Loading...
HomeMy WebLinkAbout20190648 Ver 1_Full_Planset_20190514CONSTRUCTION PLANS FOR: lt)UAIL RUN � HAS / 1 OWNER / DEVELOPER: PENNY ROAD DEVELOPERS, LLC 10305 PENNY RD. RALEIGH, NC 27606 BEFORE YOU DIG! CONTACT ONE -CALL CENTER 1-800-632-4949 SHEET IND X S-1 COV R S-2 OVERALL SITE LAYOUT S-3 UTILITY PLAN S-4 GRA ING, DRAINAGE, AND EROSION CONTROL PLAN S-5 STO MWATER DRAINAGE PLAN S-6 PLA /PROFILE -BARK WAY S-7 PLA /PROFILE - BELLINI COURT S-8 PLA /PROFILE -FETCH COURT & BELLA VITA WAY S-9 DETAILS S-10 DET ILS 5-11 DETAILS, 5-12 DETAILS 5-13 DETAILS 5-14 DETAILS noch nglneers , P.A. CONSULTING ENGINEERS &,SURVEYORS 1403 NC Highway 50 South - Benson, NC 27504 Phone: (919) 894-7765 Fax: (919) 894-8190 E-mail: general@enochengineers.com N.C. Firm License #C-2061 PETER E. NORFLEET TEMPLE DATE ATE: February 21, 2019 PROJEC NO.: 4914 REVISED: 04-01-2019: HRW COMMENTS EE PROJECT: 4914 S-1 OF 14 Approximates f - 100 Year � 1ss < 1 Phase Breakdown Data Sheet One o f One 5 rs� PP Net Area of Phase 4A = 24.297 Ac. in Traverse Net Area of Phase Six = 31.421 Ac. In Traverse % Flood limit � A \ ( ) Required Area of Dedicated Oen Space = 4.859 Ac. Required Area of Dedicated Open Space = 6.284 Ac. \ q P P Preliminary Subdivision Plan 30' RCP Area of Dedicated Open Space = 4:297 Ac. (In Traverse) �o� � 0 �" Oen ' . �� � Area of Dedicated Open Space in 6.777 (In Traverse) y P Area of Roads = 4.003 Ac. )Kipling �` / (// 1 Area of Roads in 2.498 Ac. Phases 4-6 Spa e Area of lots in = 15.022 Ac. Area of lots := 23.121 Ac. 0 r, I 7 �� 10 Grav !and Soil Path 20. Access Easement per 38 Lots 61 Lots Approved under the Compatibility tibili t pp p y Design Concept QJ� 0� F ��, Maplum 2003-335 and Deed Book 1843, Page 481 Average Lot Size 17,219 sq. ft Average Lot Size = 16,510 sq. ft ite \ 1h o 26,142 to be'reloc ted at the developers expense Smallest Lot Size in 15,100 s . ft. Smallest Lot Size = 15,100 sq. ft. q �, c� sq. ft. ;; Quoil Glen Subdivision ` Cumulative Net Area = 93.129 Ac. (in Traverse) Bruce L. Rendall\ �\ 4 �f%'78 Wetlands Net Area of Phase 4B 12.248 Ac. (In Traverse) Cumulative R = Black River Township Harnett Required Area of Dedicated Open S Required Area of Dedicated Open Space 18.626 Acres p t t County, NC 1431 / ; ` � 0 \ ands Note q p pace = 2.450 Ac. Cumulative Area of Dedicated Open Space = " ' 1437 Kim. Austin Rendall ��__ Ql� J 25,447 / � _ \ Any impact to include but not limited to, Area of Dedicated Open Space = 2.898 Ac. (In Traverse P20.347 Ac. (In Traverse) Scale: - - - Deed Book 2645, Pae 32 / s s�. ft _ )20 Date: 5 8 18 Page ,� clearing and/or filling will be subject to Area of Roads = 1.420 Ac: one RA -30 and CONS Map Book 22, Page 95 \ (�- 6 �� prior inspection, permitting and approval Area of lots = 7.930 Ac. \ 1432 1yo • by the Army Corps of Engineers, 19 Late PIN: 0652- 93-2092.000 & 0652-83- 6751.000 dao �0 0 5 15,326 NG L1ENR and or NC DWQ Average Lot Size _ 18,180 sq. ft Street Tree Requirements Notes \ Smallest Lot size - 15100 s ft: PID: 110662 0022 & 110662 0022 36 24,888 O p O/sq. ft. 1, ...5, //' �\ � � �J ` q• I V� / sq. ft. �'T 6 >S� �p �+ \ \� The subdivider/developer shall either plant or retain existing healthy trees so tha there is at 0 120 240 (-\ ' Cumulative Net Area = 36.545 Ac. In Traverse j � ) least one (1) deciduous tree for every 50 linear feet of street. Street trees shall be planted or Cumulative Required Area of Dedicated Open Space = 7.309 Acres retained' along both sides of news created 4' P P g y public streets. Street trees shall be s aggered on I sides of the right(s)-of-wayon local or cul-de-sac streets ' GRAPHIC SCALE \ S Qo, o Cumulative Area of Dedicated Open Space = 9.675 Ac. (In Traverse) in residential subdiv ions. US \ O\ / O 'Z ; 8G `s 7 �Oty d' C `S l \\ Net Area of Phase Five = 25.163 Ac. (In Traverse) Street trees shall be of species that is expected to attain a minimum height of 5 - 35 feet PREPARED BY \ > Required Area of Dedicated Open Space = 5033 Ac. at maturity. Where required street trees are located under overhead utility lines, he species �/{ / `@ NC 2Y S J l '�� %; 4j / 15, 4 �9ti s5,20t o ,per d' q p p shall be of a type to reach a maximum of 20 to 25 feet. All street A/ V CIL & A CIA TES 27 h ry s ft. q F+ p Area of Dedicated 0 en S ace 6.375 Ac. In Traverse fp t trees shall eat least US ¢ E l / 23,065; 9� q p. \ n /� \ P P = ( ) two (2) ;inches in caliper and a minimum of six (6) feet in height at the time o planting R sq. ft/; ; 0 " �, \ 1,, \ �� /� > Area of Roads = 3087 Ac. PROFESSIONAL LAND SURVEYOR, P.A. C-0831 15,100 1` Area of lots = 15.701 Ac. \ \ \ "�cs / , � �• �0.. �� O � Street trees shall be planted in a linear arrangement parallel to the street no less than 71 \ N sq. ft. �o / / 41 Lots five (5) ,feet and no more than 10 feet outside the riht-of-way. Street trees s a/J be planted 98 Depot Street, P.O. BOX 730, Angier, /�/ C. 27$01 o- ,- - Average Lot Size = 16,681 sq. ft at leost:eight (8) feet from utility poles and 10 feet from electrical transformers Lillington � � ��,-150- f � _ � • .� �, • / � \ c (919} 639-2133 (919} 639-2602 (FAX} 16�20� . � �` Smallest Lot Size = 15,100 sq. ft. s ft. _ 15,133 ,p �° \ Plans for street tree planting and retention of existing trees shall be approved b the NCDOT Sfar1ClISUJ'Ve mail cam 15,100 ��-q. 35. 9 �0 sq. ft. 1101�/ for all streets proposed to be dedicated as public streets. sq. ft. Fl \ p �' Cumulative Net Area = 61.708 Ac. In Traverse v� P nn �o %� p o` 9 �' Cumulative Required Area of Dedicated Open Space = 12.342 Acres Note Owner and Developer VICINITY MAP /� pe 15, 00 'as v 8Q 15.1 9� �- Cumulative Area of Dedicated Open Space = 16.050 Ac. (In Traverse) No Scale L-147 .- sq. ft. j cn ��cPo 000 0� \ / / { No UNPERMITTED disturbance is permitted 'thin Penny Road ©e velop ers, Inc. Wetlands s� w 8= I ' the 30 Blue/ine stream buffers as shown hereon. / 10305 Penny Road Raleigh, NC 27606 919-362-7336 R W SR 2215 Neills Creek Traverse ! 15,2 �'� 3 A� / / l } / L-1.46 15,100 �d,� O s� \ sq. ft. b/�a, \ sq. ft. 8 �� �� �� Utilities Note THIS DOCUMENT IS Course Bearing Distance Course Bearing Distance Q ( � �' � 6 � o / s <\ �/�y // FOR REVIEW PURPOSES All u till o• � ties and drainage easements \ \ g are to be centered In ONLY AND SHOULD NOT L -T S 2T01'S0" E 5320' L-94 N 4546'16" W 4.90' 15,909 � 2 0 3 6 / � ``S �\ � \\ L-2 S 2949'56" E 57.61' L-95 N 09°1026" W 36.34' 9 �� SL sq'. ft. / S, �s roximat locat 112 { a Public Dedicated Utility or Drainage e/ I e Easement, refer 6 sq. ft9� l° Y 9 to BE CONSIDERED L-3 S 33363 � I 1 I �7 '\ � � o •�• °�, ar tt Cdunty W t r Line \ ---_\ A 2 E 59.56 L-96 N 78 44 06" W 9.00' ( a' / 0„ o,� / /`� L-4 S 3734'15" E 54.92' L-97 N 02'09'45I\ �� >>�'r a' �� ��' � � � �r � '/ os 0o x� w� `�-`( \_. approved construction plans for finalized locations. CERTIFIED PLAT. THIS E 55.68 o. +tr e \ 19,451 �. �0 15,10/ 83 ` ��ry pe PP l�� \ \ ���\ \ I PLAT SHOULD NOT BE L-5 S 4134'12" E 5717 L-98 N 2525'12" W 67.59' � i sq. ft. o; � i sq. f . �" 59 �-Space L-6 S 44 40 35 E 54.39' L-99 N 5538'48" W 60.63' , Z r'o `�'? �S 0. 32 4,2 w e ` \ USED FOR CONVEYANCE 4 2 3 \ \--� � W Ex � OF TITLE OR ANY s o o FH �. \ \ L-7 S 46°1928" E 57.79 L-100 S 82°4315 W 95.20 .� \�\•. 1 �6' `-__: o- •o- � I � \ 15, 00 \ .' 19 080 ��27 wex _ OTHER TRANSACTIONS. L=8 S 4639'07" E 111.26' L-101 N 26'1928" E 179.22' -,� I � � \ 66 � � � 16 330 sq. ft: ��� 58 '� • ��. sq, f , / / � � � w E,c oN . L-9 S 46 52 23" E 51.63' L-102 N 32 44 24" E 156.42' O ' ` o '� 4 : 4� w x Revise of Phases and Size of Ph uses 10-9- 2 18 L-90 S 4705' i E \ � `� ' sq: ft. �o / J� - '� �� w Ex L-34 05 E 56.33 L-103 N 47°15'41 E 55.39' O 1 8,40 •� s: • 6 3 '�- � 35. j 'h1 \ "` � L-33 L-11 S 47°4628" E 56.46 L-104 N 4553'15" W 44.72' i oq. ft. &0 Q 15,100 �� I N Area et ne e V. P aH L-311 Revise Lots and roads per located Streams etc 10-22-18 v C 1IC 0•. q. ft. 5 5,1 0 \ L- L L-12 S 48 ° 'i \ 15 435 0 / wn�ei� �"-- 22 2 E 37.03 L-105 N 342825" E 102.47 O q Revise Open Space and Lot Along Road 12-3-18 L-13 S 5058'12" E 52.18' L-106 V ` 6 sq. ft. 00 /': L 3>- q. ft. 1Y 0 Ac. N 34 °10 36 E 92.05 ` h o. 16,026 0 N Relocat Stream Crossingand associated lots and o - - L-14 S 54 47'12" E 57.76' L-107 N 50 04'48" E 44.41' \ 6" p /sq. ft. C'o 5.949 ¢ 0 N p� _ f� \ oo pen space 12 12 18 <, \ 6 64 �o. sq. ft. j 15,100 ,� -- �- �+ \ shares Tyler Long Lots 38-41 and 44-50 and remove C -D -S 1-23-19 L -15 S 58 43'37" E 52.12' L -108 N 19 29'10" E 87.00' �Qo N-----$(}B@� -=� �f '� \\ h _ _ D 34 8, Page 127 L-16 S 6308'52' E 57.56' L-109 N 68°14'17" E 107.54' i 9,9 0 20,318■ ■ / o. / " 6 U ) % �' \\ Phases 4A 4B and 6 Summaries L-17 S 68:43'42" E 59.40' L-110 N 2353'06" E 85.75' ��� q. ft. sq. f. �' �� 56_ 0 -Cr IMtlan \ S ace ap tub 2007-635 L-18 S 72°4020" E 54.81' L-111 N 3527'16 W 52.56 s`P 5 '�0 5 7a ��, 15,100 c \\\ Revise to include only Phases 4- 6 3-21-19 \ 1 t� 654" c5� sq. ft. 8. J L-19 S 74 '53777- E 48.77 L-112 N 86 30'50 W 72.68' L-20 S 754853" E 61.39' L-113 N 1144'05" E 37.86' \ r 21:889 w' \ 7 lam,_ i��� �r87s3, '�k 6 Justjn Hai L-21 S 7556 20 E 174 \ q / .37 L-114 N 46 30'10" E 62.23' \ \ � 15,850 -• R � ,� �'f � LJnaysey ire , Mafibox Kiosk , L-22 S 76-4677E 5390' L-115 N 48-07'12" E 9.03' .�' /� g?• '> ' , sq. --� /g / � ms's -9 rJ 9 °p D�3304, Page ,2� (� \ 200. o' L-23 S 775548" E 61.96' L-116 N 6041'19" E 34.11' 4 \ ase \ \ ry "� vim- �,o _ -- ��L�' / s op Number 191-63� L-24 S 79.1422" E 14.68' L-117 I N 19.13'10" E 37.79' L�-134 \ Q S 5 / . /� J f / 24 78t• �ry sq. ft. \ L-25 S 8120'46" E 55.07 L-118 N 2531'02" W 4301' ` / L-26 S 84°17'07" E 51.65' L-119 S 8438'11" W 34.49' tO\21,418 �•'. 8" e / / / / �/ q� )3 / / 4 4, 0 \ � 0• S 18,65. s f L-27 S 870520" E 56.78' L-120 N 712358" W 29.09' o L-132\ \ sq. ft. O S /^ 9 O R /s t. >2 ,7 1 \ 0 ^ \ q / 1 ti q 0 156 0. �?• J \ L-28 N 89 4937" E 59.40' L-121 N 4733'04" W 3353 \\ J \ L-29 N 870854" E 57.80' L-122 N 07°43'15" E 70.47' --- \ �` o `� s 2ft5 `�� 1, 48 v L-30 N \� 25, 98 / 15,484 0 852653 E 4562' L-123 N 28°19'06" W 48.76' N q. A ip 16,13 93 97 /,Jac uelJne1. WJl o "16'6Q9 16,563-'-- sq. ft ( co _. �, , 5,1.00 sq. ft. sq. ft Deed Book ?ly9 Pa 767 \� _-...-__'s�}' 5,100 _ t cn O �o I / L-31 N $42842" E 5355' L-124 N 782755" W 27.01' `,, \ ---__r_' sof .8 1iI L-32 N 8246'17" E 52.23' L-125 S 38°10'16" W 55.60' \ _ � q 5 �'� 188 Ma N ber 2007-635 / 5a:. p L-33 N 80'4527" E 56.65' L-126 N 69°14'46" W 22.83' � `� .y2/' 88.8 188.8' \ 188.8' (x� 15,100 / . \ • 01 L-34 N 79 08'45" E 18.98' L-127 N 30 *2528 " W 1 1J. 71' ,� '�� We d s '.`o t4 � �. t t -ta � oo co 15, � o � sq. ft. / I Run of Branch Traverse L -128 N 33 25'30 " W 58.21 ' p .SL 1 09 u,r L-129 N 4901'07" W 29.61' i o. ` °0 5,90 9? 91 ft. o p sq. ft. @92 ;r 1 1888' FEMA FLOOD HAZARD STATEMENT Course Bearing Distance L-130 N 163 �r . \ o, sq. ft x OS 58 05 W 36.44 / ft _ s9 g DeTE Edward G/oc w A portion of Lots shown on this plat L-37 S 7139 53" W 5334' L-131 S 68°14'43" E 113.27' \ / > A g.'- -163-7 Jan llzab e th G/ k 1 y ' - • - 6 ' -' - 15,100 oi are located within the FEMA 100 year �- L-124 � � ..�, -i63�''.. �.... �. . - \ � �/ - ry' 1 Zone 'AE , Flood Hazard Area as shown L-38 S 2920'06'' W 8.29' L-132 N 8520'35" E 32.68' L-126 - -- ss 99 sq. ft. C-) Deed Bk 2732 Pa 797 / h _ Easement I g L-39 S 64 5652" W 24:7T L-133 N 5153'44" E 41.99' \ , „ I 15,73 0• .�,. ,�- �SS- ::� - e la i y -�7-^� �_- � � Ma Number 2007- 36 -- on -FEMA map No. 3720064200) 1 8.8 P Effective date: 1%3/06 Wetlan \ s t• w -�0:0= • • 60. � L-40 S 36°11'51 W 24.78 L-.134 N 833425" E 9.19' � \ / -•A-T-••-•8��'-"' � � L-41 S 873932" W 30.28' L-135 N 1257'20 E 38.42' \ N \ \ �- 8 #� 2 `�G 1 15,9 C0 A roximate loca' n 8" Harnett Count L-42 S 16'58'09 " W 14.10' L-136 N 16 36'19" W 69.11' f 1 <, Exr ting ' am tt Coun tyg " � n�� 1 ' Viz° / ,t �� n s . ft. o Har tt County Wa er Line \ w Ex y e S ni e gEasement � �. s q j" N \, Ex Minimum Build' • � - � I Ing L-43 S 733749" W 26.75' L-137 N 2907'03" W 52.31, Penny Road Developers, LLC �, w L-44 S 673930" W 30.91' L-138 N 4751'44" w 51.76 Deed Boo 4 Pae 221 - Deed Bbo 3622 Page 968 g w\ �, �� 5 7 0 15,103 1 5 q " �,' �3 "' -- - w E _ _ I Setback Requirements L-45 8224'33" W 70.13' L-139 N 8458'06" W 54.95' _ Map_>Ntlmt -360 \ /� L� sq. ft. oo - w RA -20R RA -20M RA -30 & RA -40 L-46 S 52°18'15 W 50.18' L-140 Map tuber 2018-200 �6 - Open / s6 , q ft' , 1 _� au 15,1 0 5 eo , N 633206 w 94.06' � Ma Numb 2 1 1 4 .s 1 x32.8 ,100 1 ,90 ublic R W ' P � \ \ S . anter /v � _ �` L-47 6320'02" W 6220' L-141 N 665227" E 50.46' � k � y` __ Map Nie 1.366-"""" � --�� . p� _„_-...._--- � 61 1 t ft. FRONT: 30' from R/W L-48 59°10'09 W 49.55' L-142 N 245645" E 40.87 / �,IN / I �A a Number \ ss `� ft. q' v\ cn - 1 p \ \ .. ;. -1F3.� - o REAR: 20' L_49 34°4732" W 46.29' L-143 N 04 01'44" E 52.18' �.`� �,„��ss-----'� _� �C� 8\ r' .R \ SIDE: 10' L-50 S 89 33'15" W 73.86' L-144 N 21 06'08" E 74.92' \/ \ v 1 ,1 ?0 0• gQ.O b55 «U» n o �\ CORNER LOT SIDE. 20' n k�J_7;411 01 1 ,909 Carol Anders n 7-51 62'J427" W 81.10 L-145 N 01 0641 " E 93 \ _ �\ \ 96' \ Q 1 / /�° 15>10p r d? 5� /��88. sq. ft. y Deed ook045, P e 565 L-52 55 5443" W 26.02' L -146 N 25 °17'50" W 20.96' / , I \\ . / / J \ s+ �� \ ami - /��'/ , �� } \� `~ 1 22' 31• _ \:, z\ sq. f ! / 1 8.8' o si__\ Ai - �. a AlnTV- L-53 L-54 L-55 S 7705'54" W V 42 *0,525 W 8344'49" W 11.62' 26.66' 40.94' Run Course Of Ditch Travers Bearing Distance L-56 61 08'12" W 33 48' L-147 IN 00 47'14" W 6.20' L-57 3802'11" W 3781' L-148 N 323924" E 91.52' L-58 6201'57" W 21.85' L-149 N 7822'41" E 40.15' L-59 S 6021'57" W 22.54' L-150 N 7723'18" E 37.49' L-60 6105'45" W 51.91' L-151 N 3121'41" E 109.25' L-61 N 37°10'08" W 27.22' L-152 N 35°15'17" E 124.51' L-62 S 53 06'41 " W 20.13' L-153 N 4J'09'1 9 " E 71.62' L-63 V 64 40'16" W 48.95' L-154 N 4J'10'52" E 224.97' L-64 S 55 34'13" W 21.36' L-155 N 535943" E 11.4.08' L-65 S 87°32'10" W 40.82' L-156 S 83'14'07" E 49.45' L-66 N 6138'48" W 27.63' L-157 is 68°12'15" E 87.83' L-67 S 512749" W 27.60' /, - / - - > > f 15,1A0 ��� \ \pace wI sq ft. \ I t -- - -- --, Harnett County location 8" / 1! -63� ••-.. L-68 S 87°1434" W 30.25' / 6J 0 Qi 8 9 tx o o� o Open �1 T Harnett County Water Line r ^ '�'C / � 510 i L-69 6641'05" W 2313' s . ft. d L-70 S 4033'50" W 26.53' \ '� $ �' I �OC q' t C o -�5 4 4 15,535 cn L-71 S 8505'37" W 79.30' \ Area Retain d I 18,3 4 1606 ^rO' �sq 4 r q '! L-72 S 49 49'04" W 42.35' ft. o-, fr\, h 1 8 �i s Wetlan ` LO L-73 S 0455'16" W 40.98' V o 0 18.179 Ac. 1 '�� / 9\ / d 7 .4' 166.8 y / '�'"0 0 9�' 0 0. '��\ I �: 1 \ ro Site Data nd Notes �� (NOT PART OF SUB /VISION sq. ft. 15,1 0 _ 6L 15,4 8 L-74 S 305154" W 54.83' � � } / Deed Book 3635, Pae 817, , � Gj g � I` t � g Deed Book 3635 Page 823 and Map Number 2018-258 L-75 S 730327" W 42.73' C s 19 _ \ 1 15,312 �, y� Pro ert s own hereon is located Watershed District IV, and the maximum impervious L-76 S 292643" W 31.51' 0 Ap roximate 1` �� a o �\ P y , sq. ft. O area shall be limited to 249' with curb and gutter. ' 8 5,107 - p �� o 100 Year �' 5, 46 o O L-77 S 67°0740" W 27.03' / \ `, , / l�y8o s ft. e8o' 1�4 \��' \ \ t.�o' ° Propertys own hereon is located in Meduim DensityResidential and Environmental/ L-78 804227" W 2293' o- ' \ `�� � Flood Limit ,� °' 0 1 / 7 ft: "' q" 1 s NSensitive Area. o- \�, _ O°15,1 4 21.0 � Ly L-79 S 2257'08" W 16.61' ") sq. ft3 / O r2�, a \��� k \ O a._- . =� ;..,,, �� � / 3 s . ft. � � � � � o No lot shown hereon shall have direct access to SR 2215. L-80 S 61°19'44" W 27.84' . �` ` �� N 15,100 2 / f°aw. 2s, N \�\ \ �` SO \ � 93.129 Ac. Net (In Traverse) In Subdivision L-81 735846" W 24.57' / / `\� re q X88 o ti 6 - \ _ \ 0 18.626 Ac. Net Required 209 Open Space L-82 S 800744" W 38.81' -� rn / ° o' - \ O: -20.347 Ac In ry r %� ��- � P c'e 18,41 � �,°" 7�'�' � � c� Traverse Provided Open Space (21.89) L-83 S 89°11'09" W 27.28' , r QJ �° 1 �� sq: ft. / sq f sq, ft.80 �aZ2 °"�� 6 �� °' Q-157 Lots fanned with Harnett County Municipal Sewer and Water = 1.7 DUA L-84 68°14 25" W 38.49' \ / _ y 3 7 rft �\ \'- -Minimum - ! j / 100 s� o �1�079 4 --___y��- l t size - 15,100 sq. ft. L-85 87°45 24" W 3207' %\ o' - ' 1a rs� .. sL �s sq. \ \ o Maximum t size 26,142 sq. ft. ^� 8 0 40 0 o L-86 675453" W 68.24' , % /% % ��\ - -- -� / _ �, °' �o' 0 5 °' S �?", �- \ Average to size = 16,718 sq. ft. L-87 6001'14" W 62.20' /� l /" _ _ /i6� rS, S : f 15,100 / - k0• �c'o V �ltetlands \Minimum l t width C� R/W on Cul-de-sac = 40.00 L-88 375959" W 18.23' / / �/ i \ _�i�i,' •" ssG"" r �8 09 q,\Minimum 1 t width ®R/W = 80.00' }4 L-89 S 7956'33" W 16.73' �� �� �w° 5 ss�.g' �,` ss ft. a 8g' 15%� 15\ j \Approxima ely 214 linear feet in Pointer Drive Extension L-90 000353" W 26.41' r� / `� `�' `Ja 21,815 sL-80• is h• ft. 67 s . f�\ \3 APProxima ely 214 linear feet in English Springer Drive Extension moo, r O \ <y`� 6' - / /O h' 1 ,926 flf 74 15,. 0 y� No �\ 4' \A roxiWay L-91 34 38'58" W 2284' •� � �. �_ sq. ft. � � \ � 1'� � pp ma ely 638 linear feet in Bark � 1/ 1l / \ l L-92 6758'15" W 39.99' r �y v\` \�\\\ 34 �" -80' L} /2'Z• \sq/ff ,88 ft 190.9' 20.4' l2 .4' 17s.s` rn �` =15, 04� �� =APProxima ely 698 linear feet in Bellini Court Zo \ \\ i 8 L-93 S 7826'18" W 14.57' , \ 4' ,'T5,6 Approwmo ely 375 linear feet in Fetch Court N 26,106 h' _ oo o� . :a� 41 151 ° ° w -m� / s 15,1 �� o w Approxima ely 1452 linear feet in Bella Vita Wa /\ �q ft, v -/� 17,612 9 3 151�F4 9• 4 a w -,-..- y o •n -sq ft. tV t ,13 rj �,C t� / 15,605 ' 1Z - X3�-� Y3 I 66 &q. ft. p \ +v 3 \ N Approxima ly 179 linear feet in Powder Court Z E 40 °' 5177 v 15,1 0 q. f . Q>� ? , ' ` _ sq- sq. ft. as d o L -zoo � •�96�. •.• ,� L > •. � `�s •.\ �. -..Approxima ly 808 linear feet in Bird Dog Court �z eso 3 ! q 6 2t 7:APProxima ly 214 linear feet in Cutty Court c� a �� a ` �\ ti 15,125 15,100,' �-� o o 15, 8 A roxima l 416 linear feet in Florentine o 15' y e ne Court 6 / a0 - Approxima / 980 linear feet in Donatella Court o sq. 2 - 1 \ \ C_ ON5+ ' 16,104 sq. t. \� 40 s ft. W ` 1 a' SS �-=ss ss ss �S ss�-- =ss ss ss ss ss-� y t°rn \ Zog 35 �d'q sq. ft. $0. 58.1 1 1 1 / _ ; fi �' N A roxima / 166 linear feet in Boone Court Li s I. I,- sq. 1 1 '� �¢ i. _ a` = o' _ So= \ z co PP y N IN � mit _ 8D -gp g'.. X0:.0'.94-91. - • a89.5'- 88 0 - 9' \ b ,2 herr//l Butts ` 23,763 fa e' �, sL - - -,. O o, Approxima ly 257 linear feet in Musket Court l / go. 2 q SL Approxima ly 1972 linear feet in Hunting Wood Court � R De Bok 649, Page 628 ` N Isq. ft. moo: O.B� ' � � ' c 8 3� \ W _ o. � � �, 20' I �. L- 4 1 , oo ��,' \ I Approxima ly 8531 linear feet Total in Development `----� ! 38 _i'��� er S . ft. s se 55 ( 15,20 / All streets shown hereon are to be 50' Public D ' / s \ 9g / ` 1 / 20 ._.--- _ f f • - 4 0 0 „ 58 \�o� sq. ft. Dedicated R/W and 50 Utility Easements. ,-,_.I`� , L -ss \ l ? 5'150 ���i'` - -''�� \ ^ _ 3 5,1oa N �@56 s- �crn," /l constru tion shall be in accordance with Harnett County and/or NC DOT Standards. 36 20 _- \ 3 ft/ �: 2T N 57 , 59 �- �u lots sh l� ;� q / i ( � w Z 1�Jeo- -sq'�' t oo v G cc,, 15,909 N \, o�o L moo l be served by Harnett County Municipal Water and Sewer. Any utilities not located �' L-94 � /< / / �� �`�'�. �:� \ 21 0 1 o ft. �I, � `L in the 5 Utility Easements shall have a R/w % \ • 22,-k65 17, 44 �. �� / `�� \\ s9 15 - --� q. ft. 1 909 " sq. ft. q�. 1' �b y public dedicated dedicated on the recorded plats. Road ' ' -- -- -� ` \ sq• sq. ft. 1 / �^-- \`�\ \�` 9 N - 1 s� #t 1005' sq. ft. I 15,1 f{ 15q,446\ ti ��/All Drainageeasements are to be permanent & public. The maintenance of all said drainage 1, 2 ---, o z easem en s shall b e res o / 2 \ I nsibi/it of individual lot \ L_s3 \ / / _ _ \ \ \ \ t. g6 \ %� / �� P y owners that border all such easements / \ -� \ \ 4 etlands 1 Refer too roved construction la -8 9' `� ��� �����, \ \ 114.0 110.4\ i P plans for all final utility and drainage locations. Typical Sin Ease \ L 1�6 / /- ' 85.0'. 