HomeMy WebLinkAbout20050575 Ver 1_Complete File_20050406Permit Class b 'j C > 5 - Z 5 NEW C5ea _k? STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Permit Number 116-05 Coastal Resources Commission C r mi t D for JUL 2 5 2005 X Major Development in an Area of Environmental b?W rn pursuant to NCGS 113A-118 ?dZN031T FRB RANCH X Excavation and/or filling pursuant to NCGS 113-229 Issued to Victoria E. Paul, 590 Candy Field Road, Pantego, NC 27860 Authorizing development in Beaufort County at adi. Pungo River, SR 1722, Belhaven , as requested in the permittee's application dated 3/10/05, including the attached workplan drawing (1), dated 1/26/05 This permit, issued on ,1111y 15,2(1(15 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2008 Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Charles S. Jories, Director 'Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee VJ Victoria E. Paul ADDITIONAL CONDITIONS Permit #116-05 Page 2 of 3 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The authorized structure and associated activity shall not cause an unacceptable interference with navigation. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he/she abandons the : s permitted activity without having it transferred to a third party. 6) This permit shall not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Shoreline Stabilization 8) The bulkhead alignment shall be constructed along a straight line form the existing corners on the east and west side of the project property. 9) The bulkhead shall be constructed prior to any backfilling activities. 10) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 11) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation or other land disturbing activities is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 12) The backfill material shall be clean and free of any pollutants except in trace quantities. 13) The riprap shall not extend waterward more than 10 feet from the authorized bulkhead alignment at any point along its alignment at the time of construction. 14) The riprap material shall be free from loose dirt or any pollutant. It shall be of a size sufficient to prevent its movement from the site by wave or current action. 15) The riprap material shall consist of clean rock or masonry materials such as but not limited to granite, marl, or broken concrete. Y Victoria E. Paul Sedimentation and Erosion Control Permit #116-05 Page 3 of 3 16) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.) 17) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. General 18) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 19) All highground grading and construction shall be done in accordance with the attached workplan drawings. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that the rules of the Environmental Management Commission prohibit many non-water dependent activities within 50 feet of the normal water level. NOTE: The permittee and/or his contractor is urged to meet with a representative of the Division prior to project initiation. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3490 (DWQ Project No. 050575), which was issued on 515105. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. 200510785. 401 continents Subject: 401 comments From: Tom Steffens <Tom.Steffens@ncmail.net> Date: Mon,_ 02 May 2005 13:49:28 -0400 To: Cyndi Karoly <cyndi.karoly@ncmail.net> CC: Laurie Dennison <laurie.j.dennison@ncmail.net>, Debbie Edwards <debbie.edwards@ncmail.net>, Kyle Barnes <kyle.bames@ncmail.net> the folowing projects have been entered into fp5: 05-0563 Vancroft Section II, Vanrack Inc nwl4/nbr 6-Apr HOLD - Applicant needs to provide information on total buffer impacts and stormwater flow into the buffer. Site plans provided are unclear. ACE JD needed for pond impacts 05-0492 Clearwater Ventures-Goose Creek SID nw14 5-Apr HOLD- applicant needs to provide copy of signed wetland plat from USAGE, and supporting data for riparian buffer impacts ...ie; variance app or approval. 05-0575 Victoria E. Paul dcm 4-Apr Issue.n/c 05-0529 Robert and Janet Knight dcm 24-Mar HOLD- applicant needs to justify need for offshore sills, given rip rap shoreline, No SAV study included with application.(required) Water depths submitted w/application need verification with actual survey. 