Michael F. Easley, Governor
\
William G. Ross Jr., Seeretary
North Carolina Department of Environment and Natural Resources
~
Alan W. Klimek, P,E. Direetor
Division of Water Quality
April 29,2005
DWQ Project # 05-0702
Yancey County
Michele Lawhern, County Manager
Yancey County
Room 11, Courthouse
Burnsville, NC 29714
Subject Property: Price Creek EWP 2004-43 &48
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mrs. Lawhern:
You have our approval, in accordance with the attached conditions and those listed
below, to place fill within or otherwise impact 130 feet of streams for the purpose of
streambank stabilization at the subject properties, as described within your application
received by the N.C. Division of Water Quality (DWQ) on April 25, 2005. After reviewing
your application, we have decided that the impacts are covered by General Water
Quality Certification Number(s) 3376 (3376). The Certification(s) allows you to use
Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In
addition, you should obtain or otherwise comply with any other required federal, state or
local permits before you go ahead with your project including (but not iimited to) Erosion
and Sediment Control, Non-discharge, and stormwater regulations. Also, this
approval to proce~d with your proposed impacts or to conduct impacts to waters
as depicted in your application shall expire upon expiration of the 404 or CAMA
Permit.
This approval is for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new
application. If the property is sold, the new owner must be given a copy of this
Certification and approval letter and is thereby responsible for complying with all
conditions. If total fills for this project (now or in the future) exceed one acre of wetland
or 150 linear feet of stream, compensatory mitigation may be required as described in
15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in
the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
Oneth ,.
N -Pf Caro ma
/valllrall!/
401 Wetlands Certification Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786/ FAX 919-733-6893/lnternet http://h20enr,state,nc,us/ncwetlands
An Equal Opportunity/Affirmative Action Employer - 50% Recycledl1 0% Post Consumer Paper
--'--J ~~~'''J'
Page 2 of6
April 29, 2005:
l
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific
and general conditions of this Certification (or Isolated Wetland Permit) are met.
No other impacts are approved including incidental impacts:
Stream
Plan Location or Reference
Price Creek
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all
specifications governing the proper design, installation and operation and
maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Sediment and Erosion Control Planning
and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and
erosion control measures must be such that they equal, or exceed, the
requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on
all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the
reclamation in accordance with the requirements of the Sedimentation
Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian
areas beyond the footprint of the impacts depicted in the Pre-Construction
Notification. All construction activities, including the design, installation, operation,
and maintenance of sediment and erosion control Best Management Practices,
shall be performed so that no violations of state water quality standards, statutes,
or rules occur.
l ancey county:
Page 3 of6
April 29, 2005:
f
4. No Sediment & Erosion Control Measures wIn Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources has released the project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification
or applicable Buffer Rules, and any subsequent modifications, the applicant is
required to return the attached certificate of completion to the 401/Wetlands Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650.
6. Construction in this creek and disturbance within a 25-foot trout buffer should be
avoided during the January 1 to April 15 rainbow trout spawning period to avoid
adverse effects of sediment on eggs and larvae. However, Wildlife Resources
Commission will not object to construction of Natural Resources Conservation
Service "urgent and compelling" sites during the spawning period provided these
projects are, to the extent appropriate and practical, constructed by: (1) using flow
diversion structures such as sand bags, (2) placing large-sized rock toes and filter
cloth backing for stabilization sites before backfilling, and (3) excavating new
channel alignments in dry areas. Construction at the other non-"urgent and
compelling" sites should not occur during the spawning period to minimize the
potential adverse effects of multiple construction activities on trout resources in this
creek.
7. Sediment and erosion control measures must be implemented prior to construction
and maintained on the sites to minimize sediment in downstream areas, Seeding for
a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous
cover should occur on all bare soil within five (5) days of ground disturbing activities
to provide long-term erosion control. The projects should be accomplished in stages
instead of leaving large tracts exposed to further storm events. Erosion control
matting should be used in conjunction with appropriate seeding on disturbed soils in
steep slope and riparian areas. Matting should be secured in place with staples,
stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall
fescue should not be used in riparian areas, In addition, because of an anticipated
difficulty in establishing ground cover during the winter, reseeding should be
conducted, as necessary, in the spring-time with a native annual and perennial seed
mix with a temporary nursery crop of wheat, millet or other grain.
... ......LL........l _V......ll...J.
Page 4 of 6
April 29, 2005:
.
8. Only clean, large, angular rock, large woody material, or other natural stream design
materials and techniques should be used for bank stabilization. Rock should not be
placed in the stream channel in a manner that constricts stream flow or that will
impede aquatic life movements during low flow conditions. Filter cloth should be
placed behind large rock that is used for bank stabilization. Properly designed rock
vanes should be constructed wherever appropriate on bank stabilization and
channel realignment stream reaches to improve channel stability and to improve
aquatic habitat. Root wads should be installed low enough in the bank so that a
significant portion (at least one-third) the root wad is inundated during normal flows.
