Loading...
HomeMy WebLinkAbout510046_PERMIT FILE_20171231rype of visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason r Visit: 0 Routine 0 Complaint Wollow-up 0 Referral 9 Emergency 0 Other 0 Denied Access Date of Visit: iq 1$� Arrival Time: y Departure Time: County: Farm Name: NA _ Owner Email: Owner Name: Mailing Address: Physical Address: Phone: 1 !J ' Facility Contact: t Title: Onsite Representative: �' IhS�l� CSul Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Region: , , R Design l lIR4 Current I INllt llll Design Current TO city Design Current apr acity Pop. Wet; Poultry Cap Pop. Cattlera neaf uda� , Finish La er Dai Caw Feeder rVFeeder Non -La er Dai Calf Finish € Dai Heifer Wean Desi' n Current, D Cow Feeder p . 1'oult ,'� Ga aei , . Pop. Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other TurkeyPoults Other Other �uwwwµy.µ��µ�y,yayys€itlswmyafwu€sµu4wFiWNnl�s�+�uµ MMM�fpllYxi�€'MslvenwsguHss�4nN3 ,[t€cusnupyMuryygg{psMtAlw¢flE£ Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: _ a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? [—]Yes `0 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [] No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑Yes No ❑NA ❑NE []Yes RNo - ❑ NA ❑ NE Page 1 of 3 21412015 Continued Facilily [Number: I Date of Ins ection: cr I!q Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ® Yes a. if yes, is waste level into the structural freeboard? ❑ Yes Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Spillway?: Designed Freeboard (in): _ Observed Freeboard (in): l �� 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) ❑No ❑NA El NE EgNo ❑ NA ❑ NE Structure 6 ❑ Yes ® No ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes Ca No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ® No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes � No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA J�g NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA �Er NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Hcavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes .IR No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? [] Yes ❑ No ❑ NA JR] NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes] No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes Q No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA g NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes []No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA E"NE ❑ Weather Code ❑ Sludge Survey ❑ NA ONE ® NA ❑ NE Page 2 of 3 21412015 Continued ' Facil]1Kummer: l _410 jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ® NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA 2 NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 25. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes E] No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA CRNE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes �g No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. [:]Yes &No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? [:]Yes 0 No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes Ef No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes tg No 0 NA ❑ NE -F{eeb04 evjju f,9, af4ff 4vrri � o,#Xe. Se�r.ei �h�1�f � Q,. Layer, ©�Jh_jWe q. ergl t ov3j L� 1 00wel) In cw &/t n ow strucfdgl L c> a � �- [. 1 r �60ard_. rne- war-f-rc�s�'c�rc� 0Vefo�� n)j-Pear layaa, a o � r ib_g ©n hY 0/ r dd es rail g6 0,d( gh -i"oloYP adMetl* D1 _ � �fPn�r�r C IfJ�td 04'- h C� th �Ytoo]vecorl �� 1a yoa, ► � Reviewer/Inspector Name: �(L_ &l n-e ('e Phone: 17Q 7Q'—q 0 I ReviewerlInspector Signature: Page 3 of 3 Date: S ) Q a U If 21412015 Divi§ion of Wateii ter`c 'sacility Number L� !- y'� Dlislon o4fj4nd W onservatiau ®,�t7th�Agency Type of Visit: Compliance Inspection 0 Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral Q Emergency 0 Other Q Denied Access Date of Visit: Arrival Time: Departure Time: Q County: Region:� Farm Name: St4Y 1 e. Por Owner Email: Owner Name: W i S'f i Mailing Address: Phone: Physical Address: kk , PQirc Facility Contact: I h4ey skoh, so) Title: � �-ef Phone: Onsite Representati Certified Operator: Back-up Operator: Location of Farm: Latitude: Integrator: Certification Number: Certification Number: Longitude: Design Currentesign �l�il Current i` 1#1?IIII il6polli esign Current Pop. Swine j Capacity Pop. Wet Poultry Capacity Pap. Cattle y Capacity iFf�.liiflattR $$ lBtltlAlfFl�p tbN.�ltlffifit[Ga uri I�ISWII' i i .Wisa3idiltlills PIV4A€€€iE Wean to Finish La er Dairy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Daia Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder D 1?ouft . Cad aci Po P. Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Nan -La ers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other TurkeyPoults Oth=1 er I I�ry3kkS 10ther J Is4[PEfYqlu€3Pd#d.DIMNrilttp€(&(33�3'�x»ii�uplMrIM111h h�M<tt�iiii3€ x�MmNYOYnNnl43iVJlw�pnmve3ayrM€l�ylwNdlAFlwrvlvA(Pfia�wi{v}5pW,14t.I41ME€E�bPB€fw Dischar ee s and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑Yes "QNo ❑NA ❑NE ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes J�fl No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [RNo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued liacili Number: j - Date of ins ection:7 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑NA ❑NE ❑NA ONE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: a Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to theintegrityof any of the structures observed? ❑ Yes P No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes SkNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes `N No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes FX] No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 5 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crap Type(s): i�j� ��►ll��! Q cS V JtaP 13. Soil Type(s): Gr��ff�. II V 14. Do the receiving crops differ om those designated in the CAWMP? [] Yes V9 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes tR No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [] Yes ® No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ftNo ❑ NA ❑ NE Reauired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes CKNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes [XNo ❑ NA ONE the appropriate box. ❑ WUP ❑Checklists [:]Design [—]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes I' No [DNA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �q No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ERNo KI NA ❑ NE Page 2 of 3 �`�'� 21412015 Continued Facility Number: 4 - Date of Inspection: -7 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [g No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes C� No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 23 No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes [] No ❑ NA I'M NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes '� No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes Z[ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes] No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? if yes, check the appropriate box below. O Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes � No ❑ NA ❑ NE 33, Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 2INo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ®"No ❑ NA ❑ NE ..... ,, I (refer taiAaesho # �{Ex lamlan y.YES answers adddid/organ-add>Iti)nai recommendations or('anp-'othedreamments�a.k r vIdjIi Ilia&'y^.vll o r.l .olp �• �,. g [, ���I. Il3i.r:I:�,j ��P ;Iy1 ❑ €B€ fa l fH' rt8 I.4IeiP I °78 i i EI 1 E et. r :II :1 ,I ✓ i Y,- i ..a , ,Ill € i; i�.: -.r1 t..,., #r{}S , ttli(!i.-Idl ,S f,dddl, it Pr ..lad (@E l ilc>a.?GPPIt=-ddd,Itl. l!!di [dl.. IPd�€Ruth ?($ltll! Il NI li i ;di i td<i+r, I ? dl l se,drawmgs'of�fgeil(ty,. a, better,,explain,srtuations,{use,additional� pages: A& necessary).:",��:,r� f) ld(I?Ii1 ld if ��i ��li�(}, �i a�-- h►hitl�y has sv�`fi"ci$if S(ud)eSyry l4,14r 5 '? Ual .tV0 G6fdl)d'l .) . 5" s 4 u 0 10 yti 410 a, a�- Co 01 a IWMPA*ej Sol' 17-1-60d10 , WO d0a,oA19'Q f b6e d6lydf�ab,4/#�e 5)d 8 jl$ Woo -7 Pime coot GUf re,* DIv� {} + d{� `G' bda�f49� 4 �Ja.3l iq IV66 Sb3p Iagl�$ . 0-3.5,3,7s[J#5 Mdieja 9 06 l gig IDlasll� �r4na�aa �7)190 WOO Oy;) 0 �I3((� w00_77_7q �13J w06Y?A IS up` odAe Reviewer/Inspector Name: _�—d iy1 sch (j o 1 Reviewer/Inspector Signature: Page 3 of 3 U J &A, Sc }nMKOrU an y0 ✓ Phone: 11 q_W _V 9 k Date:U a Q 21412015 Division of Water Resources ',rracilit Number - © 0 Division of Soil anLZ d Uater Conservation �+ Other Agency Type of Visit: 19 Compliance Inspection 0 Operation Review O Structure Evaluation p Technical Assistance Reason for Visit: trRoutine O Complaint 0 Follow-up O Referral D Emergency () Other O Denied Access Date of Visit: 'Jjayj�2 Arrival Time: 'Q Departure Time: County: rin Farm Name: ���� ror Owner Email: Owner Name: }V}i� Phone: Mailing Address: Physical Address: W-N T6Xn,fr SI& A , Pout 60�j Facility Contact: • IhLel ns Title: y►ae"n Phone: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Integrator: Certification Number: % 3 Certification Number: Latitude: Longitude: Region: R Rio Design Current Design Current Curet Poultry Caii pacity Pop. Hint Cattle CapaPop. Wean to Finish Layer Dairy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean D Design Current Dry Cow Farrow to Feeder D . P,ouitr, Ca acity P,o Non -Dairy Farrow to Finish Layers Beef Stocker Gilts on -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other JEJ 10ther Discharges and Stream lmt)acts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes [jNo ❑ NA ❑ NE [] Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE Page I of 3 21412015 Continued Facility Number: - Date of Ins ection: Walke Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E No [DNA ❑ NE a. if yes, is waste level into the structural freeboard? ❑ Yes ❑ No [] NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in):_ Observed Freeboard (in): a3 Qy 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes f' No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �R No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ;K No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 15? No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �4 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes W No ❑ NA ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window{ Evi iep�7c�S of Wind Drift ❑Application Outside of Approved Area 12. Crop Type(s): ed0j �'(i 0 ,d C�1��� 13. Soil Type(s): ❑ NE 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes r'�7r No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes �] No ❑ NA ❑ NE 20. Does the facility fail to have al l components of the CAWMP readily available? If yes, check ❑ Yes �] No ❑ NA ❑ NE the appropriate box. ❑WUP [:]Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall [] Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge`? [] Yes tEg No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No D3�NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - Date of Inspection: 24. Ad the'Iacility fail to calibrate waste application equipment as required by the permit? ❑ Yes JgNo ❑ NA ❑ NE 25. is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes tg No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30, Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below, ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes CS No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑Yes 4No ❑NA ❑NE ❑ Yes M No ❑ NA ❑ NE ❑ Yes `® No ❑ Yes [A No ❑ Yes Dg No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer, to question #):.Explain any YES answers and/or, any additional recommendations,or any other comments. Use �drawings`of facility to better explain situations "(use additional. pages as necessary). a� }vhi* will nel�. � hrs Coi6L4? @d-b l� 13) II g -7. Asmdll r' ison D�Fs^� s,sl�d% 5��e iabob* p��� lrrl a or)ab0Arnftow G�fza Br tri.� s YV411 be— e- 5, s Y '3 -his's M-K. 4s 3g 01.cdtfb o al04 Flow 70 4g a` wak AAakys>P) � srYt�O q 41q I � n hrOD 3� 3 /1141 � qhl try MOMS 613011r YVOW03� 31 hrDOb b+111na i s u'o'M dE cttI✓ J soi � �763s' 31aa �l� �.Irne �70� Pall d*s w2 below 1 Tonkc, . &Oi,l w lMober Reviewer/inspector Name: l aQ_5('hAf I Phone: 11`1 (7IHOI? { Reviewer/Inspector Signature: Page 3 of 3 UJOd� schn�i�r(�7ncd�n r q Q✓. Date: AVI - a o 12 21412015 DIMS CPJS 34711 (o Type of Visit: V Compttll ce Inspection Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: VRd'utie O Complaint O Follow-up O Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: td` Arrival Time: Departure Time: � County: Farm Name: s F`Ur Owner Email: Owner Name:Yc�Tt'y/[7D&J YyJ,. )*,Jd,0W r*,V.s Phone: Mailing Address: Region: R Physical Address: DO-7y U�uner D ri'ddp- �. P&,- Ooks Facility Contact: Tyhl�y S�/IS�/1 Title: Phone: Onsite Representative: �flf'lri�,yUi1$tSQn Integrator: Certified Operator: hlh lfv ,,) Pehe,1 m Certification Number: � 1o43SI Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Swine Capacity Pop. Wean to Finish Design Current Design Current Wet Poultry Capacity Pop. Cattle C►apacity Pop. Layer DairyCow Wean to Feeder Non -La er DairyCalf Feeder to Finish Farrow to Wean Dairy Heifer Design Current Dry Cow Farrow to Feeder Farrow to Finish l Dr, Poultry C*.a .aci Layers P,p ,. Non -Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow rk Other koults Other ItOutrhe±r Discharees and Stream Imnacts 1. Is any discharge observed from any part of the operation? . ❑ Yes 2 No ❑ NA ❑ NE Discharge originated at: ElStructure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ® No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Q No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412014 Continued vaciFTN umber: - Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ® Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Cc Spillway?: Designed Freeboard (in): Observed Freeboard (in):_ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ® No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes CR No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window Evidence of Wind Drift [3 Application Outside of Approved Area yyyy,❑ 12. Crop Type(s): Md��.,_1P !P_ %01,�i_7j Vl#lyQa l� 4 6,214 SM411amio 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [2 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes W No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes CE No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ® No ❑ NA ❑ NE 18. is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP []Checklists [:]Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes M No ❑ NA ❑ NE 4421 ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA [] NE 23: If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ® NA ❑ NE Page 2 of 3 21412014 Continued Facility Number: SI 1 Date of Ins ection: � I I'S 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes CR No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes R] No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? [—]Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [:]Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? [:]Yes ® No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the []Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ® No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question ##): Explain any YES answers and/or any' -additional recommendations or;anyother,, comments., Use drawings:of'facility to better explain situations,( use additional pages as necessary). a�E�rh 1`IQ wi11 r ed hovy cur& ed- bit -he ed �y �a19 y3A �ls 51�d �r� r esfi " -ar el la to aS, �s a� ly for a� �� ,-�1-s i �f�,,'il-)I �i� ,y h � 17`t IT la rrSlI wd.sUrvey -h,Is�qdr, a9'Cal ibtdon 1"13al1q, wir II heek Cali Woj-Ws year t, �Va sameks rr7 5oI)S0 i s(.ao�`6k, 4�a1�3� �f -n r�r_below Ira,/a-c, 14Q00, 1ao<<� 4i14 1 1) so +U, �eed�.