ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued a- 6-(4 Type of Visit: AZ) Com . ce Inspection O Operation Review p Structure Evaluation p Technical Assistance I Reason for Visit: 2rRoutine O Complaint O Follow-up O Referral Q Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: O ` j Departure Time: ® County: Region: Farm Name: 6r S I I Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Onsite Representative: L A-Q- 62tx e$ ►L Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Wean to Finish I Layer ]Non -Layer Dairy Cow Dairy Calf Wean to Feeder Feeder to Finish Farrow to Wean Design Current Dr, P�oultr, Ca acit P,o . Dairy Heifer D Cow Farrow to Feeder Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes OINO ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes E1,N ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system'? (if yes, notify DWR) ❑ Yes a NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? EltNo o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: - S c Date of Ins ection: 67 —,497 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in}; 2 YIt 5. Are there any immediate threats to the integrity of any of the structures observed? [] Yes No NA ❑ NE (i.e,, large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmFNo eat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit`? ❑ Yes NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE maintenance or improvement'? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes;No No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? if yes, check the appropriate box below. ❑ Yes ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 570 r<)A �," , W cr n &Ld $4, I-)n 4 r 4 l el - r / G'-014-611- --J �- I 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes NA 0 NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 011 [] NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ YesPNX ❑NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application'? ❑ Yes❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box, ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste TigEj ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall InspectiSludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes❑ NA [] NE 23. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment'? ❑ Yes NA ❑ NE Page 2 of 3 21412015 Continued Fatili .Nymber: - 3 ' Date of Inspection: L 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes VNo NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge'? If yes, check ❑ Yes❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes N ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [] Yes o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comnnents'(refer to question #): Explain any YES answers and/or any additional recommendations or' any other comments. Use drawings -of facility td better explain- situations (use additional pages as necessary). S1X1dSe SurP,eY A-(- 17- /wl iV- S� �� Z3 �- M1 _ (_ pr 7-30- roaY Reviewer/Inspector Name: Reviewer/Inspector Signature: 0k S` 4e- 1p'LJje—, Page 3 of 3 Phone: -7 Date: I ~I (Q 21412015 /o-(,2-r 4Type of Visit: O Co fiance Inspection O Operation Review O Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: p 1 Tj Arrival Time: © Departure Time: County: Region: Farm Name: r--812r.. 11 Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Onsite Representative: COt a 4Q1x ee_,✓ Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Design r1rent Swine a acit-v= Pop. Wean to Finish Design Current Wet Poultry C1ty Pop. Layer I Design C►urrent Cattle Capacity Pop. Dairy Cow Wean to Feeder I INon-Layer I Dairy Calf Dairy Heifer Feeder to Finish arrow to Wean 2- .1-7 8 Design Current Dr, P,Oult , Ca aci P,n .. Layers Non -Layers Dry Cow Farrow to Feeder Farrow to Finish Non -Dairy Beef Stocker Gilts Beef Feeder Boars Pullets Turke s Turkey Poults Other Beef Brood Cow Other Other Discharges and Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes 0 NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes to ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility umber: li� L Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 Zlt 411 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment h eat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes /No❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes LLJ o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ YesVNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes/No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists []Design ❑ Maps ❑ Lease Agreements []Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 4No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412014 Continued Facili Number: 6 to JDate of Inspection: —g 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes;No No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes N ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA [3 NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [] Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non -co xipliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #) Expla1njany YES answers, and/or any, additional reddmmendations�or;any' therlcotninents Use �draydings,°af;facili ` to"better;explain slkuatlon's, (use additional pages -as necessary) �E, e , t „ � a. � . ��: x' ti �� (moo ►4 '� - 7 .7u rVQ.,y IV - 6,.5-3 1,/ - r•17 d - 5.0 C) s zi a Reviewer/Inspector Name: ,p Phone: Reviewer/Inspector Signature:Gc�j�/1�— Date: _40 --q —17 2/4/2015 Page 3 of 3 for Visit: 0 Routine 0 Follow-up 0 Referral 0 0 Other 0 Denied Access Date of Visit: —/- Arrival Time:--�-�y+w Departure Time: County: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: (2 0 e t- i f Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Region: Design Current Swine Capacity Pop. Wet Poultry Wean to Finish La er Design Current Capacity Pop. Design Current Cattle Capacity Pop. DairyCow Wean to Feeder Non -La er DairyCalf Feeder to Finish Farrow to Wean Farrow to Feeder Dr, P,oult . Design C►urrent Ca aci P■o , DairyHeifer D Cow Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets keys Turkey Poults Other Beef Brood Cow Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No 'NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facili Number: jDate of Inspection: • Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No 0 NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �[_] NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr t; notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ErNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑, NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ErNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [] Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): j9 e j- �Gs. J-/; , 3�. 14-11 f 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Reauired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA • ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued ' Facility Number: 113ate of Inspection: '- S 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 25. is the facility out of compliance with permit conditions related to sludge? if yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 29. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No [] NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [:]Yes ❑ No ❑ NA ❑ NE ❑Yes ❑No ❑NA ❑NE Comments (refer to question.#): Explain any YES answers and/or any additional recommendations or, any other comments. Use drawings offacility.to better explain'situations (use additional pages as necessary). GuhiP fi9.I4- Reviewer/inspector Name: Reviewer/Inspector Signature: L3 6z S J�� Page 3 of 3 Phone: 7/(� �Z(3 Date: -3 21412011 Type of Visit: AD Compl cc inspection Q Operation Review O Structure Evaluation O Technical Assistance .0, R/I Reason for Visit: 1outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: --1 — Arrival Time: L/ 5 1 Departure Time: County: Region: Farm Name: tlOwner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: 0 1i e e y Phone: Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Design Current Swine Capacity Pop. Wean to Finish Wet Poultry La er Design C►urrent Capacity Pop. Cattle DairyCow Design C►urrent Capacity Pop. Wean to Feeder Feeder to Finish Non -La er Dairy Calf Dairy Heifer Farrow to Wean Farrow to Feeder Farrow to Finish Dr. P,aultr. I Layers Design Current Ca acit Pao P. Dry Cow Non -Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Othe11 illill Other F Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ZNo ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes 3Vo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes R3Vo NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412014 Continued Facility Number: f - �� t. Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [:]Yes No A ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): � / 6 4 5. Are there any immediate threats to the integrity of any of the structures observed? ❑Yes ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes:�NoO NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental th t, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes A ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �oFoA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes <O ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 1;'No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): C_v V f' f <J d L/ ;e q n S , , J pS-, (fir r/ 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® N ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ YesVN ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes gj No NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box, ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sl e Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes N NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412014 Continued Facili Number: - Date of Inspection: 24. Did the facility fail to calibrate Inste application equipment as required by the permit? ❑ Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ZI No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑Yes o ❑ NA ❑ NE Other Issues 28, Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29, At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). J 61 rvQ.t� Zrfr �Y O Reviewer/Inspector Name: Reviewer/Inspector Signature Page 3 of 3 s ko- �vr.,,� c Phone: Date: 21412014 L (Type of Visit: ,�C 7Routine ance Inspection O Operation Review 0 Structure Evaluation Q Technical Assistance sit:Reason for Vi� Complaint Q Follow-up Q Referral Q Emergency O Other O Denied Access Date of Visit: �— V Arrival Time: Departure Time:® County: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Co ¢ (9+\ed.&1 Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Region: Design Curreut Design Current Design Current Swine Capacity Pop. Wet Poultr"Wiffiky Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder P. Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow ke s ke Poults tO er Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ErNo ❑ NA ❑ NE ❑ Yes !EJ ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify D WQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ElYes F ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 L. 21412011 Continued Facili Number: - . L Date of inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes hlo ❑ NA ❑ NE Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes J217No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes VNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental reat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 0 VNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ NA ❑ NE Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etY(No" ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of AcceptableCrop Window 0 Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): SO ti bown x , ",%*4 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0 o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes �l o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ YeseN ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard [3 Waste Analysis ❑ Soil Analysis C] Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yesd>0`1:1 NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued jFacility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes 0 No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑Yes ❑No ❑NA ❑NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [:]Yes [:]No ❑ NA [] NE Comments (refer to question ##): Explain any YES answers and/or any additional recommendations or any,other,comments.. Use drawings: of facility, to better explain situations (use additional pages as, necessary). Reviewer/Inspector Name: Phone: / Ze, k Reviewer/Inspector Signature: Page 3 of 3 lcrt�. Date: C 2 —1 Jr_ 1 $� 21412011 Type of Visit: _,Q Coance Inspection U Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: Routine O Complaint O Follow-up Q Referral Q Emergency O Other O Denied Access Date of Visit: /3 Arrival Time: Departure Time: County: Farm Name: f7j S k z Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: t 1m,/ �14 Cc h I �G_4,*V y- �✓ �Qj�' 4rl �' Integrator: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Certification Number: Certification Number: Longitude: Region: Design Current Design Current Swine Capacity Pop. Wet Poultay Capacity Pop. Wean to Finish Layer Design Cattle Capacity Dairy Cow Current Pop. Wean to Feeder I INon-Layer I Dairy Calf Feeder to Finish Farrow to Wean Design Current Farrow to Feeder Dr. P,oultr. Ca achy P,o Farrow to Finish Layers Dairy Heifer Dry Cow Non -Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turke Poults Other Other Discharses and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ YesrNo ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued IFacHity Number: L Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): (, —of- 5. Are there any immediate threats to the integrity any of the structures observed? ❑ Yes Ef7No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [—]Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental reat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) N�oNA 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes Vj"N/❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): Sala"v`, rigs 4 (A ! er,-z ti d o : 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? [:]Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes2f�N�oD NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [] Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Ld No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 6 No ❑ NA D NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers [] Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued rkl(fl Facility Number: -7 I Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes K❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑NA V ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes N ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes gNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to property dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No []NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [—]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain -'any YES sanswers and/or any additional recommendationsfor any,"other°com nenfs."� r'�,1� Use drawings of facility to better explain situations (use additional pages as necessary-)'..' M , SIL j SC"1(0-(ir 13 Pr 1 - �V SS e c . U (, _ (,7- 1 3 0 % 5-, 2 l lv .a- d C/ rC- i b /v;�J, 0-k 5 � a s Reviewer/Inspector Name: Reviewer/Inspector Signature: . (�} La S k _ /V I e Page 3 of 3 Phone: -7 cJ l -qzo Q Date: �/ 3 /-1 3 _ 21412011 Type of Visit: 0 Com ' nce Inspection U Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access / 7A1�1 Date of Visit: Arrival Time: L L Departure Time: County: Farm Name: iY� �!j f" r► jZ�-• Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: two— r m� ECG✓ Certified Operator: Back-up Operator: Location of Farm: Phone: Title: Phone: Integrator: Certification Number: Certification Number: Latitude: Longitude: Wean to Finish I Layer Dairy Cow Wean to Feeder [Non -Layer Dairy Calf Dairy Heifer Feeder to Finish Farrow to Wean Z Design Current Dry Cow FUrow to Feeder D , P,oult . C►.a aci P.a Non -Dairy Beef Stocker harrow to Finish Layers Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turke s OtherI Turkey Poults Other I Other Region: Discharees and Stream Imoacts I. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes N NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ YesjNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesrNo NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facilit Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): _ Observed Freeboard (in): / 5. Are there any immediate threats to theintegrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ZI No NA ❑ NE No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes YNO NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental reat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes :No No NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acce-ptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): �!%I kr�. APle'"t- 044-- 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes N ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes LLJX❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes dNo Y ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfe ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspectio ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �/_o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: jDate of Inspection: (+ 2r 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? if yes, check ❑ Yes g No ❑ NA ❑ NE the appropriate box(cs) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No NA [3 NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below, ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional°recommendations or any'other•,,comments _ � r = 11 Use drawings;offacilityto.betterexplainasituations,(useadditional pages: as necessary) „.3, �f°` ,r i:V `'�;, `.,, i; �r3 4S 7f JA-r l9 LI 0tre_ --- 0 Reviewer/Inspector Name: Phone: -7q /rVZ04 Reviewer/Inspector Signature: (74. Page 3 of 3 Date: VIQ f'L-- 21412011 2(I l U 3 (Type of Visit: QJCo once Inspection O Operation Review Q Structure Evaluation O Technical Assistance I Reason for Visit: C) Routine O Complaint O Follow-up O Referral O Emergency 0 Other 0 Denied Access it Date of Visit: �1 i--t 1--Eu Arrival Time: ® Departure Time: County: Farm Name; Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: C-11 i21 C I-te, h Integrator; Phone: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Region: Design Current Swine Capacity Pop. Design Current Design C►urcent Wet Poultry C•aQacity Pop; Cattle Capacity Pop. Wean to Finish La er DairyCow Wean to Feeder Non -La er DairyCalf Feeder to Finish DairyHeifer Farrow to Wean Design Current D Cow Farr o Feeder Dr, P,oultr. Ca ,aei P,o Non -Doi arrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Ft_her Turke Poults her Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [:]Yes [3'No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes E3<o ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from'any part of the operation? ❑ Yes [%f ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facilit Number: - Date of Inspection: ft 11—i Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): _ Observed Freeboard (in): Z P 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2TNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental reat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ YesVNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 4. Does any part of the waste management system other than the waste structures require ❑ Yes ZfNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Z No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift D Application Outside of Approved Area 12. Crop Type(s): C,9 11 n 60— r Al L"_ d � 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ICJ LVO ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 0 NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes VN ❑ NA ❑ NE Required Records & Documents 14. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ZN❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall []Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22, Did the facility fail to install and maintain a rain gauge? ❑Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facilit Number: - j Date of Ins ection. (/ t l 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Vo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA [3 NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? El Yes;;No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative'? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE C, tr'al recommendations.or ony,other commentsl" K i i Comments ( referao question #): _Explatn any YES answez rs andlor any,ad'tlitio Use drawings of facility to better explain situations (useadditional pages as necessarv):: ': f Reviewer/Inspector Name: ReviewerAnspector Signature: Page 3 of 3 Phone: Date: Ili 21 1 1 1 21412011 L f Visit PCompl' a Inspection O Operation Review O Structure Evaluation O Technical Assistance n for Visit Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: Arrival Time: � Departure Time: County: r Farm Name: LA f2z!n Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: G Certified Operator: _ , '_ Gab(G Q Back-up Operator: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Location of Farm: Latitude: = e = 0 41 Longitude: 0 e = g = {5 Design Current Design [at WpX Capacity Population Wet Poultry CaaitPoulation Caleity Population ❑ Wean to Finish ❑ La er ❑ Dairy Cow ❑ Non -Layer q ❑ Dairy Calf ❑ Dairy Heifer ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean Dry Poultry E]Dry Cow ❑ Non -Dairy ❑ La ers ❑ Fa to Feeder Elfarrow to Finish ❑ Beef Stocker ❑Non -La ers ❑ Gilts ❑ Pullets ❑ Beef Feeder ElBeef Brood Cow ❑ Boars El Turkeys Other ❑ Other ❑ Turkey Poults ❑ Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ONo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes No - NA ❑ NE b. Did the discharge reach waters of the State'? (If yes, notify DWQ) El Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ YesV NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes NA ❑ NE other than from a discharge? Page 1 of 3 12128104 Continued r 1 Facility Number: 4f— Date of Inspection ! d Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure l Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): L[ �l /r 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No NA [INE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes ETNo ❑ NA ❑ NE ❑ Yes ffNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threa notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes I No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes R<o ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setback's, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s)1 f e)r U n 13. Soil type(s) r7 'y 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes TNo [I NA [�WKN ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ YesFNo NA ❑ NE 17. Does the facility lack adequate acreage for land application? El NA El 18. Is there a lack of properly operating waste application equipment? El Yes NA ❑ NE Cv nts {refertoq'uestion�#)��Ezp sin'' any YES answe sn'dd/ty recommendations or any other comments., Use drawin s of+�facili�{to /letter$ z"`latn situations. use ad�ditionai a es;as necessar> Reviewer/InspectorName Phone: ILC� Reviewer/Inspector Signature: -� LY Date: lla. Page 2 of 3 12128104 Continued 01 Facility Number: eo 0 — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes .`��No[01 A ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check El Yes NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps [I Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No NA ❑ NE 24. Did the facilityfail to calibrate waste application equipment as re required b the permit? ❑ Yes No ❑ NA '❑ NE ppq Y 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional ,Comments and/or —Drawings: .n .-¢:_ r _ $_: �� 2 �40'W :I ; rait I i / , � r ,Tv c l�• �, �%es � D 1i bZ Ce n - f r �9 i D F5F% � �►���rZ S�r� �7'7(�(dYYj ( � w--? J C Cp A�e Per e-r i l( 4 l C N4n3C 0 1= igWl "I � �tP e A4�� � S prl� lei n Sy 5 12- s Pi Page 3 of 3 12128104 -- Type of Visit 2rcompliance Inspection O Operation Review O Structure Evaluation 0 Technical Assistance Reason for Visit 01Routine O Complaint O Follow up O Referral O Emergency Q Other ❑ Denied Access Date of Visit: 0 0 Arrival Time: Departure Time: L� County: Region: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: ��// Certified Operator: V_" ✓ L"� I i"'� Back-up Operator: Location of Farm: Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Boars Phone: Title: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: = e =' Q Longitude: = ° Non -haver I I l®ILJ Dairy Calf Cow LJ Beef Stocker Non -Lay ers Pullets ❑ Beef Feeder ❑ Beef Brood C er Poults Discharges & Stream impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Iml ❑ Yes No ❑ NA ❑ NE ❑ Yes No NA ❑ NE ❑ Yes No ❑ NA ElNE J ❑ Yes No"ON %❑ NE ❑ Yes No NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 12128104 Continued Facility Number: — Date of Inspection oZ v Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? nStructure 1 Structure 2 Structure 3 Structure 4 Identifier: _pY Se C, Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan'? ❑ Yes No ❑ NA ❑ NE El Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ' NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑Yes No ❑ NA El NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑Yes No El NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 0 <NloZl[:] NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [:]PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) '4f X 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes VN❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes N NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE ''41A&jif !`'F.1' " .f�.$3 s' AL` k?.#;4AaT .PY Ei 9�4'� Comments�(refe�r to questn 4) ".Explatin n YE aniwers andlor anyVtcommendatio s r any other comments.. G - 1 a'c' 1 G k•-. � Use dra►vgt,�ngs of facility to better explain situations. (use,addRion4 pages as ne��c„„eLLssary,).: .t .'a+x �{'g+a .i � ,1 '� +.. 4 ,. a {�,da+'.-'�' S �5 ', :-t, t r.F i ... i i6WI� ii A �3••e.' AL Reviewer/inspector Name �` .1 Phone: ] j Reviewer/inspector Signature: Date: 2,�/4/0 Page 2 of 3 12128104 Continued i Facility Number: — j Date of Inspection D Pl Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WLJP ❑ Ch kl' t ❑ D . ❑ M ❑ no, ❑ Yes No El NA [I NE ❑ Yes No ❑ NA El NE ec �s s es�gn aps er 2 1. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes"N[:l NA -❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes NA ElNE 26. Did the facility fail to have an actively certified operator in charge? ❑ YesFoo NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ YesNA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE e Add>tionalG0.mm�entsandlorDrawings.r "ta�'('� .$ ;_f, t� '- Page 3 of 3 I2128104 Page 3 of 3 I2128104 Type of Visit QrCo lance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: 2 D Arrival Time: Departure Time: County: l/ Farm Name: � /Z^ Owner Email: Owner Name: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: l= ry- Certified Operator: T' Sack -up Operator: _ Location of Farm: Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: = 6 = t Longitude: 0 ° = 1 = 1{ Design Current Design Current Design Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity Current Population ❑ Wean to Finish 10 Laver I I ❑ Dairy Cow ❑ Wean to Feeder 10 Non -Layer ❑ Dairy Calf ❑ Fee inish ❑ Dairy Heifer Ej'Pa'rrA to Wean Dry oultry ❑ Dry Cow ❑ Layers Non -Dairy ❑ Beef Stocker ❑Non -La Non -Layers ❑ Beef Feeder ❑ Farr o"Feeder arrow to Finish❑ ❑ Gilts ❑ Boars t t e ❑ Pullets ❑ Turke s 10 TU rkey Poults ❑ Other ElBeef Brood Co Number of Structures: ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Ficid ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes o ❑ NA ❑ NE ❑ Yes No NA ❑ NE ❑ Yes o ❑ NA [I NE ❑ Yes FN [INA [I NE ❑ Yes❑ NA ❑ NE El Yes❑ NA ❑ NE 12128104 Continued II Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Struc ure I Structure 2 Structure 3 Structure 4 Identifier: Yes ❑ No A ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 7No El NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10, Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 7No ❑ NA El NE maintenance/improvement? 11. Is there evidence of incorrect application? if yes, check the appropriate box below. ❑ Yes❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) �� 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes E] ❑ NA ❑ NE El NA ❑NE NA ❑ NE o El NA El NE No ❑ NA ❑ NE aAw,�� _�_'� ;. �•�tit: "s$ "R,. a'; �.i • �, ° c,.' �4.3 s.ct,+ar.r' #� ��: .t �:�.' . � . :. .,'�. ,:, u t i r ; �,•= Comments�(r�eferito question;#)Ezplarnany,tYES answers and/or.anvfrecommendations' or any othercomments �€ . ;,`��.k. r� ;�3if� oaf _� � .•�. � ME" ise drawings of facility to better explain situations(use additional pages:as neeessarPyzi«.i C,>d 4 © En +k Q L, , 4 fly- �J P.y- f?- L�. (2 ` '"1 1 n re . 4-1 P 4 1-4, +0 F+Gr2�,— 3 0 G,j a_,� E$ Z I e- t .. , i,.c ; r Reviewer/Ins ector Name`I' �t t �� p ' Ys P �r c s: K � �A..; : , , i4i ' Phone: Reviewer/inspector Signature: QCj Date: 12128104 Continued Facility Number: Date of Inspection Z f Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ElYes ONo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Z No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ t20 Minute Inspections ❑ Monthly and 1" Rain Inspectio!'No ❑ er Code 22. Did the facility fail to install and maintain a rain gauge? El Yes NA ❑ NE - 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ YesNA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? El Yes ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes - ❑ ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE 12128104 Facility Number U ()'Division of Water Quality b Division of Soil and Water Conservation 0 Other Agency ?-0~4'8 Type of Visit Co lance Inspection Operation Review Q Structure Evaluation Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: I /(G / I — Departure Time: County: Region: Farm Name: r 'O — _ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Phone No: Onsite Representative: nn Integrator: Certified Operator: C) - �� r Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder .Farrow to Finish Gilts Boars Other ❑ Other Latitude: [= o a 4 = Longitude: [� ° =1 Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er ❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turke s ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Daia Heifei ❑ Da Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures: d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ONo ❑ NA ❑ NE Z [IYes N ❑ NA El ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 1128 4 Continued Facility Number:dZ Date of Inspection b Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. if yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) ❑ Yes No NA ElNE ElYes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan'? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes N NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application W. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ElYes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs []Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NA ❑ NA o ElNA No ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE Comments (refer to question ft Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name 7j Phone: —ZL!�1N[E-71 . Reviewer/Inspector Signature: Date: 4D 12128104 Continued Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ONo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes EfNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections -Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes l.Q N ❑ NA ElNE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ElYes N El NA El NE 25. Did the facility fail to conduct a sludge survey as required by the permit`? El El NA El NE 26. Did the facility fail to have an actively certified operator in charge? El Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes El NA El NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? El Yes ZNo ElNA ElNE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ElYes ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: I 12128104 1 c Division of Water Quality FaCllity, Number Division of Soil and Water Conservation 0 Other Agency Type of Visit Com nce Inspection Q Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: 2 D Arrival Time: Departure Time: County: f Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: �- Certified Operator: ''{ 'l ^'" Phone: Phone No: Integrator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Region: Latitude: 0 c 0 4 Longitude: =° 0 I❑ Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to -Wean ❑ F w to Feeder Farrow to Finish 0 D 6 ❑ Gilts ❑ Boars Other ❑ Other ❑ La er ❑ on -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turke s ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocket ❑ Beef Feeder ❑ Beef Brood Co Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2, is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ZNo❑ NA ❑ NE ❑ Yes �NoDNA N - NA ❑ NE ❑ Yes ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes o NA ❑ NE ❑ Yes o ❑ NA ❑ NE 12128104 Continued Facility Number: — ' ( Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Struct I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): r�Z&I 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No , NA ElNE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed El o El NA El NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr t, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No NA ElNE 8. Do any of the stuctures lack adequate markers as required by the permit? Yes�No ❑ NA [I NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ff.No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application'? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window 1❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) ( .mil 4 4z�-7 . 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[:] Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes [Z N ❑ NA No'❑NA Ld ❑ NA No ,❑ NA ��o ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Poo } '`1 54 r r- AC. F(k- f'Y4 f.2 /W S'Q C . (�jt) r�RZ- 7-200( pi D0� -7 .��. 4-t> CC tt Wo s'100T r �L M14r-� JJO-1-1 SPCJric�Ae-` 7D rn94&h toL,r4 0ge_M���. � Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: Date: 3 I r 2 12128104 Continued Facility Number: — G Date of Inspection (? Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes - No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain InspectionZN Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes El NA El NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? El Yes❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes A ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ElYesrNoE] A ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ YesA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document [] Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE nai Comments and/or Drawings: 12128104 Type of Visit 9rcomplia nspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Vis' Routine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: or- / Arrival Time: Departure Time: County: Farm Name: 6,1i^-- *W __ Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: rr�� L+ /_/ Q G k r n(j1C..� Certified Operator: - - - „"^^^ _., Back-up Operator: Location of Farm: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: = 0 = I Longitude: 0 ° = ' = Design C►urrent Swine C►apacity Population Design Current Wet Poultry Capacity Population Design C*urrent Cattle Capacity Population ❑ Wean to Finish ❑ Layer ❑ Dairy Cow ❑ Wean to Feeder I ❑ Non -Layer ❑ Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Layers ❑ Gilts ❑ Non -Layers ❑ Pullets ❑ Boars ❑ Turke s Other ❑ Turke Poults ❑ Other ❑ Other ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑Beef Feeder ❑ Beef Brood Cow Number of Structures: Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ NA El NE El Yes:XNo[--] NA ❑ NE ❑ Yes PNo NA El NE El Yes NA ❑ NE El Yes NA ❑ NE 12128104 Continued Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ZNoZC NA ❑ NE a. If yes, is waste level into the structural freeboard? El Yes ❑ NA ❑ NE Stru�ture 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): %4F 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes dNo NA ❑ NE (ic/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ElYes o ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 7N9" El NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ yes❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application M. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNoNA ❑ NE maintenance/improvement? 11, Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN ? 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable /Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) / _M 1%a / 5 M 6l /+¢t -? S . , 4rIY'K 13. Soil type(s) -.7 0Y r—j I Y 14. Do the receiving crops differ from those designated/in the CAWMP? ❑ Yes dNo NA ❑ NE 15. Does the receiving crop and/or land application site need improvement`? ❑ Yes R< ❑ NA ❑ NE t 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes Zo NA El NE 17. Does the facility lack adequate acreage for land application? El YesNA ❑ NE 18. Is there a lack of properly operating waste application equipment? El o ❑ NA El �. y�flar�S ¢A.J� E jaf Comments (refer to question #) Explain any YES answers and/or any recommendations o�anylother comments � � r1 .Use drawings of facility to better explain situations '(useadditional pages as necessary} ��'e . 49 ,: E �'" �.NTi�. Reviewer/inspector Name 1 Phone. Reviewer/Inspector Signature: vl Date: �L Page 2 of 3 121281041 Continued FA Facility Number: Date of Inspection Z / Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes /No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes N ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes o ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes No NA ❑ NE ❑Yes o ❑NA El NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No ❑ NA ❑ NE Additional Comments and/or Drawings: A, Page 3 of 3 12128104 Type of Visit QfCompliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason far Visit outine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: I j "l r(JfJI Departure Time: County: Farm Name: 7A Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: � _L �1 Q-" i Certified Operator: 7&v- ' Back-up Operator: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Location of Farm: Latitude: = o ❑ 1 = 1{ Longitude: = o ❑ ' ❑ W"Designrrent ��t. Design �raCurrent �� V I oio�I�'f'� i 4 �Desrg ` C•urrent acity ine apacity Populatiion Wet' Poultry .. ❑ La er C population " Cattle Capacity Population apA. . �.� ❑ DairyCow ❑ Wean to Finish to Feeder ❑Non -La er ❑ DairyCalf er to Finish i El Dairy Heifer w to Wean oultry ❑ D Cow w to Feeder kn ❑ La ers❑Beef ❑ Non -Dairy Stocker w to Finish ❑ Non -La ers ❑ Beef Feeder s ❑ Pullets ❑ Turkeys - ❑ Beef Brood Cow El Turkey Poults El other Number of Structures:, ❑ OtherJ Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE C. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes O<N NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes No ❑ NA ❑ NE other than from a discharge? 12128104 Continued •L Facility Number: — 3 Date of Inspection L�LICLJ Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: SP �z_ Spillway?: Designed Freeboard (in): Observed Freeboard (in): a�GtO 1 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No 0 NA ❑ NE ❑ Yes No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes n No ❑ NA ❑ NE ❑ Yes 2 �No❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre , otify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No NA ElNE 8. Do any of the stuctures lack adequate markers as required by the permit? [I Yes;No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require El Yes No ❑ NA ❑ NE or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ONo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drill ❑ Application Outside of Area 12. Crop type(s) & '- P e 13. Soil type(s) rt p rra f ,� 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? [Dyes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination',[] Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes Z'No ❑ NA ❑ NE No ❑ NA ❑ NE �No❑ NA ❑ NE No ❑ NA ❑ NE Fo ❑ NA ❑ NE Phone: Reviewer/Inspector Name R ¢ +'� v� ; Reviewer/Inspector Signature: : . / Date: 0_> 12128104 Continued Facility Number: 1.4 Date of Inspection / d Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the approprrate box. ❑ WUP El Checklists El Design El Maps El Other ❑ Yes . No ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. LJ Yes L'JNo LJ NA LJ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑Stocking ❑Crop Yield ❑ 120 Minute Inspections El Monthly and 1" ❑ther Code Rain Inspection�N�oONA 22. Did the facilityfail to install and maintain a rain gauge? g g ❑ Yes ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No -❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes;No E NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? Yes ❑ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No .2< ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA , ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, frceboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE E1'dditional Co uineiits andloc;Drawin.gs 7_410Q y W►y S 0 q C �PI`r/ a4 j O� c: S 0 15 3 �1( D5' /I% �%� L G►i�r ,h S t"J CC u �O / d1't - r rr ;. f 'I' a ^.e.. 1Z/Z8104 I lType of Visit O Compliance Inspection Q Operation Review Lagoon Evaluation ReasonforVisit O Routine Q Complaint Q Fallow up Emergency Notification Q Other ❑ Denied Access F� ty Number Date of Visits 3 eNotOO=erational Time: 0 Below Threshold Permitted C) Certified LL © Conditionally Certified © Registered / Date Last Operated or Above Threshold: ................ Farm Name: ....Kr..�! :.....�t!hs.... �.2"- .....�.... County: ,rrd r.7.!�T!f:�*'�,?.T........................I....... f 4r Pli OwnerName: .......:.................................................................:.............I................... Phone No:............................................................................ _........ 