9. The channel should be restored to a more stable condition. However, under no
circumstances should river rock, sand or other materials be dredged from the stream
channel under authorization of this permit except, if necessary, in the immediate
vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or
flow/grade control structures or for reestablishing the natural and more stable stream
channel dimensions. Stream bed materials are unstable in flowing-water situations
and are unsuitable for bank stabilization. In stream dredging has catastrophic effects
on aquatic life and disturbance of the natural form of the stream channel can cause
downstream erosion problems. The natural dimension, pattern, and profile of the
stream upstream and downstream of the permitted area should not be modified by
widening the stream channel or changing its depth.
10. Stabilization measures should only be applied on or near existing erosion sites,
leaving other stable stream bank areas in a natural condition. Grading and
backfilling should be minimized and tree and shrub growth should be retained where
possible to ensure long term availability of stream bank cover for aquatic life and
wildlife. Backfill materials should be obtained from upland sites except in cases
where excess stream bed materials are available. Berms should not be permitted
because they block the floodplain, constrict and accelerate flood flows, and otten fail
and sometimes impede drainage during large flood events.
11. Repairs to eroded banks should be conducted in a dry work area where possible,
Sandbags or other clean diversion structures should be used where possible to
minimize excavation in flowing water. Channel realignments should be constructed
by excavating the new channel from downstream to upstream before connecting it to
the old channel.
12. Heavy equipment should be operated from the bank whenever possible. All
mechanized equipment operated near surface waters should be inspected and
maintained regularly to prevent contamination of stream waters from fuels,
lubricants, hydraulic fluids or other toxic materials. Equipment used in stream
channel must be clean, new or low hour equipment.
13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is
practical under the site conditions, should be restored where possible along the
construction sites to natural riparian conditions with native trees and shrubs (e.g.,
silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black
willow, sycamore) to provide long-term bank stability and stre~m shading. Note,
silky dogwood, silky willow and black willow can be planted as live stakes collected
during the dormant growing season. Cuttings should be randomly planted on four
(4) foot centers from the waters edge to the top of the bank. Trees should be planted
on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be
seeded with a native annual and perennial seed mix with a temporary nursery crop
of wheat, millet or other grain.
4. U.U'"'''''J \,..uuJ.uy.
Page 5 of6
April 29, 2005:
14.lf pasture along the stream is to be used for grazing, a fence must be constructed
outside of the riparian zone and the stream to prevent livestock from entering these
areas.
15. Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained
as diffuse flow at non-erosive velocities through the protected riparian zones
such that it will not re-concentrate before discharging into a stream. If this is not
possible, it may be necessary to provide stormwater facilities that are considered
to remove nitrogen. This may require additional approval from this Office.
16. Riparian Zone Replanting
Replanting of vegetation within disturbed areas located within 30 feet of the
streambank associated with any land disturbing activity, repair, replacement
and/or maintenance must be done in a manner consistant with the Guidelines
for Riparian Buffer Restoration immediately following construction. (Please
see attached.)
45. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained
jurisdictional wetlands, waters and protective woody riparian zones in order to
assure compliance for future wetland, water and buffer impact. These
mechanisms shall be put in place prior to impacting any wetlands, waters and/or
buffers approved for impact under this Certification Approval and Authorization
Certificate. A sample deed notification can be downloaded from the
401/Wetlands Unit web site at http://h20.enr,state.nc.us/ncwetlands. The text of
the sample deed notification may be modified as appropriate to suit to this
project.
17. Turbidity Standard
The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be
exceeded as described in 15 A NCAC 28. .0200. Appropriate sediment and
erosion control practices must be used to meet this standard.
18. No Sediment and Erosion Control Measures in Wetlands
I
I'
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources or locally delegated program has released the project.
...-...........J _VUU''''J.
Page 6 of6
April 29, 2005:
Violations of any condition herein set forth may result in revocation of this Certification
and may result in criminal and/or civil penalties. The authorization to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application and
as authorized by this Certification, shall expire upon expiration of the 404 or CAMA
Permit.
If you do not accept any of the conditions of this Certification (associated with the
approved wetland or stream impacts), you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition, which conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
N.C. 27699-6714. This certification and its conditions are final and binding unless you
ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of
the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the
Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville
Regional Office at 828-296-4657.
Sincerely,
C> /l ~1 / L
1) OJVl L. . {--:;l!tt.'tf,. u~''v r C1.
Alan W, Klimek, P.E.
AWKlkhb
Enclosures: GC 3376
Certificate of Completion
Guidelines for Riparian Buffer Restoration
cc: USACE Asheville Regulatory Field Office
DWQ Asheville Regional Office
DLR Asheville Regional Office
File Copy
Central Files
Filename: 05-0702.EWP.PriceCreek.Approval
MEMORANDUM
TO:
John Dorney
Non-Discharge Branch
Regional Contact:
WQ Supervisor:
Date:
Barnett. Kevin
Rngp.r Frlwrlrrls
SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS
Facility Name Price Creek EWP Site 2004-48
Project Number 05
Recvd From APP
Received Date 4/25/05
Project Type
0702
County Yancey
County2
Region Asheville
Recvd By Region
Certificates
Permit Wetland Wetland Wetland Stream
Type Type Impact Score Index
Stream
Class
Acres
Basin Req.
