HomeMy WebLinkAbout20050678 Ver 1_Complete File_20050421O?O? W A T ?9pG
? Y
' r
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
June 29, 2005
Town of Cary
Attn: Jarrod Buchanan
Post Office Box 8005
Cary, NC 27512-8005
Subject Property
Alan W. Klimek, P.E. Director
Division of Water Quality
DWQ Project # 05-0678
Wake County
Hillsdale Forests Sewer Extension Project
Unnamed Tributary to Lynn Branch [03-04-02, 27-43-3, WS III NSW]
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River
Buffer Protection Rules (15A NCAC 2B.0233) with Additional Conditions
Dear Mr. Buchanan:
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 0.08 acres of wetlands, 40 feet of streams and 1,916 square feet (ft) Zone 1
and 426 square feet (ft) Zone 2 of protected riparian buffers foi+. the purpose of providing sanitary sewer
service at the subject property, as described within your revised application dated June 15, 2005 and
received by the N.C. Division of Water Quality (DWQ) on June 20, 2005. After reviewing your
application, we have decided that the impacts are covered by General Water Quality Certification
Number(s) 3374 (GC3374). The Certification(s) allows you to use Nationwide Permit(s) 12 when issued
by the US Army Corps of Engineers (USACE). This letter shall also act as your approved Authorization
Certificate for impacts to the protected riparian buffers per 15A NCAC 213 .0233. In addition, you should
obtain or otherwise comply with any other required federal, state or local permits before you go ahead
with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge
regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to
waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
401 Oversight/Express Review Unit
1650 Mail Service Center, Raleigh, North Carolina 27699.1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919.733.1766 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetiands
N?on?enCarolina
Naturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycledll0% Post Consumer Paper
Town of Cary
Page 2 of 3
June 29, 2005
Amount Approved Units Plan Location or Reference
Stream 40 feet UT to L Branch
404 Wetlands 0.08 acres Modified Forested Woodland
Buffers - Zone 1 1,916 s uare ft. UT to Lynn Branch
Buffers - Zone 2 426 (square ft. UT to Lynn Branch
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all, construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
d. The reclamation measures and implementation must`comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
3. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning
fencing (or similar high visibility material) for the areas that have been approved to infringe
within the buffer, wetland or water prior to any land disturbing activities to ensure compliance
with 15A NCAC 213.0233 and GC 3374.
4. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
5. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters
is unavoidable, they shall be removed and the natural grade restored within six months of the date
that the Division of Land Resources has released the project.
Town of Cary
Page 3 of 3
June 29, 2005
6. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality,
1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director fora decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B.,,
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have
any questions, please telephone John Dorney or Cyndi Karoly at 919-733-1786.
AWK/cbk/bjs
Enclosures: GC 3374
Certificate of Completion
cc: USACE Raleigh Regulatory Field Office
DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Sincerely,
c?!t tzr
6
Alan W. Klimek, P.E.
C
Filename: fS:\2005 Correspondence\05-0678 Hillsdale Forest Sewer (Wake) 401 NBR.doc
ENGINEERING DEPARTMENT
June 15, 2005
DWQ Wetlands Unit
2321 Crabtree Blvd.
Suite 250
Raleigh, NC 27604
Attn: Cyndi Karoly
D ?a
u 005
JUN ? Z
DES pSIOR1fiNA1?NG?+Ari°?+
Re: North Carolina DWQ PCN Submittal - Hillsdale Forest Sewer Extension Project
DWQ Project # 05-0678
Dear Ms. Karoly,
On June 13, 2005, the Town of Cary (TOC) received your Request for More
Information concerning DWQ Project # 05-0678, Hillsdale Forest Sewer Extension
Project. Please find five copies of the altered North Carolina DWQ PCN, dated June
15, 2005, enclosed.
In response to the 3 items listed, the following comments have been added to the
North Carolina DWQ PCN:
1. The maintenance corridor is 20-feet wide, which is the Town's required
standard easement width. Since the crossing is less than 20-feet, this should
be allowable, and require no mitigation. The easement will be mowed yearly,
with sapling removal as needed. The sapling removal is conducted by hand to
minimize disturbance.
2. 1 have included as Attachment A-3, a copy of the TOC's SECTION 16000 -
SOIL EROSION AND SEDIMENTATION CONTROL, from our Technical
Specifications, which is part of all TOC Construction Project contracts, and will
be adhered to on this project. This section of the Technical Specifications fully
explains the re-vegetation plan which will be implemented. In the areas
considered wetland, a wetland grass mixture will be planted instead of the
standard mixtures.
3. The NW-12 has been approved by the USACOE. There are 3,500-square-feet
of wetland impacts associated with the installation of this sewer main. This
was calculated using the easement width of 20-feet and the length of the
sewer main between the tie-in at Existing Manhole "B" at Station 10+00 and
the toe of the slope located at station 11+75, which is 175-feet. The 3,500-
TOWN Of CARY
318 North Academy Street -Cary, NC 27513-PO Box 8005-Cary, NC 27512-8005
te1919-469-4030 - fax 919-460-4935- www.townofcary.org
square-feet of disturbance calculates to 0.08 acres, which is below the 0.10
acres of disturbance which requires mitigation. Also, there will be no filling in
the affected area and the surface will be restored to its approximate original
contour.
I want to thank Ms. Edwards for discussing this project with me over the phone and
helping me find a solution to the DWQ's concerns. The Town of Cary and the
residents of the Hillsdale Forest neighborhood will be glad to see this project under
construction.
If you have any questions or need any other information concerning this project,
please contact me at 919-469-4335 or at larrod.buchanan(a)townofcary.org.
Sincerely,
arrod A. Buchanan
Project Engineer
cc: Eric Kulz, DWQ Raleigh Regional Office
RAEngineeringDept\PROJECTS (Capita1)\Sewer\SW5002 - Hillsdale Forest Phase 3 - Jarrod\Stream X-ing\DWQ PCN Letter 2.doc
i F WAIF
?Q 9P Michael F. Easley, Governor
William G. Ross Jr., Secretary
DW r North Carolina Department of Environment and Natural Resources
_,.._.?_..? -i
'C Alan W. Klimek, P.E. Director
`" Division of Water Quality
lz?
June 7, 2005
DWQ Project # 05-0678
Wake County
Page 1 of 2
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Town of Cary
PO Box 8005
Cary, NC 27512-8005
JUN 2 0 2005
Subject Property: Hillsdale Forests Sewer Extension Project DENR-WATER QUALITY
1%tTW@S AND STOMYATER BRANCH
REQUEST FOR MORE INFORMATION
Dear Sir or Madam:
On April 21, 2005, the Division of Water Quality (DWQ) received your application dated April 13, 2005
to impact 40 feet of stream and 2,342 square feet (ft) of protected riparian buffers to construct the
proposed sewer line extension. The DWQ has determined that your application was incomplete and/or
provided inaccurate information as discussed below. The DWQ will require additional information in
order to process your application to impact protected wetland, streams and/or buffers on the subject
property. Therefore, unless we receive the additional infonnation requested below, we will have to move
toward denial of your application as required by 15A NCAC 2H .0506 and 2B .0233(8) and will place
this project on hold as incomplete until we receive this additional information. Please provide five copies
of the following information so that we may continue to review your project.
Additional Information Requested:
1. You have proposed mitigation for the two, 20' stream crossings. According to the Riparian Buffer
Rules, mitigation is required for perpendicular non-electric utility line when the crossing is between
40' and 150' (per crossing) and the maintenance corridor is greater than 10'. Additionally, you
have not stated how wide the permanent maintenance corridor is to be, please provide this
information so the DWQ can determine if mitigation is required.
2. Please provide a re-vegetation plan for the two, 20' temporary crossings.
3. The two streams that are being proposed to be impacted are within 50' of each other and the USGS
topographic map shows this to be a low lying, flat area. Additionally, the soils are mapped as
Worsham SL, which is a hydric soil. Please provide information as to whether a jurisdictional
determination for wetlands has been done for this site.
Please respond within three weeks of the date of this letter by sending this information to me in writing
and Eric Kulz of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we
will assume that you no longer want to pursue this project and we will consider the project as withdrawn.
401 Oversight/Express Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919.733-1786/ FAX 919-733-6893/ Internet: http://h2o.enr.state.nC.trs/ncwetlands
NotthCarol i na
JI alnrally
An Equal opportunity/Affirmative Action Employer- 5006 Recycled/l0% Post Consumer Paper
Town of Cary
Page 2 of 2
6/7/05
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Ms. Debbie Edwards at 919-733-9502 if you have any
questions regarding or would like to set up a meeting to discuss this matter.
Sincerely,
Cyndi Karoly,
401 Oversight/Express Permitting Unit
CBK1dae
cc: Eric Kulz, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Filename: 05067811illsdalerorest(NVake)401 + hold
141LE COP'
Office Use Only: Form Version May 2002
USACE Action ID No. DWQ No. S - 1) Lc7 S
(If any particular item is not applicable to tnis project, please enter 1-401 AppliCaUle U1 MIA .)
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NW-12
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ? If applicable.
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further d o iI-'?l?jJ? D
II. Applicant Information SUN 2 U 2005
1. Owner/Applicant Information DENik • WATER QUALITY
Name: Town of Cary WETLANDS M40 STOROATER BRMCK
Mailing Address: P.O. Box 8005
Cal y, 27512-8005
Telephone Number: 919-469-4335 Fax Number: 919-388-5806
E-mail Address: iarrod buchanan(a townofcary.org
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Fax Number:
Page 5 of 12
C ,
III. Project Information
Attach a8vitinity -nfapr_ clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided. See Attached -
"Vicinity Map", "Site Plan", and "Soils Map"
1. Name of project: Hillsdale Forest Sewer Extension Project
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): 0773014239
4. Location
County: Wake Nearest Town: Cart/
Subdivision name (include phase/lot number): Hillsdale Forest, Lot 10, Block F, Section 5
Directions to site (include road numbers, landmarks, etc.): From Walnut Street (SR ), turn
Southwest onto Kingston Ridge Road (SR ) for 2,500-feet. Turn right onto Imperial Road
and follow it to the end. The interceptor will pass to the left of 1101 Imperial Road.
5. Site coordinates, if available (UTM or Lat/Long): See attached sheet A-1.
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 2.50
7. Nearest body of water (stream/river/sound/ocean/lake): UT to Lynn Branch
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Residential subdivision. Town of Cary greenway at rear of
property. Yard contains sparsely populated trees of varying type. Semi-established ground
vegetation.
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used: Sanitary
sewer main installation 3 332-feet in length The last three sections of the sewer main will be
installed along the property line between 1101 and 1103 Imperial Road, with the remainder
being installed in the roadway. The last section of the sewer main will be installed under two
small streams that run parallel to each other and are located approximately 50-feet apart,
where the proposed crossings occur. An independent contractor will install the sewer main
using a variety of ecLuipment including a track-hoe back-hoe end loader, skid-steer, dump-
truck and compactor.
11. Explain the purpose of the proposed work: Provide sanitary sewer service to the residents
of the Hillsdale Forest Subdivision along Imperial Road, Savannah Circle, and Kingston
Ridge Road
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 7 of 12
1. Provide a written description of the proposed impacts: Crossing two streams with an 8-inch
Ductile Iron Pipe sewer main. The sewer main will be installed perpendicular to the two
streams. An illustration of the crossings is included on Attachment A-2. Also, disturbance to
Riparian buffers as defined in section X of this document and delineated on attached map. Also,
wetland impacts as listed in Section VI, Part 2 below.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
(es/no Distance to
Nearest Stream
linear feet
Type of Wetland***
1 Excavation 0.08 NO 0 Modified Forested
Woodland
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://ww\v.fema.eov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: 0
Total area of wetland impact proposed: 0
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
linear feet
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
1 Excavation 20 UT to Lynn Branch 20 Perennial
2 Excavation 20 UT to Lynn Branch 12 Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightcning, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uses,eov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.tol)ozone.coni,
www.mapnuest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 40
Page 8 of 12
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: N/A
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The Town of Cary is installing a sanitary sewer main to improve the public health of the
residents in the Hillsdale Forest Subdivision. Many of these residents have failing septic systems
that require a high level of maintenance to keep them from releasing raw sewage. The trench in
which the sewer main will be placed will be as narrow as possible. Also, silt fence will be
placed on the up and downhill sides of the construction corridor and rock check dams will be
installed to keen the transportation of solids to a minimum. The crossing installation will be
done during low-flow periods to cause the least impact
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 9 of 12
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http:/ih2o.enr.state.nc.us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wm/index.litm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information: Request letter submitted to NCEEP on 4/11/2005, copy attached.
Will forward reply upon receipt. Mitigation not required as considered allowable
under NC0233.
Amount of stream mitigation requested (linear feet): 0
Amount of buffer mitigation requested (square feet): 0, See Sheet 11, Section X
Amount of Riparian wetland mitigation requested (acres): 0
Amount of Non-riparian wetland mitigation requested (acres): 0
Amount of Coastal wetland mitigation requested (acres): 0
Page 10 of 12
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ? No
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ? N/A
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ® No ? If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers. See Attached "RIPARIAN BUFFERS ZONE I & ZONE 2 MAP"
Zone* Impact
(square feet Multiplier Required
Mitigation
1 1,916 3 5,748 sf
2 426 1.5 639 sf
Total 2,342 6,387 sf
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
Page 11 of 12
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
Bufer mitigation not required as considered allowable use per NC0233.
XI, Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
No new impervious acreage is proposed, There are 7,850 square feet or 0.18 acres of impervious
area at present which includes the home and driveway. Silt fence will be installed along both
sides of the construction corridor. Rock check dams will be installed along the downstream edge
of the construction corridor.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
This waste water will flow to the South Cary WWTP. The Plant, rated at 12.8 mgd with over 5
mud of excess capacity, has more than enough excess capacity to cover the additional 12,320
gallons per day proposed under this project. The Plant discharges into Middle Creek and uses
the following processes to treat the influent flow: bar screens, grit removal facilities, three
aeration basins, four secondary clarifiers, seven deep-bed tertiary filters, ultraviolet disinfection,
and a cascade aerator for reaeration prior to discharge.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
The Town of CM is installing this project at its earliest convenience for two reasons. First,
several of the properties have failing septic systems which are an environmental concern.
Second, several of the properties have shallow water wells with poor quality water.
L't,? ? - Z ooS
/ Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
Attachment A-3
SECTION 16000
SOIL EROSION AND SEDIMENTATION CONTROL
(Revised 1-9-02)
PART 1 - GENERAL
A. Temporary and permanent erosion control measures shall be provided for
all land disturbing activities in accordance with the Contract Documents
and/or an erosion control plan approved by the North Carolina Department
of Environment and Natural Resources (NCDENR). Temporary measures
shall be installed by the Contractor, then inspected by the Inspector and the
NCDENR for compliance prior to any land disturbing activity. The inspection
and approval process shall be required on each phase of construction. All
permanent erosion control measures shall be incorporated into the work at
the earliest practical time. All temporary measures shall be maintained until
the permanent measures have taken effect. Temporary and permanent
measures shall be coordinated to provide effective and continuous erosion
control throughout the construction and post-construction period to minimize
siltation of streams, lakes, reservoirs, and other impoundments, ground
surfaces, and other property. These measures shall remain in effect until
final approval for removal is given by the Inspector and/or the NCDENR at
which time the Contractor shall remove all temporary erosion control
measures at no additional cost to the Owner.
B. The Contractor shall be familiar with the applicable provisions of the
Sedimentation Pollution Control Act of 1973, General Statutes,
Chapter 113A, Article 4. The Contractor shall be responsible for
incorporating conservation procedures necessary to comply with this act in
minimizing erosion and sediment pollution associated with the construction
of this project as directed by the Engineer.
C. The Contractor shall be financially responsible for any and all fines that
result from the Contractor's failure to install and/or maintain erosion control
measures in accordance with the Contract Documents.
D. The Contractor shall check all erosion and sediment control measures for
stability and operation following each rainfall event, and no less than once
per week. The Contractor shall make any needed repairs immediately to
maintain all control measures as designed.
