Loading...
HomeMy WebLinkAbout640076_PERMIT FILE_20171231Div�'ision .of W�ate�r Resodrees ' acili Number �p - © Division ofSul and Water Conservation QtherAgeney Type of Visit: <D Co lance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ® Arrival Time: Departure Time: 17= County: Region: Farm Name: Q r'o"l , S Q-✓ Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator: Certified Operator: Phone: Certification Number: Sack -up Operator: Certification Number: Location of Farm: Latitude: Longitude: n C went es gn€ Curint nes1gn ..0 ent Swine ag€es Capacity Pop. Wet Poultry Capacity Pap. Cattle Capacity p Popp Wean to Finish La er Dai Cow Wean to Feeder ❑Non -La er Dai Calf Feeder to Finish[Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dr ,1?qulti Ca act Po Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -Layer Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other €reaiwn..ew€ase.r€uun.ounr�wwrut++rw..wrer€¢ rnrar€na€€rnere€rrzrs33nn€ux.rurrssu..mn€mu€ur€para€s€.€3ru»nwn.as,€€F€+.uynauat Other ¢€¢€nr€.n¢E€wwrw.muwu Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes . No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes o ❑ NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? Z11- d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes NA ro[]:] ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Faci! Number: - Date of Inspection: — a Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): '50 Structure 2 Structure 3 Structure 4 3a 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Structure 5 ❑ NA ❑ NE gNo ❑ NA ❑ NE Structure 6 ❑ Yes No NA 0 Yes No ❑ NA ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment hreat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes:No No NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): rt 57 , j.3QromA J !a,-- 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Re wired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑WUP ❑Checklists [:]Design ❑ Maps ❑ Lease Agreements ❑Yes 0>o ❑NA ❑NE ❑Yes W o ❑NA ❑NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ILJ ° ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑Yes �t ❑NA ❑NE ❑ Yes ❑ NA ❑ NE ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfer ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued ` [Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? Ifyes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance; 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes VN0o NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [:]No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE l�? �l S r � � � rf. ✓ �iE7 � �-ds C)9 - Reviewer/Inspector Name: T Reviewer/inspector Signature: ��iz�T L&w ei 54iil��r'� Phone: '?I I . V 2100 Date: q r 2-e — 4 $ Page 3 of 3 21412015 w (Type of Visit: © Co lance Inspection U Operation Review U Structure Evaluation U Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Z c Departure Time: 17� iS County: Farm Name: - �� GC22' :!� 4:7jtn' 5� �,&' Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Phone: Title: Phone: Latitude: Integrator: Certification Number: Certification Number: Longitude: Region: Design Current Design Curr Design Current Swine Capacity Fop. Wet P.vultry Capacity Fop. Cattle Capacity Fop. Wean to Finish Layer airy Cow Wean to Feeder Non -La er airy Calf Feeder to Finish airy Heifer Farrow to Wean Design Current D Cow Farrow to Feeder D . P,oultr, Ca ac P,o Non-DaiEz Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults F—TO—ther Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes a ❑ NA gNo ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWQ) ❑ Yes VJ o ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facility Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? es o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? es CC]No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in) 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes o ❑ NA [] NE ❑ Yes �C] ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental at, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑Yes No NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [] Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ heavy Metals (Cu, Zn, etc. ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): r-n g t s;1- 41 '7 —S 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No �] NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes NA PNo ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes N ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other. 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No [DNA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - Date of Ins ection: Z;L— O 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes N NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [—]No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [] No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fait to discuss review/inspection with an on -site representative? [] Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE R mments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. drawings of facility to better explain situations (use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: (;L 7 —� I dd Page 3 of 3 l Phone: 07 Date: - 2/4/2011 `Type of Visit: Q Com nee Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up O Referral Q Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: EI d County: Region: Farm Name: L 1313- �oueu'(2 6) t s-klz Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: '� l eK -4 i; &"%,, Phone: Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Latitude: Wean to Finish NJ JLaycr Wean to Feeder Non -La Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Layers rNon-La Gilts Boars Poults Certification Number: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Dairy Cow Dairy Calf Dairy Heifer DDr _Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes No aNA ❑ NE ❑ Yes-'�No NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes rNo ❑ NA ❑ NE ❑ Yes❑ NA ❑ NE El Yes❑ NA ❑ NE Page 1 of 3 21412011 Continued Facili Number: & K - ZA2 jDate of Inspection: 741211cl Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? Yes NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ! Ce(f Spillway?: Designed Freeboard (in): Observed Freeboard (in): �{ 5. Are there any immediate threats to the integrity of any of the structures observed? Yes ❑ No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [] No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or cnviro ental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) TTT 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Ai mlication 10. Are there any required buffers, setbacks, or compliance alternatives that need [] Yes E2 No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE Excessive Ponding ❑ Hydraulic Overload [] Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 6 e A, 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ZN ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ YesVN [3NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? [::]Yes ❑ NA �No/ ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents 19. Did the facility fait to have the Certificate of Coverage & Permit readily available? ❑ Yes_ ❑ NA ❑ NE ❑ 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists [:]Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall []Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 7* ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes YNo ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - G Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? Oyes No 1VA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA 0 NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Goinments (referto..question #): Explain:`any YES answers and/or any additional recommendations, or. any other comments. Use drawings of facility io better exnlain`situations fuse additional naues as necessarvl. 13 r74/! t 1n) CVk K ro tj i n� Reviewer/Inspector Name: Reviewer/Inspector Signature: 3 L S Q 2" izu Page 3 of 3 f9 A 'c Phone: -2 1- V lao Date: 21412011 — 2 (—r Type of Visit: 0 ZCO"11-e Inspection U Operation Review p Structure Evaluation Q Technical AssistanceReason for Visit:tine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: ® County: Region: Farm Name: /�� Qt� s�'l Cji✓ Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Phone: Latitude: Integrator: Certification Number: Certification Number: Longitude: Wean to Finish 01 ILayer I Dairy Cow Wean to Feeder El jNon-Layer I -;Designil Dr P,ouItn Ca a La ers Dairy Calf Feeder to Finish Farrow to Wean Farrow to Feeder Dairy Heifer D Cow Non -Dairy Farrow to Finish Beef Stocker Gilts Non - Layers 7Boars Beef Feeder Pullets Beef Brood Cow O:t. rkey Pouets Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes g No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWQ) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesrNo NA [] NE 3. Were there'any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facility Number: i ! - 14 1 1 Date of Inspection: qf ( Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ YesgN No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yeso ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 60 << Observed Freeboard (in): arc Y 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta rest, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes CZ <No❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 6Z ►'r-a 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ff�❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes VN��M NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA [:3NE 18. Is there a lack of properly operating waste application equipment? ["� Yes N ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes VNo NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑Yes I ❑ NA ❑ NE ❑ Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Sl dge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ o ❑ NA ❑ NE Page 2 of 3 21412011 Continued acili umber: 6 C - Date of Inspection: 17 1 I d Z 0 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes VNo NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [—]No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or. any other; comments. ; Use drawin skof facility to better explain situations, useadditional pages as:necessa �, (N 0 l f s' yes �`-- Reviewer/Inspector Name: Reviewer/Inspector Signature: 1Lt S 70 Cj-� Page 3 of 3 Phone: �n? - V Z D 0 Date: ! f ( DF l 13 _ 21412011 Type of Visit Com ante Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit gRoutine 0 Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: D stir Arrival Time: Departure Time: County: Region: Farm Name: 4 J ? 0-DA Owner Email: Owner Name: Phone: Mailing Address: _ Physical Address: Facility Contact: Onsite Representative: Phone No: Integrator: �5 Certified Operator: L V r1 S l3 tn>n Je c I� Operator Certification Number: Back-up Operator: Location of Farm: Swine Wean to Finish W o Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Title: Back-up Certification Number: Latitude: ❑ o = d Longitude: ❑ ° 0 , 0 n Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ aver � 1i ❑ Non-Layet Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer E]Dry Cow ❑ Non -Dairy_ ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl I Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZNo❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes dN ❑ NA ❑ NE Z. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes No ❑ NA ❑ NE other than from a discharge? 12128104 Continued Facility Number: — Date of Inspection 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 'CENo ❑ NA El NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA [I NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): r 9 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr t, notify DWQ 7. Do any of the structures need maintenance or improvement? []Yes N ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑yes No 0 NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Yes No ❑ NA ❑ NE maintenance or improvement`? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo "NA El NE maintenance/improvement? It. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 1 O lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) e ✓ M w d 1Z y (� ✓� S 5 � r .f .. _ 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? []Yes ZN ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination;❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? NA ❑ NE ❑NA El NE ❑ NA ❑ NE o ,❑ NA ❑ NE ❑ Yes ❑,P�o ❑ NA ❑ NE ReviewerlInspector Namep Phone: Reviewer/Inspector Signature: 1- ;e Date: o 2-(, of 12128104 Continued ` i - s Facility Number: 7 Date of Inspection lt7r'2L Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA El NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropiiate box. ❑ WUP ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ElYes 9<0 ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? El�No No NA El NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? El Yes NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32, Did ReviewerlInspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes N ❑ NA ❑ NE ❑ Yes N ❑ NA El El Yes;No N ❑ NA ❑ NE ❑ Yes 'NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE AddrhOi al,Com'mentvan dlor 1,raw in S 12128104 Facility Number Date of Visit: Z g D Time: ©O a Q Not Operational Q Below Threshold Doi ermitted 0 Certified 13 Conditionally Certified 13 Registered Date Last Operated or Above Threshold: ............ FarmName: .....9 .......i.�.�.ee...................................•- County :.............................................................. ........ OwnerName: ......... 13K!... ....6a D'7..s;;,....................................................................... Phone No:........................................................................ Mailing Address: Facility Contact: Title: Onsite Representative: /................................................................•-• Certified Operator:...... 1.(�.:5....... !........ � �%L............................ ...................... .... Location of Farm: Phone No: Integrator:... .1.3 G.Y. j .............................. Operator Certification Number:.... ...................................... ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 4 " Longitude • 9 44 Discbarses & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. if discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 ❑ Yes ❑No ❑ Yes o ❑ Yes No ❑ Yes VN ❑ Yes ❑ Yes o ❑ Yes No Structure 6 Identifier: ......................................................................................................... Freeboard (inches): 12112103 Continued =Facilit_; Number: Date of Inspection 2 b Reguired Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 25. Did the facility fail to have a actively certified operator in charge? 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 28. Does facility require a follow-up visit by same agency? 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) 3I. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 32. Did the facility fail to install and maintain a rain gauge? 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes /No ❑ Yes ❑ No ❑ Yes ❑ No [--]Yes ❑ No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After 1" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 121.12103 Facility ZIumber: — Date of Inspection /Z 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (if any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenancelimprovement? 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Analication 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc i 12. Crop type 13. Do the receiving crops differ with tliose designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. ❑ Yes ❑'NO ❑ Yes o ❑ Yes Ro El Yes ❑ Yes ❑ Yes D No ❑ Yes []'No ❑ Yes ONo ❑ Yes 0 ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes 0 ,! ❑ Yes ❑ Yes ❑ Yes No No �3' '••,• E,.. b;i� Eea ee.. ,....• E{ss'.'..� �? t. d$�$s�:€i?,:.'`v..,6 F.?.e"° .�j°}�. ..�... v�,e 84 � ,S>�txa,:>,Pf � esi$&r•. € i€reverte �. 3 yY�Rj�.i' ,ems �$ `_Ii� B .•A�.�2j. (�L l}�� �eyw �y y�% �B•� y py�y�y.�yy� /��p t��OInille�t"S(Pe�el;tQ {�estian) }l! lain an TMWA<i!i .F'rMiM1Rl{11�1(lANVrIN! 1IMRMLi4Y1{fYN�'°e`FtP:.Eg°E:1Y£9 E�{'€'4 "ry _ €; §ds:,.= i§ii�Y'€6SY <aP° ✓E 3 'da .3 "[•'Y3" d<'B u:Y i . E .88y.. •,'.ax1y:".±afK;xa.38i,s ,.,:..:.".j.;isit.:ievisi&f"t:rs$€>ii€�Ids`si3dafa �f8 .-' d3P� a e $ €?� ��:h±` "it..rs:�'z,�?ri 4 ' � a,a�t� �.€B.. c;,' .i....... �..ia��.i? �¢� :..� "s:tt� 3.=,.t 9.ds:.9 §B . � ,f £§;4.;„.,>>5>�d stx �4�P,°a.Esf � 3 � E € ,6 es�st,., Lidtt ,af #o�brtt r, laan;situatip addittoti es as sec .€," x , € gs.b E aan§ ' ; ;pa fE,<. , .::,E;m :. .p g:: B' �47' F€c€ ❑ Field Copy ❑ Final Notes .Eae•<<; *°s E= ia° ..h:g= < a;,r._: '.e t ` e :..B�.,r.4€<, . : F r, n,ad€R .?sib �Ik�, 4, 3k�..€1 a€ r � 6 3 i: f P E Reviewer/inspector Name �ti ti i7� E �,€� t� � ? d:` ' �3i7- a3i ii ..n!� -v E �.. (3 �€ � i i -- �7 aPg�3: , f 3j 3'$€ cP 3 vd� 7 f #?:' 3 d �� :-:.. s. r. ,.._ Reviewer/Inspector Signature: Date: r7L. 12112103 Continued Type of Visit O Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit O Routine O Complaint Q Follow up O Emergency Notification O Other ❑ Denied Access rlity Number L Date of Visit: 17 Time: a (] Not Operational 0 Below Threshold Permitted [3 Certified 0 Conditionally Certified [3 Registered Date Last Operated or Above Threshold: Farm Name: �- f 2 County: Owner Name: Phone No: Mailing Address: Facility Contact: Title: Phone No: Onsite Representative:/ Integrator: Certified Operator: " p k �S _�47L Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0' 4 " Longitude Da 1 « Design Current Design Current Design Current Swine PoplationPCa aci uoultry.;� ab'accapacityo�unP ❑ W n to Feeder JE1 Layer I Dairy ceder to Finish Q i ' ❑Non Layer 10 Non -Dairy ❑ Farrow to Wean � El Farrow to Feeder ❑ Other' ❑ Farrow to Finish jotat DestgnCapaclty ❑ > �" Gilts.. ❑ Boars Total SSLW ' Number=o"fsLagoons '': ❑ Subsurface Drains Present_JIEI Lagoon Area 10 Spray Field Area ........ Holding Ponds /Solid Traps 0 ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d, Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): 05103101 ❑ Yes No ❑ Yes No ❑ Yes Ld'Na ❑ Yes ❑ Yes Noo ❑ Yes IdNo ElYes o Structure 6 Continued s . :'4 Facility Number: � y — 7 Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, ❑ Yes No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes o (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes 1�TNo S. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes L 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes o Waste Appl}cgtion 10. Are there any buffers that need maintenance/improvement? ❑Yes ffNo 11. Is there evidence of over appltion? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes o 12. Crop type e r— H 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Hgagired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes 9rNo 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? El Yes 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (iel discharge, freeboard problems, over application) ❑ Yes 23, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 24, Does facility require a follow-up visit by same agency? ❑ YesZI 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. ..::.tv.•.';yl. p�'j:-,.-..'.,. -'-:'. ,. ;u: ,.sue. ::_,..'a#.kw«M .;., ._., ..,. .. --...� . �, . Fr:.',.-x4r.an Fh'3' :a::r`:"c.'. Reviewer/Inspector Name ! Reviewer/Inspector Signature: ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes 9 N No ❑ No ❑ No ❑ No 0 ❑ Yes ONo c.uuunwuaa,w,a� uca.caa+uy) ,;�:- I --I Field Copy IJ Final Notes Date: 05103101 Continued Type of Visit A Compliant spection O Operation Review Q Lagoon Evaluation Reason for Visit O pofine O Complaint. O Follow up O Emergency Notification Q Other ❑ Denied Access U7DFac' ' Number Date of Visit: Time: Q Not Operational Q Below Threshold �7PeZtted [3 Certified 0 Conditionally Certified 13 Registered Date Last Operated or Above Threshold: ......................... FarmName: ... lr.t... 9 ........Q) ..on..e......... (..^...f. .tk!, ................... County:..................................................................................... OwnerName: ........................................................................................................................... Phone No:...................................................................................:. FacilityContact:.............................................................................. Title:................................................................ Phone No:................................................... Mailing Address: OnsiteRepresentative: ........................................................................................................... Integrator:.......... /r"I.......................................................... Certified Operator:.......................................................................................... Operator Certification Number:.......................................... Location of Farm: ❑ Swine ❑ Poultry [] Cattle ❑ Horse Latitude • 6 66 Longitude �• �4 it Swine . . ❑ Wean to Feeder eder to Finish Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts n Boars Design Current Design . ` Current: • Design.' Cum Capacity Population poultry =Capacity .:Population Cattle Capacity :" Populi Number of Lagaans ; ❑ Subsurface Drains Present ❑ Lagoon Area p S rey F eld Area Holding PondB / Solid:Traps [] No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed. did it reach Water of the State? (if yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? Strylcturel I Structure 2 Structure 3 Identifier: ................................................. . 0.. ±................... ........., Freeboard (inches): 5/00 ❑ Spillway Structure 4 Structure 5 ❑ Yes .-r:twO ❑ Yes ❑ Yes � ❑ Yes ZNoo ❑ Yes ;;-,0 ❑ Yes 5{ ❑ Y �No Structure 6 Continued on Lack Facility Number: — Date of Inspection 012 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste AnQication 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes o ❑ Yes No ❑ Yes o ❑ Yes o ❑ Yes aw ❑ Yes o ❑ Yes o 12. Crop type fr, i •� 13. Do the receiving crops differ w4h those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes JQ1 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes j2Vo 16. Is there a lack of adequate waste application equipment? ❑ Yes ;�O� Reuuired Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? �eso No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑Yes o 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) es ❑ No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes o 21. Did the facility fail to have a actively certified operator in charge? es ❑ No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes o 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 1do 24. Does facility require a follow-up visit by same agency? ❑ Yes No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? El Yes � . i01Aiilrris:at' 40r1cleneiel wire Rio ed.O(Wiftthis:Als1t,-X00 wjli•>�eeeite ijo futi6er c6riesb6fideii& about this 'visit. ................................... . lzJ 17 4 C r�l � Y� � /L Gass P1 D q C - L tv r✓0 G � C-e Qir �� r r-a' 7 fll� 5' � e- w 0 Z4 I't r=J f2e AL Reviewer/Inspector Name i �s.. i = 8.. a - - • .7 3 g.� . �.�„ ,�. �� t,, . ,fir ( z.> .€,�s .,� st 4,a sd,�,,,¢,�.� Reviewer/Inspector Signature: Date: 2LZ29 5/00 4 � Facility Number: — Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e'. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes o ❑ Yes No ❑ Yes o Cl Yes �No ❑ Yes a/ ❑ YesO ❑ Yes No 5/00 Q. Routine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow-up of DSWC review 0 Other �Yi�l.q �..IILI�L1.111.1�� Facility Number 9E2:Ez�� Date of Inspection Time of Inspection 24 hr. (hh:mm) © Permitted [3 Certified [3 Conditionally Certified © Registered 113 Not O erational Date Last Operated: Farm Name: .....................J' e 1�q-R County:.. ........................:r.............................. ►�- Wks ..................................... OwnerName: ................................................... ........................................................................ Phone No:....................................................................................... Facility Contact: . L. ©..' ........... .......................... Title: Phone No: .................................................................................................................... Mailing Address: OnsiteRepresentative:........................................................................................................... Integrator: ........ ,(!Y�............................................................. Certified Operator:..L P.AI. 5.............;,, 0-0— Operator Certification Number: ............................................................................................................... Location of Farm: r..........................................................................................................................................................................................................................................................................E Latitude' �` �" Longitude Design F Current" ' Design Current;: !: ,°Design F3Current ' ne Ca aci Po `tilation Poultry Ca aci Po` ulation ,Cattle :.Ca 'ace ^Po tilabon .. _. . ❑ 'to Feeder ❑ Layer ; ❑ Dairy eeder to Finish ❑Non -Layer'° ❑Non -Dairy ❑ Farrow to Wean . , �,... :. s s F a ,, ❑Farrow to Feeder ❑ Other '` `41„i :...3 Farrow+ to Finish Total Design Capacity€.; ❑ Ci11Cs .. ' ' : � ° 4�' � e - 'A4. l' '.' F I � ! '� ❑ Boars f' r �F otal'SSLW;'= Discharges & Stream Impac 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (II' yes, notify DWQ) c. If discharge is ohserved, what is the estimated flow in gal/min'? d. Dues discharge bypass a lagoon system? (II'yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): ......2r Zl....................................................................................................... ....�..................................... ................................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, El Yes No 3/23/99 R D-1-bl I � oI fuiD l o � seepage, etc.) Continued on back Facilify Number: b y — Date of Inspection Printed on: 7/21/2000 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes e 2 "" seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or �,� closure plan? El Yes Imo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidences of over application? -- ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type Yer �'" n /149 `/ . fm -1 -,4 i S 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14, a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available'? 18, Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available'? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement'? (ie/ irrigation, Freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge'? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative'? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes e1Vo ❑ Yes , No ❑ Yes No ;/1 ❑ Yes No ❑ Yes ❑ No ❑ Yes 'E Io ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ Yes E�o ®'No ❑ Yes No ❑ Yes a es ❑ No ❑ Yes o ❑ Yes 0 ❑ Yes �l ❑ Yes ;�N9� ElYes Yes N 0: R4yiolatidiis'or- deficiencies were noted. during this:visit: • Y;oit will •receive irio; further: : corres• oridence: about: this visit.. :: Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. ., Use drawings of facility to better explain situations. (use additional pages as necessary): )V 0 /y t=,,c,1rvi-J ,eram►-Js . r19G. /,47 /0er,.­ d'W CVC "'7,'r (In Reviewer/Inspector Name _ Jj 6 r � / `� I Reviewer/Inspector Signature: Date: 5100 Z. Facility Number-& Date of Inspection Odor issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes o ❑ Yes ❑ Yes No ❑ Yes No ❑ Yes o/ ❑ Yes o/ ❑ Yes o • ''` 4 " ¢ Division of S it and Water Conservation Qperation Review �/J} 1"E '� Di O sQllFand water C011Sei"Vat30n� Compliance rvision o€ Water Quality Compliance Inspection Other Agency Operation Review gg ._.».:.�_ Q'Routine 0 Complaint 0 Follow-up of DWQ inspection Q Follow-up of DSWC review Q Other Facility Number u: �4t w��,," Date of.[nspection Time of Inspectiou p 24 hr. (hh:mm) © Permitte Certified 0 Conditionally Certified [3 Registered ti Not O eraonal Date Last Operated: 4 Farm Name: .J...... doo ... ..... County:........................................................... OwnerName: ..... �..�!^^...R�....................................................................................... Phone No:....................................................................................... Facility Contact: L( f..sJ3..o.;v—e . ...Title: Phone No .............................................. MailingAddress: 1 S U ..{..0 &--p .................................................................................. .......................... Onsite Representative:. ..K...f....... .. Integrator:........../...................................................................... .....................................................................J Certified Operator:...........''h--'........:............................................................... Operator Certification Number:.,........................................ Location of Farm: A ............. ..................................................................................................... ................... Latitude ' & •4 Longitude • ' 44 Number of Lagoons. Subsurface Drains Present ❑lagoon Area ❑Spray Field Area Holding'Ponds Solid Traps _'' "'' ❑ No Liquid Waste Management System r_ .. Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: []Lagoon ❑ Spray Field []Other a. If discharge is observed, was the conveyance man-made? b. If discharge is ohserved, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed. what is the estimated flow in gal/min'? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes No ❑ Yes Zo ❑ Yes ❑ Yes N ElYes Np� ❑ Yes No ❑ Yes No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard (inches): �, .............. ............. I........................... ............................../No ............. ............ ....... .`f.................................................................................. 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Ye5 seepage, etc.) 3/23/99 Continued on back Farili'ty Nimiber: — Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenatce/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Write_ Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type �ll0'1fY 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? Oe/ discharge, freeboard problems, over, application) .23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes es ❑ Yes ❑ No ❑ Yes {�No ❑ Yes o ❑ Yes o ❑ Yes ❑ YesVNo� ❑ Ye Yes FNo o ElYeso ❑ Yes ❑ Yes 044o ❑ Yes No ❑ Yes ❑ Yes ❑ Yes �NoZ ❑ Yes ❑ Yes ❑ Yes rNo ❑ Yes 0' Rio violalr>fgns:or dclficiencies wire noted• d(wi ig Ns'visit' • Y:oo wiil•teeotye Tito: furthoe ' comes 6iidence. a"aut. this visit .. t � � i. , E I - k I A E "! c i r6 n st a ' I , t. f! ! Comments(refer to quests©n #) ,iExpla>n any YE$ answers andlortany,recommendations oe any other comments s Use drawings of fat ility,to better,explam,situatton`s (use addi4onal pages as necessary) t "i' .f !�, ,�:,:�_-,N,.'-.l3,:..,&s.,!8..--:d,�, a...:_<f�P"IT,rrt;,t.,:?.:t.c..•i�.<F+.:f_��lneTaY;91�.1.�,..�...e �, - 6_. .�.,. C; r C7Gt n �� 'damram- �J R G16 S) Ail A- G V L.s_ . Reviewer/Ins ector Name (f �-.-- z ,I �, y ..asp nq p t � :.'I' Reviewer/Inspector Signature: Date: �7 � ' r . FacilityNumber — Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes o 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes N 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes o 3/23/99 ® Registered © Certified © Applied for Permit 0 Permitted t Operational ' Date Last Operated: Farm Name: L.. Ci. d3oowc F.:+ "'A.4 — O erdt, b.t Countv:....�0`l.4` ................. ...... !....................................................................................... OwnerName: .....&P.wt.s........ c...................................................................... Phone No:...Z3...-..y`�3...3.3..y?f................................... FacilityContact: .....�a :.. ......... ............................. Title: ............................................ I ......... .......... Phone No: ......°.^'�e........,.............I........ Mailing Address: ........... ZjV.A..... V*4" <cep..R�.........A/•r`..C.'..".../C'?.7.eZZ................... ....::...`.\ ......................... �l`'�` Onsite Representative:,..Ati 5-- �.`"' �.......... ............ Integrator :......................... ....... t ....... ...................... Certified Operator-_ .....................`."'`-................................................................---------- Operator Certificatio Number:/......._ �......:................ Location of Farm: !� \ .. I f� a, .-- ....-- ........... Latitude Longitude �• �' ��" \� ' Desrgn Current a Design Curren # :Design Current Svvlrte Capacity: Population PoultryV Capacity Population Cattle, ?. Capacity Population ❑ Wean to Feeder ® Feeder to Finish 2.160 D ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars . ❑ Layer ❑ Dair) ❑ Non -Layer ❑ Non- ❑ Other." Total Dtsign Capai .Total SSI Number of`Lagooris / Holdtng Ponds ❑ Subsurface Drains Present 110 Lagoon Area ❑ Spray Field Area'. m y" --_; �' 0 No Liquid Waste Manaeement Svste,�_�. f. Genera 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. if discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3.. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 7Y1 V07 ❑ Yes 0 No ❑ Yes 151 No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ® No ❑ Yes [Z No ❑ Yes ® No ❑ Yes Q No ❑ Yes ygNo Facility Number:,/ y 8. Are there lagoons or storage ponds on site which need to be properly closed? Z Yes ❑ No Structures (Lagoons.Holdine fonds. Flush Pits. -etc,) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes JNNo Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: .s' ' .....^:.... ..... ....... .........� '... ...........................................................I...................... ......... ......... ......................... 2 6 Freeboard (ft2, S ):.................................................................................... ......................... ..... ................. ........... ...... ................................. 10. Is seepage observed from any of the structures? ❑ Yes ® No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 10 No 12. Do any of the structures need maintenance improvement? ❑ Yes JO No (If any of questions 9-12 was answered yes, and the situation poses . an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes ® No Waste Application 14. Is there physical evidence of over application? ❑ Yes [SI No (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. ........... Crop type A �d 5,...0-..( Gr... %. � .................................... ....................................................