Loading...
HomeMy WebLinkAbout660019_PERMIT FILE_20171231Division of Water Quality Facility Number i O Division of Soil and Water Conservation 49Other Agency Type of Visit C OiTpatice Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit Routine O Complaint Q Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: EZ 0Arrival Time: � Departure Time: County: Region: Farm Name: �'`"`� +42�►--s �Gr» 1D t./ Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone No: Onsite Representative: 2 Integrator: Certified Operator: 5qre rJ�4/q /L Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = e 0 t = At Longitude: = ° = i = it Design Cnrrent Design M-6- Designepacity Population Wet Poultry Capacity Pnpulatttle C•apIty Population ❑ Wean to Finish La er ❑ Dai Cow ❑ Wean to Feeder 7❑ on -Layer ❑ DairyCalf ❑ Feeder to Finish ❑ DairyHeifer ❑ Farrow to Wean Dry Poultry ❑ D Cow ❑ Farrow to Feeder El Non -Dairy ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker ❑ Gilts ❑Non -La ers ElBeef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Cow ❑ Turkeys Other ❑ Turkey Poults ❑ Other ❑ Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes No ❑ NA ❑ NE ❑ Yes t] NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ Yes ❑ Yes INA El NE �NA [I NE INA El NE 12128104 Continued t i Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps [I Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes a<o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ,-❑ NA ❑ NE 23. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes " El NA El NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? El /// N ❑ NA [I NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes VNIEJ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ❑ NA PNo',10 El NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? El Yes ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Wo Page 3 of 1 12128104 Facility Number: — Date of Inspection a Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. if yes, is waste level into the structural freeboard? Structure l Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): s Observed Freeboard (in): 'V 1t 5. Are there any immediate threats to the integrity of any of'the structures observed'? (ie/ large trees, severe erosion, seepage, etc.) ElYes M-1Qo - NA El NE ❑ Yes o ❑ NA El Structure 5 Structure 6 ❑ Yes No ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr at, notify DWQ 7. Do any of the structures need maintenance or improvement? [I Yes N ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑Yes No ElNA ElNE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ElYes o ElNA ElNE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes "NoNA ❑ NE maintenance/improvement? 11, Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) (jOyq-5 j-/, ` o' A ✓141 '2 5 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? El Yes L N , [I NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes � No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes �No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �TNo ❑ NA ❑ NI •''�'? � ?' y' ` a °rkria v. ,, ks �. «':, a .:#,�' d,�FY!�.'.,-. ri. `.. '.1�: •'. _..,, ;A' i , @ mmes(refer toqueshon4 #) �1 xpIIamanyYESanstw,ersland/orttny reco,mmendattonsior any other comments. Us`eddrawtngs'of1faetlttystu better, explain�s�tfu,ations (us&addittonal pages as necessa�riyL)�'1Ft� "['e�.`o'.i�t �:,?..�: " ..� T:i7�. ...-{",'r. Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: f2 .Ci Date: l 252 D 2 Page 2 of 3 12128104 Continued Type of Visit Qrcompce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine O Complaint O Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: ter ty �u'P ICU , -„ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Phone No: Onsite Representative: Integrator: Certified Operator: ;�- Operator Certification Number: Back-up Operator: Back-up Certification Number: Region: Location of Farm: Latitude: 0 e = 1 = Longitude: 0 ° = d Design Current Design Current Design Current Swine Capacity Population Wet Poultry C**apacity Population C*attle C*apacity Population ❑ Wean to Finish ❑ Layer El Dairy ❑ Feeder to Finish ❑ DairyHeifer arrow to Wean Dry Poultry ❑ D Cow ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish ❑ Layers ❑ Beef Stocker ❑ Gilts ❑Non -La Non -Layers ❑ Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Cow ❑ Turke s Other ❑ Other ❑ TurkeyPoults ❑Other Number of Structures: Cow ❑ Wean to Feeder ❑Non -La er El Dairy Calf Discharges &Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: El Structure El Application Field [I Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? ([f yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 ❑ Yes No ❑ NA ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ Yes ❑ Yes A ❑ NE A ❑ NE A ❑ NE 12/28/04 Continued Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes < ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes 6 No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threa ,notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes I No ,.0 NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes �No❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Aaulication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ETNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ElYes -E No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) p� �, r• w �s} 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [TNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No,. ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes / N ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? El Yes No NA ❑ NE 18. 1s there a lack of properly operating waste application equipment? ❑ Yes o ❑ NA ❑ NE 'Comments (refer.to question #): Explain any YES answers and/or any recommendationsiortany�at>her comments' ?Use drawings of facility to better explain situations. (use additional pages as necessary):, a Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: �— T Date: '~jo Page 2 of 3 12128104 Continued Facility Number: — Date of Inspection 7� Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ffNo C :NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box. ❑ WUP El Checklists El Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. 2rYes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ffNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 2rNo 2NA N 'NE q Y 24. Did the facility fail to calibrate waste application equipment as required b the permit? El Yes [I No Q NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ❑ No A ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes o ❑ N NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ElYes ElNo NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: i S (v � l Page 3 of 3 12128104 9 Type of Visit O'Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Qf Arrival Time: Q 0 Departure Time: County: Farm Name: a" I Cqj �_��L-- Owner Email: Owner Name: r✓/i% ` l / A PS-2 F6-ri2—f 9 tt IVC Phone: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: J Back-up Operator: Title: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region:911_�_ Location of Farm: Latitude: [7e = i = Longitude: = o = 1 = td 'i I'3 r Design e' CurrentDesign Capacity Population ? �2�.rtn�vT t..AlltApiYR6® s'C>urrent Wet Poultry map city "Popullaation Cattle -r-�w.31� tRe�.�t..,Pf n6 xsl..sc. Design Cnrrent Capacity Population �Iu:�a. ean to Finish ❑ La er ❑Dai Cow ean to Feeder ❑Non -La ec ❑Dai Calf ❑ Fe er to Finish arrow to Wean b 0 Dry Poultry ' ❑ La ers ❑Nan -La ers ❑Pullets ❑ Turkeys ❑Turke Poults DairyHeifer 7, ❑ D Cow it El Non -Dairy ❑ Beef Stocker El Beef Feeder ❑ Beef Brood Cowl I Number of Structures: ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other ther Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZfNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes CJ < NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ElNA ElNE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes NA El NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes No ❑ NA ❑ NE other than from a discharge? 12128104 Continued m Facility Number: — Date of Inspection y 0 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 36 it 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ��No ❑ NAElNE ❑Yes❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes o 0-NA ❑ NE ❑ Yes ZfNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr , notify DWQ 7. Do any of the structures need maintenance or improvement? El Yes No 0 NA El NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑Yes No El NA El NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNoQ'NA ❑ NE maintenance/i mprovement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 1. k QIA, �+►� 1 13. Soil type(s) 14, Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No . ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination;❑ Yes No NA ElNE 17. Does the facility lack adequate acreage for land application? El o 'NA El 18. Is there a lack of properly operating waste application equipment? El Yes o ❑ NA ❑ NE Reviewer/Inspector Name �,- b „ Gt. J s_. l�r']:`l °/1.'�" i Phone: Reviewer/Inspector Signature: Date: 12128104 Continued Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available'? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21, Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code ❑ Yes ONo ❑ NA ❑ NE ❑ Yes 0No ❑ NA ❑ NE 22. Did the facility fail to install and maintain a rain gauge'? ❑ Yes ONo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No NA` ❑ NE 24, Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No �<NAElNE 25. Did the facility fail to conduct a sludge survey as required by the permit? ElYes ❑ No , NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No , ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No El NA El NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes No [I NA [I NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes - ❑ NA ❑ NE If yes, contact a regional. Air Quality representative immediately VNo 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE %Adliiional,Ctir tinents and/or Drawings:Mi a c d"b P 111-9e_ ' S 12128104 iType of Visit 4 Compl- a Inspection O Operation Review O Lagoon Evaluation ReasonforVisit outine O Complaint O Follow up 0 Emergency Notification O Other ❑ Denied Access F eil ty Number mute of Visit: Time: rO Not Operational 0 Below Threshold Permitted [3 Certified 0 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name: DiA '''LTtV O ,-1" County: ,/Lr Owner Name: IV ��1 yU I f �`' Phone No: Mailing Address: �� �S /':� 2 nr t-7 r+ e ( 1 S -. 1'YL �3 '2 Facility Contact: Title: Phone No: 27 ,? J l ! — no j Onsite Representative: Integrator: Certified Operator: Operator Certification Number: Location of Farm: []Swine ❑ Poultry ❑ Cattle ❑Horse Latitude 0' D1 66 Longitude 0• �� �11 Design Current Swine Capacity Po ulatioi ❑ Wean to Feeder ❑ Fee o Finish arrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts [:]Boars " 4 1Vumber of Lagoons Holding Ponds 1 Solid Traps Design Current Design Current . Poultry Capacity Population Cattle Capacity Population ❑ Layer EEO]Non-Dairy ai❑ Non -La er ❑ Other Total Design Capacity Total SSLW Subsurface Drains Present id Waste DischaE= & SA- re m I_mRacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. if discharge is observed, was the conveyance man-made? b. if discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure S Identifier: Freeboard (inches): 05103101 Field Area i i ❑ Yes eNo ❑ Yes No El Yes ❑ Yes o El Yes [ - ❑ Yes "o ❑ Yes No Structure 6 Continued l Facility Number: k — Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type 1? / I., ir-J.'r{. S.� r A,4 a s= 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Reauired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? I& Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design'? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes E5 No ❑ Yes Ef No ❑ Yes No ❑ Yes 2 ❑ Yes Id'No ❑ Yes No El Yes Ala ❑ Yes 0<1 ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑�N0 El Yes ❑ Yes IL3 ryo ❑ Yes M <0 ❑ Yes to ❑ Yes P ❑ Yes Rio ❑ Yes No ❑ Yes ❑ Yes N ElYes No © No violations or deficiencies were noted during this visit. You will receive no further correspondent out this visit. Comments (rle,comments. r to ttuesdo i' ), Explain any�YsES,a send/or any recommendations or a�Fi Use drawings facility41 to betterexplarn situations (use additional pages as°°necessary): d Copy ❑Final Notes Reviewer/Inspector Name Reviewer/Inspector Signature: Date: t d 05103101 Continued Facility Ndmber: Date of Inspection Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (iel WUP, checklists, design, maps, etc.) 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 25. Did the facility fail to have a actively certified operator in charge? 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 28. Does facility require a follow-up visit by same agency? 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? NPDES Permitted Facilities 30.. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 32. Did the facility fail to install and maintain a rain gauge? 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ❑ Yes Lf 5O ❑ Yes Di o ❑ Yes IQ�a ❑ Yes ❑ Yes/ ❑ Yes KNo YesZZ ElYes ❑ Yes 80 ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After V Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 Type of Visit O Corn nce Inspection t) Operation Review 6 Lagoon Evaluation Reason for Visit Routine O Complaint O Follow up 0 Emergency Notification O Other ❑ Denied Access Date of Visit: f'ime: d Facility Number , Permitted G Certified 0 Conditionally Certified [3Registered Date Last Operated or Above Threshold: Farm Name: J�if h 1 074, F-71 -- County: Owner Name: Mailing Address: Facility Contact. — Onsite Representative: Certified Operator: _ Location of Farm: Title: Phone No: Phone No: Integrator: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0' 0" °° Longitude • 6 11 Design Current Swine Capacity Po ulatioi ❑ Wean to Feeder ❑Feder to Finish Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Number of Lagoons Holding Ponds / Solid Traps Design Current Design Current Poultry Ca aci Population Cattle Capacity Population ❑ Layer I Dairy ❑ Non -La er ❑Nan-Dai ❑ Other Total Design Capacity Total SSLW Subsurface Drams U Present LI Lagoon Area [J Spray Field Area No Liquid Waste Management System I Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ZOth, a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min'? d, Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard {inches}: t t1 05103101 ! 31 ON Yes o ;Yes ,❑, No ❑ Yes i�'IVo ❑ Yes ❑ Yes �, o� El Yes I�'N0 ❑ Yes V No Stricture G Continued . 3 . Facility Number: — Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type ✓r'4 13. Do the receiving cro s differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement2 (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20• Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No ❑ Yes No ❑ Yes ElYes�Nq No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ No ❑ No ❑ No ❑ No ❑ No ❑ Yes No ❑❑ Yes ;VN9X Yes El Yes ElYes No " ❑ Yes N ❑ Yes No El Yes o ❑ Yes o © No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. �C, , inents " refet.`to " uestion # Ex lain a y Y>aS answers and/or any recommendations or any other caaaarrtents, Tt ' C q } p Use;drawings of faculty to better explain•situations "(use#additional pages as necessary) a ❑ Field Copy ❑ final Notes .. aaxxe� �" y - •Y.4"t�'! ,y. C'lnsx'- Z3:etll 3iS. ,M.e LAvi '^ , RH" 5 `` C,14- 4-44 f ol,+rJ a Z i a,•f �' s a -rl-ram*- tit J S P,-e h �`f �, ; l �r ��a� ker� s•I e r�- � o r am► - c� /!!_i j W-5 ' o- 4h � /-44 &t p9'4�/A�9 � 1 d CI vtw, - r, A� ,}' 443 0±3L Fer�-,, Reviewer/Inspector Name ,• M3- A Reviewer/Inspector Signature: Date: —Dr 05103101 Continued \\ jType of Visit 0 Comp9nce Inspection O Operation Review O Lagoon Evaluation for Visit Routine' O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date or Visit: 3 ZS e: .f Printed on: 7/21/2000 O Not Operational 213elow Threshold Permitted U Certified 13 Conditionally Certified ❑ Registered Date Last Operated or Above Threshold: ..................... FarmName: .. !..�..f�r!'r...................................................... County:................................................................................... OwnerName: .!......"".5............................. Phone No: ....................................................................................... Facility Contact: ..L� �?.!- .............: ...................Title:................................... Phone No: ................ MailingAddress: ................................................................................................................. . OnsiteRepresentative: ..................... . ..................................................................................... Integrator: ......... _... ......................... Certified Operator:,.... r �...... ..... F2..9_ ,V,1 .................................................................. Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 4 44 Longitude F—Do �G F—D`s Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Ca aci Po ulation ❑ Wean to Feeder ❑ Layer 10 Dairy ❑ F i;r to Finish ❑ Non -Layer ❑ Non -Dairy ,ErFarrow to Wean ❑ Farrow to Feeder Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number of Lagoons Holding Ponds / Solid Traps Subsurface Drains Present 110 Lag -,on Area f ❑ Spray Field Area No Liquid Waste Management System Discharees & Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? b. If discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment ❑ Yes No ❑ Yes WNIoZ ❑ Yes No ❑Yes ❑N ❑ Yes L`I ❑ Yes �Ic 4. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes Nr Structure 1 Structure 2 Structure Structtire 4 Structure 5 Structure 6 Identifier: ................................... ........ ........................... .................................... ............. ....................... ........................... I........ Freehoard (inches): 7 Facility Number: l (r' I l l Date of Inspection 7 Printed on; 7/21/2000 r 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type 13. Do the receiving crops differ with those designed in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 1.8. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did ReviewerAnspector fail to discuss review/inspection with on -site representative'? .ai 24. Does facility require a follow-up visit by same agency? 25.-Were any additional problems noted which cause noncompliance of the Certified AWMP? 'Vfl.yiol'aiions oi.. Ocienc�ies vt�erenote0•00-ring�h#s:Visit}• XoU wiil r.eeeiye o fuftiter T rorresponde... about: this .visit. _ : _-- ❑ Yes ❑ Yes ❑ Yes [� ❑ Yes No E.Yes LYNo , ❑ Yes No ❑ Yes to ❑ Yes E No ClYes ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes �Io ❑ Yes No ❑ Yes ON-_0 ❑ Yes , No es ❑ No ❑ Yesrq ❑ Yes No Cl Yes �13zo ❑ Yes ❑ Yes 91 ❑ Yes No Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): 6C.J. 1-1 tZfJ S�/rn�G/a"S A14- .4 4d�r, r� j�� P/ � 3. r2e�,. ls e.e,�. �z, -i-o .�/ l-1i d/� ,�}G..� lb-6q , L 67q&�/e = , - 9-eI Ik,;, J( -3 l4v-j1' = 2 / ic., s' Reviewerfinspeclor Name /' 4 fkr_-, Routine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow-ug of DSWC review 0 Other Iwl III ICI .1 .. cility Number Date of Inspection i Time of Inspection t) 24 hr. (hh:mm) Permitted [3 Certified © Conditionally Certified (3 Registered 113 Not O erationAal/ Date Last Operated: .......................... .1 Farm Name: ...... .!^.k.. RJ r% ,. .... County:..II Q.r .� h-,!I........................................... Owner Name: ! .:...�..:.'� "'�3 . r:li lsj ........C..i-..1✓�......................................... - Phone No: ....................................................................................... .......................... Facility Contact: 1Q✓ e.. �+— ..................V�Li ." ...................................Title:................................................................ Phone No: ................................................... MailingAddress: ..................................................................................................................... ..................................................................................... .......................... Onsite Representative: „!7�?r;�:...01..�.....�.......................................................... Integrator:...:.��.i.!9.h'S....... .......................... Certified Operator:.......... , v� 1. 4 g, Operator Certification Number:, .................................................................................. ......................................... .ocation of Farm: fps v A ..................... Latitude `7 t, .0 1 =11 Longitude E�1:1' �' EZZ" F Design" `, Current Design Cairrent:;; ; tDesign` :° Current s; Ca `ace i',-Po ufatton:' Poultry 1 Ca aci Po utahon t1e Ca ace Po ulagon ❑ Wean to Feeder ❑ Layer .. ..� .:. ❑ Dairy,' ❑ Fe to Finish ❑ Non -Layer ❑ Non-Dairy W arrow to Wean ,I `I' Farrow to Feeder 'yi ❑Other F'E 1 Farrow to Finish T6UUDeslgn'CapaClty , Gilts III a �.: ; [I Boars t ��� 1 1 �I i.Tota1SSL'W lea "' 3 x I Neamb r Lagoons Subsurface Drains Present Lagoon Area ❑ Spray Field Area i �s Hof E � - a } � i` i' .l $nds Solid Traps R [ i .. 1�. ^r� �I No Liquid Waste Management System Ii ;Holding' ❑ i °z .... ., x�., Discharges & Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance tnan-made'? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (It* yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure l Structure 2 Structure 3 Structure 4 Structure 5 ❑ Yes No ❑ Yes ❑ Yes ❑Ai�' ❑ Yes ❑ ❑ Yes o ❑ Yes 0140 r' Cl Yes o Structure 6 Identifier: 1 l Freeboard(inches): .........J.V....................................::............................................................ ...... ............................................................................................. 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes o seepage, etc.) 3/23/99 Continued on back [Facility. Number: — f Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes ;'Zo _ ❑ Yes ❑ Yes oo ❑ Yes No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes �No 12. Crop type 4�' r 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. is there'a lack of adequate waste application equipment? Required Records & Documents IT. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the.Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20- Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail, to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No ❑ Yes .lz ❑ Yes ❑ No ❑ Yes P q ❑ Yes 00 ❑ Yes 21' o� ❑ Yes ! No ❑ Yes B' o ❑ Yes 0No ❑ Yes LJ N ❑ Yes `LJ N ❑ Yes No 'IF'aeility Number: — Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? 1e 0 30 z/ z'q- es ❑ No ❑ Yes �10 ❑ Yes Iff No ❑ Yes ❑ Yes < ❑ Yes ❑ lya� ❑ Yes J o al Facili y-Number Date of Visit: � Time: C„! Gad I Q Not Operational Q Below Threshold ermitted [3 Certified 0 Conditionally Certified [3 Registered Date Last Operated or Above Threshold: ......................... Farm Name: a i... �099a,... ......... County: .... �dY'f �� OwnerName: ...IU.1=..C-............................................................................... Phone No:........................................,............................................ FacilityContact:............................................................................... Title:................................................................ Phone No:................................................... Mailing Address: Onsite Representative: .... Integrator:�G C �`r ................./�................. Certified Operator: K ��p,,, [ Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude �• �� ��. Longitude �• �� ��� Design," Curtent Design<CurTent Ca aci Po` t>ilatron Poultry , . • Capacity ; .Popu1 tldn Cattle C ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts LEE ❑ Boars i Number of Lagoons , l❑ Subsurface Drains Present �I❑ Lagoon Area . I❑ Spray Field Area 1. ^^' �Holdlug Ponds 1 Solid Traos' 'T ❑ No Liquid Waste Management System Discharges &Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes No b. if discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) ❑ Yes �No`� c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: ............�� O.. .I .......... .................................... I............I...... ....................................................................................... ❑ Yes 01�o ❑ Yes o ❑ Yes o ❑ Ye ,.�n No Structure 6 Freeboard (inches): S/00 Continued on back Facility Number: Date of Inspection 1-7ZZTZZ1 Printed on: 10/26/2000 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste. Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? []Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes Flo ❑ Yes o ❑ Yes ZNo El Yes ❑ Yes o ❑ Yes ❑ Yes o 12. Crop type (je r I'r PS 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes N 14. a) Does the facility lack adequate acreage for land application'? ❑ Yes N b) Does the facility need a wettable acre determination? ❑ Yes No c) This facility is pended for a wettable acre determination? ❑ Yes ZN o15. Does the receiving crop need improvement? ❑ Yes16. Is there a lack of adequate waste application equipment? ❑ Yes Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes o 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ic/ WUP, checklists, design, maps, etc.) ❑ Yes No 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ YesFo? 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design'? ❑ Yes 21. Did the facility fail to have a actively certified operator in charge'? ❑ Yes 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative'? ❑ Yes 24, Does facility•requirc a follow-up visit by same agency? ❑ Yes o 25. We any additional problems noted which cause noncompliance of the Certified AWMP? [I Yes ❑ No �.*iolhttQiis or- dgficiendia-g -were noted• diWirig �his:visit' • Yoo will-> ooh,e ij fu t�gr corres' ondence: abvut this visit . • .. • ' • . . Comments (refer to question #) y Explain any YES answers and/or any recommendations or any other comments L �k t i Use drawings of facility to better explain situations. (use additional pages as,necessary): _ ; 4 , 013. t , Reviewer/Inspector Name Reviewer/Inspector Signature: Date: —2 //y/ 5100 r Facility Number: Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond'or lagoon fail to discharge at/or below OYes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes o 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes o 5100 Q D1VI510 Soil andhWateCl Conset'hvatlOn QperatioR Review j ; $q+ t € lepli "ts {ii -.. €t er6'a r QD' ion QfSOl118RdrWater<COnSCCVatIOR Cpmpllaneeinspeetlonlr I�iki il;t!�I f10-� Ef,l� 1 d'� '63€1`6s;a ,,�E Ivision,ofwater: 1,al tl,l,�,,,. l,,n,,.a 3 p'<el . €6::E1 39 4 € , ''l'�!'tl'!�i'Ilo3h,E+l i} °�j'o '� €,6;✓ 3£i t t,E 1 , , ❑ b IQuB lt�k� €tiCQIMlpllal1Ce �n$l3eCgOn' ... <tllerAgeRCy,r DpelAttOnt.@V1CW �Q'Routine Q Complaint Q Follow-up of DWQ inspection Q Follow -tip of DSWC review Q Other Faci ' y Number Date of Inspection 'Time of Inspection } 24 hr. (hh:mm) Permitted © Certified [3 Conditionally Certified 0 Registered g 0 Not O erattonal Date Lust Operated: Farm Name: �.�..L ..... '?`j ?Zr-s ...................................... County: ............... .... -- ............... ............................ Owner Name:... ;.......!.,5 !'�? 2.�-s ..-- .r/ L Phone No: Facility Contact: ............................................... .!;. . I .........Title:......................................I......................... hone No: Mailing Address:... 1.....Q.0.......... .....% ..........yt......... .Q.,x..d.G./ ......... !� -7-)...,.,.......................... ........,................. /I/ r Onsite Representative: � i. j........... .. ......... Inte;gyrator:.4v:..!........�nf....(�.��i��............... ..... .... ....:.�-. r ........... Certified Operator: ........... �1...'.1..!]7!..I..j....,...0 J.4..O.-F r+►„r................................_ Operator Certification Number:.......................................... Location of Farm: I.J9 I, , u/ 4 r................................................................................ J_..'.. Latitude �� �� Longitude • �' �'j Design Current ` ;�' �, `' Deslg'ii Current _, Design Current Swine,EcaacityoulatloCapacity Eo ulation Ca aci Population. Poultry: te ❑ Wean to Feeder ❑Layer El Dairy ❑ Fee r-to Finish ❑ Non -Layer ❑ Non -Dairy arrow to Wean ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts, ❑ Boars ` Total -SSLW i Niabiber of Lagoons,.. ❑ Subsurface Drains Present ❑-La goon Area Spray Geld Area A. Holding3Ponds / Soli Traps ; ,l E ❑ No Liquid Waste Management System g. Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made.'? h. If discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/thin? d. Does discharge bypass a lagoon system'? (If ycs, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes , No ❑ Yes No ❑ Yes No ❑ Yes 9>0// ❑ Yes PW ❑ Yes V N ❑ Yes No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier- Freeboard � .tt .............. .. Freeboard (inches):.............................................................................................................................................................................. ... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, No/ seepage, etc.) ❑ yes 3/23/99 Continued on t. Facility Number: Date ofinspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type 6, Q,r'- w 1 A , cv Ya't . S'r94 a ❑ Yes eeN<o ❑ Yes ❑ Yes No ❑ Yes No ElYes N ❑ Yes No 13. Do the receiving crops differ'with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes Z No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes � fI� o b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes 2 No 16. Is there a lack of adequate waste application equipment? ❑ Yes To Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes E5 o 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes No 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) El Yes N 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 21. Did the facility fail to have a actively certified operator in charge? ❑Yes N 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes r o 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 24. Does fac'li vy require a follow-up visit by same agency? ❑ Yes N 25. W e any additional problems noted which causd noncompliance of the Certified AWMP? Yes o o yiolaro . . . .... ies wire jngtea clueing sit: Yoitt ;wilt r;eceiye o; #'urth�r correspondence: abvuk this visit. ..::::: ::::::.:::: ... ::: ... ... ... ... ... ... ... :... ... ... ... . 3/23/99 rFacilityNumher: — late of inspection Odor ISSLies 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation'? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32, Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Yes ❑ No ❑ Yes /No ElYes o ❑ Yes /No ❑ Yes ❑ Yes o ❑ Yes j No 3/23/99 0 Division of Soil and Water Conservation - Operation Review D;Division of Soil and Water Conservation - Compliance Inspection J] Divisior of Water Quality - Compliance Inspection 1 Other'Agency - Operation Review O Routine O Com faint O Follow-up of DWQ inspection O Follo,-u orDS�VC review O Other Facility Number D.Itc of 111St11'L'tif111 Time of Inspeclinli � 24 hr. (hh:mm) Permitted 0 Certified © Conditionally Certified © Registered 1131.Not Opera Date Last Operated: Farm Name: ID%J., ......................................................... County: ...ti Q.1L. 'f ;<.. ;rs`��S.J.................... Owner Name :............. Phone No: FacilityContact:...............................................................................Fitle:............,................................................... Phone No: ................................................... AdailingAddress:.................................................................................................................................................................. .......................... Onsite Representative: (J,I{J E— A F tnteurator:................... . ...................... Certified Operator :................................. ..... . Operator Certification Number ......................................................................... ................. Location of Farm: Latitude • ° �• Longitude ° �: �• Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder ❑ Layer I 1 1[:] Dairy ❑ Feeder to Finish ❑ Non -Layer I JE1 Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area 10 Spray Field Are. Holding Ponds / Solid Traps ❑ No Liquid Waste Management System Discharites & Stream Impacts 1. Is any discharge observed from any part of the operation'? Discharge originated at: ❑ Lagoon ❑ Spray Field []Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it rCI1eh W Itcr nf' the State" (If ycs, notify DWQ) c. If discharge is observed. what is the estintawd flow in galhnin'' d. Does discharge hypass a lagoon system? (lf ycs, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure ? Structure 3 Structure 4 SIRLClure 5 +r ❑ Yes [;lo ❑ Yes �NO ❑ Yes 5�(No 1 ❑ Yes No ❑ Yes No ❑ Yes 70 ❑ Yes (� No SU'tICIUrc {�/ Identifier: Freeboard............ ........ ............. ..... ...........................................................................I............. 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion,El Yes No seepage, etc.) 3/23/99 Continued dfn hack Facility Number:U - - Date of Inspection 6. Are there structures on-;ite which are not properly addressed andlor managed through a waste management or closure plan? El Yes XNo If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? Yes ❑ No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes o 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ YesXNo elevation markings? Waste Ap2lication 10. Are there any buffers that need maintenance/improvement? ❑ Yes 11. Is there evidence of over application? ❑ Excessive Pondhi , ❑ PAN ❑ y xo 12. Crop type C C dy / 13. Do the receiving crops differ with those designated in the Certified Animal Waste Manageme t Plan (CAWMP)? ❑ Yes No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes No b) Does the facility need a wettable acre determination? ❑ Yes No c) This facility is pended for a wettable acre determination'? �^1'es ❑ No '%J ` C ', 15. Does the receiv ng c�rropneed impr v mcnt? ❑ Yes o 16. Is there a lack of adequate waste application equipment? ❑ Yes EYNo Required Records. & Documents 17, Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes 2rNo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, elc.) ❑ Yes ZNo 19, Does record keeping need improvement? (se/ irrigation, freeboard. waste analysis & soil sample reports) ❑ Yes ZNo 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes z o 21. Did the facility faii to have a actively certified operator in charge'? ❑ Yes No 22. Fail to notify regional DWQ of cmerII-ency situations as required by General Permit'? (ie/ discharge, freeboard problems, over application) ❑ Yes VN 0 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative'? ❑ Yes �INo 24. Does facility require a follow-up visit by same agency? ❑ Yes No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes IN0 :: Vo violaiigris or &flcienctes -r'ere pgt:ed• du•rifng #iiis:vtsit'. Yoit will receive Rio further. - corres� 6fidence. aba f this .visit.......:: :::..... . Comments:(re fer to question #):''Explairit any YES answers andlor any recomi iendattons dr any'other cbirninents `�, a Ilse drawings of f iHity to better explain.situations. (use additional gages as necessary) a , -7 , �U ��-� .�U6 7 1,71-10,c) ,fiaQ L Reviewer/Inspector Name Reviewer/Inspector Signature: Date: 3/23/99 of Soil and Water Conservation ❑ Other Agency of Water Quality Facility Number u...�•o� Date of Inspection ! Time of Inspection 24 hr. (hh:mm) E3 Registered E3 Certified E3 Applied for Permit 0 Permitted 113 Not Operational Date Last Operated Farm Namr..<....�.L..L..9:!! 5...._F^..5 �:_.'..�.:........ii 4i i0t ✓ Countya�r.%'3.r!a!1.................................... II --'' �p Owner Name:...V�..'.1.1..�.f! s.....!!/Lii.S....... 1l..flwF—�!'.��,h�Phone No: .....4J� Z Facility Contact: %y F.lt/.¢:.._644—.fkn^............................ Title:................................................................ Phone No: Mailing Address:.............Q..i..... i...........M. 0.C./G......... N ..... L....................... 50 .................!..................................................... OnsiteRepresentative: ....... n,4V..e..._pl4H-11..............................W...../C%C .... %......................... Certified Operator ...... .tl4&/..jq?�....... A' .. ............................................ Operator Certification Number .......................................... Location of Farm: Latitude =*=, =11 Longitude 0' =, =" t' ' �,DesignW Curint "" Design-' Current Desi q Current g "Capacrty)Population Poultry, Capacity Population Cattle _ Capacity .Population '" ❑ Wean to Feeder. Layer ❑ Dairy ❑ F er to Finish 1 ❑ Non -Layer ❑Non -Dairy '. []Farrow to Feeder. ❑Other a Total Design Capacity I� []Farrow to Finish ff Gilts N; u ❑Boars Total SSLW: Nnmber f Lagoo m /•Holding Ponds ,L--4�sr. ❑Subsurface Drains Present ❑Lagoon Area I[] Spray Field Area ❑ No Liquid Waste Management System � General L Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes. notify DWQ) c. If discharge is observed, what is the estimated flow in gallium? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 7/25/97 ❑ Yes No ❑ Yes J 0 ❑ Yes X0 ❑ Yes No ❑ Yes Ef ❑ Yes Yes � El. ❑ Yes VN ❑ Yes ❑ Yes No e Facility Number: — r 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures La�oons,Nolding Ponds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Structure L Structure 2 Structure 3 Structure 4 . Structure 5 ❑ Yes 12 o ❑ Yes No Structure 6 Identifier: Freeboard(ft): ............'................................................................................. ................................................................................................................... 10. Is seepage observed from any of the structures? ❑ Yes 11. is erosion, or any other threats to the integrity of any of the structures observed? ❑Yes No 12. Do any of the structures need maintenance/improvement? ❑ Yes No (1f any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes en No Waste Application 14. Is there physical evidence of over application? ❑ Yes No (If in excess WMP, or runoff entering waters of the State, notify DWQ) /o�f, /•.s�c••+-.• 15. Crop type �r[!�,.,,��i??NO+±.$!n'`!✓o......................................................................................................................................•--------- 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes ErNo 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes Q., o 18. Does the receiving crop need improvement? ❑ Yes 6rs O 19. Is there a lack of available waste application equipment? ❑ Yes No 20. Does facility require a follow-up visit by same agency? ❑ Yes No 21. Did Reviewer/Inspector fail to'discuss review/inspection with on -site representative? ❑ Yes No 22. Does record keeping need improvement? ❑ Yes No For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes��O� 24. Were an ditional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 25.Ze any additional problems noted which cause noncompliance of the Permit? ❑ Yes No oviolationsor deficiencies. were, noted, during this, visit, - You ,will receive, i oo. further . - corres'p4itdeike about this:visit:: :. :... .. ...... , i (�DSWC Animal Feedlot Operation Review h i ❑ DWQ Animal Feedlot Operation Site Inspection r e ,... Routine O Complaint 0 Follow-up of MV0 inspection FacilityNumber Follm -u of DSIVC: review 0 Other Date of Inspection 2 'rime of Inspection 1124 hr. (hh:mm) Total Time fin fraction of hours Farm Status: Registered ❑ Applied for Permit iex: i.25 for 1 hr 11 mini) Spent on Review Certified ❑ Permitted or Inspection (includes ti-Avel and processing) ❑ Not operaational Date Last Operated:................................................................................................................................................ Farm Name: ........ .- ✓?Vl... .. ..... County: ... o:..... 4'. '.. �. .. '..7./.. .1........: ................... OwnerName:....,..i. '.. �,� /'� �.........a�l •'-� I'hnne No:............................................................................................................ Facility Contact: ..,'kith.: .... Phone No: Alxllinr:1L1iII'4ss:....................................................................:..................................................... ........................................ ..,............. ............. I.......... .......................... OnsiteRepresentative: ...P,&C1 fa....... ............................................ Integrator :.....itv.�.!��.�..��.M...,.5.............................. Certified Operator: ........................................ .. Operator Certification Number Location of Farm: Latitude Longitude. ��• �' 0° Type of operation Design Cui rent ` .,:Design,::::.:.. Current°' A Design Current swine :;. Capacity Population:: Poultry Capacity, Populatigri Cattle Capacity. Papulatioi ❑ Wean to Feeder ❑ Feeder to Finish Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Other General 1. Are there any buffers that need maintenance/improvement? 2• Is any discharge observed from any part of the operation? Discharee originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the convey°once man-made'? b, lf'discharge is observed, slid it reach SUr11ce Water? (Ifyes, notify DWQ) c: If dish u,-e is observed, what is the estimated flow in gal/nun? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement?. 4/30/97 ❑ Yes No ❑ Yes No ❑ Yes /0 No ❑ Yes PrNo ❑ Yes ff No ❑ Yes 2fNo ❑ Yes LeNo ❑ Yes IVNo Con ittued - :ya • on 'W Fadlity Nttmbe . 8. Are there lagoons or storage ponds on site which need to be properly closed'? ❑ Yes [ No Structures (Lagoons,Iloldint' Ponds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes No 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 7� ,Structure Identifier: rr�(l111` Freeboard(ft) .........%1. �.,,,,...................................................................................................................................................................................... 10. Is seepage observed from any of the structures? ❑ Yes Pfgo 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 12'No 12. Do any of the structures need maintenance/improvement? Yes ❑ No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes F,.e(No Waste Application 14. Is there physical evidence of over application? ❑ Yes VNO (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type .............................................................................................................................................................................................................................. 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes ;dNo 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes �No 18. Does the receiving crop need improvement? Yes ❑ No 19. Is there a lack of available waste application equipment? ❑ Yes ONo 20. Does facility require a follow-up visit by same agency? ❑ Yes ONo 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 4� No 22. Does record keeping need improvement? ❑ Yes 1�(No For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes O No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ,,,,�(No 25. Were any additional problems noted which cause noncompliance of the Permit? El Yes ,CJ No [ : No.vialations_or deficiencies.were_n6ted,d66n' gg this" visit. , You:rviII:r, kei ve:n6ltirtheir cOerespotidehce About this. visit'.-'-'.'. Ctcc t= �G�YJ.tJ'idn'T,{�:er`t 5 v ex i> iJ/L'�OIIt°E7� �J`�is✓i /-� cN n C2d TIf/s- I Cf 5,*7,•t G TE{ 1 5 ��-�- G- r�{/ J f1v / c FOrL e1eV47 tI 7/25/97 Reviewer/Inspector Name Reviewer/Inspector Signature:/`%f'/��gGj,��� U�vJ� :� Date; fib "' .,,�a',xit DSWC Animal Feedlot Operation Review DWQ Animal Feedlot Operation Site Inspection F ,� 10 Routine' 0 Complaint O Follow-up of DWQ inspection -0 Fallow=u 'of DSWC review-'�10Other Date of Inspection. ll Facility Number Time of Inspection 24 hr. (hh:mm) Total Time fin traction of hours Farm Status: ❑ Registered ❑ Applied for Permit (ex:1?5 for I hr 15 min)) Spent on Review ❑ Certified . ❑ Permitted or Inspection (includes travel and processing) Not O perational Date Last Operated:............................................................................................................ FarmName: ..................W.w......................................................... County:..................................................................................... OwnerName:............................................................................ ................................................ Phone No:..............................................,........................................ FacilityContact: .............................................................................. Title:.................,........,..................................... Phone No:................................................... MailingAddress: ..................................................................................................................... ..................................................................................... .......................... Onsite Representative:,..../.t.I............... LLY'�.. ..... Integrator:.... ....................................... Certified Operator:................................................................................................................ Operator Certification Number:............................ Location of Farm: Latitude • =' 44 Longitude rr • �� �14 T e of O eration Yp p Design.,, ., { Swine Ca- it ❑ Wean to Feeder ❑ Feeder to Finish Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish • ❑ Other Subsurface Drains Present Jj❑ Lagoon Area J❑ Spray Field Area General 1. Are there any buffers that need maintenance/improvement? ❑ Yes No 2. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If dischar�-e is observed, was the conveyance inan-made'? ❑Yes No h, if discharge is observed, did it reach Surface Water'? (If' yes, notify DWQ) ❑ Yes /ZNo c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (if yes. notify DWQ) ❑Yes No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes P No 4, Were there any adverse impacts to the waters of the State other than from a discharge'? ❑ Yes C"No 5. Does any part of the waste management system (other than lagoons/holding ponds) require _.es ❑ No 4/30/97 maintenance/improvement? Continued on back - Facility Number: 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes V�No ^�j.8.•vAre there lagoons or storage ponds on site which need to be properly closed? ❑ Yes Uf No Structures (lagoons andlor Holding fonds 9. is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes V No Freeboard (.ft): Strucvr� I Structure Stricture 3 Structure 4 Structure 5 Structure 6 ........ I..,t... .�.................................... I.................................................................................................................................................................. I..... 10, Is seepage observed from any of the structures? ❑ Yes No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes No 12. Do any of the structures need maintenance/improvement? Yes ❑ No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level'markers? Yes ❑ No Waste Application 14. Is there physical evidence of over application? ❑ Yes VNO (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type ...fiii.. SLCJ . ..... ! . f........... ............................................ 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (A)&MP)? OYes ❑ No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes 9&0 18. Does the receiving crop need improvement? XYes ETN o 19. Is there a lack of available waste application equipment? ❑ Yes �dNo 20. Does facility require a follow-up visit by same agency? ❑ Yes 9*110 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes C For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management flan readily available? ❑ Yes ❑ No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 24. Does record keeping need improvement? t`�L�;�S ta. � ,` Fln_ -rrL 14 O FF ❑ Yes ❑ No PAA"tl U5 tT'�UN�t7 vim' Q a" d t7. R,cq-v r7 2 6 41- jbg c k- lti )9A1D ntrAt} d- twvero aw A6ZU0 . r /'9%.W S p�orl i,- l.v,/_ �_ �PtiA-crn�L Pt%�� .' �. A/e &- -0 4? Tv Reviewer/Inspector NameROW ..�}�"# f� �` W }f '1 Fe Reviewer/Inspector Signature: Date: i? cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 DSWC Animal Feedlot Operation Review DWQ Animal Feedlot Operation Site Inspection' mwwww O Follow'w-'bf DWO in Facility Number Farm Status: Registered ❑ Applied for Permit gCertiried [3 Permitted 113 Not Operational Date Last Operated: FarmName.......... .L..e[J. *„.1.................................................. Follow-u�of DSWC review--'O Other Date of Inspection Time of Inspection 24 hr. (hh:mm) Total Time (in fraction of hours (cx:l?S for 1. hr 15 min)) Spent on Review or Inspection (includes travel and processing) ................................................................................................................................................ County: .................. OwnerName:........................................................................................................................... Phone No:.............................,......................................................... Facility Contact: ........................ ................. Title:................ . Phone No: MailingAddress: ..................................................................................................... Onsite Representative:....... p4n...............Ll.r'%..f� ............... CertifiedOperator: .................................................. .................. ........................... Location of Farm: Integrator: .................................... Operator Certification Number :......................................... im i iii C C Latitude Longitude Type of Operation ` Swine ❑ Wean to Feeder ❑ Feeder to Finish Farrow to Wean Farrow to Feeder ❑ Farrow to Finish ❑ Other DesigiiCurrent „r " Poultry Capacity Population ,Cattle ` ❑ Layer I I Dairy J Non -Layer I 10 Non-DairyI a < Total Design .Capacify Total SSLW Subsurface Drains Present I ❑ Lagoon Area I0 Spray Field Area General I. Are there any buffers that need maintenance/improvement? ❑ Yes VNo 2. Is any discharge observed from any part of the operation'? El Yes iNo Discharge originated at: ❑ Lagoon ❑ Spray Field ElOther a. If discharge is observed, was the conveyance man-made'? ❑ Yes �No b. If discharge is observed. did it reach Surface Water? (If yes, notify DWQ) El Yes VNo c. Ifdischar�,e is observed, what is the estimated flow in galinu'?n d. Does di,cliarge bypass a lag*oon system'? (If yes, ntitify 1)WQ) ❑Yes No 3. Is there evidence of past discharge from any part of the operation? ElYes No 4. Were there any adverse impacts to the waters of the State other than from a discharge'? ❑ Yes o 5. Does any part of the waste management system (other than lanoons/holding ponds) require 1 s No maintenance/improvement? �/3�/97 Continued on back Facility Number — 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have.a certified operator in responsible charge? v;rv. m 8. Are there lagoons or storage ponds on site which need to be properly closed?._ Structures ( Lagoons and/or Holding, Ponds) -9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft):ruct� I Structure 2 ,Structure 3 Structure 4 dJ .............................................................................................. ..................... .......................... I ............ .... 10. Is seepage observed from any of the structures? I I- Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes VNo ❑ Yes P No ❑ Yes R1 No ❑ Yes ONo Structure 5 Structure 6 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type .�l..L.,........'..��..................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/inspector fail to discuss review/inspection with on -site representative? For Certified Facilities Onl 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? ....................................................... ❑ Yes ;Z No ❑ Yes ONo VI Yes ❑ No /Yes ❑ No ❑ Yes [�No ............................... Cl Yes j2(No (� Yes ❑ No (❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes XNo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 1-7, Pry,40 � 2 Emrri� LAWIr Ws 1 ti 6 rt O--P l VD l ti 1-0 Cei 77/_j) SO C490 s pecw6, ICE 6EM vat TV MA' "5- A- t P .5 ti �. � -o S �_S D V G T fj► j !cr t� Z� Reviewer/Inspector Name ,> x W--, -- - -- As --- Reviewer/Inspector Signature: Date: cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 OPERATIONS BRANCH - WO Fax:919-715-6048 + itate )of North Carolina epartment of Environment, lealth and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Apr 28 197 15:07 P.02f05 1•• MW [DEHNFZ DIVISION OF WATER QUALITY April 3,f1997 Dr. Fred Cunningham, DVM Williams Farms of N.C. P.O. Box 416 Moyock, North Carolina 27958 Subject: Dear Dr. Cunningham: Compliance Facility # Dunlow Farm Northampton Evaluation 66-19 County Inspection On March 27, 1997, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division'% efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the Swine operation was not discharging wastewater into,waters of the State and that the waste lagoon had the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste _mana management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil. and Water Conservation District office. 38M Barrett Drive, Suite 101, A* FAX 919-571-4718 Raleigh, North Carolina 27609 N� C Are Eaua1 Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/ 10% post -consumer paper OPERATIONS BRANCH - WQ Fax:919-71S-60481 Apr 28 '97 15:07 P.03/05 i i Dr. Fred Cunningham Page 2 The General Assembly recently passed Senate Hill 1217 which will require all animal waste management systems to designate an It Operator in Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more .information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional office appreciates your cooperation in this matter. If you have any questions regarding this 'inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, Judy Garrett Water Quality Section Supervisor cc: Northampton County Health Department Mr. Tony Short, Northampton Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC---RRO DWQ Compliance Group RRO files RECEIVED APR 16 1991 FACUTIES ASSESSMENT UMT k> ti State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B, Hunt, Jr., Governor Jonathan B. Howes, Secretary A�� DEHNR DIVISION OF WATER QUALITY November 13,1996 Dr. Fred Cunningham Williams Farms of North Carolina P.O. Box 416 Moyock, North Carolina 27958 Subject: Compliance Evaluation Inspection Facility # 66-19 Williams-Dunlaw Farm Northampton County Dear Dr. Cunningham: On October 24, 1996, Mr. Buster Towels from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the swine operation was not discharging wastewater into waters of the State and that the waste lagoon had more than the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility stewardship are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, �� FAX 919-571-4718 Raleigh, North Carolina 27609 N :fKC An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper Williams-Dunlaw Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an it Operator in Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, �T ( f . A alv�e Judy E. Garrett Water Quality Supervisor cc: Northampton County Health Department Mr. Tony Short, Northampton County Soil and Water Conservation District Mr. John Fitzgerald -Regional Coordinator, DSWC--WARO DWQ Compliance Group RRO Files State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary DEHNR DIVISION OF WATER QUALITY November 13,1996 Dr. Fred Cunningham Williams Farms of North Carolina P.O. Box 416 Moyock, North Carolina 27958 Subject: Compliance Evaluation Inspection Facility # 66-19 Williams--Dunlaw Farm Northampton County Dear Dr. Cunningham: On October 24, 1996, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the swine operation was not discharging wastewater into waters of the State and that the waste lagoon had more than the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility stewardship are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh, North Carolina 27609 NifC An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper Williams-Dunlaw Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an of Operator in Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, Judy E. Garrett Water Quality Supervisor cc: Northampton County Health Department Mr. Tony Short, Northampton County Soil and Water Conservation District Mr. John Fitzgerald -Regional Coordinator, DSWC--WARO DWQ Compliance Group RRO Files +� Facility Number: 4� Division of Environmental Management Animal Feedlot Operations Site Visitation Record Date:-;- 7-3 Time: General Inf rmation: Farm Name: r 11, r'9/"+— County: n4 rl Owner Name: Fart-' IG Gam-Wg t S Phone No: 9 19 - S 0'9 - 01 � y On Site Representative:___ q ti^ x t i Ge Integrator: Lv , /1' - w- s- Mailing Address: Physical Latitude: 1 1 Longitude: 1 I Operation Description: (based on design characteristics) Typyo f Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals Sow 3 ❑ Layer ❑ Dairy ❑ Nursery ❑ Non -Layer ❑ Beef ❑ Feeder OtherType of Livestock. Number of Animals: Number of Lagoons:- - I (include in the Drawings and Observations the freeboard of each lagoon) Facility Ins ection: Lagoon Is lagoon(s) freeboard less than 1 foot + 25 year 24 hour storm storage?: ! Yes ❑' No ❑ Is seepage observed from the lagoon?: Yes ❑ No Is erosion observed?: Yes ❑ No C-1� Is any discharge observed? Yes ❑ No ❑ Man-made ❑ Not Man-made Cover Crop Does the facility need more acreage for spraying?: Yes ❑ No ❑' Does the cover crop need improvement?: Yes allo ❑ ( list the crops which need improvement) Crop type: Ix /= escHy Acreage: Setback Criteria Is a dwelling located within 200 feet of waste application? Yes 0 No Is a well located within 100 feet of waste application? Yes ❑ No Is animal waste stockpiled within 100 feet of USGS Blue Line Stream? Yes ❑ No Is animal waste land applied ed or spray ungatedwithin 25 feet of Blue Line Stream? Yes❑ No -J AOI -- January 17,1996 Maintenance Does the facility maintenance need improvement? Yes U-'No ❑ Is there evidence of past discharge from any part of the operation? Yes ��UNo ❑ Does record keeping need improvement? Yes ICI' Igo ❑ Did the facility fail to have a copy of the Animal Waste Management Plan on site? Yes Z No ❑ Explain any Yes answers: Signature: / _ _ Date:_ 3 — 2C cc: Facility Assessment Unit Drawings ow -Observations: Use Attachments if Needed AOI -- January 17,1996 Facility Number: Division of Environmental Management Animal Feedlot Operations Site Visitation Record Date:. _10- Time: General Information: Farm Name:_ Dj,a<"4.j 24, County: Owner Name: tv4 L P L Phone No: One Site Representative: 0 r C rx h ._ H so�- Integrator: Mailing Address: Physical Address/Location Latitude: I 1 Longitude: 1 I Operation Description: (abased on design characteristics) Ty Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals ow OLayer ODairy ONursery r0[7 - ❑Non —Layer E]Beef OFeeder Other Type of Livestock: Number of Animals: Number of Lagoons: ( (include in the Drawings and Observations the freeboard of each lagoon) Ffacillt�r Inspection: 2 r e",-a60,x-j Lagoon Is lagoon(s) freeboard less than 1 foot + 25 year 24 hour storm storage?: Yes ❑ No ❑ Is seepage observed from the lagoon?: Yes ❑ No ❑ Is erosion observed?: Yes ❑. No ❑ Is any discharge observed?: Yes 0 No ❑ ❑ Man-made ❑ Not Man-made Cover Crop Does the facility need more acreage for spraying?: Yes ❑ No ❑ Does the cover crop need improvement?: Yes ❑ No ❑ (list the crops which need improvement) Crop type: Acreage: _ Setback Criteria Is a dwelling located within 200 feet of waste application?: Yes ❑ No ❑ Is a well located within 100 feet of waste application?: Yes ❑ No ❑ Is animal waste stockpiled within 100 feet of USGS Blue Line Stream?: Yes ❑ No ❑ Is animal waste land applied or spray irrigated within 25 feet of Blue Line Stream?: Yes ❑ No ❑ Maintenance Does the facility maintenance need improvement?: Yes ❑ No ❑ Is there evidence of past discharge from any part of the operation?: Yes ❑ No ❑ Does record keeping need improvement?: Yes ❑ No ❑ Did the facility fail to have a copy of the Animal Waste Management Plan on site?: Yes ❑ No ❑ Explain any Yes answers: Signature: cc: Facility Assessment Unit Drawings or Observations: AO1-January 17, 1996 Date: Use Attachments if Needed - n L-14-1995 15.26 FROM DEM DATER DUALITY SECTION TO RRO P.02/02 Site Requires immediate Aiten!jon-"__� Facility No. U6 DNISION OF'ENVIRONMENTAL MANAGEMEN-'T ANIMAL FEEDLOT OPERATIONS SrM VISITATION RECORD DATE: '9 l 5 ` , 1995 . Time: 01 O D P; x m Name/Owner:_-Fy -1? fL Lv�l / 1 4 �-s _ 0 u L 9-y l`/t_f_Lk._ - Mailing Address: 6�0 Z a 142 ,S County: Jll 0 r j -/ Q Integrator. `►"._ Av 11 . A--M' Phone: 1 :2 O O On Site Representative: SG04 F r' t !