E. The Contractor shall clean out all sediment trapping devices when the
device reaches 50% trap capacity and shall dispose of the sediment by
spreading on the site in a protected area or by hauling away if not suitable
for fill at no additional cost to the Owner.
PART 2 - TEMPORARY MEASURES
A. Temporary Silt Fence shall be installed around inlets, at the toe of all fill
slopes, and any other necessary locations as shown on the plans and as
directed by the Engineer. Silt fence shall be erected in accordance with the
Town of Cary Standard Specifications and Details.
B. Inlet Protection shall be installed around inlets and any other necessary
locations as shown on the plans and as directed by the Engineer. Inlet
protection shall be erected in accordance with the Town of Cary Standard
Specifications and Details.
C. Diversion Ditches shall be installed at the top of cut and fill slopes and any
other necessary locations as shown on the plans and as directed by the
Engineer. Diversion ditches shall be installed in accordance with the Town
of Cary Standard Specifications and Details.
D. Tree Protection Fence shall be installed around the drip line of trees in the
construction work area as shown on the plans and as directed by the
Engineer. The tree protection fence shall be installed in such a manner that
it prevents all construction activities from encroaching into the area inside
the drip line of the tree. The material and installation specifications for the
tree protection fence shall be approved for use by the Engineer prior to
installation.
E. Construction Entrances shall be installed at all points of access to the
construction site. Any access point, which does not have a construction
entrance, shall be barricaded to prevent its use. Construction entrances
shall be installed in accordance with the Town of Cary Standard
Specifications and Details. Construction entrances shall be included in the
unit bid price for "Mobilization."
F. Sediment and Filter Basins shall be installed at all points where
accumulated runoff is released to natural drainage channels as shown on
the plans and as directed by the Engineer. Sediment pits and filter basins
shall be sized to hold 1800 cubic feet of sediment for every acre of denuded
area tributary to the structure. Sediment and filter basins shall be installed
in accordance with the Town of Cary Standard Specifications and Details.
G. Catch Basin Risers/Filters shall be installed at proposed catch basin
locations or at other necessary locations as shown on the plans and as
directed by the Engineer. Catch basin risers/filters shall be erected in
accordance with the Town of Cary Standard Specifications and Details.
Project No: SW 5002 16000-2 Hillsdale Forest Sewer Extension Project
H. Check Dams shall be installed in ditches any and at other necessary
locations as shown on the plans and as directed by the Engineer. Check
dams shall be erected in accordance with the Town of Cary Standard
Specifications and Details.
1. Basis of Payment: Payment for temporary erosion control measures shall be
at the contract unit price for each item as indicated on the Itemized Proposal
in the contract documents. These prices will be full compensation for all
work covered by this section including but not limited to the labor,
equipment, and materials for furnishing and installing all temporary erosion
control measures indicated on the plans, and maintenance of the work
throughout the life of the project as required by the Inspector.
PART 3 - TEMPORARY AND PERMANENT NON LAWN SEEDING MEASURES
A. General:
i. After construction is complete in any area or phase of the project, the
disturbed areas shall receive a permanent ground cover. Seeding and
mulching shall be performed immediately behind construction. The
Contractor shall provide permanent seeding in all disturbed areas as
indicated in the Contract Documents. The Contractor shall adapt
permanent seeding operations to protect and to accommodate any
temporary seeding and soil and erosion control measures that may
already be in place during the work period.
ii. When seeding must take place out of season for permanent grass the
appropriate temporary seeding shall be done and the contractor shall be
responsible for permanent seeding as specified in season at no
additional cost to Owner.
iii. Contractor shall be responsible for turf maintenance through substantial
completion. Slopes must be at 90% coverage at substantial completion
review to be accepted. If not at 90% coverage, substantial completion
will be delayed until the following growing season.
B. Site Preparation and Installation:
L Ground Cover: All disturbed areas shall be dressed to a depth of five (5)
inches. The top two (2) inches shall be pulverized to provide a uniform
seedbed. Rake or harrow the site to establish a smooth and level final
grade. Soil particles should be no larger than marble size, and pea
gravel size is even better. Agricultural lime shall be applied at the rate of
95 lbs./1000 sq. ft. immediately before plowing. Grass seed shall be
applied at the rates outlined in Tables 1 and 2.
Project No: SW 5002 16000-3 Hillsdale Forest Sewer Extension Project
ii. 5-10-10 fertilizer shall be applied to all disturbed areas at a rate of
21 lbs./1000 sq. ft. Mulching shall consist of small grain straw applied at
a rate of 70 lbs./1000 sq. ft. Mulched areas shall be tacked with asphalt
or other approved method sufficient to hold the straw in place, at a rate
of 150 to 200 gallons per ton of straw.
iii. If active construction ceases in any area for more than thirty (30) days,
all disturbed areas must be seeded, mulched, fertilized and tacked at no
additional cost to the Owner.
iv. Some areas may require temporary seeding due to an interruption of
work exceeding thirty (30) days or seasonal restrictions as specified in
the permanent seeding schedule, or a combination thereof. These
areas shall be reseeded in accordance with the permanent seeding
schedule. If temporary seeding is required due to Contractor delays,
there will be no compensation for the temporary seeding. Temporary
seeding shall be performed only at the direction of the Engineer or
Inspector.
v. When seeding must take place out of season for permanent grass the
appropriate temporary seeding shall be done and the contractor shall be
responsible for permanent seeding as specified in season at no
additional cost to Owner.
C. Cleanup and Inspection:
Upon completion of work, the Contractor shall remove from the site all
equipment and other articles used. All excess soil, stone, and debris
shall be removed and legally disposed of at no additional cost to the
Owner. All work areas shall be left in a clean and neat condition. All
damage to existing construction caused by landscaping operations shall
be repaired to the satisfaction of the Town at the Contractor's expense.
ii. Seeded areas shall be protected and replanted as necessary to
establish a uniform stand of specified grass. Scattered bare spots, none
of which shall be larger that one (1) square foot, will be allowed up to a
maximum of 3% of the seeded area for each property. When seeded
areas are ready for inspection, the maintained turf areas shall be neatly
mowed to the uniform height of approximately two and one-half (2.5)
inches. The lawns shall be considered established only when the
specified grass is vigorous and growing well in addition to meeting the
other requirements specified.
iii. An inspection of the completed seeding shall be made at the conclusion
of the landscape work upon written notice requesting such inspection
Project No: SW 5002 16000-4 Hillsdale Forest Sewer Extension Project
submitted by the Contractor to the Engineer, at least ten (10) days prior
to the anticipated date of inspection.
iv. A final inspection shall be performed when a satisfactory stand of
seeded turf grass has been produced, upon written notice requesting
such inspection submitted by the Contractor to the Engineer, at least ten
(10) days prior to the anticipated date of inspection. If a satisfactory
stand of turf has not been produced at the time of final inspection,
necessary repairs shall be performed in conformance with the
requirements of this section. Upon completion of these repairs, the
seeded grass shall be reinspected upon written notice as above.
D. Basis of Payment:
Payment for establishing permanent and temporary ground cover shall
be the actual amount of seeding installed and will be paid for at the unit
price bid per acre or square yard as indicated on the Itemized Proposal
in the contract documents for "Seeding and Mulching" and/or
"Temporary Seeding and Mulching." These prices shall be full
compensation for all work covered by this section including but not
limited to furnishing all permanent and temporary seeding, mulching,
fertilizing, tacking, site preparation, cleanup, maintenance, and warranty
of work as specified.
ii. Distribution of Billing and Payments for "Seeding and Mulching" and/or
"Temporary Seeding and Mulching" shall be made as follows:
a) Fifty percent (50%) of the total quantity of the seeding and mulching
items on the Itemized Proposal on the first partial payment estimate
after which the initial seeding has been completed and accepted.
b) Twenty-five percent (25%) of the total quantity of the seeding and
mulching items on the Itemized Proposal on the first partial payment
estimate made after which the initial establishment of grass and any
required reseeding is complete.
c) Twenty-five percent (25%) of the total quantity of the seeding and
mulching items on the Itemized Proposal on the first partial payment
after the final establishment of grass and the project is one hundred
percent (100%) complete.
Project No: SW 5002 16000-5 Hillsdale Forest Sewer Extension Project
i
TABLE 1
SHOULDERS, SIDE DITCHES, SLOPES
For Slopes Between 2:1 and 3:1
Date Type Planting Rate
Mar 1 - June 1 Sericea Lespedeza (scarified) 50 lbs./acre
and
Mar 1 - Apr 15 Add Tall Fescue 120 lbs./acre
or
Mar 1 - June 30 Add Weeping Lovegrass 10 lbs./acre
or
Mar 1 - June 30 Add Hulled Common Bermuda grass 25 lbs./acre
***Tall Fescue and 120 lbs./acre
June 1 - Sept 1 ***Browntop Millet or 35 lbs./acre
***Sor hum-Sudan Hybrids 30 lbs./acre
Sept 1 - Mar 1 Sericea Lespedeza (unhulled/unscarified) 70 lbs./acre
and Tall Fescue 120 lbs./acre
Nov 1 - Mar 1 Add Abruzzi Rye 25 lbs./acre
TABLE 2
SHOULDERS, SIDE DITCHES, SLOPES
For Slopes 3:1 and Flatter
Date Type Planting Rate
Au 15 - Nov 1 Tall Fescue 300 lbs./acre
Nov 1 -Mar 1 Tall Fescue and Abruzzi Rye 300 lbs./acre
Mar 1 - Apr 15 Tall Fescue 300 lbs./acre
Apr 15 - June 30 Hulled Common Bermuda grass 25 lbs./acre
July 15 - Aug 15 Tall Fescue and ***Browntop Millet
or ***Sorg hum-Sudan Hybrids 35 lbs./acre
Notes:
Consult Stormwater Management Engineer or Natural Resources Conservation
Service (NRCS) for additional information concerning other alternatives for vegetation
of denuded areas. The above vegetation rates are those, which do well under local
conditions; other seeding rate combinations may be possible but must be approved by
the Engineer.
***Temporary - Reseed according to optimum season for desired permanent
vegetation. Do not allow temporary cover to grow over 12 inches in height before
mowing to keep fescue from being shaded out.
Project No: SW 5002 16000-6 Hillsdale Forest Sewer Extension Project
PART 4 - PERMANENT LAWN SEEDING MEASURES
A. General
The following information shall be applicable for all permanent lawn
seeding. Permanent lawn seeding shall take place within all developed
areas of disturbance including residential and commercial areas and
shall be replaced in kind of existing material by the Contractor. An
approved turf type tall fescue blend shall be used per the Contract
Documents. Kentucky 31 is not an acceptable blend.
ii. When seeding must take place out of season for permanent grass the
appropriate temporary seeding shall be done and the contractor shall be
responsible for permanent seeding as specified in season at no
additional cost to Owner.
iii. Contractor shall be responsible for lawn maintenance through
substantial completion. Lawns must be at 90% coverage at substantial
completion review to be accepted. If not at 90% coverage, substantial
completion will be delayed until the following growing season.
B. Site Preparation:
Remove or kill any undesirable existing turf or vegetation. Herbicide
spraying or other chemical treatment shall be approved by the Engineer
prior to being used by the contractor. If preexisting turf or other
vegetation is mixed with the soil to be reused, the contractor shall use
best judgement in removing it or incorporating it into the soil during
preparation.
ii. If topsoil was not used to reestablish the upper soil layer and the upper
soil is heavy with high clay content, spread 1.5-2 inches of aged ground
pine bark or bagged organic humus over the area to be repaired.
iii. For all grasses except centipedegrass, apply per 1,000 square feet:
75 pounds of ground limestone and one of the following fertilizers:
40 pounds of 5-10-10; 20 pounds of 10-20-20; or 20 pounds of 8-8-8
or 10-10-10 in combination with 4 pounds of 0-46-0. Centipedegrass
prefers acidic soils and low levels of phosphorus and may not require the
addition of lime and phosphorus.
Project No: SW 5002 16000-7 Hillsdale Forest Sewer Extension Project
iv. Incorporate lime and fertilizer (and pine bark if added) into the top 6
inches of the soil using a rototiller or by hand. Rototill or hand cultivate
to well incorporate the amendments and get a uniform loosely textured
soil of minimum 6-inch depth.
v. Rake or harrow the site to establish a smooth and level final grade. Soil
particles should be no larger than marble size, and pea gravel size is
even better. Hand raking to level the soil and work out hills and hollows.
For areas larger than 100 sq. ft. allow rain or irrigate to settle the soil. In
some situations, the Engineer may require rolling or cultipacking to firm
the soil before seeding. Hand rake again to break up the crusty surface
before seeding or planting.
C. Installation:
L General:
a) Seed or plant the required grass according to Table 3.
b) The choice of turfgrass type, variety and propagation form shall be
specified in the Contract Documents, as specified in the Itemized
Proposal, or as designated by the Engineer.
c) Seed shall be tagged certified seed. Germination shall be a
minimum of 95%. Seed shall be 98% pure with less than 2% other-
crop seed or debris. Seed shall be free of noxious weed seed.
d) Sod, sprigs, plugs of
shall be certified free
health and vigor, free
adverse temperature,
that are older than
condition.
e) The Contractor shall maintain
or other seeding installation
property and shall notify the
progress.
other vegetative plant propagation materials
of noxious weeds. Materials shall be in good
of disease or pests, or damage from dryness,
herbicides, fertilizer or other chemicals. Sprigs
48 hours are not acceptable regardless of
ii. Seeding:
a log of dates that sod, sprigs, plugs,
was completed for each individual
Engineer or Inspector of each day's
a) Sow the seed on freshly prepared soil. Ensure uniform coverage by
using a centrifugal (rotary) or drop-type spreader. Areas larger than
100 sq. ft. shall be seeded with a minimum of two passes at the
appropriate partial rate for each pass. For areas averaging greater
Project No: SW 5002 16000-8 Hillsdale Forest Sewer Extension Project
15 ft. width, apply half the seed in one direction and the other half at
right angles to the first direction.
b) Apply a starter-type fertilizer to the soil surface for example, 10
pounds of 5-10-10 or 5 pounds of 10-20-20 per 1,000 square feet at
the time of seeding.
c) Lightly cover the seed by hand raking or dragging with a mat or
chain-link fence. Roll or tamp the soil lightly to firm the surface and
provide good seed-to-soil contact.
d) Mulch grass seed with weed-free small grain straw or hay. Use one
bale per 1,000 square feet for warm-season grasses and 1 to 2 bales
for cool-season grasses. Stabilize small areas of mulch by rolling,
watering or tacking with asphalt tacking spray. Twine netting can be
used if wind displacement is a problem. If applied evenly and lightly,
these materials need not be removed. Larger areas shall be
stabilized by asphalt tacking spray or twine netting.
ii. Sprigging or Broadcasting:
a) Sprigging is the preferred method of installing bermudagrass in larger
areas. For smaller areas of bermudagrass, sprigging and plugging
are both good options. The less expensive is preferred. In some
cases sod may be less expensive or necessary due to
circumstances.
b) Broadcasting sprigs uniformly over the entire area. Bermudagrass or
zoysiagrass sprigs shall be broadcast at a minimum rate of 5 bushels
(yards) of sprigs per 1,000 square feet. Up to 10 bushels (yards)
may be used where very fast cover is desired. Press the sprigs into
the top Y2 to 1 inch of soil by hand, and then by using an old disk, set
straight. In the case of very large areas use a sprigging machine,
cultipacker, or roller. (Note - St. Augustinegrass is seldom
established through broadcasting because the stems are too
sensitive.)
iii. Plugging:
a) Plugging is the preferred method of installing zoysia and St.
Augustine except where sprigging or sod is less expensive or
necessary due to circumstances.
b) Plugs shall consist of individual pieces of sod that are 2 inches or
larger. The plugs shall be planted at grade on 8 inch centers.