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes [![No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes Jallo 18. Does the receiving crop need improvement? ❑ Yes ($ No 19. Is there a lack of available waste application equipment? ❑ Yes No 20. Does facility require a follow-up visit by same agency? ❑ Yes ® No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ® No 22. Does record keeping need improvement? ❑ Yes P No For Certified or Permitted Faciliiies Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit? 0 No.violitions-or deficiencies.were-itoted-durritig this:visit.-.You.wiin recei've,no firiher :. correspondence d4oid this: visit: 441 sa;--9 fo 6AL c-.f;-( ­dS. &Ja.,..•fs 4a e-l•sf-- dov•%. ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 7/25/97 Reviewer/Inspector Name Reviewer/Inspector Signature; Z �,"e� L,r7 Date: yFl /-:5Vi1____ Facility Number to ? Date of Inspection Time of Inspection /Q : /.S 124 hr. (hh:mm) ® Registered 13 Certified 13 Applied for Permit © Permitted JE3 Not Operational Date Last Operated: FarmName:..L�. :..0oo—r-.....f�:-,.sk.:. )....O�v...af....................................... County:.... `.............................................................. Owner Name: ( wi s a . Qaa.. c Phone No; ...:�:............ y..3 - 3....y.c.................................... FacilityContact: .....�a4+.i.. ....... .Qa^ 5,............................. Title: ..................................................... I., ........ Phone No: , ......................... Mailing Address: ........... 2b'.. 2.....v.l�.. Ittee ?-e A44- C,'f �t/C Z..i'.�2Z.................................................................. ..................................................................... 1.5 Onsite Representative:.... 40.. � u "` ............... .... .... Integrator:.---............ Certified Operatom..................9. °`.::"-......................................--•---.----......................... Operator Certification Number,..............:.......................... Location of Farm: III IN I C mimii ME Latitude ='=` =" Longitude =• 0' =11 ;y Destgn ; Design, :;:Current:, Destgn' ;Current Swine .: :current ,.,µ Capactty. PopuWao. n Poultry "Capacity. Population, ~Capacity 'Population a. ;. -;; ❑Wean to Feeder ❑ Layer F _Cattle Dairy ® Feeder to Finish 2/6o O •`' ❑ Non -Layer ❑ Non -Dairy ❑ Farrow to Wean r. ❑ Farrow to Feeder ❑Other ❑ Farrow to Finish �` Total Design Capacity ❑ Gil ts z: ❑Boars Tota1 SSLW y �Nuniber o[ Lagoons 1 Holdtteg Ponds a ❑ Subsurface Drains Present ❑ Lagoon Area I0 Spray Field Area mot{` ❑ No Liquid Waste Management System General ' ,1 ` r Id 1 - I. Are there any buffers that need maintenance/improvement? ❑ Yes ® No 2. Is any discharge observed from any part of the operation? jklukl 1 6 !_ ._ ❑ Yes P No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ` ❑ Yes ❑ No b. If discharge is observed, did it reach Surface Water? (If yes. notify DWQ) _ ❑ Yes ❑ No c. If discharge is observed, what is the estimated flow in gaUmin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes ® No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes No 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes ® No maintenance/improvement? 6. is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes Q No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes qNo 7/25/97 Facility Number: g-y — 7 6..... 8. Are there lagoons or storage ponds on site which need to be properly closer!? 0 Yes ❑ No 'tructum (Laeoons.Holding Ponds, Flusb E115, V1cJ 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes 2rNo Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identitier: .3.":� .. ....... . '............................................................................................ .............................................. ............... Freeboard(ft):.......... 2:...6.......... ..............z' S.. ............................ ............. ..... ...... ..... ....... . .... . ...... . ....... . ....... ....................... 10. Is seepage observed from any of the structures? ❑ Yes ® No 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum Iiquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering /waters of the State, notify DWQ) 15. Crap type ..................................................................................................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? r Ecaniftd FaeflitiesOnly 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit? No.vioiations.or deficiencies. were.noted dtiring this:visit.,.You:wN receive,noftir -tlier :: ::•correspondeinceabou�this:visit:-:•.�.�.-:.•:-.:.�:-:::-:�:. . .:�.::.•. ......... 1216`f 50;*-5 tG 6AL tO-1414 'C91 lwJCL'fl -10 c/Sfc dCt"-%' ❑ Yes ja No ❑ Yes J@ No ❑ Yes ® No ❑ Yes [�j No ❑ Yes L9 No ❑ Yes IRNo ❑ Yes [3 No ❑ Yes 0 No ❑ Yes ® No ❑ Yes ® No ❑ Yes P No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 7125/97 Reviewer/Inspector Name Reviewer/Inspector Signature: Date: 1Fl 1-5r/ l2 w4gf—on of Soil and Water Conservation 0 Other Agency vision of Water Quality 10 Routine O Complaint O Follow-uD of DWO inspection O Follow-up of DSWC review O Other l F ility Number Date of Inspection tL Time of Inspection 24 hr. (hh:mm) Registered [3 Certified [3 Applied for Permit © Permitted 113 Not Operational Date Last Operated: Farm Name: 4?.t x....:.........`.... 4y.f....l ��.� ............................................................. Q ..... County: Owner Name:...t?.w..r........:.....'?r ,. Phone No: 119 7j..33........................ ............................................................................................................... Facility Contact: ......................................... Title: ... Phone No: Mailing Address: 11.13 .. l �u p�= r..4/ C_.............:Z?'g ........ ,.......... .......................... Onsite Rep resentative:..f .17.? ........... 7..0�i� L..<.................................................. Integrator:....,..' . .............................................................. Certified Operator; ................. ►� Operator Certification Number;.................... ..... .......'�.............................................................. Location of Farm: S l /yam F... ......... ................. ........ .. Latitude LJ•� 1 " Longitude ° 0« General 1. Are there any buffers that need maintenance/improvement? ❑ Yes No 2. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at; ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gaUmin? d, Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintcnance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 7/25/97 ❑ Yes No ❑ Yes ❑ Yes No ❑ Yes No ❑ Yes N ❑ Yes No ElYes o ❑ Yes ❑ No ttailtf Number: �(— S. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes rvo Structures a oon. H din Pons lush Plts etc. 9, Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes j�'No g tY Structure 1. Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: it ...I. 1....................... ........1. ?� yy............................................................................ Freeboard (ft): ......... �L.a. 1........ ........ ..:.0 10. Is seepage observed from any of the structures? ❑ Yes 1 No I L Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes No 12. Do any of the structures need maintenance/improvement? ❑Yes o (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures tack adequate minimum or maximum liquid level markers? Waste Apptication ❑ Yes '2 o 14. Is there physical evidence of over application? ❑ Yes o (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type ? .t.. ^^" : .9.....(... .. .1 ..'..^.... .......... ......................... 16. Do the receiving crops differ with those designated in the Animal Waste Managemen Plan (AWMP)? V ❑ Yes ❑ No I o 7 Q-4 c�►-f� t .Q �/ 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes I�J<0 18. Does the receiving crop need improvement? ❑ Yes 19. Is there a lack of available waste application equipment? ❑ Yes 0 20. Does facility require a follow-up visit by same agency? ❑ Yes No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes o 22. Does record keeping need improvement? ❑ Yes Id'N0 For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 25. W,,,orrany additional problems noted which cause noncompliance of the Permit? El Yes ❑ No -No.violations-or. deficiencies.were noted -during this:visit.:You,W'ill eeceiive,ito•ftrih:er: ::correspundehce;atioulthis:visit:•::.::.•::::•:.:-:-.-:-. ...... ...•:: W Gyf Kt-• v-,t c 4-fit,i j I_r Cv"_pla �S�r.Uf l.,.r /l f���. pFp- d)-,U__ 7/25/97 Reviewer/Inspector Name Reviewer/Inspector Signature: /�i�- Zt.-G�j Date: 7 Revised January 12, 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION Facility Number -7 � Farm Name: e ►+ r:t On -Site Representative: IIIir,5 15ah _ _1 ' Inspector/Reviewer's Name: %V r,r Date of site visit: 174 1 1 I J Date of most recent WUP: Z �� Operation is'flagged for a wettable acre determination due to failure of Part 11 eligibility item(s) F1 F2 F F4 Operation not required to secure WA determination at this time based on exemption E1 E2 E3 E4 Annual farm PAN deficit: — -� ' pounds Irrigation System(s) -circle #: 1. hard -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system wlpermanent pipe; 5. stationary sprinkler system w/portable pipe; 6. stationary gun system wlpermanent pipe; 7. stationary gun system w/portable pipe PART I. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete , and signed by an I or PE. E2 Adequate D, and D2/D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 ' Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part Ill. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eiicibi€ity checklist, Part 11 - F1 F2 F3, before completing computational table in Part lil). PART II. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (PAN) on spray _Z�field(s) according to farm's last two years of irrigation records. F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure to deduct required buffer/setback acreage, or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers or less than Z.F<acres for stationary sprinklers). 4WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part III. 1 Revised January 22, 1999 Jty Number- �b .art III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT FIELD TYPE OF TOTAL CAWMP FIELD COMMENTS3 NUMBER NUMBER'.2 IRRIGATION ACRES ACRES % SYSTEM S! s7 1 rA E3.7 d 7 J3 6-7 7y r, z FIELD NUMBER' - hydrant, pull, zone, or point numbers may be used in place of field nurnbers depending on CAWIv1P and type of irrigation system. If pulls., etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by fieid determination for exemption if possible; otherwise operation will be subiect to WA determination. FIELD NUMBER - must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1' 97 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. Facility Number Farm Status: Date of Inspection I (-/-/ - Time of Inspection. V!12�1 Use 24 hr. time Total Tim.e..(in. hours) Spent onReview or Inspection (includes travel and processing) Firm Name: I EJW County: Owner Name: Phone No: V0 12 o> MaHing Address: 7Z Onsite representative: _L3 4,, Integrator: Certified Operator Name: Location of Farm: Latitude Longitude 113 Not Operational Date Last Operated: rype of Operation and Design Capacity Wine �F: "Number Poultry Number Number ,,.Cattle W o Feeder JC3 Layer L Non -La er _jBeef 0 I El 0 ther Type of Livestock F ceder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Number oMagqons . ilqding'.Ponds' 113 Subsurface Drains Present 113 Lagoon Area 113 Spray Field Area 1. Are there any buffers that need maintenance/improvement? 0 Yes 0. 2. Is any discharge observed from any part of the operation? 0 Yes 0 lNo a. If discharge is observed, was the conveyance man-made? 13 yes �A10 b. If discharge is observed, did it reach Surface Water? Of yes, notify DWQ) 0 Yes 0 No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? of yes, notify DWQ) E3 Yes 21 or 3. Is there evidence of past discharge from any part of the operation? 0 Yes 01NO/' 4. Was there any adverse impacts to the waters of the State other than from a discharge? 0 Yes u 0 5. Does any part of the waste management system (other than lagoons/holding ponds) require EC31 Yes No maintenance/improvement? Continued on back 1 w 6. llt facility not in compliance with any applicable setback criteria? ❑ Yes l 7. Did the facility fail to have a certified operator in responsible charge (if inspection after i/l/97)? ❑ Yes - �'_O 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes No Structures (Lagoons and/or Holdin " Pands 9. Is structural freeboard less than adequate? Yes ❑ No Freeboard (it): Lagoon I Lagoon 2 Lagoon 3 Lagoon 4 I0. Is seepage observed from any of the structures? ❑ Yes 2<0 11. Is erosion, or any other threats to the integrity of any of the structures observed? l 0 Pr (W01-- ❑❑ No 12. Do any of the structures need maintenance/improvement? ❑ Yes Er, o (If any of questions 9-12 was answered yes, and the situation poses an Immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adquate markers to identify start and stop pumping levels? es ❑ No Waste Application 14. Is there physical evidence of over application? ❑ Yes 01a 0 " (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type LL m_ 16. Do the active crops differ with those designated in the Animal Waste Management Plan? PVJO e'er- V (? / ❑ Yes ❑ No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes ❑ No 18. Does the cover crop need improvement? ❑ Yes No 19. Is there a lack of available irrigation equipment? ❑ Yes No For Certified Facilities Only 20. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 21. Does the facility fail to comply with the Animal Waste Management Plan in any way? ❑ Yes ❑ No 22. Does record keeping need improvement? ❑ Yes ❑ No 23. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No 24. Did Reviewer/Inspector fail to discuss reviewCmspection with owner or operator in charge? ❑ Yes ❑ No Comments (refer to question #):. Explain any YES answers and/or any recommendations or any other comments. Use offacili to.better ex lain' situations" use'additionaI es as necessary)- 6 Reviewer/Inspector Name ft+" T Reviwer/Inspector Signature: `' Date: rr• Tli..iri..n .,/' Wn�nr /l..nlih+ Wnrsr /7..nJih+ S�rrinn Fnr;l;ry .4.csessmenf Unit _ I 1 /14/96 I (Type of Visit: fO Com a Inspection U Operation Review U Structure Evaluation U Technical Assistance Reason for Visit; Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: ® Departure Time: I 10-1h __ County: Region: Farm Name: I Owner Email: Owner Name: r Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Integrator: Certification Number: Certification Number: Longitude: Design Current Swine Capacity Pop. Wean to Finish Wet Poultry Layer Design Current Design Current Capacity Pop. Cattle Capacity Pop. DairyCow DairyCalf Dairy Heifer Wean to Feeder Feeder to Finish Non -La er Farrow to Wean Farrow to Feeder Farrow to Finish Gilts D , l;oul Layers Design Current Dry Cow aci P,o Non -Dairy Beef Stocker Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other Other =MLIOther Turkeys Turkey Poults Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes <No NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes o ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes UgNo ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? / d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yest/No [] NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yeso ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued February 13, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr, And Ms. Louis B. Boone 2813 Volunteer Road Elm City, North Carolina 27822 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Subject: Notice of Intent To Enforce L.B. Boone Finishing Operation COC # AWS640076 NasliCounty - -_ -- - Dear Mr. And Ms. Boone: Alan W. Klimek, P.E. Director Division of Water Quality 11 ,i % I; FEB 1 9 2007 k OI h51; Ri�LEiH RFGiOidrtt OFFICE; On December 4, 2006, this Office issued you a Notice of Violation/Recommendation to Enforce letter, which required a written response within ten days of the receipt of the Letter. The Return Receipt was signed for by Ms. Brenda Boone on December 7, 2006, and as of today no written response has been received by the Division of Water Quality concerning this matter. On''February 8, 2007; Mr: Buster Towel] with the Raleigh Regional Aquifer Protection Section returned to the site and observed that the secondary lagoon still had only 10 inches of freeboard. As described in the aforementioned Notice, the permitee is required to notify the appropriate regional office whenever the. freeboard level becomes non- compliant within 24 hours of discovery. The Raleigh Regional Office has received no correspondence either via phone or in writing regarding this matter. The Raleigh Regional Office of the Division of Water Quality, Aquifer Protection Section, will prepare an enforcement action for the earlier referenced violations of your General Permit. You shouid continue to work towards gaining freeboard in the secondary lagoon. and you should respond in writing within ten days of receipt of this correspondence. If you have any questions in this matter you should call Buster Towell at (919) 791-4200. Si ly, mmerman, L.G. Regional Supervisor Cc:-Nash:Soil & Water District APS Compliance Unit "RRO Files '' Aquifer Protection Section - Raleigh Regional Office One N orthCarolina %1 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791.4200 Customer Service 1-877.623-6748 aturall / 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Internet: http:ft2o.enrztate,naus i� ' �/ An Equal Opportunity/Affirmative Action Employer — 50% Recycled/1 0% Post Consumer Paper J FEB -1 9 200I DLNR RALEIGH REGIONAL OFFICE. / m W 4rE�Q Michael F. Easley, Governor 7 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division ol' Water Quality February 13, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. And Ms. Louis B. Boone 2813 Volunteer Road Elm City, North Carolina 27822 Subject: Notice of Intent To Enforce L.B. Boone Finishing Operation COC # AWS640076 Nash County Dear Mr, And Ms. Boone, On December 4, 2006, this Office issued you a Notice of Violation/Recommendation to Enforce letter, which required a written response within ten days of the receipt of the letter. The Return Receipt was signed for by Ms. Brenda Boone on December 7, 2006, and as of today no written response has been received by the Division of Water Quality concerning this matter. On February 8, 2007, Mr. Buster Towell with the Raleigh Regional Aquifer Protection Section returned to the site and observed that the secondary lagoon still had only 10 inches of freeboard. As described in the aforementioned Notice, the permitee is required to notify the appropriate regional office whenever the freeboard level becomes non- compliant within 24 hours of discovery. The Raleigh Regional Office has received no correspondence either via phone or in writing regarding this matter. The Raleigh Regional Office of the Division of Water Quality, Aquifer Protection Section, will prepare an enforcement action for the earlier referenced violations of your General Permit. You should continue to work towards gaining freeboard in the secondary lagoon and you should respond in writing within ten days of receipt of this correspondence. If you have any questions in this matter you should call Buster Towell at (919) 791-4200, Sincerely, S. Jay Zimmerman, L.G. Regional Supervisor Cc: Nash Soil & Water District APS Compliance Unit Aquifer Protection Section - Raleigh Regional Office One NorthCarollina 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service 1-877-623-6748 / 3800.BarrettDr. Raleigh, NC 27609 FAX (919)571-4718 Internet: http:dh2o.enr.state.nc.us Naturally An Equal OpportunitylAHirma6ve Acton Employer — 50% Recycled110% Post Consumer Paper �OF V A rFgp Michael F. Easley, Governor `Q ti William G. Ross Jr., Secretary ff} North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality December 4, 2006 CERTIFIED -MAIL RETURN RECEIPT REQUESTED Mr. And Ms. Louis B. Boone 2813 Volunteer Road Elm City, North Carolina 27822 Subject: Notice of Violation Recommendation To Enforce L.B. Boone Finishing Operation COC # AWS640076 Nash County Dear Mr. And Ms. Boone: On Thursday, November 30, 2006. Mr. Buster Towell of the Raleigh Regional Office conducted an inspection at the subject swine facility. The inspection noted the following violations of your Certificate of Coverage (COC) and General Permit Conditions: There are two (2) waste lagoons on site. The primary lagoon had 22 inches of freeboard. The secondary stage lagoon was observed to have only 11 inches of available freeboard. Your second stage lagoon is in violation of General Permit Condition V.,2.. Permit Condition IH.13.,c.. states that the permitee notify the appropriate Division of Water Quality Regional Office within 24 hours should the storage capacity of a waste lagoon become less than the designed amount. An inspection preformed at the facility on October 10, 2006 indicated that the secondary lagoon was at the minimum freeboard required of 19 inches. Mr. Towell noted that there was no available growing crop to land apply waste on. The spray field located across the farm path from the facility on Volunteer Road had dormant coastal Bermuda grass with no overseed of rye or wheat. This issue was discussed with Mr. Louis Boone Jr. via phone after the earlier inspection. He indicated that he would try to get someone to plant a winter annual so that waste could applied to this field. Please note that the failure to maintain crops is a violation of your Certified Animal Waste Management Plan, which is considered a violation of your General Permit. Aquifer Protection Section - Raleigh Regional Office ne olof Carolina 1628 Mail Service Center Raleigh. NC 27699-1628 Phone (919) 791-4200 Customer Service 1-877-623-6748 )aturnlly 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Internet: http:/t%ww.ncwaterquality.org �! An Equal opportunitylAfllnnative Action Employer— 50% Recycied110% Post Consumer Paper Mr. and Ms. L.B. Boone Notice of Violation Recommendation To Enforce Page 2 The October 10, 2006 inspection also found that no sludge survey had been done. Your General Permit required that within 2 years after issuance of the permit dated October 1, 2004, that sludge survey be conducted. To date, there has been no sludge survey completed for your facility. As the owner of a permitted swine facility in North Carolina you are required to designate an Operator In Charge (OIC) to oversee the operation and land application of animal waste for your facility. Currently Mr. Louis Boone Jr. is that designated OIC. However, our records indicate that he does not have adequate continuing education hours to be able to satisfy this requirement for the upcoming year. Please note that failure to designate a certified OIC is a violation of your COC and General Permit. The Raleigh Regional Office is prepared to recommend that an enforcement action be taken against your for the above referenced violations. If you have justification that these violations were caused by circumstances or events beyond your control you may include them along with your written response to this Notice within ten days of your receipt. In the absence of any such justification the Director will proceed with an enforcement action. If you have any questions regarding this matter you should call Buster Towell at (919) 791-4200. Sincerely, S. Jay Zimmerman, L.G. Regional Supervisor Cc: Nash County Health Department Nash Soil & Water Conservation District Mr. John Hunt—RRO DS W C APS CAFO Unit RRO Files A Facility` Number Division of Water Quality lZ�t'4oC O Division of Soil and Water Conservation O Other Agency Type of Visit 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 0 Routine 0 Complaint 0 Fallow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: VD D p Arrival Time: t) I Departure Time: County: Region: Farm Name: e-tZ Owner Email: Owner Name: Mailing Address: Phone: Physical Address: Facility Contact: %r%. S (3 Pzxi A; Title: Phone No: Onsite Representative: Integrator: &2t: Certified Operator: l -emu Operator Certification Number: Back-up Operator: Location of Farm: Back-up Certification Number: Latitude: =' =' =" Longitude: = o =' = 2r� i S5 0025)Z -e s S,Design CurrentDesign .Current - Swine Capacity Population Wet Poultry Capacity Population is e ❑ Layer ❑ Non -La er El Wean to Finish [] � eeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder El Farrow to Finish ❑ Gilts ❑ Boars We o Feeder p Other El Other Dry Poultry ElLayers p Other El Other Dry Poultry ElLayers ❑ Non -Layers El Pullets ElTurkeys ❑ TurkeyPoults ❑ Other Destgn;� �Current �,. Capacity, Populahon ❑ Dairy Cow El DaiEX Ca ;e :Number Discharses & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page 1 of 3 []Yes o ❑ NA ❑ NE ❑ Yes No NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes N NA ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued Facility Number: — %G Date of Inspection /r) r!oleL Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. if yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: P S Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 // ❑ Yes No A ❑ NE El Yes o ❑ NA ❑ NE Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ,PTNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properl addressed and/or managed through ElYes ❑ No ❑ NA ElNE a waste management or closure plan?e,,-+S If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NoZ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ZNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need`, ❑ Yes ❑ No ❑ NA ❑ NE maintenance/improvement? S?Z' e17 TY 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 0je,-o-&,,, 4W/111--- 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑Y es 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. is there a lack of properly operating waste application equipment? ❑ Yes El NA El NE El No ❑NA ❑NE No NA ❑ NE o NA El NE No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations,o"r.;,ariy,nther..comments. '. Use drawings of facility to better explain situations. (use additional pages as necessary):` . c{ /.j A J 1 v9. h ,� r o , / �-►9 - _ r3 of !� 12fjernkld4 s'�,UL.1 L[�7O /3 14 C fi f 4 r0�' e �l . Reviewer/Inspector Name G Phone: Reviewer/Inspector Signature: Date: p o Page 2 of 3 12128104 Continued Facility Number: 6 41 —7G Date of Inspection I 10(fil a Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps [I Other 21. Does reco d keeping nee;Weekly pr ment? If yes, check t -appropriate box below. Yes ❑ No ❑ NA ❑ NE ast .Application Freeboard Was c.Analysis ❑Soil Analysis El Waste Transfers El Annual Certification ainfall ❑ Stocking ❑ Crop Yield 0 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ We her Code 22. Did the facilityfail to install and maintain a rain gauge? ❑ Yes Ld"N0 NA ❑ NE g g 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Ye No ❑ NA ❑ NE 25. Did the facilityfail to conduct a sludge survey as required b the permit? Yes ❑ No _NA ❑ NE g Y q Y 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No NA El NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑Yes:No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ic/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings: I FJaC S L3c%t� e �iZ �% -1 C do J_ L/ QJ a j ,"/C Do A- J /,4y s r7 p���:���� be,, �. AL Page 3 of 3 12128104 FacTii Number: & jDate of Ins ection: 40 2( Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): '6� 0 t/ 36 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environJNo threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yeso ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ❑ NE maintenance or improvement? 11. is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN> t0% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): f 367—, ryt.,. 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ID ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ YesVN9o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes N ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0 No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfe ` ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspection ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA [] NE 23. if selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412014 Continued Facili Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes oNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes �ffKNoNA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [] Yes ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? []Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE L 'jlr"g J ' �iGls� l —[O✓ YL <JC7 Lap, — (V e 4/l/d 416,6f Frv✓ 17!/C": �o l 13 y zS Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: ? jj / Ci Zc7' Date: (G = ZG / 7 21412015 �oF w A rEq p Michael F. Easley, Governor William G. Ross Jr., secretary Vj North Carolina Department of Environment and Natural Resources 0 1 AIan.W. Klimek. P.E. Quality Division of Water Quality December 4, 2006 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. And Ms. Louis B. Boone 2813 Volunteer Road Elm City, North Carolina 27822 Subject: Notice of Violation Recommendation To Enforce L.B. Boone Finishing Operation COC # AWS640076 Nash County Dear Mr. And Ms. Boone: On Thursday, November 30, 2006. Mr. Buster Towell of the Raleigh Regional Office conducted an inspection at the subject swine facility. The inspection noted the following violations of your Certificate of Coverage (COC) and General Permit Conditions: There are two (2) waste lagoons on site. The primary lagoon had 22 inches of freeboard. The secondary stage lagoon was observed to have only I I inches of available freeboard. Your second stage lagoon is in violation of General Permit Condition V.,2.. Permit Condition IH.I3.,c.. states that the permitee notify the appropriate Division of Water Quality Regional Office within 24 hours should the storage capacity of a waste lagoon become less than the designed amount. An inspection preformed at the facility on October 10, 2006 indicated that the secondary lagoon was at the minimum freeboard required of 19 inches. Mr. Towell noted that there was no available growing crop to land apply waste on. The spray field located across the farm path from the facility on Volunteer Road had dormant coastal bermuda grass with no overseed of rye or wheat. This issue was discussed with Mr. Louis Boone Jr. via phone after the earlier inspection. He indicated that he would try to get someone to plant a winter annual so that waste could applied to this field. Please note that the failure to maintain crops is a violation of your Certified Animal Waste Management Plan, which is considered a violation of your General Permit. Aquifer Protection Section - Raleigh Regional Office ne Noofth Carolina 1628 Mail Service Center Raleigh. NC 27699-1628 Phone (919) 791-4200 Customer Service 1-877-623-6748 tMM11j/ 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Intemet, http:/ANww.ncwaterquality.org fff/// ��� T! An Equal OpportunitylAfflnnative Action Employer - 50% Recycledll0% Post Consumer Paper Mr. and Ms. L.B. Boone Notice of Violation Recommendation To Enforce Page 2 The October 10, 2006 inspection also found that no sludge survey had been done. Your General Permit required that within 2 years after issuance of the permit dated October 1, 2004, that sludge survey be conducted. To date, there has been no sludge survey completed for your facility. As the owner of a permitted swine facility in North Carolina you are required to designate an Operator In Charge (OIC) to oversee the operation and land application of animal waste for your facility. Currently Mr. Louis Boone Jr. is that designated OIC. However, our records indicate that he does not have adequate continuing education hours to be able to satisfy this requirement for the upcoming year. Please note that failure to designate a certified OIC is a violation of your COC and General Permit. The Raleigh Regional Office is prepared to recommend that an enforcement action be taken against your for the above referenced violations. If you have justification that these violations were caused by circumstances or events beyond your control you may include them along with your written response to this Notice within ten days of your receipt. In the absence of any such justification the Director will proceed with an enforcement action. If you have any questions regarding this matter you should call Buster Towell at (919) 791-4200. Sincerely,. ��afo-r S. Jay Zimmerman, L.G. Regional Supervisor Cc: Nash County Health Department Nash Soil & Water Conservation District Mr. John Hunt—RRO DSWC APS CAFO Unit RRO Files -.. Type of Visit 0 Comp' nce Inspection O Operatiog Review O Lagoon Evaluation Reason for Visit Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access ility Number n Date of Visit: ime: Permitted O Certified 0 Conditio�naally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name: L` 3 - 801ll--.� 0- �f4y County: ojo� Owner Name: Mailing Address: Phone No: Facility Contact: Title: Phone No: Onsite Representative: . LL2i4f5 6m-e Integrator:._�r i✓!/c S Certified Operator: Operator Certification Number: Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑Horse Latitude 0 1 0« Longitude 0' �0« Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Sprav Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? rite Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): 05103101 ❑ Yes No ❑ Yes VNo ❑ Yes i� ❑ Yes o ❑ Yes o ❑ Yes o ElYes o Structure 6 Continued Facility Number: C — Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not property addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Annlication 10. Are there any buffers that need maintenance/improvement? 11. is there evidence of over application? ❑ Excessive Ponding r 12. Crop type d Qi ✓r+ u- A , S 9 r F1 r< J ❑ Yes Z No ❑ Yes No ❑ Yes OrNZ r ❑ Yes No ❑ Yes �No ❑ Yes , ❑ No ❑ PAN �ydraulic Overload es ❑ No 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Rewired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes IlJ N VNoN ❑ Yes o Yes ,❑ oo N ❑ Yes 6QNo ElYes No es ❑ No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes r'_1 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? El Yes I Q 24. Does facility require a follow-up visit by same agency? ❑ Yes No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 5f' "'0 10 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. a;�- ;.. �._ :: sy❑ Field Copy ❑ Final Notes e raw ngsoaco,aer exa sa ouse aonaag es as;necessar - "fix.. ! `�a>,'?% �n�d4i'.ve.Y --�,�i' (1) ►? u-P 5+ t 14M C-C A r 40rl e-41 S , j9 Tor Cc on e ff ' MI ,L) VV 0 �, a,,a�1 p L • e„4 � . ! � �� r K► � C w c �. �, a ! b✓ �1 t, ,4 �� `� �h � ii1✓�-S 5�LI r j O �K1.0 Reviewer/Inspector Name S.�C Reviewer/Inspector Signature Date: 5_1 ZZI Q 7/ 05103101 Continued Facility Number: Date of Inspection ! Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge actor below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is -the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan bladc(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Addltinnal:Comments and/or Drawings 05103101 ❑ Yes ZNo ❑ Yes �T ElYes No ❑ Yes No eN ElYes ElYesElYes State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office Michael F. Easley, Governor William G. Ross Jr., Secretary Division of Water Quality May 23, 2002 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Louis B. Boone 2813 Volunteer Road Elm City, North Carolina 27822 Subject: Notice of Violation Recommendation To Enforce L.B. Boone Finisher Farm COC AWS640076 Nash County Dear Mr. Boone: Nc rrni CARoU A n2P^F;rrmrjtT oF-. . EHviRCHMEMr AND NRVR/J. RU-,K3u icEs On May 22, 2002, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection of the subject swine operation. The inspection revealed the following violations of your Certificate of Coverage (COC) and General Permit: General Permit Condition V.,2., requires that facilities covered under a COCIGeneral Permit designate an Operator In Charge.(OIC) to oversee the waste management activities on site. Currently there has been no OIC designated for this facility. It should also be noted that an inspection conducted in August 2001 also revealed that no OIC had been designated. General Permit Condition V.,9., requires that the Permittee maintain in full force and effect all lessee and -landowner agreements which are requires in the Certified Animal Waste Management Plan. The subject inspection noted that all land included in the CAWMP for this facility is under a lease agreement and that these agreements were up in 1999. The inspection also revealed that hydraulic overloading occurred during and application of wastewater this year to field # 5. The Waste Utilization Plan indicates that this field is .40 acres and the WUP calls for application rates of .50 inches per hour with an overall application of 1 inch. Records indicated that one application was made of .91 inches. General Permit Condition I.,2., states that violations of the CAWMP are considered to be violations of the General'Permit. 1625 Mail Service Center, Raleigh, NC 27699-1623 Telephone (919)571-4700 FAX (919)571.4718 An Equal opportunity Affirmative Action Employer 50% recycled/10% post-consUrner paper Mr. L.B. Boone Page 2 Please be advised that the above violations of the COCIGeneral Permit are subject to civil penalties of up to S 10,000.00 per day, per violation, and in some cases up to S 25,000.00 per day. Please respond to this Notice in writing within fourteen days of your receipt. If you have justification that these violations were caused by circumstances or events beyond your control you should include them along with your response which will be forwarded to the Director for his review. In -the absence of any such justification, the Director will proceed with the appropriate enforcement action. If you have any questions regarding this Notice you should contact Buster Towell at (919) 5 71-4700. Sincerely, Kenneth chuster, E. Regional Water Quality Supervisor cc: Nash County Health Department Nash Soil & Water Conservation District Ms. Margaret O'Keefe, RRO-DSWC DWQ Nondischarge Compliance Group RRO Piles State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Kerr T. Stevens, Director Mr. Louis B. Boone 2813 Volunteer Road Elm City, NC 27822 Dear Mr. Boone: IT1A A � • r�rNOW Nk �� NCDENR NORTH CAROUNA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES March 9, 2001 CERTIFIED MAIL RETURN RECEIPT REQUESTED RE: Request for Remission of Civil Penalty L. B. Boone Farm Farm #64-49 Nash County File No. PC 0 1 -00 1 In accordance with North Carolina General Statute 143-215.6A(f), I considered the information you submitted in support of your request for remission and did not find grounds to modify the civil penalty assessment of S830.91. There are two options available to you. You may pay the civil penalty assessment or you may present your request for remission to the Committee on Civil Penalty Remissions of the Environmental Management Commission. If you choose to pay the penalty, please make your check payable to the Department of Environment and Natural Resources and reference the case number. Send payment within 30 days of your receipt of this letter to the attention of: Mr. Steve Lewis NCDENR DWQ 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Mailing Address: Telephone (919) 733-3083 1617 Mail Service Center Fax (919) 733-0059 Raleigh, North Carolina 27699-1617 State Courier #52-01 -01 An Equal Opporrunhy /Af rmative Action Employer 50% recycled / 10% post -consumer paper http://7?2o.enr.state.nc. us Location: 512 N. Salisbury St. Raleigh, NC 27699-1617 N i You also have the option of presenting your request to the Committee on Civil Penalty Remissions, which is comprised of members of the Environmental Management Commission. You may present your request for remission to the committee and a representative from the Division of Water Quality will present the case against remission. The Committee on Civil Penalty Remissions will render a final and binding decision in accordance with NCGS 143B-282.I(c). if you would like to present your request for remission to the Committee on Civil Penalty Remissions, please notify Steve Lewis at the above address within 30 calendar days. The next scheduled committee meeting is in Raleigh on April 12, 2001. If you are unable to attend on this date, your request will be scheduled for a meeting at a future date. Thank you for your attention to this matter. If you would like a receipt that your check or request for remission was received, please send it via certified mail. Please feel free to contact Steve Lewis at (919) 733-5083, extension 539, if you have any questions. Sincerely, Kerr T. Stevens cc: Ken Schuster, Raleigh Regional Supervisor st ' oweil; RRO File # PC 01-001 Central Files illailing Address: Telephone (919) 733-5083 1617 Mail Service Center Fax (919) 733-0059 Raleigh, North Carolina 27699-1617 State Courier #52-01-01 An Equal Opportunin• /Afrmarire Action Employer 50% recycled / 1017r post -consumer paper http:11h2o. en r. state. nc. us Location: 512 N. Salisbury St. Raleigh, NC 27699-1617 Boon® Nrms 2813 Volunteer Road Elm City, NC 27822 Phone 252-443-3349 Home Phone 252-043-0674 Email boonefarms@hotmail.com �rj 45 ll 0 -, SEP September 18, 2000 pE�tNR RALEIGN REGIONAL off ICE Mr. Kenneth Schuster, Regional Water Quality Supervisor 1628 Mail Service Center Raleigh, NC 27699-1628 Subject: Violation Corrections L.B. Boone Joyner Farm Facility # 64-78 Nash County Dear Mr. Schuster, This letter is concerning a certified letter I received on September 9, 2000, regarding an inspection done by Buster Towell on August 7, 2000. The inspection indicated that two of my three lagoons had only 14 inches of available freeboard. I now have pumped to below 18 inches. My levels were so high due to the excessive rainfall we had during the month before Mr. Towell's inspection. Because we had no animals in the facility, the ground was saturated, we could not cut hay, and our nitrate levels were .06 lbs. of plant available nitrogen per 1000 gallons of water I thought it better not to pump and risk a runoff into surface waters. Sincerely, Louis B. Boone, Jr. 77. Boon® Farms 2813 Volunteer Road Elm City, NC 27822 Phone 252-443-3349 Home Phone 252-44M674 Email boonefarms@hotmaii.com September 18, 2000 Mr. Kenneth Schuster, Regional Water Quality Supervisor 1628 Mail Service Center Raleigh, NC 27699-1628 Subject: Violation Corrections L.B. Boone Farm Facility # 64-49 Nash County Dear Mr, Schuster, 5EP 2 0 2000 iDF'H-NR RALEIGi1 hLG (}ri;;L OFFICEi1. This letter is concerning a certified letter I received on September 9, 2000, regarding an inspection done by Buster Towed on August 7, 2000. The inspection indicated that one of my lagoons had only 14 inches of available freeboard. I now have pumped to below 18 inches. My levels were so high due to the excessive rainfall we had during the month before Mr. Towell's inspection. Because we had no animals in the facility, the ground was saturated, we could not cut hay, and our nitrate levels were .06 lbs. of plant available nitrogen per 1000 gallons of water I thought it better not to pump and risk a runoff into surface waters. Sincerely, Louis B. Boone, Jr. mk ,f] F 2- State of North Carolina "7 ti Department of Environment , ffl�m and Natural Resources Raleigh Regional Office Michael F. Easley, Governor NCDENR Sherri Evans -Stanton, Secretary NORTH CAROLINA DEPARTMENT OF ENVIRONMENT ANo NATURAL RESOURCES January 11, 2001 DIVISION OF WATER QUALITY CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Louis Boone, Jr. 2813 Volunteer Road Elm City, North Carolina 27822 SUBJECT: Assessment of Civil Penalties for For Violations of G.S.143-215.1 and 15A NCAC 2H.0217 Nash County L.B. Boone Farm File No. PC 01-001 Dear Mr. Boone: This letter transmits notice of a civil penalty assessed against L.B. Boone Swine Farm in the amount of $830.91 ($500 + $330.91 enforcement costs). Attached is a copy of the document explaining this penalty This action was taken under the authority vested in me by delegation provided by the Secretary of the Department of Environment and Natural Resources and the Director of the Division of Water Quality. Any continuing violation(s) may be the subject of a new enforcement action, including an additional penalty. Within thirty days of receipt of this notice, you must do one of the following: 1. Submit payment of the penalty: Payment should be made directly to the order of the Department of Environment and Natural Resources (do not include waiver form). Payment of the penalty will not foreclose further enforcement action for any continuing or new violation(s). Please submit payment to the attention of: Mr. Steve Lewis Non Discharge Compliance Unit L.B. Boone Farm Page 2 NCDENR Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 W 2. Submit a written request for remission or mitigation including a detailed justification for such request: A request for remission or mitigation is limited to consideration of the reasonableness of the amount of the penalty and is not the proper procedure for contesting the accuracy of any of the statements contained in the assessment letter. Because a remission request forecloses the option of an administrative hearing, such a request must be accompanied by a waiver of your right to an administrative hearing and a stipulation that there are no factual or legal issues in dispute. You must execute and return to this office the attached waiver and stipulation form and a detailed statement which you believe establishes whether: (a) one or more of the civil penalty assessment factors in G.S. 143B- 282.1(b) were wrongfully applied to the detriment of the petitioner; (b) the violator promptly abated continuing environmental damage resulting from the violation; (c) the violation was inadvertent or a result of an accident; (d) the violator had been assessed civil penalties for any previous violations; (e) payment of the civil penalty will prevent payment for the remaining necessary remedial actions. Please submit this information to the attention of - Mr. Steve Lewis Non Discharge Compliance Unit NCDENR Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Please note that all information presented in support of a request for remission must be submitted in writing. The Director of the Division of Water Quality will review the information during a bimonthly enforcement conference and inform you of his decision in the matter of the remission request. His response will provide details regarding case status, directions for payment and provision for further appeal of the penalty to the Environmental Management Commission's Committee on Civil Penalty Remissions. Please be advised that the Committee cannot consider information that was not part of the original remission request L.B. Boone Farm Page 3 considered by the Director and therefore, it is very important that you prepare a complete and thorough statement in support of your request for remission. 3. Submit a written request for an administrative hearing: If you wish to contest any statement in this assessment letter, you must request an administrative hearing. This request must be in the form of a written petition to the Office of Administrative Hearings and must conform to Chapter 150B of the North Carolina General Statutes. You must file your original petition with the Office of Administrative Hearings P.O. Drawer 27447 Raleigh, North Carolina 27611-7447 and Mail or hand -deliver a copy of the petition to Mr. Dan McLawhom, General Counsel Department of Environment and Natural Resources P.O. Box 27687 Raleigh, North Carolina 27611-7687 Failure to exercise one of the options above within thirty days, as evidenced by a date stamp (not a postmark) indicating when we received your response, will result in this matter being referred to the Attorney General's Office with a request to initiate a civil action to collect the penalty. Please be advised that any continuing violation(s) may be the subject of a new enforcement action, including an additional penalty. If you have any questions about this civil penalty assessment, please contact the Water Quality Section staff of the Raleigh Regional Office at 919-571-4700. � l ZaOi ATTACHMENTS Kenneth Schuster, P.E. Water Quality Regional Supervisor Raleigh Region Division of Water Quality cc: Regional Supervisor wl attachments Compliance/Enforcement File wl attachments Central Files w/ attachments STATE OF NORTH CAROLINA COUNTY OF NASH IN THE MATTER OF L.B. BOONE FARM NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES File No. PC-01-001 } FINDINGS AND DECISION FOR VIOLATION OF ) AND ASSESSMENT OF G.S. 143-215.1 AND 15A NCAC 2H .0217 } CIVIL PENALTIES } Acting pursuant to delegation provided by the Secretary of the Department of Environment and Natural Resources and the Director of the Division of Water Quality, I, Kenneth Schuster, P.E., Division of Water Quality Regional Supervisor for the Raleigh Region, make the following: I. FINDINGS OF FACT: A. L.B. Boone owns and operates the L.B. Boone Swine Farm located in Nash County. B. The L.B. Boone Farm was deemed permitted as a nondischarge facility on February 1, 1993 in accordance with 15A NCAC 211.0217. C. Deemed permitted facilities are required to have a Certified Animal Waste Management Plan (CAWMP) under 15A NCAC 2H .0217. The CAWMP for the L.B. Boone Farm states that in no instance should the volume of the waste stored in the lagoon be within the 25-year, 24-hour storm storage or one foot of freeboard except in the event of the 25-year, 24-hour storm. D. The 25-year, 24-hour storm event for the facility's location is about seven (7) inches according to the National Weather Service, Technical Paper 40, Rainfall Frequency Atlas of the United States, 1961, E. Based on the 25-year, 24-hour storm event of seven inches and one foot of required structural freeboard, the waste level in the lagoon for the L.B. Boone Swine farm shall not exceed nineteen (19) inches. F. DWQ staff from the Raleigh Regional Office inspected the L.S. Boone Swine Farm on August 7, 2000 and observed that the waste level of the lagon was fourteen (14) inches which exceeded the level specified in the CAWMP. G. The cost to the State of the enforcement procedures in this matter totaled $ 33,Q,91 L.B. Boone Page 2 Based upon the above Findings of fact, I make the following: II. CONCLUSIONS OF LAW: A. L.B. Boone is a "person" within the meaning of G.S. 143-215.6A pursuant to G.S. 143-212(4). B. A permit for this animal waste management system is required in accordance with 15A NCAC 2H .0217 and G.S. 143-215.1. C. The above cited failure to maintain the liquid level in the lagoon at the level specified in the CAWMP is a violation of the 15A NCAC 21-1.0217 nondischarge deemed permit and G.S. 143-215.1. D. L.B. Boone may be assessed civil penalties pursuant to G.S. 143-215.6A(a)(2) which provides that a civil penalty of not more than ten thousand dollars ($10,000.00) per violation may be assessed E. The State's enforcement costs in this matter may be assessed against the L.B. Boone Farm pursuant to G.S. 143-215.3(a)(9) and G.S, 14313-282.1(b)(8). F. The Regional Water Quality Supervisor pursuant to the delegation provided by the Director, Division of Water Quality, and the Secretary of the Department of Environment and Natural Resources, has the authority to assess civil penalties in this matter. Base upon the above Findings of Fact and Conclusions of Law, I make the following: III. DECISION: L.B. Boone is hereby assessed a civil penalty of $ 500.00 for failing to maintain the liquid level in the lagoon at the level specified in the CAWMP as required by 15A NCAC 2H .0217. $jQC� TOTAL CIVIL PENALTY, which is f5' percent of the maximum penalty authorized by G.S. 143-215.6A. $ 330.91 Enforcement costs $ �7I TOTAL AMOUNT DUE L.S. Boone Page 3 As required by G.S. 143-215.6A(c), in determining the amount of the penalty I considered the factors listed in G.S. 143B-282.1(b), which are: (1) The degree and extent of harm to the natural resources of the State, to the public health, or to private property; (2) The duration and gravity of the violation, (3) The effect on ground or surface water quantity or quality or on air quality; (4) The cost of rectifying the damage; (5) The amount of money saved by noncompliance; (d) Whether the violation was committed willfully or intentionally; (7) The prior record of the violator in complying or failing to comply with programs over which the Environmental Management Commission has regulatory authority; and (8) The cost to the State of the enforcement procedures. 7;ate ►II=1- - ----------------------------- Kenneth Schuster, P.E. Regional Water Quality Supervisor r STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION COUNTY OF IN THE MATTER OF ASSESSMENT ) WAIVER OF RIGHT TO AN OF CIVIL PENALITIES AGAINST ) ADMINSTRATIVE HEARING AND PERMIT NO. ) STIPULATION OF FACTS FILE NO: Having been assessed civil penalties totaling for violation(s) as set forth in the assessment document of the Director of the Division of Water Quality dated, , the undersigned, desiring to seek remission of the civil penalties, does hereby waive the right to an administrative hearing in the above -stated matter and does stipulate that the facts are as alleged in the assessment document. _ This the day of , 20 ,E SIGNATURE i ADDRESS �.� TELEPHONE State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office Michael F. Easley, Govemor William G. Ross Jr., Secretary Division of Water Quality May 23, 2002 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Louis B. Boone 2813 Volunteer Road Elm City, North Carolina 27822 Dear Mr. Boone: �V-6 f NCDEiTR NORTH CAftOLINA DEPARTMENT OF , ENVIRONMENT AND NATURAL RESouRGEs Subject: Notice of Violation Recommendation To Enforce L.B. Boone Bissette Farm COC AWS640047 Nash County On May 22, 2002, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection at the subject swine operation. The"inspection revealed that this facility has been abandoned for approximately 3 years. Mr. Louis Boone, Jr., stated that there were no plans to ever repopulate this facility. Please note that even though this operation has been depopulated, it is covered by a Certificate of Coverage (COC) and General Permit which require that all conditions be met. The inspection noted that no Operator in Charge (OIC) had been designated for this facility. This constitutes a violation of General Permit Condition V.,2.. A previous NOV from this Office dated August 29, 2001, also noted that no OIC had been designated for this facility during last years annual inspection. Violations of the COC and General Permit are subject to civil penalties of up to $ 10,000.00 per day, per violation and in some cases up to $ 25,000.00 per day. This Office is considering an enforcement action for the above referenced violations. If you have justification that this violation was caused by events or circumstances beyond your control you should include them in your response to this Notice. Please respond in writing within fourteen days of your receipt. In the absence of any such justification the Director will proceed with the enforcement action. If you have any questions regarding this Notice please call Buster Towel] at (919) 571-4700. Sincerely, t L b �3 .s5-.e44 . Kenneth Schuster, P.E. -7 P , f 1L", k + Regional Water Quality Supervisor � cc: Nash Health Dept. � � � �,, � rI L'r Nash Soil & Water Conservation District DWQ Nondischarge Compliance Group 3 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919)571-4700 FAX (919)571-4718 An Equai Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper oo K T dt # 5157 Field # 5 Field Size (acres) (, 0.4 Fartri3Owner LB Boone Owners Address 2813 Volunteer Road Elm City, NC 27822 (252)443-3349 Owner's Phone # Crop Type Bpi Lagoon Liquid Irrigation Field Record One Form for Each Field Per Crop Cycle Facility Number fro Irrigation Operator Louis Boone. Jr. Irrigation Operators 2B41 Volunteer Road Address Elm City, NC 27822 Operators Phone # (252) 443-0674 From Animal Writs Management Ptah Recommended PAN 305 Loading (Iblacre)= (B) 76 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) Date (mmiddlyr) Start Time f 1rinmin) End Time (hr:min) Total Minutes (3)-(2) # of Sprinklers Operating Flow Efate (gallmin) Total Volume (gallons) (4) x (6) x (6) Volume Per Acre (gallac) (7)1(A) Waste Analysis PAN (Ib11000 gal) PAN Applied (Iblac) 1(8) x (9)] 11000 Nitrogen Balance (Iblac) [B) - (10) 30-A r 12:OOnm 1:00pm 60 1 165 9900 24750 1.7 42.075 #REF! 1 165 0 0 0 #REF "- #REF! 1 165 0 0 0 1 165 0 0 0 #REF! 1 165 0 0 0 #REF! #REF! 1 165 0 0 0 1 165 0 0 0 #REF' 1 165 0 0 0 #REF! 1 165 0 0 0 #REF! #REF! 1 165 0 0 0 Crop Cycle Totals 9900 42.075 Owners Signature Certified Operator (Print) Louis B. Boone, Jr. Operators Signature Operator Certification # WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) hereby give/dick_ permission to apply animal waste from his Waste Utilization System on � acres of my land for Khe duration of time shown below. 'rhe field(s) on which waste can be applied are shown on the - attached map . 71on�k- ?q of r `6- I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial. fertilizer. AAdjacent Landowner: Date: Waste Producer: Date: Technical Representative: Date: Z SWCD Representative: // Date: Term of Agreement: - , 19_`to _aC)C 3 (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: lI WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) hereby give ive permission to apply animal waste from his Waste Utilization System on � acres of my land for the duration of time shorn below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or. crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landow Waste Producer: Technical Repre SWCD Representa Term of Agreement: Date: 6 A L Date W, -$_ I= Date : Date : (p�� (Minimum of Ten Years on Cost Shared .Items) (See Required Specification No. 2.) Page: 11 State of North Carolina Department of Environment and. Natural Resources Raleigh Regional Office Michael F. Easley, Governor William G. Ross Jr., Secretary Division of Water Quality May 23, 2002 CERTIFIED MAIL RETURN RECEIPT REQLMSTED Mr. Louis B. Boone 2S 13 Volunteer Road Elm City, North Carolina 27822 Subject: Notice of Violation Recommendation To Enforce L.B. Boone Finisher Farm COC AWS640076 Nash County Dear Mr. Boone: NORTH cmtoumA DEQARrmmmT or. , ENVIRCHMEW AND NAVRAL RESOURCES On May 22, 2002, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection of the subject swine operation. The inspection revealed the following violations of your Certificate of Coverage (COC) and General Permit: General Permit Condition V.,2., requires that facilities covered under a COC\General Permit designate an Operator In Charge (OIC) to oversee the waste management activities on site. Currently there has been no OIC designated for this facility. It should also be noted that an inspection conducted in August 2001 also revealed that no OIC had been designated. General Permit Condition V.,9., requires that the Permittee maintain in full force and effect all lessee and landowner agreements which are requires in the Certified Animal Waste Management Plan. The subject inspection noted that all land included in the CAWMP for this facility is under a lease agreement and that these agreements were up in 1999. The inspection also revealed that hydraulic overloading occurred during and application of wastewater this year to field # 5. The Waste Utilization Plan indicates that this field is .40 acres and the WUP calls for application rates of .50 inches per hour with an overall application of 1 inch. Records indicated that one application was made of .91 inches. General Permit Condition I.,2., states that violations of the CAWMP are considered to be'violations of the General Permit. 1628 Mail Service Center, Raleigh, NC 27699-1625 Telephone (919)571-4700 FAX (919)571.4718 An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper Mr. L.B. Boone `Page 2 Please be advised that the above violations of the COCIGencral Permit arc subject to civil penalties of up to S 10,000.00 per day, per violation, and in some cases up to $ 25,000.00 per day. Please respond to this Notice in_writina within fourteen days of your receipt. If you have justification that these violations were caused by circumstances or events beyond your control you should include them along with your response which will be forwarded to the Director for his review. In the absence of any such justification, the Director will proceed with the appropriate enforcement action. If you have any questions regarding this Notice you should contact Buster Towell at (919) 571-4700. Sincerely, M Kenneth Schuster, E. Regional Water Quality Supervisor cc: Nash County Health Department Nash Soil & Water Conservation District Ms. Margaret O'Keefe, RRO-DSWC DWQ Nondischarge Compliance Group RRO Files �pF WATF9Q Michael F. Easley, Governor �Q �✓ William G. Ross Jr., Secretary C7 North Carolina Department of Environment and Natural Resources Alan W. Klimek. P.E. Director Division of Water Quality February 13, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. And Ms. Louis B. Boone 2813 Volunteer Road Elm City, North Carolina 27822 Subject: Notice of Intent To Enforce L.B. Boone Finishing Operation COC # AWS640076 Nash County Dear Mr. And Ms. Boone: On December 4, 2006, this Office issued you a Notice of Violation/Recommendation to Enforce letter, which required a written response within ten days of the receipt of the letter. The Return Receipt was signed for by Ms. Brenda Boone on December 7, 2006, and as of today no written response has been received by the Division of Water Quality concerning this matter. On February 8, 2007, Mr. Buster Towel] with the Raleigh Regional Aquifer Protection Section returned to the site and observed that the secondary lagoon still had only 10 inches of freeboard. As described in the aforementioned Notice, the permitee is required to notify the appropriate regional office whenever the freeboard level becomes non- compliant within 24 hours of discovery. The Raleigh Regional Office has received no correspondence either via phone or in writing regarding this matter. The Raleigh Regional Office of the Division of Water Quality, Aquifer Protection Section, will prepare an enforcement action for the earlier referenced violations of your General Permit. You should continue to work towards gaining freeboard in the secondary lagoon and you should respond in writint; within ten days of receipt of this correspondence. If you have any questions in this matter you should call Buster Towell at (919) 791-4200. Si ly, mmerman, L.G. Regional Supervisor Cc: Nash Soil & Water District APS Compliance Unit RRO Files., Aquifer Protection Section - Raleigh Regional Office One NorthCarofiina 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791.4200 Customer Service 1-877.623-6748 ;Vaturra!!rf 3800 Barrett Dr. Raleigh, NC 27609 FAX (919) 571-4718 Internet: httpalh2o.enr.state.nc,us .`/ An Equal OpportunkylAfrmative Acton Employer-- 50% Recycled110% Post Consumer Paper ."41MAL WASTE UTILIZATION PL«d kPD Producer: L. B. BOONE Location: 2813 VOLUNTEER ROAD / ELM CITY NC 27882 Telephone: 919-443-3349 Type Operation: Existing Feeder to Finish Swine Number of Animals: 2160.00 hogs (Design Capacity). J � STORAGE STRUCTURE: Anaerobic Waste Treatment L go�onADp 3 " ?009 APPLICATION METHOD: Irrigation�I•i 4 4r The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients.can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. RECEIVED I DENR I DWQ AQUIFFR'PPnTFCTinN gFCTION MAR 31 2009 Page: 1 ANIMAL WASTE UTILIZATION PLiN + 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility., In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 21.60 hogs x 1.9 tons waste/hogs/year = 4104 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2160 hogs x 2.3 lbs PAN/hogs/year = 4968 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. fir, ..J:. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL -TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC . AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END I TOTAL10 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN r TABLE 2% ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent Landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME 3294 51.57 1 NOB BH 6.1 305 0.0 10.8 APR-SEPT 5157 1-1 NOB SG 50.0 150 10.0 5157 B NOB BH 6.1 �305 10.0 aWJ 5157 I-B NOB SG 50.0 50 0.0 5157 15 1NOB PaMAI 5157 1-5 NOB 742 1 1 NOB 742 -1 1 NOB 6.1 1305 10.0 H 16.1 1305 10.0 G 150.0 ISO 0.0 10.8 1540 SEPT-MAR 488 1.6 APR-SEPT 80 1.6 SEPT-MAR 122 0.4 APR-SEPT 0.4 120 SEPT-MAR 366 1.2 APR-SEPT 1.2 160 SEPT-MAR TOTAL 4970 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four Pagel 4 ANIMAL WASTE UTILIZATION PLAN inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to'l.et small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result, in reduced yields and less' nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP,CODE CROP UNITS PER UNIT BH SG BERMUDAGRASS - HAY SMALL GRAIN OVERSEEDED TONS BU 50 1.0 TABLE I TABLE 2 TOTAL TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 0 0 14 4970 14 4970 * BALANCE -2 Page: 5 rLNIMAL WASTE UTILIZATION PLzLN r , *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 6 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in ordep to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. ,See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures.to prevent over application of nutrients or other elements. Your production facility will produce approximately 799.2 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 3996 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 13.32 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre you will need 31.968 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25a depending on your sludge waste analysis, soil types, realistic' yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 7 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) 5157 5157 1 NOB BH 0.50 *1.00 5 NOB BH 0.50 *1.00 5157 B NOB BH 0.50 *1.00 5157 NOB SG 0.50 *1.00 5157 -5 NOB SG 0.50 *1.00 5157 "B NOB SG 0.50 *1.00 742 1 NOB BH 0.50 *1.00 742 NOB SG 0.50 *1.00 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. Pages 8 ANIMAL WASTE UTILIZATION PLAN NARRATIVE OF OPERATION Page: WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS �. Animal waste shall not reach surface waters of thq state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. B. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in tall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover,crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11_ Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from'a lagoon that is a component of a swine farm shall be at least 50 feet from any re'bidential property boundary and from any perennial stream or river (other than an irrigation ditch or canal.. Animal waste other than swine waste from facilities sited on or after October i, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste'shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures4should`'be'ihspected regularly for evidence of erosion, leakage or discharge. Page: 11 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels,, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 12 ANIMAL WASTE UTILIZATION BAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:L.� B. BOONE FINISHING OPERATION Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon. request. Name of Facility Owner: L. E. BOONE (Please print) Signature: Date: 1 �a� /n Name of Manager(If different from owner) ; low"s S. &oeoye 7r. Signature: � f,��7 - p 1 Date: � �� �/9 Name of Person Preparing Plan: (Please print)J. Edward bong Affiliation:Nash Soil and Water Conservation District Phone No. 919-459-4115 Address (Agency): Room 107 Ag. Center Drive Nashville NC 27856 Signature: Date: /.Z/z//9r Page: 13 ANIMAL WASTE UTILIZATION PLAN TMAL ffASIE UTIg!IZATIOX AgRESMENT (Needed only if addItIonal land has to be leased, etc.) T , - hereby give "L.-46ZO 16, permission to apply animal waste from his Waste Utilization System l on / aC. acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. 7�,74 7y-�- I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial. fertilizer. Adjacent Landowner: Date: Waste Producer: -x�C _ Date: Technical. Representative : � —Date: SWCD Representative: /ter Date: Term of Agreement: ! /- out __ 44-_ to G % (Minimum of Ton Years on cost Shared Items) (See Required Specifiaablon No. 2.) 0 Pagel 14 ANIMAL WASTE UTILIZATION PLAN AVZMAL,WAETg UTILIZATION &GREEMENT (Needed only if additional land has to be leased, etc.) S, zaL , hereby give & Lg -- -- permission to apply animal waste from his Waste Utilization System on G 3 acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map . .S /S 7 a /, 1 A- I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my 'land or crops. I also understand that the use of waste will reduce my need for commercial. fertilizer. Adjacent Landowner: Date : ///o Waste Producer: 'e,r Date Technical Representative: �iG--� G--� -__ Pate: SWCD Representative: 0 L/ Date: Term of Agreement: L /o ,_ to (Minimum of Tan Years on Cost Shared Items) (,see Required Specification No. 2.) Pagel 14 U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE SOIL MAP LEGEND Legend Map Soil name symbol AaA jAltavista sandy loam, 0 to 3 percent slopes AbA JAltavista-Urban Land complex, 0 to 3 percent slopes AuB lAutryville loamy sand, 0 to 6 percent slopes Bb `Bibb loam, frequently flooded BrnB !Blanton loamy sand, 0 to 6 percent slopes Boa lBonneau loamy sand, 0 to 4 percent slope's Co !Congaree fine sandy loam, frequently flooded DOA (Dothan loamy sand, 0 to 3 percent slopes FaB IFaceville loamy sand, 1 to 6 percent slopes GeB IGeorgeville loam, 2 to 6 percent slopes GeC Georgeville loam, 6 to 10 percent slopes Ge8 iGeorgeville loam, 10 to 25 percent slopes G9B lGeorgeville gravelly loam, 2 to 6 percent- slopes GgC lGeorgeville gravelly loam, 6 to 10 percent slopes GgE lGeorgeville gravelly loam, 10 to 25 percent slopes GoA IGoldsboro fine sandy loam, 0 to 2 percent slopes GrB lGritney sandy loam, 2 to 6 percent slopes GrC lGritney sandy loam, 6 to 10 percent slopes GuB �Geergeville-urban Land complex, 0 to 6 percent slopes Hes !Helena coarse sandy loam, 2 to 6 percent slopes Me �Meggett loam, frequently flooded NaC INankin sandy loam, 2 to 10 percent slopes NnB INason loam, 2 to 6 percent slopes NnC INasen loam, 6 to 10 percent slopes NoA INorfolk loamy sand, 0 to 2 percent slopes NoB INorfolk loamy sand, 2 to 6 percent slopes NpB (Norfolk -Wedowee complex, 2 to 6 percent slopes NrB INorfolk, Georgeville, and Faceville soils, 2 to 8 percent slopes NUB Norfolk-Urhan Land complex, 0 to 6 percent slopes Ra !Rains fine sandy loam Rb (Rains -Urban Land complex To ITcmotley fine sandy loam Ud jUdorthents, loamy Ur jUrban Land w 1water Wea lWedowee coarse sandy loam, 2 to 6 percent slopes WeC 1wedowee coarse sandy loam, 6 to 10 percent slopes Wh lWehadkee loam, frequently flooded WkA lWickham fine sandy loam, 0 to 3 percent slopes WcA lWorsham loam, 0 to 2 percent slopes PAGE 1 OF 1 01/4/99 t �■ ti 04V S w �tlml '7J 7Lq ,}yq t iH.',i�, 1.e 7 • d: l L39 ..