HomeMy WebLinkAbout310763_Plan of Action_20180529ab�U0M PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 31-763 Facility Name Britt Farm Certified Operator Name. Kendall Huffman County. Duplin Operator Number. 16819 31—Tc 3 ho-kr f qZ�1 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways Lagoon Name/ID Spillway(Y or N): Level(inches) Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 no 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures Five and 30 day Plans of Acton are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations Volume and PAN content of waste to be pumped and hauled is reflected in section III tables Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule vnth corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste, 6/4/2018 1 hereby certify that I have reviewed the Information listed above and Included within the attached Plan of Action, and to the best of my knowledge and ability, the information Is accurate and correct. DM Farms of Rose Hill LLC Phone 910-285-1357 Facility Owner/Manager (print) Date, 5/2912018 Facility Owner/Manager (signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID)' I Britt 2. Current liquid volume in 25 yr /24 hr. storm storage & structural freeboard a current liquid level according to marker b designed 25 yr./24 hr storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Protected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 18.0 inches 19 0 inches 1 0 inches 411471 ft2 256484 gallons 180 days g volume of waste produced according to structural design 523042 ft3 h. current herd # 4600 certified herd # 4600 actual waste produced = current herd # x line g = certified herd # i volume of wash water according to structural design j excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 5/16/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 523042 ft' 0 ft3 245394 ft3 957984 gallons 2.03 Ibs/1000 gal 2466.4 Ibs PAN PoA (30 Day) 2/21/00 H. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID 2 Structure ID 3 Structure ID 4 Structure ID 5. Structure ID. 6 Structure ID n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 2465 4 lb PAN line m = lb PAN line in = lb PAN line in = lb PAN line m = lb PAN line in = lb PAN 2465 4 Ito PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD DO NOT LIST FIELDS Tn WHICH PAN CANNOT RF APPI.IF❑ DIIRING THIS 30 DAY PERIOD. o tract # p field # Q crop r. acres a mmar ing IRR 2 PAN balance plUaaeJ t TOTAL PAN BALANCE FOR FIELD (Ilm ) column r x s u apphmlbn wntlav' 1300 P2 Com 46 163.00 74980 March -June 1300 P1 Com 50 16300 81500 March -June 'State current Crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v Total PAN available for all fields (sum of column t) = 15648 0 lb PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w Total PAN to be land applied (linen from section II) - 2465 4 lb. PAN x Crop's remaining PAN balance (line v from section 111) = 15648 0 lb PAN y. Overall PAN balance (w -x) = -13183 lb PAN Line y must show as a deficit If line y does not show as a deficit, I st course of action here Including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new Information. If new fields are to be included as an ophon for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Imgahon onto existing spray fields will begin as weather and field conditions permit. There m sufficient land and PAN available PDA (30 Day) 221/00