� _ _ Phone:. Physical Address/Location: OFF � G Type of Operation: Swine Poultry Cattle F' — G�.✓ Design Capacity: Number of Animals on Site: 2S_r DEM Certification Number: ACE DEM Certification Number: ACNEW Latitude: _' ` Longitude: Elevation: Feet Circle Yes or No Does the .Amoral Waste Lagoon have sufficient freeboard of 1 Foot + 25 year 24 hour storm event (approxi=ceiv 1 Foot f 7 inches) Yes or No Actual Freeboard: i. Inches Was any seepage observed from the lagoons)? Yes or No Was any erosion observed? Yes or No Is adequate land available for spray'? Yes or No 1s the cover crop adequate? Yes or No Crop(s) being utilized: ' G % 4-x-f Does the facility meet SCS minimum setback criteria'? 200 Feet from Dwellings'lYes or No 100 Feet from Wells? e or No ate animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes or No { animal waste land applied or spray irrigated Within 25 Feet of a USGS Map Blue Line'? Yes or No animal waste discharged into of the state by inan-made ditch, flushing system, or other ,imi;ar mats -made cic ��ices'? Y,es r No If Yes. Please Explain. pr y ow facility maintain adequate waste mariagernctit records ('volumes of nnanure, land applied - spray irrigated on specific acreage with cover crop0 Yes or! Additional Comments: n r o KPH.. rs 4' t S L`ytJ— t�� �S r f�J kac3�^ p S rrb T ! � L v Llvt 1/V�9 3 r (i cc: Facility Assessment Unit " uv/,- S igna acre Use Attachments if Needed - TOTAL F _ 32 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director June 25, 1999 Williams Farms of NC Inc Dunlow PO Box 416 Moyock NC 27958 Attn: Fred Cunningham A&44 IL NC,DENR NORTH CAROL-INA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Certificate of Coverage No. AWS660019 Dunlow Swine Waste Collection, Treatment, Storage and Application System Northampton County Dear Fred Cunningham: In accordance with your application received on February 2, 1999, we are forwarding this Certificate of Coverage (COC) issued to Williams Farms of NC Inc, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Dunlow, located in Northampton County, with an animal capacity of no greater than 650 Farrow to Wean and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date, of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system' in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms Ind conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper r . -* Certificate of Coverage AWS660019 Dunlow Page 2 ve the to If any parts, requirements, or limitations contained ntact n the engineethis COC are r lis ed belowyou foranformationt on apply for an individual non -discharge permit by co g this process. Unless such a request is made within 30 days, this COC shall be final and binding. ta The subject farm is located in the Raleigh Regional Office. The Re ion concerning gates Qua i yoS the ff may be reached at (919) 571-4700. If you need add itional General Permit, please contact Sue Homewood at (919) 733-5083 ext. 502. Sincer , Kerr T. Stevens cc: (Certificate of Coverage only for all cc's) Northampton County Health Department Raleigh Regional Office, Water Quality Section Northampton County Soil and Water Conservation District Permit File NDPU Files State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Williams Farms of NC Inc Dunlow PO Box 4] 6 Moyock NC 27958 Dear Williams Farms of NC Inc: NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCE5 December 30, 1999 Subject: Fertilizer Application Recordkeepiig Animal Waste Management System Facility Number 66- 9 Northampton -County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, IRR2, DRY] , DRY2, -DRY3, SLUR1, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincerel Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Northampton County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919.733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of North Carolina Department of Environpient and Natural Resource Division of Water Quality COP Non -Discharge Permit Application Form HIS FORM MAYBE PHOTOCOPIED FOR USE AS AN ORIGINAL) )III* General Permit - Existing Liquid Animal Waste Operations The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. GENERAL INFORMATION: RECEIVED 1.1 Facility Name: Dunlow WATER QUALITY SECTION 1.2 Print Land Owner's name: Williams Farms of NC Inc FEEB 0 7 anon 1.3 Mailing address: PO Box 416 City, State: Mo ock NC Zip: 27958 on -Discharge Permitling Telephone Number (include area code): W-435-6930 1.4 County where facility is located: Northampton 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): _ From Gaston take SR 46 West about 8 miles. Farm is on left. r , .,..,.• ...•__..,. 1.6 •Print Farm Managees name (if different from Land Owner): fit.- 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): 1.8 Date Facility Originally Began Operation: 1.9 Date(s) of Facility Expansion(s) (if applicable): 2. OPERATION INFORMATION: 2.1 Facility No.: 66 (county number); 19 (facility number). 2.2 Operation Descrip i not no Swine operation to Wean 650- Certified Design Capacity Is the above information correct? yes; r7 no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum numTer'or which the waste management structures were designed. Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) 6 Turkey 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) Other Type of Livestock on the farm: No. of Animals: FORM: AWO-G-E 5/28/98 Page I of 4 66 -19 3. 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 40 ; Required Acreage (as listed in the AWMP): 33.1 2.4 Number o lagoons storage ponds (circle which is applicable): 2.5 Are subsurface drains present within 100' of any of the application fields? YES or NO (please circle one) 2.6 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or(3� (please circle one) 2.7 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS Standards, etc.) (Swine Only) YE or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? [Q 7 l What was the date that this facility's land application areas were sited? REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your- iniiials in the space provided next to each item. 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; ,. 3.2 Two copies of a general location map indicating the location of the animal waste facilities and Feld locations where animal waste is land applied; r" 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. The CAWMP must include the following components: 3.3.1,"The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2', Me method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3✓A map of every field used for land application. 3.3.4wThe soil series present on every land application field. 3.3.5✓Me crops grown on every land application field. 3.3.6✓Me Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7wThe PAN applied to every land a plication field. 3.3.8-17he waste application windows for every crop utilized in the WUP. 3.3.9-''fhe required NRCS Standard specifications. 3.3.10'A site schematic. 3.3.1 YErnergency Action Plan. 3.3.12LMsect Control Checklist with chosen best management practices noted.l: 4y;; , 3.3.1360dor Control Checklist with chosen best managembnt practices. noted. 3.3.14Mortality Control Checklist with the selected method noted. 3.3.15<agoon/storage pond capacity documentation (design, calculations, etc.). Please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 3.3.16-Operation and Maintenance Plan. If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. Applicants Initials Q FORM: AWO-G-E 5/28/98 Page 2 of 4 66 -119 RECEIVED VATER QfJ.4,iTY SECTION Facility Number: 66 - 19 ffB 0 21999 Facility Name: Dunlow Non -Discharge Paimitting 4. APPLICANT'S CERTIFICATION: 1, t 1 S ��'�e�,�c _ (Land Owner's name listed in question 1.2), attest that this application for UNjDw �•Q7Q _______ (Facility name listed in question 1.1) has been reviewed by me an _ is accurate and c mplete to est of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Signature w,� � aadA Date 5. MANAGER'S CERTIFICATION: (complete only if different from the Land Owner) 1, (Manager's name fisted in question 1.6), attest that this application for (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete tote best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 5/28/98 to DIVISION OF WATER QUALITY REGIONAL OFFICES (INS) AsbevWe Regional WQ Supervisor Washington Regional WQ Supervisor ]Weigb Regional WQ S%wvisor 59 WoodSn Place 943 Washington Square Mall 38W But Dr. AshevWe, NC 28801 Washington, NC 27889 Raleigh, NC 7761.1 (704) 251.6208 (919) 94"481 (919) 571-4700 Fax (704) 251-6452 Fax (919) 975-3716 Fax (919) 733-7072 Avery Macon Beaufort Jones Chatham ' Nash Buncombe Madison Bertie Lenoir Durham Northampton Burke McDowell Camden Martin Fdgecombe Orttrtge Caldwell Mitchell Chowan Pamlico FhWtlin Person Cherokee Polk Craven , Pasquotaak Qranville Yana . i-Uy. Rudwfurd Currituck Puimans ` _ -' Halii'a: wake% Graham Swain'. Dare Pitt Jobnston Warren Haywood Transylvania 0011", Tgrell Lee Wilson Henderson Yancey Greene Washutgtcxt Jackson Hertford Wayne Hyde Fayetteville Regional WQ Supervisor Wacbovia Building, Suite 714 Fayetteville, NC 28301 (910) 486-1541 Fax (910) 486-0707 Anson Moore Bladen Richmond Cumberland Robeson Harnett Sampson Hoke Scotland Montgomery Winston-Salem Regional WQ Supervisor 585 Waughtown Street Winston-Salem. NC 27107 (910) 771-4600 Fax (910) 771.4631 Alamauee Rockingham Alleghany Randolph Ashe Stokes Caswell Sutry Davidson Watauga Davie Wilkes Forsyth Yadkin Guilford Mooresville Regional WQ Supervisor 919 North Main Street Mooresville, NC 29115 (704) 663-1699 Fax (704) 663-6040 Alexander Lincoln Cabarms Mecklenburg Catawba Rowan Cleveland Stawy Gaston hedell Union J Wilmingtm Region. WQ Supervisor 127 Cardinal Drive Extension Wilmington, NC 284054845 (910) 395-3900 Fax (910) 350-2004 Brunswick New Hanover Carteret O116100 Columbus Ponder Duplin FORM; AWO-G-E S128198 Page 4 of 4 ANIMAL WASTE UTILIZATION PLAN Producer: Williams Farms of NC / Dunlow Farm Location: 7 miles west of Gaston on NC 46 Telephone: 252435-6930 Type of Operation: Farrow/Wean Number of Animals: 650 Storage Structure: Anaerobic Waste Treatment Lagoon Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of the surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are required so all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in a environmentally safe manner: I . Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials; cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and the crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. ANIMAL WASTE UTILIZATION PLAN Amount of Waste Produced Per Year (zallons, tons, etc.) 650 animals x 8.8 / day x 365 gal. Waste / animal / year = 2,087,800 gals. waste / year. Amount of Plant Available Nitrozen (PAN) Produced Per Year 650 animals x 5.4 lbs. PAN / animal / year = 3510 lbs. PAN / year. ( PAN from N.C. Tech. Guide Std. 633) Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown and surface application: Table 1: ACRES OWNED BY PRODUCER Tract H Field !!TVV0 soil Crop R.Y.E. x N Application Rate Lba. N/A,.* Comm. N or Residual N/Acre Amos Lbs. N Utilised "' Month of Application 2631 3 TO Bermuda [lay 6.0 50 300 0 10.6 3,180 - 2631 3-- TuB Wheat -Grain 50 50 0 10.6 530 Nov. -March 2631 4 TO Comm Bermu aj&50 240 0 2.9 6% 2631 4- TuB Wheat -Grain 50 50 0 2.9 145 Nov, March 2631 1 TuB Cotton 650 0.12 78 0 8 624 Ma -June 2631 1^ TUB wheat ham 50 50 0 8 400 Nov. -March 2631 2 TuB Cotton 650 0.12 78 0 8.1 632 may -June 2631 1^ TuB Wheat -Grain 50 50 0 8.1 405 Nov. -March none none rtonc none Totals 59.2 l 6 612 * This N is from animal waste only. If nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on realistic yield expectation. ** Acreage figures may exceed total acreage in fields due to overseeding or double cropping. *** Lbs. N Utilized equals total required nitrogen from waste less any commercial nitrogen supplied. Indicates that this is field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. Reference is from Sixth Guidance Memo (Revision Two) issued on August 25, 1998 including a memo from Dr. Jim Green, Chairman, Crop Management Practices for Selected Forages Used in Waste Management. (see attached memo for suggested management practices and expected yields and total amount of PAN/acre.) A Indicates that this field is being double cropped ( two different crops planted in the same field during the same year). In the case of wheat followed by soybeans followed by corn planted the following year we have allowed 20 lbs. N/ac to carryover into the PAN requirements for corn, (i.e. 201bs. N / ac has been decreased from the corn PAN) due to residual nitrogen from the soybean plant. ANIMAL WASTE UTILIZATION PLAN Table 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached.) (Required only if operator does not have adequate land. See required specifications 2.) WWI M (See footnotes for Table 1) Totals from above Table I & Table 2 Table 1 Table 2 Total Amount of N Total. Acres Lbs. N Utilized 59.2 1 6,612 n/a n/a 59.2 1 6,612 Produced **** Balance 3510 -3102 **** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Note: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Acres shown in each field of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that address all nutrients. This plan only addresses nitrogen. ANIMAL WASTE UTILIZATION PLAN Table 3: Application of Waste by Irrigation Field # Soil Type Crop Application Rate (In/Hr) Application Amount Ln/Event * 3 TuB Bmnu& Hay 0.5 1.0 3— TuB wtmt-Gmin 0.5 1.0 4 TuB CommB=MU& Hay 0.5 1.0 4— TuB Mnmt-&ain 0.5 1 TuB Cotton 0.4 bare 1 ^ TuB Wheat -Orin 0.5 2 TuB cotton 0.4 bare 2^ TuB Wheat-Gmi, 0.5 (none) * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Application of Waste by Irrigation The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation not should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and the irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Your facility is designed for 75 days of temporary storage and the temporary storage must be removed on the average of once every 2_ _ _ months. In no instance should the volume of waste being stored in your structure exceed 1.7 feet from the top of the dike. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. Narrative of Operation: Waste will applied to bermuda hay, wheat, & cotton. Wheat will be overseeded into bermuda. The PAN for overseeding small grain into bermuda is 50 lbs/acre above the normal rate for coastal. Small grain must be harvested before the heads begin to form (ref See Sixth Guidance Memo, Revision Two, 1.11 Cotton and wheat will be double cropped on the same field the same year., (1) Total acreage was calculated by using all waste application fields as individual fields in the same crop year, thus this reflects the total acres that may receive waste in a given year, not mapped acres. Mortality management will be by complete incineration and ashes will be land applied to spray fields. .1 ANIMAL WASTE UTILIZATION PLAN SWINE WASTE MANAGEMENT SYSTEM OPERATION AND MAINTENANCE Producer: Williams Farms of NC/Dunlow Farm The purpose of this plan is to provide guidelines for carrying out the routine operation and maintenance work needed to keep this swine waste management system functioning as planned. Routine maintenance is considered to be normal good care of the system. Good maintenance adds to beauty, usefulness, and permanence. 1. Maintenance a) The routine maintenance of the lagoon involves the following: i) Maintenance of a vegetative cover on the embankment top and side slopes: bermuda and fescue should be well established on these areas. The embankment should be fertilized with 10-10-10 per acre each year to maintain a vigorous stand. ii) Control of brush and trees on the embankment. This may be done by mowing, spraying, or chopping, or a combination of all three. This will need to be done at least once each year and possibly twice in years favorable to heavy growth of vegetation. b) Maintenance inspections of the lagoon should be made at least annually. Items to be checked should include, as a minimum, the following: i) Waste Inlet Pipes, Overflow Pipes a) Condition of pipes ( 1) Separation of pipes (2) Cracks or breaks ii) Pool Area a) Undesirable vegetative growth b) Floating or lodged debris iii) Embankment a) Settlement, cracking, or "jug" holes b) Side slope stability - slumps or bulges c) Erosion and rodent damage iv) Transfer Pumps 2. Operation a) Your animal waste management facility was designed for a total of 650 / Farrow/Wean. The lagoon contains both permanent and temporary storage. The permanent storage is not to be in order to ensure that anaerobic action will occur. The design include§ permanent storage of one cubic foot per pound of steady state live weight. b) The temporary storage portion of the lagoon includes capability for the volume of waste produced over 75 days, the amount of rainfall in a 25 year 24 hour storm event, and rainfall in excess of evaporation. Your facility is designed for 75 days of temporary storage; therefore, it will need to ANIMAL WASTE UTILIZATION PLAN be pumped every 2 months. Begin pump out of the lagoon when the liquid level reaches elevation 98.7 as marked by the permanent marker. Stop pump out when the liquid level reaches elevation _96.5 . c) The attached waste management plan should be followed. This plan recommends sampling and testing of waste every 90 days and before land application. The waste material should be analyzed before each application cycle to determine its nutrient content. A soil test of the area of application must be made annually to insure the waste is applied as reasonably and practically possible to recommended rates. d) It is strongly recommended that the treatment lagoon be pre -charged to'/2 it's capacity to prevent excess odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. e) The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources; Division of Environmental Management, has the responsibility for enforcing the law. i i ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Williams Farms of NC Owner / Manager Agreement I (We) understand and will follow and implement the specification and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (We) know that any expansion to the existing capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management (DEM) before the new animals are stocked. I (We) also understand that &re must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. dame of Facility Owner: miease Prio 'lliams Farms of NC ignature: '4 ��r=ice Date: 19 9,9 Name of Manager (if difre t fi= ): Signature: Date: Name of Person Preparing Plan : David Oldham Affiliation : Certified Technical Specialist Address : 414 Hwy 158 Elizabeth City, NC 27909 25 -8210 Signature: Date: �� 9 ❑ New Plan ® Revised Plan Date:1/19/99 ❑ Amended Plan Date THIS DESIGN IS FOR A SINGLE STAGE SWINE LAGOON IENTS�NAME-�`-,^--===> Williams Dunlaw WUNTY -_> r amptan TODAYS DATE ___________________________> 8/27/97 SITING LAW DISTANCES OKAY (YES OR NO) => Yes NUMBER OF PIGS WEANLING TO FEEDER 0 NUMBER OF PIGS FEEDER TO FINISH ====_==> 0 NUMBER OF SOWS FARROW TO WEANLING 550 NUMBER OF SOWS FARROW TO FEEDER =______> 0 NUMBER OF SOWS FARROW TO FINISH 0 NUMBER OF DEVELOPING GILTS =-__-,--___,> 0 NUMBER OF STUD BOARS OR GESTATING SOWS > 0 NUMBER OF YEARS OF SLUDGE ACCUMULATION > 0 (5 year minimum unless retrofit) TOP LENGTH AT NORMAL WATER LEVEL TOP WIDTH AT NORMAL WATER LEVEL NORMAL WATER LEVEL ELEVATION =---=--_==> SEASONAL HIGH WATER TABLE ELEVATION =__> LAGOON BOTTOM ELEVATION Depth of Permanent Water 6.6 (minimum depth including sludge = 6 feet) (maximum depth.of sludge = 2 feet) SIDE SLOPES=___-�------------------�_=> Permanent Volume Required 159560.5 Permanent Volume Provided 170821.2 DITIONAL DA W/O EVAP. (VEGETATED) ===> DITIONAL DA W/O EVAP. (NON-VEGET.) ==> (i.e. feedlot & non -diverted area) ADDITIONAL, D. A. WITH EVAPORATION (i.e. pumpout pond) LENGTH OF PUMPING CYCLE GALLONS OF FRESH WATER ADDED DAILY NORMAL RAINFALL FOR PUMPING CYCLE PERCENT RUNOFF ON VEGETATED AREAS =---_> PERCENT RUNOFF ON NON -VEGETATED AREAS => NORMAL EVAPORATION FOR PUMPING CYCLE 25YR/24HR STORM RAINFALL =------------=> RUNOFF DEPTH FROM VEGETATED AREAS RUNOFF DEPTH FROM NON -VEGETATED AREAS => INCLUDE HEAVY RAIN (YES=1, NO=O) FREEBOARD 236.0 FEET 134.0 FEET 96.0 FEET 93.0 FEET 89.4 FEET feet 2.5.1 cubic feet cubic feet 0 SQUARE FEET 0 SQUARE FEET 0 SQUARE FEET 90 DAYS 0 GALLONS 21.5 INCHES 30 PERCENT 65 PERCENT 12.6 INCHES 6.7 INCHES 0.0 INCHES 0.0 INCHES 0 (NUMBER ONLY) 1.0 FEET ESTIMATED TOP OF DAM ELEVATION ========> 100.0 FEET Temporary Storage Volume Needed 99029.7 cubic feet Temporary Storage Volume Provided 103422.0 cubic feet Top of Dam Elevation = •.100.0 feet Inside Dimensions of Lagoon at Top of Dam Length = 256.0 feet Width = 154.0 feet ESTIMATED DEPTH TO PUMP = 2.2 FEET ke lume To Be Pumped = 77018 cubic feet me for Estimated De th = cubic feet gin Pumping Elevation = 98.2 fee Stop Pumping Elevation = 96.0 feet 0 EMERGENCY ACTION PLAN PHO9 57 _��A5 DWQ ENLERGENCY INIA.NAGEN ENT SYSTEM _ 911 SWCD .9,3a-.25.21_ --- IvRCS )3_4 25gl This plan •ill be implemented in the event that wastes from your operation are leaking. overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted Ln an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation. this may or may not be possible. Suggested responses to some possible problems are listed befow. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the Iagoon irnmediatel_v. d. Call a pumping contractor. e. Make sure no surface water is entering lasoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. ' b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include; , a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks F-ior to restarting pumps. D: Leakice from flush systems. houses. solid separator. -action include: .1. Stop recycle pump. b. Stop irrigation puinp. c. Make sure no :iph on occurs. J. Stop :ill tiow,i in ilie !souse. tlu,;h or �Qild separators. e. Repair all leaks prior to restarting purlips. E: Leakage from bass or side�vall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage. put in a submersible pump. and pump back to lagoon. b. If holes are caused by burrowing animals. trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how march was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f.. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? . 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office: Phone - - After hours, emergency number: 919-t3-39-12. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the Iocation or direction of movement of the spill, weather and wind conditions. The carrecd%-e measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number - c. Instruct EMS to contact local Health Department. d. Contact CES, phone number - - , local SWCD office phone number - - and local MRCS office for advice/technical assistance phone number - 4: If none of the above v,-orks call 911 or the Sheriffs Department and explain your problem to diem and ask that person to contact the proper agencies for you. Contact the contractor of your chorcc to begirt repair of problem to minimize off -site daml,e. a. Contractors mare: s of/YC. b. Contractors Address: .tau p ce K , •+�i? -1 C. Con[r.sctors Phoric:.�'/�� 0 • b: Contact the technical specialist who certified the lagoon (NRCS, Consulting Enginc4r. etc.) r1 • a. rtiamt:— .I—nORES b. Phone:= is Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage. repair the system. and reassess the waste management plan to keep problems with release of wastes from Happening again. ! I �96 Swine Farm Waste Management Odor Control Checklist Source Cause UNIPs l0 111iniluize Odor Sile Specific Practices l argil teal0 Swine producliowt Cevegetative or wooded but- ers; L-3 Recommended best mananement practices; 0 /Good judgment and common sense Ai,imal bo.ly surfaces 0 flirty manurc-covered animals 11 pry floors 1:1114)1 !,Ht t':,ces a Wei manutc-covered !lours - ER"Sloued floors; [?l!' Waterers located over slowed floors; 0-*"Eeeders at high end of solid floors; 1" Scrape manure buildup from floors; 2- llnrlerfloor'ventilation for drying I,,nolC CUIIC1t11111 Ails • I, rime; f-} 1'reyuent manure removal by flush, pit recharge, • I'arlial microbial decomposition or scrape; Ff,�,Underfloor venlilatiuil VCIIId.111o11 c\l,aust tans • Volatile gases; _ Fan ulaiutenanCe; Dust L4"I:Ificicnt air ruovcmcnt tu,lour snrfales • Dust Washdown bei\Veen groups of animals; rn Deed addilives; f] Feeder covers; L1 Feed delivery downspout extenders to feeder covers i:lu-dh laliks 0 Agitulian ofreeycled lagoon n rhlsh lank covers; liquid while tanks are filling ❑ Extend fill lines to near boltuln of tanks with anti -siphon vents 1:11I511 alleys • Agitation during wastewater ❑ Underfloor hush ►vide underfloor ventilation conveyance I'll Iccholi;c I,uilils • Agitation of recycled lagoon 17.1 Extend recharge lines to ue:u bollun, of.JOS liquid While pits are Iiliing wills anti-siphmt vents Lift a Agitation during sump wA 0 Sump tank covers filling and drawdown nut>idr.,lrain collection • Aglialio„ during waslewalcr I'] ilex covers ur junction boxes cunveyancc AhI( November 11, 1116, Page 3 SOLIM: Cause 1;iNIPS to Aliililidu Odor SIIC Specific Prmefices Esd of drainllipes at Agitation during wastewater ❑ Extend discharge point of pipes underneath l;boos conveyance lagoon liquid level Laguull surfaces Volatile gas emissions; 9--lProper lagoon liquid capacity, • Biological rnixillg; ❑ Correct lagoon startup procedures; • Agitation fi"inimum surface area -to -volume ratio; 0,44inimurn agitation when.pumping; ❑ Mechanical aeration; ❑ Proven biological additives IiiiL lllon Sllrtlikler • Iligh pressure agitation; Irrigate on dry days with little: or no lvind-, noLLlcs • Wind drift C lVllniniu n recommended operating pressure; lump intake near lagoon Iigiiid surface; 3--'pump from second -stage lagoon Slorage lack or basis Partial Microbial {Iccouiposition-, Elotiom or midlevel load•trlg; siilauc 0 Mixing while filling; ❑ Talik covers; • Agitation when emptying C7 Basin surface orals of solids; C'1 Proven biological additives or oxidants SLI11111t: 10.1]ili • Partial •lli,:foblal dacallipusrnoA; CI Extend drilllkpllic outlets midernuath liquid • hlixirl" while filling; Ee�cl; • Agitation when emptying ❑ Remove settled solids regularly ALlm L:. slurry m slodge • Agitation wizen slltcading; (71 Soil injection of slurrylsiudLcs; spicalf:1 oullets • Volatile gas eillissiolls ❑ Wash residual manure from spreader after use; ❑ Proven biological additives or oxidants lncuvcicll Illaillne, • Volatile gas emissions %~•Mile ❑ Soil injection of's1mry/sluliges - slurry Of sludve ton field drying ❑ Soil incorporation within�tS hrs.; surLltcs [7 Spread in thin mliform layers for rapid dryiiw; ❑ Proven biological additive's or oxldaws Dead ikllllllalS Carcass decomposition T t-i)roper disposition of carcasses v 1)L:ad akiiukal di:posal Carcass decompusilion ❑ Compicle covering of' carcasses in Elul ial pits; P'[s 171 Proper location/constrimion of dispoxll pits ~Iuuucl,�l�us Y llILWIllo]cic: C01111lustir 11 ❑ tievoml;Ir%, slack lutirms �— Oembur 1 I, 1996, Page 4 1 0 9 Source Cause HNIPs to Minimize Odor Silt Specific Praclices Standing wafer around • Improper drainage; Grade and landscape such that water drains faciliucs 0 Microbial decomposition of away from facilities organic mailer I,lannrr traCl:rcl unto 0 Poorly utaiutained access roads GV Farm access road maintcrtauce public: ruaih tiutn faun access Additional Information : Available. Frrnn : S%vine Manure Management ; 0200 RuleA3MP Packet NCSIJ, County Extension Center Swinc Produuian Vann Potential Odor Sources and Remedies ; I:f3AE Fact Sheet NCSIJ - HAI: Swinc Production Facility Manure Managerent: Pit Recllarge - Lagoon Treatment ; EBAE 128-88 NC -St J - I IA I: Swine Produclion Facility h'tanure Management: Underfloor Flush - Lagoon Treatment ; E13AE 129-88 NCS1 J - IIAE Lagoon f)csign and Managetnctu for Livestock Manure Treatment and Storage ; EBAE~ 103-83 NCSIJ - IIAE CaliUratiwt of Manure and Wastewater Application Equipment ; EBAE Fact Sheet NCSI I - HAI, Cowfullisig Odors from Swint Buildings ; PII I-33 NCSIJ - Swine F.ytension Iiiivirunmenial Assurance Pro -rain ; 14I'1'C hianual NC Pock, Producers Assoc 01)6011s fur Managing Odor ; a report from the Swinc Odor Task Fnrce NCSIJ Atri Communications Nuisance Ctml:crns in Animal Manure Manatentent: Odors and Flies ; PRO107, 1095 Conn-Crencc Prucecdutgs 1=lnriila Cuolrclativc Extcnsiun AM( W, • idwr 1 1. 191,16, l .iC.t 5 Insect Control Checklist for Animal Operations Source Cuttse — IIMPS to Control llrseets -Site Specific Practices .� Liquid Systems ----- - �—� HLJr h t LIUCrS Accumulation of solids ❑ Flush system is designed and operated sufficiently to remove accumulated solids ftaul gutters as designed. X❑ Remove bridging of accumulated solids ;it discharge Lagoons and Pits Crusted Solids ❑ Maintain lagoons, settling basins and nits where nest breeding is apparent to minimize the crusting of solids to a depth of no mare than 6 - 8 inches over more than 30% of surface. Eac usive Vegetative Decaying vegetalion Pf Maintain vegetative control along banks of 01 I)WIll lagoons and outer impoundments to prevent accumulation of decaying vegetative; matter along waler's edge on impoundment's perimeter. Dry Syslews Vcc.lcl., • I'celi �pilhlcc _ 1}Cslgll, llperate and ell illiatn teCLl Sysivills (e.g , bunkers and troughs) to minimize the accumulation of decaying wastage. Clean up spillage net a routine basis (e.g., 7 - 10 day interval dltring stmlmer; 15-30 day mlcr'val during urinler). geed Stlnage Accunitilatlnlls of feed residues (j-"Iteduce: tnuisture accumulation within and aronrul immediate perimeter of feed storage areas by insuring drainage assay fturn site and/or providing adequate containment covered hill Iirr brewer's grain :md similar hit;lr �imislure grain Inwhlclsl. ❑' Inspect for and remove or break up ac:citinw tied solids ill filter strips around feed s[ur,r};e as rtecdccl. Ocher I I, 1096, ]'age I Source Cause IiAZI's to Control Isisects Si1c Sorcific Practices Animal Holding Areas ACUnnldations of animal wastes and feed wastage 0- Eliminate low areas tltat trap moisture along fences and other locations where waste accumulates and disturbance by animals is / minimal. t3 Maintain fence rows and lilrer'strips around animal Folding areas to miniutize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed). Dry Alanure I landlutb Accumulations of animal wastes ❑ Remove spillage an a routine basis (e.g., 7 - 10 Systctus day interval during summer; 15-30 day internal during winter) where manure -is loaded for land application or disposal. ❑ Provide for adequate drainage around manure stockpiles. * Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and mantire handlim, areas as necdcd" Fur Inure inliOnnation contacl the Coolierativc Extension Servicc, Department of fituuniology, Dox 76 13, Nortit Carolina Sta[c l lniscrsii� , kalciLh, NC. 27695-7613. i A rd W 0hcr 11. 1996, Pate _1 • Mortality Management I lethods (check which method(s) are being implemented) J Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must be at least 300 feet from any flowing stream or public body of water. J Rende-nng at a rendering plant licensed under G.S. 106-168.7 Complete incineration CD In the case of dead poultry only. piacina in a disposal pit of a size and design r approved by the Department of agriculture Anv method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) • fly, Jrl4 , "I r - I, rill I I,% -A. log -T ,A r2AW, ;JryIm X I -V A 4, 41, cq j.V'je� 4 ld, J61 4 L .44 N oo W4rk Ar rK A-;:z 3"N"�-NnA" . -to s Dunlow Farm Site Map Facility # 66-19 0 Is Office Storage Building O Well MapQuest Map Results • http://www•.mapquest.com/cgi-bin/ia_find?...8000atcyt&randon=1217&1inl,=ia-map-resuI t �''� ���'ly� .fir ' �g.,•.: - raw7��uy� w e �:,;, prr,o uestn.• rvr�:`s � :a D[�ettions• •�.�efd.:�p�=_ ,lVleirtb�Fal�fs}�"�'/ Saivica��: Map Results use t':71xc11 t �-�1i;sr,R. license/copyrightb, SHARE YOUR LIFE. SNARE YOUR DEC1SI.t}k. Your search origin is: Gaston, NC, US ! N 1AAP�ti/�ST'"ch5f r U 45-sseami ►Map Tips i " Sk NW NE: pTripiet z7 ►Get a NewMap IN ` E itchells Mirt SW SE 'casbuFg� `l Goo .` kDhfia ►Small Map ffxrievv S j ° pGar ` dr nvsC ssroads ►Medium Map L �..� r.._ . 6 6 w Stro oeit ,. - ck o, �.t, sa- t4 Large Map V" ra m rr,:l4e rr,aF �- 46 Best br Printing - r 301 ►Customize Map Cum rorksJ, tubs .. E!,;; rr.', •- pCookysCrossasda F ��'. Recenter Map OEgterpnx rialm"o Rpa oke Rapids 1$6 ►E mail Map y ►savekoad Map Identify Icon ! ; 158 03 158 5o�t -Rox wy Carysburg rrernbersonly Recenter Map u4b weidon Printable M ap nd Zoom In 4 Rhtas.il 125 t For best printing 1 t ! result;didt here ! Gretna C;r.0 48 �'* `` i i . _.,_- r__:___ 1 . j AMud Castle 10 190 Geo5 vste rns G b ba I Oara.: 01993 NavTech Quick Places of Interest(,Ma3rund 8uttGw) Places of Interest (US/L•urvre onh) : Click on buttons to show/remove the location(s) on the map. Select a category and click on Update Map: + Attractions ,�� Lod in r • ' i >" Vc, SrRog' Banks & ATMs _ Recreation ' y members only - Dining.. . , w# TranW sportatlon ...., i duration ✓i Personal Plan Lodging Plan Dining iPtusGitytntp+, h� Get City Info. IiAtlraciinnsT V>tttd x ` ' -� AT&T Weather .�. Get a New Map state / Address / Intersection City Province Zip (for US Only) ..,i Gaston Country . ��e�.._..._..,. ,_:...._...�. wiz-- . j Restore j Maps j Driving Directions ! Plan a Trip ; Buy a Map i Free Membership j Products &Services Home I About 'I Feedback 1 H. eln I Copyright 1996-98 1 GeoS stems Global Corporation 17J ON 12/30/98 2:39 MA State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary . Kerr T. Stevens, Director Williams Farms of NC Inc Dunlow PO Box 416 Moyock NC 27958 Attn: Fred Cunningham Dear Fred Cunningham: • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURGES April 7, 1999 ` Subject: Application No. AWS660019 Additional Information Request Dunlow Animal Waste Operation Northampton County The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. Please address the following by May 7, 1999: Please incorporate the NRCS Required Specifications into your Waste Utilization Plan (WUP) and resubmit the WUP showing the specifications have been incorporated. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter, must be submitted on or before May 7, 1999 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 2H .0200 and your facility will be considered to be operating without a permit. Please be advised that operation of the subject animal waste management system without a valid permit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 502. Sincerely, ue Homewood Environmental Engineer Non -Discharge Permitting Unit cc: Raleigh Regional Office, Water Quality Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper ,3tate of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director a I, i RECEI' V'JATER QUALi- - , "'INCDEN' 1V0rt•DrSCherge ftf6 CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES April 7, 1999 Williams Farms of NC Inc �v�ri Dunlow r; ; PO Box 416 Moyock NC 27958 - - - _ _ - _ _ - _ Attn: Fred Cunningham ` Subject: Application No. AWS660019 Additional Information Request ------ - - _ - ------ _ — -- -" _ -Dunlorv- - -- - Animal Waste Operation Northampton County Dear Fred Cunningham: The Non -Discharge Permitting Unit has completed a preliminary engineering review of the subject application. Additional information is required before we can continue our review. Please address the following by May 7, 1999: 1. Please incorporate the NRCS Required Specifications into your Waste Utilization Plan (WUP) and resubmit the WUP showing the specifications have been incorporated. Please note that all WUP revisions must be signed and dated by both the owner and the technical specialist. Please reference the subject permit application number when providing the requested information. All information should be signed, sealed, and submitted in duplicate to my attention at the address below. The information requested by this letter, must be submitted on or before May 7, 1999 or the Division will return your application as incomplete in accordance with 15A N.C.A.C. 21-1 .0200 and your facility will be considered to be operating without a permit. r. Please be advised that operation of the subject animal waste management system without a valid perinit is a violation of North Carolina General Statute 143-215.1 and will subject you to the enforcement authority of the Environmental Management Commission. If you have any questions regarding this request, please call me at (919) 733-5083, extension 502. Sincerely, ue Homewood Environmental Engineer Non -Discharge Permitting Unit cc: Raleigh Regional Office, Water Quality Permit File P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper I RECEIVED ANIMAL WASTE UTILIZATION PLAN `r Nan -Discharge Permitt Producer: Williams Farms of NC / Dunlow Farm Location: 7 miles west of Gaston on NC 46 Telephone: 252435-6930 Type of Operation: Farrow/Wean Number of Animals: 650 Storage Structure: Anaerobic Waste Treatment Lagoon Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of the surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are required so all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in a environmentally safe manner: ® 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize, 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. ;.. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5: Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied noLnjorc than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. Jf you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application niet'hods are no the same The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you `may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall ade for the area receiving waste to be flexible so as to accommodate changing waste analysis content and the type.' Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 1SA NCAC 21-1.0217 adopted by the Environmental Management Commission. 9 X. ANIMAL WASTE UTILIZATION PLAN ' i h Amount of Waste Produced Per Year leallons, tons, ete 1 650 animals x 8.$ /day x 365 gal. Waste / animal Iyear — _ 2,087;800 gals, waste /year.+' Amount,of Plant Available Nitrogen (EAM Produced Per Year fE V 650 animals x _ 5 4 lbs. PAN /animal /year = 3510 lbs. PAN / year. { PAN from N.C. Tech. Guide Std. 633) L;R Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the*'*.-,' waste in a timely manner.. The following acreage will be needed for waste application based on the crop to be grown and surface application: Table 1: ACRES OWNED BY PRODUCER ; Tract 4 Field N soil T Crop RY.E. x N Application Rate Lbs, N/Ao.