Loading...
HomeMy WebLinkAbout20050516 Ver 1_Complete File_20050328 vtEMORAND\UM ! TO: John Dorney Non-Discharge Branch Regional Contact: J. Steenhuis WQ Supervisor: Frf RAr.k Date: SUB~ECT: i WETLAND STAFF REPORT AND RECOMMENDATIONS " -l.a ,. ~.~I PFoM1"WeI " ! Mitiaation Is Wetland Rating Sheet Attached? 0 YON Did you request more info? 0 YON Have Project Changes/Conditions Been Discussed With Applicant? 0 YON Is Mitigation required? 0 YON Recommendation: (j) Issue 0 Issue/Cond 0 Deny Provid~d ~y Region: Latitude (ddmmss) Longitude (ddmmss) Comments: No 401 Water Quality Certification is required for the project as proposed JHS 04/20/05 cc: Regional Office Central Office Page Number 1 1 I M~hael F. Easley, Governor .M'A HCDENR North Carolina Departmentof Environment and Natural Resources Division of Coastal Management Charle~ S. Jones, Director 050516 William G. Ross Jr., Secretary TO: Ms. Cyndi Karoly Environmental Biological Supervisor Division of Water Quality &&@&OtVJ@(p) MAR 2 8 2005 H.t:TJ P.€~R . WArs ....,&.I'I/VOS AND STtlDI'tg,UALITY -'....ffl\7tR 8RANcH March 22, 2005 ~MO~UM: \! I ~OM: Doug Huggett Major Permits Processing Coordinator SU$JEct: CAMA/DREDGE & FILL P!ermit Application Review Applicant: First and Last Child, LLC c/o Mr. Robin Comer Project LQcation: Carteret County: Wetherington Landing Road (NCSR 1101) near Stella, NC. P~oposed Project: I I The applicant is proposing a600-space RV park (White Oak Shores) adj, to the White Oak River with a 580' pier including (10) ten boat slips, platforms for fishing, and a covered viewing platform. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 12, 2005. If you have any questions regarding the proposed project, please contact Ryan Davenport at (2p2) 808-~808. When appropriate, in-depth comments with supporting data are requested. RltPL Y: _ This agency has no objection to the project as proposed. _ This agency has no comment on the proposed project. _ This agency approves of the project only if the recommended changes are incorporated. See attached. _ This agency objects to the project for reasons described in the attached comments. SIGNED DATE 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper Development Type I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C. or D below applies: III(A), For Private, non-commercial development, If General water Quality Certification No.3301 (see attached) can be applied: III(C). If General Water Quality Certification No. 3301 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concems related to water quality or aquatic life: 111 (D). If General Water Quality Certification No. 3301 (see attached) can not be applied: IV. For development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: ", DCMo/. (143001601 43510009316256253 100% ($250) 100% ($400) 100% ($250) 100% ($400) 60% (5240) 60% ($240) 60% ($285) DWQ% (2430016024351000952341 0%($0) 0%($0) 0% ($0) 0% (SO) 40% (S160) 40% (5160) 40% ($190) DIVISION OF COASTAL MANAGEl\1ENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: First and Last Child, LLC, c/o Mr. Robin Comer 2. LOCATION OF PROJECT SITE: Wetherington Landing Rd. (NCSR 1101) near Stella, Carteret County Photo Index - 2000: (37-471) grid Kll-011-J22-F22 1995: (36-443) grid U2-X2-VI4-QI4 State Plane Coordinates - X: 2558507.04 Y: 376157.899 Rover # 1122216A 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE:Dates of Site Visit - December 22,2004 & March 11, 2005 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received - February 23,2005 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Carteret County, NC 1996 Land Classification From LUP - Rural with Services I Conservation (B) AEC(s) Involved: CW, EW, PTA, ES (C) Water Dependent: Yes (D) Intended Use: Community (E) Wastewater Treatment: Existing - On-site septic Planned - N I A (F) Type of Structures: Existing - Roads and Parking Lot, Bathhouse, Pool, RV Spaces , Planned - Dock, Campers (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: (A) Vegetated Wetlands N/A N/A 1,710 ff . Shaded (B) Open Water N/A N/A 13,160 ft2lncorp. 