Loading...
HomeMy WebLinkAbout20190062 Ver 1_More Info Received_20190419gv WETLANDS .�. & WATERS Mr. David Bailey US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 RE: SAW -2018-01856 Verona Subdivision Request for Additional Information — 2 Burlington, Guilford County Mr. Bailey and Ms. Homewood, Ms. Sue Homewood NC Division of Water Resources Winston Salem Regional Office 450 W. Hanes Mill Rd. Suite 300 Winston Salem, NC 27105 April 191h, 2019 Below is a response to the request for additional information for the project referenced above. Included is the original request, along with a response to each question, including responses from the project engineer (in bold) where applicable. Supporting information and modified plans have been included as attachments as necessary. 1a. The Corps appreciates your efforts to reduce wetland impacts. However, direct wetland impacts are still proposed for Lots 29, 71, and 72, with no indication of efforts to avoid or minimize impacts to Wetland Area 3 as required by NWP General Conditions 23(a) and (b); The applicant continues to contend that all practicable avoidance and minimization for the entire project site has been demonstrated, and cannot redesign this area to avoid impacts without the loss of these three lots. Trying to redesign the site to reduce impact to wetland number 3 is impractical due to insuring we can have fire access. Per the 2018 International Fire Code, Appendix D Fire Apparatus Access Roads, Section D107 we are required to have two separate and approved access roads to more than 30 lots. A redesign to avoid the area is impractical. If we stop the Gooseberry Drive at the wetlands, it will have 40 lots accessed by Old Cedar Lane and by the fire code only 30 are allowed. There are no other reasonable access points to replace Gooseberry Drive connection. This would be a major redesign the plans were to be changed at this point. Given the low quality of this wetland area as indicated by NC WAM, the applicant contends that the proposed compensatory mitigation is a suitable method of minimizing overall impacts to aquatic resources. 1b. The Corps recognizes your efforts to incorporate retaining walls into upland areas in Lots 103-106 in order to avoid direct wetland impacts. As you did for Lot 53, please show the retaining wall location for these Lots of the plan sheets, No walls are necessary to avoid wetlands on lots 103 to 106. Limits of disturbance have been indicated on the plan sheets, and appropriate erosion control measures will be employed such that materials incidental to grading activities are not transported into the wetland limits. 