1 of 1 5/3/2005 9:27 AM O?O? W AT ?RQG W r D o - -c Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources May 5, 2005 Ms. Victoria E. Paul 590 Candy Field Road Pantego, NC, 27860 Subject Property: Off SR1722 on the west side of the Pungo River Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 05-0575 Beaufort County Approval of 401 Water Quality Certification (GC3490) with Additional Conditions Dear Ms. Paul: You have our approval, in accordance with the attached conditions, to dredge, place fill material within or otherwise impact by shading 0.10 acres of waters and/or wetlands to construct a bulkhead with riprap, pier and boatlift as described in your application received by the Division of Water Quality (DWQ) Wetlands/401 Unit on April 6, 2005. After reviewing your application, we have determined that the Division of Water Quality (DWQ) General Water Quality Certification Number 3490 covers these water impacts. This Certification allows you to General Permit No. 198000291 when issued by the US Army Corps of Engineers (USACE). In addition, you should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations and CAMA. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference 404/CAMA Wetlands 0.10 (acres) DCIM Field Investigation Report 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-6893 / Internet http://h2o.enr.state.nc.us/ncwetlands None Carolina Ntirrallif Victoria E. Paul Page 2 of 2 May 5, 2005 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 3. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification (GC) 3490. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative $earings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919- 733-9721 or Tom Steffens in the DWQ Washington Regional Office at 252-946-6481. Sincerely, cr-?'-A 'Iao? Alan W. Klimek, P.E. AWK/cbk Enclosures: GC 3490 Certification of Completion cc: Doug Huggett, DCM USACE Washington Regulatory Field Office DWQ Washington Regional Office File Copy Central Files Jerol Selby, 5724 Sidney Road, Belhaven, NC, 27810 Filename: 050575 Paul(Beaufort)401 MEMORANDUM TO: John Dorney Non-Discharge Branch SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Victoria E Paul Project Number 05 0575 Recvd From APP Received Date 4/6/05 Project Type Bulkhead Regional Contact: tom steffens/Barnes WQ Supervisor: al hndgp Date: County Beaurfort County2 Region Certificates Stream Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. CAMA ? O Y O N ? 29-34-(12) SA NSW 30,307. O v O N F-- F_-F__F__ I-- F__ Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y 0 N Recommendation: 0 Issue 0 Issue/Coed 0 Deny Provided by Region: Latitude (ddmmss) 352909 Longitude (ddmmss) 763647 Comments: Issue n/c Recvd By Region cc: Regional Office Page Number 1 Central Office d? CDAS7q??,? 0' 0 7 North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary MEMORANDUM TO: Ms. Cyndi Karoly Division of Water Quality Wetlands Unit r ` 1 FROM: Doug Huggett r` Major Permits Processing Coordinator DATE: 4 April 2005 SUBJECT: CAMA and Dredge & Fill Application Review APPLICANT: Victoria E. Paul By Jerol Selby, Agent 5724 Sidney Road Belhaven, NC 27810 PROJECT LOCATION: Beaufort County PROPOSED PROJECT: Applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment ±25' waterward of the normal water level (NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6' x 200' pier with a 16'x 20'platform and a 4'x 36' finger pier around a 16'x 16' boat lift. Please indicate below your position or viewpoint on the proposed project and return this form by 25 April 2005. Please contact David W. Moye, at 252-948-3952, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-6481 1 FAX: 252-948-0478 1 Internet: www.nccoastalmanagement.neY An Equal Opportunity 1 Affirmative Action Employer- 50% Recycled 110% Post Consumer Paper One No liCarolina ,Yatimally DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 2 3. APPLICANT'S NAME: Victoria E. Paul LOCATION OF PROJECT SITE: Off SR 1722, on the west side of the Pungo River, below Belhaven, at the residential subdivision locally referred to as Ellis Cove, in Beaufort County, North Carolina Photo Index - 2000: 108-1266; H-10 1995: 108-1145; G-7; 1989: 2-96-5; Q-12 State Plane Coordinates - X: 2,709,400 Y: 641,000 Pamlico Beach Quad. (upper left corner) INVESTIGATION TYPE: CAMA and D/F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit- 3/23/05 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 3/23/05 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP - Limited Transition (uplands) (B) AEC(s) Involved: EW, PTA, ES, PTS (D) Water Dependent: YES (D) Intended Use: Private (E) Wastewater Treatment: Existing - None Planned - None at this time (F) Type of Structures: Existing - Undeveloped lot Planned - Bulkhead, riprap, and pier (G) Estimated Annual Rate of Erosion: Unknown 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non-Vegetated Wetlands 3,000 ft2 1,544 ft2 (shaded) Pun go River bottom (C) Other Uplands (D) Total Area Disturbed: 0.1 acre or 4,544 ft2 (E) Primary Nursery Area: No (F) Water Classification: SB NSW Open: Yes 8. PROJECT SUMMARY: The applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment±25' waterward of the normal water level (NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6'x 200' pier with a 16'x 20'platform and a 4'x 36' finger pier around a 16'x 16' boat lift. Victoria E. Paul Pungo River Beaufort County Project Setting The project site is located off SR 1722 on the west side of the Pungo River below Belhaven at the residential subdivision locally referred to as Ellis Cove in Beaufort County, North Carolina. The project site is a wooded undeveloped 0.39 -acre residential lot with ±120' of natural shoreline with no man made shoreline stabilization i.e. bulkhead or rip rap. The lot is vegetated primarily with various large oaks, loblolly pines and red maple trees. The under story consist of various vines and shrubs. There is a ±5' high erosion escarpment that transitions to a sandy estuarine beach at the normal water level (NWL). Both adjacent waterfront properties are developed with single-family residences. The developed property downstream of the project site has a ±150' long pier. The shorelines on adjacent properties are stabilized with bulkheads. The bulkhead return wall on the downstream side is 30' long while the bulkhead return wall on the upstream side is 20' long. Water depths offshore are shallow with a sandy bottom substrate. Water depths are approximately 2.5' 200' offshore the NWL and 8" to 12" between the bulkheads on adjoining lots. The presence of submerged aquatic vegetation (SAV) was not observed at or near the project area although this observation was made recently during a dormant period for SAVgrowth. The Pungo River at this location is designated as SB NSW by the Environmental Commission, Coastal Waters by the Division of Marine fisheries and is open to shell fishing. Project Description The applicant proposes to construct a bulkhead from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment ±25' waterward of the NWL. The maximum distance between the proposed bulkhead and the NWL is ±30'. The proposed bulkhead will be backfilled to the ±5' high erosion escarpment. The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. The applicant also proposes to construct a 6' x 200' pier with a 16' x 20' T-head platform, and a 4' x 36' finger pier around a 16' x 16' boat lift. Project Impacts The project as proposed will result in the filling of ±3,000 ft2of shallow water habitat in the Pungo River. The There will be some short-term localized turbidity associated with the construction activities. Steve Trowell - Washington Regional Office - 23 March 2005 SELBY LAND CONCEPTS 5724 Sidney Road Belhaven, NC 27810 252-964-4171 / FAX 252-964-4686 March 11, 2005 N. C. Dept. of Environment and Natural Resources 943 Washington Square Mall Washington, NC 27889 Attention: Steve Trowell Reference: Victoria E. Paul Woodstock Pt. Sub-Division Dear Mr. Trowell: Enclosed is a Major CAMA Dredge and Fill Permit Application for the construction of a wooden bulkhead and rip rap on site on an undeveloped residential lot owed by Victoria E. Paul located off SR 1722 at Woodstock Pt. Sub-Division on the Pungo River near Belhaven in Beaufort County, North Carolina. The bulkhead project will be to construct the proposed bulkhead in a straight line from the corners of bulkhead on adjoining properties. The bulkhead alignment will average + - 25 ft. waterward of the normal water level. Dragline mats will be used to facilitate the movement of a trac hoe while driving the bulkhead sheets. The rip rap is to be placed once the bulkhead is constructed. Rip rap is proposed to be placed at a 2'/1' slope with an average alignment of 10 ft. waterward of proposed bulkhead. The area landward of the proposed bulkhead will be backfilled to the + - 5 ft. high erosion escarpement. The area will then be planted with typical yard grass such as Centipede and or St. Augustine. Also proposed is a 6 ft. x 200 ft. pier with a 20 ft. x 16 ft. T-Head platform, 4 ft. x 36 ft. finger pier around a 13 ft. x 13 ft. boat lift. The application package has been sent certified mail return receipt requested to the adjacent landowners. The required signed green cards will be submitted to your office when received by me. Sincerely, 7- L ' Jerol Selby Form DCM-M1P-1 Ar.ic L AcCA7rRON (To be completed by all applicants) 1. APPLICANT a. Landowner: b. City, town, community or landmark P c, I I?? Ud_ ?