Loading...
HomeMy WebLinkAbout310593_Inspection_20181001Division of Water Resources Facility Number - Division of Soil and Water Conservation J/ 0 Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 9 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: INn� Region: t� Farm Name: Owner Emall: Owner Namer Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to I Wean to I Feederto Farrow to Farrow to Other Other Title: Latitude: Phone: Integrator: /yytV xV AV/ n Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er Non -Layer La er Design Current Dry Poultry Canacity Poo. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other. a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes yy I No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes [—]No ❑ Yes . No ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE ❑ NA ❑ NE Page 1 of 21412015 Continued Facili Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier. Spillway?: Designed Freeboard (in): 6\ Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 411 No ❑ NA ❑ NE (i e., large trees, severe erosion, seepage, etc ) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �4 No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [:]No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes DQ No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) T ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s)- 13. Soil Type(s)- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA RQ NE 15, Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA ® NE acres determination? T` 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA 7[� NE Required Records & Documents 19. Did the facility fall to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA [� NE 20. Does the facility fad to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ® NE the appropriate box. �� ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA '�J NE ❑ Weather Code ❑ Sludge Survey ❑ NA � NE ❑ NA r4 NE Page 2 of Z14/2015 Continued Facility Number: Date of Inspection- b I IN 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No 25. Is the facility out of comphance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ❑ NA " NE ❑NA 'WNE 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA '%� NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA �l NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA NNE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concem? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes] No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other. 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [A No ❑ NA ONE 33. Did the Reviewer/Iuspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34 Does the facility require a follow-up visit by the same agency? ❑ Yes JKJ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). �?. W6 haft'-Fi ed 4 inun agile m au n r � �IC)Y-VAC-e,A jV\Vv�ku�-Cj �1-y� oaw . ;vbbvs, cx- U_ UAS I\C)X vn db yt" ?(_br 4_� Sh-rry\ 030 Q) AaAllGX- d� -V C.A Uy-r—I CDYICe-rn " C,U gYwo� \O V. vo l N Y-) 0 \taA A t`t . 0 b J p0A yds -�z be Us SOM a; Reviewer/InspectorName: Ud"A.jJU6(l / t Phone:C( — S� Reviewer/InspectorSignatur . Date: to 1� Page 3 of 3 14/201 S