1c. It is unclear how the bypass offsite storm sewer outfall will retain hydrology to the remainder of Wetland Area 2 such that it will remain jurisdictional after Lot development. Given that the outlet is down -gradient of the portion of Wetland Area 2 between Lots 57 and 103, it is apparent that this area CHRISTOPHER HUYSMAN 1 70 DEW DROP ROAD SPAPTA, NC 2B675 336.406.0906 CHPIS.HUYSMAN@GMAIL.COM WETLAND'S &c WATER'S, INC. TAMP BANDY 41 DB LB PPOPST DRIVE CONOVEP, NC 2B61 3 B2B.302.3437 JTAMPBANDY@GMAIL.COM would become an indirect wetland impact by removal of hydrologic input once the proposed up -gradient road in constructed, The applicant concedes that it is possible this area could become an indirect wetland impact as a result of less hydrologic input, yet a re -design is impractical for a number of reasons: If the pipe is relocated to the upstream portion wetland 2 it will require raising the road grade and result in an additional wetland disturbance of 1200 sf. Further, raising the road at this point would cause a major redesign. The site is balanced at this point and raising the Old Cedar Road would resort in a shortage of dirt and cause grade revisions in another portion of the site to balance. Sewer in the area is already 13 foot deep and can't be raised. If the grade of the road is raised this issue will only worsen. Storm pipes will have to be adjusted and redesigned. Plans have already been submitted to the City and are under review; this will cause added delay to the approval process. In light of these reasons, the applicant contends that a re -design is not practical and thus proposes to compensate for these potential indirect impacts via purchase of additional 0.2 acres of wetland mitigation credits. The area with potential to be impacted is shown on plan page W2, and is approximately 0.2 acres. Given the low quality of this feature as determined by NC WAM and the speculative nature of this impact, a 1:1 ratio is proposed. 6. Has a delineation of potential waters of the US been completed in the project area of the proposed 40' bore under the continuation of Stream T1 (outside of the PJD Review Area)? Given the extent of wetlands on the reminder of the site, it is likely that wetlands occur adjacent to this portion of Stream T1 as well, extending beyond a 40' bore length. The some concerns goes for the proposed temporary impact area at Back Creek near the tie-in with the existing sewer. Please provide information on how you determined the extent of potential waters of the US in these areas. If no on-site delineation was conducted, please do so and provide the relevant information for the Corps' evaluation. A delineation