Loading...
HomeMy WebLinkAbout20190442 Ver 1_Determination Letter_20190515 May 13, 2019 Duncan Family Irrevocable Trust Attn: Reid F. Duncan, Jr. Trustee 5960 US Highway 17 South New Bern, NC 28562 DWR #19-0442 CRAVEN County Subject: On-Site Determination for Applicability to Neuse Riparian Buffer Rules (15A NCAC 02B .0233) Subject Property/ Project Name: Pecan Grove Solar, LLC Address/Location: 6075 US Highway 17 South, New Bern Stream(s) Evaluated: Unnamed Tributary to Deep Gulley Creek and Deep Gulley Creek Determination Date: 04/29/19 Staff: Anthony Scarbraugh Determination Type: Buffer: Stream: Neuse (15A NCAC 02B .0233) Tar-Pamlico (15A NCAC 02B .0259) Catawba (15A NCAC 02B .0243) Jordan (15A NCAC 02B .0267) (governmental and/or interjurisdictional projects) Randleman (15A NCAC 02B .0250) Goose Creek (15A NCAC 02B .0605-.0608) Intermittent/Perennial Determination *E/I/P/NSP = Ephemeral/Intermittent/Perennial/No Stream Present The Division of Water Resources has determined that the streams listed above and included on the attached map have been located on the most recent published NRCS Soil Survey of CRAVEN County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale and evaluated for applicability to the NEUSE River Riparian Buffer Rules. Each stream that is checked “Not Subject” has been determined to not be at least intermittent or not present on the property. Streams that are checked “Subject” have been located on the property and possess characteristics that qualify them to be at least intermittent streams. There may be other streams or features located on the Stream E/I/P* Not Subject Subject Start@ Stop@ Soil Survey USGS Topo 19-0442 A P X Flag: 19-0442 A Begin Flag: 19-0442 A End X X 19-0442 B P X Flag: 19-0442 B Begin Flag: 19-0442 B End X X CRAVEN County Page 2 of 2 property that do not appear on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) calendar days of date of this letter to the Director in writing. If sending via US Postal Service: c/o Karen Higgins DWR – 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.): c/o Karen Higgins DWR – 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 This determination is final and binding as detailed above, unless an appeal is requested within sixty (60) days. This determination only addresses the applicability to the buffer rules and does not approve any activity within the buffers. The project may require a Section 404/401 Permit for the proposed activity. Any inquiries regarding applicability to the Clean Water Act should be directed to the US Army Corps of Engineers Washington Regulatory Field Office at (910) 251-4629. If you have questions regarding this determination, please feel free to contact Anthony Scarbraugh at (252)948-3924. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: LASERFICHE Jerry R. Jones, DEMLR (via email) Frederick Flagstad, GreenGo Energy US, Inc. (via email: rp@greengoenergy.com) USGS Topgraphic Map Write a description for your map. Legend Subject 1000 ft N➤➤N Neuse 05/13 19 Neuse05/1319