5� MailingAddress:.................................................................................................................................................................................................... .......................... FacilityContact: ..............................................................................Title:................................................................ Phone No:......... Onsite Representative:........................ ................ Integrator:........ Certified Operator: ................................................... .. . ......................................................... Operator Certification Number: Location of Farm: J 0 1.3 z y //"A A &. d� ED ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude • ° " Longitude • 4 64 ❑ Wean to Feeder` Layer El ❑ Feeder to Finish`. ❑ Non -Layer ❑ Farrow to We ❑Other ❑ F w to Feederr� arrow to Finish Ej Gilts ❑ Boars PE>fi i;SL'4E�9i Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field Other a. If discharge is observed, was the conveyance man-made? N b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: It �� Frecboard (inches): 0 rim es ❑ No ❑ Yes 8'No r es ❑Now es ❑ No ❑ Yes ❑ Yes ❑ No ❑ Yes ❑ No Structure 6 �i 12112103 Continued 9 Facill'ty Number: — Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ❑ No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes ❑ No closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ❑ No 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? ❑ Yes ❑ No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes ❑ No elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes ❑ No 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ❑ No 16. Is there a lack of adequate waste application equipment? ❑ Yes ❑ No Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ❑ No liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ❑ No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes ❑ No roads, building structure, and/or public property) 20, At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes ❑ No Air Quality representative immediately. Aroma l 12' 60 Sw• �q �- Fla# 7nne 3ooyo/, V+ ReviewerAnspector Name IX ReviewerAnspector Signature: Final Notes ov-t. 4-o ek scAr4 r FP4- � ,i %� f-ou- R. j DW(o n,,F a A i5vo 6. , 5-�� l-ew� . A 2A/ # 8 A4 L4 14 - 4< Flvz FPcj7-13 l 40 12112103 Continued si .JCS Facility Number Date of Visit: C)` Time: � O Nat O erational Q Below Threshold ermitted 13 Certified 0 Conditionally Certified © Registered Date Last Operated or Above Threshold: Farm Name: ........... r..,/.l................................................................`',....:....�.�County: ...................... .............................................................. . Owner Name: MailingAddress: ..................................................................................................................... Facility Contact: Title: Onsite Representative: .......................................................................... Certified Operator:...../ .. .. .......... Q.! e `......................................................... Location of Farm: ' Phone No: Phone No: Integrator: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Worse Latitude • ° && Longitude ' d « Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. if discharge is observed, was the conveyance man-made? ❑ Yes o b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes o c. If discharge is observed, what is the estimated flow in gat/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes N 2. Is there evidence of past discharge from any part of the operation? El N 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes No Struct 1 Structure 2 Structure 3 Structure 4 Structure 5 Structur 6 Identifier:...................................................................................................................................................... .................................. ...................... Freeboard (inches): y 12112103 Continued Facility Number:�jj�Date of Inspection OC 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? S. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type E ¢ r r t' d � , $n. �+ , , 17& 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. is there a lack of adequate waste application equipment? Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. ❑ Yes p i ❑ Yes o ❑ Yes o ❑ Yes o ❑ Yes o f ❑ Yes o ❑ Yes o ❑ Yes �Ko ❑ Yes No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No El Yes o ❑ Yes 019 ❑ Yes ❑ No ❑ Yes [:]No ❑ Yes ❑ No st71 '.rviW-u.'.:!?Y:�titif-!#" h:ik- 'c Y n.,�Y °:�`C':'"'Y::M.S,Y�'^G.1�rc'z^.=:4.•''�'.�,.:.'�ti:i; rn vYut'i�t�s:'f'Y:.4a°,::...FM,..,..;R �4.:u!"'&E€ 11i,""K 3 -al• Comments *for gaestion:#} Ezplasntany�YES?answers aad/ortaay recommendations.or,anygther comments A, 4P � ` 'Use drawn` €of faciLaEo�betterex'laulsldlatlons:*useaddltlonal�atasrECC�i [sj,;4J*�';%St sjrn 1' y.,h'x .< P� } �. P 4 - E , p :;B , . F . r3') t ❑Field COPY ❑Final Notes i, .,t .<:; ! t:..�`< � . E,.� •: � l�`�?8ift{,,1 s? �.e��Ni.�4�J��.�f9 ...�a,�t�fil�i��.�t.�d,..� at5�4L�ts �I��•tu���t� r��,.�Cg�f ,ti�€€g:�.k ���:t:��.& i1.lF'iifnytr.t,'i I.,�� _';St.",ii3�s'c� _.w�aei��i�!!it�t€, :iu+i�t:�!r� tt�r�i�%4i - T n I iReVlewib u J;� I Reviewer/inspector Signature: Date: r 12112103 Continued Foeili,ty Number: — 3 C Date of Inspection Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes No 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes o 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling �n 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes Z 1`+ 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes No �- 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (iel discharge, freeboard problems, over application) ❑ Yes o 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 28. Does facility require a follow-up visit by same agency? ❑ Yes Uo 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes k NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) ❑ Yes 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [_-]Yes ❑ No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ❑ No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No [:]Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After V Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 : 1 Type of Visit PrCo�outine Inspection O Operation Review 0 Lagoon Evaluation Reason for Visit 0 Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access Cility Number Date of Visit: i71� r �> Time: Not Operational 0 Below Threshold Permitted © Certified (3 Conditionally Certified [3 Registered pate Last Operated or Above Threshold: Farm Name: L---A [O., I I County: Owner Name: Mailing Address: Facility Contact: Onsite Representative: Certified Operator: Location of Farm: Phone No: Title: Phone No: Integrator: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude Tama ' " Longitude ' 6 « Design Current Design Current Design Current Swine . Capacity Population . P ultry Capacity Population Cattle Ca aci Po ulation ❑ Wean to Feeder I ❑ Layer I Dairy ❑ Feeder to Finish ❑ Non -Layer ❑ on -Dairy El Farrow to Wean ... ... ..... ......... ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Discharees 8� Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (if yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste IBC i�,2n & Treatment 4. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: r 5 Freeboard (inches): s4 20 05103101 Field Area ❑ Yes 0 No ❑ Yes No ElYes L o ❑ Yes ,., N/o ❑ Yes Ld'No ❑ Yes Le!'N0 ❑ Yes o Structure b Continued Facility Numbers — j Date of Inspection L O 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which arc not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenancc/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Ayyileation 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ElPAN ElHydraulic Overload j 12. Crop type _ L 7 " ci z.-.S"' 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Rcouired Records & D c ment 17, Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/lnspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ Yes � o ❑ Yes 0<0 ❑ Yes No ❑ Yes �No ❑ Yes ❑ No ❑ Yes o ❑ Yes ❑ Yes JJ'lVo ❑ Yes ,L_,t, Na/ ❑ Yes INN ❑ Yes Wo ❑ Yes ❑ Yes No ❑ Yes ❑ Yes ❑ Yes ❑ Yes Ll'iVo ❑ Yes E o ' ❑ Yes No ❑ Yes No ❑ Yes No © No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. YESanswersandlor'any.:recommendatrons or anyother comments: •a Comdrawings�of faciity�to:bettcr�ex'�Explalnany ose �plain sltuations.,(uk.additionil 'pages as necessary):::..; v ❑ Field Copy 20Pinal Notes � g .. ,. Reviewer/InspectorName, Reviewer/Inspector Signature: Date: Z 05103101 Continued Facility Number Date of Visit: 1 ,---� N� Time: ^T Nat O erational OBelowThreshold O Permitted 0 Certified 0 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name: ��%��V/� _,._ County: Owner Name: Mailing Address: Facility Contact: Title: Onsite Representative: Certified Operator: Location of Farm: Phone No: Phone No: Integrator: Operator Certification Number: ❑ Swlne ❑ Poultry ❑ Cattle ❑ Horse Latitude 0 ' " Longitude 0 6 0« `Swine ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish �❑ Gilts ❑ Boars Design' , ,;;Current Design Current =b°" 'anacitv Po ulation Poultry Ca aci Population Cattle ❑ Layer ❑ Dairy ❑ Non -Layer ;; ❑ Non -Dal ❑ Other Total Design Capacity Total SSLW Number of Lagoons Holding Ponds / Solid Traps No Liquid Waste Ma Discharges & Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? b. If discharge is observed, did it reach Water of the State? (Ifyes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? )esign. Current;- an aciiv Po) ation E . 5 ❑ Spray Field Area ; 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: f T Freeboard (inches): ❑ Yes No ❑ Yes ��o o El Yes ElYes N ❑ Z ., Yes No ❑ Yes o ElYes No Structure 6 05103101 Continued FacilityNumber: — C Date of Inspection / m 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes LQ Na seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? El Yes o (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes o 8. Does any part of the waste management system other than waste structures require maintenance/improvement? El Yes No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level / elevation markings? ElYes �' Waste Annlication 10. Are there any buffers that need maintenance/improvement? ❑ Yes io 11. Is there evidence of over application? ❑ Excessive Ponding El PAN ❑ Hydraulic Overload El Yes No 12. Crop type ' 13. Do the receiving crops differ with hose designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ YrCS05X<�Co�' 14. a) Does the facility lack adequate acreage for land application? El Yes b) Does the facility need a wettable acre determination? ❑ Yes ' " c) This facility is pended for a wettable acre determination? ElYes No 15. Does the receiving crop need improvement? ❑ Yes 10 16. Is there a lack of adequate waste application equipment? ❑ Yes No Reauired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes o IS. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (iel WUP, checklists, design, maps, etc.) ❑ Yes �No 19. Does record keeping need improvement? (ic/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes o 20. is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes o 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes o 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (iel discharge, freeboard problems, over application) ❑ Yes No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes No 24. Does facility require a follow-up visit by same agency? ❑ Yes o 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ElYes o �] No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Comments (.refer tognestion #) Explain,any YES answers'iindlor a y; mmendiihons or any other comments , se°dirawings of facility to better explaln iWations (use additronalipages as essary) �.- ❑ Field Copy ❑,Final Notes1 MN ReviewerlInspector Name ". ReviewerlInspector Signature: 05103101 tom`. C: Date: Continued Facility Number: Date of Inspection b Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge atlor below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes No ❑ Yes No ElYes ❑ Yes �No ❑ Ycs VN El Yes ❑ Yes Additional Comments and/or Drawings: i 7 O5103101 3`0 IV1810i1 OfS0114nd WatewCbnservahfln� OperaLfln�Review t#�` ' Watew Consewvation �Com hance�Ins tton t%� i + rv�sion'bfater Walp Cnm Lance Ins ecbon� 4 Qn tYa - P P a r � _ OtherA e�C �� CratlOfl-;Re'1CVY. IQ -Routine O Complaint O Follow-up of DWQ inspection O Follow-up of DSWC review O Other �,�.I ILI�I�PIII Facility Number Date of Inspection Time of Inspection 24 hr. (hh:mm) ermitted Q Certified Q Conditionally Certified Q Registered 10 Not O erational Date Last Operated: .......................... Farm Name: .......... �-s.... ... �^^ .... viY�r�.1............1 ............. "'County: OwnerName:........................................................................................................................... Phone No:....................................................................................... Facility Contact: 2q-kk�. .(.�'` C 2 �.�................................................... ....................................Title:................................................................ Phone No: MailingAddress:.......................................................................................................................................................................................................... .......................... Onsite Representative: .............................. ......... .......... ..... Integrator:...................................................................................... Certified Op f `'aOperator:.. '`_091c «C el`� -T� .......... Operator Certification Number: .............. ... ............................................ Location of Farm: ..-"...........................................:...... Latitude �' �" Longitude =0 1 Desig[t Cori ent Desegn Current ' : t i v Design: + "_€Current Swine lid. Poultry, Cttleaace'P_, . .,.Capactty E >Puliaon, tPt ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Faffow to Feeder B'Parrow to Finish ❑ Gilts ❑ Boars ❑ Layer I ❑ Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other I,IIEf,,t - Tofal Design Capae ty, ��t ; I v , � It � •r°I ,°1� g�� 1 ��� Total SSLW'NYE O, Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a, If discharge is observed, was the conveyance man-made? b, If discharge -is observed, did it reach Water of the State? (If ycs, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: 11 Freeboard (inches): I,� �0 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 3/23/99 ❑ Yeses ❑ Yes No ❑ Yes L o [:]Yes �Vv ❑ Yes Cl Yes [I Yes Structure 6 ..............................ZNo ❑ Yes Continued on back Facility Number: — 3 Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Yes o (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes I, KO 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ..Id' 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes 12. Crop type r 13. Do the receiving crops differ with Lse de ignated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes LSO 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ONO b) Does the facility need a wettable acre determination? ❑Yes No c) This facility is pended for a wettable acre determination? ❑ Yes 015. Does the receiving crop need improvement? ❑ Yes ;;0 16. Is there a lack of adequate waste application equipment? ❑Yes :� Required Records & Documents 17.. Fail to have Certificate of Coverage & GeneraI Permit readily available? ❑ Yes J"" ' -" 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes ��O< 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes 20-, Is facility not in compliance with any applicable setback criteria in effect at the time.of design? ❑ Yes 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? / (ie/ discharge, freeboard problems, over application) ❑ Yes 7No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 24. Does facility requi•a-follow-up visit by same agency? ❑ Yes 25. Were an ditional problems noted which cause noncompliance of the Certified AWMP? ElYes o 0 •yiolaiioos'oi• 001cper; do *r rb, noted• ft ing tb1s'vpsft; Y:oa Will-teegiye 00 t'u>!- o .. • coriesnorideRce: about this visit.: •................................... . Facility Number: - 3 Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below Yes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes;;No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? El Yes Id 0 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes N 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Yes ❑ No ivtsion of Soil and Water Conservation - Operation Review Division of Soil and Water Conservation - Compliance Inspection ❑ Dtvision of Water Quality - Compliance Inspection Review ,. OthervA,gency - Operation 10 Routine O Com laint 0 Follow-up of MVQ ins ection Follow-u of DSkVC revic►s, 0 Other Facility Number gi Date of Inspection t Tinii of Inspeclion `` 24 hr. (hh:mm) ❑ Permitted 0 Certil"ied ❑ Conditionally Certified ❑ Registered JE3 Not Operational Date Last Operated: erated: Farm 'an• ��:1^T�'�G'L L- V.County ...................................................................................... Owner Name .................... Phone iN'o: Facility Contact: ............................ .. .Title:........................................................... Phone No: MailingAddress: ..................... ..................................................... .../............................ ........... Onsite Representative: ..Tt......... iy ..r......,P....1/.:Llr�f.!?1!J Intetirator:.................................................................................... ..,. Certified Operator: ................................................... ......................................... . .................. Operator Certification Number:.......................................... Location of Farm: Latitude ' < C].. Longitude �]" Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder ❑ Layer ❑ Dairy ❑ Feeder to Finish ❑ Non -Layer ❑ [Von -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Soars Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area Holding PG.ids / Solid Traps ❑ No Liquid Waste tManagetnent System Disch:ar41:� & Sti-cilnl Impacts 1. Is any discharge observed From any part of the operation'? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? h, lFdischarge is observed, did it reach Water of the State'? ([I' yes, notify DWQ) C. IF discharge is observed. what is the estimated flow in pihnin? cf. Dices discharge bypass a lagoon systcm'? ([f ycs, notil'y DWQ) 2. Is there evidence of past discharge from any part of the operation'? 3. Were there any adverse impacts or potential adverse im acts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm sw ge) less than adequate? ❑ Spillway SlraCIUYU I Structure 2 S[ructcrc 3 SII-ticlure 4 Structure 5 ❑ Yes [:]No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No SCI-UCtrlrc b lcicntil�icr: hreehoard (inches): ..........lj..,�7 ...................4L% ..0............................................................................................................................................................. 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees. severe erosion, ❑ Yes ❑ No 3/23/�)9 seepage. etc.) �� L%%S �t"7 �L r;✓ I E � I L 1 � S i J—. �✓1��j Continued on back fl C s4r) -L IF Routine O Comulaint O Follow-up of DWO inspection `Facility Number 13 Registered 0 Certified © Applied for Permit 0 Permitted Farm Name:..... ...G.C%�.F- `�............�... 1.... ......... OwnerName: ................................................... .......................................................... Facility Contact: ...................................................................,.......... Title:........... Follow-up ot'DSWC review Date of Inspection C Time of Inspection 17 Not Onerational Other 24 hr. (hh:mm) Date Last Operated: County: .............................................................. ....................... PhoneNo:....................................................................................... Phone No: .............. MailingAddress: .................................................... ...................................................................................................................................................... .......................... j Onsite Representative:.,:.�.�J..lj....... Lln./1.K.Ir .......... .� �r��� ��Integrator: ...................................................................................... Certified Operator:............................................................................................................... Operator Certification Number:................. ........................ Location of Farm: C C Latitude ` I " Longitude • ' 46 Design. Current Design Current . Design Current Swine , Capacity Population "Poultry Capacity Population Cattle Capacity'''Popu6tton"": ❑ Wean to Feeder ❑ Layer JE1 Dairy ❑ Feeder to Finish JE1 Non -Layer I I JEJ Non -Dairy ❑ Farrow to Wean El Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑Boars Total SSLW Numher of Lagoons 1 Holding Ponds ❑Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area M ❑ No Liquid Manage System � 3 General L Are there any buffers that need maintenance/improvement? ❑ Yes No 2. Is any discharge observed from any part of the operation? ❑ Yes r� No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes No b. If discharge is observed, did it reach Surface Water? (if yes, notify DWQ) ElYes &NO c. If discharge is observed, what is the estimated flow in IaUmin? d. Does discharge bypass a lagoon system? (lfyes, notify DWQ) ❑Yes �No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes L{No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes P(No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes No maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes No 7/25/97 Continued on back Facility Number: 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons,floldina Postds, Flush Pits. -etc.) 9. is storage capacity (freeboard plus storm storage) less than adequate? Structure I Structure 2 Structure 3 Identifier: Freeboard (ft):.,1 f........................... .L� ��...... ........... ... ................................ 10. Is seepage observed from any of the structures? 11'-1/0-1 ❑ Yes /No Yes ❑ No Structure 4 Structure 5 Structure 6 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes Ld No ❑ Yes OINo 12. Do any of the structures need maintenance/improvement? ,(Yes ❑ No (1f any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13, Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes )2j No Waste :Application 14. Is there physical evidence of over application? es No (If in excess of WHIP, or runoff entering waters of the State, notify DWQ) 15. Crop type 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes PNo 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes No _�(G El 18. Does the receiving crap need improvement? Yes Na 19. Is there a lack of available waste application equipment? ❑ Yes No 20. Does facility require a follow-up visit by same agency? /Yes ❑ No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ONo 22. Does record keepin�g�n'd impr ent'? XYes For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes )?I No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No 25. Were any additional problems noted which cause noncompliance of the Permit? jo ❑ Yes PfNo [] No violations or. deficiencies, were noted during this. visit. You.will receive no further correspbndence about this.visit : , . ; ' 61 Revised January 22, 1999 JUSTIFICATION & DOCUMENTATION FOUR MBA-NDATORY WA DETERMINATION Facility Numbe�L_ (/ Operation is flagged for a wettable Farm Name:' u 4L,,,44 t5 , f 1 _ acre determination due to failure of On -Site Representative: Part ll eligibility item(s) F1 F2 F3 F4 Inspector/Reviewer's Name: Date of site visit: L c Date of most recent WUP: Operation not required to secure WA determination at this time based on exemption E1 E2 E3 E4 Annual farm PAN deficit: pounds Irrigation System(s) - circle #: 1. hard -hose traveler; 2. center -pivot. system; 3. linear -move system; 4.-stationary sprinkler system wlpermanent pipe; 5. stationary sprinkler system w/portable pipe; 6. stationary gun system wlpermanent pipe; 7. stationary gun system wlportable pipe PART I. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D2ID3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part Ill. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eligibility checklist, Part 11 - F1 F2 F3, before completing computational table in Part 111). PART ll. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation records. �F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure to deduct required buffer/setback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers or less than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits fieid(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part 111. Type of Visit O Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit O Routine O Complaint O Follow up mergency Notification O Other ❑ Denied Access 'Number [)ate of Visit: a Time: E== NNot O erational C Below Threshold Permitted 0 Certified /[3 Conditionally Certified. © Registered Date Last Operated or Above Threshold: ......................... Farm Name: .... ..k z A�f. ........r �l 7.fA^...5.... �2t+-. � County:... %.✓. ?!.tl .�..P — ....................... OwnerName:......1 lrL' /� .... � - ... ....... Phone No:.. .... ............................ ... . .... . .......... .................. ........................... .......... MailingAddress: ................................................................ . ................................................... ..................................................................................... .......................... Facility Contact: ..............................................................................Title:....................... Phone No: OnsiteRepresentative:...... ....iTQ 2 t.........................................0.............. Integrator:...................................................................................... Certified Operator: ................................................... .... Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude • 4 44 Longitude • 4 44 Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field Other a. If discharge is observed, was the conveyance man-made'? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/tin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure; 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: ,.: '''" ................. ............................................................................................................................ ...... Freeboard (inches): 12112103 Yes ❑ No ❑ Yes 0-1 o es ❑ No es ❑ No es ❑ No ❑ Yes o ❑ Yes ZNo Structure 6 Continued Facility Number: & -_3 Z/� Date of Inspection! 2 0 IV 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ❑ No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes [:]No closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, :notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ❑ No 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? ❑ Yes ❑ No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes ❑ No elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes ❑ No 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ❑ No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ❑ No 16. Is there a lack of adequate waste application equipment? ❑ Yes ❑ No Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes ❑ No liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ❑ No 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes ❑ No roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes ❑ No Air Quality representative immediately. Field Copy ❑ Final Notes Bu i1 o -�+ F� 7 /= 5P I !� 6Y7 Su r c,1 v 2 S a V t.3 • 7CV t // d b�/ l le h, q rvir k-,A o C C e-w 4-0 Gc n e 1oyy i',;t_e G� c.Ser' G„ ✓� ar + � , �� r I � h a c. � �t �s o F l wt1 � r-'� o i� � trOi- (S ! cJ � �►' v r- r.,-�t s a-c..�-��,1 d► eYs. `� r-R-a�._ f3 i y Reviewer/Inspector Name j Reviewer/Inspector Signature: Date: 12112103 Continued Facil' yNumber Date of Inspection 7 /L Time of Inspection 24 hr. (hh:mm) Allople-rmitted. 0 Certified © Conditionally Certified 0 Registered 113 Not O erational Date Last Operated: Farm Name:'!!;1 rl1.I�..�`-1.�........ .(...1.. ......... County:.�.rCL/! ............................... OwnerName:....... . '> ........Q Phone ..�...z .................... ................................................................................ ............................L s Facility Contact: .... J:...11.4. :.... .'1..................... llTitle: ................................................................ Phone No:................................................... Mailing Address: ... 10.. �... . 0 ......... ......l I: 1. ``t..... Jv�.......... �. . J v...................................... .......................... Onsite Representative :....../...'!f �'t Integrsrtor:.t:/ri't�............................................... Certified ...... Operator . ...14' Operator Certification Number: ......... .... ...............�................... .................... ....................., Location of Farm: ............................. ................I. ............................ .............................. .....� r Latitude a �_ �•° Longitude �• �° �« Design Current. Design Current Design Current SwPoultry Population Cattlene Capacity Population a y Capacity Po dlation, ❑ Wean to Feeder ❑ Layer ❑ Dairy ❑ Feeder to Finish ❑ Non -Layer ❑ Non -Dairy ❑ Farrow to Wean ❑Farrow to Feeder ❑ her - r arrow to Finish po ; , Total Design Capacity ❑ GiltsE ❑ Boars Total SSLW ! Number of Lagoons `E El Subsurface Drains Present agoon Area ❑Spray Field Area , Hnldin Ponds / Soltd'Traps .1❑ No Liquid Waste Management System Discharttes & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: El Lagoon El Spray Field El Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (Ii'yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Dees dischargc bypass a lagoon system? (If ycs, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identi Fier: Z II $ 44 `t Freeboard(inches): ...........LI............... I.. ................................... .................................... ............ I ...................... ................................... .... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) ❑ Yes No ❑ Yes ❑' 11� wo ElYes ❑ Yes N ❑ Yes Zff ❑ Yes o ❑ Yes No Structure 6 ❑ Yes ZNo 3/23/99 Continued on back Facility Number: —3 Datr• of Inspection 6. Arc there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type ' QC— WJ, :LA= 9y15�1 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? N' • Vwo ttQris pe. dt�f eier bC •were ho ed- il(rrir�g this: visit: - Y:oir 'W i... eeciye Oo: futtht tt' • ' ' comes' 6Tidertce: albotit this :visit: ::: . ❑ Yes ❑ o_d ❑ Yes B, El Yes No ❑ Yes No ❑ Yes ZNo Yes [-]Yes t2�tvo ❑ Yes ;Zo_ ❑ Yes J ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes L.. Ko ❑ Yes No ❑ Yes ❑ Yes ��No ❑ Yes ❑ Yes no� Yes El Yes ❑ Yes o 3/23/99 Facility Number: —3 Date of Inspection`— Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below Yes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑YesLe 1-40 28. Is there any evidence of wind drift during land application? (i.e, residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes No 30. Were any major maintenance problems with the ventilation fans) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes ;"NPNo 31, Do the animals feed storage bins fail to have appropriate cover? ❑ Yes 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes o rtiona omments an...:or IWtn5 ." t�" i�(� ! i l r'1 Tiff i�u': yi 3/23/99 11/3 ❑ D' n of Soil and Water Conservation ❑ Other Agency - Division of Water Quality 10'Routine O Complaint O FoHow-up of DNVQ inspection O Follow-up of DSWC review O Other Date of Inspect ion 3 Facility Number Time of Inspection E2= 24 hr. (hh:mm) g � Registered /fit Certified [3 Applied for Permit WPermitted0 Not Operational I Date Last Operated: Farm Name: ..1 ..✓...� f.. �. �..-5....../"?I/ / /� County:../'%.!?. Y.. '^.................................... ......................................................... Owner Name* .Cj'!l!...........r�............................................... Phone No:.......... ...f.... ......................... Facility Contact: A..LV. ...:'.......L.......................... Title Phone No:. .................................................. MailingAddress:........................................................ ......................... Onsite Representative:.A.l..k..:3...... ..1.' 1.......................N.......... Certified Operat.or;.P.p �....... .1 {S 0 l ✓r •r .................................... Integrator: ......................................... Operator Certification Number; ......................................... Location of Farm: 2 1 3 L J .... ..... ... .... ..... Latitude �•.' ��" Longitude Design Current " Design Current; Destgn Current Swmeiy� Capacity Population Poultry , :Capacity Population Cattle r „Capacety,Popuiatioa, aY ❑ Wean to Feeder Io Layer ❑ Dairy 3 ❑ Feeder to Finish I0 Non -Layer ❑Non-Dairyk, ❑ Farrow to Wean ❑ F to Feeder ❑ Other m; �" arrow to Finish p p. J Total Design Capacity ❑ Gilts x. LO�❑ Boars X T W� otal SSL £ ,. ,:. w# Number o agoo 1 Holding.fonds ❑ Subsurface Drains Presrea ent❑ Lagoon A ❑ Spray Field Area .� � -[' K 'i�.4r ... ... ❑ No .. ... ....... . Liquid Waste Management System General L Are there any buffers that need maintenance/improvement? El Yes ,� 0<0 2. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes Of No b. if discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes 0 No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑,Yes E7 No a 3. is there evidence of past discharge from any part of the operation? ❑ Yes (a' 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes No 5. Does any part of the waste management system (other than. lagoons/holding ponds) require ❑ Yes No maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes i5 "' 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes ❑ No 7/25/97 Continued on back ,. C do — Facility Number: 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (LaLioons,tioidine Ponds, Flush Pits. etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes to ❑ Yes io Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: �,t-..."+91L- - ......................................................................................................... Freeboard(ft): ............./` ..................................................................................... .............................. 10, Is seepage observed from any of the structures? ❑ Yes : 'u 11, Is erosion, or any other threats to the integrity of any of the structures observed'? ❑ Yes No 12. Do any of the structures need maintenance/improvement'? ❑ Yes ;�'o (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes No Waste_ P—Plication 14. Is there physical evidence of over application? Cl Yes No (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type ...l1�ir�'....` sit'`..':.J............................................. ....................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes t o 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes (P xxo 18. Does the,receiving crop need improvement? ❑ Yes ffNo 19. Is there a lack of available waste application equipment? ❑ Yes 21 No 20. Does facility require a follow-up visit by same agency? ❑ Yes 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes �o 22. Does record keeping need improvement? 'es ❑ No For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24, Were any additional problems noted which cause noncompliance of the Certified AWMP? 25, Were any additional problems noted which cause noncompliance of the Permit'? 0 No.violations or deficiencies. were noted- during this: visit.- :You 4ill receive no ftirttier correspondence about this•.visit:• .. crest 6n4): Expla ❑ Yes PIKIO ❑ Yes 0 1 0 ❑ Yes 0, o 7/25/97 `,.ffDSWC Animal Feedlot Operation Review k ❑ DWQ Animal Feedlot Operation Site Inspection fi y M : M a„v t •S x't`^ -„ram' ,�, a« �m Routine O Cam laint 0 follow-u of DW } ins ection 0 Follo%r-u of DSNVC review Q Other —y Date of Inspection 'L Facility Number *re _T__-__I Time of Inspection 24 hr. (hh:mm) Total Time (in fraction ot'hours Farm Status: ❑ Registered ❑ Applied for Permit tex: L25 for 1 hr 15 min)) Spent on Review ❑ Certified ❑ Permitted or Inspection (includes travel and processing) 10 Not Operational Date Fast Operated: . Farm Name:. .l�I�f-F .=5...........r # ! OwnerName: ................................................... ..................................... Facility Contact:.............................................................................. Title: .............. County :............... MailingAddress: .......................................................... .......................... 04ite Representative:,A,.Vj f,,. Certified Operator: .................................................. ................. Location of Farm: ... Phone No: ............... .......................................... Phone No:................................................... integrator: ............................ . I .............................................. Operator Certification Number .......................................... C C Latitude 0 QC CC Longitude a C LC Type of Operation Design Current Design Current Design Current Swine : r Capacity Population; : Poultry. Capacity Population .- Cattle.:.' Capacity Population.-. ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Other r Number aELagoons/Holding Ponds ❑ Subsurface Drains Present ❑ Lagoon Area IF3 Spray Field Area General 1. Are there any buffers that need maintenance/improvement? ❑ Yes ID'No 2. Is any discharge observed from any part of the operation? ❑ Yes PNo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made' ❑Yes No b. If discharge is observed, slid it reach Surface Water? (If yes, notify DWQ) ❑ Yes No c. If discharge is observed. what is the estinlated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) ❑Yes PNo 3. Is there evidence of past discharge from any part of the operation? ❑ Yes No 4. Were there any adverse impacts to the waters of the State other than from a discharge'? ❑ Yes No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes No 4/30/97 maintenance/improvement'? __ -- Y x • Facility Number: 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons and/or Holding Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): St cturp I Struucctttre 2 Structure 3 Structure 4 ............................... ................ ................................................................. 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 0 No ❑ Yes PNo ❑ Yes No ❑ Yes 0 No Structure 5 Structure 6 ❑ Yes 9 No ❑ Yes [I -No 12. Do any of the structures need maintenance/improvement? E Yes ❑ No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Anplicatiort 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type rnu .............5.6 ...................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP) 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23, Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? $. -ECP Gb rL—C CaVEr M V C= 6— i tj t/t, --,? 119 E Cp g &�K w 41z--6Ct L-1051" ❑ Yes Y(No ❑ Yes & ......................................................... ❑ Yes No ❑ Yes VNo �] Yes ❑ No ❑ Yes No ❑ Yes No ❑ Yes �] No ❑ Yes UrNo ❑ Yes 0 No ❑ Yes prNo sr%nr 7 0 �,Q i rfe_X Reviewer/Inspector Name Reviewer/Inspector Sign Date: re- niuicinn -f Wnl 11-1h., W !a. Fnrilitu d eracemavf rinif dlinw `a}: -y .fs' f; �`Yy�Gsn�`54 .UGH'ti.n.:+pie-w+ .�r�sV.!v„aw �u' rT:!�+t1Ci:��:rWf�K ny eF���l. r' y '77G• r� s :.. �;{aL�:^r+rie'v:e - .--.��.:...,.rP 3..w.+' s�-r•:v}[xr,r- - .f,.-----,.-- T f I (—*� l-2 Q P n nn ri r-- Facility- Number Farm Status: ® Registered ❑ Applied for Permit Ell-tertified © Permitted Elate of Inspection 'rime of Inspection 24 hr. (hh:mm) Total Tirne fin fractiotr of hours (ex;1.2; t4 �I hr 15 min.)) Spent on Review or Inspection (includes travel and processing) 0 Not Opera}tional r Date Last Operated: ............................................................................................ ................................................... Farm Name: GCf i)� 1.... �Q �..�. County: ,...1� vr.T 1;G L? + o h.. s ......................... .............I....... Owner Name: ��� t I'hnnc �ffr . l'—.....�..., .......... .r ................. a.�s........,.,.......�a..-...,.,.....,.,.............. c��� ..,.,. -Z u. 2 .......,..... Facility Contact: tl ........�r �w+m a.. ................ 1'itle:.,.......................,..... Phone No: „ , /.............-,2/U� MailingAddress: ....... p... .'.....!. XJ,Y....... ........ 1.!lt,.Q.ke �1......."! ........... ...... IF.Q........................................ ............ ,............. Onsite Representative: ,,,,,,....,,,,.,....l...Y.r!h........ .. Integrator: ................... ii Certified Operator:,�r-�f �/ l'1 C P'r'r ............ Operator Certification Number:...,p...,:.f............. Location of Farm: ................ 7 ............ //. � . ..... F Latitude 0 �� ©« Longitude Type of Operation Design Current D+vsign Current Design , : Current Swine - Capacity :Population' Poultry Capacity Population Cattle ,. Capacity Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder Farrow to Finish I / OM ❑Other ........... . Subsurface Drains Present 11❑ Lagoon Area J❑ Spray Field Area General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If dischargge is observed, was the conveyance man-made'! b. If'discharge is observed, (lid it reach Surface Water? f if yes, notify DWQ) c. If dischage is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If ves, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? *r:x 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste nuuiaaement system (other than lagoons/holding ponds) require maintonancehmprovement? 4/30/97 e ❑ Yes a1Vo ❑ Yes UNo ❑ Yes ❑ No ❑ Yes.., ❑ No ❑ Yes ❑ No ❑ Yes Q'< --- .❑ Yes 04�0 ❑ Yes j o r`€ Continued an back i� +-.,.y'•,.,..�y�r�s� -•- -ti •�-� _.--,. -�--�f� {�4.:.r.:.-c.,'.,,j.���,fr:�..,.'a�+�ti'"...,.y�•��.�;sT`iti'�k:iFN.'�`"'►'�x�n�,,,• - ,� ..---n .��•w.-..