of the proposed off-site sewer easements has been completed, with the results shown on the revised Approximate Depiction of Aquatic Resources. At the proposed bore location of the continuation of stream T1, there is a small abutting wetland approximately 10' wide containing indicators of hydric soils and vegetation, including Juncus effusus. A profile of the non -impact sewer crossing has been added to sheet W9. The approximate limits of this wetland feature are shown on this page. Both adjacent bore locations on either side of this tributary occur well outside the wetland limits and contain non -hydric soils. There are no wetlands adjacent to Back Creek within the proposed sewer easement, and this easement occurs in an already managed roadway and utility right-of-way. Photos depicting these two areas are included. Please do not hesitate to let me know if you have any questions about the provided information. Best regards, Perry Isner 704.773.4239 CHRISTOPHER HUYSMAN WETLANDS & WATERS, INC. TAMP BANDY 1 70 DEW DROP ROAD 41 CG LB PROPST DRIVE SPARTA, NO 25675 CONOVER, NO 2561 3 336.406.0906 525.302.3437 CHRIS. H UYSMAN@�GMAIL. COM JTAMPBAN DY(2)�GMAIL. COM Enclosures CC via email Revised Permit Plan Drawings Revised Approximate Depiction of Aquatic Resources Olivia Munzer, NC Wildlife Resources Commission Greg Davidson, Eastwood Homes CHRISTOPHER HUYSMAN WETLANDS & WATERS, INC. TAMP BANDY 1 70 DEW DROP ROAD 41 CB LB PROPST DRIVE SPARTA, NO 28675 CONOVER, NO 2861 3 336.406.0906 626.302.3437 CHRIS. H UYSMAN@�GMAIL. COM JTAMPBAN DY(2)�GMAIL. COM 5TREAM5 > PERENNIAL DELINEATION EMBIT 5TREAM NO. I 4Q1 LR BUFFER ZONE I 32,666 5F BUFFER ZONE 2 23,360 5F TOTAL BUFFER AREA 5b,026 5F 5TREAM NO.2 135 LE BUFFER ZONE 1 5,103 5F BUFFER ZONE 2 4.1015E TOTAL BUFFER AREA 10,404 5F WETLAND5 TOTAL WETLAND AREA 66,189 ± 5F LEGEND 5TREAM/POND BUFFER ZONE TOTAL 51TE AREA: 46.55 AGt 7 50BU�M w 5QBUFF AM 6ZONE 2 ZONE 1 NjZONE I ZONE 2 Ti T-iii-iT-iii�ii-iiii-iii�11- 1 -1ll�11.,,J1-lli- 5TREAM BUFFER — TYPICAL 5EGTION NOT TO 5GALE ZONE I MU5T REMAIN NATURAL AND UNDI5TURBED. ZONE 2 MAY BE D15TURBED BUT MU5T BE REVEGETATED. ALL BUFFER DIMEN51ON5 ARE FROM 5TREAM BANK, TOP OF 5LOPE, OR EDGE OF GONTI60005 YETLAND5 (WHICHEVER PRODUGE5 A GREATER BUFFER). ml U.5. ROUTE 7 VICINITY MAP N. T. 5. RYEW ODI DRI1\1E' I .�` > SHEET h-1 DELINEATION EMBIT SHEET h-2 IMPAG75 EAET I �� a MUN SHEET 144 PROFILES SHEET W3 DETAILS SHEET W-6 TEMPORARY IMPACTS SNS f N-1 WILAND IWAGTS -J--- 3`P I I PLAN L15T I �, SHEET h-1 DELINEATION EMBIT SHEET h-2 IMPAG75 EAET I �� SHEET W3 PROFILES SHEET 144 PROFILES SHEET W3 DETAILS SHEET W-6 TEMPORARY IMPACTS SNS f N-1 WILAND IWAGTS FARM VIEW, DR. -, -Fj ■CtM17,. LI c S rt, 1 0 b.. 11 2-M-2-11 P76 218E E 14C 174201882 It 335 011 331 S 3-1. R'eb bown ,�nde cl.v IEX 24" Irw n I� �� I I I I I I 30' UND15TURBm r II FRD FlT. 20' MANAGED a3 1 I I FARM VIEW, DR. -, -Fj ■CtM17,. LI c S rt, 1 0 b.. 11 2-M-2-11 P76 218E E 14C 174201882 It 335 011 331 S 3-1. R'eb bown ,�nde cl.v IEX 24" Irw n I� �� J STIr-r 1311 30' UND15TURBm r II FRD FlT. 20' MANAGED a3 / O O J O Z RE51DUAL LAND p m ; \� NOT PART OF ❑ a Z o 51BDIV1510N \ \ p[ =o �s, j I o N w x a, Lu ,— U > _ &arm 0D 6W SV FORKS ROAD, SUITE 100 RAU*K NO 276E � w1v,56-6208 i GRAM W. HA DATE. 12-20-2016 REmor. 2-2S-Iq- GOMMENT5 T17E EXHIBIT 5TREAM BUIFFER5 6RAPH1G56ALE p $ WETLAND5 FILE N0,M--p-0WL-*CW 0 100' 200' 400' 600' DRAHW 9CALE. N 2W RAN 51ffT N0. I 1 " = 200' now IMPACT5141 LF IMPAGT5 (PERMANT) 141 L� 23 LF IMPAGT5 (TEMPOARY) WI JA WLW AREA 8,116 5F1 Approximate limits . 1 potential � � � * it --: ►. • -. ; 4 �_ - _ • y impacts -8389 sf L r \\\ / 1 _ 1 p � �NII MCM, WIWI' 21n LF IWACT RE51DUAL LAND WT PART OF Ig r ■ r---,. - _ � ., � ����� o,.� � ` �\� \. 1. ' Lw ---g' 6L STIFEM #1 W'Mi 114 LF D lip, D ° p �.� 4 4 4 4 0 4 E7 � ►� r h* � II.. q ®OAF . • • r • • • r III / v. - -- 1 it -- r Of - lip II PROMCT. "71 11882 C -b- NC 2-4101882 z oQo Q U 0 C�' J z J Ck O " Q Z CD ,c = 1! J J N LU > o w OMRRIDBVRDFM Uarym 6W SM FORKS ROAD. SUITE 100 RALEICN. NG MIS (919)158-8" DRAW W. MA DATE. 12-20-2016 REv1810Nz 2-28-19- GOMMENT5 41-19- GOMMENT5 T17E IMPAGT5 EXHIBIT 5TREAM, BUFFER5 $ WETLAND5 RIP N0.EASTW0OVW-1O-M1RL ,*-W 75 DRA" SCAU. P=100' RAN 51ffT N0. N2 605TRUGTION 5EQUENGE I. NO GON5TRUGTION TO BEGIN UNTIL ALL NEGE55ARY 51TE DEVELOPMENT PERMIT5 ARE OBTAINED (INGLUDIN6 A GRADING PERMIT FROM NGDEQ). 2. FOLLOW THE APPROVED ER05ION GONTOL PLAN AND 5EQUENGE IN ORDER TO CLEAR AND 6RADE THE SITE. 3. IN5TALL 51LT FENCE ALONG THE LIMITS OF 015TURBANGE WITHIN THE IMPACT AREA. 4. EN5URE THAT A COFFER DAM AND PUMP AROUND 15 IN5TALLED TO DIRECT RUN—OFF DRAINAGE FROM THE WETLAND5 THROUGH THE 51TE. 5. COFFER DAM AND PUMP AROUND MUST BE LEFT IN PLACE UNTIL NEW 48" RGP 5TORM SEWER PIPE5 ARE IN5TALLED. 5EE DETAIL ON SHEET W-4. 6. GRADE 51TE SUFFICIENT TO ALLOW FOR THE INSTALLATION OF THE PROP05ED 48" RGP 5TORM SEWER UNDER PROP05ED ROAD. 1. CONTRACTOR TO FOLLOW THE DETAIL5 OF THE APPROVED ER05ION CONTROL PLAN TO EN5URE THAT NO OFF-51TE 5EDIMENTATION OGGUR5 DURIN6 GON5TRUGTION. 8. 51TE 5HALL BE 5TABILIZED IN A TIMELY MANNER A5 PER THE REQUIREMENT5 OF THE APPROVED ER05ION CONTROL PLAN AND THE APPLICABLE NGDENR 5TANDARD5 AND REC7ULATION5. 