�iis �� , Ma n4 lime, I�i1�l� wooer, y % �1�Ils W00 M3 I 31aa1�s w��o1 11311 -��bah►1 �a�y bjo fflfe_ L'Tqd �d, iv'i�.r r ea�e�Clih�all CB��n�#a816 403 4t dory In i Yr mWcAIn ph)-toexild, p � Won., k-fa0O� MUem; FV-to W pil�noa eat �, �"C&�.qXo (N�)a9wed d) s111b is ofo d�e, M&W, ok ti-5� MmlyW944,1111w l 11, Reviewer/Inspector Name: ���-'1 ScJr nN_fi�r Phone: qlq jq j-ga3 y Reviewer/Inspector Signature:tp/l, Date: a Page 3 of 3 21412014 Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: P Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ® Arrival Time: Departure Time: County: Farm Name: 5 Fbor Owner Email: Owner Name: 1✓ Phone: Mailing Address: Region: *PJa Physical Address: _ �� ahvn-A. Mdao , PoI!! QQkl Facility Contact: s Title: Phone: Onsite Representative: �1/h � Q/yPAC& Integrator: Certified Operator: ��1r1 �rS�e�he�lst�t - - -� Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Wean to Finish La er DairyCow Current Pop. Wean to Feeder Non -La er DairyCalf Feeder to Finish DairyHeifer Farrow to Weant. Farrow to Feeder Farrow to Finish j$ Design Current Dry Cow Dt. P.ouitr, Ca aci I;o Non -Dairy Layers Beef Stocker Gilts Non -Layer Beef Feeder Boars Pullets I Beef Brood Cow Other Other Turke s Turkcy Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes & No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) []Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? []Yes n No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes CgNo ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facility Number: - qh jDate of! ection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes RNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? [:]Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier:� Spillway?: Designed Freeboard (in):_ Observed Freeboard (in): a9_ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ® No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes Qg*No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [—]Yes n No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes j'0'71 No ❑ NA ❑ NE maintenance or improvement? Waste Apolication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ® No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes RNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA 0 NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes VN No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. C' Yes [:]No ❑ NA ❑ NE X] Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 11001j No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No � NA ❑ NE Page 2 of 3 21412011 Continued Facility umber: 5 - Date of Inspection: $ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Z] No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28, Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Z No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA N NE ❑ Yes [-No ❑ NA ❑ NE ❑ Yes Z] No ❑ NA ❑ NE ❑ Yes % No ❑ NA ❑ NE ❑ Yes n No ❑ NA ❑ NE ❑ Yes X No ❑ NA ❑ NE ❑ Yes Zj No ❑ NA NE ❑ Yes � No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any.other comments. Use drawings of facility to better explain situations (use additional pages as necessary). %_wh;t q n>pdr & ho j coA-fil►o tht &0 of-ftle yea^ ,. la130114 �daw►�� 5,0 Lif q�f0 1a)3011y - 5�y�E� 7��, J abg � 1E ref +�dE Careeis,] ay Cad r� ayvs>aMla t]s00 1_�9- sl1 7I�1�pkfioD0ca#r, N&Ss Mf�� �M3(a Oda .wDO(mp 4IlpI W00 �sliy wdeh WNrvyy bP �(aol wed yvpos �b J 3 )mil i } I S II Sam le aalclA Cv�gjq(5- `1 �,Dq& rnow 6tYj lie 6 , Vellm, . a; l ll Ij p`�» Ja>� � CAdd f�'thal ink a W� ko- PadUc� COryJ. Reviewer/Inspector Name: 4-tQ_owee,6' ylodn Scharf& Phone: R1R7%_g0_3y Reviewer/Inspector Signature: Page 3 of 3 Date: g a0 S 1412014 M � Div'i"sion of Water y KZ'�0� J Facility Number j - ®Division of Sail and Water Conservation Other Agency Type of Visit: & Compliance Inspection 0 Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: OFRoutine 0 Complaint O Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access ilol Date ofVisit: Arrival Time: r , Departure Time: Farm Name: _%Ai y _ R lGU1 P_ V Q/' Y Owner Name: 1�Vht� ��P4 .shYDIFf'nS S Av �Ll/M Mailing Address: Physical Address: Facility Contact: Onsite Representat Certified Operator: Back-up Operator: Location of Farm: 81,101 Owner Email: Phone: County: Region: �0 Title: ow,14- Integrator: Latitude: Phone: Certification Number: 1643 Certification Number: Longitude: Design Current Design Current Swine G, a —pa c I t ipop. Wet Poultry Capacity Fop. Wean to Finish Layer Design Current Cattle Capacity Pop. Dairy Cow Wean to Feeder 11 INon-Layer I Dairy Calf X1 Feeder to Finish Farrow to Wean Farrow to Feeder Design Current it Ca aci P.o P. Dairy Heifer Dry Cow Non -Dairy Farrow to Finish Layers Beef Stocker Beef Feeder Gilts Non -Layers Boars I Pullets Beef Brood Cow OtherI Other Turkeys Turkey Poults Other Discharpes and_Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes R No ❑ NA ❑ NE []Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [:]Yes No ❑ NA ❑ NE " ❑ Yes No ❑ NA ❑ NE Page I of 3 21412011 Continued Facili N mber: - Date of Inspection: 411ollij Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [RNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [] No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): ,3 1 a 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes CgNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes rRNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? 0 Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ®' No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes C'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area �,Crop 12. Crop Type(s): i tt�t,L rQal-b2l 13. Soil Type(s): I-e0d, S 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ®' No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes CR No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes CR No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes C2 No ❑ NA ❑ NE ❑ Yes [5j No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes S No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes N No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [2 No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes allo 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [] No ❑NA ❑NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE Ga-NA ❑ NE Page 2 of 3 21412011 Continued IFacility Njimber: .9- y Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [' No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [R-No ❑ NA ❑ NE the appropriate box(es) below, ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ['No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes [5j-No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes CRNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �'No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes Ef No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [S No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [M No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [g No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of'facility fo.better explain situations (use additional pages as necessary). r)f-,Pd r hrs co,-Sih ed beFb,e- to le 11s- t� as� sr� °�9� st���eys nl�ed ~k�l r pol Lan mar -�Ic , p-i-cols a, C40 6orfiol d A� it s � P l�1PGY',_ ap#� Coil �ar�DA1' W� � �g9�m �ia�l�d �a9lP m Mel a I"so i 004l751' 1' (414113 -sLq0 qQow COrtPr4 Zrir���, A41 pgirv.�d* I `�/u'cle ii!r�Pnr�r �sIf- 4notyfj W0034-7 1131+y "DI WOO I-7q a, g1)(5(1.3 0.17 w®® _;qa�, 5_130 (13 I-�3 Woo 0a07 3 iarl 13 7t Pleo)e_ yvol k a, pas 0,1 10 jfrm 001 form har resJmL us� k sheep who'e+h e- no do rc7l�vc,� c, -lve r�G�lS�r.0 p•,d vle tie Y'' �e �_fiA � - I' boa "INN- e4, add u -b �1$, a+oryot-v dove--t�llr n�hll a� sArw*&I n m 61 �9 1 Reviewer/Inspector Name:p�n Reviewer/Inspector Signature: Page 3 of 3 M1-m Phone: Date: Apnd i o a 0 21412011 n htS 011311 iVj Type of visit: ® "mpuance inspection v Liperation xevtew V btructure r vaivanon V i ecnnicat ,assistance Reason for Visit: 0 Routine ($Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ® Arrival Time: Departure Time: County: T o h#9`6 Region: P R Farm Name: Owner Email: WA 'IVY ibafS' mef_ 1 � Owner Name: ��il T �'�y S` eOpheidol Phone: Mailing Address: Physical Address: Facility Contact: Wh l l t, E�ey l (m Title: QVd er Phone: Onsite Representative: 1 Integrator: h 1t. ff Certified Operator: KA-1ty SkA."Sal Certification Number: 16 13 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry C.apac�ty Pop. Cattle Capacity Pap. Wean to Finish La er = I Dairy Cow Wean to Feeder Layer Dairy Calf Feeder to Finish DairyHeifer Farrow to Wean Design Current D Cow Farrow to Feeder Dr. Point . a Ca a, P,oP . Non -Dairy Farrow to Finish I Beef Stocker Gilts I Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? ❑ Yes J�j No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes 0 No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes 2 No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2011 Continued Facili Number: - Date of Inspection: Waste Collection & Treatment 014) 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes o ❑ NA ® NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ❑ No ❑ NA ®NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ No ❑ NA ® NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes [] No ❑ NA ® NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA ® NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ONE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA [@,NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA Cj;?NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ® NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA 2g NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA ® NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No []NA ONE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA C'NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA [Z NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [:]No ❑ NA aNE the appropriate box. ❑WUP El Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ® NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and l" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ® NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [:]No ❑ NA MINE Page 2 of 3 21412011 Continued Facili Number: 51 - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA [R NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA U NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 24. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ® NE ❑ Yes ❑ No ❑ NA NE 2] Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA [Sa NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ® NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ® Yes ❑ No [DNA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ® Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ® Yes ❑ No (] NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Its 1"nsfectlq1 War d1fe.'Fv 0,1 an�rn aw Ca►a Idrf- merved eelY Hadar, a, al/oft y g6a,i - &eqfi ha M de adpfts e awe a°,,- a 16d r a; 3o PAf ei�- Chec441-hcf-'+d--%M lxeial P -jlvt proceed&L_�a`f� Secm,d a�r4,,Thls ell -was c0'A'91eV6CC(W_e 9"Ve, aid ma+a I fr rVar al ve -t v PP O e& -N e om e� , I`l- laokl�C � have be% a. Me i� Ona h i l l sho ld'er Ivi-, file. l aid svr c� Oh es% C asf ef�r ca 11 talda ( 3rs ; A( 21da ,The talusVwol aj� OAd,Scttir a� .319) f �;JgA4 wehi-ka. , Peju oir `f�rnamat MW6( cal( btlrl'q I wi-r a q h ots ai`-a m Jj rm 0, d 1=ii*7(P_ o' 5-bofWF &0" a f (ow l �r_f-eaP7 , XJJ&17a I r �e�n'rP�IrGt`�1`f�QbnlYm4j mAhl are /lavt f file.S' e �efe/rin re�(�+U� iI n t/At s f , 1 ' uloL f A�F i aU , Th,e ma sht�ld 6e Sen`f- iv-Ne. R �Gha D�Frce w,�'; / da p ?wa.r (1il� r 14- w, O'h fih� 1 � 4e nvl�es sod+c� n �`1^e v� �w�71f� 1� r`�'h � �, Dwn�ay` 7��,e , ewar`m abo `h,e n �r�,al ma al,'� re�L��PMat�l a6o y: as PM l,�l 31�j rvI`fi� � r �e�l a-, Comrnen�andclarA&c bjj e Mj1,je(a, �1,� a,df�e, hu�dco w'lJbe b 3 �11 w- u�'bc�ler�q, ire yew �trral si , h1/ bedo,e '`�' (�) V1h `heA4Ww i fib-, w pia weeks, .7 ('`i1' Reviewer(Inspector Name: s'C j}f h Phone: % I 7q —y)0 Reviewer/Inspector Signature:%41kDate: "mil 13 )ow - Page 3 of 3 21412011 Division of Water Quality Facility Number - ® Division of Soil and Water Conservation Other Ag ;ncy Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County:,3tA,1tiS(`Cr&/ Region:. Farm Name: Say., dam! y d fLK Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Integrator: Phone: Certified Operator: V��hl*� ��1eQt►e,n50�J Certification Number: Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Swine Wean to Finish Design Current Capacity Pop. Design Current Wet Poultry Capacity Pop. a er La' Design C►urrent Cattle Capacity Pop. Dairy Cow Wean to Feeder Non -La er DairyCalf Feeder to Finish Design Current D_r, I;oultr. Ca ueit P,o .. Layers DairyHeifer Farrow to Wean Farrow to Feeder Farrow to Finish Q D Cow Non -Dairy Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow I I ke sPoults Prkey Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation'? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State'? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes I/(No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes [ f_No ❑ Yes 7 No ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE Page 1 of 3 21412011 Continued Facili umber: 5 / - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes gNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structtge 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier:�11! Spillway?: Designed Freeboard (in): Observed Freeboard (in): an_ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ONo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes WfNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement`? ❑ Yes ZNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ONo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ONo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [EI/No ❑ NA ❑ NE maintenance or improvement'? 11, Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Excessive Ponding ❑Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): L 13, Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes .j No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes , f No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ZNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ZNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ff No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ZNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ,2!rNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below, ❑ Yes 7No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I " Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ,E� No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes eNo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑NA ❑NE Page 2 of 3 21412011 Continued Facility Number: - Ds ection: `6 — 24. Did the facility-tail'ty cto calibrate waste application equipment as required by the permit? ❑ Yes %%%t/I No 25. Is the'fal ilioutompl of ciance with permit conditions related to sludge? If yes, check [] Yes No the appropriate box(es) below. a0 4 a �): - ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ NA ❑ NE ❑NA ❑NE ❑ Yes WrNo ❑ NA ❑ NE ❑ Yes eNo ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes �fNo ❑ NA ❑ NE ❑ Yes 0No ❑ NA ❑ NE ❑ Yes jZfNo ❑ NA ❑ NE ❑ Yes ONO ❑ Yes ,] No ❑ Yes eNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or; any other commentL.; £ , Use drawings -of facility to better explain situations; (use additional:; . ages as necessary]. rcn - Cj 1 t'l oil o ` Reviewer/Inspector Name: Reviewer/Inspector Signature Page 3 of 3 Phone: Q I g 7914931, Date: 21412011 Type of Visit: /40 C_om�fiance Inspection U Operation Review U Structure Evaluation Q Technical Assistance Reason for Visit: .Routine i) Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access t Date of Visit: Arrival Time: Departure Time: County: Sohfl5jQfJRegion: e �� r Farm Name: 5CL ` �`,, Q _ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Phone: Integrator: Certification Number: 11,aL Certification Number: Longitude: Design Current Swine !opacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Wet Poultry La er Non -La er Dr, P,oultr, Design C►►opacity Design Ca aei Current Pop. Current P,o .. Design Current Cattle Capacity Pop. Dairy Cow Dai Calf Dairy Heifer Dry Cow Non-Dai Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other"Turkey Other keys Poults Other im Discharges and Stream impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge?. ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes []No ❑ Yes J;31No ❑ Yes No ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE Page I of 3 21412011 Continued lFacilky Number: - Date of inspection: of Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes.,ZNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):5 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Structure 5 Structure 6 ❑ Yes �no ❑ NA ❑ NE ❑ Yes goNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E Vo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) /� 9. Does any part of the waste management system other than the waste structures require ❑ Yes :'� }' o ❑ NA ❑ NE maintenance or improvement? / Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes )2< ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Z'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13, Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes RTI�o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Z&o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes eNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment'? ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 2 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes. No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZrNo ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes„ no 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 12,-No ❑NA ❑NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑NA ❑NE Page 2 of 3 21412011 Continued Facilit Nu=er: - G Date of Inspection 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ;2 o ❑ NA ❑ NE 25, Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [;;,1tTo ❑ NA ❑ NE the appropriate box(es) below. TT ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes F,-O�o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ell J' No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 3 1. Do subsurface tile drains exist at the facility'? if yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Signature: Page 3 of 3 ❑ Yes�o ❑ NA ❑ NE ❑ Yes P[lNo ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE ❑ Yes f!fNo ❑ NA ❑ NE ❑ Yes [�fNo ❑ NA ❑ NE ❑ Yes �`No ''❑ NA ❑ NE ❑ Yes �❑ NA ❑ NE Phone/ ` 7V Date: . :5144 0�-) 21412011 Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit�R%ouettiine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: If/J/1� 1l Arrival Time: Departure Time: County:3Q J( dNt/Region: OZR0 Farm Name , In CIU 9,l _A gzJo (' k _ Owner Email; 0 Owner Name: 3 t-C_P jla0 dV_) lV`S Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: iiiiiiiiiiiiiiiiiiiiiill Design Current Design Current Design Current Swine Capacity P. Wet Poultry C pacify Rap. C*attle Capacity Pop. Wean to Finish La er Dai Cow Wean to Feeder Non -La er Dai Calf Feeder to Finish Dai Heifer Farrow to Wean IbOD n Current re D Cow Farrow to F e r Dr, P.oultr ci Pao Non -Dairy Farm 2k Layers Beef Stocker Gifts 4E I Non -Layers Beef Feeder Soars Pullets Beef Brood Cow Turke s Other Turkey Pouets Other Other Discharges and Stream Impacts 1, Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? []Yes []No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes []No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) []Yes []No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes eNo ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facili Number: 51 - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 0 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 35 3� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [''No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [] Yes V No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ YesTNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes I /f No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 7`-'' 9. Does any part of the waste management system other than the waste structures require [:]Yes Z No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [�fNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 16 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ hlydraulic Overload ❑ Frozen Ground ❑ heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s). 14. Do the receiving crops differ from those designated in the CAWMP? [:]Yes allo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes��o ' ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 25"No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes V No TT ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Ej No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [] Yes PI -No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ONO ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 71'No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes V�No ❑ NA ONE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili Number: -_j jDate of Inspection: 67 24. Oid the -facility fail to calibrate waste application n equipment as required by the permit? ❑ Yes ErNo ❑ NA ❑ NE 25. Is [he facility ©t ooff coreianceLwiith�ehnit conditions related to sludge? If yes, check ❑ Yes Rio ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ,�No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes El"No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ONo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �2rNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ,PI/No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ,2!rNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes .L'_I No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommeiidations:or�any other comments." ��,• . �x� �: Use drawings of facility to better explain situations (use additional pages as necessary). a o E D S wa- Sf a-s) Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 jt�_ I y 9 °70 j, o'tA du-'- 9 O 11 a- y- ag--►I Phone: b Date: 1, h / 011 0 " L f Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance n for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time- i / i7t - i County: ORegion: % 1"% e Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: QQ Title: Onsite Representative: �.�„ 1LS _ �J deiAOAIAPn Certified Operator: Back-up Operator: Location of Farm: Owner Email: Phone: Phone No: Integrator.'%31 � Mo rttiln," Operator Certification Number: Back -up -Certification Number: Latitude: ❑ o ❑ I ❑ « Longitude: ❑ ° = 1 Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity Population ❑ Wean to Finish ❑ La er ❑ Dairy Cow ❑ Wean to Feeder I 1 10 Non -Layer I I ❑ Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ Layers ❑ Dry Cow ElNon-Dairy Farrow to Feeder lb ❑ Farrow to Finish El Stocker ❑ Gilts El Non-Layers ElBeef Feeder El ❑ Boars ❑Pulle ❑Beef Brood Cow LiTurke s Other ❑ Other ❑Turkey Poults ❑ Other I Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes /No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ YesI o ❑ NA ❑ NE ❑ Yes XNo ❑ NA ❑ NE Page I of 3 12128104 Continued Facility Number:: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ONo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 St ure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA El NE (ie/ large trees, severe erosion, seepage, etc.) /// 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes NA ❑ NE IdNo❑ through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes �No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes UlNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) I4. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �dNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [ZNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes LQ No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes L No ❑ NA ❑ NE 'IfIi-ti�i Reviewer/inspector Name ~: ` t Ali'; r t_ Phone: % and Reviewer/inspector Signatur Date: d Page 2 of 3 1212*104 Continued Facility Number: 15— Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes XNo ElNA ElNE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ElNo Yes . ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ;2No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes dNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ZNo ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Flo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ZrNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ElYes No ElNA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes PKNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 01&o ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes eNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately '� 31. Did the facility fail to notify the regional office of emergency situations as required by []Yes RfNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ZNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes La No ❑ NA ❑ NE Addit>analComments andlo`r, Drawin s i {; TT-a-e 10 6 W_-t� SO - ONka� ao I n aA-'_k 0 9 ce/sleq p- 9 . (6 :11l : q tS ffa- UA dam- s o c I r Ulv) 44-k� Page 3 of 3 12128104 R Division of Water Quality Facility Number Q Division of Soil and Water Conservation O Other Agency Type of Visit C pliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason fqr V it Routine O Complaint O Follow up O Referral O Emergency `O[ Other ❑ Denied Access Date of Visit: s;m�_o r� r V `-' of Arrival Time: t Departure Time: County Regi VFarm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: = 0 0 6= Longitude: 0 o 0` 0 Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er ❑ Non -La er Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Cattle Design Current Capacity Population ❑ Daia Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes /rNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes Z Noy ❑ NA ❑ NE El Yes P No ❑ NA ❑ NE 12128104 Continued Facility Number: s — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate`? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 21 No ❑ NA ❑ NE (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes 21'No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 2 No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ;54 ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes /No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes Oo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ONo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 0"No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?El Yes [:�No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? El Yes ] No ❑ NA [I NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: r?q Reviewer/Inspector Signature: Date: J 12128104 - Continued Facility Number: —L Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps El Other ❑ Yes JZ/No ❑ NA ❑ NE ❑ Yes,,2rNo ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ,2No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfali ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? []Yes ?(No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �io ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Z No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ZNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ZNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes RrNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes �KNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes PNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes J!rNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ZrNo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ YesZrNo ❑ NA ❑ NE AL sv i -Xoj', 1,3 s l i 10 9 r,/ / G / o 1, 1 1, 3 Page 3 of 3 12128104 Type of Visit 6mpliance Inspection 0 Operation Review O Structure Evaluation 0 Technical Assistance Reason for Visit j�>0outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit:9?�OI-N k I e—% a Arrival Time: ICJ Departure Time: County: Region: Farm Name: Owner Email: Owneri�1�� '>r.7i1.•1+l►>>�`r!7��ITtt:��+lf�)J��a1L� .Phone: S Q Mailing Address: Kv_r_ '+ r Physical Address: Facility Contact: Onsite Representative: _l Certified Operator: �11� �-I P 5 l7hO VLS�i V Back-up Operator: Title: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: = o = 1 = 11 Longitude: = ° = 1 = Design Current Design Current Design Current Swine Capacity Population Wet Poultry Ccity Population Cattle Capacity Population ❑ Wean to Finish ❑ La er ❑Dai Cow ❑ Wean to Feeder ❑Non -La er ❑Dai Calf ❑ Feeder to Finish ❑Dai Heifer ❑ Farrow to Wean Dry Poultry, ❑ Dry Cow ❑ Farrow to Feeder ❑ Non -Dairy ❑ Farrow to Finish ❑ La ers ❑Beef Stocker Gilts ❑ ers ❑ Beef Feeder PEl Boars Pullets ❑Pllets ❑ Beef Brood Cow ❑ Turkeys the ❑ Turkey PouIts ❑ Other ❑ Other Number of Structures: Discharges & Stream Impacts i . Is any discharge observed from any part of the operation? ❑ Yes ONo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes 4,No El NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) El Yes �No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ NA El NE 2. Is there evidence of a past discharge from any part of the operation? El Yes ,Z/No 2 o El NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State El Yes 7No ❑ NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): S 5. Are there any immediate threats to the integrity of any of the structures observed'? ❑ Yes o ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ,� / ?"No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes V No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [I NA [I NE maintenance/improvement? tNo 11. Is there evidence of incorrect application? If yes, check the appropriate box below. El Yes ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ) No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes �rNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes El NA ❑ NE 18. Is there a lack of properly operating waste application equipment'? El Yes VN ❑ NA ❑ NE .I P. �f .*;°'rsk. �.k x,,d.i . omen�ts��{ efer togiiesttons#) Expla�tnapyYES answersand/oar any, rec�o�mmendnon�s orany other comrnents. Use druwmgs of facility toybetter cxp�ain�s,ituat�ons (use additional pages,asJhecessaryl) Reviewer/Inspector Name ( Phone: Reviewer/Inspector Signature: (1 9 Date: Page 2 of 3 1 f 12128104' Continued Facility Number: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check Yes�Ko ❑ NA ❑ NE the appropirate box. ❑ WUP ❑Checklists ❑Design ❑Maps ❑Other 21. Does record keeping need imp vement? If yes, chec the appropriate box elow. []Yes V]No ❑ NA ❑ NE ste Application Weekly Freeboard Waste Analysis Soil Analysis aste Transfers A ual Certification Rainfall Mocking Crop Yield 20 Minute Inspections Monthly and 1"Rain Inspections?No Bather Code 22. Did the facility fail to install and maintain a rain gauge? El Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. D' tj��faci� email to calibrate waste application equi ment yequired by the permit? 25. id t facility fail to conRct a sAie� as required bye permit? b 26. Di the faci ity ai to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? Comments and/or Drawings: 0 Al i y- &OPY N4"u4t4-- ElP�o ❑NA I--] NE ❑ Yes No ❑ NA ❑ NE ❑ Yes 2fNo ❑ NA ❑ NE ❑ Yes �rlqo ❑ Yes PNo ❑ Yes JNo ❑ Yes ZI No ❑ Yes 4NO ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA [I NE ❑NA ❑NE ❑ Yes �f l ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE ❑ Yes ;No ❑ NA ❑ NE 12128104 FARM WHO 5RP002 5/26/2008 5/25/2008 W06433 3/26/2008 1.8 1 /2612008 Irrigation 5/7/2008 W04170 3/8/2008 1.5 1/8/2008 Irrigation 1 /712008 12/30/2007 12/29/2007 W02929 10/30/2007 1.6 8/3112007 Irrigation 11/4/2007 W01624 9/5/2007 1.9 7/7/2007 9/14/2007 W00347 7/16/2007 1.7 5/17/2007 I -- Division of Water Quality Facility Dumber O Division of Soil and Water Conservation -n O Other Agency Type of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 F flow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: eparture Time: Con ntyz6&9 r-22yn% Region.l Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Owner Email: Phone: Phone No: Onsite Representative: iv Integrator: Certified Operator: J�%17«T 1� Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Latitude: 0 O = 6 0 Longitude: 00= 1=" Design Current Design Current Capacity . Population Wet Poultry Capacity Population ❑ Layer i� ❑Non -La et Dry Poultry Nc Pu Other 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocket ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State'? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes �No ❑ NA ❑ NE ❑ Yes [�No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑ Yes/No ❑ NA ❑ NE 12128104 Continued Facility Number: J Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Identifier: $� Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 4 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes epNo ❑ Yes , No Structure 5 ❑ Yes ICJ No ❑ Yes 6 No ❑ NA ❑ NE ❑NA ❑NE Structure 6 ❑NA ❑NE El NA El NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes yNo ❑ NA ❑ NE 8. Do any of the stucwres lack adequate markers as required by the permit? ❑ Yes VNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes VNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes /No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes OKNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes PNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? El Yes KNo ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ONo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment'? ❑ Yes PNo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: Reviewer/Inspector Signature Date: 12128104 Continued Facility Number:$ Date of Inspection Required Records & Documents 19. Did the facility fail have Certificate of C v rage & � r ' readily available? ❑ Yes �N ❑ NA ❑ NE 20. Does the fa li y ail to have all � components ofthe CAWMP r adi1 available? if es, check Yes No NA NE facility p � Y ❑ ❑ ❑ the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑ ether 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes KNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard PrWaste Analysis Soil Analysis El Waste Transfers El Annual Certification El Rainfall [I Stocking ❑ Crop Yield ❑ 120 Minute Inspec ions ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes ANo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ANo ❑ NA ❑ NE ❑ Yes XNo ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes /No ❑ NA ❑ NE ❑ Yes VfNo ❑ Yes V(No ❑ Yes FfNo ❑ Yes PNo ❑ Yes o ❑ Yes No El NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Additional Comments and/or Drawings:] 0 Q7 4 spy% 9/6107 _to 003 9�' �/'/ ' 9 :2 LP� 12128104 Type of Visit .110 Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit (1 Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: f Arrival Time: 1a Departure Time: CountyA.O1 FST. %A Region: Farm Name: SA,J91/ 8--12C,C_ CC) S-V-- Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: W 4 11f_4 S''i+=! 69nL J Certified Operator: Back-up Operator: Location of Farm: Design Current Swine Capacity Population ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ILS9 C699 ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars ..Other ❑ Other Phone: Phone No: Integrator: Operator Certification Number: �( Back-up Certification Number: Latitude: = o = I Longitude: = ° = ' ❑ Design Current Wet Poultry Capacity Population ❑ Layer ❑ Nan -La ej Miry Poultry ❑ Layers ❑ Non -Layers ❑ Puilets ❑ Turke s ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dai Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes tZ No ❑ NA ❑ NE ❑ Yes ❑ No P NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ZNo ❑ NA ❑ NE ❑ YesNo ❑ NA ❑ NE 12128104 Continued Facility Number: S t — Date of Inspection >fo Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: �Z Spillway?: Designed Freeboard (in): Observed Freeboard (in): �� 25 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes A No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ElNA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area •2.3 'C ~Ls S 12. Crop type(s) KA-T'j (r C1JV__ QP r ) kV16-'1) C. / t.r /—c Q - i 13. Soil type(s) � I G e- - 3, - 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? /2fNo ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination%❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes p No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE e.° '• �a `74l YzReviewerlins ector Name Phone: I Reviewer/Inspector Signature: ���� .,� ,,,� Date: , / 1 6 / o S Continued • , .. Facility Number: 5 —41 Date of Inspection Z v Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes e1A No ❑ NA ❑ NE � .,,rr r �C��W 20. Does the facility fail to have all components of the CP readily available? If yes, check ❑Yes 0 No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design [I Maps [I Other 21. Does record keeping need improvement? If y , check the appr riate bo bel$w. ❑ Yes VNo ❑ NA ❑ NE �' i. L +t � ElWaste Appation ElWee*k free oard El Wash Analysis Soil Anlyys_19� ElWaste Transfers ElAnnual Certification ❑ RainfaIC❑ Sto king ❑ CrXYield ❑ 120 MinuInspections ElMonthly and 1" Rain Inspections ❑ Weat Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes/Z No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes VTNo ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes P No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? 5.1 ' 6. 7- r ❑ Yes RfNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes M No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes PfNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Vj No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes P�No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes V No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 10 No ❑ NA ❑ NE 12128104 Type of Visit grCompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 9 Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: LLLATI Departure Time: r County: Farm Name: rf�� �ir?�+t2 G Y_ ����� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: n Title: Onsite Representative: Certified Operator: Back-up Operator: Phone No: Region: Integrator: �� :i JG - MFAI)O�j Operator Certification Number: Back-up Certification Number: Location of Farm: Latitude: 00 = g 0 Longitude: 00 0' 0 Design Current Swine ` Destgn Current , Wet Poultry �'� Design Cetrrent Cattle `acity Ca a ity Fopulation C city PAopulat on Capp PO ulllation ❑ Wean to Finish ❑ La er ❑ DairyCow ❑ Wean to Feeder ❑Non -La er ❑ ❑ Feeder to Finish ❑ Farrow to Wean 2-=: _DairyCalf Dairy Heifer ❑ D Caw Dry Poultry ❑ Farrow to Feeder'' ❑ Non -Dairy ❑ Farrow to Finish ❑ La ers ❑ Beef Stocker Gilts ❑ Non -Layers ers = ❑ Beef Feeder 8001 Boars El Pullets Y ❑Beef Brood Cow ❑ Turkeys Otherill ❑ Turkey Poults '` ❑ Other ❑Other Number of StructuYres: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes �VNo ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE ❑ Yes JNo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE 12128104 Continuer) i`acility Number: S t — `AJ0 Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes VNo ❑ NA ❑ NE a. If yes, is waste level into the structural Freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 1 2 Spillway?: Designed Freeboard (in): Observed Freeboard (in): Z 'Z3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �] No ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ,mot lJJ No ❑ NA ❑ NE through a waste management or closure plan? 1 If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 1� No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ❑Ao ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ElNE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes P No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area Z.-vs 12. Crop type(s) Ar'r.1 ?s— 6- C _201A(� 13. Soil type(s) 7a C; , 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 101 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination: ❑ Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes//] No El NA El NE 18. Is there a lack of properly operating waste application equipment? El Yes it No ❑ NA ❑ NE Hz,j r;i� #: a^i 2.. ems` Tf, zwr Reviewer/inspector Name , ?,. ,. � � � ,� t.. s -.ri' ,s".. Phone: Reviewer/inspector Signature: Date: 1 T b s 12128104 Continued Facility Number: S) — Date of Inspection 1 Required Records & Documents 19, Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes [ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ` No ❑ NA ❑ NE the approprrate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If es, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE I t I.L !11z i.s 112 '3 ❑ Waste Ap(ication El Weekly Freloard El Waste Analysis ❑ Soi! Uysis ❑ Waste Transfers ❑ Annual Certification ❑ Rai0all ❑ Socking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weat)(er Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes VNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ONo ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E2rNo ❑ NA ❑ NE 25, Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes VNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ZNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ;?�No ❑ NA ❑ NE Other Issues 28, Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes V No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes VfNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes VfNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes &o ❑ NA ❑ NE General Permit? (iel discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? El Yes V o El NA El NE 33. Does facility require a follow-up visit by same agency? ❑ Yes 9No ❑ NA ❑ NE Add�t odalComments.andlor>Drawinls 12128104 71 . _ 4. o� �1 1 v t�c„',�:'a�:'��:.:.�'.v"7"s:. �'_ _.. ....e,..... a 3 �,�.,� .,� ?.�.,..„N�en: ar �.. •. ,,. ... s�'.. i ,,, ... � v..�.W - _. �. ...'� ........ ., s". � r �_�'.^) I Type of Visit A Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit eRoutine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number Date of Visit: Time: rO not Operational 0 Below• Threshold E3"Permitted/b Certified [3 Conditionaliv Certified Registered Date Last Operated or Above Threshold: Farm Name: _ S�^r2f�_1?f dR� County: *rfST Owner -Name: Mailing Address: Phone No: Facility Contact: Title. Phone No: Onsite Representative: hW Integrator: SAA+'"J�- M eAN,, Z rm Certified Operator: Operator Certification Number: %.6 4; Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 0 ` D µ Longitude 0 0 1 Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Ca acfty Po ulation ❑ Wean to Feeder JE1 Laver I ❑ Dai ❑ Feeder to Finish 10 Non -Laver I ❑ Non-Dairy arrow• to Wean El Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SSLW Number of Lagoons 1 2— , ,'�❑ Subsurface Drains Present JI❑ Laeoon Area_1❑ Spray Field Area' ,Holding Ponds 1 Solid Traps -" ❑ No Liquid Waste Management System' , Discharges 8 Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No Discharge originated at: ❑ Laeoon ElSpray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes No b, if discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes No c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes 2No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes )z No Waste -ColLectipp & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes '10 No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: z Freeboard (inches): �-� 05103101 Continued Facility Number: Sj — Date of Inspection I ti 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered ves, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do anv of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes aZ No ❑ Yes ;ZNo ❑ Yes 0 No ❑ Yes Z No ❑ Yes PNo Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes (FNo 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes PNo 12. Crop type t1� 6- 3 r Cr • L32Q ^.1�Ir 27~s , 131. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAR'MP)? ❑ Yes ON 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ;INO 16. Is there a lack of adequate waste application equipment? ❑ Yes )J No Reouired Records & Documents 17, Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps. etc.) L ❑ Yes ZNo 19. �o t. Does record keeping need improvement? (ie/ irriga%n, freeboard, was a analysts &soil sampl to ❑Yes �LI No 20. is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑Yes o 21. Did the facility- fail to have a actively certified operator in charge? ❑ Yes No 22. Fail to notify regional DW"Q of emergency situations as required by General Permit? ❑ Yes ;EfN (ie discharge, freeboard problems, over application) o 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes A No 24. Does facility require a follow-up visit by same agency? ❑ Yes ZeNo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes P1110 IALNn violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit •.F":.-i:. .'-.-il.w.... : ...�t�wi-.•!�'!-•' -' -- r'rf 9'k-::'-+'.Yfs. 'iiiL53.'�`.n.Ua4rid$tl�.: lr� m3^'S1.y;.rr Comtnents'{refer to gnestsod#)c 'EZj3le3A aII3T} Y $'BRSwerS a11d/or AIIy TeCQIIIIIIeD Ono 0 ,8 other_co IDCRtS y , + �T q�l r ` i'.^- tise drawings of f�aMcility,to better eezp6latn situ sittions."}{nse additional paggesAastteee({s� ary) ;1' ii. ❑Field Copv ❑ FinaI Notes i4�`Y: 4,�!� .Q&M1 Ly , ��w. 5 N1�L7 r•. '�"�A.d?il�✓�1f�:1 .ALYiww f.ii4ti._+w �.Cnrw-.• .•^TT't.^wv!.•.v.m,wn•.�- —� .i.YY.a�'{i �. 'r_'�J.1O�E,.}� �,+1 LAGo�j,.'S 'ru MAOOo AA: Zs WWI a AntD 1�oit•3:+.�.� �,�C �yt4• 5• S Reviewer/Inspector Name ru. " {'•:1 .,'3 +„+ty � �` s � k i' z,; tz ` fir" ' �4 ,` `s- • j�`. w �� Reviewer/Inspector Signature: •--� Date: 1 05103101 I Co#tfnued -Y Facility Number: — So Date of Inspection or Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31, Do the animals feed storage bins fail to have appropriate cover? 32, Do the flush tanks lack a submerged fill pipe or a perrnanentdtemporary cover? es ❑ No ///���❑ Yes N ❑ Yes No ❑ Yes �No ❑ Yes I* ❑ Yes ZNo ❑ Yes 'J6No Additivgal Gamnrin ntii, and/or prawings ; Aex/}er o,J A4D E✓A-PoP-ter: .J r�� S G�1Ss '�c�4„s i RL r 05103101 Type of Visit rC,00mpliance Inspection O Operation Review Q Lagoon Evaluation Reason for Visit �v Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date oFVisit: V=NotO 3 Time: f' eration1 0 Below Threshold A51P­e,r,mltted ertitied [3Conditionally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name: _ Arliff `c.;JGL_ N'i County: _ �1 w'[W-ff'- Owner Name: Mailing Address: Phone No: Facility Contact: Title: Phone No: Onsite Representative: H �-�y �� Integrator: b M 41� Certified Operator: Location of Farm: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' ° 64 Longitude Oe 1 6. ` Design Cur'rent Design Current Design Current Swine Capacity Population.. P ultry Capacitv Population Cattle CHI)Hcitv Population ❑ Wean to Feeder ❑ Layer ❑ Dairyl ❑ Feeder to Finish JEJ Non -Layer 1 10 Non -Dairy ❑ Farrow to Wean _ _ — ....... ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity i ❑Gilts Tota1:SSLW ❑ Boars Number ofiLagoons ®F '' ❑ Subsurface Drains Present ❑ Lagoon Area JE1 Spray Field Area :Po Holdtn nds 1 SohdaTra s =' x g� p � . ❑ No Liquid Waste Management S stem Discharges & Stream Impacts t. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (if yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d, Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 3� ' 4. Is storage capacity (freeboard plus storm storage) less than ad6giiate? ❑ Spillway Structure 1 Structure 2 Structure 3 -Structure 4 Structure 5 Identifier: / ='M 2— Freeboard (inches): s 7. 05103101 . ❑ Yes 2 NNo ❑ Yes Z No ❑ Yes Z No ❑ Yes No ❑ Yes ;2�o ❑ Yes 01N*o ❑ Yes P"No Structure 6 Continued Facility Number: ,S I — Date of Inspection L o 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ❑ No seepage, etc.) " 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or �{ closure plan? (If any of questions 4-6 was answered yes, and the situation poses an El Yes � ] No immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes �No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes gNo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes FgNo Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes No 11. Is there eviden pf pver application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes No 12. Crop type (� V ( 2 3 .l�$r- Z 13, Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes elqo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ONo 16. Is there a lack of adequate waste application equipment? ❑ Yes ;�rNo Renuilred Records & DocumRUt 17. Fail to have Certificate of Coveragg(/eMl Permit or other Permit readily available? ❑ Yes .L�-vo 18. Does the facility fail to have all components of the Certified Animal Waste Manement Plan readily available? % L y ❑ <o (ic/ WUP, checklists, design, maps, etc.) / 1,6 r -�W Z6 el /.I Y� 19. Does record keeping need improvement? (ie/ irri5ation, freeboard, wa a anal sis &soil sam Ieports) Yes ❑ Yes .�,N o 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ONo 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes I'lKo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? ❑ Yes VN, (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes o 90 24. Does facility require a follow-up visit by same agency? ElYes 25, Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Comments (refer to question #} Explain iany YES answers and/or an), recommendationsor any.other comments. : IUsera wings, 'flfacili ttoltietteraexplaii�n situations: (us%additlottal pages -as necessary)'WrField Copy ❑ Final Notes i� r'E.0 S JdCi A i1e G&-ttO Y'fl" t V its f r �j t' ,,rot .