-, c. Street address or secondary road number S1? 1'7.77,2- Name V )'G-62 r Ct_. C, ?Q la Address _6-q pa a ndC r1,C.1(j e??d o -J City an c State G Zip 2 U Day Phone Fax b. Authorized Agent: Name G? }? V cJ I Address 5 22 City ho. Ge r) State ?V Zip 2 -7 Day Phone 252 -064 _41-7 Fax Z - - L (p 6(,o 1 c. Project name (if any) NOTE: Perrrat will be issued in name of landowner(s), mid/or project name. 2. LOCATION OF PROPOSED PROJECT ' a. County ' -Bea P.4.-' ov? d. Is proposed work within city jurisdiction? Yes 1' is or planning No e. Name of body of water nearest roject (e.g. river, creek, sound, bay) !nQ Q ,i U ' ii' 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or fillip activities. (inn 'fir tk Ct d 1 [go ? c: 4r- o ,-)i- Off- cq t b. Is the proposed activity maintenance of an existing project, new work, or both? N e,t y woe k c. Will the pro,' be for public, private or commercial use? 7'r 1, U n , &?- d. Give a brief description of purpose, use, methods of construction and daily. operations of proposed project. If more space is needed, please attach additional pages. L' O ?f Y (A . . Grp5s -H &, P6 c gad, Y rL--? ct, p Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract . UI a rP b. Size of individual lot(s) Lai- Approximate el vation of tract above MHW or NWL ?5 - -1-0 d. Soil type(s) and texture(s) of tract S C? n c,t (? tx.,?t e. Vegetation on tract 11'?f 1?? ?1?. 5 n1d S hru_bs? f. Man-made features now on tract IV Q N F g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) Conservation Developed Rural V Transitional Community Other h. How is the tract zoned by local government? rlr. -t- z6)ned i. Is the proposed project consistent with the applicable zoning? Yes No (Attach zoning compliance certificate, if applicable) [VIA j• Has a professional done for the tract? If yes, by whom?. k.. Is the project located in a National Registered Historic District or does it involve a National Register listed or eli ' le property? Yes No / 1. Are there wetlands on the site? Yes v No Coastal (marsh) Other If yes, has a delineation been conducted? (Attach documentation, if available) archaeological assessment been Yes No m. Describe existing wastewater treatment facilities. 0 n a e-- n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) 6u y-4&c%. (? n 1- 0 o. Describe existing drinking water supply source. 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. 10 An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. A Stormwater Certification, if one is necessary. © A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by testified mail. Such landowners must be advised that they have 30 daystin which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Y 5 Address J PQ 6? Q Y_ 169 q:2 ° n N .7W9 Phone 250- c p- 5 4 5 q Name -T_h o trr S . 4=1 I,( m v'? Address ti o(o e nP -+ "tr) rhn ra ,. NC' 978?4;, Phone Z s_ - P-;t 3 -- RAJ 4? 3 Name Address Phone A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the U day of ? Print Name -YI 0 'G 1-43 Signature wncr or Aphorized Agau Please indicate attachments pertaining to your proposed project. ZDCM MP-2 _ DCM MP-3 _ DCM MP-4 _ DCM MP-5 _ DCM MP-6 Excavation and Fill Information Upland Development Structures Information Bridges and Culverts Marina Development NOTE: Please sign and dare each attachment in the space provided at the bottom of each form. Form DCM-MP-2. IE?YCAA7Cff ON AND FILL (Except bridges and culvwts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Average Final Existing Project Length Width Depth Depth Access channel (MLW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilization) Revised 03195 1. EXCAVATION A- a. Amount of material to be excavated from below MHW or NWL in cubic yards A10 n P, b. Type of material to be excavated _ Afntl e? c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? Yes ? No d. Highground excavation in cubic yards N6h f- 2. DISPOSAL OF EXCAVATED MATERIAL