Loading...
HomeMy WebLinkAboutWQ0040863_Application (FTSE)_20190403State of North Carolina Department of Environmental Quality DWR Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: °'`J(k_9 ?] 4 o 5 (to be completed by DWR) All items must be completed or the application will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: Wake County Board of Education (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ® State/County ❑ Municipal ❑ Other 3. Signature authority's name: David Neter. per 15A NCAC 02T .0106(b] Title: Chief Operating Officer 4. Applicant's mailing address: 5625 Dillard Drive, City: Cary State: NC Zip: 27518- ®� 5. Applicant's contact information: APR d 3 2019 Phone number: (919) 588-3577 Email Address: whartleyP,wcpss.net or. H. PROJECT INFORMATION: 1. Project name: Fu ua -Varina High School -Renovation I P,. 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 __ 3. County where project is located: Wake 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.596' Longitude:-78.798' 0 w 5. Parcel ID (if applicable): 0667-12-0653 Cz O (or Parcel ID to closest downstream sewer) U N c � o III. CONSULTANT INFORMATION: 1. Professional Engineer: Lester Lowe License Number: 018511 Firm: The Wooten Com an a. Mailing address: 120 North Boylan Avenue, A City: Raleigh State: NC Zip: 27603-1423 Z Phone number: (919 828-0531 Email Address: llowe _ thewootencompany.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Terrible Creek W WTP Permit Number: NC000066516 Owner Name: Town on Fuguay-Varina 1 V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): f( 1. Permit Number(s): WQ UNKNOWN Downstream (Receiving) Sewer Size: UNKNCP" inch System Wide Collection System Permit Number(s) (if applicable): WQCS vi LS o fl q Owner Name(s): Town of Funuay-Varina 1 FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. if the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. if the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N!A 3. If the Applicant is a Home/Property_Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N: A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ® School 1 preschool / day care ❑ MedicaI / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial 0 % Industrial (See 15A NCAC 02T .0103(20)) 1 4, Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(o ❑ Yes ® No If yes, provide a cony of now reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.01140 Daily Design Flow',b No. of Units Flow School with cafeteria, gym and showers 315 gal: day 1 315 GPD gal.' GPD gall GPD gall GPD gall GPD gal! GPD ++ „�✓ S th ! r s 1a!'tJ e I 'O 9'aLk = ; f Total 315 GPD a See 15A NCAC 02T .01 14(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 315 GPD (per 15A NCAC. 02T .01 14)10 Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-I6 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1 1893 Ductile Iron 8 1520 SDR-35 PVC SDR-35 PVC J68� SDR-35 PVC .5 w%4.l, 00 ➢ Section lI & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) Z Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable)— 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -. _ . 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. i If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 Ix. SETBACKS & SEPARATIONS — (02B .0200 & I5A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(o & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands (see item IX.2) 50 feet *"Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet AnX building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical)_36 inches 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. D ***Stream classifications can be identified using the Division's NC Surface Water Classifications webpage D If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ®Yes ❑ No ❑ N:A i See the Division's draft separation requirements for situations where separation cannot be meet > No variance is required if the alternative design criteria specified is utilized in design and construction D As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N:'A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permittin Branch 5. Does project comply with 15A NCAC 02T.0105 c 6 (additional permitslcertifications)? ® Yes [:]No Per I5A NCAC 02T.0_105(c)L], directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N'A > If yes, include an attachment with details for each line, including type (aerial Iine, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of X. CERTIFICATIONS: I. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance. -'Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and sunt)orting documents. 2. Professional Engineer's Certification: I, Z, (2-3 ¢% Zo UjC _ _ „ attest that this application for (Professional Engineer's name from Application Item Ill.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. _ North Carolina Professional Engineer's seal, signature, and date: .�`'-( , T O 1851 lo �lz�'' ................. .......`.��[sr.j .'r ii �t`'..,,......,,. 3. Applicant's Certification per 15A NCAC 02T .0106(b): I. "xi) E TZ-12, rpss 66-T-ic OW77'416 O 4M attest that this application for (Signature A(ithority's name & title from Application Item U.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE - In accordance with General Statutes 143-2I5.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: _, 9�� �� FORM: FTA 04-16 Page 5 of 5 IF - 4NVI R •,+� ' lL lei i mu S.0"Affinew(Wtw"W"M m 6trMO tmOdOraruwomawr�FFuxLwKm FumoL/nKlUAY.VMINAUUAARAMM UAL GVA M.r Y DMIMOFF Or LAM WAMMTA PKWM CA03UNA PiDom F Wou"A GmxmM*A "Mm 73AmLNFC 1LallT3 R01v�+vFt] arm PROJECT AREA #� SFr -x, .•}F Jr fir * Rf -41 �' F, b ' _ _ , '• �l F ,�,Iy� .r _� •.� . k . � ytt r Pam'"5 `i k{I S i I1 1 let . Y *.. r t f'T� M _f.Y •� I t j �- L .�W '�,',.']` � ��lS? �' 1� .: Yi.1 ���'.y� ••k ' yF �. A��. ` �� _ y —� _ .. � a. • +{ _� : _`� s �€`4'1{I y �� .,� . .111 y J L�S �i��M1i: • ��-11 1R7fIR Y wtwrw,Y.l 'r' - - ' � �.�. f ti 'I "� '� �Tl.' • w ^ � { �a•>! I�!yM� I��.M��rli...r��u�_r•��N�JIM .L - � ss ' �I , � yYr �,..��i .�tirY __ - l�MrrrY'L�F�i'J1.w y+SIl=:�.�a.,�es...d• •• ��,,_„�n�R. -- [.ar+•r��..Fnw '- �- ,ssn.wen.+wew,.Fl.ww�'fYL...... E _ FUOUAY-VARtNA, MC ,OF WATF9 State of North Carolina O� QG Department of Environment and Natural Resources r Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 06-13) Project Applicant Name: Town of Fu ua -Varina Project Name for which flow is being requested: Fu ua-Varina HS Renovation (private' More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the rortle of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Terrible Creek WWTP b. WWTP Facility Permit #: NCO066516 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used AlI lows are ill 3.000 0.638 1.353 0.001 1.992 66.4% cE�v �31019 U II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Pius (Name or Capacity,* (Firm.! pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 FTSE 06-13 Certification Statement: I Jay T. Meyers, P.E., Public Utilities certify to the best of my knowledge that the addition of Director the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. IA 2g Mart r 7 Date Page 2 of 6 hTSE 46-13 THE WOOTEN COMPANY ENGrNEENING PLANNING AHCHItECrNNe 120 North Boylan Avenue Raleigh NC 27603-1423 919 828.0531 lax 919.834 3589 TO: NCDEQ-Division of Water Resources Attn: Christyn Fertenbaugh 512 N. Salisbury St. Archdale Building, 91h Floor Raleigh, NC 27604 TRANSMITTAL Transmittal Sent Via- O ❑ Regular Mail ❑ FedEX!t�4 UPS — El Certified Mail ® CourieP" Q 3 2019 IZL s t/!J DATE: 4/3/2019 o.: 3153- RE: Fuquay-Varina High School Renovation Sewer Fast Track Application — Private Side Fuquay Varina, North Carolina WE ARE SENDING: ® Attached ❑ Under separate cover via the following items.- [] Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ❑ Other. COPIES DATE NO. DESCRIPTION o' 2 Sewer Fast Track Application Z M 2 FSTE 06-13 cal o � 2 Cover Letter '— 1 Check for $480,00 o Q 2 USGS Topographic Map and Aerial Map Q THESE ARE TRANSMITTED as checked below: ® For Approval ❑ Reviewed ❑ Revise and Resubmit ❑ For Your Use ❑ Rejected ❑ Submit Copies for Distribution ❑ As Requested ❑ Corrected ❑ Return Corrected Print ❑ For Review and Comment ❑ Other: ❑ For Bids Due [ ] ❑ Prints Returned after Loan to Us REMARKS: COPY TO: TWC file SIGNED: �oyy�� is Ivana Barham, E.I. If enclosures are not as noted, kindly notify us at once. Cashion, Ted From: Lester Lowe <Ilowe@thewootencompany.com> Sent: Thursday, May 09, 2019 4:15 PM To: Cashion, Ted Cc: Robinson, Jason Subject: RE: [External] RE: Fuquay-Varina High School Renovation application Importance: High erneii: —Do not dick?inky or open atta@Gmei n s unless yore verify, Send all suspicion aii as an attachmeflt to Ted As a follow up to your voice mail. The school is the applicant for the onsite /private side of the sewer collection system. They did the same thing for the other new High School in Fuquay Varina- Willow Spring