Loading...
HomeMy WebLinkAbout20050719 Ver 1_Complete File_20050428 r~Pe;;;;~;'-._-><-"~-.~'m.c:S;;'C';t-~C<*0rl(r.Cy~~~~:;- . l.' NE\V ~ ,- '../ 113-05 i STATE OF NORTH CAROLINA ~ Department of Environment and Natural Resources ~ ~d ~ Coastal Resources Commission x ! lJermit ~~@~DW~ @ ~ for JUL 1 9 2005 :~ ~ Major Development in an Area of Environmental Concern J pursuant to NCGS 113A-118 DENR-WATERQUALITY I_Excavation and/or filling pursuant to NCGS 113-229 : Issued to Patricia CoCo, 335 Tuscarora Beach Road, Winton, NC 27986 \',8lmllSANO STORMWATER BRANCH t y Authorizing development in Hertford f. " x :~ ,} I County at adj. Chowan River, SR 1401, Winton , as requested in the permittee's application dated (MP-1. MP-3. MP-4) d~ted :f 3/21/05 & (lYlP-6) dated 4/18/05, including the attached workplan drawini!s (5), 3 dated 4/21/05.1 dated 11/1/04 & I dated 3/2/04 " :;: This permit, issued on July B, 200~ , is subject to compliance with the application (where consistent f with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may :~ be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. J :( 1\Iarina Reconstruction ., , t '( ~: :~ :[: :1 '( :( .~ 1) This permit authorizes a maximum of 14 total boat slips. At no time shall more than 14 vessels be docked or moored at this facility without permit modification. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal watercraft. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. :~ :i :~ :~ :~ " ,~ :t '( ., ~ .~ i: ,} " ::: ;: This permit action may be appealed by the permittee or :i other qualitied persons within twenty (20) days of the issuing :~ .. dJte. An appeal requires resolution prior to work initiation or " ~: continuance as the case may be. :~ '( 3) The authorized structure and associated activity shall not cause an unacceptable interference with navigation. This permit must be accessible on-site to Department , }. personnel when the project is inspected for compliance. Y' , -" -t/~ --_/y~ v'" /--', /. /; . ~-/ " ' ' .-</~~vn / ? Charles S. Jones, Director Division of Coastal Management ~....:.:--;........x--:-;..:<<""...~-v<<.:.<<-><,."'~.y.:..~~..;:...;..y.:..r,:..:...,~~~x..;..:..'.y.Xo(">-,,,X...:-x<<...x..:-?~x-',-:--><:-:.y.:-:":~>-:~:.>-':":.:"';-':":-:-;":"'''':':-<--;-X-<~''':~>>'~-:*x--:-X-:--:''''''<'->:-x'-)-X.-x.x..... ~ ' {. I Patricia CoCo I * ~ 4) ~ x " " ~ ~ 5) :( :~ f , x x ~ ~ * :( * ~ ::: ,. y * { x i * ~ ~ ~ 1: k ~ z * f ~: * '( * k :( } ~ :1 ~ ;; ~ Any portion of the permitted boardwalk falling within 30 feet of the normal water level shall be no ~ wider than six feet, and shall be elevated, slated, and made of wood. { ~ ~ ~ :t :~ * ,} ,. I :~ ~ :i i .r..;-:-:-..-..;..:..;..:.:-;..x..:.;~..:~-....:":":":-;";";,,;,,;,,,,,:,,:,,:,,:-:-:,,:.......:..;..;..:~..:..x-:..;..,..;..:-:.;-:-:.;-:.:..-:..:...:..;.....:-:..:..:..:..:..;-:-:->-.~:..;...'->>:..;......;....-..;-:-.'..;..,;.:-:..;~.:..:..x...'"'.:...:-:..:-;-;..;....:..;..;-;..:-:..:-;..;..;.:......'-;..;..:.......:-:..;..:..;.,-;.:..;.....;..;....;..:..;...._;_:...:_:..:_:..;-.....:_x_;..;..:..;..._;..:..:..:.;..:..:v;..:_;..;..;-:_;..;-:..............:-x- ~ ~ y :f. 7) :f. ~ ,} :f. " :;. ): i: z 8) " ,} ... x * ~( f y :~ " " 'f Z i 'f f i ~ ;:: x * :( x ?;: ::: 9) z * f y :f. :( :~ .} :~ :\ * ~ :~ X ~~ :i 10) f ~ ~ ~: " ;:: !, " :'. ., ~; }. :i J Permit #113-05 Page 2 of 3 ADDITIONAL CONDITIONS This permit authorizes only the structure and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina without pelmit modification. No non-water dependent uses of structures shall be conducted on, in or over public trust waters without pemlit modification. No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 6) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee shall not be relieved of this requirement if he/she abandons the permitted activity without having it transferred to a third party. This permit does not authorize the interference with any existing or proposed Federal project, and the ~ permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury ~t which may be caused from existing or future operations undertaken by the United States in the public 1 ~ interest. The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. NOTE: It is strongly recommended that the permittee exercise all available precautions in the day-to-day operation of the facility to prevent facility waste from entering the adjacent waters. Such discharge, either directly or indirectly, to adjacent waters could contravene state water quality standards, thereby violating state law. General The permittee understands and agrees that, if future operations by the United States' requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. No vegetated wetlands or open water areas shall be excavated or filled, even temporarily. 