Loading...
HomeMy WebLinkAbout310740_Inspection_20180306�''���j'j�Division of Water Resources Facility Number u - I� O Division of Soil and Water Conservation O Other Agency (Type of Visit: KXCompliance Inspection U Operation Review O Structure Evaluation O Technical Assistance I Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other jO Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: Farm Name: % %i9 Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: j t1T TItle: Onsite Representative: l , - , A r�( �TYY1�S' bws� Certified Operator: k6 �: , �/ 1/ �l WU t l G Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Other Other Latitude: Phone: Integrator: Certification Number: " l M &A 4S Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IN Non-- La er Poults Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify D WR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2 Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes 9 No ❑ NA ❑ NE [—]Yes [—]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page 1 of 3 21412015 Continued Facilif Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes kNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure u1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 q� / � Q C Identifier: Spillway?: Designed Freeboard (in): 7 Observed Freeboard (in): L4_ 3 I U_ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ENO ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �WNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [ VNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �VNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below ❑ Yes �VNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window �❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): � 6p VI tM(�l. _ � � _ Aw"A qrraoj 13. Soil Type(s): Q U 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [N�o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? [:]Yes 0q No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Ld No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19 Did the facility fail to have the Certificate of Coverage & Permit readily available? ElYes No gNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes k No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 9No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [� No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �KFNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [X No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [ NA ❑ NE Other Issues 28 Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 10 No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface file drains exist at the facility? If yes, check the appropriate box below. ❑ Yes z No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other. 32. Were any additional problems noted which cause non-compliance of the permit or CAWW? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendationg or apy other comments. Use drawings of facility to better explain situations (use additional pages as necessa Reviewer/inspectorName: ICY �' t0" i "Llt Reviewer/Inspector Signature: Page 3 of 3 Phone: �t D —Ip u—1 3 k Date: 3 111 214415