Feet
Req.
Prim. Supp.
I NW37 I Stream IOY @N I I 7-3-21 rc-I TR 140,307. I I 130.00
I I IOY ON I I r--I I I I
MitiQation
MitigationType
Wetland
Type Acres
Feet
r
Is Wetland Rating Sheet Attached? 0 Y @ N Did you request more info? 0 Y @ N
Have Project Changes/Conditions Been Discussed With Applicant? 0 Y @ N
Is Mitigation required? 0 YON Recommendation: 0 Issue @ Issue/Cond 0 Deny
Provided by Region: Latitude (ddmmss) 355339 Longitude (ddmmss) 822331
Comments:
Issued ARO - KHB - 05/10/2005
cc:
Regional Office
Central Office
Page Number 1
Triage Check List
Kevin Barnett, Asheville Regional Office
Project Name: Price Creel\: EWP
DWQ#: OS-070a
County: Yancey
Date: 4/27/05
To: 60-day Processing Time: 4/25/05 to 6/23/05
From: Cyndi Karoly Telephone: (919) 733-9721
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
D Stream length impacted
D Stream determination
Wetland determination and distance to blue-line surface waters on USFW topo maps
D Minimization/avoidance issues
D Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman)
D Pond fill
O Mitigation Ratios
Ditching
D Are the stream and or wetland mitigation sites available and viable?
D Check drawings for accuracy
o Is the application consistent with pre-application meetings?
Cumulative impact concern
o
D
D
1-- !} n 1~~
..J ,( '1 ,--4
J J.:........ U
1 " .,
Comments: As per our discussion regarding revision of the triage and delegation processes,
please review the attached file. Note that you are the first reviewer, so this file will need to be
reviewed for administrative as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a "second
reviewer" as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!
Office Use Only:
~~@~nw[g@
.,.-.fWg
DENR . WATER QUALITY
USACE Action ID No. WETWlDSAND STORMWATER BRANCH D\VQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
Form Version May 2002
050702
I.
Processing
. J '; . ~ .-;;
1. Check all of the approval(s) requested for this project:
~ Section 404 Permit D
Section 10 Permit D
~ 40 I Water Quality Certification
'- ~ ; . ..-
Riparian or Watershed Buffer Rules
Isolated Wetland Permit from DWQ
2. Nationwide, Regional or General Pennit Number(s) Requested:
Nationwide 37
3. If this notification is solely a courtesy copy because written approval for the 40 I Certification is
not required, check here: D
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verifY availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: D
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4),
and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: D
II. Applicant Information
1. Owner/Applicant Information
Name: Michele Lawhem, Yancey COWlty Manager
Mailing Address: Room 11, Courthouse
Burnsville, NC 29714
Telephone Number: (828) 682-3971 Fax Number: (828) 682-4301
E-mail Address: m.lmvhern@countymanager.yanceycounty.org
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must
be attached if the Agent has signatory authority for the owner/applicant.)
Name: Stuart A. Ryman
Company Affiliation: Altamont Environmental, Inc.
Mailing Address: 50 College Street
Asheville, NC 28801
Telephone Number: (828) 281-3350 Fax Number:(828) 281-3351
E-mail Address:srvman@altamontenviron171ental.com
Page 1 of 11
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding propcrties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may bc included at the applicant's discrction,
so long as the property is clearly defincd. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans, If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project:
Price Creek EWP Site 2004-48
2. T.I.P, Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): See attached Table 1
4. Location
County: Yancey County Nearest Town: BUr11sville
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.):
Follow Highway 19E East towards BUr11sville. Turn right on Price Creek Road (SR 1121),
which follows the stream for the length of the project. The project area includes Price Creek
fi'om the confluence of Blankenship Creek (at the intersection of Price Creek Road and SR 1120)
to the confluence the Cane River, a distance of approximately 21,198 feet of stream. See
attached Figure 1.
5. Site coordinates, if available (UTM or Lat/Long): 35053'39.07" N/820 23'31.59" W
(approximate center of project area). Project is linear andfollows the same waterbody, which is
Price Creek. (Note - If project is linear, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): Multiple - See attached Table 1
7. Nearest body of water (strcam/river/sound/ocean/lake): Price Creek
8. River Basin: French Broad
(Note - this must be one of North Carolina's sevcnteen designated major river basins. The River
Basin map is available at http://h20.enr.state.nc.us/admin/maps/.)
Page 2 of 11
9. Dcscribe thc existing conditions on thc site and gencralland use in the vicinity of the project at
the time of this application:
The proposed project site consists primarily of residential and agricultural uses, although a
plant nursery also exists along the stream reach. The stream banks were impacted in several
areas during Tropical Storms Frances and Ivan and show evidence of erosion.