11) r;:;.:~;:~:;::~:>>~~~~~~x~v>>~,:~~~,,~~_VX~~~X~<<'X':~~^~~V_~x~-~:?>>:-x~-:_:-:,x~~,:~-:-:~~<<;::~~;~;~xv~~>>l * Pagc 2 of 3 i 1 ~ 4) ~ ~ ,} I * ~ 5) * x x 1 ~( ~ :( ~ :..: :( j i. t. " * ::: :( ), :f * ::: ::: ~ * :i t. :l 1 :( x * ~ t. 1: :i * z * '( :f '0' * '( ~ z ~ ( ~ :~ J. ;; { Any portion of the permitted boardwalk falling within 30 feet of the normal \vater level shall be no * wider than six feet, and shall be elevated, slated, and made of wood. * :( 1 i. 1 :( :( .~: ~ i :f :~ * :( ~ .:_;-:.._:-._;~:..:..:..:..,;..:_:-;_:-.;..._;.., _:_:_:_:_;_;-:..;_"_:.., ..;..:_;_..:..;..:_;_;_;..:..:_:..:_;_...;..;_;_;..;...;.;-:_:--:_;_;_;_...:..;..;..:..;_;_;_:-:.......__;-:..;..:..;..:_;..:..:_,..:_:....:_:..:-.;..._:_;_:-.;_:_:_;_:_;_;_:..;.;..;,,;,,:,,;_. .:..;..;..._:_:.'-...;_...:_._:_...:--:_:_:_......:..:_ _._:_;...'-;..:..;...;_;...._...:...:.:..:_:..;.-,;_:_;..:_:....._:..;_...;.. _;..;..:_:_:......_:_;_:_:--:..:..;-:..x....-.......:-;. * r: :; 7) t :( * * ::~ " 0' .~ ::: .} :i y x }, ,} :~ ~OTE: 1 '( ~ '0' f. 'i Y 1. x ::: ~ :~ ~: :;: 9) ;( x '( '0' :'; ~. :( .} :~ :1~ '0' :~ " } 0' '0' '( :[. ., ~( ,( 10) ,( x " ~ 11) .' "} ( >; " .~ ;; " ;.: '( '( ',' " i ADDITIONAL CONDITIONS This permit authorizes only the structure and uses located in or over the watcr that are expressly and spccifically set forth in thc permit application. No other structure, whether floating or stationary, shall becomc a permanent part of this marina without permit modification. No non-water dependent uses of structures shall be conducted on, in or over public trust waters without pemlit modification. No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 6) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee shall not be relieved of this requirement if he/she abandons the permitted activity without having it transferred to a third party. This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 8) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorizcd facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. It is strongly recommended that the permittee exercise all available precautions in the day-to-day operation of the facility to prevent facility waste from entering the adjacent waters. Such discharge, either directly or indirectly, to adjacent waters could contravene state water quality standards, thereby violating state law. Gcneral The permittee understands and agrees that, if future operations by the United States. requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the pennittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. No vegetated wetlands or open water areas shall be excavated or filled, even temporarily. ------------------ - - - - - - - - - - --- -- ----- ------- --- - -- -- - - . - - - - - - - - - - - - - - - . .. - -.- .-.-.- .- ,-. . -. .. -.-.-.-.-.-.-.-.-_-_--_-.--_-.-.-.--.-.-.-.-.-_~.~.F_.F_.F"=_~__..._.__...~_~.=--=--.~.~~-.-.-~-.~.--.-.-.r=..=.~.F'r.~..=.=.r_~-..;...._"'..__.;._<;~..;:,.:;..;-:;-.;-:>-._:-..-.....-_.-r.-._._~.~..~.."__.""-._""__.oJ<._~_""""........___-.-.-.-.-._.-.-.-._..."_;-_-_-:-_- i --~.-~- Permit Class i. NEW ~ * ~ * ~ ~ ~ i 01~ ~5rJ ,-. STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission ~trmit for JUL 1 9 Z005 -L Major Development in an Area of Environmental Concern pursuant to NCGS 113A-II8 DENR-WATERQUALlTY WET1.ANDS AND STORM'WATER BRANCH QS01ICf Permit Number 113-05 ~~@~ow~w _ Excavation and/or filling pursuant to NCGS 113-229 Issued to Patricia CoCo, 335 Tuscarora Beach Road, Winton, NC 27986 ~ h y Aut orizing development in Hertford County at adj. Chowan River, SR 1401, Winton ~ x ,~ ] x ,~ ',' ~;: :~ :( 1 t '( '( ~ ,~ ~ :~ .~ :< :~ .~ x :( y t f 1) This permit authorizes a maximum of 14 total boat slips. At no time shall more than 14 vessels be 1 t docked or moored at this facility without permit modification. The restriction of the number of vessels J :1 shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and ~ :t personal watercraft.i ~ ~ f x I 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the t. :~ marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the 1 :! permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence ~ :~ of the permitted structure. t: ~ ~ ~ 3) The authorized structure and associated activity shall not cause an unacceptable interference with ~ * navigation. * ~: This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the t :i ether qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. :i :~ x :{ date. An appeal requires resolution prior to work initiation or t y continuance as the case may be. :~ 1 I j p,~~i~n~'~~;~ t~:~tmf:,t :~~~:~i:;~'d of~~s~~m~~i,~:~"tm'nt Y c----7c:: ~ F A_U/'i'"r j ::f.(. / L Charles S. Jones, Director ',},,(.' , Any maintenance work or project modification not covered ~~ :f hereunder requires further Division approval. Division of Coastal Management :1 :!! All work must cease when the permit expires on This permit and its conditions are hereby accepted. 1 i f 1 ~ :i December 31, 2008 :l f i J In issuing this permit, the State of North Carolina agrees :1 ( that your project is consistent with the r\onh Carolina Coastal " ~ Management Program. Signature of Permittee ~ ~t.;..;e:~..:-:..:..;.........:..:.:-:.:-;..:_x_:_.:..:-v-:_:..;<<..;..;-;_:__:.;.:.:..:-;-:-;-)-.:-:-;.-~:-;..:_:_;.;..,..:_;.......:.:..:-:-:_:.:..:.:-X_1_;_:..;..;.....-..;-:-:--:..~:_;-:-._;..:-:..:..;.;..:.:-:..:..:..:..,:~...'":_:_;..:...:_....:-:~...;-:_:-;...;..;..;_:_....;.:-:_;.:..;..;..:-:.;.:_:.;.....;_:..;..;..:-.."":_:_:-:.;..:..;.;...:-:..;......-....;..:.:..;_;.;..-;..:_:-;...;_;..;..:..:..;..;_;.;...:_:_.:__:_:_:..:_:...:1 ,as requested in the permittee's application dated (MP-1. MP-3. MP-4) dated 3/2[/05 & (tvlP-6) dated 4/[8/05, including the attached workplan drawings (5), 3 dated 4/21/05, [dated 1[/1/04 & [ dated 3/2/04 This permit, issued on July B, 2005 , is subject to compliance with the application (where consistent f with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may * be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. :! :\ Marina Reconstruction r>>>-;.<<-,s..v:~~X-:--:<<"';"''''r'''X<<-X4:-;''':<--X~..x--",,;,-*;<<~~:-x~>-''''''r~;-:->>:'';.:-;.~V''''';-:-:....-...:....,...:. :~...:...;~:--:-:-:- >>;.y.;..:.;-y.>>X-<.o)o:41-"....>>r:--,..;..:-:-;4>>X-:-:-:-X...;-:-:.X-)oo.X-:-;.:-:Vx--.>>:-;...;.:-X--;-x..;.-X"";"';";-:-;'-:'-X-:--;.;..:.-:--;..' . * Patricia CoCo Permit #113-05 ~ Page 3 of 3 l ~ ~ I NOTE: f. '( ~ NOTE: I The N.C. Division of Water Quality has authorized the proposed project under General Water l. Quality Certification No. 3490 (DWQ Project No. 050719), which \vas issued on 6/14/05. ~ '( ~ ~ ,~ x -} :i ~ ~ ::: ~ {. ~ f ( .. :( -} x ,( A ., " i ~ A t .. x :( ~ :\ " ~ ~ ::: ;( ~ '( :} ~ " " ,. f " ! i ), :( " -} * '( '( ~ ~: ~ i f ~ ~ :( ~ , .~ '( .~ ~ :( ~ :~ f ,~ " :s~ _~,,;-':_._: _;_:-:-:_; _:.;_: -< _, _:_:-: _: _;....:_: _. _:_;_,_;.. ..:... _. _;_. _:- :_;.;_;_;_:-;-: _;-:-;_;_:_:_....:.. ..: _:_:_:.: .; _:_ ._;_._:_;.: .;_....:-:_;.._ :_:_ '.;-;_: -.-;-:-;...;-;..;...;_:-:_: .:-;_;";_,., . ,-:": -. .: ..:-;-....-... ;-;...;-:-; -;...;...;-:-;-:....:..: ..; ..:-;-;...;-:......;_. -;-:- :-: -." -.'.~: ..'..: -: -;-; -:-." .. -...:.;.. -; -:-:-:-;-:-:- ;-;..: -.-:";-'; -,- :.:~;.:..:~...:-:.;.;";.:-':"';.:'-y NOTE: ~ } NOTE: J: " ::: t: :( -} '( :( .~ ~( x ,( :[. :} x ,. " :~ " * ~: .:: :} x " " i :~ :~ { ,~ :( " :f :( * ] } :~ )- :( " " :( ~ " NOTE: ,( :} x ,~ ... :( ~ :( ~ ::: " + ,. :i " ,~ :( ., " " :~ x ~ ADDITIONAL CONDITIONS This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. I Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal water level. The permittee and/or his contractor is urged to meet with a representative of the Division prior to project initiation. The U.S. Anny Corps of Engineers has assigned the proposed project COE Action Id. No. 200510785. oX- WA r~;y o~~c. OJ DllJG)'Y -' \ > - - ,', ~""=>~ -j O\~~ ~ Michael F. Easley, Governor William G. Ross Jr.. Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek. P,E, Director Division of Water Quality June 14,2005 DWQ Project # 050719 Hertford County Ms. Patricia R. CoCo 335 Tuscarora Beach Rd Winton, NC 279S6 Subject Property: Chowan River Resort Marina SR 1401 at Tuscarora Beach Winton, Hertford County, NC Approval of 401 Water Quality Certification (GC3490) with Additional Conditions Dear Ms. CoCo: You have our approval, in accordance with the attached conditions, to place fill material within or otherwise impact acres 0.0 ISof waters to install ten new boat slips, build a boardwalk and extend the existing pier as described in your application received by the Division of Water Quality (DWQ) Wetlands/401 Unit on April 2S, 2005. After reviewing your application, we have determined that the Division of Water Quality (DWQ) General Water Quality Certification Number 3490 covers these water impacts. This Certification allows you to General Permit No. 198000291 when issued by the US Army Corps of Engineers (USACE). In addition, you should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations and CAMA. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Plan Location or Reference (Units) Waters O.OlS (acres) One C }' Norh am lOa .;\ alllmll!! 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919.733-17861 FAX 919.733-6893/lnternet: http://h2o.enr,state.nc.us/ncwetJands An Equal Opportunity/Affirmative Action Employer - 50% Recycledl10% Post Consumer Paper Patricia R. CoCo Page 20f2 June 14,2005 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 3. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification (GC) 3490. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919- 733-9721 or Tom Steffens in the DWQ Washington Regional Office at 252-946-6481. Sincerely, Alan W. Klimek, P.E. A WKlijm Enclosures: GC 3490 Certification of Completion cc: Jeff Nicolaides, 335 Tuscarora Beach Rd., Winton, NC 27986 Doug Huggett, DCM USACE Washington Regulatory Field Office DWQ Washington Regional Office File Copy Central Files Filename: 050719ChowanRiverResortMarina(Hertford)CAMA 401 comments Subject: 401 comments From: Tom Steffens <Tom.Steffens@ncmail.net> Date: Tue, 14 Jun 2005 16:05:53 -0400 To: ian <Ian.Mcmillan@ncmail.net> CC: Kyle Barnes <kyle.barnes@ncmail.net> the following comments have been enteredd into fp50 in response to the tracking list 05-0716 Edenton Cotton Mill l6-Jun 401 6-May Issue n/c 05-0726 Mary L. Perchy l6-Jun 401 25-Apr Issue n/c 05-0719 Chowan River Resort Marina 14-Jun dcm maj 27-Apr Issue w/condition that applicant provide notarized letter of no intent to sell fuel. Application has conflicting statements to that effect. variance issued by WaRO this week 6-Apr tas tas genmaj Pamlico Donald Grizzard 6-Jun Issue no cond, Zone II impacts only no mit 10-Jun tas Beaufort tas min var Windsong III Lot 21 10-Jun Hold- needs justification for house site, needs professional appraisal for economic hardship I of I 6/14/20054:08 PM DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Patricia CoCo, Chowan River Resort Marina 2. LOCATION OF PROJECT SITE: Hertford County Photo Index - 2000: 144-1674, G-ll 1995:144-1674, E-17 State Plane Coordinates - X: 2,615,300 Y: 967,450 Winton Quad. (lower right corner) 1989: 1 (1-15), K-5 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7 October 2004 & 21 April 2005 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received - 22 April 2005 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan -Hertford County Land Classification From LUP -Conservation (B) AEC(s) Involved: EW, PT, CS (C) Water Dependent: Yes (D) Intended Use: Commercial/Public (E) Wastewater Treatment: Existing - Septic Tank Planned - N/A (F) Type of Structures: Existing - Existing - fuel pier, pier with four boat slips, 2- boat ramps, house, restaurant, bulkhead Planned - fuel pier extension, 10 boat slip pier, :1:280' of boardwalk (G) Estimated Annual Rate of Erosion: N/A Source - N/ A --~-- . --- ~- --- ..--.- _._----- (A) Vegetated Wetlands (B) Non-Vegetated Wetlands :1: 786 ft2 Shaded River bottom (C) Other :l:2240 ft2 Disturbed Uplands DREDGED [AREA] EILLED OTHER 7. HABITAT DESCRIPTION: (D) Total Area Disturbed: :l: 0.07 Acres (:l:3026 ft2) (E) Primary Nursery Area: No (F) Water Classification: B NSW Open: NO 8. PROJECT SUMMARY: The applicant proposes to construct a boardwalk, extend the existing fuel pier and to re-construct a 1 O-slip pier destroyed by Hurricane Isabel. North Carolina Department of Environment and Natural Resources NC Division of Coastal jl1anagement 943 Washington Square Mall Washington, NC 27889 252-946-6481 ItTF/ UTF D) D1 Iq 1:1 ij MEMORANDUM TO: Major Permit Distribution List FROM: Kelly Spivey DATE: 28 April 2005 RE: Major Pem1it for Patricia CoCo Chowan River Resort Marina Hertford County Please replace the Field Investigation Report ONLY that was distributed on 27 April 2005 with the one enclosed. Thank you very much. ~[g@lliWW&j@ MAY 2 2005 . DENR - WArEH ULJ....UTY \ ,'ETUJ.D31::D s,C:~':;i"lER C;1.:J;Clj e~ ~~ ~ z. ~ North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary MEMORANDUM TO: Ms. Cyndi Karoly Division of Water Quality Wetlands Unit FROM: Doug Huggett Major Permits Processing Coordinator ~~@@aw{JJ@ APR }; 8 ?U05 DATE: 27 April 2005 SUBJECT: CAMA Application Review APPLICANT: \'-=n ~Et.r(. ~iA' 'i' 'C'L/WDS '''DSTO' s... U,'UA!..ITY "', 'I"'''J''E' I '",II" I~ SP"'CH Mr. Jeff Nicolaides, Authorized Agent ..., For: Patricia R. CoCo Chowan River Resort Marina PROJECT LOCATION: Hertford County PROPOSED PROJECT: Applicant proposes to construct a boardwalk, extend the existing fuel pier and to re-construct a I a-slip pier destroyed by Hurricane Isabel at property located off SR 1401 at Tuscarora Beach, on the Chowan River, near Winton, in Hertford County, North Carolina. Please indicate below your position or viewpoint on the proposed project and return this form by 18 May 2005. Please contact R. Kelly Spivey, at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-6481 \ FAX: 252-948-0478 \ Internet: www,nccoastalmanagement.neV Oll~ . N0I1hCarohna ;VntIlJ'll//!/ An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper . , DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Patricia CoCo, Chowan River Resort Marina 2. LOCATION OF PROJECT SITE: Hertford County Photo Index - 2000: 144-1674, G-ll 1995:144-1674, E-17 State Plane Coordinates - X: 2,615,300 Y: 967,450 Winton (lower right corner) 1989: 1 (1-15), K-5 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit -7 October 2004 & 21 April 2005 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received - 22 April 2005 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan -Hertford County Land Classification From LUP -Conservation (D) Water Dependent: Yes (D) Intended Use: Commercial/Public (E) Wastewater Treatment: Existing - Septic Tank Planned - N/A (F) Type of Structures: Existing - Existing - fuel pier, pier with four boat slips, 2- boat ramps, house, restaurant, bulkhead Planned - fuel pier extension, 10 boat slip pier, :1:280' of boardwalk (G) Estimated Annual Rate of Erosion: N/A ..._--~----._- --- -------- - --- (A) Vegetated Wetlands (B) Non-Vegetated Wetlands 786 ft2 Shaded River bottom (c) Other 2240 ft2 Disturbed Uplands DREDGED [AREA] FILLED OTHER 7. HABITAT DESCRIPTION: (D) Total Area Disturbed: 3026 ft2 (E) Primary Nursery Area: No (F) Water Classification: B NSW Open: NO 8. PROJECT SUMMARY: The applicant proposes to construct a boardwalk, extend the existing fuel pier and to re- construct a 10-slip pier destroyed by Hurricane Isabel. ". , Patricia CoCo Chowan River Resort Marina Winton Hertford County Project setting The project site is located off SR 1401 at Tuscarora Beach, on the Chowan River near Winton in Hertford County, North Carolina. The cun'ent use of the site is a docking facility, campground, and restaurant, with associated recreational activities. On the same property, CAMA Major Permit 56-96 was issued on 15 April 1996 to SRF, Inc. for the construction of a boat ramp, 275' of bulkhead and four finger piers. The total number of slips proposed under the aforementioned CAMA Major Permit was 21. All work under the previous permit had been completed prior to the fall of2003. The facility was an active marina prior to Hurricane Isabel. Hurricane Isabel destroyed all but four boat slips. The property owner received a Storm General Permit (7H .2500) for the replacement of 1 0 boat slips. The owner was unable to initiate development activities prior to the expiration of the General Permit, which was 22 September 2004. The project area is bordered on the downstream (east end) by a developed lot, which includes a bulkhead and pier. The project area is bordered on the upstream (west side) by a developed lot that contains remnants of a pier. The elevation of the tract ranges from :1::2' above water level adjacent the Chowan River to an elevation of :1::25' above the water level approximately 100' landward of the shoreline. A portion of the shoreline (:1::280 linear feet) is stabilized with a bulldlead. The remaining portion of the shoreline is used as a recreational beach. A fuel pier, a 4-slip pier structure, 2-boat ramps, a residence, parking lot, campground, and restaurant are present on the site. The fuel pier is :1::4' wide by :1::60' long and the 4-slip pier is :1::8' wide by :1::80' long with a :1::20' bY:1:: 10' platform. The adjacent properties are of similar contour, primarily vegetated with mixed hardwoods, pines, lawn grasses and ornamental shrubs. The Chowan River is classified as B NSW by the Enviromnental Management Commission at the project site. The Chowan River is Joint waters and is not open to shell fishing. Project description The applicant proposes to extend the existing :1::4' wide by :1::60' fuel pier an additional 20'. Also, the applicant proposes to construct a :1::6' 10" wide by :1::90' long floating pier with six - 4' 10" by 19' 6" finger piers for the purpose of creating 1 0 fixed boat slips. Additionally, the applicant proposes :1::8' wide by :1::280' long boardwalk on the landward side of the bulkhead. . J~. ,) . , ~, .... .. , . . " .. .. _ ... . ........ .. . ~.. . . . .. .. .. . .... roO.. . ..... . . . . 