HomeMy WebLinkAbout310740_Inspection_20180306�''���j'j�Division of Water Resources
Facility Number u - I� O Division of Soil and Water Conservation
O Other Agency
(Type of Visit: KXCompliance Inspection U Operation Review O Structure Evaluation O Technical Assistance I
Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other jO Denied Access
Date of Visit: Arrival Time: Departure Time: County: Region:
Farm Name: % %i9 Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Phone:
Facility Contact: j t1T TItle:
Onsite Representative: l , - , A r�( �TYY1�S' bws�
Certified Operator: k6 �: , �/ 1/ �l WU t l G
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Other
Other
Latitude:
Phone:
Integrator:
Certification Number: " l M &A 4S
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
IN
Non--
La er
Poults
Design Current
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify D WR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2 Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes 9 No ❑ NA ❑ NE
[—]Yes [—]No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No
❑ Yes No
❑ Yes No
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
Page 1 of 3 21412015 Continued
Facilif Number: Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
kNo
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA
❑ NE
Structure
u1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
q�
/ � Q C
Identifier:
Spillway?:
Designed Freeboard (in):
7
Observed Freeboard (in): L4_ 3 I U_
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
ENO
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
�WNo
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes [ VNo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �VNo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below ❑ Yes �VNo ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window �❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): � 6p VI tM(�l. _ � � _ Aw"A qrraoj
13. Soil Type(s):
Q U
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [N�o ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? [:]Yes 0q No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Ld No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No
❑ NA
❑ NE
Required Records & Documents
19 Did the facility fail to have the Certificate of Coverage & Permit readily available?
ElYes
No
gNo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes k No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 9No ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facility Number:
Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes
[� No
❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
�KFNo
❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge?
❑ Yes
[X No
❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
❑ No
[ NA ❑ NE
Other Issues
28 Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
No
❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
[ No
❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
10
No
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface file drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
z No
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other.
32. Were any additional problems noted which cause non-compliance of the permit or CAWW?
❑ Yes
No
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
No
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
No
❑ NA
❑ NE
Comments (refer to question ft Explain any YES answers and/or any additional recommendationg or apy other comments.
Use drawings of facility to better explain situations (use additional pages as necessa
Reviewer/inspectorName: ICY �' t0" i "Llt
Reviewer/Inspector Signature:
Page 3 of 3
Phone: �t D —Ip u—1 3 k
Date: 3 111
214415