�.'`: Tuyl W1 L21 n ti 76°05' 4! _ CASIALIA Slog Y POP. 33a ♦� 4 - - ' 1410 1 • r.-0 14J1i39 (, � .H 1 -- _ .... M1Y 1•J.+� Y ]4L7 'a Jd � / . o re� m�l_� ,:i���w,+'' .a:R;, t� r�t�41t;S1 iv' L1t47`�+'�'',y..► ° :a / \ LdiJ / ro O Ll?+ Slit IQi7 :.1 Id 2 : o- Lila Lanaatter Motd,ewl Nu 1 i +.H 11j3 F 1 P t 19 Crmsradt 111L �i,': .B Ji14 ib• 3+ p oGotsraadt PAS )AU \0 A I li AEU OAK ' Dukel � 1 IA21 J i I.li LOP. 914MA � I ^ L43.1 rs7' "F !3-Q 56 ifs 1.4 LSiY -' t 1476ku PAS / o '%yam b- J9S4 j Sellrnt lils 1.4 7 .A , ° Star. jJ. f in Branch g 'm I/u a •� �. !♦ ',* / ,A / 6 I7 •4 'N' '. L47a loos u 1491 May �� /C-,roads " 1!� q ' -3 /1 11 1 1}Q@ .4 lD0e i1i 1691i- Sal / Edaardv.r / H _ I'�_ I a .5 1 = Cre.,wads LM .�, L�90 LM- F.1 ; Iil n L421 ,.] .712A I'1 J P-hfree 4 '/ �cki �, �r ;S r1�i? ev y LM L#k4 m Ch. ae oo CL421 arinH o l Pleamnl Grovg 0 110e CS, _I S, Union Hill >J14 b v Puuchlrr,�_ *, Bunn, Sln F Ch. Cho. �•� !� is : =i ] t r> ~ '.1 n `` LQ4L 1712 /.71596 Lin_ /0 I. 17V7- C, 5a 3� W Irk y y5 Batt / 5714 -0.1� 114P Croa,read, •_ NASHVILLE POP\3.0;7 ' .Z _K "``:�::',il � FCA 7.] +I•P 1L1S Ir �.\} •a 17 � 4 ®94P1 vl Z .J .e ;:i' Hu y, .6 T •/+ / 1991 LllE 1` I.1 1 I] , a I/ nLij4 Mom.yer 1.7 W IFI .] IA5 LEL' iL+1 Y FASUu - � _ o •lt_•. 5 � � +� ',�' M1� 'L: 4 r5 �.: :, :o-7 �� Wo1ry - y 0 $ fs j0 < SPRING HOPE loot u• .,, FAs csY ,p }11vn e , 'a 1Lffi 140) 1,774 :- �r ,3 r �,� � 19{L9 1.19Q] � �3 \. 1911\ $ - 1-PL ♦\?e. g 1P.91 V r 1 j4 rL 1�7 MY I.7 ,III `^.-..1. • (,t� +iti II IT ] 3 1 1 A .I ''•� �- 'a Ilr L9➢F C I,� i. L I] s �_ TrII �'r tR 10 7 FCA b.Y 26 Whalen .} i ,a F si w`4 a L� . w f- M1"d - '1: LaosQ �98 nra� SS r ���s', j37Z 117TI r �� lI-17 Il.r Ilrs l.d y?191v \�I M. L291 of • L344 M1� / „ 1 1� 1_SQ LL aA a lammi t - 1` Ca ti 7. Crowraad, r ,off n @•.i !� ^J r,r M1A IZ.E.£ ley V ry • Lzu Crmsr"d 271 laal Ca 115a �. � � I9t7 •. .9 � a r�.,i � a 1 .9 .. } ='Gold Valley rt� / * SBI LUZ 1919 1� .�/ v :6 le 1a1 S:.e ? 4��6 ..� '. Cro,xoadl r .6 1.1 113e L939. 4 I 121I ,ti 1LSY .7 / K � 1�1 i4.F1 Ir .6 T. IH17 ia1,1 1 p 1�•s - v 17-7_! ./ M 1P77 ;a , r�: 17JZ • ^'i77s IHtp s au 1 I Y, s7 1 ' ) I1-1 L/ t Sandy AIO 1 \ -Taylan ',ti\h 1 ii�;Cro„y� f♦�1 `�� S Cro,troad+ .'r lvQg_ c Deant 11I6 'I I Mo<edoniaf ,e re i..N r e Fro7ier Sapt Ch. {a 1@is 7 1 •@,2 F G osxood, L99! 1 II}@ ? h nrs u e Llr1 h 'rr' / •;� 4 1141' . 1111.d9� ,y�o a •,k. ,youphn e i 6 :t'� B A 1J ilu n a'Y �T 1�. was 1°il - 5amario r a Flood' \Ch.m '7 Pq 7 97 Biaselle'a- -P.I )911 " L6 IZ43 da �ro,xaad4 - A 94Z i! 19�9 f^5 F d I M �r :+ 1981 /S?ram rood, a L.14 S -°I I Slricklonduii •./"i f Crostraads +! n t� •1 14 .,F,irFfe_'997 3 Ia1L1 F n~•.eM1 Rrxky Mc i 1.2'3 - r ?% v7 9 1L11 Wilt n e� .. n \ L9i1 1.9 J _ IPS .7 ,d ,� I� i Airp .e � e- 1: S �s � 1953 - ^ 1lsi, '•7 Ivrq n7' j win,leod � 97 t a � •.,itl 7' ILt lcli 0 1 '7 �•?a,�i, o .7u C,ouraad,� nr7 15a ( i -®s7 -`7 16 01-� 1' 947 _7 VMoan, n 11L 4 •.a �\a4 1_7 al\ ! k1� Pleawnt a DaA: N UL. 1 .�, a ~yr \ ±fk?,rrr IF 113?n e, 1914 1 1 A ./ a k".�. 11..Z 0tr 1. fll ae Q• - Nlhile - b o 144. ` vai ' II LA_4P,w } !h,7 3 LLIM L�1 'I, FA IY q.I U � St. Mpary, lrPo 581 1109 � 1997 . .1 Hi h a Slo,l I r]r _ Cron air y 2 a / .7 q y; 143Y -/ �7 95 ?.? �iHa 1L4Q ML L^� ve 05 0. er�ft4 12" �/ .] '-%POP, baS 12l1 Bullhead-, /7 y�i .. nos oq'? - L0 .q• Croum-•'6 1 Q Sandy Criss CVTIS r - luui/ ' r `tiapnnr . � l,h IN[" ' f Celli r , Alhlellc I iow , (1154) r ' � i'w r�u•1'. �1931' tirh I• � r Celli 92 j n Cent w ��' INf1�� rw l o ' r,r � 'Par River•'��' Fch o � 6 144 P „` j , to) Attachment B Page 1 of 3 Narth Carolina Agricultural Extension- Service Agri -Waste Management =mrour ita= Sa=c, ■Ra== L= =.Ga =o;i OF IA eBZIsC=()N ass James C. Barker* 1. SA= CO=C=Ow A. Semi -Solid Lot e i. 5c: aped directly xrcm lot into spreader a. Fr= loaded spreader, collect about 2 lbs of maxn,sra tram &.ffarent locations using mown-11 is collectors. .. From srarage a. Collect about 2 lbs of mat=a fatom —dat the xu=-O=a c---Iz,sz avoiding bedding mazarials and using aonmeralLc collec_orz. B . I =q=d Haaore Sltn =7 L. Qnder-slozzad-floor pit L. Lzzand a 1/20 no=erarlZic conduit open on both ands inro mansn:e to pit floor. b. Seal sapper and of conduit (a.g., by placing a thumb over end of caadzdt) .piling ma=a that has enzared lowar end, remove and empty sl=--7 inza plaxcia bucket or aonmarallic container. a. Take subsazples .mom 5 or more locations or a= least 1 quart. d. dim and add about 3/4 pinz to nonmatallic saspla canrainex. U. Exterior storage basin or tank a. Hake x= manure bas been wall mimed with a liquid manure zho per-agirator p=p or propeller agizarmr. b . Take subsa*lns yam ',abour Il pit locations, from agitator pump or from mazure spreader and place is a plasmic bucket. * ?--sazessor and xtaasioa Specialist. Biological. and Ag;3.c-.altssral Engineer=ng *.achment B ,e2of 3 c. Mix and add 3/4 pint to a nonmetallic sample container. C. Lagoon Liquid I. Collect about 3/4 pint of recycled lagoon liquid from inflov pipe to flush tanks in a nonmetallic sample container. ii. From lagoon a. Place a small boctle (1/2 pint or less) on and of 10-15' vola. b. Extend bottle 10-15' away from bank edge. c. Brush away floating scum or debris. d. Submerge bottle within 1' of liquid surface. e. Empty into a plastic bucket, repeat about S times around lagoon, mix, and add 3/4 pint to uoumatallic sample container. D. Broiler or Turkap Littar L. House litter a. Visually inspect litter for areas of varying duality, e,.g,, areas around feeders and waterers, and escimata percent of floor surface in each area. b. Take about 3 litter subsamples at locations proportionate to Item a. E.g., if 20% of litrar of similar visual quality is around feeders and vatarers, tasks 1 subsample there and the other 4 subsamples from ramainder of floor surface. c. At each location, collect littar from a 6* by 6" area down to earth floor and place in a plastic bucket. d. After 5 subsamples have bean added to the bucket, mix, and add about 2-3 lbs litter to a nonmetallic sampla container such as a 1-gallon freezer bag and seal. U. From stockpile a. Take subsamples from about 5 locations ac least 18" into pile. b. Mix, add 2-3 lbs to nomezallic sample containar and seal. Attachment B Page 3 of 3 I1:. SAL PREPARATION AND TRANSFER A. Place sample into an expandable container that can be -sealed. Rinse residues from container with clean water but do not use disinfectants, soaps, or.treaz in any other way. B. Pack sample in ice, refrigerate, freeze, or transfer _Fo lab quickly. C. Hand -delivery is most reliable way of sample transfer. D. If mailed, protect sample container with packing material such as newspaper, box or package with scrapping paper, and tape. E. Commercial sa Is containers and sailers are also available. Contacts: L. AEI. Eastern Agricultural Lab, Inc. iii. Poly -foam Packers Corp. 7621 'Whitepine Road 2320 S. Foster Avenue Richmond, VA 23237 - 'Wheeling, IL 60090 Ph: (804)743-9401 Ph: (312)398-0110 U. Fisher Scientific Co. 3315 'Winton Road Raleigh, NC 27604 Ph: (919)876-2351 iv. HASCO 901 Jangsville Avenue Fort Atkinson, 171 53538 Ph: (414)563-2446 F. Private analyrical labs are available, but sample analyses are costly. G. The NCDA provides this service for :forth Carolina residents; i. Address: Ncr-h Carolina Department of Agriculture Agronomic Division Plant/Vaste/Solution Advisory Section Blue Ridge Road Canter P.O. Box 27647 Raleigh, NC Z7611 Fh: (919)733-2655 Lt=: Dr. Rap Campbell ii. Forward $4 along with the sample. iii. Include the following identification information with sample: a. Livestock species (dairy, swine, turkey, etc.) b. Livestock usage (swine -nursery, finishing; turkey -breeders, brooderhouse, grower, number flocks grown on litter; etc.) e. qasze type (dairy -lot scraped mw=e, liquid slurry; swine -pit slurry, lagoon liquid, sludge; broiler -house litter, stockpile iv. Routine analyses performed on all samples: N; F, R, Ca. Ng, Na. S, Fe, pia. 2n. Cu. B v. Additional analyses performed upon request: DX, No, Cd: Ni. Pb EMERGENCY ACTION PLAN PHONE NUMBERS DWQ 919 571— 4700 EMERGENCY MANAGEMENT SYSTEM 919-459- 7376 SWCD 919- 4 5 9- 4115 NRCS 919 - 4 5 9- 4115 This plan will be implemented in the event that wastes from your operation are leaking, overflowing,,or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. - You should make every effort to ensure that this does not happen. This plan should be, posted in an accessible location -for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of'dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e_ Make sure no surface water is`entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. t C. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. C. Close valves to eliminate further discharge. d. Repair all Leaks prior to restarting pumps. D: Leakage from flush systems, houses, solid separators -action include: a: Stop recycle pump. b. stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks - possible action: a. Dig a small well or ditch to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. C. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach t surface waters? g. Are potable water wells in danger (either on or off of the property) ? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, tail your DWQ (Division of Water Quality) regional office; Phone 919 571 -4700. After hours, emergency number: 919- 733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of.the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been lender taken, and the seriousness of the situation. b. If. spill leaves property or enters surface waters, call local EMS Phone number 919-459-7376. C. Instruct EMS to contact local Health Department. d. Contact. CES, phone number 919-459 -9814 , local SWCD office phone number 919-459- 4114 and 'local NRCS office for advice/technical assistance phone number 919- 459- 4115. 4: If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask. that person to contact the proper agencies for -you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: C-X -ze b. Contractors Address: o2F/3 , sn % C. Contractors Phone:_ 4N3­ 3 SV _ w 6: contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: NRCS/SWCD b. Phone:919 459-4115 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. c4udrh+ndlwordl.mp�c[pian.tl4 ° .e ! 5 4 i"', �:.•t �, !' .f+J/ :'! Ai.,, .,al Waste Management Plan C -, Lification Please tvne or mint all information that does not require a signature General Information: Name of Farm: Boone Fret,, ki, Facility No: 6Y -- 7e Owner(s) Name: _8..A2gne T PhoneNo:_9i9-.Wy3-33y� Mailing Address: z l,� vol",Lteee gQo_cj slh c;ty Nc 17rzz.- Farm Location: County Farm is located in: N0.s� Latitude and Longitude: 3S" 54' 3 7. 77 ° .58 ' 0 o2. 7 ' Integrator: ' Please attach a copy of a county road map with location identified and describe below (Be specific: road names, directions, milepost, etc.): on .5Q l815 C Volunteer Rd) b h;n Coog_er's F/c- QcQ4,,f ne4 Operation DescriDtio Type of Swine No. of Animals O Wean to Feeder Q1 Feeder to Finish _ ,.16 0 ❑ Farrow to Wean -. ❑ Farrow to Feeder ❑ Farrow to Finish O Gilts ❑ Boars Type of Poultry ❑ Layer © Pullets No. of Animals Type of Cattle 0 Dairy El Beef No. of Animals Other Type of Livestock. Number of Animals. Acreage Available for Application:LIP Required Acreage: Number of Lagoons /Storage Ponds : Total Capacity: s 3 �j 7d8.8 Cubic Feet (ft3) Are subsurface drains present on the farm: YES or (!�) (please circle one) If YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD (please circle one) Owner / Manager Agreement I (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. 1 (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25-year, 24-hour storm and there must not be run-off from the application of animal waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conservation Service. The approved plan will be Sled at the farm and at the office of the local Soil and Water Conservation District. I (we) know that any modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to implementation. A change in land ownership requires written notification to DEM or a new certification (if the approved plan is changed) within 60 days of a title transfer. Name of Land ?7 Signature•�� n Date: Name of Manager(if different from owner): Signature: Date: r� AWC -- August 1, 1997 ethnical Specialist Certifcation L As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005, i certify that the animal waste management. system for the farm named- above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEM) as specified in 15A NCAC 2H.0217 and the USDA -Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001- .0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC, 1), the technical specialist should only certify parts for which they are technically competent. H. Certification of Design A) Collection Storage, Treatment System Check the appropriate box �D Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity; storage capability consistent with waste utilization requirements, =etrofitted)[ggilily El New, expanded o (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print): t e L Affiliation N F,. ( S Date Work Completed: t 2 - - Address (Ageaq): kokt-, to-i 4, N, 4L,'. �G. n1L. ; 7i, sc. Phone No.: 2 rz - Ycr- 4�/ Signature _ c -IK�. C Z -L / —9 B) Land Application Site (WUP) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management; hydraulic and nutrient loading rates. Name of Technical Specialist (Please Print): !, Edw"d Lone . . Affiliation Na.xk sa;1 D;gf,; Date Work Completed:z / V 175 Address ( Signature C) Runoff Controls from Exterior Lots Check the appropriate box a Facility withQut exterior lot (SD or WUP or RC) This facility does not contain any exterior lots. No.: z'fa •-y59-y/l,6' A A//9F ❑ Facilily with exterior (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print): T. E cjard Lane Affiliation iL so;w COA eoodl'crn D+3tl':C-f Date Work Completed: /A AZI/ 98 Address (Agency): Ra l07 4@ ce tf, or�ue: Alai .u, Ile NCy.Vie Phone No.:,a5z- yJ9-91l f_ Signature _ 2- - Date: /z112/1 g8 AWC -- August 1, 1997 III. Certification ication of Installation A) Collection, Storage Treatment Installation New —expanded or retrofitted facility (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meet or exceed the minimum standards and,specifications. For existing facilities without retrofits, no certification is necessary. Name of Technical Specialist, (Please Print): 5 4 -e 86 71 Affiliation X c: Q, Date Work Completed: r Z - F . ? s Address (Agency) F,,;,,10-7 ':.�� ?�, t� N,/,�,lC� Nk. ?�,£4. ._Phone No.: r5-2-Q( i-q//- — Signature: B) Land Application Site (WUP) Check the appropriate box Z The cropping system is in place on all land as specified in the animal waste management plan. rl Conditional Approval: all required Iand as specified in the plan is cleared for planting; the cropping system as specified in the waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by (month/day/year); the proposed cover crop is appropriate for compliance with the wasteuWiza6on plan. cl Also check this box if appropriate if the cropping system as specificd in the plan can not be established on newly cleared land within 30 days of this certification, the owner has committed to establish an interim crop for erosion control; Name of Technical Specialist (Please Print): J- fd ward Long _..._ Affiliation 61j QA ,So, f oistr; O Date Work Completed: !z - Z/ - 48 . Address (Agency): o Dr;r- ,t.v;l NC ;L ? Fr,56 Phone No.:z-q59-y//5 Signature: �y Date: /zz/---V/ i� This following signature block is only to be used when the box for conditional approval in III. B above has been checked. I (we) certify that I (we) have committed to establish the cropping system as specified in my (our) waste utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: _ _ Date: AWC -- august 1. 1997 D). A lication and Han. - tg-Eguil2ment Check the appropriate box (WUP or I). Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates, a schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). J w without existing w (I) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate rife waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). w withg2ut existing waste �nrav irrigation. (WUP or I) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). Name of Technical Specialist (Please Print): U-Edward Gd Affiliation GWaJer ^� Date Work Completed: I2/A/ / 98 Address (Agency):__ Roam. 107 AQ Cepler True Na.skv;lle &C� t7ef6 Phone No.:;J;Z-y69-yl1S Signature: 5�� Date: IA/Al/98 E) Odor Control, Insect Control, Mortality Manat*ement and Emereencv Action Plan (SD SI. WUP, RC or I} The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Management Plan and the Emergency Action Plan are'complete and can be implemented by this facility. Name of Technical Specialist (Please Print): T. Edwurd 1-*-,9 Affiliation 4- Soil ¢ coa.4e-e Date Work Completed: /A /.Z//913 _ Address (Agency): R 102Cea er ;u a v ` NG a,7-y d Phone No.: ZS�'y19-y113 Signature: ��_ L-/= _Date: 1-Z/2//98 F) Written Notice of New gLExpanding Swine Farm The following signature block Is only to be used for new or expanding swine farms that begin construction after June 21, 1996. If the facility was built before June 21, 1996, when was it constructed or last expanded I (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and all property owners who own property located across a public road, street, or highway from this new or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-803. A copy of the notice and a list of the property owners notified is attached. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: Date: AWC -- August 1, 1997 3 C) Runoff Controls iron. Aerior Lots (RC) Facility with exterior lot Methods to minimize the run off of pollutants from lounging and heavy use areas have been installed as specified in the plan. For facilities without exterior lots, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation _ Date Work Completed: Address (Agency): Phone No.: Signature: Date: D) Application and Handling Equipment Installation (WUP or I) Check the. appropriate block _ _ ® Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as part of the plan. tJ Animal waste application and handling equipment specified in the plan has not been installed but the owner has proposed leasing or third party application and has provided a signed contract; equipment specified in the contract agrees with the requirements of the plan; required buffers can be maintained; calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Cl Conditional approval: Animal waste application and handling equipment specified in the plan has been purchased and will be on site and installed by (month/day/year); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): J AffiliationN.-5G so;/ 4 w�-+Gr ConS[c,,�,J,-a D,*gt'-,•E± Date Work Completed: iz/zi/9k' Address (Agency): RQgo, 102 Phone No.: a5z- y59-1111.3 Signature:, -� ��-, _ Date: 1211U _ The following signature block is only to be used when the box for conditional approval in III D above has been checked. I (we) certify that I (we) have committed to purchase the animal .waste application and handling equipment as specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature:_ _ _ Date: Name of Manager (if different from owner): Signature: Date: E) Odor Control. Insect Control and Mortality ManaLrement (SD, SI, WUP, RC or I Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system as specified in the Plan has also been installed and is operational. Name of Technical Specialist (Please Print):_T, Z-0,. _- v----- Affiliation co'sery-F;ow 0;5fr,'0-1 Date Work Completed: l Address (Agency): A,, o.? A, Cetfer c.skd,;!/c IYC 6 Phone Signature: Date: /G21,2//M AWC -- August 1, 1997 Please return the completed form to the Division of Water Quality at the following address: Department of Environment, Health, and Natural Resources Division Of Water Quality Non -Discharge Branch, Compliance Unit P.O. Box 29535 Raleigh, NC 27626-0535 Please also remember to submit a copy of this form along with the copiplete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your flies with your Animal Waste Management Plan. AWC -- August 1, 1997 6 X4 THIS DESIGN IS FOR A'SINGLE.STAGE LAGOON CLIENTS NAME --------------------------> COUNTY TODAYS DATE _-___--_-------------------> DISTANCE TO NEAREST NONFARM RESIDENCE => NUMBER OF PIGS WEANLING TO FEEDER NUMBER OF PIGS FEEDER TO FINISH =======> NUMBER OF SOWS FARROW TO WEANLING NUMBER OF SOWS FARROW TO FEEDER NUMBER OF SOWS FARROW TO FINISH DEGREE OF ODOR CONTROL (minimum 1.0 cu. ft. per lb SSLW) (maximum 3.0 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > TOP LENGTH AT NORMAL WATER LEVEL TOP WIDTH AT NORMAL WATER LEVEL NORMAL WATER LEVEL ELEVATION ==========> SEASONAL HIGH WATER TABLE ELEVATION =__> LAGOON BOTTOM ELEVATION=------------�T> Depth of Permanent Water 11.0 (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES Permanent Volume Required 197316.0 Permanent Volume Provided 226678.0 ADDITIONAL DRAINAGE AREA IN SQUARE FEET> (i.e. pumpout pond & other outside area) LENGTH OF PUMPING CYCLE GALLONS OF FRESH WATER ADDED DAILY ====> EXCESS RAINFALL ABOVE EVAPORATION =--==> 25YR/24HR STORM RAINFALL FREEBOARD=----------------------------> ESTIMATED TOP OF DAM ELEVATION =-----==> Temporary Storage Volume 83486.0 Top of Dam Elevation = 45.9 Inside Dimensions of Lagoon at Top of Dam Length = 320.0 feet Width = 110.0 Begin Pumping Elevation = Stop Pumping Elevation = Volume To Be Pumped = BURT BOONE NASH COUNTY, NORTH JANUARY 29, 1997, 0 FEET 0 1260 0 0 0 1.0 2.0 YEARS 304.4 FEET 94.4 FEET 42.0 FEET 0.0 FEET 31.0 FEET feet 2.0.1 cubic feet cubic feet CAROLINA 0 SQUARE FEET 180 DAYS 0 GALLONS 7.7 INCHES 6.6 INCHES 1.0 FEET 45.9 FEET cubic feet feet feet = 33, x0o ft" - Vag 113 Fi L 44.2 feet 42.0 feet 64126.0 cubic feet 1. STEADY STATE LIVE WEIGHT ' 0 head weanling to feeder x 30 lbs. - 0 lbs 1260 head feeder to finishing x 135 lbs. - 170100 lbs 0 sows farrow to weanling x 433 lbs. - 0 lbs 0 sows farrow to feeder x 522 lbs. = 0 lbs 0 sows farrow to finish x 1417 lbs. = 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) - 170100 lbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.080 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in swine. Years of sludge accumulation in design? 2.0 Sludge Volume = 27216.0 cubic feet 3. REQUIRED LIQUID VOLUME OF LAGOON Design for 1.0 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = 197316.0 cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 42.0 feet Construct lagoon bottom elevation 31.0 feet Lagoon size for normal lagoon liquid volume using prismodial formula SS/ENDI SS/END2 SS/SIDE1 SS/SIDE2 DEPTH 2.0 2.0 2.0 2.0 11.0 AREA OF TOP LENGTH *WIDTH = 304.4 94.4 28735.4 (AREA OF TOP) AREA OF BOTTOM Lb * Wb = 260.4 50.4 13124.2 (AREA OF BOTTOM) AREA OF MIDSECTION (Lm * Wm) 282.4 72.4 20445.8 (AREA OF MIDSECTION) CU. YD. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 28735.4 81783.0 13124.2 1.833 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL=226678.0 CU. FT. VOLUME NEEDED = 197316.0 CU. FT. THE SURFACE DIMENSIONS OF THE LAGOON AT NORMAL LIQUID LEVEL ARE 304.4 FEET LONG BY 94.4 FEET WIDE 5. DIKE Place spoil as a continuous dike to elevation 45.9 feet. 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width - 320.0 110.0 35200 square feet Additional Drainage Area 0 square feet TOTAL DA 35200 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 170100 SSLW * 0.0101481 gallon/lb. SSLW/day in the pumping cycle / 7.48 gallons per cu. ft. Volume = 41539.4 cubic feet 6B. Volume of wash water This is the amount of fresh water used for washing floors or volume fresh water used for a flush system. Flush systems that recycle the lagoon water are accounted for in 6A. Volume = 0 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 0.0 cubic feet 6C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) = 7.7 inches Volume = 7.7 inches * DA / 12 inches per foot Volume = 22586.7 cubic feet all, V41uhle of 25 year - 24 hour storm Volume = 6.6 inches * DA / 12 inches per foot Volume = 1.9360.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 41539.4 cubic feet 6B• 0.0 cubic feet 6C. 22586.7 cubic feet 6D. 19360.0 cubic feet TOTAL TEMPORARY STORAGE 83486.0 cubic feet 7. DEPTH OF STORAGE REQUIRED (ABOVE NORMAL LIQUID ELEVATION OF LAGOON) Depth required = Volume of temporary storage divided by surface area of lagoon. Depth required = 83486 cu.ft. / 28735 sq. ft. Depth required = 2.9 feet Normal lagoon liquid elevation = 42.0 feet Depth required = 2.9 feet Freeboard - 1.0 feet Top of Darn - 45.9 feet THE DIMENSIONS OF THE INSIDE EDGE OF THE DAM AT ELEVATION 45.9 ARE 320.0 FEET BY 110.0 FEET 8. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 6A. 41539.4 cubic feet 6B. 0.0 cubic feet 6C. 22586.7 cubic feet TOTAL PUMPED VOLUME = 64126.0 cubic feet Depth required = Volume of pumped storage divided by surface area of lagoon at normal water level. Depth required = 64126.0 cu.ft. / 28735.4 sq. ft. Depth required = 2.2 feet DESIGNED BY: APPROVED BY: DATE: DATE: IN nn•n Rp n'nC AC'I Ap ulul A adid 10 td0] AA'paF pp7 T'ph Ah'F pF ujui A adid 10 du "I APP ON ;,ph AC'C IC lJJl1T p adid 10 dua nr,IFC pap A`Rh AC'F 4C 4i]UI p adid 10 da1 (An 'fit'r n NT Allb nG'F CF TaAaT pinbif Ali, 41 TT h'hh nf'I hP „n'h4'F Pt 414h AV FC' 0 1.aC A/R A. U T 7F An'ppF GaF 7'kh AF'p rF nn'i'7C 1.aC F'Ah A;'p AF AA'FtF ChF p'G6 fit h kp An'GAF hhF 17'7h A�. h pp A!1'IAr P;c h'qh Af'C la nn'hA;' CkT 4'4h A1,16 RR An Opp FTt A4'C Cp A6,ohp Fh h'Oh A1'C h7 An'4F7 hl C'Gh An'C :P ltA'CFR A6 h'4h nr'C 77 nn'Ar AT !'4h Ap'h TP AA'Ah 7p n'f6 nC'h Ap J! aTOU AA'k Ph C'!h An'h AT IahaTYpinbu An '44 I n'Th AC'nT pr Il3lli P adid 10 d01 nA'CQ 16 F'Fh APIP fT U]4li P adid 14 d+ia An'np w p'ah n!'P PT A+1'PC Ph C'Ch I]A'4 CT A {.T I'P6 nh•p hT nit'v6T 44, A*Pb APIP Ff Ikn'Chl CPT !'7h np'R at An`phf pCT 4P6 AG'p tt AA'7PT At R'ph At IQ nt ,tn•CTI PAP F'ph APIP t.. Cap T'Ch 1W R p An'xk 16P C'F6 Ail'p 1 An'f14 TFa 'p6 n9'p 4 An'1q PAT A'Ch (1c P C AWAC PDT :'Ph AC'p h An'hC I C T 1'hh nR'Q C ti,'pC ppT ?'Ch AF'4 p Fi a5n0ll a0isaa %0Q f sm i 1auiu Mil 11A I AA'A Ap nA•TIC nC' TC nC' f _ T :RltSallfJm 11CW0 IRTa Al -II RJ T4t CA y_, U 'r 'T ::) _I. e i ! .I 1. _t o t� l `` '`ti :Z. l_2 i" l d —I l_f Z ?i? N I am I abeo 1119 .fan -LIFT Zob Numb(!:?r ..... Fo�nt isio. X C-sord. y [oord. =��� 6.7"1,9 � 4L" -1 i4.14 i6.G� �i 6.i6 7.5G -52.7-1 7j,4 ��9 -6i,�5 E4 -B 0.54 -46.5� E�6 -i7G.i4 TZ�.3i �7 -�5'7.i6 i7G � e -�67.3� �i6.4� -256.G5 E3�.�� 0 675 3l -iG E7�.�7 32 -iS9.06 a3i'44 -73.()3 i9 6.73 4�.47 �istance rnm last point to i r s t point........ Length of path from first point to la5t point.. Total per�meter of ti .............,,. Total area within the boun(jary'..'...'...' Total area G65.� feet 065 fet 4tJ,7i3.() 5q.Tt, �.9 acros QH- Ver 3.v iu i x uv ir`� L 0 ff 1 F:1 U L FD- 0C- V - 1- wt I J. J. lid i"1 i] 'G f 3 Page i rioicea 0i1e1,;i i Producer: L. B. BOONE (FINISHING FARM) The purpose of this plan is to provide guidelines for`carryind out the routine operation and maintenance work needed to keep this swine waste management system functioning as -planned. Routine maintenance is considered to be normal good care of the system. Good maintenance adds to beauty, usefulness, and permanence. A. Maintenance The routine maintenance of the lagoon involves the following: 1. Maintenance of a vegetative cover on the embankment top and side slopes: FESCUE is being established on these areas. Beginning in 1998 and each year thereafter, the embankment should be fertilized with 800 pounds of 10-10-10 per acre to maintain a vigorous stand. 2. Control of brush and trees on the embankment. This.may be done by mowing, spraying, or chopping, or a combination of all three. This will need to be done at least once each year and possibly twice in years favorable to heavy growth of vegetation. Maintenance inspections of the lagoon should be made during the initial filling of the lagoon and at least annually. Items to be checked should include, as a minimum, the following: 1. Waste Inlet Pipes, Overflow Pipes a. condition of pipes (1) separation of joints (2) cracks or breaks 2. Pool Area a. undesirable vegetative growth b. floating or lodged debris 3. Embankment a. settlement, cracking or "jug" holes b. side slope stability - slumps or bulges C. erosion and rodent damage 4. Transfer Pump 1 M B. Operation Your animal waste management facility was designers for a total of 1260 sows/animals (—FEEDER— to —FINISH—). The lagoon contains both permanent and temporary storage. The permanent storage is not to be pumped in order to ensure that anaerobic action will occur. The design includes permanent storage of one cubic foot per pound of steady state live weight. The temporary storage portion of the lagoon includes capacity for the volume of waste produced over 180 days, the amount of rainfall in a 25 year 24 hour storm event, and rainfall in excess of evaporation. Your facility is designed for 180 days of temporary storage; therefore, it will need to be pumped every six months. Begin pump -out of the lagoon when fluid level reaches elevation 44.2 as marked by permanent markers. Stop pump -out when the fluid —level reaches elevation _42.0` The attached waste management plan should be followed. This plan recommends sampling and testing of waste (see Attachment B) before land application. The waste material should be analyzed before each application cycle to determine its nutrient content. A soil test of the area of application should be made annually to insure the waste is applied as reasonably and practically possible to recommended rates. It is strongly recommended that the treatment lagoon be pre -- charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environmental Management, has the responsibility for enforcing this law. 2 1. STEADY STATE LIVE WEIGHT 0 head weanling to feeder x 30 lbs. - 0 lbs 900 head feeder to finishing x 135 lbs. = 121500 lbs 0 sows farrow to weanling x 433 lbs. = 0 lbs 0 sows farrow to feeder x 522 lbs. 0 lbs 0 sows farrow to finish x 1417 lbs. - 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) - 121500 lbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.080 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in swine. Years of sludge accumulation in design? 0.0 Sludge Volume = 0.0 cubic feet 3. REQUIRED LIQUID VOLUME OF LAGOON Design for 1.0 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = 121500.0 cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal .lagoon liquid level at elevation 39.0 feet Construct lagoon bottom elevation 30.4 feet Lagoon size for normal lagoon liquid volume using prismodial formula SS/END1 SS/END2 SS/SIDEI SS/SIDE2 DEPTH 2.5 2.5 2.5 2.5 8.6 AREA OF TOP LENGTH *WIDTH 171.5 146.5 AREA OF BOTTOM Lb * Wb = 128.5 103.5 AREA OF MIDSECTION (Lm * Wm) _ 150.0 125.0 25124.8 (AREA OF TOP) 13299.8 (AREA OF BOTTOM) 18750.0 (AREA OF MIDSECTION) CU. YD. = [AREA,TOP`+ (4*AREA MIDSECTION):+ AREA BOTTOM] * DEPTH/6 'tit :W _T 25124.8- 75000.0 13299.8 1.433 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL=162575.1 CU. FT. THIS DESIGN IS FOR A SINGLE STAGE LAGOON CLIENTS NAME COUNTY=_--__----------------___---_ __> TODAYS DATE DISTANCE TO NEAREST NONFARM RESIDENCE _> NUMBER OF PIGS WEANLING TO FEEDER NUMBER OF PIGS FEEDER TO FINISH =____=_> NUMBER OF SOWS FARROW TO WEANLING NUMBER OF SOWS FARROW TO FEEDER NUMBER OF SOWS FARROW TO FINISH DEGREE OF ODOR CONTROL (minimum 1.0 cu. ft. per lb SSLW) (maximum 3.0 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > TOP LENGTH AT NORMAL WATER LEVEL TOP WIDTH AT NORMAL WATER LEVEL NORMAL WATER LEVEL ELEVATION ==========> SEASONAL HIGH WATER TABLE ELEVATION LAGOON BOTTOM ELEVATION Depth of Permanent Water 8.6 (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES Permanent Volume Required 121500.0 Permanent Volume Provided 162575.1 ADDITIONAL DRAINAGE AREA IN SQUARE FEET> (i.e. pumpcut pond & other outside area) LENGTH OF PUMPING CYCLE GALLONS OF FRESH WATER ADDED DAILY =___> EXCESS RAINFALL ABOVE EVAPORATION =____> 25YR/24HR STORM RAINFALL---____----_-__> FREEBOARD ESTIMATED TOP OF DAM ELEVATION ========> Temporary Storage Volume 67029.7 Top of Dam Elevation = 42.7 Inside Dimensions of Lagoon at Top of Dam Length = 190.0 feet Width = 165.0 BURT BOONE NASH COUNTY, NORTH JANUARY 29, 1997 0 FEET 0 900 0 0 0 1.0 0.0 YEARS 171.5 FEET 146.5 FEET 39.0 FEET 0.0 FEET 30.4 FEET feet 2.5.1 cubic feet cubic feet CAROLINA 0 SQUARE FEET 180 DAYS 0 GALLONS 7.7 INCHES 6.6 INCHES 1.0 FEET 42.7 FEET cubic feet feet feet = 3113.50.0-P24 31, 699, dffz Begin Pumping Elevation = 41.0 feet Stop Pumping Elevation = 39.0 feet Volume To Be Pumped = 49787.2 cubic feet VOLUME NEEDED = 121500.0 CU. FT. THE SURFACE DIMENSIONS OF THE LAGOON AT NORMAL LIQUID LEVEL ARE 171.5 FEET LONG BY 146.5 FEET WIDE 5. DIKE Place spoil as a continuous dike to elevation 42.7 feet. 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 190.0 165.0 31350 square feet Additional Drainage Area 0 square feet TOTAL DA 31350 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 121500 SSLW * 0.0101481 gallon/lb. SSLW/day in the pumping cycle / 7.48 gallons per cu. ft. Volume = 29671.0 cubic feet 6B. Volume of wash water This is the amount of fresh water used for washing floors or volume fresh water used for a flush system. Flush systems that recycle the lagoon water are accounted for in 6A. Volume = 0 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 0.0 cubic feet 6C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) = 7.7 inches Volume = 7.7 inches * DA / 12 inches per foot Volume = 20116.2 cubic feet 6D. Volume of 25 year - 24 hour storm Volume : 6.6 inches * DA / 12 inches per foot Volume = 17242.5 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 29671.0 cubic feet 6B. 0.0 cubic feet 6C. 20116.2 cubic feet 6D. 17242.5 cubic feet TOTAL TEMPORARY STORAGE 67029.7 cubic feet 7. DEPTH OF STORAGE REQUIRED (ABOVE NORMAL LIQUID ELEVATION OF LAGOON) Depth required = Volume of temporary storage divided by surface area of lagoon. Depth required = 67030 cu.ft. / 25125 sq. ft. Depth required = 2.7 feet Normal lagoon liquid elevation = 39.0 feet Depth required - 2.7 feet Freeboard _ 1.0 feet Top of Dam - 42.7 feet THE DIMENSIONS OF THE INSIDE EDGE OF THE DAM AT ELEVATION 42.7 ARE 190.0 FEET BY 165.0 FEET 8. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 6A. 29671.0 cubic feet 6B. 0.0 cubic feet 6C. 2011.6.2 cubic feet TOTAL PUMPED VOLUME = 49787.2 cubic feet Depth required = Volume of pumped storage divided by surface area of lagoon at normal water level. Depth required = 49787.2 cu.ft. / 25124.8 sq. ft. Depth required = 2.0 feet DESIGNED BY: APPROVED BY: DATE: DATE: ° � all-Ver �urt �o�r�e / ~^� � - �0 ' � � ======== � � i � 6 u 3ob i\umber ��.1y i27� .