5,296 ft2 Shaded DREDGED FILLED OTHER (D) Total Area Disturbed: 14,870 ff (E) Primary Nursery Area: Yes (F) Water Classification: SA Open: No 8. PROJECT SUMMARY: The applicant is proposing a 600 space RV park (White Oak Shores) adjacent to the White Oak River near Stella. As an amenity to the park the applicant is proposing a 580' pier. The pier would have 10 boat slips, platforms for fishing, and a covered viewing platform. Field Investigation Report: White Oak Shores Page 02 9 Narrative Description: The White Oak Shores project is located on Wetherington Landing Road (SRI 101) near Stella in Carteret County. N.C. Hwy. 58 lies a few miles to the east of the site. The site is identifiable by the bathhouse for the RV Park located near the road. The White Oak River borders the site to the west. White Oak Shores is 115.62 acres in its entirety and varies from 0' to 28' in elevation above NHW, The high ground portion of the site is a previous sod farm and is vegetated with various upland grasses. The infrastructure for the RV Park is mostly in place. These facilities include the bathhouse, access roads, electricity service and on-site septic systems. Several RV's have already been "set-up" in the park. A strip of Section 404 Wetlands crosses the high ground and is approximately 900' wide. A portion of this wetland has been filled through the use of Nationwide Permit # 14 to allow for a road to access another highground hammock closer to the shoreline. On this section of highground there is a swimming pool, paved parking and more R V spaces. All work completed thus far lies outside of the 75' AEC. The shoreline has a wide fringe of coastal marsh that is both irregularly and regularly flooded. High marsh species include Cattail (Typha spp.) and Black Needle Rush (Juncus roemarianus). The regularly flooded low marsh consists of Smooth Cordgrass (Spartina alterniflora). The low marsh has a series of mosquito control ditches that have been cut through the marsh. The shoreline on either side of the proposed project is similar in nature and undeveloped. This section of the White Oak River has been designated by the Division of Marine Fisheries as a Primary Nursery Area and the Division of Water Quality classifies it as SA waters. The area in which the proposed project would take place is closed to the taking of shellfish. Carteret County's Land Use Plan dated 1996 classifies this area as Rural with Services and Conservation. The Division of Land Resources approved the sedimentation and erosion control plan (CA-03029) on 11/25/02. The Stormwater Certification (SW8 020806) was approved 02/06/03. There are no shellfish leases in the area. The substrate in the area is mainly sand and mud. 10. Proiect Description: As an amenity to the RV Park, the applicant proposes to construct a 580' pier. The pier would have 10 boat slips, fishing platforms and a covered viewing platform. Also 12 mooring pilings would be installed. Extending from high ground, the proposed 6' wide dock would cross a fringe of high marsh before crossing 285' oflow marsh reaching open water. The 6' wide dock would continue over open water for 125' before widening to 10'. The 10' wide dock would continue for another 158'. Constructed on the end of the dock would be a 12' X 40' (480 ft2) covered viewing platform. Two 10' X 100' (1000 ft2 each) fishing platforms would branch off each side of the 10' wide dock. Inshore of the fishing platforms would be 10 boat slips. To aid in the docking of boats, 12 mooring pilings would be placed along the slips. Access to boat slips would be gained by a series of six finger piers that are 23' long each. Four of the finger piers would be 4' wide and two would be 8' wide. The proposed pier would extend a total of 580' into the White Oak River from the NHW. At this point the water is -5' at NL W. Riparian property lines would be greater than 500' from the pier. This project is not a Field Investigation Report: White Oak Shores Page 03 marina and there is not fuel or maintenance service. This is a community project to be used by White Oak Shores residents and their guests. The highground development for this project is mostly complete and is outside of the AEC. The 80 acre site was previously graded to allow for RV sites, access roads, utilities under road right of ways, LPP on-site septic systems and a swimming pool. The 20' wide roads will be paved and RV's will be connected to utilities at their space. 10. Anticipated Impacts: The proposed pier would result in a total of 10 slips. The potential exists for a large number of transient boaters to dock at this structure. Overboard discharge is possible from both permanent slips and from transient boaters. Temporary turbidity would result from the setting of the pilings. The proposed pier would shade 1,710 ft2 of vegetated wetlands and 5,296 ft2 of open water. The pier and boat slips would incorporate 13,160 ft2 of public trust area. A total of 80 acres would be disturbed during this project of which no impervious area will be within the AEC. Name Ryan Davenport Date March, 14 2005 Morehead City STROUD ENGINEERING, P.A. Hestron Plaza Two 151-A Hwy. 24 MOREHEAD CITY, NC 28557 [1~uu~~ @[? u~8!J@GillDuu&[1 (252) 247-7479 ATTENTION TO 1'-.