Project No: SW 5002 16000-9 Hillsdale Forest Sewer Extension Project
iv. Soddinq:
a) Lay sod as soon as possible after it has been harvested to prevent
injury. Sod should be installed within 24 hours of delivery. While
installing, take action as necessary to prevent heat buildup within the
unlaid sod. Plan to unstack and unroll the sod if it cannot be laid
within 48 hours. Soil should be moist (but not overly wet) before
laying sod. Irrigating the soil several days before delivery is often
adequate.
b) Start sodding from a straight edge (driveway or sidewalk) and butt
strips together, staggering them in a brick-like pattern. Avoid
stretching sod. Use a knife or sharp spade for trimming to fit
irregularly shaped areas. Lay sod lengthwise across the face of
slopes and peg or stake the pieces to prevent slippage. After the sod
has been placed, roll the lawn to ensure good sod-to-soil contact.
c) Water sod immediately after installation. Soak sod thoroughly
enough to penetrate soil below the newly installed sod to a minimum
depth of two (2) inches. Contractor is responsible for insuring
adequacy of water supply. The Contractor shall provided any
necessary temporary means to properly water sod, including
temporary pumps and sprinklers. Proper irrigation shall be required
by the contractor until the project has been inspected and is accepted
by the Town of Cary. (The Contractor shall be required to obtain all
applicable watering permits from the Town of Cary prior to beginning
watering activities.)
d) In some cases sod can be laid in space planting "semi-checkerboard"
fashion in order to lower costs. This method is described here
assuming that the sod is cut into the standard 18 in. x 24 in. size.
The first piece of sod is laid with the narrow side flush to a straight
edge. This will start a row that is 24 in. wide. The next piece of sod
is laid likewise but it is spaced 9 in. away and parallel to the first
piece along the longer side. This is continued to make the first row.
The next row is laid flush with the previous and in the same fashion
except it laid offset by 9 inches, i.e. laid beginning at the centerline of
the first piece of sod in the previous row. Subsequent rows are laid in
this alternating pattern.
D. Cleanup and Inspection:
i. Upon completion of work, the Contractor shall remove from the site all
equipment and other articles used. All excess soil, stone, and debris
shall be removed and legally disposed of at no additional cost to the
Owner. All work areas shall be left in a clean and neat condition. All
Project No: SW 5002 16000-10 Hillsdale Forest Sewer Extension Project
damage to existing construction caused by landscaping operations shall
be repaired to the satisfaction of the Town at the Contractor's expense.
ii. Seeded areas shall be protected and replanted as necessary to
establish a uniform stand of specified grass. Scattered bare spots, none
of which shall be larger that one (1) square foot, will be allowed up to a
maximum of 3% of the seeded area for each property. When seeded
areas are ready for inspection, the maintained turf areas shall be neatly
mowed to the uniform height of approximately two and one-half (2.5)
inches. The lawns shall be considered established only when the
specified grass is vigorous and growing well in addition to meeting the
other requirements specified.
iii. An inspection of the completed seeding shall be made at the conclusion
of the landscape work upon written notice requesting such inspection
submitted by the Contractor to the Engineer, at least ten (10) days prior
to the anticipated date of inspection.
iv. A final inspection shall be performed when a satisfactory stand of
seeded turf grass has been produced, upon written notice requesting
such inspection submitted by the Contractor to the Engineer, at least ten
(10) days prior to the anticipated date of inspection. If a satisfactory
stand of turf has not been produced at the time of final inspection,
necessary repairs shall be performed in conformance with the
requirements of this section. Upon completion of these repairs, the
seeded grass shall be reinspected upon written notice as above.
E. Basis of Payment:
Payment for establishing permanent lawn ground cover shall be the
actual amount of seeding installed and will be paid for at the unit price
bid per acre or square yard as indicated on the Itemized Proposal in the
contract documents for "Permanent Lawn Seeding and Mulching." This
price shall be full compensation for all work covered by this section
including but not limited to furnishing all permanent and temporary
seeding, mulching, fertilizing, tacking, watering, site preparation,
cleanup, maintenance, and warranty of work as specified.
ii. Distribution of Billing and Payments for "Permanent Lawn Seeding and
Mulching" shall be made as follows:
a) Fifty percent (50%) of the total quantity of the seeding and mulching
items on the Itemized Proposal on the first partial payment estimate
after which the initial seeding has been completed and accepted.
Project No: SW 5002 16000-11 Hillsdale Forest Sewer Extension Project
b) Twenty-five percent (25%) of the total quantity of the seeding and
mulching items on the Itemized Proposal on the first partial payment
estimate made after which the initial establishment of grass and any
required reseeding is complete.
c) Twenty-five percent (25%) of the total quantity of the seeding and
mulching items on the Itemized Proposal on the first partial payment
after the final establishment of grass and the project is one hundred
percent (100%) complete.
TABLE 3
LAWN SEEDING
Cool- and Warm-Season Grasses
Typical Planting Rate/1,000 sq. ft.
Lawn Grass Planting Dates' Seeds2 Spaces
Planting Sprigging4
Tall fescue March 1 to Oct. 15
(Aug. 15 to Oct. 1
optimum)
6
-
-
Tall fescue/annual (winter) rye Oct. 15 to March 1 6 fescue
1 rye
Berm udagrass(seed) Apr. 1 to Aug. 15 1 to 2 - -
Bermudagrass (vegetative) Apr. 15 to Aug. 30 - 5 4 5
Centipedegrass March to July 0.25 to 0.50 5 4 -
o sia rass Aril to Jul - 5 5
St. Au ustine rass Apr. to Jul - 5 -
Notes:
1 Sod consisting of cool-season grasses can be installed anytime the ground is not
frozen. Sod consisting of warm- season grasses can be installed as long as soil
temperature exceeds 55° F. (typically April 15 to Oct. 1)
2 Pounds of seed per 1,000 sq. ft.
4 Square yards of turf cut into 2-inch centers to plant 1,000 sq. ft.
4 Bushels of sprigs per 1,000 sq. ft. (1 sq. yd. of turf pulled apart is equivalent to 1
bushel of sprigs.)
PART 5 - MATTING FOR EROSION CONTROL
A. Matting for erosion control shall be jute matting or excelsior matting. Matting
for erosion control shall not be dyed, bleached, or otherwise treated in a
manner that will result in toxicity to vegetation.
Project No: SW 5002 16000-12 Hillsdale Forest Sewer Extension Project
B. Jute Matting: Jute matting shall be of a uniform open plain weave of single
jute yarn, forty-eight (48) inches in width, plus or minus one (1) inch. The
yarn shall be of a loosely twisted construction and shall not vary in thickness
by more than one-half its normal diameter. There shall be 78 warp ends,
plus or minus 2, per linear yard; and the weight shall average 1.22 pounds
per linear yard of the matting with a tolerance of plus or minus 5 percent.
C. Excelsior Matting: Excelsior matting shall consist of a machine-produced
mat of curled wood excelsior at least 47 inches in width. The mat shall
weigh 0.975 pounds per square yard with a tolerance of plus or minus 10
percent. At least 80% of the individual excelsior fibers shall be 6 inches or
more in length. The excelsior fibers shall be evenly distributed over the
entire area of the blanket. One side of the excelsior matting shall be
covered with a woven fabric of twisted paper cord or cotton cord, or with an
extruded plastic mesh. The mesh size for either the fabric or plastic mesh
shall be a minimum of 1" x 1" and a maximum of 1-1/2" x 3".
D. Wire Staples: Staples shall be machine-made of No. 11 gage new steel wire
formed into a "U" shape. The size when formed shall be not less than
6 inches in length with a throat of not less than 1 inch in width.
E. Basis of Payment: Payment for erosion control matting shall be based on
the actual quantity of matting in square yards installed in accordance with
the project Contract Documents and per unit price indicated on the Itemized
Proposal for "Erosion Matting."
PART 6 - RIPRAP DISSIPATION PADS
A. After construction is complete, all points of stormwater release shall be
protected by riprap dissipation pads.
B. Stone for plain riprap shall consist of field stone or rough unhewn quarry
stone. The stone shall be sound, tough, dense, resistant to the action of air
and water, and suitable in all other respects for the purpose intended.
Stone shall vary in weight from 5 to 200 pounds. At least 30 percent of the
total weight of the riprap shall be in individual pieces weighing a minimum of
60 pounds each. Not more than 10 percent of the total weight of the riprap
may be in individual pieces weighing less than 15 pounds each.
C. Unless otherwise directed by the Engineer, the stone shall be placed on a
flat slope or as indicated on the plans. The stone shall be graded so that
the smaller stones are uniformly distributed throughout the mass.
Project No: SW 5002 16000-13 Hillsdale Forest Sewer Extension Project
D. The Contractor may place the stone by mechanical methods, augmented by
hand-placing where necessary, provided that when the riprap is completed it
forms a properly graded, dense, neat layer of stone.
E. The completed riprap shall be at least the thickness indicated on the plans,
with the top of the riprap pad flush with the surrounding finished grade.
F. Geotextile fabric consisting of Mirafi 140N or equivalent shall be installed
under all riprap unless otherwise noted. No direct payment shall be made
for geotextile fabric. The price for geotextile fabric used under riprap shall
be included in the unit price bid for "Riprap."
G. Basis of Payment: Payment for riprap shall be based on the actual quantity
of riprap in tons provided and per the unit price for the appropriate class as
indicated on the Itemized Proposal in the Contract Documents for "Riprap."
The unit prices and payments for "Riprap" will be full compensation for all
work covered by this section including, but not limited to, all excavation,
embankment preparation, backfilling, and furnishing and placing riprap and
other materials.
PART 6-LEVEL SPREADERS
A. Level spreaders shall be constructed in accordance with the most current
Town of Cary, NCDOT, and NCDENR standards.
B. Basis of Payment: Payment for "Level Spreader" shall be made under the
contract unit price bid per linear foot for the type of level spreader as
indicated on the plans and in the Itemized Proposal. The unit prices and
payments shall be full compensation for all labor, equipment, and materials
necessary to properly install and maintain the level spreader in accordance
with the Contract Documents and shall also include any necessary clearing
and grubbing, grading, seeding and mulching and other incidentals to
satisfactorily install level spreaders.
END SECTION 16000
Project No: SW 5002 16000-14 Hillsdale Forest Sewer Extension Project
? f
Office Use Only' Form Version May 2002
USACE Action ID No. DWQ No. DS 06r)8
(if any particular item is not appacame to tors project, please enter tvut t1PPn.;uuic Vl 1??L1 •?
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NW-12
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ? If applicable.
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division f?o, t t Area of
Environmental Concern (see the top of page 2 for further d 2 O
II. Applicant Information
JUN 2 0 2005
1. Owner/Applicant Information Yrtt 4?i,- WATER 'b9TCMMTER?aRRXH
Name: Town of Cary
Mailing Address: P.O. Box 8005
Cary NC 27512-8005
Telephone Number: 919-469-4335 Fax Number: 919-388-5806
E-mail Address: jarrod buchananPa townofcaryorg
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Fax Number:
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided. See Attached -
"Vicinity Map", "Site Plan", and "Soils Map"
1. Name of project: Hillsdale Forest Sewer Extension Project
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): 0773014239
4. Location
County: Wake Nearest Town: Cary
Subdivision name (include phase/lot number): Hillsdale Forest, Lot 10, Block F. Section 5
Directions to site (include road numbers, landmarks, etc.): From Walnut Street (SR ), turn
Southwest onto Kingston Ridge Road (SR) for 2,500-feet. Turn right onto Imperial Road
and follow it to the end. The interceptor will pass to the left of 1101 Imperial Road.
5. Site coordinates, if available (UTM or Lat/Long): See attached sheet A-1.
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 2.50
7. Nearest body of water (stream/river/sound/ocean/lake): UT to Lynn Branch
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Residential subdivision. Town of Cary greenway at rear of
property. Yard contains sparsely populated trees of varying type. Semi-established ground
vegetation.
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used: Sanitary
sewer main installation 3,332-feet in length The last three sections of the sewer main will be
installed along the property line between 1101 and 1103 Imperial Road with the remainder
being installed in the roadway. The last section of the sewer main will be installed under two
small streams that run parallel to each other and are located approximately 50-feet apart,
where the Proposed crossings occur. An independent contractor will install the sewer main
using a variety of equipment including a track-hoe back-hoe, end loader, skid-steer, dump-
truck and compactor.
11. Explain the purpose of the proposed work: Provide sanitary sewer service to the residents
of the Hillsdale Forest Subdivision along Imperial Road Savannah Circle, and Kingston
Ridge Road
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 7 of 12
1. Provide a written description of the proposed impacts: Crossing two streams with an 8-inch
Ductile Iron Pipe sewer main. The sewer main will be installed perpendicular to the two
streams. An illustration of the crossings is included on Attachment A-2 Also disturbance to
Riparian buffers as defined in section X of this document and delineated on attached map Also
wetland impacts as listed in Section VI Part 2 below.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
es/no Distance to
Nearest Stream
linear feet
Type of Wetland***
1 Excavation 0.08 NO 0 Modified Forested
Woodland
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: 0
Total area of wetland impact proposed: 0
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
linear feet
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
1 Excavation 20 UT to Lynn Branch 20 Perennial
2 Excavation 20 UT to Lynn Branch 12 Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozonc.com,
www.maonucst.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 40
Page 8 of 12
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: N/A
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
* List each impact separately and identify temporary impacts. Impacts include, but are not lttmted to: till, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The Town of Cary is installing; a sanitary sewer main to improve the public health of the
residents in the Hillsdale Forest Subdivision Many of these residents have failing septic systems
that require a high level of maintenance to keep them from releasing raw sewage. The trench in
which the sewer main will be placed will be as narrow as possible Also silt fence will be
placed on the up and downhill sides of the construction corridor and rock check dams will be
installed to keep the transportation of solids to a minimum The crossing installation will be
done during low-flow periods to cause the least impact
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 9 of 12
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/iicwetlands/strmgide.litml.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.litm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information: Request letter submitted to NCEEP on 4/11/2005, copy attached.
Will forward reply upon receipt. Mitigation not required as considered allowable
under NC0233.
Amount of stream mitigation requested (linear feet): 0
Amount of buffer mitigation requested (square feet): 0, See Sheet 11, Section X
Amount of Riparian wetland mitigation requested (acres): 0
Amount of Non-riparian wetland mitigation requested (acres): 0
Amount of Coastal wetland mitigation requested (acres): 0
Page 10 of 12
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ? No
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ? N/A
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ® No ? If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers. See Attached "RIPARIAN BUFFERS ZONE 1 & ZONE 2 MAP"
Zone* Impact
(square feet Multiplier Required
Mitigation
1 1,916 3 5,748 sf
2 426 1.5 639 sf
Total 2,342 6,387 sf
Zone 1 extends out 30 fcct perpendicular from near bank of channel; Zone 2 extcnds an
additional 20 feet from the edge of Zone 1.
Page 11 of 12
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 213.0242 or.0260.
Bufer mitigation not required as considered allowable use per NC0233
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
No new impervious acreage is proposed There are 7,850 square feet or 0 18 acres of impervious
area at present which includes the home and driveway. Silt fence will be installed along both
sides of the construction corridor. Rock check dams will be installed along the downstream edge
of the construction corridor.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
This waste water will flow to the South Carv WWTP The Plant rated at 12.8 mgd with over 5
mgd of excess capacity, has more than enough excess capacity to cover the additional 12,320
gallons per day proposed under this project The Plant discharges into Middle Creek and uses
the following processes to treat the influent flow: bar screens grit removal facilities three
aeration basins, four secondary clarifiers seven deep-bed tertiary filters ultraviolet disinfection
and a cascade aerator for reaeration prior to discharge
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
The Town of CM is installing this project at its earliest convenience for two reasons First
several of the properties have failing septic systems which are an environmental concernSecond. several of the properties have shallow water wells with poor quality water
w
6 PE 2 OOS
Applicant/Agent's Signature ate
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
Attachment A-3
SECTION 16000
SOIL EROSION AND SEDIMENTATION CONTROL
(Revised 1-9-02)
PART 1 - GENERAL
A. Temporary and permanent erosion control measures shall be provided for
all land disturbing activities in accordance with the Contract Documents
and/or an erosion control plan approved by the North Carolina Department
of Environment and Natural Resources (NCDENR). Temporary measures
shall be installed by the Contractor, then inspected by the Inspector and the
NCDENR for compliance prior to any land disturbing activity. The inspection
and approval process shall be required on each phase of construction. All
permanent erosion control measures shall be incorporated into the work at
the earliest practical time. All temporary measures shall be maintained until
the permanent measures have taken effect. Temporary and permanent
measures shall be coordinated to provide effective and continuous erosion
control throughout the construction and post-construction period to minimize
siltation of streams, lakes, reservoirs, and other impoundments, ground
surfaces, and other property. These measures shall remain in effect until
final approval for removal is given by the Inspector and/or the NCDENR at
which time the Contractor shall remove all temporary erosion control
measures at no additional cost to the Owner.