10. Describe the overall projcct in detail, including the type of equipment to be used:
All work will be performed as per conversations between Altamont Environmental, US Army
Corps of Engineers, NC Wildlife Resources Commission, and on-site consultation with the US
Fish and Wildlife Service personnel on other EWP sites in this watershed. Work will include
stream bank stabilization in several areas described below as well as localized removal of
organic and mineral debris and stream bank re-vegetation. Equipment used to accomplish the
above tasks includes: rubber tired skid del's, 15 ton dump truck, and a hydraulic track mounted
excavator with thumb.
Price Creek is classified as 'Class C' and 'Trout' waters throughout the project area. The
following activities are proposed in the project area:
StJr:am Balik StahilizaJioll
Approximately 130 feet out of21, 198 feet of stream along Price Creek could benejitfrom stream
bank stabilization. These areas include (see Figure 2):
· Stabilization Area A, Parcel Map ID #63 - Behind the Carolina Native Plant Nursery,
there is an eroding bank approximately 40 feet in length and 12 feet in height where the
stream is reworking a terrace on the right bank descending. (See photo in Figure 3)
· Stabilization Area B, Parcel Map ID #124 - Approximately 60 feet of stream on the left
bank descending is eroding adjacent to a residential yard and driveway. (See photo in
Figure 4)
· Stabilization Area C, Parcel Alap ID #122 - A 30 foot stretch of stream on the right bank
descending is eroding along the road. (See photo in Figure 5)
At Stabilization Areas A, B, and C, the stream bank will be stabilized in place. Large (four to jive
foot diameter) angular rocks or coir logs will be used to stabilize the toe of the bank. A second
tier of rock will be used, as needed. The decision to use rock or coir logs will be site dependent.
The area behind the boulders or coir logs will be backfilled with rocky debris material excavated
from the floodplain or imported material, and topsoil will be placed on the top of the
reconstructed bank to aid in the establishment of vegetation. The reconstructed streambank will
be protected with erosion control blanket and seeded with grasses upon completion of heavy
equipment work. With landowners' permission, live stakes and bare root stock native trees and
shrubs will be planted Oil top of the bank stabilization work.
Work will be peiformed ji'om the river bank to the extent possible and equipment will not tread
in the water. Schematics of the restored cross-sections for Areas A, B, and C are shown in
Figures 3A, 4A, and 5A, respectively as well as proposed stream bank stabilization measures.
Page 3 of 11
Excessive rocky debris within the flood plain will be removed using an excavator. Excessive
rocky debris will be identified by determining the drainage area of the DSR in discreet locations,
and using Regional Curves and other natural channel design parameters to determine stable
dimensions for the appropriate channel. If the existing channel dimensions are not within the
range of expected stable dimensions for the appropriate channel, and it is determined that
excessive mineral deposits account for the difference in channel dimensions, rock may be
removed. The purpose of mineral debris removal is to restore the hydraulic capacity of the
stream to more stable dimensions.
The work addressed in this application is intended to improve the post flood hydraulic capacity
of the stream reaches discussed and stabilize eroded stream banks that may threaten structures
on adjacent properties. The proposed actions are not intended to enhance existing conditions or
restore the stream reaches using natural channel design techniques. Such activities would
require detailed engineering evaluation and design, which are beyond the intent of the EWP
program.
11. Explain the purpose of the proposed work.
The work being described is recovery work under the Emergency Watershed Protection program
to protect existing property and structures. Stream bank stabilization will also prevent further
erosion and sedimentation to the Cane River resource, located immediately downstream.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date pernlits and
certifications were issued or withdrawn, Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.LP. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any future permit requests anticipated for tlils project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
N/A
VI. Proposed Impacts to Waters of the United StateslWaters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
Page 4 of 11
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and tcmporary, must bc listcd hercin, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all strcams (intermittent and perennial) must be shown on a
delineation map, whcther or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation fonns should be included as appropriatc. Photographs may be
included at the applicant's discretion. If this proposcd impact is strictly for wctland or stream
mitigation, list and describc the impact in Section VIII below.' If additional spacc is needed for
listing or description, please attach a separatc shect.
1. Provide a written dcscription of the proposed impacts:
Proposed impacts include stream bank stabilization. Precautions will be taken to keep heavy
equipment out of the stream channel except where absolutely necessary to install bank
stabilization measures. Work will be conducted in the dry to the extent practicable. Sediment
and erosion c011lrolmeasures, including sand bags, silt fences and reseeding, will be utilized
to minimize sedimentation.
The applicant recognizes the natural resource significance of the Cane River, located
downstream of the project, which is designated by the State of North Carolina as Trout Waters
and Critical Habitat for the federally endangered Appalachian elktoe mussel. Upon
consultation with the US Fish and Wildlife Service, Altamont understands that additional
federally listed plant and aquatic species may occupy nearby sites in the Cane River
watershed.