\ G D ~ Q..- Coa.s:~ \ tvU-"'1.J(1,~j- RE: ~~s -- i""::':J ~ tJ L._J WE ARE SENDING YOU > o Attached o Under separate cover via ~, 1....~. ,.1",,", ,; (";" . the following items: :0.... -_..: '-"4.. -.-..:.-....;"...... ......~., -, " J o Shop drawings o Copy of letter o Prints o Plans o Samples o Specifications o Change order o COPIES DATE NO, DESCRIPTION THESE ARE TRANSMITTED as checked below: > 0 For approval 0 For your use 0 As requested [J For review and comment D FOR BIDS DUE o Approved as submitted o Approved as noted o Resubmit copies for approval copies for distribution corrected prints o Submit o Returned for corrections o Return o -l PRINTS RETURNED AFTER LOAN TO US REMARKS 61-\.. COpy TO , ' ~ ( I~~~ <:1r.:I\I~n. .~:J.c~<...1--t"~ Form DCM-MP-l APPLICATION " ~-'."\'~ "J., :1".. ' .1t 1 r '_j . , - " ~. -.-.J (To be completed by all applicants) 1. APPLICANT a. Landowner: Name r\ RSllt LAS'i C~, L.D I L.. U. Address ~'2.1.!.WOOV FARM RO~t> City SWAtJ.S~R.O State N.c. Zip zese"-L- Day Phone (ZC;'Z) IZS-054S Fax b..s2) ~'5 y.... "*' \ 0 b, Authorized Agent: Name STROUD E?lJq\ "'\~U,\Cl ,'Pr\ Address \c;\ -/A. \4WY 24 City lv\.oR.'E~EiAt) cxrY State N~ Zip 2eJ;Sl Day Phone (2 S '2. ') '2A 1- 741'1, Fax ('2..'5'2.) '2..41- 40QB c. Project name (if any) W\-\\TE- b~~ <;t\oRES NOTE: Permil will be islMetl m1tame ofltlttdowMr(l), and/or project MIM. 2. LOCATION OF PROPOSED PROJECT a. County C.ARTE12..e'T Revised 03/95 , , ("\.I'" j\ .." .j ,j../v L b. City, town, community or landmark S,ELLA c. . Stteet address or secondary road number WEi1;~1 t..tqTD~ LAJ-U)IU(1 RoAt> t-lC.&R \ \0 \ d. Is proposed work within city limits or planning jurisdiction? l< Yes No c:.A~~E'1" ~ u t-.l.,-y e. Name of body of water nearest project (e,g. river, creek, sound, bay) W~ IT€- OA-'tt. R\v ~ 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. bujJdin~ a home, motel, marina, bulkhead. pier. and excavation and/or filling activities. -RV f>Aa.\< ~8vtoVSL-Y GAAbl?D ,RoA-~ CoN5l12V~. \JT1Ul1P.!.IMSrnueD -P!2t)~ TbCOI\J'O'rR.VCT Poa::LoI10 S(..IP5 ~ 'PtA-rroRMS 'Forz. -FIS~t\l& b. Is ~e proposed activity maintenance of an existing proJect, new work, or both? New \^" 0 R. " c. Will ~e project be for public, private or commercial use? t12\VAiF - "FoR USE' o~ 'RVPAR\( d. Give a br!ef description of purpose, use. methods of co~tructlon and daily operations of proposed project. If more space is needed please attach additional pages. 'TllE? PRoJElT lS'A~ R\I "PN2-t< t t\-A~ ~~Al.-~a.u~, A-"I>rJaC.. wi JO,~L\?S 100 l?:,l:?i N G.~~bSBi> WI l>(.A",,",R~ ~ F\s.c.t1~q. ~a.A 'PLArro~S T' :e.€ r..a.t-JsrJ:l.v~n:n::> ,~ CoNFt>/1YVIJ4NrlT Wr"rrl Au." 5T1f-1EF lil Fie.., uu4n ol-tS . Form DCM-MP-l 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract \ \ C;. b'2. A (..Q.e So b. Size of individuallot(s) N I A ("-10 Lei 5 ') - ~\J 6rAWS- c. Approximate elevation of tract above MHW or NWL \ I ~\~ Ft2ow\" 0' - 'Z. "0" f-t+h.V I ~ I . . J i-I ...~ m. Describe existing wastewater treatment facilities. bM-i::.\'rcr LPP S'l<3>TrMS n.. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater. industrial/commercial effluent. "wash down" and r~identia1 discharges.) ':;u R 'FAC I;' Ru N 0 F F' d. Soil type(s) and texture(s) of tract o. Describe existing drinking water supply source. t\~e..~LILI ~()("pslOt)R.O 1 M~Sf)t-n1)wN i S~oK CtJMMUk.llTY we, L DNLVTO SERve- 'TH E?'" RV J> Ai~ K e, Vegetation on tract Gt~s ,We=rn.~~ CoAS~(...- ~~it f. Man-made features now on tract ~I 'i?:A-TH~ t::eA\ t-JM'1 tf 1=-~1V ~e:s g. What is the CAMA Land Use Plan land classification of the site? (ConsulI the loa21land rue pltzn.) Conservation _ Developed ~ Rural _ Transitional _ Community _ Other h. How is the tract zoned by local government? VN U> N I?'l> i. Is the proposed project consistent with the applicable zoning? --A- Yes _ No (Attach tOfling compliartce certificale, if applicable) j. Has a professional archaeological assessment been done for the tract? _ Yes ~ No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? _Yes ~No 1. Are there wetlands on the site? ~ Yes _ No Coastal (marsh))(' Other If yes, has a delineation beell condQcted? ~ES (Anat:Ia doaunmtalion, if aw:dlable) s. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: . A copy or the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. . An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 112" by 11" white paper. (Refer to Coastal Resources Cl'mmission Rule 7J .0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the . A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, an~ issuing dates. LQ.Nl Qv~h. 1t-c,ll.-C>'?>02.'l1 \\1z.~Joz.' r^ \\/f'hJo:7 . +tv I.I""\.' (S1b~W ~ .SW io 2J~Jt>3S1gna: Dw~ ~ 0 ?:roZ;"Zk ) '5 <:1 03 Nc..Do1" Cpr. w-U?-'1 P-22..o3tl \6 PWS \ i)"#/n-lk:r-t;17 ) ~c..lo4 . A check ror$2SO made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. Form DCM-MP-l site. Include highway or secondary road (SR) numbers, landmarks, and the like. . A Stonnwater Certification, if one is necessary. . A signed AEC hazard notice for projects in oceanfront and inlet areas. . A statement of compliance with the N.C. Environmental Policy Act (N.e.G.s. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Revised 03/95 j ;, - .. j /'-'~ ~, ,"', ; _.'" v...j ~'.. ..j 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained ;"1 the permit. I certify that to the best of my knowledge, the proPosed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact . . ' , grant permission to representatives of state and federal ' review agencies to enter on the aforementioned lands in connection with evaJuatinginformation related to this pe~t application and follow-up monitoring of the proJect. I further certify that the information provided in this application istnlthful to the best of my knowledge. 4h 20 This is the .2~ day of .t--lbVei1'l~ ..wM. , VfJ.Yl 6>~r Please indi"cate project. chments pertaining to your proposed DCM MP-2 Excavation and Fill Information X DCM MP-3 Upland Development L DCM MP-4 Structures Information _ DCM MP-SBridges and Culverts _ DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided Ql the. bottom of each form. Form DCM-MP-3 UPLAND DEVELOPMENT (Construction an~/or land,d~turbi~g ~ctiviti~) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities, units or structures proposed STb~~~JC~) BATH House) 'Pobl~ w/BAn-I FklL._ b. Number of lots or parcels c. Density (give the number of residential units and the units per acre) ~ hbO R\I ~t:'$ e:: 5.~ (2.-1 SF>Nf?6/AG .. . d. Size of area to be graded, filled or disturbed including roads, ditches, etc. ~ BC>~~ e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? X 'Yes No If yes, date submitted 'PEeMl \ :tt (A - 0 ~., , ""??~eP 'PA1"e: II {2S /07- f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. S\b~E?" AI4t> AAPl-\ALT g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. O'/. R ..vl...d Rl/QI; . ,',.- " ~ .; -' .1 _- ~ "'-- . '_-.. ,i -..-' ..~. -,_ j ~...... h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? X. Yes No If yes, date subnlitted PE'RMIT''lt 5W8 O'2.D~b6 APP~oveO 'DA~ o2./obl 0;3 i. Describe proposed method of sewage disposal. Ot.l-~IT'P L.Pp S'1'.sTFM5 j. Have the facilities described in Item i. above received state or local approval? 'I FS (Attach appropriate tWcumenlalion) k, Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges), '5uR1=Aa;= RuNOFF l. Describe proposed drinking water supply source , (e.g. well, community, public system, etc.) C.ol'\i\MV N nOo\-, LV ELL ('Yo..L L Y ,0 St:Rv e ~er RV 'PAl< l< m. Will water be impounded? _ Yes ~ No If yes, how many acres? n. If the project is a oceanfront development, when was the lot(s) platted and recorded? N 1/+ Date Form DCM-MP-4 STRUCTURES ", '"" ~'..; v '" .".) (Construction within Public Trust Areas) "'; r~" /'~:r\',] ._, ",.. ~-,,,.. 1 ::.J ~.....! J' .I -- -." Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application which relate to this proposed project. e. Mooring buoys N I flr (1) _ Commercial_Community _ Private (2) Number (3) Description of buoy (Color. inscription, size. anchor, etc,) a. Dock(s) and/or Pier(s) (1) .1S.... Commercial _Community _ Private (2) Number \ (3) Length ~ l4\Q ~ (4) Width ~' (5) Finger Piers ~ Yes _ No (i) Number L-I (ii) Length 2CC/ f. Mooring stru~re (boatlift.~ng p~etc.) (Hi) Width 4 I (1) L Commercial _ ommunity _ Private (6) Platform(s) -X- Yes _ No (2) Number 12. PIL€"~ (0 Number . (., (3) Length (ii) Length (2.'~2.~' ~ (-z.)e>rot>'j \st/ j 40'R~J>gttl~ (4) Width (Hi) Width (z.)~ 5' ;(2.