B. The Contractor shall be familiar with the applicable provisions of the
Sedimentation Pollution Control Act of 1973, General Statutes,
Chapter 113A, Article 4. The Contractor shall be responsible for
incorporating conservation procedures necessary to comply with this act in
minimizing erosion and sediment pollution associated with the construction
of this project as directed by the Engineer.
C. The Contractor shall be financially responsible for any and all fines that
result from the Contractor's failure to install and/or maintain erosion control
measures in accordance with the Contract Documents.
D. The Contractor shall check all erosion and sediment control measures for
stability and operation following each rainfall event, and no less than once
per week. The Contractor shall make any needed repairs immediately to
maintain all control measures as designed.
E. The Contractor shall clean out all sediment trapping devices when the
device reaches 50% trap capacity and shall dispose of the sediment by
spreading on the site in a protected area or by hauling away if not suitable
for fill at no additional cost to the Owner.
PART 2 - TEMPORARY MEASURES
A. Temporary Silt Fence shall be installed around inlets, at the toe of all fill
slopes, and any other necessary locations as shown on the plans and as
directed by the Engineer. Silt fence shall be erected in accordance with the
Town of Cary Standard Specifications and Details.
B. Inlet Protection shall be installed around inlets and any other necessary
locations as shown on the plans and as directed by the Engineer. Inlet
protection shall be erected in accordance with the Town of Cary Standard
Specifications and Details.
C. Diversion Ditches shall be installed at the top of cut and fill slopes and any
other necessary locations as shown on the plans and as directed by the
Engineer. Diversion ditches shall be installed in accordance with the Town
of Cary Standard Specifications and Details.
D. Tree Protection Fence shall be installed around the drip line of trees in the
construction work area as shown on the plans and as directed by the
Engineer. The tree protection fence shall be installed in such a manner that
it prevents all construction activities from encroaching into the area inside
the drip line of the tree. The material and installation specifications for the
tree protection fence shall be approved for use by the Engineer prior to
installation.
E. Construction Entrances shall be installed at all points of access to the
construction site. Any access point, which does not have a construction
entrance, shall be barricaded to prevent its use. Construction entrances
shall be installed in accordance with the Town of Cary Standard
Specifications and Details. Construction entrances shall be included in the
unit bid price for "Mobilization."
F. Sediment and Filter Basins shall be installed at all points where
accumulated runoff is released to natural drainage channels as shown on
the plans and as directed by the Engineer. Sediment pits and filter basins
shall be sized to hold 1800 cubic feet of sediment for every acre of denuded
area tributary to the structure. Sediment and filter basins shall be installed
in accordance with the Town of Cary Standard Specifications and Details.
G. Catch Basin Risers/Filters shall be installed at proposed catch basin
locations or at other necessary locations as shown on the plans and as
directed by the Engineer. Catch basin risers/filters shall be erected in
accordance with the Town of Cary Standard Specifications and Details.
Project No: SW 5002 16000-2 Hillsdale Forest Sewer Extension Project
H. Check Dams shall be installed in ditches any and at other necessary
locations as shown on the plans and as directed by the Engineer. Check
dams shall be erected in accordance with the Town of Cary Standard
Specifications and Details.
Basis of Payment: Payment for temporary erosion control measures shall be
at the contract unit price for each item as indicated on the Itemized Proposal
in the contract documents. These prices will be full compensation for all
work covered by this section including but not limited to the labor,
equipment, and materials for furnishing and installing ail temporary erosion
control measures indicated on the plans, and maintenance of the work
throughout the life of the project as required by the Inspector.
PART 3 - TEMPORARY AND PERMANENT NON LAWN SEEDING MEASURES
A. General:
L After construction is complete in any area or phase of the project, the
disturbed areas shall receive a permanent ground cover. Seeding and
mulching shall be performed immediately behind construction. The
Contractor shall provide permanent seeding in all disturbed areas as
indicated in the Contract Documents. The Contractor shall adapt
permanent seeding operations to protect and to accommodate any
temporary seeding and soil and erosion control measures that may
already be in place during the work period.
When seeding must take place out of season for permanent grass the
appropriate temporary seeding shall be done and the contractor shall be
responsible for permanent seeding as specified in season at no
additional cost to Owner.
iii. Contractor shall be responsible for turf maintenance through substantial
completion. Slopes must be at 90% coverage at substantial completion
review to be accepted. If not at 90% coverage, substantial completion
will be delayed until the following growing season.
B. Site Preparation and Installation:
L Ground Cover: All disturbed areas shall be dressed to a depth of five (5)
inches. The top two (2) inches shall be pulverized to provide a uniform
seedbed. Rake or harrow the site to establish a smooth and level final
grade. Soil particles should be no larger than marble size, and pea
gravel size is even better. Agricultural lime shall be applied at the rate of
95 lbs./1000 sq. ft. immediately before plowing. Grass seed shall be
applied at the rates outlined in Tables 1 and 2.
Project No: SW 5002 16000-3 Hillsdale Forest Sewer Extension PI oject
ii. 5-10-10 fertilizer shall be applied to all disturbed areas at a rate of
21 lbs./1000 sq. ft. Mulching shall consist of small grain straw applied at
a rate of 70 lbs./1000 sq. ft. Mulched areas shall be tacked with asphalt
or other approved method sufficient to hold the straw in place, at a rate
of 150 to 200 gallons per ton of straw.
iii. If active construction ceases in any area for more than thirty (30) days,
all disturbed areas must be seeded, mulched, fertilized and tacked at no
additional cost to the Owner.
iv. Some areas may require temporary seeding due to an interruption of
work exceeding thirty (30) days or seasonal restrictions as specified in
the permanent seeding schedule, or a combination thereof. These
areas shall be reseeded in accordance with the permanent seeding
schedule. If temporary seeding is required due to Contractor delays,
there will be no compensation for the temporary seeding. Temporary
seeding shall be performed only at the direction of the Engineer or
Inspector.
v. When seeding must take place out of season for permanent grass the
appropriate temporary seeding shall be done and the contractor shall be
responsible for permanent seeding as specified in season at no
additional cost to Owner.
C. Cleanup and Inspection:
L Upon completion of work, the Contractor shall remove from the site all
equipment and other articles used. All excess soil, stone, and debris
shall be removed and legally disposed of at no additional cost to the
Owner. All work areas shall be left in a clean and neat condition. All
damage to existing construction caused by landscaping operations shall
be repaired to the satisfaction of the Town at the Contractor's expense.
Seeded areas shall be protected and replanted as necessary to
establish a uniform stand of specified grass. Scattered bare spots, none
of which shall be larger that one (1) square foot, will be allowed up to a
maximum of 3% of the seeded area for each property. When seeded
areas are ready for inspection, the maintained turf areas shall be neatly
mowed to the uniform height of approximately two and one-half (2.5)
inches. The lawns shall be considered established only when the
specified grass is vigorous and growing well in addition to meeting the
other requirements specified.
iii. An inspection of the completed seeding shall be made at the conclusion
of the landscape work upon written notice requesting such inspection
Project No: SW 5002 16000-4 Hillsdale Forest Sewer Extension Project
submitted by the Contractor to the Engineer, at least ten (10) days prior
to the anticipated date of inspection.
iv. A final inspection shall be performed when a satisfactory stand of
seeded turf grass has been produced, upon written notice requesting
such inspection submitted by the Contractor to the Engineer, at least ten
(10) days prior to the anticipated date of inspection. If a satisfactory
stand of turf has not been produced at the time of final inspection,
necessary repairs shall be performed in conformance with the
requirements of this section. Upon completion of these repairs, the
seeded grass shall be reinspected upon written notice as above.
D. Basis of Payment:
L Payment for establishing permanent and temporary ground cover shall
be the actual amount of seeding installed and will be paid for at the unit
price bid per acre or square yard as indicated on the Itemized Proposal
in the contract documents for "Seeding and Mulching" and/or
"Temporary Seeding and Mulching." These prices shall be full
compensation for all work covered by this section including but not
limited to furnishing all permanent and temporary seeding, mulching,
fertilizing, tacking, site preparation, cleanup, maintenance, and warranty
of work as specified.
ii. Distribution of Billing and Payments for "Seeding and Mulching" and/or
"Temporary Seeding and Mulching" shall be made as follows:
a) Fifty percent (50%) of the total quantity of the seeding and mulching
items on the Itemized Proposal on the first partial payment estimate
after which the initial seeding has been completed and accepted.
b) Twenty-five percent (25%) of the total quantity of the seeding and
mulching items on the Itemized Proposal on the first partial payment
estimate made after which the initial establishment of grass and any
required reseeding is complete.
c) Twenty-five percent (25%) of the total quantity of the seeding and
mulching items on the Itemized Proposal on the first partial payment
after the final establishment of grass and the project is one hundred
percent (100%) complete.
Project No: SW 5002 16000-5 Hillsdale Forest Sewer Extension Project
TABLE 1
SHOULDERS, SIDE DITCHES, SLOPES
For Slopes Between 2:1 and 3:1
Date Type Planting Rate
Mar 1 - June 1 Sericea Lespedeza (scarified) 50 lbs./acre
and
Mar 1 - Apr 15 Add Tall Fescue 120 lbs./acre
or
Mar 1 - June 30 Add Weeping Lovegrass 10 lbs./acre
or
Mar 1 - June 30 Add Hulled Common Bermuda grass 25 lbs./acre
***Tall Fescue and 120 lbs./acre
June 1 - Sept 1 ***Browntop Millet or 35 lbs./acre
***Sorg hum-Sudan Hybrids 30 lbs./acre
Sept 1 - Mar 1 Sericea Lespedeza (unhulled/unscarified) 70 lbs./acre
and Tall Fescue 120 lbs./acre
Nov 1 - Mar 1 Add Abruzzi Rye 25 lbs./acre
TABLE 2
SHOULDERS, SIDE DITCHES, SLOPES
For Slopes 3:1 and Flatter
Date Type Planting Rate
Au 15 - Nov 1 Tall Fescue 300 lbs./acre
Nov 1 - Mar 1 Tall Fescue and Abruzzi Rye 300 lbs./acre
Mar 1 - Apr 15 Tall Fescue 300 lbs./acre
Apr 15 - June 30 Hulled Common Bermuda grass 25 lbs./acre
July 15 - Aug 15 Tall Fescue and ***Browntop Millet
or ***Sorg hum-Sudan Hybrids 35 lbs./acre
Notes:
Consult Stormwater Management Engineer or Natural Resources Conservation
Service (NRCS) for additional information concerning other alternatives for vegetation
of denuded areas. The above vegetation rates are those, which do well under local
conditions; other seeding rate combinations may be possible but must be approved by
the Engineer.
***Temporary - Reseed according to optimum season for desired permanent
vegetation. Do not allow temporary cover to grow over 12 inches in height before
mowing to keep fescue from being shaded out.
Project No: SW 5002 16000-6 Hillsdale Forest Sewer Extension Project
PART 4 - PERMANENT LAWN SEEDING MEASURES
A. General
i. The following information shall be applicable for all permanent lawn
seeding. Permanent lawn seeding shall take place within all developed
areas of disturbance including residential and commercial areas and
shall be replaced in kind of existing material by the Contractor. An
approved turf type tall fescue blend shall be used per the Contract
Documents. Kentucky 31 is not an acceptable blend.
When seeding must take place out of season for permanent grass the
appropriate temporary seeding shall be done and the contractor shall be
responsible for permanent seeding as specified in season at no
additional cost to Owner.
iii. Contractor shall be responsible for lawn maintenance through
substantial completion. Lawns must be at 90% coverage at substantial
completion review to be accepted. If not at 90% coverage, substantial
completion will be delayed until the following growing season.
B. Site Preparation:
Remove or kill any undesirable existing turf or vegetation. Herbicide
spraying or other chemical treatment shall be approved by the Engineer
prior to being used by the contractor. If preexisting turf or other
vegetation is mixed with the soil to be reused, the contractor shall use
best judgement in removing it or incorporating it into the soil during
preparation.
ii. If topsoil was not used to reestablish the upper soil layer and the upper
soil is heavy with high clay content, spread 1.5-2 inches of aged ground
pine bark or bagged organic humus over the area to be repaired.
iii. For all grasses except centipedegrass, apply per 1,000 square feet:
75 pounds of ground limestone and one of the following fertilizers:
40 pounds of 5-10-10; 20 pounds of 10-20-20; or 20 pounds of 8-8-8
or 10-10-10 in combination with 4 pounds of 046-0. Centipedegrass
prefers acidic soils and low levels of phosphorus and may not require the
addition of lime and phosphorus.
Project No: SW 5002 16000-7 Hillsdale Forest Sewer Extension Project
iv. Incorporate lime and fertilizer (and pine bark if added) into the top 6
inches of the soil using a rototiller or by hand. Rototill or hand cultivate
to well incorporate the amendments and get a uniform loosely textured
soil of minimum 6-inch depth.
v. Rake or harrow the site to establish a smooth and level final grade. Soil
particles should be no larger than marble size, and pea gravel size is
even better. Hand raking to level the soil and work out hills and hollows.
For areas larger than 100 sq. ft. allow rain or irrigate to settle the soil. In
some situations, the Engineer may require rolling or cultipacking to firm
the soil before seeding. Hand rake again to break up the crusty surface
before seeding or planting.
C. Installation:
L General:
a) Seed or plant the required grass according to Table 3.
b) The choice of turfgrass type, variety and propagation form shall be
specified in the Contract Documents, as specified in the Itemized
Proposal, or as designated by the Engineer.
c) Seed shall be tagged certified seed. Germination shall be a
minimum of 95%. Seed shall be 98% pure with less than 2% other-
crop seed or debris. Seed shall be free of noxious weed seed.
d) Sod, sprigs, plugs o
shall be certified free
health and vigor, freE
adverse temperature,
that are older than
condition.
other vegetative plant propagation materials
of noxious weeds. Materials shall be in good
of disease or pests, or damage from dryness,
herbicides, fertilizer or other chemicals. Sprigs
48 hours are not acceptable regardless of
e) The Contractor shall maintain a log of dates that sod, sprigs, plugs,
or other seeding installation was completed for each individual
property and shall notify the Engineer or Inspector of each day's
progress.
ii. Seeding:
a) Sow the seed on freshly prepared soil. Ensure uniform coverage by
using a centrifugal (rotary) or drop-type spreader. Areas larger than
100 sq. ft. shall be seeded with a minimum of two passes at the
appropriate partial rate for each pass. For areas averaging greater
Project No: SW 5002 16000-8 Hillsdale Forest Sewer Extension Project
15 ft. width, apply half the seed in one direction and the other half at
right angles to the first direction.
b) Apply a starter-type fertilizer to the soil surface for example, 10
pounds of 5-10-10 or 5 pounds of 10-20-20 per 1,000 square feet at
the time of seeding.
c) Lightly cover the seed by hand raking or dragging with a mat or
chain-link fence. Roll or tamp the soil lightly to firm the surface and
provide good seed-to-soil contact.
d) Mulch grass seed with weed-free small grain straw or hay. Use one
bale per 1,000 square feet for warm-season grasses and 1 to 2 bales
for cool-season grasses. Stabilize small areas of mulch by rolling,
watering or tacking with asphalt tacking spray. Twine netting can be
used if wind displacement is a problem. If applied evenly and lightly,
these materials need not be removed. Larger areas shall be
stabilized by asphalt tacking spray or twine netting.
ii. Sprigging or Broadcasting:
a) Sprigging is the preferred method of installing bermudagrass in larger
areas. For smaller areas of bermudagrass, sprigging and plugging
are both good options. The less expensive is preferred. In some
cases sod may be less expensive or necessary due to
circumstances.
b) Broadcasting sprigs uniformly over the entire area. Bermudagrass or
zoysiagrass sprigs shall be broadcast at a minimum rate of 5 bushels
(yards) of sprigs per 1,000 square feet. Up to 10 bushels (yards)
may be used where very fast cover is desired. Press the sprigs into
the top Y2 to 1 inch of soil by hand, and then by using an old disk, set
straight. In the case of very large areas use a sprigging machine,
cultipacker, or roller. (Note - St. Augustinegrass is seldom
established through broadcasting because the stems are too
sensitive.)
iii. Plugging:
a) Plugging is the preferred method of installing zoysia and St.