625 620 615 0+00 0+50 5GALE I"= 40' HORIZONTAL I" = 4' VERTIGAL X. GRADE RIP -RAP PAD 7 1+00 BUFFER IMPA05NARRATIVE 42 5TORM 5EWER PIPES TO BE GON5TRUGTED FIR5T A5 PER THE Eno . n p r ZONE I – 5,846 5F GON5TRUGTION 5EQUENGE ON THI5 PLAN AND/OR A5 PER ANY SUBSEQUENTLY Planar ZONE 2– 3,804 5F APPROVED 6RADINWER0510N CONTROL PLAN. THE INTENT OF THI5 PLAN s ,r 15 TO PROVIDE ADEQUATE GON5TRUGTION NOTE5 AND DETAIL5 5UGH THAT THE CONTRACTOR GAN ALLOW THE EXI5TIN6 DRAINAGE THAT RUN5 FROM s o r u n, ' wade —d A" a `` s ' F . A '�w�," 121r.,l��"b NORTH TO SOUTH ALONG THE STREAM TO CONTINUE TO FLOWTHROUGH THE ,d�.,rtom.14p�1.2,�� 1'06ox 21882 C,,—b—, 141 174210 1881 SITE UNTIL THE NEW 5TORM SEWER 15 IN–PLACE AND FUNCTIONAL. %nn 6 -0471 `"-27S-3, q GRAPHIC 56ALE 0 15' 30' 60' q0' I"=30' FRD.FlT. S z ROAD ca o U 6 0 o, J } Ow V I 2' z J O M � � z ROP. 6RA E 2 9 F0�42u 6/ 3, G�® 2.6,% Q C-4 1! J J RIP WP TO BE EMBED ED INTO N THE D 15TINC7 5TREAM D 5EE DETAIL 5HEET WB o 0+00 0+50 5GALE I"= 40' HORIZONTAL I" = 4' VERTIGAL X. GRADE RIP -RAP PAD 7 1+00 BUFFER IMPA05NARRATIVE 42 5TORM 5EWER PIPES TO BE GON5TRUGTED FIR5T A5 PER THE Eno . n p r ZONE I – 5,846 5F GON5TRUGTION 5EQUENGE ON THI5 PLAN AND/OR A5 PER ANY SUBSEQUENTLY Planar ZONE 2– 3,804 5F APPROVED 6RADINWER0510N CONTROL PLAN. THE INTENT OF THI5 PLAN s ,r 15 TO PROVIDE ADEQUATE GON5TRUGTION NOTE5 AND DETAIL5 5UGH THAT THE CONTRACTOR GAN ALLOW THE EXI5TIN6 DRAINAGE THAT RUN5 FROM s o r u n, ' wade —d A" a `` s ' F . A '�w�," 121r.,l��"b NORTH TO SOUTH ALONG THE STREAM TO CONTINUE TO FLOWTHROUGH THE ,d�.,rtom.14p�1.2,�� 1'06ox 21882 C,,—b—, 141 174210 1881 SITE UNTIL THE NEW 5TORM SEWER 15 IN–PLACE AND FUNCTIONAL. %nn 6 -0471 `"-27S-3, q GRAPHIC 56ALE 0 15' 30' 60' q0' I"=30' FRD.FlT. z O ca o U 6 0 o, J } QO O 2' z J O M � � z � 2 Q C-4 1! J J LJ � N Lu i o w OmIlERIOPYRDRm ublym 66D151X FORKS ROAD, SUITE 100 RALEKN, NO 2766 (919)756-6206 DRAW W. ,M1 DATE. 12-12-2016 REV51QYz 2-28—l9— CAMMENT5 T17E IMPAGT5 EXHIBIT 5TREAM, BUFFER5 WETLANDS RIP ND.EA57WDOD'OM'_70-BURL_NETM DRAIN6 SCA.E. N 40 "%M N0. W3 BUFFER I MPAGT5 ZONE I - q50 5F ZONE 2- 2,lgS 5F (IN( SCM DAM) z O l a N `fl z CV O ca O w w 0 c� J 620 2 z J EX. 26.01 LE OF 24" RrIp ®3.5% 615 511 mo 6051 1 1 0+00 0+50 5GALE I"= 40' HORIZONTAL I" = 4' VERTIGAL 605TRUOION 5EQUENGE I. NO CONSTRUCTION TO BEC71N UNTIL ALL NECESSARY 51TE DEVELOPMENT PERMITS ARE OBTAINED (INGLUDIN6 A 6RADIN6 PERMIT FROM NGDEQ). 2. FOLLOW THE APPROVED EROSION GONTOL PLAN AND SEQUENCE IN ORDER TO CLEAR AND GRADE THE SITE. 3. INSTALL SILT FENCE ALON6 THE LIMITS OF DISTURBANCE WITHIN THE IMPACT AREA. 4. ENSURE THAT A COFFER DAM AND PUMP AROUND 15 INSTALLED TO DIRECT RUN-OFF DRAINAGE FROM THE WETLANDS THROUGH THE SITE. 5. COFFER DAM AND PUMP AROUND MUST BE LEFT IN PLACE UNTIL NEW 24" RGP STORM SEWER PIPES ARE INSTALLED. SEE DETAIL ON SHEET W-5. 