PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 31-763
Facility Name Britt Farm
Certified Operator Name. Kendall Huffman
County. Duplin
Operator Number. 16819
31—Tc 3
ho-kr f qZ�1
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways
Lagoon Name/ID
Spillway(Y or N):
Level(inches)
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
no
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures
Five and 30 day Plans of Acton are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule vnth corresponding animal units and dates fro depopulation
'if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste, 6/4/2018
1 hereby certify that I have reviewed the Information listed above and Included within the
attached Plan of Action, and to the best of my knowledge and ability, the information Is
accurate and correct.
DM Farms of Rose Hill LLC Phone 910-285-1357
Facility Owner/Manager (print)
Date, 5/2912018
Facility Owner/Manager (signature)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID)' I Britt
2. Current liquid volume in 25 yr /24 hr. storm storage & structural freeboard
a current liquid level according to marker
b designed 25 yr./24 hr storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Protected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
18.0 inches
19 0 inches
1 0 inches
411471 ft2
256484 gallons
180 days
g volume of waste produced according to structural design 523042 ft3
h. current herd # 4600 certified herd # 4600
actual waste produced = current herd # x line g =
certified herd #
i volume of wash water according to structural design
j excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 5/16/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
523042 ft'
0 ft3
245394 ft3
957984 gallons
2.03 Ibs/1000 gal
2466.4 Ibs PAN
PoA (30 Day) 2/21/00
H. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1 Structure ID
2 Structure ID
3 Structure ID
4 Structure ID
5. Structure ID.
6 Structure ID
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
line m = 2465 4 lb PAN
line m = lb PAN
line in = lb PAN
line in = lb PAN
line m = lb PAN
line in = lb PAN
2465 4 Ito PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD DO NOT LIST FIELDS Tn WHICH PAN CANNOT RF APPI.IF❑ DIIRING THIS 30 DAY PERIOD.
o tract #
p field #
Q crop
r. acres
a mmar ing IRR
2 PAN balance
plUaaeJ
t TOTAL PAN
BALANCE FOR
FIELD (Ilm )
column r x s
u apphmlbn wntlav'
1300
P2
Com
46
163.00
74980
March -June
1300
P1
Com
50
16300
81500
March -June
'State current Crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v Total PAN available for all fields (sum of column t) =
15648 0 lb PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w Total PAN to be land applied (linen from section II) -
2465 4 lb. PAN
x Crop's remaining PAN balance (line v from section 111) =
15648 0 lb PAN
y. Overall PAN balance (w -x) =
-13183 lb PAN
Line y must show as a deficit If line y does not show as a deficit, I st course of action here Including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new Information. If new fields are to be included as an ophon for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Imgahon onto existing spray fields will begin as weather and field conditions permit. There m sufficient land and
PAN available
PDA (30 Day) 221/00