Loading...
HomeMy WebLinkAbout310754_Inspection_20180620n FacitjAy Number t 0 Division of Water Resources I! I7 - F7� O Division of Soil and Water Conservation O Other Agency of Visit: <D Comp] a Inspection in for Visit: outine O Conan :w O Structure Evaluation O Technical Assistance O Referral O Emergency O Other O Denied Access Date of Visit: /�� Arrival Time: o Departure Time: / fl County: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Owner Email: Phone: Onsite Representative: G rf— Integrator: Certified Operator: Back-up Operator: Location of Farm: Swine to Finish to Feeder rto Finish vto Wean vto Feede Other Other Latitude: Phone: Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer 7_00 1 1 1 INon-Layer Poults Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2 Is there evidence of a past discharge from any partof the operation? 3 Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Region: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes E2-9_o___Ej NA ❑ NE [—]Yes [:]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes No NA ❑ NE ❑ Yes Jo ❑ NA ❑ NE Page I of 21412015 Continued ]Facility Number: - Date of Inspection: L. Waste Colleagection & Treatment 4. Is storcapacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes o ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ N ^❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes E�No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 0 No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN> 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s) 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E:fNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? 21oso No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [%� ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes E No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Io ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design []Maps ❑ Lease Agreements ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0A ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and I" Rainfall Inspection Sludge Survey 22. Did the facility fad to install and maintain a ram ❑ gauge? Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA 'E2-Nff_ Page 2 of 3 2/4/2015 Continued Facifi Number: Date of Ins ection: sq 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes Ijo —❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues �-� 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ElZ Yes io ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWW? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑Yes ❑No ❑NA ❑NE ❑ Yes ❑ No ❑ NA 6; ❑ Yes ❑ Yes ❑ Yes f�No ❑ NA ❑ NE �b DNA ❑NE [%No ❑ NA ❑ NE Comments (refer to question # ): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Z f ^ -e— c s re c((o, �—�L �� Ce � sd, (�-, s /ems f� Reviewer/Inspector Name: Gov l Q Phone: 'l 4 Q 309 Reviewer/Inspector Signature: Date: -0 Page 3 of 3 214120I5