Loading...
HomeMy WebLinkAboutNC0076643_BIMS Report_20190515United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 IF I 3 I NC0076643 111 12 I 19/05/09 I17 18 I S J 19 L G] 201 I 211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6 Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 QA ---------------------- Reserved ------------------- 67 I 72 I r, I 73 I I I74 751 I I I I I I I80 1.0 70 I z I 71 tyI I I —I � I I i Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 10:OOAM 19/05/09 15/12/01 Hickory Plant 1223 Fairgrove Church Rd Exit Time/Date Permit Expiration Date Hickory NC 28602 11:15AM 19/05/09 20/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Ray S Penley/ORC/828-466-7818/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Ray S Penley,1611 Indian Springs Dr Conover NC 28613/Operator/828-466-7818/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program 0 Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Edward Watson MRO GW/// Signature of Management Q A Review Docusigned by: Agency/Office/Phone and Fax Numbers Date �s... Ei P44-ft 5.15.19 1`161 FB69AMUAI.. EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type (Cont.) NCO076643 I11 121 19/05/09 117 18 JCJ Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On May 9, 2019, the MRO performed a Compliance Inspection for the former General Electric transformer manufacturing facility under permit NC0076643. No additional building demolitions were observed to have occurred since the November 10, 2016 site visit. The treatment system was observed during the site visit. Primary treatment is the on -site Air Stripper. The wet well was observed during the site visit. The high water alarm provides notification to the ORC through a SCADA system. Three wells are now connected to the SCADA system. GW sampling is being performed by EPA method 8260 for VOCs. Sampling data continues to report elevated levels of PCE and TCE in some of the recovery wells. Sampling analytical results were reviewed as part of the AR. The facility continues to collect surface water samples at the designated locations. Multiple stream surface water measuring points are also present at the site. TCE and TCA are continuing to have an elevated presence. However, based on the analytical data, the treated water appears to be displaying a reduction in the TCE and TCA. Page# Permit: NCO076643 Owner - Facility: Hickory Plant Inspection Date: 05/09/2019 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The current Dermit was Dresent durina the site visit. The Dermit expires 7/31/2020. The ORC was reminded that the application for permit renewal should be submitted by 01/31/2020. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: O&M records were reviewed during the site visit. The records were in order and up-to-date. Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ Page# 3 Permit: NCO076643 Owner - Facility: Hickory Plant Inspection Date: 05/09/2019 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? 0 ❑ ❑ ❑ Comment: All records were present and in aood order. A CODv of the AR was present and available for review. The ORC visitation logs are in order and up-to-date. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: The effluent was clear of solids, color, foam and odor. The receiving stream waters were clear. The up -stream sampling points were observed during the site visit. An updated site map was provided via email. Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? 0 ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ ❑ Comment: The effluent flow meter calibration records were reviewed during the site visit. The calibration records indicate the meter was calibrated on January 24, 2019. Page# 4