�ir:r,:- �....w:+r.,�,�y -�,ar , --� Facility Number: — 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed'? Structures (Lagoon~ and/or Holding Ponds) 9. is storage capacity (freeboard plus storm storage) 16ss than adequatel) Freeboard (ft): Structure I Structure 2 Structure 3 .............................. ., .......................... ........................ I ....... ., 10. Is seepage observed from any of the structures? Structure 4 11. is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate. public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application'? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) ❑ Yes 0,Ko ❑ Yes ®'No ❑ Yes Ulslo z ❑ Yes [O'No Structure 5 Structure 6 ❑ Yes &1b ❑ Yes E]-NO ❑ Yes Q- ❑ Yes B"No 15. Crop type...................................................................................................................................................................................... 16. Do the receiving crops differ with -those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? Soll"e, �.tpS On �;,jG 5 Q�CaP(.J U 0r1 Ff �� j 0R 0 ALo1Ca, S(71j4?r] ��� 1a h LJCc� p.(1Q /VUr -P,1 Reviewer/Inspector Name ❑ Yes ©YNo ....................................... ❑ Yes 91'No ❑ Yes 010 i ❑ Yes ©•o Cl Yes © <O ❑ Yes [9- o ❑ Yes EK ❑ Yes ❑ Yes ©'No ❑ Yes [91V0 Reviewer/Inspector Signature: cc: Division of Water Quality, Water' Quality Section; Facility Asses. --- Date: Unit 4/30/97 ,.96 State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr„ Governor Jonathan B. Howes, Secretary XFONWA EDF.=HNF;Z DIVISION OF WATER QUALITY July 16, 1997 Mr. Rudy Grammer Smithfield Carroll's P.O. Box 1240 Waverly, Virginia 23890 Subject: Compliance Evaluation Inspection Facility # 66-34 Carroll's Farm 11 Northampton County Dear Mr. Grammer: On July 8, 1997, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. The inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the operation was not discharging wastewater into waters of the State and that operations were proceeding according to your approved Animal Waste Management Plan. As a result of the inspection, the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. The Raleigh Regional Office appreciates your cooperation and compliance. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerel , J�{dy Garrett, Water Quality Section Supervisor cc: Northampton County Health Department Mr. Tony Short, Northampton Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC-RRO DWQ Compliance Group RRO Files 38M Barrett Drive, Suite 101, ��' FAX 919-571-4718 Raleigh, North Carolina 27609 N�� An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper Facility Number Date of Inspection T Time of Inspection ®24 hr. (hh:mm) Re�st�re Total Time (in fraction of hours Farm Status: ❑D Re d ❑ Applied for Permit (ex:1.25 for I hr .15 min)) Spent on Review ertified ❑ Permitted I or Inspection (includes travel and processing) 0 1Not Operational Date Last Operated: .................................. . ....................... . ........................................................................................ Farm Name:..L/rr�.��s �,// 1/ �t ..................._........................................., County:%1.S?�/.�(....kJ(7/............_...q................. Land Owner Name:n..v(q.rrjlilt/5........................................................................ Phone No:....7.._._'.A.;_.7...-...Zl.0_/................ Facility Conctact:..._K �9 fir w .1 QirL .............. Title:....................................._......... Phone No: 4�...< ...._......._......._........ .....:.... o �_ ..Z y lj' �✓KI v e �t/ ..........._u ..� ...__.... � 3 �S .......................... _........................ Mailing Address:.._ ............................_..... _ .........D Yru .r OnsiteRepresentative:..P.. ..._....�t'...................................................................... Integrator:..C1..t..:!'.Y�................................................. Certified Operator:....._........................................... ...................................... _..................... , Operator Certification Number: Location of Farm: S 1 Z 13 2 Latitude =*='=° Longitude =0=,=µ General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is'observed, did it reach Surface Water? (if yes, notify DWQ) C. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require 4/30/97 maintenance/improvement? ❑ Yes No ❑ Yes No El Yes �NNoo ❑ Yes IQ No ❑ Yes ❑ Yes ❑ Yes 7No ❑ Yes Continued on back ~ ' Facilfty Number: . 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes Ergo 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes �Ld'No 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes C-I'N0 Structures (Lagoons gndlor I, olding Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ YesO Freeboard (ft): Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 .......... .. / ....... �:.:5... / ......................... ............................ ............................ ................ ............. 10. Is seepage observed from any of the structures? ElYes Ingo 11. Is erosion, or any other threats to the integrity of any of the structures observed? Yes ❑ No 12. Do any of the structures need maintenance/improvement? ❑ Yes B-No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? es ❑ No Waste AUplication 14. Is there physical evidence of over application? ❑ Yes Ergo - (If in excess of WMP, orrunoff entering waters of the State, notify DWQ) 15. Crop type ................................................................... 16, Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes 0-114o' 17. -Does the facility have a lack of adequate acreage for land application? ❑ Yes No 18, Does the receiving crop need improvement? ❑ Yes [TNo 19, Is there a lack of available waste application equipment? ❑ Yes O-Noo 20. Does facility require a follow-up visit by same agency? ❑ Yes EM 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes L-J"No For Certified Encilities ODIX 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 24. Does record keeping need improvement? ❑ Yes No bAc,es. d e af= sS-'/ (P., "'q'y.) (-per . sho NI cf .-e c a. Reviewer/InspectorName Reviewer/Inspector Signature: ,G.r�j �� Date: cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 V11JijL- 0 ( "35 15: 41 15 943 P02 (0 (P Wagige N C114. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH $ NATURAL RLSOURCES DIVISION OF ENVIRONHENTAL MANAGENSNT Fayetteville Regional -office Animal Operation Compliance Inspection Form , aA) e4 f�q.� m S e /3 Z 77 // • ro A /C` ,.,.. t�A3�Y�G,ADp�R,�C�::r�-�=- ' All questions answered negatively will be discussed in sufficient detail in the Comments Section to enable the deemed Permittee to perform the appropriate corrections: gECTION I Animal Operation Type: Horses, cattle, swine, poultry, or sheep ���� e- �ECTIDN II 1. Does the number and type of animal meet or exceed the (.0217) criteria? [Cattle (100 head), horses (75), swine (250), sheep (1,000), and poultry (30,000 birds with liquid waste too system) 7 „fu`(�4/ f ►�,rvu k0 P.wS h �. �u 2. Does this facility meet criteria for Animal operation REGISTRATION? 3. Are animals confined tad or maintained in this facility for a 12-month period? 4. Does this facility have a CERTIFIED ANIMAL WASTE NANAGEHENT PY..AN? 5. Does this facility maintain waste management records (Volumes of manure, land applied, spray irrigated on specific acreage with specific cover crop)? 6. Does this facility meet the 5C5 minimum setback criteria for neighboring houses, wells, etc? Y N Cpways By says L t2m,q /c1 lip' 7 �"JL a? ' 95 15 : 42 943 P03 SsCTiON III Field Site Management t_ Is animal waste stockpiled or lagoon construction within 100 £t. of a USGS Map Blue mine Stream? 2. Is animal waste land applied or spray irrigated within 25 ft. of a USGS Map Blue Dine Stream? 3. Does this facility have adequate acreage on which to apply the waste? 4. Does the land application site have a cover crop in accordance with the TIrIGATIp PLAN? 5. is animal waste discharged into waters of the state by man-made ditch, flushing system, or other similar man-made devices? 6_ noes the animal waste management at this farm adhere to Hest Management Practices (BMP) of the approved CERTIFICATION? 7. Does animal waste lagoon have sufficient freeboard? How much? (Approximately ) S. Is the general condition of this CAF0 facility, including management and operation, satisfactory? SECTToy IV Comments m i OEM I a - XI. JUL-14-1995 15:26 FROM DEN WATER QUALITY SECTION TO PRO P.02/O2 Site Requires Immediate Agt:ntior. Facility No. DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: �7-11- , 1995 7 Time: /0 Farrn Name/Owner: s�"' �Hr• a/cl Gtjrv�//S Mailing Address: a a County: Y✓ V rI / 0 Integrator: Phone: _ o y - _-?3 -_Z/o 9 On Site Representative: nr""l B ru Phone: Physical Addmss/Location: S:rZ 13 ? f c Type of Operation: Swine a?oultry Cattle Design Capacity: O v 0 Scw' S Number of Animals on Site: �(oa-o a DEINi Certification Number: ACE DEM Certification Number: ACNEW_ - _ Latitude: " Longitude: Elevation: -_____Feet Circle Yes or No Does the Animal Waste Lagoon have sufficient freeboard of l Foot +. 25 year 24 hoar storm event (approximately 1 Foot f 7 inches)�or No Acrual Freeboard: Wit. Inches Was any seepage observed from the lagoon(s)? Yes o, Ng Was any erosion observed? Yes o>�l Is adequate land available for spray?D or No Is the cover crop adequate? Y� or No Crop(s) being utilized. h'k , / 6_ S—,,wzr c S Does the facility meet SCS minimum setback criteria"! 200 Feet from Dwellings?(e or No 100 Feet from Wells?J�e_i or No _}!e arimal waste stockpiled within 1001=eet of USGS Blue Line Stream? Yes of�q anmal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line'? Yes 091 ro animal waste discharged into waters of the state by man-made ditch, flushing system, or other .,ir^ila.r man-made devices? Yes ore If Yes. Please ExpJaitt. ^.)t �cs me facility maintain adequate waste ukuiagement records (volumes of manure, land applied. spray irrigated on specificre acage with cover crop)�s or No :additional Comments: t4— - - Signatwe cc: Facility Assessment Unit Use Attachments if Needed. TOTAL P.O'2 1 JP State of North Carolina Department of Environment, Health and Natural Resources ` • Raleigh Regional Office James B. Hunt, Jr., Governor p H N R Jonathan B, Howes, Secretary Boyce A. Hudson, Regional Manager DIVISION OF ENVIRONMENTAL MANAGEMENT August 21, 1995 Mr. Rudy Grammer Smithfield Carrolls P. 0. Box 1240 Waverly, Virginia 23890 Subject: Compliance Evaluation Inspections -Swine Operations Facility Numbers: 11, 27, 29, 30, 36, 37, and 39. Northampton County Dear Mr. Grammer: on July 11, 12, and 15, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted compliance inspections of the aforementioned animal facilities. These inspections are part of the Division's efforts to determine potential problems associated with liquid waste disposal systems. Mr. Towell's site visits determined that wastewater from these facilities was not discharging to the surface waters of the state. In addition, no manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) were observed at these facilities. As a result, these facilities were found to be in compliance at the time of their inspection. Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity.to remind you that you are required to have an approved animal waste management plan by December 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal opportunity Affirmative Action Employer 50%recycled/ 10% post -consumer paper Rudy Grammer Smithfield Carrolls Compliance Evaluation Inspection Page 2 The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspections please call Buster Towell at (919) 571-4700. Sincerely, Jud�E. ett o� Water Qual y Supervisor /ds H:\animdn cc: Northampton County Health Department .Northampton County Soil and Water Conservation District Pat Hooper -Regional Coordinator, Division of Soil and Water Conservation 7L3L-14-1995 15:26 FROM DEM WATER QUALITY SECTION TO RRO P.02/02 Site Requires lmtnediate,Attend P, _ Facility No. m � �" � 1 � G✓ A �hMENT AN�I•N1ADIVISION OF L FEEDLOT OEPERATION.S STI'E VNTAL ISITATION ON RECORD DATE: 7-/,/ , 1995 Time: //°y Farm Name/Owner Mailing Address: ,� �' 3 ° , i 2 `/ County: Integrator. _ _ Phone- ti • 7I c 9 On Site Representative: ?�.r� ✓� ��f �• ^ _ _ _ Phone: Physical Mdressf-ocation: Type of Operation: Swine :'?ouitry Cattle Design Capacity: _ _ /ac v S r Number of Animals on Site. 10', f p DEM Cerd ication Number: ACE DEM Certification Number: ACNEW Latitude: Longitude: ' " Elevation: _-__—_Feet Circle Yes or No Does the Aniinal Waste Lagoon have sufficient freeboard of 1 Foat + 25 year 24 hour storm event (approximately 1 Foot + 7 inches) (.Y or No Acrual Freeboard: , -L-Ft. Inches Was any seepage observed from the lagoon(s)? Yes of:Sq-, Was any erasion observed? Yes o{�tiQ- Is adequate land available for spray or No is the cover crop adequate? 1,Ygs or No Crop(s) being utilized: Does the facility meet SCS ruaimum setback criteria'? 200 Feet from Dwellings2;De or No 100 Feet from Wells? ,,%R or No _�-e animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes orb animal waste land applied or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes or'&T Its animal waste discharges into waters of the state by man-made ditch, flushing system, or usher ;imilas than -made de0ces? Yes orCo If Y- s. Please Explain. "J+M5 tric facility waimain adequate waste Mataagerncrrt records (volumes of manure, land applied. spray irrigated on specific acreage with cover. crop) or No Additional Comments: f.-�_s ... Signature cc: Facility Assessment Unit Use Attachments if Needed. TOTAL P.02 NORTH CAROLINA Department of Environmental Qua r L. jl� Report to: WATER QUALITY SECTION CHAIN OF CUSTODY (COC) RECORD NC DENRIDWQ LABORATORY (check one): I I CENTRAL I I ARO I I WaRO Page J— of For Investigation af: Sample collector (print name) and DM -I forms completed by: �� D Q Sample collector's signature: Field storage conditions and location (when applicable): Lab Use Only LAB NO,. • *. STATION NO. STATION LOCATION DATE SAMPLED TIME SAMPLED NUMBER OF CONTAINERS i i%2 r d/ r 2 (o o�— -7ZG oy 000 �---- K Re • wished (signal r • C Date Z� of Time 3 ec a by (signatu at - ime -�e Relinquished by (signature): Date Time Received by (signature): Date Time Relinquished by (signature): Date Time Received by (signature): Date Time Method of Shipment circle one): State Courier ( in -de i red Federal Ex r ss UP5 Other: Security Type and Conditions: Scaled by: Bro en by: 19 r ",, "MORN 'k i '11 ' �r QAIForms\Sample Receiving%COC form WQ • /1 ' s DIVISION OF WATER QUALITY Chemistry Laboratory Report! Water Quality F] SAMPLF_TYPE COUNTY NORTH HAMPTON PRIORrry RIVER BASIN: AMBIENT 0 QA STREAM X EFFLUENT REPORT TO PRO Regional Office COMPLIANCE KI CHAIN OF CUSTODY LAKE INFLUENT Other EMERGENCY VISIT ID ESTUARY COLLECTOR(S) : B TOWF,LL �7 Estimated ROD Range: Station Location: MURPHY BROWN FARM MI Seed: Chlorinated: Remarks: Slatim # Date Begin (yy/mmfdd) Dale End (yyhnmldd) Time Begin Time End Depth - DM, DB. DBM Vslue Type - A, H. L Composite-T. S, Sample Type MURPHYBROWNDIVERSION 20040726 1045 X BOD 310 65 inglL COD High 340 mg/L COD Low 335 -EJL Coliform: MF Fetal 31616 /loom[ Coliform: MFToial 31504 /loom] Coliform tube Fecal 31615 1100-1 Coliform: f-acal Strep 31673 /IOOml Residue: Total 5W m Volatile 505 mg/L Fixed MO m ResKbue: Suspended 530 mg/L Volatik 535 mrJL Fixed 540 MWL H 403 units Acidity to PH4,5436 MvL Acidity to pH8.3435 mg/L Alkalinity to PH 8.3 415 m Alkalinity to pH4-5410 mg/I, TOC 680 m Turbidity 76 NfU CoHf.ormTotaI Tube '/100 ml COMMENTS: Chloride 940 m Chi a: Tri 32217 u Chi a: Corr 32209 u91L Pbcophyvin a 37213 u Color. True 80 C.U. Color. (EH ) 83 Pjj= C.U. Color. pli 7.6 82 C.d. Cyanide 720 m Fluoride 951 mg/L Formaldehyde 71880 MELI- Crc and Oils556 mg/L Hardness Total900 m Specific Cond. 95 umhoskm2 MBAS 38260 m Phenols 32730 u Sulfate 945 mg(L Sulfide 745 mgfL Baron Tannin & [a mn u Hexavalcm Chromium ug/L Bicarbonate m Carbonate mwL X NH3 as N 610 40 m X TKN an N 625 48 M911, X NO2 plus NO3 as N 630 0.02U mrJL X P: Total as P 665 16 mg/L PO4 as P 70507 m R Dissolved as P 666 mg/L K-Potassium _FJL Cd-Cadmium 1027 u Cr-Chromium:Tolal 1034 u Cu-C r t042 ug/L Ni-Nickel 1057 u Ptr Lcad 1051 ug/L Zn-Zinc 1092 UVIL IV -Vanadium ugAL Ag-Silver 1077 ug/L Al- Aluminum 1105 u Be- Be ilium 1012 ug/L Ca- Calcium 916 m Co Cobalt 1037 ugfL. Fc- Iron t045 v Li -Lithium 1132 ug(L Mg- Mapesium 927 mg)L Mn-Man nest 1055 uFJL Na- Sodium 929 mg/L Arsenic.Toial 1002 uEYL Se -Selenium 1147 ug/L H - Marvry 71900 UVI- Ba-Barium ug/L Organochlorine Pesticides OTamphosphorus Pesticides Acid Herbicides Bas&Neutml&Acid Extractable OTpnics TPH Diesel Range Pwgeable anh:s (VOA bottle 'd) TPH Gasoline Range TPHBTEX Gasoline Range Phytoplankton 1 P lr d (O N fir:,: i� l DIVISION OF ENVIRONMENTAL MANAGEMENT WATER tMAMPLETYPE B FORM (DMI) Cotkm .441%PRIORITY R1VF31 BASIN — [:]AMBIENT ❑ QA ❑ STREAM "EFFLUENT REPORT TO: ARO FRO MRO R WaRO WIRO WSRO TS AT BM ❑COMPLIANCE CHAIN ❑ LAKE ❑ INFLIJENT Other OF CUSTODY Shipped by: Bus Courier, ff Other ❑EMERGENCY ESTUARY COLL£CTORISr ta, Q Estimated BOD Range: 0- -25/25 /40-130 or 100 plus STATION LOCATION: Fnr Ir h Iles AN1 v Lab Number: Date Recelved: Q Time: Rec'd by! From: Bus-Courie Hand eJ% DATA ENTRY BY: CK: DATE REPORTED: 'Pe' Utz- f-y' 0, 4, —f (4 Seed: Yes N Chlorinated: Yes No REMARKS:�r 6 F Lea .sTe c Al �y�, 2(ao .l al f t�zo as . _,'9 at.-C t_ 5tatlon # Date Begin (yy/mm/dd) Time Begin Date End Time End Depth DM DB DBM Value Type Composite Sample T I►'�I:Lr����Lc-ri 0cye'r5' A H G T S B Cf, G 1GNXX 1 DODS 310 mgA 2 COD High 340 mg/I 3 COD Low 5 mg/I 4 Collform: MF Fecal 31616 /100ml 5 Collform: MF Total 31504 /100m1 6 Collform: Tube Fecal 31615 /100ml 7 Coliform: Fecal Strep 31673 /100ml 8 Residue: Total 5W mg/I 9 Volatile 505 mg/1 10 Fixed 510 mg/I 11 Residue: Suspended 530 mg/l 12 Volatile 535 mg/I 13 Fixed 540 mg/I 14 pH 403 units 15 Acidity to pH 4.5 436 mg/I 16 Acidity to pH 8.3 435 mg/1 17 Alkalinity to pH 9.3 415 mgA 18 Alkalinity to pH 4.5 410 mg/I 19 TOC 690 mg/I 20 Turbidity 76 NTU Chloride 940 mg/I Chi a: TO 32217 Itg/1 Chi a: Corr 32209 ugA Pheophytin a 32213 ug/I Color: True 80 Pt -Co Color:(pH ) 83 ADMI Color. pH 7.6 82 ADMI Cyanide 720 mg/I Fluoride 951 mg/I Formaldehyde 71890 mg/1 Grease and Otis 556 mg/I Hardness Total900 mg/1 Specific Cond. 95 uMhoa/cm2 MBAS 38260 mg/1 Phenols 32730 ugA Sulfate 945 mg/I Sulfide 745 mg/1 NH3 as N 610 mg/1 TK. ns N 625 mg/1 02 plus NO3 as N 630 mg/l otal as P 665 mgA PO4 as P 70507 mg/1 P: Dissolved as P 666 m9A Cd-Cadmium 1027 ug/I CrChromlum:Tetai 1034 ogA Cu-Copper 1042 ug/I NMickei 1067 ug/I Pb-Lead 1051 USA Zn-Zinc 1092 ug/I A liver 1077 ng/1 A1-AIuminum 1105 ugA Be -Beryllium 1012 ug/i Ca -Calcium 916 -911 Co -Cobalt 1037 ugA Fe -iron 1045 ugA Li -Lithium 1132 ug/I Mg -Magnesium 927 mg/1 Mn-Manganese 1055 ug/I Na-Sodium 929 mgA Arsenlc:Total 1D02 ug/I Se-Selenlum 1147 ug/I Hg-Mercury 71900 ugA Organochlorine Pesticides Olganophosphorvs Pesticides Acid Herbicides Base/ Neutral Extractable Organics Acid Extractable Organics Purgeable Organics (VOA bottle reg'd) Phytoplankton Sampling Point X Conductance -at 25 CNateIrTemperaturejO D.O. mgA pH AIkaIinity pH 8.3 pH 4.5 Acidity pH 4.5 pH 8.3 Air Temperature fo 2 94 10 1 300 • 400 to 822" 431 82243 182242 20 Salinity % Precipition On/day) Cloud Cover X Wind Direction (Deg) Stream Flow Severity Turbidity Severity Wind Velocity M/H can Stream Depth ft. Stream Width It. 480 46 32 36 1351 1350 35 64 14 CJf r LJ NC DENR/DWO Chemistry Lahnratnry Report to: Sample Anomaly Report (SAR Lab Number: /��_ Sample ID: �Vo `'tion Location: �[J/l� un Regio sample Type: Priority: S.�Q�� Collector- Date collected: c I Ig95G DatSeceived: 7l_�7 I,BSG_ Datte ilalyzed: r� /g72 /d9 Affected Parameter(s): Analytical Area (check one): ❑ WCH ❑ ETALS El NUT MICRO 7S, llowing anomalies occurred (check all that apply): mples ❑ Improper container used ❑ VOA vials with headspace ❑ Sulfide samples with headspace ❑ Samples not received, but listed on fieldsheet ❑ Samples received, but not listed on fieldsheet ❑ Mislabeled as to tests, preservatives, etc. ❑ Holding time expired ❑ Prior to receipt in lab ❑ After receipt in lab ❑ Insufficient quantity for analysis ❑ Sample exhibits gross non -homogeneity ❑ Sample not chemically preserved properly ❑ pH Out of range (record pH): ❑ Improper chemical ❑ Residual chlorine present in sample ❑ Color interference ❑ Heavy emulsion formed during extraction ❑ Sample bottle broken in lab - no reportable res Its c � Other (speci 'a Comments: Corrective Action: ❑ VOA ❑ PEST ❑ SVOA ❑ Quality Control ❑ Instrument failure — no reportable results ❑ Analyst error — no reportable results ❑ Surrogates ❑ None added ❑ Recovery outside acceptance limits ❑ Spike recovery Cl None added ❑ Recovery outside acceptance limits ❑ Failed to meet criteria for precision ❑ Internal standards ❑ Blank contamination ❑ QC data reported outside of controls (i.e. QCS, LCS) ❑ Incorrect procedure used ❑ SOP intentionally modified with QA and Branch Head approval ❑ Invalid instrument calibration ❑ Elevated detection limits due to: Insufficient sample volume ❑ Samples were rejected by DWQ Lab. Authorized by: Date: / 1 ❑ Accepted and analyzed after notifying the collector or contact person and determining that another sample could not be secured. ❑ Sample(s) on hold until: ❑ Sample reported with qualification. Data qualification code used: ❑ Other (explain): Notification Required (circle one)? Yes No Person Contacted: Form 1 Chemist Re w n'tial): - I Bloc H =* ❑ PEST METALS / ❑ VOA Branch Head Review (i ' a tVnV( QA/QC Review { nitial): QA%Fa nmAL&bo nlorylS AA Date: / 1 Date: '? I�I�� ❑ SVOA !7� Logged into database by (initial): IW2310ldbr Oil -1% t-„ DIVISION OF WATER QUALITY Chemistry Laboratory Report / Water Quality lab Number : 4W4586 W�. SAMPLE TYPE Date Received: 7/27I2004 COUNTY NORTH HAMPTON MRTOBIIY Time Received: 9:30AM RIVER BASIN: AMBIENT QA STREAM KI EFFLUENT Received By OS REPORT TO - RRO Regional Office COMPLIANCE 0 CHAIN OF CUSTOUY LAKE ❑ INFLUENT Other EMERGENCY VISIT ID ESTUARY Data Released o AR"'I! COLLECTOR(S) : B TOWEL1 Date Reported : W012004 Estin noted BOD Range: Station Location: MURPHY BROWN FARM # 1 I Seed: Chlorinated: Remarks: Station If Date Begin (yyh.Wdd) Dale End (yy/mm/dd) Time Begin I Time End I Depth • DM, DR, DBM Value Type - A, H, L Composite-T, S, Sample Type MBPARM011 20M726 1100 R BOD 310 320 mg/L. COD High 340 m COD Lnw 335 mg/L Coliform: MF Fecal 31616 /t00mf Coliform: MF Total 31-%9 /I00m1 ColifMm: tube Fecal 31615 /100ml Colifonrc Fecal Strrp 31673 1100mr Residue: Taal 500 m Volatile 505 mg/L Fixed 510 m Residue: Suspended 530 m Volatile 535 m Fixed 540 m H 403 units Acidify to PH 4.5 436 nig/L Acidity to PH 83 435 mSfL AlkaliniQ to PH 8.3 415 MZIL Alkalinity to pH 4.5 410 m TOC 690 mWL Turbidity 76 NTU Coliform Total Tube "1100 ml COMMENTS: Chloride 940 m Chi a: Tri 32217 ug/L Chi a' Corr 32209 ug/L Pheophytin a 32213 uVL Color. True 80 c.u. Coior-f H) 83 pH= CA. Color. PH 7.6 82 Cu. Cyanide 720 mg/L. Fluoride 951 mg/L Formatdch de 71880 m Grease and Oils 556 mg/L Hardness Total 900 M&4- Specific Cond-95 umhWcm2 MBAS 38260 mrJL Phenols 32730 ugtL Sulfate 945 mg/L Sulfide 745 mg1L. Boon Tannin & Li in ug/L Hexavalew Chromium ugJ]- Bicarbanate m Carbonate m X INK3.N610 130 mg/L X TKN an N 623 150 mg1L X NO2 plus NO3 as N 630 0.02U mg/L X P: Total as P 665 50 mg/L P'04 as P 70507 mg/L P: Dissolved as P 666 m K-Potassium m Cd- Cadmium 1027 ug/L, Cr-Chmmium:Totai 1034 u Cu- copper 1042 u Ni-Nickel 1067 ug/L Pb- Lead 1051 u Zar- Zinc 1092 ug/L V-Vanadium u A - Silver 1077 uSIL AI -Aluminum 1105 ug/L Be -Beryllium 1012 ug/L Ca- Calcium 916 In Co- Cobalt 1037 u Fe- ]run rO45 ug/L. Li -Lithium 1132 ug/L M - Magnesium 927 m Mr -Manganese 1055 uglL Na- Sodium 929 mfJL Arsenic:Total 1002 ug/L Se -Selenium 1147 u H - Mercury 71900 upll- Ba-Harium ug/L Or anochlorine Pesticides Organophosphorus Pesticides Acid Herbicides BasdNeulml&Acid Extractable Organics TPH Diesel Range Purgeable anics(VOA bottle read) GasolineRan e H/BTEX Gasoline Range Il ytoplankinn !r t I For Lab Use ONLY DIVISION %Jr r_�NVIRONMENTAL MANAGEM£N7 WAT U Q-LAB FORM MMI) CC�IJmy V 14A1." f PRIORITY SAMPLE TYPE RIVER BASIN e ❑AMBIENT ❑STREAM REPORT TO: ARO FRO MRO RO aRO WiRO WSRO TS PCHAIN� EFFLUENT AT BM ❑COMPLIANCE ❑ LAKE ❑ INFLUENT Other OF CUSTODY ❑ESTUARY Shipped by; Bus Courler to , Other EMERGENCY Lab Number: II�� Date RecelvedP V: Time: Rec'd b ; From: Bus-Couri -Hand Del DATA ENTRY BY: CK: DATE REPORTED: COLLECTORIS): 04) --e/ ( � -P l�'r3 r✓�1V �4� // Estimated SOD Range: 0-5/ -25/ 40-190 or 100 plea STATION LOCATION(_ (.LI' 'iC Seed: Yes 11 No Chlorinated: Yes No Er —REMARKS: _�tt i 5 ~� -Q_ � H [ 2 &P-41le-e- 47 _ 3,q I-n Station # �-'one -Q2 Date Begin (yy/mm/dd) I Time Begin Date End Time End Depth DM DB DBM Value Type Composite Sample Type 0-( . 0 ( i ?� (too QYfQ� f�� _[� F7jJ &ejO�__ I A H L T S 8 C (:D GNXX 1 I 2fT OD5 310 mgA 2 COD High 340 mgA 3 COD Low 25 mg/1 4 Colliorm: MF Fecal 31616 /100ml 5 Colliorm: MF Total 31504 /loom[ 6 Colliorm: Tube Fecal 31615 /100ml 7 Colliorm: Fecal Strep 31673 /100ml 8 1Residue: Total 500 mg/I 9 volatile 505 mg/I 10 Fixed 510 mg/1 1 I Residue: Suspended 530 mg/I 12 Volatile 535 mg/I 13 Fixed 540 mg/l 14 pH 403 units 15 Acidity to pH 4.5 436 mg/l 16 Acidity to pH 8.3 435 mg/1 17 Alkalinity to pH 8.3 415 m9A 18 Alkalinity to pH 4.5 410 mg/1 19 TOC 680 mgA Turbidity 76 NTU Chloride 940 mg/I Chl a: Tri 32217 ug/1 Chi a: Corr 32209 ug/l Pheophytin a 32213 ug/1 Color: True 80 Pt -Co Color:(pH ) 83 ADMI Color: pH 7-6 82 ADM[ Cyanide 720 mg/1 Fluoride 951 mg/I Formaldehyde 71880 mg/t Grease and Oils 556 mgA Hardness Total900 mg/I Specific Cond. 95 uMhos/cm2 MBAS 38260 mg/1 Phenols 32730 ug/l Sulfate 945 mg/1 Sulfide 745 mg/1 IqH3 m2A TKN as N 625 mgA NO2 plus NO3 as N 630 mgA Total as P 665 mgA PO4 as P 70507 mg/I P. Dissolved as P 666 mg/I Cd-Cadmium 1027 ugA CrChromium:Total1034 u9/1 Cu-Copper 1042 ug/1 Ni-Nickel 1067 ug/1 Pb-Lead 1051 ug/1 Zn-Zinc 1092 u9A lArSilver 1077 USA APAIuminum 1105 u11/1 Be-Berylltum 1012 149/1 CaCalclum 916 mg/I Co -Cobalt 1037 ugA Fe -iron 1045 ugA Ll-Llthlum 1132 ugA Mg -Magnesium 927 mgA Mn-Manganese 1055 ug/I Na-Sodium 929 mgA Arsenie Total 1002 ug/l Se-Selenlum 1147 ug/1 Hg-Mercury 71900 ug/I 1Organochlorine Pesticides , 1 Organophc+aphonts Pesticides T� I 1 Acid Herbicides I Base/ Neutral Extractable Organics Acid Extractable Organics Purgeable Organics IVOA bottle reg'd) I Phytoplankton I Sampling Point x Conductance at 25 C Meter Temperature 16 D.D. mgA pH Alkalinity Acidity Air Temperature IC) pH 8.3 pH 4.5 pH 4.5 pH 8.3 2 94 10 300 • 400 1• 82M 431 82243 182242 20 Salinity X Precipition (In/day) Cloud Cover X Wind Direction (peg) Stream Flow Severity Turbidity Severity Wind Velocity M/H Wean Stream Depth ft Stream Width it 490 45 32 36 1351 1350 35 64 4 to: NC D1r.NR/DWQ Chemistry Laboratory Sample Anomaly Report (SAR) Lab Number: Wyl/ r Sample TD:A le e__ ation Location' FA unty: Region: sample Type: Priority: [L Collecttoor: l Date collected: 2_lg?ji l ^P Date received: �Ic7ZI95G Daalyzed: Affected Parameter(s): Analytical Area (check one): ❑ WCH ❑ /4ETALS ❑ NUT Q-40 MICRO •The ff flowing anomalies occurred (check all that apply): Ga' Samples ❑ Improper container used ❑ VOA vials with headspace ❑ Sulfide samples with headspace ❑ Samples not received, but listed on fieldsheet ❑ Samples received, but not listed on fieldsheet ❑ Mislabeled as to tests, preservatives, etc. ❑ Holding time expired ❑ Prior to receipt in lab ❑ After receipt in lab ❑ Insufficient quantity for analysis ❑ Sample exhibits gross non -homogeneity ❑ Sample not chemically preserved properly ❑ pH out of range (record pH): ❑ Improper chemical ❑ Residual chlorine present in sample ❑ Color interference ❑ Heavy emulsion formed during extraction ❑ Sample bottle broken in lab -nno reportable results celo (sP(:c Comments: Corrective Action: ❑ VOA Cl PEST ❑ SVOA ❑ Quality Control ❑ Instrument failure - no reportable results ❑ Analyst error - no reportable results ❑ Surrogates ❑ None added ❑ Recovery outside acceptance limits ❑ Spike recovery ❑ None added ❑ Recovery outside acceptance limits ❑ Failed to meet criteria for precision Cl Internal standards ❑ Blank contamination ❑ QC data reported outside of controls (i.e, QCS, LCS) ❑ Incorrect procedure used ❑ SOP intentionally modified with QA and Branch Head approval ❑ Invalid instrument calibration ❑ Elevated detection limits due to: Insufficient sample volume ❑ Samples were rejected by DWQ Lab. Authorized by: Date: 1 I ❑ Accepted and analyzed after notifying the collector or contact person and determining that another sample could not be secured. ❑ Sample(s) on hold until: ❑ Sample reported with qualification. Data qualification code used: ❑ Other (explain): Notification Required (circle one)? Yes Nye J Person Contacted: / / , / Date I Chemist R ie initial): bBIOCHE ❑ ❑ SVGA METALS ❑ OA Branch Head Review itial): QA/QC Review ( dial): Logged into database by (initial) QA7om %LrburaWrylSAR 1043/O1dbi -7)j z 4;2 J/":;r M m Postage $ a- M Certified Fee � Postmark Return Receipt Fea Hero r. (Endorsement Required) Iru Restricted Deifvery Fee O {Endorsement Required) G E— C3 ATN: MR. WILLLMM KLEIN ,..,,...T.•r,.,r.nr�v�innncvn�rrCUAl7Y Report to: t] WATER QUALITY SE 3N ; r l page --L ol'—L CHAIN OF CUSTODY (CO JRE�CORD �s NC UENR/OWQ LABORATORY (check one): (I CENTRAL I 1 ARO I I WaRO ��'� - -•``�f11 For Investigation of: Sample collector (print name) trs 7-0 tv R I and DM-1 forms completed by: Field storage conditions and location (when applicable): Sample collector'sisignature: a y 1 1L 1� 1 Lab Use Only LAB NO. STATION NO. STATION LOCATION u^ "= !SAMPLED TINI F. SAMPLED NUMBER OF CONTAINERS S �Z 13 Z Gu .17 n i� p • �.,- �n, c� 3 $/ `l /v 3 v 7 1 02 3 `� 0-dds' DS Jt= 5' lr 5 7� 3 23 Oaf lG�/s s"7 rzei ,- �� 5:e u j 5, Q 01-1 J Reli uished by si natu D to Time ec" y ( igna re} ge/ Time R linquished by (signature): Date Time Received by (signature): Time Relinquished by (signature): Date Time Received by (signature): Date Time Method of Shipment circle one): State Courier Hand -delivered Federal Ex ress UPS Other: Security Type and Conditions: Sealed by: Broken by: IN TRA LABORATORY CHAIN OF CUSTODY - Lab Use Only LAB NUMBERS FROM THROUGH NUMBER BOTTLES ANALYSES REQUESTED RELINQUISHED BY: RECEIVED BY: DATE TIME 7 U 3-q 'd/+ q5' 371 4, 4t/�- 5 �r QA\Fonnsl.SamPle Receiving\COC form WQ 4110101 dbs L"r COUNTY NORTH HAMPTON RIVER BASFN : REPORTTO : RRO Regional Orrice Olhrr COLLECTOR(S) : B TOWELL DIVISION OF WATER QUALITY C'hemidry 1-thoratory Report 1 Water Quality PRIORITY AMBIE T El QA El COMPLIANCE El CHAIN OF CUSTODY l EMERGUNCY VISff ID 0 I-� r ) 1 — El � r 1: 1 � STREAM n ir•-r}T•LU �C ' --�� , f � LAKE LNFL J �l ❑ FSTUARY l Lah Numhcr - 4W I274 Da1c Rcs:civcd: - 2004 Time Received: 8:30 AM Received By - DS [n! Utica Released : AR Date Reported: 311g2004 Estimated BOD Range: Station Location: SR 1328 BRIDGE. UPSTRFAM Seed: Chlorinated: Remarks: Station A Date Begin (yylmmldd) Date End (yylm-Vdd) Time Begin Time End Depth - DM, DB, DBM Value Type - A, It, L Compadle-T. S, Sample Type SR 1328DUPSIDE 200i0..W am % BOD 310 29 mffl- COO High 340 m COD Low 335 mrJL Coliform: MF Fecal 31616 /loom) COifpm: MFTolal 31519 110011,11 Coliform: luhe Fecal 31615 1100ml Coliform: Fecal Simp 31673 flooml Residue: Tnt21 SW MPJL Volatile SOS nTiL Heed 510 m - Residue: Sua riled 530 MVL Volatile 535 mfJL Ftscd UO mrJL H 403 units Acidity to pli4.S436 mgfL Acidity to PH83435 mg/l. Alkalinity in pil 8.3415 mrJL Alkalinity in pH4.5410 m TOC 680 moll. ITurbidily 76 WU Coliform Taal Tube '1100 mis COMNIFNIS : Chlnnde WO mgfL Chia: Tn 32217 u Chi a: Core 12.'09 ugA. PhetOyfin a 32213 ug1L Color: True 80 C.U. Color: (fi) 83 PH= C.U. Color: pH 7.6 82 C.U. Cyanide 720 mg11. Flumide 951 mgfL Formatdeh de 71 B80 MVL Grease and Oils 556 mg1L Hardness Tufa19011 mgA. Specific Cond. 95 umhosfem2 MBAS 39260 m9fL Phermis 327.40 uglL Sulfate 945 mFJL Sulfide 745 mgn- Bmmn Tannin & US in ugfL Hesavalem Chromium ug/L Bicartxxiate mgfL Caritmriate MEJL N NIO as N 610 16 mg/L X TKN an N 625 18 mgll_ N 1,102 plus NO3 as N 630 1.4 mgfl. X P: Taal as P 665 1.1 mgfL PO4 as P 70507 mg1L P: Dissnlwd as P 666 m K-Potassium mgfL Cd. Cadmium 1027 ugA, Cr-Chmmivm:Tmla1 t034 ugfL Cu- Copper 1042 uVL Ni-Nickel 1067 UA Pb- Lead [051 ug/L Zn- Zinc 1092 ug/L. V -Vanadium UA A - Silver 1077 uglL Al- Aluminum [ 105 ug/L Be- Beryllium IM2 UgtL Ca- Calcium 916 mgiL Co- Cobalt 1037 ugfL Fe- Iron 1045 uYL U-Uthium 1132 ugfL Mg- Ma ncsium 927 mgA. A!n-Man ancsc ]0.55 ug1L N.- Sodium 929 mg(L Arscriic:Tntal 1002 ugfL Se- Selenium 1147 ug/L. H - Mercury 71900 u Ba_Banum u Or annchlmioe Pesticides ann hms horus Peslicides Acid Hcdiicidcs BaeelNcuiraL& Acid Estivelahie Organic TP14 Diesel Range Pur cahlc O anics (VOA honle rcq'd) TPH Gasoline Range TPWBTCX Gasoline Rage phyioplonlWil DIVISION �IOFENVIRONMENTAL MANAGEMENT WATER COUNTY't/'I/ �" 1 , wl✓T 4�yPRIORITY RjJM BASIN C �� /L_/ _ _ _ REPORT TO: ARO FRO MR RR WaRO WIRO WSRO TS AMBIENT AT BN ❑ COMPLIANCE Other Shipped by: Bus Couurle , S� tall, Other EMERGENCY COLLECTOR(•S): Estimated BOD Range: 0-5/5- /25-65/40-130 r 100 plus STATION LOCATI Seed: Yea ElN Chlorinated: Yes ElN�REMARKS: C LJ STREAM CHAIN ❑ LAKE OF CUSTODY ❑ ESTUARY 413z�� Bf�c>1 4 1:ur Lab Use ONL.1 FORM (DM1) Lab Number: Uujt Date Received: Time: Rec'd by: From: Bu and Del DATA ENTRY BY: CK: DATE REPORTED: EFFLUENT INFLUENT r� �7 . -;yam r17 Station # Date Begin (yy/mm/dd) Time Begin Date End Time End Depth DM DB DBM Value Type Composite Sample Type 5 2 i 3 z j� , J IL 0L i7� (> [� C1 ,3 A H L T S B C G GNXX 1 RODS 310 mgA COD High 340 mgA 2 3 COD Low 335 mg/i Conform: MF Fecal 31616 /100ml 4 5 Collform: MF Total 31504 /100ml 6 Collform: Tube Fecal 31615 /104m1 Collform: Fecal Strep 31673 /100ml 7 S Residue: Total 500 mg/1 _ Volatile 505 mg/f 11 Residue: Suspended 530 mg/I 12 Volatile 535 mg/I 13 Fixed 540 mg/l 14 pH 403 units 15 Acidity to pH 4.5 436 mg/I 16 Acidity to pH 8-3 435 mg/l 17 Alkalinity to pH 8.3 415 mgA 18 Alkalinity to pH 4.5 410 mg/l 19 TOC 660 m9A Turbidity 76 NTU Chloride 940 mg/i Chi a: Trl 32217 ug/l Chi a: Corr 32209 ug/I Pheophytin a 32213 ng/1 Color: True 80 Pt -Co Color:(PK ) 83 ADMI Color: pH 7.6 82 ADMI Cyanide 720 mg/i Fluoride 951 mg/1 Formaldehyde 71880 mg/I Grease and Oils 556 mg/1 Hardness Total900 mg/l Specific Cond. 95 uMhos/cm2 MBAS 38260 mg/l Phenols 32730 ug/1 Sulfate 945 mgA Sulfide 745 mg/I NH3 as N 610 mg/1 N as N 625 mgA 02 plus NO3 as N 630 mg/i Total as P 665 mg/I F04 as P 70507 mg/I P: Dissolved as P 666 mg/I CdCadmium 1027 u9/1 CrChromiuucTotal10M ug/1 Cu-Gopper 1042 u9/1 Ni-Nickel 1067 ugA Pb-Lead 1051 ugA Zn-Zinc 1092 ugA Ag-Silver 1077 USA Al -Aluminum 1105 ag/l Be -Beryllium 1012 ug/l Ca -Calcium 916 mgA Co-Cob'It 1037 ug/I Fe -Iron 1045 ugA Li -Lithium 1I32 ug/1 Mg-Magneslum 927 mgA Mn-Manganese 1055 ug/I Na-Sodium 929 mg/1 Arsenic:Total 1002 u9/1 Se -Selenium 1147 ug/l Hg-Mercury 71900 ug/1 Organochlorine Pesticides Orgasophospiarus Pesticides Acid Herbicides Base/ Neutral Extractable Organics Acid Extractable Organics Purgeable Organics (VOA bottle reg'd) Phymplankton Sampling Point X Conductance at 25 C Water Temperature 10 D.O. mgA PH Alkalinity Acidity Air Temperature (C) pH 8.3 pH 4.5 pH 4.5 pH 9.3 2 94 10 300 • 40D t. 82244 1431 82243 102242 20 Salinity x Precipition On/day) Cloud Cover % Wind Direction (Deg) Stream Flow Severity Turbidity Severity Wind Velocity MM Vlean Stream Depth ft. Stream Width fL 480 45 32 36 1351 1350 35 64 4 DIVISION OF WATER QUALITY f,'hemictry [Alsoratory Report! Water Quality ^`l ..7 !/nf Lah Number : 4W1275 ElOV •ate Recciyetl : 31912t101 COUNTY NORTH HAMPTON PRtOkITY ' `r T"ncRecciveJ: S:30AM RIVER BASIN: AMBIENT QA STREAM /f X g g r -y Received By DS REPORT TO RRO RegionalOffiice COMPLIANCE %� CHAINOFCUSTODY LAKE IN17-UENT i� �g 1� Other _ %� FMrRGENCY VISIT ID ESTUARY �` !f Data Released : AR COLLECTOR(S) : B TOWELL _ Dace Reported: 3118/2004 Estimated DOD Range: Station L ration: DS OF SPILL IN BEAVER POND Seed: Chlorinated: Remarks: Station # Date Begin (yy/mm/ddi (late Find (yyhnm/dd) Time Begin Time End Depth • DM. DR, DRM Value Type - A. It, L Composile•T, S. Sample Type DSBEA V ERPOND 2CM0308 1030 X 13OD 310 27 m COD High 340 mrJL COD L.ow 335 MO. Cohforrn: MF Fecal 31616 / I IX3ml Colifurm' MF Taal 31504 /l0[1mI Coliform: mile Fecal 31615 /100mi Coliform: Fecal Sure 31673 /1(X)Ml Residue: Tntal SOO m Volatile 505 MVIL Fixed 510 m Ruidue: Suspended 530 mgfL Volatile 535 m Fixed 540 mriL H 403 units Acwtuy to PH C5 436 m Aridity to PH 8.3 435 mrJL Alkalinity to PH8.3415 m Alkalinity to pH4.5410 m TOC 680 m Ttubuhiy 76 NTU Cohrorm Taut Tubc '/100 m1. COMMENTS: Chloride 940 m Chi a: Tri 32217 UFJL Chi a: Curt 322109 uefL Phcophylin a 32213 ug/L Color: True 80 c u- Color. (pH) 83 PH= C.U. Color. PH 7.6 82 c_u. Cyanide 720 mg/L Fiur ride 951 mg(L Formaldch de 71880 mg)L Grcasc and ()its 556 mg/L Hardness Total 900 mg/L Specific Cond. 95 umhos/cm2 WAS 38260 mg/L Phenals 32730 UELL Sulfate 945 mg/L Sulfide 745 mg/L Rmun Tannin d Li in v Hexayaknt Chmmium ug/L Bicarbonate '911- Carbonate mg1L X NH3 as N 610 19 m X TKN an N 625 21 m X NO2 plus NO3 as N 630 0.88 MCAL X P: Total as F 665 1.4 mvT- PO4 as P 70507 m P: DissnNed as P 666 MSIL K-Pmassium MVL Cd-Cadmium 1027 u Cr-Chmmium.Tnta1 1034 u Cu- Copper 1042 u Ni-Nickcl 1067 u Pb- Lead 1051 uEj Zn- Zinc 1092 UPIL V-Vanadium u Ag- Silver 1077 u AI- Aluminum 1105 u Be- Beryllium I012 ug/L Ca- Calcium 916 m Ca -Cobalt 1037 uFJL Fe- Imn iO45 ugft- HF—� Li -lithium 1132 uEj Mg. Ma ncsium 927 mEJL Mn-Man anew 1055 ug/L N.- Sndium 929 m Arxenic:Totat IOO2 u ,c-Selenium 1147 uglL Hit- Mercury 71900 ug/L Ra_Banum ug/L Or anochtrsinc Nmicidcs Orfanvphosphorus Pesticides Acid Herbicides BasdNcu1MlAAcid UiractaNe (k anics TPH Diem[ Range Pu cable Organics IVOA bottle 'd) TPH Gawlim Range TPWBTEX Gasoline R.npe Phytopt.nitton DIVISION OF ENVIRONMENTAL MANAGEMENT WAT QUAL - EL FORM (DM1) COUNTY Iy0�� I �1'1 �"��%T FJ PRIORITY PE RiVER'SASIN UCU' ❑AMBIENT ❑ QA rE_FfFLUENT REPORT TO: ARO FRO MR RR WaRO WIRO WSRO TS ❑STREAM LJ AT BM ❑COMPLIANCE CHAIN ❑ LAKE ❑ INFLUENT Other �'OF CUSTODY Shipped by: Bus Courier CStal l ; Other EMERGENCY ESTUARY COLLECTOR(S): �� �O C,/ � � { Estimated BOD Range: 0-5/5- 5-65/40-13 100 plus STATION LOCATIO/N: S h` /fI ✓p�'�e Seed: Yes ❑ N Chlorinated: Yes ❑ No -REMARKS: / L.. Pf Q Cv t�>� Station }� Date Begin (yy/mm/dd) Time Begin Date End Time End Depth DM DB DBM (2s !3 .� v r�a��i 10Y 0 3 o t5 0 Y 0 023 1t) 3 o 1 OD5 310 mg/i COD High 340 mg/I 2 3 COD Low 33S mg/I Collform: MF Fecal 31616 /IOOmI 4 5 CofHorm: MF Total 31504 /100m1 6 Collform: Tube Fecal 31615 /100m1 Collform: Fecal Strep 31673 /100m1 8 Residue: Total 500 mg/I Volatile 505 mg/I 10 Fixed 510 mg/I 11 Residue: Suspended 530 mg/1 12 Volatile 535 mg/1 13 Fixed 540 mg/1 14 pH 403 units 15 Acidity to pH 4.5 436 mg/1 16 Acidity to pH 8.3 435 mg/1 17 Alkalinity to pH 8.3 415 mg/I 18 Alkalinity to pH 4.5 410 mg/1 19 TOC 690 msA -A Turbidity 76 1'Iili Chloride 940 mg/1 Chi a: TO 32217 ug/1 Chi a: Corr 32209 ug/1 Pheophytin a 32213 ug/1 Color: True 80 Pt -Co CoIor:(pH ) 83 ADMI Color: pH 7.6 82 ADMI Cyanide 720 mg/1 Fluoride 951 mg/i Formaldehyde 71880 mg/I Grease and Oils 556 mgA Hardness Total900 mg/1 Specific Cond. 95 uMhos/em2 MBAS 38260 mg/I Phenols 32730 ug/1 Sulfate 945 mgA Sulfide 745 mg/I For Lab Use ONLY Lab Number: Date Received: Time- Rec'd b ; From: Bu and Del Y DATA ENTRY BY: CK: DATE REPORTED: A H L NH3 as N 610 msA TKN as N 625 mg/1 02 plus NO3 as N 630 nrgA otal as P 665 mgA PO4 as P 70507 mgA P: Dissolved as P 666 mg/1 CdCadmium 1027 u9A Cr-Chromlum:Tota11034 u9A CuCopper 1042 ug/1 Ni-Nickel 1067 ugA Pb-Lead 1051 ugA Zn-Zinc 1092 ugA Ag-Silver 1077 u9A Al -Aluminum 1105 ug/1 Be•Beryllium 1012 ug/I Ca -Calcium 916 mg/1 Co -Cobalt 1037 u9A Fe -Iron 1045 uqA Composite Sample T S B C �C G GNXX LI-Lithium 1132 ugA Mg -Magnesium 927 mg/1 Mn-Manganese 1055 ug/l Na-Sodium 929 mgA Arsenic -Total 1002 USA Se -Selenium 1147 ug/1 Hg-Mercury 71900 ug/1 Organochlortne Pesticides Otganophosphoru_s Pesticides Acid Herbicides Base/ Neutral Extractable Organics Acid Extractable Organics Purgeable Organics (VOA bottle reg'd) Phytopiankton Sampling PointX Conductance at 25 C oter Temperature D.O. m9/1 pH Alkalinity Acidity Air Temperature $a pH8.3 PH 4.5 pH 4.5 pH 8.3 2 94 10 300 400 • 82244 431 82243 82242 20 x Precipition On/day) Ckd Coves X Cloud Wind Direction (Deg) Stream Flow Severity Turbidity Severity Wind Velocity M/H can Stream Depth ft. Stream Width ft. 490 45 32 36 1351 1350 35 64 4 r0A1 /rt-4...1 tn/RF • 2 DIVISION OF WATER QUALITY Chemistry Laborulory Report I Water Quality 0 COUNTY NORTH HAMPTON PRIORITY RIVER BASIN: AMBIENT QA STREAM RF,PORTTO RRO Regional Office El COMPLIANCE CHAINOFCUSTODY 13 LAKE Other EMERGENCY VISITID ESTUARY COLLECTOR(S) : B TOW+ELL Lab Numhcr : 4 W 1276 bate Received: 319/2(X)4 Time Received: 8:30 AM Received Hy p5l Data R leased AR Date Reported: 3/1712004 F{fimafed ROD Pynw: Station i.ora[ion: WOODS US OF SPILL ENTRY SITE Seed: Chlorinated: Remarks: Station # Daft Begin (yylmmldd) Dale £nd (yplmrnldd) Time Begin Time End Depth - DM, DR, DRM Value, Type- A, H, L Composite-T, S, Sampfe Type INWOODSDSOFSPILL 20040308 1045 x HOD 310 120 m COD High 340 mEi COD law 331 MfJL Cohfrxm' MF Fecal 31616 / IOOmI Coliform: MFTda131504 /loom[ Coliform: tube Fecal 31615 HOQmI Coliform: Focal 5(mp 31673 1100tn1 Residue: Total 500 m Volatile SO meJL Fixed 510 m Rosiduc: Suspended 5-10 m Volatile 535 m Fixed 540 m H 403 units Acidly to IIH 4.5 436 MFJL Acidit to H 8.3 435 mELL Alkalinity to pli 8.3 415 m Alkalinity to pH 4.5 410 mfJL TOC 680 mg/L Turbidity 76 NTU Colifrxm Total Tube '1100 mis COMMENTS t Chloride 940 mg/L Chi a: Tri 32217 u Chi a: Corr 32209 u Pheophnn a 32213 uglL Color: True 80 C_u_ Color: (li ) 83 PH= C.U. Color: pH 7.6 82 C.U. Cyanide 720 mg/L Fluoride 95I mfJL Formaldeh 71880 mg/L Grease and Oils % m Hardness Total 9W mglL Specifrc Coed. 95 umhosfcm2 MBAS 38260 mg1L Phenols 32730 ug1L Sulfate 945 mWL Sulfide 745 __mpfL Baron Tannin 3 Li nin u flexavalent Chromiom ug/L Bicarbonate mg/L CarMnate mg/L d J / r: u r � EFFLUENT r - C D •, INFLUENT T X r-- z NH3 as N 610 mg/L TKN an N 625 mg/L NO2 plus NO3 as N 630 mg/L P: Total as P 665 mVL PO4 as P 70507 mg/L P: Dissolved as P 666 mgll.. K-Potassium mgfL Cd- Cadmium 1027 ug/L Cr-Chmmium:Total 1034 ug/L Cu-Copper 1042 uglL Ni-Nickel 1067 ugll. Pb- Load 1051 uelL 7,ri- Tnc I092 ug/L V-Vanadium uWL Ag- Silver 1077 ug/L AI- Aluminum 1105 ug/l, Be- Beryllium 1012 uSfL Ca- Calcium 916 mg/L. .