85.0' o Developer all conform to all Harnett County yp g �n t � ' �\ / � /� / =T�\ �-. -�.�- 8 ' 8 ° 6 w 0.00 o p and/or North Carolina soil and erosion regulations a� The homeo vers association shall be responsible for maintains Note:.) ' �' j `�� % /.r 3op er-ty� �tl� _ \\\\ �\� - O p ng the streetscape buffer No Scale , 1 11 /%r� � ��'�_ _ �� 17b 1J__ // - �___�� \� - -� all open pace, sidewalks and street trees. Street Trees MAY NOT be removed. EE PROJECT: 4914 A 10' x 70' Sight t Tri lY ' / L3 / / \� -� _�� L' 37 'Fire Hydrants g ange takes ffi � L � ,�-- � / / \`-,` � \ �and Street Lights shall be installed per Harnett Count Regulations. precedence over sign easement. / 1 �f l _ �\ en Space /-� \ 6' An lots s acted b Flood Hazard Ares y 9 -� J �� P% p / y P y a will require an elevation certificate prior S 2 / ( I/ �`'��-� \�` ��k Sherrill Bu t t� % � `41 Dc•�ed Book 6,49, t7og,� 62 I OF 14 LHBR- 909 P1 Approxim a to t I\ 100 Year - o'` P P Flood Limit J Kipling G�, 30" RCP ` ite Op en \ OF Space 1431 1437 � I 5 ' 1432 0 \ 74 & /VC 41S 427 27 Bruce L. Rendall nn'' ti Kl in Ren doll �J \ Deed Book 2645, Page 323 �F \ Lillington Map Book 22, Page 95 \ NEW SSMH#9 TOP RIM=170.50 VICINITY MAP / F-1- �73 INV.OUT=163.41No Scale 20UTILITY ' \ EASEMENT76 � J �...- -•�' i ��� NEW SSMH-4') ° EMEM_ ' o TOP RIM=170.95 RNM S \ \ -D .... / � INV. IN=163.00 $ . INV. OUT=162.80 \ \ ASSEMPCOW F �� \ .NEW 2" WATER -S- PVC SDR 21 TYP. C� • � � /'�/�� / / �� (3' OFF BC TYP.)7 8 \ NEW 6"X6" TEE ?6 \ >C \ , / W/6'X2" REDUCER, LOQ 71\ 1-2'GV, & 1-6"'GV \ sew \ ` ,: �•� � NEW SSM 3 --30' UTILITY EASEMENT TOP RIM=175 P INV.IN(SE) 68.20 t \LNV. IN( =168.20 _ NEW SSMH#1 10'X70' SIGHTv� \ TOP RIM=175.00 EASEMENT TYP. `� IN1F. =168.0079 g�-160. _ INV. IN=158.20 \ �Q NEW 12'X8' TAPPING Ex. SS Manhole - --= ~ '��- INV. OUT -158.00 F/ \ CC \ Ground Elev = 55.0 NEW 6"X2' NEW, fH SLEEVE &VALVE. „� J INSTALL NEW 8" WATER % REDUCER & AV / \ \ P WITHIN 4OLF-16'0 Rim Elev = 1 7.34 �� STEEL DRY BORE Inv to = 14 .15 Op en O / \ s i /' CASING. USE 8' DIP Inv Out = 46.10 I Q / - ( ) - / ,' Space ` y� 8 o \ `\ \ WITHIN NCDOT R/w INSIDE DROP MH i � ��� l ` \ (50L17 COTIE NEW I . IN H W/EPDXY 0 i \ \ \ COAT INS E Of MH W/EPDXY C-3SL/ \ \ , We t l a n d s i R �' / / \ ' �PVVC SDR 21 TYP 3dR 60 / ® OFF.BC TYP.) / �ry X-) / I \NEW n I NEW 2" WATER / 61 \ \ NEW SSMH#5 st / .TOP RIM=184.08 , i ! PVC SDR 21 IYP. , (3' Off SC TYP.} / 1W, W.' IOLIT 176 00 er ` / / \ \ NEW 8" WATER i 6 / NEW SSMH 3A 60 s� 2 PVC SDR 21 TYP. / \ 0'X70' SIGHT ry I / TOP RIM17.81 (3' OFF BC TYP.) / EASEMENT TYP. sQ 7/ INV. IN=169.48 \ \ / \ 0* /�' / INV. ouT=169.28 Z 83 / / Op en \. Q 1 / \ 4�`k s / / 5 9 Space \ NEW SSMH 7 TOP RIM=196.41 v INV. OUT=190.00 n i / \ 62 \ ® NI". �' / / EW 3 4' TER METER I..� • O 1 st i '� ,9�; \ , W 4 EACH L `l 58, NEW 4' SEWER CL OUT lYP EA OT W fX PF yv \ V Y NEW 2' BLOWOFF tt 1` l J J ASSEMBLY \ � � to'xla' slcHr 6 EASEMENT TYP. \. / Area Ret ire e \ 20' UTILITY n I � J4 EASEMENT �tJ � 'NEW B"X6' TEE i ' W/2-8'GV'S \ 5 7 & 1-6 GV By Owner EW SSMH 4 \ TOP RIM=180.50 s 4� ' t / O Ex. SS Manhate INV. OUT=172.26 /i NEW SSMH 6 / 1 RIM=192.28 1.000 C. \J round Elev - 155. \ INV. (NE)=182.7 0( I Elev = 15 08 \ ,' / INV. I )=1.76 6 PART /j TInv n = 146. o 1 INV. OUF= 76 (NOT / A / Inv u 45.96' \ !� \ �� �� / ��"ti / ,' SUBDI VI S ON, BFE=156.0 � ` / Ak36 3 56 NEW 8"X8" TEE ��' / / .. 'Cr m� • , ' co o ¢ W/2-8'GV'S, 10'X70' SIGHT 1-8"X2" REDUCE ' i EASEMENT TYP. & 1-2"GV ' CII55W \j W -- G W W 6� O X' ,rte\ F \ �OJ, / • ' �G \37 �o � \ NEW 2" WATER +Nz PVC SDR 21 TYP. 20°_QR4INAGE EASEMENT (3' OFF BC TYPy \ \ :END PAVEMENT FOR Op en / �` \ PHASE 4A AT STA 1+95 Space•NEW 2" BLOWOFF\ ate` 20' UTILITY \, 54 EASEMENT \ \ \ EW 8" WATER '. /�� ` \+ IIhOX K/OIC -'' NEW SSMH 8 PVC SDR 2, TYP. \ Op e' / ` ¢ \ TOP RIM=190.00 (3' OFF BC TYP.) \38 S a C e \ INV. GUT=182.78 � 9 p `, 4 r 0 INSTALL NEW 8" VALVE & ��3/// �/ 4- 0 Q , TEMPORARY BLOWOFF ASSEMBLY. \ \ 5. 7V 5 A C. \� ` D PART 4A WATER CONSTRUCTIO \ i 5352 �\ r Op en x. SS Manh le \ Ground Elev 153. , \ Rim Elev = 15 55 ` W,D Spa e \ Inv In = 145.80 e 4 Inv Out = 145.70\\ NOTE: WETLANDS DELINEATED BY: ADAMS SOIL CONSULTING 1676 MITCHELL ROAD ANGIER, NC 27501 NC LICENSED SOIL SCIENTIST LSS #1247 GRAPHIC SCALE 60 0 30 60 120 = 6A �� I i-=� ( IN FEET ) 1 inch = 60 ft. 240 3 w EL 0 Q �o Q J V (1) ul m 5z4 o U U) Wo Q a (n Z Z 0 } O LU w C o LLJ z � 0 z � z I ca) U N z �zU H o o q).5 V•� H cv z� O o> O�z ~ 00 U z z Hx� w zpW 1- z NUZ O Q a Q z o W Z 3 o =..gym= a 0 a.[If z ro V 3 w EL 0 Q Q J V (1) ul m U) co C.0 U U) Wo Q a (n Z Z 0 } O LU w J (.0 Wry IA LLJ z � 0 z � z I ca) U N z �zU O ~ L H cv 0 o> O�z ~ 00 U w zpW 1- z NUZ O Q a Q a Z 3 o =..gym= a 0 a.[If z O z � m m¢ m o 75 z� z0- o� O OO CD w LiU z z C2 w w y w U Z > U) Cn z w O � O Gf .0 Gf Z 6i (D 0 N I 0 I o 3 FD E E U 0 a EE PROJECT: 4914 '- w O S=3 z OF 14 c> EL 0 Q J � V (1) m d D=U CL W 0O Q a (n Z Z 0 } O LU w J (.0 Wry IA LLJ z � 0 z � J w �LLJ o z �zU z LIJ _ >0 o 0 O W �mW O�z ~ �mC� U w zpW 1- z NUZ O Q a Q a W Q 3 o =..gym= a 0 a.[If a m FD E E U 0 a EE PROJECT: 4914 '- w O S=3 z OF 14 / — 'ApproximateTEMPORARY SKIMMER BASIN iA WAAFFIES'\ D.A.=1.2AC. _- \ \ \ \ \ SCTIONSEQUENCE ? TOTAL DRAINAGE AREA=I.2AC: / 1 00 Year Q10=(0.3)(7.21N/HR)(1.2AC.)=2.6CFS t,�_ PP \ \ \ \ \ 1) INSTALL THE TEM'ORARY CONSTRUCTION ENTRANCE. ' VOL: REQ'D-1,8000F AC* 1.2AC =2160CF �I / g` V A 2) INSTALL EROSION CONTROL MEASURES AS SHOWN ON PLANS. o� 1fl ( `-r Limit t / / �'' ` \ \ \ \ \ \ \ \ \ 3) COMPLETE INSTAL ATION OF SITE DRAINAGE NETWORKS AND SITE SWALES J Kipling ti SURFACE AREA REQ D=325SF/CFS*(2.6CFS)=845SF / \ \ \ N b TEMP. SILT / / / \ \ \ \ \ \ \ \ WITH ASSOCIATED ER SION CONTROL PROTECTION BEFORE BEGINNING SITE TOP L-45', TOP W=25 ; D=3 (2:1 SIDE SLOPES) , / i' \ 3 0 � RCP \ i \ \ \ \ \ \ \ \ SURFACE AREA PROVIDED 1,125SF i/ � GRADING. �? •L.: PROVIDED=2,259CF FENCE AS / / / / \ \ \ \ 4) STRIP TOPSOIL ite f / SHOWN TYP. / ' / / ` \ \ \ \ \ \ } ' \ \ 5) GRADE SITE. IR WIDTH 4' / / r ace " \ \ ' \ \ \ \ \ t \ \ \6) GRASS AREAS TH T WILL NOT BE DISTURBED. SKIMMER SIZE 1 5" \ \ 1 \ 7) INSTALL UTILITIES. 1431 �----- iMMER ORIFICE DIAMETER=1.0" TEMP. IV SIGN BERM �s ��C/ / ) \ \ \ \ \ I I ' \ \ 7) PLACE BASE -COU SE. 1437 D RING TIME: 2.6 DAYS AS SHtpWN / / \ \ \ \ l ` ' \ \ SH? S / / / 'i \ t / \ \ \ \ \ SEED: AND, MULCALL TO PROVIDE PERMANNT GRUN ITHN 114 WORKINGH REAS AYS AFOLLOWNG COMPLETION OFEANY PHASE OFER 1432 _ NOTE: INSTALL PIPE 0 �N ` / / / / / 1 \\ \ \ GRADING, AND WITHIN14 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER 0o ro o THIS POINT DURING " ' / / f _ �?` ` \� \ 1 \ ' ' \ \ \ \ \ \ PERIOD IS SHORTER, .FOLLOWING COMPLETION OF CONSTRUCTION :OR o� 74S) 7433 N GRADING OPERATIONS. } , DEVELOPMENT. v \ COMPLETE INSTALIATION MAINTAIN ALL TEMPORARY MEASURES UNTIL PERMANENT GROUND COVER IS T 2 PIPE AFTER REM ALESTABLISHED. \ 01j \/ ,' o / \ \' \ mo G OF 1 � \ �, � � \ \\ � � 10) NO SEDIMENT OR EROSION CONTROL MEASURES ARE TO BE REMOVED ., 7 j `� \ \ \ ` \ \ \ \ ` \ \ \ \ WI7f0UT THE APPRO A :OF AN NCDEQ INSPECTOR. S sro' TEMPORARY _S3KIMMER BASIN 11 .111AF I FIR\ 7s 9 GILT CES �'o \ f 1\\ \ ` \ \ \ \ \ \ \ \I 1 �J US 4?7 D.A.=6 6AG \\„ � y He ?> S TOTAL DRAINAGE AREA=6.6AC. / ; F �� \ / \ \ \ \ \ NOT t)F COMB14D SELF MONITORING AND. SELF -INSPECTION FORM: US 427 Bruce L. Ren da/talo=(0,3)(7:21N/HRj(6:SAC.)=14:3CFS / �� \\ f �,'F9 \ ' \ \ \ \ KI r73 i�li? Ren dNOL REQ'D=1,800CF/AC*(6.6AC)=11,880CF go \\ \ \ [" \ ` \ THE SEDIMENTATION POLLUTION C NTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS URFACE AREA REQ'D=325SF/CFS*(14.3CFS)--4,648SF \ \ �'�' 2 \ \ ' \ \ \ \ \ RESPONSIBLE FOR LAND-DISTURBI G ACTIVITIES : INSPECT A PROJECT AFTER EACH PHASE OF THE Deed Book 2645, PCI OP DIMENSIONS AS SHOWN, D=3.5' \ \ ) \ Linin ton � , , l / ( � � \' ^�. I � ` \ � y I PROJECT TO .MAKE SURE THAT TH APPROVED EROSION AND SEDIMENTATION CONTROL PIA IS BENE g Ma Book 22 Pa E2:1 SIDE SLOPES \ \ \ FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, Map g SURFACE AREA PROVIDED=4,675SF 16 >J ) , ' �• / \� \\ /� I ` ` \ \ I 2010. VOL. PROVIDED=13,161CF ' / / j WEIR WfDTH=8' / / \ / , �? ! \\ I ` \ \ \ �TO SIMPLIFY DOCUMENTATION OF ELF -INSPECTION REPORTS AND NPDES SELF-MONITORING REPORTS, VICINITY MAP i " — \ \ ' 'DWQ AND DEMLR DEVELOPED A C MBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM SKIMMER SIZE:. 2.0 ' \ � / � 1 � \ \ ' \ \ `' No Scale \ SKIMMER ORIFICE DIAMETER=2:0: / ` / y / \ THE WEEKLY SELF-MONITORING P 06RAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION DEWATERING TIME:.3.2 D YS f / \ \ \ ` \ \ \ \ ACTIVITIES. THE FOCUS OF THE S LF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF —a —� ----� --D --� TEMPORARY DIVERSIqN BERM \ SEE NOTE Q TSB#1 \ EROSION AND SEDIMENTATION C0 ROL MEASURES ACCORDING TO THE APPROVED PLAN. THE (7 DAY STABILIZAT16N TIME FRAME}z COMPLETE INSTALLAITON OF TORI OUTLET / A i �� T P. SILT \ �``- \ `� \ \INSPECTIONS SHOULD BE CONDUG ED AFTER EACH PHASE OF THE PROJECT; AND CONTINUED UNTIL 1 —_—•—_—•—" _—_—■— TEMPORARY SILT NCE AFTER REMOVA TSB#5. / r i ; A NCE AS / ��` \ \ \ \ \ PERMANENT GROUND COVER IS ABUSHED. THE: FORM CAN BE ACCESSED AT.- LIMITS T: p p asnsss, LIMITS OF DI BED AREA SOWN TYP. � � , \ \ OUTLET PROTECTION 2 `:: :� : -''% �-, QST \ ` \ \ � � HTTP://PORTALNCDENR.ORG/WEB LR/EROSION TOTAL DISTURBED ARFA=19.1%ACRES = I '`a'.: -:: .. _ i �o / / DA 4.7ac , / / �� • • � \ , \ IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL a00 Q10=16.9cfs ' ----------��x �XfSTING CONTOUR f / �V1O=7:5fps ( ;..,:� ....,:•'.:::• .... � , ` 8'12 , � / � V� � �\ �• � \ \ \ \ OFFICE AT (91 Q): 433-3300. 1 -FINISH GRADE CO UR Qfu11=21:5cfs , \� \ J / �- / \ \ \ \ "� Vfu 1=6. - � \ NOTE: ASEPARATE- EROSION CONTROL PERMIT WILL BE REQUIRED FOR EAC H, INDIVIDUAL LOT PRIOR TO $fps .,. •..: `' :�; SKIMMER BASIN DRAINAGE AREA _ ::..;:::•::; : ':. • --- -< ' Lp / - - LAND DISTURBANCE. ZONE=2 N $� ' C } \ / \ V \ \ \ y� NOTE. INSTALL EXCELSIOR M TTIN IN \ - / \ . CLASS -B � a CB11 NTE: NO SURFACE WATERS WEI' NDS OR FLOOD ZONE$ ARE TO BE DISTURBED. DURING \ O Lo=6XDo=12ft / / / ::::' / \ TC IMMEDIT Y U Id �ONSTRU TIOM .....: , o. / ,o CONSTRUCTION. Q, • DEPTH=18" TEMP. -SIT •` � sop � � l W1=3XD0=6' / FENCE / / / / / , (( \ t! 9 Q / _/ --9UT[!Ei PROTECTION 3 \ \ \ D.A.=1.2AC. - 25XW1=7:5 �i ` \ -PURSUANT TO G.S. 143-215:1 ALL PERIMETER DIKES, SWALES, TEMPOR•5KWN / / / / / % Q25=2.5cfs / \ DITCHES, PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 ` TOTAL DRAINAGE AREA=I.2AC. / \ �! \ / V25=8.9f \ ../ /`� oo yV�` � . \, \ pp�� � F`T'ORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED Q10=(0.3)(7.21N/HR)(L2AC.)=2.6GFS / / / ; / / \ / \ i 7y �' �s ( Qfull=218cfs \ TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER `VOL REQ'D=118OOCF/AC*(1.2AC)=2,16OCF \ -_ /�/ / , S� \ A �Tpo LDS \ ^ VFd 12.9fps _S SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 SURFACE AREA REQD=325SF/CFS*(2:6CFS)=845SF \ — / ��.�, J / 04, ` *_O� �\ DO= 1.5' CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. `TOP L=45 TOP W=25', D=3 (2:1 $IDE SLOPES) E SLOE :� / / / / /op �� S,00� \\ \ / ZONE=) I� I SURFACE AREA PROVIDED=1,125SF I ` ( / VOL PROVIDED=2,259CF r � n / /•'--'��� / J J \ C61 B1 ,� / ` �Ff3,�P� \� \�S / `�y I � La 6XDO--Qk-- ✓ �' WEIR WIDTH=4 / D60 6" / j SKIMMER SIZE 1.5° 150.7, / Jyl �\\\ DEPTH=18" SKIMMER ORIFICE DIAMETER=1:0" /W1=3XDO=4.5' �\ �\ \ W2=1.2501==6� DEWATERING TIME: 2:6 DAYS g ; SEE NOTE 0 TSB#1 Ex.SS Manhole , / ' Ground Elev = 7.55.0 0 P Q \ ql' Rim Elev = 1 34/ / Inv In = i4 .15 I" CTEMPORARY / Inv Out = 46.1 ` Q / /, / / / J l ( �/ r^ / \ n / / / / / CIS CK AM — \\ CONSTRUCTION ENTRANCE USE CB (% TE � / 1 _2po / PROTECTION / / MP SILT � ( �/ �'� J / ��•,� / / ( FEN A5 AT ALL CB'S o / f OWN lyr. a & DI'S TYP/ TEMPORARY SKIMMER BASIN A W FFLES . l �f� �// J`' / Q V \ / / / ��� / l lr D.A.=3.5AC; SI FE C TOTAL DRAINAGE AREA=3.5AC. 10- 0.3 7.21N H 3.5A .-7.6CFS VOL. REQ'D=1,800CF/AC*(3.5AC)=6,300CF / SURFACE AREA REQ'D 325SF/CFS*(7.6CFS)=2,470SF TOP L=80, TOP W=40 , D=3' (2:1 SIDE SLOPES) SURFACE AREA PROVIDED=3,200SF / I Q / / /- 1 \ B •.�° / WAS OU W FX 2 VOL PROVIDED=7,584CF - A4. SILT �\ \ �/� / f / '\ j� � 2 .f WEIR WIDTH=6' /F N AS MMR SIZE 15" 5H0 N Site Area Stabilization Stabilization Time Description Time Frame Frame Exceptions • Perimeter dikes, LU >C, swales, ditches 7 days None and slopes 0 0 • High Quality H Water (HQW) 7 days None Zones Z w M z0- w� z° If slopes are 10' or • Slopes steeper 7 days less in length and are than 3:1 not steeper than 2:1, 0 LU 14 days are allowed. • Slopes 3:1 or w 7 -days for slopes flatter 14 days greater than 50 feet o oCn in length • All other areas Z W None (except for with slopes flatter 14 days perimeters and than 4:1 O4a H W Zones SKI E SKIMMER ORIFICE DIAMETER=t 5" l ' 7j \ Qq'� / J/ TCYB''S / 1 \ \ �``�� /� W� DEWATERING TIME 3.4 DAYS S ,, % ,, 2 / ) NOTE: CLEAN SKIMMER BASIN WHEN 50% FULL DURING CONSTRUCTION. WHEN / ( r \ , / UPSTREAM AREAS ARE STABLE AGAINST EROSION AND PERMISSION HAS BEENy9 -, OBTAINED FROM NCDENR, REMOVE TEMP. SKIMMER BASIN, INSTALL PERMANENT\ % p�/ / //-� \ GRADES, AND. SEED: ALL DISTURBED .AREAS PER SEED SPECS. _ � � � � • / / a � � 2 ba. / • • . A � \ / / � .�/ , � �h / B18 c �`�da / / / j yp� �n �o,�• // / /� k. CB19 �1� / A ` ��r'• / % /J� NOTE: WETLANDS DELINEATED BY: ADAMS SOIL CONSULTING 1676 MITCHELL ROAD ANGIER, NC 27501 % NC LICENSED SOIL SCIENTIST I \� , I / /• / s��a /. / 4Via` `� t� /�� e LSS #1247 Ex. S.S5K,,Manhole \J round G ON E v ` 155. SLOPNS TYP.\ ' y�L L �LO ST L NG 101 TXP. L Inv u 45.96' o TE � o oto � ,• =. \ / ' BFE=156.0 \ r / 1 6 o •o y �� 1fCE --- 1 t / TEMPA DI R ON a�� \SH WN / 5V 100 w 00 \ \ \ SWALI "A" �W w rn o N �• �.�c ` i� \ oJ, \ � \ 11.... ' � ®1.4% cP � 7 '''9� ✓ ` � � _" / / /� ` --' /� �- �/ FENp \ \ ( �r i- CB4 • C� \ \ y S�pWt�\" .`� p • ` ` 1 p fl Q / / ( C g PROTECT)6N / OUTLETS �\ . � ALL CBS TEMPORARY SKIMMER BASIN 2 W AFFLES �g D -.D.A.=2.8AC: - 65 \ TOTAL DRAINAGE AREA8AC. / - •- / \ ` VOL REQ'D=1800CF/AC*(2.8AC)=5,040CF / SURFACE AREA REQ'D-325SF/CFS*(6.00FS)-- L950SF J OWTLUPROTECTION 1 / TOP L=65' TOP W=35' D=3' 2:1 SIDE SLOPES \ ( } i SURFACE AREA PROVIDED=2,275SF\\ Q10=8.6cfs \ \ ` \ 3 r VOL PROVIDED=5,169CF \ �,,,V10=6.6fps \ i 0 WEIR NADTH=6' �\ \Qfull=10.5cfs / /,SKIMMER SIZE: 1.5" \\\ Wuil=5.9fps \ // \ /VK SKIMMER ORIFICE DIAMETER=1.5" ZONE= I S/- DEWA TERING OTE ®TIME: 2.TDAYS \ CLASS A �. �* / / / / 2��� / N TS !l1 \ W-4XD0=6ft // / / 5.78*B" NOTE: INSTALL SWALEAFTER REMOVAL OF TSB ( \DEPTH=12" I ■ \ W1D 3XDU=4.5'SILT \ X. SS Manh to OUTLET \ \ \ � Ground Elev 153. \ \ \ ✓ / / I ! / , Rim Elev = i5 55 ` I , \,,, OS \ �\ _ `7 ` g/// // t \ 0 ` Inv In = 145.80 s �`�iAN \ _ as 1T �E f?ALT // ( I I \ \Inv Out = 145.70. � '•�• ,� ---._. .__,_ � •\ --__ � SHOWN INSTALL SILT FENCE AT INSTALL TOP OF STRAW GRAPHIC SCALE WALL AFTER MATTING ON CONSTRUCTION SLOPES ON 60 0 30 60 120 240 OF WALL ( IN FEET ) 1 inch = 60 ft. a O o1 ' o =U (nZ ZLLj Q ot� 0 Z U�� �. >_ C,4 V ry �Q� 0 Q (,n "'I Q =gym= ui � O Z O O ui 0 U Z ~ > QD LU U N LU H N oCD z Q LU >C, Z Lu0 N 0? o d w 0 0 0 a O o1 ' o =U (nZ ZLLj Q ot� 0 Z U�� �. >_ C,4 V ry �Q� 0 Q (,n "'I Q =gym= ui � O Z O O ui 0 U Z ~ > QD LU U N LU H N oCD z Q O_ >C, N 0? O 0 ZO H ca m¢ m Z w M z0- w� z° O W ^ � h-� V z� @) 0 LU Q w = w �n U O Z o oCn Z W 0 v a O4a W Cn U a O o1 ' o =U (nZ ZLLj Q ot� 0 Z U�� �. >_ C,4 V ry �Q� 0 Q (,n "'I Q =gym= ui � O Z O O ui 0 U Z ~ > QD LU U N LU H N oCD z O_ O 0 H ca m¢ m Z w M z0- w� z° O W ^ � h-� z w 0 LL LU Q w = w Z O U o 0 v a U) W Cn I Q z � w z LJ o �/ ) O � o O V v o N o fq G�,LLJ U E EE PROJECT: 4914 U 0 '- S-4 ii.i O z L •� z = 63 ai o N N 1 �_ o 1 C) t woo a O o1 ' o =U (nZ ZLLj Q ot� 0 Z U�� �. >_ C,4 V ry �Q� 0 Q (,n "'I Q =gym= U J vi W� O O J W wW a ry N z �ZZ 0 O w w ZLU �pW O Z�`�J Il..I 0 Q a d.-ry x ca ca a d cn z z U o 3 _ o a co O_ Cli w w Z J Z w Z W ^ � h-� z w 0 �] W c O � o 0 v � W I Q `r"�� o �/ ) O � o O V N o v T Q E EE PROJECT: 4914 U 0 '- S-4 ii.i O z L OF 14 1 / Approximate 100 Year Flood Li it � / 1 m J�Kipling aG�A� / / I / / // X- 1431 Sp oc 1437 c 14J?It cly '7t _V . QP i e' Us ¢?�?Bruce L. Rendall \ l / -1 K17 r�in Rendall Ciliington Deed Book 2645, Page 323 \ \ Map Book 22, Page 95 VICINITY MAP No Scale / / / IN / 1 TOP BC 170. E1Y u 1 INV =164.40 o G IIN•1635Q ,� 0.6 AC. ,ld' 20 . Q10=16s c /_. C666. c ^t INV AC. 0 • t r l l I I / � � • A.3 AC. ,1 166.57 � T S I l It \10 ou fto, Ex. SS Manhole Ground Elev = 55.0��`�- / Rim Elev = 1 7.34/ i r _' / N 13 21 /. Inv In = 14 .15 i ,,_ �n(�n/ // / 1 P 171 �0 r / Inv Out = 46.� Wetlands!` / NEW /0.2 NEW C - 6 / TOP 177.73/ C j0_ =1773 1 � cn' �t 1 � \ �\ � / .= 4.20 .10 �-; • � / . • 1NV. � 70 C `\ \ � \ \�\ �.'�� \ ata= 'c SLS•/ � } BC=, 79.1 / 18000 174.07 0.3 AC. 1 C() 1 , o x. t r Effld -` e \ ! I �J rounf�ev R El15 08 zo Inv a 45.96, 6\5 6�� J ( o BFE=00 156.0 NC' O' \ O@ n\ ;45-A - � 1 1 5 ON . \ \ \ \ . \ \ `•, FES 1 NEN / Op erg / Space I 5.785 Ac. \ \ X180.0 x. SS Monh le \ \ ------ Ground Fiev 153. \ \ - Rim Elev = 15 55 ` ' • , \ \ "`aA+VOs \ \ • �'BY1� L3 00 =A / \ Inv = 145. * O 145: , I \ WA6L Inv Out = 70\ o \ \ RETAINING \ -bES1G IQBY OTHERS 30� RCP \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ 1 i/ I� NOTE: WETLANDS DELINEATED BY: ADAMS SOIL CONSULTING } \ \\ \ \ \ \ \ \ \ 1676 MITCHELL ROAD ANGIER NC 27501 NC LICENSED SOIL SCIENTIST LSS #1247 00 _ \ TOP BC. -11• .97 =170107 • \ � � } I \\ <4- \ � / � / / � .-- •-..._ vim\ / / / - .� / �� / / / / , • . ,\ �-200 \�\ / � / \ NEP 3 BC-- 8182.x' / / / / / / 871x3 '\ o \ 05= mom / / / / / 0. T. T. \ 5.0 10=1.8 ✓ Fk \ PER - NSP' 2.79 \ -177 6 ' • \ F5 INV.=1 0.2 , 0.7 1 98 06 = (q?t I>Cfe ,' -, ) t iorN6 C8#4 :18;9 '2 >' 1. O / / 0 AC: y - i - CFS C 4A i 20� =1 P C90.20 INYr 184.96 0. AC. NEW 5 s9. Nv=.40 7 A1C. 185:7 oto= Fs ox -9 / /- / // r��r//// 1 / /� // // I / � l l / /Z.00 GRAPHIC SCALE 60 0 30 60 120 ( IN FEET ) 1 inch = 60 1t. R. ■ J U) 'c:) J CO Q z II OF-LIJ OOf W U V) Z w W O W N Cu i 0 N N ¢o 0 z J o �o 0 z 0 o a ..z4 �� m � � o C) r W 00 O Za �� wF- 0"'01 N U �Cr - -@a LL Caw �w U �w � W U^>U z� z OWz aU �zow o z j w Zoa Z w >- Lo a Q U� R. ■ J U) 'c:) J CO Q z II OF-LIJ OOf W U V) Z w W O W N Cu i 0 N N ¢o 0 z J .2 0 0 z 0 F- a m m � Q d C) Q z0- W 00 O Za �� wF- z z LL Caw �w U LU � W U^>U W V OWz 0 o z j w Z w >- Lo a Q U� d U) 3 Cn Q �Q of o En- CL 0--tr a z W O Of Of Q66 0 N I 0 I CD R. ■ Q a 240 EE PROJECT: 4914 '- 00 S-5 z OF 14 U J .2 0 (n x m CU L Q =U a0O W Q d Cf) z O W J w w z 0 Oz a N z z Wo z�z� LU U^>U OWz 0 w Z w >- Lo L Q U� d O J w0Q 3 o Q �Q of o En- CL 0--tr a C1 Q a 240 EE PROJECT: 4914 '- 00 S-5 z OF 14 /," 0 a� W BARK WAY 50' PUBLIC R/W 35' B/B W/30" ROLL CURB & GUTTER PLAN SCALE: 1" = 50' PROFILE SCALE: 1" = 50' HOR. 1" =5' VER. Station NOT : WETLANDS DELINEATED BY: ADAMS SOIL CONSULTING 1676 MITCHELL ROAD ANGI R, NC 27501 NC LICENSED SOIL SCIENTIST LSS d#1247 Q a ' V] W o W N U N Lu I F- N 0 Z �. v > o O z O 0 X O ~ = CJ m w O 00 a < w m¢ z� �� � 0 � O X gw U� u p � y u zo��a V ''—' w C } ot p pv O > Lc) H >- ��= �zow ty- a Ooa Lf) CD c p cn Z 0-' c.Q�' Q(n-I<( w O u o O -i =gym= w cL n —Ltf F- z ►: w g m O � ,C/) N 66 O 205-1 N I 0 I d - O moo 199 _ ��■■. MIS®ice®■ •:.. . -197 -193 92-1 -192 19 -191 If• ■1_ ;. ail .:/- . , ,r4l ITH M NIAT;. - r ill -187 18t- jWd aW— 186 11�_���A!l1111� � ■1/�' . -1184 182- ., ; , ■■ , :�,�:..®®.......elm 182 -181 MAINTAIN 3' MIN. *OVER. INSTALL 20 Station NOT : WETLANDS DELINEATED BY: ADAMS SOIL CONSULTING 1676 MITCHELL ROAD ANGI R, NC 27501 NC LICENSED SOIL SCIENTIST LSS d#1247 Q a O ' V] W o W N U N Lu I F- N 0 Z �. v > o O z O 0 X O ~ = CJ m w O 00 a < w m¢ z� �� � 0 � O X gw U� u p � y u zo��a V ''—' w C } ot p pv O > Lc) H >- ��= �zow ty- a Ooa Lf) CD c p cn Z 0-' c.Q�' Q(n-I<( w O u O LL] cUn o _I Lc) Z II ` o tii v - � Lo ¢ II ~ .