� 7tti. '�i 'l £. %_ i r, E- N��{ `� er AFc'a.J _ h �. F �?.<+Lslv Ttd r5 $ 'yi Reviewer/Ins ector Name` 7, P to V �? r „C Reviewer/Inspector Signature: Date: Z b 05103101 1 Continued Facility Number: S1 — Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below Yes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes PTNo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes P1110 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes PINo 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Yes ❑ No Additional`Comments�aniilor,l)r:.uw n s �� � �.�; , . AL 05103101 1► Type of Visit RQ Compliance Inspection O Operation Review O Lagoon Evaluation fieason for Viaitx'Routine O Complaint. O Fonow up O Emergency Notification O Other ❑ Denied Access Facility Number ! Date of Visit: b ime: �t7p O Not Operational_0 Below Threshold Permitted ertified U Conditionally Certified U Registered Date Last Operated or Above Threshold: . Farm Name: ................s!'a:'.......k. ...... a12-- . County:........... a......... . ..................... Owner Name: Facility Contact: Mailing Address: Title: Phone No: Phone No: Onsite Representative: ; S ......... "�.���`x.� �i................................ integrator:...... s �z,a�....µE..&.4..,............................... Certified Operator:................................................................................................................ Operator Certification Number:...,..... ......................... Location of Farm: HN wine ❑ Poultry ❑ Cattle ❑ Horse Latitude �• �4 it Longitude • 6 46 rE ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current cult','k_;:.Capacitv.,:Populationk„ �Csttle, ; :, I❑ Non -Layer 1 „I I -10 Non -Dairy L ❑ Other Total Design Capacity Total SSLW Nua Muof Lagoons 2_ "t ', ', J0 Subsurface Drains Present III Lagoon Area . I❑ Spray Field44 Area tl Holding Ponds'/ Sohd Traps ' ❑ No Liquid Waste Management System Discharees & Stream Im acts 1. Is any discharge observed from any part of the operation? ❑ Yes PNo Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes Vo b. If discharge is observed. did it reach Water of the State? (if yes, notify DWQ) [] Yes P-9�O c. li' discharge is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes : /o '2. Is there evidence of past discharge from any part of the operation? ❑ Yes 0 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 52N�o Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes N`' - Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ................. .t................. ............�.................. ................................... .................................................................................. ..... ..................... Freeboard (inches): S1�7 5/00 v Continued on back Facility Number: — Date of Inspection 5_ Are there any immediate threats to the integrity of any of the structures observed. P(iclrees, severe erosion, ❑ Yes 2fNo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes 0No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes ONO 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ;!(No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes )2f'No Waste Application 10, Are there any buffers that need maintenance/improvement? ❑ Yes �No 11. is there evidence ofover appliAion? Is❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes o 12. Crop type aaS C*-- S $ Cr r ' $_ (a a .as 13. Do the receiving crops differ with those designated in the Certified Animal Waste M nagement Plan (CAWMP)? ❑ Yes ONO 14, a) Does the facility lack adequate acreage for land application? ❑ Yes o b) Does the facility need a wettable acre determination? ❑ Yes o c) This facility is pended for a wettable acre determination? ❑ Yes 15. Does the receiving crop need improvement? ❑ Yes ro 16. Is there a lack of adequate waste application equipment? ❑ Yes ZNo Required Records & Documents b�g� Fail have Certificate Covera General Permit 17. to of a 8d readily available? ❑ Yes No 18. Does the facility fail to have all components of the Certd Animal Waste Management Plan readily available? 19. (ie/ WUP, checklists, design, maps, etc.) // _ 311 �� t, 4 �r Does record keeping need improvement? (ie/ irri on,�deboard, rv�ds�e analys�& soil1savip`6e rep6rts) ❑ Yes .P ❑ Yes PIKO 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ,[4o 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes PNo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? discharge, freeboard ❑ Yes RNo (ie/ problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes E] No 24. Does facility require a follow-up visit by same agency? ❑ Yes ❑40 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No defclepfuel ware noted. Ot;WI69 i�ls.vls}t; • Your wiil•teeoiye 00 futtho . • 'etiriesaaridence: Motif this visit` ......::..........................: . v=- Facility Number: S — Date of Inspection I Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below /YYes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes 4o 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑Yes TNo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes ZNo 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan biade(s), inoperable shutters, etc.) ❑Yes 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Yes ❑ No Additional Comments andforDrawinpr. +, arl— pEsz vA�.; T J 5/00 4 1 %�-1 1 'n� Type of Visit OeC,,omCCpliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit yr,��outine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number 5 j Date of Visit: Time: Not O crational 0 Below Threshold Permitted Certified © Conditionally Certified © Registered Date Last Operated or Above Threshold: ......................... Farm Name: ................. J.Y.. �� ".�D. G i`-.. County: ���a �-s 7"�......... ........... I ........... ........... ........................ .................. OwnerName: ................................................... ........................................................................ Phone No:....................................................................................... FacilityContact:.........................................Title:................................................................ Phone No:................................................... MailingAddress: ..................................................................................................................... ..................................................................................... ........................... Onsite Representative:�`i�'TL . ...,5� P E,fS�•�.... ......... Integrator Certified Operator: ................................................... ............................................................. Operator Certification Number:...... ................... Location of Farm: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude �• �� �« Longitude �• �� �« ±vine Cap 1 'Population Poultry Capacity Populatioe . ,Cattle ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean { b J j O ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars ❑ Non -Layer " ❑ Non -Dairy ❑ Other " Total Design Capacity Total SSLW Number of,Lagoons -. i Holding Ponds / Sohn Traps . ; ❑ Subsurface Drains Present JJ❑ Lagoon Area J© Spray Field Area No Liquid Waste Management SystemNl '��1i1�11 ti Discharges & Stream Im acts 1. Is any discharge observed from any part of the operation? ❑ Yes ENo Discharge originated at: []Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes E 'ko b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes 21<0 c. II' discharge is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (if yes, notify DWQ) ❑ Yes o 2. Is there evidence of past discharge from any part of the operation? ❑ Yes �Io 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ❑'�I0 Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes ;31�0 Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ....... Vf-................... ...........-..I............................................................................................................................................................... Freeboard (inches): 5/00 Continued on back Facility Number: — 6 Date of Inspection Printed an: 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management of closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public. health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 1 /9/2001 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type 4 /S :e 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does thefacility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Re uired Records & Doctiments `r 17. Fail to have Certificate,velf leVeneral Permit readily available? a ] 18. Does the facility fail to have all components of the Certified .� mal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ja 3 j I� 19. Does record keeping need improvement? (ie/ irron, freeb d, wa te�nalysis & soil samp�e're�orts) Ss nt, T'b 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? Q Yi tiorls:o ' � f cue e{es ry re � ed Og �hIs:v1spt;, Y:oo�Jlj-teeeiye 00 further: cori'espimdence: ahoilt this visit::... : ❑ Yes VNo ❑ Yes W&o Yes ❑ No ❑ Yes ZNo ❑ Yes ,�No ❑ Yes No ❑ Yes (�10 ❑ Yes ,fNo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ;3<o ❑ Yes O No ❑ Yes PIN ❑ Yes No ❑ Yes 0o ❑ Yes &No ❑ Yes �01NO ❑ Yes L31q'o ❑ Yes E�No ❑ Yes ONo ❑ Yes 'CIN0 ❑ Yes ;:�iQo 4E9�� � W-+�_e«►�s (s��� FkC.A" c��P��W,,NPOA59 ��r�,r 0/,( us4-toQ4 ,_fn A A. pu /�i'r�t'�N NJ �I��E1 [���� �t��[,� • �`� j/ f S C� �-G W j w% / -'.,-�,r VA a (,ems I �� �•O /�nl� /�w i 4 P�lq-Cr I� l• (-.1��' �Q,w �L5L �U"'��c�� r�%��i E` Tr• / IpGmMME'n� E� 1ANP Of' PULLS Fvt 6BCbAtr'%04 07'"A 'rf-AVSLLc4_A44�1 RH P�L�..; t�►c�..►n� A�eCa� Pam- Pui-L, ��, � J {�-£ TO 1' v4 � ►�T L� +vt E A x tJ E�� j ��^v�+ � n Cb FL��rn s� t' �� Q'�.s�"r ' Tr 'Ta 'j�E s11AC Z VZ�, ems. -aJ EQtDF_N REVlewer/In8 eCtOr Name ;� a€a� �I p 3 �31 7� !ii r SEA k mkwl, E`IE �y a+fig j p p �. ,I} i ., a JyJ. &9`. ;6:,ML.; Reviewer/Inspector Signature: ( �,r ,,,,� — Date: 5/001 Facility Number: Date of Inspection Printed on: 1/9/2001 Qdor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below es ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes 21-No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes 1'No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes R$io 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes �o 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes 4!�No 32, Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ONo '24- ) llrl L,1 -J GV-a- 4" a-C-L> , A61 5100 J c . r O'Div�sion of Soil and Water. Conservation Compliance Ins tvtston of Water Quality CompLance ns Ipection , Ci Other Agency = Uperatiori,Review,.•��,,hp ...._rc w. Routine OComplaint O Follow-up of DWQ inspection O Follow-up of DSWC review O Other Facility Number S Date of Inspection 5 Z - '00 Time of Inspection �� 24 hr. (hh:mm) Mermitted,G<ertified © Conditionally Certified 13 Registered [3 Not O erational Date Last Operated: Farm Name: .5±,tDA.. o.�.....f..ol?- County:........�T aJ OwnerName:..... .......�av.... 2 .................. Phone No:............. ......... ....................................................................................................... Facility Contact:..............................................................................Title:....... MailingAddress: ..................................................................................................................... Onsite Representative: . t E,J +J Certified Operator:... ...............................:................ Location of Farm: Phone No: Integrator:..... !V J MEADuyj Operator Certification Number:,,,,,,, ....... ............................................................................... .. . •r Latitude De"signa "'°"Cu ;;!wme , 'CapacityPopulation ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean co ❑ Farrow to Feeder Farrow to Finish ❑ Gilts ❑ Boars Longitude• Design Current ,' ; ; �. .Poultry . Ca °aci� Poula 'tion ' Cattle,r�,�1,; . . ❑ Layer ❑ Dairy ❑ Non -Layer E� ❑ Non-1 B U ' ❑ Other a[4 Total Design Capaci Total SSLi Discharp,es & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made'? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gallmin ! d. Does discharge bypass a lagoon system'? ([f yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 ❑ Yes I'No ❑ Yes FdrNo ❑ Yes ONo ❑ Yes No ❑ Yes J[ ^No ❑ Yes /Q"No ❑ Yes 8 No Structure 6 Identifier: Freeboard(inches): ..............l,........................................................................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes seepage, etc.) 3/23/99 Continued on back Facility Number: •$ - Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Plfqo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes 9No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes p'No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes )z No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes ,91No 12. Crop type d�- 2-5 f- 01-i w 1-W-A a/ 9Q 14 of 13. Do the receiving crops differ with those iesignated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes .,,eNa 14. a) Does the facility lack adequate acreage for land application? ❑ Yes,,eNo b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes .� �O 16. Is there -a lack of adequate waste application equipment? ❑ Yes �o Required Records & Documents IT. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes j"No 18. 'Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? WUP, design, etc.) ❑ Yes E!(No (ic/ checklists, maps, / 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste ana sis & soil same reports) ❑ No 20.' Is facility not in compliance with any applicable setback criteria in effect at the time.of design? ❑ No Zs 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes 01No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? ❑ Yes (ie/ discharge, freeboard problems, over application) FrNo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes No 24. Does facility require a follow-up visit by same agency? ❑ Yes 0'N0 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ,00o ��1Q yiolaignjs'ojr• ftrjcaejmcie$ *�re )rtpted• ftr ing s.vjs;it; - Yoecgiye o fur • . • . Corresb6fidence: about. this Visit. 7� Mf J7--?"StrJ plSc.u,sEE.D A rEr-O i`o ?WS; J9 Ly Aoo � � D �, z3 � �t- �l4-Cs� Jt, � i '� �° "1 � J L- � C�NGt' S 5'M F I�•j ��orL i16 A i '�'`orJRt. �CaM MCiJA � Li.)L-- A MoPa�Ft�c.Ai�`d�S'� SLIaNt 0 ADVr'-E LA.-, �V^O't+A A-P i?L' C/S V L-%Z_ Reviewer/Inspector Name ',. t, , ;^ ' 1` $. ``r# a`r"'a.9', .1'•'-,; €E {(. 4' j- r i -' i , b�l",,.:,�,. „.�V_._ Reviewer/Inspector Signature: L,., Date: C-f zyr AQ-1, Facility Number: S I- Date of ILispection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below 0Yes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ,EYNo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes 0No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes 20 Ko 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes _+—'o 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes �0 z1-} c),ie 1-w-, 3toWa Irk -r� r L,4 6oa d J ;1 'DiVigion of,Soll and,Water CoI15eCYatlOn ,OpErdtlon Rk V1eW E � ,. .. �'Dlvision of Water Quality Comp p • p P n Division of Soil and Water Couservatlirn - Com Nance ins ectio Q y - Compliance Ins cchonri Other Agency,- Operation Review " t' IgRoutine 0 Complaint _O Follow-up of DWQ inspection Q Follow-up of DSWC review Q Other — Facility Number Dak of Inspection 2 'rime of Inspection 24 hr. (hh:mm) 0 Permitted © Certified © Conditionally Certified ❑ Registered [3 Not O cration.Il (late Last Operated: .......................... Farm Name: ........,SAt4c.,. . I)C'M County: ...... !4�0.NST-04....... .............. ....................... Owner Name: ....l±!'r..1�.t........f..l?S'��^i...................................................... ['hone No:..........t3.....'....?. g......................................... FacilityContact: .............................................................................. Title:................................................................ Phone No: ... ................................................. Mailing Address: ........................................... Onsite Representative:..W.... .:i L .....S.T ! .S. L.......... Intct;rator:..-s ..........� .......................�a M Certified Operator : ................................................... ........................................ ..................... Operator Certification Number: .......!.E',`!,3°r................ Location of Farm- .................. ........ I ...... . .............................................................................................................................................................................................. . Latitude �'�' �" Longitude �• ��°� Design Current Swine Capacity Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean i bv,�, t 6csJ ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer _ ❑ Dairy ❑ Non -Layer ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons "L ❑ Subsurface Drains Present ❑ Lagoon Area 10 Spray yield Area Holding Ponds / Solid Traps ❑ No Liquid Waste Management System Discharges & Stream impacts 1. Is any discharge observed from any part of the operation (I!' yes, notify DWQ)'? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. II'discharge is observed, was the conveyance roan -made? h. If discharge is observed. did it reach: ❑ Surface Waters ❑ Waters of the State c. If discharge is observed. what is the estimated flow in szal/min` d. Does discharge hypass a lagoon system? 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts to the waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): Y .................................. 1 i. ............................................................................................ ❑ Yes"ONo ❑ Yes ❑,No ❑ Yes ;2'No ❑ Yes ep No ❑ Yes RrNo ❑ Yes Jj No ❑ Yes ;z No Structure 6 I/6/99 Continued on back A7 Facility Number: — Date of Inspection ! 5. Are there any immediate threats to the integrity of any of the structures observed'? (ie/ trees, severe erosion, 0yes �No 4 seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan`? ❑ Yes ONO (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes '0No S. -Does any pact of the waste management system other than waste structures require maintenance/improvement? ❑ Yes �No 9. Do any stuctures lack adequate, gauged markers with required top of (like, maximum and minimum liquid level elevation markings? ❑ Yes XNo Waste Application 10. Are there any buffers that need maintenance/improvetile nt? ❑ Yes VNo 11. Is there evidence of over application? ❑ Ponding ❑ Nitrogen El Yes ONO 12. Crop type 4 Q.+ ..!(� �� i3+..1..................................-Bc �n�u�]l� `S/�_ Co.2Ar�................................................... ` . ................................................... 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes ONo 14. Does (lie facility lack wettable acreage for land application? (footprint) ❑ Yes No 15. Does the receiving crop need improvement? ❑ Yes 0No 16. Is there a lack of adequate waste application equipment? ❑ Yes offNo Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes dNo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.), ❑ Yes ZNo 19. Does record keeping need improvement'? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes 2rKO 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes XNo 21. Did the facility fail to have a certified operator in responsible charge? ❑ Yes dNo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes XNo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ;dNo 24. Does facility require a follow-up visit by same agency? El Yes XNO No.vialations.or. deticienries.werenoted. during Ais.visit;. You wilfre'eive nog further .:.:. ...... p .. ....about. this his .. ... . ........... . .... . ... ....... .... Comm'' tints (refer.to question #): Explain any YES answers and/or atiy;recotnmendati.oy iis'or an ot}ier comments .t R3 Use drawin s'of facilit .to better ez lain situations. use"additional pages as necessa ) g Y p { P.$ rJ, r niv. er tJA.$ Q &-J1"U. 44-- C-E" e— Ak4O XUOUL D e& $uFFGdxZ IOoI Vl T A9etp 4& s� �i� 5 �;>4t�, Revi ewer/[ nspector Name Reviewer/Inspector Signature: C)e jt j - �4 --A Date: ?j 2Z.l 17 11/6/99 _ Division of Soil and Water Conservation - Operation Review Division of Soil and Water Conservation -.Compliance Inspection q 0 Division of Water Quality - Compliance Inspection i' E3 Other Agency -Operation Review O Routine O Complaint O Follow-up of DWU inspection O Follow-up of DMVC review O Other Facility Number Date of Inspcc:tion Time of Inspection 24 hr. (hh:mm) 0 Permitted ❑ Certified © Conditionally Certified © Registered 113 Not O erational Date Last Operated: FarmName: ......... Cutinty:..................................................................................... OwnerName: ................................................... ........................................................................ Phone No:..............,........................................................................ Facility Contact: ................................................................. ...... Title: .... Phone No: 19ailint; Address ..................................................................................................................................................................................................... .......................... Onsite Representative... epresentative:.......... ..... .......................................... Intel rotor:...�P/Z ,(,r,... t�i�T1�,,�� ...... 4• Certified Operator : ................................................... ............................................................. Operator Certification Number:............................. Location of Farm: Latitude = • ° ���4 Longitude ° Design Current Design Current Design Current Swine Capacity Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder ❑ Layer ❑ Dairy ❑ Feeder to Finish 1C] Non -Laver IM Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts EE - ❑ Boars Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑Lagoon Area 10 Spray Field Area Holding Ponds / Solid Traps JE1 No Liquid Waste Management System Discharges & Stream Impacts I. Is any discharge observed from any part of the operation'? ❑ Yes/No Discharge originated at: ❑ Lagoon ❑ Spray Field- ❑ Other a. If discharge is observed, was the i:onvcyance man-made? ❑ YesNo h. If discharge is observed, dirt it reach Water nl'the State? (]byes, notify DWQ) ❑ Yes No c. If discharge is observed, what is the estimated flow in 4gal/inin? / d. Does discharge bypass a lagoon systcin? (II'ycs, notify DWQ) ❑ Yes No 2. Is there evidence of past discharge from any part of the operation'? ❑ Yes N o 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes x No Waste Collection & Treatment 4. Is storage capacity (Freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes �No StrUC[UI'C I Structure 2 Structure 3 Structure 4 Su-ucwre 5 Structure 6 ldcntil'iti:r: Freeboard(inches): .... ...r i ............. .........3-6.......... .................................... ................................... ... ....................... I ...... ..................................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ic/ trees, severe erosion, ❑ Yes ZNo seepage, etc.) 3/23/99 Continued on back Facility Number-5/ MkIe of inspection ,0. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑Yes _P/No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement'? ❑ Yes ANO 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes �No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ elevation markings? Yes 0 No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes ff No 11. Is there evidence of over application) ❑ Excessive Ponding ❑ PAN ❑ Yes y'No 12. Crop type 5� 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes o 14. a) Does the facility lack adequate acreage for land application'? ❑ Yes [:]No b) Does the facility need a wettable acre determination? ❑ Yes [:]No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes P(No lb. Is there a lack of adequate waste application equipment'? ❑ YeslZIN0 Records & Documents _Required 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes 11Vo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available'? / (ie/ WUP, checklists, design, maps, etc.) ❑ Yes [].lQ0 ,/❑ 19. Does record keeping need improvement? (ie/ irrigation, rreeboard, waste analysis & soil sample reports) ❑ Yes No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ❑ No 21. Did the facility fail to have a actively certified operator in charge'? El Yes RTo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑Yes �o 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes P;Vo 24. Does facility require a follow-up visit by same agency? ❑ Yes No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No O V101atiQrls.oi' &flclendeS •W ere h6fe . ft-f if4g 4i 6'vlslt. • Y,otk W fll- '&6,0V iic3 ful'th&' correS onden' &; Out. thIS V151t_ Gomments�{refer to questiton #) any YES answers and/or any recoirnmendaions or;any5other comments i `,Explain Ilse drawings of facility to.lietter explainsituations. (use additional pages as necessary) 2 Reviewer/Inspector Name --a Reviewer/Inspector Signature: Date: r], rl 3/23/99 Facility Number Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes p No liquid level of lagoon or storage pond with no agitation? ((((r 27. Are there any dead animals not disposed of property within 24 hours? ❑ Yes No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes��No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes YlNo 34. Were any major maintenance problems with the ventilation fan(s) noted'? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes tZ No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes �No 32. Do the flush tanks lack a submerged fill pipe or a permanenUtemporary cover? ❑ Yes ❑70 3/23/99 lG 4 98 10 23 13 Division of Soil and Water Conservation ❑ Other Agency Mivision of Water Quality Q'Routine Q Como laint O Follow-up of DNVQ inspection O Follow-u of DSWC review O Other Date of Inspection D Z Facility Number Time of Inspection 3 a 24 hr. (hh:mm) El Registered ,(Certified U Applied for Permit E*ermitted JUNot Opera . Date Last Operated: .......................... p Farm Name S Gt/Y� N4 Count J U C1 ....................... Owner Name: q p` ....1+.11 �..!:h!..��.......�..,�.. h'�1.%Q�.?iE. 1...................................... Phone \o•(..............�4.......3(.......... I...Q ~g8`7 � Facility Contact: .. ?1.�f1. ....�� Title : .......... ...................................................... Phone No:................................................... Mailing Address:........ . ...........W�..J 1.....�14... ....., ................... ............................. 1........................ .J.` . 11,,��''4,, Onsite Representative:......uv .1,1419. ....S r_, ko,(l l,.. ... Inte ratcfr:. ................ Certified Operator;.....N.......""" Operator Certification Number, .................:....................... rlll�e�..,......�!` h�............. . Location of Farm: Latitude =10 =' l Z 66 Longitude . ®' ®1 Ei21 « Design , - Current (Design ,Current Design Current Swute Capacity Population . Poultry,: Capacity Populattpn Cattle �Capacttopulatian `'° ❑ Wean to Feeder - ❑ Layer ❑ Dairy ❑ Feeder to Finish =y ❑ Non -Layer I I ❑Non -Dairy arrow to Weans ` ; 4 ❑ Farrow to Feeder ❑ Other ❑ Farrow to Finish Total Design Capacity ` k ❑ Gilts - El Boars Tota1:SSL'W ------------ «.. A Number of Lagoons / Holdin Ponds 7 g g ❑Subsurface Drains Present ❑ La goon Area ❑ Spray Field Area ' y S3 ❑ No Liquid Waste Management System M� General __j 1'. Are there any buffers that need maintenance/improvement? ❑ Yes a No 2. Is any discharge observed from any part of the operation? ❑ Yes tLd' 0 Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes Eq-�o b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes EKo c. If discharge is observed, what'is the estimated flow in -a]/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes 92'N0 3. Is there evidence of past discharge from any part of the operation? ❑ Yes 0'1�4o 4. Were.there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes E3fgo Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes ItG No maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes M110 7. Did the facility fail to have.a certified operator in responsible charge? ❑ Yes {�dQo 7/25/97 Continued on back Fasility Nu her: s , — y 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes ONO Structures (Laioons.Iloldina Ponds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes (,o • Structure I 'j Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 2. LT fl ......................................................................................................................................................... Freeboard(ft): ................................................:,.,......,.,. 10. Is seepage observed from any of the structures? ❑ Yes I,,� NO 11, Is erosion, or any other threats to the integrity of any of the structures observed'? ❑ Yes l,,,lY ,1Na 12. Do any of the structures need maintenance/improvement? ❑ Yes 03"No (If any of questions 9-12 was answered yes, and the situation Poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers'? ❑ Yes EKO Waste Application 14. Is there physical evidence of over application'? ❑ Yes ifNo (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type GbY>C. c............................. .pia.Q. .......... I ............ heG?.. �......... ...�. `? �............5 ! r-�Q�....�Yc, ........ lb. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes, j 2'Nlo 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 0. Does facility require a follow-up visit by same agency? 21. Did Reviewer/lnspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit'? No.violations,or de'fidencie's,we're noted during this:visit. �:You will receive no further correspondence ah:out this.visit: : ❑ Yes (UIo ❑ Yes Wo ❑ Yes [�No ❑ Yes [9�<o ❑ Yes `o ❑ Yes U3,50 ❑ Yes it' No ❑ Yes Mo ❑ Yes M*o Comments (refer to question'#): Explain any YES answers and/or any recomfnendateons or any other comments' Use di awings of facility to;6etter explain situations (use addtfiomal'pa cs as nece5tiary) s #�, ��Ru p3U-A6 C" 7/25/97 Mivision of Soil and Water Conservation ❑ Other Agency ❑ Division of Water Quality JgRoutine O Complaint O Follow-up of i)WQ.in peetion O Follow-up of DSWC review• O Other Facility Number / Date of Inspection TT Time of Inspection ' 24 hr. (hh:mm) Registered [3 Certified © Applied for Permit © Permitted JE3 Not Opera Date Last Operated: Farm Name: ....... ,Ita�`(...... F.. /r. ....�� .��. County:..G...!, .. !. .L......................................... OwnerName..................................................................... Phone No:...,.,.....,.......................................................................... FacilityContact: .............................................................................. Title:................................................................ Phone No:................................................... MailingAddress:.................................................................................................................................................... .......................... Onsite Representative:...,V.. a-l-r-key...........57 !f Ivsv ............ Integrator/..xw........................ Certified Operator;............................................................................................................... Operator Certification Number............................... Location of Farm: Latitude ' 4 4C Longitude 0 ' 46 Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars gn Current Design : Current Design` city %PopWataon -,' Poultry, , Capacity Pdpulativn Cattle Capacity ❑ Non -Layer ❑ Other Non -Dairy, tl SSLW Lagoon Area 10 Spray Field Area System C C I■ General 1. Are there any buffers that need maintenance/improve men t? ❑ Yes ZfNo 2. Is any discharge observed from any part of the operation? ❑ Yes �`No Discharge originated at: ❑ Lagoon El Spray Field El Other l a. If discharge is observed, was the conveyance man-made? ❑ Yes PNo b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ Yes 00 c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) ❑ Yes A No 3. Is there evidence of past discharge from any part of the operation'? ❑ Yes] No 4, Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes )?�No 5. Does any part of the waste management system (other than lagoons/holding ponds) require Yes ElNo maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes VNo 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes No 7/25/97 Conlinu Int back Facility Number: 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes No Structures (Lagoons.Holding Ponds,lush Pits etc. 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes El No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Freeboard(tt):.....1..'A.................................. D............ ................................... .................................... 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type 16. Do the receiving crops differ with those designated in the Animal Waste Management Plait (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? For Certified or Permitted Facilities -Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. Were any additional problems noted which cause noncompliance of the Permit? ❑ Yes 0 No ❑ Yes ZNo &Yes ❑ No ❑ Yes �j No ❑ Yes No ❑ Yes No ❑ Yes LV 4 J No 10 Ye No ❑ Yes No ❑ Yes No ❑ Yes OrNo ❑ Yes 'dNo ❑ Yes J�No ( zYes !❑ No ❑ Yes �Na 0 - No.violatio'ns-or deficiencies. were noted during* this', visit.'- Yo'U'W'ill receive•no' furtlier- : - eorrespondeiice. about this:visit:- : • :. 47 :,g C �L.4 sW,,. A's=enti(refer to uestion # •" Ex 6tt an YES answers and/or an recommendations Oran 'other Comments, q paw." P �'� � � iR&�E: s h°iei � p'S� ova r ecre °.,£`.' '�xsw'.,°".' 1�7 rawiM of ti li%to better,eat�laut situahttns. use addltional Pages as t�eeessatry}. 1 . 50n, & &9qf, &9�O A) U?P6TJz O f L d f - .t/, 1t)A;_ V r� �s T #-6,tr15N V 6 Gc` 77;-17ei c.? % g A),O D F 9I'MMEX 10 ICUE'Arr 6-/Z,06 1"5 5 , P507M,, RU10 t71= )ZAUV k/1 rF?r— /47V J 06,6141� AO 7,rrtn , _im 6- EAO6/" M425 v c:GvlG �r Aer—e-p Ta EST D2 JPOd5gLa- NU:- PlL Y Cei,Up /Tlo[A) 57/25/97 H Reviewer/Inspector Name f F ` #� ` *�,.:. ram.. E , •� Reviewer/Inspector Signature: Date: fZz Facility Number: v37 — Date (il' Inspection !�. 1`iR5 D�1G �rEi•fJ y�¢R- }�1�5 l3GeN �.�5�°)uk4C/ . ,4-0 ev ra %tJO P t6 IA uo ' PALO (t Ta 6--14�u I-jAe.. o g i� �- 3 h nN c- peg �o v0 rz� P,c ,v 7- 04, 5 OL) 11V To TA-Ct ©, 4/30/97 SWC Animal Feedlot Operation Review []DWQ Animal Feedlot Operation Site Inspection 10-toutine O Complaint 0 Follow-up of D%V0 inspection O Follow-ut) of l)SWC review 0 Uther Facility Number Farm Status: ❑ Registered ❑ Applied for Permit ❑ Certified ❑ Permitted Date of Inspection Time of Inspection 24 hr. (hh:mm) Total Titne (in fraction (if hours (ex.1.25 for I hr 15 min)) Spent on Review or Inspection (includes travel and processing) 10 Not O perati:onal Date Last Operated: .................................................................... ...... ... ............... I--....................... Farm I1'ame:.... /i1....�7.r„(.C... .�.F- .....r--liw/�� County:.......5, ..~' .t %........................................ OwnerName:... i�L'I l , {{...V ........... `� .. - Phone No:................ ................................................. ....... ................ Facility Contact: .................................... ...: ............... ....................... Title:,................,.......,...................................... Phone No:...................... �....�'s ......... t"�, Mailingaddress:.................................................................................................................................................................L. .......... u y Onsite Representative: J�%�r ................ /r�r'./ 1 ....... integrator:..........].LJ.Lj.1.................................................. . [.J j 2i7 i PEPtlp R Certified Operator: ................... Operator Ccrtitication.Nutx'��elt:;•„ Location of Farm: Mec Latitude ' ' 46 . Longitude 6 " l Number of LaQ ons /Ha)dG Ponds`' I FIE] Subsurface Drains Present 110 Lagoon Area 0 Spray Field Area ' g P Y ` Genera! 1. Are there any buffers that need maintenance/improvement? ❑ Yes o 2. Is any discharge observed from any part of the operation? ❑ Yes 7No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes /No b. If' discharge is observed, did it reach Surface Water? (if yes, notify DWQ) ❑ Yes 21No c. If dischar-e is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system?.(lf yes, notify DWQ)._.,".,. "'j" a, [].Yes:. No 3. Is there evidence of past discharge from any part of the operation? T ❑ Yes IN 4. Were there any adverse impacts to the waters of the State other than from a discharge. ❑ Yes [ No 5. 'Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes [io maintenance/improvement? 4/30/97 Continued on back 'Facility Number: / — 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? 8. Are there lagoons or storage ponds on site which need to be properly closed'? Structures (i.,a oons and/or Holdin Ponds 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): St. r cture/l :tr �ure 2 Structure 3 Structure 4 ............................ ....................... .. ....I............. .. ....... I............................ 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes <, o El Yes ////// o ❑ Yes No ❑ Yes [INo Structure j Structure 6 ❑ Yes 0 No ❑ Yes VNO 12. Do any of the structures need maintenance/improvement? Wyes ❑ No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14. Is there physical evidence of over application'? (If in excess of WMP, or runoff entering waters of the St te, notify DWQ) 15. Crop type�L1..'�"I.....J.. ........... ��..................... ..... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? ❑ Yes No ❑ Yes j No ❑ Yes [IN0 ❑ Yes No ❑ Yes jl No ❑ Yes �I No ❑ Yes [A No ❑ Yes rNo ❑ Yes �No ❑ Yes PrNo ❑ Yes VNO �a , fie_ oA err r m s L vv,v r s :v7 w ,tea . L Reviewer/Inspector Name /t!/iIFG: :3 ;1+-% t _ i✓ i>1 t'; ,>,�7 Y� Reviewer/Inspector Signature: Date: Itf // &_ cc: Divisions of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B, Hunt, Jr., Governor Jonathan B. Howes, Secretary AT?WA rDEHNR DIVISION OF WATER QUALITY July 30, 1997 Mr. Whitley Stephenson 2080 Wilson Mills Road Smithfield, North Carolina 27277 Subject: Compliance Evaluation Inspection Facility # 51-46 Spring Meadow Unit #1 Johnston County Dear Mr. Stephenson: On July 23, 1997, Mr. Charles Alvarez from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. The inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the operation was not discharging wastewater into waters of the State and that operations were proceeding according to your approved Animal Waste Management Plan. As a result of the inspection, the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. The Raleigh Regional Office appreciates your cooperation and compliance. If you have any questions regarding this inspection please call Mr. Charles Alvarez at (919) 571-4700. incerely� �a dy rrett, Water Quality Section Supervisor cc: Johnston County Health Department Mr. Ken York, Johnston Soil and Water Conservation District Ms. Margaret O'Keefe, DSWC-RRO DWQ Compliance Group .RRO Files 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh, Norkh Carolina 27609Niq f C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper 10rRoutine 0 Complaint 0 Follow-up of DWQ inspection 0 Follow-up of DSWC review 0 Other Date of Inspection Facility Number Time of Inspection ® 24 hr. (hh:mm) Total Time (in fraction of hours Farm Status: VCertified egistered [I Applied for Permit (ex:.1.25 for I hr .15 min)) Spent on Review ❑ Perniltted or Inspection includes travel andprocessing) ❑ Not Operational Date Last Operated:...., ......................................... . ....... .......................... ........ ....................................................... FarmName: ................ .....: 4.sAk.s1........... a.1......... 4:..I............ ......... County:..........�................... .... .......... ............ LandOwner Name: ........'k.............. .... .......�T�fL'? Nsoiv ............................ Phone No:........... ` ....... .. ...t )f,1................. Facility Conctact:...W.! .t. SS ......... ........... Title: ............. .y!. ^ .'^............. �Prholne No:... q .y. . z1.d �. �r 4�.f✓ Mailing Address:...... 08.�............. !1 :. �.* �.........Mei�s.........lCg :.................. 5'*!.. !2...L:!.1t1.!........N�.................�..........� ............. OnsiteRepresentative: ...... P.lAy........... A,X.^!.Sn................................................ Integrator: ...... ��.........�Fi r^ Certified Operator:.. +� g ^' �/.. J . !."1 C.............................. Operator Certification Number:.....11 132................ y;v Location of Farm: .._f.............................s..................................................... �..........«.......... a............1.......7........... ._.....,.1..g1......m....7..................... a Latitude Longitude �• ��« General 1. Are there any buffers that need maintenance/improvement? ❑ Yes No 2. Is any discharge observed from any part of the operation? ❑ Yes [] No Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes 2'No b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) ❑ �es 134o c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes [!(No 3. Is there evidence of past discharge from any part of the operation? ❑ Yes �G(No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes [if/No S. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes L+J No 4/30/97 maintenance/improvement? Continued on back Facility Number:. 1. ... 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 53"No 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes [j<o 8, Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes KO Structures (Lagoons and/or },folding Fonds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes L -N-b Freeboard (ft). Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 �.q............. .......J.'............. ........2. `........... .........2............. ....................... .... ...................... 0o 10. Is seepage observed from any of the structures? ❑ Yes 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes �lo 12. Do any of the structures need maintenance/improvement? ❑ Yes QX0 (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? 53Yes ❑ No Waste application 14. Is there physical evidence of over application? ❑ Yes U'No (If in excess of WMP, or runoff entering waters of the State, notify.DWQ) 15, Crop type ..............................................' ......INl c...................6CS.R.F...............................0 n4..s. �............... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes Q ko 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes 2 NQ 18. Does the receiving crop need improvement? ❑ Yes E(TNo 19. Is there a Iack of available waste application equipment? ❑ Yes No 20. Does facility require a follow-up visit by same agency? ❑ Yes E No 21, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes Eh o For Certified Facilities Only 22, Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes LD No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes [�No 24. Does record keeping need improvement? ❑ Yes F4KO Reviewer/InspectorName��e E�h.<. " �:. , ..., Reviewer/Inspector Signature: 2L.=L Date: cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 1L'L--14--1995 15 : 2b FR ER OUPLITY SECTO PRO P.22i02 Site Requires Lrr mediate A ttentior! Facility No. DIVISION OF ENVIRONMENTAL MANAGEN>ENT ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: It - (Y- 1995 Time: Farm Name/Owns Mailing Address: County: h Tntegratar: Phone: On Site Representative: Phone: _ `��-_K971-1 Physical Address/Location: Type of Operation: Swine ✓ Poultry Cattle Design Capacity: Number of Animals on Site: DEM Certification Number: ACE- DEM Certification Number: ACNEW Latitude- Longitude: _ Elevation_ _______-__meet Circle Yes or No Does the &kn mal Waste Lagoon have suffcient. freeboard of 1 Foot + 25 year 24 hour- storm event (approximately i Foot + 7 .arches) � or No Actual Freeboard: Wit. .inches Was any seepage observed from the lagoou(s)? Yes or&% Was any erosion observed? Yes or Is adequate laud available for spray? '5'�s or No is the cover crop adequate? (S�or No Crop(s) being utilized: Does the facility meet SCS rai.nimum setback criteria'? 200 Feet from Dwellings? Yes or No 100 Feet from Wells? Yes or No vlhc animal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes or No 1-ini-mal waste land applied or spray irrigated within 25 Feet of a USGS &tap Blue Line'? Yes or No Zs anirral waste discharged into waters of the state by man-made ditch, flushing system, or other -iiTn"L- man spade devices? Yes or(!!g) if Yts, Please Explain Ooasthi: Facility inainta-in adequate waste managernear records (volumes of ruanure, land applied. spray "gated on spccific acreage with cover crop)'? Yes or No Additional U �ILS��OC cc: Faciliry Asscssment Unit S igria lure Use Attachments if Needed. TOTAL P.02 RRO P.02/02 JL'L-14-1995 15:26 FROMl WATER 0UALITY SECTION TO l Site Requires Immediate Artention Facility No. y IQ DIVISION OF ENVIRONMENTAL MANAGEMENT ANIMAL FEEDLOT OPERAZTONS STYE VISITATION RECORD DATE: G/ 07 , 1995 Time: cr Y.r-e S /- S Y Farm Name/prone Mailing Address: County: Integrator: -..,..,,"....., _ _ phone: On Site Representative: _ �c� _ - --- Phone: Physical Address/Location:..:gg22c=C_ . 77 Type. of Operation: Swine k--' Poultry Cattle , Design Capacity: ,�2 ,. a Number of Animals on Site; ai�pJ .Z, cr;11 � DEM Certification Number: ACE___, ___ DEM Cer ification Number: ACNEW Latitude::_5 ` Longitude: -7 20 ' Elevation: ________Feet Circle Yes or No Goes the A mal Waste Lagoon have sufficient freeboard of 1 Foot + 25 year 24 hour storrn event (approximately 1 Foot + 7 inches) Qr No Actual Freeboard: 3 fit. Inches Was any seepage observed from the lagoon(s)? Yes ot�& Was any erosion observed? Yes orlO Is adequate land available for spray?6y� or No. Is the cover crop adequate? OLe�)or No Crap(s) being utilized: Does the facility meet SCS minimum setback criteria! 200 Feet from Dwellings? Yes -or No. 100 Feet from Wells?' Yes or No -wthe animal waste stockpiled within 100 Feet of USGS Blue Line S tream? Yes or Na auixnal waste land applied or spray irrigated within 25 Feet of a LUSGS' Map Blue'Line? Yes or No animal waste discharged into waters of the state by inan-made ditch, flushing system, or other •�!Tnila_r man-made devices? Yes or No If Yes. Please Explain.' Doechc facility maintain adequate waste roxiagernerit Tecords (volumes of rtianure; land applied spray irrigated on specific acreage with cover crop)'' Yes or No -yp Additional. Comments: T� n J i s r / r cc: Facility Assessment Unit Signature Use Anachmenwif Needed f�/ TOTAL P.02 aolP 1570 ptzfPk xK0 lolah?- a;,I/rm PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 51-46 County: Johnston Facility Name: Sandy Ridge Pork Certified Operator Name: Whitler Stephenson Operator Number: 16439 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 1 N. N 16 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/22/2018 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. POA & Plan Amendment completed by Curtis Barwick, Technical Specialist Sandy Ridge Pork Manager Phone Facility Owner/Manager (print) Date Facility Owner/Manager (signature) 919-989-8878 10/8/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 320.1 lb PAN 2. Structure ID: 2 line m = 200.3 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 520.4lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lblacre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 8820 4 coastal bermuda 8.68 73.00 633.6 Mar -Oct 8820 3 coastal bermuda 6.61 63.00 416.4 Mar -Oct 8820 1 H1 matua 2.87 221.20 634.8 Sep -Aug 8820 1 H2 matua 2.91 225.20 655.3 Sep -Aug 8820 1 H3 matua 2.93 225.30 660.1 Sep -Aug 8820 1 H4 matua 1.17 225.20 263.5 Sep -Aug 8820 21-15 matua 3.23 235.00 759,1 Sep -Aug 8820 21-16 matua 2.28 235.00 535.8 Sep -Aug 8820 21­117 matua 1.37 235.00 322.0 Sep -Aug 8558 5H8 coastal bermuda 2.57 131.70 338.5 Mar -Oct 8558 51­19 coastal bermuda 2.64 115.00 303.6 Mar -Oct 8558 51-110 coastal bermuda 2.13 135.80 289.3 Mar -Oct 8558 5H11 coastal bermuda 2.51 130.30 327.1 Mar -Oct 8558 5H12 coastal bermuda 1.89 169.20 319.8 Mar -Oct 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 6458.