HomeMy WebLinkAbout20180623 Ver 1_Minor mod to CAMA Major No 104-18_20190515Permit Class Permit Number
MODIFICATION/MINOR 104-18
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Mark and Anita Frena 119 South Dogwood Trail Southern Shores NC 27949
Authorizing development in Dare County adito man-made canal lead to Jean Guite Creek,
at 199 & 121 S. Dogwood Tr., in Southern Shores, as requested in the permittee's letter dated 2/27/19, incl the art.
workplan drawings (5) (3) dated "Received DCM-EC 4/4/19" and (2) dated "Received DCM-EC 3/8/19"
This permit, issued on May 15, 2019 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
. A _ .1
:)e subject to tines, imprisonment or civu acuuu, V. May �""DV UIV r.,==.._. _-
Docking Facilitv Reconfiguration
1) This permit authorizes only the removal of the platform over the breakwater and the extension of the
boardwalk/dock located along the bulkhead, and uses located in or over the water that are expressly
and specifically set forth in the permit application. No other structure, whether floating or stationary,
shall become a permanent part of this docking facility without permit modification. No non -water
dependent uses of structures shall be conducted on, in or over Public Trust waters without permit
modification.
(See attached sheet for additional conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2021
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Nignee oy me uuuiunuy ut uic ac c Y u=
of the Coastal Resources Commission.
b Braxtont. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Mark and Anita Frena
ADDITIONAL CONDITIONS
Permit No. 104-18
Page 2 of 2
2) This permit modification does not authorize any additional formalized boat slips, but does relocate one
formalized boat slip to the dock portion of the boardwalk.
3) The boardwalk and the dock portion of the boardwalk over the water, and associated structures shall
have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property
owner's areas of riparian access.
Upland Development
4) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities
associated with the development of the above referenced property associated with the pile supported
rope fence, all as expressly and specifically set forth in the attached permit application and workplan
drawings.
General
5) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
6) This Minor Modification shall be attached to the original Permit No. 104-18, which was issued on
10/21/18, as well as all subsequent refinements, and copies of all documents must be readily available
on site when Division personnel inspect the project for compliance.
7) All conditions and stipulations of the active permit remain in force unless specifically altered herein.
NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW -
2018 -00902.
NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 18-0623.
NOTE: A minor modification application processing fee of $100 was received by DCM for this project.