2. Individually list wetland impacts below: There will be no wetlands impacted at this site.
Wetland Impact Area of Located within Distance to
Site Number Type of Impact* Impact 1 OO-year Floodplain** Nearest Stream Type ofWetland***
(indicate on map) (acres) (yes/no) (linear feet)
*
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separatcly list impacts due to both structure and flooding.
** roO-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEl\1A-approved local floodplain maps. Maps are available through the FEl\1A Map Service Center at 1-800-358-9616, or
online at httn://www,fema,gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolatcd (detcnnination of isolation to be made by USACE only).
Page 5 of 11
List the total acreage (estimated) of all existing wetlands on the property: None
Total area of wetland impact proposed: N/A
3. Individually list all intermittent and perennial stream impacts below:
Stream Impaet Length of Perennial or
Sitc Number Type ofImpaet* Impact (linear Stream Name** Average Widtl1 of Intcnnittcnt?
(indicate on map) fect) Stream Beforc Impact (please speeify)
EWP 2004-48 Stream bank stabilization 40 feet Price Creek 15 Perennial
Map /D 1/63
EWP 2004-48 Stream bank stabilization 60 feet Priee Creek 15 Perennial
Map/D#124
EWP 2004-48 Stream bank stabilization 30 feet Priee Creek 15 Perennial
Map/D#122
*
List eaeh impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet beforc and after, and net loss/gain),
stabilization activities (ccmcnt wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, ete. If stream relocation is
proposed, plans and profilcs showing the lincar footprint for both thc original and relocated strcams must be included.
** Stream names can bc found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearcst
downstrcam named stream into which it flows. USGS maps arc available through the USGS at 1-800-358-9616, or online at
wWW.USgS.gov. Sevcral internet sites also allow direct download and printing of USGS maps (e.g., www,topozone,com,
www.mapquest.com. etc.).
Cumulative impacts (linear distance in feet) to all streams on site:
approximately 130 feet
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
There will be no impacts to open waters.
Open Water Impact Area of Name of Water body Type of Water body
Site Number Type of Impact* Impact (if applicable) (lake, pond, estuary, sound,
(indicate on map) (acres) bay, ocean, etc.)
Page 6 of 11
I I
* List cach impact separately and identify temporary impacts. Impaets includc, but arc not limited to: fill, excavation, dredging,
flooding, drainagc, bulkheads, ete.
5. Pond Crcation
If construction of a pond is proposed, associated wctland and stream impacts should be
includcd above in the wctland and strcam impact sections. Also, the proposcd pond should be
describcd here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): D uplands D stream D wetlands
Describe thc mcthod of construction (e.g., dam/embankment, excavation, installation of draw-
down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, acsthetic, trout pond,
local stormwater requirement, etc,): N/A
Size of watershed draining to pond: N/A
Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of altcrnative, lower-impact
site layouts, and explain why these design options were not feasible, Also discuss how impacts
were minimized once the dcsired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts,
On behalf of Yancey County, Altamollt will provide contractors engaged in the implementation of
this work both written and verbal instructions of all impact avoidance statements provided below.
All heavy equipment will be kept out of the stream channel during stream bank stabilization except
where absolutely necessary to install bank stabilization measures. Excavation will be done in the
dry to the extent practicable. Disturbance of channel bottom and banks and equipment access
areas shall be held to the minimumllecessary to allow for bank stabilization or to restore the
hydraulic capacity of the channel. No boulder, cobble, gravel, or sediment will be collectedji-om
the stream channel to perform streambank stabilization work Temporary grass cover shall be
planted on all bare soil within 15 days of ground disturbing activities. Provided landowners give
permission, herbaceous and woody shrub and tree vegetation will also be installed on the riverbank
upon completion of bank stabilization work Yancey County will provide a site manager to
periodically inspect and supervise contractor work to help ensure impact avoidance instructions
are beingfollowed
VIII. l\'litigation
Pagc 7 of 11
DWQ - In accordance with 15A NCAC 2H ,0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Pennits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed,
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Teclmical Guide for Stream Work in North Carolina, available at
http://h20.em.state.nc. us/ncwetlands/ strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide as
much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of
mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc,), and a description
of the current site conditions and proposed method of construction. Please attach a separate
sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior to
submittal of a PCN, For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h20.enr.state.nc.us/wro/index.htm. If use of the
NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
Page 8 of 11
IX. Environmental Documcntation (rcquircd by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ~ No D
If yes, does the project require preparation of an envirorunental document pursuant to the
requirements of the National or North Carolina Envirorunental Policy Act (NEP AlSEP A)?
Note: If you are not sure whethcr a NEP AlSEP A document is required, call the SEP A
coordinator at (919) 733-5083 to review current thresholds for envirorunental documentation.
Yes D No ~
If yes, has the document revicw becn finalizcd by the State Clearinghouse? If so, please attach a
copy of the NEP A or SEP A final approvallettcr.