Augustine except where sprigging or sod is less expensive or
necessary due to circumstances.
b) Plugs shall consist of individual pieces of sod that are 2 inches or
larger. The plugs shall be planted at grade on 8 inch centers.
Project No: SW 5002 16000-9 Hillsdale Forest Sewer Extension Project
iv. Sodding:
a) Lay sod as soon as possible after it has been harvested to prevent
injury. Sod should be installed within 24 hours of delivery. While
installing, take action as necessary to prevent heat buildup within the
unlaid sod. Plan to unstack and unroll the sod if it cannot be laid
within 48 hours. Soil should be moist (but not overly wet) before
laying sod. Irrigating the soil several days before delivery is often
adequate.
b) Start sodding from a straight edge (driveway or sidewalk) and butt
strips together, staggering them in a brick-like pattern. Avoid
stretching sod. Use a knife or sharp spade for trimming to fit
irregularly shaped areas. Lay sod lengthwise across the face of
slopes and peg or stake the pieces to prevent slippage. After the sod
has been placed, roll the lawn to ensure good sod-to-soil contact.
c) Water sod immediately after installation. Soak sod thoroughly
enough to penetrate soil below the newly installed sod to a minimum
depth of two (2) inches. Contractor is responsible for insuring
adequacy of water supply. The Contractor shall provided any
necessary temporary means to properly water sod, including
temporary pumps and sprinklers. Proper irrigation shall be required
by the contractor until the project has been inspected and is accepted
by the Town of Cary. (The Contractor shall be required to obtain all
applicable watering permits from the Town of Cary prior to beginning
watering activities.)
d) In some cases sod can be laid in space planting "semi-checkerboard"
fashion in order to lower costs. This method is described here
assuming that the sod is cut into the standard 18 in. x 24 in. size.
The first piece of sod is laid with the narrow side flush to a straight
edge. This will start a row that is 24 in. wide. The next piece of sod
is laid likewise but it is spaced 9 in. away and parallel to the first
piece along the longer side. This is continued to make the first row.
The next row is laid flush with the previous and in the same fashion
except it laid offset by 9 inches, i.e. laid beginning at the centerline of
the first piece of sod in the previous row. Subsequent rows are laid in
this alternating pattern.
D. Cleanup and Inspection:
i. Upon completion of work, the Contractor shall remove from the site all
equipment and other articles used. All excess soil, stone, and debris
shall be removed and legally disposed of at no additional cost to the
Owner. All work areas shall be left in a clean and neat condition. All
Project No: SW 5002 16000-10 Hillsdale Forest Sewer Extension Project
damage to existing construction caused by landscaping operations shall
be repaired to the satisfaction of the Town at the Contractor's expense.
ii. Seeded areas shall be protected and replanted as necessary to
establish a uniform stand of specified grass. Scattered bare spots, none
of which shall be larger that one (1) square foot, will be allowed up to a
maximum of 3% of the seeded area for each property. When seeded
areas are ready for inspection, the maintained turf areas shall be neatly
mowed to the uniform height of approximately two and one-half (2.5)
inches. The lawns shall be considered established only when the
specified grass is vigorous and growing well in addition to meeting the
other requirements specified.
iii. An inspection of the completed seeding shall be made at the conclusion
of the landscape work upon written notice requesting such inspection
submitted by the Contractor to the Engineer, at least ten (10) days prior
to the anticipated date of inspection.
iv. A final inspection shall be performed when a satisfactory stand of
seeded turf grass has been produced, upon written notice requesting
such inspection submitted by the Contractor to the Engineer, at least ten
(10) days prior to the anticipated date of inspection. If a satisfactory
stand of turf has not been produced at the time of final inspection,
necessary repairs shall be performed in conformance with the
requirements of this section. Upon completion of these repairs, the
seeded grass shall be reinspected upon written notice as above.
E. Basis of Payment:
Payment for establishing permanent lawn ground cover shall be the
actual amount of seeding installed and will be paid for at the unit price
bid per acre or square yard as indicated on the Itemized Proposal in the
contract documents for "Permanent Lawn Seeding and Mulching." This
price shall be full compensation for all work covered by this section
including but not limited to furnishing all permanent and temporary
seeding, mulching, fertilizing, tacking, watering, site preparation,
cleanup, maintenance, and warranty of work as specified.
ii. Distribution of Billing and Payments for "Permanent Lawn Seeding and
Mulching" shall be made as follows:
a) Fifty percent (50%) of the total quantity of the seeding and mulching
items on the Itemized Proposal on the first partial payment estimate
after which the initial seeding has been completed and accepted.
Project No: SW 5002 16000-11 Hillsdale Forest Sewer Extension Project
b) Twenty-five percent (25%) of the total quantity of the seeding and
mulching items on the Itemized Proposal on the first partial payment
estimate made after which the initial establishment of grass and any
required reseeding is complete.
c) Twenty-five percent (25%) of the total quantity of the seeding and
mulching items on the Itemized Proposal on the first partial payment
after the final establishment of grass and the project is one hundred
percent (100%) complete.
TABLE 3
LAWN SEEDING
Cool- and Warm-Season Grasses
Typical Planting Rate/1,000 sq. ft.
Lawn Grass Planting Dates' Seeds2 Space 3
Planting Sprigging4
Tall fescue March 1 to Oct. 15
(Aug. 15 to Oct. 1
optimum)
6
-
-
Tall fescue/annual (winter) rye Oct. 15 to March 1 6 fescue
1 rye
Berm udagrass(seed) Apr. 1 to Aug. 15 1 to 2 - -
Bermudagrass (vegetative) Apr. 15 to Aug. 30 - 5 4 5
Centipedegrass March to July 0.25 to 0.50 5 4 -
o sia rass Aril to Jul - 5 5
St. Au ustine rass Apr. to July I - 5 -
Notes:
1 Sod consisting of cool-season grasses can be installed anytime the ground is not
frozen. Sod consisting of warm- season grasses can be installed as long as soil
temperature exceeds 55° F. (typically April 15 to Oct. 1)
2 Pounds of seed per 1,000 sq. ft.
4 Square yards of turf cut into 2-inch centers to plant 1,000 sq. ft.
4 Bushels of sprigs per 1,000 sq. ft. (1 sq. yd. of turf pulled apart is equivalent to 1
bushel of sprigs.)
PART 5 - MATTING FOR EROSION CONTROL
A. Matting for erosion control shall be jute matting or excelsior matting. Matting
for erosion control shall not be dyed, bleached, or otherwise treated in a
manner that will result in toxicity to vegetation.
Project No: SW 5002 16000-12 Hillsdale Forest Sewer Extension Project
B. Jute Matting: Jute matting shall be of a uniform open plain weave of single
jute yarn, forty-eight (48) inches in width, plus or minus one (1) inch. The
yarn shall be of a loosely twisted construction and shall not vary in thickness
by more than one-half its normal diameter. There shall be 78 warp ends,
plus or minus 2, per linear yard; and the weight shall average 1.22 pounds
per linear yard of the matting with a tolerance of plus or minus 5 percent.
C. Excelsior Matting: Excelsior matting shall consist of a machine-produced
mat of curled wood excelsior at least 47 inches in width. The mat shall
weigh 0.975 pounds per square yard with a tolerance of plus or minus 10
percent. At least 80% of the individual excelsior fibers shall be 6 inches or
more in length. The excelsior fibers shall be evenly distributed over the
entire area of the blanket. One side of the excelsior matting shall be
covered with a woven fabric of twisted paper cord or cotton cord, or with an
extruded plastic mesh. The mesh size for either the fabric or plastic mesh
shall be a minimum of V x 1" and a maximum of 1-1/2" x 3".
D. Wire Staples: Staples shall be machine-made of No. 11 gage new steel wire
formed into a "U" shape. The size when formed shall be not less than
6 inches in length with a throat of not less than 1 inch in width.
E. Basis of Payment: Payment for erosion control matting shall be based on
the actual quantity of matting in square yards installed in accordance with
the project Contract Documents and per unit price indicated on the Itemized
Proposal for "Erosion Matting."
PART 6 - RIPRAP DISSIPATION PADS
A. After construction is complete, all points of stormwater release shall be
protected by riprap dissipation pads.
B. Stone for plain riprap shall consist of field stone or rough unhewn quarry
stone. The stone shall be sound, tough, dense, resistant to the action of air
and water, and suitable in all other respects for the purpose intended.
Stone shall vary in weight from 5 to 200 pounds. At least 30 percent of the
total weight of the riprap shall be in individual pieces weighing a minimum of
60 pounds each. Not more than 10 percent of the total weight of the riprap
may be in individual pieces weighing less than 15 pounds each.
C. Unless otherwise directed by the Engineer, the stone shall be placed on a
flat slope or as indicated on the plans. The stone shall be graded so that
the smaller stones are uniformly distributed throughout the mass.
Project No: SW 5002 16000-13 Hillsdale Forest Sewer Extension Project
D. The Contractor may place the stone by mechanical methods, augmented by
hand-placing where necessary, provided that when the riprap is completed it
forms a properly graded, dense, neat layer of stone.
E. The completed riprap shall be at least the thickness indicated on the plans,
with the top of the riprap pad flush with the surrounding finished grade.
F. Geotextile fabric consisting of Mirafi 140N or equivalent shall be installed
under all riprap unless otherwise noted. No direct payment shall be made
for geotextile fabric. The price for geotextile fabric used under riprap shall
be included in the unit price bid for "Riprap."
G. Basis of Payment: Payment for riprap shall be based on the actual quantity
of riprap in tons provided and per the unit price for the appropriate class as
indicated on the Itemized Proposal in the Contract Documents for "Riprap."
The unit prices and payments for "Riprap" will be full compensation for all
work covered by this section including, but not limited to, all excavation,
embankment preparation, backfilling, and furnishing and placing riprap and
.other materials.
PART 6-LEVEL SPREADERS
A. Level spreaders shall be constructed in accordance with the most current
Town of Cary, NCDOT, and NCDENR standards.
B. Basis of Payment: Payment for "Level Spreader" shall be made under the
contract unit price bid per linear foot for the type of level spreader as
indicated on the plans and in the Itemized Proposal. The unit prices and
payments shall be full compensation for all labor, equipment, and materials
necessary to properly install and maintain the level spreader in accordance
with the Contract Documents and shall also include any necessary clearing
and grubbing, grading, seeding and mulching and other incidentals to
satisfactorily install level spreaders.
END SECTION 16000
Project No: SW 5002 16000-14 Hillsdale Forest Sewer Extension Project
OF \NA" Michael F. Easley, Governor
'O G William G. Ross Jr., Secretary
co ? North Carolina Department of Environment and Natural Resources
p to r `--IC
Alan W. Klimek, P.E. Director
Division of Water Quality
June 7, 2005
DWQ Project # 05-0678
Wake County
Page 1 of 2
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Town of Cary
PO Box 8005
Cary, NC 27512-8005
Subject Property: Hillsdale Forests Sewer Extension Project
REQUEST FOR MORE INFORMATION
Dear Sir or Madam:
On April 21, 2005, the Division of Water Quality (DWQ) received your application dated April 13, 2005
to impact 40 feet of stream and 2,342 square feet (ft) of protected riparian buffers to construct the
proposed sewer line extension. The DWQ has determined that your application was incomplete and/or
provided inaccurate information as discussed below. The DWQ will require additional information in
order to process your application to impact protected wetland, streams and/or buffers on the subject
property. Therefore, unless we receive the additional information requested below, we will have to move
toward denial of your application as required by 15A NCAC 2H .0506 and 2B .0233(8) and will place
this project on hold as incomplete until we receive this additional information. Please provide five copies
of the following information so that we may continue to review your project.
Additional Information Requested:
1. You have proposed mitigation for the two, 20' stream crossings. According to the Riparian Buffer
Rules, mitigation is required for perpendicular non-electric utility line when the crossing is between
40' and 150' (per crossing) and the maintenance corridor is greater than 10'. Additionally, you
have not stated how wide the permanent maintenance corridor is to be, please provide this
information so the DWQ can determine if mitigation is required.
2. Please provide a re-vegetation plan for the two, 20' temporary crossings.
3. The two streams that are being proposed to be impacted are within 50' of each other and the USGS
topographic map shows this to be a low lying, flat area. Additionally, the soils are mapped as
Worsham SL, which is a hydric soil. Please provide information as to whether a jurisdictional
determination for wetlands has been done for this site.
Please respond within three weeks of the date of this letter by sending this information to me in writing
and Eric Kulz of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we
will assume that you no longer want to pursue this project and we will consider the project as withdrawn.
401 Oversight/Express Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786/ FAX 919-733-6893/ Internet: http://h2o.enr.state.nc.us/ncwetiands
n` Carolin
Na
NIrrrally
An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper
Town of Cary
Page 2 of 2
6/7/05
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Ms. Debbie Edwards at 919-733-9502 if you have any
questions regarding or would like to set up a meeting to discuss this matter.
Sincerely,
WL?r
Cyndi Karoly,
401 Oversight/Express Permitting Unit
CBK/dae
cc: Eric Kulz, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Filename: 0506781E1illsdaleForest(Wake)401 + hold
MEMORANDUM
TO: John Dorney Regional Contact:
Non-Discharge Branch WQ Supervisor:
Date:
SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS
Eric Kulz
K_ Schuster
Facility Name Town of Carv - Hilldale Forest Sewer Extension County Wake
Project Number 05 0678
Recvd From APP
Received Date 4/21/05
Project Type Sewer main
County2
Region Raleigh
Recvd By Region
Certificates Stream
Permit Wetland Wetland Wetland Stream Class Acres Feet
Type Type Impact Score Index Prim. Supp. Basin Req. Req.
NW 12 Stream OY ON ? 27-43-3 WSIII NSW 30,402. F 40.00
NBRO Buffers F7 O N F-F-F-I-- 30,402. 0.05
F- F_
F___ F-O Y ON F_F__F_F_F_F__F-
Mitiqation Wetland
MitigationType Type Acres Feet
Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N
Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N
Is Mitigation required? Q Y O N Recommendation: 0 Issue 0 Issue/Cond 0 Deny
Provided by Region: Latitude (ddmmss) 354519 Longitude (ddmmss) 784510
Comments:
Have wetlands been checked for? Soils are manned as Worsham SL, which is a hydric soil. and the
topography along the streams and between the two streams is pretty flat. May be below
thresholds, but it is unclear if the site was investigated for the presence of wetlands. EWK
cc: Regional Office i
Central Office Page Number 1
Triage Check List
Date: oleo Project Name:,.
To: ? - ARO
? FRO
? MRO
fig RRO
County: 4,d?z
Kevin Barnett ? WaRO Tom Steffens and Kyle Barnes
Ken Averitte ? WiRO Noelle Lutheran
Alan Johnson ? WSRO Daryl Lamb
Mike Horan
From: S-koz Telephone : (919) 7 3 ?? 6
The file attached is being forwarded to ? our for your evaluation.
Please call if you need as}stance.
? Stream length impacted `t
? Stream determination
? Wetland determination and distance to blue-line surface,.waters on USFW topo maps
Minimization/avoidance issues
[9 Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
? Is the application consistent with pre-application meetings?