� i56.H6 66 4 76.E� _,j'7�� i6.7G 33.54 z:�6'i4 Y, [oord. �istance from last point to first point........ LL-ngth of path from first point to laF� t point.. Total perimeter of the bound�.ry..'.......'..... Total are La within the boundary............ Total area within the boundary.'.......-....... ^ �.� TeeT 657.3 �eet 65feet 3i,6�5.G ft. �.� acrms Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through.143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any pans, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be rea6ed",k-(919) 571-4700: --Ifyou need- additional information concerning this COC or the General Permit, please contact Michelle Barnett at (919) 733-5083 ext. 544. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWGI00000) CC' (Certificate of Coverage only for all cc's) Raleigh Regional Office, Water Quality Section Nash County Health Department Nash County Soil and Water Conservation District Permit File AWS640076 NDPU Files Michael F. Easley, Governor William G. Ross Jr„ Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Duallty May 1, 2003 Louis B. Boone L.B. Boone Finishing Operation 2813 Volunteer Road Elm City NC 27822 Subject: Certificate of Coverage No. AWS640076 L.B. Boone Finishing Operation Swine Waste Collection, Treatment, Storage and Application System Nash County Dear Louis B. Boone: On April 28, 2003, .the North Carolina General Assembly ratified Senate Bill 733 which directs the Division of Water Quality (Division) to extend the expiration date of the Swine Waste Operation General Permit AWG100000. Therefore, the General Permit has been re -issued by the Division to extend the expiration date to October 1, 2004. During the period of this extension the Division will be working with all interested parties on the development of a new version of the Non -Discharge General Permit. In accordance with your application received on February 28, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Louis B. Boone, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG 100000. The issuance of this COC supercedes and terminates your previous COC Number AWS640076 which expired on April 30, 2003. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the L.B. Boone Finishing Operation, located in Nash County, with an animal capacity of no greater than an annual average of 2160 Feeder to Finish swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until October 1, 2004. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. A rRN Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 Customer Service Center An Equal Opportunity Action Employer Internet httpJ/h2o.enr.state.nc.us/ndpu Telephone (919) 733-5083 Fax (919)715-6048 Telephone 1-877-623-6748 50% recycled/10% post -consumer paper 00 ."4IMAL WASTE UTILIZATION PL,4 Producer: Location: Telephone: Type Operations: Number of Animals: (Design Capacity). STORAGE STRUCTURE: APPLICATION METHOD: L. B. BOONE 2813 VOLUNTEER ROAD ELM CITY NC 27882 919-443-3349 Existing Feeder to Finish Swine 2160.00 hogs Anaerobic Waste Treatment Lagoon Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients.can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5'or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, ' or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. r Page: 1 ��i ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to'reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve -nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2160 hogs x 1.9 tons waste/hogs/year = 4104 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2160 hogs x 2.3 lbs PAN/hogs/year = 4968 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL -TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE. CODE AW N PER ACRES AW N PER AC . AC USED --- - or -----•--- APPLY RESID. APPLIC METH N TIME END z TOTALI0 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required -only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------ APPLY RESID. APPLIC METH N TIME 5157 1 NOB BH 6.1 305 0.0 1.0.8 3294 APR -SEAT 5157 5157 5157 5157 5157 742 FL,56 -1 INOB B NOB -B NOB 5 NOB " 5 NOB 1 NOB �1 NOB END SG I50.0 150 10.0 110.8 (540 SEPT-MAR BH 6.1 305 0.0 11.6 1488, APR--SEPT SG 50.0 0.0 150 11.6 180 SEPT--MAR BH 6.1 305 0.0 10.4 1122 APR-SEPT SG 50.0 0.0 150 10.4 120 SEPT-MAR BH 6.1 305 0.0 1.2 1366 APR-SEPT SG 50.0 150 0.0 11.2 160 SEPT-MAR TOTAL14970 Indicates that this field is being overseeded (i:e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four Page: 4 ANIMAL WASTE UTILIZATION PLAN inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to'let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result, in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height'of about two inches before drilling for best results. ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP,CODE CROP UNITS PER UNIT 50 1.0 BH SG BERMUDAGRASS - HAY SMALL GRAIN OVERSEEDED TONS BU TABLE 1 TABLE 2 TOTAL TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 0 0 14 4970 14 4970 * BALANCE -2 Page: 5 ANIMAL WASTE UTILIZATION PL*N *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 6 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures.to prevent over application of nutrients or other elements. Your production facility will produce approximately 799.2 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 3996 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 13.32 acres of land. If you apply the sludge to corn at . the rate of 125 pounds of nitrogen per acre, you will need 31.968 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the.soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 7 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts.. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) 5157 1 NOB BH 0.50 *1.00 5157 5 NOB BH 0.50 *1.00 5157 B NOB SH 0.50 *1.00 5157 -1 NOB SG 0.50 *1.00 5157 -5 NOB SG 0.50 *1.00 5157 'B NOB SG 0.50 *1.00 742 1 NOB SH 0.50 *1.00 742 -1 NOB SG 0.50 *1.00 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. in no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior.to applying the waste. Page: 8 ANIMAL WASTE UTILIZATION PLAN NARRATIVE OF OPERATION Page: WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of thq state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 11 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility -of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels,, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the. markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 12 ANIMAL WASTE UTILIZATION .AN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:L B. BOONE FINISHING OPERATION Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing,design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil, and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: L. B. BOONE (Please print) Signature: Date: /9 Name of Manager( if different from owner) : S. I6644le (r. Signature: � ,yp �.� �L Date: '�i� I� 0/99 'Name of Pearson Preparing Plan: (Please print)J. Edward Long Affiliation:Nash.Soil and Water Conservation District Phone No. 919-459-4115 Address (Agency): Room 107 Ag. Center Drive Nashville NC 27856 Signature: Date: /z/a//9r Page: 13 ANIMAL WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be .leased, etc.) �J � 1, C� /`�/ ' B�c.� -^. hereby give�-�-- permission to apply animal waste from his Waste Utilization System on A" --S acres of: my land for t_he duration or time shown below. The field(s) on which waste can be applied are shown on the attached map. A�el 6�/J I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand ,that the use of waste will reduce my need for commercial fertilizer. 1 rf/ Adjacent Landowner: lE,� 1` Date: ' Waste Producer: Date: Technical Representative: Date, 2 - 2 -p 3 SWCD Representative: Date: 2 - 2 -d3 �_ Term o_f Agreement: %"�-E}CJ: to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 14 ANIMAL WASTE UTILIZATION PLAN ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be .leased, etc.) hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map.�� I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial. fertilizer. Adjacent Landowner: r �% i Date: Waste Producer: C�dz Date. Technical Representative: -Date: oz-7- 03 SWCD Representative: Z! _ Date: o z--7-03 Term of Agreement: , -1-9_ to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 14 ;I• + ' .. 1 '' •� I ::' n� W ��.',Y1"l�� y��:h'/�r' .ter. ' J • I �SI, FI -1 � I S�.[ '�i• � Z�.i.iirxJ frnJ�1 ///� �•.� jam' s>,• .;�'.'�, -J'' �,• i'y �;.,! k. ' r ter" �: .v r U.S. DEPARTMENT OF AGRICULTURE PAGE I OF I NATURAL RESOURCES CONSERVATION SERVICE O1/4/99 SOIL MAP LEGEND Legend Map Soil name symbol AaA jAltavista sandy loam, 0 to 3 percent slopes AbA lAltavista-Urban Land complex, 0 to 3 percent slopes AuB lAutryville loamy Band, 0 to 6 percent slopes Bb jBibb loam, frequently flooded BnB IRlanton loamy sand, 0 to 6 percent slopes BoB jBonneau loamy sand, 0 to 4 percent slopes Co lCongaren fine sandy loam, frequently flooded DoA jUothan loamy nand, U to 3 percent slopes FaB IFaceville loamy sand, 1 to 6 percent slopes GeB jGeorgeville loam, 2 to 6 percent nlopf!v GeC lGeorgeville loam, 6 to 10 percent slopes GeE lGeorgeville loam, 10 to 25 percent slopes GgB lGeorgeville gravelly loam, 2 to 6 percent slopes GgC jGeorgeville gravelly loam, 6 to 10 percent slopes GgE �Georgeville gravelly loam, 10 to 25 percent slopes GoA (Goldsboro fine sandy loam, 0 to 2 percent slopes GrB jGritney sandy loam, 2 to 6 percent slopes GrC IGritney sandy loam, 6 to 10 percent slopes GuB IGeorgeville-Urbarr Land complex, 0 to 6 percent slopes HeB lHelerra coarse sandy loam, 2 to 6 percent slopes Me IMeggett loam, frequently flooded NaC INankin sandy loam, 2 to 10 percent slopes NnB INason loam, 2 to 6 percent slopes NnC jNason loam, 6 to 10 percent slopes NoA INorfolk loamy sand, 0 to 2 percent slopes NOB jNorfolk loamy sand, 2 to 6 percent slopes NpB Norfolk -Wedowee complex, 2 to 6 percent slopes NrS INorfolk, Georgeville, and Faceville soils, 2 to 8 percent slopes NUB Norfolk -Urban Land complex, 0 to 6 percent slopes Ra lRains fine sandy loam Rb Rains -Urban Land complex To ITomotley fine sandy loam Ud jUdorthents, loamy Ur jUrban Land W lWater WeB 1wedowee coarse sandy loam, 2 to 6 percent slopes weC kWedowee coarse sandy loam, 6 to 10 percent slopes Wh IWehadkee loam, frequently flooded WkA 1wickham fine sandy loam, 0 to 3 percent slopes WOA lWorsham loam, 0 to 2 percent slopes j I �­ "­ , 1, . : , �md' 'vr I 4,41 THIS DESIGN IS FOR A'SINGLE.STAGE LAGOON CLIENTS NAME ----___-___----______----___> BURT BOONE ; COUNTY -----_________________-_--____-__> NASH COUNTY, NORTH CAROLINA TODAYS DATE _---_______----_-_____---_-___> JANUARY 29, 1997 DISTANCE TO NEAREST NONFARM RESIDENCE _> 0 FEET NUMBER OF PIGS WEANLING TO FEEDER =-_=_> 0 NUMBER OF PIGS FEEDER TO FINISH =-_____> 1260 NUMBER OF SOWS FARROW TO WEANLING =--=_> 0 NUMBER OF SOWS FARROW TO FEEDER=-WW===> 0 NUMBER OF SOWS FARROW TO FINISH.====___> 0 DEGREE OF ODOR CONTROL -_______________> 1.0 (minimum 1.0 cu. ft. per lb SSLW) (maximum 3.0 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > 2.0 YEARS TOP LENGTH AT NORMAL WATER LEVEL =_---__> 304.4 FEET TOP WIDTH AT NORMAL WATER LEVEL =______> 94.4 FEET NORMAL4WATER LEVEL ELEVATION =___===—=> 42.0 FEET- SEASONAL HIGH WATER TABLE ELEVATION 0.0 FEET LAGOON BOTTOM ELEVATION===Q=====n=====> 31.0 FEET Depth of Permanent Water 11.0 feet (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES =__.________________________> 2.0:1 Permanent Volume Required 197316.0 cubic feet Permanent Volume Provided 226678.0 cubic feet ADDITIONAL DRAINAGE AREA IN SQUARE FEET> 0 SQUARE FEET (i�.e. pumpout pond &,other outside area) LENGTH OF PUMPING CYCLE _______________> 180 DAYS GALLONS OF FRESH WATER ADDED DAILY ====> 0 GALLONS EXCESS RAINFALL,ABOVE EVAPORATION =____> 7.7 INCHES 25YR/24HR STORM RAINFALL ______________> 6.6 INCHES y FREEBOARD 1.0 FEET ESTIMATED TOP -OF DAM ELEVATION ========> 45.9 FEET �r ; Temporary Storage Volume 83486.0 cubic feet z Sr Top of Dam Elevation - 45.,9 feet Inside Dimensions of Lagoon at Top of Dam Length = 320.0 feet Width 110.0 feet = 35, Begin Pumping Elevation• = ' '` 44.2 feet Stop Pumping< Elevation = - 42.0 feet Volume To.." Be Pumped - 64126.0 cubic feet •:h - S it ,] 1P3 t h ♦ ' }��11 :k_ '�ti11115.4y.`��...- 1..�!`9 1f..i; 4,, i �Ih41 4'f���..;}i� f / 1 V t; �h rf�.�4A�� �yA �•M* �i i I •r ,w .'�L/ S 1 Jf. �.� ...y 4.y �4hw vA ._._ .. .• . T �� y;•. , _.... .vf 1. STEADY STATE LIVE WEIGHT 0 head weanling to feeder x 30 lbs. - 0 lbs 1260 head feeder to finishing x 135 lbs. = 170100 lbs 0 sows farrow to weanling x 433 lbs. _ 0 lbs 0 sows farrow to feeder x 522 lbs. = 0 lbs 0 sows farrow to finish x 1417 lbs. - 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 170100 fbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.080 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in swine. Years of sludge accumulation in design? 2.0 Sludge Volume = 27216.0 cubic feet 3. REQUIRED LIQUID VOLUME OF LAGOON Design for 1.0 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = 197316.0 cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 42.0 feet Construct lagoon bottom elevation 31.0 feet Lagoon size for normal Lagoon liquid volume using prismodial formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 DEPTH 2.0 2.0 2.0 2.0 11.0 AREA OF TOP LENGTH *WIDTH = 304.4 94.4 AREA OF BOTTOM Lb * Wb - 260.4 50.4 AREA OF MIDSECTION (Lm * Wm) 282.4 72.4 28735.4 (AREA OF TOP) 13124.2 (AREA OF BOTTOM) 20445.8 (AREA OF MIDSECTION) CU. YD. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 28735.4 81783.0 13124.2 1.833 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL=226678.0 CU. FT. VOLUME NEEDED = 197316.0 CU. FT. THE SURFACE DIMENSIONS OF THE LAGOON AT NORMAL LIQUID LEVEL ARE 304.4 FEET LONG BY 94.4 FEET WIDE 5. DIKE Place spoil as a continuous dike to elevation 45.9 feet. 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon ( top of dike) Length * Width - 320.0 110.0 35200 square feet Additional Drainage Area 0 square feet TOTAL DA 35200 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 170100 SSLW * 0.0101481 gallon/lb. SSLW/day in the pumping cycle / 7.48 gallons per cu. ft. Volume = 41539.4 cubic feet 6B. Volume of wash water This is the amount of fresh water used for washing floors or volume fresh water used for a flush system. Flush systems that recycle the lagoon water are accounted for in 6A. Volume = 0 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 0.0 cubic feet 6C. Volume of rainfall in excess of evaporation. Use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) = 7.7 inches Volume = 7.7 inches * DA / 12 inches per foot Volume = 22586.7 cubic feet 6D. Volume of 25 year - 24 hour storm Volume = 6.6 inches * DA / 12 inches per foot Volume = 19360.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 41539.4 cubic feet 6B. 0.0 cubic feet 6C. 22586.7 cubic feet 6D. 19360.0 cubic feet TOTAL TEMPORARY STORAGE 83486.0 cubic feet 7. DEPTH OF STORAGE REQUIRED (ABOVE NORMAL LIQUID ELEVATION OF LAGOON) Depth required = Volume of temporary storage divided by surface area of lagoon. Depth required = 83486 cu.ft. / 28735 sq. ft. Depth required = 2.9 feet Normal lagoon liquid elevation = '42.0 feet Depth required = 2.9 feet Freeboard = 1.0 feet Top of Dam = 45.9 feet THE DIMENSIONS OF THE INSIDE EDGE OF THE DAM AT ELEVATION 45.9 ARE 320.0 FEET BY 110.0 FEET 8. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 6A. 41539.4 cubic feet 6B. 0.0 cubic feet 6C. 22586.7 cubic feet TOTAL PUMPED VOLUME = 64126.0 cubic feet Depth required = Volume of pumped storage divided by surface area of lagoon at normal water level. Depth required = 64126.0 cu.ft. / 28735.4 sq. ft. Depth required = 2.2 feet DESIGNED BY: APPROVED BY: DATE: DATE: Up r u3ui A adid T.d doi uut A adid .la dot t.3ui A adrd fa dOl put R_ adid is dai TanaT oinbir Prt aray lanai oinbxi u3ui A adid id dai um A adid io dai ra a5nou adl5ao XOG Milli larllp7 AN pal :>;t uAUT1nn An•n AA ,ln•gac g�a AAIOr 9CP nf,' Fgc :rnP tin 'pcc n1i n,l•9F TT An'hrr Air nn•kpr nip AA'47p Gap AA'PPF Aat: An'FTF Pbv An'AAC hhr AA'1fir PPC ,Ll'hA. CAT A41',1ga PTT AA 9r; fil O'l n b AA'AF A AA'A6 PP AA'A FIT A rl ko / h nn'cg rl� An'119 nr AA'Fe Ph nf,'ATT AT nA'gbT qh 'ChI FCT iWPhT a9T AA'PCF 4111 OA'CIT CAP �d,'Cr�t Cal An'kA IhP Ai TrP An'19 CAT ,lr}•cc cAT An fiC ICT 1i1i'PC PPT (WA AA 71914 l 1 C T R n•AC AC'I T'Are nh'C ?'RIB nF'C n•Ah nc•c �,•�fi nq•c h•hh ni•1 q•Ah AV 1'Ah AA'T 7'Ah AF'P r'Ah APIP A'Gh A1'h G'9h AA•h fi•ah nr'c q•qh AA•h A'Chti n9'C h'Gfi AT'C C'qh AA•+' h'9h AT I'Gh All n'1fi nC'6 C•rh AA'h A•Th Ac•AT C'Fh na•R A•;1y n1'g C•C6 An'9 T'Ch Ah'A A'Pfi n9'A 1'Ph AA'R A'Pfi AO'R Pb A1•A I'Ph AG'A T'rh Afi'A C'rr, AA'A AV A A'Ffi nc'A P'rh Ar•A 1'fih APIG Ch AF•9 AA'AC A777 4J AC'TC A):•r Tu r an E,Lr T', r -::t AEl r l3 LIVl-:]"1 Uc!•h.1 m T abed A'r JaA-un y in D2220114 1 aDe4 , 11. .1. >i1 U 3 b U Q I' T Y LP -k a A Q pa a n d u) o "i a4v dai - \ag+, da2 ['Ai, 4E3i3.1. I = 1,1.',)U I T : A-IHICZ aMA00P 1-0-44 hl A'P , Durt Boone Job Number ..... W7 Fodnt No. ========= Coord. ========== Y [oord. ========== i� 6.7:9 20 i4^i4 i6.8 251 2i 6.i6 7.04 W -12.77 -M.04 W -61'35 -4i,5GI 24 -80.54 -46.5) 25 -iii'26 -iq.Q, 26 -iJ8.i4 7?.3i G7 -257.i6 jii.78 -E67.34 Rj6'4;,-; -250'65 53?.9:� 3{' -iW.&D 262.75 &i -iG2.0) 570'2-,- 3� -159.()6 aW'44 33 -78.03 M.% i9 6.73 4i.47 Distance from last point to first point''.'.... Length of path from first point to last point.. Total perimeter of the boundary...........,.... Total area within the bounbary..'.....'..' Total area within the boundarv..-...'......,... 0 i / 22/97 0.() fmot 665.0 feet 865'0 feet 4()M3.() Sq-ft. 0.1 acros .Producer: L. B. BOONE (FINISHING FARM) The purpose of this plan is to provide guidelines for 'carrying out the routine operation and maintenance work needed to keep this swine waste management system functioning as planned. Routine maintenance is considered to be normal good care of the system. Good maintenance adds to beauty, usefulness, and permanence. A. Maintenance The routine maintenance of the lagoon involves the following: 1. Maintenance of a vegetative cover on the embankment top and side slopes: FESCUE is being established on these areas. Beginning in 1998 and each year thereafter, the embankment should be fertilized with Boo pounds of 10-10-10 per acre to maintain a vigorous stand. 2. Control of brush and trees on the embankment. This may be done by mowing, spraying, or chopping, or a combination of. all three. This will need to be done at least once each year and possibly twice in years favorable to heavy growth of vegetation. Maintenance inspections of the lagoon should be made during the initial filling of the lagoon and at least annually. Items to be checked should include, as a minimum, the following: 1. Waste Inlet Pipes, Overflow Pipes a. condition of pipes (1) separation of joints (2) cracks or breaks 2. Pool Area a. undesirable vegetative growth b. floating or lodged debris 3. Embankment a. settlement, cracking or "jugs' holes b. side slope stability - slumps or bulges c. erosion and rodent damage 4. Transfer Pump 1 antes B. Operation Your animal waste management facility was designed for a total of 1260 sows/animals (—FEEDER— to _FINISH_). The lagoon contains both permanent and temporary storage. The permanent storage is not to be pumped in order to ensure that anaerobic action will occur. The design includes permanent storage of one cubic foot per pound of steady state live weight. The temporary storage portion of the lagoon includes capacity for the volume of waste produced over 180 days, the amount of rainfall in a 25 year 24 hour storm event, and rainfall in excess of evaporation. Your facility is designed for 180 days of temporary storage; therefore, it will need to be pumped every six months. Begin pump -out of the lagoon when fluid level reaches elevation 44.2 as marked by permanent markers. Stop pump -out when the fluid —level reaches elevation _42.0_ The attached waste management plan should be followed. This plan recommends sampling and testing of waste (see Attachment B) before land application. The waste material should be analyzed. before each application cycle to determine its nutrient content. A soil test of the area of application should be made annually to insure the waste is applied as reasonably and practically possible to recommended rates. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States.. The Department of Environment, Health, and Natural Resources, Division of Environmental Management, has the responsibility for enforcing this law. i THIS DESIGN IS FOR A SINGLE STAGE LAGOON r CLIENTS NAME BURT BOONE COUNTYNASH COUNTY, NORTH TODAYS DATE JANUARY 29, 1997 DISTANCE TO NEAREST NONFARM RESIDENCE => 0 FEET NUMBER OF PIGS WEANLING TO FEEDER 0 NUMBER OF PIGS FEEDER TO FINISH =======> 900 NUMBER OF SOWS FARROW TO WEANLING 0 NUMBER OF SOWS FARROW TO FEEDER 0 NUMBER OF SOWS FARROW TO'FINISH=---___> 0 DEGREE OF ODOR CONTROL 1.0 (minimum 1..0 cu. ft. per lb SSLW) (maximum 3.0 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > 0.0 YEARS TOP LENGTH AT NORMAL WATER LEVEL =__-__> 171.5 FEET TOP WIDTH AT NORMAL WATER LEVEL 146.5 FEET NORMAL WATER LEVEL ELEVATION ==========> 39.0 FEET SEASONAL HIGH WATER TABLE ELEVATION 0.0 FEET LAGOON BOTTOM ELEVATION30.4 FEET Depth of Permanent Water 8.6 feet (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES2.5:1 Permanent Volume Required 121500.0 cubic feet Permanent Volume Provided 1.62575.1 cubic feet ADDITIONAL DRAINAGE AREA IN SQUARE FEET> (i.e. pumpout pond & other outside area) LENGTH OF PUMPING CYCLE GALLONS OF FRESH WATER ADDED DAILY EXCESS RAINFALL ABOVE EVAPORATION 25YR/24HR STORM RAINFALL FREEBOARD ESTIMATED TOP OF DAM ELEVATION ========> Temporary Storage Volume 67029 CAROLINA 0 SQUARE FEET 1B0 DAYS 0 GALLONS 7.7 INCHES 6.6 INCHES 1.0 FEET 42.7 FEET 7 cubic feet Top of Dam Elevation = 42.7 Inside Dimensions of Lagoon at Top of Dam Length = 190.0 feet Width = 165.0 feet feet = Begin Pumping Elevation = 41.0 feet Stop Pumping Elevation = 39.0 feet Volume To Be Pumped = 49787.2 cubic feet 1. STEADY STATE LIVE WEIGHT 0 head weanling to feeder x 30 lbs. - 0 lbs 900 head feeder to finishing x 135 lbs. = 121500 lbs 0 sows farrow to weanling x 433 lbs. = 0 lbs 0 sows farrow to feeder x 522 lbs. = 0 lbs 0 sows farrow to finish x 1417 lbs. = 0 The TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 121500 lbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.080 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in swine. Years of sludge accumulation in design? 0.0 Sludge Volume = 0.0 cubic feet 3. REQUIRED LIQUID VOLUME OF LAGOON Design for 1.0 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = 121500.0 cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 39.0 feet Construct lagoon bottom elevation 30.4 feet Lagoon size for normal lagoon liquid volume using prismodial formula SS/END1 SS/END2 SS/SIDEI SS/SIDE2 DEPTH 2.5 2.5 2.5 2.5 8.6 AREA OF TOP LENGTH *WIDTH = 171.5 146.5 AREA OF BOTTOM Lb * Wb = 128.5 103.5 AREA OF MIDSECTION (Lm * Wm) - 150.0 125.0 25124.8 (AREA OF TOP) 13299.8 (AREA OF BOTTOM) 18750.0 (AREA OF MIDSECTION) CU. YD. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 25124.8 15000.0 13299.8 1.433 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL=162575.1 CU. FT. VOLUME NEEDED = 121500.0 CU. FT. THE SURFACE DIMENSIONS OF THE LAGOON AT NORMAL LIQUID LEVEL ARE 1*71.5 FEET LONG BY 146.5 FEET WIDE 5. DIKE Place spoil as a continuous dike to elevation 42.7 feet. 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon ( top of dike) Length * Width = 190.0 165.0 31350 square feet Additional Drainage Area 0 square feet TOTAL DA 31350 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 121500 SSLW * 0.0101481 gallon/lb. SSLW/day in the pumping cycle / 7.48 gallons per cu. ft. Volume = 29671.0 cubic feet 6B. Volume of wash water This is the amount of fresh water used for washing floors or volume fresh water used for a flush system. Flush systems that recycle the lagoon water are accounted for in 6A. Volume = 0 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 0.0 cubic feet 6C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) = 7.7 inches Volume = 7.7 inches * DA / 12 inches per foot Volume = 20116.2 cubic feet 6D. Volume of 25 year - 24 hour storm Volume = 6.6 inches * DA / 12 inches per foot Volume = 17242.5 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 29671.0 cubic feet 6B. 0.0 cubic feet 6C. 20116.2 cubic feet 6D. 17242.5 cubic feet TOTAL TEMPORARY STORAGE 67029.7 cubic feet 7. DEPTH OF STORAGE REQUIRED (ABOVE NORMAL LIQUID ELEVATION OF LAGOON) Depth required = Volume of temporary storage divided by surface area of lagoon. Depth required = 67030 cu.ft. / 25125 sq. ft. Depth required = 2.7 feet Normal lagoon liquid elevation = 39.0 feet Depth required = 2.7 feet Freeboard = 1.0 feet Top of Dam = 42.7 feet THE DIMENSIONS OF THE INSIDE EDGE OF THE DAM AT ELEVATION 42.7 ARE 190.0 FEET BY 165.0 FEET 8. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 6A. 29671.0 cubic feet 6B. 0.0 cubic feet 6C. 20116.2 cubic feet TOTAL PUMPED VOLUME = 49787.2 cubic feet Depth required = Volume of pumped storage divided by surface area of lagoon at normal water level. Depth required = 49787.2 cu.ft. / 25124.8 sq. ft. Depth required = 2.0 feet DESIGNED BY: APPROVED BY: DATE: DATE: 166 "Li-i Burt Bonne job Number ..... 01-1 PoAnt No. X Word. Y Coord. IR ?6. P.) 75.ii i27.02, %.M, j56.G6 10 . M.? 5 177.66 6 238.01 -3;. 7k) Ai -W.K/ W Q2.28 i i 9q.74 13 ES.M -Aa.&F 04 16.7G -6.M i5 3 3. St 25-2a P- ?6. iii 75.i.i DistanC2 from laSt pOint to first Point. . . , . . . . 0.0 feet Length of path from first point to last point.. 657,3 feet Total perimeter of the boundary ................ 657A feet Total area within the boundary ............ W,6ii.G iq.ft. Total area within the boundary ................. 0.7 acres Will Producer: L. B. BOONE (FINISHING FARM) The purpose of this plan is to provide guidelines for carrying out the routine operation and maintenance work needed to keep this swine waste management system functioning as planned. Routine maintenance is considered to be normal good care of the system. Good maintenance adds to beauty, usefulness, and permanence. A. Maintenance The routine maintenance of the lagoon involves the following: 1. Maintenance of a vegetative cover on the embankment top and side slopes: FESCUE is being established on these areas. Beginning in 1998 and each year thereafter, the embankment should be fertilized with 800 pounds of 10-10-10 per acre to maintain a vigorous stand. 2. Control of brush and trees on the embankment. This may be done by mowing, spraying, or chopping, or a combination of all three. This will need to be done at least once each year and possibly twice in years favorable to heavy growth of vegetation. Maintenance inspections of the lagoon should be made during the initial filling of the lagoon and at least annually. Items to be checked should include, as a minimum, the following: 1. Waste Inlet Pipes, Overflow Pipes a. condition of pipes (1) separation of joints (2) cracks or breaks ' 2. Pool Area a. undesirable vegetative growth b. floating or lodged debris 3. Embankment a. settlement, cracking or "jug" holes b. side slope stability - slumps or bulges C. erosion and rodent damage 4. Transfer Pump 1 B. Operation Your animal waste management facility was designed for a total of 900 sows/animals (—FEEDER— to —FINISH—). The lagoon contains both permanent and temporary storage. rThe permanent storage is not to be pumped in order to ensure that anaerobic action will occur. The design includes permanent storage of one cubic foot per pound of steady state live weight. The temporary storage portion of the lagoon includes capacity for the volume of waste produced over 180 days, the amount of rainfall in a 25 year 24 hour storm event, and rainfall in excess of evaporation. Your facility is designed for 180 days of temporary storage; therefore, it will need to be pumped every six months. Begin pump -out of the lagoon when fluid level reaches elevation 41.0 as marked by permanent markers. Stop pump -out when the fluid level reaches elevation _39.0— The attached waste management plan should be followed. This plan recommends sampling and testing of waste (see Attachment B) before land application. The waste material should be analyzed, before each application cycle to determine its nutrient content. A soil test of the area of application should be made annually to insure the waste is applied as reasonably and practically possible to recommended rates. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environmental Management, has the responsibility for enforcing this law. 2 EMERGENCY ACTION PLAN PHONE NUMBERS DWQ 919-571 - 4700 EMERGENCY MANAGEMENT SYSTEM gig-459- 7376 SWCD 919-- 459-4115 NRCS 919- 459-4115 This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. - You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow --possible solutions are: a. Add soil to berm to increase elevation of'dam. b. Pump wastes to fields at an acceptable rate. C. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. C. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. C. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D: Leakage from flush systems, houses, solid separators -action include% a: Stop recycle pump. b. Stop irrigation pump. C. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks - possible action: a. Dig a small well or ditch to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. C. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and For what duration? C. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach.surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property) ? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone 9 19571 -4700. After hours, emergency number: 919- 733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the .location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number 919-459--7376. C. Instruct EMS to contact local Health Department. d. Contact CES, phone number 919-459 -9810 , local SWCD office phone number 919-459- 4111 and 'local MRCS office for advice/technical assistance phone number 919- 459- 4115. 4: If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. %1 a. Contractors Name: b. Contractors Address:12- c. Contractors Phone: 4Yy3•-3 IT el? 6: Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: NRCS(SWCD b. Phone: (919) 459-4115 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. dmW@1n*. W w ordl @m 9wgM M. d m sips 12.96 s Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Sneciftc Practices Flush Gutters • Accumulation of solids tW Flush system is designed and operated • , sufficiently to remove accumulated solids from gutters as designed l7 Remove bridging of accumulated solids at discharge Lagoons and Pits • Crusted Solids Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 - 9 inches over more than 30% of surface. Excessive Vegetative • Decaying vegetation 10 Maintain vegetative control along banks of Growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along watees edge on impoundment's perimeter. Dry Systems � Feeders • Feed Spillage Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage. 0 Clean up spillage on a routine basis (e.g., 7 - 10 day interval during summer; 15-30 day interval winter). + Accumulations of feed residues 63 Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). 0 Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. AM1C - November 11, 1996, Page t I* Source Cause BMPs to Control Insects. Site Specific Practices Animal Holding Areas • Accumulations of animal wastes Eliminate low areas that trap moisture along and feed wastage fences and other locations where waste accumulates and disturbance by animals is minimal. O Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed). Dry Manure Handling • Accumulations of animal wastes Q Remove spillage on a routine basis (e.g., 7 - 10 Systems day interval during summer, 15-30 day intervalARM during winter) where manure is loaded for land application or disposal. O Provide for adequate drainage around manure stockpiles. Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC, 27695-7613. AMIC -November 11, 1996, Page 2 Swine Farm Waste Management Odor Control Checklist Source Cause 8MPs to Minlmkm Odor Site Specific Practices Swine production ff Vegetative or wooded buffers; (3 Recommended best management practices; ;' Good- judgment and common sense Animal body surfaces : Dirty manure -covered animals St Dry floors Floor surfaces • Wet manure -covered floors El Slotted floor:; BI( Waterers located over slotted floors; El Feeders at high end of solid floors; El Scrape manure buildup from floors; Ur"'lJnderfloor ventilation rot drying Manure collection pits • Urine; Lf Frequent manure removal by flush. pit recharge., . • Partial microbial decomposition ` or ape; 10 Underfloor ventilation Ventilation exhaust fans • Volatile gases; an maintenance; Dust Cy Efricient air movement Indoor surfaces • Dust ` Wash -down between groups of animals; fY reed additives; 0 Feeder covers; I] Feed delivery downspout extenders to feeder covers Flush tanks • Agitation of recycled lagoon El Flush tank covers; liquid while tanks ate filling p Extend rill lines to near bottom of tanks with vents alleys • Agitation during wastewater It Underfloor flush with underfloor ventilation conveyance Pit recharge points • Agitation of recycled lagoon D Extend recharge lines to near bottom of pits liquid while pits are filling with anti -siphon vents Lill stations • Agitation during sump tank 0 Sump tank covers filling and drawdown Outside drain collection • Agitation during wastewater D 8ox covers or junction -boxes conveyance AMO7C - November 11, 1996, Page 3 Source Cause Bll h to Minimlxe Odor Site Spec itePnctka End of drainpipes at . Agitation during wastewater ❑ Extend discharge point of pipes undo usth lagoon conveyance lagoon liquid level Lagoon surfaces • Volatile gas emissions; G9 Proper lagoon Ilquid capacity; • Biological mixing; 0 Colley kgop dupnp procedures; • Agitation ❑ Minimum Wrface area -to -volume ratio; ❑/ Minimum agitation when funtping; Med mial madw; Proven biological additives irrigation sprinkler • High pressure agitation; 19 Irrigate on dry days with little or no wind; nozzles • Wind drill Minimum recommended operating pressure; ❑ Pump intake neat lagoon liquid surface; ❑ Pump from second -stags lagoon Storage tank or basin • Partial microbial decomposition; ® Bottom or midlevel loading; surface . • Mixing while filling; Tank covers; • Agitation when emptying ❑ Basin surface mats of solids; Cl Proven biological additives or oxidants Settling basin surface • Partial microbial decomposition; ❑ Extend drainpipe outlets underneath liquid . Mixing while tilling; _ level; • Agitation when emptying d Remove settled solids regularly Manure, slurry or sludge • Agitation when spreading; Soil injection of slurry/sludges; spreader outlets . Volatile gas emissions ❑ Wash residual manure from spreader after use; ❑ Proven biological additives or oxidants Uncovered manure, - a Volatile gas emissions while ❑ Soil injection of slurry/sludges slurry or sludge on field drying Soil incorporation within 48 hrs.; surfaces ❑ Spread in thin uniform layers for rapid drying; C7 Proven biological additives or oxidants Dead animals . Carcass decomposition Gi Proper disposition of carcasses Dead animal disposal • Carcass decomposition Gf Complete covering of carcasses in burial pits; pits ❑ Proper location/construction of disposal pits Incineratbrs • Incomplete combustion Secondary stack burners AMOC - November 11, 1996, Page 4 Source Cause BKFs to Minimize Odor She Spahk Practices ''Standing water around • Improper drainage: 13 Orade and landscape such that water drains facilities . Microbial decomposition, of away Timm tac es organic matter Manure tracked onto • Poorly maintained access roads Farm access road hrtaWenaace public toads from farm access Additional Information: Available From Swine Manure Mdnagement ; 0200 RuldBMP Packet NCSU, County Extension Center Swine Production: Farm Potential Odor Sources and Remedies ; EBAE Fact Sheet NCSU - BAE Swine Production Facility Manure Management: Pit Recharge - Lagoon Treatment; EBAE 128-89 NCSU - BAE Swine Production Facility Manure Management: Underfloor Flush - Lagoon Treatment: EBAE 129-88 NCSU - BAE —agoou Design and Management for Livestock Manure Treatment and Storage ; EBAE 103-83 NCSU - BAE Calibration of Manure and Wastewater Application Equipment; EBAE Fad Sheet NCSU - BAE Controlling Odors from Swine Buildings; PIH-33 NCSU - Swine Extension Environmental Assurance Program ; NPPC Manual ' NC fork Producers Assoc Options for Managing Odor ; a report from the Swine Odor Task Force NCSU Agri Communications Nuisance Concerts in Animal Manure Management: Odors and Flies ; PRO107, 1995 Conference Proceedings Florida Cooperative Extension AMOC - November 11, 1996, Page 5 Mortality Management Methods (check which method(s) are being implemented) Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must be at least 300_feet from any flowing stream or public body of water. ❑ Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the Department of Agriculture ❑ Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) Z d December 18, 1996 o� w A rEgQG f Louis B. Boone L.B. Boone Finishing Operation 2813 Volunteer Road Elm City NC 27822 Dear Louis B. Boone: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality October 1, 2004 Subject: Certificate of Coverage No. AWS640076 L.B. Boone Finishing Operation Swine Waste Collection, Treatment, Storage and Application System Nash County On June 11, 2004, the North Carolina Division of Water Quality (Division) issued a revised State General Permit for swine facilities. The General Permit was issued in accordance with the directive of Senate Bill 733 (Session Law 2003-28). In accordance with your application received on February 28, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Louis B. Boone, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supersedes and terminates your previous COC Number AWS640076 which expires October 1, 2004. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the L.B. Boone Finishing Operation, located in Nash County, with an animal capacity of no greater than an annual average of 2160 Feeder to Finish swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until September 30, 2009. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Since this is a revised State General Permit, it contains new requirements in addition to most of the conditions contained in the previous State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record keeping and monitoring conditions in this permit. Aquifer Protection Section — Animal Feeding Operations Unit 1636 Mail Service Center, Raleigh, North Carolina 27699-1638 One NofthCarolina Phone: 919-733-3221 I FAX: 919-715-05881 Internet: h2o.enr.state.naus �aturallr� An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 2H .0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Duane Leith at (919) 715-6186. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all ce's) Raleigh Regional Office, Aquifer Protection Section Nash County Health Department Nash County Soil and Water Conservation District Permit File AWS640076 APS Central Files 1-1177"D Qr rnT State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office Y Michael F. Easley, Govemor William G. Ross Jr., secretary Division of Water Quality . August 29, 2001 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Louis B. Boone 2813 Volunteer Road Elm City, North Carolina 27822 Subject: Notice of Violation Recommendation To Enforce L.B. Boone Farms AWS640047 AWS640076 Nash County Dear Mr. Boone: NCDENR NORTH CARouN^ DEPARTMENT oR EmVIRCHMEWT Alto NAn►:t^L REsauRCe lt9 On August 27, 2001, Mr. Buster Towell of the Raleigh Regional Office conducted compliance inspections at the above referenced swine facilities: The inspection revealed that both farms have not been populated with animals for almost two years. Please note that these farms are covered by General Permits which require the following conditions to be met : General Permit Condition I.,4., requires that a copy of the Certificate of Coverage (COC) and General Permit Conditions be kept on site and available for inspection. General Permit Condition III.,2., requires that weekly freeboard levels be recorded for waste, lagoons, and that these records be kept along with all other records pertaining to the permitted site. General Permit Condition V.,2, requires that facilities covered under the COC1General Permit designate an Operator In Charge (OIC) to oversee the waste management activities on site. 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919)571-4700 FAX (919)571-4718 An Equal Opportunity Affirmative Action Employer 50% recyclec1110% post -consumer paper •+ State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office P icfiaelf.lasley, Governor l iam G. Ross Jr., Secretary A&T4 NCDENR NORTH CoRcuNA DHPARTmENT oR EMvIRommm,m ANo NATURAL RESOURCES On the inspection date the above referenced violations of your COC and General Permit were noted for both farms. These violations may be subject to civil penalties of up to $ 10,000.00 per day, per violation, and in some cases may be subject to penalties of up to $ 25,000.00 per day, per violation. If you should decide to close out either of these operations you should obtain a lagoon closure plan from your local Soil & Water Conservation District Office. Once the lagoons have been properly closed you may write the Director, Division of Water Quality, and request that your General Permits be rescinded. Please respond to this Notice in writing within fourteen days of your receipt. If you have justification that the violations were caused by circumstances or events beyond your control you should include them with your response. Your response will be forwarded to the Director for his review. In the lack of any such justification, the Director will proceed with the appropriate enforcement action. If you have any questions regarding this Notice you should contact Buster Towell at (919) 571- 4700. Sincerely, Kenneth Schuster, P.E. Regional Water Quality Supervisor cc: Nash County Health Department Mr. Terry Best, Nash Soil & Water Conservation District Ms. Margaret O'Keefe, RRO-DSWC DWQ Nondischarge Compliance Group RRO Files 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919)571-4700 FAX (919)571-4716 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH REGIONAL OFFICE Division of Water Quality August 14, 2000 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Louis Boone 2813 Volunteer Road Elm City, North Carolina 27822 Subject: Notice of Violation L B-RcimeYinisher Operation 40076j �Nash_Gounty-� Dear Mr. Boone: On August 7, 2000, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection at the subject swine facility. The inspection revealed the following violation of your Certificate of Coverage (COC) under General Permit AWG100000. Your Permit requires that lagoon freeboard levels be recorded on a weekly basis. This facility has been permitted since May 1999 and no freeboard levels were available during the recent inspection. Please note that violations of our COC are subject to civil penalties of up to $ 10,000.00 per day, per violation. The inspection indicated that your lagoon levels were both at 22 inches. While this level is compliant with your COC, you should start land application activity as weather permits to prevent the possibility of lagoon overflows or structural failure in the event of continued high rainfalls or the possibility of a Hurricane to our area of the State. Please respond to this Notice in writing within fourteen days of your receipt. Your response should include your intentions to correct the referenced violation as well as your plans for lowering your lagoon levels to a more safe level. MAILIN6 ADDRESS. 1626 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1620 LOCATION. 9600 6ARRETT DRIVE, SUITE 101, RALEIGH, NC 27609 PHONE O19.571-4700 FAX 919-571-4719 AN EQUAL OPPORTUNITY / APPIRMATIVE ACTION EMPLOYER - SO% RECYCLED/10% POST -CONSUMER PAPER Mr. L.B. Boone Page 2 The Raleigh Regional Office appreciates your cooperation in correcting this matter. if you have any questions regarding this Notice, please contact Buster Towel] at (919) 571-4700. Sincerely, Kenneth Schuster, P.E. Regional Water Quality Supervisor cc: Nash County Health Department Mr. Terry Best, Nash Soil & Water Conservation District Ms. Margaret O'Keefe, RRO-DSWC DWQ Nondischarge Compliance Group RRO Files Boon® Farms 2813 Volunteer Road Elm City, NC 27822 Phone 252-443-3349 Home Phone 252-443-0674 Email boonefarms@hotmail.00m September 04, 2000 Mr. Kenneth Schuster, Regional Water Quality Supervisor 1628 Mail Service Center Raleigh, NC 27699-1628 1 Subject: Violation Corrections L.B. Boone Finisher Operation AWS640076 Nash County R'i UQH 2EGIOPIAL OFFICE Dear Mr. Schuster, This letter is concerning a certified letter I received on August 19, 2000, regarding an inspection done by Buster Towell on August 7, 2000. The following has been done to correct the violation of the lack of weekly freeboard records: markers have been installed and weekly freeboard records are currently being taken. Mr. Terry Best from Nash County Soil and Water Conservation is going to come and approve the markers the week of September 4, 2000. The inspection also indicated that lagoon levels were both at 22 inches. The levels have been reduced to approximately 34 inches. This level should prevent overflows and structural damage in the event of continued high rainfalls or the possibility of a hurricane to our area. Sincerely, 13 .6- 42f+rl Louis B. Boone, Jr. rvb NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH REGIONAL OFFICE Division of Water Quality August 14, 2000 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Louis Boone 2813 Volunteer Road Elm City, North Carolina 27822 Subject: Notice of Violation h B.:,Boone_F.inisher Operation AMWS640070 gNashtCounty-�) Dear Mr. Boone: On August 7, 2000, Mr. Buster Towell of the Raleigh Regional Office conducted an inspection at the subject swine facility. The inspection revealed the following violation of your Certificate of Coverage (COC) under General Permit AWG100000. Your Permit requires that lagoon freeboard levels be recorded on a weekly basis. This facility has been permitted since May 1999 and no freeboard Ievels were available during the recent inspection. Please note that violations of our COC are subject to civil penalties of up to $ 10,000.00 per day, per violation. The inspection indicated that your lagoon levels were both at 22 inches. While this level is compliant with your COC, you should start land application activity as weather permits to prevent the possibility of lagoon overflows or structural failure in the event of continued high rainfalls or the possibility of a Hurricane to our area of the State. Please respond to this Notice in writing within fourteen days of your receipt. Your response should include your intentions to correct the referenced violation as well as your plans for lowering your lagoon levels to a more safe level. w r.®1 MAILING ADDRESS: 1628 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1628 LOCATION: 9800 BARRETT DRIVE, ELITE 101, RALEIGH, NC 27609 , PHONE 919-571-470o FAX 919.571-4716 AN EQUAL OPPORTUNI7Y ! AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLE6/10 6 POST -CONSUMER PAPER Mr. L.B. Boone Page 2 The Raleigh Regional Office appreciates your cooperation in correcting this matter. if you have any questions regarding this Notice, please contact Buster Towell at (919) 571-4700. Sincerely, Kenneth Schuster, P.E. Regional Water Quality Supervisor cc: Nash County Health Department Mr. Terry Best, Nash Soil & Water Conservation District Ms. Margaret O'Keefe, RRO-DSWC DWQ Nondischarge Compliance Group RRO Files State of North Carolina Department of Environment and Natural Resources James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director CERTIFIED MAIL RETURN RECEIPT REQUESTED Louis B. Boone L.B. Boone Finishing Operation 2813 Volunteer Road Elm City NC 27822 Dear Louis B. Boone: A14 � • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES May 15, 2000 f • V �n J �3 �] f r ? x Subject: Status Update Wettable Acre Determination Animal Waste Management System Facility Number 64-76 Nash County The Division of Water Quality (DWQ) is hereby requesting a status update concerning the completion of a Wettable Acre Determination for your subject facility. A letter dated August 27, 1999 was sent to advise you that your facility was required to complete a Wettable Acre Determination within six months (see attached letter). As of May 10, 2000 DWQ has not received the facilities Wettable Acre Determination Certification Form. Please submit to DWQ within 10 days a written explanation as to why a Wettable Acre Determination Certification Form has not been submitted. Please include the necessary information detailing the steps taken to certify this facility for Wettable Acres. Please be aware that not submitting this certification within the allotted six months may result in civil penalty assessments, permit revocation, and/or injunctive relief. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact me at (919) 733-5083 ext. 571. Sincerely, Sonya Avant Environmental Engineer cc: Raleigh Regional Office Nash County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Louis B. Boone L.B. Boone Finishing Operation 2813 Volunteer Road Elm City NC 27822 Dear Louis B. Boone: NCDENR NORTH CAROL-INA DEPARTMENT OF ENVIRONMENT AND NAT_^UR L RE5OURCES P2, '1' J December 30, 1999 Ali; Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number 64=76i Nasli_County—%. This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, IRR2, DRY1, DRY2, DRY3, SLUR1, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincerel X 4�� Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Nash County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director May 10,1999 L.B. Boone Finishing Operation 2813 Volunteer Road Elm City NC 27822 Attn: L. B. Boone Al �� 4 ffl.,�NWA • 2 __ NCDENR NORTH C,AROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURcEs Subject: Certificate of Coverage No. AWS640076 L.B. Boone Finishing Operation Swine Waste Collection, Treatment, Storage and Application System Nash County Dear L. B. Boone: In accordance with your application received on April 22, 1999, we are forwarding this Certificate of Coverage (COC) issued to Louis B. Boone, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the L.B. Boone Finishing Operation, located in Nash County, with an animal capacity of no greater than 2160 Feeder to Finish and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the. revocation of this COC, • or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer, paper Certificate of Coverage AWS640076 L.B. Boone Finishing Operation Page 2 If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Dianne Thomas at (919) 733-5083 ext. 364. cc: (Certificate of Coverage only for all cc's) Nash County Health Department Raleigh Regional Office, Water Quality Section Nash County Soil and Water Conservation District Permit File NDPU Files { I .. 14f.; i REQUEST FOR REACTIVATION OF REGISTRATION Please reactivate this following facility on the 2H .0200 active animal operations list. f Facility Number: Q Facility Name: • ,� oaNN. /—i��.s�iy Ieryl"4 Owner: �, �C3 �o0.y e- F Mailing Address: � ._ V614NI-Le e r- �- County: A copy of a complete Animal Waste Certification Form must be submitted with this form in order for this facility to be reactivated. Documentation that this facility has been operated within the last four years must also be submitted. You will be notified by the Division of Water Quality when the facility has been reactivated and may stock animals once notification is received. r If a facility is abandoned or unused for a period of four years or more; It would be considered as a new facility if the owner wanted to reopen it and would have to meet all requirements of a new facility before it could be restocked. Signature: . Date: o? Please return completed form to: DEHNR-DWQ Non -Discharge Branch, Compliance Group P.O. Box 29535 Raleigh, NC 27626-0535 RR4&7 At.. ..al Waste Management Plan C... 4ification (Please tvve or print all information that does not reauire a signature General Information: Name of Farm:'i-. a, Aoone OAuof;e#% _,F , acility No: 6y Owner(s) Name: �� ne Phone No:_ 9t9-_,Sfy3 - 33 y9 Mailing Address:_ gaij , vat"&t-er• &g ci Ein c; tj_."_'c_. ;L7 raz .,. .... _ Farm Location: County Farm is located in: 4.s 1, Latitude and Longitude: 3 S o 5 z" 3 7.1 77 ° 58 " OX?" Integrator: Please attach a copy of a county road map with location identified and describe below (Be specific: road names, directions, milepost, etc.): o„ j18 is ( yoi A ttees. Rd) kzia d Cooper's F;,c- De�o�rtnte.til� Operation_Description: Type of Swine No, of Animals 0 Wean to Feeder ® Feeder to Finish A 16 0 ❑ Farrow to Wean 0 Farrow to Feeder 0 Farrow to Finish ❑ Gilts 0 Boars - Type of Poultry No. of Animals Type of Cattle No. of Animals 0 Layer 0 Dairy 0 Pullets 0 Beef Other Type of Livestock: Number of Animals: Acreage Available for Application: A „_ Required Acreage: H Number of Lagoons / Storage Ponds : Z Total Capacity: .f39 768. 8 Cubic Feet (ft3) Are subsurface drains present on the farm: YES or ®O (please circle one) If YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD (please circle one) Owner / Manager Agreement I (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25-year, 24-hour storm and there must not be run-off from the application of animal waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conservation Service. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. I (we) know that any modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to implementation. A change in land ownership requires written notification to DEM or a new certification (if the approved plan is changed) within 60 days of a title transfer. Name of Land 0.. Stfynatnre! `;i Date: Name of Manager(if different from owner): Signature: Date: AWC -- August 1, 1997 ethnical Specialist Certiacation e L As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005, 1 certify that the animal waste management.system for the farm named -above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEM) as specified in 15A NCAC 2H.0217 and the USDA -Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001- .0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC, I), the technical specialist should only certify parts for which they are technically competent. IL Certification of Design A) Collection Stamm Treatment S stem Check the appropriate box �3 Existini facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity; storage capability consistent with waste utilization requirements. E New, expanded o etroftttedl[acility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print): ���� ire.-.. C . r Affiliation N P,( S Date Work Completed: _1 z -y - y P Address (Agggg): ryeo-•ic--7 4y G J Dr,;ICjN(. 2-"" sc Phone No.: vr� . 12-L/ -9"q B) Land AvOication Site MUP) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management; hydraulic and nutrient Ioading rates. Name of Technical Specialist (Please Print): T, Ed "J Long _ Affiliation w,,ier ;aft f.. Date Work Completed:_ / x / zi / go Address (Agency): c t �i I /V Phone No.: 3f2 --my-y//3_ Signature:_,, --- �s�— --- -- Date• /A//9F C) Runoff Controls from Exterior Lots Check the appropriate box cilily without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. Ci Facility with exterior lots (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by MRCS. Name of Technical Specialist (Please Print): T. Affiliation Il uj k so, ( 4- wader Co.t5geOOJidr-- Di s tr; c f Date Work Completed: I Z 1A 1198 Address (Agency): Rang. /oy Ae Cetifer Dr�ac: Naiku,He A/C w*' 6 Phone No.: - 10 Signatu21�gu_st Date: /z/A//4d AWC -- 1, 1997 2 D). Application and Han,_ .tg Equipment Check the appropriate box Fxi5lin_ OC extending facility with existing waste anp,(ica� lion eAl,llynienj (WUP or n. Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates, a schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). 0 New, expanded, -gE gNis ng facility without existing waste application equipment r spay irrigatioq, (I) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or,nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). .0 New rav irrigation. (WUP or I) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). Name of Technical Specialist (Please Print): J Edw Led 40ap AffiliationNask Sot, :j wade, „Q�jjro-a 'Date Work Completed: 12/2l / 99 Address (Agency): ,rykoNe. C 179 Phone No.:;J;Z-yyq-ylis Signature: 4E.,2Z� Date: !z/zl / 9 S - E) Odor Control, Insect Control,_ Mortality Management and Emergency Action -Plan (SD SI, WUP, RC or I) The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Management Plan and the Emergency Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print):, S. Ed —ed Z--y Affiliation k. .Sat * 4J.-Fe, Ca-,re,vdt{ vr, Date Work Completed:, 4& Azi/YS Address (Agency): Rao,,, /07 Aa Cc-Lfe, j2.roa Na5/`ai44L VC a7rig Phone No.: X52-Y 9-Wi : !2/Z//99 F) Written Notice of New or Exnandinsr Swine Farm The following signature block Is only to be used for new or expanding swine farms that begin construction after June 21, 1996. If the facility was built before June 21, 1996, when was it constructed or last expanded - I (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and ail property owners who own property located across a public road, street, or highway from this new or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-805. A copy of the notice and a list of the property owners notified is attached. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature:_ �_ Date: AWC -- August 1, 1997 3 III. Certification of Installation A) Collection, Storage, Treatment Installation w, expanded or retrofitted facility (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meet or exceed the minimum standards and,specifications. For existing facilities without retrofits, no certification is necessary. Name of Technical Specialist- (Please Print): 11 ! �o n C �J a C 4,r _ Affiliation-, P, C S Date Work Completed: 1 L- R 9 5 Address (Agency)• �., Signature: B) Land Application Site (WUP) Check the appropriate box No. ?f2-_4ci-y/rf' Z The cropping system is in place on all land as specified in the animal waste management plan. G Conditional Approval: all required land as specified in the plan is cleared for planting; the cropping system as specified in the waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by (month/day/year); the proposed cover crop is appropriate for compliance with the wasteutilization plan. ❑ Also check this box if appropriate if the cropping system as specified in the plan can not be established on newly cleared land within 30 days of this certification, the owner has committed to establish an interim crop for erosion control; Name of Technical Specialist (Please Print): T. „6dwa.; d Lo -g Affiliation k o; ! w,,tcr Co,,.se. , � cf Date Work Completed:_ 1.2 - a/ - 98 Address (Agency): Signature to No.:-2-Sz-y59-y//5 yJr This following signature block is only to be used when the box for conditional approval in III. B above has been checked. I (we) certify that I (we) have committed to establish the cropping system as specified in my (our) waste utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: Date: AWC -- august 1, 1997 C) Runoff Controls fron. Aterior Lots (RC) Facility with exterior lots Methods to minimize the run off of pollutants from lounging and heavy use areas have been installed as specified in the plan. For facilities without exterior lots, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Address (Agency): Phone No.: Signature: Date: D) Application and Handling_ Equipment Installation (WUP or n Check the appropriate block �I Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as part of the plan. ❑ Animal waste application and handling equipment specified in the plan has not been installed but the owner has proposed leasing or third party application and has provided a signed contract; equipment specified in the contract agrees with the requirements of the plan; required buffers can be maintained; calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. lQ Conditional approval: Animal waste application and handling equipment specified in the plan has been purchased and will be on site and installed by (month/day/year); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): J. EdW.,d LOny Affiliation Mxsi, s.;J $ [dofer Date Work Completed: i?l ai/9Y Address (Agency): R=.k 107 Ag rrxfee D.: lVe.S ,,,11c NC 27Jr3,( Phone No.: IZ.5z- y39-V11S /212//9 The following signature block is only to be used when the box for conditional approval in III D above has been checked. I (we) certify that I (we) have committed to purchase the animal waste application and handling equipment as specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: Date: E) Odor Control. Insect Control and Mortality Management_ (SD, SZ, WUP, RC or D Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system as specified in the Plan has also been installed and is operational. Name of Technical Specialist (Please Print): Jr, Gort.e _ Affiliation Al sk sa: / .d &)wtce C.a•oe,,,, , w D,'s, t/ Date Work Completed: / 7-/z Address (Agency): Signature: Phone No.:-2f.2-yf9-y//.S AWC -- August 1, 1997 5 Please return the completed form to the Division of Water Quality at the following address: Department of Environment, Health, and Natural Resources Division Of Water Quality Non -Discharge Branch, Compliance Unit P.O. Box 29535 Raleigh, NC 27626-0535 Please also remember to submit a copy of this form along with the complete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your files with your Animal Waste Management Plan. AWC .. August 1, 1997 6 -11 - 1w Im Lei ;Y-16 'o . 'S� 34 Toy1 l 14TV A� 36*05' CASIAUA 5191411 C.A POP. 256 Lug im 10 JjLL a de uU L411 t� aIm Im 0 Lm tin LUA io La Sslw LLU 11JA o C."d, Cro�d, PAS Dukes 1411 Av RED OAK LUG IALL 1424 PCIP. 314 I.d Lin Lin Im UAL IALU im Im 0 Sew* Brooch ing 141Z LUZ im Liu Im Lin Ao Ila Un e Croa.relaim ILoa Edwards Y 11.—fq 11127 .3 C,d. 1721 UV9 .7 .0 Ligi Im 11022 Pa. JAZZ 1471 Liu 36b ]Lila ii� -LIE LAM Ilu flocscaIt GrISve, c N*1 .11 . Unkm H.11 h ISO@ 141a chp.- q 12. 14,11 UK 1.3 URL a ilm Crmaraodt HVILLE Ian 2.3 Lin JHS W aLVZj e" ae 1112 9 11J U-I j .ROW 1 No,$ AD s. " UMI U Lm SPRING HOPE I! •Lo V Se im im im A it mu LZU -Uwl 130d Uw" ' b 1 12 fa ... I Im Izu FCA 0 .2 While, TAR Lo k 7 .4 4 'A i,44 loki API au 1L47 in Liu 64 Lawnill loop VAI Iml crauro. 4111 4 a Sal -V iziz iz, IT23 IP23 JM b -sL 74- Lai Tuyk- LUZ' UAI 1��22 df Mocadmio P 6 a IN, 0 IL4 L B.Pi OL 15 Frazier im �m Crck 1743 I.J " 10 SIC! .6 IAt I 1145 -Y' 170 1935 \Ch. SCI,Icri 1136 Flwd'i" 'o , I 7 pop 1.6 IL43 X LEO ti+ 113 44 sods LLH• •Stiklo.d 17 7MUA C.o Mci fp LLD 4 U7"—Ife 1137 7 �1"" 4 9 1106 .LS� " Lzdl D Ll 24 23 13M C, 11.11 1100 .7 N JnL -LfAL I -3 ...�ry 1"? Oak.' J4 pwwnm . d un 1� " i2m Lm LIM im A. N 1 f 'q LM 1141 ign St LLD 1 as socaft"y Six A 46 .2 URLPLI In LLZ* 1943 6�- OL . i a' LW im A FA 9 THIS DESIGN IS FOR A-SINGLE.STAGE LAGOON CLIENTS NAME COUNTY TODAYS DATE DISTANCE TO NEAREST NONFARM RESIDENCE => NUMBER OF PIGS WEANLING TO FEEDER NUMBER OF PIGS FEEDER TO FINISH NUMBER OF SOWS FARROW TO WEANLING NUMBER OF SOWS FARROW TO FEEDER NUMBER OF SOWS FARROW TO FINISH DEGREE OF ODOR CONTROL (minimum 1.0 cu. ft. per lb SSLW) (maximum 3.0 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > TOP LENGTH AT NORMAL WATER LEVEL TOP WIDTH AT NORMAL WATER LEVEL NORMAL WATER LEVEL ELEVATION ===--=====> SEASONAL HIGH WATER TABLE ELEVATION LAGOON BOTTOM ELEVATION Depth of Permanent Water 11.0 (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES Permanent Volume Required 197316.0 Permanent Volume Provided 226678.0 ADDITIONAL DRAINAGE AREA IN SQUARE FEET> (i.e. pumpout pond &.other outside area) LENGTH OF PUMPING CYCLE GALLONS OF FRESH WATER ADDED DAILY ====> EXCESS RAINFALL ABOVE EVAPORATION 25YR/24HR STORM RAINFALL FREEBOARD ESTIMATED TOP OF DAM ELEVATION Temporary Storage Volume 83486.0 Top of Dam Elevation = 45.9 Inside Dimensions of Lagoon'at Top of Dam Length = 320.0 feet Width = 110.0 Begin Pumping Elevation = Stop Pumping -Elevation = Volume To Be Pumped = BURT BOONE NASH COUNTY, NORTH JANUARY 29, 19970 0 FEET 0 1260 0 0 0 1.0 2.0 YEARS 304.4 FEET 94.4 FEET. 42.0 FEET 0.0 FEET 31.0 FEET feet 2.0.1 cubic feet cubic feet CAROLINA 0 SQUARE FEET 180 DAYS 0 GALLONS 7.7 INCHES 6.6 INCHES 1.0 FEET 45.9 FEET cubic feet feet feet = 33, xoo fti sp 9o, 113 if ` 44.2 feet 42.0 feet 64126.0 cubic feet 1. STEADY STATE LIVE WEIGHT 0 head weanling to feeder x 30 lbs. = 0 lbs 1260 head feeder to finishing x 135 lbs. = 170100 lbs 0 sows farrow to weanling x 433 lbs. - 0 lbs 0 sows farrow to feeder x 522 lbs. = 0 lbs 0 sows farrow to finish x 1417 lbs. - 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 170100 lbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.080 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in swine. Years of sludge accumulation in design? 2.0 Sludge Volume = 27216.0 cubic feet 3. REQUIRED LIQUID VOLUME OF LAGOON Design for 1.0 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = 197316.0 cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 42.0 feet Construct lagoon bottom elevation 31.0 feet Lagoon size for normal lagoon liquid volume using prismodial formula SS/ENDI SS/END2 SS/SIDE1 SS/SIDE2 DEPTH 2.0 2.0 2.o 2.0 11.0 AREA OF TOP LENGTH *WIDTH = 304.4 94.4 AREA -OF BOTTOM Lb * Wb = 260.4 50.4 28735.4 (AREA OF TOP) 13124.2 (AREA OF BOTTOM) AREA OF MIDSECTION A Lm * Wm) _ 282.4 72.4 20445.8 (AREA OF MIDSECTION) CU. YD. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 28735.4 81783.0 13124.2 1.833 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL=226678.0 CU. FT. VOLUME NEEDED = 197316.0 CU. FT. THE SURFACE DIMENSIONS OF THE LAGOON AT NORMAL LIQUID LEVEL ARE 304.4 FEET LONG BY 94.4 FEET WIDE 5. DIKE Place spoil as a continuous dike to elevation 45.9 feet. 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon ( top of dike) Length * Width 320.0 110.0 35200 square feet Additional Drainage Area 0 square feet TOTAL DA 35200 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 170100 SSLW * 0.0101481 gallon/lb. SSLW/day in the pumping cycle / 7.48 gallons per cu. ft. Volume = 41539.4 cubic feet 6B. Volume of wash water This is the amount of fresh water used for washing floors or volume fresh water used for a flush system. Flush systems that recycle the lagoon water are accounted for in 6A. Volume = 0 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 0.0 cubic feet 6C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) = 7.7 inches Volume = 7.7 inches * DA / 12 inches per foot Volume = 22586.7 cubic feet 6D. Volume of 25 year - 24 hour storm Volume = 6.6 inches * DA / 12 inches per foot Volume = 19360.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 41539.4 cubic feet 6B. 0.0 cubic feet 6C. 22586.7 cubic feet 6D. 19360.0 cubic feet TOTAL TEMPORARY STORAGE 83486.0 cubic feet 7. DEPTH OF STORAGE REQUIRED (ABOVE NORMAL LIQUID ELEVATION OF LAGOON) Depth required = Volume of temporary storage divided by surface area of lagoon. Depth required = 83486 cu.ft. / 28735 sq. ft. Depth required = 2.9 feet Normal lagoon liquid elevation = 42.0 feet Depth required = 2.9 feet Freeboard = 1.0 feet Top of Dam = 45.9 feet THE DIMENSIONS OF THE INSIDE EDGE OF THE DAM AT ELEVATION 45.9 ARE 320.0 FEET BY 110.0 FEET 8. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 6A. 41539.4 cubic feet 6B. 0.0 cubic feet 6C. 22586.7 cubic feet TOTAL PUMPED VOLUME 64126.0 cubic feet Depth required = Volume of pumped storage divided by surface area of lagoon at normal water level. Depth required = 64126.0 cu.ft. / 28735.4 sq. ft. Depth required = 2.2 feet DESIGNED BY: DATE: APPROVED BY: DATE: .1,;kd 5H-der 3.0 .e-x e..a Y-- -i-- K-� Cz. C_-. I--% F"a' in kiztsn Clpun.ty n ► C,rth iarc.i any, page i Oi/aai,97 is Ri i'S ELty -UISI ANELE CONNER iz i i.56 3i.30 56.0ti H 0.0 TM 6 corner flush lips beside house 13 E 6.3u 45.E i2a 3r.'J() b.il 44.7 i57 54.6 4 6-K 45.2 ii3 5 il% 43.v 03 67.6 0 t1.bt1 4E.i 23i io.VV 7 i.W 43.5 241 ii.W i 8.4V 43.1 EE5 i45.')', i i.6V Q J 203 ii5.VV iV 8.7 4E.6 i i 1 LOO ii i.60 4M i62 i4C.W iG B.tiV 42.7 133 145.0 i3 C.bV 42.Y 46 14b.VV 14 i.4V 43. i 0 i ii. ;)(I i5 6.6,ir 45.5 4E 53.uu i6 6.70 4EA 70 60.00 top of pipe 6 inch i7 6.E0 43.5 4i 65 A0 cop of pipe i inch 16 i�.N 4i.i . 47 6MO liquid ievei ii 4.00 47.5 43 i.W noie K io 4.3V 47.6 [f 4V.00 Gi 4M 46.1 lU 38.00 H 3.1V 46.4 40 i35.0 23 74 G36.UU t G4'i.1V 46.4 73 t:4V.t�'1 - 25 7.bk! 4 1i3 Ebtl.UG Ga MO 46.6 05 t ! 5.101 46.4 3EE 3Vl.LiU Ciy M. 4616 344 30 . V EY 4.70 46.6 343 30.VV 30 2.E0 4M Ri HMO 31 2.3V 4i.2 3E6 326.UV 3E ilio 4i.7 E70 32MO 33 i.YV 4i.6 i7i 334.0 34 7JO 44.4 11 ib.VV liquid level 35 3.0 47.i 06 333.00 top of pipe 6 inch 36 MO 46.ir EVE 33i.4u top of pipe 6 inch 37 3.30 46.E 256 3Ey.W top of pipe ii inch 3n 3.40 46.i 266 KE W 'top of pipe 6 inch 3Y i.N NA H MO ian N-ver 3.0 W W.--- -. j —C Burt Wone j SCALE: 1 inch i0o feet 46 i Computed overall length = 3`i5 7t. Page 1 piottk Oijz3;7? 5 0 A A aas J. CPR !I as 1 r't • rc7R J�.lQa/i'ri .''."''''•".'/.%_teDU}l0t, aU3. UiU:LtM L-a_lLZ Tt101 . . . ' ' ' ' " /,-AvC3ullaa aaua I-tTUITM ea -kV TeaO . . . . . .. . . . . . . . . • .,.-4epl_ naq au 1 �L-7 ,lemma awt -t7d [e'.t, o i • •aLltOd aSwT :)1 a.utod 1S.At.R WO_tJ isq.*?d 10 U115IJa-i • ' . . • • ' 1E_ltad a.S,lt 1 o1 '1.UTod ;s-eT We_i_i,k a:)Ue15tn J4,•R4-7 -H+p T PP C/ • RQR A47'QTR R/'PAT T P— A,1 Q' AT-. RQ • T t.- rq•QT "tv•R47 C7 Crl"RJ- Pn'APT- tic" r!e1- (:W) R,4 T - r'R[,iCR- QT JCP-- P1 T- RR'TTT- r_ r•: ' T c7._ / / • RG'- QT'Q 4zT "4�7 �' J • Q UJOOPI Y hT T >_` li L' Alp RR QQ C- P hQ Ra Q� T P riP AT "Ohl a.0 T-OA / Tr"1 ' • ' ' ' .t aQ[ nKt cor c'3Ll Q j:) P n'c Jan_un nnm Producer: L. B. BOONE (FINISHING FARM) The purpose of this plan is to provide guidelines for carrying out the routine operation and maintenance work needed to keep this swine waste management system functioning as planned. Routine maintenance is considered to be.normal good care of the system. Good maintenance adds to beauty, usefulness, and permanence. A. Maintenance The routine maintenance -of the lagoon involves the following: 1. Maintenance of a vegetative cover on the embankment top and side slopes: FESCUE is being established on these areas. Beginning in 1998 and each year thereafter, the embankment should be fertilized with 800 pounds of 10-10-10 per acre to maintain a vigorous stand. 