0..... ." ", _ . . . . . . . ... .'"............,.............................. < . .. , . .. ... , . . . . . L.. ~ . , ., . ~ .. . . , .. .. ... . March 28th 2005 NCDENR. Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 Dear Mr. NIoore This letter is a request for a major permit as per our discussion on 4 November 2004 Prior to Hurricane Isabel we had 22 slips for boats. After the hurricane we had 4 slips that are located on the restaurant pier. We are trying to obtain a major permit to install 10 new slips; this will give us a total of 14. Also in the permit we are applying to build a walkway or boardwalk inland from the current bulkhead this will extend the entire length of the bulkhead 280 ft. This will not protrude into the water area as it will be 8 ft from the bulkhead inland. We would also like to extend the current fuel pier 20 ft. This will allow for safer embarking and disembarking of boats from the boat ramp. We will be removing the gas pump this year due to poor sales. Enclosed is a drawing of each project. If you have any questions please call me at 252-287-7655 . .---::.-. '. ( -----~..-._. ) ------- .. -.FQrm pCM-MP-l APPLICATION (To be co,mpleted by all applicants) , 1. APPLICANT '- a. Landowner: Name OPn\L\Cl.'?r- e.., c..oQ..O Address 335 '1Us~eA- ~'(.{K)-\ (2.D qty W\IUIO,u State tJl- l o.(r,I- ?t::;,? t;'J.('2'111oS"S-- Zip '-:1 1'0\0 Day Phone (..-.J I,...- 'Co D Fax 15'2.. '3SCC IS" \ <6 b. Authorized Agent: Name r-:s ~cF \\J \ (./~ Lk11 '0 ~ 3 Ad 3.....5 "Il"Sf1 D..-tJc.r;z /\ ~Zc..,1'U\ I-I (2D dress ',':=" IV '-ro \.... n- I....Lr>..... City L011010 '0 10L State . b. City, town, community or landmark . l.0iNlbrU , c. Street address or secondary road number 33 '5 'I\J"7.lUt1WCLPr p:.>ce,f1t.J'-\ RE> 5fL lyO \ - , d. Is proposed work within city limits or planning jurisdiction? Yes. V No e. Name of body of w~t~r n~~t proj~t (e.g. river, creek, sound, bay) v~o(;.Jft1U R-I \) .:.JL. 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation andlor filling activities. 10 S Li P 'PI i(L 1. Dr t2.-y,.l'i-r..J7::>/o/..) 0;; fl)~-L- P,CZ,,'Z.. BE " 2... 'Co r 13oA-a-DuJf1t..-L iA,;'t...,'YIl.i,':J C';' Cu;z..a, 'C:..i0i e:, U \.-it. H ~FYOI Zip 7...19 Sle Day Phone 7..51- 7---T/l -, l,S-') b. Is the proposed activity maintenance of an existing project, new work, or both7i3ol14 ' (~__, ,___~..,_~~:~.~~~~ro/ t~b;,i~,~J';~::~~r conunerciaJ L,.'c':> eo.., \ ' d. Give a brief description of purpose, use, methods oj constrUction and daily operations of propose: project. Ii more space is needed, please attacr additional pages. PlJ0L\C /Y1f1-{lI)lj~ Win-( Dv'7;; :)UP-S (L~J.:n1L. 'VaU'j Fnl'L ~LCR-llN~ ?wYiTi' MfTT'C~At- ?rz..o::'~LT LCio\'PL'LL'TIU.J \-;.J.'IN/{,. 1 D Prt( S 0 ~ f'r(?~cr-ct..- A 6lt'S P I <C {2.. t(. ~I'~ ...,:.." IS ZJ::,'( elfT'C.rJ"~iC"; ~f 'i:...ilS"il AJb P i ~(Z. II LV ill- lS<. Mf\1)'L c~ ~DoD l:! PU)-SJ'\L H,..c:rr -nt') W il.L ((t1t. "L L, 3 O~5;l Ib ~ ..\ PL- 'l:T't.. 'Bof;1't.O L,;) ::1LIL I:' lU CoOi.;\,j ~~j"T'...uc...TV ~"i. ~ ( Lv , v') 'L '/. 1. 'C; 0 ~ La:J b '(:.1.11(..''- 0 IN (",1''':' 0 0::- \..-t-IS/li0b 6U....llH't:.fro; 'jJ(li)~rc..Clv.:,;u- -nrt.''-. '~() DMj S ~C(L Q,r.\?L:L~N, Fax ZtS1- ~.sg\ c:; \ '0 c. Project name (if any.) QOl.Cfh":' ~LH)"<.(L '(Y\ "twl.. \ 1\J .A- NOTE: Perm: will be iww! in name oJ~r(l), end/or project nam~. 2. LOCATION OF PROPOSED PROJECT a, CauntyH ce~-rfbR.O Revised 03f~ Form DCM-MP-l site. ,Includ'e highway or seC(lndary road (SR) numbers, landmarks, and the like. . A Storffiwater Certification, if one is necessary. . A list of the names and complete addresses or the adjacent waterCront '(riparian) landowners and signed return receipts as proof that such OMlCl"'S have received a copy or the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant fu~er certifies that such notice has been provided. Name UDf0W I t... ~ bCc..L Address \ 01 6 A-{Lc.ft..D t:.! DfL '/0 t2.Jt.:roi.J;.) Phone V fY Name (U PTDrLl 0J4",Yc:JL Address 'Log S S'C:J5;rVO sr. miJ,'2...r-,1J:fs&fLi) Phone i\J \..-. Name Address Phone o A list oC pre'Vious state or feder'al permits issued for w<;>rk on the project tract. Include permit numbers, permittee, and issuing dates. liP '3"1 to"1 L - \3 SID ,lyv\ ?~ rLill fi I'll P 5 ~ - <1 0 I ':{':.V'~ DID S~~ YA;'l.:';~ ~ ,,,,- . A check for ~j$4001$475 made payable to the Department of Environment & Natural Resources (NCDENR) to cover the costs of processing the application. 