HomeMy WebLinkAbout310593_Inspection_20181001Division of Water Resources
Facility Number - Division of Soil and Water Conservation J/
0 Other Agency
Type of Visit: 0 Compliance Inspection 0 Operation Review 9 Structure Evaluation 0 Technical Assistance
Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: County: INn� Region: t�
Farm Name: Owner Emall:
Owner Namer Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to I
Wean to I
Feederto
Farrow to
Farrow to
Other
Other
Title:
Latitude:
Phone: Integrator: /yytV xV AV/ n
Certification Number:
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
La er
Non -Layer
La er
Design Current
Dry Poultry Canacity Poo.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other.
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes yy I No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes [—]No
❑ Yes . No
❑ Yes No
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
❑NA ❑NE
❑ NA ❑ NE
Page 1 of 21412015 Continued
Facili Number: Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
Yes
❑ No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier.
Spillway?:
Designed Freeboard (in):
6\
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
411 No
❑ NA
❑ NE
(i e., large trees, severe erosion, seepage, etc )
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
�4 No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental
threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
[:]No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
DQ No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
❑ No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
❑ No
❑ NA
NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA
NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals
(Cu, Zn, etc.)
T
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge
into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved
Area
12. Crop Type(s)-
13. Soil Type(s)-
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
❑ No
❑ NA
RQ NE
15, Does the receiving crop and/or land application site need improvement?
❑ Yes
❑ No
❑ NA
NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
❑ No
❑ NA
® NE
acres determination?
T`
17. Does the facility lack adequate acreage for land application?
❑ Yes
❑ No
❑ NA
NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
❑ No
❑ NA
7[� NE
Required Records & Documents
19. Did the facility fall to have the Certificate of Coverage & Permit readily available?
❑ Yes
❑ No
❑ NA
[� NE
20. Does the facility fad to have all components of the CAWMP readily available? If yes, check
❑ Yes
❑ No
❑ NA
® NE
the appropriate box.
��
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes ❑ No
❑ Yes ❑ No
❑ NA '�J NE
❑ Weather Code
❑ Sludge Survey
❑ NA � NE
❑ NA r4 NE
Page 2 of Z14/2015 Continued
Facility Number: Date of Inspection- b I IN
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No
25. Is the facility out of comphance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
❑ NA " NE
❑NA 'WNE
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA '%� NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA �l NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA NNE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concem?
❑ Yes
No
❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes]
No
❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other.
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
[A No
❑ NA ONE
33. Did the Reviewer/Iuspector fail to discuss review/inspection with an on -site representative?
❑ Yes
No
❑ NA ❑ NE
34 Does the facility require a follow-up visit by the same agency?
❑ Yes
JKJ No
❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
�?. W6 haft'-Fi ed 4 inun agile m au n r � �IC)Y-VAC-e,A
jV\Vv�ku�-Cj �1-y� oaw . ;vbbvs, cx- U_
UAS I\C)X vn db yt" ?(_br 4_� Sh-rry\
030 Q) AaAllGX- d� -V C.A Uy-r—I CDYICe-rn "
C,U gYwo� \O V. vo l N
Y-) 0 \taA A t`t . 0 b J
p0A yds -�z be Us SOM a;
Reviewer/InspectorName: Ud"A.jJU6(l / t Phone:C( — S�
Reviewer/InspectorSignatur . Date: to 1�
Page 3 of 3 14/201 S