2. Control of brush and trees on the embankment. This may be done by mowing, spraying, or chopping, or a combination of all three. This will need to be'done at least once each year and possibly twice in years favorable to heavy growth of vegetation. Maintenance inspections of the lagoon should be made during the initial filling of the lagoon and at least annually. Items to be checked should include, as a minimum, the following: 1. Waste Inlet Pipes, Overflow Pipes a. condition of pipes (1) separation of joints (2) cracks or breaks 2. Pool Area a. undesirable vegetative growth b. floating or lodged debris 3. -Embankment a. settlement, cracking or "jug" holes b. side slope stability - slumps or bulges C. erosion and rodent damage 4. Transfer Pump 1 k nnna B. Operation Your animal -waste management facility was designed for a total of 1260 sows/animals (—FEEDER— to FINISH_). The lagoon contains both permanent and temporary storage. The permanent storage is not to be pumped in order to ensure that anaerobic action will occur. The design includes permanent storage of one cubic foot per pound of steady state live weight. The temporary storage portion of the lagoon includes capacity for the volume of waste produced over 180 days, the amount of rainfall in a 25 year 24 hour storm event, and rainfall in excess of evaporation. Your facility is designed for 180 days of temporary storage; therefore, it will need to be pumped every six months. Begin pump -out of the lagoon when fluid level reaches elevation 44.2 as marked by permanent markers. Stop pump -out when the fluid level reaches elevation —42.0_ The attached waste management plan should be followed. This plan recommends sampling and testing of waste (see Attachment B) before land application. The waste material should be analyzed before each application cycle to determine its nutrient content. A soil test of the area of application should be made annually to insure the waste is applied as reasonably and practically possible to recommended rates. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environmental Management, has the responsibility for enforcing this law. E THIS DESIGN IS FOR A SINGLE STAGE LAGOON CLIENTS NAME ________------_---- -- -_� COUNTY TODAYS DATE DISTANCE TO NEAREST NONFARM RESIDENCE _> NUMBER OF PIGS WEANLING TO FEEDER NUMBER OF PIGS FEEDER TO FINISH =__--__> NUMBER OF SOWS FARROW TO WEANLING NUMBER OF SOWS FARROW TO FEEDER NUMBER OF SOWS FARROW TO'FINISH DEGREE OF ODOR CONTROL (minimum 1.0 cu. ft. per lb SSLW) (maximum 3.0 cu. ft. per lb SSLW) NUMBER OF YEARS OF SLUDGE ACCUMULATION > TOP LENGTH AT NORMAL WATER LEVEL =----_=> TOP WIDTH AT NORMAL WATER LEVEL NORMAL WATER LEVEL ELEVATION =_________> SEASONAL HIGH WATER TABLE ELEVATION ==_> LAGOON BOTTOM ELEVATION Depth of Permanent Water 8.6 (minimum depth without sludge = 6 feet) (minimum depth with sludge = 8 feet) SIDE SLOPES Permanent Volume Required 121500.0 Permanent Volume Provided 162575.1 ADDITIONAL DRAINAGE'AREA IN SQUARE FEET> (i.e. pumpout pond & other outside area) LENGTH OF PUMPING CYCLE GALLONS OF FRESH WATER ADDED DAILY =___> EXCESS RAINFALL ABOVE EVAPORATION =_-_-> 25YR/24HR STORM RAINFALL FREEBOARD ESTIMATED TOP OF DAM ELEVATION =--_____> Temporary Storage Volume 67029.7 Top of Dam Elevation = 42.7 Inside Dimensions of Lagoon at Top of Dam Length = 190.0 feet Width = 165.0 BURT BOONE NASH COUNTY, NORTH JANUARY 29, 1997i 0 FEET 0 900 0 0 0 1.0 0.0 YEARS 171.5 FEET 146.5 FEET 39.0 FEET 0.0 FEET 30.4 FEET feet 2.5:1 cubic feet cubic feet CAROLINA 0 SQUARE FEET 180 DAYS 0 GALLONS 7.7 INCHES 6.6 INCHES 1.0 FEET 42.7 FEET cubic feet feet feet=3),3.50.0;043r,699.641 Begin Pumping Elevation = 41.0 feet Stop Pumping Elevation = 39.0 feet Volume To Be Pumped = 49787.2 cubic feet 1. STEADY STATE LIVE WEIGHT 0 head weanling to feeder x 30 lbs. = 0 lbs 900 head feeder to finishing x 135 lbs. - 121500 lbs 0 sows farrow to weanling x 433 lbs. - 0 lbs 0 sows farrow to feeder x 522 lbs. - 0 lbs 0 sows farrow to finish x 1417 lbs. = 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) - 121500 lbs 2. SLUDGE ACCUMULATION Sludge accumulates at the rate of 0.080 cu. ft. per year per pound of STEADY STATE LIVE WEIGHT in swine. Years of sludge accumulation in design? 0.0 Sludge Volume = 0.0 cubic feet 3. REQUIRED LIQUID VOLUME OF LAGOON Design for 1.0 cu. ft. per pound SSLW Total Volume = (SSLW * Design factor) + Sludge Volume Total Volume = 121500.0 cubic feet 4. NORMAL LAGOON LIQUID LEVEL Maintain normal lagoon liquid level at elevation 39.0 feet Construct lagoon bottom elevation 30.4 feet Lagoon size for normal lagoon liquid volume using prismodial formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 DEPTH 2.5 2.5 2.5 2.5 8.6 AREA OF TOP LENGTH *WIDTH = 171.5 146.5 AREA,OF BOTTOM Lb * Wb 128.5 103.5 AREA OF MIDSECTION (Lm * Wm) -- 150.0 125.0 25124.8 (AREA OF TOP) 13299.8 (AREA OF BOTTOM) 18750.0 (AREA OF MIDSECTION) CU. YD. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 25124.8 15000.0 13299.8 1.433 VOLUME OF LAGOON AT NORMAL LAGOON LIQUID LEVEL=162575.1 CU. FT. VOLUME NEEDED = 121500.0 CU. FT. THE SURFACE DIMENSIONS OF THE LAGOON AT NORMAL LIQUID LEVEL ARE 171.5 FEET LONG BY 146.5 FEET WIDE n 5. DIKE Place spoil as a continuous dike to elevation 42.7 feet. 6. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 190.0 165.0 31350 square feet Additional Drainage Area 0 square feet TOTAL DA 31350 square feet Pumping cycle to be 180 days. 6A. Volume of waste produced Volume = 121500 SSLW * 0.0101481 gallon/lb. SSLW/day in the pumping cycle / 7.48 gallons per cu. ft. Volume = 29671.0 cubic feet 6B. Volume of wash water This is the amount of fresh water used for washing floors or volume fresh water used for a flush system. Flush systems that recycle the lagoon water are accounted for in 6A. Volume = 0 gallons/day * 180 days in the pumping cycle divided by 7.48 gallons per cu. ft. Volume = 0.0 cubic feet 6C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. Excess rainfall (difference) = 7.7 inches Volume = 7.7 inches * DA / 12 inches per foot Volume = 20116.2 cubic feet 6D. Volume of 25 year - 24 hour storm Volume = 6.6 inches * DA / 12 inches per foot Volume = 17242.5 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 6A. 29671.0 cubic feet 6B. 0.0 cubic feet 6C. 20116.2 cubic feet 6D. 17242.5 cubic feet TOTAL TEMPORARY STORAGE 67029.7 cubic feet 7. DEPTH OF STORAGE REQUIRED (ABOVE NORMAL LIQUID ELEVATION OF LAGOON) Depth required = Volume of temporary storage divided by surface area of lagoon. Depth required = 67030 cu.ft. / 25125 sq. ft. Depth required = 2.7 feet Normal lagoon liquid elevation = 39.0 feet Depth required - 2.7 feet Freeboard = 1.0 feet Top of Dam = 42.7 feet THE DIMENSIONS OF THE INSIDE EDGE OF THE DAM AT ELEVATION 42.7 ARE 190.0 FEET BY 165.0 FEET 8. SET BEGIN PUMPING ELEVATION PUMPED STORAGE VOLUME 6A. 29671.0 cubic feet 6B. 0.0 cubic feet 6C. 20116.2 cubic feet TOTAL PUMPED VOLUME = 49787.2 cubic feet Depth required = Volume of pumped storage divided by surface area of lagoon at normal water level. Depth required = 49787.2 cu.ft. / 25124.8 sq. ft. Depth required = 2.0 feet DESIGNED BY: DATE: APPROVED BY: DATE: sa.(Zle / "r,l '11'LlC; Q.44.Q4 Tf: 1 ,CQ 2aa1 r'1•n /ti/RQ: 1'9"1 • • • "' " " " . . . . . . . .A,.ITMAI1-:10 aU1 UTUITM E'a..le Tell3 f •. • "' ' "' ...4-LDU1100 c"aU1 UtulTM Lma_!e Teldt ' . ' .. . " . . . ' . " . . •.' -(LMDU1100 aU1 10 _;-32aWI _lad T1310I "1LITOd 1SeT 02 aLVEOd 1S_l'E1 W11_(.L U3.>?d LQ U16Lla"1 •. •1UTl:)d 1S_lil 02 1UTOd 2SE'T WOJI aDUrISTlT rT"C R.� • !RQ fi T • (_! f= - R_('iT-. QQ' / RT- r T " 4 r T - A / ' ap.- y_a L1r. c'u'1 " r"1. •• T4r•f�/ c " M4 RQ.QA rT'r_/ h T • PA, "QT R/ • r—Q_ L.Q • Q/ IMP IPP,r PA."frRT (w) ' T {~ Q QQ' ! / T QR.Qcl, Rrl•!aT 47T *QA D-Aa':)") 1! R CT 47 T PT Q7 T T r'► T CI Q r_ t, G' R 'Ohl 1 Ll T-'7: 4 ! Ti1 • " • ' " _AaOUl11hf C3or Producer: L. B. BOONE (FINISHING FARM) The purpose of this plan is to provide guidelines for -carrying out the routine operation and maintenance work needed to keep this swine waste management system functioning as planned. Routine maintenance is considered to be normal good care of the system. Good maintenance adds to beauty, usefulness, and permanence. A. Maintenance The routine maintenance of the lagoon involves the following: 1. Maintenance of a vegetative cover on the embankment top and side slopes: FESCUE is being established on these areas. Beginning in 1998 and each year thereafter, the embankment should be -fertilized with 800 pounds of 10-10-10 per acre to maintain a vigorous stand. 2. Control of brush and trees on the embankment. This may be done by mowing, spraying, or chopping, or a combination of all three. This will need to be done at least once each year and possibly twice in years favorable to heavy.growth of vegetation. Maintenance inspections of the lagoon should be made during the initial filling of the lagoon and at least annually. Items to be checked should include, as a minimum, the following: 1. Waste Inlet Pipes, Overflow Pipes a. condition of pipes (1) separation of joints (2) cracks or breaks 2. Pool Area a. undesirable vegetative growth b. floating or lodged debris 3. Embankment a. settlement, cracking or "jug" holes b. side slope stability - slump's or bulges C. erosion and rodent damage ` 4. Transfer Pump 11111N B. Operation Your animal waste management facility was designed for a total of 900 sows/animals (—FEEDER— to _FINISH_). The lagoon contains both permanent and temporary storage. The permanent storage is not to be pumped in order to ensure that anaerobic action will occur. The design includes permanent storage of one cubic foot per pound of steady state live weight. The temporary storage portion of the lagoon includes capacity for the volume of waste -produced over 180 days, the amount of rainfall in a-25 year 24 hour storm event, and rainfall in excess of evaporation. Your facility is designed for 180 days of temporary storage; therefore, it will need to be pumped every six months. Begin pump -out of the lagoon when fluid level reaches elevation _41.0_ as marked by permanent markers. Stop pump -out when the fluid level reaches elevation _39.0_ The attached waste management plan should be followed. This plan recommends sampling and testing of waste (see Attachment B) before land application. The waste material should be analyzed before each application cycle to determine its nutrient content. A soil test of the area of application should be made annually to insure the waste is applied as reasonably and practically possible to recommended rates. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environmental Management, has the responsibility for enforcing this law. 2 EMERGENCY ACTION PLAN PHONE NUMBERS DWQ 919 571- 4700 EMERGENCY MANAGEMENT SYSTEM 9I9-459- 7376 SWCD 919-459-4115 NRCS 919- 459-4115 This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem., You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility_ The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of'dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. C. Close valves to eliminate further discharge. . s • r , d. Repair all leaks prior to restarting pumps. D: Leakage from flush systems, houses, solid separators --action include: a: Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks - possible action: a. Dig a small well or ditch to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? £. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property)? -h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone 9 19571 -4700. After hours, emergency number: 919- 733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number 919-459-7376. c. Instruct EMS to contact local Health Department. d. Contact-CES, phone number 919-459 4810 , local SWCD office phone number 919-459- 4114 and 'local NRCS office for advice/technical, assistance phone number 919- 459! 4115. 4: If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask. that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. /% a . Contractors Name : c R /dZrXaa!-8�'ua b. Contractors Address: old 3 ;, • aV4_ c . Contractors Phone: W3-- 3 3 y,9 6: Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: NRCS/SWCD b. Phone:-(919)459-4115 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. dwA*Ww.NwwWwnqwcP".dm OW 12.90 Insect Control Checklist for Animal Operations Source Cause BMPs to Control insects Site Specific Practices Gutters. • Accumulation of solids IV Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. O Remove bridging of accumulated solids at Lagoons and Pits Gusted Solids ® Maintain lagoons, settling basins and pits where pest brt eding is apparent to minimize the crusting of solids to a depth of no more titan G - 8 inches over more than 30/9 of surface. Excessive Vegetative • Decaying vegetation Maintain vegetative control along banks of Growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. Feeders • Feed Spillage 1W Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage. D Clean up spillage on a routine basis (e.g., I -10 day interval during summer, 15-30 day interval i durine winter). ! , Feed Storage Accumulations of feed residues 13 Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewers grain and similar high moisture grain products). f3 inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Source Cause BMPs to Control Insects Site Specific Prad ices Areas • Accumulations of animal wastes ®" Eliminate low areas that trap moisture along and feed wastage fences and other locations where waste accumulates and disturbance by animals is minimal. 17 Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (Le., inspect for and remove or break up accumulated solids as needed). Dry Manure Handling • Accumulations of animal wastes O Remove spillage on a routine basis (e.g., 7 - 10 Systems day interval during summer, I5-30 day interval during winter) where manure is loaded for land application or disposal. A Provide for adequate drainage around manure stockpiles. Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC, 27693-7613. A mFr - mn.,.MtiPr 1 1 W30C o..,.e I Source Swine Farm Waste Management Odor Control Checklist use Vegetative or wooded bulkrs; 17 Recommended best management prtu tices; WOoodjuftrnent and common sense Animal body burfaces : Dirty manure -covered animals Dry floors Floor surfaces -• Wet manuraoovere l floors 61 Slotted lbetrs.. 0( Watatrs looted Over slotted doors: 0 Feeders at high end of solid floss; O Scrape tnanure buildup hom floors; 13"O'Underfloor ventilation for drying Manure collection pits • Urine; It Frequent umure removal by flush, pit recharge. . • Partial microbial decomposition y t� Underfloor ventilation Ventilation exhaust fans • Volatile gases; /�an maintenanex-,. Dust G Efficient air movement Indoor surfaces • Dust Gr/ Washdown between groups of animals; III Feed additives; O Feeder covers; 13 Feed delivay downspout extenders to feeder covers Flush tanks • Agitation of recycled lagoon Cf Fludt tank covers; liquid while fouls are filling O Extend fill lines to near bottom oftu&s with vents Flush alleys • . Agitation during wastewater iff Underfloor flush with underfloor ventilation conveyance Pit recharge points • Agitation of recycled lagoon O Extend recharge lines to near bottom of pits liquid while pits are filling with anti -siphon vents Lift stations • Agitation during sump tank O Sump tank covers filling and drawdown Outside drain collection • Agitation during wastewater El Box covers or Junctioi�•boxes conveyance AMOC - November 11. 19%. Page 3 Source Cause BMFB to End of drainpipes at + Agitation during wastewala - - - O Extend discharge point of pipes tmdernesdt tagvon conveyance lagoon liquid level Lagoon surfaces • Volatile gas emissions; proper lagoon ]squid capacity; • Biological mixing; O Correct lagoon startup procedures; • Agitation © Minimurni wrface areado-volume ratio; O Minimum agitation whM pumping; ' Met�anical aastio:t; Proven biological additives Irrigation sprinkles + High pressure agitation; of Irrigate on drydays with little or no wind; nom + Wind drift Minimum recommended operating promo; O Pump intake an lagoon liquid surface; [] pump from second -stage lagoon Storage tank or basin + partial microbial decomposition; ® Bottom or midlevel hording; sulfa". + Mixing while filling; l� Tank covers; + Agitation when emptying p Basin surface mats of solids; 0 Proven biological additives or oxidants Settling basin surface • partial microbial decomposition; O Extend drainpipe outlets underneath liquid • Mixing while filling; level; • Agitation when emptying C( Remove settled solids regularly Manure, slurry or sludge • Agitation when spreading; ii Soil injection of slanylsludges; spreader outlets . Volatile gas emissions O Wash residual manure from spreader after use; O Proven biological additives or oxidants ` Uncovered manure, • • Volatile gas emissions while 13 Soil injection of slurry/sludges slurry or sludge on field dryhrg Gi Soil incorporation within 49 hrs.; surfaces O Spread in thin unifrnm layers for rapid drying; O Proven biological additives or oxidants Dead animals • Carcass decomposition -Proper disposition of carcasses Dead animal disposal • Carcass decomposition 119 Complete covering of carcasses in burial pits; pits 0 Proper location/consiruction of disposal pits Incineralbo • Incomplete combustion secondary stack burners AMOC -November 11. 1996, page 4 s r � Source water around • Cause to Minimize Odor attcll drat crater drains facilities . Microbial decopositiim of away fimn redlines organic matter Manure tracked onto . Poorly maintained access roads Farm WX*U rind mainknance public roads lima farm access Additional lnformatlon : Available From: Swine Manure MAnagement ; 0200 RuWBMP Packet NCSU. County Extension Center Swim Production Farris Potential Odor Sources and Remedies,* EBAE Fact Sheet HCSU - BAE Swine Production Facility Manure Management: Pit Recharge -Lagoon Treatment ; EBAE 128-88 NCSU - BAE 'twine Production Facility Manure Management: Underfloor Flush - Lagoon Treatment; EBAE 129-88 NCSU - BAR ...agoon Design and Management for Wvestock Manure Treatment and Storage ; EBAE 103-13 NCSU - BAE Calibration of Manure and Wastewater Application I&pipment ; EBAE Fad Sheet NCSU - BAE Controlling Odors fmm Swine Buildings; PIH-33 NCSU - Swine Extension Envirunrnental Assurance Ptogram ; NPPC Manuel ' NC Pork Producers Assoc Option Pot Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communications Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO 107.1995 Conference Proceedings Florida Cooperative Extension AMOC - November 11. 1996, Page 5 Mortality Management Methods {check which method(s) are being implemented) + E� Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must be at least 300feet from any flowing stream or public body of water. ❑ Rendering at a rendering plant licensed under G.S. '106-168.7. Complete incineration ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the Department of Agriculture ❑ Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) to r December 18, 1996 -'" '-wiAIMAL WASTE UTILIZATION P"i Producer: L. B. BOONE Location: 2813 VOLUNTEER ROAD ELM CITY NC 27882 Telephone: 919-443-3349 Type Operation: Existing Feeder to Finish Swine Number of Animals: 2160.00 hogs (Design capacity) STORAGE STRUCTURE: Anaerobic Waste Treatment Lagoon APPLICATION METHOD: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than .10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. ` Page: 1 i�NIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to'reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting.a crop or forages breaking dormancy. Injecting the waste or disking will conserve -nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2160 hogs x 1.9 tons waste/hogs/year = 4104 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2160 hogs x 2.3 lbs PAN/hogs/year = 4968 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. `,,.,.A:... Page: 2 ANIMAL WASTE UTILIZATION Pb& TABLE 1: ACRES OWNED BY PRODUCER TRACT IFIELD SOIL -TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC . AC USED ---- or ------ APPLY RESID. APPLIC METH N TIME END I TOTAL10 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 3 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required -only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP IYIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME 5157 1 NOB BH 6.1 305 0.0 10.8 3294 APR -SEE 5157 INOB SG 50.0 500.0 10.8 I�1 S540 EPT-MA 5157 B NOB BH 6.1 1305 10.0 11.6 1488 APR-SEF 5157 NOB SG 50.0 J-B 150 10.0 11.6 180 SEPT-MA 5157 5 NOB BH 6.1 1305 10.0 10.4 1122 APR-SEP 5157 NOB SG 50.0 1-5 150 10.0 10-4 120 SEPT-MA 742 1 NOB BH 6.1 1305 10.0 11.2 1366 APR-SEP 742 NOB SG 50.0 1-1 150 10.0 11.2 160 SEPT-MA END j j I TOTAL 4970 •- Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four Page: 4 ANIMAL WASTE UTILIZATION P inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to'let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result. in reduced yields and less' nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. ** Acreage figures may exceed total acreage in fields due.to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables I and 2 above: CROP.CODE CROP UNITS PER UNIT 50 1.0 BH SG BERMUDAGRASS - HAY SMALL GRAIN OVERSEEDED TONS BU TABLE 1 TABLE 2 TOTAL ** TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 0 0 14 4970 14 4970 * BALANCE -2 Page: 5 `ANIMAL WASTE UTILIZATION PLErN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 6 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 799.2 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 3996 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 13.32 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 31.968 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 2516 depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation.is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 7 ANIMAL WASTE UTILIZATION PEAT amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts.. Tract Field Soil Type Crop Application Rate (in/hr) Applic. Amount (inches) 5157 1 NOB BH 0.50 *1.00 5157 5 NOB BH 0.50 *1.00 5157 B NOB BH 0.50 *1.00 5157 "1 NOB SG 0.50 *1.00 5157 NOB SG 0.50 *1.00 5157 "B NOB SG 0.50 *1.00 742 1 NOB BH 0.50 *1.00 742 -1 NOB SG 0.50 *1.00 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the, temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the. responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior,to applying the waste. Page: 8 [� ANIMAL WASTE UTILIZATION PLAN NARRATIVE OF OPERATION Page: WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of thq state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the -site during application. No ponding should occur in order to control odor or flies. S. Animal waste shall not be applied to saturated soils, during rainfall events,' or when the surface is frozen. 9. Animal waste shall be applied on actively growing drops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. 'Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right -of --ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 11 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels,. etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 12 ANIMAL WASTE UTILIZATION BAN WASTE UTILIZATION PLAN AGREEMENT Name of Fazm:L: B. BOONE FINISHING OPERATION Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing.design capacity of the waste treatment and storage system or construction -of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: L. B. BOONE (Please print) oaz Signature: Date: L,� Name of Manager (If different from owner) : ,[QG//S I. &OONe_ Vt. Signature: Date: fro /9 ^ �T Name of Person Preparing Plan: (Please print)J. Edward Long Affiliation:Nash Soil and Water Conservation District Phone No. 919-459-4115 Address (Agency): Room 147 Ag. Center Drive Nashville NC 27855 Signature: Date: 1 Z/2/19r Page: 13 ANIMAL WASTE UTILIZATION PLAN C ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) I, �4( hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. Tt&d .51J 7 F;erdi 115� a I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: � _ Date : /2 -1 -- S Waste Producer: Date: -016 Technical Representative: Date: /Z -A9- 9p SWCD Representative: Date: 17, 2y-fe Term of Agreement: ' 3 /" , 19_ to /'e (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 14 ANIMAL WASTE UTILIZATION—OLAN a ANIMAL WASTE UTILIZATION AGREEMENT (Needed'only if additional land has to be leased, etc.) I, _ J k� Y� �e-Yfaereb give O/f 400�� permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. Teae4 7 Y 1 F, e!d 1 I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowneri" Date:;?Fh'009 Waste Producer: Date: Technical Representative: . II-)e SWCD Representative: Term of Agreement: Date: /Z - z9 - �.V Date: / Z - 2y �7Y o? �-31- g� ,1.9 to /�-3/-99 (minimum of Tan rears on Cost'abared Items) (See Required SpeclficatIon No. 2.) Page: 10 {, :'y r.. •` k-. J. - � f•^'• Vi�Y.• 4 y � ��.\t �.r .' vi ' �, F w \fA . r b`. ��i_ F:.i �1 Fill W tf�� .'� i `�ejt,�7w dK�, � � s� l� ��� �,, s rT1 � „y r.n •�>, y} �F GAk �7,A�y '�1 '`= iV � > > r• +F',i _ �'} k.,{.Y.;� t .�.4 ?,� � - f s T� , y +�. �,, .-y.. •,�, SY'L- ^�.F- , � � s v+ 1 k � r �E . R �"' _ t � " r �"i�E -5`4 h�`�" � f arf •1 r ' �. •� ' .„te.,�`S'.�� lr r 4. i r l � -�! r r gs'_ �'%e +: ,��,. `{k •',v.� 1, ��t 4 r'�r�,{''._�r- I� �� - r r a �t�. y, t �� �'� + •r c. � ter- '� r � �r J.r• yr '7 y ' t .S-. ,y'.. .r IF � '� � � - �� � t � . � ../ y f • kit' :� 1 Or r `� � f' ° rr n � , t ffy', yrf+ .t � •!ki+ - f, - v F �s,,. i s •. :��, �s. `„!�a. Y',•s,tLi ;-k�S r �. A,�. ��w�I ,}'. • � � 1Y t ` 'Vj. [ !, 1.��..� t•�� � ii �„ r• r0�_ ]fix- { r' r'ls• ! T. �5!! ; wia.O!['E�, r Y. .'�' Y, ft 1 V yy � � sr,ti,.. � r. � r!•5 �'i t t��k� C� 'j. r '"K..:j r h .•r Trk *xM+.f `.i r-`• �'rw t "G,.. -' -T `• r a - � e-f,•,�lv x. '�, �� i a �- �."` x c }5 �r sY!- `'; 4�-: � e ' -Y" +� rAa y{�, a•" �� ;? .•i,� . ° t •^ d� _ i F • k-S F� N �� s t fe ' $��'' �, _ ' irk. 4 ,�Ir ry ��i�rr4 �a y • r fir' �; � � F,. c - �" t �''� r..T ., y � ar a .a.r i . _ +�, t • � (r t'i' t`9 .. �.y -`1. � °y�t + `t�� �,- ��} '++`'' � •4I'f•� r �' '�i'.9 }fry � 1• 1 'C fit"•• y a+ s a ',: - f �... '��`.. 1 � - + r3 .i� M1� '�•� 'S 1 ty � 'ILL 4. f 1 �'f=�= U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE Map symbol I SOIL MAP LEGEND Legend Soil name I AaA (Altavista sandy loam, 0 to 3 percent slopes AbA (Altavista -Urban Land complex, 0 to 3 percent slopes AuB IAutryville loamy sand, 0 to 6 percent slopes Bb (Bibb loam, frequently flooded BnB {Blanton loamy sand, 0 to 6 percent slopes BOB IBonneau loamy sand, 0 to 4 percent slopes Co ICongaree fine sandy loam, frequently flooded DOA IDothan loamy sand, 0 to 3 percent slopes FaB IFaceville loamy sand, 1 to 6 percent slopes GeB IGeorgeville loam, 2 to 6 percent slopes GeC IGeorgeville loam, 6 to 10 percent slopes GeE IGeorgeville loam, 10 to 25 percent slopes GgB IGeorgeville gravelly loam, 2 to 6 percent slopes GgC IGeorgeville gravelly loam, 6 to 10 percent slopes GgE IGeorgeville gravelly loam, 10 to 25 percent slopes GoA IGoldsboro fine sandy loam, 0 to 2 percent slopes Gre IGritney sandy loam, 2 to 6 percent slopes GrC IGritney sandy loam, 6 to 10 percent slopes GuB IGeorgeville-Urban Land complex, 0 to 6 percent slopes HeB (Helena coarse sandy loam, 2 to 6 percent slopes Me IMeggett loam, frequently flooded NaC INankin sandy loam, 2 to 10 percent slopes NnB INason loam, 2 to 6 percent slopes NnC INason loam, 6 to 10 percent slopes NoA INorfolk loamy sand, 0 to 2 percent slopes NoB INorfolk loamy sand, 2 to 6 percent slopes NpB INorfolk-Wedowee complex, 2 to 6 percent slopes NrB INorfolk, Georgeville, and Faceville sails, 2 to B percent slopes NuB INorfolk-Urban Land complex, 0 to 6 percent slopes Ra (Rains fine sandy loam Rb IRaine-Urban Land complex To ITomotley fine sandy loam Ud jUdorthents, loamy Ur jUrban Land W IWater WeS (Wedowee coarse sandy loam, 2 to 6 percent slopes WeC (Wedowee coarse sandy loam, 6 to 10 percent slopes Wh IWehadkee loam, frequently flooded WkA (Wickham fine sandy loam, 0 to 3 percent slopes WoA (Worsham loam, 0 to 2 percent slopes PAGE 1 OF 1 O1/4/99 L.Cems Ce v '{ lc, ch r.. Gem - ; Cem :r f _;Athletic _.'Field 1 TD, . E;I�I�tw•rn kh Ih f Cem i' - .. i:Cem r` I934",� } o r Tar Ricer` d Sch i l457 ~III+71 �..:-. F� Attachment B Page 1 of 3 Narth Carolina Agricultural Extension' 'Service Agri 'Waste Management BiolagirszI and Ayfi=&dul EnO=ririg North Q=ib= 5tma Ld==Sizy .Imes C. Bazimr* -s: • A.. Semi -Solid Lot llsaare L. Sc=aped diraccly trm lot into spreader a. Frain Icad ad spreader, collocz about 2 Ibs of a=n=a yam dUMarear locations using no ==11' is collacars . ii. FroM szaraga a. Collect about 2 1bs of mire rtom radar the =Usz avoidlag badding marari,als and using aomat-174c collecrarz. B. s rg=td Hanxtre SUCC:7 i. Undax-slo=tad-floor pit a. F.szaad a 1/2' norm:erall,ic capt it open an bath ends into ms=re to pit floor. b. Seal upper and of conduit (a.g.. by pig a thumb over end of conduit) =zpping zw=e thaz bas enured lower and, remove and enpty shiver into plastic buc at or na=wca" I r- =nzainer. c. Take sobssuplas :rum 5 or more locazians or sz least 1 quart. d. His and add abouz 3/4 pint to aonmersl].ic sample container. U. F.xtarl= starsga basin or tame a. XWw sure zzzw= bats bean wall mixad with a liquid manure chopper -agitator pump or propeller agizazar. t b. Talm subsmplas :_-m about 5 pi= locations. mom . agiattor pump or am= sprestdar and place in a plasma buW=t. * P;flfessor and ?,xzeasion Spec:alis=. Biological and Ag-riczalzu:al :agiaeering Nor-h .".arclia Stara iniverz4t—, Bslaigh. NC. w `nachment o ,a2of 3 c. Him and add 3/4 pint to a nonmetallic sample container. C. Lagoon Liquid L. Collect about 3/4 pint of recycled lagoon liquid from inflow pipe to flush ranks in a noamaza �i�ic sample container. ii. From lagoon a. Place a small battle (1/2 pint or less) on and of 10-15` vole. b. Extend bottle 10-15' away from bank edge. c. Brush away floating scua► or debris. d. Submerge bottle within 1' of liquid surface. a. Empty into a plastic bucket, repeat about 5 times around lagoon, mix, and add 3/4 pint to nonmetallic sample container. D. Broiler or Tarkey Litter L. House Litter a. Visually inspect litter for areas of varying quality, e.-g., areas around feeders and waterers, and estimate percent of floor surface in each area. b. Take about 5 litter subsamples at locations proportionate to itam a. E.g.,-if 20% of litter of similar visual quality is around feeders and waterers, take 1 subsample mere and the other 4 xubsa Alas from remainder of floor surface. c. At each location, collect litter from a 6* by 6" area down to earth floor and place in a plastic bucket. d. After 5-subsamples bava been added to the bucket, mix, and add about 2-3 Lbs litter to a nonmetallic sample container -such as a I -gallon freezer bag and seal.. ii. From stockpile a. Take subsamples from about 5 locations at least IS= into pile. b. X xz, add 2-3 lbs to nometallic sample container and seal. r Attachment B Page 3 of 3 • 11. SAXn PREPARATION AM 73ANSMM A. Place sample into an expandable container that can be sealed. Rinse residues from container with clean water but do not use disinfectants, soaps, or _txaat in any other way. B. Pack sample in ice, refrigerate, freeze, or transfer.;o lab quickly. C. Nand -delivery is most reliable way of sample transfer. D. If mailed, protect sample container with packing material such as newspaper, box or package with wrapping paper, and :ape. E. Commercial s"wple containers and mailers are also available. Contacts: I. A&L Eastern Agricul-- tal Lab, Inc, iii. Polyfoam Packers Corp. 7621 Sihitepine Road 2320 S. Foster Avenue Richmond, VA 23237 Vhenling, IL 60090 Ph: (804)743-9401 Ph: (312)396-0110 U. Fisher Scientific Co. iv. NASCO 3315 'Winton Road 901 Janesville Avenue Raleigh, NC 27604 Fort Atkisson, 'Wi 33538 Ph: (919)876-2351 Ph: (414)563-2446 F. Private analytical labs are available, but sample analyses are costly. G. The NC.7A provides this servics for North Carolina residents. I. Address: North Carolina Depar unt of Agriculture Agronomic Division Plans/Rasze/Solnzion Advisory Section Blue Ridge Road Canter P.O. Box 27647 Raleigh, NC 27611 Ph. (919)733-2655 Atta: Dr. Ray Campbell ii. Forward $4 along with the sample. iii. Include the following identification iafoxaacion with sample: a. Livestock species (dairy, swine, turkey, etc.) b. Livestock usage (swine-nursasy, finishing; turkey-breedars, brooderhouse, grower, number flocks grown on Littar; *cc.) c. Waste t)rpe (dairy -lot scraped ma =ra, liquid slurry; swine -pit slurry, lagoon liquid, sledge; broiler-housa litter, stockpile iv. Routine analyses performed an all samples: N, P, R, Ca, Ng. Na. S . Fa , Na. Za. Cis. B v. Additional, analyses performed upon request: DX, No. Cd. Ni, Pb •• , S Y I Z%L • 7/ 8o Psr 3 of Per J� : TRAVELING IRRIGATION SYSTEM CALCULATIONS TRAVELING IRRIGATION GUN APPLICATION RATE I =((96.3*q)/(3.14*(.09*r)^2))*360/w where, I = approximate actual application rate (iph) q = discharge (gpm) r = wetted radius (ft) w = portion of circle receiving water (degrees) A iication Rate = 0.30 inches per hour TRAVELING IRRIGATION GUN APPLICATION AMOUNT d = (1.605*q)/(I*s) where, d = gross application (in) q = sprinkler discharge (gpm) I = travel lane spacing (ft) s = travel speed (fpm) Total Application Amount = 0.39 inches VELOCITY IN A PIPELINE v = [0.408*q]/dA2 where, v = velocity of water (fps) - q = fiowrate (gpm) d;; inside diameter of pipe (in) Velocily 9f Water = 0.00 feet per second IF q = 165.00 gpm r = 150.00 ft and w = 330.00 degrees then 1 = 0.30 iph IF q = 165.00 gpm I = 225.00 ft and s = 3.00 fpm then d = 0.39 in I F q = 0.00 gpm and d = 6.00 in then v = 0.00 fps 4 In R'�19 ZI"t-. I, Sa PJ 3 F� pre TRAVELING IRRIGATION SYSTEM CALCULATIONS TRAVELING IRRIGATION GUN APPLICATION RATE I =((96.3*q)1(3.14*(.09*r)"2))*3601w where, I = approximate actual application rate (iph) q = discharge (gpm) r = wetted radius (ft) w = portion of circle receiving water (degrees) APPlication Rate = 0.40 inches Per hour TRAVELING IRRIGATION GUN APPLICATION AMOUNT d = (1.605*q)1(I*s) where, d = gross application (in) q = sprinkler discharge (gpm) I = travel lane spacing (ft) s = travel speed (fpm) Total Application Amount = 0.62 inches VELOCITY IN A PIPELI v = [0.408*q]ldA2 where, _v = velocity of water (fps) q = flowrate (gpm) d = inside diameter of pipe (in) Velocity of Water = 0.00 feet Per second IF q = 315.00 gpm r = 180.00 ft and w = 330.00 degrees then I = 0.40 iph IF q = 315.00 gpm I = 270.00 ft and s = 3.00 fpm then d = 0.62 in IF q = 0.00 gpm and d = 6.00 in then v = - 0.00 fps .. '�y4•r.:!j{!� elm'?` .. '. " y:• ••t.. !'ii�% ,...; �):;..'. "�`u-ti5+. ti*.,r,:`: "BIG GUN° PERFORMANCE TABLES U.S. UNITS, •: SERIES BIG GUNS — 24° TRAJECTORY" . 100 T TAran OOng NOZZLES � •i1�;.•1' �� Nor:e GPM CIA. Nozzu flPM •DIA. Nozzle GPM �• D!A •: Nozzta GPM • CIA, Nonl� GPMDIA. Nossq GPIAe CIA, Hassle . GPM • CIA. Nosale GPM • CIA. NOalla GPM A• CIA, ZOPI:CIA- soaP.S.I. 1 60 205' 6a 21S' 74 225' 87 235' 100 245, Its 250, 130 26s• ISO 273• Ids 280' 204 300' s r =r =6 rip -+Y�+ =ij 70 60 27S' 75 236' 6e - 250' tOs 263' 120 275• 136 7e3' 155 24S' 177 302' 197 310' 2a3 336' 90 a6 say 63 256• 100 ' 270, 117 203' 135 295' 1Ss 300, ITS 31s' 201 326 223 33S'. 