- o > W o W N U N Lu I F- N 0 Z �. v > O z O 0 X O ~ = CJ m w O 00 a < w m¢ z� �� � 0 � O z°- Ow gw U� LL z V5 oz0 w } Z p pv O > Lc) H >- ��= w ty- a W>- Lf) CD c p cn Z 0-' c.Q�' Q(n-I<( w O zw LUOQ o O -i =gym= w cL n —Ltf F- z w g m O � ,C/) N 66 O N I 0 I d - O moo O O T O C EE PROJECT: 4914 '- ui S-6 'z OF 14 j a 0 a �. v > 0 X O = CJ aO w O d a a (n Z Z Q� � w Li Lj > w z cu �Lu z p ��N O z W �O Ld z oz0 = O..>_U 3 pwZ O z Lc) H >- ��= w O W NVW NOZ W>- Lf) CD c I= U Z 0-' c.Q�' Q(n-I<( w O zw LUOQ o O -i =gym= w cL n —Ltf O T O C EE PROJECT: 4914 '- ui S-6 'z OF 14 j v 0 z �. w 0 0 Q a 0 cu <C G4U L`7 O U O T O C EE PROJECT: 4914 '- ui S-6 'z OF 14 j lit NOTE: WETLANDS DELINEATED BY: ADAMS SOIL CONSULTING 1676 MITCHELL ROAD ANGIER, NC 27501 NC LICENSED SOIL SCIENTIST LSS #1247 1 � I U ` 1 G°U(1 " 0' Nor E°5eo� l0 v� 3 eK 2a 1 1361 S ed g°�aerr 20 0113 009 Nw 10er 2 003 009 tjv�mber ? ' MOP N� C3. N1b � GpP 74 19 cqo 9q 4 174 19 0 _ >�� Nh - co 7 188-- Lu ui U W 187- o .- cc '- 185- o N 0 18+- 183- 73 0 182- 8180 181- Wow � 0 18 r Z U 7 � � z � z 171717 �Dz ° W 72 W 17 O > _ _ ~z 71- t7 GGALE:_ 17 '--- 71 17 17'- D 17 1 6 163 1 / - Z O 0 U a 5 16 69 6 Om m NEW 18"PP 68 m Q D Z a- Z �w M L~ O U O2 O -l 6 U�` z % Z Z 67 6 y Q 66 6 p cin w U 65 L6 vt u3 24 MIN. N C 6 C6 164 6 w� w w o U 163 _® C 6 62 � Of 0 2•h6% '> 6 N I o Z S o 61 0 In Ma cV o c 1 n E 5 x i•_ zwa W Ca cr , _ c-) I � 59 5 o m 158 5 L 57 5 a ° o 0 156 0 N 00 �oo'r v 55- ,9 Y ZQ N g n J J 55 54 05 co m�N vi cr X to cu 54 o ai W Q cn z z�zz 53 5 Q> > >o� W 152 5 � � z 'LIJ W o o N z c� NEW FH _ 194 151 4 w z w -� 93 49 3: O o 192 O _ {� H W W 0 W �C� 4 ^�2-1 co� N 48 pN.-.-a °O 91 ~ <Q� UO zNUz W w ZO11 z�J 3 4 zcn� 90 Q�JQ =moo= 0 WOQ a a. - r o 47 cn�zzo 89 � Z�zzz - - 4 as 46 w NEW 8 6" TEEJ I 86 z W 2-8 V S 85 4 Lq to ,n c0 q h cq d.to 84 0 0-" CO 10 NN tn� i17� t0 c0 X01 �O NN MM MM I+]�"� NN z o r_=110021111 ffiffi�--R�- diii11��F3'�41In NtW 82'-8" N. SEW. ® 0.5 ° PVC SDR 35 5+50 5+00 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 0+50 0+00 -0+50 7+50 7+00 EXTEND NEW 2" WATER MAIN AROUND CUL-DE-SAC AND INSTALL NEW 2" BLOWOFF ASSEMBLY W/VALVE �J t t 7�y tion AS SHOWN IN PLAN VIEW. MAINTAIN 3' MIN. COVER. c INSTALL 20'-4" DIP CASING W/MIN 2' COVER (;FNTFRFFD 11Nf1FR NFW 94"PP (d) nR#d19 BELLINI COURT - 50' PUBLIC RNV 29' B/B W/30" ROLL CURB & GUTTER PLAN SCALE: 1'' = 150' PROFILESCALE: 1" = 50'HOR. 1" =5' VER. O p� N h cco o ifIf ...- m �� ^ mvn x u V.C. 1-2rGV, & 1-6""GV .q:—. R� h 00� CV ^ 00� 2DP �M 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+00 Station 2+50 2+00 1+50 Q 19 19 19 o 19 0 190- 918181818181818O >�� 189- 188-- Lu ui U W 187- o 186-- 185- o N 0 18+- 183- 0 182- 8180 181- Wow � 0 18 r Z U `% NOTE: WETLANDS DELINEATED BY: ADAMS SOIL CONSULTING 1676 MITCHELL ROAD ANGIER, NC 27501 NC LICENSED SOIL SCIENTIST LSS #1247 I= 1s 1 1 1 1 18 17 9 1 1 1 16 m i FETCH COURT - 50' PUBLIC RM 29' B/B W/30" ROLL CURB & GUTTER PLAN SCALE: 1"=50' PROFILE SCALE: 1" = 50' HOR. 1" =5' VER. 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 Sto tion 0+50 0+00 -0+50 0 0 NEW 6"X6" TEE W 6X2 REDUCER, 01-2"GV, & 1-6""GV -,NEW 6" WATER PVC SDR 21 TYP. 3 21 21 21 21 21 21 21 21 21 210• 191 'Jill X10 JQ �:�`b4. r0�Q� D.OQ�Q�?�,0g0� \ 67 41 NO \7 N ss 91 w C)00 I� \ �\1\\ \\ \ \ \ (<IDj 461 300' V.C. D.=+7:02 K=42.74 e=2.63 �■� ■;Nan 11a� %1/►,[,—'■11Q—•11�11�J:i�ly►iU�'��i■��■`� �MI 17 16 15 14 13 12 11 210 ui w rn � o cUn a c0- Ln �o N • �o co --j W � Z 11 :a c U N .. � Z o 00 NJ ^II H 00 w O Lu Q W W co WA O zo5 co V z o a O r--� „�_�� LD • �I��?r!!.i � III � �. �z8wO m ¢ m 0 z O G Of O Z°- z� �w wz C-) Z taw W w EN " D PART 4A- WARTRIMILM9 MON o ZLL z W o U > _:. ■11I � maw ■ > 0 2 U) F-- 0 0 2-7 w E _ 0 EE PROJECT: 4914 ~ S-8 w Q OF 14 O ry N � c3i o '�'■�iL�ld� ����`iF� �_ til . =;= N I , .. 0 I O Ill 21' 11"PP P9 234' U J J V =U w ww Z zLIJ t O o ID !�— OZ Lu w � [If W �O LOU �zU z U^j0 O OWZ z �1) or- a'- O W N W t= Z UZ w Zpw C) =cnm= ry a- 0--ry 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 Sto tion 0+50 0+00 -0+50 0 0 NEW 6"X6" TEE W 6X2 REDUCER, 01-2"GV, & 1-6""GV -,NEW 6" WATER PVC SDR 21 TYP. 3 21 21 21 21 21 21 21 21 21 210• 191 'Jill X10 JQ �:�`b4. r0�Q� D.OQ�Q�?�,0g0� \ 67 41 NO \7 N ss 91 w C)00 I� \ �\1\\ \\ \ \ \ (<IDj 461 300' V.C. D.=+7:02 K=42.74 e=2.63 �■� ■;Nan 11a� %1/►,[,—'■11Q—•11�11�J:i�ly►iU�'��i■��■`� �MI 17 16 15 14 13 12 11 210 1-8"X2" REDUCER, i & 1-2"GV 1 1 1 1 181 1 171 1 1 1 1 16 -0+50 0+00 0+50 1+00 1 1+50 2+00 Sto tion Coco 2+50 3+00 5 4 0 3 -� J 2 � 1 Q) 90 W 83 82 81 -180 79 78 77 76 75 74 73 72 71 -170 69 68 67 66 -165 4+00 4+50 ui w rn � o cUn a c0- Ln �o N • �o co --j W � Z 11 :a c U N .. � Z o 00 NJ ^II H 00 w O Lu Q W W co WA O zo5 co V z o a O r--� „�_�� LD • �I��?r!!.i � III � �. �z8wO m ¢ m 0 z O G Of O Z°- z� �w wz C-) Z taw W w EN " D PART 4A- WARTRIMILM9 MON o ZLL z W o U > _:. ■11I � maw ■ 1-8"X2" REDUCER, i & 1-2"GV 1 1 1 1 181 1 171 1 1 1 1 16 -0+50 0+00 0+50 1+00 1 1+50 2+00 Sto tion Coco 2+50 3+00 5 4 0 3 -� J 2 � 1 Q) 90 W 83 82 81 -180 79 78 77 76 75 74 73 72 71 -170 69 68 67 66 -165 4+00 4+50 Q IL w w z Q z W 0 ui w rn � o cUn a c0- Ln �o N • �o co --j W � Z 11 :a c U N .. � Z o 00 NJ ^II H 00 w O Lu Q W W co O zo5 co V z o a O r--� U LD E a 4Qm �z8wO m ¢ m 0 z O G Of O Z°- z� �w wz C-) Z Q IL w w z Q z W 0 ui w rn zO z cUn a c0- Ln �o N �. J U-) co --j W � Z 11 :a c U N NJ ^II H Fw N O w O Lu Q U 2 z O o U LD E a 4Qm 0 m ¢ m 0 ow Of O Z°- z� �w wz C-) Z taw W w w o ZLL z W o U > 0 > 0 2 U) F-- 0 0 2-7 w E _ 0 EE PROJECT: 4914 ~ S-8 w Q OF 14 O ry N � c3i o N I 0 I O moo U J J V =U w ww Z zLIJ t O o ID !�— OZ Lu w � [If W �O LOU �zU z U^j0 O OWZ z �1) or- a'- O W N W t= Z UZ w Zpw C) =cnm= ry a- 0--ry Q IL w w z Q z W 0 zO z �. w 0 :a c 0 U 2 o U E N \.J N 0 o 0 0 2 0 0 Q. E _ 0 EE PROJECT: 4914 ~ S-8 w Q OF 14 DESIGN CRITERIA AGGREGATE SIZE - USE 2-3 INCH WASHED STONE. DIMENSIONS OF GRAVEL PAD: THICKNESS: 6 INCHES MINIMUM WIDTH: 12 -FEET MINIMUM OR FULL WIDTH AT ALL POINTS OF THE VEHICULAR ENTRANCE;AND EXIT AREA, WHICHEVER IF GREATER LENGTH: 50 -FEET MINIMUM LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES, �O $0.411& AND ENTRANCES AT CURVES IN PUBLIC ROADS. �O WASHING - IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE J�� `: ':" "�`> ': ..:•;;: ; , MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING t . • a�..; ? ":.' SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE 6° MIN. THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE; DISPOSAL ' y �.. AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE. 2-3" COURSE CONSTRUCTION SPECIFICATIONS AGGREGATE 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY EXISTING SLOPE FOR VEHICULAR TRAFFIC GRADE IT. PAVEMENT EDGE MAINTAIN BERM & VALLEY 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS TO PREVENT SEDIMENT LADEN SHOWN ON THE PLANS, AND SMOOTH IT. „ 12' 10 WATER FROM LEAVING SI 3. PROVIDE DRAINAGE TO CARRY WATER TO SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY 24p 6" MIN. FILTER FABRIC OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2 -INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCUTRE USED TO TRAP SEDIMENT AND TEMPORARY CONSTRUCTION ENTRANCE CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO (NOT TO SCALE) PUBLIC ROADWAYS. STORM PIPE CONSTRUCTION SPECIFICATIONS PLACE RIPRAP SO THAT IT FORMS A DENSE, BEGIN FILTER FABRIC WELL -GRADED MASS OF STONE WITH A MINIMUM OF 0 END OF PIPE/FES VOIDS. THE DESIRED DISTRIBUTION OF STONES RIP RAP APRON THROUGHOUT THE MASS MAY BE OBTAINED BY THICKNESS AS CON77NUE FILTER FABRIC SELECTIVE LOADING AT THE QUARRY, AND PER PLAN BEYOND RIP RAP APRON CONTROLLED DUMPING DURING FINAL PLACEMENT, RIP RAP GRAVEL PLACE RiPRAP TO ITS FULL THICKNESS IN ONE SIZED & PLACED OPERATION. DO NOT PLACE RIPRAP BY DUMPING AS PER PLAN THROUGH CHUTES OR OTHER METHODS THAT F. E.S� CAUSE SEGREGATION OF STONE SIZES. TAKE CARE NOT TO DISLODGE THE UNDERLYING BASE OR FILTER WHEN PLACING STONES. STORM PiPE W2 MAINTENANCE ' RIPRAP SHOULD BE INSPECTED PERIODICALLY AND �j AFTER HEAVY RAINFALLS FOR SCOUR OR Wl DISLODGED STONES. CONTROL OF WEED AND (3*Do) BRUSH GROWTH MAY BE NEEDED IN SOME La LOCATIONS. IMMEDIATELY MAKE ALL NEEDED (Apron Length) REPAIRS TO PREVENT FURTHER DAMAGE. RIP RAP APRON STABILIZATION DETAIL (NOT TO SCALE) min 9-' 1.5 min. CONSTRUCTION / _ _ 1.PLACE STRUCTURAL STONE (CLASS B) TO THE LINES AND DIMENSIONS SHOWN ON --------- ------------ _ _ _ _ _ _ _ _ _ THE PLAN ON A FILTER FABRIC FOUNDATION. THE CREST WIDTH OF THE DAM SHOULD BE A MINIMUM OF 2 FEET. 2.KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW THE END WHERE THE DAM ABUTS THE CHANNEL BANKS. &PLACE SEDIMENT CONTROL STONE (#5 OR #57) ON THE UPSTREAM SIDE OF THE DAM THAT IS A MINIMUM OF 1 FOOT THICK. 4.PROVIDE AN APRON THAT IS 3 TIMES THE HEIGHT OF THE DAM. THE APRON WIDTH Fitter Cloth IS AT LEAST 4 FEET LONG. UNDERCUT THE APRON 80 THAT THE TOP OF THE APRON IS FLUSH WITH THE SURROUNDING GRADE. Platt View &EXTEND THE STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 12' of NCOOT #5 or #57 6.EXCAVATE SEDIMENT STORAGE AREA TO THE DIMENSIONS SHOWN ON THE PLAN. washed stone 1.5' Class B Riprop ?�T MAINTENANCE Z max. at INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH center SIGNIFICANTINCH OR GREATER RAINFALL EVENT AND REPAIR IMMEDIATELY. Filter Cloth ( ) CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION 4' to 6' FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL Cross -Section View MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT CHECK DAM WITH WEIR DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT AND (NOT TO SCALE) CROSS SECTION. UPSTREAM END OF OVERFLOW UPSTREAM END OF STORM DRAIN I 11 -Ili= STORM DRAIN 111=TLI" LI111 11- " 1/3 PIPE rl� ILII 8 o DIAMETER �I1 1111 IL I-_ INT °< 3/4" EXTERIOR PLYWOOD 11= 3/4" EXTERIOR PLYWOOD �� - 1 � II I l =1I -1I =_�=I1-n=-I_I11 1-1aII 1I= - FPoMOLYwoo TII= PLYWOOD INLET PROTECTION NOTE: ALL PARTIALLY COMPLETED STORM DRAINS, UP TO 24" PIPE SIZE, SHALL BE PROTECTED AT THE END OF EACH DAY IN ACCORDANCE WITH STEEL FENCE POST UPSTREAM END OF THESE DETAILS. (TYPICAL) STORM DRAIN TI I, IMC IIS'- UPSTREAM END OF '=111-911 �I I loll; STORM DRAIN OVERFLOW 11( ! IIRT 1/3 PIPE ii ii ii I1IL= DIAMETER I11 u u Il II -I WASHED STONE FILTER Ill II a ° ACROSS PiPE INLET 111 1,.Aa a WASHED STONE FILTER I1- ACROSS PIPE INLET HARDWARE CLOTH II- ' _- 111��1 mil 11= ll-jl ��II�T")�I-III III 11! SII-.,_. SII- 1 l=_91 _ l I� I I� N -IJ I IT=III-IIIII-I�III fI" HARDWARE CLOTH 1 ( 1 ( II HARDWARE1, 11=11 ITE U U U STONE FiLTER INLET PROTECTION STANDARD PIPE INLET PROTECTION (PLYWOOD & STONE) SILT FENCE DETAIL (NOT TO SCALE) CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) J. CONSTRUCT THE FILTER FABRIC FROM A CON77N000S ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN 7HE FILTER CLOTH ONLY AT A SUPPORT POST W177-1 4 FEET MiNIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD S7RENG77-1 FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO 7HE UPSLOPE SIDE OF THE POSTS EXTEND THE WiRE MESH SUPPORT TO THT BOTTOM OF 77 -IE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLAS77C ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO 77 -IE GROUND A MINIMUM OF 24 INCHES 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOE NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS WiRE OR PLAS77C ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. Z. EXCAVATE A 77?ENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER (FIGURE 6.62a). 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WiIN SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. 77-IOROUGH COMPAC77ON OF 77-1E BACKFILL iS CRi77CAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FiLTER FABRIC TO EXIS77NG TREES. 11. NO MEASURES ARE TO BE REMOVED UN77L DENR APPROVAL. INSTALLA77ON SPECIFICATIONS 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MiDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRI77CAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS J. INSTALL POSTS 2 FEET DEEP ON 7HE DOWNSTREAM SIDE OF 7HE SiLT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS NTH 77 -IE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH 7HREE TIES, ALL SPACED W77ViN THE TOP 8 INCHES OF FABRIC. ATTACH EACH 77E DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VER77CALLY APART. ALSO, EACH 77E SHOULD BE POS177ONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPAC770N. 9. COMPAC77ON iS VITALLY IMPORTANT FOR EFFECTIVE RESULTS COMPACT 77 -IE SOIL IMMEDIATELY NEXT TO 77 -IE SILT FENCE FABRIC Wl77-1 77 -IE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXER77NG AT LEASY 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FiRST, AND THEN EACH SIDE TWiCE FOR A TOTAL OF 4 TRIPS. MAINTENANCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD 7HE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME iNEFFEC7TVE, REPLACE iT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CON7721BU77NG DRAINAGE AREA HAS BEEN PROPERLY Drape baffle material overwire strand and secure with plastic ties at posts and on wire every 12" 9GaugeMin.Nigh ®_.+'" , T Tension Wire Strand 3' MIN i Shall Be Secured To Post To Support Baffle Material I Baffle Material If the temporary sediment basin will be converted to a permanent stormwater basin of greater depth, the baffle height should be based on the pool depth during use as a temporary sediment basin. Note: install three (3) coir fiber baffles in basins at drainage outlets with a spacing of i14 the basin length. Two (2) coir fiber baffles can be installed in the basins less than 20 ft. in length with a spacing of 113 the basin length, 4' Max. POROUS BAFFLES DETAIL FiGURE 6.65b (NOT TO SCALE) CONS7RUC770N SPECIFICA77ONS Compacted soil 2' '` min >1 ! i { •+ •-fs~• -- 6' typical �-�--- Figure 6.20a Temporary earthen diversion duce. 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONAL MATERIAL. 2. ENSURE THAT THE MINIMUM CONSYRUCTED CROSS SECTION MEETS ALL DESIG REQUIREMENTS. 3. THAT THE P F HE DIKE I NOT LOWER AT ANY POINT THAN THE ENSURE E TO O T S DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIRTHE DIVERSION RIDGE. CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED TO AVOID GULLY FORMATION WHEN THE AREA ABOE THE TEMPORARY DIVISERSION IS PERMANENTLY STABILIZED, REMOVE THE DIVERSION AND FILL AND STABILIZED THE CHANNEL TO BLEND VVITH THE NATURAL SURFACE. TEMPORARY DIVERSION DITCH (NOT TO SCALE) Ann Ably 'C' Eabeure water Entry PERSPECTIVE VIEW unit PVC End PVC Elbow PVC Vent Schedule40 Cap pip. PVC Pipe Wat Surface PVC End ar 7 Schedule 40 PVC TeePVC Pipe PVC Pipe z Holes in PVC Tee orifice underside Fleodble Plate Hose e Bottom Surface ENb VIEW FRONT VIEW 18" min f-\dw 6.20.1 1. Grade the basin so that the bottom is level front to back and side to � side. li.i . Install the coir fiber baffles immediately upon excavation of the basins. Extend 9 gauge wire to basin side or install T -post to anchor J. Install posts across the width of the sediment trap (Practice 6.62, baffle to side of basin and secure to vertical post Sediment Fence). ' n 4. Steel posts should be driven to a depth of 24 inches and spaced a 2 Q Z maximum of 4 feet apart. The top of the fabric should be a minimum of 6 Ei 4 �* nches higher than the invert of the spillway. Tops of baffles should be a O IV z 00 minimum of 2 inches lower than the top of the earthen embankment. �. . Instal/ at least three rows of baffles between the inlet and outlet 00 � V)Z discharge point. Basins less than 20 feet in length may use 2 baffles. > 6. Attach a 9 gauge high tension wire strand to the steel posts at a Variable Depth height of 6 inches above the spillway elevation with plastic ties or wire O asteners to prevent sagging. If the temporary sediment basin will be w onverted to a permanent stormwater basin of a greater depth, the baffle w¢ eight should be based on the pool depth during use as a temporary i Secure bottom of baffle to ground with sediment basin. 1 I 12'staples at 12'maximum spacing, 7 Extend 9 gauge minimum high tension wire strand to side of basin or -• install steel T -posts to anchor baffle to side of basin and secure to O ertical end posts as shown in Figure 6.65b. w 00 . Drape the coir fiber mat over the wire strand mounted at a height of 6 Baffle Material 10. Install porous baffles as specified in Practice 6.65, Porous Baffles. inches above the spillway elevation. Secure the coir fiber mat to the wire /strand machine compact it. Over fill the embankment 6 inches to allow for settlement. with plastic ties or wire fasteners. Anchor the matting to the sides Z structure > Z and floor of the basin with 12 inch wire staples, approximately 1 ft apart, Ld O 1 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling long the bottom and side slopes of the basin. > Q O 0 W into the mud by excavating a shallow pit under the skimmer or providing a low support under . Do not splice the fabric, but use a continuous piece across the basin le nn skimmer of stone or timber. 0. Adjustments may be required in the stapling requirements to fit Staple way 4. Place the barrel (typically 4 -inch Schedule 40 PVC pipe) on a firm, smooth foundation of individual site conditions. j c _ .. [^1 I -' i i MAINTENANCE f 11 1 Iii �I•• around the pipe. Place the fill material around the pipe spillway in 4 -inch layers and compact it Inspect baffles at least once a week and after each rainfall. Make any 1 ' under and around the pipe to at least the same density as the adjacent embankment. Care required repairs immediately. Steel Post t 2'te Depth must1be taken not to raise the pipe from the firm contact with its foundation when compacting Be sure to maintain access to the baffles. Should the fabric of a baffle Erosion and Sedincera Pollution Control Manual, Mara, 2006. under the pipe haunches. collapse, tear, decompose, or become ineffective, replace it promptly. Material should be secured to the bottom Remove sediment deposits when it reaches half full, to provide adequate ides of basin using 120 landscape staples storage volume for the next rain and to reduce pressure on the baffles. Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE Take core to avoid damaging the baffles during cleanout, and replace if damaged during cleanout operations. Sediment depth should never exceed ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE half the designed storage depth. After the contributing drainage area has been properly stabilized, remove all VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN TH baffle materials and unstable sediment deposits, bring the area to grade, and stabilize it. Compacted soil 2' '` min >1 ! i { •+ •-fs~• -- 6' typical �-�--- Figure 6.20a Temporary earthen diversion duce. 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONAL MATERIAL. 2. ENSURE THAT THE MINIMUM CONSYRUCTED CROSS SECTION MEETS ALL DESIG REQUIREMENTS. 