-Cobalt 1037 ugfL. Fe- iron 1045 ug/L Li -Lithium 1132 ugIL M - Magnesium 927 nigIL Mn-Man arose 1055 u Na- Sodium 929 myJL Arsenic:TMA 1002 uvL Sc- Selenium 1 147 H - Mercury 71900 uFIL Ba_Hanum uFJL Orgattochlorine Pesticides Organophosphorus Pesticides Acid Hcrtricidcs BasdJNeutraMAcid Extractable organic& TPH Diesel Range Pur eabic Organits {VOA "Ile 'd) TPH Gasoline Range TPH/BTEX Gasoline Range Phyloplankltm DIVISION OF ENVIRONMENTAL MANAGEMENT WATE UALIT EL COUNTY- 1! / / �/7 /t PRIORITY RIVER BASIN Ic — L✓gi REPORT TO: ARO FRO Mn RR WaRO WIRO WSRQ TS ❑AMBIENT QA AT BM ❑COMPLIANCE CHAIN Other �� OF CUSTODY Shipped by: Bus Courier f, Other d 1 emERGENCY COLLECTOR(•S). lr"-L l FORM (DM1) SAMPLE T / STREAM L J AFFLUENT ❑ LAKE ❑ INFLUENT ❑ ESTUARY Estimated BOD Range: O-S/S_25 65/40-13 or 100 plus STATION LOCATION: W f� v�! 1! D os i� S Seed: Yea El NChlorinated: Yes ElNo E2 -'£MARKS: Iy L i / 0 CJi7, For Lab Use ON? V Lab Number: Date Received: C Tim i. Rec'd by: From: B -Hand Del DATA ENTRY BY: CK: DATE REPORTED: l / Q h 4, y S, .1 E '11' 13 / Iq r n , /tp` / / Station Date Begin (yy/mm/dd) Time Begin Date End Time End Depth DM DB DBM Type Composite Sample �r1 WCt_ldy bs OI= S ,/I U` �3 Lf t �! I Ci �3 0 QL Salue �— A H L T S 8 G GN?CX 1 DODS 310 mg/l COD High 340 mg/I 2 3 COD Loa 335 mg/1 Coliform: MF Fecal 31616 /100m1 4 5 Coliform: MF Total 31504 /loom] 6 Coliform: Tube Fecal 31615 /100ml 7 Coliform: Fecal Strep 31673 /100ml 8 Residue: Total 500 mg/l Volatile 505 mg/1 10 Fixed 510 mg/I 11 Residue: Suspended 530 mg/1 12 Volatile 535 mg/1 13 Fixed 540 mg/1 14 pH 403 units 15 Acidity to pH 4-5 436 mg/1 i6 Acidity to pH 8.3 435 mg/l 17 Alkalinity to pH 8.3 415 mg/I Alkalinity to pH 4.5 410 mg/i 19 t20i8 TOC 680 mgA Turbidity 76 NTU Chloride 940 mg/1 Chi a: Trk 32217 ug/I Chi a: Corr 32209 ug/I Pheophytin a 32213 ug/I Color: True 80 Pt -Co Color:(PH ) 83 ADMI Color: pH 7.6 82 ADMI Cyanide 720 mg/l Fluoride 951 mg/1 Formaldehyde 71880 mg/I Grease and Oils 556 mg/l Hardness Total900 mg/I Specific Cond. 95 uMhos/cm2 MBAS 38260 mg/1 Phenols 32730 ug/i Sulfate 945 mg/l Sulfide 745 mg/l NH3 as N 610 mgA TKN as N 625 mgA NO2 plus NO3 as N 630 m9A P. Total as P 665 mg/I PO4 as p 70507 mgA P Dissolved as P 666 mgA Cd- Cadmium I027 ugA Cr-Chromium:TotalI034 USA Cu-Copper I042 ug/i Ni-Nickel 1067 ugA Pb-Lead 1051 ugA Zrr-Zinc 1092 ug/I Ag-Silver I077 ugA Al -Aluminum 1I05 ug/I Be -Beryllium 1012 ug/I Ca -Calcium 916 m9/1 Co -Cobalt 1037 ug/I Fe -Iron 1045 ugA Li -Lithium 1132 ug/I Mg -Magnesium 927 mg/I Mn-Manganese 1055 ug/I Na-Sodium 929 mg/1 Arsenic:Total 1002 ug/l Se -Selenium 1147 ug/I Hg-Mercury 71900 ug/1 Organochlorine Pesticides Organophosphorus Pesticides Acid Herbicides Base/ Neutral Extractable Organics Acid Extractable Organics Purgeable Organics (VOA bottle reg'd) Phytoplankton Sampling Point % Conductance at 25 C Water Temperature D.O. mg/l PH Alkalinity Acidity Air Temperature 00 pH 8.3 pH 4.5 pH 4.5 pH 8.3 2 94 10 300 1 400 t• 82244 431 82243 182242 20 Salinity S Precipition (in/day) Cloud Cover A Wind Direction (Deg) Stream Flow Severity Turbidity Severity Wind Velocity M/H Mean Stream Depth ft. Stream Width ft. 480 45 32 36 1351 1350 35 64 4 DIVISION OF WATER QUALITY r l,Tremistry lAboralory Report! Water Quafity ----� _ i.�,r'-� l.abNumhcr 4WE278 - i! Date Received: 3/9/2004 COUNTY - NORTH HAMPTON PkIORITY {'� J Time Reetiyed : 8:30 AM RIVER BASIN: AMBIENT ❑ QA El STREAM X�EFFLUENT _ 7 RmcivcdByqD ll Q ��REPORT TO RRO Regi—alO(fice COMPLIANCE 19 CHAIN OF CUSTODY LAKE INFLUENT !-_--.1p Other EMERGCNCY VISIT In ESTUARY ___,i Data kaxd COLI,ECTOR(S) B TOWELL lam, rL f, --�✓I Date Reported : 3117/2004 R'l'f Estimated BOD Range: Station I-ocalion: SPILL SfTE MB HOG FARM pl I Seed: Chlorinated: Remarks: Statlon a Date Begin (yy/mmldd) Dale End (yy/mtWdd) Time Begin Time End I Depth - Dh7, DB, DB%I Value Type - A, H, L Composite-T, S, 1 Sample Type SPrf.L.SCCE 2OD401OR 1130 X BOD 310 2300 mrjL COD High 340 mg/L COD Low 335 mgfL Codif� MF Fecal 31616 /I00m1 Coliform: MF Taal 31-W 1100ml Coliform: tube Fecal 31615 1l0(lmr Coliform: Fecal Sirep 31673 /IOOmr Residue: Taal 500 m Volatile 505 mVL Fzcd 510 rjL Residtr neled 531) m Volatile 535 mFIL Fi sed 540 m fl 403 units Acidity In pH 4.5 436 mvL Acidity to pit 9.3 435 m Alkalinity to H 8-3 4I5 -rA- Alkalinity to pFf4.3410 m TOC 680 mvL Turbidity 76 NTU Cobform Total Tube -/100 ml. COAIAILXTS Chlondc 940 m Chl'a: Tri 32217 uglL Chl a: Corr 32209 Pt"y;in a 32213 u Color. True 80 C.U. Color. (PH ) 83 II= C.U. Colm: PH 7.6 82 c.u. Cyanide 720 mgJL Fkk idc 951 MCA - Formaldehyde 71890 mFA- Grease and Oils 5..% mg/L Hardness Tnwl9tM1 m Spccific CFud. 95 umhus/cm2 MRAS 38260 m - Phenola 32730 u Sulfate 945 mgA, Sulfide 745 mrfL Boron Tannin & LU nin u Hcsayaknt Chromium u9fL Bicarbonate inglL Carbonate -FJL NH3 as N 610 mgA_ TKN an N 625 m NO2 plus NO3 as N 630 mg/L P: Tmal as P 665 mg/L PO4 as P 70507 mglL P_ Dissolved as P 666 mg/L K-Potassium me,/L. Cd- Cadmium 1027 ug/L Cr-Chmmium:Tmal ]034 ug/L Cu- Coppc, 1012 ug/L Ni-Nicket 1067 u Pi} Lead 1051 ug/L 7— Zinc 1092 ugA- V-Vanadium ug/L Ag-Silver 1077 ug/L Al- Aluminum 1905 utJL Bc- Beryllium d012 ug/L. Ca- Calcium 916 mg/L Co- Cobalt 1037 ugA. Fc- iron 1045 ur/L Li -Lithium 1132 u M - Magnesium 927 mrJL Mn-Mangarcse 1055 upA, Na- Sodium 929 mrJL Atsenic:Total 1002 uFJL Sc- Selenium 1147 ug/L H - Mercury 71900 ugIL Ba_Barium Organoehlotine Pesocides Organ . phsxus Prmicides Acid Herbicides BawfNeut-I&Acld Estmctahlc Orgamcs MI Diesel Range PuFycabir OrIzzamcs(VOAhmtk 'd) TPH Gasoline Range TPH/BTEX Gasoline Range Ph o lanktno DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY FIELD -LAB FORM (DM1) _ /!/ o r� /J '^�J-4 COUrd^IT PRIORITY SAMPLE TYPE RIVER BASIN &-/�} ❑AMBIENT STREAM TO: ARO FRO MRO RRO WaRO WIROWSRO TSAT A ,�1 EFFLUENTREPORT 8M Other O PLIANCE &CHAIN OF CUSTODY ❑ LAKE ❑ INFLUENT Fnr I_ab rl— ON1 V Lab Number:WUJ / Date Received: C Time-( Rec'd by-, From: Bus-Courie and Del DATA ENTRY BY: CK: DATE REPORTED: Shipped by: Bus Courier, tat Other/ EMERGENCY ❑ ESTUARY COLLECTOR(S): /� / _EaHmated BOD Range: 0-5/5-25/25-65/ -130 �1100plusSTATION LOCATION:-5 t /� S %� 13 /Al6 h9rrI-` �I- �� 1 Seed: yes ❑ No JQ Chlorinated: Yes ❑ No l� '�EMARICS: ---��� r µFr Station # S./P/ 11 s,1g_ )ale Begin (yy/mm/dd) Time Begin Date End Time End Depth DM DB DBM Value Type �/ _i v C1x 1 li3 1 {)� %� (} a H L 2 COD High 340 mg/1 3 COD Low 335 mg/l 4 Coliform: MF Fecal 31616 /100mi 5 Coliform: MF Total 31504 /I00ml 6 Coliform: Tube Fecal 31615 /100ml 7 Coliform: Fecal Strep 31673 /100ml 8 Residue: Total500 mg/1 9 Volatile 505 mg/I 10 Fixed 510 mg/1 11 Residue: Suspended 530 mg/l 12 Volatile 535 mg/1 13 Fixed $40 mg/I 14 PH 403 units 15 Acidity to PH 4.5 436 mg/l 16 Acidity to PH 8.3 435 mg/1 17 Alkalinity to pH 8.3 415 mg/l 18 Alkalinity to pH 4.5 410 mg/1 19 TOC 680 mg/l __ Turbidity 76 NTU Chloride 940 mg/1 Chi a: Tri 322I7 ug/1 Chi a: Corr 32209 ug/l Pheophytin a 32213 ug/1 Color: True 80 Pt -Co Color:(pH J 83 ADMI Color: pH 7.6 82 ADMI Cyanide 720 mg/1 Fluoride 951 mg/l Formaldehyde 71880 mg/l Grease and 011s 556 mg/1 Hardness Total900 mg/I Specific Cond. 95 uMhos/cm2 MBAS 38260 mg/I Phenols 32730 ug/I Sulfate %S mg/1 Sulfide 745 mg/1 NH3 as N 610 m9A TKN as N 625 mg/1 NO2 plus NO3 as N 630 mgA P: Total as P 665 mg/1 PO4 as P 70507 mg/l P. Dissolved as P 666 m9A CA -Cadmium 1027 ugA CrChrondun%Total1034 ug/1 Cu-Capper 1042 ug/1 Ni-Nickel 1067 ug/l Pb-Lead 1051 u9A Zn-Zlnc 1092 ugA AgSllver 1077 ug/1 AI Aluminum 1105 ug/1 Be -Beryllium 1012 ug/1 Ca -Calcium 916 m9A Co -Cobalt 1037 ug/I Fedron 1045 u9A Composite Sample Type T S B GNXX Li -Lithium 1132 ug/1 Mg -Magnesium 927 mg/I Mn-Manganese 1055 ug/I Na-Sodlum 929 mgA Arsenic -Total 1002 ug/1 Se -Selenium 1147 ug/l Hg-Mercury 71900 ug/I Organochlorine Pesticides Organophosphorus Pesticides Acid Herbicides Base/ Neutral Extractable Organics Acid Extractable Organics Purgeable Organics (VOA bottle reg'd) Phytoplankton Sampling Point 7L Conductance at 25 Water Temperature D.O. mgA PH Alkalinity Acidity Air Temperature (C) PH 83 PH 4.5 pH 4.5 pH 8.3 2 94 10 300 • 400 • 82244 431 82243 82242 20 Salinity % Preclpitlon On/day) Cloud Cover x Wind Direction Meg) tream Flow Severity Turbidity Severity W Ind Velocity M/H can Stream Depth it Stream Width It 480 45 32 36 1351 1350 35 64 4 1 a•_ '_ 1 \ A DIVISION OF WATFR QUALITY Chemistry [Abornlory Report 115'ater Quality v 0 SAIMpl FTYMi \G 'Number : Received: 4 W I277 3I9r20Ut ,• \ �E3 COUNTY RIVER BASIN. NORTH HAMPTON PRIORITY AMBIENT Q A EFFLU X❑ STREAM ^ �E" - tme Received By g. 30 AM DS r+ J ecewcdved- REPORT TO RRO Rcgiwal Office COMPLIANCE CHAIN OF CUSTODY LAKE ' ("� ' ❑ IN -UENT ,• G^ , r) } n Other - X❑ EMERGENCY VISIT ID ESTUARY �� !� Data .,leased : AR COLLECTOR(S) : B TOWE11 Date Reponed : 3/18/2004 v \ Estimated BOD Range: Station I. Galion: IfPSTRFAM OF SPIV �\ Seed: Chlorinated: Remark.,: - Stall- 1 Dale Begin (yylmm/ddi Date End iyylmm7dd) Time Begin Time End Depth - DM, DR, DRRI Value Type - A, F1.1, Camposile-T, S, Sample Type UPSTREA "PILL 20040.308 I300 BOD 314 mgJL COD Hi h 340 m COD Low 335 m Cotifarm: MF Fecal 31616 WOW Coliform: MFTotal 31-W 1100ml Cdiform: tube Fecal 31615 Itooml Cotifornt; Fecal St 31673 II(x1mr Residue: Tdal 5W mrJL Volatile 505 mrjL Fixed 510 mVL .Residue: Suspended 530 mgJL Volatile 535 m Fixed 540 m H 403 units Acidity to pH 4.5 436 -VIL Acidit to li g.3 d35 m Alkalinity to H 8.3 415 mglL Alkalind to H 4.5 410 m TOC 680 mglL Turbidil 76 NTU Cohrorm Taal Tube "1100 mis COMMENTS: Chloride 940 Chi a: Tri 32217 u Chi a: Corr 32209 ugfL Pheophyl.. a 32213 uEJL Color. True 90 c.u. Color. (pH) 83 PH= c.u. Color: PEJ 7.6 82 C.U. C snide 720 Fluoride 951 FnrmAdehyde 71890 Grease and Oils 556 mgA. Hardness Total 900 m . Specific Cond. 95 umho.4cm2 MBAS 38260 m - Pltcads 32730 uglL. Sutfale 945 m Sulfide 745 m Balm Tannin & Li nin IS Hctavalcnt Chmmium ug1[. Bicarbonate Carbonate m X NH3asN610 0.07 m X TKN an N 625 0.35 m X NO2 plus NO3 as N 630 1-3 mgA. X P: Taal as P 665 0.03 m - P4t as P 70.507 P: Dissolved as P 666 mg/L K-Po4acium mgfr. Cd- Cadmium 1027 u C,Chmmium:Total t034 u Cu-C Per I(W2 u Ni-Nickcl 1067 uglL Pb- Lc d 1051 ug/L. Zn- Zinc 1092 u V-Vanadium ug/L. A - Silver 1077 u AI- Aluminum 1105 ug! Be. Beryllium 1012 ug)L Ca- Calcium 9t6 in Co- Cnhdt 1037 uglL. Fe- iron 1015 u Li -Lithium 1132 u Mg- Ma noaium 927 mgfL Mn-Man arose 1055 urJL Na- Sodium 929 m Arscaic Total 1002 u Sc- Selenium 1147 uriL FI - Mcrcury 71%0 u Ba_Barium u annchlorine Pesticides OrgivicipticKfilwieus Pesticides Acid Herbicides BaccINCU[ml &Acid Extractable Organics TPH Diesel Range PuTgcable,Or anics(VOAbook 'd) 7PH Gasoline Rangc TPHIBTEX Gasoline Ranee Ph o lanklm DIVISION OF ENVIRONMENTAL MANAGEMENT WATER C1T FORM (DM;EFF i COUN Y- n�f�,(��_ PRIORITY RIVER BASIN t" REPORT TO: ARO FR R MRRO WaRO WIRO WSRO TS ❑AMBIENT STREAMLUENT AT BM ❑ COMPLIANCE 6CHAIN ❑ LAKE ❑ INFLUENT Other f OF CUSTODY Shipped by: But Courler, of . Other EMERGENCY ❑ESTUARY Estimated ROD Range: 0-5/5-2 /25-65/40.130 or 100 plus STATION LOCATION: v`S 101f �• , r 51 ' Seed: Yes ❑ NIrf Chlorinated: Yea ❑ No LJ REMARKS: C Station # jDate Begin (yy/mm/dd) I Time Begin I Date End ITIme End Depth DM DB DBM )Sfre4,,A 0Fsyi ( � o? j r,(� 1 BOD5 310 mg/I 2 COD High 340 m2A 3 COD Low 335 mg/1 4 Coliform: MF Fecal 31616 /100ml 5 Collform: MF Total 31504 /100ml 6 Coliform: Tube Fecal 31615 /100m1 7 Collform: Fecal Strep 31673 /100ml S Residue: Total 500 m9/1 Volatile 505 mg/l 10 Fixed 510 mg/1 11 Residue: Suspended 530 mg/l 12 Volatile 535 mg/1 13 Fixed 540 mg/1 14 PH 403 units 15 Acidity to PH 4.5 436 mg/1 16 Acidity to pH 8.3 435 mg/I 17 Alkalinity to pH 8-3 415 mgA 16 Alkalinity to pH 4.5 410 mg/l 19 TOC 690 mg/l 20 Turbidity 76 NTU Chloride 940 mg/l Chi a: TO 32217 ug/1 Chi a: Corr 32209 ug/I Pheophytin a 32213 ug/i Color: True 80 Pt -Co Color -(PH ) 83 ADM[ Color. pH 7.6 82 ADMI Cyanide 720 mg/l Fluoride 951 mg/1 Formaldehyde 71880 mg/I Grease and Oils 556 mg/1 Hardness Total900 mg/l Specific Cond. 95 uMhos/cm2 MBAS 38260 mg/l Phenols 32730 ug/I Sulfate 945 mg/1 Sulfide 745 mg/l Lab Number: Date Received! U Time: Rec'd b From: Bus -Hand De DATA ENTRY BY: CK: DATE REPORTED: ue type A H L NH3 as N 610 m9A TKN as N 625 mgA NO2 plus NO3 as N 630 mg/1 Total as P 665 mg/l PO4 as P 70507 mg/I P: Dissolved as P 666 mg/1 CdCadmfum 1027 ugA Cr-Chromlum:Total1034 ugA Cu-Copper 1042 ug/l Nl-Nickel 1067 USA Pb-Lead 1051 ug/I Zn•Zinc 1092 ugA A ilver 1077 ug/I AI -Aluminum 1105 og/1 Be -Beryllium 1012 ug/i Ca -Calcium 916 mgA Co -Cobalt 1037 ug/l Fe -Iron 1045 ug/1 Composite Sample T e T S R C G GNXX LI-Lithium 1132 usA Mg -Magnesium 927 mg/l Mn-Manganese ]L055 ng/I Na-Sodlum 929 mgA ArsenicTotai 1002 ug/1 Se -Selenium 1147 ug/I Hg-Mercury 71900 ugA Organochlorine Pesticides Organoplmsphortu Pesticides Acid Herbicides - Base/ Neutral Extractable Organics Acid Extractable Organics Purgeable Organics (VOA bottle reg'd) Phytoplankton Sampling Point % Conductance at 25 C Water Tempemtun D.O. mgA PH Alkalinity 1 Acidity Air Temperature JO pH 8.3 PH 4.5 pH 4.5 pH 8.3 2 194 10 300 t 400 1 . 82244 431 82243 182242 20 Salinity x Precipitlon On/day) Cloud Cover >< Wind DirectionOeg) Stream Hour Severity Turbidity Severity Wind Velocity M/H Mean Stream Depth ft Stream Width ft. 480 45 32 36 1351 1350 35 64 4 AVW DIVISION OF WATER QUALITY ChemistryLaboratory Report f Water Quality tj IL, Lab Nu 1414WI276 SAMPIFTYPF REt v 319f2004 COUNTY NORTH HAMPTON PRIORITY 8:30 AM RIVER BASIN: AMBIENT QA El STREAM X Rocei,,&d B, 7 PS REPORT TO - RPO Regional Office COMPLIANCE CHAIN OF CUSTODY LAKE F-1 174FLUENT EMERGENCY "SIT ID ESTUARY Dana COLLECTOR(S) B TOW]ML Date Reported: 3/2512004 Estimated BOO Range: Station Location: WOODS DS OF SPILL ENTRY SITE Seed; Chlorinated: RenuuU-. nation # Date Begin (yylmtWdd) Date End (y3dutzintildl Time &On Time End Depth - DM, DB, DBM Value Type - A, H, L Cornpodte-T, S, Sample rNWOODSDSOF SPELL 20040308 1 1045 1 1 1 1 1 K BOD 310 120 mgfL COD High 340 mg/L COD 1-ow 335 mg/L Colifom: MF Fecal 31616 1100ml CoTiform: MYToud 31504 1100ml Coliforim: tube Feral 31615 /10DITIL Cofiforar Focal Strep 31673 (loom[ Residue: Total 500 mg/L Volatile 505 mg/L Fixed 310 mg/L Residue: Suspended 530 rn&/t Volatile 535 mg/L Fixed 540 -9/1, pH 403 units Acidity to pH 4.5 436 mg/L Acidity to pH 8-3 435 MPJL Alkalinity to pH 83 415 mg/L Alkalinity in pH 4-5 4 10 -myt TDC 68D mg/L Turbidity 76 NTU lColiform Total Tube "1100 rnl! I 70NVAENTS.- Li -Lithium 1132 ug/L Mg- Magnesium 927 mg/L Mn-Mangimmic 1055 uFJL Na- Sodium 929 mg/L Ari;enic.'Total 1002 U91L Sc- Selenium 1147 ug/l, Hg- Mercury 71900 ugAL lEaLBariunt ug/L Ogariochlomc Pesticides Organophosphorus Pesticides Acid Herbicides B&w./Nieutral&Acid Exuactable Organics TPH Diesel Range 1 Purgeabie Orgamcs (VOA battle req'd) TPH Gasoline Range TPH/BTEX Gasoline Range Phroplanktoo n,IVISION OF ENVIRONMENTAL MANAGEMENT WATE UALIT EL - COUNTY J� rn/ /� / {J✓ 1 PRIORITY RIVER BASIN ` z-L-r2L✓g/? _ _ REPORT TO: ARO FRO MR RR WaRO W]RO WSRO TS ❑AMBIENT �7 QA AT BM ❑ COMPLIANCE )Q CHAIN Other OF CUSTODY Shipped by: Bus Courier f, Other EIdERGENCY Estimated BOD Range: 0-5/5- 25f5/40-1 or 100 plus �STATION LOCATION: W (j� Seed: Yes ElN Chlorinated: Yes El No L? -KEMARKS: C /L) rORM (DM1) SAMPLE Wwa STREAM 0EFFLUENf ❑ LAKE ❑ MWENT ❑ ESTUARY r— lah rte. nm V Lab Number: LfW '♦ Date Received:. //�� q TIm ^ Rec'd b : From: B -Hand Del DATA ENTRY BY: CK: DATE REPORTED: Ds o F // Q h 4,-,, 54,4 Q &1 13 /.,3 / / - Station , Date Begin (yy/mm/dd) Time Begin Date End Time End Depth DM DB DBM Value Type Composite ds �1S Q f` S +11 CIS U l 0 t Jr U d3 4 �Ll A H L T S B ra.ple G GNXX 1 5005 310 miVl 2 COD High 340 mgA 3 COD Low 335 mg/l 4 Coliform: MF Fecal 31616 /loom] 5 Coliform: I4F Total 31504 /loom[ 6 Coliform: Tube Fecal 31615 /100m1 7 Coliform: Fecal Strep 31673 /100m1 8 Residue: Total 500 mg/1 9 Volatile 505 In 10 Fixed 510 mgA 11 Residue: Suspended 530 mg/l 12 Volatile 535 mgA 13 Fixed $40 mg/l 14 pH 403 units 15 Acidity to pH 45 436 mgA 16 Acidity to pH 8.3 435 mg/l 17 Alkalinity to pH 8.3 415 mg/l 18 Alkalinity to pH 4.5 410 mg/l 19 TOC 600 man 201 Turbidity 76 NTU Chloride 940 mgA Chi a: TO 32217 ug/I Chi a: Corr 32209 USA Pheophytin a 32213 ug/l Color_ True 80 Pt -Co Color:(pH ) 83 ADM[ Color. pH 7.6 82 ADMI Cyanide 720 mg/l Fluoride 951 mg/1 Formaldehyde 71880 mg/l Grease and Oils 556 mg/l Hardness Total900 mg/1 Specific Cond. 95 Umhos/cm2 MBAS 38260 mg/1 Phenols 32730 USA Sulfate 945 105/1 Sulfide 745 mg/1 NH3 as N 610 mg/1 TIN as N 625 mg/I NO2 plus NO3 as N 630 mg/l Ir: Total as P 665 mgA PO4 as P 70507 mg/I P: Dissolved as P 666 mg/l Cd-Cadmium 1027 "A CrChrornium:Totai 10M ug/1 GuCopper 1042 ng/l Ni-Nickel 1067 ug/1 Pb-Lead 1051 ugA ZrrZinc 1092 ug/1 Ag-Silver 1077 agA AI -Aluminum 1105 ugA Be-Bery0ium 1012 ug/l Ca -Calcium 916 m9/1 Co -Cobalt 1037 ugA Fe -iron 1045 ugA Li-Lithlum 1132 ugA MgaMagnestum 927 mg/1 Mn-Manganese 1055 ug/I Na-Sodium 929 mgA Arsenic -Total 1002 ugA Se -Selenium 1147 u9A Hg-Mercury 71900 ugA Organochlortne Pesticides Organophosphonts Pestickles Acid Herbicides Base/ Neutral Extractable Organics Acid Extractable Organics Purgeable Organics (VOA bottle reg'd) Phytoplankton Sampling Point X Conductance at 25 C LVater Temi;maene 10 D.O. m9/1 pH Alkalinity Acidity Air Temperature (G pH 83 pH 4.5 pH 4.5 pH 8.3 2 94 10 300 1. 400 is 82244 431 92243 182242 20 Salinity X Precipition On/day) Cloud Cover X Wind Dhec&m Deg) Stream Flow Severity Turbidity Severity Wind Velocity M/H can Stream Depth ft. Stream Width ft. 480 45 132 136 11351 1350 g5 64 4 rust rtr..,r...t tnnu to: NC DENRIDWQ Chemistry Laboratory Sample Anomaly Report (SAR) Lab Number: Sample [D:. ;&�-,- Station Location: County:r� Region: jample Type: '�'�:� Priority: CollectorOf ir7 r Date collected: -/—� l� Date received:_I Date analyzed: Affected Parameter(s): _ �� IZ414e Analytical Area (check one): ❑ WCH ❑ METALS ❑ NUT DO MICRO T%'niples flowing anomalies occurred (check all that apply): ❑ Improper container used ❑ VOA vials with headspace ❑ Sulfide samples with headspace ❑ Samples not received, but listed on fieldsheet ❑ Samples received, but not listed on fieldshcct Cl Mislabeled as to tests, preservatives, etc. ❑ Holding time expired ❑ Prior to receipt in lab ❑ After receipt in lab Cl Insufficient quantity for analysis ❑ Sample exhibits gross non -homogeneity ❑ Sample not chemically preserved properly ❑ pH out of range (record pH): ❑ Improper chemical ❑ Residual chlorine present in sample ❑ Color interference ❑ Heavy emulsion formed during extraction ❑ Sample bottle broken in lab - no reportable re: 6/Other (soeciffw—.%o7/ Comments: Corrective Action: ❑ VOA ❑ PEST 0 ❑ SVOA Quality Control ❑ Instrument failure — no reportable results ❑ Analyst error — no reportable results ❑ Surrogates ❑ None added ❑ Recovery outside acccptance limits ❑ Spike recovery ❑ None added ❑ Recovery outside acceptance limits ❑ Failed to meet criteria for precision ❑ internal standards ❑ Blank contamination ❑ QC data reported outside of controls (i.e. QCS, LCS) ❑ Incorrect procedure used ❑ SOP intentionally modified with QA and Branch Head approval ❑ Invalid instrument calibration ❑ Elevated detection limits due to: ❑ , Insufficient sample volume ❑ Samples were rejected by DWQ Lab. Authorized by: Date: / 1 ❑ Accepted and analyzed after notifying the collector or contact person and determining that another sample could not be secured. ❑ Sample(s) on hold until: ❑ Sample reported with qualification. Data qualification code used: ❑ Other (explain): Notification Required (circle one)? Yes No �J Person Contacted: �� // Date: �. Chemist Revie v initial): ❑ SVOA BIOCHE `❑ PEST ❑ METALS ❑ VOA Branch Head Review (initi QA/QC Review (initi 1): Logged into database by (i QATonnALaborauryLSAR IM , ldbr /, DIVISION OF WATER QUALITY Chemistry i-6orawry Report! water Quali3y Lab Number : 4W I278 CAMU.R TYPF Date Received: 319f2004 COUNTY - NORTH HAMPTON PRIORITY Time Received: 9:30 AM RIVER BASIN : AMBIENT QA STREAM X�EFFI_UF14T Received By DS REPORT TO RRO Regional Office COMPLIANCE CHAIN OF CUSTODY El LAKE RNIFLUENT n Other _ EMERGENCY VISIT ID ESTUARY Data R AR COLLECTOR(S) : BTOWELL Dale Reported: 32512004 Estimated DOD Range: Station L. tion: SPILL SITE RIB HOG FARM 81 I Seed: Chlorinated: Remarks:IVA?cation 7.1L 0 Date Degin (yy/rmoldd) Dale End (yy/rruoldd) T1nre Begin Time End Depth - DM, DB, DBMValue Type- A, H, L Compasite-T, S,ipTLCS1TE 2OW308 I E30 K BOD 310 2300 mg/LCOD High 340 mCOD Low 335 myjL Coliform: MT Fecal31616 /loom] Coliform: MFTotal 3I504 /100m1 CD[iform: tube Fecal 31615 /loond Coliform: Feral Snep 31673 /lo0ml Residue- Tote! 500 mVolatile 505 mg/L Fixed 510 mg/L Rcsidue, Suspended 530 mVolatile 535 mg1L Fixed 540 mH 403 units Aridity to 4-5 436 mg/L Acidity to pH 8-3 435 mg/L Alkalinity to pH 11 3 415 mAlkalinity to H 4-5 410 mTOC 690 mg/L Turbidity 76 NI'U Coliform Total Tube V100 ml COMMENTS r hloride 94o mg/LChi a: Tri 32217 uglLChla:Corr 32209 uPheophytin a 32213 uglL Colo,. True 80 C.U. Color- (H ) 83 pH= C.u. Cola,- pH 7.6 82 c.aCyanide 720 tnglL Fluoride 951 mFormaldehyde 71980 mg/L Grease and Oils 556 mg/4Hardness Total 900 -VXSpecific Cond- 95 umhos/cm2 MBA$ 38260 mPhawk 32730 ug/L Sulfate 945 mg/L Sulfide 745 mgJLBoronTannin & Lignin ugILHexavalentChromium ugILBicarbonate mg/L Carbonate mwL NH3as N610 mTKNanN625 mg/LN02 plus NO3 as N 630 mg/L P: Total as P 665 mPO4 as P 70507 mg1L PDissolved as P 666 mg& K-Potassium mCd-Cadmium 1027 ug/L Cr-Chmmium:Total 1034 UVLCu- C 1042 ug/LNi-Nickel 1067 ug/LPb- Lead 1051 uZn- Zinc 1092 ug/L V-Vanadium ag/L.Ag- Silver 1077AI- Aluminum 1I05 ug/L Be -Beryllium 1012 ug/L Ca- Calcium 916 mg/L Co- Cobalt 1037 ug/L Fe- Iron 1045 uFJL Li -Lithium 1132 Mg- Magnesium 927 Mn-Manganese 1055 u Na- Sodium 929 m Atsenic:ToW 1002 u Se -Selenium 1147 uVL Hg- Mercury 71900 uWL Ba_Barium USIL Organochlorine Pesticides Cirganoompharus Pesticides Acid Herbicides BasdNmtml&Acid Extractable Or2mcs TPH Diesel Range PurgeSible Organics (VOA baale mq'd) TPH Gasoline Range TPHIBTEX Gasoline Ran Phytoplankton For Lab Use ONLY DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY FIELD -LAB FORM tDMI) 'r / r COUNTY 11/ 1) � � ^" �� PRIORITY SAMPLE TYPE T RiVF3t BASIN C d2 l^ /14 r✓ ❑AMBIENT ❑C LIANCE vvEMERGENCY ❑ QA CHAIN OF CUSTODY ❑ STREAM ❑LAKE ❑ ESTUARY EFFLUENT ❑ 94FLUENT REPORT TO: ARO FRO MRO RRO WaRO WiRO WSRO TS AT BM Other Shipped by: Bus Courier, tat Other Lab Namber: Ito Date Received: Time: Ree'd b From: Bus-Couri and not DATA ENTRY BY: CK: DATE REPORTED: COLLECTORS) l �� e ( f _ Estimated BOD Range: 0-5l5-25/25�5/ 130 or 100 pins STATION LOCATION:.5 1 � l s e- m U Ho 6 'I rr l Seed: Yes ❑ No Chlorinated: Yes ❑ No U REMARKS: u f S� - F/,r Station 7•! )ate Begin (yy/mm/dd) Time Begin I Date End y 1l .0 I/.3 P 16 Y. 03 1 i ---- --- — COD High 340 mg/l 2 3 COD Low 335 mg/l Coliform: MF Fecal 31616 /100ml 4 5 Coliform: MY Total 31504 /loom] 6 Coliform: Tube Fecal 31615 /100ml Coliform: Fecal Strep 31673 /100ml 7 o Residue: Total 500 m9/I 10 Fixed 510 mgA 11 Residue: Suspended 530 mg/l 12 Volatile 535 mg/I 13 Fixed 540 mg/l 14 PH 403 units 15 Acidity to pH 4.5 436 mgA 16 Acidity to pH 8.3 435 mg/I 17 Alkalinity to pH 8.3 415 mg/I i8 Alkalinity to pH 4.5 410 mg/1 19 TOC 680 mgA n� Turbidity 76 NTU Chloride 940 mgA Chi a: Tri 32217 ug/1 Chi a: Con 32209 ugA Pheophytin a 32213 ug/I Color: True 8o Pt -Co Color:(pH 83 ADMI Color. pH 7.6 82 ADMI Cyanide 720 mg/I Fluoride 951 mSA Formaldehyde 71880 mg/I Grease and Oils 5S6 mg/i Hardness Total900 moll Speciiie Cond_ 95 uMhos/cm2 MBAS 38260 mgA Phenols 32730 ugA Sulfate 945 mgA Sulfide 745 mg/1 EndjDepth DM DB DSM IValue Type i) I.. jl A H L NH3 as N 610 mgA TKN as N 625 mg/I NO2 plus NO3 as N 630 mgA P: Total as P 665 mgA PO4 as P 70507 m9A P: Dissolved as P 666 mg/l Cd-Cadmium 1027 ugA CrChromiumTota11034 u9A Co Copper 1042 ug/1 Ni-Nickel 1067 ug/I Pb-Lead 1051 agA Z rMne 1092 ugA ASSllver 1077 u9A Al -Aluminum 110S USA Be-Berynium 1012 ug/1 Ca -Calcium 916 moll Co -Cobalt 1037 ugA Fe -Iron 1045 ugA Composite T S B Sample Type GNXX Li -Lithium 1132 ug/1 Mg -Magnesium 927 mgA Mn-Manganese 1055 ug/I Na-Sodium 929 mgA ArsenicTotal 1002 ug/l Se -Selenium 1147 ugA Hg-Mercury 71900 ug/1 Organochlorine Pesticides Otgawg6osphotus Pesticides Acid Herbicides Base/ Neutral Extractable Organics Acid Extractable Organics Purgeable Organics (VOA bottle reg'd) Phytoplankton Sampling Point % Conductance at 25 C I Water Tempemium IM D.O. mgA pH Alkalinity Acidity Air Temperature 40 PH 8.3 pH 4.5 pH 4.5 pH 8.3 2 94 10 300 • 400 1& 822" 431 82243 182242 20 Salinity % Precipition (In/day) Cloud Cover % Wind Direction (Deg) Stream Flow Severity Turbidity Severity Wind Velocity M/H [ean Stream Depth fL Stream Width fL 480 45 32 36 1351 1350 35 4 NC DENR/DWQ Chemistry Laboratory to: %_� Sample Anomaly Report (SAR) - 4' Lab Number: Sample 1D: Station Location• � oample Type: Priority: Date collected: _5 Date received: Affected Parameter(s): Analytical Area (check one): ❑ WCH ❑ ETALS ❑ NUT 8' MICRO The f94owing anomalies occurred (check all that apply): U//Samples ❑ Improper container used ❑ VOA vials with headspace ❑ Sulfide samples with headspace ❑ Samples not received, but listed on fieldsheet ❑ Samples received, but not listed on fieldsheet ❑ Mislabeled as to tests, preservatives, etc. ❑ Holding time expired ❑ Prior to receipt in lab ❑ After receipt in lab ❑ Insufficient quantity for analysis ❑ Sample exhibits gross non -homogeneity ❑ Sample not chemically preserved properly ❑ pH out of range (record pH): ❑ Improper chemical ❑ Residual chlorine present in sample ❑ Color interference ❑ Heavy emulsion formed during extraction �❑ -Sample bottle broken in la�bb - no reportable re Its B' ()tticr (specify-1-_3Y _ �fi �_�rf� Comments: Corrective Action: Region: llector:.1�, Date analyzed: ❑ VOA ❑ PEST ❑ SVOA ❑ Quality Control ❑ Instrument failure - no reportable results ❑ Analyst error - no reportable results Cl Surrogates ❑ None added ❑ Recovery outside acceptance limits ❑ Spike recovery ❑ None added ❑ Recovery outside acceptance limits ❑ Failed to meet criteria for precision ❑ Internal standards ❑ Blank contamination ❑ QC data reported outside of controls (i.e. QCS, LCS) ❑ Incorrect procedure used ❑ SOP intentionally modified with QA and Branch Head approval ❑ Invalid instrument calibration ❑ Elevated detection limits due to: /1 ❑ Insttffiicient sample volume ❑ Samples were rejected by DWQ Lab. Authorized by: Date: 1 / ❑ Accepted and analyzed after notifying the collector or contact person and determining that another sample could not be secured. ❑ Sample(s) on hold until: ❑ Sample reported with qualification. Data qualification code used: ❑ Other (explain): Notification Required (circle one)? Yes No Person Contacted: �� - .._ - % Date: d Chemist Rev' w in- ial): / /JJ / B10CHEM ❑ PEST �1'`e'�/_ ❑ SVGA T METALS ❑ VOA Branch Head Review (init' ): QAIQC Review (inil al): Logged into database by (initial):. QA\FortnALaborelary\yAR I oR3r'Ol dbs STIFICATION FOR REMISSION REQUEST DWQ Case Number: DV 04-010 County: Northampton Assessed Party: Murphy -Brown, LLC Permit No. (if applicable): N/A Amount Assessed: $6,998.21 Please use this form when requesting remission of this civil penalty. You must also complete the "Re uest For Remission Waiver of Right to an Administrative Hearinz, and Sti ulation of Facts" form to request remission of this civil penalty. You should attach any documents that you believe support your request and are necessary for the Director to consider in evaluating your request for remission. Pleas be aware that a request for remission is limited to consideration of the five 'factors listed below as they may relate to the reasonableness of the amount of the civil penalty assessed. Requesting remission is not the proper procedure for contesting whether the violation(s) occurred or the accuracy of any of the factual statements contained in the civil penalty assessment document. Pursuant to N.C.G.S. § 143B-282.1(c), remission of a civil penalty may be granted only when one or more of the following five factors applies. Please check each factor that you believe applies to your case and provide a detailed explanation, including copies of supporting documents, as to why the factor applies (attach additional pages as needed). (a) one or more of the civil penalty assessment factors in N.C.G.S. 143B-282.1(b) were wrongfully annlied_ to the detriment_ of the petitioner (the assessment factors are listed in the civil penalty assessment document); ✓ (b) the violator promptly abated continuing environmental damage resulting from the violation (i.e., explain the steps that you took to correct the violation and prevent future occurrences); (c) the violation was inadvertent or a result of an accident (i.e., explain why the violation was unavoidable or something you could not prevent or prepare for); (d) the violator had not been assessed civil penalties for any previous violations; (e) payment of the civil penalty will prevent payment for the remaining necessary remedial actions (i.e., explain how payment of the civil penalty will prevent you from performing the activities necessary to achieve compliance). EXPLANATION (attach additional pages as necessM): C(4J Murphy -Brown LLc July 26, 2004 Mr. Steve Lewis # Division of Water Quality I617 Mail Service Center Raleigh, NC 17699-1617 Mr. Lewis, PO Drawer 856 2822 Hwy. 24 West Warsaw, NC 28398 Tel: 910-293-3434 Fax: 910-293-6957 In response to your letter dated June 28, 2004 regarding the assessment of civil penalties against Farm 11, facility number 66-34 in Northampton County, I am requesting a remission or mitigation of the fine amount of $6,998.21. The justification for this request is based on the fact that the Murphy -Brown, LLC promptly abated continuing environmental damage resulting from the violation, and took swift and immediate action to reduce the risk of a re -occurrence in the future. The facts of the case are not in dispute. For this reason, I have included the appropriate `Waiver of right to an administrative hearing and stipulation of facts' form. We acknowledge that the violation in question did, indeed, occur as described. In fact, we reported the incident to the Division originally and detailed the situation much as described in the findings of fact. We feel, however, that the Division does need to take into further consideration our acts immediately after the discharge in terms of cleanup, as well the system changes made to prevent re -occurrence, Upon discovery of the discharge, immediate action was taken to stop the flow of wastewater. Our spill response plan, as outlined in our Environmental Management System, was then implemented, with a spill response team being dispatched to the site in an effort to —recover as much wastewater as possible. At the same time, the Division was contacted to make them aware of the situation. This quick response resulted in much of the discharged wastewater being recovered and returned to the waste treatment system, thereby greatly reducing potential environmental damage. The cleanup activities described cost approximately $6000, but were effective in their intended goal. An investigation of this discharge showed that the company policy specific to recycle system operation were not followed. The employees responsible for this were terminated, and additional training specific to this policy was carried out for every farm in this division. While we do not expect the Division to give us 'credit' for this action, we do feel that the situation was dealt with in a judicious manner and, while costly from a monetary standpoint, in a way that will prevent it from re -occurring again. While not attached, I would ask that you review once again the March 10, 2004 response letter sent to the division specific to this matter. It should be contained as part of your files. Murphy -Brown, LLC is committed to compliance with all applicable rules and regulations, continuous improvement, and pollution prevention. We feel our actions in this case demonstrate our commitment to these principles, and ask that you grant our request for remission based on the facts presented. If there are any questions or concerns, please feel free to contact me at (910) 293 5330. ly, We crbeek Environmental Compliance Cc_ Johilnv Hassle DWQ- - CIVIL ASSESSMENT REMISSION FACTORS CONSIDERATION Case Number: DV 2004 0010 Region -- Raleigh County: Northampton Assessed Entity: Murphy -Brown Farm #11 () Whether one or more of the civil penalty assessment factors were wrongly applied to the detriment of the petitioner; Notes: ( x } Whether the violator promptly abated continuing environmental damage resulting from the violation; Notes: While actions by the company were quick, observations by staff indicate the environmental damage associated with the spill migrated down % - 1 mile from the discharge point. An estimated 8,000 gals. was discharged over a period of approximately 21 hours -as a result of employees not complying with company policy. {) Whether the violation was inadvertent or a result of an accident; Notes: {) Whether the violator had been assessed civil penalties for any previous violations; Notes: O Whether payment of the civil penalty will prevent payment for the remaining necessary remedial actions. Notes: Decision (Check one Request Denied Full Remission Partial remission Amount remitted to f4 6 Date I I Alan Klimek, P.E. STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION COUNTY OF NORTHAMPTON IN THE MATTER OF ASSESSMENT ) WAIVER OF RIGHT TO AN OF CIVIL. PENALTIES AGAINST ) ADMINISTRATIVE HEARING AND MURPHY-BROWN, LLC _ ) STIPULATION OF FACTS FILE NO. DV 04-010 Having been assessed civil penalties totaling $6 998.21 for violation(s) as set forth in the assessment document of the Director of the Division of Water Quality dated June 28.2004 , the undersigned, desiring to seek remission of the civil penalties, does hereby waive the right to an administrative hearing in the above -stated matter and does stipulate that the facts are as alleged in the assessment document. The undersigned further understands that all evidence presented in support of remission of this civil penalty must be submitted to the Director of the Division of Water Quality within thirty (30) days of receipt of the civil penalty assessment. No new evidence in support of a remission request will be allowed after thirty (30) days from the receipt of the civil penalty assessment. rF` This the a �' day of , ,"_� ,i , 200 SIGNATURE �o o< JD D �A' VC TELEPHONE 4?/0 'L9 3 5 3 3 0 'f NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor July 29, 2004 Mr. Kraig Westerbeek Murphy -Brown, LLC PO Drawer 856 Warsaw, NC .28398 RE: Remission Request Farm # 11 Facility #66-34 Northampton County File # DV 04-010 Dear Mr. Westerbeek: William G. Floss, Jr., Secretary Alan W. Klimek, P.E., Director This letter is to acknowledge receipt of your request for remission of the civil penalty levied against the subject facility. This request will be reviewed at the next scheduled conference on October 6, 2004, and you will be notified about the Division's decision concerning remission. If you have any questions, please call me at (919) 733-5083, ext. 539. Sincerely, Steve Lewis Non -Discharge Compliance & Enforcement cc: Ken Schuster, Raleigh Regional Office w/attachment Jg eim�, Raleigh Regional Office w/attachment Buster Towe11, Raleigh Regional Office w/attachment Central Files File # DV 04-010 w/ 3 attachments 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 One 512 N. Salisbury St., Raleigh, North Carolina 27604 OCarolina Phone: 919-733-7015 / FAX: 919-733-0059/ fntemet: h2o.enr.state.nc.us An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper ;Vaturally F r �I NtkwrmCDENN E*~~ mm Rg&oL EET NORTH CAROLINA DEPART ; ENT OF ENVIRONMENT AND' NATURAL RESOURCES Raleigh Regional Office 1628 Mail Service Center M Raleigh, NC 27699-1628 I Pagan including cover sheet FAX: `? o �' y - sz a7 TO: _ - I FROM: u�Sr�--LJ�— �� I �! DATE; SUBJECT:_ I—`� l� I �}SSe sJ my e- � I MESSAGE: 1 I ! E� ,f NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor July 29, 2004 Mr. Kraig Westerbeek Murphy -Brown, LLC PO Drawer 856 Warsaw, NC 28398 RE: Remission Request Farm # 11 Facility #66-34 Northampton County File # DV 04-010 Dear Mr. Westerbeek: William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director This letter is to acknowledge receipt of your request for remission of the civil penalty levied against the subject facility. This request will be reviewed at the next scheduled conference on October 6, 2004, and you will be notified about the Division's decision concerning remission. If you have any questions, please call me at (919) 733-5083, ext. 539. Sincerely, 25� Z4.1-r_z Steve Lewis Non -Discharge Compliance & Enforcement cc: Ken Schuster, Raleigh Regional Office w/attachment gJay�- ^rm3,n, Raleigh Regional Office w/attachment Buster Towell, Raleigh Regional Office w/attachment Central Files File # DV 04-010 w/ 3 attachments 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 One 512 N. Salisbury St., Raleigh, North Carolina 27604 NQ Carolina Phone: 919-733-7015 / FAX: 919-733-0059 / lntemet: h2o.enr.state.nc.us An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10916 Post Consumer Paper Natimally STATE OF NORTH CAROLINA COUNTY OF NORTHAMPTON ENVIRONMENTAL MANAGEMENT COMMISSION IN THE MATTER OF ASSESSMENT } WAIVER OF RIGHT TO AN OF CIVIL PENALTIES AGAINST } ADMINISTRATIVE HEARING AND T MURPHY-BROWN, LLC ) STIPULATION OF FACTS FILE NO. DV 04-010 Having been assessed civil penalties totaling $6,998.21 for violations) as set forth in the assessment document of the Director of the Division of Water Quality dated _ June 28, 2004 __, the undersigned, desiring to seek remission of the civil penalties, does hereby waive the right to an administrative hearing in the above -stated matter and does stipulate that the facts are as alleged in the assessment document. The undersigned further understands that all evidence presented in support of remission of this civil penalty must be submitted to the Director of the Division of Water Quality within thirty (30) days of receipt of the civil penalty assessment. No new evidence in support of a remission request will be allowed after thirty (30) days from the receipt of the civil penalty assessment. This the QL (. day of S--J S 20 0 SIGNATURE L TELEPHONE /e �-9 3 533 0 Murphy -Brown ILA July 26, 2004 Mr. Steve Lewis 41 Division of Water Quality 1617 Mail Service Center Raleigh, NC 17699-1617 Mr. Lewis, PO Drawer 856 2822 Hwy. 24 West Warsaw, NC 28398 Tel: 910-293-3434 Fax: 910-293-6957 In response to your letter dated June 28, 2004 regarding the assessment of civil penalties against Farm 11, facility number 66-34 in Northampton County, I am requesting a remission or mitigation of the fine amount of S6,998.21. The justification for this request is based on the fact that the Murphy -Brown, LLC promptly abated continuing environmental damage resulting from the violation, and took swift and immediate action to reduce the risk of a re -occurrence in the future. The facts of the case are not in dispute. For this reason, I have included the appropriate `Waiver of right to an administrative hearing and stipulation of facts' form. We acknowledge that the violation in question did, indeed, occur as described. In fact, we reported the incident to the Division originally and detailed the situation much as described in the findings of fact. We feel, however, that the Division does need to take into further consideration our acts immediately after the discharge in terms of cleanup, as well the system changes made to prevent re -occurrence. Upon discovery of the discharge, immediate action was taken to stop the flow of wastewater. Our spill response plan, as outlined in our Environmental Management System, was then implemented, with a spill response team being dispatched to the site in an effort to —recover as much wastewater as possible. At the same time, the Division was contacted to make them aware of the situation. This quick response resulted in much of the discharged wastewater being recovered and returned to the waste treatment system, thereby greatly reducing potential environmental damage. The cleanup activities described cost approximately $6000, but were effective in their intended goal. An investigation of this discharge showed that the company policy specific to recycle system operation were not followed. The employees responsible for this were terminated, and additional training specific to this policy was carried out for every farm in this division. While we do not expect the Division to give us `credit' for this action, we do feel that the situation was dealt with in a judicious manner and, while costly from a monetary standpoint, in a way that will prevent it from re -occurring again. While not attached, I would ask that you review once again the March 10, 2004 response letter sent to the division specific to this matter. It should be contained as part of your files. Murphy -Brown, LLC is committed to compliance with all applicable rules and regulations, continuous improvement, and pollution prevention. We feel our actions in this case demonstrate our commitment to these principles, and ask that you grant our request for remission based on the facts presented. If there are any questions or concerns, please feel free to contact me at (910) 293 5330. r1 .ara�l.eeL Environmental Compliance Cc: JohAnv Hassle JUSTIFICATION FOR REMISSION REQUEST DWQ Case Number: DV 04-010 County: Northampton Assessed Party: Murphy -Brown, LLC Permit No. (if applicable): N/A Amount Assessed: $6,998.21 Please use this form when requesting remission of this civil penalty. You must also complete the "Request For Remission, Waiver of Right to an Administrative Hearing, and Stipulation of Facts" form to request remission of this civil penalty. You should attach any documents that you believe support your request and are necessary for the Director to consider in evaluating your request for remission. Pleas be aware that a request for remission is limited to consideration of the five factors listed below as they may relate to the reasonableness of the amount of the civil penalty assessed. Requesting remission is not the proper procedure for contesting whether the violation(s) occurred or the accuracy of any of the factual statements contained in the civil penalty assessment document. Pursuant