PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 31-683
County Duplln
Facility Name S GRADY 6-9
Certified Operator Name Steve Grady Operator Number.
18050
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways
Lagoon Name/ID
Spillway(Y or N)
Level(inches)
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
6 6A 7A 7B 8
N N N N N
7 7 8 8 8
2 Check all applicable items
Lagoon 6
9
N
8
Liquid level is within the designed structural freeboard elevations of one or more structures
Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are
within acceptable ranges
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations Volume and PAN content of waste
to be pumped and hauled is'reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates fro depopulation
Y animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3 Earliest possible date to begin land application of waste: 9/2212018
I hereby certify that 1 have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the Information is
accurate and correct.
Steve Grady Phone 919 658-5757
Facility Owner/Manager (print)
Date 10/1712018
Facility Owner/Manager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1
Structure ID
6
line m =
701 0 lb PAN
2.
Structure ID.
6A
line m =
2954 lb PAN
3.
Structure ID
7
line m =
8576 lb PAN
4
Structure ID.
7A
line m =
3340 lb PAN
5
Structure ID
8
line m =
7460 lb PAN
6
Structure ID:
9
line m =
5776 lb PAN
n. lines 1 +2+3+4+5+6= 3510.5 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
O. tract #
p field #
G crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u application wndow'
1128
1
COASTAL BERMUDA
1251
40.00
500.4
MAR-SEP
1128
2
COASTAL BERMUDA
3.27
50.00
163 5
MAR-SEP
1128
3
COASTAL BERMUDA
1379
40.00
5516
MAR-SEP
1128
4
COASTAL BERMUDA
1279
50.00
639.5
MAR-SEP
1128
5
COASTAL BERMUDA
533
50.00
266 5
MAR-SEP
1128
6
COASTAL BERMUDA
1 77
50.00
88 5
MAR-SEP
1128
7
COASTAL BERMUDA
767
50.00
383 5
MAR-SEP
1128
8
COASTAL BERMUDA
6.08
50.00
304 0
MAR-SEP
1128
9
COASTAL BERMUDA
6.27
50.00
313 5
MAR-SEP
1128
10
COASTAL BERMUDA
7.46
40.00
298 4
MAR-SEP
1126
11
COASTAL BERMUDA
10.59
50.00
529 5
MAR-SEP
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period
v. Total PAN available for all fields (sum of column t) = 4038.9 lb. PAN
N. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 3510 5 lb. PAN
PDA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 4038.9 lb. PAN
y. Overall PAN balance (w - x) _ -528 lb. PAN
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
onto existing spray fields has begun and will continue as weather and field conditions permit
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/ldentifier(ID): 16
2. Current liquid volume in 25 yr./24 hr storm storage & structural freeboard
a current liquid level according to marker
b designed 25 yr./24 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x line d x 7 48 gallons/ft3
3 Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
7 0 inches
19.5 inches
12.5 inches
E--9—ookol ft2
701250 gallons
180 days
g. volume of waste produced according to structural design 121352 ft3
h. current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
I. excess rainfall over evaporation according to design
k (lines h +i+j)x748x 30 days/line f=
4 Total PAN to be land applied during draw down period
I current waste analysis dated 9/26/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
121352 ft'
Oft3
56058 ft3
221171 gallons
0 76 Ibs/1000 gal
701.0 Ibs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelldentifier (ID)` 6A
2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a current liquid level according to marker
b designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallonslft'
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
7 0 inches
19.5 inches
12.5 inches
37656 ft2
293403 gallons
180 days
g volume of waste produced according to structural design 40353 ft3
h. current herd # 1224 certified herd # 1224
actual waste produced = current herd # x line g =
certified herd #
i volume of wash water according to structural design
t excess rainfall over evaporation according to design
k (lines h + i +f) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down penod
I current waste analysis dated 9/26/2018
m. ((lines e + k)/1000) x line 1 =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
40353 ft'
ft3
24223 ft3
80505 gallons
0 79 Ibs/1000 gal
295.4 Ibs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/Identifier (ID) 1 7
2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x line d x 7.48 gallons/ft'
3 Projected volume of waste liquid produced during draw down penod
f. temporary storage period according to structural design
8.0 inches
19.5 inches
11.5 inches
96100 ft2
688877 gallons
180 days
g. volume of waste produced according to structural design 121352 ft3
h. current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g = 121352 ft'
certified herd #
i. volume of wash water according to structural design
j excess rainfall over evaporation according to design
k (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied dunng draw down period
I current waste analysis dated 9/26/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
57881 ft3
223444 gallons
0 94 Ibs/1000 gal
867.6 Ibs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure NameAdentifier (ID)' I 7A
2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7 48 gallons/ft3
3 Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural,design
8.0 inches
19.5 inches
11 5 inches
38144 ftz
273429 gallons
180 days
g. volume of waste produced according to structural design 40353 ft3
h current herd # 1224 certified herd # 1224
actual waste produced = current herd # x line g =
certified herd #
i volume of wash water according to structural design
I excess rainfall over evaporation according to design
k. (lines h + i +j) x 7 48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I current waste analysis dated 9/26/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
40353 W
0 ft3
25317 ft3
81869 gallons
0.94 Ibs/1000 gal.
334.0 Ibs PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PANTO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID)' 1 8
2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3 Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
8 0 inches
19 5 inches
11 5 inches
76772 ft2
550327 gallons
180 days
g volume of waste produced according to structural design 121352 ft3
h current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
I. excess rainfall over evaporation according to design
k (lines h + i + t) x 7.48 x 30 days/line f=
4 Total PAN to be land applied during draw down period
I. current waste analysis dated 9/26/2018
m ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
121352 ft3
ft3
46958 ft3
209826 gallons
0.98 Ibs/1000 gal.
745.0 Ibs PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/ldenhfier(ID) 1 9
2 Current liquid volume in 25 yr./24 hr storm storage & structural freeboard
a. current liquid level according to marker
b designed 25 yr/24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e. line U12 x line d x 7 48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
f temporary storage period according to structural design
8 0 inches
19 5 inches
11 5 inches
62411 ftZ
447383 gallons
180 days
g volume of waste produced according to structural design 77780706 ft3
h. current herd # 2448 certified herd # 2448
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j excess rainfall over evaporation according to design
k (lines h + i + j) x 7 48 x 30 days/line f=
4 Total PAN to be land applied during draw down period
I current waste analysis dated 9/26/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
80706 ft'
0 ft3
43035 ft3
154264 gallons
0.96 Ibs/1000 gal.,
577.6 Ibs PAN
PoA (30 Day) 2/21/00