3. THAT THE P F HE DIKE I NOT LOWER AT ANY POINT THAN THE ENSURE E TO O T S DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIRTHE DIVERSION RIDGE. CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED TO AVOID GULLY FORMATION WHEN THE AREA ABOE THE TEMPORARY DIVISERSION IS PERMANENTLY STABILIZED, REMOVE THE DIVERSION AND FILL AND STABILIZED THE CHANNEL TO BLEND VVITH THE NATURAL SURFACE. TEMPORARY DIVERSION DITCH (NOT TO SCALE) Ann Ably 'C' Eabeure water Entry PERSPECTIVE VIEW unit PVC End PVC Elbow PVC Vent Schedule40 Cap pip. PVC Pipe Wat Surface PVC End ar 7 Schedule 40 PVC TeePVC Pipe PVC Pipe z Holes in PVC Tee orifice underside Fleodble Plate Hose e Bottom Surface ENb VIEW FRONT VIEW 18" min f-\dw 6.20.1 1MMER SEDIMENT BASIN � (n li.i Z basin is completely dewatered (m land 24 hams). O F- U) ' n >4 v �o� 2 Q Z W w' I Ei 4 �* I- O IV z 00 F- CV E w 00 � V)Z O > surface water away from the bare areas. Complete the embankment before the area i O m� O cleared. Stabilize the emergency spillway embankment and all other disturbed areas w tap of principal spBk-v elevation w¢ Z o Phn vkw U O a Q L O • w 00 I' Freeboard Embankment w 10. Install porous baffles as specified in Practice 6.65, Porous Baffles. an Tnftow Baffles machine compact it. Over fill the embankment 6 inches to allow for settlement. +� E Z structure > Z zow Ld O 1 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling O Q, > Q O 0 W into the mud by excavating a shallow pit under the skimmer or providing a low support under U~ W 1MMER SEDIMENT BASIN (n li.i Z basin is completely dewatered (m land 24 hams). v F- U) N 2 Q Z W w' I W �* I- O IV ~ F- CV E w Q O O > surface water away from the bare areas. Complete the embankment before the area i O m� O •Dewalern -Allow the maximum reasonable detention periodWore the 1MMER SEDIMENT BASIN (n 7., I spillay way Z basin is completely dewatered (m land 24 hams). F- O • Inflow rata -Reduce dte inflow velocity and. divert ail sediment -free Z W �* I- runoff: wdttV 1. Clear,grub, and strip the area under the embankment of all vegetation and root mat. 9. Erosion control -Construct the structure so that the disturbed area is minimized. Divert LIJ Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it surface water away from the bare areas. Complete the embankment before the area i O m� O cleared. Stabilize the emergency spillway embankment and all other disturbed areas ry 0 Z tap of principal spBk-v elevation w¢ Z w I- w LL_ Phn vkw O (Z7 W Q L U Z I' Freeboard Embankment w 10. Install porous baffles as specified in Practice 6.65, Porous Baffles. LU U Tnftow Baffles machine compact it. Over fill the embankment 6 inches to allow for settlement. Z structure > Z 11. After all the sediment -producing areas have been permanently stabilized, remove the Ld O 1 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly. (References: Surface Stabilization). > Q O 0 W into the mud by excavating a shallow pit under the skimmer or providing a low support under I nn skimmer of stone or timber. Wow structure 0 way 4. Place the barrel (typically 4 -inch Schedule 40 PVC pipe) on a firm, smooth foundation of MAINTENANCE Cir) i impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill •� Sediment Cross-5ect,an around the pipe. Place the fill material around the pipe spillway in 4 -inch layers and compact it INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH d storage zone view under and around the pipe to at least the same density as the adjacent embankment. Care SIGNIFICANT (ONE-HALF INCH OR GREATER) RAINFALL EVENT AND REPAIR E�' 1MMER SEDIMENT BASIN (n 7., I spillay way F- Z J W �* CONSTRUCTION SPECIFICATIONS wdttV 1. Clear,grub, and strip the area under the embankment of all vegetation and root mat. 9. Erosion control -Construct the structure so that the disturbed area is minimized. Divert LIJ Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it surface water away from the bare areas. Complete the embankment before the area i O * Ar fb.&-ter oud-cr was properly. Haul all objectionable material to the designated disposal area. Place temporary cleared. Stabilize the emergency spillway embankment and all other disturbed areas ry 0 Z tap of principal spBk-v elevation sediment control measures below basin as needed. above the crest of the principal spillway immediately after construction(References: z _JW (0 O � > � 0 0 2 Ensure that fill material for the embankment is free of roots, woody vegetation, organic I' Freeboard Embankment matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches, and 10. Install porous baffles as specified in Practice 6.65, Porous Baffles. I- I- Z Tnftow Baffles machine compact it. Over fill the embankment 6 inches to allow for settlement. Z structure 11. After all the sediment -producing areas have been permanently stabilized, remove the Ld O 1 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly. (References: Surface Stabilization). 0 Q O 0 W into the mud by excavating a shallow pit under the skimmer or providing a low support under I nn skimmer of stone or timber. 0 way 4. Place the barrel (typically 4 -inch Schedule 40 PVC pipe) on a firm, smooth foundation of MAINTENANCE Q [ Ury Q CL z O J impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill •� Sediment Cross-5ect,an around the pipe. Place the fill material around the pipe spillway in 4 -inch layers and compact it INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH d storage zone view under and around the pipe to at least the same density as the adjacent embankment. Care SIGNIFICANT (ONE-HALF INCH OR GREATER) RAINFALL EVENT AND REPAIR Figure6.64o Ebsmpie of a sedaaM basin with a skimmer outlet and emergency spillway. From Pwnsyl-la must1be taken not to raise the pipe from the firm contact with its foundation when compacting IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL Erosion and Sedincera Pollution Control Manual, Mara, 2006. under the pipe haunches. DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE S 1MMER SEDIMENT BASIN - % J J CONSTRUCTION SPECIFICATIONS V 1. Clear,grub, and strip the area under the embankment of all vegetation and root mat. 9. Erosion control -Construct the structure so that the disturbed area is minimized. Divert LIJ Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it surface water away from the bare areas. Complete the embankment before the area i = U W CL properly. Haul all objectionable material to the designated disposal area. Place temporary cleared. Stabilize the emergency spillway embankment and all other disturbed areas ry 0 Z a0 O sediment control measures below basin as needed. above the crest of the principal spillway immediately after construction(References: z _JW (0 Surface Stabilization). _J > � 0 0 2 Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches, and 10. Install porous baffles as specified in Practice 6.65, Porous Baffles. I- I- Z a 0 N machine compact it. Over fill the embankment 6 inches to allow for settlement. Z w ? 11. After all the sediment -producing areas have been permanently stabilized, remove the Ld O Z Z Z 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly. (References: Surface Stabilization). W � Ld tf) Q O 0 W into the mud by excavating a shallow pit under the skimmer or providing a low support under > ry O_the skimmer of stone or timber. O1-- NYW In 4. Place the barrel (typically 4 -inch Schedule 40 PVC pipe) on a firm, smooth foundation of MAINTENANCE Q [ Ury Q CL z O J impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill UO Q W Q 0 W Q around the pipe. Place the fill material around the pipe spillway in 4 -inch layers and compact it INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH J = um = under and around the pipe to at least the same density as the adjacent embankment. Care SIGNIFICANT (ONE-HALF INCH OR GREATER) RAINFALL EVENT AND REPAIR must1be taken not to raise the pipe from the firm contact with its foundation when compacting IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL under the pipe haunches. DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE crossing it with construction equipment. In no case should the pipe conduit be installed by ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE cutting a trench through the dam after the embankment is complete. VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN TH SKIMMER. 5. Assemble the skimmer following the manufactures instructions, or as designed. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATE 6. Lay the assembled skimmer on the bottom of the basin with the flexible joint at the inlet IS FLOWING UNDERNEATH OR AROUND THEM. of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support. Be sure to attach a rope to the skimmer and anchor it to the side of IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE the basin. This will be used to pull the skimmer to the side for maintenance. REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY W FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE 7. Earthen spillways -Install the spillway in undisturbed soil to the greatest extent possible. The achievement of planned elevations, grade, design width, and entrance and exit channel REPOSITIONING THE SKIMMER. slopes are critical to the successful operation of the spillway. The spillway should be lined with CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED laminated plastic or impermeable geotextile fabric. The fabric must be wide and long enough to REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPEC ALL REPAIR 1 ,a� Peal edges may be secured with 8 -inch staples or pins. The fabric must be long enough to extend THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE NECESSARY hail down the slope and exit onto the stable ground. The width of the fabric must be one piece, not IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. joined or spliced; otherwise water can get under the fabric. if the length of the fabric is insufficient for the entire length of the spillway, multiple sections, spanning the complete width, O may be used. The upper section(s) should overlap the lower section(s) so that water cannot flow the fabric. Secure the the fabric in trench FREEZING WEATHER CAN RESULT IN iCE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN iN THE WINTER TO PREVENT THE SKIMMER under upper edge and side of a with staples or pins.,(Adapted from "A Manual for Designing, Installing and Maintaining Skimmer Sediment FROM PLUGGING WITH ICE. w Basins." February, 1999. J.W. Faircloth & Son). h-1 8. Inlets - Discharge water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency. (References: Runoff Control Measures and Outlet Protection). EE PROJECT: 4914 S = V OF 14 co 0 0 0 0 0 rn Cn LU J J Q CY d- c --I Z O' t 4 rn di kA U (3) 0 CL X Figure 6.174 Temporary Channel Liners; Washington State Department of Ecology Excavate channel to design Overlap 6" min. grade and cross-section a° Design depth ft Longitudinal anchor trench Overcut channel 2" t0 allOW' itlf�ln - ;Ail/((� �/ !tllA, a i ' '.Y� during seedbed preparation s , P 6" Typical installation ' with erosion control blankets or turf x. reinforcement mats �� w Intermittent check slot Longitudinal anchor trench Shingle -lap spliced ends or begin new roll in an intermittent check slot Prepare soli and apply seed before installing blankets, mats or oth� temporary channel liner, syste USE STRAW MATTING FOR SLOPE PROTECTION NOTES: 1. Design velocities exceeding 2 ft/sec require temporary blankets, mats or similar liners to protect seed and soil until vegetation becomes established. 2. Grass -lined channels with design velocities exceeding 6 ft/sec should include turf reinforcement mats Maintenance 1. Inspect Rolled Erosion Control Products at least weekly and after each significant (1/2 inch or greater) rain fall event repair immediately. 2. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. 3. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. 4. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. 5. Monitor and repair the RECP as necessary until ground cover is established. SEEDING SPECIFICATIONS SEEDBED PREPARATION THOROUGHLY CULTIVATE LAWN AREAS BY DISCING TO A DEPTH OF 6" AND RAKING THE SURFACE SMOOTH TO REQUIRED GRADES. APPLY 4,000 LBS. OF AGRICULTURAL LIME PER ACRE AND 1,000 LBS. OF 10-10-10 OR EQUIVALENT FERTILIZER PER ACRE. TEMPORARY SEEDING WHERE TEMPORARY SEEDING IS REQUIRED PRIOR TO SEEDING OF PERMANENT LAWNS OR FILL SLOPES, PROCEED AS FOLLOWS: AUG. 15TH -MAR. 1ST SOW RYE GRAIN AT THE RATE OF 120 LBS. PER ACRE. MAR. 1ST -AUG. 15TH SOW GRAIN MILLET AT THE RATE OF 40 LBS. PER ACRE. PERMANENT SEEDING SEASON VARIETY RATE(LBS/ACRE) AUG 15 - NOV 1ST KOREAN LESPEDEZA 50 OR KOBE LESPEDEZA 50 AND TALL FESCUE 60 NOV 15 - MARCH 1ST TALL FESCUE 120 AND ABRUZZI RYE 25 MARCH 1 - APRIL 15 TALL FESCUE 120 APRIL 15 - JUNE 30 HULLED COMMON BERMUDA 12 JUNE 30 - AUG 15 TALL FESCUE 60 AND BROWNTOP MILLET 25 MULCHING IMMEDIATELY AFTER SEED AREA SOWN, MULCH THE ENTIRE AREA EVENLY WITH A LAYER OF WHEAT STRAW TO PROTECT AREA FROM EROSION. MULCH TO BE APPLIED AT A RATE OF 75-100 LBS. PER 1000 SQUARE FEET. SECURING MULCH: THE MULCH SHALL BE HELD IN PLACE BY EMULSIFIED ASPHALT BINDER ON SLOPES 2 TO 1 OR STEEPER, OR AS REQUIRED. APPLY ASPHALT AT 0.10 GALLON PER SQUARE YARD. IN HEAVY TRAFFIC AREAS, USE TYPE "RS" OR "CRS" TO MINIMIZE REMOVAL OF TACK COAT. SYNTHETIC BINDERS MAY BE USED AS RECOMMENDED BY THE MANUFACTURER TO ANCHOR THE MULCH. TEMPORARY CHANNEL LININGS IF REQUIRED SHALL BE INSTALLED IN AREAS AS SHOWN ON PLANS, OR AS REQUIRED TO PREVENT EROSION. LININGS AREA TO BE LEFT IN PLACE THROUGHOUT PERMANENT SEEDING PROCEDURE. MAINTENANCE I. TEMPORARY SEEDING: RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. Il, PERMANENT SEEDING: GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. RESEEDING --IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. NOTE: Pursuant to G.S. 113A-57(2), the angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion -control devices or structures. In any event, slopes left exposed will, within 14 calendar days of completion of any phase of grading be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. Pursuant to G.S. 113A-57(3), provisions for permanent ground cover sufficient to restrain erosion must be accomplished for all disturbed areas within 14 working days or 90 calendar days (whichever is shorter) following completion of construction or development. VEGETATION MANTAINANCE: IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LiME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF THE YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. Figure 6.17e Channel Installation and Slope Installation; Washington State. Ecology Department Longitudinal anchor "= Terminal slope and trench 12" channel anchor trench 6" Stake at 3'-5' intervals .._.. slot at 25' intervals Initial channel Intermittent anchor trench ,. check slot NOTE: 1. Check slots to be constructed per manufacturers specifications. 2. Staking or stapling layout per manufacturers specifications. Slope surface shall be smooth before If there is a berm at the top of placement for proper soil contact, slope, anchor upslope of the berm. Stapling pattern as Min. Z" overlaAnchor in 6"x6" min. Trench per manufacturers p and staple at 12" intervals. recommendations. Min. 6" overlap. Te StaP ( overlaps P max. 5" spacing. Do not stretch blankets/matting tight-allowBring material down to a level area,. turn the end under 4" and staple at i2" the rolls to conform to any irregularities. intervals. For slopes less than 3H:1V, rolls Lime, fertilize, and seed before installation. Planting may be placed in horizontal strips. of shrubs, trees, etc. should occur after installation. E noch nginee`rs, P. A. Consulting Engineers Surveyors 1403 NC Hwy 50 South Benson, NC 27504 (919)894-5731 Intensity -Dura Intensity (in/hr) UJI tion-Freuenc Data CB18 174.07 CB17 27 Time STORM DRAINAGE - PIPE SCHEDULE STAPLES (2 PER BALE) Duration 5 min. 10 min. 15 min. 30 min. 1 hr. 10 r. 7.22 6.13 5.25 3.71 2.41 25 r. 8.19 7.01. 6.03 4.32 2.84 50 r. 8.96 7.71 6.64 4.8 3.17 UJI 174.20 CB18 174.07 CB17 27 15 STORM DRAINAGE - PIPE SCHEDULE STAPLES (2 PER BALE) STRAW BALE BINDER WIRE- 10 mil PLASTIC LINING- / PLYWOOD 0.50 10 mil PLASTIC SANDBAG -� LINING --� \ �- - SECTION A -A 3' � ff 1.1 Pipe Beg. Inv. NATIVE MATERIAL 48"X24" BLACK LETTERS � PAINTED WHITE, - (OPTIONAL) J 6" HEIGHT End Inv. LATH AND NOT TO SCALE � Dia. Slope Material � `- / Rat. C FLAGGING ON BERM I Q10 Q25 050 � 2.5 3 SIDES -� 7.1 P15 172.70 (ft.) CONCRETE LAG SCREWS (%) � ---10'MINIMUM---- I 1.1 (SF) (acres) aY SECTION 6-6_ WASHOUT - (cfS) (cfs) (cfs) 4.9 WOOD OR 7.3 N07 TO SCALE 171.13 CB14 � O � O CB13 METAL STAKES 18 0.5 PP 0.012 0.50 (2 PER BALE} 1.40 36" -- WOOD POST P1 _ \Y SANDBAG 187.92 \ 10' MINIMUM---- 3.5"X3.5'XS' 15 0.5 PP 0.012 0.50 8712 0.20 0.7 0.8 0.9 4.9 P2 187.92 CB2 186.09 CB3 199 15 0.9 PP 0.012 0.50 VARIES ' 2.9 B 3.6 �+ B CONCRETE WASHOUT P3 lJ CB3 ' � _ -----� SIGN DETAIL 1.1 PP PLAN 0.50 VARIES 1.20 ------- -•-, (OR EQUIVALENT) 4.9 5.4 NOT TO SCALE P4 I � 184.96 CB4A 28 � BERM 0.5 PP 0.012 0.50 4356 1.50 5.4 6.1 6.7 8.0 • 184.96 CB4A 184.40 CB5 83 18 0.7 PP 10 mil PLASTIC LINING - TYPE "BELOW GRADE" 8712 -- -- 6.1 ...- .... .... 1.12" DIA 7.6 9.3 P5 184.40 CBS . . e • , � s � ° � �-- - STEEL WIRE 137 ----- .- PP 0.012 0.50 STAPLE 2.40 8.7 ----------_----..- 10.8 o.,,. 10 mil PLASTIC LINING -� PLAN STRAW BALE DETAIL 0.6 178.61 �- 10 mil PLASTIC LINING 0.02 1.5 0.05 5,., NOT TO SCALE (TYP) 178.83 Outlet / 182.79. no P9 �E�a TYPE "ABOVE GRADE" WITH STRAW BALES 178.76 3.65 � 185.86 CB6 185.70 CB7 33 WOOD FRAME SECURELY 0.5 PP 0.012 0.50 4356 0.10 FASTENED AROUND SECTION SECTION B -B 0.4 4.9 P7 185.70 CB7 ENTIRE PERIMETER _ NOT TO SCALE 45 15 1.3 _- 0.012 WITH iVUO STAKES 4356 0.20 0.7 0.8 0.9 - no P12 0.6 166.66 1.00 0.88 1.5 0.68 1.56 166.06 inlet 166.66 170.00 no 10' MINIMUM----- I 177.89 CB8 177.76 CB9 27 15 0.5 PP TWO -STACKED 0.50 21780 0.50 D 2.0 2.2 4.9 P9 2X12 ROUGH CB9 169.87 CB10 VZJi 15 NOTES PP 0.012 T WOOD FRAME 21780 1.00 3.6 o 4.5 12.8 f e e 166.57 CB11 145 18 2.3 PP 1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD- 0.50 17424 3.60 13.0 � O 16.1 17.2 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED 166.57 CB11 164.40 CB12 � � � 3.2 WITHIN 30' OF THE TEMPORARY CONCRETE WASHOUT FACILITY. 0.012 VARIES STAKE (TYP} 8712 �7 ry 16.8 3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE 20.3 P12 � CB12 163.50 FESZ 182 WASHOUT FACILITIES SHALL BE REMOVED FROM THE SITE 0.5 PP 0.012 ;+ , -m.{ 4.70 17.0 OF THE WORK AND DISPOSED OF OR RECYCLED. 21.1 17.2 �' 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE O � CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE I � WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, AND -- � STABILIZED TO PREVENT EROSION. V�. 0 � 10 mil PLASTIC LINING --� TYPE "ABOVE GROUND" NOT TO SCALE WITH WOOD PLANKS Notes: 1. Q=CIA 2. Qfull=(1/1630)*[D"(8/3)]*[S"(1/2)] 3. TW assumed to be at 1/2 Pipe Diameter. 