6. 6RADE 51TE SUFFICIENT TO ALLOW FOR THE INSTALLATION OF THE PROPOSED 24" RGP STORM SEHER UNDER PROP05ED ROAD. 1. CONTRACTOR TO FOLLOW THE DETAILS OF THE APPROVED EROSION CONTROL PLAN TO ENSURE THAT NO OFF-51TE SEDIMENTATION OCCURS DURING CONSTRUCTION. 8. 51TE SHALL BE STABILIZED IN A TIMELY MANNER A5 PER THE REQUIREMENTS OF THE APPROVED EROSION CONTROL PLAN AND THE APPLICABLE NGDENR STANDARDS AND REGULATIONS. NARRATIVE 48" STORM SEWER PIPES TO BE GONSTRUGTED FIRST A5 PER THE CONSTRUCTION 5EQUENGE ON THIS PLAN AND/OR AS PER ANY SUBSEQUENTLY Biu r r APPROVED 6RADINWER05ION CONTROL PLAN. THE INTENT OF TH15 PLAN s r M 15 TO PROVIDE ADEQUATE CONSTRUCTION NOTES AND DETAILS SUCH THAT THE CONTRACTOR CAN ALLOW THE EXI5TIN6 DRAINAGE THAT RUNS FROM s o r u n, ' wade and A" o a `` "' F . A NORTH TO SOUTH ALONG THE STREAM TO CONTINUE TO FLOW THROUGH THE ��� ��'',B '11'�1C,,-,14Cm.201881.2,�� 1'06ox 21882 Crti�vsEom, NG2]42.}7882 51TE UNTIL THE NEW STORM SEHER 15 IN-PLACE AND FUNCTIONAL.°.,�,33�2, >' `"-27S-3,q 6RAPHIG 56ALE 0 15' 30' 60' q0' I"=30' FRD.FlT. z O ca o 0 c� J 2 z J M � � z c, — 2 H Q C4 1! J J Cyder_ LJ � N Lu ,— u > o w ublym 66DI SIX FORKS ROAD, SUITE 100 RALEKN, NO 2766 (919)756-6206 DRAW W. ,M1 DATE. 12-12-2018 REv1s1DN. 2-28-19— GOMMENT5 T17E IMPACTS EXHIBIT STREAM, BUFFERS $ HETLANDS RIP N0.EASTWOOVW_70-0WL_ 4ElM DRAIN6 SLA.E. N 40' RAN %M N0. W4 NOTE: AS BEST POSSIBLE, INSTALL STORM SEINER DURING DRY CONDITIONS. HOWEVER, IF NEGESSARY, USE A COFFER DAM W/ PUMP AROUND. INSTALLATION NOTES A. INSTALL 5ANDBA66 DAM UPSTREAM OF CULVERT AND PUMP WATER INTO DOWNSTREAM. B. REMOVE COFFER DAM AND PUMP AFTER AFTER BY-PA55 STORM SEWER 15 FULLY R NGTIONAL. r.. . LIMITS OF 23 LF OF TE IMPACTS SAND BAG COFFER DAMS SGALE I"= 40' / \/ I / I OFF5I TE TEMP 015TUR13ANCE TO INSTALL SANITARY SEWER OUTFALL N g 600 �4 N� :MR e EXI5TIN6 IS" SANITARY SEWER (61550NVILLE) 585 580 lu DATUM ELEV 2+00 1+50 1+00 0+50 0+00 575.00 5GALE I" = 40' HORIZONTAL I" = 4' VERTICAL PROM.U. z O ca o Q U cs� o o = J } QO o 2' Z J O Z ° o x z z � � o Q C4 1! J J N LJJ t— ,c > o w OmmWoevamm Uarym 6W SM FORKS ROAD, SUITE 100 RALWK NO 2766 (ql,V 756-6210 DRAW W. HA DATE. 12-132016 wifflo - 2-28-Iq- COMMENTS 'T m": TEMPOARY IMPACTS EXHIBIT STREAM, BUFFERS $ WETLANDS RIP N0.EAS7WDODY -lO-BURL-1'E1LN75 DRAIN6 SONE. N 40 RAN 51ffT N0. W6 1 v I 8" 5 EXTE N SEWER 510N I +: �r 161.1 L.E. S" DI 7 L 'Q ZL40 0 N SAN. EW. @ 0.55 16' E L.E. ') GASEMENT z_ N g 600 �4 N� :MR e EXI5TIN6 IS" SANITARY SEWER (61550NVILLE) 585 580 lu DATUM ELEV 2+00 1+50 1+00 0+50 0+00 