* Comm. N or Residual N/Aom A,=* f Lb,. N Uaiwd "• Month of Application 2631 3 Tai3 Bermuda Hay 6.0 50 300 0 10.6 ' 3,180 A ril•Se t. 2631 3-- Tu13 Whost- rain 50 so 0 10.6 530 Nuv.4&rch 2631 4 TuB Comm Berrntu a4jiy50 240 0 2.9 696 A nil-Sa it. 2631 4— TuB Wheat-Omin 50 5o 0 2.9 145 Nov. -March 631 1 TuB Cotton 0.12 78 0 8 624 Ma -hula 2631 1^ TuB Wheat-Grain50 5o 0 8 400 Nov. -Mauch 2631 2 TuB Cotton !65010. 12 78 0 8.1 632 Ma -3u�w 2631 2^ TO Wheat-Grain50 50 0 0.1 405 Nov. -Munch none none none none Totals [ 59.2 (1) 1 6,612 1 * This N is from animal waste only. If nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on-reillistic yield expgctation. ** Acreage figures may exceed total acreage in fields due to overseeding or double cropping. *** Lbs. N Utilized equals total required nitrogen from waste less any commercial nitrogen supplied. Indicates that this is field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. Reference is from Sixth Guidance Memo (Revision Two) issued on August 25, 1998 including a memo from Dr. Jim Green, Chairman, Crop Management Practices for Selected Forages Used in Waste Management. (see attached memo for suggested management practices and expected yields- and total amount of PAN/acre. ) ^ Indicates that this field is being doubld cropped ( two different crops planted in the same field during the same year). In the case of wheat followed by soybeans followed by corn planted the following year we have allowed 20 lbs. N/ac to carryover into the PAN requirements for corn, (i.e. 20 lbs. N / ac has been decreased from the corn PAN) due to residual nitrogen from the soybean plant. •i ANIMAL WASTE UTILIZATION PLAN tie 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached.) (Required only if operator does not have adequate land. See required specifications 2.) WWIr ® mmu=lwx� Totals (See footnotes for Table 1) Totals from above Table I & Table 2 ® Table 1 Table 2 Total Amount of N a a" **** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced.' Note: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates.: The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or y other elements. Acres shown in each Feld of the preceding tables are considered to be' the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due E to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste.. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that address all f, nutrients. This plan only addresses nitrogen. Acres Lbs. N Utilized 59.2 1 6 612 n/a n/a 59.2 t 6,612 Produced **** Balance 3510 -3102 rwsanc,..u1rrrr.nM�..�er rrrerwwiue �ee�rwerwenr�ve�eew aAureRYfnelrek4ah3ni L6 .xiu+swu A-,Vd,n a .,nk k!.h W: k:-:fauea� M7 ANIMAL WASTE UTILIZATION PLAN We 3: Application of Waste by Irrigation Field # Soil Type Crop Application Rate (In/1 r) . Application Amount In/l:vent * 3 TuB Bermuda H°y 0.5 1.0 3--- TuB wheat -Grain 0.5 1.0 4 TuB Comm Bermuda Hay 0.5 1.0 4— TuB Wheat -Grain 0.5 1 TuB coum 0.4 bare I ^ TuB Wheal-0rain 0.5 2 TuB cotton 0.4 bare 2^ TuB Wheat -Grain 0.5 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. .j Application of Waste by Irrigation ft irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding'capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and the irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Your facility is designed for 75 days of temporary storage and the temporary storage must be removed on the average of once every 2 months. In no instance should the volume of waste being stored in your structure exceed 1.7 feet from the top of the dike. Call your technical specialist after you receive the waste analysis report for assistance in'determining the amount of waste per acre and the proper application rate prior to applying the waste. Narrative of Operation: Waste will applied to Bermuda hay, wheat, & cotton. Wheat will be overseeded into bermuda. The'PAN for overseeding small grain into bermuda is 50 lbs/acre above the normal rate for coastal. Small grain must be harvested before the heads begin to form (ref See Sixth Guidance Memo, Revision Two, 1.11 Cotton and wheatwill be double cropped on the same field the same year.. 1 Total acreage was calculated by using all waste application fields as individual fields in the same crop year, thus reflects the total acres that may receive waste in a given year, not mapped acres. ' ortalitymanagement will be by complete incineration and ashes will be land applied to spray fields. ANIMAL WASTE UTILIZATION PLAN SWINE WASTE MANAGEMENT SYSTEM OPERATION AND MAINTENANCE Producer: Williams Farms of NC/Dunlow Farm The purpose of this plan is to provide guidelines for carrying out the routine operation and maintenance work needed to keep this swine waste management system functioning as planned. Routine maintenance is considered to be normal good care of the system. Good maintenance adds to beauty, usefulness, and permanence. 1. Maintenance a) The routine maintenance of the lagoon involves the following:. j i) Maintenance of a vegetative cover on the embankment top and side slopes: bermuda and fescue should be well established on these areas. The embankment should be fertilized with 10-10-10 per acre each year to maintain a vigorous stand ii) Control of brush and trees on the embankment. This may be done by mowing, spraying, or chopping, or a combination of all three. This will need to be done at least once each year and possibly twice in years favorable to heavy growth of vegetation. b) Maintenance inspections of the lagoon should be made at least annually. Items to be checked should include, as a minimum, the following: i) Waste Inlet Pipes, Overflow Pipes a) Condition of pipes (1) Separation of pipes (2) Cracks or breaks ii) Pool Area a) Undesirable vegetative growth b) Floating or lodged debris iii) Embankment a) Settlement, cracking, or "jug" holes b) Side slope stability - slumps or bulges c) Erosion and rodent damage iv) Transfer Pumps 2. Opgration a) Your animal waste management facility was designed for a total of 650 / Farrow/Wean. The lagoon contains both permanent and temporary storage. The permanent storage is not to be in order to ensure that anaerobic action will occur. The design include§ permanent storage of one cubic foot per M� pound of steady state live weight. b) The temporary storage portion of the lagoon includes capability for the volume of waste produced over 75 days, the amount of rainfall in a 25 year 24 hour storm event, and rainfall in excess of evaporation. Your facility is designed for 75 days of temporary storage; therefore, it will need to ANIMAL WASTE UTILIZATION PLAN be pumped every 2 months. Begin pump out of the lagoon when the liquid level reaches elevation 98.7 as marked by the permanent marker. Stop pump out when the liquid level reaches elevation 96.5 c) The attached waste management plan should be followed. This plan recommends sampling and testing of waste every 90 days and before land application. The waste material should be analyzed before each'application cycle to determine its nutrient content. A soil test of the area of application must be made annually to insure the waste is applied as reasonably and practically possible to recommended rates. d) It is strongly recommended that the treatment lagoon be pre -charged to'/z it's capacity to prevent excess odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. e) The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources; Division of Environmental Management, has the responsibility for enforcing the law. ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Williams Farms of NC Owner / Manager Agreement I (We) understand and will follow and implement the specification and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (We) know that any expansion to the existing capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management (DEM) before the new animals are stocked. I (We) also understand that'there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner: (Phase print) V •lliams Farms of NC Signature: r syive Date: 1191V3� Name of Manager (iraitre=t &m owner): Signature: Date: Name of Person Preparing Plan: David Oldham Affiliation : Certified Technical Specialist Address : 414 Hwy 158 Elizabeth City, NC 27909 25 -82} 10 �'IanAtllrP.' A ❑ New Plan ® Revised Plan Date: l/19/99 ❑ Amended Plan Date �19 ��� X1,flP �zWA`I: ION�PL�►N REQUIRED SPECIFICATIONS I. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to the assessment of civil penalties of $10,000 per day by the Division of Environmental Management for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement (sample enclosed) with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet but not exceed, the Nitrogen needs for realistic crop yields on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application of other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used, the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Suffers" required by DEM. 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when the wind is blowing. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. 7. Liquid Waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur off site or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that no more than 20 to 25 percent of the leaf area is covered by solids. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crops planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop on bare soil. 11. Animal waste shall not be applied closer than 25 feet to surface water. This distance may be reduced for waters that are perennial provided adequate vegetative filter strips are present. 12. Animal waste shall not be applied closer than'100 feet from water wells. �.�' 13. Animal waste shall not. be applied closer than 200 feet of dwellings �:7 other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by overspraying. Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, and only then at agronomic rates provided the application causes no runoff or drift from the site. 15. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. Lagoons and other uncovered waste containment structures must maintain a maximum operating level to provide adequate storage for a 25-year, 24--hour storm event in addition to the one (1) foot mandatory freeboard. 18. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and Accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage,„or discharge. WASTE.... UTILIZATION PLAN _� 19. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 20. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills, A regular maintenance checklist should be kept on site'. 21. Highly visible permanent markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Soil tests shall be made every two years and a liquid waste analysis be taken at least twice each year consistent with waste utilization plan. Poultry litter shall be tested prior to application. Soil and waste analysis records shall be kept for -five years. 23. Dead animals will be disposed of in a manner that meets NC regulations. N aw l. Ak �"zt a U1,iA D 1 W_ . tie Av. Lr 4 jj�'V� Awl 4.. o" "�"i :.��Y�?�.: 1I Ij tit �1 lk All -Ulf jr Me X6, Ml A - Will 1 - Ir 4. VV44 L A mi r5 MT. I Ru Q RN A 0 IF 5 gz: N I -102 k . . . . . . . jq� -19 "zV.. If j A;4 Ul 4TI Dunlow Farm Site Map Facility # 66-19 J , } Office Collection Box --r� Recharge Pump Houso Incinerator j - Storage Building -T IVcll -/ 0 apQuest Map Results hilp://%vww.mapquest.r,oni/cgi-birL/ia—f-md? ... 800(ja tcyt&randon= 12 1 7,U ink= ia-nia p-res uh I CA& Map Results use sublect to 0)gtm 1 --r, I I it license/co yda SHARE YOUR LIFE. SHARE YOUR DECISION. Your searcn oriqln 18 : UaSTOn, NU, Uti Njr P-Map Tips NW NI"' Trip4at 5k it 0. 0 et a N evv N1 ar) 'i 4 C, (700 01 65 W __4w .E itc ells Mill S� )�Slnall Map W-, S SE' 015"Atrz Min OT T FES.Mlchs 1-Mediul I Map P46 O-Large v L $ J rT'1 :: TJ'a� all Best for P"ritog Gum -Forks -Forks 301 ►Custotnize Niap op!ior, a eelmvn_G &86 ►i�E-mail Map Recenter Map cEQtPrFf im Rb�.ayjae Rapids_--- jSave�Load Map Identify Icon -.158 1 �58 lasaut Rom my C'rysburq rrembers only �0'- ry ath Waldo n Printable lyll ap Recenter Map 125 For best printing nd Zoom In results od h,�f e 40 NO M Lid Ca5ile 0 1908 GeoSystamsGbbal Corp.; 0 199.8 Nav7ech u You. m. st havethe zoom l6vel set at qA 0 n'the Map y.leyel'. it o Quick Places of Interest (rv[a'43rund Buliul s)' 'laces of Interest (TJS1U'Al10PL; 0111N.) Pick on buttons to show/remove the.location(s) on the map. Select a category and click. on.Update Map. Lod -gin Ell .2 5; Y-1O, I r Attractions *MJ'Banks & ATMsl-t: Recreation e�rremm n y 4 . -Transportation Education V✓i Personal porlsoir Plan Lodging Plan Dining =7--= AT&TGet City Info, VLAnntoh Weather Get a New Map Address I intersection city Country us� �i Get MapRestore. State / Province Zip (for US Only) I Maps I Driving Directions i Plan a Trin I Buy a Map j Free Membership j Products & Services I I Home I About 1 Feedback I Help i Cop eoSysteals Global Corpof0on .-Yrjnht 199.6m9a I GQ - I' 10198 2:39 PNI THIS DESIGN IS FOR A SINGLE STAGE SWINE LAGOON TENT S- NAME > W=amptonms Dunlow " OUNTY ==_-__--_-__.._____________ - _� TODAYS DATE __-_--_______________-_---__> 8/27/97 SITING LAW DISTANCES OKAY (YES OR NO) => Yes NUMBER OF PIGS WEANLING TO FEEDER 0 NUMBER OF PIGS FEEDER TO FINISH =======> 0 NUMBER OF SOWS FARROW TO WEANLING 550 NUMBER OF SOWS FARROW TO FEEDER =--__-_> 0 NUMBER OF SOWS FARROW TO FINISH 0 NUMBER OF DEVELOPING GILTS 0 NUMBER OF STUD BOARS OR GESTATING SOWS > 0 NUMBER OF YEARS OF SLUDGE ACCUMULATION > 0 (5 year minimum unless retrofit) TOP LENGTH AT NORMAL WATER LEVEL =-____> 236.0 FEET TOP WIDTH AT NORMAL WATER LEVEL =_-____> 134.0 FEET NORMAL WATER LEVEL ELEVATION ==========> 96.0 FEET SEASONAL HIGH WATER TABLE ELEVATION =W=> 93.0 FEET LAGOON BOTTOM ELEVATION _______________> 89.4 FEET Depth of Permanent Water 6.6 feet (minimum depth including sludge = 6 feet) (maximum depth.of sludge = 2 feet) SIDE SLOPES =---------------------- -=> 2.'5:1 Permanent Volume Required 159560.5 cubic feet Permanent Volume Provided 170821.2 cubic feet Iy' DITIONAL DA W/O EVAP. (VEGETATED) 0 SQUARE FEET DITIONAL DA W/O EVAP. (NON-VEGET.) =_> 0 SQUARE FEET (i.e. feedlot & non -diverted area) ADDITIONAL D. A. WITH EVAPORATION 0 SQUARE FEET (i.e. pumpout pond) LENGTH OF PUMPING CYCLE 90 DAYS GALLONS OF FRESH WATER ADDED DAILY =-_=> 0 GALLONS NORMAL RAINFALL FOR PUMPING CYCLE _____> 21.5 INCHES PERCENT RUNOFF ON VEGETATED AREAS =_-__> 30 PERCENT PERCENT RUNOFF ON NON -VEGETATED AREAS => 65 PERCENT NORMAL EVAPORATION FOR PUMPING CYCLE _ > 12.6 INCHES 25YR/24HR STORM RAINFALL =------------=> 6.7 INCHES RUNOFF DEPTH FROM VEGETATED AREAS =_ =,> 0.0 INCHES RUNOFF DEPTH FROM NON --VEGETATED AREAS => 0.0 INCHES INCLUDE HEAVY RAIN (YES=1, NO=O) W-==W=> 0 (NUMBER ONLY) FREEBOARD =--__-_--____________________> 1.0 FEET ESTIMATED TOP OF DAM ELEVATION ====--==> 100.0 FEET Temporary Storage Volume Needed 99029.7 cubic feet Temporary Storage Volume Provided 103422.0 cubic feet Top of Dam Elevation = 100.0 feet Inside Dimensions of Lagoon at Top of Dam Length = 256.0 feet Width = 154.0 feet ESTIMATED DEPTH TO PUMP = 2.2 FEET 'volume To Be Pumped = 77018 cubic feet A eet top Pumping Elevation = 9G.0 feet EiMER GEN CY ACTION PLAN PH09 i �i� —M' DWQ ENLERGEVCY NIA-NAGENLEtiT SYSTEM SWCD 5u-2sgL _ MRCS _ n4-7ri41 1-his plan will be implemc:tted in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. I. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. U 01 c. Stop all flows to the lagoon imrnediatel_v. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. I nmediateIy stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and spriniders-action include; a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D: Leakage from Rush systems. houses. solid separators -action include: a. Stop rec%-cle pump. h. Stop irrigation pump. C. Make :ure no siphon oc::urs. d. Stop .111 Ilcm.; in the house. tlu�h systems. w solid Separators. IS. lure, y., _ � ,. .�r. �sr.r.x,m:�-a��an�mvr,�usya�n':rr.::•; •ina;,^r":..:a: - st-., e. Repair all leaks prior to restarting, purttps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed .0 flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage. put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals. trap or remove animals and fill holes and compact with a clay type soil. c. Have it professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was rcleased and for what duration? c. Any darnaae noted, such as employee injury, fish kills, or property dama2c? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f.. Could a future rain event cause the spill to reach surface waters? Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office. Phone - - After hours, emergency number: 919-7/33-3942. Your phone call should include: your name, facility, telephone number, the dcmils of the incident from item ? above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The correctiVe measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number - c. Instruct EMS to contact local Health Department. d. Contact CES, phone number - - , local SWCD office phone number - and local MRCS office for advice/technical assistance phone number - 4: If none of the above works call 911 or the Sheriffs Departinent and explain your problem to them and ask that person to contact the proper agencies for you. Contact the contractor of your choice to begin repair of problem to minimize off -site darna'Te. a. Contractors `acne: iv6LrRt,. s 7r7,e.as.6 674-NC b. Contractors AJdross:_,.,cr,, N,'t-_., A-( c. Cori(rnctors G: Contact the technical specialist who certified the lagoon (NRCS, Consulting Enainetzr. ctc.) a. Teny—f4i9vt7—NRCS b. Phone: A I m--34 2591 --- 7: implement procedures as advised by DWQ and technical :assistance agencies to rectif•' the damage. repair the system. and reassess the waste management plan to keep problems with release of wastes from happening again. Dcceinbc: ! iCOO, Swine Farm Waste Management Odor Control Checklist Source Cause IIA1111; to Afiniulize Odor Silc 5l,ccilic 1'r;14:iiccs I uu t scl Sv.inc produclion t- Vcbctauvc or wooded buffers; — ElRecommended best nrana,-=nrent practices; CY/Goodjud2nrrnt and common sense animal body surGlcei a flirty manure -covered animals C7 Dry floors 1=1��or awllaica • Wet lllallllic-coveted 011111s /Slowed floors; R Waterers located over slatted floors; ©"feeders at high end of solid floors; 2"' Scrape manure buildup front floors; C4 Underfloor'vcntilaiion for drying :4111L114 COUCLlion pits • Oune; 0 Freeplenl ntanure removal by Elfish, pit rechar_c, • Partial microbial decomposition or scrape; ft"'Underllnor venlilatiun Vc11111alion csilauat fdm, Volatile gases; fzr l.au tuainicnance; Dtlst O"l:fficictll air ntoventcul lnduor serf;KCN 6Dust Washdnwft belweelt troops of animals; n iced additives; 0 feeder covers; 0 Deed delivery dowuspuut exlenders to fccflcr covers 1:lusb l;tlll a Agitation of recycled lagoon 0 Flush tank covers: licgnid while tanks arc filling 0 Exiend fin lines to near bottorn of tanks with anti-siplio_n vents _ 1 111s11 alleys • A6iialion during wastewater ❑ Underfluttr flush with underfloor vcntilaiiuli conveyance Pig IcL11.11rc poillis • Alplation ofrccycictl lat;ono n Emend rCL'harUc lilies in ncar 1lontnll of puts liquid while Ails arc filling with anti-SiI111011 VC11B 1-ill stalluns 0 Agilation during sump lank ❑ Sump tank covers fining; and drawdown Olnsidc drain cullcololl • Agilatiol, dclrillg; W!1Stcw;11cr ❑ flux covers or juntaion lulacs conveyaifce AMCA-}- llovullhcr 11, 19116, Page 3 Source Cuuse BN11's to Minimize Odor Silt; Sinxific Practices End of dralripipes at • Agliation during wastewater C1 Extend discliarge point of pipes undtrilcalll Lgoon conveyance lagoon liquid level 1.Ji'Wi❑ SllrfJCCS Volatile gas emissions; t3-Proper lagoon liquid capacity; * Biological mixing; ❑ Correct lagoon staritip procedures; • Agitation CL"inimum surface area-to-volunie ratio; 0,- l inimum agitation when.ptimping; ❑ Mechanical aeration; ❑ Proven biological additives Itrigalioll Sprinkler 0 I ligh pressure agitation-, rrigate on dry days With filth: or no %vied; notLICS . Wind drift ti'Millimuun recotnrnended operating pressure; r/ump intake near lagoon ligpid stirface; 2 Ptuup froth second -stage lagoon Slurabc I;uli: or basin • Paitial microbial ticcomposilion; Rllottom or uiilllevcl load;ng; sklr & Mixing while tilling; Q 'tank covers; • Agitation when woprylno ❑ Basin sitrfice: mats of solids; ❑ Proven biological additives or oxidants Scnlin� I�.ni,i :llrl:kee Partial nilaohial decomposition; ❑ Exlcnd drainpipe outlets unllerncatl! liquid • Nixill" while filling; level; • Agitation when emptying Cl Remove willed solids regularly M.uunc, ,Illrry Ili siudt;C Agilarinit when spicading; ❑ Soil injcclion of slmry/7;ltldges; spncadcl uullets a Volatile gas cmissiolis ❑ Wash residual manure from spreader after use; ❑ Proven biological additives or oxirl:mts Uncovered lllarnlic. &VulattlC ails errliSSllillS While ❑ Soil lniectim, asiotry/.