4. Cd 0.65 (grooved end projecting) & Ke 1.0 + 0.5(End Section Conforming to Fill Slope) = 1.5 6. HW (Inlet Controlled) = (Inlet Invert)ft. + (1/2 Pipe Diameter)ft. + {[Q/(Cd*A)]2)/(2*g)ft. 7. HW (Outlet Controlled) = (Outlet Invert)ft. + (Tailwater)ft. + H(ft.) H=hf+hm hf = 2,660,000*(L*Q2*n2)/(D5.33) hm = 522*Ke*Q2/D4 P18 174.20 CB18 174.07 CB17 27 15 STORM DRAINAGE - PIPE SCHEDULE PP 0.012 0.50 13068 0.30 1.1 Pipe Beg. Inv. Beg. @ End Inv. End @ Len. Dia. Slope Material "n" Rat. C D.A. per CB Total D.A. Q10 Q25 050 Qlull 2.5 2.7 7.1 P15 172.70 (ft.) (in.) (%) 146 15 1.1 (SF) (acres) (cfs) (cfS) (cfs) (cfs) 4.9 5.4 7.3 P14 171.13 CB14 171.00 CB13 27 18 0.5 PP 0.012 0.50 8712 1.40 5.1 P1 188.08 CB1 187.92 CB2 33 15 0.5 PP 0.012 0.50 8712 0.20 0.7 0.8 0.9 4.9 P2 187.92 CB2 186.09 CB3 199 15 0.9 PP 0.012 0.50 26136 0.80 2.9 3.3 3.6 6.7 P3 186.09 CB3 185.10 CB4, 93 15 1.1 PP 0.012 0.50 17424 1.20 4.3 4.9 5.4 7.2 P4 185.10 CB4 184.96 CB4A 28 18 0.5 PP 0.012 0.50 4356 1.50 5.4 6.1 6.7 8.0 P4A 184.96 CB4A 184.40 CB5 83 18 0.7 PP 0.012 0.50 8712 1.70 6.1 7.0 7.6 9.3 P5 184.40 CBS 183.50 FES1 137 18 0.7 PP 0.012 0.50 30492 2.40 8.7 9.8 10.8 9.2 P8 0.6 178.61 1.00 0.02 1.5 0.05 0.07 178.83 Outlet 178.83 182.79. no P9 0.6 178.76 3.65 P6 185.86 CB6 185.70 CB7 33 15 0.5 PP 0.012 0.50 4356 0.10 0.4 0.4 0.4 4.9 P7 185.70 CB7 185.10 CB4 45 15 1.3 PP 0.012 0.50 4356 0.20 0.7 0.8 0.9 8.1 no P12 0.6 166.66 1.00 0.88 1.5 0.68 1.56 166.06 inlet 166.66 170.00 no P8 177.89 CB8 177.76 CB9 27 15 0.5 PP 0.012 0.50 21780 0.50 1.8 2.0 2.2 4.9 P9 177.76 CB9 169.87 CB10 234 15 3.4 PP 0.012 0.50 21780 1.00 3.6 4.1 4.5 12.8 P10 169.87 CB10 166.57 CB11 145 18 2.3 PP 0.012 0.50 17424 3.60 13.0 14.7 16.1 17.2 P11 166.57 CB11 164.40 CB12 68 18 3.2 PP 0.012 0.50 8712 4.10 14.8 16.8 18.4 20.3 P12 164.40 CB12 163.50 FESZ 182 24 0.5 PP 0.012 0.50 26136 4.70 17.0 19.2 21.1 17.2 P18 174.20 CB18 174.07 CB17 27 15 0.5 PP 0.012 0.50 13068 0.30 1.1 1.2 1.3 4.9 P17 174.07 CB17 172.70 CB15 134 15 1.0 PP 0.012 0.50 13068 0.60 2.2 2.5 2.7 7.1 P15 172.70 CB15 171.13 CB14 146 15 1.1 PP 0.012 0.50 13068 1.20 4.3 4.9 5.4 7.3 P14 171.13 CB14 171.00 CB13 27 18 0.5 PP 0.012 0.50 8712 1.40 5.1 5.7 6.3 7.9 P13 171.00 CB13 169.87 CB10 43 18 2.6 PP 0.012 0.50 13068 1.70 6.1 7.0 7.6 18.4 P18 Project Quail Glen 1.16 Location: Harnett County, North Carolina HEADWATER CALCULATIONS Project No. 4914 Outlet Date February 6, 2019 Cd Prepared By Fleet Temple Area (acres) hf = Head Loss Due To Friction (ft.) Outlet Control hm Flow (cfs) hm = Head Loss Due To Minor Losses (ft.) Controlling Headwater Intensity (in/hr) n = Manning Roughness Coefficient Over - topping Rational Runoff Coefficient Ke = Aggregate Loss Coefficient P15 Pipe Length (ft.) Cd = Coefficient of Discharge 3.04 Flow (cfs) HW = Headwater 0.29 Diameter (in.) TW = Tailwater Outlet P18 0.6 174.86 1.16 0.01 1.5 HEADWATER CALCULATIONS 0.02 175.25 Outlet 175.25 Pipe Cd inlet Control HW TW hf Ke Outlet Control hm H }{W Controlling Headwater Headwater Elevation T.C. Elevation Over - topping 179.10 no P15 0.6 173.86 3.04 0.57 1.5 0.29 0.86 175.03 Outlet 175.03 P1 0.6 188.72 0.86 0.00 1.5 0.01 0.01 188.79 Outlet 188.79 192.98 no P2 0.6 188.78 1.56 0.34 1.5 0.13 0.47 188.12 Inlet 188.78 192.98 no P3 0.6 187.25 1.90 0.36 1.5 0.29 0.65 187.65 Outlet 187.65 190.99 no P4 0.6 186.26 1.76 0.06 1.5 0.22 0.28 187.00 Outlet 187.00 190.20 no P4A 0.6 186.23 1.79 0.24 1.5 0.28 0.53 186.72 Outlet 186.72 190.20 no P5 0.6 186.19 0.75 0.80 1.5 0.56 1.36 185.61 Inlet 186.19 189.50 no 170.37 Outlet 170.37 171.67 no P19 201.42 DI1 196.42 FES3 106 18 4.7 P6 0.6 186.49 1.31 0.00 1.5 0.00 0.00 187.01 Outlet 187.01 190.76 no P7 0.6 186.34 1.90 0.00 1.5 0.01 0.01 187.01 Outlet 187.01 190.76 no P8 0.6 178.61 1.00 0.02 1.5 0.05 0.07 178.83 Outlet 178.83 182.79. no P9 0.6 178.76 3.65 0.63 1.5 0.20 0.83 174.35 Inlet 178.76 182.79 no P10 0.6 172.95 3.78 1.91 1.5 1.26 3.17 173.52 Outlet 173.52 174.97 no P11 0.6 170.35 2.26 1.16 1.5 1.63 2.80 169.46 Inlet 170.35 174.97 no P12 0.6 166.66 1.00 0.88 1.5 0.68 1.56 166.06 inlet 166.66 170.00 no P18 0.6 174.86 1.16 0.01 1.5 0.02 0.02 175.25 Outlet 175.25 179.10 no P17 0.6 174.83 2.33 0.13 1.5 0.07 0.20 175.23 Outlet 175.23 179.10 no P15 0.6 173.86 3.04 0.57 1.5 0.29 0.86 175.03 Outlet 175.03 177.73 no P14 0.6 172.23 2.93 0.05 1.5 0.19 0.24 174.17 Outlet 174.17 176.23 no P13 0.6 172.27 3.65 0.13 1.5 0.28 0.41 173.93 Outlet 173:93 176.23 no P16 172.83 CB16 172.70 CB15 27 15 0.5 PP 0.012 0.50 13068 0.30 1.1 1.2 1.3 4.9 P16 0.6 173.49 2.33 0.01 1.5 0.02 0.02 175.05 Outlet 175.05 177.73 no F--- = ' Z P10A 170.07 CB10A 169.87 CB10 27 15 0.7 PP 0.012 0.50 21780 0.50 1.8 2.0 2.2 6.0 SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. 0.247 CHAMFER ALL EXPOSED CORNERS 1". 1.082 0.038 DRAWING NOT TO SCALE. 24" •.. 21-0'r 3'-8r' 0.362 P10A' 0.6 170.79 3.65 0.02 1.5 0.05 0.07 173.59 Outiet 173.59 174.97 no 1.227 0.059 0.085 30" 31.1311 21.0" 41-011 0.362 0.247 0.988 1.350 0.092 0.127 36" 31-811 22r„OOtr 4'-6" 0.362 0.247 1.112 1.474 0.132 0.178 P11A 166.77 CB11A 166.57 CB11 27 15 0.7 PP 0.012 0.50 13068 0.30 1.1 1.2 1.3 6.0 P11A 0.6 167.43 3.78 0.01 1.5 0.02 0.02 170.37 Outlet 170.37 171.67 no P19 201.42 DI1 196.42 FES3 106 18 4.7 PP 0.012 0.50 26136 0.60 2.2 2.5 2.7 24.7 P19 0.6 202.23 0.75 0.05 1.5 0.05 0.10 197.27 Inlet 202.23 204.42 no i PLAN -- FRAME AND GRATES TOP IL AD - 61f 'a` 611 .. tr 4,1-1-4 r1 -t `_, 6 4u no fl. OUTLET PIPE 1 311 . SEE NOTE SECTION X -X CONCRETE APRON 4" SEE DETAIL 611 p 6rf • OUTLET PIPE 4'1 611 SEE NOTE MAX. PIPE THIS SIDE - 18" SECTION Y -Y DITCH GRADE .� - t t MINIMUM Z GENERAL NOTES: INLET 0 � USE CLASS "B" CONCRETE THROUGHOUT. SPAN WIDTH PROVIDE ALL GRATED DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" < y H� ON CENTER. USE STEPS WHICH COMPLY WITH STD. 'DRAWING 840.86. D OPTIONAL CONSTRUCTION -MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT C�C3= L 12" CENTERS AS DIRECTED BY THE ENGINEER. H PER FT. HT. CC USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. LU < IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB U 0 Q � N AS SHOWN ON STD. NO. 840.00. 0.362 F--- = ' Z CONSTRUCT WITH PIPE CROWNS MATCHING. 0.958 LJ 0 F- O a _J MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION 0 IS 12 FEET. 21-01t �� 1 USE STANDARD FRAMES AND GRATES 840.22 (SHOWN), 840.24(SHOWN), 840.20, 0- 840.29, AND AND 84-0.33. 0.023 0.036 18" 31-811 s� SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. 0.247 CHAMFER ALL EXPOSED CORNERS 1". 1.082 0.038 DRAWING NOT TO SCALE. 24" •.. CONCRETE APRON 4" SEE DETAIL 611 p 6rf • OUTLET PIPE 4'1 611 SEE NOTE MAX. PIPE THIS SIDE - 18" SECTION Y -Y DITCH GRADE .� - t t l l t t t i E t 1 I -- 1 t t r -'--'-MEDIAN D.I. DETAIL (APRON SUPPORT NOTCH) CL 0 LL 0 W Z J UJ H Q lam. W %.L.; X C'? d Z C� N IW C/) CU T- #4 BAR W r- 611`" Z DOWEL "A" SHEET 14F 1 840 a 1 8 NCDO ROCK DOUGHNUT INLET PROTECTION (NOT TO SCALE) CONSTRUCTION SPECIFICATIONS 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. 2. INSTALL THE CLASS B OR CLASS 1 RIPRAP IN ASEMI-CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RIPRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MiNIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS. 3. A 1 FOOT THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, .COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE INSPECT ROCK PIPE THEFT PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING, CHECK THE STRUCTURE FOR DAMAGE. ANY RiPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. MAXIMUM .PLACEMENT OF POST USiNG HOGWIRE WITH APPROVED EROSION CONTROL FABRICS TO BE 10 FEET. VARIES (SEE PLAN) MAXIMUM PLACEMENT OF POST WITHOUT HOG WiRE USING �z' MIN' APPROVED EROSION CONTROL FABRICS TO BE 8 FEET TO 8 FEET APART. POST POST METAL T POST 5 FEET OR 6 FEET IN HEIGHT SILT -FENCE � SILT -FENCE DEPENDING ON FILL SLOPE. OVER HOG WIRE OVER HOG WIRE FABRIC 36 INCHES IN WIDTH (MUST MEET ENGINEERS SPECIFICATIONS FOR EROSION CONTROL) STONE #4 WASHED STONE TO BE PLACED 12 INCHES DEEP AT SILT FENCE TOP VIEW HOG WIRE METAL FENCE POST METAL SILT -FENCE.,,` SILT -FENCE FENCE POST SILT -FENCE OVER HOG WIRE OVER HOG WIRE 1.5 FT. � MIN. Z q , 0W 1.d F?: 1 � M SEDIMENT CONTROL STONE STRUCTURAL STONE � 1-5 FIT- 6�� ct;.. MIN. N FRONT VIEW CRASS SECTION NOTE: STRUCTURAL STONE SHALL BE (CLASS "B" STONE FOR EROSION. CONTROL PURPOSES. MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE GRATED DROP INLET PIPE SPAN WIDTH HEIGHT CUBIC YARDS OF CONCRETE: IN BOX DEDUCTIONS FOR ONE PIPE D A B H BOTTOM SLAB H PER FT. HT. H MIN. TOTAL TOTAL C.S. R.C. 121' 3'-8" 2'-0" 2'-6'r 0.362 0.247 0.597 0.958 0.020 0.032 15" 3'-8J1 21-01t 2'-9'r 0.362 0.247 0.659 1.021 0.023 0.036 18" 31-811 21-01? 31 ^ O r' 0.362 0.247 0.720 1.082 0.038 0.049 24" 31-8J1 21-0'r 3'-8r' 0.362 0.247 0.865 1.227 0.059 0.085 30" 31.1311 21.0" 41-011 0.362 0.247 0.988 1.350 0.092 0.127 36" 31-811 22r„OOtr 4'-6" 0.362 0.247 1.112 1.474 0.132 0.178 l l t t t i E t 1 I -- 1 t t r -'--'-MEDIAN D.I. DETAIL (APRON SUPPORT NOTCH) CL 0 LL 0 W Z J UJ H Q lam. W %.L.; X C'? d Z C� N IW C/) CU T- #4 BAR W r- 611`" Z DOWEL "A" SHEET 14F 1 840 a 1 8 NCDO ROCK DOUGHNUT INLET PROTECTION (NOT TO SCALE) CONSTRUCTION SPECIFICATIONS 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. 2. INSTALL THE CLASS B OR CLASS 1 RIPRAP IN ASEMI-CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RIPRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MiNIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS. 3. A 1 FOOT THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, .COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE INSPECT ROCK PIPE THEFT PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING, CHECK THE STRUCTURE FOR DAMAGE. ANY RiPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. MAXIMUM .PLACEMENT OF POST USiNG HOGWIRE WITH APPROVED EROSION CONTROL FABRICS TO BE 10 FEET. VARIES (SEE PLAN) MAXIMUM PLACEMENT OF POST WITHOUT HOG WiRE USING �z' MIN' APPROVED EROSION CONTROL FABRICS TO BE 8 FEET TO 8 FEET APART. POST POST METAL T POST 5 FEET OR 6 FEET IN HEIGHT SILT -FENCE � SILT -FENCE DEPENDING ON FILL SLOPE. OVER HOG WIRE OVER HOG WIRE FABRIC 36 INCHES IN WIDTH (MUST MEET ENGINEERS SPECIFICATIONS FOR EROSION CONTROL) STONE #4 WASHED STONE TO BE PLACED 12 INCHES DEEP AT SILT FENCE TOP VIEW HOG WIRE METAL FENCE POST METAL SILT -FENCE.,,` SILT -FENCE FENCE POST SILT -FENCE OVER HOG WIRE OVER HOG WIRE 1.5 FT. � MIN. Z q , 0W 1.d F?: 1 � M SEDIMENT CONTROL STONE STRUCTURAL STONE � 1-5 FIT- 6�� ct;.. MIN. N FRONT VIEW CRASS SECTION NOTE: STRUCTURAL STONE SHALL BE (CLASS "B" STONE FOR EROSION. CONTROL PURPOSES. T #5 or #F washed stone TEMPORARY STONE OUTLET FOR SILT FENCE W ° Z ./s :R ac8 eo etc�a W ® z � w O 0 0 +a s � m • Wo 0 ^ � U d- ° o � j N www o � 00 -3C�3 00 ) o cz co Cn cri CZ "U o ll Z o W � C vr } U C 0 E 0 C6 0 C) u.i CO-) o U U � � o CA � N 2 Q U U N N Qo `o c w E Z � O � O y_ :5� m:5 � m O -r3 ty_ 0- Z w I--- LL o O w �� W� z o Z � cn ILL 0 M Lu C/) o LLJ z °' O LLco or LLJ J o U O � .o o � o •� z a, Q Io o ,✓ I I 2ry ry - o � Z: v; a� a. 0 U � X W = U � 0 Cl) z o J LU Qry 0COs }- W W rry ) CO z O� a CLLJ )�N z �O z �zU = �.>v o OWz o Z ��� � X11= w o New � }-�c F-Uz w zUW � 3 0 I�< Q � W prCU 010 o Q o n3 Q a cn W W z c� z W o. z ILLI ware doth enings) STEEL 0 N U r #5 OR #57 � ED STONE M c mss' r ��✓.�.�,��<��. `� ark �!r'�/_�<���.. CONSTRUCTION SPECIFICATIONS wV 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING V THE INLET. 2. DRIVE 5 -FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2 -FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING iS RECOMMENDED. 4. PLACE LEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE MAINTENANCE. WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND (1/2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ESTABLISH FINAL GRADING ELEVATION. ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR 6. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH SUBSEQUENT RAINS. TAKE ARE NOT TO DAMAGE OR UNDERCUT THE GROUNDCOVER. WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. T #5 or #F washed stone TEMPORARY STONE OUTLET FOR SILT FENCE W ° Z ./s :R ac8 eo etc�a W ® z � w O 0 0 +a s � m • Wo 0 ^ � U d- ° o � j N www o � 00 -3C�3 00 ) o cz co Cn cri CZ "U o ll Z o W � C vr } U C 0 E 0 C6 0 C) u.i CO-) o U U � � o CA � N 2 Q U U N N Qo `o c w E Z � O � O y_ :5� m:5 � m O -r3 ty_ 0- Z w I--- LL o O w �� W� z o Z � cn ILL 0 M Lu C/) o LLJ z °' O LLco or LLJ J o U O � .o o � o •� z a, Q Io o ,✓ I I 2ry ry - o � Z: v; a� a. 0 U � X W = U � 0 Cl) z o J LU Qry 0COs }- W W rry ) CO z O� a CLLJ )�N z �O z �zU = �.>v o OWz o Z ��� � X11= w o New � }-�c F-Uz w zUW � 3 0 I�< Q � W prCU 010 o Q o n3 Q a cn W W z c� z W o. z ILLI ware doth enings) STEEL 0 N U r #5 OR #57 � ED STONE M c mss' r ��✓.�.�,��<��. `� ark �!r'�/_�<���.. CONSTRUCTION SPECIFICATIONS wV 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING V THE INLET. 2. DRIVE 5 -FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2 -FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING iS RECOMMENDED. 4. PLACE LEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE MAINTENANCE. WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT STABILIZED, REMOVE ACCUMULATED SEDIMENT, HARDWARE CLOTH &GRA VEL PROTECTION (NOT TO SCALE) 0 rT� o �r 0 U u � F� o 1 h� m 0 N o O a� 0 -v s c U 0 Ei PROJECT: 4914 '- o ttt� z OF 14 AND (1/2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ESTABLISH FINAL GRADING ELEVATION. ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR 6. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH SUBSEQUENT RAINS. TAKE ARE NOT TO DAMAGE OR UNDERCUT THE GROUNDCOVER. WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. HARDWARE CLOTH &GRA VEL PROTECTION (NOT TO SCALE) 0 rT� o �r 0 U u � F� o 1 h� m 0 N o O a� 0 -v s c U 0 Ei PROJECT: 4914 '- o ttt� z OF 14 10'-0" Street Tree Esm't See Notes E Utility Esm't 7,_6» V loge _ 1�2» /ft 10'-0" Street Tree Esm't See Notes k Utility Esm't 10'-6" ��o O �1 1/2" �Q 50' Right-of-way ^•� TYPICAL 35' B -B ROAD SECTION Not To Scale 50' Right -of -Way 10'-0" Street » 2,_g'3'_g„ , „ 2, Tree Esm't 14'-g" 12 -D 5 -0 See Notes Pavement Sidewalk Utility Esm't 1 2" 2929. %ft 1/4" /ft v?" » •.. 1, 1 2'-6" ROLLED TYPE GUTTER 2" S-9.5 B Superpave Asphalt Mix 9" STBC, Type A or C 2'-6" Rolled Type 2'-6- 1-112" S-9.5 B Superpave Asphalt Mix Curb & Gutter 8" ABC, Type B 6" 1 2'-0' TYPICAL 29' B -B ROAD SECTION 1,2" RADIUS ( 3" RADIUS o, 3" RADIUS' 04 Not To Scale = N a C s 2'-6" CURB & GUTTER Roadway Section i cV STD. 840.038 FRAME, GRATE AND HOOD 1U _U PLAN VIEW 10'-0" S-1 1/2' • 10'-0' DEPRESSEDGUTTER UNE RPp• (FLOW UNE) i EXSPANSION JOINT SEE STANDARD N0. 840.01 RENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-8" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.68. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER 8'-0" TO 16'-0" IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. 50' Right-of-way -n Z70 Cn <� O O» >HDA -� Co m 0 --j° 10'-0" Street " 36,-0" 2.5 2, Pavement d 14 1/2" :.• : a 1 T -g" » 15 -D 2'-g'-0" , » 5 -0 1.5 Tree Esm't See Notes Slope As Required 1�2,. eft 4: = M 000 Z o -n _.04 z a W m a 2'-2" Pavement � 4 Z N Sidewalk = Utility Esm't o .� Z G 0.015 0.026 15" 0 0 - 00- 1%ft t7 3'-0" Z'.l. ami Z V ,� c e d wo o 2% 2� 0.023 0.036 1/4» /ft ,a LQ 2'-2" .o o d . o, Q z=c=0 �v= L .. 0.235 0.887 W Z 2" S-9.5 B Superpave Asphalt Mix��: 1 - co W - WHERE 42" TO 54" PIPE IS USED Z r 2+-6" ("� 9" STBC, Type A or C 2'-6" Rolled Type 1-1/2" S-9.5 B Superpave Asphalt Mix Curb & Gutter 0.235 1.001 0.059 s" ABC, Type B 30" 3'-0" CURB TRANSITION SECTION TYPICAL 35' B -B ROAD SECTION Not To Scale 50' Right -of -Way 10'-0" Street » 2,_g'3'_g„ , „ 2, Tree Esm't 14'-g" 12 -D 5 -0 See Notes Pavement Sidewalk Utility Esm't 1 2" 2929. %ft 1/4" /ft v?" » •.. 1, 1 2'-6" ROLLED TYPE GUTTER 2" S-9.5 B Superpave Asphalt Mix 9" STBC, Type A or C 2'-6" Rolled Type 2'-6- 1-112" S-9.5 B Superpave Asphalt Mix Curb & Gutter 8" ABC, Type B 6" 1 2'-0' TYPICAL 29' B -B ROAD SECTION 1,2" RADIUS ( 3" RADIUS o, 3" RADIUS' 04 Not To Scale = N a C s 2'-6" CURB & GUTTER Roadway Section i cV STD. 840.038 FRAME, GRATE AND HOOD 1U _U PLAN VIEW 10'-0" S-1 1/2' • 10'-0' DEPRESSEDGUTTER UNE RPp• (FLOW UNE) i EXSPANSION JOINT SEE STANDARD N0. 840.01 RENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-8" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.68. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER 8'-0" TO 16'-0" IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. 50' Right-of-way -n Z70 Cn <� O O» >HDA -� Co m 0 --j° BACK OF CURB X '. • . °• . D o •, D. " 36,-0" 2.5 2, Pavement PIPE D 0= --4° :.• : a a O =-nzn>m ° m ---- L Slope As Required 1�2,. eft 4: = M 000 Z o -n UJO z a W m a 2'-2" -- -- C? H . jSjo ADD Std. 2'-6" 03o [14 PLAN Rolled Curb z X SECTION X -X FF BE TYPICAL CUL-DE-SAC 17 Not To Scale C7 z o: o a co D„ T'. ,•9 o.. D' •tl. 0' •.O' 0.7 N SECTION Y -Y ' �mRISERz C > VARIESHT.- 01 17 c A �n v 6" M g1 °' Do SEE NO rn y z WHERE 30" TO 36" PIPE IS USED H VARIESHT. Z rn O J LL) WHERE 42" TO 54" PIPE IS USED J DETAIL SHOWING METHOD i curer i nc n no nTacn rnuatQiLPTTnu 7' TO BO S/GV z G H H If; L [A Ul to Z I� J Q 61- 4LL *0 lu � W if) 0 ih all, GALVANIZED 'U" SUPPORT POST S To SECURED wl7H cNCRE77 12 IN 12PLAN OF TOP SLAB SECTION S -S " DIAMETER POST HOLE OF 36' DEP7H (MINIMUM). n Z FINISHED GRADE o I"' Z H CON II -M CD 6"--{ E--{ #8 "W" BARS #4 BAR II° I f ii n = m > #4 BARS "V" iv z @ EQUAL SPACES �o> „� II1=1I 4-4 0 u '=I III 0 #4 BARS "U" 1n °II1-1I = If••, =1 I W M SECTION R -R DOWEL IIIIIIII rn (A G) =1111 Z o 70 SHEET 2 OF 2 STOP SIGN DETAIL NTS Roadway Section EXSPANSION JOINT ELEVATION o B 0 C D• D o o . D" 6. .o SECTION J -J WHERE 30" TO $6" PIPE IS USED STD. NO. 840.66 Oy p <Q H z 43" NOTE: USE TYPE "E", 'IF" AND "G" GRATE -j5(0 'e v H 0 M UNLESS OTHERWISE NOTED. LLJr �Z m0 -n"101 LLJQZLL OZ --t --1m Q = =-n >m cc -n Z70 Cn p 0 0 Z N OW LL 1-4 J OOCD� z,,-ar--n 00" O=-Mj'Z PIPE D DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN IMIN. A B C G z H>> a O 6" CL r>� < H NO 4: A UJO z a W m a 2'-2" -- -- � 4 Z N HOOD ELEVATION = m a :A A .p I ofU. pi p 0 0 Z N 7oH*z >co00 3'-078" PIPE D DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN IMIN. A B C G HEIGHT H COVER DIMENSION E F O 6" - BARSW N0. ILENGTH I G 4: 6" 12" z a W m a 2'-2" -- -- 2'-9" D D HOOD ELEVATION = Q H _ = a- 0 Z 0.235 0.772 0.015 0.026 15" 0 0 - 00- 2'-2" t7 3'-0" Z'.l. ami Z V Z wo o ;HEET 1 OF 2 0.235 0.829 0.023 0.036 18" ,a LQ 2'-2" .o 3'-3" o, Q z=c=0 �v= L .. 0.235 0.887 W Z SECTION M -M 1 - co W - WHERE 42" TO 54" PIPE IS USED Z r U N J z v M M W PLAN PLAN - EXPANSION JOINTS 4'-6" 4'-E STD. 840.03 PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP all USE ON FLAT ELEV. EXPANSION JOINT GRADES 296 AND UNDER 3'-0"1I DEPRESSED GUTTER LINE EXPANSION JOINT I Go ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE 8. EXPANSION JOINT 6, USE ON GRADES VER 2% ELEV. DEPRESSED GUTTER LINE EXPANSION JOINT i 10n I 6'-0" MAX. ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES :A A .p I ofU. pi p 0 PLAN PLAN - EXPANSION JOINTS 4'-6" 4'-E STD. 840.03 PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP all USE ON FLAT ELEV. EXPANSION JOINT GRADES 296 AND UNDER 3'-0"1I DEPRESSED GUTTER LINE EXPANSION JOINT I Go ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE 8. EXPANSION JOINT 6, USE ON GRADES VER 2% ELEV. DEPRESSED GUTTER LINE EXPANSION JOINT i 10n I 6'-0" MAX. ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES * RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT A ALIGN FRAME WITH INSIDE EDGE OF WALL TO ALLOW FOR VERTICAL ADJUSTMENT -/°•'o.` WALL SECTION- SECTION ECTION SECTION - RR rn PLAN 700 z FRAME, GRATE, & ,HOOD ASSY C: O M M C/) O Z G) 0 CA 41 z -Ai v vm> H C7 SECTION - AA v" v - >IZ!g n z = G) NO a 6„ O .- z T r, Err 316 r1 31_011 Sitrr �"G SECTION - '. KK SHEET1 OF 2 SHEET 1 OF 2 840.02 840.03 v z 1 ►L ►M DETAIL SHOWING TYPES OF GRATES MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER) 7oH*z >co00 3'-078" PIPE D DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN IMIN. A B C G HEIGHT H COVER DIMENSION E F BARS -U NO. LENGTH BARS -V N0. LENGTH - BARSW N0. ILENGTH I TOTAL LBS. CU.YOS. CONC. IN BOX TOP BOTTOM Tom• SLAB SLAB FOR YINDPA HEIGHT H DEDUCTIONS ONE PIPE C.M. R.C. 12" 3'-0" 2'-2" -- -- 2'-9" D D HOOD ELEVATION -'� o Clirhoi -- SAG WATER FLOW -- 0 Z 0.235 0.772 0.015 0.026 15" 3'-0" 2'-2" t7 3'-0" Z'.l. ami Z V Z wo o ;HEET 1 OF 2 0.235 0.829 0.023 0.036 18" 3'-0" 2'-2" z 14 °A z 3'-3" Hx0 �b Q z=c=0 zow 0.235 0.887 0.033 0.049 24" 3'-0" 2'-2" U 3'-9" (�FU.0 J 0CS Q Z9> 0.235 1.001 0.059 0.085 30" 3'-0" 2'-2" 3'-4" 4`-3" V-2" 4'-0" 4 1'-5" 2 3'-9" 3 3'-9" 39 0.123 0.321 1.433 0.092 0.127 4'-9" 1'-8" 4��-i4 '1"3'-9" 3 3'-91,161 0.358 1.714 0.132 0.178 4'-5" 5'-3" 1'-5" 31,_8„ 2 2,-11» 3 2'-11" 32 0.112 0.318 1.738 0.180 0.243 5`-0"5'2'-0" 32'-3" 3 2'-11" 3 2'-11" 35 0.1.45 0.352 12.052 0.235 0.317 N 5,-7n 6,-,3,r 2,_7" 3'-2" 4 2'_10" 5 2'-11° 3 2'-11" 41 0.180 0.386 2 987 0.297 0-401 * RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT A ALIGN FRAME WITH INSIDE EDGE OF WALL TO ALLOW FOR VERTICAL ADJUSTMENT -/°•'o.` WALL SECTION- SECTION ECTION SECTION - RR rn PLAN 700 z FRAME, GRATE, & ,HOOD ASSY C: O M M C/) O Z G) 0 CA 41 z -Ai v vm> H C7 SECTION - AA v" v - >IZ!g n z = G) NO a 6„ O .