8 A signed ABC hazard notice for projects in oceanfront and inlet areas. .6. CERTIFICATION AND PERMISSION TO ENTER ON LAND 1 understand that any permit issued in response to this applicatioll will allow only the development described in the application. The project will be subject to conditions and restrictions contained i'1 the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in 'a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to eQ,ter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information 'provided in this application is truthful to the best of my knowledge. Z.-r:.:cS ,-2B~. 1'1 l erC) This the"bl.- day of (Y\A-fl- Print Name ? n.. t- r I C. Iv,- ;,..~-'-~ ,,' / Signature ,/----hA...1 It z:--- .~ Landa~r or A.u.lhtJril.~d AgrnJ _, _._.?J~~_!pdicate.~chmeE~ pertaining to your propose> project. --.--" ......_,- _ DCM MP.2 Excavation and Fill Information v DCM MP.3 Upland Development v DCM MP-4 Structures Information _ DCM MP-5 Bridges and Culverts V"'DCM MP-6 Marina Development NOTE: Please sign and date each attachm.enJ in tl space provided at the bottom oj each Jom. . A statemel)t of compliance with the N.C. Environmental Policy Act tN.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 400 copies of this public document were printed at a total cost of S52.48 or $ .13 per copy. Revised 0.3/9':5 '. Form DCM-MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities, units or structures proposed G U, LO 60~LQkLi"- 870.{\ U IS/h) 10 B lk...t. WckO 10 l..f.hJ Q <is I L;) iO Ll. is C '. .m t:.. ui:)'2./2.'~N'T L'2./J...TN or- 6uL-It.H~t1-O b. Number of lots or parcels c. Density (give the number of residential units and the units per acre) tJ I A- d. Size of area to be graded, filled or disturbed including roads, ditches, etc. Z l Lj D S Q I=-"'i e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? Yes \/" No If yes, date submitted f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. W (80 D ~"-.) P.JOAAD W A-t.../L g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. l) \A- h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? Yes V No If yes, date submitted i. Describe proposed method of sewage disposal. E::-? I SJlIlJ Co S ~. PT1 c... Tf'r /oJ '- j. Have the facilities described in Item i. above received state or local approval? ''/ '2..5 f.J4 STH...) 16 (Attach appropriate documentarian) k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges). S LJ iZ F A-\..... <C- a. L) (....J 0 r- r= 1. Describe proposed drinking water supply source (e.g. well, community, public system, etc.) S.~I ~-n tV I.- CDi..': :,J"-t m. Will water be impounded? _ Yes K- No If yes, how many acres? n. If the project is a oceanfront development, when was the lot(s) platted and recorded? D IPr ?().f:t.i.... Co CO ,~PPU~_~~;$~_.____--,.. Signature cP I /!J {if" (/) S Date Revised 03/95 400 copies of this public document were printed at a total cost of $7.00 or $ .02 per copy. Form DCM-MP-6 MARINA DEVELOPMENT d. Check all of the types of services to be provided. vU /;4- Full service, including travel lift andlor rail V Dockage, ~lIe ~uppli~ V Dockage ("wet slips") only Number of slips ~ 10 'v;I.;AD'J'<D 4 Cl!: tU.'e..u71..'f b. Describe treatment type and disposal location for all Ulfr Dry storage sanitary wastewater. '2..fisnl\J~ S'2?TlC Number of boats .'*.)/11- "2 Boat ramp(s) \i.j,/-:,Tlt01.:.> if! /t4- Other (describe) (Required for the mooring of more than 10 vessels) Attach thi::. corm to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. l\.fARINA CHARACTERISTICS -7 Mf!-oC' a. Check below the type of mlima proposed. ~ Commercial ~-Pub1ic _ Residential b. Will the marina be open to the general public? 'X Yes No c. If there is residential development associated with th~ marina, how many units or lots are planned and how many are currently developed? 1JIA- e. Check below the proposed type of siting. ;J / Ii- Land cut and access channel IJ lit Open water with dredging for basin andlor channel V"' Open water, no dredging required IV Ill- Other (describe) f. Describe the typical boats to be served (for example, open runabout, charter boats, sail boats, mixed types). rl\ \ \i ~o Revised 03/95 g. Typical boat length LO" 35/ h. Maximum boat length i. Are any floating structures planned? Vf. '5 If so, describe ?ru:.I==Af3rL\!.:.f\'T"<.:.D \-LDR41rvto D~ U STT1...l:l c-ru\l.. 'i.s ?ur-::)"'n <.:.. ~ '"2.. 0 (J l..K... (Y\ Po \ 2. MARINA OPERATIONS a. Check each of the following sanitary facilities that will be included in the proposed project.. I Office toilets EX()"f7,i/6 8 Toilets for patrons VI;ji/U ,; Number q' . Location Y-{...I::,TllUb PaD Pi-.zTl/ /J-tiX-IJ.