Yes D No D
X. Proposed Impacts on Riparian and Watcrshcd Buffcrs (rcquircd by DWQ)
It is the applicant's (or agent's) responsibility to detennine, delineate and map all impacts to
required state and local buffers associated with thc projcct. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying sitc plan. All buffers must be shown on a
map, whether or not impacts arc proposed to the buffers. Correspondence from the DWQ
Regional Office may be includcd as appropriatc. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffcrs identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B ,0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or othcr (plcasc idcntify )?
Yes D No ~ If you answercd "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of thc riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact Multiplier Required
(square feet) Mitigation
1 3
2 1.5
Total
*
Zone 1 extends out 30 feet perpendicular from ncar bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone I.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Propcrty, Conservation Easement, Riparian Buffer Restoration / Enhanccment, Prcservation or
Page 9 of 11
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the propeliy.
Impervious acreage will not change.
Erosion and sedimentation prevention and control will be maintained throughout this project
primarily through proper water management, construction sequencing, proper staging and
stockpiling of materials, and the maintenance, at all times, of suitable channel capacity for
expected flow events. Equipment, fuels, lubricants, or other potential sources of water pollution
will not be stored in areas that could be flooded during this project.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Portable facilities shall be provided at the work site.
XIII. Violations (required by DWQ)
Is this sitc in violation of DWQ Wetland Rules (15A NCAC 2H ,0500) or any Buffer Rules?
Yes 0 No [g]
Is this an after-the-fact permit application?
Yes 0 No [g]
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangcred and
Threatencd Species, accessibility problems, or other issues outside ofthe applicant's control).
N/A
Page 10 of 11
Applicant/Agent's Signat rc Da c
(Agent's signature is valid only if. an authorization lcttcr [rom the applicant is provided.)
Page 11 of 11
00 cj
"'i .5
-.:to
g a
tIlC"lU
8 0 ~
a Z ~
(!)p-<o::Z
:g~~r::
E-< 0 c:
~ ~ g
<e: ~ U
U >.
(!) 8
.g a
P-<>-
.
x~t'3
oUS~
cr:cr:1-
&:1-0
~U)o
u..
"'....<0
N'<t<O
'<tN
~z
zQ
~~
""-
USc5
I-~
u)1-
U)
I-
-'z
WW
z~
zZ
~Q
I-'
uUS
cr:
xxx
0-
N
'<t <0 '<t
o
.... 0....
<ON<O
N l") N
W
~
U)
U-'U
z1Lz
~
u
~"E~
(/) .E II)
~ ~ E
rnrn~
U)
U)
W
cr:
o
o
~
o
0::-,0::
.<::Q.O
u I 0
C I- -'
ro <0 W
ll::Ni:i:
~W~
~z~
uifio
l")"'....
(J) ~ ~
W
(')
us
cr:
u
~
l") (J)....
~~~
~ ~ ~
cr:
W
Z
~
o
-'
<t:
o
W z
::i~~
Wo>
I 0:: 01
U<t:I
WUI-
~olW
-,~~
O:2W
>=;<t:
d~5
:2(')~
:JOZ
XQ.O
W Z
Z
<t:
U
z
a:
000
000
000
<DO
(J) (J) <0
N<o'<t
'<t <0 0
....l")l")
"' '<t '"
000
000
(J) '" '"
'" '" '"
............
"'''''''
-'
W
Uo
cr:-
~
0-
Q
0-
~
<0 0 '<t
~~gj
;:;:""
l") N '<t
<D N N
'2
o
.,
'"
,~
a.
Cl.
'"
E
U;
Cl.
,S
<')
2"
0:
o
.,
u
(J)
U)
(J)
(J)
$
(J)
:a
~
tl
'"
Cl.
.s
E
'"
~
in
,S
'0
(J)
co
u
'0
,S
<1)
"'
tl
"'
Cl.
.s
'0
5
'"
0:
~
C
(J)
<1)
(J)
a.
e
'0
0:
VJ
(J)
o
'0
'0
0:
"'
W
~
ro
Cl.
ro
c:
5
':;:
E
"'
e
in
'0
5
'"
c:
~
ro
E
(J)
5
VJ
C
(J)
VJ
Q)
a.
e
(J)
'"
"'
'0
.Q
E
~
in
2
"'
E
;(
o
Ci
Cl.
~
YANCEY COUNTY
Michele P. Lawhem, County Manager
John Renfro, Chairman
Dcan Hicks, Commissioner
Blaine \Vhitson, Commissioner
CounryCourthousc, Room 11 · Burnsville, North Carolina 28714
PHONE: (828) 682-3971 · FAX: (828) 682-4301. EMAIL:mlawhern@yancey.main.nc.us
November 10,2004
Altamont Environmental, Inc.
50 College Street
Asheville, NOlih Carolina 28801
Stu,
At the regular monthly meeting of the Yancey County Board of Commissioners last
evening, the enclosed contract for professional services was executed, relative to EWP
Section 216 work. Pursuant to, or in the spirit of the further intent of this contract, this
Yancey County Local Govemment hereby authorizes Altamont Environmental, Inc. to
sign and execute all necessary permits and coordinate communications with said
regulatory agencies.