? Cumulative impact concern
Comments:
L ??rvt12 t-f' 1 . -? 1n a f?c _? t 6&_4 f
`?. ??J ?-t-I.,'L,/1 ? 55v e. ? ?'L Vim- ?/?Zt1"'t t,/` ??•C, . (f i r•F `?
u
050678
ENGINEERING DEPARTMENT
April 13, 2005
2 12 @ Om 0 WR 00
APR 2 1 2005
DWQ Wetlands Unit
2321 Crabtree Blvd.
Suite 250
Raleigh, NC 27604
DENR - WATER QUALITY
WETLANDS AND STORMVIATER BRANCH
Re: North Carolina DWQ PCN Submittal - Hillsdale Forest Sewer Extension Project
Dear DWQ Representative,
Please find five copies of the North Carolina DWQ PCN submittal for the Hillsdale
Forest Sewer Extension Project enclosed. I have forwarded 2 copies of this package
to the North Carolina DWQ and have also submitted the In Lieu Fee Request Form to
the North Carolina Ecosystem Enhancement Program as required.
The Town of Cary has designed this sewer extension project to remedy problems
occurring within the Hillsdale Forest neighborhood with respect to failing septic
systems. The residents of this neighborhood were annexed into the Town of Cary
recently, and the Town is moving forward with plans to provide public water and
sewer services to this neighborhood.
If you have any questions or need any other information concerning this project,
please contact me at 919-469-4335 or at Jarrod.buchanan(cDtownofcary.org.
;SS' cerely,
rod A. Buchanan
Project Engineer
RAEngineeringDept\PROJECTS (Capital)\Sewer\SW5002 - Hillsdale Forest Phase 3 - Jarrod\Stream X-ing\DWQ PCN Letter t.doc
TOWN Of CARY
318 North Academy Street -Cary, NC 27513-PO Box 8005-Cary, NC 27512-8005
te1919-469-4030 - fax 919-460-4935- www.townofcary.org
APR 2 1 2005 ?
I ; k, -l- )t_
LLLNt(- WATER QUALITY
Office Use Only: Form Version May 2002
fi
USACE Action ID No. DWQ No. `r
ku ally paiucuiar ucui is not. appiicaoie to tnis project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NW-12
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ® If applicable.
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Town of Cary
Mailing Address: P.O. Box 8005
Cary, NC 27512-8005
Telephone Number: 919-469-4335 Fax Number: 919-388-5806
E-mail Address:iarrod.buchanan(oDtownofcar .org
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Fax Number:
Page 5 of 12
t ?
.* t
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided. See Attached -
"Vicinity Map", "Site Plan", and "Soils Map"
1. Name of project: Hillsdale Forest Sewer Extension Project
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): 0773014239
4. Location
County: Wake Nearest Town: Cary
Subdivision name (include phase/lot number): Hillsdale Forest, Lot 10, Block F, Section 5
Directions to site (include road numbers, landmarks, etc.): From Walnut Street (SR ), turn
Southwest onto Kineston Ridae Road (SR ) for 2.500-feet. Turn rip-ht onto Imperial Road
and follow it to the end. The interceptor will pass to the left of 1101 Imperial Road.
5. Site coordinates, if available (UTM or Lat/Long): See attached sheet A-1.
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres):
7. Nearest body of water (stream/river/sound/ocean/lake): UT to Lynn Branch
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at 11ttp://l12o.enr.state.nc.us/adniin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Residential subdivision. Town of Cary greenway at rear of
property. Yard contains sparsely populated trees of varying type. Semi-established ground
vegetation.
Page 6 of 12
;.. r
10. Describe the overall project in detail, including the type of equipment to be used: Sanitary
sewer main installation, 3,332-feet in length The last three sections of the sewer main will be
installed alonee the property line between 1101 and 1103 Imperial Road, with the remainder
being installed in the roadway. The last section of the sewer main will be installed under two
small streams that nun parallel to each other and are located approximately 50-feet apart,
where the proposed crossings occur. An independent contractor will install the sewer main
using a variety of equipment, including a track-hoe, back-hoe, end loader, skid-steer, dump-
truck, and compactor.
11. Explain the purpose of the proposed work: Provide sanitary sewer service to the residents
of the Hillsdale Forest Subdivision, along Imperial Road, Savannah Circle, and Kingston
Ridge Road.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to detennine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perermial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 7 of 12
Y
I. Provide a written description of the proposed impacts: Crossing; two streams with an 8-inch
Ductile_ Iron Pipe sewer main The sewer main will be installed perpendicular to the two
streams. An illustration of the crossings is included on Attachment A-2 Also disturbance to
Riparian buffers as defined in section X of this document and delineated on attached map
2. Individually list wetland impacts below: N/A
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
(es/no Distance to
Nearest Stream
linear feet
Type of Wetland***
*
List each impact separately and identify temporary impacts. Impacts include, but are not limited to, mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fenia.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: 0
Total area of wetland impact proposed: 0
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
linear feet
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
1 Excavation 20 UT to Lynn Branch 20 Perennial
2 Excavation 20 UT to Lynn Branch 12 Perennial
*
List each impact separately and identify temporary impacts. Impacts include, but arc not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uscs.cov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mapgucst.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 40
Page 8 of 12
r
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: N/A
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
(acres) Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The Town of Cary is installing a sanitary sewer main to improve the public health of the
residents in the Hillsdale Forest Subdivision. Many of these residents have failing septic systems
that require a high level of maintenance to keep them from releasing raw sewage. The trench in
which the sewer main will be placed will be as narrow as possible. Also, silt fence will be
placed on the up and downhill sides of the construction corridor and rock check dams will be
installed to keep the transportation of solids to a minimum. The crossing installation will be
done during low-flow periods to cause the least impact
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 9 of 12
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http:/ih2o.enr.state.nc.us/ncwctlands/stn-ngide.htin].
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wi-p/indox.litm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information: Request letter submitted to NCEEP on 4/11/2005, copy attached.
Will forward reply upon receipt.
Amount of stream mitigation requested (linear feet): 40
Amount of buffer mitigation requested (square feet): 6,387, See Sheet 11, Section X
Amount of Riparian wetland mitigation requested (acres): 0
Amount of Non-riparian wetland mitigation requested (acres): 0
Amount of Coastal wetland mitigation requested (acres): 0
Page 10 of 12
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ? No
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ? N/A
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ® No ? If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers. See Attached "RIPARIAN BUFFERS ZONE 1 & ZONE 2 MAP"
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 1,916 3 5,748 sf
2 426 1.5 639 sf
Total 2,342 6,387 sf
Luc , cnLcuua VUL w'"' pcipcnuicmar lrom near oanK or cnannel; Gone 2 extends an
additional 20 feet from the edge of Zone 1.
Page 11 of 12
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
Payment into the Riparian Buffer Restoration Fund is proposed Request letter submitted to
NCEEP on 4/13/2005. Will forward reply upon receipt
XL Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
No new impervious acreage is proposed There are 7,850 square feet or 0 18 acres of impervious
area at present which includes the home and driveway. Silt fence will be installed along both
sides of the construction corridor. Rock check dams will be installed along the downstream edge
of the constriction corridor.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
This waste water will flow to the South Cary WWTP The Plant rated at 12.8 mgd with over 5
mgd of excess capacity, has more than enough excess capacity to cover the additional 12,320
gallons per day proposed under this project The Plant discharges into Middle Creek and uses
the following processes to treat the influent flow: bar screens Grit removal facilities three
aeration basins, four secondary clarifiers seven deep-bed tertiary filters ultraviolet disinfection
and a cascade aerator for reaeration prior to discharge
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
The Town of Cary is installing this project at its earliest convenience for two reasons First
several of the properties have failing septic systems which are an environmental concernSecond, several of the properties have shallow water wells with poor quality water.
h-o".5
Applicant/Agent's Signature ate
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
Yt
IN LIEN FEE REQUEST FORM (revised 3/29/05)
Fill in information, print, sign, and date, and either mail to NCEEP, 1652 Mail Service Center, Raleigh, NC 27699-
1652, or fax to 919-715-2219. Attachments are acceptable to clarify information on the form.
1. Name of Applicant or Agent
* Jarrod A. Buchanan
2. Name of Business * Town of Cary
3. Street Address * P.O. Box 8005
4. City, State, Zip * Cary, NC 27512-8005
5. Telephone * ( 919 ) 469 - 4335
6. Fax ( 919 ) 388 - 5806
7. E-mail jarrod.buchanan@townofcary.org
8. Project Name * Hillsdale Forest Sewer Extension Project
9. Project Location * Rear of lot located at 1101 Imperial Road, Cary, NC 27511-5909
10. Lat-Long Coordinates Lat 35d 45.571m N Long 78d 45.781m W
11. River Basin * Neuse
12. Cataloging Unit (8-digit) *** 03020201
11. Project County* Wake
14. Riparian Wetland Impact
ac * N/A
15. Non-Riparian Wetland
Impact ac * N/A
16. Coastal Marsh Impact (ac) * N/A
17. Stream-Cold Impact (ft) * N/A
18. Stream-Cool Impact (ft) * 40
19. Stream-Warm Impact (ft) * N/A
20. ** Buffer-Zone 1 Impact (sq
ft * 1,916
21. ** Buffer-Zone 2 Impact (sq
ft 426
22. ** Buffer-Total (Zone 1 ¢
Zone 2 s ft 2,342
Attachments? IV] Yes Signature of Applicant or Agent:
pate.
* Required information; zero answers in 14-22 should be indicated with 110" or "N/A", not left blank.
** Buffer mitigation applicable only in the Neuse, Tar-Pamlico and Catawba River Basins
and the Randleman Lake Water Supply Watershed.
*** Go to EPA "Surf Your Watershed" http_//cfpu,epa goy/surf/locate_/index_.cfm for CU determination.
Direct all questions to Carol Shaw at 919-733-5205 or carol.shaw@ncmail.net
Attachment A-1
Stream crossing #1:
35°45.571' N
78°45.781' W
Stream crossing #2
35°45.569' N
78°45.767' W
RIPARIAN BUFFERS
ZONE 1 & ZONE 2
MAP
/ ZONE 2
ZONE 1 426 SF
640 SF MH 1
I ZONE 1 ST 11+35
ZONE 1 951 SF _
32h SF
E STING M H "B"
A 10+00
ZONE 1 = 1,916 SF = 0.0440 ACRES 20 10 ?0 40
ZONE 2 = 426 SF = 0.0098 ACRES
SCALE 1 " = 20'
TOWN OF CARY
316 N. Academy St. - P.O. Box 8005
Cary, North Carolina 27512-8005
(919) 469-4049
PO VOUCHER INVOICE DESCRIPTION
04/20/2005 159127 PI9038 APP FEE HILLSDL MISC SERVICES
?L
Ar' = 2005
V `DSANDSTORR61QUALITY
oWATER Eta.„
=V1
CHECK NO. 2 6 0 0 7 9
tj IT, no 111k fr
200.01
NC DIV OF WATER QUALITY 624333 of
$*******200.
?_
IJ • � • � ' f``r . 11 � � �`
` �} � � ��,r_- � • t : ice` _) / �%J/�,".
1
I /�� P 'yilY?�+ � �,( � ' "�"� _ ' ._•i ' —'•.: s,.,,. i-'� ��� —~ $ :.. � � r 4% w, �r +�" '"�: �. �..� � Fes!
��--.._ � `� J��- �� _� \. _ r Rvra 1� �A i1a �\ �-•"ti..-i e Yom, � j•� ' f ` fir' J - - ��
VAO
•- : �i rti • �� .t � .. �}• ,. fir- �..
� ' ->i �. __-'-�� j O. ` �, - F{j • O ,--\ � � > 1 � �! �,r'"f� , 1 � i- - �s 3�, �'• • 1
kr
.-- �' Lm '•�'�� j'a'i• .t f �,"� _ j � ____.�
SIJ'^ 8 7.j'IG w • \\\
!I ElJ � �� /l/i-_ice`~/ /lJ%YY ,-�Q�� � _^��•�t• _ � ^/�/•��/ 4 �'�� �°.,ra''k �� \����_✓` �S� / r//(/.
(-r.-, � ~ � J/�^� -y -.--i ^" � , i V � `•"V��r / / �.r.-"�; "�\�1 t � � l` �I �,i� •,r' %;�� � r � � mow. ^'� �J -�� � a _ 1 i� �.-
i
1r • • ` '1 \ ' % '� +, •'
' - r'•'-" .1 (1 • f 1� '>))_,1 �'-.,•''''".-� ..,-•'r%� - - - �-✓ t".� b • _ p•- �� C \'\..--� ,%� y..�"'..._�. r j 1 / .. �1 � '��/;1� ryy�
-vir
_ ,P., ' `l ' "�-.,." _ ) - O q a. f 1. , /' / .;� I f / �r t. •�1
IN
• r' ;- may, �� 1. � � ; ---t - - .��.'yyf" y_.
�14 7j,
If
r{ i �� � ,, J ' . it y � •11 _ _ �pi,• ii r; " `� `O.5�1.
V
r +I
- _ rel - _�� \ I s•' � •� � i '�� � �l� : :/� � ./� 11 I � ��
1-111" O
0
0
0
0
c
:v 0 ? O
w
r
w ? 6J
.. _ Q
I
0
a Qri w
w ?
ar? ar Ct. ? U
0
1 o
i
O
J ^>
.I. j
L?
i ~ ,ti
' ~ 1 ~ 1 S i II
E%ISTINO YH 'A'. ~ ~ T OUT a 392,81 ` ~ / INVER ~ ~ ~ NOW OR FORML111Y""' NOW OR FORMERLY NOW DR FORMERLY NOW OR fORMEALY ~ PATRKYA K. NELSON k ~ ERi G. & MARGARET GAINES
i / ~ SEE SHEET 2 FOR SEWER TAP ~ r~ ;,v INFORMATION. (FIGURE 1~„r Ff r A. R RDSE A, KNI T HOWEIi R P KFE7Fl1 P ~ ~ ROUTH W, 1145 1MPERIAI RD. 1109 IMPERIAL RD, 1111 IMPERIAL RD. 1N3 IMPERIAL RD. 1 CARP, NC 27511-5909
~ ~ fr r,~ CARY, NC 27511-5909 CARY, NC 27511-5969 ~ CARY, NC 27511-5909 I) PINt 0773171}2098 PW~ 077JI7019827 PIN/ 077317110898 PIN/ 071317111898 ~
~ 1 ~ , ._,,..._m._...m. .M _..m...
~ r NOW OR FW$AIERLY / r,~^~ \ N N. & wARLYN S. IALLER I~ LOCATIDN: 1115 IMPERIAL RD.