-oml6es sllrrry or slutl_c tin field drying ❑ Soil incorporation within 48 hrs.; sur r'.lk:cs Sprcad in thin uniform layers for rapid drying; Cl Proven biological additives or oxidants I?�.ui :nook is Carcass dCCollipositirilt 9-111roper disposition of carcasscs I)_a!I anilu;ll di.pus;d Carcass (decomposition 171 CotllplCIC covering of C;VCISSCS in Inn i:ll pits; pill fl Proper location/construction of dispw;;il pits losulcr.lruls - hicurnpfcEC conrdrilsrikmi Cl SvCollda(.;• slack 111urltls Aph At.10 nihcr 11, 191)6, Pape 4 So II FCC - -- -- — - Cause - - - - - UNIPS to lllinimi-ee 011ur-'. - - -- - - -- - �Siie Specific Pr;tc[icc5 -- - Staliding water around a Improper drainage; Grade and landscape such that xaicr drailis faLilltiz:5 a Microbial decomposi!ion or away from facliules organic matter l.la nllfc Irach:,[ unto foot ly maiutaillcd access loads Q' Fann access road uiaini,-nancc public ruatL bunt farin access Additional Information : -- -- — - Available Front : Swine hlamirc Managcnietit ; 0200 lWlcfBMP Packet NCSE1, C00111y lalcrtsiuu CC111C1 S%vinc l'ruduction Farin Putential Odor Sources and Reniedics ; FBAE Facf Sheet NCSU - BAE S+vine Procluc[iun Facility tiianure Management: Pit Recll-arge - Lagoon Treatment ; ERAE 128-88 NCSII - I1AE S%Yitle I'ruduct 011 Facility Maiturc. Management: Underfloor Flush - Lagoon Treatuicril ; EBAE 124-88 NCSIJ - BAE Lagoon Design and Managciuent fur Livestock Manure Treatment and Storage ; EIIAE 103-93 NCSU - I1AE Calibration of Manure anti Wasiewaler Application Equipment ; EBAC Fact Slice[ NCSIJ - IlAII Cunirulling Wors from Swir,c Buildings ; Pill-33 NCSIJ - Swine Es!cnsiun I'liviruimicn!al Assurance Program ; NI111C Manual 14C I'mk Producers Assoc Ohtitja} lur t4anaglilg Odor ; a report Isom the Swine Odor Task Force NMI Agri Communications 1 1 iHiS:[ t:L: C1111Cerr15 in Animal Maimrc Malla"Cll;Clit: Odors and flies ; P1'0107, 1995 Conl::rcltce ProceeAin,s I'lllllll;l Coojwf;11ivv EXIL:11511Ht ��/ AtAc 31 - rl.Itrntbt:r ! !. 1990, Pace 5 SI III cc Insect Control Checklist for Animal Operations cunse HMI's Io Cuutrol Insects Sirc Specifi Pl-acliccs Liquid Systenis . 1,14ldI tiulic(s ACCrlmulation of sulids Cl Flush system is dcsigued and uperaicd sufficiently to remove accurnul acd solids from gutters as designed. .❑ kemovr bridging of accunurlatcd solids at discharge I.agoous wid fits • Crusted Solids ❑ Maintain lagaons, setiling basins and pits wlicie pest breeding is apparent to minimize the crusting of solids to a depth of no more than b - 8 inches over mare than 30% Of surface:. I:l,Lc»ive ♦rCL!ClatlVC Decaying vegetation _ Maintain vegetative control along hanks of t ire++Ih lagoons and other inlpoLill dnients to prevent aecumulatian of decaying vegetative ivalter along ++'atef s edge oil impo1nkdmenl's. pci-imeicr. Dry S)•strnis Deal S1li11aLC aymsicil, opci. le anti nlailltaitl feed systems (c.L_, -- - r hunkers and troughs) In minimize the acctuillilalion of decaying waslage.. U/CI an up spill;lLr on :1 saline basis (e.g., 7 - EO day interval daring summer; 15-30 ckty hitcival (Itiriog +einler). Decal stolaLe 0 Accwuulaiions of feed residues Reduce moisture accunlula[ion within and around imniedi:ne periincier of Eued storage ;tress b}' insuring drainage away lions silt and/or providing adceluale C0111ai1n11Cr1[ ctimcd hill for hrewcr's f;rain and similar hiCh noislure El'aill prothlrts), ct/11nspccl for and lenlove or hll;tk up accinnrihictl solids in lil[cr drills aroulld feed slola,;e as needed. ether I1, 109c), I'age I Smirce Cause RNIPS to CoWrol 1115CCtS - _ — Site Specific Practices - Auiitwl holding Areas AccunmUiarts ofanintal wastes and Iced wastaee CT Eliminate low areas that trap moistitre aimig fences and other locations where xvast� accumulates and disturbance by animals is / minimal. 13 Maintaiv fence rows and htrcr'strips :tretnnd animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed). Dry Manure Ilanslling • Accumulations of animal wastes Cl Remove spillage an a routine basis {e.g., 7 - In Systcuts day interval during summer, 15-30 day interval during winter) where manure -is loaded for land application or disposal. 0 Provide for adequate drainage around manure stockpiles. ❑ Inspect for anti remove or break up accumulated wastes in filter strips around stockpiles and manure handling are;js as needed. For mort: inliunia[ion eont;jc[ the Cooperative Extension SrrVlCC, nepar[ntew of Entumology, 11ox 76 13, North Carolina Scitc Uniccrsity, kalciUh, MR.% 2769i-7613. MortaIity Management IMethods (check which methods) are being implemented) _! Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must be at least 300 feet from any flowin<< stream or public body of water. 1 Rendering at a rendering plant licensed under G.S. 106-163.7 Complete incineration In the case of dead poultry only. piacing in a disposal pit of a size and design - approved by the Department of :Agriculture J Anv method which in the professional opinion of the State Veterinarian would mare possible the salvage or part of a dead animal's value without endanLc:rinrt human or animal health. (%Vri(ten approval of the State Veterinarian must bC attached) c1c;1r11t`t'- 1.%. 1061 ) State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary via E)EHNR DIVISION OF WATER QUALITY. April 3, 1997 Dr. Fred Cunningham, DVM Williams Farms of N.C. P.O. Box 416 Moyock, North Carolina 27958 Subject: Compliance Evaluation Inspection Facility # 66-19 Dunlow Farm Northampton County Dear Dr. Cunningham: On March 27, 1997, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the Swine operation was not discharging wastewater into waters of the State and that the waste lagoon had the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with -the State's animal nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management tan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh, North Carolina 27609 NO C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/ 10% post -consumer paper M Dr. Fred Cunningham Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an 11 Operator in Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, Judy Garrett Water Quality Section Supervisor cc: Northampton County Health Department Mr. Tony Short, Northampton Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC--- RRO DWQ Compliance Group RRO Files — • V/ ❑ D WC Animal Feedlot Operation Review WQ Animal Feedlot Operation Site Inspection ' outine Q Complaint [3State employee call 1317GHO •-up of DWQ Inspection © Follow-up of DSWC review Date of Inspection - Z 2 Facility Number / Time of Inspection Use 24 hr. tithe F� v �y. Total Time (in hours) Spent onReAtiv Z Farm Statv.._.� s:, .:.s� � ._. �.. .- �.._ or Iaspectloo (includes travel and processing) 191 Farm Name:F�q gtj}— County: 1.Z.ta.1�. Owner Name: fdL..�dhz�jr"'S 01,_ /1/ ... Phone No: �!9 j(09� d (DFF.CG Mailing Address: (i f (, m o y 0 c /L1. _ �?% (. � '1 Onsite representative: �Ll ✓�0/ J h r _ . Ilntegrator: ` '�`� nAw y:yY Cerdfied Operator Name: r /d w r n V�" 6}-h= Location of Farm: Latitude �•�•�" Longitude • * Cj Vot O eratfonal Date Last Operated: Type of Operation and Design Capacity Number of Lagoons ilolding'Ponds [i Subsurface Drains Present r ' ram• er: t;,',•'`:hA""' Lagoon Area S rav Field Area 1. Are there any buffers that need maintenancdimprovement? ❑ Yes [dNo 2. Is any discharge observed from any part of the operation? 0 Yes �N a. If discharge is observed, was the conveyance roan -trade? ❑ Yes VNo b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes c. If discharge is observed, what is the estimated flow in gallmin? d. Does discharge bypass a lagoon system? (If yes, notify 1)3,Q);, 1- Is there evidence of past discharge from any part of the operation? I. Was there any adverse impacts to the waters of the State other than from a d Does any part of the waste management system (other than lagoonsfholding ❑ Yes VNI ❑ Yes ❑ Yes 0 Yes FNo 3 D W C An Feedlot Operat ion Review WQ Animal Feedlot Operation Site Inspection ' outine [3 Complaint 13 State employee call 0 Follow-up of DWQ inspection [3 Follow-up of DSWC review Date of inspection 2_- ' Facility Number Time of Inspection Use 24 hr. time �j Total Time (in hours) Spent onRe%•iew Farm Status: of Inspection (includes travel and processing) r- Farm Name: _.__L� `� Y� 1� _„Q3 Fp s+- - -- - - County: C� Owner Name: k3� r'r '!] r�. S ^✓3 �'�..^ S 0 r'` �_ _ Phone No: _r r 97.3 fa �13 0 C t7Ff•� t �' ` , Mailing Address: ,�!� r o X (l (6 0 c � � rt/• (- �'j g S-i ..,._ ': p Y �L ,✓ lY�l C1 /.� eira f re Onsite re rrseotative: '9''1. Certified Operator Name: _ �d�, ^ • ^ R'�+--- } L (' � Location of Farm: Gti / 7 { ;] -1 &,� 1Z en A S 4-0 W 41- C.- Latitude Longitude 0 Not Operational Date Last Operated: rype of Operation and Design Capacity Swine ' ,. : ...:. . :'Number . `' Poultry Number Cattle ''` Number ;t. ❑ Wean to Feeder ID Layer , Dairy ❑ Feeder to Finish ,; ❑ Non -Laver Beef F w to Wean s Farrow to Feeder M k Farrow to Fini h ❑ Other Type of Livestock ;jj Number oFagoons . Holding Ponds.` t ii C. •' S ' y" �' I. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? a- If discharge is observed, was the conveyance man-made? Subsurface Drains Pruent. b. If discharge is observed did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? Of yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Was there any adverse impacts to the waters of the State other than from a discharge? S. Does any part of the waste management system (other than lagoons/holding ponds) require M:%in1Pnanrr1irr.nmv "..7 rid AArea i Yes �r Mo ❑ Yes W "o ❑ Yes ❑ Yes LJ N No ❑ Yes VU/Nj ❑ Yes Sd ❑ Yes ❑ Yes No M Anunal Feedlot Operation Review A WQ Awimaf#eedlot Operation Site Inspection outine Q Complaint {f State employee call Q Fallow -up of DWQ inspection Q Follow-up of DSWC review ""rf"7 Date of Inspection r'; Z - c , Facility Number Time of Inspection " ` �% 3 Q�� Use 24 hr, time x{ Farm Status:.... r Total Time (in hours) Spent oaRe%iew •-- or Inspection (includes travel and processing) r Fames Name: v-\ �\ c'1 �_� F+q 9-1,-- County- CJ d r i .�a-bJ. ' a ' f a Ys�, Owner Name: �[ir ! ��'�1F►-S �'n�'�*-5 p�. Phone No; �l !_ MaUiDg Address: �g x r G°-�0 14 ,�i� C . � 9 rY i ' . Onsite representative: .Dll ✓�y� Dz_J_`t /Ire — Intep�tators�°�' -�' Certlaled OperstorName: /acj '' ^ , " LL ' '';,t ``"��5'-Ht Location of Farm: S fo y✓ ?! C �r t �" rc ': Latitude Longitude �• �� �..... �.l�aw t, _w Q Not Operational Date Last Operated: Type of Operation and Design Capacity Switse Poultry " Number h: Cattle " Number :''Number ❑ Wean to Feeder Da ❑ Feeder to Finish OF Big Laver Beef to Wean arrow to Feeder rl Farrow to Finish0 Other Type of Livestock Number of(Laguons Holding -Ponds. 0 Subsurface Drains Proust'-,!-_ 5... It s: 71 'M ' ."`. •ruY-1 �".i'�r�'�I ti .,�, r.-. I y r 'f' .•`" l.� 68II �1"!S, r�?7 S - rsY'F4e1d Area- - ^ - - - - - +iMM�ii•n. r r rr.r.rrir.rrr�� I. Arc there any buffsrs that need maintenancelimprovement? Z. Is any discharge obsct•ved from any part of the operation? a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? Of yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? Of yes, notify DWQ) I. Is there evidence of past discharge from any part of the operation? v i eS d C7 Yes �a ❑ Yes Yes {� N No �] I. Was there any adverse impacts to the waters of the State other than from a discharge? Does any part of the waste management system (other than lagoon holding ponds) require maintrnanro-/imnrnur,, —r9 ❑ Yes V[31N5 ❑ Yes ❑ Yes CQ Yes No :j *;T, State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Govemor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Dr. Fred Cunningham Williams Farms of North Carolina P.O. Box 416 Moyock, North Carolina 27958 A 4 IDEHIVR DIVISION OF WATER QUALITY September 2, 1997 Subject: Compliance Evaluation Inspection Facility # 66-19 Dunlow Farm Northampton County Dear Dr. Cunningham: On August 7, 1997, Mr. I3ustcr To%vcll firom the Raleigh Regional 0111ce conducted a compliance inspection of the Sill) )'ject animal facility. This inspection is part of' the Division's ell'orts to dcicrinine compliance with the State's animal "waste nondischarge rules. The inspection delcrnnned that your animal operation was not disLharging wastewater into Wgters of the State and that the waste lagoon had the fcquired amount ol'ii-ceboard. As a result of the inspection the Jacilily was lound to lie in compliance with the State's animal nondischarge regulations. This office would also like to take this opportunity to remind you that you arc required to have an approved aLmal waste manaWnient >an by December- 31, 1997. This plan must be Certified by a designated technical specialist or a Professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact vour local Soil and Water Conservation District office. The Raleigh Regional Otfiee appreciates your ccxrlleralion in this natter. Ii'you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sinccrciv udy Cairctt Water Quality Scction Supervisor cc: Northampton County Health Department Mr, Tone Short, Northampton Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC---RRO DWQ Compliance Group RRO Files P.O. Box 29535, Raleigh, North Carolina 276226-0535 Telephone (919) 733-7015 FAX (919) 733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Facility Number Date of Inspection / ..� �,.....,,. Time of Inspection b t) 24 hr. (hh:mm) Total Time (in fraction of hours Farm Status: Registered ❑ Applied for Permit (ex:1.25 for 1 hr .I5 mto)) Spent on Review ❑ Certified ❑ Permitted or Inspection (includes travel and orocessinnl ❑ Not Operational Date Last Operated: Farm Name: Land Owner Name:�i✓.:.1.�.!.9_'s., ....�:.!-5...._..�`...� ... PhoneNo:...:(... 5 6........_._............................ 4 �✓'� rwob Facility Conctact:...................................... .�xh� .................... Title: f^!SIB�C; f�¢ do � . -phone No:.. .'.33j Mailing Address: ... (l. V_P 0 X._. L..� ?.......M.P.X..P..Ga ..........e OnsiteRepresentative:.........................................................vC�7thaw, Integrator: :.......:........_!. y� _.............................................. Certified Operator: _ [�( '.... 4..... P..... - 4k-•................................. Operator Certification Number:........................................., Location of Farm: /,.L , . , v / .................... _............................................. _..:................................... ............................................................................................................................................................... 4 ... ..................................................................................................................................... Latitude =*0<0" Longitude 00�.�.. Type of Operation and Deshm Canacitv Other ace Drains Present Area .Z ❑ Spra 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require 4/30/97 maintenance/improvement? Field Area ❑ Yes Noo ❑ Yes eo ❑ Yes 0<0 ❑ Yes ;O ❑ Yes 50' ❑ Yes ❑ Yes 1a 10 ❑ Yes Continued on back �- 1 acidty Number:.. . �7... Z........... 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes P 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes No St u t ernes (Lagoons awl/or Holding fonds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes 00 Freeboard (ft): Structure Ir Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 , .�.. ....... ............................ ............................ ............................ ............................ ........................... 10. Is seepage observed from any of the structures? ❑ Yes 0 No 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do ❑ Yes Id"No any of the structures need maintenance/improvement? ❑Yes t,a'1V0 (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? 2<cs ❑ No NVas e_Applic_ation 14. Is there physical evidence of over application? ❑ Yes ❑ No Of in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type GS................................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Mana ent Plan (AWMP)?� P7*7K ❑ Yes El No vt/ 0 4s yQi7`! 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes 18. Does the receiving crop need improvement? ❑ Yes ; No 19. Is there a lack of available waste application equipment? ❑ Yes o20. Does facility require a follow-up visit by same agency? ElYes ;�o 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? Certified ❑ Yes o For Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes [].No 24. Does record keeping need improvement? ❑ Yes ❑ No Reviewer/Inspector Name 1 # ? e'rc�,w: Reviewer/Inspector Signature: Date: cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 State of North Carolina Department of Environment, Health and Natural Resources James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Williams Farms of NC Inc Dunlaw Star Rt Box 213-M Gaston NC 27832 IDEHNF;Z November 12, 1996 SUBJECT: Operator In Charge Designation Facility: Dunlaw Facility ID#: 66-19 Northampton County Dear Farm Owner: Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator, The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this'requirement please call Beth Buffington or Barry Huneycutt of our staff at 91gn33-0026. Sincerely, A. Preston Howard, Jr., P.E., Director Division of Water Quality Enclosure cc: Raleigh Regional Office Water Quality Files P,O. Box 27687. W FAX 919-715-3060 Raleigh, North Carolina 2761 1-7687 Nvf' C An Equal Opportunity/Affirmative Action Employer Voice 919-715-4100 50% recycled/10% post -consumer paper Post Office Box 416 Moyock, North Carolina 27958 ( 919)435-6930,- office (919)435-6837 - fax August 319 1995 Mr. Kenneth Schuster, P.E. Regional Supervisor Division of Environmental Management 3800 Barrels Drive Suite 101 Raleigh, NC 276o9 Dear Mr.. Schuster, O'A C y �=vtii 4 In regards to your letter dated August 234 1"S concerning the_ Dunlow Farm. The pipes that connect the confinement houses to the lagoon have been dug up and replaced with new eight (8) inch SDR sewage pipe. The old pipe had continually stopped up and a decision was made to completely replace the old system. This project should be completed no later than September 8, i"s. If you. have any further questions or concerns please feel free to contact me at the Williams Farms of North Carolina office at 919- 435-6930..Our mailing address is P: O. Box 416, Moyock, NC Z7958a, Sincerely, Fred L. Cunningh DVM Vice -President a State of North Carolina '14 a Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor E H N Jonathan B. Howes, Secretary Boyce A. Hudson, Regional Manager Division of Environmental Management August 23, 1995 Mr. Frank Williams 5021 Morris Neck Road Virginia Beach, Virginia 23457 Subject: Management Deficiency Notification Dunlaw Farm/Williams Farms Inc, Northampton County Hwy. 46 Dear Mr. Williams: On August 15, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is a part of the Division's effort to determine potential problems associated with animal waste disposal systems. Mr. Towell's site visit determined that wastewater from your facility was not discharging to the surface waters of the state, nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiencies were observed: Broken pipes were observed that connect confinement houses to your lagoon. These pipes intersected with subsurface storm water diversion lines and caused animal waste to pool underneath a metal culvert that acts as a conveyance to surface waters. No waste was observed in adjacent surface waters on the day of the site visit. It was also apparent that this same problem had, in the past, caused waste to be discharged illegally to adjacent surface waters. In addition to continued facility waste management, these deficiencies must be immediately addressed to help prevent the possibility of an illegal discharge. The Raleigh Regional Office will require a written response to the aforementioned issues within 30 days of receipt of this letter. You should specifically address how you plan to correct this problem and submit a schedule (with' dates) stating when these management deficiencies will be corrected. 