~tlb'; 10''; \'2-' ~e"~(nyeLY (7) Number of slips proposed \ 0 g. Other (Give complete description) (8) Proximity of structure to adjacent riparian property lines 5"1..\0' , I ~~O' (9) Width of water body (to) Water depth at waterward end of pier at MLW or NWL ~ -1:::/ ~ HW (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline b. Boathouse (including covered lifts) Nt A (1) Commercial Private (2) Length (3) Width e~~ API> t_~N II {21 (Dl{ Date c. Groin (e.g. wood. sheetpile. etc,) NI A.. (1) Number (2) Length(s) d. Breakwater (e.g. wood, sheetpile. etc.) N/A (1) Length (2) Average distance from MHW. NWL or wetlands (3) Maximum distance beyond MHW. NWL or wetlands )f-NOTf1-I2../)C4D' l'LA1FoRM \~ PRopoSeD AS A(~VE;p..m> ~vcrv J:lE". Revised 03/95 ._-." ........ .~~ :-,. '; \ .: '~l../.;i ,--.:.::,,/ ~ :_ J 2 3 L~; :_; J I -, " ....,. t- ".-"'l'\'J ' , -,j, .) ...J 0. :j Message for the owners: White Oak Shores Camping and RV Resort As owners and operators of White Oak Shores Camping and RV Resort, we respectfully ask for consideration for the project proposed in the application. We would like to give you a quick overview of the project and why we feel this pier will be an important addition to our success, When all phases are completed we should have approximately 600 campsites available for the public to use. Approximately 3%-4% of these sites will be near or in a CAMA AEC. About 6% will be with 100 ft - 300 ft of a CAMA AEC. The remaining sites will be approximately 1500 ft to 3500 ft from any AEC. We have reserved most of our river front areas for leisure recreation, and enjoyment of the aesthetics and view the White Oak River offers. Our hope is to have a 50% occupancy thoughout most of the year, with higher percentages during prime season, which is between Memorial Day and Labor Day. Averaging 3 people per site this is 900 - 1200 people in the resort at any given time. We feel that 10% - 15% of these people will use a nice fishing pier at any given time. If you remove the Square footage of the 6 ft walk that gets you to the covered landing, this leaves about 3800 sq- ft of landing we are asking for that we feel is reasonable for the amount of traffic we expect. This averages out to about 30 sq-ft per person. This is approximately a 5 x 5 area to fish in. At times when fishing is at it's best there will obviously be many more people than average, and other times will be less people. Weare going to promote the fishing pier as a key feature to our resort and we feel the amount of space we are asking for is well within reason given the number of users. We have several thousand feet of river frontage and it is our hope to keep the remainder as undisturbed as possible; to be enjoyed by all who come. Please contact Robin Comer personally if any questions or concerns I can help address should arise. (252-725-0548) _..,----." Sin~~rel-y;"-- / / // /,/ / /" ,/" ~ I ...7 ~4~:.:mnPing and RV Resort fIOItTH ~ -. ~ '- o ..." @~uw~@ AR 2 8 2005 ~ R - WATER QUALITY SAND STORMWATER BRANCH 0: w > 0: '" < o W t- ::r: == t- < u o oJ W t- III '" < o W t- ::r: == MAJOR CAMA VICINITY MAP SHEET 1 OF 6 PROJECT: PM1258 DRAWING FILE: 1258/1258.DGN ""nun"" ~"" ~H CAJ1 "'~, ...' O-q.. ......... 0/ '" S- ~ .... f E.SS .......~, ~ .. · 0 '0 · -~ ~ ~ ..~ :.of,.., .. ... en -Y . .- ~*., 7-... : : SEAL r- : : : : 13343 :*: .~. . - P~e . ,. "O..A ." .. . "Jr. ^' . Q:-': \ '1-- ...:~GlNc~~;'" 0 $ "~(() ......... ~V;; ...... "1111 D, C\J\...\-.~\\\\ II"if""'\\ WHITE OAK SHORES WHITE OAK TWSP., CARTERET COUNTY. CLIENT: FIRST & LAST CHILD. LLC ADDRESS: P.O. BOX 1253 SWANSBORO. NC 28584 PHONE: 252-393-6646 NORTH CAROLINA DESIGNED: RDC DRAWN: GYT CHECKED: ROC APPROVED: RDC DATE: (~ 2/21/05 y~ SCALE: NOT TO SCALE ~ STROUD ENGINEERING. P.A. ~ 15lA HIGHWAY 24 ~EAD CITY N.C. 28557 \J!!~/D:/') ..~v.;wu 1: ~ \1..) RONALD~ LEGEND II; -&tiltS uc-<<aarrlftllllDNilf..'AlCOlCtIlll ~-CCltJlJCl&'totll:tAl"Il'( wr - C.... II f1lClllCues cpp.f:OlllIUIO&tU",.SflCPIl'( ~ -DUDMICl lCN - UIUUlCl ctJClllfl ......., (I"-lIl",IIOI""11'( tilt -UISflllCllllOllllQD U.t(- nlCt'JII( l" .lIISTIIION....'L ill .UISTlflCl IInr-IwtIlt IlIIS-I......,"...1 ~" - LIONt I'Q,[ .. -IW'MICl ,,--llnl_tuILDIWlI.IIC .. -1C"'.IIlll...nlt MA -1ClI'0Il rtJllll(..., PO -...... J'QI-POI.TIIKGI_IIC 1lCl"-ItlI"OIlC(.~n"lf'[ ..,....ICOltll...' SI.~'([I ..I.-w.TDtlu,aTlOlll r - LICN' I'Q,lS cno..n H.". smlll" I-DlUI-..ctiast:ICJffS .....,...,.tlMCI~_ . -.nL&Ie"~1. _.TDIlt .