575.00 5GALE I" = 40' HORIZONTAL I" = 4' VERTICAL PROM.U. z O ca o Q U cs� o o = J } QO o 2' Z J O Z ° o x z z � � o Q C4 1! J J N LJJ t— ,c > o w OmmWoevamm Uarym 6W SM FORKS ROAD, SUITE 100 RALWK NO 2766 (ql,V 756-6210 DRAW W. HA DATE. 12-132016 wifflo - 2-28-Iq- COMMENTS 'T m": TEMPOARY IMPACTS EXHIBIT STREAM, BUFFERS $ WETLANDS RIP N0.EAS7WDODY -lO-BURL-1'E1LN75 DRAIN6 SONE. N 40 RAN 51ffT N0. W6 � 102 2 71 \ wl w TLANDA A AGT b,2gb 5F 65 (30) LO 1 64 \ � 31 13 / �q 0100 0qq . 8 Limits of disturbance n o 103 Q U 6 \ \ \ IMPAGT %n C> C \ 440 5F }_ U �< 36" STORM 62 I A55OFF51TE PROP. 33 (D5 STORM R 'VETLAND5 6RADE5 Q 1! J J / (N Oj ON, 105 — Cy N � � 1 N U(� U �PROPL� > o I WIN= 66D151X FORKS ROAD, SUITE 100 RALEKN, NO 7166 35 �, 77 — (919)'66-6206 nlww W. a.ri 5 RETAININ DATE. 12-20-2016 9 �� 2-28-19- IIS � 54 53 _ _ 78 7q �ME IMPAGTS EXHIBIT WETLANDS 6RAPHIG SCALE FILE �M -p .* 0 30' 60' 120' ISO' ° �' N60' RAN%M N0. I,�I I11 = 60' Y 1 MEMENNOWNI FirI I ;Ml i 0 1`118� 11881 C,, -b- 14C 17420 1881 21" DEPTH OF GLA55 "I" RIP RAP TO BE EMBEDDED INTO THE EXI5TIN6 5TREAM BED I PIPE GULVERT OUTLET PROTEGTI ON ABRIG EXI5TIN6 GRADE EX. 15" 5TORM PIPE NORTH AMERICAN 6REEN G1255N LINER PROP05ED 6RADE I. 5GRATGH EXI5TIN6 501L AND 5EED PER 5PEGIEIGATION5 WITH NORTH AMERICAN 6REEN LINING G1256N LINER. PIPE GULVERT REMOVAL AT WETLAN05 PROMCT. ORMADBYRZIM &arm= bW SIX FORKS ROAD, SUITE 100 RALEKN, NO 2766 (9191756-6" ORMM W. a.N DATE. 12-20-2016 mmow- 2-28-Iq- GOMMENT5 3-31-Iq- GOMMENT5 SIFT TIRE. DETAIL5 RIP N0,EASTW00VW-70-0WL_NE M DRA" SCAM. RAN 51ffT N0. 'V-Vl nn 7 1V / I �4N� _ I / I BORE PIT \~ I \S I 2 X � \ GREEK BANK`S I E . GULVERT �QQ' BORE UNDER REEK \ \ I El� 50' STREAM BUFFER land 30' UNDISTURBED Z 20' MANAGED )sed z Q N / I I 5GALE I"= 40' OFF5I TE NON 015TUR13ANCE TO I N5TALL 5ANI TARY 5EWER OUTFALL ,/ o Approximate We limits within prop Bore 580 1+00 5+00 q+00 5GALE I" = 40' HORIZONTAL I" = 4' VERTIGAL 10+00 ■��S�J177■ I■Ibl,A&!k'% �A\■ I����P������ 51 Cuy v^ Cnurt 5-100, Greemabom. NC r+)1-2911 P06os 31882 Gatv,sb— Vr 2/41101882 Ph -e 3361, 011 r c 335 -2T -3-N �e b_ , ,bow,.-,, &.. SENS. PROM.U. z O ca o 0 0, J z J O z ° o pc�o Q 1! J J N Lu ,— u > o W OMMRIOPYRDFM Uary OOD 6601 SIX FORKS ROAD, SUITE 100 RALEICN, NO MIS (9191758-8" DRAW W. HA DATE 41-20W REMOW. SNEE7 TITLE. NONIMPAGT5 SANITARY SEWER GR0551N6 EXHIBIT RIP N0.EASTMOOVW-10-0URL-1'E7LN75 DRA" SOAP. N 40 RAN SN�r N0. W� tF 2 X � land )sed z Q "a, I/ L m 2±7771 358.35 L.E OE 8" 5AN SWR, ®0, q o� �r z o 3 L.E. Ib" ENGA5EMENI 1+00 5+00 q+00 5GALE I" = 40' HORIZONTAL I" = 4' VERTIGAL 10+00 ■��S�J177■ I■Ibl,A&!k'% �A\■ I����P������ 51 Cuy v^ Cnurt 5-100, Greemabom. NC r+)1-2911 P06os 31882 Gatv,sb— Vr 2/41101882 Ph -e 3361, 011 r c 335 -2T -3-N �e b_ , ,bow,.