If there should be any questions about the above, please feel free to call me at any time.
m;ely,
V "~~hcrn
Yancey County Manager
Work: 828/682-3971; Cellular 828/284-0746
ALTAMONT F:NVIRONMENTAL, INC.
Figure 1
Site location Map
March 8, 2005
USGS Bald CreeklBarnardsville Quadrangles
Scale 1 inch= 2000 feet
Price Creek
Yancey County, North Carolina
I E N GIN E E R I N G & H Y D R 0 G E 0 L O:G vi
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC. 828.281.3351
www.altamontenvironmental.com
I
03-08-05
I
...L
---'--
Legend
900
,
o 900 1800 Feel
,
Figure 2
Price Creek
EWP Project Area 48
Yancey County, North Carolina
.\1. 1'.\:\10'\ I' EM'mO'\:\IEN 1'.\1.,1:\<'.
IE ~ <3 I N~E E R I N G &~ H V O:R 0 G E;o.LP G.vI
so COLLEGE STREET. ASHEVILLE, N:J C 28801
TEL, 828.281.3350 FAC, 828,281. ,351
Www.altamontellvirornnental.con~ .
I 03-08-05
.
Stream bank stabilization sites
Property boundary of affected parcels
/V
/V
Roads
Surface waters
1
~--
L
l
I
Figure 3
Price Creek Area A:
DSR 2004-48
Yancey County, North Carolina
AL T AMONT ENVIRONMENTAL, INC.
I'E N a I NEE R I'N a & ,H y 0 R 0 a'E 0 LOa yi'l
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC ,828.281.3351
www.altamontenvironmental.com
__L__u_____ _____J_
, '1
~-
,,[. ,I"
. ~ :t~.41 I Ii
"'" ....,1'-1.
~h~~~'I'''l' '
~
cd
M
I
Z
l?
U)<I:
w w CO ~
01- 1Wl-
UU) c3~5
I- I Or>O
~ N wU
<I: <I: 0.... U >-
2: I- as c:: w
Ww Cl....U
IO ~
U >-
U)
.;.w,:.
III
..1
Figure 4
Price Creek Area B:
DSR 2004-48
Yancey County, North Carolina
AL T AMONT ENVIRONMENTAL, INC.
ENG'INEER'ING & HY'OIROGEOLOGYI
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL, 828.281.3350 FAC .828.281.3351
www.altamontenvironmental.com
~~
('
z
o
I-
1<:( CO
N
-WOO
-11-1'
CO - ..j'
<:( (f) g
I-~C\J
(f)-o....
<{ :s:
L:I-W
<:(~
W
~
I-
(f)
;;
00
00 _
Non
u:::lE
_Z...;8
_ ~oo '
NOl
oOC
>- ~ V
~ ,~
ei ~.g
<I: :-
~.O Ii
on-
~15
mod
!3"!0l
-~~~
o~
U
o
on
-----L__------"-
I
CO
~
I
U
Z
~-;;
WI-
Wz
o::~
Uo
~u
u>-
o::W
o....U
z
<(
>-
W
--l
<(
U
en
a
f-
f-
a
z
Z
<l
:E
)-
a::
::>)-
wtnl-
u Z
- ::>
0:::..0
o...ffiu
ZC:>)-If)
,<1:<lWo
I NZU~
..~~:::::
)- )--.1
aH- 0
u ..
~w~..
:>"')ww
<1:0_1-,
O:::O:::.J<ll
Clo...UCl
I
I
, I
Figure 5
Price Creek Area C:
DSR 2004-48
Yancey County, North Carolina
AL T AMONT ENVIRONMENTAL, INC.
I, E N GIN E E'R I N G & H Y OlR 0 G E 0 L' 0 G Y i
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 F AC .828.281.3351
www.altamontenvironmental.com
I
_J
AL T AMONT ENVIRONMENTAL, INC.
STREAM STABILIZATION
DETAil-SITE C
EWP 2004-48
PRICE CREEK
YANCEY COUNTY, NC
IENGINEERING & HYDROGEOLOGYI
50 COLLEGE STREET, ASHEVll.LE, NC 28801
TEL,828,281.3350 FAC.828.281.3351
www.altamolltenvironmentaJ.com
DRAWN BY: ZAN PRICE
PROJECT MANAGER: STU RYMAN
CLIENT: YANCEY COUNTY
DATE: 04114/05
I
FIGURE
I
5a
lJ
[Fwd: ~Fwu: [F~d: STream Clearing Activities]]]
Subject: [Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
From: Cyndi Karoly <cyndi,karoly@ncmail.net>
Date: Wed, 16 Mar 2005 15:58:57 -0500
To: Laurie J Dennison <Laurie.J,Delmison@ncmail.net>
fyi - so please note that fees are waived when you create these files - perhaps a
brief handwritten note in the file jacket, or we can add a copy of this message
Subject: [Fwd: [Fwd: STream Clearing Activities]]
From: Tom Reeder <tom.reeder@ncmail.net>
Date: Wed, 16 Mar 2005 15:43:18 -0500
To: Cyndi Karoly <cyndi.karoly@ncmail.net>
Cyndi - In answer to your question yesterday it appears that the fees are being
waived for the EWP associated 401s.