- z T r, Err 316 r1 31_011 Sitrr �"G SECTION - '. KK SHEET1 OF 2 SHEET 1 OF 2 840.02 840.03 v z 1 _ O Z L!_ C'3 Co m Uj H = a a o v v H1W-A- LU _ N M Z r -I O 0 V Z W HEET 2 OF 2 840.02 ----------------------------------- M = z WATER FLOW -- SAG WATER FLOW -- C - tn rn m H 0) z �AA _ TYPE "F" TYPE "E" TYPE "Go' CD Y/ --1 Cn > e- D RAISED FLOW ARROW P� 0/4" N =v %e" HIGH v" O > Z11/2 rr ' --ir - = v z 1/811 _ O \ CCn O 11/211 H D I 11/211 14" Z nr r�:2<11 .03 1q SECTION A -A TYPE - F r L r 1 1/2 r, 2/61, I SECTION - PP N N CV 2'-11 PA 1 y2„ ►L ►M DETAIL SHOWING TYPES OF GRATES FRAME PLAN 7oH*z >co00 3'-078" LL--LaHZ r-O"n_gv' =IO W P HZ, -•I=D n 2-01 Z Q CCLL As 1r O= 444it rr O I-N~QW -� n6 . 2'-111-2„ - -WATER FLOW R D D HOOD ELEVATION _ O Z L!_ C'3 Co m Uj H = a a o v v H1W-A- LU _ N M Z r -I O 0 V Z W HEET 2 OF 2 840.02 ----------------------------------- M = z WATER FLOW -- SAG WATER FLOW -- C - tn rn m H 0) z �AA _ TYPE "F" TYPE "E" TYPE "Go' CD Y/ --1 Cn > e- D RAISED FLOW ARROW P� 0/4" N =v %e" HIGH v" O > Z11/2 rr ' --ir - = v z 1/811 _ O \ CCn O 11/211 H D I 11/211 14" Z nr r�:2<11 .03 1q SECTION A -A TYPE - F r L r 1 1/2 r, 2/61, I SECTION - PP N N CV 2'-11 PA 1 y2„ C7 m DETAIL SHOWING TYPES OF GRATES ¢¢ Q,_3 zcc=Q 7oH*z >co00 USE ACCORDING TO WATER FLOW. LL--LaHZ r-O"n_gv' =IO W P HZ, -•I=D SECTION Z Q CCLL Sw -n>m Z TYPE PIG"YPE "F" I-N~QW 0 Z�p0� . - -WATER FLOW o D D z cc �H -'� o Clirhoi -- SAG WATER FLOW -- 0 Z -------------- -------------------- d U 3;:w _ O Z L!_ C'3 Co m Uj H = a a o v v H1W-A- LU _ N M Z r -I O 0 V Z W HEET 2 OF 2 840.02 ----------------------------------- M = z WATER FLOW -- SAG WATER FLOW -- C - tn rn m H 0) z �AA _ TYPE "F" TYPE "E" TYPE "Go' CD Y/ --1 Cn > e- D RAISED FLOW ARROW P� 0/4" N =v %e" HIGH v" O > Z11/2 rr ' --ir - = v z 1/811 _ O \ CCn O 11/211 H D I 11/211 14" Z nr r�:2<11 .03 1q SECTION A -A TYPE - F r L r 1 1/2 r, 2/61, I SECTION - PP N N CV 2'-11 PA 1 y2„ r rr SECTION - NN 41 - cm to 0 1 N 07 N7r, �a�o r SECTION - JJ 5 3" R rr r 4A�,r SECTION ��- RR 1 1/2 rr� O W � ¢ 2 U Wa > 6, Q O aw� O o H r or �y< ¢~�' =IO W P Ca LL SECTION f�cc 00CL 0ZZ �U00 2 r U. )-C6 00 . F- W 0 o �z� SECTION - MM O= O � Q J w > >oco d w CC Z Lp H r F.> U 3;:w Q W Y w o t7 C1) W Z'.l. ami Z r rr SECTION - NN 41 - cm to 0 1 N 07 N7r, �a�o r SECTION - JJ 5 3" R rr r 4A�,r SECTION ��- RR 1 1/2 rr� 23411 W � ¢ 2 U Wa > 6, Q O aw� O o Z I 8%8" =IO W 1 %2 n 13� rr SECTION B -B = 0 1.4 0 o a _ m 3 Z N tea; C3 C0 cc W pl-z Qat Cl) J V) 2 O O W � ¢ 2 U Wa > 6, Q O aw� O o Z J =IO W 0 �o 0 n �U00 0- W LLL � LLLI O o co o �z� m Q �> J w > >oco d w mn Z Lp H O 0 Of U 3;:w Q.) W Y w o / i C1) W Z'.l. ami Z V Z wo o ;HEET 1 OF 2 wo00 O•W�j hn f J =gym= tL CL --O:f z 14 °A z a Hx0 �b Q z=c=0 zow o0in=Z Oma z U. HU U Cl) J V) 2 O O W � ¢ 2 U Wa > 6, Q O aw� O o Z J =IO W 0 Z O 0- W LLL � LLLI O o co m Q �> J w > >oco d w mn Z Lp H O 0 Of �Lj 3;:w vL- LL z Z C1) W W Lu Z wo o ;HEET 1 OF 2 v > 00 J =gym= tL CL --O:f � a Q z=c=0 Cl) o0in=Z z U. HU F- ¢ i-- H (�FU.0 J 0CS Q Z9> �- C) w --W O 3: orf N 6i Q; o cV I 0 I 0 Cl) U J O J =IO W w 0- W LLL LLLI O o co Q �> J w > >oco orfz 0 wp N Z w Wo W z QZU U�>U O UWZ O W N W E_ z NOZ Q' Q' Q� U O Q U) -i W >- U W Zow ztr�J 0 woa ;HEET 1 OF 2 840.03 z 00 J =gym= tL CL --O:f 4H- ¢ Q z=c=0 o0in=Z z U. HU ¢ i-- H (�FU.0 J 0CS Q Z9> �- C) w 21/4 or Z a� rn SECTION -A LL O m TYPE - E Z H Q a V 1 RAISED It ARROW 23of = 0 1e HIGH a N Q - i ¢Wz�� T 00 Vzd O r - V/ n O C/; W w 13 /4111 ll/2"R / 1/Su W LL O 2'- 11 U- 1/2 - 1 " TYPE G SECT-IIOO••IIN A -A SHEET 2 OF 2 840.03 CL co LU LU z z z w U O z W O O W Q m 0 `o E 0 O L on o 2 0 a 0 m U In T Q EE PROJECT: 4914 \ ~ W S -11z OF 14 / ...... ........ BRASS MARKER PLATE MARKED PLATE WITH ANCHOR v EA. CORNER LAYING AT S ", LAYING .�'� , g , / MAll CAST THE LETTERS "MV" IN CONDITIONS DESCRI TION PROJECT USE �` ONE FACE OF THE CONCRETE 4 #3 BARS _', c MARKER AND ORIENT TOWARD �w o THE ROADWAY - 1 _ z_ co LU ROTATE MARKER TO OTHER END Li FOR BLOW-OFFFLAT BOTTOM "DISTURBED NOT USED. �yr,�{� lz VALVE NO. EARTH TRENCH, LOOSE BACKFILL ,V�" 58 oZn4" SO. PRECAST CONC.POST (4000 P.S.I.) =FT, a PLATE �, TH VAI_VE NUMBER, DIRECTIONAL ARROW -POINTED TYPE �I 3 TO MARKED VALVE & DISTANCE Vi O °' TO THE JEARc;T FOOT. • �+ d �o0 TYPICAL VALVE MARKER DETAIL(j) \ NOT USED. z � ° o NOTES: 1 \ FLAT BOTTOME UNDISTURBED EARTH00 NO SCALE TRENCH. BACKFILL LIGHTLY o CONSOLIDATED TO CENTERLINE �'-i cS N ca PAINT MARKER BLUE AFTER INSTALLATION OF PIPE. W U o 5vw, o TYPE 2 V Z��U�� •ri z�� FINISHED GRADE " W . h� w 2 O �/vw BACKFILL TO EDGE bi z o a d d PIPE BEDDED N 4" MININUM ALL DUCTILE Z o w IRON GRAVITY Z o � • _ /SEWER LINE. BACKFILL LIGH LY CONSOLIDATED I I—III-III —III—I � \ TO TOP OF PIPE. _ o PRECAST CONCRETE o PROTEC ION RING TYPE 3 STEAMER AS SHOWN PRECAST CONCRETE CONNECTION cu Q w EDGE ON PLANS PROTECTION RING to b OF ROADALL PVC WATER ¢ LU o o PIPE BEDDED I SAND, GRANULAR LINE AND PVC w v o `o FORCE MAIN. _j co 4 2 1/2 HOSE � � MATERIAL OR GRADED GRAVEL TO a N o CONNECTION THE DEPTH OF 1 8 PIPE DIAMETER, / / �z ¢Z �! \\ \ 4" MIN. JOB E CAVATED MATERIAL z 0 "' COMPACTED TO 4" ABOVE TOP OF PIPE. L N Q L� \\{•`�'•';'•'•`•';`�'�'�'�'•'• /APPROX. 95% �w \\\\ AASHTO T-99)STANDARD PROCTOR,p>o"6!" G.V. & BACKFILL 6" WATER C. I. BOX STONE U TYPE 4 E U VALVE Box VALVE OPERATOR NUT LINE (7 C.F. MIN.) } zO 00 z ,n ALL PVC \ SEWER LlNE.AVITY w CL z o o a �, + + + + + + + + + PIPE BEDDED 0 ITS CENTERLINE ¢ o m ¢ 0 o CONC. /+++ a w� +•++++ +++++ / IN COMPACTED GRANULAR MATERIAL z L z BLOCKING + + + + + 4 MIN. UNDE PIPE. COMPACTED Ow 2 Li ' ' U " (SEE NOTE) `++++ +++++ GRANULAR OR SAND MATERIAL TO ? LU w = w " 4-3/4 TIE RODS WITH BRACKETS \ + + >, z o o > 6 HYDRANT TEE \ + + +++++ 4 ABOVE TOP F PIPE. SEE DETAIL WEEP HOLE TO \ + + + + + + + + + ( ) REMAIN OPEN + + + +++(APPROX. 95% STANDARD PROCTOR, NOTE: AASHTO T-99) TYPICAL VALVE BOX DETAIL W TIE HYDRANT TO MAIN LINE 2-0 No SCALE 2 W/TIE RODS IN LIEW OF CONC. TYPE 5 a BLOCKING IN SANDY SOIL. TYPICAL LAYING CO DITIONS DETAIL W 0 NO SCALE to a TYPICAL FIRE HYDRANT INSTALLATION DETAI W NO ES: VALVE Box No SCALE Q6� 1. INSTALL METER AT R/W q 6"-8" ExcEss 2 INSIDE(A) 2'/SLEEVESERVICE LINES MUST BE INSTALLEDLD LOOPED IN BOX PLACE EMPTY VALVE BOX AT INTERVALS WHERE Co _ cn TRACER WIRE VALVES Do NOT OCCUR & PLACE TRACER WIRE r 3. "TWO (2)-1" SERVICE LINES MUST BE INSTALLED > a> IN Box. H INSIDE A 3" SLEEVE." N 6i cn NOTE: No. 1 w w 4. SLEEVES SHOULD BE SCHEDULE 40 PVC PIPE. ( o DRILL HOLE PRECAST C ONC RETE PROTECTION RING EXISTING STORM SEWER CL 5. SEE DETAIL FOR SERVICE MATERIAL AND METER F N VALVE BOX. FOR TRACER WIR BACKFILL TO EDGE J SETTING ' 2 FINISHED GRADE 6. SERVICE LINE SHALL BE 3' BELOW FINISHED GRADE o ` f ;.* e . ;., • OF DITCHES. 7. CONDUIT MUST EXTEND PAST PROPOSED SIDEWALK o CD I ''•• .II .I 24" MIN. E I• � 1' R z NOT NOTES: ENCASEMENT AREA TO INCLUDE 6' AT PIPE INTERSECTIONS, MULTIPLE 1. CONCRETE SHALL BE 3,000 PSI MIN. VALVES, RUN WIRE UP AT ONLY f VALVE BOX VALVE BOX 2. CONCRETE FOR THRUST BLOCKING SHALL BE KEPT DUCTILE IRON PIPE ONLY T ONE VALVE. FAIRLY DRY, THUS MAKING THE CONCRETE WEDGE I SHAPE MORE EASILY FORMED WITH THE WIDEST o SINGLE 12 AWG SOLID CORE WIRE '".:,;:. • ':".»ti'• PART (BLOCKING AREA) AGAINST UNDISTURBED SOIL. o 3. NO CONCRETE SHALL COVER ANY BOLTS OR GLANDS. U > 4. ALL PIPING AND ACCESSORIES TO BE WRAPPED WATER MAIN Jco ' WITH 10 MIL. POLYETHYLENE PRIOR TO POURING X BLOCKING. 2" PVC LEEVE W/ 3/4" CARRIER uS cn 5. VOLUME OF THRUST BLOCKING SHALL BE AS SHOWN X cu P.V.C. PIPELINE ON THE THRUST BLOCKING SCHEDULE. w s LENGTH OF ENCASEMENT Z O p a TO BE STORM SEWER 0 _j co TRACER WIRE TO BE LAID Q �' > > p co w UNDERNEATH WATER UNE GATE VALVE 21P0"PORSAS DSHOWN . PLUS STREET p w w o z ON PLANS. WATERM IN z ~ a N z TYPICAL TRACER WIRE INSTALLATION DETAIL W w ryO z clzU LLJ No SCALE j - as ° 6„ MIN. 12' MIN I- > F- o 0 Ld z o NOTES: LU SINGLE 3/4" SERVICES z I- N I- a- _ 1. DRILL HOLE IN VALVE BOX TO INSERT TRACER WIRE,BRING UP TO INSIDE AND ROLL UP AT LEAST 6"-8" EXCESS TYPICAL STORM SEWER CROSSING DETAIL W O Z N U Z w Z 0O LL1 3 2. PLACE TRACER WIRE IN VALVE BOX AT 1,000" INTERVALS OR AS NOTED ON THE PLANS, TYPICAL. a a aof CL NO SCALE R W p �C Q Q 0 W p Q o 3. DO NOT SPLICE WIRE WHEN BEGINNING A NEW SPOOL INSTEAD INSTALL A VALVE BOX AND ATTACH EACH WIRE WITH A °•. °• 4 A 9 _ �m = 0 r BRASS SCREW TO THE VALVE BOX. " 6" MIN. METERS SHOULD BE cc INSTALLED 3' OFF W La a X PROPERTY LINE 0- ? c w z BRICK SUPPORT HYDRANT TEE OF PIPE SIDE '•®•' M I N.1 /3 C.Y. AT 3000 P.S.I. PLAN TEES z LU ` PLAN BENDS TYPICAL DOMESTIC WATER SERVICE INSTALLATION DETAIL W 18" MIN. d" W RECAST CONCRETE NO SCALE (2 0 PROTECTION RING 76 MIN I AS' OF ERDIEC]ION RING TO BE EXPOSED pt�J a = -� BACKFILL TO ED G' a v m FINISH a a J 0 GRADE v z - 12" 12" �-• AS NOTED ON PLANSco> m w EXISTING ( a N w SAW CUT EXIST. PAVEMENT ROAD a ° a. a — ° a. :v — - " a ROAD SHOULDER d ° ° 1 d ° MICP 6 a' _ D > .. 2 (n N EXIST. EXIST. PAV'T. o -I- - E PAVi. -III- - - - - _ - I-m=tt1- - - - - - - _ I-II I -I L I -I I -I - - III- I I-II I -I .) I I-III—III—) I I I I III—III I I „ ! •` gb:4•a oRQgoQ'a°r?qa'4°'mob:bq":•:'�:":":'•}:•••C•'•""'•'- 10" STONE MEETING N.C.D.O.T. SPECIFICATIONS , - O �. ¢'".osq`:ota.o •a,.aoAp` oqp •bq.g FOR �j as 18" MIN. 10 OR LESS ::?::::. aq. :om. Ao •a+�. :aq. op.•oo:..•::':::'"::.'.::;::.:::::':::%: A.B.C. STONE, TYPE B OR, TO BE C� E III III I III I I J A III 111 I I „ „ 004 aq9 .Qn . �� .pq� .�.q ..o ..:..:..•:.•:.•:.:•:: 24 MIN. - 12 0 OR LESS :•: op'D°t94°od.¢opb:ap0°i14ao�- .:}:..:•.•:.:.•:..,.:.:{:::.: o COMPACTED TO 100 %MAXIMUM, DRY DENSITY z BACKFILL AS VALVE BOX ° qa q 'b�" p° op —v INDICATED CD ;...,. - cn - :...: .....•". ..,•.., ...,•. THREADED - z x 1 v.:::.. , _ •:...: COUPLING Mei SQUARE i .TAMPED BACKFILL . VALVE NUT ONLY -• ECHANICAL JOINT " N1TH GRIP RING Mlll--QE 2-4BRASS RE PIPE NIPPLE 2" DIA RICK TO OR LONGER TO BRING PIPE 2 BRASS SUPPORT UP TO FINISHED GRADE THREADED VALVE BOX PIPE NIPPLE PIPE O.D. PLUS 18" FOR PIPES UNDER 33" O.D. PIPE O.D. + 18" FOR PIPES UNDER 33" O.D. PIPE O.D. PLUS 24" FOR PIPES OVER 33" O.D. PIPE O.D. + 24" FOR PIPES OVER 33" O.D. a NOTE: C 1. "SERVICE CONNECTION" IN PROPOSAL TO INCLUDE SERVICE SADDLE, MIN 18" < 45' BEND, CORPORATION COCK AND ALL LABOR INVOLVED IN <D MAKING A COMPLETE SERVICE CONNECTION. B 4' o PIPE NIPPLE 2" DIA MIN. 1/3 C.Y. AT 3000 P.S.I. '•4 . eCONCRETE •• 2. SERVICE PIPING TO BE 3/4" D CAP ON PLUG WITH 2"THREADED PORT 3. ALL BRASS FITTINGS SHALL BE COMPRESSION TYPE EE PROJECT: 4914 ~ LTi TYPICAL PERMANENT BLOW—OFF ASSEMBLY DETAIL W TYPICAL WATER SERVICE CONNECTION S 012 z NO SCALE 4 TYPICAL THRUST BLOCK DETAIL(W'TYPICAL TRENCH IN BITUMINOUS SURFACE AREAS DETAIL W USING TAPPINGS SADDLE DETAIL W NO SCALE OF 14 NOTE: SEE TYPICAL VALVE BOX DETAIL NO SCALE Q NO SCALE 1 3 FOR BRICK INSTALLATION o p I cj- tOQ N� M� f 1 11��1� a) NOTES: i p 45° BEND SERVICE LINE TO CORPORATION METER CONNECTION CORPORATION COCK-A.Y. MCDONALD NEW COMPACTED eacKFILL plpE C C 1. PAVEMENT SHALL BE CUT TO TRUE LINE AND REMOVED BEFORE TRENCH IS CUT. 2. STONE AND PAVEMENT TO BE PLACED WITH LEASTE INTERFERENCE To TRAF TRAFFIC, 3. STABILIZED AGGREGATE TO BE SECURED FROM AN APPROVED QUARRY. WATER LINE H v cn o o o 4. ALL PAVEMENT REPAIRS TO BE IN ACCORDANCE WITH N.C.D.O.T. SPECIFICATIONS. SERVICE SADDLE - A.Y. MCDONALD OR EQUAL STYLE HINGED 38 1 FOR 3 4° SERVICE SADDLE 9 A.Y. MCDONALD OR EQUAL TRENCH WIDTH J V - o is PIPE O.D. PLUS 18" FOR PIPES UNDER 33" O.D. PIPE O.D. + 18" FOR PIPES UNDER 33" O.D. PIPE O.D. PLUS 24" FOR PIPES OVER 33" O.D. PIPE O.D. + 24" FOR PIPES OVER 33" O.D. a NOTE: C 1. "SERVICE CONNECTION" IN PROPOSAL TO INCLUDE SERVICE SADDLE, MIN 18" < 45' BEND, CORPORATION COCK AND ALL LABOR INVOLVED IN <D MAKING A COMPLETE SERVICE CONNECTION. B 4' o PIPE NIPPLE 2" DIA MIN. 1/3 C.Y. AT 3000 P.S.I. '•4 . eCONCRETE •• 2. SERVICE PIPING TO BE 3/4" D CAP ON PLUG WITH 2"THREADED PORT 3. ALL BRASS FITTINGS SHALL BE COMPRESSION TYPE EE PROJECT: 4914 ~ LTi TYPICAL PERMANENT BLOW—OFF ASSEMBLY DETAIL W TYPICAL WATER SERVICE CONNECTION S 012 z NO SCALE 4 TYPICAL THRUST BLOCK DETAIL(W'TYPICAL TRENCH IN BITUMINOUS SURFACE AREAS DETAIL W USING TAPPINGS SADDLE DETAIL W NO SCALE OF 14 NOTE: SEE TYPICAL VALVE BOX DETAIL NO SCALE Q NO SCALE 1 3 FOR BRICK INSTALLATION Jdf L w D [3 1�• Z SERVICE LINE FROM STREET METER SETTER CENTERED IN BOX BRICK SUPPORT 1' FROM EDGE OF ROW a METER BOX LID, CAST IRON " X 18" SS NIPPLE �/4 inch Gate Volve Required or, Ctistarner side Within 12 inches of the Meter Box METER TO BE INSTALLED N V. Locution down stream of the cuL-oil vove METER SETTER WITH DOUBLE CHECK VALVE 1. METER AND SERVICE LINE NOT IN CONTRACT UNLESS SPECIFIED (BACKFLOW PREVENTER) 2. INCLUDE STONE IN PRICE OF METER BOX. 3. METER SETTER SIZE AS NOTED ON PLANS. 4. ALL BRASS FITTINGS SHALL BE COMPRESSION TYPE. TYPICAL 3/4" METER SETTER INSTALLATION DETAI NO SCALE PLAN ELEVATION { A ) 0 24"X18" I#crTeeirsr n eo VI ISOMETRIC + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +++++++ I8MA++++++ + + + + Ae7I~ + + A ++++METER. +++ + + + + + + + + + + 16 314" CAST IRON 11" TYPICAL METER BOX DETAIL FOR 3/4" SERVICE NO SCALE HAND PLACED DENSELY COMPACTED BACKFILL TO 1 FT. ABOVE TOP OF PIPE BEDDED PIPE - MINIMUM STONE EMBEDMENTAS INDICATED. GREATER IF REQUIRED BY MANUFACTURER - SHAPED STONE TO PROVIDE BEARING ALONG ENTIRE LENGTH OF PIPE BARREL HAND PLACED DENSELY COMPACTED BACKFILL TO 1 FT, ABOVE TOP OF PIPE BEDDED PIPE - MINIMUM STONE EMBEDMENTAS INDICATED. GREATER IF REQUIRED BY MANUFACTURER - SHAPED STONE TO PROVIDE BEARING ALONG ENTIRE LENGTH OF PIPE BARREL D18k3" D14 24" + O.D. MAX. 12" + O.D. MIN. SANITARY SEWER (0'—B' DEPTH) PIPE LAYING CONDITION "A"' DI&3 1 D12 "" / } PIPE / O.D. 24H + O -D. MAX, 12"+O.D. MIN. SANITARY SEWER (<8'-16' DEPTH) PIPE LAYING CONDITION "13" TYPICAL PIPE LAYING CONDITION DETAIL_ NO SCALE NO TE: 1. THE FLOW CHANNEL THROUGH MANHOLES SHOULD BE MADE TO CONFORM IN SHAPE AND SLOPE TO THE SEWER MAIN - 2. CHANGE IN DIRECTION OF THE CHANNEL SHALL NOT BE EXCEED 90 DEGREES. 3. SEE DETAIL S-24 FOR TYPICAL MANHOLE: STRUCTURE. TYPICAL MANHOLE INVERT DETAIL S NO SCALE r1 I d ° PLACED .-I NOTE- NOTE: PIPE SHALL BE BEDDED UP TO V inside ABOVE T EASEMENT SHALL BE PROVIDED FOR SERVICE SPRING LINE AND MINIMUM 4" BELOW RW CAST IRON VALVE BOX WHERE SERVICE CONNECTION IS PLACED N_�I ENT AS r.. •I I• I ENCOUNTERED. I. a I = I -TUBER - ! dl D STONE CRASSLEANOUT PLUG D GAP I''!I E LENGTH OF PIPE PSK MANHOLE CONNECTOR I :' 1 Ex. MANHOLE (OR APPROVED EQUAL) PIPE w - _ TO MANHOLE CONNECTOR I; I aw 1- a 1 UNDISTURBED EARTH III I CORE BORE PROPOSED EJC. MANHOLE In_ SEWER I I •. BRICK &MORTAR INVERT I' • I, g II • E co BEDDED PIPE - O.D.-'-- BE INSTALLED AT 1 112 TO 2° DEEP. 1}r� AT'SLOPE - ON ALL INVERTS 4" PVC VERTICA CORE BORE AT EX. MANHOLE TYPICAL PIPE LAYING CONDITION DETAILS NO SCALE FINISHED GRADE BASE COURSE COMPACTED FILL FRAME & COVER • 1.5" MIN. } STD. MANHOLE I. RING & COVER ;d 4 RAM -N E K SEALANT TYPICAL SEWER SERVICE CNNECTION DETAIL S NO SCALE 29 USE MIN. 4 EA. 318" ANCHOR BOLTS TO SECURE FRAME TO MANHOLE ---BASE COURSE COMPACTED FILL .o a NOTE: FRAME CONCRETE ENCASEMENT SHALL ONLY BE USED IN AREAS WHERE COVE=R IS TO BE FLUSH WITH PAVEMENT OR CONCRETE. CONCRETE ENCASEMENT SHALL NOT BE USED IN NON -TRAFFIC AREAS AND ABOVE GRADE INSTALLATIONS. TYPICAL STANDARD MANHOLE FRAME & COVER DETAIL S NO SCALE r71 HA PLACED DENSELY CC MPACTED BACKFI L TO 1 FT. ABOVE T P OF PIPE BEDDIED PIPE - SHAPED SI TO PROVIDE ALONG ENTIRE OF PIPE RELPIPE O.D. 24'" + D.D. MAX. MON. SANITARY SEWER (DUCTILE IRON ONLY) (0'-16' DEPTH) PIPE LAYING CONDITION "C" HAN PLACED DENSELY CC NOTE- NOTE: PIPE SHALL BE BEDDED UP TO V inside ABOVE T EASEMENT SHALL BE PROVIDED FOR SERVICE SPRING LINE AND MINIMUM 4" BELOW RW CAST IRON VALVE BOX WHERE SERVICE CONNECTION IS PLACED BOTTOM OF PIPE WHEN WET AREAS ARE ENT AS INDICATED. AGR OUTSIDE OF RNV DUE TO PHYSICAL CONSTRAINTS. OUTSIDE ENCOUNTERED. IRED BY WI CHARLOTTE HUB -TUBER - HAND PLACED D STONE CRASSLEANOUT PLUG D GAP DENSELY COMPACTED E LENGTH OF PIPE BARREL BACKFILL TO I FT.-- - --- w w - _ � z aw o UNDISTURBED EARTH III I I I I I I �- - - ELECTRONIC MARKER BALLS AT 1 GOP ON In_ -PIPE- CENTER & AT BENDS, MARKER BALLS SHALL co BEDDED PIPE - O.D.-'-- BE INSTALLED AT 1 112 TO 2° DEEP. - 4" PVC VERTICA NOTE: MARKER BALLS SHALL BE INSTALLED SCH 40 PVC VE TICAL SHAPED SUBGRADE - - CONCURRENTLY WITH PIPE=. MARKER W - I BALLS SHALL NOT BE INSTALLED AFTER SHALL PROVIDE BEARING - - MAX. 4" SWEEP WYE TRENCH HAS BEEN COMPLETELY ALONG ENTIRE LENGTH # STOP AT R/W SCH 40 PVC BACKFILLED. OF PIPE BARREL SERVICE LINE 112 PIPE O.D. SCH 40 PVC 24" + O.D. MAX. 45° SANITARY TEE IN-LINE WYE 12" + O.D. MIN. (SAME MATERIAL FITTING, FOR NEW AS MAIN) CONSTRUCTION OR NOTE: ROMAC-CB SADDLE FORCE MAINS 8"0 AND SMALLER SHALL PLUG FOR TAP ON EXISTING HAVE MINIMUM OF 3' COVER. FORCE (DO NOT GLUE) SANITARY SEWER MAIN. MAINS LARGER THAN 8R. SHALL HAVE A _ TEE BRANCH MINIMUM OF 3'-fi" C{3VER. Q SLOPE MIN. 1 /m .5: FORCE MAIN PIPE LAYING v cr; O SANITARY SEWER CONDITION "E" rl I MAIN TYPICAL PIPE LAYING CONDITION DETAILS NO SCALE FINISHED GRADE BASE COURSE COMPACTED FILL FRAME & COVER • 1.5" MIN. } STD. MANHOLE I. RING & COVER ;d 4 RAM -N E K SEALANT TYPICAL SEWER SERVICE CNNECTION DETAIL S NO SCALE 29 USE MIN. 4 EA. 318" ANCHOR BOLTS TO SECURE FRAME TO MANHOLE ---BASE COURSE COMPACTED FILL .o a NOTE: FRAME CONCRETE ENCASEMENT SHALL ONLY BE USED IN AREAS WHERE COVE=R IS TO BE FLUSH WITH PAVEMENT OR CONCRETE. CONCRETE ENCASEMENT SHALL NOT BE USED IN NON -TRAFFIC AREAS AND ABOVE GRADE INSTALLATIONS. TYPICAL STANDARD MANHOLE FRAME & COVER DETAIL S NO SCALE r71 HA PLACED DENSELY CC MPACTED BACKFI L TO 1 FT. ABOVE T P OF PIPE BEDDIED PIPE - SHAPED SI TO PROVIDE ALONG ENTIRE OF PIPE RELPIPE O.D. 24'" + D.D. MAX. MON. SANITARY SEWER (DUCTILE IRON ONLY) (0'-16' DEPTH) PIPE LAYING CONDITION "C" HAN PLACED DENSELY CC OPACTED BACKFI L TO 1 FT, ABOVE T OF PIPE BED D PIPE - MINIMU STONE EMBED ENT AS INDICATED. AGR TER IF REQ IRED BY MANUF -TUBER - SNAP D STONE TO PROVIDE BEARING ALONG ENTIR E LENGTH OF PIPE BARREL r O12 D18z3'° d Yz PIPE O.D. 24" + Q.D. MAX. SANITARY SEWER (DUCTILE IRON ONLY) (}16' DEPTH) PIPE LAYING CONDITION "D" TYPICAL PI E LAYING CONDITION DETAIL S NO SCALE 7 _j U7 Lu p mi 11 Enz d a CD < ?- p [D w Li C3�>C3 j:: QZZ 4 Lit a - O LZ N W Ir > to C7 t= Z 0Z w ZpW Q W Q- Z I ' mz ui CC w z ua x 0 0 w CD CD 4 4 2 EL a"La `m ED zi •2 0 c E R U 0 EE PROJE=CT: 4914 w S -� 013 z iii z �N� V z � i3 CC Lu =- O Co Q • 7' r 0 0 Z9 a� <m¢ Q LIJCL wLL Z z w w :4z � z aw o Zq?a In_ _j U7 Lu p mi 11 Enz d a CD < ?- p [D w Li C3�>C3 j:: QZZ 4 Lit a - O LZ N W Ir > to C7 t= Z 0Z w ZpW Q W Q- Z I ' mz ui CC w z ua x 0 0 w CD CD 4 4 2 EL a"La `m ED zi •2 0 c E R U 0 EE PROJE=CT: 4914 w S -� 013 z iii z �N� V z � i3 CC Lu =- O Co 0 0 a� <m¢ Q LIJCL wLL Z W u � w w 7- � z w o In_ co Z W 0 `9 35 _ .5: v cr; O rl I I C)LQ _j U7 Lu p mi 11 Enz d a CD < ?- p [D w Li C3�>C3 j:: QZZ 4 Lit a - O LZ N W Ir > to C7 t= Z 0Z w ZpW Q W Q- Z I ' mz ui CC w z ua x 0 0 w CD CD 4 4 2 EL a"La `m ED zi •2 0 c E R U 0 EE PROJE=CT: 4914 w S -� 013 z NOTE: IN NDN -TRAFFIC AREAS,TOP OF FRAME AND COVER SHALL BE INSTALLED AT LEAST 2 FT ABOVE FINISH GRADE OR AT LEAST 1 FT ABOVE FLOOD STAGE. i__ __ ____ . 8" 8" MAX. PA FOR ER 0 iD SPACER 2,-O„ 3'-U' OR 4'-0" r d; ;- ECCENTRIC TAPER UNIT STANDARD MANHOLE; RING AND COVER USE 4 EA. W" ANCHOR BOLTS TO BOLT FRAME TO SPACER. USE ROPE C MA TI SEAL S BETWEEN FRAME AND SPACER. MANHOLE STEPS 16" O.C. SEE DETAIL S-27 JOINTS SHALL BE SEALED ,,WITH A RUBBER O-RING GASKET OR ROPE MASTIC SEAL. CEMENT GROUT All JOINTS INS '\: ' � 117E AND OUT .. RISER UNIT . '• 4' DIA. MIN. _ y _ . O• O■t ■ ■ : ■r (REQUIRM OVER 1Z) I I � 111 .r .s .................