~S1tD ,... US (.IX '\. '\. '\. '\. '\. " ,~ -- ~~ ~ " I *- ,/ . HUlON " ( I I I \ \ " / /' /' '" ( \ \ , . /' " ( ( \ \ \ \ i I / / I i I \ \ \ " I \ \ ~ \ -- -- \ I ~ ~ J I .---_ "- I I r ,'>, \ ~ I \, "~ I \ , \ \ , \ , , \ ' , " " , , ' , \ ' , \ " (-, , ", \ /'... , '-I " \ \ // ..:--:,/ /-/ / /~ J "", /' / ) '" "''' / / I ~ I .\>: / I / / '" / '" .r' ~'" "'" - " \ I /. I ~ -/' /; /' / / //AY ./' / \~}\/// " / // /' /' /" ,___ --,/ . / '-. ._tHO>"" / ,Arr /"'."'....... /......... - - - - ""'~' ti ~ ' / // ",'" / / ,,~. /' / -------- ..," --1-\ C<r-r:;: '1" " ( / I / r I ~,/~.. ---" / . _,"--- I'r'i"r\ ' ......... --- / / I "- \... r.~.>' -/ ......... ,! ~ ."--(OC.~Y/ ',_ '" / \ "\ ..../ / E " ,- ~/. - ___-J / ) " '__".........l-._...... j /" fQ" ~" ",' ~ -u8,... ~ ~ ........ / "- _'" { ..... :: :' ...~...I ./ / 0....., ~ ....... ,,- ....." ( ...;x- - /b.' ~ "-....... :;, ": ~. ;'\'-.:.. S y~.. / , ,"" 1\ "" ~ " < I EA' r: : " ~ I '- \ - - ~ : - >- }-< 1;, . * - / l: -d" "'{:'I \.--" .,343 J i \ ~5?t. .'~'I"\ ~~ ...:'J;: I ",. f. '" '? INE"..' . 'iY .:- . -'" '4f, <() .......~. ~,",,'" ," #"" D. CU~\..'\ ,\", ""iU..,,'" I I I , r i I , ,,:: .......::::.- - - - ;,. MAJOR CAMA SITE PLAN - UPLAND DEVELOPMENT --~ , , " , , , WHITE OAK SHORES /' NORTH CAROL! NA DESIGNED: ROC DRAWN: GYT CHECKED: ROC ~ STROUD ENGINEERING, P.A. APPROVED: ~ 151A HIGHWAY 24 ROC 51EAD CITY, N.C. 28557 DATE: 5) 4n47p"~_I...I,~ 2/21/05 _ ~j _~~;:> SCALE: RONALD D.CUU IPHER P.E, - 1 "- 300' WHITE OAK TWSP.. CARTERET COUNTY. CLIENT: FIRST & LAST CHILD. LLC ADDRESS: P.O, BOX 1253 SWANSBORO. NC 28584 /' I '" '" / / I '" ./ " /' - I ( " I I .~ \ PHONE: 252-393-6646 ~~-- SHEET 2 OF 6 PROJECT: PM1258 DRAWING FILE: 1258/1258,DGN ..... ..... ------ j/ "- \ \./...../ "- ...... / ...... ...... / ...... "- / "- "- / / "- "- -:;0, / ,/ -, / "- / "- "- / "- "- / / /' 'W , "* ~ ~- 7 'W 'W 'W 'W r-' \ 'J;>- ..... , + " ~ ~. <' \ 'W 'W 'W " 'W " " " 'W 'W / " 'W " 'W 'W 'W / 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W 'W ~+ .... .J 'W 'W 'W 'W 'W 'W 'W 'W /'''-V ;....--- / ---- ____ ,,-3.0 =---- ... !> (, ~--" ~ FINGER PIER 1 ~ ')(_4.0 ---- STEPS. TYP I CAL .- --:- ---- ---- ) 8 ---. ~ SITE DATA LENGTH OF SHORELINE = ALLOWABLE DECKING PROPOSED DECKING 4. BOO LF (APPROX,) 19.200 SF 4.990 SF CJ ~ ,,_!;.O ... .... ~ )(_6.0 MAJOR CAMA DOCK PLAN WHITE OAK SHORES PHONE: 252-393-6646 ,^\~,~MH~UC'W";l,~ OAK RIVER .."..~:\ 4" '~." " OP ryO ~ ,,'" ___'-' ..II"'~'. ""./', ..' '" .0 <::ES t. <.... .. ~ .' Oi" S;.'. '-'1, .. .....t).. O' '1/ ... ..... . ,",. "A _I. -r7 -:. : )t- lQ.. St::Jt 's,':'-: :: I..J1L r: :: :: ..... ~ 13')"3 : * :: ~ ~ . ~ . ~ .O'''^' ... ~ 1 Cl '\";' o'J ~ o 'i~ '. "J~ d .G /'}... ~ ~ ..:7 '0 GIN Er;;.r.. /;<-. ~ , ,./ 00 00 . '}..v ... '" '\1) 'OO'I9'~. 'f('''' ,,,,, 'fi'l D. CU\..\..\\\~" l&iifenU'" SHEET 3 OF 6 PROJECT: PM1258 DRAWING FILE: 1258/1258.DGN NORTH CAROLINA DESIGNED: ROC DRAWN: GYT CHECKED: ROC ~ STROUD ENGINEERING, P.A. APPROVED: &i 15lA HIGHWAY 24 ROC i1l0 EAD CITY. N.C. 28557 DATE: I l 0'lA'-\47f'\ ~ A J ... ~ 2/21/05 _ . ~ 1..1 o:s SCALE: RONALD D.CUCLIPHER P. - 1 "- 60' WHITE OAK TWSP.. CARTERET COUNTY. CLIENT: FIRST & LAST CHILD. LLC ADDRESS: P.O. BOX 1253 SWANSBORD. NC 28584 o "0 VI ;:o;:o:r: J>OfTI ~c....fTI -fTl-t ZO (;)-tJ>. " a -"0" oS:::: fTI~O'l uN 111 ~O> N 111 0> 7 "- N 6 111 5 co 0 4 (;) z 3 2 1 COASTAL ,---- ---- - - n~RSH - - - TOP Of' F XED DOCK - ~ I.-- - - ---~ ~._- - -- -- - f-- -- --- z - -- - I- - -- f--- -- -- -- I-- -- I-- .- -- - , i I-- . ---- - -- -- - 1-- -- --- - -- - I- - -- I--- -- -- -- - -- I-- .- -- - ---- I~ J I-- ' -- I ~ -- -- - f- - - - - I- - -- f-- - -- -- -- - -- I-- -- .- -- - ---- I-- -- ~~ -- 1 ~~ -- -- ~~ ~ 1-- - - -- - - -- I--- -- -- -- - -- I-- .- -- - -- -- f--'- -- - .....lolcO f-- -- I-- - -- - - - I- - -- f-- - -- -- -- - -- I-- .- -- - -- -- ",' '., ~, k *- ~ .- -- - ~- -- '-- --- - - - ~ -- f-- - -- -- -- - -- I-- .- -- - -- -- ~..--15'~ - ---- ----- ----- ---- 1----- -- I-- - -- -- -- - -- I-- .- -- - -- -- ~~ f# I- _EX.GRADEJ \ - ~- ---- ---- ----- ---- -- I--- -- - - -- I-- .- -- - -- -- o~.. -- --"t\ - "";- ---- ----- ----- ---- 1----- - -- I-- - -- -- -- - -'=- r--_ .- -- - -- -- m~ . .., 1----- -- -cI).(); 1---- ----- ---- ~---- - -- f-- - -- -- -- - -- I-- ! Co:..A, .. i ~. -z---2.---- L....._________ ---- ~----- --~- -- -- -- - -- ~- - -- - ----, o o.-.:tJ.. 0 0 0 0 0 0 0 0 0 0 0 ~,:;\., ,,0 $ 'f ~ If) 0 If) 0 If) 0 If) 0 If) + + + + + + + + + .0- ~,.:- 0 ~ ~ N N 1'1 1'1 V V If) If) '-d ..~ ...... ,~,tU)~ ....."