to N.C.G.S. § 143B-282.1(c), remission of a civil penalty may be granted only when one or more of the following five factors applies. Please check each factor that you believe applies to your case and provide a detailed explanation, including copies of supporting documents, as to why the factor applies (attach additional pages as needed). (a) one or more of the civil penalty assessment factors in N.C.G; S. 143B-282.1(b) were wrongfull applied to the detriment of the petitioner (the assessment factors are listed in the civil penalty assessment document); ✓ (b) the violator nromntly abated continuing environmental damage resultine from the violation (i.e., explain the steps that you took to correct the violation and prevent future occurrences); (c) the violation was inadvertent or a result of an accident (i.e., explain why the violation was unavoidable or something you could not prevent or prepare for); (d) the violator had not been assessed civil penalties for any previous violations; (e) payment of the civil penalty will prevent payment for the remaining necessary remedial actions (i.e., explain how payment of the civil penalty will prevent you from performing the activities necessary to achieve compliance). EXPLANATION (attach additional pages as necessary): 0� W A r�;,QG Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Jack Keane, General Manager Murphy -Brown's PO Box 1240 Waverely, Virginia 23890 Dear Mr. Keane: March 30, 2004 Notice of Violation Notice of Intent To Enforce Murphy -Brown's Farm # 11 COC AWS660034 Northampton County Alan W. Klimek, P.E. Director Colleen H. Sullins, Deputy Director Division of Water Quality On Sunday, March 7, 2004, Mr. Buster Towel] of the Raleigh Regional Office responded to an emergency spill call at the subject swine operation located on High Bridge Road in Northampton County. It was determined that an estimated 8,000 gallons of wastewater had run out from under the back door of barn number 8 and entered an unnamed tributary to Cypress Creek within the Chowan River Basin. Murphy -Brown's response letter dated March 10, 2004, has stated that employee negligence was The cause of the spill, and that the employees responsible for this event have been terminated. While the Division appreciates the swift response to this event, the discharge of wastewater to surface waters of the State without the required permit is still considered a violation of NCGS 143-215.1(a), and as such is subject to civil penalties of up to S 25,000.00 per day, per violation. The Raleigh Regional Office has recommended to the Director that the appropriate enforcement action be taken. If you wish you may submit any additional comments in writing to the Raleigh Region within ten days of your receipt of this Notice. If you have any other questions concerning this matter you can contact Buster Towell at (919) 571-4700. Sincerely, Kenneth Schuster, P.E. Regional Water Quality Supervisor Cc: Northampton County Health Department Ms. Betsy Gerwig, RRO-DSWC DWQ Nondischarge Compliance Group RRO Files Raleigh Regional Office 1628 Mail Service Center Water Quality Section Raleigh, NC 27699-1628 PAMN CDEPtt phone (919) 571-4700 Customer Service Awally ehCarolina facsimile (919) 571-4718 1-877-623-6748 AGa NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor Mr. Kraig Westerbeek Murphy -Brown, LLC PO Drawer 856 Warsaw, NC 28398 RE: Remission Request Farm #11 Facility #66-34 Northampton County File # DV 04-010 Dear Mr. Westerbeek: s July 29, 2004 William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director This letter is to acknowledge receipt of your request for remission of the civil penalty levied against the subject facility. This request will be reviewed at the next scheduled conference on October 6, 2004, and you will be notified about the Division's decision concerning remission. If you have any questions, please call me at (919) 733-5083, ext. 539. Sincerely, 2�� Z_� Steve Lewis Non -Discharge Compliance & Enforcement cc: Ken Schuster, Raleigh Regional Office w/attachment Jay Zimmerman, Raleigh Regional Office w/attachment sBuster-Towell; Raleigh Regional Office w/attachment Central Files File # DV 04-010 w/ 3 attachments 1617 Mail Service Center, Raleigh, North Carolina 27699.1617 512 N. Salisbury St., Raleigh, North Carolina 27604 Phone: 919-733-7015 / FAX: 919.733-0059 / Internet: h2o.enr.state.ne.us An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper On e NCarolina ;Vatimally STATE OF NORTH CAROLINA COUNTY OF NORTHAMPTON ENVIRONMENTAL MANAGEMENT COMMISSION IN THE MATTER OF ASSESSMENT ) WAIVER OF RIGHT TO AN OF CNIL PENALTIES AGAINST ) ADMINISTRATIVE HEARING AND MURPHY-BROWN LLC ) STIPULATION OF FACTS FILE NO. DV 04-010 Having been assessed civil penalties totaling $6 998.21 for violation(s) as set forth in the assessment document of the Director of the Division of Water Quality dated _. June 28, 2004 , the undersigned, desiring to seek remission of the civil penalties, does hereby waive the right to an administrative hearing in the above -stated matter and does stipulate that the facts are as alleged in the assessment document. The undersigned further understands that all evidence presented in support of remission of this civil penalty must be submitted to the Director of the Division of Water Quality within thirty (30) days of receipt of the civil penalty assessment. No new evidence in support of a remission request will be allowed after thirty (30) days from the receipt of the civil penalty assessment. This the a (. day of SIGNATURE RESS TELEPHONE 6/b �93 5330 E L� Murphy -Brown LLc July 26, 2004 Mr. Steve Lewis Division of Water Quality 1617 Mail Service Center Raleigh, NC 17699-1617 Mr. Lewis, PO Drawer 856 2822 Hwy. 24 West Warsaw, NC 28398 Tel: 910-293-3434 Fax: 910-293-6957 In response to your letter dated June 28, 2004 regarding the assessment of civil penalties against Farm 11, facility number 66-34 in Northampton County, I am requesting a remission or mitigation of the fine amount of $6,998.21. The justification for this request is based on the fact that the Murphy -Brown, LLC promptly abated continuing environmental damage resulting from the violation, and took swift and immediate action to reduce the risk of a re -occurrence in the future. The facts of the case are not in dispute. For this reason, I have included the appropriate `Waiver of right to an administrative hearing and stipulation of facts' form. We acknowledge that the violation in question did, indeed, occur as described. In fact, we reported the incident to the Division originally and detailed the situation much as described in the findings of fact. We feel, however, that the Division does need to take into further consideration our acts immediately after the discharge in terms of cleanup, as well the system changes made to prevent re -occurrence. Upon discovery of the discharge, immediate action was taken to stop the flow of wastewater. Our spill response plan, as outlined in our Environmental Management System, was then implemented, with a spill response team being dispatched to the site in an effort to recover as much wastewater as possible. At the same time, the Division was contacted to make them aware of the situation. This quick response resulted in much of the discharged wastewater being recovered and returned to the waste treatment system, thereby greatly reducing potential environmental damage. The cleanup activities described cost approximately $6000, but were effective in their intended goal. An investigation of this discharge showed that the company policy specific to recycle system operation were not followed. The employees responsible for this were terminated, and additional training specific to this policy was carried out for every farm in this division. While we do not expect the Division to give us `credit' for this action, we do feel that the situation was dealt with in a judicious manner and, while costly from a monetary standpoint, in a way that will prevent it from re -occurring again. While not attached, I would ask that you review once again the March 10, 2004 response letter sent to the division specific to this matter. It should be contained as part of your files. Murphy -Brown, LLC is committed to compliance with all applicable rules and regulations, continuous improvement, and pollution prevention. We feel our actions in this case demonstrate our commitment to these principles, and ask that you grant our request for remission based on the facts presented. If there are any questions or concerns, please feel free to contact me at (910) 293 5330. r, �e_w�ev Environmental Compliance Cc: Johhnv Hassle JUSTIFICATION FOR REMISSION REQUEST DWQ Case Number: DV 04-010 County: Northampton Assessed Party: Murphy -Brown, LLC Permit No. (if applicable): NIA Amount Assessed: $6,998.21 Please use this form when requesting remission of this civil penalty. You must also complete the "Request For Remission, Waiver of Right to an Administrative Hearing, and Stipulation of Facts " form to request remission of this civil penalty. You should attach any documents that you believe support your request and are necessary for the Director to consider in evaluating your request for remission. Pleas& be aware that a request for remission is limited to consideration of the five factors* listed below as they may relate to the reasonableness of the amount of the civil penalty assessed. Requesting remission is not the proper procedure for contesting whether the violation(s) occurred or the accuracy of any of the factual statements contained in the civil penalty assessment document. Pursuant to N.C.G.S. § 143B-282.1(c), remission of a civil penalty may be granted only when one or more of the following five factors applies. Please check each factor that you believe applies to your case and provide a detailed explanation, including copies of supporting documents, as to why the factor applies (attach additional pages as needed). (a) one or more of the civil penalty_ assessment factors in N.C_G.S. 143B-282.1{b) were wrongfully applied to the detriment of f the petitioner (the assessment factors are listed in the civil penalty assessment document); (b) the violator promptly abated continuing environmental damage resulting from the violation (i.e., explain the steps that you took to correct the violation and prevent future occurrences); (c) the violation was inadvertent or a result of an accident (i.e., explain why the violation was unavoidable or something you could not prevent or prepare for); (d) the violator had not been assessed civil penalties for any previous „violations; (e) payment of the civil enal will prevent payment for the remaining necess remedial actions (i.e., explain how payment of the civil penalty will prevent you from performing the activities necessary to achieve compliance). EXPLANATION attach additional pages as necessar MEMORANDUM April 16, 2004 To: Jeff Poupart, Nondischarge Compliance Supervisor Through: Ken Schuster, P.E. RRO Regional Supervisor Through: John Hunt, Environmental Engineer From: Buster Towell, Environmental Specialist Subject: Murphy -Brown's Farm # 11 Discharge Enforcement Case On Sunday, March 7, 2004, at approximately 3:00 pm I received a call from Steve Lewis who had the ER pager for the Central Office that weekend. Steve said that he had received a call from Murphy -Brown's that notified the Division of a spill that occurred earlier the same day from the subject swine operation. Steve knew that I was carrying the pager that weekend for the RRO so he notified me. I responded to the spill and arrived on the farm at around 5:30 pm. I met with Kel Terry who immediately showed me wastewater in a ditch on SR 1328, which he had traced further, down stream to a large beaver pond. Since it was getting dark we looked at the back end of the closest spray field to the stream where Murphy -Brown's employees had been making efforts to pump the wastewater back up on to the spray field. The distance from the creek to the field was probably 400-500 yard up hill, and it seemed that these efforts were not getting the desired results. It was clear that it would be very hard to recover all of the wastewater that had spilled. Shortly afterwards it became too dark to see and I told Kel that I would return to the farm early the following morning. At around 9:00 am I met with Kel and Johnny Hassell on site to further investigate the cause of the spill. It was determined that production employees had left the recycle pump on for 21 hours straight. Company policy dictates that all recycle lines will not be operated when all employees have left the farm. Murphy - Brown's conducted their own in-house investigation, which resulted in several production employees, including the farms manager being terminated. Johnny and I walked the stream as far as we could walk and both agreed that the spill traveled for between '/< and 1 mile to where the large beaver pond widened out and was near impossible to follow. I pulled several samples all along the route of the spill, including an extreme upstream sample. There are only a few digital photos available due to the disk being full after the first evening. Please find the following information relating to this Case: I . NOV1NO1 to Murphy -Brown's Farm # 11 dated March 30, 2004 2. Murphy -Brown's Response letter dated March 10, 2004 3. Copy of the Inspection Report dated 318104 4. Lab Sheet and COC 5. Finding and Decision and Assessment Factors 6. Copy of Green Card 7. Maps 8. Digital Photos If additional information is needed please call Buster Towell at the RRO (919) 571-4700. Murphy-,BrownLLC March 10, 2004 Buster Towell Division of Water Quality 1628 Mail Service Center Raleigh, N.C. 27699-1628 Re: Action Plan Report for Dear Mr. Towell: i-34 On Sunday, March 7, 2004 at approximately 2:00 PM, a Murphy -Brown Land and Nutrient Management (LNM) employee, Larry Majette, contacted his supervisor, Kelvin Terry, to inform him that wastewater from barn 8 at Farm l I had exited the back door, and had traveled to a tributary of Wiccacanee Swamp. Murphy -Brown LNM staff notified DWQ personnel, and measures were immediately put in place to contain and stop the flow of wastewater. Temporary earthen dams were established in the affected drainageway, and the contained water was then irrigated on to crops located on the farm in accordance with state permit requirements. This discharge occurred due to an obstructed flush line that had been. blocked for an estimated 21 hours. Approximately 8,000 gallons was discharged, calculated based on the time to fill 2 — 800 gallon flush tanks and the flush frequency at that site. Our internal investigation determined that the barn manager left the farm Saturday, March 6 at approximately 1:30 PM and two herdsmen left shortly after at approximately 2:30 PM, leaving the production area unattended. The flush system was not shut off during the time in which employees were absent, which contradicts current company policy. The current Murphy -Brown flushing procedure states that "the time the recycle system is to be running should be scheduled around the normal working hours of the farm so that the system will not be operating while unattended for a substantial period of time." We train all Murphy -Brown employees to the policies and procedures associated with our Environmental Management System, in order to ensure that the highest regard for environmental protection is met. The barn manager and herdsmen at this site were in no way instructed to act in the manner in which they chose. Immediate and swift action was taken against these individuals, and termination followed for violating Murphy -Brown policy. Please understand that Murphy -Brown has no tolerance for this display of negligence. The company considers the responsibility of avoiding permit violations a condition of employment with the company, and takes necessary action to see that incidents such as this do not continue to occur. In addition to the disciplinary action against the employees M involved, heightened emphasis on these procedures are being communicated to all levels of production employees. Please find attached the press release that was sent to news outlets in Northampton County on Tuesday, March 10, contingent to N.C. General Statute Article 21 Chapter 143.215.0 If any additional information is needed, please contact me at 252-578-1827 (c) or 252- 826-6516 (o). Thank you. Sincerely, Johnny Hassell North Carolina Land and Nutrient Manager Murphy Brown, LLC Waverly Division CC: DWQ Central Files Jack Keane Kraig Westerbeek April 13, 2004 Mr. Kenneth Schuster, P.E. Regional Water Quality Supervisor 1628 Mail Service Center Raleigh, N.C. 27699-1628 L� ' � 152004 Notice of Violation d! Notice of Intent To Enforce COC AWS660034 �E�t Northampton County Dear Mr. Schuster; I would like to offer some additional comments in response to your letter dated March 30, 2004. Murphy -Brown makes every effort to comply with all permit requirements and, in many cases, has made the effort to exceed these requirements. As demonstrated in Murphy -Brown, LLC's EMS manual, we feel that employee training and awareness are key to this effort. To insure that our employees understand what is expected, there are very specific policies and procedures contained in our EMS manual that address environmental issues specific to each and every farm position. Regretfully, in this particular case, there were employees that failed to follow these very well outlined procedures, which resulted in a release to the waters of the State as noted in your letter. As mentioned in my letter dated March 10, 2004; swift and immediate action was taken against this negligence, and termination followed immediately. I ask the Director to please take into consideration as part of determining enforcement action, our position, our response, and our effort to eliminate potential problems of this nature in the future. The actions taken were swift, and involved substantial cost to this company. While the discharge referenced is most regrettable, we feel that the appropriate actions have been taken to prevent this sort of thing from happening on this farm again in the future. Any additional information that we can provide will be available upon request. As well, I am certain we can ask for your guidance in the future. YlIour Friend In Agriculture, Vv William J. assell North Carolina Land and Nutrient Manger Cc: Northampton County Health Department Jack Keane Kraig Westerbeek f _ ' Michael F. Easley, Governor., William G. Ross Jr„ Secretary North Carolina Department of Environment and Natural Res6urces f ' � t Alan W. Klimek, P. E Director Division of Water Quality nab ` :! r J August 4, 2004 CERTIFIED MAIL` i RETURN RECEIPT REQUESTED Smithfield Carroll's Farms Farm 11 PO Box 1240 Waverly VA 23890 Subject. Facility Number.66- 34-National Pollution Discharge Elimination System (NPDES) General Permit Dear Smithfield Carroll's Farms: The Division of Water Quality (Division) has been required by the U.S. Environmental Protection Agency (EPA) to develop a NPDES permit program for animal waste management systems. The Division has developed a general NPDES permit similar to the state Non -Discharge General Permit that this facility is currently permitted under. Pursuant to the requirements of North Carolina General Statues §143-215.1, 40 Code of Federal Regulations §122.23, and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated May 9, 1994, coverage under the General NPDES permit is required of all facilities that have had a discharge of wastewater reaching Waters of the State. According to our records your facility meets the requirement for an NPDES permit based on the discharge criterion. Please sign and submit the enclosed NPDES Short Form B — Existing Facility. Please carefully follow the instructions on the form. Please submit completed enclosed application within 60 days from receipt of this letter. Failure to submit the application as required may subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. If you have any questions about the new NDPES permit, the enclosed applications, or any related matter please feel free to contact J R Josh! at 919-733-5083 ext. 363. Sincerely, M. Paul Sherman, P.E. Cc: Northampton -County Soil and Water Conservation District cR . Regional -Office, Division of Water Quality Permit File AWS660034 I�D�R Non -Discharge Permitting Unit Internet http,,//h2o.enr.state.nc.us/ndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 Fax (919)715-6048 Customer Service Center Telephone 1-877-623-6748 An Equal Opportunity Action Employer 50% recycled/10% post -consumer paper . - - E I . - - - 1 _ y N _'�%A j' F 13� }.,�J 0Y y'�i1• yav 7 .., •• 1t I ' I , , ' 1Jd c s4. ^! ref • ... ' .. . 'r +' . •, . . • . . I ; • !� , 1 . . •r ,, . . . . . - , p ' 1 , rink' , •.r .r . .. ,, .. "nfr t'.:. ! Q Sri IRC ppp n wr`",�..i1 . ' '. K,% •' 1.4 'r - , , 1'F k- Lry ♦. 1 ; "' tr' •'. , �An+ J T • s-.^ F ' 1 ; I s ;,,1� k ;, , .'' .."a 7 r6aU, toµ,-y'i.M•• - ,y r` " ,.t'"< I'.-1. rr '> 'ii r Ybn� y '' i-Se a,i ." k'I -r' r .:... r f t . t tk� *��¢�f 1 ,y -1-"' I , yy ��..^ r M . Vt , {". ';r �, i "t I i 'r `7 1 4: , -; T r A. . ' . , . . , _ �' , Y..y. t A. 4 �- r�`rtl t . 5 h ..� r '� . r .. r%v «tr i F I t, � ., r > S r Ve 1 ; S • , f ly 7 ar , lr'a 11 r �. s - p r s t'm, v j } 41 g, i i 4 �} 4 ; :�, v1° ! j e' � 42 , r ; 1�?u St W w 'i�'t •r�%" s" i 44 1 _ r ''L:. r , r '-i '., *'AI' 7 AM `?�{. Ire 5i .�" { .r .. 4 • . y r k gtF . ``,%. , , 0�4 ` pr 7r" �� 6ri� ai.: rl. r - �'1 t S? -+ 11¢+<, , �',61 R��� sy +, r�� ' 1., Ft 7i`- i . �Y� Inr r i•i� e j+Si.;� .r< fir` araw Lis: r-:5�}CIS t , s 7r ., r7 �' r '1 w.:'yw �... I ,I "r x - fi yA'i .'S 't. ,; .. s'` T'"�.`FSts'S yr4 OJT vr'ar yr. �i. i ' ,. .� .rt1 } ff, 5,-'1' i 1� r ,1i 'dj",: r'rr u. }!✓ ! r `'" 'T.''k`-+i i hG�""'S °`tit"`fr"•.�" •.c:" -r r , r _ l -.,. . p til l' 1, y; V kr 11 w ` •. ,;a r 7N4 � . - 1, ;r" - . ' Ih• 9 „'• _ ." .'. ;r), 3 ,.r.V'+.y ��?R, A '" ja""' f '• j.� s'I k`Lh , . ,'1 }�, V , .z r r ' .>: r ,0 t1 T' Ali' ,.' f n ,yV �yi. nr' _.,tlt4n iF�' r ` ' +*i . r , r 1 ' -r V.' yY r z'r t-', 't' °P' µAS t , 1 I� :;,yy�T�`y i' , I °, w .•: ',a f Wr!, w ry.., ' x { + ! 4' 1'- r t ,`5.!"f illy a i. k a t �, ✓d »'a ., ,S i; +' Ir 4 r* h, i .r ''.'�' 'r r a:, t s ; +I ... �; y `i' r 4? , ;'4'! 0.,, .1� +rv`. O.gj i . + ir'"'1 , " !� �'.>.,Y 4 x `4.a, t�, ..t, _ ,.t r r - hr . r1 -•r � ! '., y.-r':,tL x,J :,..t...,l, g, 11 T _ , r r y ,y • , R C w - ' C .r"�'_4 ``+++c..dfffi' �a�r�•n.,„ .�.�. ^�i`.y s....� - t 'r , tr',' r. , HI ,:. > s, iY� � ; yl. r 7_'I `1' J' r '�'�' i� ,� ar t, rP,-,1 S V,r ' a i 9 r i. ,,r �. t Yl :1Y _. - _ _ ! i t r - �; yL, 51 : ,[ ir, 'L, ! - ` ' y t i. �y fir. .i . pp��: '� r i r �YY�',1-r � �t ���}'y; WrY: ` 11 � � i of r *'' ',t � v„y,"' 1 4 Fy 1 -i�, ! .�1{{ "�^'+y. ji. P 4 3 de d d5. i t r I Li• ,S i f ? "-. ` j Mi j err r�yy,�g''R ""y� � xr �y r 5i'�1 ]" ' t S t -r . fi ail � hi , 4 ., y '� , r �I f rr `r.A¢T»"t18,O4,'�, kO" �,' h r (�y§i• "{{'4ea,�5� C lakp •Ai .. , 4 s 'r t , r . ,ii1r4' r ;:.ga r � � re `� l r S .y , c. , f .. - t• r )- ",; a,r' ,-,ay Rr' Y•+—�,z---� x,.r 1 c 7p-1 r "v+. � .. - } {i x y. A ,4..,- e i 7 1 dri. s � 'i._ ' . '. , 1 ,,11J.jj ,'` ta�dy1."r ,�-+(.� Ir 1 -, , 1 11ir, 4 M *. if '14.tii r.•:'"`; 5 y -4 � i- et s ,tom.!? L , ^ ,,.. , �' h 'r ' rat HV ,�r1 i.w,r �'� , TT `•-""' '�' „ �,"'n.g � rt ' .., r t ` ,' L r. t 5 � ,W j1 r f' S W i; �k d' V' > OI,.y 5� f, r "4r�ry ...5 i >4• ' S,; r c V. ,Rar . a '!ts [+.' qr F , � {t �' a j ,: r, ' r 'l flf i •^'`ir; I I I'' 's i r` s i . t ,a I Y. ; h k ti7 p ¢'+; .. . "'I 'reiy'.,eifd i.—i ti r�' .r ' 1 rq 3 ..; 1� x�-,.0 y11 a" 1 fY4r x. n.a"wr. .+.a:uu`:k'�''.m- 'rP_.,,Irl,r� 5' •kcJ `&+ot.,�^,=fy4',re•e \.r+r .,,1I j `;' "t � d j, 4 y 4 m r f;" �1+ i„ 1 , 11 I T r I .SRT ,• i s, . 7 5ti -[Y "�'-. ' "i 1 .A r , Jt 4 l .r + :, `•, f d -r r 61 • r \ ri: • ' S R}I �' i ~ ', J'-4:` r3 x .."': t ,14 �' - _ `a t.r ''L a s L ..` ` 3, i In til `r .,.A r , ri t , r 1" . f .,'-"•'T i:a •` i J f,l. 1 ,1N �i"• r', 1 I :,,. ,s ',. t y.f:.i�' } -•-Y r i Y k.{ \ 46 r i ' r • i X r F 5t.i { i x d r' h �t �`l..�1}1••J , , ,M Rw A4 " W Y 1. r ' ,..._f ,o-: 4, i 1 a1 Fa P''^� tYr 1 P" , 4 k 1 r. S'hi i ,K q, rrFr1 Miai,R} µ, W l' .,I aRy Y . rai.' t y -F 9 C.. , +' '^^'''i'�Y�c r �t'r ,fir•TWlaL 'r- !y9 r {SA .a U,�'y 1. .>. .r ., t+ ,� "rrll' r,y, 4i4 ,.!r1 d � . i , af_r' a # ,y y �-V' ,?' rl415k. •+` , 1 rr-r1.' •, 4 - •�- Lr. J r 4' ,. w+/ i{r, r T A C„"',L Y *�' f'y"'+`*..i-' ' yi' 4' yy {1p.°,�y,,4� 1 �I i t r : f. 1 r'! y cky IJ„I,'' � \ , S }NfY� I fir' } Mr ` V d h [. :,}I' 11 "' 4 .—' ^ W �r'}�' , .. ; `" } ` .. - I CCC S �Y r f1ta.E 1 .. ,tr ;sr,' I� eft'}y. "�.,.w. ,v w ! ,r.� if4 1. .. 1 i t. -nh S 7!+ ,d ,it, rTl J��j't Y,,,`,� f } I Er 1 '`l.i * ,,^. ' . � + tpr-, . i T�7n� ., 3 4_w I � 4 . i s 7 1 � � . r , to `r � � s{ r :r l . y j}�" d. y °"7pj�� 19- ' ` f S �' h - M _ t d,f .u*�,.I �r Fi`�'', J1'�.Nn �',"'Nii;.; ' Y ° F t 'rr ' FF`. is r 44 1 ',fa , ��, r'{ S'r - �t - .I } '�`i, t 11,x n,: Aa ,3 , . i } t.�� 't rkl. ",`�'�s�'nV ' j, :�' k� iJ i%l 5 t M `G}} S,yY i4 11 r.. }S F 1* ,r i ,a�T,.',.. ,^1 x " nu Y,g n raQ'� ., 4:.... ' r rrly! ' is F.q�,p 4 d' ' �, � S .. - . - i. ` G ,4 1. h =S 'I I. ' ti r��j`��rx}.rY � _.i< "�y'y�: ll/'�� i� wr.,�5r�+ka �>�` � I i+. 't; •s r., i , �ai'Y- P , I ' , -., y 4 . , !' ,.� ,r -1''` f,—j T . ihti, ,.,,,yy1p Q4,4} 'l- i r . . ' -• a.rl'",'_---_.5r'^Lf- ,. I_, ra r! l , , , t KY •Y *. d ,ae • .. r -r t� • i! s s s Y _ �y ' r . r l t . - , ,«, 1`i? h. '-' ✓ 4- b - , 9✓ r ,t,..1�r a .1_ : , r O, i ' 1L x t 4 f? , Fr yr; Lr, l,�iq' �! 1 d , I.f! ( d } by r ar , ...rt 1Sd - - :; �` 1+ ., f. «.ti'd + - Ts i1 C.44i7 r�N. " a , yI" t ^' ny ;r , .'AT" , 'r llr i ,V i?AW +1 , ;. « i fi 'YI -a',r h I.r ; . t •." Mr C" , aWACb x dA' (,t'ie } $:k K v "j', t -'" i. { 7, a „' a . _ d Y1 r"a I, v S:'. •gtn�'•`4, , ', { x a 5:1 r. F A{.:x ,1 ar" r q �' 7 1 {y'�, �, a",4 'L``& ,.-Sr F t L 7 x 1 ta:.. .'{ t s , :F d' c 7' .1 a s :i a r r 1`i 1� y h _'.t* i; I i x -+r - +� r m[f,�ri ' }i r ,� �d2 a i�,a'"'+I„y z15.°.4 k �f,. = ia1 ' " yt . s :ri, . r ,,e' Y Q r rt { T tr `.4 f c S'!rm r � 5 ��r rrj .is 1 , � '?'Ar a �.' a r , } k . 'y 4 t" f "',' , tii , [ €€` + = V+ r s },4t L ;= a 4 t �, t x ; ,. x F : y a q r`, • x T` d �,.. ! d k r; +. _ • ,T, t 1 g .. 4Sr f, t-• {. - ,yr V F Y, J r 'a y r ^ 4 ffi R f t` S i d `�k 1k 1+ i f y +"A- 1` r x r, '' ,.t? r u , . a S 1{d , n +. %ti.ettl ti Yj L ,4 •.. r, q tY'—• ri' ., �. -F n1. 'r y' .Y'. 1. '1', i'r x K� rytpv4-'$'{fib .., r•,Z';} a r.. "K,-, �.. n r r d C. .� i r " .. C Y r i! _ p { 'r '' 1- a-�rri��M"`r ,1, s e�•,. N* , ',v}k r 'vs-., , t • e�+W ,.:'s ,�, 4 i t,.`,, 4 r y}.- '� ryr9 Y.n .: '}j 5' �; -r . ; , , ' ' i s .. rf. ! 3 �a ��,.+,, h. - � r i s f ' •: ,T C r . J,{a 2A W.1 r 1 L w , r,, & x�'h�' S. J1r;.1 t•' 1'ay'f� i �+�'r tL, / fw Cs, 'r'; {1!irt�t�'YPg s r 1,r51 .,� 1 ,�1;f, r':'c 1 . �T s'.�� , 1 _ i? r +M F 4,. ,, p , sy r..y: +'l _ -4e T . r` „>< « , �`!" -w -, C'=.. .`n ' a}` �.' ' .',�'x.�,,r. 't`h�,r "siV �`, rx�, ryylT"- A ri �,- r .^":" : >' , 1, ! ' .. ' r ' ``rG, `" 1 x "o, , g, f r. s v e« '�., b St: �. 1 1 - V z n.r y, �;� r r" 4. E r p''. s h r g :.dry uirk.,ixl['. . «, rs . a. t't' da t `" r' L i'"4 k t�. ra`I ',}: r., - ... - �a e:� 1+•j. ' •. � ... " r 1 ` y4 ', Ar. i_. * .;C 5.. S ni-,:i,d�f j,'•:'2.c1 -.l> t a- .�',:,V,r'-r. 1 _ r.'e, 1r t t. j :e 1 r ar`.t .P h y 1 - t .•, J - Y _ f ti,.t.. - - t = A- r `-w l,, '< -. t L S r s , - ` , /.! ' ii �Jir r 5 Jt,:t,tj . 4l.' p � r 'L.s r+-,r '' -jy" � t.• r 1 i. .I S -V ' j '`' 1'. L- a ,eEs } .y i V c K u t°°' yy rt ,a .rj 6 T s'.',"--'.%1— . `""'i,r•r'?'"'' 7 ' `J ''t 1t F '; r JJ �F p r ter.- y NU , .fk'9'4 r .'1%% r 1 yA;.,t , .r t)^ I, & ,may} >•. Yam,„. 4t"sSjt".i,t`--Yr"l,,m k4 ,1:�-•,,.' r r _ .+ -yfi �,y._{ , 1 f,• it 1 {i .t'r ' x f'1 I - :f v- . ; „�g,'�p ry. ,4:lks: 'far*, ' x ;r' 'j, `i', :,,. A�.j„:" i"• `�,.,.A �.4 - , .`� .� . ti ,e3' ° o-f',�.o ; T f�::'t is. �`,r 1Y;1 p• r j -,' 4 : ak tT' eT 1 r 1 f Y , 'r ri' j" !",TI,f ; �!r - +, p' yyAR t�k yy f t A' .:{ }-y,_ '.11.... 4; -e4 P I. "M{ } -?• 6 v n,4 :r it yr,x, r y r4,f? i. Tr -v� tid ':£..'� ry- it .sg, .s4 ,W �`..1,,- �FI'M,yritFir V `�`rwir 4 'y ;'i• �1. �r... .. J. ., 1 r.:-.0 ,C \. «�.sk '. Y rr r- �}' { : G C "r' . tv-; `r kr i' r' !"�.f A ; k : ,I'' 1'i' N t Q 4i i- ,. t . ,— . .,. !;ih A - £ ; ,T' 1. a t t,r',_ S f '" v`,' 3".� h �'k' ' l;�C-"` $3,!1 �i 'i " p, 3, ya, ' f •T;.t , 1" _ Tir'. 6 „`'s r^• r;�.ty d i':1'V:.,, ta• �_ 1a.- x :>1 ,,: �, � Y�}.rr "`v '4'. '"5,.1 .r'rs "i i` ,* _ •r. >_�.-1aa "' ° �,�:'.. V + -:a ,'•, ti''I.'t ? v .°i •"n"'+-° r f ti. 4uti'1 IJ' ,R;y p, 5Lk 1� �C vW` a, *- r}t aYj9 . ' r 4. 'l+s vM -1i ' �•. 4 .`,. , ��:. .' s `i'; ^ - 1 M ' M-: ,YiFa s' ' -i T, }a L•�.. r - 7 r r �1` f• 4";—tir.""t "••' ; J 'p= V sk -�' �' -`.{ h?fsr�y V- ?.ry, 1 ,rye •1• 'ra -ar Cs Ta' -;Zr ..t; i e . r � k Y .r ' ��T, S - ,,, � a" '�-7 - .I. ' :r, � dIY* r rI. ..r . -.' r y. §�:�a Q d J r . } ;j. ,.�,- ti ,, �N-��'V4: ahm :"ria , •✓ri '1: �'N, fit, s, r.� --r lr a, t`, x . �, -'' , 4- .a..4� _i r 1 y: I.r• r`, - i ,f: err.; M. :, `:R, LT ;#y r •,,:r '-E t ,,c.C, rx:' p..2t `` d `�. ' s..'r' y 5:., 1. :tk 2 !4'+i"- 't w y5.' �:fi i. r+'f i-%%. ' ".a ;t, .. `1 J .,w ••'1,.. r1;..n -1 , -'r JY . .v �' ? ,_3',,fy: �," .,, , � pi r x .`.; w a ,r ..,� ' i}? .i,- ti x"+.i o e y `,.� r!}. ,i 'h = ::.,{i '•' 1••. V 7""'.1 '{� rj,ii.`• $h••- 1e rP Yi ti. 3>J' 'hr7 : x }i' S � , tS'r, , :d+ y; a, yyr tut '' }b r,i ?,r `f rya .. t 5f i , iu � * ,.� :i • r /kr. ,.rr., .y , d .,�y, a� �.' �'i�a A �" i ; :+R . t '�"7A C} 'a y .�' 4— i i it i t 1 r r• M ,�, R . M, r,.f}7 .E' �.6 Ci�,9 J.§ d4'. STATE OF NORTH CAROLINA Department of Environment and Natural Resources Raleigh Regional Office 3800 Barrett Drive, 'Suite 101, Raleigh, NC 27609 919/571-4700 File Access Record SECTION TIME/DATE NAME REPRESENTING: Guidelines for Access: The staff of the.Raleigh Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following uidelines before slanina the form: 1. We prefer that you call at least a day in advance to schedule an appointment to review the files. Appointments will be scheduled between 9:00 a.m. and 3:00_apm. Viewing time ends at 5:00 p.m. Anyone arriving without an appointment may view the files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name. The number of files that you may review at one time will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is 10 cents for ALL copies if you make more than 25 copies - there is no charge for less than 25 copies; payment may be made by check, money order, or cash at the reception desk. You can also be invoiced. 4. FILES MUST BE KEPT IN THE ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00. 5. In accordance with General Statute 25-3-512, a $20.00 processing fee will be charged and collected for checks on which payment -has been refused. FACILITY NAME COUNTY 1. r 4 rye �� (Va r4 IM 2. 3. 4. 5. Signature and Name of Firm/Business at Time In Time Out Freese attach a bushmm cmd to dots fine _LG! •NOV ROUTING SLIP • 1)Type of violation (pick one): illegal discharge _ (discharge) oil spill inspection of minor source _ (oil spill) _ (inspectmin) inspection of major source (inspectmaj) pretreatment _ (pretreat) wetland (wetland) poultry operation _ (poultry) swine operation X (swine) dairy/cattle operation _ (cow) other _ (other) 2) Will the vio. result in a recommendation of enforcement? (y, n, ?) ! i 3) Is the violation resolved? N 4) Target date for enforcement report? w✓ 4 . 5) Comments (50 spaces) f e torJ kee�-V 5) Routing OPA-(initial/d 3 /?to3 U r� U r� ,46 , 3Y A W S 6 �&03q .,o !ME 1ACDrVrrT?'1_- mr NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGN REGIONAL OFFICE Division of Water Quality March 16, 1998 Mr. Rudy Grammer Smithfield Carroll's P.O. Box 1240 Waverly, Virginia 23890 Subject: Notice of Deficiency Farm # 11 Permit No. AWS660034 Northampton County Dear Mr. Grammer: On March 3, 1998, Mr. Buster Towell Regional Office conducted a compliance ;subject animal operation. This inspection 5 gDivision's effort to determine compliant ;Animal Waste Management Regulations. from the Raleigh inspection of the is a part of the e with the State's Mr. Towell's site visit determined that wastewater from your facility was not actively discharging to the surface waters of the State, nor were any manmade pipes, ditches, or other willfully result of observed: prohibited conveyances (for the purpose of discharging wastewater) observed. However, as a the inspection, the following deficiency was Record keeping at these facilities needs improvement. There should be copies of the waste application records kept on site on the approved forms labeled IRR-1 and IRR-2. These forms should be separated by field number,crop type, and crop cycle so that an accurate determination of nitrogen balance can be assessed. These records are to be signed by the Operator In Charge designated for each facility. On the date of inspection no records were available to indicate amounts of wastewater and nutrients applied. Without these records there is no way to determine compliance with the State's regulations. 3800 BARRETT DRIVE, 6UJTE 101, RALEIGH, NORTH CAROLINA 27609 PHONE 919-371-4700 FAX OIO-571-4718 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER- 50% RECYCLED/1 O% POST -CONSUMER PAPER .7 • Mr. Rudy Grammer ` Page 2 • • • The deficiencies regarding record keeping should be corrected to reflect an accurate record of land application activity at the subject farms. The Raleigh Regional Office suggests that you check your records and adjust them accordingly back to the first of calender year 1998. By doing so, the facilities can again be considered to be in compliance with their approved animal waste management plans and regulations governing 'the requirements for Certified Operators in Charge. Please respond to this Notice within 30 days of your receipt, outlining what measures that you will take to correct the above deficiencies. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this matter please call Mr. Buster Towell at 9919) 571-4700. Sincerely, enne c ust r, P.E. Regional Supervisor cc: Northampton County Health Department Mr. Tony Short, Northampton Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC--RRO DWQ Compliance Group RRO Files NOD 66\34 Murphy -Brown, LLC Growers): Farm Name: 4/9/2009 P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN (o Clo -- Murphy -Brown, LLC Farm 11 County: Northampton Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 1000 Wean to Feeder Feeder to Finish Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation RECEIVED 1 DENR 1 DWQ Aquifer Prntartinn SPdjorl APR Q 9 2009 The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. ` 71 rr 1 of 8 1 r`J r This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft3, tons, etc.): `Based on site specific data Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gallyr gallyr Farrow to Feeder 4015 gallyr gallyr 1000 Farrow to Finish 7416.242 gallyr 7,416,242 gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 gall r gallyr Total 7,416,242 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibslyr Ibs/yr Farrow to Feeder 6.5 Ibslyr Ibslyr 1000 Farrow to Finish 12.311 lbs/yr 12,311 lbs/yr Wean to Feeder 0.48 Ibslyr Ibslyr Feeder to Finish 2.3 Ibslyr Ibslyr Total 12,311 1 bslyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 63.17 Total N Required 1st Year: 18927.6425 Total N Required 2nd Year: 15337.86 Average Annual Nitrogen Requirement of Crops: 17,132.75 Total Nitrogen Produced by Farm: 12,311.00 Nitrogen Balance for Crops: (4,821.75) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of8 �Reception Area Specifications Tract Field Irrigated Soil I st Crop Time to istCrop 1$tCrop LbsNjAc Lbs N Total lb Acreage Type Code _ _Apply_ Yield _Ibs N/Unit Residual lAc Utiliz 3(a) of 8 Reception Area Specifications Trw:t Field Irrigated Soil 1st Crop Time to lstCrop 1stCrop LbsNiAc Lbs N Totallio-s-N Acreage Type Code Agply Yield _.Ibs N/Unit Residual /Ac Utilized 2-nd-Cro-p- Tim-eto 2ndCr*p 2ndCrop--Lbs-N-/A-c--Ll&iN-T&allbsN���i�� Code Apply Yield lbs N/Unit Residual /Ac Utilized OUR=I 3(b) of 8 Reception Area Specifications 200412010AmendmentforPumpingAgreement-AenvayApplication-Davis Tract Field Irrigated Sail 1st Crop Time to 1st Crop 1st Crop Lbs NfAc Lbs N Total Ibs N Arrea e Type Code Apply Yield Ibs N1Unit Residual lAc Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs NIAc Lbs N Total Ibs N Code Apply Yield Ibs NlUnit Residual lAc Utilized Total Lbs N1Ac Total Ibs N Utilized 2384 1 17.3 Gritney I F -Au 675.0 0.12 81 1401.3 N r 45 2.4 108 1868A 189 3269.7 2 13 Grim F -Au 675.0 0.12 81 1053 N r 45 2.4 108 1404 189 2457 3 7.5 Norfolk F -Au 875.0 0.12 105 787.5 N r 60 2.4 1" 1080 249 1867.5 4 19.4 Gritne F -Au 675.0 0.12 81 1571.4 N Sept -Apr 45 2A 108 2095.2 189 3666.6 5811 1 3.4 Norfolk F -Au 875.0 0.12 105 357 Cover t r 1 35 35 119 140 476 2 8.7 Norfolk F -Au 875.0 0.12 105 913-5 Cover 1 35 35 304.5 140 1218 3 4.06 Norfolk F Aar-Aun 875.0 0.12 105 426.3 Cover 1 35 35 142.1 140 568.4 4 4.1 Norfolk F -Au 875.0 0.12 105 430.5 Cover 1 35 35 143.5 146 574 5 3.84 Gold F -Au 925.0 0.12 ill 426.24 Cover 1 35 35 134.4 146 560.64 5810 1 11.5 Norfolk F -Au 875.0 0.12 105 1207.5 Cover 1 1 35 35 402.5 140 1610 2 15.6 Norfolk F 875.0- 0.12 105 1638 Cover 1 35 35 546 140 2184 2384 1 17.3 Gri D Feb1 100.0 1.25 125 2162.5 N 45 2.4 108 1868.4 233 4030.9 2 13 Gritne D Feb1 100.0 1.25 125 1625 N 45 2.4 108 1404 233 3029 3 7.5 Norfolk D Feblfi-June 115.0 1.25 1" 1078A25 N r 60 2.4 144 1080 287.75 2158.125 4 19.4 Gritn D Febl 5-Junel i00.0 1.25 125 2425 1 N Sept -Apr 45 2.4 108 2095.2 233 4520.2 5811 1 3.4 Norfolk D Feb15Jun 115.0 1.25 144 488.75 Cover Se r 1 35 35 119 178.75 607.75 2 8.7 Norfolk D Febl5-Jtrnel 115.0 1.25 144 1250.625 Cover 1 35 35 304.5 178.75 1555.125 3 4A6 Norfolk D Febl5-Junal 115.0 1.25 1" 583.625 Cover 1 35 35 142.1 178.75 725.725 4 4.1 Norfolk D Febi6Jun 115.0 125 144 589.375 Cover 1 35 35 143.5 1. 178.75 732.875 5 3.84 Goldsboro D Feb'15-June 130.0 1.25 163 624 Cover 1 35 35 134.4 197.5 758.4 5810 1 11.5 Norfolk 0 FeblS-June 115.0 1.25 144 1653.125 Cover Qop SeptApr1 35 35 402.5 178.75 2055.625 2 15.6 Norfolk D Feb15-June 115.0 1.25 1" 2242.5 Cover 1 35 35 546 178.75 2788.5 2384 1 17.3 Gritn O Jun -Sept 35.0 4 140 2422 N SeptApr 45 2A 15 93 1608.9 233 4030.9 2 13 Gitney O Jun -Sept 35.0 4 140 1620 N Sept -Apr 45 2A 15 93 1209 233 3029 3 7.5 Norfolk O Jun -Sept 42.0 4 168 1260 N Sept -Apr 60 2.4 15 129 967.5 297 2227.5 4 19.4 Ghtny O Ju 35.0 4 140 2716 N SeptAor 45 2.4 15 93 1804.2 233 4520.2 5811 1 3.4 Norfolk O Jun -Sept 42.0 4 168 5711 Cover SeptApr 1 35 15 20 68 198 639.2 2 8.7 Norfolk O Jun -Sept 42.0 4 168 1461.6 Cover Cr Sept -Apr 1 35 15 20 174 188 1635.6 3 4.06 Norfolk O Jun 42.0 4 168 682.08 Cover ! 1 35 15 20 81.2 188 763.28 4 4.1 Norfolk O Jun 42.0 4 168 688.8 Cover 1 1 35 15 20 82 188 770.8 5 3.84 Goldsboro 0 Jun 45.0 4 180 691.2 Cover t 1 35 15 20 76A 200 768 5810 1 11.5 Norfolk 0 J 42.0 4 168 1932 Cover ! 1 35 15 20 230 188 2162 2 15.6 Norfolk O J 42.0 4 168 2620.E Cover 1 35 15 20 312 188 2932.6 5811 1 3.4 Norfolk 0 0 N t 60 2.4 15 129 438.6 129 438.6 2 8.7 Norfolk 0 0 N 60 2.4 15 129 1122.3 129 1122.3 3 4.06 Norfolk 0 0 N t r 60 2.4 15 129 523.74 129 523.74 4 4.1 Norfolk 0 0 N Sept -Apr 60 2.4 15 129 $28.9 129 528.9 5 3.84 Goldsboro 0 0 N Sept-AprSept-Apr 2.4 15 141 541.44 141 541.44 581E 1 11.5 Norfolk 0 0 N Set 60 2.4 15 129 1483.5 129 1483.5 2 15.6 Norfolk 0 0 N Sept -Apr 60 2.4 15 129 2012.4 129 2012.4 Totals: 376.4 41800.55 29743.68 71544.23 !Reception Area Specifications 200412010 Amendment for Pumping Agreement - Aerway Application - Davis Tract Field Irrigated Soil I it Crop Timeto 1stCrop 1stCrop LbsNlAc LbsN TotallbsN�L;Z= Acreage Type Code Apply Yield lbs NlUnit Residual lAc Utilized M-Mr.1111110r.1 I -To; I Is rinw [MTM�[-� I MM �MMMM „ i����v�*�� � � � ����t�•*�a����©�®®imp � � � � ��■ ram■■ ■■� � � � �� �■ �■■� � � � i�.■■R ■■�■■■ � � �■■� ■■■wry �� � � �� �� ■�■■■ �� � �■■�� ram■■ ■� � � � �■■� � � � Reception Area Specifications 200612010 Amendment for Pumping Agreement - Aerway Application - Tayfor Tract Field Irrigated Soil 1st Crop Time to 1st Crop 1st Crop Lbs N1Ac Lbs N Total lbs N Acreage Type Code Apply Yield lbs N1Unit Residual lAc Utilized 2nd Crop Time to 2nd Crap 2nd Crop Lbs NIAc Lbs N Total lbs N Code Apply Yield lbs NlUnit Residual lAc Utilized Total Lbs N1Ac Total lbs N Utilized 2398 1 7.8 Gritne F Mar-A 675A 0.12 61 631.8 CaverCro Se 1 35 35 273 116 904.8 2 5.1 Gritne F Mar -A 675.0 0.12 61 413.1 Cover C. 1 35 35 178.5 116 591.6 3 41.9 Norfolk F Mar -A 875.0 0.12 105 4399.5 Coverprop Se 1 35 35 1466.5 140 5866 2399 1 38.3 Grime F Mar-Aug675.0 0.12 81 3102.3 Cover Cro 1 35 35 1340.5 116 4442.8 2 7.1 Gritne F Mar -A 675.0 0.12 81 575.1 Cover Crop Se 1 35 35 248.5 116 823.6 3 1.7 Norfolk F Mar A 875.0 0.12 105 178.5 Cover Cro 1 35 35 59.5 140 238 4 3 Norfolk F Mar -A 875.0 0.12 105 315 Cover Cro 1 35 1 35 105 1 140 420 5 1 Gritne F Mar-A 675.0 0.12 81 81 Cover 1 35 35 35 116 116 6 19.7 Norfolk F Mar -A 875.0 0.12 105 2068.5 Cover C 1 35 35 689.5 140 2758 7 10.4 Grime F Mar-A 675.0 0.12 81 842.4 Cover Crop 5e 1 35 35 364 116 1206.4 B 1.7 Gritne F Mar-A 675,0 0.12 81 137.7 Cover 1 35 35 59.5 116 197.2 9 2.3 Gritne F Mar-A 675.0 0.12 81 186.3 Cover 1 35 35 80.5 116 266.8 10 19.6 Gritne F Mar-A 675.0 0.12 81 1587.6 Cover 1 35 35 686 116 2273.6 2398 1 7.8 GrItnev O Feb15-June 100.0 1.25 125 975 N 45 2.4 108 842.4 233 1817.4 2 5.1 Gritne D Feb15June 100.0 1.25 125 637.5 N 45 2.4 1 108 550.8 1 233 1188.3 3 41.9 Norfolk D Feb15-June 11&0 1.25 143.75 6023.125 N 60 2.4 144 6033.6 287.75 12056.73 2399 1 38.3 Gritney D Feb15-June 100.0 1.25 125 4787.5 N 45 2.4 108 4136,4 233 8923.9 2 7.1 Gritney D Feb15June 100.0 1.25 125 887.5 N q?r45 2.4 108 766.8 233 1654.3 3 1.7 Norfolk D Feb15June 115.0 1.25 143.75 244.375 N 60 2.4 144 244.8 287.75 489.175 4 3 Norfolk D Feb15June 11&0 1.25 143.75 431.25 N 60 2.4 144 432 287.75 863.25 6 19.7 Norfolk D Feb15June 115.0 1.25 143.75 2931.875 N 60 2.4 144 2836.8 287.75 5668.675 7 10.4 Gritney 0 Feb15June 100.0 1.25 125 1300 N %W-Apr 45 2.4 108 1123.2 233 2423.2 8 1.7 G ' D Feb15June t00A 1 1.25 1 125 212.5 N 45 2.4 1 108 183.E 1 233 396A 9 2.3 Gritney 0 Feb15June 100.0 1.25 125 287.5 N 45 2.4 108 248.4 233 535.9 10 19.6 GLAM 0 Feb15June 100.0 1.25 125 2450 N 45 2.4 108 2116.E 233 4566.8 2398 1 7.8 GdDM O Apr -Aug 35.0 4 140 1092 0 0 140 1 1092 2 5.1 Gritney O 35.0 4 140 714 0 0 140 714 3 41.9 Norfolk O A 42.0 4 168 7039.2 0 0 168 7039.2 2399 1 38.3 Grltney O Apr-Auq 35.0 4 140 5362 0 0 140 5362 2 7.1 Gritney O 35.0 4 140 994 0 0 140 994 3 1.7 Norfolk O A AuQ 42.0 1 4 1 168 285.6 1 0 1 0 16B 285.6 4 3 Norfolk O 42.0 4 168 504 0 0 168 504 6 19.7 Norfolk O Apr -Aug 42.0 4 168 3309.6 0 0 1 168 3309.E 7 10.4 Grime 0 AIX-Auq 35,0 4 140 1456 0 0 140 1456 8 1.7 Gntnev O A -A 35.0 4 140 238 0 0 140 238 9 2.3 Gritrra O -A 35.0 4 140 322 0 0 140 322 10 19.6 G' O A r A 35.0 4 140 2744 0 0 140 2744 Subtract 15 lbs res. N 0 0 from anv crop followi soybeans 0 0 L if Subtract lbs of N applied to cover 0 0 crop from the foll2wr crop. Q Q Tofals: 476.8 59647.33 25101.6 84748.93 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized / unit yield A Barley 1.6 Ibs N 1 bushel B Hybrid Bermudagrass - Grazed 50 Ibs N 1 ton C Hybrid Bermudagrass - Hay 50 Ibs N / ton D Corn - Grain 1.25 Ibs N / bushel E Corn - Silage 12 Ibs N 1 ton F Cotton 0.12 Ibs N / ibs lint G Fescue - Grazed 50 Ibs N 1 ton H Fescue- Hay 50 Ibs N / ton Oats 1.3 Ibs N / bushel J Rye 2.4 Ibs N / bushel K Small Grain - Grazed 50 Ibs N 1 acre L Small Grain - Hay 50 Ibs N / acre M Grain Sorghum 2.5 Ibs N / cwt N Wheat 2.4 Ibs N / bushel O Soybean 4.0 Ibs N / bushel P Pine Trees 40 Ibs N 1 acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT rlanimai Farm Totall r Farrow to Wean 0.84 Farrow to Feeder 1 1000 Farrow to Finish 4.1 4100 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 4100 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 20500 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 68 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 164 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant _ Type Crop in/hr * inches 125 A Norfolk D 0.5 1 B Norfolk D 0.5 i C Norfolk D 0.5 1 D Norfolk D 0.5 1 E Norfolk D 0.5 1 F Gritney C 0.5 1 G Gritney C 0.5 1 H Gritney C 0.5 1 1 Norfolk C 0.5 1 J Gritney C 0.5 1 K Bonneau C 0.75 1 125 subl Norfolk D 0.5 1 sub4&7 Gritney C 0.5 1 sub6 Norfolk D 0.5 1 sub8 Bonneau C 0.75 1 125 3s Norfolk D 0.5. 