-/1j i...j Showers S~"l ;;Tl /J b (/; Boat holding tank pump out Type and location rv I r-t- c. Describe the disposal of solid waste, fish offal and trash disposal. L Dv;I\p-jZ..,'2...~ 'B'I-IO OiJ .? (Lo P rC. ~\'t - ~ V- I ':>71 rV0 d. How will overboard discharge of sewage from boats be controlled? Lu. \-\0 v 0.... (11\J~~ iT~ "3 '2R.L? A'V{1\)(.. 'i...., LCc.J:.E,/;I b:?t:J fb u '-if NaT I11J.QI-tJE 0 e. Give the location and number of "No Sewage DischargeR signs proposed. z.. Oiv~,- iN i=(Zt;i":'-;- C;:::' <2...y:..i~'lltV"" V"I'Z-R... . , ,r "0 ^ ~ c ( ~ lD,,--C po S i. 0" \J i ~ {2 . 0'...... L I)... /-Ie. ,~,' +- t:l m :0 ~ r\1 c ~ ,-e r.. .'r() G 0 ~\ (i\C)~, V J..> ~ lS? z:: fi ~ ....i 1 1'7) r Q \' )) -1 o L 1- (i\ ~~ \I C \) L f ...j.. \) , ...s: n o '" CJ "\;) "0 z: -( (''') lJ Tv -f o ....., 'I 0~ \ r> ";::lr o c ,r\~ v ",'l G ~ i""'" ...... <::' 0'" r. - 0 ~ ~ <; o~. =. () 8 3 5.....;..., ..., E" ~ ..., 5..... ::T' 0.. 0 0..(; 0.. 0 ~ ~ =: ~ 0..:. ? () ~ ~ Vl ~,~ g..... ' o g_~~dg~-S:--:r 2.. fJ 5 0..-<.... ~ '< .... (;,"0 .,if (") -:t;fr. .....'~ &OJ~;4.>g-l ~ . f[ rn;;r<~.~'a (tl () c , e::. (tl.~~.;r'- : ~ ..t;" ~tti,<;fj~.e,,-..'g . '0 ~..... ~,O,.Vl ,CJl llJ ;J .';;J ;'T'~ ;:;. ~ o C:. .... .- g -..;- . ~ Proposed 20' Extension Existing Fuel Pier 60' Boat Ramp Beach Hill ~ 70 InJ i.:, U.. f)[ll:; P'd5:} Proposed Floating Pier 90' With 10 Slips Piling \G I OPiling L 0 '1 Z. Chowan River 3 ~/j4-i~. Piling ~ 3 OPiling ?,.- 0 Cj 4. ~ tjling 10 5 xisting Pie OPiling with 4 Slips I:> <1"4:' II}C Parking Band Stand Hill Dpump House 8ectric Pole Chowan River Resort o IJ Scale: 1/4" = 12.5' Chowan River Resort 335 Tuscarora Beach Rd. Winton, NC (252)287 -7655 Existing Bulkhead 290',1} ~ Boardwalk Proposed Boardwalk 8' Wide x 280' long Parking Private residence Existing Beach Existing Road Riverside Restaurant ~ 71) J..)~j..N..,.t ?1!C>jl<<.i-'/Y Jeff Nicolaides Pro'ect Contact: Chowan River Resort Project # 01 wo# Date: Rev, Date: 11-01-04 'ON tJDd uondposeo ^lO 'oN tJDd uond!Joseo ^lO ,(oMfiuc:> wnulwnlV ,~I X ,7 01090~ uo!~:)as lj:lO(] .0 I X .09 lj:lO(] Z3 I~ SS~O<;;O<;; ,(Iqwas..... Q6u!H 1u~w~nqy 090~~ I~UuC4:) -<l!I!tn .OZ '1:)0(] Z3 91 Oto-()<;;Ol J"lIO~ OOIIO~ (/lcd-l) ,(lqw~s&V JOlldno:) lj:>OO Z3 09 ()<;;~OOC 11>1 JllllO~ lj:lOO Z3 IOSOOC 1a;s~ JllWOO lj:xl(J Z3 01 IOtOO? a~cld uo!UsUCJl ,? osrolz 1~:)DJ8 ad!d aUll!-<410l.<jOd -<lno Mo9H B 9COOOI doO lld!d '1000 Z3 9 S~OI~1 Qd!d 6u!J040UY B -1f/(1l,J ~fB At"~!d ,.~\) ~;J?'f!" ,1 cjJ:rf' ,;:0 ,I' eze> tllOCd JJl .....wo 98LlZ3: I I:l]llflON 0NV0IVll<l ,lJIlU3JJ\! ,UJar J OOJ <D<NdJ lJOStlH JaA!lI UUMOq:J SID!Je+D~ to 1118 OOtO-L8t (toL) 'ON XYJ tOIUE 31~ 6lfL-l8t (toL) 'ON JNOHd I 8918-tS9-008 'ON 3JllJ 1lOJ. ISl8l ~N 'Aqlaqs I PAUl UOX!U 3: 9S0l O:JOHS -pnpcuJ lpOO Z::I .I0/01111~llllpClIC pJl!JOl(lncun JO;PUC 'pnpoJJ poo Z::I.lO lIO!lU::l!J!POlU p;.JlpmUllcun hq p~snc=> Sl;);)J~P JO S;lllll!CJ 'SJfictlwp )lIIJJJC^' IOU s~p ljJOa Z::I 'S:JU!41 JO'I1O :JUOlLlV '^ll'lpWJ ^IUIJJJCh\ PJI!lLI!1 PO() Z::I pC~}j EDI.LON if 3. ~ & ,\ ,,'> L-4~ ~ ~ ~ r<\ 11 ~ "X. - lr. 1/\ E 'I ~ 8 ~ (t, r ~ 1/ GJ ~ l::. ~ D G r- (Y) v. " .t: ....... OJ 'b , 't) ~(l/l;'d01.'O cJ:()f'. " e \Fo , ~ C, \ A~~ ?, 'l 0\ t,,~t' '\ (I'd') '^ \ 6 ~ N' ..t{1 .c.... G. . ~\' " J ... ,,~ 1.1 ",,"". 1\1.-- '/ / AI,q_---+~ -- QI II ,../I T3.':;jIl/~ ,/? pI :}O ON] WiJiId ,SI V\ o rt,"'..d ~ '1'0 Q. fJ " 0.10:0 ,l , IlL !L8- o &)('I(\'c.~ 4'-;()~ II I, to) '~, ~ i!.. Cl{'l(1'd'?g (}:><1"" ,,0 I' ..t.. b' ~ ~ a::EEEEb II II lS' -.... C'J:" .t!S,,~h .fJ,.b I . ~ I\) <\i .../ J:" Side View 2x4x10 with decking on top LEGEND: c-. fj vJL- Current Bulkhead (Boardwalk will not protrude over the bulkhead) AJ W L OJ 0' o ...... - -- ~ - - - -~ -- - ~ - - - - - - - ::E a: CD Wood 1x8 decking Boardwalk will be made in 10 feet sections and placed on the ground for easy removal during inclement weather, benches will be mounted for viewing of the river. Light posts will also be added on the boardwalk for night viewing. :\(K Chowan River Resort, Inc. Boardwalk View Pro'ecl # wo# Dale: l.l APe O~s- Rev. Dale: Chowan River C=I LBenCh I o I = ~;9htPost Parking Area LEGEND: {~ NWL () Parking Area Chowan River Resort, Inc. Boardwalk ress-rnun eI'" ax Current Bulkhead IV UJ L.. Proposed Boardwalk 8 x 270 I I () Proiect Desioner: (f <(ff N)LDL.(h 0-;5 Proiect Contact: Project # WO# Date: Rev. Dale: 'ZIHJfZ oc:; I CU.rrent Gas Pier 60ft Il: \~ --.-- .~- ....------. - _....-_._---_..~ ~ T gas I j)Q11l t./ Proposed Extension 20Ft 4ft wide o 1J ...J~ , DcrrH /5 Current pier is Fixed. The extension will be floating with 2 pipes at the end to ride up and down 'UQ.jWi-J Gf '~J ~?-f jU )(j)LtT10 l: 5 2/ Prf r[ o-S-