Subject: [Fwd: STream Clearing Activities]
From: Alan Klimek <alan.klimek@ncmail.net>
Date: Wed, 16 Mar 2005 15:37:40 -0500
To: Tom Reeder <Tom.Reeder@ncmail.net>
Yes, the fees are being waived. See attachment.
Alan
-------- Original Message --------
Subject:STream Clearing Activities
Date:Mon, 28 Feb 2005 09:40:08 -0500
From:"Robin W, Smith" <robin.w.smith@ncmail.net>
Organizatiol1:NC DENR
To:Alan Klimek <Alan.Klimek(a}ncmail.net>, Jim Simons <.Jim.Simons(a)ncmail.net>,
David Vogel <David.Yogel@ncmail.net>
CC:Johanna Reese <Johanna.Reese(a?ncmail.net>, Nann Guthrie
<Nann. Guthri e@ncmaiI.net>
~
"'-\'" ..
.... ~
~ll: Attached is an electronic copy of the letter and information sheet
sent to the 19 counties and one town that have contracts with NRCS for
stream clearing projects. Those letters went out over the Secretary's
signature on Friday. We will hand-deliver a memo containing the same
basic information to the mountain area legislators tomorrow. We are
also working with the Governor's Office on a news release; I am not sure
how soon that will go out. Give me a call if you have any questions.
Thanks for working toward getting meetings set up. Robin.
;,."
10[2
3/17/20056:46 AM
[Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
.
Robin W. Smith <robil1,w.smith(a),ncmail.net>
Assistant Secretary of Planning & Policy
Office of the Secretary
NC DENR
Content-Type: message/rfc822
[Fwd: [Fwd: STream Clearing Activities]]
Content-Encoding: 7bit
_.__m______~,.____._ _.____.,...,..__.___.____~___ .__.____~_..._.______.'m_.__________,._,____.__.~__.______,..,__________.__._.._._ ____.._.____.__.____~__...__.___...._m__.._.__..___.._
Content-Type: message/rfc822
[Fwd: STream Clearing Activities]
Content-Encoding: 7bit
letter to
Content-Type: applicationlmsword
Content-Encoding: base64
_________.__.___, ,____~_~=_=..::...-=_..,.::::__...::...___=-::...:_:_ .1______.....
!i Content-Type: applicationlmswordi
iStream-Clearing Activities-3.doc'i 'b '
ii Content-Encoding: ase64
_.,'------~.._-----~-_._-----_.- ---_._---_._--_._-~---_._-------_._--_.._._--_.,---'--.__._-~._.._----_..-.:.
2 of 2 3/17/2005 6:46 AM
I
February 25, 2005
Page 1 of2
February 25, 2005
RE: Emergency Watershed Protection Stream-Clearing Projects
Dear
I know that County experienced stream damage as a result of the fall
hurricanes. Our department would like to work closely with your county to insure that
stream restoration proj ects receiving state and federal funds under the Emergency
Watershed Protection (EWP) program move as smoothly as possible through the
environmental review and permitting process, I have enclosed for your information a
brief summary of the types of permits and approvals that may be required for these
projects. For projects that involve work directly affecting the streambed, the United
States Army Corps of Engineers will be the primary environmental permitting agency.
For those projects, our staff in the Division of Water Quality and the Division of Land
Resources playa supporting role and issue related state approvals.
I have asked our staff to meet with all of the western counties, either individually or in
small groups, to talk about each county's proposed stream restoration projects and answer
your questions about permit requirements. Our staff will ask the Corps of Engineers and
Soil and Water Conservation staff to join in those meetings in an effort to put together a
plan of action for reviewing and approving stream restoration projects as quickly as
possible. You should receive a telephone call from DENR staff soon to talk about a date
and time that would be convenient to meet and talk about your projects.
I have also directed our staff to waive fees for state water quality certifications (under
Section 401 of the Clean Water Act) and for approval of erosion and sedimentation
February 25,2005
Page 2 of2
control plans for stream-clearing projects funded under EWP. Fees will be waived for all
EWP permit s requested by September 1,2005.
I hope these efforts will ease the burden on county governments already challenged by
the demands of reconstruction and recovery. If we can help you in any other way, please
do not hesitate to call. I have asked Assistant Secretary Robin Smith to be a ,primary
contact on these projects for DENR; you can reach Ms. Smith at (919) 715-4141. The
enclosed information sheet also provides contact information for DENR staff in both the
Asheville and Winston-Salem Regional Offices and for the Corps of Engineers office in
Asheville.
Sincerely,
William G, Ross, Jr.