1 6 of 8 Additional Comments: Subfield acres listed in this plan is the balance of total field acres minus wet acres. Subfield acreage will be claimed when applyin g with an aerway machine. Fields A-E ,Sub 1 M were changed to a corn, wheat, soybean rotation. The following residuals need to be deducted. 15 Ibs from any crop following soybeans. All PAN applied {up to 35 Ibs allowed} from any crop following cover crop. A cover crop can be planted on row crop fields. Application dates are September - April at a rate of 35 lbs. 7 of 8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Farm 11 Owner: Murphy -Brown, LLC Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. 11we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: M Signature: Name of Manager (if different from owner): Signature: Name of Technical Specialist: Amy E. Roberson Affiliation: Murphy -Brown, LLC Address: 2822 Hwv 24 West. PO Drawer 856 Signature: Warsaw, NC 28398 Telephone; (910) 293-3434 Date Date Date 8of8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recievinq crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary; to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3 of 3 Waste Management Plan Changes Facility �� 3 _ T Farm I r QCioe"I alli, This farms Waste Management Plan has made the following changes: ❑ Crop changes ❑ Wetted Acres Increased Acreage ❑ Decreased Acreage ❑ Changed Irrigation Design ❑ Change in Farm type ❑ Plan based on 3 Years On Farm Records ❑ Other Comments: S-\5-0g Date 1�rj,, MAY 1 7 ?007 Murphy -Brown, LLC 5/15/2007 P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Farm Name: Murphy -Brown, LLC Farm 11 county: Northam to Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 1000 Wean to Feeder Feeder to Finish Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of $ l � � MAY 17 2007 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft3, tons, etc.): "Based on site specific data Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gallyr gallyr Farrow to Feeder 4015 gallyr gallyr 1000 Farrow to Finish 7416.242 gallyr 7,416,242 gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 gallyr gallyr Total 7,416,242 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (ibs): Capacity Type Nitrogen Produced eer Animal Total Farrow to Wean 5.4 lbslyr lbs/yr Farrow to Feeder 6.5 lbslyr Ibs/yr 1000 Farrow to Finish 12.311 lbslyr 12,311 lbslyr Wean to Feeder 0.48 lbslyr lbslyr Feeder to Finish 2.3 Ibs/ r Ibsl r Total 12,311 Ibs! r Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 60.74 Total N Required 1st Year: 18264.86 Total N Required 2nd Year: 14929.62 Average Annual Nitrogen Requirement of Crops: 16,597.24 Total Nitrogen Produced by Farm: 12,311.00 Nitrogen Balance for Crops: (4,286.24) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 8 Reception Area Specifications Tract Field Irrigated Soil Ist Crop Timeto IstCrop IstCrop LbsN/Ac LbsN TOWI Acreage Type Code Apply Yield lbs NfUnit Residual IAC UtIlizea Tim M I ��©■� =�o�®�a■�®�����©E���■vim®� 3(a) of 8 Reception Tract Field Irrigated Soil 1st Crop Timato 1$tCrop IstCrop LbsN/Ac Lbs N 7' 1 Mm-N ------- App - ths NlUnit Residual /Ac Utilized Yield I ' Code Yield lbsNIUnit Residual /Ac Utilized Apply Emu= ■u■■�©�r�o�s�®o�®moo■��om� ,, �®� ■ ������om�s���o��r0�o■���■���o■�¢aOREM �� � �� �■� � �� ■� � �� �� � ■ram � �■ �� �� �� ■�r� �� �� 3(h) of 8 Reception AreaSpecifcations 20"gOl0Ameadme-Mfor Pumping Agreement -AerwayAppltcatfon-Davis Tract Field Irrigated Soil 1st Crop Time to 1st Crop 1st Crop Lbs NlAe Lbs N Total Ibs N Acrea e Type Code Apply Yield Ibs WUnit Residual fAc Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs NIAc Lbs N Total Ibs N Cade Apply Yteid Ibs NlUnit Residual lAc Utilized Total Lbs NIAc Total Ibs N Utilized 2384 1 17.3 G6tne F A r-Au 675.0 0,12 81 1401.3 N t• r 45 2.4 100 1868.4 189 3269.7 2 13 Grilna F r-Au 675.0 0.12 81 1D53 N Se - r 45 2.4 108 1404 189 2457 3 7.5 Norfolk F Apr -Aug 875.0 0.12 105 787.5 N Se t- r 60 2.4 144 1080 249 18674 4 19.4 Gritne F Apr-Aug675.0 0.12 81 1571.4 N Se t- r 45 2A 108 2095.2 189 3666.6 5811 1 3.4 Norfolk F A r-Au 875.0 0.12 105 357 Cover Se t- r 1 35 35 119 140 476 2 8.7 Norfolk F r-Au 875.0 0.12 105 913,5 Cover C Se t- r 1 35 35 304.5 140 1218 3 4.06 Norfolk F r-Au 875.0 0.12 105 426-3 Cover Se t- r 1 35 35 142.1 140 568.4 4 4.1 Norfolk F r-Au 875.0 0.12 105 430.5 Cover C Se t- r 1 35 35 143.5 140 574 5 3.64 Goldsboro F A r-Au 925.0 0.12 111 42624 Cover Gr Sept -Apr 1 35 35 134.4 146 560.64 5810 1 11.5 Norfolk F r-Au 875-0 0,12 105 1207,5 Cover Cro Seat -Apr 1 35 35 402.5 140 1610 2 15.6 Norfolk F A r-Au 875.0 0.12 105 1635 Cover Cro Se I r 1 35 35 546 140 2184 2384 1 17.3 Gritne D FebtS-Jun 100.0 1.25 125 2162-5 N Sept -Apr 45 2A 108 186804 233 4030.9 2 13 Gntne D FebtS-Jun 100.0 1.25 125 1626 N Sept -Apr 45 2.4 108 1404 233 3029 3 7.5 Norfolk D Feb 15-Ju 115.0 1.25 144 1078.125 N Se t- r 60 2.4 144 1080 287,75 2158.125 4 19.4 GnIne 1] Feb15-Jun 1MI) 1.25 125 2425 N Sept -Apr 45 2.4 108 2095.2 233 4520.2 5811 1 34 Norfolk D FeblSJun 115.0 1.25 144 488.75 Cover Cro Sept -Apr 1 35 35 119 178-75 607.75 2 8.7 Norfolk D Feb15-Jun 115.0 1.25 144 1250.625 Cover Cro Sept -Apr 1 35 35 304,5 178,75 1555.125 3 4.06 Norfolk D Feb15-Jun 115A 1.25 144 583.625 Cover Cro Se t- r 1 35 35 142.1 178.75 725,725 4 4,1 Norfolk U Feb15-Jun 115-0 125 144 589,375 Cover Cro Sept -Apr 1 35 35 143.5 178.75 732.875 5 3.84 Goldsboro D Feb lSJun 130-4 125 163 624 Cover Cro Sept -Apr 1 35 35 134.4 197.5 758.4 5810 1 11.5 Norfolk D Feo15-Jun 115.0 125 144 1653.125 Cover Cro Se t- r 1 35 35 402.5 178.75 2055.625 2 15.6 Norfolk D Feb15 Jun 115-0 7.25 144 2242.5 Cover C Sept -Apr 1 35 35 546 178.75 2788.5 2384 1 17.3 Gnuley O Jun -Sept 35.0 4 140 2422 N Se I- r 45 2.4 15 93 1608.9 233 4030.9 2 13 Gritne O Jun -Sept 35.0 4 140 1820 N Se t- r 45 2.4 15 93 1209 233 3029 3 7.5 Norfolk O Jun -Sept 42.0 4 168 1260 N Se t- 60 2.4 15 129 967.5 297 2227.5 4 19A Gritne O Jun -Sept 35.0 4 140 2716 N t- r 45 2.4 15 93 1B042 233 4520.2 5811 1 3.4 Norfolk O Jun -Set 42.0 4 168 571.2 Cover Cro Se t- r 1 35 15 20 68 188 639.2 2 8.7 Norfolk O Jun -Set 42.0 4 168 1461.6 Cover Cr t r 1 35 15 20 174 188 1635.6 3 4.06 Norfolk O Jun -Set 42.0 4 168 6B2-08 Cover Cro Se t- r 1 35 15 20 81.2 188 763.28 4 4.1 Norfolk 0 Jun -Set 42.0 4 168 688.8 Cover Crop SeptApr 1 35 15 20 82 188 770.8 5 3.84 Goldsboro O Jun -Set 45-0 4 180 691.2 Cover Cro Sept -Apr 1 35 15 20 76.8 200 768 5810 1 11.5 Norfolk O Jun -Set 42.0 4 168 1932 Cover Cro Sew -Apr 1 35 15 20 230 188 2162 2 15.6 Norfolk O Jun -Sept 42-0 4 168 2620.8 Cover Cro Se t- r 1 35 15 20 312 188 2932A 5811 1 3.4 Norfolk 0 0 N Sept -Apr 60 2.4 15 129 438.E 129 438.6 2 8.7 Norfolk 0 0 N Se t- r 60 2A 15 129 1122.3 129 1122.3 3 4.06 Norfolk 0 0 N Sept -Apr 60 2-4 15 129 523.74 129 523.74 a 4.1 Norfolk 0 0 N Se [- r 60 2.4 15 129 528.9 129 528.9 5 3.84 Goldsboro 0 0 N Seot-Apr 65 2A 15 141 541A4 141 541.44 SIM 1 11.5 Norfolk 0 1 0 N Sept -Apr 60 2.4 15 129 14815 129 1483,5 2 15.6 Norfolk 0 0 N Seat-Aor 60 2.4 15 129 2012.4 129 2012.4 Totals: 376.4 41800.55 29743.68 71544.23 Reception Area Specifications r 1 Tract Field trrigated Sail ist Crop Thm to IstCrop IstCrop LbsWAc LbsN Tow Acreage Type Code Apply Yield lbs NJUrtit Residual JAC Utilized 11111111-TV, ��®WYS7'+'+Li0LL1�51��LI 1 1 ®-��©4���91Ya�•r.p��.®�-®' �� Reception Area Specifications 200612010 Amendment for Pumping Agreement - Aerway Application - Taylor Tract Field Irrigated Soil 1st Crop Time to lsl Crop 1st Crop Lbs NlAc Lbs N Total Ibs N Acrea e Tvoe Code Apply Yield Ibs Nltfnit Residual JAc Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs N1Ac Lbs N Total Ibs N Code Apply Yield ibs Nlllnit Residual !Ac Utilized Total Lbs N1Ac Total Ibs N Utilized 2398 1 7.8 Grime F Mar -Awn 675.0 0.12 81 631.8 Cover Crop Se t-A r 1 35 35 273 116 904.8 2 5.1 Gritne F Mar -A 675.0 0.12 81 413.1 Cover CER Sept -Apr 1 35 35 178.5 116 591.6 3 41.9 Norfolk F Mar-A 675.0 0.12 105 4399.5 Cover Crop Sept -Apr 1 35 35 1466.5 140 5866 2399 1 38.3 Gritne F Mar -Aug 675.0 0.12 81 3102.3 Cover Crop Sept -Apr 1 35 35 1340.5 116 4442.8 2 7.1 Gritney F fAar-Auq 675.0 0.12 81 575.1 Cover Crop Sept -Apr 1 35 35 248.5 116 823.6 3 1.7 Norfolk F Mar-A 875.0 0.12 105 178.5 Cover Crop Sept -Apr t 35 35 59.5 140 238 4 3 1 Norfolk F I Mar-A 875.0 1 0.12 105 315 1 Cover Crop Se t-A r 1 1 35 1 35 105 1 140 420 5 1 Gritne F Mar-A 675.0 0.12 81 81 Cover Crop Sept -Apr 1 35 35 35 116 116 6 19.7 Norfolk F Mar-A 875.0 0.12 105 2068.5 Cover Crop Se -A r 1 35 35 689.5 140 2758 7 10.4 Gdtne F Mar-A 675.0 0.12 81 MA Cover Crop Sept -Apr 1 35 35 364 116 1206A 8 1.7 Gritne F Mar-A 675.0 0.12 81 137.7 Cover Cro Sept -Apr 1 35 35 59.5 116 197.2 9 2.3 Gritne F Mar-A 675.0 0.12 81 186.3 Cover Crop S -A r 1 35 35 80.5 116 266.8 10 19.6 Gritne F Mar -Aug 675.0 0.12 81 1587.6 Cover Crop Sept -Apr 1 35 35 686 116 2273.6 2398 1 7.8 Grime D FeW-June 100.0 1.25 125 975 N I Se -A r 45 2.4 108 842.4 233 1817.4 2 5.1 1 G61nev D Feb15-June 100M0 1.25 125 637.5 N Sept -Apr 45 1 2.4 1 108 550.8 1 233 1188.3 3 41.9 Norfolk D Feb15-June 115.0 1.25 143.75 6023,125 N Se t-A r 60 2.4 144 6033.6 287.75 12056.73 2399 1 38.3 Grime D Feb15-June 100.0 1.25 125 4787.5 N Sept -Apr 45 2.4 108 4136.4 233 8923.9 2 7.1 Gritney D Feb15-June 100.0 1.25 125 887.5 N Sept -Apr 45 2.4 108 766.8 233 1654.3 3 1.7 Norfolk D Feb15-June 115.0 1.25 143.75 244.375 N Sept -Apr 60 2.4 144 244.8 287.75 489.175 4 3 Norfolk D Feb15-June 115.0 1.25 1 143.75 431.25 N Sept -Apr 60 2.4 144 432 287.75 863.25 6 19.7 Norfolk D Feb15-June 115.0 1.25 143.75 2831.875 N Se t-A r 60 2.4 1" 2836.8 287.75 5668.675 7 10.4 Grime D Feb15-June 100.0 1.25 125 1300 N Sept -Apr 45 2.4 108 1123.2 233 2423.2 8 1.7 1 Gritney ❑ Fe415-June 100.0 1.25 125 212.5 N Sept -Apr 45 2.4 108 183.6 233 396.1 9 2.3 Gritney D Febl5-June 100.0 1 1.25 125 287.5 N SeptApw 45 2.4 108 248.4 233 535.9 10 19.8 Grib)ey D Feb15-Jtrne 100.0 1.25 125 2450 N Sept -Apr 45 2.4 108 2116.8 233 4566.8 2398 1 7.8 Gritne O Apr -Aug 35.0 4 140 1092 0 0 140 1092 2 5.1 Gritne O Apr -Aug 35.0 4 140 714 0 0 140 714 3 41.9 Norfolk O Apr -Aug 42.0 4 168 7039.2 0 0 168 7039.2 2399 1 38.3 Grime O Apr -Aug 35.0 4 140 5362 0 0 140 5362 2 7.1 Gritne O Apr -Aug 35.0 4 140 994 0 0 140 994 3 1.7 1 Norfolk O 1 Aor-Auq 42.0 4 168 285.E 0 0 168 285.6 4 3 Norfolk O A r-AuQ 42.0 1 4 198 504 0 0 168 504 6 19.7 Norfolk O Apr-AApr-Ayg 42.0 4 168 3309.6 0 0 168 3309.6 7 10.4 Gritne O Apr-AApr-Apq 35.0 4 140 1456 0 0 1 140 1456 8 1.7 Gritne 0 Apr -Aug 35.0 4 140 238 0 0 140 238 9 2.3 Gritne 0 Apr -Aug 35.0 4 140 322 0 0 140 322 10 19.6 Gdtne O Apr -Au 35.0 4 140 27" 0 0 140 2744 Subtract 15 Ibs res. N 0 0 from aqy Crop followi soybeans 0 0 Subtract Ibs of N applied to cover 0 0 Cro from 0* followim crop. 0 0 Totals: 476.8 59647.33 25101.6 84748.93 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc; interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop A Barley B Hybrid Bermudagrass - Grazed C Hybrid Bermudagrass - Hay D Corn - Grain E Corn - Silage F Cotton G Fescue- Grazed H Fescue- Hay I Oats J Rye K Small Grain - Grazed L Small Grain - Hay M Grain Sorghum N Wheat O Soybean P Pine Trees Lbs N utilized / unit yield 1.6 lbs N 1 bushel 50 lbs N / ton 50 lbs N / ton 1.25 lbs N / bushel 12 lbs N / ton 0.12 lbs N I lbs lint 50 lbs N / ton 50 lbs N / ton 1.3 lbs N I bushel 2.4 lbs N / bushel 50 lbs. N / acre 50 lbs N / acre 2.5 lbs N / cwt 2.4 lbs N / bushel 4.0 lbs N / bushel 40 Ibs N / acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT rlanimal Farm Totall r Farrow to Wean 0.84 Farrow to Feeder 1 1000 Farrow to Finish 4.1 4100 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 4100 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 20500 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 68 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 164 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not. exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop in/hr inches 125 A Norfolk D 0.5 1 B Norfolk D 0.5 1 C Norfolk D 0.5 1 D Norfolk D 0.5 1 E Norfolk D 0.5 1 F Gritney C 0.5 1 G Gritney C 0.5 1 H Gritney C 0.5 1 1 Norfolk C 0.5 1 J Gritney C 0.5 1 K Bonneau C 0.75 1 125 sub1 Norfolk D 0.5 1 sub4&7 Gritney C 0.5 1 sub6 Norfolk D 0.5 1 sub8 Bonneau C 0.75 1 6of8 Additional Comments: Subfield acres listed in this plan is the balance of total field acres minus wet acres. Subfield acreage will be claimed when applying with an aerway machine. Fields A-E ,Sub 1M were changed to a corn, wheat, soybean rotation. 7 of 8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Farm 11 Owner: Murphy -Brown, LLC Manager: Owner/Manager Agreement: /we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. /we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owr Signature: Name of Manager (if different from owner): Signature: uate S-i5-Of Date Name of Technical Specialist: Amy E. Roberson Affiliation: Murphy-Brown,_LLC Address: 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 Telephone: 910 293-3434 Signature: qr�t^ (�-`+ S-�s-0 8of8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). i Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2of3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be -established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3 of 3 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT Facility Number: 66-34 County: Facility Name: Smithfield-Carroll's Farm 11 Certified Operator Name: Terry McClintock Operator Number: ANIMAL FACILITjgS=-:`�- ` Northampton 27441 1. Current liquid ievel(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 11S Spillway(Y or N): N Level(inches): 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day flans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility , l Earliest possible date to begin land application of waste: 05 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Rz,�-O- r t c) 1 Phone: SC T. Fa 'lity Owner/Man er (pr' t) Date: �JO OJT Facility OwnerlManager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 11S line m = 1846.8 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 1846.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 11 A Bermuda 4.31 310.00 1336.1 Mar -Sept B Bermuda 4.11 273.50 1124.1 Mar -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2460.2 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1846.8 lb. PAN PoA (30 Day) 2/21 /00 x. Crop's remaining PAN balance (line v from section III) = 2460.2 lb. PAN y. Overall PAN balance (w - x) _ -613 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 11S 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 18.01 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 791281 ftz e. line c112 x fine d x 7.48 gallons/W 49323 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 1000 certified herd # 1000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 3/4/2005 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 173019 fl3 i�ft3 103473.61 ft3 689388 gallons 2.50 Ibs11000 gal. 1846.8 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 66-34 County: Northampton Facility Name: Smithfield- CarrolI's Farm 11 Certified Operator Name: Terry McClintock Operator Number: 27441r j\ 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to t� lowest point on the top of the dam for lagoons without spillways; and from the current liquid lev in the lagoon to the bottom of the spillway for lagoons with spillways.s Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 + - Lagoon Name/lD: 11S Spillway(Y or N): N O/ Level(inches): 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. X Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: A [5 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. a � �+� Phone: UDq-. 1PFacility Ow r/Mana er (print) , �k ,, Date: i Facility Owner/Manager (signature) a r II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 11 S line m = 1846.8 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines1+2+3+4+5+6= 1846.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 40A&B 10 SG 4.72 33.13 156A Sept -Apr 11 SG 5.04 40.65 204.9 Sept -Apr 13 SG 5.35 42.68 228.3 Se t-A r 14 SG 6.38 21.49 137.1 Sept -Apr 1 A SG 3.27 24.56 80.3 Se t-A r 2A SG 6.02 24.56 147.9 Sept -Apr 3A SG 6.02 24.56 147.9 Sept -Apr 313 SG 3.75 24.56 92.1 Sept -Apr 4A SG 3.51 24.56 86.2 Sept -Apr 46 SG 4.23 23.47 99.3 Sept -Apr 6 SG 5.29 21.46 113.5 Sept -Apr 7 SG 4.85 21.48 104.2 Sept -Apr 8 SG 3.24 19.60 63.5 Se t-A r 9 SG 4.32 33.13 143.1 Sept -Apr 1A & B Bermuda 7.02 325.00 2281.5 Mar -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) - 4086.1 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1846.8 lb. PAN PoA (30 Day) 2121 /00 x. Crop's remaining PAN balance (line v from section III) = 4086.1 lb. PAN y. Overall PAN balance (w - x) = -2239 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility_. _ Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. Receiver lagoon is at Facility #66-5 Farm 40A&B. Current level at B lagoon is 28" and farm is fully stocked. PAN summary reflects crop system at Farm 40&B. PoA (30 Day) 2121I00 Q PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL_ FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): ills 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 79128 ftz e. line c112 x line d x 7.48 gallons/fts 49323 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 1000 certified herd # 1 D00 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated L 3/4/2005 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 173019 ft' ® ft3 103473.E ft3 689388 gallons 2.50 lbs11000 gal. 1846.8 lbs. PAN PoA (30 Day) 2/21100 Murphy -Brown, L.L.0 6/12/2006 P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Farm Name - Murphy -Brown, LLC Farm 11 county: Northampton Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 1000 Wean to Feeder Feeder to Finish Storaae Structure: Anaerobic L Storage Period: Application Method: >180 days Irrigation RECEIVED I DENR I DWQ AQIJIFFR'PRnTFr.TinN SECTION DEC 2 7 2006; The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. �]01A,lQ 1VNOID3� H9131'd�i NIG1 1 of 8 F . r,► 7nn7 C _ Wr` III -71 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft5, tons, etc.): *Based on site specific data Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gallyr gallyr Farrow to Feeder 4015 gallyr gallyr 1000 Farrow to Finish 7416.242 gallyr 7,416,242 gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 gallyr gallyr Total 7,416,242 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): Capacity Type Nitrogen Produced p2r Animal Total Farrow to Wean 5.4 Ibslyr Ibslyr Farrow to Feeder 6.5 Ibslyr Ibslyr 1000 Farrow to Finish 12.311 Ibslyr 12,311 Ibslyr Wean to Feeder 0.48 Ibslyr Ibslyr Feeder to Finish 2.3 Ibsl r Ibslyr Total 12,311 Ibs! r Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 60.74 Total N Required 1st Year: 18264.86 Total N Required 2nd Year: 13484.62 Average Annual Nitrogen Requirement of Crops: 15,874.74 Total Nitrogen Produced by Farm: 12,311.00 Nitrogen Balance for Crops: (3,563.74) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of8 SpecificationsReception Area Acreage Tract Field Irrigated soil 1 st Crop Time to 1st Crop Ist Crop Lbs N/Ac Lbs N Total lbs N 2nd Crop Time to 2nd Crup 2nd Crop Lbs N/Ac LbSN Total lbs N'�gmwm 3(a) of 8 Reception Area Specifications Tract Field Irrigated Soil Ist Crop Time to Ist Crop Ist Crop Lbr. NlAc Lbs N Total lb �■i ■ter ��■ �■ r� �� �� �� �� �� �� ■�� ter■ ��■ ��■ �� �� �■■�� �� �■ ����������������������■■■ram■■■������ ��■■� 3(b) of 8 Reception Area Specifications 2004aO10Amendment for Pumping Agreement -AerwayApplication -Davis Tract Field Irrigated Sail 1st Crop Time to 1st Crop 1st Crop Lbs NIAc Lbs N Total tbs N Aceea e Type Code Apply Yield Ibs NIUnft Residual IAc Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs NIAc Lbs N Total Its N Code Apply Yield Ibs NlUnit Residual lAc Utilized Total Lbs MAC Total Ibs N utilized 2384 1 17.3 Gritney Apr-Auq 675.0 0.12 81 1401.3 N Sept -Apr 45 2.4 108 1868.4 199 3269.7 2 13 Gritna FApr-Aug 675.0 0.12 Al 1053 N Sept:r 45 2.4 108 1404 189 2457 3 7.5 Norfolk FApr-Aug 875.0 0.12 105 787.5 N Sepl-Apr 60 2.4 144 1080 249 1867.5 4 19.4 Gritne FApr-Aug 675.0 0.12 81 1571.4 N Sept -Apr 45 2.4 108 2095.2 189 3666.6 5$11 1 3.4 Norfolk F Apr-Auq 875.0 0.12 105 357 L Sept-Aor 1 100 100 340 205 697 2 8.7 Norfolk F -Au 875.0 0.12 105 913.5 L Sept -Apr 1 100 10D 870 205 1783.5 3 4.06 Norfolk F Aor-Auo 875.0 0.12 105 426.3 L SeDt-Apr 1 100 100 406 205 832.3 4 4.1 Norfolk F Apr._Aug 875.0 0.12 105 430.5 L Sept -Apr 1 100 100 410 205 840.5 5 3.84 Goldsboro FApr-Aug 925.0 0.12 111 426.24 1 L Sept -Apr 1 100 1D0 394 211 810.24 5810 1 11.5 Norfolk FApr-Aug 675.0 0.12 105 1207.5 L Sept -Apr 1 100 100 1150 205 2357.5 2 15.6 Norfolk FApr-Aug 875.0 0.12 105 1638 L Sept t 100 S00 1560 205 3198 2384 1 17.3 Grime D Mar -Jul 100.0 1.26 125 2162.5 N Sept -Apr 45 24 108 1868.4 233 4030.9 2 13 Gritne ❑ MarJui 100.0 1.25 125 1625 N Sept -Apr 45 2.4 108 1404 233 3029 3 7.5 Norfolk D MarJul 115.0 1.25 144 1078.125 N Se t- r 60 2.4 144 1080 287,75 2158,125 4 19.4 Gritne ❑ Mar -Jul 100.0 1.25 125 2425 N Se t- r 45 2.4 108 2095.2 233 4520.2 5811 1 3A Norfolk ❑ Mar -Jul 115.0 1.25 1" 488.75 L Se t-A r 1 100 100 340 243.75 828.75 2 8.7 Norfolk D Mar -Jul 115.0 1.25 144 1250.625 L Se t- r 1 100 100 970 243.75 2120.625 3 4.06 Norfolk ❑ Mar -Jul 115.0 1.25 144 583.625 L Se t- r 1 100 100 406 243.75 989.625 4 4.1 Norfolk D Mar -Jut 115.0 1.25 144 589.376 L Se t- r 1 1D0 100 410 24375 999.375 5 3.84 Goldsboro D Mar -Jul 130.0 1.25 163 624 L Se t- r 1 100 100 384 262.5 1608 5810 1 11.5 Norfolk D Mar -Jul 115A 1.25 144 1653.125 L Se t• r 1 160 100 1150 243.75 2803,125 2 15.6 Norfolk 0 Mar -Jul 115.0 1.25 144 22425 L Se t- r 1 100 100 1560 243.75 3802.5 23$4 1 17.3 Gritne 0 Jun -Set 35.0 4 140 2422 N Sept -Apr 45 2.4 15 93 1608.9 233 4030.9 2 13 Gritne 0 Jun -Set 35.0 4 140 1820 N Sept -Apr 45 2.4 15 93 1209 233 3029 3 7.5 Norfolk O Jun -Sept 42.0 4 168 1260 N Sept -Apr 60 2.4 15 129 967.5 297 2227.5 4 19.4 Gritne O Jun -Sept 35.0 4 140 2716 N Sept -Apr 45 2.4 15 93 18042 233 4520.2 5811 1 3.4 Norfolk O Jun -Sept 42.0 4 168 571.2 L Seot- r 1 100 15 85 289 253 860.2 2 8.7 Norfolk 0 Jun -Sept t 42.0 4 168 1461.6 L Sept -Apr 1 100 15 85 739.5 253 2201.1 3 4A6 Norfolk 0 Jun- t 42.0 4 168 682.08 L Se t- r 1 100 15 85 345.1 253 1027.18 4 4.1 Norfolk 0 Jun-S t 42.0 4 168 688.8 L Se I -A r 1 100 15 85 348.5 253 103T3 5 3.54 Goldsboro O Jun -Sep! 45.0 4 180 691.2 L Sept -APE 1 100 15 85 326.4 265 1017.E 5910 1 11.5 Norfolk O Jun -Set 42.0 4 168 1932 L Sept -Apr 1 100 15 85 977.5 253 2909.5 2 15.6 Norfolk 0 Jun -Set 42.0 4 168 2620.8 L Sept -Apr 1 100 15 85 1326 253 3946.8 5811 1 3.4 Norfolk 0 0 N Sept -Apr 60 2.4 15 129 438.6 129 438.6 2 8.7 Norfolk 0 0 N Se t-A r 60 2.4 15 129 1122.3 129 1122.3 3 4.06 Norfolk 0 0 N Set r 60 2.4 15 129 523.74 129 523.74 4 4.1 Norfolk 0 0 N Se t- r 60 2A 15 129 528.9 129 528.9 5 3.84 Goldsboro 0 0 N Se i- r 65 2.4 15 141 541.44 141 541.44 5810 1 11.5 Norfolk 0 0 N Se t- r 60 2.4 15 129 14835 129 1483.5 2 15.6 Norfolk 0 0 N Se t-A r 60 2.4 15 129 2012.4 129 2012.4 Totals: 376.4 418000.55 39727.68 81528.23 Reception Area Specifications 200612010 Amendment for Pumping Agreement- Aerway Application -Taylor Tract Field Irrigated Soil ist Crop Time to 1st Crop 1stCrop Lbs N1Ac Lbs N Total lbs N Acrea e Tvoe Code Aeptv Yield Ibs NlUnit Residual lAc Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs NIAc Lbs N Total Ibs N Code Apply Yield Ibs NfUnit Residual /Ac Utilized Total Lbs N1Ac Total Ibs N Utilized 2398 1 7.8 Gdtney F Mar -Aug 675.0 0,12 81 631.8 L Sept -Apr 1 100 100 780 181 1411.8 2 5.1 Grttne F Mar -Aug 675.0 0.12 81 413.1 L Sept -Apr 1 100 100 510 181 3 41.9 Norfolk F Mar -A 875.0 0.12 105 4399.5 L Se -A r 1 100 100 4190 205 '2399 1 38.3 Gritne F Mar-Aug675.0 0.12 81 3102.3 L Sept -Apr 1 100 100 3830 181 2 7A Gritne F Mar -Aug 675.0 0.12 81 575.1 L Seat -Apr 1 100 100 710 181 N35 3 1.7 Norfolk F Mar A 675.0 0.12 105 178.5 L Sept -Apr 1 100 100 170 205 4 3 Norfolk F Mar A 875.0 0.12 105 315 L Sept -Apr 1 100 100 300 205 5 1 Grime F Mar -A 675.0 0.12 81 81 L Se t-A r 1 100 100 100 181 6 19.7 Norfolk F Mar-Aug875.0 0.12 105 2068.5 L Sept -Apr 1 100 100 1970 205 4038.5 7 10.4 Gritne F Mar -Au 675.0 0.12 81 842.4 L Sept -Apr 1 100 100 1040 181 1882.4 8 1.7 Gritne F Mar -Au 675.0 0.12 81 137.7 L Sept -Apr 1 100 100 170 181 307.7 9 2.3 Gritne F Mar-Aug675.0 0.12 81 186.3 L Se t-A r 1 100 100 230 181 416.3 10 19.E Grit F Mar -A 675.0 0.12 81 1587.E L Sept -Apr 1 100 100 1960 181 3547.6 2398 1 7.8 GHtne D Mar -Jul 100.0 1.25 125 975 N I Se -A r 45 2.4 108 842.4 233 18174 2 5.1 1 Gritne D Mar -Jul 100.0 1.25 125 637.5 N Sept -Apr 1 45 2.4 1 108 550.B 233 1188.3 3 41.9 Norfolk ❑ I Mar -Jul 115.0 1.25 143.75 6023.125 N Sept -Apr 60 2.4 1 144 6033.6 287.75 12056.73 2399 1 38.3 Gritne D Mar-lul 100.0 1.25 125 4787.5 N Sept -Apr 45 2.4 108 4136.4 233 8923.9 2 7.1 Gritne D Mar -Jul 100.0 1.25 125 887.5 N Se t-A r 45 2.4 108 766.8 233 1654.3 3 1.7 Norfolk ❑ Mar -Jul 115.0 1.25 143.75 244.375 N Sept -Apr 60 2.4 1" 244.8 287.75 489.175 4 3 Norfolk D Mar -Jul 115.0 1.25 143.75 431.25 N Se t-A r 60 2.4 144 432 1 287.75 863.25 6 19.7 Norfolk D Mar -Jul 115.0 1.25 143.75 2831.875 N Sept -Apr 60 2.4 144 2836.8 1 287.75 5668.675 7 10.4 Gritne D Mar -Jul 100.0 1 1.25 1 125 1300 N Sept -Apr 45 2.4 108 1123.2 233 2423.2 8 1.7 Gritne D Mar -Jut 100.0 1.25 125 212.5 N Se t-A r 1 45 2.4 108 183.6 233 396.1 9 2.3 f Gntne ❑ 1 Mar -Jul 100.0 1,25 125 287.5 N Sept -Apr 1 45 2.4 10B 248.4 233 535.9 10 19.6 Gritney D I Mar -Jul 100,0 1.25 125 2450 N Sept -Apr 45 2.4 108 2116.8 233 4566.8 2398 1 7.8 Gritne O Apr-AApr-Auq 35.0 4 140 1092 0 0 140 1092 2 5.1 Gdtnev O Apr-AApr-Auq 35.0 4 140 714 0 0 140 714 3 41.9 Norfolk O Apr -Aug 42.0 4 168 7039.2 0 0 168 7039.2 2399 1 38.3 Gritne O Aar -Aug 35.0 4 140 5362 0 1 0 i 140 5362 2 7.1 Gritne O A r-AuQ 35.0 1 4 1 140 994 0 0 140 994 3 17 Norfolk O Apr-AApr-Ayg 42.0 4 168 285.6 0 0 168 285.6 4 3 Norfolk O A r-Aucl 42.0 4 168 504 0 0 168 504 6 19.7 Norfolk O Apr-AApr-Auq 2.0 4 168 3309.6 0 0 168 3309.6 7 10.4 Gritne OI Apr -Aug 35.0 4 140 1456 0 0 140 1456 8 1.7 Gritne O Apr-AApr-Auq 35.0 4 140 238 0 0 140 238 9 2.3 Gritne O A r-A 35.0 4 1 140 322 0 0 140 322 10 19.6 Grime O Apr-AApr-Auct 35.0 4 140 2744 0 0 140 27" Subtract 15 Ibs res. N 1 0 0 from anycroa followl sovbeans 0 a Totals. 476.8 59647.33 35475.6 95122. 33 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand -of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized 1 unit yield A Barley 1.6 lbs IN 1 bushel B Hybrid Bermudagrass - Grazed 50 lbs N 1 ton C Hybrid Bermudagrass - Hay 50 lbs N 1 ton 0 Corn - Grain 1.25 lbs N 1 bushel E Corn - Silage 12 lbs N 1 ton F Cotton 0.12 lbs N 1 Ibs lint G Fescue - Grazed - 50 lbs N 1 ton H Fescue- Hay 50 lbs N 1 ton Oats 1.3 lbs N 1 bushel J Rye 2.4 lbs N 1 bushel K Small Grain - Grazed 50 lbs N / acre L Small Grain - Hay 50 lbs N 1 acre M Grain Sorghum 2.5 lbs N 1 cwt N Wheat 2.4 lbs N 1 bushel O Soybean 4.0 lbs N 1 bushel P Pine Trees 40 lbs N 1 acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm S ecifications PANT rlanimal Farm Totall r Farrow to Wean 0.84 Farrow to Feeder 1 1000 Farrow to Finish 4.1 4100 Wean to Feeder 0,072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 4100 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 20500 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 68 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 164 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions, Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. M11-1 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inlhr * inches A Norfolk D 0.5 1 B Norfolk D 0.5 1 C Norfolk D 0.5 1 D Norfolk D 0.5 1 E Norfolk D 0.5 1 F Gritney C 0.5 1 G Gritney C 0.5 1 #REF! H Gritney C 0.5 1 1 Norfolk C 0.5 1 J Gritney C 0.5 1 K Bonneau C 0.75 1 125 subl Norfolk D 0.5 1 sub4&7 Gritney C 0.5 1 sub6 Norfolk D 0.5 1 sub8 Bonneau C 0.75 1 6of8 Additional Comments: Subfield acres listed in this plan is the balance of total field acres minus wet acres. Subfield acreage will be claimed when applying with an aerway machine. Fields A-E ,Sub 1 M were changed to a corn, wheat, soybean rotation. 7of8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Farm 11 Owner: Murphy -Brown, LLC Manager: Owner/Manager Agreement: /we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owr Signature: Name of Manager (if Signature: b` I Ck— Ub Date Name of Technical Specialist: Affiliation: E. Roberson Address: 2822 Hwv 24 West. PO Drawer 856 Warsaw, NC 2839E Telephone: (910) 293.3434 Signature: 4� I o(; Date 8 of 8 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 to per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients, Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal, Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3 of 3 1 .1.2/16/2009 WED 15:13 FAX 9102933L38-WRLNM1 1& 001 / 0 0 7 r )h-y r3 4, " rove ll . Murphy BVOW11 LLC PO Box 856 2822 Hwy 24 West Warsaw, NC 28398 Phone, (910) 293-3434 Fax (910) 293-3138 Fax Transmittal Sheet To; Yes., Phonc: Date: CC, ......... .... ClUrgent. For Review L3 Plcasr: Commonf [.1 .111casc Reply 'lease Rocych, 12/1.6/2009 WED 15:15 FAX 91,02933138 WRI,NM1 Z 002/007 PLAN OF ACTION(Paa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 66-34 County: Northampton Facility Name: Smithfleld••CarrolI's Farm 11 Certified Operator Name: Lee Farmer Operator Number: 28699 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/Ifs: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 lip 11 s 27 N N N _._.14 T 21 81 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or rnore structures, Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Y. liquid level is within the 25 ,year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable r•�inge. X Waste: is to be pumped and hauled to off .,,ite locations. t3olume and PAN contord of waste to he pumped and hauled is reflected in section Hi tables. InclUded within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a sitr, not covored in the facilil:0; CAWMP. _..-._._.._... Operation will ho partially or fully depopulated, *Attach a compteto schedule with corresponding animal uNts astd dates tro depopul�ltinrl 'if animals are to be moved to another penrritted facility, provide, facility ntrrnber, lagoon freeboard levels and herd population for the rt.c;eivino facility 3. Earliest possible date to begin farad application of waste: 12/18/2009 I hereby certify that I ('rave reviewed the information listed af>ovo and inctuded within the attached Plan of Action, and to the best of my knowledge and agility, the information is accurate and correct. R,O, Britt Pav4ity Owner/Manager (print) FkitOwr acg ig } Phone'. 1-804-834-2109 Date: 12/16/2008 12/16/2009 WED 15:16 FAX 9102933138 WRL.NKI Q 003/007 111. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL rREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 11 P line m T 1780.7 lb PAN 2. Structure ID: 11 S line m = 1591.2 lb PAN 3. Structure ID: 27 line in = -4291 Ih PAN 4, Structure Ili: line m = lb PAN 5. Structure ID: line m PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 a• 5 + 6 = -919 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIELDS TO WHICH PAID CANNOT RF APPI_IFD DURING THIS 20 DAY PERIOD_ o. tract 4 p. field # q. crop r. acres s. remaining IRR• t. TOTAL PAN u, application window' 2 PAN balance BALANCE FOR (Vacre) HELD (Ibs.) Column r x s Wheat y, 4,31 -�.- 128.01 - -5511 _ Sept- Drill _W.. -----A - B Wheat 4.11 128.01 526.1 Sept April Wheat 5.10 128.01 652.9 Sept- APrii -^ -- -- _-C D Wheat 6.22 - 128.01 668.2 _ - Sept_rApriI F Small Grain 4.11 3_1_.37 128.9 Sept -- .aril G SrnaI1Grain- --N 1.07 -31.37-_T- 33.6 ----,- Sept• April--- --____.-- -____._ H Small Grain --µ 3.12 --_, 22.37 69.8 --� Sept - April ' I Small Grain 3.76 33.27 12.5.1 Sept .-A I I J Small Grain 2.63 35.00 92:1 Sept ._nprtl.._.__..._._. i It Srnall Grain 4.83 35.00 ---.. 169.1 �..._..._.... Sept - April _..._.....--- subl -_...._._ --------- ..- --._ 6.2.0 ._._._._.......... _._....----.....__._ _._... _sub 4&7 -- ---- G.'l0 __..._r._ .. _._.__..._.._.__..._. --------•--.�. 6 subG _..T.-_,..._.._ _..._ . _ _...__._...._.. 1.62 _- ___ __ -__ sub ----- - 3.28 Taylor 2398 _ =-3 - - -- _---- - -� 41.90 -------- - - - ---- - _ - ---- �� 'Slate current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3017.4 1b. PAPS IV. FACILITY'S PoA OVERALL PAN BALANCE w. Tbtal PAN to be land applied (line n from section 11) - -919 lb, PAN PoA (30 Day) 2121 /00 12/16/2009 WED 15:19 FAX 9102933138 WRLNMI I£7.j004/007 x. Crop's remaining PAID balance (line v from section 111) = y. Overall PAN balance (w - x) 3017.4 lb, PAN -3936 lb, FLAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance_ If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. Water is being hauled from Farm 8511 to Farm 8527. The route the tanker trucks will be traveling is: Farm 11 - Bethel Church Road, Rt. 186 W, Rt. 301 N. Makin Price Rd. (SR 1201), cross highway 48 on SR 1201, turn right on Barrow Lane to farm 8527, More than adequate volume is @ Farm 27 to accomodate the additional water that will be hauled'there. PoA (30 Day) 2/21/00 12/16/2009 WED 15:20 FAX 91.02933138 WRLNM1 9 005/007 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Narne/ldentifier (ICi): 2. Current liquid volume in 25 yr.124 hr, storm storage & struclural freeboard a. current liquid level according to marker 1�T 1 inches b. designed 25 yr.124 hr. storm & structural freeboard inchcs c. line b - line a (inches in red zone) - 5.0 inches d. top of dike surface area according to design _ (area at below structural freeboard elevation) 114885 ft2 e, I'rre c/12 x line d X 7.48 gallons/ftu 358058 gallons 3. Projected volurne of waste liquid produced during draw down period f. temporary storage period according to structural design F— 961days g. volurne of waste produced according to structural design _ 173019 W h. current hard # �100t)ii Vertified herd ltl— 1000 actc.Eal waste; produced c,irrent herd „# x line q 173019 ft`i certified herd d! i. volume of wash water accordinc) to strc,rti.rral c!c>sic7n j. oxcess rainfall over evaporation according to design 103473.6 f1 k. (lines h + i + j) x 7.48 x 30 days/line fi- 689388 gallons i, Total PAN to be land applied during draw clown period 1. current waste analysis dated 11123/200� I 1.70 lbs/1000 gal. m. ((lines e + k)/1000) x line 1 = 1780.7 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE, (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 12/16/2009 WED 15:22 FAX 9102933.138 WRLNMI IM 006/007 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMA, FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL. PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/ldentifier (0); [Ti 2. Current liquid volume in 25 yr,/24 hr, storm storage & structural freeboard a, current liquid level according to marker [ 21.ojirrehcs b. designed 25 yr./24 hr. storm & structural freeboard L_ 26.0 'snches c. line b - line a (inches in red zone) = 5,0 inches d'. top of dike surface area according to design (area at below structural freeboard elevation) L 79128 ft' e, line c/12 x line d x 7.48 gallons/W 246616 gallons 3. Projected volume of waste liquid produced during draw down period g p g rg0 days f. temporarystory e period according to structural desigia g. volume of waste produced according to Structural design =HEKIRf4'i h. current herd # 100{) certified herd 4t 1000? actual waste produced = current herd 11 x line g 173019 ft'i certified herd i, volcayie of wash water according to structural design m (JIIt'i j. e,xcess rainfall over evGlat}ration according to des-igr103473.6�ft' k. (lines h + i + j) x 7.48 x 30 daystline f= 689388 gallons 4. Total PAN to be land applied during draw down period 1. current waste analysis dated I� � 4/7_31200� Fw �T70�1bs/,1000 goal. rn. ((lines e •+• Ic)/1000) x line 1 = 1591.2 lbs. f-'AN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON Si't -. (Click on the next Structure tab shown below) PoA (30 Day) 2121100 .12/16/2009 WED 15:23 FAX 9102933138 WRLNM.t ZOD7/007 PLAN OF ACTION (€'oA) FOR HIGH FREEBOARD AT ANIMAL. FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure NamelIdentifier (ID): 27 2._ Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) d. top of dike surface area according to design (area at below structural freeboard elevation) o. line c/12 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period E— 81.Oinches 19.0 inches -62 inches =90424Iftz 3494�86 gallons f. temporary storage period according to structural design _ 1 t30 days g. volume of waste produced according to structural design L �346031�ft� h. current hard f 1049�6 certified Nord #E__ 104 66' actual waste: produced -= current -hard fl. x !ine g = 346031 ft certified hord 1t n .� . �a• i. voiurmlr, of wa ln�, ter rtccorciiizg to sirs ctural c1t>. is}n j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.45 x 30 days/line fM 4. Total PAN to be land applied during draw down period I. current waste analysis dated r 11 2,31 009 m. ((lines e k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Glick on the next Structure tab shown below) PoA (30 Day) 2121/00 {G2.G31 ft'' 634132 gallons F-- _1_50IIbs/1000 gal. -4291 lbs. PAN ot.WAr�94 r� 7 `? r 0 � November 5, 2004 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. R.O. Britt, Manager of Farming and Environmental Murphy -Brown LLC PO Box 1240 Waverly, Virginia 23890 Subject: Notice of Violation Murphy -Brown Farm # 11 Permit No. AWS660034 Northampton County Dear Mr. Britt: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.B. Director Division of Water Quality The Raleigh Regional Office is in receipt of a Plan of Action (POA) for the subject facility, dated October 28, 2004. The POA stated that the secondary lagoon was at 16 inches of freeboard which is less than the required. Mr. Johnny Hassell had earlier called this in to the Regional Office which satisfies the reporting requirement stated in your General Permit. Please note that freeboard violations are violations of your Certificate of Coverage and Permit and can be subject to civil penalties of up to $ 25,000.00 per day, per violation. Please respond to this Notice in writing within ten days of your receipt. Your response should include the following information: 1. All land application records from January 1, 2004 to present. 2. Freeboard records from January through the present time. 3. Rainfall records for this time period. 4. A copy of your current Waste Utilization Plan (WUP). If you have any questions regarding this Notice please call Buster Towel] at (919) 571-4700. Sincerely, S. a Z. , Supervisor AquiferProtection Section Cc: Northampton County Health Department Ms. Betsy Gerwig--RRODSWC DWQIAquifer Protection Compliance Unit RRO-Files ., Aquifer Protection Section - Raleigh Regional Office '!'*I- �raltuyrarca, Sa 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 5714700 Customer Service 1-977-623-6748 3900 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Intemet htlpJAt2o.enr.stete.nc.us An Cmisi nnr^ fimhw16Rirmnfk a drlhn rwmkwnr— fJK Rar%yWhrft Prod r'mwirmr Parwr PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name: Certified Operator Name: 66-34 County: Northampton Smithfield-Carroll's Farm 11 William Bain Jr. Operator Number: 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 11P 11S N N 18 18 2. Check all applicable items 991343 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste Is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWO prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 6/4/2014 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the Information is accurate and correct. jomk R.O. Britt F cili wrier/Manager (print) (si a Phone: 1-8 D4-834-2109 Date: 5/1/2014 r A II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: lip line m = 2587A lb PAN 2. Structure ID: 11 S line m = 2243.8 lb PAN 3, Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line rn = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+8= 4831.2lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RF APPLIED DURING THIS 30 DAY PERIOD. o, tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Iblacre) L TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x a u. application window' D Grain Sorghum 5.19 105.88 548.5 March -Sept LP1 Corn 33.65 137.85 4642.0 March -Sept LP2 Cotton 21.53 74.72 1608.7 March -Sept zone 1 Bermuda H 4.10 54.37 222.9 March -Sept zone 2 Bermuda H 3.67 62.17 228.2 March -Sept zone 3 Bermuda H 3.49 182.08 635.5 Marc; -Sept zone 4 Bermuda H 3.55 183.65 652.0 March -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) 8537.7 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 4831.2 lb. PAN PoA (30 Day) 2121/00 x. Crop's remaining PAN balance (line v from section III) = 8537.7 lb. PAN y. Overall PAN balance (w - x) _ -3706 lb. PAN Line y must show as a deficit. It line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2121/00 0 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Narnelldentifier (ID): ill P 2. Current liquid volume in 25 yr.124 hr. storm storage & structural Freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line 02 x line d x 7.48 gallonslft' 3. Projected volume of waste liquid produced during draw down period 18.0 inches 19.0 inches 1.0 inches 114885 ftZ 71612 gallons f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 1000 certified herd # 1000 actual waste produced = ,current herd # x line g = certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land appiled during draw down period I, current waste analysis dated 3/21/2014 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 173019 ft' ft3 103473.E ft3 6699368 gallons 3.40 lbs11000 gal. 2587.4 lbs. PAN 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelidentifier (ID): ills 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 26.0 inches c. line b - line a (inches in red zone) = 8.