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer W% recycled/ 10% post -consumer paper Williams Farms Inc. Page 2 Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges to surface waters of the State are subject to civil penalties of up to $10,000 per day, and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take the opportunity to remind you that you are required to have an approved animal waste_ management plan by December1997. This plan must be Certified by a designated technical specialist' or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Buster Towels at (919) 571-4700. Sincerely, Kenneth 4Schuste, P.E. Regional Supervisor CC: Northampton County Health Department Northampton Soil and Water Conservation District County) Steve Bennett-DSWC �Of WAr�94 02 t7 � CERTIFIED MAIL RETURN RECEIPT REQUESTED Dr. Fred Cunningham, MS. DVM Northeast Carolina Farms PO Box 865 Moyock, North Carolina 27958 Michael F, Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources March 26, 2003 Subject: Notice of Violation Dunlow Farm Permit No. AWS660019 Northampton County Dear Dr. Cunningham: Raleigh Regional office Alan W. Klimek, P.E„ Director Division of Water Quality On March 5, and again on March 13, 2003, Mr. Buster Towell of the Raleigh Regional Office conducted inspections at the subject swine facility: The inspections revealed the following violations of your General Permit: The March 5, 2003, inspection revealed that the freeboard level in the waste lagoon was 19.5 inches. There were water marks on the inside dike wall that looked as though the lagoon had been up to about the 16-17 inch freeboard mark. If in fact that was the case, there had been no notification given to the appropriate regional office concerning this matter. Please note that failure to notify the Division of Water Quality for certain emergency type situations is considered a violation of your General Permit and as such is subject to civil penalties. Your permit also states that lagoons and storage ponds shall be kept free of foreign debris such as. gloves, syringes, and other such solid wastes. The lagoon at this site had large quantities of this type of foreign matter floating on top of the water surface. Both inspections noted that there was a hole full of wastewater located midway between one of the confinement houses and the lagoon. It was apparent that piping had recently been replaced. However, this hole of wastewater was at grade level and if left uncovered would allow waste to combine with rain and possibly run off site into a nearby wet area. Please note that should this occur it would be considered an illegal discharge and may become subject to civil penalties. N. C. Division of Water Quality 1628 Mail Service Center Raleigh, NC 27699-1628 919. 571,4700 DENR Customer Service 1800.623.7748 FAX 919. 571.4718 AMA O NR a Dr. Fred Cunningham Dunlow Farm Page 2 There are several areas of record keeping that need improvement at the farm. The facility is in need of a current waste analysis so that the land application activity that occurred between February 28 and March 11, 2003 can be tallied on the IRR-2 nutrient balance sheets. There were weekly freeboard records on site. These records did include the actual date that these freeboard levels had been recorded. Please respond to this Notice in writing within fourteen days of your receipt. Your response should include your plans to correct these matters and copies of the land application records for the aforementioned dates. If you have any questions regarding this Notice you should call Buster Towell at (919) 571-4700. Sincerely, Z-2- Q Kenneth Schuster, E. Regional Water Quality Supervisor cc: John White, Northampton County Health Department Tony Short, Northampton Soil & Water Conservation District Margaret O'Keefe, RRO-DSWC DWQ Nondischarge Compliance Group RRO Files Northeast Carolina Farms. Inc. ........... P. O. Box 865, Moyock, NC 27958 (252)435-6930 office(252)435-2387 fax April 7, 2003 Mr. Kenneth Schuster, Regional Water Quality Supervisor N. C. Division of Water Quality 1628 Mail Service Center Raleigh, NC 27699-1628 Dear Mr. Schuster, I received your Notice of Violation for the Dunlow Farm, Permit No. AWS6600019 on April 1, 2003. 1 will try to address your concerns point by point. Due to the excessive rainfall over the 90 days prior to inspection we made every attempt to hold as much waste in our pits so as to slow the lagoon rising. When we were able to pump, again we released this waste from the pits. If the lagoon level exceeded the 19-inch mark, it was during this release, while we were pumping and was back under the mark within 24 hours. We are currently picking up the debris that flowed from the pits when they were released into the lagoon. This will be completed by mid April. We also held an employee meeting to reemphasize the importance of keeping trash out of the pit. We will have to get a boat for any debris that is free floating. The hole with "wastewater" has been pumped back into the lagoon. The standpipe has been installed properly and the area filled in with additional dirt. We have a current wastewater analysis and the records are being updated. We are currently recording the date of our weekly lagoon readings. I you have any additional questions please do not hesitate to contact me. Sincerely, , � s VW Fred L. Cunningham s. DVM President a W M i'-§ Michael F. Easley. Governor William G. Ross Jr., Secretary of North Carolina Department of Environment and Natural Resources yRaleigh Regional office wr `C Gregory J.1horpe, Ph.D. Acting Director Division of Water Quality Division of Water Quality April 5, 2002 MAIL � : nfo ,_• _ 1.r! Dr, Fred L. Cunningham, Ms DVM Northeast Carolina Farms P.O. Box 416 Moyock, North Carolina 27958 Subject: Notice of Deficiency Dunlow Farm COC AWS660019 Northampton County Dear Dr. Cunningham: On March 25, 2002, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection of the subject swine operation.'The inspection revealed the following: Record keeping at this facility needs improvement. Land application records for field # 3 were being kept on a total field basis and not according to the Wettable Acre Determination for the facility. The WA calculations for the Dunlow Farm indicate that 3 sprinkler heads are being used at a time in field # 3. According to calculations each sprinkler covers an area of .588 acres, or an area of 1.76 acres per bank (3 heads). The total acres listed for field # 3 is 10.69 acres. In order to avoid the potential of an over application of PAN or hydraulic overload, future records should be kept according to your Wettable Acre Determination. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this Notice please call Buster Towell at (919) 571-4700. Sincerely, Kenneth Schuster, P.E. Regional Water Quality Supervisor cc: Mr. John White, Northampton County Health Department Mr: Tony Short, Northampton Soil & Water Conservation District Ms. Margaret O'Keefe, RRO-DSWC DWQ Nondischarge Compliance Group RRO Files N. C. Division of Water Quality 1628 Mail Service Center Raleigh, NC 27699-1628 919. 571.4700 FAX 919. 571.4718 NMEW Customer Service 1 800.623.7748 State of North Carole Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary DEHNR DIVISION OF WATER QUALITY April 3; 1997 Dr. Fred Cunningham, DVM Williams Farms of N.C. P.O. Box 416 Moyock, North Carolina 27958 Subject: Compliance Evaluation Inspection Facility # 66-19 Dunlow Farm Northampton County Dear Dr. Cunningham: On March 27, 1997, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the Swine operation was not discharging wastewater into waters of the State and that the waste lagoon had the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in.the loss of deemed permitted status, requiring immediate -submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh, Narth Carolina 27609NiC C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper Dr. Fred Cunningham Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an " Operator in Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr'. Buster Towell at (919) 571-4700. Sincerely, Judy Garrett Water Quality Section Supervisor cc: Northampton County Health Department Mr. Tony Short, Northampton Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC---RRO DWQ Compliance Group RRO Files 6. A facility not in compliance with any applicable setback criteria? 7. bid the facility fail to have a certified o*r in responsible charge (if inspection after 10)? 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures sons and/or Holdln Ponds 9. is structural freeboard less than adequate? Freeboard (R): La goon I Lagoon 2 Lagoon 3 14. Is seepage observed from any of the structures? 1.1. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenanceJimprovement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public bealth or environmental threat, notify DWQ) 13. Do any of the structures lack adquate markers to identify start and stop pumping levels? ❑ Yes �'wo ❑ Yes ❑ Yes ❑ Yes No Lagoon 4 Waste ARplication 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) r 15. Crop type 16. Do the active crops differ with those designated in the Animal Waste Management Plan? tvc�f 17. Does the facility have a lack of adequate acreage for land application? 18. Does the cover crop need improvement? 19. Is there a lack of available irrigation equipment? For Certified Facilities Onlv 24 ' -Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 21. Does the facility fail to comply with the Animal Waste Management Plan in any way? 22. Does record keeping need improvement? 23. Does facility require a follow-up visit by same agency? 24. Did Reviewer/Inspector fail to discuss reviewi'mspection with owner or operator in charge? ❑ Yes ❑ Yes��No_ ❑ Yes 0_<O cs ❑ No ❑ Yes No ❑ Yes ❑ Yes ❑ No No ❑ Yes ❑ Yes No 0 � o ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Comments (refer to question #):. Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations: (usa additiciriat pages as necessary) 8 Reviewer/Inspector Name •_ � ' Reviwer/Inspector Signature: Date: 3 -1 7 % cc: Division of Water Oualitv. Water Ouality Section. Facility Assessment Unit 1 1/14/96 di Review [3D WC Animaee Feedlot Operation Re ie Z7Q Animal Feedlot Operation Site Inspection Moutine DComplaint 13 State employee call 13 Follow-up of-DWQ inspection M Follow-up ofDSWC review I Date of Inspection Facility Number Time of Inspection Use 24 hr. time Farm Status•: Total Time (in hours) Spent onRe%ie%- or Inspection (includes travel and processing) Farm Name: Fo county, r Owner Name: op /;/- C Phone No: if to93 0 C OF,-,C e- j Maftg Address: P,�L. 17 Onsite representative: Integrator: Certified Operator Name: Location of Farm. L!LAJ y (0 Latitude Longitude 0 4 C__ f8Not 02erational I Date Last Operated: . ..... - Type of Operation and Design Capacity ou Cattle ;Numbe Number Poultry r7 : ber ,Number Q Wean to Feeder Meeder to Finish U'F=ow to Wean "66 Farrow to Feeder Farrow to Finish La:: Da' 10 Non -La -er I Beef [I Other Type of Livestock Ptttmber of goons Holding'Ponds13 Subsurface Drains Present Lasoon AreaD 95srav Field Area General 1. Are there any buffers that need mainten=ce/improvement? 0 Yes 011N�o 0 2. Is any discharge observed from any part of the operation? 0 Yes pj� a. If discharge is observed, was the conveyance man-made? [3 Yes N b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) 13 Yes No c. If discharge is observed, what is the estimated flow in gaVmin? VNo d- Does discharge bypass a lagoon system? (If yes, notify DWQ) 0 Yes [�3/N5 3. Is there evidence of past discharge from any part of the operation? 0 Yes 4- Was there any adverse impacts to the waters of the State other than from a discharge? C3 yes o S. Does any part of the waste management system (other than lagoons/holding ponds) require 0 yes FNo maintenanr#-Amnmvo­-&') 6. facility not in compliance with any ap le setback criteria? 7 Did the faciliry fail to have a certified operator in responsible charge (if inspection after 1/0? 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lalloons andlor Holdin Ponds 9. Is structural freeboard less than adequate? ❑ Yes , o ❑ Yes \o ❑ Yes @'No ❑ Yes No Freeboard (ft): L4200n i Lagoon 2 Lagoon 3 Lagoon 4 10. Is seepage observed from any of the structures? ❑ Yes No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes No 12. Do any of the structures need maintenancegmprovement? ❑ Yes 21 o (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adquate markers to identify start and stop pumping levels? r.. es ❑ No _Waste Application 14. Is there physical evidence of over application? ❑ Yes 0 No (If in excess of WMP, or runoff entering waters of the State, notify DWQ) r 15. Crop type ._.... _.. r _ 16. Do the active crops differ with those designated in the Animal Waste Management Plan? sV U/ram— ❑ Yes ❑ No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes No 18. Does the cover crop need improvement? ❑ Yes No I9. Is there a lack of available irrigation equipment? ❑ Yes For Certified Facilities Only 20. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 21. Does the facility fail to comply with the Animal Waste Management Plan in any way? ❑ Yes ❑ No 22. Does record keeping need improvement? ❑ Yes ❑ No 23. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No 24. Did Reviewer/Inspector fail to discuss reviewlmspection with owner or operator in charge? ❑ Yes ❑ No Comments (refer to question #E): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use''additinnal'pages as necessary) 8 Reviewer/Inspector Name.�t' Reviwer/Inspector Signature: (��� B���/ Date: 3-.2?-?7 cc. Division of Water Ouality. Water Oualitv Section. Facility Assessment Unit 1 1/14/96 i State of North Carole Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary AT4 E)EEHNFZ DIVISION OF WATER QUALITY April 3, 1997 Dr. Fred Cunningham, DVM Williams Farms of N.C. P.O. Box 416 Moyock, North Carolina 27958 Subject: Compliance Facility # Dunlow Farm Northampton Dear Dr. Cunningham: Evaluation Inspection 66-09 County On March 27, 1997, Mr. Buster Towell from the Raleigh Regional Office conducted 'a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance, with the State's animal waste nondischarge rules. The inspection determined that the' Swine operation was not discharging wastewater into waters of the State and that the waste lagoon had the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State —Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate -submission of a waste management plan. - - This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, . FAX 919-571-4718 Raleigh, North Carolina 27609 N10 C An Equal Opportunity Afiirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper a Dr. Fred Cunningham Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an " Operator in Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towel'l at (919) 571-4700. Sincerely, �- `J Judy Garrett Water Quality Section Supervisor cc: Northampton County Health Department Mr. Tony Short, Northampton Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC --- RRO DWQ Compliance Group RRO Files 1. (]DSWC AnillFeedIot Operation „Review' ` Q Animal Feedlot operation Site Inspection �j Routine 0 Complaint 0 State call 13 Follow-up of DWQ inspection 0 Follow-up of DSWC review Date of Inspection . 77- Facility Number Time of inspection p Use 24 br. time Total Time (in hours) Spe t onReAew• o� Farm Status: ..._..... ..,_.... or Inspection (includes travel and processing) Farm Name:County: Owner Name: �... �.� � ....._.....�._...._.. Phone No: ..,_. Mailing Address; � � � �i �2.. M � o L �. C _.. _.. _ .. _ .. _ ........ _... __ .... _ .. , ...._ .... Onsite representative: ✓r , .,y.L _. �!a.. r. Integrator:. Certified Operator Name: !��y.._ . !:i �. �l.fv' ... ......... ._ W ..._ . _.... »..._.....M ..._...._ ...� .._..... Location of Farm: r1a 9K± Latitude �•�.« Longitude �• �� �� Q Not Operational Date Last Operated: ....._.. _ ...._.. _..... _._.» . _. ...... Type of Operation and Design Capacity Swine '; :Number ;:` Poultry Number ": Cattle .. Number :: ❑Wean to Feeder Laver Dairy ❑ Feeder to Finish I0 Non -Layer Beef Farrow to Wean -01) A - Farrow to Feeder Farrow to Finish ❑ Other Type of Livestock ; Number of -goon f Holding Ponds g Subsurface Drains Present w� G: `p Lagoon Are- 0 Spray Field Area _. General 1. Are there any buffers that need maintenance/improvement? ❑ Yes i 'Na 2. Is any discharge observed from any part of the operation? ❑ Yes a. If discharge is observed, was the conveyance man-made'? ❑ Yes No b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes 0 c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ yes No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes 4. Was there any adverse impacts to the waters of the State other than from a discharge? ❑Yes No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes O maintenancelimprovement? Continued on back 6. facility not in compliance with any applicable setback criteria? ❑ Yes No 7. Did the facility fail to have a certified operator in responsible charge (if inspection after 1/1/97)? ❑ Yes �a 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes No Structures (LLagoons and/or Holding Ponds) 9. Is structural freeboard less than adequate? ❑ Yes ❑ No Freeboard (ft): Lagoon I Lagoon 2 Lagoon 3 lagoon 4 10. Is seepage observed from any of the structures? ❑ Yes L/J No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes No 12. Do any of the structures need maintenancelimprovernent? ❑ Yes �'No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the stru tures lack adquate markers to identify start and stop pumping levelsVvwO+4t-j r,�,�, �- Yes ❑ No Waste Apniication -, 6 12-rf1041s H pkgD-W,. k4-4 F-_1 p a;4S . / 14. Is there physical evidence of over application? [--]Yes QNo (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type - t S 16. Do the active crops differ with those designated in the Animal Waste Management Plan? n o e fA- 0-5' y,2+, ❑ Yes ❑ No (,(..✓dY�ing(f✓�'E-f-E ji+s-�r.cf dF�iC2�fvH56iov^f � 17. Does thefacility have a lack of adequate acreage foyr land application? 3L E rib A-t ❑ Yes ❑ No 18. Does the cover crop need improvement? ❑ Yes N 19. Is there a lack of available irrigation equipment? [:I Yes ;eo- For Certified Facilities Only 20. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 21. Does the facility fail to comply with the Animal Waste Management Plan in any way? ❑ Yes ❑ No 22. Does record keeping need improvement? ❑ Yes ❑ No 23. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No 24. Did Reviewer/Inspector fail to discuss review/'inspection with owner or operator in charge? ❑ Yes ❑ No Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Usk diawings of facilitytp.,better explaiu'situattans: (use additional pages as necessary}. rv�c11• � I.��� /0.43 O"Z- P;At.-T, VVI /Ia4i �(.c,,,brr� ti� �� tom, ,'—f14416V 4"" oc�w�ie.� p • v c <rcrro.— -1 'c , L ,q 16, to a Z S j, a /'w l S e,, P.vr^V 8LAri^j- Reviewer/Inspector None Reviwer/Inspector Signature: I 1+ Date: -Z7-97 ..1.. nc