HomeMy WebLinkAbout310685_Correspondence_2018040531, 6 R-S-
April 3, 2018
Jonathan Miller
Agriment Services, Inc
P.O. Box 1096
Beulaville, NC 28518
RE: Sludge Survey Testing Dates
Dear Mr. Miller.
ROY COOPER
Gowmor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim DlrecYor
REGENED/WGDENRYM
APR 0 5 2018
Water Quality Regional
Operations Section
Wilmington Regional Office
The Division of Water Resources (Division) received your sludge survey information for many of the
Agriment serviced farms on January 12, 2018. With the survey results, you requested an extension of the
sludge survey requirement for the lagoons at those facilities. Due to the amounts of treatment volume
available, the Division agrees that a sludge survey is not needed for some of the lagoons until 2019, 2020,
2021 or 2022. See the attached table to determine the allowed extension date for each lagoon.
However, due to the amount of treatment volume available, and the rate of sludge accumulation, the
Division feels that an extension is not appropriate for lagoon #2 at facility # 31-371, lagoon #1 at facility
# 52-9, lagoon #1 at facility #31-576, lagoon #1 at facility #24-76, and lagoon #2 at facility #31-376. The
next sludge survey for these lagoons should be performed before December 31, 2018.
Thank you for your attention to this matter. If you have any questions, please call me at (919) 807-6340.
Sincerely,
Miressa D. Garoma
Animal Feeding Operations Program
Attachment: Extension List
cc: f Wilmington Regional Office, Water Quality Regional.Opera--ons Section
Washington Regional Office, Water Quality Regional Operations Section
Central Files
<-' Nothing Compares"...
State ofNorth Carolina I Envaonroental Quality I Dtvtaon of Water Rewnrco
Water Quality Regional Operations Section
1636 Matt Semn Center I Raletg6, North Carolina 27699-1636
919-707-9129
pp .@�..��,.�:;>re!i,�+�F., w+t'"1�eTi,�..[�S���iU%c �sd�•'4,7,.:-xirY�r, J�tt'; .p ...r°-,_a�.: .: r:3 .'.;' .. y`s..r j
__�l!!i'K•'.�Y1:x:ft5•-•'-'ir^I!S-rx...`- a:^.L'SC�_.��c•�2vii-^�:_:t[7�1: Z•.}yr:.r�-..`.�'-l"e.rl�`1..h:Y.Y Y.i [.�i
r
List ofAgriment Services, Inc facilities granted sludge survey extension.
Date of
Survey
Farm
Facitly #
Lagoon
#
Extension
Until
8/4/2017
James Brown
31-371
1
12/31/2020
8/4/2017
James Brown
31-371
2
No Extension- 12/31/2018
8/11/2017
Glenn Haddock Front Big Prima
74-6
3 (FBP)
12/31/2022
1/13/2017
Ann Herrin
31-685
1
12/31/2020
5/1812017
JC Howard (Taylor Farm
52-41
Tavior 2
12/3l/2021
5/18/2017
JC Howard No Name Faun
52-9
1 Front
No Extension- 12/31/2018
5/18/2017
JC Howard No Name Farm
52-9
2 Back
12/31/2020
5/18/2017
JC Howard Zimmerman Farm
54-144
1
12/31/2022
7/18/2017
Graham Kenned
31-133
2
12/31/2019
10/20/2017
Gerald Knowles PLT 2319
31-285
1
12/31/2019
9/29/2017
OK Farms Inc.
31-138
2
12/3112019
6/212017
The Piq Ranch Front Farm
54.4
1, Front
12/31/2022
6/2/2017
The Pig Ranch Front Farm
544
3 Front
12/31/2022
6/2/2017
The Pig Ranch Front Farm
54-4
4 Front
12/31/2022
6/2/2017
The Pig Ranch Back Farm
54-4
2 Back
12/31/2022
9/22/2017
Renewable Transport (Pipeline Farm
31-576
1
No Extension- 12/31/2018
9/2212017
Renewable Transport (Pipeline Farm
31-576
2
12/31/2022
11117/2017
Ward Stokes State Line #1
24-76
1(West)
No Extension- 12131/2018
11/17/2017
Ward Stokes State Line #2
24-76
2 East
12/3112022
4/1712017
Dwight Walker
31-530
1
12/31/2021
12/15/2017
Mike Wallace Old Farm
31-440
1
12/31/2222
3120/2017
WBW Sow Farm LLC Du lin 1&2
31-376
2
No Extsion-12/31/2018
en
Only the lagoons specifically mentioned above for these facilities have been evaluated at this time.
Any other lagoons must have sludge evaluations performed by December 31, 2018 unless granted
an extension under separate letter.
%` C�"'!�!+'i�i'x, d: yyw:yy i.,p�;y, ... +,� •.in.. ;r.�;. : t�'..-.fry -.. :'•":
6..rs�r.+_
'{� sNyA, fly K ��"''�"�.V�c:F� .�; �.•.., ��y,
.. rY Lr �` kT S'd�,"�',�!a:H1j K pn�� ?Y..e, )� • • -i:p' ,'; '. •.-•.��M; _:.,
_