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 79128 ft2 e. line c/12 x line d x 7.48 gallonslft' 394585 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 100q certified herd # 1000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + 1 + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1, current waste analysis dated 3/21 /2014 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121 !OO 173019 ft' ® ft3 103473.E ft3 689368 gallons 2.07 Ibs11000 gal. 2243.8 lbs. PAN STATE OF NORTH CAROLINA Department of Environment and Natural Resources Raleigh Regional Office FILE ACCESS RECORD SECTION — DATE/TIME L NAME � T,cjo yu 6 n s S REPRESENTING G° e n Cs Guidelines for Access: The staff of the Raleigh Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following before signing the form. 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment for file review so you can be accommodated. Appointments are scheduled between 9:00 a.m. and 3:00 pmon Tuesday Wednesday and Thursday. Viewing -time ends at 4.45 P.m. Anyone arriving without an appointment may view the files to the. extent that time and staff supervision are available. 2. You must specify files you want to review by facility name or incident number, as appropriate. The number of files that you may review at one appointment will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is 5 cents for ALL copies, front and back will be 10 cents Per copy. Payment is to be made by check, money order, or cash in the administrative offices. 4." FILES MUST BE KEPT IN THE ORDER YOU RECEIVED THEM. Files may not be taken from the office. . To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for Which you can be fined up to $500.00. 5. In accordance with General Statute 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. 6. The customer must present a photo ID, sign -in, and receive a visitor sticker prior to reviewing files. FACILITY NAME COUNTY � ME W1. !]Will 011111111111111111 i • �' AAa ' WAS 2e6AAN 1 1q ignature and N me of Firm/Business Datd Please attach a business card to this form If available n mi _ .1►1� m Time In Time Out ANIMAL FACILITY ANNUAL CERTIFICATION FORM Certificate of Coverage or Permit Number NCA266034 Facility Name (as shown on Certificate of Coverage or Permit) NorthHampto County n Year Farm 11 2006 Operator in Charge for this Facility Terry McClintock Certification # 27441 Land application of animal waste as allowed by the above permit occurred during the past calendar year 0 YES NO. If NO, skip Part I and Part 11 and proceed to the certification. Also, if animal waste was generated but not land applied, please attach an explanation on how the animal waste was handled. Part I: Facility Information: 1. Total number of application = Fields Pulls in the Certified Animal Waste Management Plan (CAWMP): 39 Total Useable Acres approved in the CAWMP 913.94 2. Total number of = Fields Pulls on which land application occurred during the year: 23 Total Acres on which waste was applied 192.16 3. Total pounds of Plant Available Nitrogen (PAN) applied during the year for all application sites: 9,495.00 4. Total pounds of Plant Available Nitrogen (PAN) allowed to be land applied annually by the CAWMP and the permit: 32,221.92 5. Estimated amount of total manure, litter and process wastewater sold or given to other persons and taken off site during the year: 6. Annual average number of animals by tvpe at this facility during the previous vear: can to Feede Feeder to Finish Farrow to Farrow to Farrow to Wean to Boar Stud Gills Comm, Total Average Wean Feeder Finish Finish Nursery 7 S. 1,000 1,000 Largest and smallest number of animals by type at this facility at any one time during the previous year: Largest NIA Smallest NIA (These numbers are for informational purposes only since the only permit limit on the number of animals at the facility is the annual average numbers.) Facility's Integrator if applicable: Murphy -Brown, LLC Part II: Facility Status: MiAR 7 A�lUi�i.i'i ��"��.t .31 i�r''�{i,•� r �li�`i. IF THE ANSWER TO ANY STATEMENT BELOW IS "NO", PLEASE PROVIDE A WRITTEN DESCRIPTION AS TO WHY THE FACILITY WAS NOT COMPLIANT, THE DATES OF ANY NON COMPLIANCE, AND EXPLAIN CORRECTIVE ACTION TAKEN OR PROPOSED TO BE TAKEN TO BRING THIS FACILITY BACK INTO COMPLIANCE. 1. Only animal waste generated at this facility was applied to the permitted sites during Dyes Do the past calendar year. See Attachment for Explanation 2. The facility was operated in such a way that there was no direct runoff of waste from ❑yes ❑X No the facility (including the houses, lagoon/storage ponds and the application sites) during the past calendar year. See Attachment for Explanation 3. There was no discharge of waste to surface water from this facility during the past [Eyes [:]No calendar year. 4. There was no freeboard violation in any lagoons or storage ponds at this facility during Des [:]No the past calendar year. 5. There was no PAN application to any fields or crops at this facility greater than the Des ❑No levels specified in this facility's CAWMP during the past calendar year. 6. All land application equipment was calibrated at least once during the past calendar year. X❑Yes ❑ 7, Sludge accumulation in all lagoons did not exceed the volume for which the lagoon Des ENO was designed or reduce the lagoon's minimum treatment volume to less than the volume for which the lagoon was designed. See Attachment for Explanation 8. A copy of the Annual Sludge Survey Form for this facility is attached to this Certification. Des ENO 9. Annual soils analysis were performed on each field receiving animal waste during the Des []NO past calendar year. 10. Soil pH was maintained as specified in the permit during the past calendar year? Des ❑No 11. All required monitoring and reporting was performed in accordance with the facility's X❑tres []NO permit during the past calendar year. 12. All operations and maintenance requirements in the permit were complied with during Des X❑No the past careendar year or, in the case of a deviation, prior authorization was received from the Division of Water Quality. See Attachment for Explanation 13. Crops as specified in the CAWMP were maintained during the past calendar year on all Ekes ❑No sites receiving animal waste and the crops grown were removed in accordance with the facility's permit. 14. All buffer requirements as specified on the permit and the CAWMP for this facility were Des ❑No maintained during each application of animal waste during the past calendar year. " I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering in information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Murphy -.Brown, LLC Permjttee Na and Title X4e or print) Pe Sighature of Operator in Charge (if different from Permittee) Date E.7a a Date 12 13 Ral As rr� w Murphy -Brown LLC 6 " Sludge Survey Form , Appendix 1. Lagoon Sludge Survey Form A. Farm or Permit Number: VA 8511 B. Lagoon I.D. Number: '11-P C. Person taking measurements: Staff D. Date of Measurements: 2/7/2006 E. Methods/Devices used for measurement of: a. Distance from the lagoon liquid surface to the top of the sludge layer: Disk b. Distance from the lagoon liquid surface to the bottom of the lagoon: Grade Rod c. Thickness of the sludge layer if making a direct measurement with "core sampler":NA F. Lagoon Surface Area (using dimensions at inside top of bank): 1.65 acres G. Estimate number of sampling points: a.. Less than 1.33 acres: Use 8 points b. If more than 1.33 acres, 1.65 acres x 6 W 10 , with max. of 24. Conduct sludge survey and record data on "Sludge Survey Data Sheet" (App. 2). a. Start Pump Level: 27 Inches b. Stop Pump Level: 27 inches c. Current Freeboard Level: 25 inches I. Distance from the max. liquid level to the the present liquid level: -2 inches J. Distance from the max, liquid level to the min. liquid level: 0 inches K. Distance from the present liquid level to the min. liquid level: '0.17 feet L. Distance from the present liquid level to the lagoon bottom: 12.08 feet M. Distance from the present liquid level to the top of sludge: 0.33 feet N. Average thickness of sludge layer: 11.75 feet O. Thickness of existing Liquid Treatment Zone (M minus K): 0.17 feet (Note: If O is less than 4 feet, a sludge removal and utilization plan is required by N,c. DWQ.) Completed by: Signature: Date: Original: 511104 Retention: 5 years Page 1 of 2 Murphy -Blown LLC Sludge Survey Form Appendix 2. Sludge Survey Data Sheet Facility Name: Lagoon I.D. Number: 11-P VA 8511 Grid Point Distance from liquid surface Distance from liquid surface Thickness of Number to top of sludge layer ft, to lagoon bottom ft. Sludge Layer (ft) 1 1 12.5 11.6 2 1 12.5 11.5 3 1 12 11 4 1 12 11 5 0 12 12 6 0 12 12 7 0 12 12 8 0 12 12 9 D 12 12 10 0 12 12 11 0 12 12 12 0 12 12 13 14 15 16 17 18 19 20 21 22 23 24 Average 0.33 12.08 11.75 Retention: 5 years - Page 2 of 2 Original: 511104 Annual Stud I!, 9'"3Q°;;,,Re�� Da ha*t rm ...� >~JAAIlA NAME � ���� `r1 DAi! %-6 � I FACILITY HUMBER - C _., r_4c--00N I.D.:��r STAFF GAUQE REAPING ■ \`� (A) CI ND taMIT 0 (6) Ir.111111M JA) WAT99 DaPTH I,nl r.>� ( j - D13TANOR RNDN LIQUID 114MACH ` d I )N OF (a) MINUS (C ) INICKNE43 OF OLUD09 1� I 14 IT is 46, .. ,,.,1,,...,..,.. 21 —,. 41 ._ .....,.,. I1I�N.Y�1 IIIMI�n 1 Imo• ReteMon. 5 years i i Orlatnel'. 511104 Murphy -Brown LLC Sludge Survey Form Nppendix 1. Lagoon Sludge Survey Form A. Farm or Permit Number: VA 8511 B. Lagoon I.D. Number: 11-S C. Person taking measurements: Staff D. Date of Measurements: 2/7/2006 E, Methods/Devices used for measurement of: a. Distance from the lagoon liquid surface to the top of the sludge layer: Disk b. Distance from the lagoon liquid surface to the bottom of the lagoon: Grade Rod c. Thickness of the sludge layer if making a direct measurement with "core sampler":NA F. Lagoon Surface Area (using dimensions at inside top of bank): 1.5 acres G. Estimate number of sampling points: a. Less than 1.33 acres: Use 8 points b. If more than 1.33 acres, 1.5 acres x 6 = 9 , with max. of 24. H. Conduct sludge survey and record data on "Sludge Survey Data Sheet" (App. 2). a. Start Pump Level: 32.4 inches b. Stop Pump Level: 108 inches c. Current Freeboard Level: Winches I. Distance from the max. liquid level to the the present liquid level: 47.6 inches J. Distance from the max. liquid level to the min. liquid level: 75.6 inches K. Distance from the present liquid level to the min. liquid level: 2.33 feet L. Distance from the present liquid level to the lagoon bottom: 8.94 feet M. Distance from the present liquid level to the top of sludge: 7.89 feet N. Average thickness of sludge layer: 1.06 feet O. Thickness of existing Liquid Treatment Zone (M minus K): 5.66 feet (Note: If O is less than 4 feet, a sludge removal and utilization plan is required by N.C. DWQ.) Completed by: i ',ignature: Date: Original: 514/04 Retention: 5 years Page 1 of 2 Murphy -Brown LLC Sludge Survey Form Appendix 2. Sludge Survey Data Sheet Facility Name: Lagoon I.D. Number: 11-S VA 8511 Grid Point Distance from liquid surface Distance from 1i uid surface Thickness of Number- to -to of-slud e-layer ft: --- .. to -lagoon bottom ft-.-- _- Slud a La er ft: 1 7 9.5 2.5 2 7 8.5 1.5 3 7 8.5 1.5 4 1 8.5 9 0.5 5 8.5 9 0.5 6 8.5 9 0.5 7 8 9 1 8 8 9 1 9 8.5 9 0.5 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Average 7.89 8.94 1.06 Retention: 5 years Page 2 of 2 Original: 511104 JUL-10-2006 02:5a Prl , Annual Sludiliv, liOIrroy Da# Seat FRrm FARM NAME /� ,...� C DA' E FACILITY NUMOVR,. Q. STAFF GAUGE ROOM ww��nNlMlllfa�rr• ,1yp1 (A) (6) MINUS (C ) ['"XITANCO MM"' L VID a KID POWT M (A} WATER VXPY { SURFAC tO ' OP OF TMCKN931 OP 9LUDON _.... _ . eL ' c 1 aNm.•l'i, H 'al M I Y a h [� 1n 71 14 13 a1W,nww•. a1.lA. 1 14 (30) vuS9-5 IlurrinWlAuluir�l! Retoollon; 6 yeara ' Drlainal; 611ID4 M PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 66-34 ' County: Northampton Facility Name: Smithfield-Carroll's Farm 11 Certified Operator Name: Terry McClintock Operator Number: 27441 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 11S Spillway(Y or N): N Level(inches): 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. X Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation "if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Phone: Facility Owner/Manager (print) 4 Date: Facility Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 11S line m = 1846.8 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 1846.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Iblacre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 40A&B 10 SG 4.72 33.13 156.4 Sept -Apr 11 SG 5.04 40.65 204.9 Sept -Apr 13 SG 5.35 42.68 228.3 Sept -Apr 14 SG 6.38 21.49 137.1 Se t-A r 1 A SG 3.27 24.56 80.3 Sept -Apr 2A SG 6.02 24.56 147.9 Sept -Apr 3A SG 6.02 24.56 147.9 Sept -Apr 3B SG 3.75 24.56 92.1 Sept -Apr 4A SG 3.51 24.56 86.2 Sept -Apr 4B SG 4.23 23.47 99.3 Se t-A r 6 SG 5.29 21.46 113.5 Sept -Apr 7 SG 4.85 21.48 104.2 Sept -Apr 8 SG 3.24 19.60 63.5 Sept -Apr 9 SG 4.32 33.13 143.1 Sept -Apr 1A & B Bermuda 7.02 325.00 2281.5 Mar -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4086.1 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section li) = 1846.8 lb. PAN PoA (30 Day) 2/21100 x. Crop's remaining PAN balance (line v from section Ili:) = 4086.1 lb. PAN y. Overall PAN balance (w - x) _ -2239 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. Receiver lagoon is at Facility #66-5 Farm 40A&B. Current level at B lagoon is 28" and farm is fully stocked. PAN summary reflects crop system at Farm 40&B. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): ills 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.6 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 79128 Jft2 e. line c/12 x line d x 7.48 gallons/W 49323 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 173019 ft3 h. current herd #F 1-0-0-0-1 certified herd # 1000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 3/4/2005 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 173019 ft' ®W 103473.E ft3 689388 gallons 2.50 Ibs/1000 gal. 1846.8 lbs. PAN PoA (30 Day) 2/21/00 Waste Management Plan Changes r Facility 66 - 3 4 Farm This farms Waste Management Plan has made the following changes: ❑ Crop changes ❑ Wetted Acres ❑ Increased Acreage ❑ Decreased Acreage ❑ Changed Irrigation Design ❑ Change in Farm type ❑ Plan based on 3 Years On Farm Records Other Comments: 30-°� Date Murphy -Brown, LLC 06/11 /2003 P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Growers): Farm Name: Murphy -Brown, LLC Smithfield Carroll's Farm 11 Amendment County: Northam ton Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 1000 Wean to Feeder Feeder to Finish Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 ,Reception Area Specifications Tract Field Irrigated Soil 1stCrop Timeto IstCrop 11stCrop LbsNIAc LbSN TotWLbi* Acreage Type Code Apply Yield lbsN/Unit Residual /Ac Utilized X 040 3(a) of 8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plant6 are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop A Barley B Hybrid Bermudagrass - Grazed C Hybrid Bermudagrass - Hay D Corn - Grain E Corn - Silage F Cotton G Fescue - Grazed H Fescue - Hay I Oats J Rye K Small Grain - Grazed L Small Grain - Hay M Grain Sorghum N Wheat O Soybean P Pine Trees Lbs N utilized 1 unit yield 1,6 lbs N 1 bushel 50 lbs N 1 ton 50 lbs N 1 ton 1,25 lbs N / bushel 12 lbs N / ton 0.12 lbs N / lbs lint 50 lbs N 1 ton 50 lbs N 1 ton 1.3 lbs N / bushel 2.4 lbs N / bushel 50 lbs N 1 acre 50 lbs N 1 acre 2.5 lbs N / cwt 2.4 lbs N / bushel 4.0 lbs N / bushel 40 lbs N / acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inthr inches subl Norfolk C 0.5 1 sub4&7 Gritney C 0.5 1 sub6 Norfolk C 0.5 1 sub8 Bonneau C 0.75 1 #REF! 6 of 8 Additional Comments: The acreage listed on this amendment is the balance of the total field acreage minus the wetted acres at this site. The areas not covered by the conventional irrigation system are being entered into the pumping records as sub fields so that the acres can be claimed when making application with an Aerway machine. 7of8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Owner: Manager: Owner/Manager Agreement: Smithfield Carroll's Farm 11 Amendment Murphy -Brown, LLC I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. Ilwe know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. Ilwe understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Murphy -Brown, LLC Signature: Date Name of Manager (if different from owner): Signature: Q_IV63 Name of Technical Specialist: Dawn Williamson Affiliation: Murphy -Brown, LLC Address: 2822 Hyj 24 West, PO Drawer 856 Warsaw, NC 28398 Telephone: 910293-3434 Signature: G -A-o Date 8 of 8 State of North Carolina Department of Environment, LTKMAI Health and Natural Resources 4 • Division of Water Quality James B. Hunt, Jr., Governor MI Jonathan B. Howes, Secretary E H N F A. Preston Howard, Jr., P.E., Director July 7, 1997 Adolf Miller Farm 11 PO Box 1240 Waverly Va 23890 Subject: Certificate of Coverage No. AWS660034 Farm 11 Swine Waste Collection, Treatment, Storage and Application System Northampton County Dear Adolf Miller: In accordance with your application received on June 13, 1997, we are forwarding this Certificate of Coverage (COC) to Farm No. 66-34, authorizing the operation of an animal waste collection, treatment, storage and land application system in accordance with the State's General Permit (attached). This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Farm 11, located in Northampton County, with an animal capacity of no greater than 1000 Farrow to Finish and the application to a minimum of 53 acres of land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until December 31, 2001. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system, for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact J R Joshi at (919) 733-5083 ext. 363. Sincerely, -11"A. Preston Howard, Jr., P.E. cc: (Certificate of Coverage only for all cc's) Northampton County Health Department Raleigh Regional Office, Water Quality Section Northampton County Soil and Water Conservation District Permit Files State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN RECEIPT.. REQUESTED Smithfield Carroll's Farms Farm 11 PO Box 1240 Waverly Va 23890 Farm Number: 66-34 Dear Smithfield Carroll's Farms: May 14, 1997 4 • You are hereby notified that Farm 11, in accordance with G.S. 143-215.10C, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has thirty (30) days to submit the attached application and all supporting documentation. In accordance with 'Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within thirty (30) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Permits and Engineering Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any question concerning this letter, please call J R Joshi at (919) 733-5083 extension 363 or Charles Alvarez with the Raleigh Regional Office at (919) 571-4700. Sincerely, fog A. Preston Howard, Jr., P.E. cc: Permit File (w/o encl.) Raleigh Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-5063 FAX (919) 733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Smithfield Carroll's Farms Farm 11 PO Box 1240 Waverly Va 23890 ,am [DEHNR November 12, 1996 SUBJECT: Operator In Charge Designation Facility: Farm 11 Facility ID#: 66-34 Northampton County Dear Farm Owner: Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator. The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycutt of our staff at 919/733-0026. Sincerely, A. Preston Howard, Jr., P.E., Director Division of Water Quality Enclosure cc: Raleigh Regional Office Water Quality Files P.O. Box 27687, Nift � FAX 919-715-�3060 Raleigh, North Carolina 2761 1-7687 �An Equal Opportunity/Affirmative Action Employer Voice 919-715-4100 50% recycled/100% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director June 26, 1998 Smithfield Carroll's Farms Farm 11 PO Box 1240 Waverly Va 23890 I Tk?WA 1 • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Reissuance of Certificate of Coverage No.AWS660034 Farm 11 Swine Waste Collection, Treatment, Storage and Application System Northampton County Dear Smithfield Carroll's Farms: The Division of Water Quality modified the Swine Waste Operation General Permit originally issued to this facility on July 7, 1997. In accordance with the issuance of the revised General Permit, we are forwarding this Certificate of Coverage (COC) to Smithfield Carroll's Farms, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Farm 11, located in Northampton County, with an animal capacity of no greater than 1000 Farrow to Finish and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003, and shall hereby void COC No AWS660034 dated July 7, 1997. The COC shall hereby incorporate by reference any specific conditions of the previous COC issued to this facility. The purpose of this COC is to allow coverage under the revised General Permit. Please review the revised General Permit (enclosed) and pay particular attention to Condition 11.10 regarding tree removal from lagoon embankments, Condition III.1 regarding inspection frequency of the waste treatment, storage and collection system and Condition III.6 regarding notification requirements for system failures, spills and emergencies. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations . as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the. number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS660034 Farm 11 Page 2 Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Sue Homewood at (919) 733-5083 ext. 502. Si erely, for A. Preston Howard, Jr., P.E. cc; (Certificate of Coverage only for all cc's) Northampton County Health Department Raleigh Regional Office, Water Quality Section Northampton County Soil and Water Conservation District Permit File State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Smithfield Carroll's Farms Farm 1 I PO Box 1240 Waverly Va 23890 Dear Smithfield Carroll's Farms: 1 0 • __MOM NC,DEN-,,R NORTH CAROLINA DEPARTM _N OF ENVIRONMENT AND NATui AX �RESOWRCS ' ��1 December 30, 1999 1 ;,j 1I ", /, Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number 66=34 Northampton -County LU,(,',1r, 3 This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, IRR2, DRY1, DRY2, DRY3, SLUR1, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincerely, 411Z�' '.__K 10� Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Northampton County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper �u U State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality Non -Discharge Permit Application Form / Survey (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) erpl Permit - Liquid Animal Waste Operations �h�.�r,,follo�w'i g questions have been completed utilizing information on file with atHe EDase review the information for completeness and make any corrections whih are appropriate. If a question has not been completed by the Division, please . i complete as best as possible. Do not leave any question unanswered.rn µ Application Date: t:a 1. REQUIRED ITEMS CHECKLIST Please indicate that you have included the followiag required items by signing your initials in the space provided next i?eacli-J item. 1. One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 2. Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is disposed; 3. Two copies of the Certified Animal Waste Management Plan (CAWMP). if the facility does not have a CAWMP, one must be completed prior to submittal of a general permit application for animal waste operations. II. GENERAL INFORMATION: 1. Farm's name: Farm 2. Print Land Owner's name: Smithfield arroll's Farms 3. Land Owner's Mailing address: PO Box 1240 City: Waverly Va Zip: 23890 Telephone Number: 834-2102 4. County where farm is located: Northampton 5. Farm Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): intersection SR,132� and,5R 1329 on the_N.W. comer. 6. Print Farm Manager's name (if different from Land Owner): Aldoph Miller _ 7. Lessee's I1(ntegrator's name (if applicable; please circle which type is listed): s 66 - 34 FORM: AWO-G-E 2/26/97 Page 1 of 3 III. OPERATION INFORMATION: 1. Farm No.: S¢-34 2. Operation Description: Swine operation Farrow to Finish 1000 - Certified Design Capacity Is the above information correct? yes; = no. If no, correct below using the design capacity of the facility Type of Swine No. of Animals Type of P It No. of Tyne of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) 0 Turkey 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Other Type of Livestock on the fa.:_t: No. of Animals,- 7/ vs 3. Acreage cleared and available for application: $ ;Required Acreage (as listed in the CAWMP): 53 , 4. Number of Lagoons: ; Total Capacity: 010 3V7 Cubic Feet (ft3) Number of Storage Ponds: ; Total Capacity: Cubic Feet (ft3) 5. Is animal waste being applied on any field which has subsurface drains? YES r NO (please circle one) 6. Are subsurface drains present in the vicinity of or under the lagoon? YES o NO (please circle one) IV. APPLICANT'S CERTIFICATION: I, (Land Owner's name listed in question I1.2), attest that this application for (Farm name listed in question ILI) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Signature Date V . MANAGER'S CERTIFICATION: (complete only if different from the Land Owner) I, /¢Del_Qll 1%44t 44 67oy.. I -lee- —(Manager's name listed in question II.6), attest that this application for /rfrT/3�/ /) — ��' �-�'S /ie/V � /l (Farm name listed in question II.I) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. / ., D Signature Date THE COMP TED APPLI ATION PACKAGE, INCLUDIN ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION PERMITS AND ENGINEERING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FORM: AWO-G-E 2/26/97 Page 2 of 3 State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality Non -Discharge Permit Application Form / Survey (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Liquid Animal Waste Operations DIVISION OF WATER QUALITY REGIONAL OFFICES (2/97) Asheville Regional WQ Supervisor 59 Woodfin Place Asheville, NC 28801 (704) 251-6208 Fax (704) 251-6452 Avery Macon Buncombe Madison Burke McDowell Caldwell Mitchell Cherokee Polk Clay Rutherford Graham Swain Haywood Transylvania Henderson Yancey Jackson Fayetteville Regional WQ Supervisor Wachovia Building, Suite 714 Fayetteville, NC 28301 (9I0)486-1541 Fax (910) 486-0707 Washington Regional WQ Supervisor 943 Washington Square Mall Washington, NC 27889 (919)946-6481 Fax (919) 975-3716 Beaufort Jones Bertie Lenoir Camden Martin Chowan Pamlico Craven Pasquotank Currituck Perquimans Date Pitt Gates Tyrell Greene Washington Hertford Wayne Hyde Mooresville Regional WQ Supervisor 919 North Main Street Mooresville, NC 28115 (704)663-1699 Fax (704) 663-604Q Raleigh Regional WQ Supervisor 3800 Barrett Dr. Raleigh, NC 27609 (919) 571-4700 Fax (919) 571-4718 Chatham Nash Durham Northampton Edgecombe Orange Franklin Person Granville Vance Halifax Wake Johnston Warren Lee Wilson Wilmington Regional WQ Supervisor 127 Cardinal Drive Extension Wilmington, NC 28405-3845 (910)395-3900 Fax (910) 350-2004 Anson Moore Alexander Lincoln Brunswick New Hanover Bladen Richmond Cabarnus Mecklenburg Carteret Onslow Cumberland Robeson Catawba Rowan Columbus Pender Harnett Sampson Cleveland ' Stanly Duplin Hoke Scotland Gaston Union Montgomery Iredell Winston-Salem Regional WQ Supervisor 585 Waughtown Street Winston-Salem, NC 27107 (910)771-4600 Fax (910) 771-4632 Alamance Rockingham Alleghany Randolph Ashe Stokes Caswell Surry Davidson Watauga Davie Wilkes Forsyth Yadkin Guilford FORM: AWO-G-E 2/97 Page 3 of 3 ! 5 T A T E O F �r I r G :t' I A 51 4 r��r ��__��_ yr. _ �•rr•_rr_w __ w rw��_�w_i�__�_ �rr�_ �__�wr� __wr___ ' i I� `� � • h •- ram} �_ • H 5 l iY• '• • • Y JORDA.,S r u• + iw. : Ilr. .SILL rorD , •J :y' J • 'ja �• •� mac. w rl., LIU +{ C t Boa ♦ J °tu ,, 8 fl A, -- • r�� rTf I.• �! - •. +r J1. , � ,Ir/ w'� Jam[. " w JR ., �, •, ~ iJ lm 3• Law di •, ";' 1WOMY . 17Le.Q ! r au Af 1nL sue iV ro.►IocE 4 ti 4; y vwL sae ML A „ c JIUL rr ./• - 1bl - lul ( 1171 TAYLORS ^ •� \\` MILL POND ` ' 5., s, .ula y.J 1= ,1 Slll TI•r.w♦ '_ w. C�,r 1111 •,i: q 'LIU e3 y +S �� GYTLtRp 1lQl •., il! WRIDOII ` "` 1 17L 171 /rf A A 1 0 - ,.>z � I>a nl ti is 1 .YlLL POND • _ J r �'� : •r ns Un IM A&W RARRO WS / , EDWARDS POCOSIN C♦I.�. .YELL POND ry • I i191 L i LUL LM LM LaIIY 1lLt .- \//i UM • , f J 11f. � • � 'lr O C. j U71 C. T 6— t b L ' CJrrr LLU faSl .7 A 1 � l i J• � Lr LM low UIL a ridiculous appearing, but none the less ef- ' e _ fective, maneuver on the part of the por- cupine,. for he literally backs into battle, swinging his tail in advance like a medieval (/ : mace. .L In summer, porcupines eat all sorts of leafy vegetation, and are particularly fond of lily 3w AD- rZ ' iol �7V �er all i Ll- 4"Ir Ap jAr fir A.mp !7d _ -.;A WASTE UTILIZATION PLAN Producer: Carroll's Foods of Virginia, Inc. Location: East of Seaboard off of Rte. 1328 Telephone: (804) 834-2109 -7 Type Operation: Farrow to Finish Number of Animals: 1000 sows (Design Capacity) The waste from your animal facility must be land applied at a specified rate to prevent pollution a of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce ° the amount of commercial fertilizer required for the crops in the fields where the waste is to be m'r� applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potential, cation exchange capabilities, and available water holding capabilities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special precautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under -OEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached, you will' find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out; meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. WASTE UTILIZATION PLAN Amount of Waste Produced Per Year(gallons, ft3, tons, etc.) 1000 animals x 10,585 gal (amt.) waste/animal/year = 10,585,000 gal (amt.) waste/year. Amount of Plant Available Nitrogen (PAN) Produced Per Year 1000 animals x 26 lbs. PAN/animal/year = 26,000 lbs. PAN/year. (PAN from N. C. Tech Guide Std. 633) Amount of Plant Available Nitrogen (PAN) From Secondary Lagoon _26,000_ lbs. PAN/year x 70% ' = 18,200 lbs. PAN/year. Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown and surface application: Table 1: ACRES OWNED BY PRODUCER Tract # Field Soil Type Crop Lbs. N per Ac. Acres i Lbs. N Utilized Month of Application 125 1 Norfolk Berm udagrass/Small Grain 305/50 25.00 8875 Mar -Nov 3 Norfolk Bermudagrass/Small Grain 305/50 6,66i 2364 Mar -Nov 4 Norfolk Bermudagrass/Small Grain 305150 8.431 2993 Mar -Nov 6 Norfolk Bermudagrass/Small Grain 305/50 6.83 2425 Mar -Nov 7 Gritney Berm udagrass/Small Grain 275/50 6.13 1992 Mar -Nov 8 Bonneau Berm udagrass/Small Grain 275/50 18.00 5850 Mar -Nov Total 1 71.051 24499� * This N is from animal waste only. If nutrients from other sources such as commercial fertilizers are applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. WASTE UTILIZATION PLAN Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached) (Required only if operator does not own adequate land [See Required Specification 2]) Tract Field Soil Crop Lbs. N Acres Lbs. N Month of " See footnote for Table 1. Table 1 Table 2 Total Totals from above Tables Acres Lbs. N Utilized 71.05 24,499 0 o 71.05 24,499 Amount of N Produced Surplus or Deficit 18 o 8,299 NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. �qq 344". 5Z WASTE UTILIZATION PLAN See attached map showing the fields to be used for the utilization of waste water. Application of Waste by Irrigation Field No. Soil Type Crop Application Rate (In/Hr) Amount Per Application In. Application Amount (In.) 1 Norfolk Bermuda rass/Small Grain 0.5 1.3 8.7 3 Norfolk Berm udag rass/Small Grain 0.5 1.3 1 8.7 4 Norfolk Bermuda rass/Small Grain 0.5 1.3 8.7 6 Norfolk Berm udag rass/Small Grain 0.5 1.3 8.7 7 Gritney Bermuda rass/Small Grain'. 0.35 1.9 8.0 8 Sonneau Bermuda rass/Small Grain 0.5 .95 8.0 THIS TABLE IS NOT NEEDED IF WASTE IS NOT BEING APPLIED BY IRRIGATION, HOWEVER A SIMILAR TABLE WILL BE NEEDED FOR DRY LITTER OR SLURRY. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 MONTHS. In no instance should the volume of waste being stored in your structure exceed Elevation 133.4 ft. Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. Narrative of Operation: This operation is located off of Rte. 1328 east of Seaboard in Northamoton County. The operation is located on CFSA tract 125. The swine operation is farrow to finish with a design capacity of 1000 active sows. It is estimated that 10,585,000 gallons of animal waste will be produced annually for land application. There are approximately 71 acres of cropland available for land application. The waste from the swine houses is stored in a primary and secondary anaerobic treatment lagoon system. The seconds lagoon is used to further reduce the nitrogen content_ of the waste before it is land applied_ Frequent sampiinp of our secondary lagoons of similar capacity and geographic location, indicates that nitrogen levels are reduced an additional 40%. The latest lagoon sample analysis for this farm shows that the nitrogen content of the secondary lagoon was 47% less than the nitrogen_ content of the primary lagoon (see attached analyses). The average of 40% reduction was used to determine_ nitrogen Production for this plan. The waste will be land applied to bermuda rass ha land. During the fall a small strain will be overseeded into the bermu_dagrass for fall and early spring applications. Before sludge is applied, samples will be taken to determine its nutrient content. Application rates for the sludge will be based on the nutrient content of the sludge so that it is agplied at agronomic rates. WASTE UTIL[ZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to the assessment of civil penalties of $10,000 per day by the Division of Environmental Management for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement (sample enclosed) with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not to exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System. (ACS). If an ACS is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by the DEM. [See FOTG Standard 393 - Filter Strips and Standard 390 (Interim) - Riparian Forest Buffers.] 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when the wind is blowing. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the Technical Reference - Environment file for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that no more than 20 to 25 percent of the leaf area is covered. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop on bare soil. WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 11. Animal waste shall not be applied closer than 25 feet to surface water. This distance may be reduced for waters that are not perennial provided adequate vegetative filter strips are present. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by overspraying. Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses. Animal waste may be applied at agronomic rates to grassed waterways that do not discharge directly into water courses provided the application causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. Lagoons and other uncovered waste containment structures must maintain a maximum operating level to provide adequate storage for a 25-year, 24-hour storm event in addition to the one (1) foot mandatory freeboard. 18. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 19. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 20. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Smithfield-Carroll's Farms 11 Owner/Manager Agreement I (we) understand and will follow and implement the specification and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. l (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environment Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner: Smithfield-Carmil's Farms, by Adolph Miller. Gene[al Manager (Please print) Signature: . �� A� Name of Manager (if different from owner): Signature: Date: xi Date: Name of Technical Specialist: (Please print)- Rudy Grammer Manager of Farming and Environmental Affairs Affiliation: Carroll's Foods of Virginia, Inc. Address (Agency): P.O. Box 1240 Waverly, Virginia 23890 Signature: Date: i ! S T A T E 0 F I F C\ I A. '.$ L e- fa.., �' o f o � � INI f Y '1L lL! CJ-.ft LYI Ck LM . fa In /ONI . I,f. .MILL POND, LAW USA S�/ r gl ` tie! i\ • ~ JJ f LW SIL I'�• 1 •'r SLiOMO UJA rJN Tf T .,f Y 1.1 la } f ...— LA LM f+ jM f Ld .r IW !� LN ILl I J �• iN Liu UM RAMS LLLL :'t IM •I LR ••�t , ,YA ri.ORS fl. LL MI" POND - C, ..: y' - ,, ' lJld .J 1L[ ,� LL I }1.�fr. f. • M,. Crrl Lu . s UU r ,` G.e.. f. Q LM l" 1.f 1 r ! ss CwvttlLLlRC J 1AL t• .. ' LNr ^, 11WV xf V 1 4 Ila I EOON£S aft f ! Ali. • LLL� Jb A f w AARROKS EDWARDS POCMM Cis .MILL POND • y LLB i L17. f1Jl. + LIl V , lla 1 • , h.d r J'LN LU J uli 0�. J71 1? is C' R CJ,f4__` LLLL fdf\ iLl 'j .Lto :at 1 rr-�.• use 4- I II,. ii; 1.L1 a ridiculous appearing, but none the less ef- r t L. fective, maneuver on the part of the por- cupine, for he literally backs into battle, O �" *•;. swinging his tail in advance like a medieval G �' r mace. ti In summer, porcupines eat all sorts of leafy vegetation, and are particularly fond of lily 1:4 ......... . . . . . zz" .,f[, �,. -y.. ram:. .•Y. --�%�?1 Li'y' v5 •e: 'r�'�r'� -'�'u• `�'�-�yl ..' r•.�' r, �rur. [ i r .`r�y,ti,. ��w Qr� . �:.. -,^+�„-=�✓.� '�+s`�• � _ � ,,, �rt- '"7-s'f'� '.. K'.. ^•t + aa'.�;; IM, %a{ � . t .• r T7-t+� ,r, '''.- •�,.-JR• :ti yam- C' .S ° 1'- •,i �+ra: • 3 � - � r .0 i`4f7 1 �� • �'�J' 1�•, �' "M �r t f :. + .i "', .�`�[' R-� �' -�i,• r, v� �ME I a r.��.. .. .rr.. �i.� r S iJi ,ti ter//�1,_`.FIT ',�� -i��T��F•.+' s�'�:� �Gt".-=. ���'•� ti'�� a ErL �, ��.',�:. � s; 4„n��bgp� + a' F,p�=i +f�,+.a � ��,x•�� ^i�a' ��ir ►•#,c�'b�'• S. -^t • ` ; '•'•ti�']�,.�*7�rYi• �' err n y '��f1+l�Y; , �� ".�'4`s"gr�,c'�,ifil"'` \ : '` •�:";.. y ' - . f � �',. py,. y'`rr', ..s ws r•�.-.r a .',•�'h {Y, �j� `,, •.,,,- �, "� ,fit. � �' �,* :_y-ML 7t9p !4 crs7/, 1 ? rl'�r, �1 �"r++.�•r � 4 r,j a�":•-�'r`.� ^+, f�'� � f 1. � i � •r?,- ;tia � Srr",E �A :k,,..v'�,, �. a Hry 7 �-. r i�iP •" �� �...., ; r C', ,� _ � �fj� ��f-`. y� 'i' > + r �` R'z r�'�_ - ll w �% '1 _ _ �; _ '�"��., W ;�� �~ �•a + � y� �� i.:l k`'!'l'� ��� fir'.. �S. �is j.� . y14 ?" l•' ri �A.�qM"��/! s�' 7 n ,{yl.. ;+• :n •.• a =�r;:i C.+*S!� � ti'.-_-:.�.r,,.r; �� _��._.y�v.' s: i�` A; n�.:fya:�; x:'�• EM ��.`v .:� err .'�'•. � %:;.I:1iS'r r�rc •i• Y 02/23/96 Smithfield-Carroll's Farms Lagoon Analyses Farm 11 Data from North Carolina Department of Agriculture Agronomic Division Laboratory Results Nutrients Available for First Crop Nitrogen TKN P K N P2O5 K2O Reduction Date Lagoon m m m Ibs./1000 al, Ibs.H000 al. lbs./1000 al. % Apr-93 11 P 1200 100 600 4.80 1.43 4.50 11 S 700 100 600 2.80 1.43 3.75 41.67 Apr-94 11 P 1700 100 900 6.81 1.43 6.76 11 S 900 100 700 3.60 1.43 5.25 47.14 Apr-95 lip 1700 400 1000 6.81 5.73 7.51 11 S 1000 200 900 4.00 2.86 6.76 41.26 Sep-95 11 P 1064 178 978 4.00 2.40 7.80 11 S 567 169 1045 2.10 2.30 8.40 47.50 Ava. 44.39 Attac.tent C.zro!in.z A ;c:c!:t1r..! Ex:e�,iiin .C: Of 3 Agri -Waste Ma--n-agement Biolagica acid Ag-r=Ltumi EnXine_-ing Nartfz C=lima Spatz U-1i.esitu LTPFS iOCK 7AS ir_ SAIL_? a. ;l7, dLLZ!;:: MAIM rir�L C " _ZQN OF "I'M a.??=CAlI0l4 &kTZS James C. Barker* I. SAIULs COLT =ZQN A. Semi -Solid Lot va.-==e i. Scraped directly f_om lot into spreader a. From loaded spreader, collet= about 2 lbs of aanure from di=ferenz locations using nonmetallic collectors. ii. From storage a. Col ec= about 2 lbs of **ate=tee from under zhe surface cash avoiding bedding materials and using narsaezall_c collectors. B . Liquid :ia=ttr a Sl==- i. Under sloctad-floor pit a. Extend a 1/2" aorm<erallic cordui= over, an back ends into narure to pit floor. b. Seal upper end of conduit (e.g., by placing a th b over end of cond•..1i=) trapping manure that has entered lower and, remove and e=zy slu---.7 into plastic buckaz or no=e_allic container. c. Take subsa les from 5 or more locations or at least 1 quart. d. and add about 3/4 pint to non=ecallis sample container. ii. ExtYr:.ar storage basin or car?c a. w.aka sure manure has been well muted With a l:quld mazura c oaae_-ag'_tacor p=p or propeller agitator. b . Take subsa.=Les f-cm about. 5 pit locac_ors , f==m agitator pump or :row manure spreader and place in a plastic buckac. * Pra=essor and Ex=ansion Soeciai'_sc Biological and 3gricul=_ral Engi-neer_ag Depar.:...ent, Ior=h Carolina State Uni7ersi'r7, Raleigh, NC. 3 - Attach---ent $ 3 0z 3 II . SAI-0 I; PRZ2ARATION AND ' RANS—= A. Place sample inco an e.-spandabla cantai=er that can be sealed. R =e residues from container with clean water buc do not use d;sinfect=cs, soaps, or treat in any Other :ray. B. Pack sample in ice, retr_3eraza, freeze, or transfer ca lab quickly. C. hand-del!ver'f is mosc reliable way of sample transfer. D. If mailed, protect satrple container with pack:ng material suc as newspaper, box or package wi_h wrappi: g paper, and tape. E. Commercial sample containers and mailers are also available. Contacts: i. Ali. Eastern Agricultural Lab, Inc. i;i. P017 zam ?ackers Carp. 76Z1 ?hitepine Road 2320 S. Foszer Avenne Ric!