HomeMy WebLinkAbout310668_Plan of Action_20180813I
,N (V c�z (t b t 10 5-
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number 31-668 County Duplin
Facility Name E&S Nursery
Certified Operator Name: Ira Delana Johnson Operator Number. #20098
1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
Lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N)
Level(inches)
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are
within acceptable ranges
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
`Attach a complete schedule with corresponding animal units and dates fro depopulation
Y animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3 Earliest possible date to begin land application of waste,
8/16/2018
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Ira Delana Johnson Phone 910-284-0426
Facility Owner/Manager (print)
Ira Delana Johnson Date 8/13/2018
Facility Owner/Manager (signature)
n
II.. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1
Structure ID: E&S Nursery
line m =
425 4 lb PAN
2.
Structure ID
line m =
lb PAN
3.
Structure ID
line m =
lb PAN
4
Structure ID
line m =
lb PAN
5
Structure ID.
line m =
lb PAN
6
Structure ID
line m =
lb PAN
n.lines 1+2+3+4+5+6= 4254lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o tract #
p field #
q. crop
r acres
s remaining IRR
2 PAN balance
(Ib/acre)
t TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u apphnhon window'
F1
Wheat
21.28
14400
3064.3
4/01-9/15
'State current crop ending application date or next crop application beginning date for available
receiving crops dunng 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3064 3 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 425 4 lb. PAN
FDA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 3064.3 lb. PAN
y. Overall PAN balance (w - x) _ -2639 lb. PAN
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN
based on new information If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility
August waste sample to be submitted to NCDA, for start of wheat season. Corn to be harvested week of August
13th, 2018 DWR will be notified just as soon as farm is in compliance with lagoon level.
PoA (30 Day) 2121/00'
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID)' I E&S Nursery
2. Current liquid volume in 25 yr/24 hr storm storage & structural freeboard
a. current liquid level according to marker
b designed 25 yr/24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
17.0 inches
19.0 inches
20 inches
39,000 ft2
48620 gallons
180 days
g. volume of waste produced according to structural design 41026 ft3
h current herd # 5600 certified herd # 5600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j excess rainfall over evaporation according to design
k (lines h + i +j) x 7.48 x 30 daystline f=
4 Total PAN to be land applied during draw down period
I current waste analysis dated 5l17/2018
m ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
41026 ft3
Oft3
22750 ft3
79507 gallons
3.32 Ibs/1000 gal
426.4 tbs. PAN
PoA (30 Day) 2/21/00