HomeMy WebLinkAboutNC0076643_Compliance Evaluation Inspection_20190515Roy COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Mr. Bob Witsell, P.E.
Brownfield Project Manager
General Electric Company
1935 Redmond Circle NW
Rome, Georgia 30165
Dear Mr. Witsell:
NORTH CAROLINA
Environmental Quality
May 15, 2019
Subject: Compliance Inspection Report
General Electric
Permit #NC0076643
Groundwater Remediation
Hickory, Catawba County
On May 9, 2019, the Mooresville Regional Office (MRO) performed a site inspection of the Remediation
System at the General Electric, Hickory Plant, located at 1223 Fairgrove Church Road, Catawba County to
determine compliance with remediation activities as per permit #NC0076643. Enclosed is a copy of the
site inspection report.
At the time of the inspection, the system was online and performing at levels consistent with the active
permit for this facility. Laboratory data indicate the system is being effective in the reduction of the TICE
and TCA constituents. Continued monitoring of the system is recommended.
Should you have questions regarding the site inspection report or the findings listed herein, please
contact Ed Watson by phone at (704) 663-1699 or email (edward.watson@ncdenr.gov).
Sincerely,
EA
DocuSigned by:
f-iI N P44-ft
F161F969A2D84A3...
Andrew H. Pitner, P.G.
Assistant Regional Supervisor
Mooresville Regional Office
Water Quality Regional Operations Section
Division of Water Resources
D Q��
North Carolina Department of Environmental Quality I Division of Water Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
NORTH CAROLINA
n,Ammvm of �W-wwiny 704.663.1699