=, oud, VA 23237 'Wheeling, ITL 60090 Ph: (804)743-9401 Ph: (312)398-0110 U. Fisher Scientific Co. 3313 cinton Road Raleigh, NC 27604 Ph: (919)876-2351 iV..NASCO 901 Janesville Avenue Fort Atkinson, 71 53538 . Ph: (414)5i3-2446 F. Private analytical' labs are available, but sample analyses are costly. G. The NCDA provides this service for North Carolina residents. i. Address: North Carolina Depaw. ant of Agronoaic Division P1aat/7asze/S0luti0M Advisar7 Sec_ian Bli:e Rldge load Center P.O. Sax Z7647 Raleigh, NC 27611 Pr: (919)733-2635 Attn: Dr. Ray Campbell. U. Forward $4 along wizh the sample. iii. Include the following idencificacion infornac_on Jith sample: a. Livestock species (dairy, swine, turkey, etc.) b. Li-rescack usage (swine-nursary, fi;:is:ziag; rsrkay-breeders, brooder.hcuse, grower, nuaber flocks grown an lit=ar; etc.) c. Vaste type (dairy-loc sc_aoed manure, liquid slurry; swipe -pit s lux y, lagoon liquid, sludge; broiler -house litter, stockpile iv. Routi:e analyses perforred on all samples: N, P, E, Ca, Leg, Na, S, Fe, Za, Ca, B V. Addicional analyses per;o red upon request: DM, Mo, Cd, Ni, Pb [to] FROM: CARROLL'S FOODS OF VIRGINIA, INC. INTERDEPARTMENTAL CORRESPONDENCE Farm Manager Rudy Grammer SUBJECT. Addition to Waste Utilization Plan DATE: March 17, 1997 Please find enclosed the Odor/Insect Control Checklist and the i✓tortality Management Methods Checklist for Farms 1 1, 32, 36, 37, 39, 40, 62, 63, 40A, and 40B. Please insert the checklist in the three ring binder that contains each farm's Waste Utilization Plan. If you have any questions, feel free to give Rudy a call at the main office. Thank you for your assistance. EMERGENCY ACTION PLAN PHONE NUMBERS DWQ 919 571-4700 EMERGENCY MANAGEMENT SYSTEM (919) 534-6811 SWCD (919) 534-2591 NRCS (919) 534-2591 This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at this facility. The following are some action items you should take. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam b. Pump wastes to fields at an acceptable rate. c. Stop all flows to jhe lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon, B. Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rules for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks -possible action. a. Dig a small sump or ditch away from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? C. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. Contact company person: Senior Prod. Mgr.- Jimmy Bridgers H - (919) 585-1833, W - (804) 834-2106 Complex Mgr. - Terry McClintock H - (919) 586-4599, W - (919) 537-6858 Farming Mgr. - Alvin Lane H - (919) 587-4881, W - (919) 587-2109 b. During normal business hours, call your DWQ (Division of Water Quality) regional office. Phone 919-571-4700. After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. c. If spill leaves property or enters surface waters, call local EMS Phone Number 919-534-6811. d. Instruct EMS to contact local Health Department. e. Contact local SWCD office phone number 919-534-2591, and local NRCS office for advice/technical assistance phone number 919-534-2591. 4. If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask that person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair of problem to minimize off - site damage. a. Contractor's Name: Johnny Sykes b. Contractor's Address: Conway. NC c. Contractor's Phone: (919) 585-1565 6. Contact the technical specialist who certified the lagoon and/or Waste Utilization Plan. (NRCS, Consulting Engineer, etc.) a. Name: Rudy Grammer b. Phone: (804) 834-2109 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. Swine Farm Waste Management odor Conlrol Checklist Soarer Came 1011's III Alillimite 011111.1. Sill• Spi•ciric Practices l :trin;l.:nl till IIle prlxhlelillo E l Vrgl l:llil'C of luxxl.d hollers.— i I Recommeoded best management practices, f 1 { iotxl jildvillen) alld C0111111011 Sellse nt1111 al NON sm i"1YCs • I )il l\' Illilllnl'C-L'l1l'Cltal animals Ilotir% I Itkll .sill Dices • Wo Itiamije-Covefed Anil ass Illx11.1, ��((I�Ulll'll lye alcrers 1(willetl over slotled Owls., 11 Fccdl:rs at high ens! ol•solid Iltws-, I I SCI3111C onuulrl: huildnp Isom llmis-. jj1Iriu1cll1ol4 VC11lilatitlil fill' dF)Mg Handle collccllim [Ills • 111 ine. Wric,11 it ILIMMIC remorall by INN. pil Yccharee, • 1t1111ii11 II11Crulllal CIHRhil5lllllil or 5'rigv- venlilalimi VCllldillltlll C\1Glll%l Iath • Volatile go%ej, ,yl`,i{3lulerlhstlr l-l- 1'i111 illailliciallll'e, ' ` Dust 1:-r 61-1cicill all Inoyemelll Ilklrnll sllflaiCi • 1hist aihdill ll liemcell groups of anillials, I I Feed wh illive], 11 1'ecdcl' covers., IWj eu1I de11\ely 11(mospolil exlellder5 111 Teellef Ct1YCrS 1 11I511 lallks • Ap1136011 OfTM-Clod lilplxlll I I Flush lank Covers, hiplitl Mille 1i1111"arC 11111ng I 1 1:\ICI111 1111 IilLCi hear 110110111 UI 1tik S 111111 anti -siphon Vellls I IL"Il illlcli ngil:IGuu during Kaslt:willcl I nll.:lIhMl Ilusll %%Aik nollcllltlot 1-C11111alli1111 I'll lcehiugc I)lllnl, • AgIlalloo 111'liecycled laglxlu i I BICnd lccharge line, to 1war lulttonl ok pil-i %%ilh ioui-sillholl vellis — -----� —� hl will %%bile Ails are filling l .111 Aar lulls • Agilutiun dm ilig slul,p IanA {J/Sunlp Iank COVOS _1iIIiI%and tie awdomI t IUlirdt: t11 i1111 CullOi 11011 • nk,llalllill dillllig WaSIClSalCt I I Ilox utivers of Imicholl sill\L'] cilllveYf lice Source Cruse BMI's to hlinimicc (hlars SilC S114-01IL' 1'r'll CliM, —� I Ild of th;lillpils:.ti ;ll Agil:uion tilling %%aslck%alel I I AIclI,I tIischa1PC poil oI piIws III .Icrlte;I I L_Ikl Nlll C11111 CN'Ll I Ice - I:1gooll InI1lid [L:Vcl I ;IpU4ll1 illl tal'l'i ^� • Vllfilllle gi15 C1r1155i11n5, LYI'roper lagtxlll litlithl cilpal'111. • I1114ogical Illl Xillp: I I Collect Invotill Slalllip Ilrocetlllres: • Algllilltolk � 4nnlntnl ilollatioll Micit pumpltl&; I Mitlin1u1111tIli".ICC MCi1-I0-1'OIUMC riltio. I I hicch8nical acratiull-, 1, i� Provull liiulo gicul additives Illll';lllull SIl11Ill.hl • I II'.11 I1reSsllre;lgHilltUll: '1r1ptc till till' ways %xilh little fit lit] Illlltl-, noiiles • Wind drill I I Minilnnul recommended opoaling pressmc. U-T411111) inliIL-C nrur laglxrll litlnitl and lslcc. (tr 1 hill r IMill secolld-Slave la'Ixrll Slulal:c lain, of Ili slit • l':uliai mirlolli:ll 4lccoulposiliorr, I I Boilom or mi4llevcl Imidlog. sullat a Mixiug while 1111111E: I I 'I all covel%-. • Apitalltlll %%Iwil otlplliily. Ilailll 5illlili'C I11:IIS ill sU11t1S-• I I I'lovell biohlliull :Ithllllye. UI n\141allls St'11lYll� 11;15111 54111a1e� • 1'a111i11 Illlllu111i11 Il4l'nt111R1i1I1011, I I I:\telttl (110111111I)e (11IIIeIS lilkhrliC11111 lltlukl • Mixing Mille 1111ing.. level-, • Agitilltull 1l1101 cillpljilly I I Remove Seined solids reyilh1h.- Mauole, Shall of >I11111tc 0 Agilation tlherl spreading, I I Soil 61je:liorl ot'sluu)/shldges; splc;ldcl 411111CI1 • Volallic ga.. cllllsiiolis I I Wash le.sid it lltalltlle Noill spreathr Ate+ thst: i I'tilrell Ilitllogicill additives or oxi4hnlls I Inroccictl Inallillt[_ 0 Volatile g;LS Ctuissious u111C ^I I' Soil irliectioll of Alit h/sIlid es slum t1r AlIdgt: on Iicid tilling i 1 Soil incolpolalion lliihin •IN hrs. smfiices I I Spicatl in Ihiu unilillnt takes lbr r:+pitl tit-%u]E. I I Proven Iuolo'Kill atlt1t11ves or IINida1dS I kiln alliMilk • Carcass decomposition 'rtlper dislx+sition of Camisics I )cat! :ulinl:lls C:+reass tlecunllxlsiliun I I COMIliele C11YCl In III Lilll'tlstil'1 ill huri:41 pill, pies I l 1'1o1x;r lui:dioll/ronslruclion of tlispos:r1lrl> _ — _ — _ Ii i11031t115 • Incomplete conlhuslion I I Secondall. stack Iluluels 2 Inscel Conlrol Cliechlisl for- Animal Operalinns Stillrlc --' Ca BN11's to Alininlicc Odors - - Liquid S}'sl •nls - - - - - - - III -Nil l4u11c1> • Acculuul:lliun ol'solids nsh s1•sluns is desipled and oprraled tinllirietilll to rentilrc arcornlllalcd solids Ii1IIII gulle[s as designed. IV,Wk:IIIOI'C III idging Elf ilcCtlllltilaled solids at disChel'ge I -Jrl)(MS i11)J 1'll, • CIusled So6k. ���� IlyACI1111i1ti1 I:tglkllls, 5011111g Ilil iltls 1111d 11its l4 hele IA:,I lu��diug is appar�nl In nlinillti�. III, crnsling of solids to a depth of no mole Ihaii h- ilkCbeS over more lhan .;11�%a Ill slll I'lace. 1'\i.ilit'4 �1ti�1:I:IIIIC • I)Ciik)1l1� vcgetillllul ,8 L.r' h'Iinnlatil vegelilli\'e collllol idmig lli I&S III' 1 inlll lh iagoans and othel lrl pfeveill ` 4 FICCIIIIIIrt:Illoll oI d1:GI)'Illg 1'ibClallYC hallC[ along %%alct 'a edge till ill il)tillild,ilelll•s IICII111CIE:r - - I-cedo S • I'CCd SIl1I1aL.0 li%I1C11r-11, opClille and Illililll;llll IQed sysIcills ic.N , bUlIkeis alit) Ir0llgIIs) Ill liittilmile the accumulation OfACCOVillg lraslagC. f1kCfean up spillage tin it iominL basis (c g., 7-I(l day inlcivill during; stimmo-1 1 -30 dill mit:1Vill I Col ti1111ilp: • Accumulations of Iced 1Csithics t I RetIOCC 1IM.INI C I11C1111111hot IMI It lllllll lllld M0111111 ill I1IIedl:lle I)er illicla E11 feed slorave ilfC-a5 b)' Ilhn[illg dfa RlagC :145'a)' Irtinl site :111d/Ol I11a1V{dlllg i1Ji{Illill4 C0111a111111C111 IC g , cOveled Hill ['Ill 1nCN'Cr s b'lllllr Anil Sllllllal 1111111 knlllshllc (:rillli pllktklClsl. f I IIISI1Ccl lily and reIII(IV C OF break tip uaelmnllatc(I solids in 1111Cr -illil]S MOUIld feed simagc as Iteeded, Silc SpccifiC Pr11C617CS R outllle Ilya) Of illscclicilic dill lilt! springlsutiteller 111OIIII IS Illwluig Its,: of rlxlclllicide Neill Ioluld Suu rcc i'aufr Amnuil I loldn,r.- Alc,1; • WAccunnll:+tiuns O'animal tr:tsles and fetal %%astage I)IN fllcuune II'Mill Itnfr a Accimmlalit+nsufaui mil a,wacs HNII'S. to fllialrttize lhlura I 1 Hintitlale in+% area, Ihal ball atuisUue M011P l6ices and olhta liwallous where waslc accunmlMes and disim Nance by animal, is nli . ill. t luilttain I: nce rubes anJ filler alrills arriun+l :mitrlal holding :ueas to urluinli7e acclauulaliolls nt' aisles (I e.. inslkwi litr and rumove or break np act:unullalecl SOWS as Ileedetl}. I I k0lhiee spillage oa i+ u+uline ba>is (e b.. -7-111 dap inlcivid thwing sununci, 1 i-ill day ltlietral dmiug minter) where manure is loaded ['Ili kind application or disimsal. i 1 I'Iuvide lire adt;tivatt: drtinagt: around uurnule clod pif er. I I Imlk.t Eilt an+l MIUM! nr break ap ucc+Ill) al:+tetl wasles in filler ships,trtaunl s1twLpiles marl 11Y.ttnllu hautllilil• iueas as uCCkIC& Sirc Sl+ecific I'ruclicel Mortality Management Methods (check which mcthod(s) are being implemented) u Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must be at least 300 feet from any flowing stream of public body of water. cJ%Rendering at a rendering plant licensed under G.S. I05-158.7. Complete incineration. In the case of dead poultry only. placing in a disposal pit of a size and design approved by the Department of Agriculture. C Any method which is in the professional opinion of the State Veterinarian woWd make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached). 6 . . THIS DESIGN IS FOR A TWO -STAGE LAGOON Carrolls 11 Permanent set at 99.0 primary, and 92.0 secondary CLIENTS NAME _______________________________> Carrolls 11 COUNTY _____________________________________> Northampton TODAYS DATE ________________________________> 7/3/96 DISTANCE TO NEAREST NONFARM RESIDENCE 2000 FEET NUMBER OF PIGS WEAKLING TO FEEDER0 NUMBER OF PIGS FEEDER TO FINISH0 NUMBER OF SOWS FARROW TO WEANLING=____---__> 0 NUMBER OF SOWS FARROW TO FEEDER=------=--==7 0 NUMBER OF SOWS FARROW TO FINISH =___________> 1000 DEGREE OF ODOR CONTROL1.0 (minimum 1.0 cu. ft. per lb sslw) (maximum 3.0 cu. ft. per lb sslw) NUMBER OF YEARS OF SLUDGE ACCUMULATION TOP LENGTH AT NORMAL WATER LEVEL TOP WIDTH AT NORMAL WATER LEVEL NORMAL WATER LEVEL ELEVATION LAGOON BOTTOM ELEVATION Depth of Permanent Water 12.9 (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) FIRST STAGE SIDESLOPES=_��-----------------> FIRST STAGE FREEBOARD Permanent Volume Required 1417000.0 Permanent Volume Provided 1235697.7 First Stage Top of Dam Elevation Inside Dimensions of Lagoon at Top Length = 345.0 feet Width = 0.0 YEARS 341.0 FEET 329.0 FEET 99.0 FEET 86.1 FEET feet 2.0.1 1.0 FEET cubic feet cubic feet 117 72-0 add 382,393 from 2nd 100.0 feet of Dam 333.0 feet ADDITIONAL DRAINAGE AREA IN SQUARE FEET (i.e. pumpout pond & other outside area) LENGTH OF PUMPING CYCLE GALLONS OF FRESH WATER ADDED DAILY EXCESS RAINFALL ABOVE EVAPORATION 25YR/24HR STORM RAINFALL LENGTH AT TOP OF ALL TEMPORARY STORAGE WIDTH AT TOP OF ALL TEMPORARY STORAGE TEMPORARY STORAGE LIQUID SURFACE ELEV. SECOND STAGE BOTTOM ELEVATION SEASONAL HIGH WATER TABLE ELEVATION Depth of Temporary Storage = 6.0 SECOND STAGE SIDESLOPES SECOND STAGE FREEBOARD Temporary Storage Required 384817.2 Temporary Storage Provided 422256.0 Second Stage Top of Dam Elevation Inside Dimensions of Lagoon at Top Length = 252.0 feet Width Begin Pumping Elevation is Stop Pumping Elevation is Volume to be pumped = 0 SQUARE FEET 90 DAYS 0 GALLONS 6.4 INCHES 6.7 INCHES 248.0 FEET �� O Z 310.0 FEET 98.0 FEET 92.0 FEET 86.0 FEET feet 2.0:1 1.0 FEET cubic feet cubic feet 99.0 feet of Dam 314.0 feet 96.3 feet 92.0 feet 276493 cubic feet 1. STEADY STATE LIVE WEIGHT 0 head weanling-to-feeder x 30 lbs. = 0 lbs. 0 head feeder -to -finish x 135 lbs. = 0 lbs. 0 sows farrow-to-weanling x 433 lbs. = 0 lbs. 0 sows farrow -to -feeder x 522 lbs. = 0 lbs. 1000 sows farrow -to -finish x 1417 lbs 1417000 lbs. TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 1417000 lbs. 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.080 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in swine. Years of sludge accumulation in design? 0.0 Sludge Volume = 0.0 cubic feet 3. REQUIRED LIQUID VOLUME OF, LAGOON Design for .1.0 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = 1417000.0 cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 99.0 feet Construct lagoon bottom elevation 86.1 feet Lagoon size for normal lagoon liquid volume using prismodial formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 DEPTH 2.0 2.0 2.0 2.0 12.9 AREA OF TOP LENGTH * WIDTH 341.0 329.0 AREA OF BOTTOM Lb * Wb - 289.4 277.4 AREA OF MIDSECTION (Lm * Wm) 315.2 303.2 112189.0 (AREA OF TOP) 80279.6 (AREA OF BOTTOM) 95568.6 (AREA OF MIDSECTION) CU. YD. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 112189.0 382274.6 80279.6 2.150 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL = 1235697.7 CU. FT. VOLUME NEEDED 1417000.0 CU. FT. THE INSIDE EDGE DIMENSIONS OF THE FIRST STAGE AT THE TOP OF DIKE ELEVATION ARE: ARE 345.0 FEET BY 333.0 FEET 5. DIKE Place spoil as a continuous dike to elevation 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: first stage lagoon (top of dike) Length * Width = 345.0 333.0 114885 square feet second stage lagoon (top of dike) Length * Width = 252.0 314.0 79128 square feet Additional Drainage Area TOTAL DA 0 square feet 194013 square feet 100.0 feet. Pumping cycle to be 90 days. 6A. Volume of waste produced Volume = 1417000 SSLW * 0.0101481 gallon/lb. SSLW/day days in the pumping cycle / 7.48 gallons per cu. ft. Volume = 173019.7 cubic feet 6B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recycle the lagoon water are accounted for in 6A. W Volume = 0 gallons/day * 90 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 0.0 cubic feet 6C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. Volume = 6.4 in * DA / 12 inches per foot Volume = 103473.6 cubic feet 9 Volume of 25 year - 24 hour storm Volume = 6.7 inches / 12 inches per foot * DA Volume = 108323.9 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 173019.7 cubic feet 6B. 0.0 cubic feet 6C. 103473.6 cubic feet 6D. 108323.9 cubic feet TOTAL 384817.2 cubic feet 7. SECOND STAGE DESIGN SS/END1 SS/END2 2.0 2.0 AREA OF TOP (BELOW FREEBOARD) LENGTH * WIDTH = 248.0 310.0 go AREA OF BOTTOM Lb * Wb = 224.0 286.0- AREA OF MIDSECTION (Lm * Wm) = SS/SIDE1 SS/SIDE2 2.0 2.0 76880.0 (AREA OF TOP) 64064.0 (AREA OF BOTTOM) DEPTH 6.0 236.0 298.0 70328.0 (AREA OF MIDSECTION) CU. YD. _ (AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 76880.0 281312.0 64064.0 1.000 VOLUME OF SECOND STAGE BELOW FREEBOARD = 422256.0 CU. FT. VOLUME NEEDED = 384817.2 CU. FT. THE SECOND STAGE FREEBOARD IS = 1.0 FEET THE INSIDE EDGE OF THE SECOND STAGE AT ELEVATION 99.0 FEET ARE 252.0 FEET LONG BY 314.0 FEET WIDE BEGIN PUMPING ELEVATION TOTAL REQUIRED TEMPORARY STORAGE 6A. 173019.7 cubic feet 6B. 0.0 cubic feet 6C. 103473.6 cubic feet TOTAL PUMPED VOLUME 276493.3 cubic feet DEPTH OF WASTE = TOTAL PUMPED VOLUME / SURFACE AREA AT BOTTOM OF SECOND STAGE DEPTH = 276493.3 CU. FT. / 64064.0 SQ. FT �JH-19-97 THU 08:45 P. 03 WASTE UTILIZATION PLAN WASTE UTILLZATIOM PL- AGREEMENT Name of Farm: Smithfield -Carroll'* Farms 11 Owner/Manager Agreement I (we) understand and will follow and implement the specltication and the operation and malntena"ce procedures eatabtished in the approved animal waste utilization plan for the farm named above. t (we) know that any expansion to the existing design Capacity of the waste treatment and storage system or construction of new 'Facilities will require a new certification to be submitted to the Division of Environment Management (OEM) before the new animals are stocked- t (we) also understand that there moat be no discharge of animal waste from this ayatern to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soli and Water Conservation District and will be available for review by DEM upon request. Name of Facility owner: Smitprleid-G{iagil's Farms- by Adolph MlllcL General MAnijoer. (please print) Signature: ^ Name of Manager (if different from owner): r. Signature: Date:_ Date: Name of Technical Specialist: (Please print) Rugy Grammer Manager of Farming and Environmental Affairs Affiliation: Carmil's Foods of Virginia, Inc. Address (Agency): P.O. Box 1240 --� Waverly, Virginia 23990 )9c-14lr/ Z-1)- t06 -V .%W1 Date: , �/- &' -19-97 THU 08:44 P. 01 dW'-w FAX Transmittal Cover Sheet carrolt"s cads of 'Virginia/ Inc. 434 East Main St. (P.O. Box 1240) Waverly, VirglnIa USA 23890 Ted: (804) 834-2109; Fax (804) 83+3207 ,mince __ & - /9 97 711me _ LEA . - 7o -To -bill, tom/ ice-w+ �rY # OVaDeS 3 from RMY (9014 -op— (including dils one) ,Notes whvr "77C I ZW 77a 77z:#. ei erurfe s r S rGry ar . �v� tctT�r�3 !ab 3� �� a�S• �OF W A rFj9Q Michael F. Easley, Governor �0 G William G. Ross Jr., Secretary Cl)North Carolina Department of Environment and Natural Resources .r Alan W. Klimek, P.E. Director Division of Water Quality January 10, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. R.O. Britt Murphy -Brown's Farms P.O. Box 1240 Waverly, Virginia 23890 Subject: Notice of Violation Inadequate Freeboard Farm # 11 COC NC2660034 Northampton County Dear Mr. Britt: On January 9, 2007, the Raleigh Regional office became aware that the subject farm was experiencing inadequate freeboard in both the primary and secondary lagoons. A Plan of Action (POA) was received via Fax on the same date. Please note that freeboard violations are violations of your Certificate of Coverage under NPDES Permit Number NCA200000, and as such may be subject to civil penalties of up to $ 25,000.00 per day, per violation. Please respond to this Notice in writing within ten days of your receipt. Your response should include a plan stating measure to be taken to ensure future compliance with regards to freeboard levels at this facility. If this facility is still experiencing freeboard violations at the time of your response, please include an updated POA . If you have any questions regarding this matter you should call Buster Towell at (919) 791-4200. Sincerely, S. Jay Zimmerman, L.G. Regional Supervisor Cc: Northampton County Health Department Mr. John Hunt, RRO-DSWC APS CAFO Unit Aquifer Protection Section - Raleigh Regional Office ,ne NotifffiCarolina 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service 1-877-623-6748ww/�IQtu1+ra��� 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Internet: http:/A&.ncwaterquality,org f/ An Equal OpportunitylAffirmative Action Employer- 50% Recycled110% Post Consumer Paper z —LOT PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name: 66-34 County: Northampton Smithfield-Carroll's Farm 11 Certified Operator Name: Lee Farmer Operator Number: 28699 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways: and from the currant liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N),. Level(Inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 t1P 11S 27 N N N 15 "19 61 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are .:attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic h alance i.s within acceptable range. X Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop Information. Contact and secure approval from the DVVQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation wilt be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and date* fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving f@Jlity 3. Earliest possible date to begin land application of waste: 21412012010 .......................... I hereby certify that I have reviewed the information fisted above and Included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. R:O. Britt F y nerlMan- r (pr" f) acility wa1erlMin ' Ire) Phone: 1-804-834-2109 Cate: 214/2010 I II, TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 11 P line m = 1658.9 lb PAN 2. Structure ID: 11 S line m = 1758.9 lb PAN 3. Structure ID: 27 4. Structure ID: 5. Structure ID: 6. Structure ID: line m = -4291 lb PAN line m = lb PAN line m = lb PAN line m = Ib PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = -873 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD, o. tract �# p. field # q. Crop r. 7Cr 5 r, remaining IRR; 2 PAN balance (Iblacre) t. TOTAL PAN BALANCE FOR FIELD (lbs,) column r x s ,application tivindo n' A _ B Wheat Wheat 4,31 4,11 T _ 128.01 -- 128.01 551.7 526.1 Sit -April----P _P Sept April_ ............ _ C Wheat 5.10 128.01 652A Sept --Apr I D Wheat 5.22 128.01 668.2 Sept - April F Small Grain 4.11 31.37 128.9 Sept - April G Small Grain 1.07 31.37 33.6 Sept - April H Small Grain 3.12 22.37 60.8 Sept - April _ I Small Grain 3.76 33.27 125.1 Sept - April- J Small Grain 2.63 35.00 92.1 Sept -April_____ K Small Grain -- 4,83 35,00 169.1 Se t - Aaril subs sub 4&7 6.10 - sub 6 1.62 sub 8 Taylor 2398 3 _3.28 41.90 _ 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period, v. Total PAN available for all fields (sum of column t) = 3017.4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = -873 lb. PAN PoA (30 Day) 2121/00 x. Crop's remaining PAN balance (line v from section III) = 3017.4 lb. PAN y. Overall PAN balance (w - x) = -3890 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. Water is being hauled from Farm 8511 to Farm 8529, The route the tanker trucks will be traveling is, Farm 11 - Bethel Church Road, Rt. 186 W, Rt. 301 N, Makin Price Rd. (SR 1201), cross highway 48 on SR 1201, turn right on Barrow Lane to farm 8527, More than adequate volume is @ Farm 29 to accomodate the additional water that will be hauled there. The primary lagoon at Farm 29 is at 22" and the Secondary lagoon is at 53". PoA (30 Day) 2l21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD? 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE I. Structure Name/identifier (0): 11 P 2. Current liquid volurne in 25 yr./24 hr. storm storage 8. structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 1148 85 ft2 c. line c/12 x line d x 7.48 gallons/ft3 286447 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design ��µ173U1�J ft� h. current herd # 1000 certified herd # 1000 actual waste produced = current herd # x ling; r = certified herd # i. voiurne of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 34 days/line f= 4. Total PAN to be land applied during draw down period 1, current waste analysis dated 11/23/2009 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 173019 fl, ...._I fri i O�i�d%3 f t3 689388 gallons 1.70 Ibs/1000 gal. 1658.9 lbs. PAN PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (lD): 11 S 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 19.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 26.0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 79128 ft2 e. line c/12 x line d x 7.48 gallonslff' 345262 gallons 3, Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design t 73U ! 9 {t h. current herd # 1000 certified herd #1 1000 actual waste produced = current herd # x ling; g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 daysXne f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 11I2312009 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE, (Click on the next Structure tab shown below) PoA (30 Day) 2121100 173019 fV 7 0347;i.0 f 13 689388 gallons 1.70 Ibs/1000 real. 1758,9 lbs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I, TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE, 1. Structure Name/Identifier (€0): 27 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 81.0 inches b. designed 25 yr.I24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = -62 inches d. top of dike surface area according to design (area at below structural freeboard elevation) fJ0424 ft� e, line c/12 x line d x 7.48 gallonslfC-3494586 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 (jays g, volume of waste produced according to structural design 346T It's h. current herd # 10496 certified herd #1 10496 actual waste produced = current herd # x line g certified herd # i, volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated E- 11l23120 9] m. ((lines e + k)l1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 346031 ft" ��jl" 1 G -2-6)-3 'd r 1 s 634132 gallons 1.130 Ibs,1000 Taal. -4291 lbs_ PAN o�oF W A rFq pG Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E, Director Division of Water Quality January 10, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. R.O. Britt Murphy -Brown's Farms P.O. Box 1240 Waverly, Virginia 23890 Subject: Notice of Violation Inadequate Freeboard Farm # 11 COC NC2660034 Northampton County Dear Mr. Britt: On January 9, 2007, the Raleigh Regional office became aware that the subject farm was experiencing inadequate freeboard in both the primary and secondary lagoons. A Plan of Action (POA) was received via Fax on the same date. Please note that freeboard violations are violations of your Certificate of Coverage under NPDES Permit Number NCA200000, and as such may be subject to civil penalties of up to $ 25,000.00 per day, per violation. Please respond to this Notice in writin>? within ten days of your receipt. Your response should include a plan stating measure to be taken to ensure future compliance with regards to freeboard levels at this facility. If this facility is still experiencing freeboard violations at the time of your response, please include an updated POA . If you have any questions regarding this matter you should call Buster Towell at (919) 791-4200. qely i erman, L.G. nal Supervisor Cc: Northampton County Health Department Mr. John Hunt, RRO-DS WC APS CAFO Unit RRO Files Aquifer Protection Section - Raleigh Regional Office Nc- - Carolina 1628 Mail Service Center Raleigh. NC 27699-1628 Phone (919) 791-4200 Customer Service 1-877-623-6748 )tu1+Q$ 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Internet: http://www.ncwaterquality,org An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper 01/09/2007 TUE 12:31 FAX 9102933138 WRLNM1 —4 DWQ Raleigh IM001/006 -13-rowfl. (Y� Kut,Oy Bi-own fi,c PO Box 856 2822 Hwy 24 West Warsaw, NC 29398 Phone (91.0) 293-3434 Fax (9 t 0) 293-3 t 38 Fax Transmittal Shut To Fro In: pacres: Rhone,• -ate-, Rer OUrgent, 0 For Reviow C3 Please CoMment p pleaffoRtPly Q please K00YO18 01/09/2007 TUE 12:32 FAX 9102933138 WRLNKI ��y DWQ Raleigh IM 002/006 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name: Certified Operator Name 66-34 County: Northampton Smithfield-Carroll's Farm 11 Lee Farmer Operator Number: 28699 1. Current liquid level(s) in inches as measured from the current liquid level In the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 11P 11S N N 17 22 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures, Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 1/10/2007 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. R.O. Britt Phone: 1-804-834-2109 acil' O nerlMan prin Date: 1/9/2007 e ng } 01/09/2007 TUE 12:34 FAX 9102933138 WRINM1 44a DWQ Raleigh U 003/006 IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 11 P line m = 2997.4 lb PAN 2. Structure ID: 11 S line m = 1596.0 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 4593.4 lb PAN III, TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r, acres s. remaining 1RR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' A Small Grain 4.31 35.66 153.7 Sept - April B Small Grain 4.11 35,26 144.9 Sept'April C Small Grain 5.10 35.51 181.1 Sept - A ril D Small Grain 5,22 35.38 184.7 Sept - April E Small Grain 5.28 50.00 264.0 Sept - ril F Small Grain 4,11 11.90 48.9 Sept - April G Small Grain 1.07 27.63 29.6 Sept - April H Small Grain 3.12 27.38 85.4 Sept -April I Small Grain 3.76 50.00 188.0 Sept - April J Small Grain 2.63 50.00 131.5 Sept - April K Small Grain 4.83 50.00 241.5 Sept - A rll sub/ Small Grain 6.20 35.34 219,1 Sept -April sub 4&7 Small Grain 6.10 50.00 305.0 Sept - A riI sub 6 Small Grain 1.62 50.00 8 1. 0 Sept - April sub 8 Small Grain 3.28 50.00 164.0 Sept - Aphl Taylor 2398 3 Wheat 41.90 144.00 6033.E Se t - April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column Q = 8456.0 lb. PAN IV. FACILITY'S PoA OVERALL, PAN BALANCE w. Total PAN to be land applied (line n from section II) = 4593.4 lb. PAN PoA (30 Day) 2/21/00 01/09/2007 TUE 12:36 FAX 9102933138 WRLNMI ->-4 DWQ Raleigh IM 004/006 x. Crop's remaining PAN balance (line v from section Ill) y. Overall PAN balance (w - x) = 8456.0 lb. PAN -3863 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PeA (30 Day) 2121100 01/09/2007 TUE 12:37 FAX 9102933138 WRLN9f1 -44 DWQ Raleigh Q 005/006 PLAN OF ACTION (PoA) FOR NIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (0): Ill P 2, Current liquid volume'in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d, top of dike surface area according to design (area at below structural freeboard elevation) 114885 ft2 e, line c/12 x line d x 7.48 gallonsW 143223 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design - 90 days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 1000 certified herd #1 1000 actual waste produced = current herd # x line g certified herd # i, volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 11129/2006 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 173019 fts ft3 10�3473.6 ft3 689388 gallons 3.60 Ibs/1000 gal. 2997.4 lbs. PAN 01/09/2007 TUE 12:38 FAX 9102933138 WRL I 444 DWQ Raleigh Q 006/006 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL_ PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure NamelIdentifier (ID): Ills 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 22.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 26.0 inches c. line b - line a (inches in red zone) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 79128 ft2 e. line c/12 x line d x 7.48 gallons/ft' 197292 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 1000 certified herd # 1000 actual waste produced = current herd # x line g = 173019 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + 1) x 7.48 x 30 daystline f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 11/29/2009 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next.Structure tab shown below) PoA (30 Day) 2/21/00 ® ft3 103473.E ft3 689388 gallons 1.80 1bs11000 gal. 1596.0 lbs. PAN Murphy Box 1A -Brown .. Wav 2 Waverly, VA 3894 Waverly Division January 24, 2007 Mr. S. Jay Zimmerman, L.G. Regional Supervisor Division of Water Quality Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 RE: Inadequate Freeboard Murphy -Brown LLC Waverly Division Farm 11 Permit NCA 66-34 JAN 2 6 2007 _. -j i?I)i_E!0 REjMIIAIL OFHCl. Mr. Zimmerman This past year's rainfall has created serious challenges to our operation here at farm 11. The beginning of 2006 started out rather dry and we were able to take advantage of this. On 6/9/2006 we recorded freeboard levels of 27 inches in the primary and 136 inches in the secondary lagoon, however the month of July changed this. By 7/28/2006 we had lost 55 inches of combined freeboard due to persistent rainfall that month. Most of the precipitation last year fell in the late summer and fall. These wet conditions prevented safe land application. Murphy -Brown LLC felt that it would be better to retain the waste in the lagoon during this period of time, rather than apply it to saturated soil. Murphy -Brown LLC has taken many steps in the past few years to facilitate safe land application on this farm. For instance there has been 853.2 leased acres added to the Nutrient Utilization Plan over the past few years. This row crop land typically has waste applications during the spring and fall. This fall, that process was significantly reduced, and almost completely halted, by the increased rainfall. Currently Murphy -Brown LLC is looking for land application opportunities, under the POA, and we will begin as soon as weather and soil conditions permit us to do so. We, at Murphy -Brown LLC, remain committed to environmental responsibility, and will continue to work to regain compliant freeboard levels. Regards, �5- Lcv�� R.O. Britt Land & Nutrient Manager Murphy -Brown LLC Waverly Division O1h24/2007 WED 14:20 FAX 9102933138 WRLNdt1 Z 002/018 •,fir.--- -��, .�� PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 4�jl I JAN 2 s zap I OENR RA.LEIGH REGIONAL. OFFI Facility Number: 66-34 County; Northampton Facility Name: Smithfield-Carroll's Farm f 1 Certified Operator Name: Lee Farmer Operator Number: 28699 1. Current liquid level(s) in inches as measured from the current liquid level In the lagoon to the ---lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon NameflD: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 11P 11S N N 17 22 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level Is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range, Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan Is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered In the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 1 /10/2007 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the Information Is accurate and correct. R.O. Britt Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 1-804-834-2109 Date: 1 /912007 01/:24/2007 WED 14:20 FAX 9102933138 WRLNMI Q 003/018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 11 P line m : 2997.4 lb PAN 2. Structure ID: 11 S line m = 1596.0 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5, Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 4593.4 lb PAN III, TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window A Small Grain 4.31 35.66 153.7 Sept -April B Small Grain 4.11 35.26 144.9 Sept - April C Small Grain 5.10 35.51 181.1 Sept - April D Small Grain 5.22 35.38 184.7 Sept - April E Small Grain 5.28 50.00 264.0 Sept- April F Small Grain 4.11 11.90 48.9 Se t - A rill G Small Grain 1.07 27.63 29.6 Sept - April H Small Grain 3.12 27.38 85.4 Sept - A r l I Small Grain 3.76 50.00 188.0 Sept - April J Small Grain 2.63 50.00 131.5 Sept - April K Small Grain 4.83 50.00 241.5 Sept - April subl Small Grain 6.20 35.34 219.1 Sept - April sub 4&7 Small Grain 6.10 50.00 305.0 Sept - April sub 6 Small Grain 1.62 50.00 81.0 Sept - April sub 8 Small Grain 3.28 50.00 164.0 Se t - A ril Taylor 2398 3 Wheat 41.90 144.00 6033.6 Sept - April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) 8456.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 4593.4 lb. PAN PoA (30 Day) 2121 /00 H/ 01/`24/2007 WED 14:20 FAX 9102933138 WRL,NM1 Q 004/018 x. Crop's remaining PAN balance (line v from section Ili) w y. Overall PAN balance (w - x) 8456.0 lb. PAN •3863 1b, PAN Line y must show as a deflcit, if line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance, If animal waste is to be hauled to another permitted facility, provide Information regarding the herd population and lagoon freeboard levels at the Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional iand is available for pumping if needed. PoA (30 Day) 2121100 01/.24/2007 WED 14:20 FAX 9102933138 WRLNMI Q 005/018 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 11 P 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 114885 ft2 e. line c/12 x line d x 7.48 gallonstft3 143223 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1 901 days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 7-1-0-0-01 certified herd #1 1000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design J. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated I 11/29/2006 m. ({lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 173019 fe 0J f t3 103473.6 ft3 689388 gallons 3.60 lbs/1000 gal. 2997.4 lbs. PAN PoA (30 Day) 2121/00 01424/2007 WED 14:20 FAX 9102933138 WRL.NM1 [?] 006/018 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1, Structure Name/identifier (ID): ills 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 22.0 inches b, designed 25 yr./24 hr. storm & structural freeboard 26.0 inches c. line b - line a (Inches in red zone) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 79128 ft2 e. line c112 x line d x 7.48 gallons/ft' 197292 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 1000 certified herd #1 1000 actual waste produced = current herd # x line g W certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + ] + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 11/29/2009 m. ((lines e + k)/1000) x line I REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 173019 ft3 0 f t3 103473.E ft3 689388 gallons 1.80 lbs/1000 gal. 1596.0 lbs. PAN PoA (30 Day) 2/21/00 02/05/2007 MON 13:46 FAX 9102933138 WRLNMI -)—* DWQ Raleigh Q 001/008 u�°phy�Br0 WIL�� Murphy Brown LLC 110 Box, 856 2822 Hwy 24 West Warsaw, NC 29398 Phone (910) 293-3434 Fax (910) 293-31.38 Fax'Transnzittal Sheet From:. s Pages-, Phone,• e. CC: OUrgent O For Review O Please Comment C7 Please Reply ❑ Please Recycle 0,2/05/2007 MON 13:48 FAX 9102933138 WRLNMI 4a4 DW9 Raleigh Q 002/006 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 86-34 County: Northampton Facility Name: Smithfield-Carroll's Farm 11 Certified Operator Name: Lee Farmer Operator Number: 28699 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Splllway(Y or N): Level(Inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 11p 11S N N 14 19 2. Check all applicable Items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptabie ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section Ili tables. Included within this plan Is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the IDWO prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/6/2007 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. R.O. Britt cility Owner/Manager (p F ity ne g r ( n ure) Phone: 1-804-834-2109 Cate: 2/5/2007 0.2/05/2007 MON 13:50 FAX 9102933138 WRLNMI 444 DWQ Raleigh IM 003/006 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1, Structure ID: 11 P line m = 4399.3 lb PAN 2. Structure ID: 11 S line m = 2172.8 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 6572.0 115 PAN Ili. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres a. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column rx 9 u. application window A Small Grain 4.31 35.66 153.7 Sept - ARM B Small Grain 4.11 35.26 144.9 Sept -April C Small Grain 5.10 35.51 181.1 Sept -April D Small Grain 5.22 35.38 184.7 Sept - April E Small Grain 5.28 50.00 264.0 Sept - April F Small Grain 4.11 11.90 48.9 Sept - April G Small Grain 1.07 27.63 29.6 Sept - April H Small Grain 3.12 27.38 85.4 Sept - April I Small Grain 3.76 50.00 188.0 Sept - April J Small Grain 2.63 50.00 131.5 Sept - April K Small Grain 4.83 50.00 241.5 Sept -April subl Small Grain 6.20 35.34 219.1 Sept -A rii sub 4&7 Small Grain 6.10 50.00 305.0 Sept - A rii sub 6 Small Grain . 1.62 50,00 81.0 Sept -April sub 8 Small Grain 3.28 50.00 164.0 Sept -April Taylor 2398 3 Wheat 41.90 144.00 6033.E Sept -April 'Stale current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down perlod. v. Total PAN available for all fields (sum of column t) = 8456.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 6572.0 lb. PAN PoA (30 Day) 2/21100 0,2/05/2007 MON 13:52 FAX 9102933138 WRLNMI DWQ Raleigh ICJ 004/006 x. CroWs remaining PAN balance (line v from section III) y. Overall PAN balance (w - x) = 8456.0 lb. PAN -1884 lb. PAN (Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 0 0.2/05/2007 MON 13:53 FAX 9102933138 WRLNMI 444 DWQ Raleigh 121005/006 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): Ill P 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 14.0 inches 1-9-01 inches 5.0 inches 11-4-8-851 ftz 358058 gallons f. temporary storage period according to structural design days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 1000 certified herd # 1000 actual waste produced = current hg[d # x line g certified herd # 1. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 1/22/2007 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 173019 fts U ft3 1 Q3473.6 ft3 689388 gallons 4.20 lbs/1000 gal. 4399.3 lbs. PAN 62/05/2007 MON 13:54 FAX 9102933138 WRLNMl -lad DWQ Raleigh �l R 006/006. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 1115 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 19.0 Inches b. designed 25 yr./24 hr, storm & structural freeboard 26.0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 79128 ftz e. line c/12 x line d x 7.48 gallons/ft3 345262 gallons 3. -Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 173019 ft3 h. current herd # 710-0-01 certified herd #1 1000 actual waste produced = current herd # x line g = 173019 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (fines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 1/22/2007 m. ((lines e + k)/1000) x line I= REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 Oft3 103473.E ft3 689388 gallons 2.10 Ibs/1000 gal. 2172.8 lbs. PAN ! r •DIY � '� �'.�,yt^�A ,�,'f � ,a; - � �, — r 1. �,.� , ... .,5 !k?I'°`' •^'=G, •r, - :mil 't;'q."!kl-'( • a ✓A s • Ala - . "!•+ 4 Ic . 7 ,. —A ✓ . vi -as , .r - - i - + e ' v`J'�'r yn•' v. G jk c ] a N 4 �`.. 4 -,-• jj -. r : '., :. �4• '. . ,�' .:r .. - _ 'tea � - - f� .�'� �^ o ., c: .-� n � r. -eb ^c �4 � Qati�-6"s.h,� c'�,�mm� a »",r•' : -:4Lo-.a•dC• � ,s,. �� ���', e. .. �e '� _ *,�o'�`i - ��s�.:•,r- ��ea' .. o.,q: a-� ` {fi`,+-`. ,.. .N, ., . y,� te�, S'`? r •1'1 .11 �� ><— "7• ..fit :.! OA •+n ,a i �ti ei ... - + , Jq V> A { er•[ • 1 �t } t ,p � .yn i - ofr�- i t 94 .. � l ' - ♦ '' e .. �/ Rr '; � 11 Nam...-. '�, • �r n� ��-