N / A- a. Location of disposal area b. Dimensions of disposal area _P/./ A- c. Do you claim title to disposal area? d J A Yes No if no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? Yes No g r A If yes, where? Form DCM-MP-2 e. Does the.disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes No NIA- f. Does the disposal include any area in the water? Yes No 3. SHORELINE STABILIZATION a. Type of shoreline stabilizat'on ? Bulkhead Riprap b. Length 101 D" 4 c. Average distance waterward of MHW or NWL d. Maximum distance waterward of MHW or NWL e. Shoreline erosion during preceding 12 months (Source of information) f. Type of bulkhead or riprap material g. Amount of fill in cubic yards to be placed below water level` C1 (1) Riprap (2) Bulkhead backfill I I I h. Type of fill material ?;Gl hrl M) 4 114 i. Source fill material C r7? 6 - PET /hill ed b/? .ti d 1'h t` n - L-(:) ,l 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) N1? a. Will fill material be brought to site? Yes No If yes-, (1) Amount of material to be placed in. the water (2) Dimensions of fil area (3) Purpose of fill A b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? Yes No N/ If yes, (1) Dimensions of fill area IVfN (2) Purpose of fill NZA 5. GENERAL. a. How will excavated or fill material be kept on site and erosion co trolled? H kh yc-tt (?on;f?uC?c'a 13P ' re, ' It r` S' n lar?? ,.. Slo,?,. Phrp ri r)toegSgArUy b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? !JDU CYI to IYLt(°'?s C.. Will wetlands be crassed in transpgkting equipment to project site? Yes L,- No if yes, explain steps that will be taken to lessen environmental impacts. uate 400 copies of this public document were printed at a total cost of $11.00 or $ .03 per copy. Revised 03/95 Form DCAi-MP-4 S(Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/o Pier(s (1) _ Commercial -Community Private (2) Number l (3) a 0?' Length (4) (5) Width Co ' Finger Piers Yes No (i) Number (ii) Length 3 fo (iii) Width (6) Platform(s) Yes No (i) Number I (ii) Length ) (0 (iii) Width D ' (7) Number of slips proposed (8) Proximity of structure to adjacent riparian property lines .- 3 0 (9) Width of water body oZ -7Cbi?I e S (10) Water depth at waterward end of pier at MLW or NWL ? , S b. Boath ouse (including covered lifts) (1) Commercial Private (2) Length (3) Width c. Groin (e.g. wood, sheetpile, etc.) (1) Number (2) Length(s) d? A- d. Breakwater (e.g. wood, sheetpile, etc.) I/ f 4 (1) Length / (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands e. Mooring buoys I IA (1) _ Commercial -Community _ Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline f. Mooring structure oatlift mooring pilings, ems) (1) _ Commercial -Community ?Private (2) Number (3) Length l.3 ' (4) Width 13 g. Other (Give complete description) 91A Applica r Project e ?,? j ure Date uo.,c?o,? nzioc 264 ama ermi a 16; \unual seater depth 2.5' . o s an 1709 o s r 4, 'R 16;~p for ~,o~ T -S, • 1C Orla aU X Normal Neater depth 2.0' °s Woodstock Point Subdivision ~~Ux wo ~ ~ Bath Townshi Beaufort Count NC p~ Y~ a v e Ihaven~ ~o Proposed new pier z Drawn =1126/2005 ~ •v X \mmal tlatcrdepth 1.5' " B = B ant Hardison PLS Y Scale : 1" = 40' 177g Set Iron Pipe O y existing rip rap ~ ~ 6 Of0 (753 e ~ / ~ ~/1 / ~ n~x~ ~ ~ ~ i c9 PungoRiver .x ` ~ j/ i, s i ~ Surveyor s Notes 0 0 ~ , f, x X \orYnal iratcrdcpti; 7.U' Proposed new bulkhead j All Distances are horizontal round. 2„ ~ ti a~;,. ~ f d Prop g A. ~ , 8,~ ~a ~ ~ ~ f ~ ; ~~-,5 Area by coordinate computatlons. a~ ~P~ ~ , ~ Slte ~ ~ ~ / 1722 ' 70 Subject to all easements, zoning regulations, or restrictive covenants of f / ~ `f;. , ro. ~ ~ record, ~ ~ , x~/ i , / Set Iron Pipe j~ ~ ~ , , ;7;~ ~ ^ " SetlronPipe o,39 Acres z_ 9~x~ From Point of Beginning 71'. 123 Bearing Distance ~~o S 46°38'25" W ~ 2A, ~0~ 390.70 ~y j ~ Ex. stake S 50°48' 40" W 485.11 ' ~o ~p 0~ 00 S 74 34 10 W 295.19' ro ~ ~ ~a o~~ ~ ~ N 82°27'05" W 362.02' D~ Q S 19°32'35" W 1485.28' Location Sketch To SR 1722 Woodstock Road Ex. Iron Pipe Ex. Iron Stake 200' total length roec i e ro ie i ti' Drawn= _ ar ison tt_ t ca e - Boat lift section Pier ical section Bulkhead / Backfill section Ex. Iron Pipe Proposed new Point of Beginning Mean ground level Salt treated bulkhead Ri Ra 2'/l' slo a Proposed new pier P P P 22t proposed grade 1' \ 2.. 5, ~ ~ ~ `Ar ba 1 3'6" ~ / 4' NWL ~ 1' 2' 21 8' 4' 4' 4' Average 25' 10' 14" 14" 8' 8' piling piling Bulkhead