Loading...
HomeMy WebLinkAbout310791_Inspection_20181008 (2)Division of Water Resources Facility Number ©- ® O Division of Soil and Water Conservation O Other Agency Type of Visit: O Compliance Inspection 0 Operation Review ® Structure Evaluation 0 Technical Assistance Reason for Visit: O Routine O Complaint ® Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: d f/►.$ "'' Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: OnsiteRepresentative: —�Tnrx-4 Ct1ra" Certified Operator: Back-up Operator: Location of Farm: Swine to Finish to Feeder -to Finish v to Wean to Other Other Phone: Title: Latitude: Integrator: Region: Phone: C I (A 2 S ZS'3 g-r Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IN Non-- La er Design Current Dry Poultry CRDacity POD. La ers Non -Layers Pullets Turkeys Turkey Poults Other Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ? No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other. a. Was the conveyance man-made? ❑ Yes ❑ No NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued FacW Number: Date of Inspection: (� Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: ' Designed Freeboard (in): %5 Observed Freeboard (in): :30 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes NpNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? [;; fYes T❑ ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? Yes [5; No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes NJ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA J�LNE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA `W ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN> 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA NE 15. Does the receiving crop and/or land application site need improvement? ❑Yes ❑ No ❑ NANE F 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA �0 NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA *,Fg] NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑LeaseAgreements ❑Other. 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23 If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Page 2 of 3 ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA [PINE ❑ Weather Code ❑ Sludge Survey ❑ NA ]0 NE ❑ NA NE 21412015 Continued Facility Number: jDate of Inspection: b 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA PDNE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA U NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA NE 9 and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes []g No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. T 30. Did the facility fall to notify the Regional Office of emergency situations as required by the ❑ Yes 4No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA V NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes `pNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drewin of facility to better explain situations (use additional pages as necessary). q 17 C"'h� Y �p�u.� vim. ��, -� Io fill Reviewer/Inspector Name: Reviewer/Inspector Signature: \ /— _ Page 3 of Phone: (61c(4-7 1 `7 Date: I 21412015