< ........ ,O'd-1 ,.... -:4~ ...... 0:- J'\: .' -2 ~ C> .oh ...... .'.:::;" -3 - v . "'- ::':0 ~ : ('):2 GJ{ : C:rn ~ ;~ ~.~ ~6 ~~ .. -;, ~ -.. i~, '" <$'"", ~O.".Cl"Q ~,~ #7 ',f I".... \,'" "iiU.Htl\' EMBEDMENT DEPTH VAR lES CROSS SECTION SCALE: H: ,"= 60' v: ,"= 6' i~ J> 0 0 0 ~ a "0 0 ~ 0 - - l'Jl :r: ;:0 0 :r: :>< N ~ ~ a fTI fTI :=" !::l >;l:l z VI Z -t 0 fTI VI fTI I ;:0 o Xx 0 -l a Z f.;i3 C a VI N " J> - VI > ~t:lX t::l VI "0 :>< -1 t'" :I! U'l ~. VI t::l n> t::l N J>O ;:0 -t fTI I z. VI ~ m 0 "'l-< Z Vol VI -t VI -t !=' :<N C':l lD OJ OJ "0 Vol 00 P- o (') Z 4>0 ..... I ;:ox z o z (1) D 0 t::l (1) J> 0 0 t'" J>. N VI J> - t::l (1) ZU'l -l ;:0 "C ;l:l 0..... 0 -t )> ~I ..... fTI Z N :r: ;:0 co fTI F1 U1 r -t A 0> 0 ~ "tl J>. (") ~ ~ r 0 r c (") Z (f) -t V -< z I a ;:0 0 ~(/') NO ;:OJ> ;:00(;)0 ;:00 -t ~O '- J> 0"0 OI-<;:O OfTI :I: " J> N-l 0"0 OfTI-lJ> o VI 0 ::IJ r~fTI ;:0 0 ~ C;J> (1) fTI '- u a :>< z 0" 0 < fTI .. z;:O U1 fTI 0 fTlO m D O~ Z (f) :t> . 6 DECKING cr -' u :i s: M STRINGERS 6'-10' N.H..... NORMAL T IDE LEVEL COASTAL MARSH I 404 "'ETLANOS DOCK-TYPICAL SECTION SCALE : NOT TO SCALE o o + '" 6 5 4 3 2 1 o -1 -2 -3 -4 -5 -6 O"tlVl ;o;o:I: >OI'Tl :E'-1'Tl -1'Tl-i zn Cl-iUl u " 0 -"tl" r;;:: 1'Tl~0"I uN Ul ~CD N Ul CD "- ~ N Ul CD I DO DO DO 12 ~ o Cl Z STORE/OFFICE FRONT ELEV ATraN > ;;:: On ~ > -0 ~r :E '- -a::- l'Jl :I: :I: 0 ~o~ .., 0 1'Tl- ;0 Z VlrTl -i ~~> := rTl VlZ rTl I n 1\l:I::I:O u u -;; )> ~f,;Ci c: 0 ;;:: VI-u .,., )> - > 'ex t:::l N ^ --I I ~ :II! Ul :E' - CD ..,jC"l> t'r.I N >0 ;0 -i c .r";; I z. VI ::E m CD~-< Z (..oJ VI -i VI r LO g: g: Do "? 0 - I\l G') (..oJ - '2:"" .... I ~x r . Z 0 Z 0"1 Cl t'r.I 0"1 . ~ )> n 0 I\l ... NVI )> rTl Ql t'r.I 0"1 ZUl -i ;0 r DO 'DO CI1 := rTl DO DO CI1 n{..oJ ("l -i )> ..,j .... rn < Z N :I: ;0 )> CD rn -i FJ Ul r -i ^ DO 0 ex> 0 0 'tl ... n z ;.. r 0 VI r C ~4' @~/k z n -i en -< . z I 0 ;0 0 ~(C'~ < ~ -:~~~ 2P~ e5g~~ e5~:i 11 "f= ~ r;:: n ~ n~ -i ~ n~ n :IJ ~~~~ &> <'00' ~ ~rn,,-u 0 ^ Z Cll> 0"0 < rn .. z~ m ?~Q Ul 8 Cl 8~ r.;r~(IJ).. z en l> $, 3' DISTURBED AREA <1 I I I I I I I I I 20)-0" PAVEMENT/RIIGHT OF WAY I I I I ~. : I'a"/Fl' ~ VARI~ ]><=1tl''''~-rl;ll;l!m'Ji1iltlW)lli\lU:<O~-'I.. " "Be l,-,,,. BeSC MINIMUM TYPE 1-2. OPTIONAL TYPICAL STREET SECTION SCALE: NOT TO SCALE 60' CROSSING 140' NET WETLAND FILLI APPROX. 11' GRAOING 'SHOULDER 20.0' EXISTING DIRT ROAD BED 6' SHOULDER o EXISTING ELEVATION 6.0 5.0 4.0 3.0 2.0 1.0 0.0 l~Q'I..___ -= 1. D"L =- - - - - - - - - - - - - - U U U - - - uA-PPR-OXlMATE-GROUNO 'ELEVATION- - - - - - - - - - - - - - - - - - - - -- SHEET 6 OF 6 PROJECT: PM1258 DRAWING FILE: 1258/1258.DGN 40' NET WETLAND CROSSING SCALE: NOT TO SCALE 120' EXISTING - DIRT ROAD EXISTS) 3' DISTURBED AREA MAJOR CAMA-CROSS SECTIONS WHITE OAK SHORES WHITE OAK TWSP.. CARTERET COUNTY. CLIENT: FIRST & LAST CHILD. LLC ADDRESS: P.O. BOX 1253 SWANSBORO. NC 28584 PHONE: 252-393-6646 ~ STROUD ENGINEERING. P.A. ~ 15lA HIGHWAY 24 MOREHEAD CITY, N.C. 28557 (252) 247-7479 NORTH CAROLINA DESIGNED: RDC DRAWN: GYT CHECKED: RDC APPROVED: RDC DATE: 2121/05 SCALE: AS NOTED DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON. NORTH CAROLINA 28402-1890 OSOS {Co ~~(.l,utA- REPLY TO ATfENTION OF: July 19,2005 RegUlatory Division ActiJon ill No. 200500866 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 ~~@~u~~~ JUl 2 2, 2005 DENR. WAiER aUAi.Jr~~Idt'.\ol yel.ANDS ~ STORMW~'tE1\ DN'\I"'''' DeaIi Mr. Huggett: _ .. Reference the application of First and Last Child, LLC for a Department of the Army pe~t request to construct White Oak Shores RV Park and boat/fishing pier adjacent to the White Oak River, on Wetherington Landing Roaa;near Stella, Carteret County, North Carolina: The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or workishall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chietl Source Data Unit N CS261, 1315 E West HWY - RM 7316, Silver Spring, MD 20910- 3282 at least two weeks prior to beginning work and upon completion of work. " 3 . Except as specified in the plans attached to this permit, no excavation, fill or mechanized land-clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 4. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land-clearing activities shall take place at any time in'the constructipn or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 5. All mechanized equipment will be regularly inspected and maintained to prevent <fO~~tion of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials.. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall imm~diately report it to the N.C. Division of Water Quality at (919) 733-5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 6. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the neqnittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reasoB other than safety. 7. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772,.2191. 8. If the permittee discovers any previously unknown historic or archeological remains while accomplis~ing the authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination procedures. 9. Approval of the structure was based on determinations that there would be no obstruction to navigation. Issuance of this permit should not be construed, as relieving the permittee of taking proper steps to insure the structure and moored boats will not be damaged by wave wash. 10. The permittee shall advise the Corps in writing at least two weeks prior to beginning the work auth(j)rized by this permit and again upon completion of the work authorized by this permit. 11. The permittee shall require its contractors and/or agents to comply with the terms and conditions.ofthis permit in the construction and maintenance of this project, and shall provide each of its contrflctors and/or agents associated with the construction or maintenance of this project with a cppy ofthm permit. A copy of this permit, including all conditions, shall be available at the project s~te during: construction and maintenance of this project. 2 , .1 12. The permittee shall employ all sedimentation and erosion control measures necessary to prev~nt an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina Genetal Statutes Chapter 113A Article 4). 13. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTUs or less in all saltwater classes and in. all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 14. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration befor~ completion of the work will, without expense to the United States and in such time and mann~r as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre-project condition. 15. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corpsl of Engineers within 24 hours of the permittee's discovery of the violation. I ! 16. The West Indian manatee (Trichechus manatus), which is listed as a federally endangered speciqs, has been reported in the waters in Carteret County. In order to protect the West Indian manatee all work should be done during the period from November 1 to May 31. Ifwork must be done during the period from June through October the enclosed guidelines, entitled "Precautions for GeneIial Construction in Areas Which May Be Used by the West Indian Manatee in North Carolina" must ~e followed. I i 17. The Permittee will maintain the authorized work in good condition and in conformance with ~e terms and conditions of this permit. The Permittee is not relieved of this requirement ifhe abandbns the permitted activity without having it transferred to a third party. 18. No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violat~n of this permit for which the permittee is responsible. This prohibition shall be applied and ,enfor,*d throughout the entire existence of the permitted structure. 3 .,;, ___> _~ " .. , Que*ions or comments may be addressed to Mr. Henry Wicker, Wilmington Field Office, Regulator){ Division, telephone (910) 251-4930, I Sincerely, Henry Wicker Regulatory Project Manager Enclosure Copies Furnished (without enclosure): ~s. CyndilKaroly /' Qiv~sion of Water Quality ~otih Car4lina Department of Environment and Na~ral Resources 1650 Mail iService Center Raleigh, North Carolina 27699-1650 Ms. Tere Barrett, District Manager Morehead City Regional Office North Carolina Division of Coastal Management 400 Commerce Avenue Morehead City, North Carolina 28557 Nlr. rete~; njamin U.S; Fish · d Wildlife Service F~s~ and ildlife Enhancement Post Offic~ Box 33726 Raleigh, Nbrth Carolina 27636-3726 Commanding Officer U.S. Coast GuardMarineS~fety Office 721 Medical Center Drive, Suite 100 Wilmington, North Carolina 28401-4895 Mr. Ron Sechler National ~arine Fisheries Service flabitat C~servation Service ~v~rs Isla~d ~ea\1fort, ~orth Carolina 28516 i Mr. David Rackley NMFS, Habitat Conservation Division 219 Fort Johnson Road Charlesto~ South Carolina 29412-9110 i Mr. iRonal~ J. Mikulak, Chief W e~ands Ijtegulatory Section Water Ma4agement Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 4