HS as a private system as the applicant. The 6" and 4"sizes in the application are actually for the various building services and should have not been included for the gravity sewer to be permitted, my apologies... only the 8" DIP and PVC, which are the mains. I trust this information is sufficient for your final review. Let me know if you have any more questions Lester Lowe, P.E. Sr. Project Manager The Wooten Company 120 N. Boylan Avenue Raleigh, NC 27603 Main 919-828-0531 www.thewootencomDanv.com THE WOOTEN COMPANY From: Cashion, Ted [mailto:ted.cashion@ncdenr.gov] Sent: Thursday, May 09, 2019 12:44 PM To: Lester Lowe; Jay Meyers ameyers@fuquay-varina.org) Cc: Robinson, Jason Subject: RE: [External] RE: fuquay-Varina High School Renovation application Thanks Lester Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.eov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 rlo'lr- -.,E"o,..Nr. Depart Unt of Enrironmenmi G"hy Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the !North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Lester Lowe <Ilowe@thewootencompany.com> Sent: Thursday, May 09, 2019 12:12 PM To: Cashion, Ted <ted.cashion@ncdenr.gov>; Jay Meyers (jmeyers@fuquay-varina.org) <jmeyers@fuquay-varina.org> Cc: Robinson, Jason <jason.t.rbbinson@ncdenr.gov> Subject: [External] RE: Fuquay-Varina High School Renovation application Ted The downstream receiving sewer is an 8". Thanks Lester Lester Lowe, P.E. Sr. Project Manager The Wooten Company 120 N. Boylan Avenue Raleigh, NC 27603 Main 919-828-0531 Wake County Public School System Fuquay Varina High School Utility Allocation Request Calculations 03-27-19 THE WOOTEN COMPANY ENGINEERING PE AN N I N G Aq C N I t E C t U RE 120 13TO HGy613 Avenae RaINRI NC ZIE03 1423 915 8230531 lai 919 83a 3589 �CEIor� APR D 3 2019 1- New Sewer Allocation Basis by regulation: North Carolina 15A NCAC 2T Rules: 15 GPD I Student Ex Student Enrollment @ FVHS = 2,202 2,202 X 15 = 33,030 Gallons Per Day currently allocated Proposed Student Enrollment @ New FVHS = 2223 Net Increase in Students (2223-2202) = 21 21 x 15 = 315 Gallons Per Day additional flow allocation Page i of 1 mN NC Dept of Environmental Qual�tx April 3, 2019 APR I � 2019 Ms. Christyn Fertenbaugh, P.E. Raleigh Regional Officc THENCDEQ - Division of Water Resources WOOTEN Water Quality Permitting Section Wastewater Branch — PERCS Unit COMPANY 512 N. Salisbury St. �C Archdale Building, 9"' Floor iEFrItr� Raleigh, NC 27604 APR 03 2019 Re: Sewer Fast Track Application ---� Fuquay-Varina High School Renovation 201 Bengal Boulevard, Fuquay Varina, North Carolina Dear Ms. Fertenbaugh: On behalf of Wake County Board of Education, we are submitting one (1) original and one (1) copy of the following documents related to the above referenced project for your review and approval: • Application Fee ($480.00) • Sewer Fast -Track Application (FTA 04-16) • Cover Letter Narrative (see paragraph below) • FTSE 06-13 — Town of Fuquay-Varina • USGS Topographic Map showing proposed utilities • Aerial map showing general project area This project will install approximately 1,854 linear feet of 8" ductile iron pipe, approximately 1,520 linear feet of 8" PVC, approximately 648 linear foot of 6" PVC and approximately 160 Iinear feet of 4" PVC. The new sewer system is part of Fuquay-Varina High School Renovation. The existing system has been currently allocated 33,030 gallons per day. This flow permit application is for additional 315 gallons per day to accommodate the net increase of 21 students in future enrollment. The Wake Board of Education will own and maintain the proposed gravity sewer; however, the Town of Fuquay-Varina owns and operates the sewer 120 North Boylan Ave system this line will discharge to. We have received executed Flow Raleigh, NC 27503 Track ing/Acceptance from the Town of Fuquay-Varina. All new sewer 919.828.0531 fax 919.834,3589 Ty THE WOOTEN COMPANY 120 North Boylan Ave. Raleigh, NC 27603 919, 828.0531 fax 919 834.3589 improvements have been designed in accordance with the Town of Fuquay- Varina published standards and 15A NCAC 02T requirements. We trust the information provided is a complete submission and adequate for your review. If we can provide additional information or answer questions you may have, please feel free to contact us at (919) 828-0531 or email me directly at llowe _ tlie_wootencompany.com . Sincerely, THE WOOTEN COMPANY Lester Lowe, PE Project Manager Enclosures: as stated. cc: