Loading...
HomeMy WebLinkAboutNCS000548_Inspection for Mod to Remove SW006 SW009 SW023_20190513Permit: NCS000548 SOC: County: Catawba Region: Mooresville Contact Person: Rick Roper Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Compliance Inspection Report Effective: 01/24/17 Expiration: 04/30/20 Owner: Duke Energy Carolinas LLC Effective: Expiration: Facility: Marshall Steam Station INC Hwy 150 Title: Station Manager Certification: Related Permits: NC0004987 Duke Energy Carolinas LLC - Marshall Steam Station Terrell INC 28682 Phone: 828-478-7600 Phone: Inspection Date: 05/13/2019 Entry Time: 01:OOPM Exit Time: 02:30PM Primary Inspector: James D Moore Phone: Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Inspection Type: Technical Assistance Page 1 of 3 Permit: NCS000548 Owner - Facility: Duke Energy Carolinas LLC Inspection Date: 05/13/2019 Inspection Type: Technical Assistance Reason for Visit: Routine Inspection Summary: Based on the inspection the MRO staff recommends that outfalls SW006, SWO09 and SW023 be removed from permit NCS000548.Physical changes have been at the facility which no longer would require sampling at these locations. See the April 5, 2019 letter from Duke Energy for further justification. Page 2 of 3 Permit: NCS000548 Owner - Facility: Duke Energy Carolinas LLC Inspection Date: 05/13/2019 Inspection Type : Technical Assistance Reason for Visit: Routine Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Outfalls 006, 009 and 023 were inspected and based on physical changes at the facility they are no longer recommended for sampling. Page 3 of 3