27a" -3a2• 110 To 265' 92 276' I11 200' 129 501• ISO 315' IT 32a• 193 333' 1 222 344' 247 353' 304 380'• •AvWaole ordy vAh PI00 i $R100. :1 ' %Y.1-Y4i. ; � .37A!�•ti''"."•'SL� 1:-':"• �, � ` '' ti.t.: ; � .._'.''� : ,..r..,.:;':'. `` r,1 ti�� �u'+- '1' .r,. •7 �=•t . :.�.:..''� ;. ' .... ' _.� .•;•:, : .�1�;"� ��a•.' ' ' ,.:- �• ,���'�'• . 100 A RING NOZZLES _ S '. '7� . ` 100 ON DIFFUSER NOZZLES • : t '. PSI • ' �s! •71 IN .77 RING ,01 ING Ad RING '.. . ' .09 RING � •, _.; .93 R1NG':, .1: : ,9& RINQ • 0.8 AN : • 0.6 CH 0 ' bPM CIA GPM CIA GPM DIA GPM CIA GPM CIA - • GPM CIA GPM CIA GPM CIA ' CPU CtA ,7 Clt GPM DIA 4 ' 0.6 Df l - GPM Di. 40 as 204 76 212 at 215 103 224 Its 235 13e x]a 152 20 a5 1S41 66 16e 91 162 tie IS '1 T* b=5 M==Td Z ' i sty 3��=mr== 7o 111 235 i'Ts3dTsa1:QL�4TZi7II@.' 00 06 255 9e 240 Ill 265 110 gas 127 275 12S 2a0 iII:i3';CZYQ� .a 141 770 :1L3�'36t�i Ia3 SOD laa 275 1i'iY.3i;dTn7II3ddA� too 305 Ins 200 211 315 — — — 11w1 700 • 143 2s ' Ali Xi100 10S 270 t2a 200 ta? 29S 2.21 152 320 212 325 236 3]5 — — — — — — B. .3 tr1�33 7 � - e, Ins alamalal of lnraw 4 appiaalmately J %'.I. lw Ina at Reteclory Ingle. as Ids Iw Iu: :11SO SERIES BIG GUNS •'•— 24° TRAJECTORY." ,'Y:= :°'-'--` :� 150 T TAPER BORE NOZZLES ' i .• , NOz tie .., Nozzle Not vs Nag its, sg R3.1. i '+ter GPM 7• CIA. ' 5m GPM d• CIA. I qe ms, G 11A g• DIA. . GPM 1�• OIA, .- Nozzle .� GPM 1 1' DIA, M.g - Nasals GPM 1 DIA. Natal@ 1j• GPM CIA. ` cr 60 110 265' 143 265' 102 305, 225 325' 27S 345, 330 36s• 365 360' 6o 126 290• Ids 310• 210 335' 260 355' 315 375' 380 395, 445 410, 100 ta3 310' 1a5 330, 223355 3355• 29e0ef�17.3�7eS' 3S5 a00' a23 a20' Soo a.0, 120 1 157 330' 1 204 350' 258 375• 320 305• 1 ads 420' aaS aaD' SaS aa0' 190 R RINa NOZZLES '• P.S.I. Rimy As CIA. "GPM DIA. Ain in OPM „ DIA,G Aln Ring M IA. .. FU 1.1e� flPM DIA RingAln 1,26 GPM CIA. 1�44 GPM CIA. RIA 1A19 CPU CIA. ^A a a 60 110 290' 143 200, 102 300, 225 315. 275 3351 330 350' 365 36S' ' ' ' Z=d'ro:,;, 1 S 6o 126 250, 3+.aot' 141s 300• ter.°art y 210 320, T�::Z1�d0� 2GO 340' 31S aRr - 3A0 3110' 445 311t Z5a5 �3i� nil 100 +a3 300, tOs 320' 235 340' 200 360, 35s 30a, '425 400' Soo a151 5"' I�'s337 2ir'.�''�L71.0 lf7SJG t20 157 its' 20i 335' 258 O60' 320 300' ios a00' aGS a20' SaS ass' '- I M atamelef of w wow N appiaaunalely 3N less law the a paleglory angle. ' 1 200 SERIES BIG GUNS -- 270 TRAJECTORY" 200 T TAPER BORE N077LE9 f I • P.&I. Nasals 1DS• GPM DIA, Hozata 1.1' GPM DIA, . Nasals 1,2' ' GPM DIA. Nozzle IJ' GPM CIA. '• Nozzle 1 IA' GPM CIA, Nozzle I.S. GPM DIA. Nozzle 1,6• GPM CIA. "Game 1,7S' GPM DIA. Nosale „ 1,• j GPM 01A. _7,a a a log 3a e g g ' 70 270 360' 310 3a0' ass 395' 415 410, 400 430, 5551 450' 630 405• 735 495, no sir 90 110 390, 350 Ato, 405 42s' 475 443' 545 445' GOs a95' QSoIC.�G15=;mrr�+-r� 825 aas' 71S so$, $55 535' 1005 sss• ISO 3a0 4. 390 a30' u5 as0'25u0'• 5'. ii ;�64 cgs 515' M6 79' a15, �t270 a2S aaS' aei a6S'S a05' ass 515, 755 Sao' 660- 560' 1025 590' 1210 620' 200 R PIING NOZZLES Ps.l. 1 1/." Ring '° (1.29• Muni. GPM 0 I b{• Fling (1,a6' aclwll GPM DIA, 1 41' Rinq f136' &gluon GPM DIA. 1 y,• ninq .(1.0i• ecluail �r GPM DIA. 1114 • Alnp (1.7P ecluaq GPM DFA, 1 'A" Rlnp (1.53, &given GAM CIA, 2• Alnq �1.93' aqusQ PM DIA. 0 '3 37 00,►' S 37 J11... MMB LWA16=1150= IMVM2 40 "* i0 100 Td� I,p .,.•30 760 340, — syd== ys--*5T 2e0 370, fd==D .123 300, iS itC'Z'�I7'615 l� 1M16 atn . 7 . 1's?eCtfSs 330 370, " S'S� 300 400, =�"7 473 425' i 35!'r=3110 .n}, 449 30S Sa0' ., aaS 420, 3r,�1'�1 4•15 410, 7MilIfa" l , S1S 440, 515 425, 3 Sao ASS, SOS 440, Imo' i6'! L^' 675 470, a9f 455' 605 490, mmm= �.lf' 3—vwZ=1Y1 C= 500 a5' $73 465' 11110 4e0' 7%:i 6fH1 :'f � J 755 5a0' lmg=.m=m rl:!i Si'n' C - 90o 52W flhS !a5' -9=2.;i'=1 1046 ai:l, 6r111 . 411!'1' .,fn'J�Rs*a5 , ., 6 '31 7 ..-. _. .. _.. _-.-......... • .-..... - ... ..- ..•pua,y wnyi.. —...e Iw ul. a- valealwy Mole. The 010 GUN& PwlOananae data has been obtained endow tdaat toai oondilbns end may be adwewsely affected by rind, pow hydraullo anllanga COndalona W othaz'IM&L . Nelson Irrigation CelpotallOn males no fopiesentallon idgafdtng dioplul condition, unifowmity, of apolicallan +ale. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director CERTIFIED MAIL RETURN MCTWT REQUESTED Louis B. Boone L.B. Boone Finishing Operation 2813 Volunteer Road Elm City NC 27822 Farm Number: 64 - 76 Dear Louis B. Boone: WA A4 0 • NCDE,i✓_>> NORTH CAROLINA DF\PARTMENT OF ENVIRONMENT AND�NATURAL.RESO0RC April 6, 1999 `- -0 G ' i You are hereby notified that L.B. Boone Finishing Operation, in accordance with G.S. 143- 215.1 OC, must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this letter, your farm has six!y (601 days to submit the attached application and all supporting documentation. In accordance with apter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section t Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please call Dianne Thomaass�at=(919)733-5083 extension 364 or Charles Alvarez with the Raleigh Regional Office at (919) 571-4700 — S• erely, for Kerr T. Stevens cc: Permit File (w/o encl.) Raleigh Regional Office (w/o encl.) P.O. Box 29535, Raleigh, Forth Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN RECEIPT REQUESTED L. B. Boone 2813 Volunteer Road Elm City, NC 27822 Dear Mr. Boone: i ILF!?FA 0 AMI NCD.ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES November 24, 1998 Subject: L. B. Boone Finishing Operation Farm Number: 64-76 Nash County This is to inform you that staff from our Raleigh Regional Office of the Division of Water Quality (DWQ) inspected the subject facility on July 1, 1998. Staff from the Raleigh Regional Office of the Division of Soil and Water Conservation performed an operation review at your facility on September 15, 1998. It was noted during both visits that this facility was riot in operation. The DWQ mailed a proposed special agreement to you on September 11, 1998. This letter was received by you on September 15, 1998. No response to this letter has been received. Therefore, as per State law, the subject facility must not be repopulated above the threshold number established by 15A NCAC 2H .0217(a)(1)(A) until you have first applied for and received a Certificate of Coverage under the Division of Water Quality's General Permit for swine facilities. To operate this farm before applying for and obtaining a Certificate of coverage would be a violation of N.C.G.S. 143-215.1 and be subject to a civil penalty of up to $10,000 per day for each day of operation. 1. Please be advised that you are also required to manage the wastewater in the subject facility's lagoon(s) in such a way as to properly treat the wastewater "and to prevent any discharge of waste to waters of the State. Nothing in this letter should be taken as removing from you either the responsibility or liability for failure to comply with the State ts-,envirRfrn}ent you have any questions, please contact Mr. Shannon Langley at (919)1733-5083;-extensiow -1� 4 Sincerely, DEC i t•-.-r;c,' RALELIGH R' GiviJ;�L OFFIC A. reston Howard, Jr.; P.E. cc: <RRQ Water_Quaiity_Supervisor Shannon Langley Sonya Avant/Facility File P.O. Box 29535, Raleigh, North Carolina 27626.0535 An Equal Opportunity Affirmative Action Employer Telephone919-733-5083 Fax 919-715-6048 50% recycled/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN RECEIPT REQUESTED Louis B. Boone L.B. Boone Finishing Operation 2813 Volunteer Road Elm City NC 27822 Dear Louis B. Boone: I M711WA T 0 • 10 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES February 11, 1998 Subject: Request for Status Update Certified Animal Waste Management Plan L.B. Boone Finishing Operation Facility Number: 64-76 Nash County In accordance with State Regulations (15A NCAC 2H .0217(a)(1)(E)) adopted by the Environmental Management Commission on February 1, 1993, the owner of the subject facility was required to submit a Certification Form for the facility's animal waste management system by December 31, 1997. This letter is to advise you that this office has no record of having received the required Certification for the subject facility. Please provide this office with an explanation as to why this Certification was not submitted as required. This explanation must be received within 30 days following the receipt of this letter. Any existing facility owner which did not submit the required certification by the deadline is no longer deemed permitted to operate their animal waste management system. Therefore, if the certification was not submitted as required and the facility is still in operation, this facility is being operated without a valid permit. N.C.G.S. 143-215.6(b) allows the Secretary of the Department of Environment and Natural Resources to take appropriate enforcement actions for this violation for as long as the violation continues. As per Senate Bill 1217, which was ratified on June 21, 1996, the Environmental Management Commission (EMC) may enter into a special agreement with facilities that did not meet the December 31, 1997 deadline. These special agreements can only be issued to facility owners which signed up for assistance with their local Soil and Water Conservation District Office by September 1, 1996 and which can demonstrate that they made a good faith effort to meet the December 31, 1997 deadline. The special agreement, if issued, would contain a specific schedule for the facility to follow to develop and/or implement an approved animal waste management plan. Attached is an application for a special agreement between the EMC and the subject facility. If you can demonstrate that this facility can meet the conditions for a special agreement, you may send this request along with your explanation as to why the plan has not been developed and implemented. This request would also be due within 30 days from receipt of this letter. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Also attached is a forni (Form RR 2/98) that must be filled out if the facility is no longer in operation or is below the threshold established in15A NCAC 2H .0217(a)(1)(A). Facilities which maintain the number of animals below certain thresholds are not required to be certified. These thresholds are: 100 head of cattle 75 horses 250 swine 1000 sheep 30,000 birds with a liquid system Please submit this form if the subject facility is not operating or is below the threshold limit established in 15A NCAC 2H.0217(a)(1)(A). Please submit all responses to this matter to the following address: Attn: Shannon Langley Division of Water Quality P.O. Box 29535 Raleigh NC 27626-0535 Once your response is received, it will be evaluated in detail along with any supporting information that you may wish to submit. Following this review, you will be advised of the results of the review and of any additional actions that must be taken to bring your facility into compliance. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with the requirement to develop and implement a certified animal waste management plan by December 31, 1997. Please also be advised that the submittal of a request for a special agreement does not assure that one will be issued. Each facility will be reviewed on a case by case basis and appropriate actions will be taken to bring each facility into compliance. Thank you for your immediate attention to this issue. If you have any questions concerning this matter, please do not hesitate to contact Mr. Shannon Langley of our staff at (919) 733-5083 ext. 581. Sincerely, A. Preston Howard, cc: Facility File — Non -Discharge CompIiance/Enforcement Unit DWQ Regional Office Shannon Langley Central Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 Fax 919.715-6048 An Equal Opportunity Affirmative Action Employer 50 % recycled/10 % post -consumer paper Ur Lila l lul`I.J Br1'rl V - l WU f CA • 717 I lJ UU-+Q nrl L�-1 71 1J • VL { UZI U'J FEB 121a oa REGISTRATION FORM FOR ANIMAL FEEDLOT OPE IO Department of Environment, Health and Natura e c ;}5y C31 Division of- Environmental Managemen }an �8r,%JC� Water Quality Section ��k_. If the animal waste management system for your feedlot operation is designed to serve more than or equal to 100 head of cattle, 75 horses, 25C swine, 1,000 sheep, or 30,000 birds that are served by a liquid waste system, then this form must be filled out and mailed by December 31, 1993 pursuant to 15A NCAC 2H. 0217 (c) in order to be deemed permitted by DEM. Please print clearly. FArm A]Ama• /--'U• &O`Je• 1rrn. Mailing Address: . d2- A aa9'X ZIP 2-- County: Phone No. Owner (s) Name:Manager(s) Name :c�iS Lessee Name: Farm Location (Be�� s ecifi as possible: r ad names, direction, milepost, etc. } : 1/ae�Yie.�►�e GW Bl.Sa7� eeper �/elrruee r Latitude/Longitude if known: Design capacity of animal wasteppman c�emend system {Number and type of confined animal (s)) 60 yore Jo+•f Ior.I _7�0 15N,4 Oooerg7 0A/ Average animal gopulaLion on th f�rm (Nu er ar)d type of animal (s) raised) :ate held c9 arc, ,� ass•�u�;:��S�ii.a e s Year Production Began: IY76 ASCS Tract No.: T Mpeoo",) of Waste Management System Used: ' 4a/ef� st5lovq fi e— 14 4s1'e- 0�" cer v ,"d iV r Acres Available for Land -Application of Waste:649 ME azw'' _do . .0 x) owner (s) Signature-(s) : �46rua. DATE: L'q - j'a OPERATIONS BRANCH - WQ Fax:919-715-6048 Apr 14 '97 13:02 P. 03/03 State of Narth Carolina Department of Environment, Health, and Natural Resources 512.North Salisbury Street • Raleigh, North CaroUaa 27604 Division of Environmental Management ]omits B. Hunt, Jr., Governor March 9, 1993 Jonathan B. Howes, Sec=nry Louis B. Boone Rt_ 2 Box 229-X Elm City NC 27822 Dear Mr. Boone, This is to inform you that your completed registration form required by the recently modified nondischarge rule has been received by the Division of Environmental Management (DEM), Water Quality Section. On December 10, 1992 the Environmental Management Commission adopted a water quality rule which governs animal waste management systems. The goal of the rule is for animal operations to be managed such that animal waste is not discharged to surface waters of the state. The rule allows animal waste systems to be "deemed permitted" if certain minimum criteria are met (15A NCAC 211 .0217). By submitting this registration you have met one of the criteria for being deemed permitted. We would like to remind you that existing feedlots which meet the size thresholds listed in the rule, and any new orexpanded feedlots constructed between February 1, 1993 and December 31, 1993 roust submit a signed certification form to"DEM .by December. 31 1997. New or expanded feedlots constructed after December 31, 1993 must obtain signed certification before animals are' stocked on the farm. Certification of an approved animal waste managementplan can be obtained after the Soil and Water Conservation Commission adopts rules later this year. We appreciate you providing us with this information. If you have any question about the new nondischarge rule, please contact David Harding at (919) 733-5083. Sincerely, �-!Sfte�veedder, Chief Water Quality Section REGIONAL OMCZS AshcvMa Fayette+ ma MoarccV0& Raleigh wuhm3mn Wtluringu= 704/251-6209 919/486-L541 704/663-1699 919/5714700 919t}46-6481 919/395-39M Pollution Pteventlon Papa P.O. Bar 29535, R2W&h. Noah Cuoiina 276Z6.0535 Triephmc 919-733-7015 An Egoat Ovpommiry Afr==va A== E-00Y- WmswnSalem 91918% ?007 Department of Environment; Health and �Natura e�t�$, ►Lily v Division of �Env i';,onm"�-a'1 Managemen lngBranch Water`j4)Q ality SectSecion Id R Pi�+t+ 1}� APR J If the animal waste management s m—for—,,yourCLfeedlot operation is designed to serve more than or Requ'alt0t} ''�1'00•-head of cattle, 75 horses, 250 swine, 1,000 sheep,--ar— ,0 0 birds that are served by a liquid waste system, then this form must be filled out and mailed by December 31, 1993 pursuant to 15A NCAC 2H.0217(c) in order to be deemed permitted by DEM. Please print clearly. Farm Name: 4 - S &ooe_ Arys Mailing Address: . .2, aa9-X [_/ /V• cif Gli' oC /ad4 c County: Phone No. 9- VY3.. Owner (s) Name: /_ aglS .9• '000Ne Manager (s) Name: /.S a.v� Lessee Name: Farm Location (Be,specifi as possibl r ad names, direction, m' 1 e p o s t, etc .} Va�W +zfex.r �o a ►~ fl at yf e e r Latitude/Longitude if known: Design capacity of animal wastemman cc�ement system of confined animal (s) ) : 3do ,�Srs2pav At -raw 7`a (Numper and type AlA,&4 Caerqo✓ Average animal population on thm rm (Num;pe�ar)d type of animal (s) raised) :_ �'OO egcl C,?pqyy owu qn i:�iS�ii,✓q hem Year Production Began: ASCS Tract No.: Type cf of Waste Management System Used: N 9de—r- Pir S Of-R e_ d' 4t,o.v , k 4.sA- %,s .oa ,, ,A ed o.V Coral a.Na wi&at 6v Acres Available for Land Application of Waste:4O� 4✓ 1J . D a ....... _ Owner (s) Signature (s) : DATE: �q _q q f 4 REGISTRATION FORM FOR ANIMAL FEEDLOT OPERATIONS Department of Environment, Health and Natural Resources Division of Environmental Management Water Quality Section _ if the animal waste management system for your feedlot operation is resigned to serve more than or equal to 100 head of cattle, 75 . verses, 250 swine, 1, 000 sheep, or 30,000 birds that are served by Liquid wash system, then this worm must be filled out and mailed .:y December 31, 1993 pursuant to ?SA, NCAC 2H:0217 (c) in order to be teemed permitted by DEM. ?lease print clearly. ._._m Name: .tW_linQ Address. Z=? County: Phone No. :wner(s) Name: :anager (s) Name: -.uses Name: arm Location (Be as specific as possible: road names, direction, ..__eDOst, enc.) la[ i nude/Longitude i,: known: .esign capeci ty of animal waste management system (Number and type .f confined animal (s)) _ -ve,age animal population on the =arm (Number and type of animal (s) a i sed) - _ear Production Began: ASCS Tract No.. -ype of Waste Management.System Used: acres Available for Land Application of waste. . ' 'tw e _ (s) Signature (s) ---.__ - � DAI i DAT7 r II } a NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY May 12, 1998 Louis B. Boone L.B. Boone Finishing Operation 2813 Volunteer Road Elm City NC 27822 SUBJECT: Designation of a Certified Operator in Charge L.B. Boone Finishing Operation Facility # 64-76 Nash County Dear Mr. Boone: North Carolina General Statute 90 A-47.2 requires the owner of each animal waste management system that serves 250 or more swine, 100 or more confined cattle, 75 or more horses, 1,000 or more sheep, or 30,000 or more confined poultry with a liquid animal waste management system, to designate a properly certified operator as the Operator in Charge (OIC). Our records indicate that the OIC you previously designated is no longer a certified animal waste management system operator. As the owner of a registered animal operation with an animal waste management system, you must designate a certified animal waste management system operator as the Operator in Charge. Enclosed is an Operator in Charge Designation Form specifically for your facility. Please return this completed form to this office by June 12, 1998. Please be advised that nothing in this letter should be taken as absolving you of the responsibility and liability for any past or future violations for your failure to designate an appropriate Operator in Charge. If you have any questions regarding the certification of an operator, or need assistance in locating a certified operator in your area, please contact Cindy Dudley with the Technical Assistance and Certification Unit at (919)733-0026 ext. 309. cd/Desig. of certified OIC Enclosure cc: Raleigh Regional Office Water Quality Files - Sincerely, It`74�- Joseph B. McMinn, Supervisor Technical Assistance & Certification Unit Fs F MAY 1 21998 all DENNR RAtEiGH REM' h 0Ff10E=..' ' WATER POLLUTION CONTROL SYSTEM OPERATORS CERTIFICATION COMMI881ON - P.O.139X 28535, RAL616H, NORTH CAROLINA 27626-0535 PHONE 818.733-0026 FA% OI O-733-1 338 AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER - 50% RIECYCLEO/10% POST -CONSUMER PAPER rYw!•'ti'rsi�R', •,.+ r..S�.:S: t��l�`�S'a:'4.v8.-. State of North Carolina i Department of Environment, v and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor NCDENR Wayne McDevitt, Secretary NORTH CAROLINA DEPARTMENT OF A. Preston Howard, Jr., P.E., Director ENVIRONMENT ANo NATURAL RESOURCES '--•- 1 55 �� k!�? Ili MEMORANDUM - t TO: Regional Water Quality Supervisor FROM: Shannon Langley SUBJECT: Application for special agreement JJ Please find attached a copy of application for special agreement for facility number If you have any questions, please call me at 733-5083, ext. 581. ATTACHMENT P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper CIA Lk' Al lo:4 j State of North Carolina Department of Environment and Natural Resource - Division of Water Quality APPLICATION FOR A SPECIAL AGREEMENT MAR 0 9 1998) (INFORMATION RES U RED FOR ANIMAL OPERATIONS REQUESTING A SPE AGREEMENT) QUALITY SECTION I. GENERAL INFORMATION: �=��-;�cl�arya Compliance EnE. I. Applicant (Owner of the Facility): 2. Facility No. 3. Facility Nan 4. Print or Type Owner's or Signing Official's Name and Title (the person who is legally responsible foi#e facility and its compliance): 5. Mailing Address: c�,g43 V B 4,Vee-r lfogd City: / %'�Y State: /V C • Zip:, Telephone No.: (gl) _3'`3% 6. County where facility is located: 1Vq1 5/2 7. Operation Type (Swine, Poultry, Cattle): J JV1w e-- 8. Application Date: / l.1=r l %orZ? f e Ii. ELIGIBILITY FOR A SPECIAL AGREEMENT: As per Senate Bill 1217 which was ratified on June 21, 1996, the Environmental Management Commission (EMC) may enter into a special agreement with an operator who registerdd by September 1, 1996 with their local Soil and Water Conservation District office and who makes a good faith effort to obtain an approved animal waste management plan by December 31, 1997. This special agreement shall set forth a schedule for the operator to follow to obtain an approved animal waste management plan by a date certain and shall provide that the EMC shall not issue a notice of violation for failure to have an approved animal waste management plan so long as the operator complies with the special agreement. Operators who did not register by September 1, 1996 with their local Soil and Water Conservation District office or who can not document that they made a good faith effort to obtain an approved animal waste management plan by December 31, 1997, will not receive a Special Agreement from the EMC. These . facilities will be subject to civil penalties, criminal penalties, injunctions and all other enforcement tools available to DWQ. 1. Date facility requested assistance from their local Soil & Water Conservation District FORM SPAG 1/98 Page 1 of 4 I k, 7. Efforts made since February 1, 1993 to develop and implement a certified animal waste management plan (Use additional sheets if necessary). This summary must include: A. All contacts made with technical specialist B. Dates and types of plans developed C. Contracts signed D. Funds expended E. Improvements made to the system F. Animals removed and not retoacked at the facility G. Other actions taken FORM SPAG 1/98 N Page 2 of 4 II. PROPOSED SCHEDULE FOR OBTAINING CERTIFICATION: Please list each of the specific things that will be done at your facility to implement a certified animal waste management plan and the date you will have each activity completed. This must include a review of the possibility of not restocking animals that are scheduled to be removed from the facility until such time as a certified plan can be implemented. Please also list the date on which animals were most recently restocked at this facility. The EMC reserves the right to deny any proposed schedules that are excessively long. (Use additional sheets if necessary). Applicant's Certification: I, _lesezgel �_ , attest this application for a Special Agreement with the EMC has been reviewed by me and is accurate and complete to the best of my knowledge. I understand if all required parta of 1his apl2lication are not completed and if all required supporting information and attachments are not included, this application package will be returned as incomplete. Furthermore, I attest by my signature that I fully understand that if this facility is found to be ineligible to enter into a special agrgement with the EMC nothing in this document removes my responsibility and liability for complying with all North Carolina General Statutes and Regulations. I understand that the failure to meet any dates that are agreed upon by mvself and the EMC will result in appropriate_ enforcement actions -being _taken -by the EMC. 40 Print Name of Owner r Date Signature of Owner FORM SPAG 1/98 . Page 3 of 4 i Ft, uOred Items: One (1) original and two (2) gPies_f the completed and appropriately executed application forna,_along with any attachments, THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFOY,NIATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE COMPLIANCEIENFORCEMENT UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 FORM SPAG 1/98 Page 4 of 4 . . . . . . . . ..... ZZ v ot; d Q/ ir n 61A 8 r q m si `1h w cz - 1 lq9 e t7o 7 h e r w) ,*.v figs Ile d tv -TV 0- dn Pn/p le- ied clam 5'lfle- w ifb /V el 7' q,5 b S/�p e- Occ, 311 . A 1 4 PRO: _ s� 7� 1 �' Y' �,"s4ai *�1 �yi *,���'�"�.��'�� ��� ��/'�� 11 ���.''7a4.�lo' ���",�"' � L -tl .� �r Fi'`,E •, p',� ���'. • r'Irf Y-^'%,,,,L Si lr f� 3" � �% a. ''f 1 '! ti-�.s 1im a" ,} �, a , � • � tS 4 � 1, < .. - i.�, - w ,ram,. �, k� - .• .. - State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN RECEIPT REQUESTED Louis B. Boone 2813 Volunteer Road Elm City NC, 27822 Dear Louis B. Boone: A, 1 � • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES September 11, 1998 Subject: Special Agreement Certified Animal Waste Management Plan L.B. Boone Finishing Operation Facility Number: 64-76 Nash County As per Senate Bill 1217, which was ratified on June 21, 1996, and your application for Special Agreement which was received on March 9, 1998, the Environmental Management Commission (EMC) hereby proposes to enter into a special agreement with Louis B. Boone in order to allow additional time for Louis B. Boone to obtain and implement a certified animal waste management plan (CAWMP) for the subject facility. PIease find enclosed the proposed Special Agreement. If you agree to abide by the dates and terms of the attached schedule, you must sign, date and return the enclosed documents to the attention of "Shannon Langley" at the letterhead address within fourteen (14) calendar days of your receipt of this letter. If you have already implemented your CAWMP or do not wish to enter into the Special Agreement, please provide us with a response to Mr. Shannon Langley within fourteen (14) calendar days of your receipt of this letter. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with all terms and conditions of the North Carolina General Statutes 143-215.1 and the relevant rules promulgated thereunder. All dates and conditions of this agreement that are not met shall be subject to civil penalties, criminal penalties, injunctions and all other enforcement tools available to the Division of Water Quality. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Therefore, in order to avoid such enforcement actions, I urge you to read the Agreement carefully, make sure you understand your commitments under the Agreement, and contact Mr. Langley, if you do not understand or are confused about any condition of the agreement. If you have any questions concerning this matter, please do not hesitate to contact Mr. Shannon Langley at (919) 733-5083 ext. 581 or Mr. Steve Lewis at (919) 733-5083 ext. 539. Sincerely, A. Preston Howard, Jr. P.E. �r Attachment cc: Facility File — Non -Discharge Compliance/Enforcement Unit RRO Regional Office Dewey Botts -- Division of Soil and Water Shannon Langley Central Files NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION X61IRIIVAus)0ill kRya IN THE MATTER OF SPECIAL AGREEMENT FACILITY NUMBER: 64-76 LOUIS B. BOONE Pursuant to provisions of North Carolina General Statutes (G.S.) 143-215.2(a) this Special Agreement is entered into by Louis B. Boone, hereinafter referred to as "OWNER", and the North Carolina Environmental Management Commission, an agency of the State of North Carolina created by G.S. 14313-282, and hereinafter referred to as the Commission: 1. "OWNER" and the Commission hereby stipulate the following: (a) "OWNER" has previously been deemed permitted in accordance with 15A NCAC 2H .0217 for the operation of an animal waste treatment works, but was unable to comply with 15A NCAC2H .0217 (a)(1)(E) requiring an approved animal waste management plan to be submitted by December 31, 1997. (b) Failure to obtain and implement a Certified Animal Waste Management Plan in accordance with 15A NCAC 2H .0217(a)(1)(E) is a violation of State Water Quality Regulations -and "OWNER" is within the jurisdiction of the Commission as set forth in G.S. Chapter 143, Article 21. (c) "OWNER" desires to continue to operate the animal waste treatment works as a Non -Discharge system. (d) "OWNER" has secured assistance from a certified technical specialist to develop an animal waste management system which, once certified, will meet or exceed all applicable guidelines and standards and will be able to comply with all aspects of the Commissions animal waste general permit. (e) During the term of this Agreement there will be no increase in Steady State Live Weight (SSLW) at the facility. Any new construction will be designed to accommodate only the SSLW for which the facility was registered in accordance with 15A NCAC 2H .0217(a)(1)(D). (e) Since this Special Agreement is by Consent, neither party will file a petition for a contested case or for judicial review concerning its terms. (f). Nothing in this Special Agreement shall be taken as absolving or relieving "OWNER" from any responsibility or liability for discharges of animal waste to surface waters of the State of North Carolina. 2. "OWNER" desiring to comply with the Permit identified in. paragraph 1(a) above, hereby agrees to do the following: (a) Undertake all necessary activities in order to obtain and implement a certified animal waste management plan by October 31, 1998. Farm Number: 64-76 Special Agreement Page 2 (b) "OWNER" shall comply with all terms and conditions of the North Carolina General Statutes 143-215.1 and the relevant rules promulgated thereunder except 15A NCAC 2H .0217(a)(1)(E). (c) No later than fourteen (14) calendar days after the date identified in 2(a) above, submit to the Director of DWQ written notice of compliance or noncompliance therewith. In the case of noncompliance, the notice shall include a statement of the reason(s) for noncompliance, remedial action(s) taken, and a statement identifying the extent to which subsequent dates or times for accomplishment of listed activities may be affected. 3. "OWNER" agrees that unless excused under paragraph four (4), "OWNER" will pay the Director of DWQ, by check payable to the North Carolina -Department of • - Environment and Natural Resources, stipulated penalties according to the following schedule for failure to meet the deadline set out in paragraph 2(a) above. Failure to obtain and fully implement a Certified - .$100.00 for the first seven days Animal Waste Management Plan by the date past the date identified in 2(a) identified in 2(a) above: $500.00 for each additional day 4. "OWNER" and the Commission agree that stipulated penalties are not due if "OWNER" satisfies the Division of Water Quality that noncompliance was caused solely by: a. An act of God; b. An act of war; c. An intentional act or omission of a third party, but this defense shall not be available if the act or omission is that of an employee or agent of the defendant or if the act or omission occurs in connection with a contractual relationship with the "OWNER"; d. An extraordinary event beyond the "OWNER'S" control. Contractor delays or failure to obtain funding will not be considered as events beyond the "OWNER's" control; or e. Any combination of the above causes. Failure within thirty (30) days of receipt of written demand to pay the penalties; or challenge them by a contested case petition pursuant to G.S. 15013-23, will be grounds for a collection action, which the Attorney General is hereby authorized to initiate. The only issue in such an action will be whether the thirty (30) days has elapsed. 5. This Special Agreement and any terms and conditions contained herein, hereby supersedes 15A NCAC 2H .0217(a)(1)(E). 6. Noncompliance with the terms of this Special Agreement are subject to enforcement action in addition to the above stipulated penalties, including injunctive relief pursuant to G.S. 143-215.6(C). Farm Number: 64-76 Special Agreement Page 3 7. The "OWNER", upon signature of this Special Agreement, will be expected to comply with all schedule dates, terms, and conditions of this document. 8. This Special Agreement shall expire upon owners submittal of a certified animal waste management plan. For L.B. Boone Finishing Operation Print Name of Owner Date Signature of Owner For the North Carolina Environmental Management Commission: _ Date Chairman of the Commission State of North Carolina Departmentof Environment, Health_ and; Natural Resource_ s Raleigh Reglonal Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Division of Water Quality . April .14, 1997 Mr. Burt Boone 2813 Volunteer Road _,,-;Elm City,,. North ,Carolina •27822 Subject: Compliance . . Facility # -L.B. Boone Nash County Dear Mr. Boone: Evaluation Inspection 64-49 and Others Farm On April 1, 1997, Mr, Buster Towell from -the Raleigh Regional Office conducted a compliance inspection of, - the subject animal :-facility. .'This inspection is part of the division's efforts to determine compliance with the State's animal waste nondischarge rules.. . The inspection., determined that your swine operations were not discharging wastewater into waters of .the State and that your waste lagoons had the required amount of freeboard. As a result of the inspection the facilities were found to be in compliance with the State's animal waste nondischarge regulations. North Carolina Administrative Code NCAC 2H. .0217, required that all animal waste facilities serving equal to or greater than the threshold number of animals (swine = 250 head) to register with the Division by December 31, 1993. We currently have you registered as facility .# 64--49, indicating 300 animals on Volunteer Rd or SR 1815 at Cooper Volunteer Fire Department. Mr . Towell' d inspectib—h-indicated "that you, -actually- have --four--.(4 ). sites with different numbers of swine at each facility. The definition of a swine farm states that all animals under the same ownership on a contiguous piece of property are considered one operation. Therefor, as you and Mr. Towell discussed, it would be beneficial to all parties involved with the inspection\technical aspect of your facilities, if you would take the time to re- register your facilities accordingly. 3800 Barrett Drive, Suite 101, FAX 919-571-4718 " Raleigh, North Carolina 27609 N%0CAnEqual Opportunity Affirmative Action Employer Voice 919-571-4700. 50% recycled/10% post -consumer paper