~ d ~ ~ ~ 1101 INPERIAL RD. r CARY, NC 27511-5909 LOCa1110N: 1109 IMPERIAL RD, r TK1N: 1111 IMPERIAL RD. LOCATION: 1113 9APERIAL RD. ~ - ~ r~ W ' ' FFF - U&13 ~ FFE • 428.90 ~ - 428.97 ~I SEWEN ELEV. - 425.50
' f aj ~ ~ ~ PIN>t 077317018836 / / / r? SEWER ELEV. • 413.00 SEWER ELEY, - 420.OD EIEV. - 423.OD W ~ OC M
a 1 r' - ~ ~ it r
~ ~ ~ ~ ~ ~ ~ y N O Q, ~ ~ , I h
•r ~ cs; l,v f~' ,,?s ,r LOCATION: 1107 IMPERIAL RD. ,r,~, _ , r~ i~ ~ ~ N
~ TOP OF BANK / FFE ~ 410.94 „ / 5ENER ELEV. ~ 401.00 W 4 _ ~ e,. ~a ~ ~ _ ~ •
~ ~ ~ ~ . ~ µ ~ I~
(n ~ ~'•~,W' ~ \ rr NOW OR t'ORMLRLY \ EJOHN A. k AVO W EDWARDS r ° / _ ~ _ N W w ~ ~ ¦ ,.yam„....«, fd71-
~ ~ ~ ARY NC 27511- r 7 ~-CONCRETE BAIDCE O ~ n. PoNt 07731701887 ~ , ti ,~..,M - ~ _ ~ ~ ~ ~ - 19 ~ , ~ , D _ _ - ,a~ ,ti H 6
?d ~ i ~ w
r~ ~t ~ ~ \
l r ~ W k~ NN r~''/ Vii;,,. ~ ~ SfiA:;413+78 i~ ~ ~ ~ '~i:,, ST~~;~$+78 ~ ~ ~ STA 19}95 _ . _ _ w . a
I a._; 20 SANATARY SEWER ~ V ,r ~h ~ / ~ ,x R ir,,, n ~ yr Z r~
~ t SEMENT , ; LocAnONc 1105 tMPERIU RO. ~}?,F , . ! ~ `f NO SERVICE REQUIRED , jr - _ tilt. '%~f ~~3 .~;a. A ~ ~ ~'i ;(,:m/" V r
~ w
, ~ THE C TRACTOR SHALL TAKE f MH # 1 ~ ~ ~ ~ i - ~ STA 1 NEC RY MEASURES TO / NOW OR FO~MEALY / ! LOCA'80N: fl0B 91PERIAL RD. ~I TWE CONTRACTOR SHALL"TAKE .t
' ~ -r:-' ~1 NG TOPAL ~ PATRIGA A, K !K 4'~ SERVE E EXISTING CULVERT ! , ~ , ~ ~I~~ ~ _ . 1103 IMPEPoAL RO. ti ~ ; fFE .439.14 ~ ~ ALL NECESSARY MEASURES TO / ~ SEE SECTION 11000 ~ I,~ : PR ERVE TWE E>nSTING CULVERT
11+00 , Nc 27511-s9o9 ~ DU G S UC 0 , ~ / ~ _ ~ ,,:rr ~ 07731701553 ~ ~ ~ ~ f ~ ART 4.B.v1 OF TECHNICAL ~ j;' U I G CON UCTION.
,r, {a}, ~ isc,YN SPEgFlCA ON5 ~ II' II; Q ~ ,
INVERT C/L -!~0•R ~ - `h1~ F //y~,,,A f~ `y ,e Q`` ~ t W '~.ti. ~ 1 ~ ~ it 1',~I LOCATION: 11081MPERIAL RD. , ~ . I~f LOCAliON: 1110 IMPERIAL RD. FFE •435.34
' NG MH 'B" 25 S ATARY I.OCAnON; 1103IMPEPoU. R0. ~ , rW ~ FFE .411.30 s~ a ?Fyv , ~ S ~ t : r SEYYEERR ELEV. ¦ 41260 NOW OR FORMERLY ~i~ I; FFE - M0.12 D ND L k OWENDOLYN W. MARTI ~ SEWER ELFY. - 426.OD
~ 10+00 ~ 2 , EASEM sEw¢R ~v. - yea m , 1108 IMPERIAL RD. II' 'I' i DARY, NC 27511-5910 III E ~u_
~ I a ~ 30' SANA ARY SEWER ;~1 rte"` PINS D77317111415 ,~11 ---~--___..,..JY f ~ t.... ,....-.,,..,,M I,i ~
3 EXISTING"C0, J , P~+F o °;lj~ ~ /,~~r ~'i ~ ~ ~ 00 EASEMEN ~~uru ,i" , ~ f ~ „!SNOW OR FORMERLY "I LUREL HURANI jjl NDW OR FORMERLY
,fiJ ' ~ ~,..r~ ' 1105 9APDON. RD. ii MAR 0. 6 KIMBFALY S, HAVES ~ CARY, NC 27511-891D 1110 IMPE78AL RD. +
r. ~ ~ Mf~~ .ri , ~ , , ~ , ~ STA 13~ PINS D7731701947 ''f - _ . NC 27511-5944 ~ r PIN/ 071317112494 m
~ ~ w, ~ ~ ~ nt ' ~ -i
!8 ~ 'n ~ r~. 1~ ' x~ ~ , N ~ ~ / i ~ ~ i~l ; r,, 1/ ~ ~ __..._w_- .,.~..,_,,,1
a ; ~ , ~ ~ r ~ , ~ it
NOW OR FORMERLY ~ f NOW OA FORNFALY IOW OA FORMFALY
~L?~ ! J ES L, k BETTY G TUD ii!~ N' a NNY AI. k ANNETTE A. SIA 1101 IMPERIAL RD. 1101 IMPERIAL R0. MH 4 r',?'~ M. k ANNETFE A. SWkiN 1104 IMPERIAL RD.
~ ARY NC 27511-5909 ~ IPSO ~~A, CARY, NC 2 7511-5 91 0 STA 1 88 . ~ PIN/ D77317014239 ~ ~I; ~ ~,r~ PW~ 077317018394 ~ NY, NC 2 7511-5 91 0 W~ 077317018394 ~
F; ~ AnON: 110 MPERIAL RD. LOCAnON: 1104 NIPERIAL RD. ~ : t c~: ~ ~ v ~ FFE 131,54 FFE 109.84 ~ _ ..w,
SEY~R ELEV. • 397.00 % : r, , ~ 411,50 n~
Jr V, ~~~7~, ~ F r , f; ~
~ SEE SECTION 110f0 ~ `+~~,r` ! ~
, PART 4.B.vT OF 'TECHNIC. r ~a~. ' ~ SPEGFlCATIONS J' F
r ~ / j ? YYf6 FlUl>m l~ ~ ~ ' r % r ~ Fr' f f~
f'` r ~ ; -LQCAIION•. X102 I AL FFE 438.
d d SENER ELEV. ~ 4 .66
r~ Loc~norr; 11oa NIPERIA~?;RD. m r r` FFE ¦ 4 X4.10 ~ NOW OR FORMERL ~ SEWER FIEV. 410.68 BEiN7HARD A. R Ellt£f?I 1L NEIDER
' NOW OR FORMERLY 1102 IMPERIAL RD. ~ / ? ~ ,f CARY, NC 27511 1
f DOUGLAS 0. ! EL1UlE H. pIN/ 07731 { 1100 9APEAIAL RD. ,,r' ~EXIS]~t1G MN / CARY, NC 27511-5810 \ ~ ~ , W Q W
~ r/ WVTsfiT III ~ 85 ~ ~ ~ PIN{P 077317017201 1f~". ~s~, ~ ~ e ~
N~ W W ~
I ' I ' ~ Z ~ I Q
f I , I ( W Z 0 ~
j ' ~ ~ ~ ~ ~ 0~
I i i i ~ ~ ~ ~ 1 u_ 1 i ~ THE TRACTOR SHAH U ' ~ ~ ~ W
! ~ ~ ~ ~ SCALES 1 - 0 HORI L E CONTRACTOR SH - ~ A STANDARD,14-ft 4i„ -D W I ~ _ ~ U _ - _ _ _ - - ~ _ RRECAST
n ~ : ~ PROwvE A sraNDARD s-n i 1 = 1;0 VER 1- As sPEaFl ~ Q I ~ IN ~ ~
DIAME PRECAST NCRETE TAI I Z i ~ ~ W
1, ~ ~ MANHOLE AS SPEGFI IN , ~ THE D TAILS. I ! ~ W ! 1HE caN ' TRACTOR SMALL W
1 : E coNTRACroR, MALL n I PRO~ADE A STAND D I THE CON ACTOR SHALL; i~ ' ' . MAN OLE RING AND ~ COVER W 0' PROVIDE ~ STANDARD 4*ft ~
DIE CONTRACTOR SHI~I.L P OVIDE A STANtARD 5-R PI s _ _ _ _ _ _ - DI } PROVIDE A STANDARDI iAMETER_PRECAS7.-CONCRE DlAME P12ECAST--CONGRE ~ FOR PAVED AREJyS_ 5 y
MANHEILE RING AND COVER ANHOLE AS SPE IFlED IN ? M ! i E DETAILS. ~ T1 MANHOLES AS SPEgFlED IN SH IN LS ' r. THE DETAILS.
FOR QUTFALL MANHOLES A ! SHOWN IN HE D AILS i ! I
! E CQNTRACTOR'iSHALL I THE TRACTOR SH I '
~ ' ~ NDE A STAN ARD PRO p I HOLE RING AND CO PROVIDE A STANDARD ~ I x a MANHOLE RING AND D A 1919
! P VED AREA AS _ ! _ :i........... A _ ' + ~ ! i I_ _ _ ~ ' , _ _ 0 D AS A I i I , _.R_PA~V~--ARE.------~_ - _ .R.~ 434.Q ...i.- SHOWN IIN THE DETAILS: INVERT C 42.00- _ _ ~ o ~w -
~ SIN~WN IN THE D TAILS ~ r i ' THE CONTRACTOR STA 13+ 5 ~ C I 1 ~ i i ~ N ~q
THE CONTRACTOR SH ' ~ RIM 422.#8 ~ SHALLi FlELD ADJUST ' STANDARDS 4 ft INVERT 410.12 PROVIDE A : : . I { , f Ei1SIING PA 3 ~ ~ ~ I o _
E TH MANHOLE COVER'' t I DIAMETER PRECAST CCINCRETE 4-Iodise ABOVE I < ! ~ MANHdL.E AS SPECIFl IN ! 3 C W 1 L
FlNISH D SURFACE I THE D TAILS, ELEVA ON. ~ ~ Ai 14+66 ! ;STA 18- ~ IM 428.26 - ~ 30 ,STA 18178 I VERT C/L 415. ~ ~ i
_ _ _ . _ I . _ ! ~ _ ; -.RIM.-.422,8. _ 1 _ i _ _ ~ _ _ _ !.RU,t..421 _ IN T C 410.88 ?INVERT _ _ 1.RII,t..42L + . I - - - --c te' RcP__ _ _ z o I INVERT C 41.00 r' X ~ o
THE Q'ANTRACTOR SHALL : ~ ! , _ I ! PROVIDE A STANDARd ~ DIP 1.82 IB' MIN 1 .00 LF 8
MANI~OLE RING AND (OVER ! a I ExlsnN D0Si1NG PAVEMENT a I I„.. ~ ~ apg8aea~aoeuacn~a
FOR ATERTIGHT MANHOLES - I , ~ w. ! , . s , TING QROUNO TM i w. 0 1 D a1Ls A r :
i i ! E%ISTING PAVEMENT
.,w, ! - ~ . ~ ~ ~ f _ I b
THE CONTRACTOR i E CONTRACTOR SHALE PROVIDE IAN SHALL MELD ADJi15T ~ E>DSnwc e' ATER Muw O ~ :.i~.f~~.. °
APPROVED CO~NNEC110N TO E' ISTING ~ E X ~ THE MA~JHOLE COVER o ~ 75x w DIP ^ ~ b n LF6 tl ~ : 1 114. a
'MANHOLE. CONNECTION TO EXISTING s MANHOLE SHALL BE CORED THRUGH 24-InQh;es ABOVE ~ ~ ! ro' 19N i ~ ~ ~ f' 1 Vtl ~/II ~n d~ ~I~~jt ~~dy'~a ~L~ b9
BENCH WITH A CONCRETE CONING NISHEQ SURFACE I " I EIEVATI ! 212. LF a DIP 0 .09z I tlQ ' ~ ara0~~ ~9 I i
MACHINE. , ~ . _ i - _ . t-_ _ _ . ! ~ ~ _ ~ 91. LF 8 DIP 0 .82 - - N ~ _ ~tl~R~G5dD6~6bUab~$~
STA 1 +00 RIM 4Q0.21t ° / ~ ! !
r • INVERT C 393.00 f ~ ®g ! H iB RIM 397.~9f p SIGNATURE
STA 10+00 INVERT C 391.84 ' 0~ ~ RIM 397.88 ' 8 ! / p0 Y ~ REVISIONS
INVERT C/L 391.00 1~5' ~ _ _ .r,,.
I! E%ISTING GROUND; ! !
I ! ~ ~ ~ s ~ I I ~ 3 ( ~ I
~ i I ~ i
" 0 0,82X 36 MIN ! i i ~ I ! ~,,.,....I 35.00 tF 8 ~ I I i i .
% ' ~ ( ~ I ~ DIP 01.79 85.00 ~ _
I - I -
CONCRETE ENCASEMENT SEE 7.O.C. ~ THE CONTRACTOR ALL BLOCK TH INLET ~ DURI G CONSTRUCTI IN ACCORDA CE WITH STANDARD D TAIL 07000.14} ~ TOC STA. DETAIL 07 0.17. THE TIE IN 70
EXIS NG SEWER UN WILL NOT BE DUCTED PROJ.~ SW-5002
UNTI SUCH TIME THE ENGINEER DEEMS i APP OP IA ! ~ ! i DESIGN BY. J. B.
i DRAWN BY: H.V.G.
~~rrrl. an:~ ~ _ I i DATE: 12 15 04
<3~ faJ Ir) w~ ti} ~:t~ . i i.j ~~,.I ~ n;l N v^ ~ ,t; ~ ~ ~ SCALE H OR:1 40'
r: ~r rei' r; ai ~ ~,'I ~t ,mil mf ~r; c?i t-i rn :pl iiS ail cr w %v e~d r'~a M~ M M) r7~ ~ .~t d- ~ tit W' ti s , ti ~ ~ ~ d~ ~ ~ v ~ v SCALE VER: 1 =10
I I ~ ! ~ i i
1 . _ _ _ ....l_......._...-._ . _ _ _ - _1 - _ _ . ~ . _.L 1.------- SHEET N0.
111 I ~ + ;~I:I z-Fn~~ 1 z±~t7 1 a I~so 1 a~ :a o 15+~o i i;~~a~ ~ ~I~ ?51 f1i) 17•F60 I E3 f 4C 19120 2(I,l GO 20.!.50 30F8
_ _
_ _ _ _
i~
i (
k 11
k .I SF-15 I I SF-16
• ` i k ~ I Y ~ ~
k k SF-14 ~ ~
r ` i ` ~ 5F-17 k ~ \ W #5
_ ~ ~ P Permanent: 152 sf
` I r SF•18 ~ i SF-13 I _
PH- • - r--"
SF-21
/ i 1 ~ PH- i SF-20 ~
~ ~ PH-6 SF-12 I I SF-19 W #4 ~
PH-6 Y ` ' - ~ ROAD D _ l ` ` I ' ` • kk k ` k k , W#6 + 4 4 t
Permanent: 4691 sf PH-6 , _ - i • , • id t k Permanent: 140 sf
~ 1 ` k ` k ` k EIOE k ~ PH- ` k - 1 1 • k ` k ~ k 8088Y LONG A JIA1111' ETHRIDGE Temporary: 1252 sf + , iD43/951
PH-32 r I k ` •~S -10 I I SF-24 ` k ` k
\ ",G R ` ` k k . ` + k ` t k
i -59 q0 N r ~ ~ - ~ ~ ` ~ RA-15
' PH-35 _ r ' ` k ~ 1 PH3 i P 5~' r r / r ~ ' ~ SF-23 ~ + ` + k
/ PH-3 , t SF•9 ` ` •k k , k` ` SF•3'~ 1SF-32
PH-36 ~ PH-57 k ~ SF-22 ~ , , SF•3'~ ~ k ` / ~ , , R
\ti k ` W #8 k \ , 1//
/ PH-37 , R ~ ~ k k SF•8 ~ r -30 ~D r r SF•26 r , M ~ sF-27 / ~ k -30 k, ~ Temporary: 987 sf I
PH-3A PH r PH- ` ~ ~ i SF-28/ / , / ~ + SF-37 • ~ / i ~ /
Tem ora :861 sf 39 ~ ~ ~ ,READ C ~ ~ / k - / _ _
PH-0~ PH-4 r H • k ~ i ~ ~ ~ SF•29 ~ ~ SF•29 k / ~ ~ 6ANNY STANLEY
~ ~ H-40i ~ 0~ ` ~ - i \ SF-38 - ' k
\ PH-4 ~ SF 6 ~ 1 r SF-77 / \ • k ~ ~ \ k ~
r ~ ~ 5F-75 i SF-78 `1 r • PH-05 52 \ ~ , / / k k ~ - ~ 1 SF-39 ' L H- 6 1, ` ` k~ ` SF-35 I i \T •20 ` ~ H- R ~
/ ~ \ + r \ SF-79 / PH-51 d ~ ~ ~ • ` / k Q i ~ ~ Q
~ ' - --,...I r k -18
• kk`` ~ I ~ k k SF•5 SF•7 ' l i` ` k k ` ` ` / r f SF i / k , ` , 4-07 I ~I PH-50 ~ ~ ~ k /k` ` t k ` k , k` ' ' ~ f SF•33 ~Q SF-40 2 ~ ~ ~ ~ i H-
• k , k • k PH PH'4 \ ` \ i k , k , Y \ \ SF-34 0 \ ~ a ~ !
RA-15 , k, k, k, w sF-a ~ 11V,r;tland, J W #2 / • k , • Y , • Y k ~ \ \ ti \ ` Y , y Y , • SF-81 O - ROgp ~ _ _ , ~ w,n FRANCES srANLEY (G ~ sF-42 339na2
PH-28 SF 53 ~ nt: 6300 sf ` k , , • k , ` • 1 , Y \ \ i \`~y ` Y , • k , , k 0~ r r Permane • k ` • , ` k ~ _ ~ sFa2 ' k Y/k/~ SF-53 ~ ~ ~ ~ ~ TH ! L ~ ~ ~
k k 1 \ ` k ` k, ~ ` • Y ` • a ` ~ ` ' k k , 2 ~ SF•51 i ~ ~ ~ k , i SF-50 SF-43
r ` k ` . , SF-2 I ~ SF-71 ~ k ` SF 82 r ,t ` ` ` ` ` ` Y ' \ k , ` ` k lY • • k PH-27 • ' / / `4 ~ LEGEND k, `~k
k ~IeV~~d , 5F-49 , ~ ~ EXISTING
FRED wart k ` ` ` ` k , ' ` ~ ~ / / SF'66 ~ ` • , Boa~'dw ` ` ' ` ` ` + , ` ` ter. SF-44 ` ` ~ CONTOURS + Boardwalk - ~ ` , ` •
/ PH-2 ~ SF-1 ~ , ~ i Y , ~/uEE - ~ ~ , / r \ SF-83 k , N.C. N, DG s~tia 1 - \ ` • SF-85 r \ k PICNIC Pb ` ~ ~ ~ ` r' ~ k ` ` ' k ` +k k` r"-- - - k ` ' ~ ~ PROPOSED 0--~
- I ` 1 1 ~ SF-70 • !40 SF.A\ \ I I • ` ` X4.56 p( ` + ~ICN4C/PbRKJ4REA + k , ` + SF-aa ~ ,0 ' , ` , , , I, ,,~`~~-~5 ` t ` ` X4.56 pCR~Sk ` + ` ~ 0 SF-45 ! ` ' ' ' ` _i ~ CONTOURS /y WETLANDS
k • , +k rk +k k L(, k ; ` k ` , ~ k ` + w ` k , ` ~ d k ~ ° • ` ' k MITCMEL. NCCDY ~ y `
PH 24~ ~ / \ k ~SOIa ` • k ~$olatB ` ' k ' SF-4/ ' ~ ` + k , ` • , ` ' k 1 170/3+2 , k T' k ~ d k k I i t311e5
k Y ,AI ' ~ RAM-15 ` ` ` e~lfind k F ~ ' ' sF-4s ` k ` + k ` + , ' k Yr ~ Op,O ~ ` k , ` + , , ` + , , IMPACTED . ` t ~
SF~B , , +k , WETLANDS k, +k - k, +k
,PH-22 / / ~ 7 tl k ` • ` ` • . / / \ ~ SF-63 ~ SF•62~ ~ . ' , ` ` ~ k ` k + k ` k ~ ~ ~ 1EMPORARILY rrr .
PH-21 k k , k , I : , k k k 5F•65 i ~ ~ ~ k k ` k , -I ' At Gra e k • , S k k t k Y ~ I I v ~ , ~ IMPA~;'~: k1 ~ - - J ~ WETLANDS
\ -10 ~ ~ \ ` k
W #1 • - Boardwa , / ~ ~ '•k `•k k • RiGMT-OF-WAY / ~ \ ~ • , ` ` ~ / ~ ~ PROPERTY LINE
Permanent: 2456 sf ^ , • : , ` . , , ` • : ~ • k \ SF•54 CHURCH OF COD fAA14Y ~ ` + T -
- PH-18 / ~ k ` , ~ Y Ik SF-60 ~ WORSHIP CENTER . , 1 lase 40o k ~ ~ ~ RoeERr WATTS Permanent: 810 sf SINGLE FAMILY HOME LOT NUMBER SF-1 \ ' ~ MAP CAB. ie, Pc ec ` + , 2841173
1 ~ - , • L ~ ' ~ , PATIO HOME LOT NUMBER PH-1
PH 17 / ` ` • ` k k ` • k 1 ` • ~ ( _ l , , ~ Y `P -10 k Y , k ~ _
/ k , , , k , k , k , COMMUNITY , SF•59 / ~ \ ` ' ~ ` ` . ` ` k ` ` k CTIVE RECR T ` k / ~ 59 / T -4 TOWN NOME LOT NUMBER / ~ _ _ TH-1 \ ~ 1 k ~ _
~ y k ~ k , , , , , , k , ~ 11 5,72 AC S / / ~ _ _ _ _ ! s k , ~ ELE TED BOARDWALK
Y, • k ' k, k, Y, _ ` r kt + I
/ PH-13 ` ` ` k k ~ ~ k ` ` y r ` ` • k ` ` • k ` • k ` w / 1 1 ~ • t ' y l ` • 1 " k , • k k SF•57 ~ ~ + 4 R ` +k T SF•57 s1wJnTn*. cNURCN of coo ` • , k AT GRADE BOARDWALK ~ ~ ~
~ PH-1 k ; , k` , , ~ T ` "NEIGHBORHOOD" ' I k , k k ~ 212//INi k , ` ' k ~ / SIELIA JONES
/ ` ' • , ` ` • k ` ` NON-RESIDENTIAL ~ \ r ' / PH-15 k ` , ` ' k 4.44 ACRES I ` ~ ~ WP CAB. D•4 PC a6 k ` ` k ~ 883/889 ~ t ~ I CONCRETE SIDEWALK I I I I I I I I I ~ ~ I I I ~ I ~
k , L , I
PH- ` Y I I ~ ~ ~ _
/ k l, " k ' Y Y k I k 1 ~
i'
Wetland Im act p f
Mitigation 25' Buffe
0.72 Ac.
W #7
Permanent: 814 sf
tae ~~vrJ>`vaDis are sornn~ Allll~flD 21311+M, • }~N3Q
Wetland Impact Mi~ 4.92 Ac ~d Impact Mitigation Area
25' Buffer ffer 0.72 Ac
TOTAL L 5.64 Ac - n
U~l~
~L
T
O1 E
200' 0 200' 400'
a a c~
co
CV an O SCALE: 1"=200' (Horiz.)
O N 2. ~ On,.,1~~,8
C O
DATE: JAN 2DD5 MkC FlLE NU118ER SCALE
a SEAL SEA ' CS101 MCE PROJ. # 3058-0003
m DRAWN JLC HORIZONTAL: DRAWING NUMBER
N O M 1 ^ ^ A' 1" = 200'
RQi i~icun~~ rno i~iTY ~~f1RTN l .OQI I~ ~IV Q DESIGNED JLC/HAG 1A1~1
W VI\VI~v111V1\ VVVI\ 1 I I 11WIN II I wl %I iIIII CHECKED MAG VERTICAL: YVV
v 243 North Front Street
m ~ Wilmington, North Carolina 28401 71~ 7 12 Vlllaycr Road. PROJ. MGR. MAG NA
? Phone: (910)343-1048 , Fax: (910)251-8282 0
°m AA0002667 E80006691 WETLANDS IMPACTS AND MITIGATION STATUS: RENSION NC 28470 S~allotto,
v 0 DALE
9 REV.NO. DESCRIPTIONS 2 REVISIONS www.mckimcreed. com
k
1
Y v ~
k y v
t , k ~ ~ 1
k ~
150' 0 150' 300' k ~ Y k t k
k k
SCALE: 1"=150' (Horiz.) t k k k Y •
Y t ~18i t
LEGEND = Y k
t Y
t ~ Y Y
k Y ~ k
k k i L i
/ k t ko ~ WETLANDS CONSERVATION AREA W W ' ~ 26.18 AC . W
k k 1 L14U34y , k L341 L34y ~ ~
<IBO k k k u k ~ k k ti k
u k k ki IMPACTED .WETLANDS W . t ' " k r / ` k Cd3> k u u k k k • ~R ~J (J3j k a f
1 k 0.35A ~,~:,,~.."r: , ,,k Y 9'"~ k k ~ Y o k ~ k k k
Y k ~3 k tt k k ~ k d k tt
y k k ~i 1 i6 J 1 ~ 16 ~ 1 ?t ~ k ~ ~
WETLANDS MITIGATION AREA y ~ ' ~ t L32 t t w 4.92 AC °k k t w WSb k m k k k ~ k k
I , k (ze>
Y 4 1 C ~1 k N ~ k 1 ~ ° ~ k
WETLANDS MITIGATION AREA t k k k 9 kG k k o ~
25' BUFFER N k ` k k t U k Y 0.72 AC t t k pp k k ~ k k 9 ~g1 k u
k Y Y k 6~ k k W k k U
Is k ~ / ~ ' ~k k k • ~a
/ P t k k k k k k k `~P `
k Y k N ~ k k k k f / k t k G~ ~y k ~ y k ~ 6
k k / Y t ~ k
obi k k 1301 k k N r
k k ~W
/ Y k ~ k k , ~ / m
k k N22'302 51kk 5 pk 181/
/ k k ~ ~ 1
k ^ k k 1391 . ~ ~ L~OI p4tip5 gU
0~ k t k k k k r ry,
/ Y t k r (~9 ~ k k t ~ ~g~ ~y G~ v4 0
k k k ~ Y I k k k ~k31 • t ' ~i
k k Y t k k k Y Y Y k Y t k k k
t Y k k k t t k k k t t k Y Y k k Y k k k i k ~
k t Y Y 1 k t t Y k Y t Y Y / k k t k Y k Y k k Y Y k k k k k (rs ~ IS k d t
/ k Y k t k k Y Y t k k t k k k {~pQ k k k t ~ ~M
t k t k t Y k t k k Ie ~~LVa Y k k~ k t t k k t W~ t k t ~ r
t t k k t k k t Y k Y Y 't tlG ~QI14k t k Y / Y t t Y Y k ,p k
k k k t k k t t Y t k t Y l k k k t t t t k t k k k t k Y k ^
Y Y k Y k k Y Y / t tk k k k t Y k k t Y Y Y Y k t J I
/ t Y k Y t k k t Y Y t k t k Y Y k t k i k t dl~ k t t k k t A
k k Y Y k t t t t k k Y t~ 1 k Y k Y Y t k ~ Y t k k k k ~ k k k t k k k k ) t • iy Y t k k k t k t r77
I k k k k k k Y t t t / k t k t Y Y k k k t Y k Y t ~ k t Y k k k k k k k k k k k t k t ti~ k k t k k t k k k t
t k t k l k k Y k t Y k l Y k t k k k k k k k t k t k k , k k k t t k t k k l k t k k t k k k t k t + i
k k t k k t / k Y t k ~ k k k k k k k k k k k k t k k k k k I k k k k
k / Y t ( k Y k t t k k k t k t k k k k k t k k k t
Y t k k k ( k t k k k? k t k k k k k k k k Y k k t k k t ~SO~at@~ k k k k k t k k t k k k k a~a k k kkf~~~kp}~j C]/~ k k k k k k k k k t k k RIQ
/ k k Y / k Y k k t k t k1/~G-i IIGIRUk k k t k k ' VVV1 k k k t k k t k Y t k k k k
i k 'P" Y k t ~ k k k k k k t w k 4 k k k k k k k k k k t k k k t k k k k k
/ t t t t~ t t Y / t t k k k k Y t k k k t Y k k k t Y k t t k k k k k k I
t k k Y Y k k t Y Y t k k k k k k Y k k ! t 1 k k k t k t t k k t k k t k k k • k k k k t k k t t l k t k k k,
f k t t k Y t Y k t t k Y Y Y t / Y k t Y Y k k k k k k k k t k t k t k t k k k k k k k k k k k k k t k k1j k t k t t k k k y
Y k t k ' k k Y k t I t k k Y Y 1 k k k k t t k k t k cy~;
7 Y t t k Y t t k k k t Y k k k t t Y t Y k Y k t k k Y k k k Y Y k k t k ! k t k k k k t k k k k IS k
t k M' t Y k k / k k k t k Y t Y k k k l k Y k t t Y k t k Y k t t k k k k k k k k I~ k ~ k k ~ ~j1 k
/ k k k t k Y k Y Y ~ Y k Y k t t k k t t t Y k k k~ t Y k Y t k k N k l k
t k k ~ Y k t Y Y Y t l3>~ k Y Y Y t t t Y Y t t k t/ t Y Y Y k k l Y k. 1 k k 1 k k k
I k Y Y t t Y Y k Y t k Y t Y Y Y Y Y Y / t Y k Y Y k t t l Y t k Y k Y t l k k k k t k k k 1 k k k t
t k k t t t k Y Y t Y Y Y t k t k k t k Y Y Y k t t k t 4 Y t t t k t Y t t t k k k t 44 1 k t • ~ V
k t k Y k / t k Y t t k k t k Y t Y k k k 1 t k k t k k Im
/ k k k k k Y k k Y k t k k t Y t k k k t k k k t k t k l Y t t k k t I
t k l t k k k Y k t t k t k k k t t k Y t Y k Y i ~ t Y k t 1 k t
/ Y k Y k t Y Y t l Y t t k Y k t Y k t k k t Y k / k I t t k t J (Spg k k k ~
k Y k t t k t k t k t t k t k t k k t Y t t k k t! k k k t Y k Y k T Y t k Y t t t Y k t t k k k
/ k t k Y t k k k k k t k t Y Y k Y k Y t k k k ~ r t /p~
/ k Y Y k k t k k k k k t k k k k t t t k k Y k k t k k t k t Y Y k Y k k 6 1 k t t 7 k
t k k k k k k k k Y / t t k l k k t k k k k C k t k k k t ( k k k k k
k t k k k / t k t l k k t! k k k t k t k k k k k k
t k k! Y Y k k t t k k k k ~ k t t k t k k k k Y k Y k k k k Y k t k ~ I k k k t
/ t t t t t k k k t Y k Y Y Y t Y Y k k '1 Y k ^ I k k k k
/ k t t Y Y t t k ~ t k k k t k t k t Y k t Y 1 Y k t t t Y k + O k N. k k k t k k k k
k t! t t k Y k t t / t k t k k t t k k k k t ( I t k t /
k / t t k t Y k 1 1 k k k k 33~W k t S24'21
t k t k t t k l t t l t k k t k k t k t -
k k / t Y t k Y k k k t t t k ~ 5y915'S6~ ~ ~ ~ • - .29'42'44'W ~ U-11
L8~ ~ ~ L81T
VAY)
NC 179 60'RIGHT OF WAY)
3
C Y U
a
m v
iri 0
N to O
O N
O
fT 3
D V O
O O
N _ DATE: dAN ~ Me~c FlLE NUMBER 0- S~AL~ _ CS101
MCE PROJ~3058-0004-0004
a ~ m DRAWN JLC HORIZONTAL: DRAIMN6 NUMBER
t ~ ~ /Il ~ 1 I\ ~
4WIV171%4LLVIL~y BRUNSWICK COUNTY, NORTH CAROLINA DHEfCKGNED ED JLC/MAG t VERTICAL: MAG wi
243 North Front Street ' ROD MGR. MAG NA
Wilmington, North Carolina 28401 7 f 2 V1ag 3 Phone: (910)343-1048 , Fax: (910)251-8282 V111agig Road, SW WETLANDS PLAT Pli -1 i
o AA0002667 EB0006691 0 shallo&e a//ofte, NC 28470 CONS MITIGA~IdN HABEAS AND STATUS flEN90x
'a 0
C) REV.ND. DESCRIPIIDNS DAZE www.mckimcreed.com % m IONS N REMS
0 r~
N