�sr sa. rc�.rFa �, ear i............. io ;. l ■ t■ .-r_r �_r_ ._r-i_i_■i_t_�-i_*_s=@_r • OZr_r-e= ? 5„ BRICK & MORTAR INVERT MIN. � MIN. 6" GRAVEL BEDDING TYPICAL STANDARD PRECAST CONCRETE MANHOLE DETAI#__. NO SCALE NOTES: 1. SEE DETAIL S-28 FOR TYPICAL INVERT. NOTE: Mill vl 1,",-1-1— —1 1 EA. JOINT OF DUCTILE IRON PIPE SHALL BE CENTERED UNDER STORM PIPE FOR ALL CROSSINGS. TED SOIL COPOLYMER POLYPROPYLENE PLASTIC M.A. INDUSTRIES MODEL U@ PSI -PF OR APPROVED EQUAL. TYPICAL POLYPROPYLENE PLASTIC STEP DETAIL NO SCALE NOTE. 1. PIPE SIZE FOR DROP TO EQUAL INFLOW SEWER PIPE SIZE. 2. FITTINGS FOR DROPS SHALL BE C-900 OR SCHEDULE 4D PVC. 3, SAW --CUT OR DRILL ALL HOLES FOR PIPE AND BOLTS. 4. DROP -MANHOLE MANDATORY WHEN DIFFERENTIAL BETWEEN INVERTS IS GREATER THAN 24". S. SEE DETAIL S-28 FOR TYPICAL INVERT MANHOLE STEI SEE DETAIL S-27 Y"x 2" SS SUPT RUR R NO SCALE TANDARD PRECAST MANHOLE RUBBER BOOT PE 316 S.S. PANSION ANCHORS 91l' BEND RULE 15A NCAC 2T.0305 PROVIDES DESIGN CRITERIA FOR SEWER LINE EXTENSIONS TYPICAL STORM SEINER CROSSING INCLUDING REQUIRED SEPARATION DISTANCES. THE RULE REQUIRES THAT SEWER SEINER DETAIL FOR SANITARYr_S_'� SYSTEMS BE LOCATED AT LEAST 50 FEET AWAY FROM ALL WETLANDS AND PROVIDES NO SCALE Q1 ALTERNATIVE CRITERIA FOR INSTANCES WHEN THE SETBACK CANNOT BE MAINTAINED. THE FOLLOWING PROVISIONS ARE RELEVANT TO THIS POLICY: NOTE: 1 EA. JOiNT OF DUCTILE IRON PiPE SHALL BE CENTERED UNDER WATER LINE FOR ALL CROSSINGS. TYPICAL WATER LINE CROSSING FOR SANITARY SEWER DETAIL S NO SCALE 32 (f) The following minimum separations shall be provided for the sewer system except as allowed by Paragraph (g) of this Rule: Waters classified WS (except WS -I or WS -V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands ... 50 feet (g). Alternatives where separations in Paragraph (f) of this Rule cannot be eachieved. (5) for all other separations, materials, testing methods and acceptability standards meeting water main standards (15A NCAC 18C) shall be specified.. TEST PROCEDURES FOR HYDROSTATIC TESTING OF GRAVITY SEWER WITHIN 50FT OF WETLAND LIMITS: 2016 HCDPU REQUIRED UTILITY NOTES (Revision 6 - June 2016) . The folWAT w : ing utility notes should be added to the coversheet of utility plans for projects located in Harnett County ER A. The Fire Marshal's Office shall approve all hydrgnt types and locations in new subdivisions. However, Harnett County Department of Public Utilities (HCDPU) prefers the contractors to install one of the following fire hydrants: L Mueller - Super Centurion 250 A--423 model with a 5j4" main valve opening three way (two hose nozzles and one pumper nozzle); 2 American Darll g - Mark B -84-B model with a 534" main valve opening three way (two hose nozzles and one pumper nozzle; 3. aterous - P cer B-67-250 model with a 534" main valve opening three way (two hose nozzles and one pumper nozzle or approved equal for standardization. B.Fire hydrants are installed at certain elevations. Any grade change in the vicinity of any fire hydrant which impedes its operation shah become the responsibility of the Utility Contractor for correction. Corrections will be monitored by the HCDPU Utility Construction inspector and the Harnett County Fire Marshal. C.The Professional Engineer (PE) shall obtain and provide the NCDENR "Authorization to Construct" permit to the Utility Contractor before the construction of the water line shall begin. The Utility Contractor must post a copy of the NCDENR Authorization to Construct" permit issued by the North Carolina Department of Environment and Natural Resources - Division of Environmental Health, Public Water Supply Section (NCDENR--DEH,PWSS) on site prior to the start of construction. The permit must be maintained on site throughout the entire construction process of the proposed water lines that will serve this project. D.The Utility Contractor shall l notifY Harnett County. Department of Public Utilities(HCDPU) and the Professional Engineer (PE) at least two days prior to construction commencing. The Utility Contractor must schedule a pre -construction conference with Mr. Alan Mass, HCDPU Utility Construction inspector at least two (2) days before construction will begin and the Utility Contractor must coordinate with HCDPU for regular inspection visitations and acceptance of the water system(s). Construction work shall be performed only during the normal working hours of HCDPU which is 8:00 am - 5:00 m Monde through Friday. Holiday n R Y 9 d and weekend wank is not ermitted b HCDPU Y Y P Y E.The Professional Engineer (PE) shall provide HCDPU and the Utility Contractor with a set of NCDENR approved plans marked 'Released For Construction" at ieast two days prior to construction commencing. The Registered Land Surveyor (RLS) should stake out all lot corners and the grade stakes for the proposed finish grade for each street before the Utility Contractor begins construction of the water line(s). The grade stakes should be set with a consistent offset from the street centerline so as not to interfere with the street grading and utility construction, F. The Utility Contractor shall provide the HCDPU Utility Construction Inspector with material submittals and shop drawings for all project materials Prior to the construction of any water line extension(s), and associated water services ces r n Harnett County. The materials to be used an the project must meet the established specifications of HCDPU and be approved by the Engineer of Record prior to construction. All substandard materials or materials not approved for use in Harnett County found on the project site must be removed immediately when notified by the HCQPU Utility Construction Inspector. G.The water main(s), fire hydrants, service lines, meter setters and all associoted appurtenances shall be constructed in strict in accordance with the standard specifications of the Harnett County Department of Public Utilities (HCDPU). The Utility Contractor shaif be responsible to locate the newly instolted water main(s), water service lines and all o ci sea gted meter setters and meter boxes for other utility companies and their contractors until the new water main(s) have been approved by the North Carolina Department of Environment and Natural Resources - Division of nvir nm I E n a eta Health, Public Water Supply Section (NCDENR-DEH, PWSS)and accepted by HCDPU. H. Prior to acceptance, all services will be inspected to insure that they are installed at the proper depth. All meter boxes must be flush with the ground level at finish grade and the meter setters must be a minimum of 8" below the meter box lid. Meter setters shall be centered in the meter box and supported by brick, block or stone. I. The Utility Contractor shall provide the Professional Engineer (PE) and HCDPU Utility Construction inspector with a set of red line drawings identifying the complete water system installed for each project. The red line drawings should Identify the materials, pipe sizes and approximate depths of the water lines as well as the gate valves, fire hydrants, meter setters, blow off assemblies and all associated appurtenances for all water line(s) constructed in Harnett County. The red line drawings should, clearly identify any deviations from the NCDENR opproved plans. All change orders must be approved by HCDPU and the Professional Engineer (PE) in writing and properly documented in the red line field drawings. J. Potable water mains crossing other utilities and non—potable water lines (sanitary sewer, storm sewer, RCP, etc.) shall be laid to provide a minimum vertical distance of twenty --four (24) inches between the potable water main and all other utilities. NCDOT requires the new water mains to be Installed, under the storm water lines. The potable water main shall be installed with twenty—four (241 inches of vertical separation and with ductile iron pipe when designed to be placed under a non -potable water line such as sanitary sewer or storm sewer lines. If these separations cannot be maintained then the water main shall be installed with ductile iron pipe. Both the potable water main and the non -potable water line must be cast iron or ductile iron pipe p p p (DIP) if the state minimum separations cannot be maintained. The ductile iron pipe must be laid so the mechanical joints are at least (10') feet from the point where the potable water main crosses the non -potable water line. K.Potable water mains installed porallel to non -potable water lines (sanitary sewer, storm sewer, RCP, etc.) shall be $aid to provide a minimum horizontal distance of ten (10') feet between the potable water main and sanitary sewer mains, sewer laterals and services. The horizontal separation between the potable water main and any other utility or storm sewer shall not be less than five (5) feet. The potable water main must be ductile iron pipe if this horizontal separation of ten (10') feet cannot be maintained. The ductile iron pipe shall extend at least ten (10') feet beyond the point where the minimum required horizontal separation of ten (10) feet can be re—established. L.Meter setters shall be installed in pairs on every other lot line where possible to leave adequate space for other utilities to be installed at a later time. The meter setters shall be installed of least one (1') foot inside the right-of-way and at least three (3') to five (5') feet from the property line between the lots. M. HCDPU requires that meter boxes for 34" services shall be 12" wide x 17" long ABS plastic boxes at least 18" in height with cast iron lids/covers. Meter boxes for 1" services shall be 17" wide x 21' long ABS plastic boxes at least 18" in height with plastic lids and cast iron flip covers in the center of the lids. Meter boxes for 2" services shall be 20" wide x 32" long ABS plastic boxes at least 20" in height with plastic lids and cast iron flip covers in the center of the lids. N. Master meters must be installed in concrete vaults sized for the meter assembly and associated appurtenances so as to provide at least eighteen (18) inches of clearance between the bottom of the concrete vault and the bottom of the meter setter. The master meter must be provided test ports if the meter is not equipped with test ports from the manufacturer in accordance with the HCDPU established standard specifications and details. Ductile iron pipe must be used for the master meter vault piping and valve vault piping. The Utility Contractor must provide shop drawings for the meter vaults to HCDPU prior to ordering the concrete vaults. 0. The Utility Contractor will install polyethylene SDR -9 water service iines that cross under the pavement inside a schedule 40 PVC conduit to allow for removal and replacement in the future. Two (2) independent ala" water service lines may be installed inside one (1) - two (21 inch schedule 40 PVC conduit or two (2) independent 1" water service lines may be installed Inside one (1) - three (3") inch schedule 40 PVC conduit, but each water service shall be topped directly to the water main. Split services are not allowed by HCDPU. P.The water main(s), fire hydrants, gate valves, service lines, meter setters and associated appurtenances must be rated for 200 psi and hydrostatically pressure tested to 200 psi, The hydrostatic pressure test(s) must be witnessed by the HCDPU Utility Construction Inspector. The Utility Contractor must notify HCDPU when they are ready to begin filling in lines and coordinate with Harnett County to witness oil pressure testing. Q. The Utility Contractor shall conduct a pneumatic pressure test using compressed air or other Inert gas on the stainless steel tapping sleeve(s) prior to making the tap on the existing water maim. This ,pneumatic pressure test must be witnessed by the HCDPU Utility Construction Inspector. The Utility Contractor shall use Romac brand stainless steel topping sleeve(s) or approved equal for all taps made In Harnett County. All new water line extensions must begin with a resilient wedge type gate valve sized equal to the diameter of the new water line extension in order to provide a means of isolation between Harnett County's existing_ water mains and the new water line extensions under construction. R.AII water mains will be constructed with SDR -21 PVC Pipe or Class 50 Ductile iron Pipe rated for at least 200 psi or greater. All pipes must be Protected during loading, transport, unloading, staging, and installation. PVC pipe must be protected from extended exposure to sunlight prior to installation, S.AII water mains will be flushed and disinfected in strict accordance with the standard specifications of the Harnett County Department of Public Utillties. All water samples collected for bacteria testing will be collected by the HCDPU Utility Construction Inspector end tested in the HCDPU Laboratory. T.AII Fittings larger than two (2") inches diameter shall be ductile iron. HCDPU requires that mechanical joints be assembled with grip rings as "Megalug" fittings are not approved by Harnett County for pipe sizes smaller than twelve inches (12') diameter. PVC pipe used for water mains shall be connected by slip joint or mechanical joint with grip rings. Glued pipe joints are not allowed on PVC pipe used for water mains In Harnett County. U. HCDPU requires that the Utility Contractor Install tracer wire in the trench with all water lines. The tracer wire shall be 12 ga. insulated, solid copper conductor and it shall he terminated at the tap of the valve boxes or manholes, No spliced wire connections shall be made underground on tracer wire Installed in Harnett County. The tracer wire may be secured with duct tape to the top of the pipe before backfilling. V.The Utility Contractor will provide Professional Engineer (PE) and the HCDPU Utility Construction Inspector with a set of red line field drawings to identify the installed locations of the water Iine(s) and all associated services. All change orders must be pre -approved by HCDPU and the Professional Engineer (PE) In writing and properly documented in the red line field drawings. W. The Utility Contractor shall spot dig to expose each utility pipe or line which may conflict with construction of proposed water line extensions well in advance to verify locations of the existing utilities. The Utility Contractor shall provide both horizontal and vertical clearances to the Professional Engineer (PE) to allow the PE to adjust the water line design in order to avoid conflicts with existing underground utilities. The Utility Contractor shall coordinate with the utility owner and be responsible for temporary relocation and/or securing existing utility pales, pipes, wires, cables, signs, and/or utilities including services in accordance with the utility owner requirements during water line installation, grading and street construction. }[.Prior to the commencement of any work within established utility easements or NCDOT right-of-ways the Utility Contractor is required to have a signed NCDOT encroachment agreement posted on site and notify all concerned utility companles in accordance with G.S. 87-102. The Utility Contractor must call the NC One Call Center at 811 or (800) 632-4949 to verify the location of existing utilities prior to the beginning of construction. Existing utilities shown in these plans are taken from maps famished by various utility companies and have not been physically located or verified by the P.E. (I.e. TELEPHONE, CABLE, WATER, SEWER, ELECTRICAL POWER, FIBER OPTiC, NATURAL OAS, ETC.). The Utility Contractor will be responsible to repair any and all damages to the satisfaction of the related utility company. Y.The Utility Contractor shall provide HCDPU with at least one (1) fire hydrant wrench and one (1) break -away flange kit for every subdivision with fire hydrants developed in Harnett County. These items must be provided to HCDPU before the final inspection will be scheduled by the HCDPU Utility Construction Inspector. In addition, the Utility Contractor shall install a 4" x 4" concrete valve marker at the edge of the right-of-way to identify the location of each gate valve installed in the new water system with the exception of the fire hydrant isolation valves. The contractor shall measure the distance from the center of the concrete marker to the center of the valve box. This distance (in linear feet) shall be stamped on the brass plate located on the top of the concrete valve marker. In lieu of installing the concrete valve markers, the Utility Contractor may provide at least two measurements from two independent permanent above ground structures to the Professional Engineer (PE) In the red line drawings to identify the valve locations. The Professionot Engineer (PE) must include these measurements in the As --Built Record Drawings submitted to HCDPU. 