-,, &.. SENS. PROM.U. z O ca o 0 0, J z J O z ° o pc�o Q 1! J J N Lu ,— u > o W OMMRIOPYRDFM Uary OOD 6601 SIX FORKS ROAD, SUITE 100 RALEICN, NO MIS (9191758-8" DRAW W. HA DATE 41-20W REMOW. SNEE7 TITLE. NONIMPAGT5 SANITARY SEWER GR0551N6 EXHIBIT RIP N0.EASTMOOVW-10-0URL-1'E7LN75 DRA" SOAP. N 40 RAN SN�r N0. W� Ingle Pro Parcel area Project are* - Project Area i 1 all of 575 Ii Pers of the A400 - 0.15 ac Off -site Sewer Crossings ff 0 (3 200 ft41111- provided for it ine use only./ perms ing r iremEnts the U Army Corps o Engit state and local authorities. ded be Bions, r �he ma by 'diction o ific . n by appropria rrojeci ivame: Ingle Property AWL WETLANDS owner / Developer: Randy & Cheryl Ingle / Eastwood Homes T77 City /county: --L Sc WATERS Burlington /Guilford Tax PIN(s): 8834775066 (Partial) Figure 1: Approximate Depiction Coordinates: Scale: Date: 06/06/18 of Aquatic Resources Lat: 36.07695 Long: -79.55013 Graphic Revised Date: 04/02/19 DIRECTION 36.07952'N ACCURACY 65 m DIRECTION 36.07933'N ACCURACY 74 m 62 deg(T) 079.54799'W DATUM WGS84 446 deg(T) �{ 079.54813'W µ _.�"��ATUM WGS84 �1y� J� �tirvt ':, %1.• 'Lay,`r �1 .1 � r. �' sem! �' s � i�� '� ��•� � +� � �� EAM +r�Y' a LA l 1-- " � c r Verona NHS soil adjacent to 2019--03-28 Verona y NHS soil adjacent to 2019-03-28 stream bore; fescue,... 10:52:55-04:00 stream bore; fescue,... 10:53:10-04:00 DIRECTION 36.07952'N ACCURACY 65 m DIRECTION 36,07895'N ACCURACY 78 m 263 deg(T) 079.54787'W DATUM WGS84 0 deg(T) 079.54860'W DATUM WGS84 qyG g`'t 1. r i. '^``-_ r; a .� a ,a°"'x"":F. r✓".. '... : .�� .L}„*,. �`¢ P � .-:.. _ i a.r , _ ` p} � � � r r ._ r-yw ..,' .. ." t i �,.� ; 4 F -ti, r Y� •: y. f+^C AT :-t ! `'* .�i.. qtr � rr � a•r• � � •,. � f f , � �t�d ��'.. ,,.� �", �„ $ �� { ,�,,� .. }, '�'. M1,� �.. � is . l �'. ,.^!� `' „hy"�I,•.� "1 . �:�,.Y �a'����t� r _eiE;4+ `%�,. PKC �+•-'��aa � .4 . .... � ., *s�� �1'3 � h :`x. / .. NHS soil adjacent to 2019-03-28 adjacent 'bis#ream 2019-03-28 Verona stream bore; fescue,... 10:53:32--04:00 Verona bore; iUncus 10:57:46-04;00 DIRECTION 36.07906'N ACCURACY 71 m 98 deg(T) 079.54738°W DATUM WG584 Zl 1414 Kt k' ME LAW r 4 �' 6 y� � Sj'+1 `•� � P Verona Offsite temp 2519-03-28 disturbance -no WL 10:46:35-04:00 DIRECTION 36.07899°N :ACCURACY 73 m 88 deg (T) 079.54732"W DATUM WG584 " 3 3 i V 74 Verona Offsite temp 2919-03-28 disturbance -no WL 10:47:05-04:00 DIRECTION 36.07568°N ACCURACY 65 m 221 deg(T) 079.54830°W DATUM WG584 7 :.,:,.�,►u�. -.Alfie,.. m .- Nps •.t.-.� w e. Verona Pipe to be removed 2019-03-28 10:20:56-04:00