2.The Utility Contractor will be responsible for any and all repairs due to leakage damage from poor workmanship during the one (1) year warranty period once the water system improvements have been accepted by Harnett County. Harnett County will provide maintenance and repairs when requested and bill the Developer and/or Utility Contractor if necessary due to lack of response within 48 hours of notification of warranty work. The Utility Contractor will be responsible for any and all repairs due to damages resulting from failure to locate the new water tines and associated appurtenances for other utilities and their contractors until the water lines have been approved by NCDENR and accepted by HCDPU. The final inspection of water system improvements cannot be scheduled with HCDPU until the streets have beenved• the rights-of-way pa e and utility easements have been seeded and stabilized with an adequate stand of grass in place to prevent erosion issues on site. AA The Engineer of Record is responsible to insure that construction is, at all times, in compliance with accepted sanitary englneering practices and approved plans and specifications. No field changes to the approved plans are allowed without prior written approval by HCDPU. A copy of each engineer's field report is to be submitted to HCDPU as each such inspection is made on system improvements or testing is performed by the contractor. Water REMOVE ALL DEBRIS FROM MAIN PRIOR TO TESTING and sewer infrastructure must pass all tests required by HCpPU specifications and those of all applicable regulatory agencies. These tests include, but are not limited to: air test, vacuum test, mandrel test, visual test, pressure test, �� r� bacteriological test, etc. A HCDPU inspector must be present during testing and all test results shall be submitted INSTALL 8 MJ CAP (TAPPED 2) ON EACH END OF INSTALLED SEWER MAIN & SECURE WITH to HCDPU. All tests must be satisfied before the final inspection will be scheduled with the HCDPU Inspector. The "STIFF KNEE" AGAINST MANHOLE WALL Engineer of Record must request in writing to schedule the final inspection once all construction is complete. The Developer's Engineer of Record and the HCDPU Utility Construction Inspector shall prepare a written punch list of any IED SOIL FILL PIPE WITH WATER & PERFORM HYDROSTATIC TEST FROM LOW END OF PIPE defects or deficiencies noted during the final inspection, should any exist. Upon completion of the punch list, the Developer's Engineer of Record will schedule another inspection. In the event the number of inspections performed TEST DURATION IS TO BE 2 HOURS 200 PSI by the HCDPU exceeds two, additional fees may be accessed to the Developer. HCDPU & ENGINEER REPRESENTATIVE ARE TO BE PRESENT DURING TESTING "FIELD -LOC" GASKETS TO BE USED ON SEWER MAINS IN THESE AREAS SANITARY SEWER A. The Professional Engineer (PE) shall obtain ani supply a copy of the sewer permit for the construction and operation of the wastewater collection system to the U City Contractor before the construction of the sanitary sewer line, sewer lift station and associated force main shall b gin. The Utility Contractor must post a copy of the sewer permit issued by the North Carolina Department of E vironment and Natural Resources - Division of Water Quality (NCDENR-DWQ) on site prior to the start of nstruction. The permit must be maintained on site during the construction of the sewer system improvemen s. B. The Utility Contractor shall notify Harnett Coll ty Department of Public Utilities (HCDPU) and the Professional Engineer (PE) at least two days prior to construction ornmencing. The Utility Contractor must schedule a pre --construction conference with Mr. Alan Mass, HCDPU Util'ty oastruction Inspector at least two (2)days before construction will begin and the Utility Contractor must coordint to with HCDPU for regular inspection visitations and acceptance of the wastewater system(s). Construction work shal be performed only during the normal working hours of HCDPU which is 8:00 am - 5:00 pm Monday through Friday. Holiday and weekend work is not permitted by HCDPU. C. The Professional Engineer (PE) shall provide HCDPU with a set of NCDENR approved plans marked 'Released For Construction" at least two days prior to consiructlion commencing. HCDPU will stamp the approved plans as "Released for Construction" and provide copies to the utility contractor. The Registered Land Surveyor (RLS) shall stake out all lot corners and establleh grade takes for the proposed finish grade for each street and sewer line before the Utility Contractor begins constructi n or installation of the manholes, sanitary sewer gravity line(s), sewer lift stations and/or sanitary sewer force main s). The grade stakes should be set with a consistent offset from the street centerline so as not to interfere with t ie street grading or utility construction. D. The Utility Contractor shall provide the HCDPU Utility Construction Inspector with material submittals and shop drawings for oil project materials prior to the construction of an gravity sewer lines manholes sewer lift g P j P Y9 Y ()� (). stotion(s) and associated farce main(s) in Ha nett County. the materials to be used on the project must meet the established specifications of HCDPU and be a roved by the Engineer of Record prior to construction. All substandard materfols or materials not appro d for use in Harnett County found on the project site must be removed immediately when notified by the HGI PU Utility Construction Inspector. E. The sanitary sewer lateral connections should a installed 90' (perpendicular) to the sanitary sewer gravity lines with schedule 40 PVC pipe. HCDPU requires the U Ellty Contractor to provide the Professional Engineer (PE) with accurate measurements for locating sanitary sewer serN ice lateral and associated each sanitary sewer clean—out. These measurements should be taken from the near mt downstream manhole up along the sanitary sewer main to the in—line wye fittlng (or tapping saddle) and th another measurement from the in—line wye fitting (or tapping saddle) to the 4" x 4" long sweep combination wye fl ting at the bottom of the sewer clean-out stack. These field measurements must be provided to the Profs sional Engineer (PE) in the red line drawings from the Utility Contractor for proper documentation in the A -Built Record Drawings submitted to HCDPU. F. The Utility Contractor shall be responsible to Dcate the newly installed sanitary sewer gravity line(s), sanitary sewer force main(s), sanitary sewer service l t r i(s and all associated sewer clean-out(s) in the proposed sanitary sewer system for other utility companies and their contractors until the new sanitary sewer line(s) and associated appurtenances have been approved by the Noi th Coralino Department of Environment and Natural Resources - Division of Water Quality (NCDENR-DWQ) and ccepted by HCDPU. All new sanitary sewer lines must have at tecst three (3 ft. ) feet of cover and extend under all existing water main and stoma water lines with a least 24" of vertical clearance below the bottom of the ex sting water main and storm water lines. G The sanitary sewer gravity line(s). manhole(s), sanitary sewer service lat rol(s) and associated clean -outs shall be constructed in strict accordance with the sta dard specifications of the Harnett County Department of Public Utiilties. The sanitary sewer gravity line(s) must pneum tically pressure tested with compressed air at 5 psi and the sanitary sewer force main(s) must hydrostatically pres re tested with water or air at 200 psi. Sanitary sewer manholes must be vacuum tested to 10 inches of mercury and cannot drop below 9 inches in 60 seconds for 4 ft, diameter manholes, 75 seconds for 5 ft. diameter man ales. Ali tests mentioned above must be witnessed by the HCDPU Utility Construction Inspector and Engineer. H. Prior to acceptance, oil sewer service laterals will be inspected to insure that they are installed at the proper depth. Ail sewerclean-outs must be installed so the 4" x 4" long sweep combination wye is at least three (3') feet but no more than four (4') feet below the finish gra unless otherwise approved in writing by HCDPU. The sewer cleanouts shall hove a four (41 schedule 40 PVC pipe i tubbed up from both ends of the 4" x 4" long sweep combination wye to be at least two (2') feet above the finish grade and cover each end with a four (4") inch temporary cop to keep out dirt. sand, rocks, water and construction ebris.The vertical stack on each clean-out must be provided with a concrete donut farP rotection. I. Once the sanitary sewer gravity line(s) have ben installed, pneumatically pressure tested and in place for at least 30 days, the Utility Contractor must contact he HCDPU Utility Construction inspector to witness the mandrel test on each PVC sanitary sewer gravity line. The Uti ity Contractor will notify HCDPU to schedule the mandrel testing. The mandrel and proving ring must be supplied by the Utility Contractor. Closed circuit video camera inspections (at the Utility Contractor's expense) may be required y the HCDPU Utility Construction Inspector If the mandrel and mirror tamping testing cannot be completed with sotisfoctory results. The sanitary sewer lines should be flushed clean using a sewer ball of the proper diameter bel re any mandrel testing can be performed. The Utility Contractor is responsible to remove all dirt, sand, silt, gray , mud and debris from the newly constructed sewer lines exercising care to keep the Harnett County's existing sa itary sewer systems clean. Sanitary sewer force main(s) shall be pressure tested to 200 psi for at least 2 hours like water lines. J. The Utility Contractor shall be responsible to I ante the newly installed sanitary sewer system(s) for other utility companies and their contractors until the new sanitary sewer system(s) have been approved by the North Carolina Department of Environment and Natural Resou ces - Division of Water Quality (NCDENR-DWQ)and accepted by HCDPU. K. HCDPU requires that the Utility Contractor ins all tracer wire in the trench with all sanitaryewer orce mains. The tracer wire shall be 12 a. insulated solid copper s 9 PP conductor and it shall be terminated at tt e top of the valve boxes or manholes. No spliced wire connections shall be made underground on tracer wire Installed in Harnett County. The tracer wire may be secured with duct tape to the top of the pipe before backfilllng. The tracer wire is not required for the gravity sewer line(s) between manholes. L. The Utility Contractor shall provide the Profes €onal Engineer (PE) and HCDPU Utility Construction Inspector with a set of red line drawings identifying the complete tewer system installed for each project. The red line drawings should identify the materials, pipe sizes and approxi ate depths of the sewer lines as well as the installed locations of the manhole(s), sanitary sewer gravity line(s), san ary sewer service laterals, clean -outs, sewer lift station(s) and associated force main(s). The red line drawin s should clearly identify any deviations from the NCDENR approved plans. All change orders must be approved b HCDPU and the Professional Engineer (PE) in writing and properly documented in the red line field drawings. M. Prior to the commencement of any work withli established utility easements or NCDOT right-of-ways the Utility Contractor is required to notify all concerned itility companies in accordance with G.S. 87-102. The Utility Contractor must call the NC One Call Center it 811 or (800) 632-4949 to verify the location of existing utilities prior to the beginning of construction. Existi g utilities shown in these plans are taken from maps furnished by various utility companies and have not been piysically located by the RE, (i.e. TELEPHONE, CABLE, WATER, SEWER, ELECTRICAL POWER, FIBER OPTIC, NATURAL GA , ETC.). N. The Utility Contractor shall spot dig to expose each existing utility pipe or line which may confiict with construction of proposed sanitary sewer line extensions wel In advance to verify locations of the existing utilities. The Jtility Contractor shall provide both horizontal and v /tical clearances to the Professional Engineer (PE) to allow the PE to adjust the sanitary sewer line design In order to avoid conflicts with existing underground utilities. The Utility Contractor shall coordinate with the utility owner and be responsible for temporary relocation of existing utilities and/or securing existing utillty poles, pipes, w es. cables, signs and/or utilities including services in accordance with the utility owner's requirements during sanitary sewer line installation, grading and street construction. 0. When making a tap on an existing sewer forco main, the Utility Contractor must hove a permit from the North Carolina Department of Environment and Natufal Resources -- Division of Water Quality (NCDENR-DWQ) prior to began the top work. The Utility Contractor shall corduct a pneumatic pressure test using compressed air or other inert gas on the stainless steel tapping sleeve and gate valve prior to making the tap on on existing sanitary sewer force main. This pneumatic pressure test must be witnessed by the HCDPU Utility Construction Inspector. The Utility Contractor shall use RoMac brand stainless stael tapping sleeve(s) or approved equal for all taps made on sanitary sewer force mains in Harnett County. The Ut lity Contractor shall use Romac brand Style ',CB" sewer saddles with stainless steel bonds or approved equal for all taps made on existing sanitary sewer gravity lines in Barnett County. P. The Utility Contractor shall provide a grease ti ap for each sanitary sewer service lateral that will be connected to a restaurant, food processing facility and any otier commercial or industrial facility as required by the Harnett County Fat, Oil & Grease Ordinance. The grease trap must be rated for a minimum capacity of at least 1,000 gallons unless otherwise approved in writing by the H DPU Pre -Treatment Coordinator. Garbage disposals should not be installed in homes and businesses that discha ge wastewater to the Harnett County Sanitary Sewer System as they are not approved by HCDPU. Q. Each sewer lift station most be provided with three phase power (at least 480 volts) and constructed to meet the minimum requirements of the latest version G1 the National Electrical Code (NEC) and Harnett County standard specifications and details, if three phase pow r is not available from the power company other arrangements must be approved by HCDPU Engineering prior to th start of construction. R. Where a new sanitary sewer force main is con ectad to on existing manhole in the Harnett County sewer collections system the Utility Contractor must pryvide a protective coating(coal tar epoxy for the interior surfaces of the manhole to protect it ogainst corrosion, orosic n and deterioration from the release of sewer gases such as methane and hydrogen sulfide. S. The sewer lift station design and associated a uipment must meet or exceed the MINIMUM REQUIREMENTS FOR HARNETT COUNTY SEWER LIFT STATIONS 2009 dit€on. Each sanitary sewer lift station must be. constructed with an all-weather access road that is at least 20 feet wide. The lift station site must be covered with weed blocking material and at least six (6") inches of # 57 stone (crush and run). T. Once a sewer lift station has been installed, tie Utility Contractor is responsible to schedule a draw down test with HCDPU Engineering and Collections staff, the f rafessional Engineer (PE), the Electrician, the original equipment manufacturer's (OEM) representatives [For botli the Pumps and the Generator]. This draw down test must be completed with power supplied from the elect cal utility company and with power supplied by the emergency generator with satisfactory results before final inspections are conducted by the HCDPU Utility Construction Inspector. U. Once the Utility Contractor completes the instillation of a sewer lift station, the Professional Engineer (PE) must submit the sewer permit certification and As— wilt Record Drawings to the North Carolina Department of Environment and Natural Resources -- Division of Water Qu lity (NCDENR—DWQ) and HCDPU for final approval. The Utility Contractor must supply HCDPU Engineering st ff with three original Operation & Maintenance (0&M) Manuals along with the associated pump curves and alectriccl schematics for the associated sewer lift station equipment including all warranty information and documentation. V. Once the Utility Contractor completes the inst Ilation of a sewer lift station, the Developer must pay HCDPU the established System Control and Data Acquisitl n (SCADA) fees before the SCADA system will be installed at the new sewer lift station. The SCADA system must b3 installed and operational before the utilities may be accepted by HCDPU and placed into operation. W. HCDPU requires the Utility Contractor to provi a all necessary equipment and devices for the testing and 'inspection of the sanitary sewer system. The equipment and devices may Include but not limited to Tamping with mirrors, mandrels, sewer balls, plugs, air compressors nd associated compressed air Tines. If the HCDPU Utility Construction inspector deems that a closed circuit video .c mera inspection of the newly constructed sewer system is necessary, then all casts for the closed circuit camera irspection will be the responsibility of the Utility Contractor. All closed circuit video camera inspections must be recd ded on VHS tapes that will released to HCDPU for record keeping, review and approval of the sewer system. X. Any use of sewer plugs to temporarily block Harnett County's existing sanitary sewer lines must be coordinated with the HCDPU Collections Supervisor at least two (2) days in advance of installing the plugs. The sewer plugs must be removed as soon as possible once the new scriltary sewer lines have been Inspected, pressure tested, mandrel tested, approved by the North Carolina Department of Environment and Natural Resources - Division of Water Quality (NCDENR-DWQ) and accepted by HCDPU to all w the sewer to flow as designed in Hamett County's existing sanitary sewer tines or when so ordered by the HCDPU Collections Supervisor to limit interruptions to the normal flow of the sanitary sewer collection The Utilitj Contractor must provide the pumps hoses and necessary connectors for a temporary pump around setup if require by the HCDPU Collections Supervisor. Mr. Randolph Clegg, HCDPU Collections Supervisor may be contacted between 8.00 am and 5:00 m Monde through Friday at 910 893-7575 p Y P Y 9 Y ( ) extension 3241. Y. The Utility Contractor will be responsible foray and all repairs due to leakage or damage resulting from poor workmanship during the one (1) year warranty period once the sewer system improvements have been approved by the North Carolina Department of Environment cad Natural Resources - Division of WaterQuality (NCDENR— DWQ) and accepted by HCDPU. The Utility Contractor wi I be responsible for any and all repairs due to damages resulting from failure to locate the new sanitary sewer lines nd associated appurtenances for other utilities and their contractors until the sanitary sewer lines have been approfed by NCDENR and accepted by HCDPU. HCDPU will provide maintenance and warranty repairs If necessary due to lack of response within 48 hours of notification of warranty work. HCDPU will invoice the Developer and/o- Utility Contractor for materials and labor in such cases. Z. In developments and projects that require utiii y easements to be established for future HCDPU right-of-way, the Registered Land Surveyor (RLS) must provide 1he HCDPU Right -of ---Way Agent with an official copy of the recorded pint and legal description of the saideaseme as recorded with the Harnett County Register of Deeds. The recorded documents must be provided to the ACDPIJ Right -of -Way Agent before the utility improvements within the said easement can be placed into operation. Any and ail easements that roust be obtained from adjoining property owners must be provided to HCDPU by the De eloper at no cost to Harnett County. The final inspection of all sanitary sewer system improvements cannot be scheduled with HCDPU until the streets have been paved; the rights-of-way and utility easements have beeii seeded and stabilized with an adequate stand of grass in place to prevent erosion issues on site. AA. The Engineer of Record is responsible to Tnsur that construction Is, at all times, in compliance with accepted sanitary engineering practices and approved ph ns and specifications. No field changes to the approved plans are allowed without prior written approval by HCDP J. A copy of each engineers field report is to be submitted to HCDPU as each such inspection is made ons tem improvements or testing Is performed by the contractor. Water and sewer infrastructure must pass all tests r iquilred by HCDPU specifications and those of all applicable regulatory agencies. These tests include, but are not lin ited to; air test, vacuum test, mandrel test, visual test, pressure test, bacteriological test, etc. A HCDPU Inspector ust be present during testing and all test results shall be submitted to HCDPU. All tests must be satisfied before the final Inspection will be scheduled with the HCDPU Inspector. The Engineer of Record must request in writing to schedule the final inspection once all construction is complete. The Developer's Engineer of Record and the HCDPU Utility Construction Inspector shall prepare a written punch list of any defects or deficiencies noted during the final 'r spection, should any exist. Upon completion of the punch list, the Developer's Engineer of Record will schedule q other inspection. In the event the number of Inspections performed 1° '. . � �yyl � . 4 `h n - rr .- 6 = . F_ w #, `� at. i. r' W. IU E0 Z � 0 N = 94<� VI C-.,) � N U NA w I < Ca ■ O y. ;>F- rn U Z V) 8 r. �s 2 � 0 Q T ft� U) Z V Z '- Cq gm ., 9� I 11-��.li I gJ w - 8 0 4 � ] y m epi � o� 1y•� 0 M w�9 4.P h" 6�F- LU 0 � � .@ou4 Ly 0 i db E Z o 4 LL2 �w w� 4!a a ZnJ — uu p U U r' W. IU E0 Z � 0 N = LL'I U cr] Jz'Y! Q 1— W UA C-.,) � N U NA w I < Ca 2 " i y i I I I ' v O✓ I T ft� U) Z o w (0 Q : > C) W y m uu w 0�N � m ¢4 � I LU 0 m.< IL Ly 0 i -LLS 9w LL2 �w w� or <fr- a ZnJ — uu p U - { Lu � # i CL to 4 I �2 l I M M ; U r 4 � A i .C4 = I3 IX i 'L6 I (N1 'i II CD iJa . y r' {J J v O✓ L i.l a 0 ft� U) Z o w (0 Q : > C) W 1— I-7 uu w 0�N Z7) LLI W LU >_ .-.7 Q p � I— W F- L'i "Z I y � (L � 04 y >- Lo (�^ C)of or <fr- a ZnJ J mum= Ix a- CL — C:: r EE PROJECT: 4914 S = 01 4 OF 14 In CD 8 N E U_ C 2 Z 2 b W W c c U 0 4 m Ui imO