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN -BALANCE w. Total PAN to be land applied (line n from section II) = 520.4 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 6458.8 lb. PAN y. Overall PAN balance (w - x) -5938 Ilb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to, another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 21.21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (10): 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a, current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 64666 ftz e. line c112 x line d x 7.48 gallons/ft3 120925 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 84593 ft3 h. current herd # 800 certified herd #1 800 actual waste produced = current herd # x line g = 84593 fts certified herd # i. volume of wash water according to structural design ®ft3 j, excess rainfall over evaporation according to design 39783 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 155055 gallons 4. Total PAN to be land applied during draw down period I, current waste analysis dated 8/30/2018 1.16 Ibs11000 gal. m. ((lines e + k)11000) x line I = 320.1 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 47952 ft2 e. line c112 x line d x 7.48 gallons/ft' 29890 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period• according to structural design 180 days g. volume of waste produced according to structural design 84593 ft3 h. current herd # 800 certified herd 91 800 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 8/30/2018 m. ((lines e + k)11000) x line I = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 84593 ft' ft3 29925 ft3 142766 gallons 1.16 Ibs/1000 gal. 200.3 Ibs, PAN PoA (30 Day) 2/21100 R Ott) 01175-] Rice 1\4�d rpo aio?a3 Ai CIO)e4 . PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 51-46 County: Johnston Facility Name: Sandy Ridge Pork Certified Operator Name: Whitley Stephenson Operator Number: 16439 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 1 Spillway(Y or N): N N Level(inches): 13 _ 12 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWO prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste 10/11/2016 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. POA & Plan Amendment completed by Curtis Barwick, Technical Specialist Sandy Ridge Pork Manager _ Phone: 919-989-8878 Facility Owner/Manager (print) Date: 11/7/2016 Facility Owner/Manager-(signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 420.7 lb PAN 2. Structure ID: 2 line m = 373.1 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 793.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Iblacre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 8820 4 small grain overseeed 8.68 50.00 434.0 Oct -Feb 8820 3 small grain overseeed 6.61 50.00 330.5 Oct -Feb 8820 1 H1 matua 2.87 224.00 642.9 Sep -Aug 8820 1 H2 matua 2.91 224.00 651.8 Sep -Aug 8820 1 H3 matua 2.93 224.00 656.3 Sep -Aug 8820 1 H4 matua 1.17 235.00 1275.0 Sep -Aug 8820 21-15 matua 3.23 235.00 759.1 Sep -Aug 8820 21-16 matua 2.28 235.00 535.8 Sep -Aug 8820 2H7 matua 1.37 235.00 322.0 Sep -Aug 8558 51-18 small rain overseeed 2.57 50.00 128.5 Oct -Feb 8558 5H9 small rain overseeed 2.64 50.00 132.0 Oct -Feb 8558 51-110 small grain overseeed 2.13 50.001 106.5 Oct -Feb 8558 51-111 small grain overseeed 2.51 50.00 125.5 Oct -Feb 8558 51-112 small grain overseeed 1.89 50.00 94.5 Oct -Feb State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 5194.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 793.8 lb. PAN PoA (30 Day) 2/21/00 * . x. Crop's remaining PAN balance (line v from section III) = 5194.3 lb. PAN y. Overall PAN balance (w - x) _ -4400 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Both lagoons are now in compliance as of 10/24/16. PoA (30 Day) 2/21/00 .ti PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d, top of dike surface area according to design (area at below structural freeboard elevation) ' e. line c112 x line d x 7.48 gallonslft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 13.0 inches 19.0 inches 6.0 inches 64666 1ft2 241851 gallons 180 days g. volume of waste produced according to structural design 84593 ft 3 h. current herd # 800 certified herd # 800 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/7/2016 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 84593 ft' 1 ft3 39783 ft3 155055 gallons 1.06 Ibs11000 gal. 420.7 lbs. PAN PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 12 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = TO inches d. top of dike surface area according to design (area at below structural freeboard elevation) 47952 fe e. line c/12 x line d x 7.48 gallons/ft' 209231 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 84593 ft3 h. current herd # F 800 certified herd # 800 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/7/2016 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 84593 ft' �ft3 29925 ft3 142766 gallons 1.06 Ibs/1000 gal. 373.1 lbs. PAN PoA (30 Day) 2/21 /00 Water R esources ENVIRONMENTAL QUALITY June 28, 2016 Whitley Stephenson Spring Meadow Farm, Inc. 2080 Wilson Mills Rd Smithfield NC 27577-7657 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Subject: Notice of Deficiency NOD-2016-PC-0267 Sandy Ridge Pork Permit No. AWS510046 Incident # 201600341 Johnston County Dear Mr. Stephenson: Director On February 9, 2016, you notified the Raleigh Regional Office of the Division of Water Resources, as required by General Permit AWG1000 condition III.13.e that the freeboard levels of both lagoons were less than the minimum required by the General Permit. The liquid levels of both lagoons 1 and 2 were reported as 18.0 inches. General Permit condition V.2 states "The maximum waste level in lagoons/storage ponds shall not exceed that specified in the CAWMP. At a minimum, maximum waste level for lagoons/storage ponds must not exceed the level that provides adequate storage to contain the 25-year, 24- hour storm event plus as additional' 1 foot of structural freeboard." In this case, the minimum required is 19 inches. The 30 Day Plan of Action was received on February 11, 2016 and you reported both lagoons back in compliance on March 7, 2016. A Compliance Inspection of the farm on February 18, 2016 indicated management of the waste system was in compliance with permit conditions at that time. If you have any questions concerning this notification, you may contact Joan Schneier or me via email at joan.schneier@ncdenr.gov or rick.bolich@ncdenr.gov or at (919) 791-4200. Sincerely ickolich, L.G., Assistant Regional Supervisor Raleigh Regional Office, Water Quality Regional Operations Section, Division of Water Resources cc: RRO-WQROS Files DWR Central Files Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://deq.ne.gov/about/divisions/water-resources 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 7914200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159 pIMSA ao*po3 q1 PfQ4 rPcelV abl11p �? qqT p/Lj PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 51-46 County: .Johnston Facility Name: Sandy Ridge Pork Certified Operator Name: Whitley Stephenson Operator Number: 16439 1, Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon NamelID; Spillway(Y or N): Level(inches)i Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 1 N N 18 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/1112016 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. POA & Plan Amendment completed by Curtis Barwick, Technical Specialist Phone: 919-989-8878 Date: 2/10/2016 1 x. Crop's remaining PAN balance (line v from section 111) = 4654.5 lb. PAN y. Overall PAN balance (w - x) = -4253 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and. haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. .Irrigation onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 2f21100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND10R 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1, Structure 0: 1 line m = 212,9 lb PAN 2. Structure ID: 2 line m = 188.2 lb PAN 3, Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure I D: line m = ib PAN n.lines I+2+3+4+5+6= 401.1lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRlnn nn NnT t IAT FIFLDA TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o_ tract # p. field # q. Crap r, acres S. remaining IRR 2 PAN balance (Vacre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 8820 4 small grain overseeed 8.68 69.00 598.9 Oct -Feb 8820 3 small grain overseeed 6.61 62.00 409.8 Oct -Feb 8820 1H1 matua 2.87 170.00 487.9 Sep -Aug 8820 1 H2 matua 2.91 163.00 474.3 Sep -Aug 8820 1H3 matua 2.93 164.00 480.5 Se -Au 8820 1 H4 matua 1.17 164.00 191.9 Se -Au 8820 21-15 matua 3.23 171.00 552.3 Sep -Aug 8820 2H6 matua 2.28 172.00 392.2 Sep -Aug 8820 21-17 matua 1.37 174.00 238.4 Sep -Aug__ 8558 5H8 small grain overseeed 2.57 64.00 164.5 Oct -Feb 8558 51-19 small grain overseeed 2.64 64.00 169.0 Oct -Feb 8558 5H10 small grain overseeed 2.13 75.00 159.8 Oct -Feb 8558 51-111 small grain overseeed 2.51 74,00 185.7 Oct -Feb 8558 51-1112 small grain overseeed 1.89 79.00 149.3 Oct -Feb `State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4654.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 401.1 lb. PAN POA (30 Day) 2121/00 y L PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD t. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (1D): 1 2. Current liquid volume in 25 yr./24 hr, storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) I 64666 ft' e. line c/12 x line d x 7.48 gallons/W 40308 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 84593 fta h, current herd # 800 certified herd #1 800 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f 4. Total PAN to be land applied during draw down period 1. current waste analysis dated I 1 /20/201 fi m. ((lines e + k)/1000) x line I REPEAT SECTION I FOR EACH WASTE STRUCTURE. ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121/00 84593 ft' l.� W 39783 W 155055 gallons 1.09 Ibs/1000 gal. 212.9 lbs. PAN . � L PLAN OF ACTION JPoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PANTO BE LAND APPLIED PER WASTE STRUCTURE 1, Structure NamelIdentifier (ID). 2 2. Current liquid volume in 25 yr./24 hr, storm storage & structural freeboard a, current liquid level according to marker 1$.p inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 47952 ft2 e. line c/12 x line d x 7.48 gallons/W 29890 gallons 3. Projected volume of waste liquid produced during draw down period f, temporary storage.period according to structural design 180 days g, volume of waste produced according to structural design 84593 ft 3 h. current herd # 1 800 certified herd # B00 actual waste produced = current herd # x line g = 84593 ft' certified herd # _...�_ i. volume of wash water according to structural design ft3 j, excess rainfall over evaporation according to design 29925 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 142766 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated [� 1/20/2016 1.09 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 188.2 lbs. PAN REPEAT SECTION t FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. Skvada, III Governor Director Secretary December 20, 2013, 3 2014 Whitley Stephenson Sandy Ridge Pork__ 2080 Wilson Mills Rd Smithfield, NC 27577 -- Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS510046 Sandy Ridge Pork Animal Waste Management System Johnston County Dear Whitley Stephenson: The Division of Water Resources (Division) received your sludge survey information on December 16, 2013. With the survey results, Curtis Barwick on your behalf requested a one year extension of the sludge survey requirement for lagoon #1 at the Sandy Ridge Pork facility that have higher sludge accumulation citing PED problem in the facility's surrounding area. Due to the reason cited above, the Division agrees that a sludge survey is not needed until December 31, 2014 for lagoon #1. The next sludge survey for lagoon #1 at this facility should be performed before December 31, 2014. Please retain this letter and keep it with your farm records for reference. Thank you for your attention to this matter. Please call me at (919) 807-6340 if you have any questions. Sincerely, Miressa D. Garoma Animal Feeding Operations Branch cc: Raleigh Regional Office Permit File AWS510046 Curtis Barwick, 103 Country Club Cir., Clinton, NC 28328 1636 Mail Service Center, Raleigh, North Carolina 27699-1636 Location: 512 N. Salisbury St. Ralegh, North Carolina 27604 Phone: 91 M07-64641 FAX: 91 M07-6496 Internet www.nmaterqualily oLg An Equal Opportunity 1 Affirmative Action Employer DEN North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director March 19, 2010 Whitley Stephenson Spring Meadow Farm, Inc. Sandy Ridge Pork 2080 Wilsons Mills Rd Smithfield, NC 27577 Natural `Reso.urces DD Freiman '. Secretary Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS510046 Sandy Ridge Pork Animal Waste Management System Johnston County Dear Whitley Stephenson Spring Meadow Farm, Inc.: The Division of Water Quality (Division) received your sludge survey information on March 12, 2010 for lagoon #2 at the above referenced facility: With the survey results, you requested an extension of the sludge survey requirement for this lagoon at the Sandy Ridge Pork. Due to the amount of treatment volume available and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed until 2011 for lagoon #2. The next sludge survey for the lagoon #2 at Sandy Ridge Pork should be performed before December 31, 2011. Please note that this extension is only valid for lagoon #2. Other lagoons should have a sludge survey performed on the normal schedule, before December 31, 2010 unless an extension has been granted separately. Thank you for your attention to this matter. Please call me at (919) 715-6627 if you have any questions. Sincerely, ristine D. Blanton Animal Feeding Operations Unit cc: Raleigh Regional Office, Aquifer Protection Section Permit File AWS510046 1636 Mail Service Center. Raleigh, north Carolina 27699-1636 �jal1C i o-atim 2728 Capital Blvd„ Rateigh. North Garoiina 2760; NortbCarolin a PhonF: 919.733 322 i 1 FAX: 919-715-0588 % Customer Ser6ce� 1-877-6233 6748 p+ intemet: www.nmaterauality.arg atu nlliy An t:aurd Oouorlwir; '� 13ttinz1t.a1/e Action Em. ioyei WASTE UTILIZATION PLAN Friday, March 16, 2007 Producer: Whitley Stephenson Farm Name: Sandy Ridge Sow Farm 51-46 2350 Wilson Mills Rd Smithfield,NC 27577 Telephone # : (919) 989-8878 Type of Operation : Farrow to Weanling Swine Number of Animals : 1600 sows design capacity Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and.to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and avaialable water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special pre -cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission, Page 1 of 9 AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 1600 sows X 6.1 tons waste/sows/year = 9760 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 1600 sows X 5.4 Ibs PAN/sows/year = 8640 PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and suface application. TABLE I: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE &CLASS- CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE NIACRE NIACRE USED TIME 8820 - 1 DOGUE 0-2% 1 235 0 9.87 2319.45 SEP-AUG 8820 2 GILEAD 2-6% 1 235 0 6.89 1619.15 SEP-AUG 8820 3 GILEAD 2-6% BP 4.7 235 0 6.61 1553.35 MAR-SEP 8820 3 GILEAD 2-6% SG 1 50 0 6.61 330.5 SEP-MAY 8820 4 GILEAD 2-6% BP 4.7 235 0 8.68 2039.8 MAR-SEP 8820 - 4 GILEAD 2-6% SG 1 50 01 8.68 434 SEP-MAY TOTALS: 8296.26 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC -to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 of 9 TABLE 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specifications 2.) TRACT FIELD SOIL TYPE &CLASS- CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE NIACRE NIACRE USED TIME 8558 1 GILEAD 0-2% BP 4.7 2351 01 11.74 2758.9 MAR-SEP 1 GILEAD 4-2% SG 1 5a 0 11.74 5$7 SEP-MAY _855$ TOTALS: 3345.9 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation * Acreage figures may exceed total acreage in field due to overseeding. **Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in TABLES 1 and 2 above: CROP CODE CROP UNITS LBS NIUNIT BP HYBRID BERMUDAGRASS-PASTURE TONS 50 SG SMALL GRAIN OVERSEEDED AC 50 M MNer MATu►k AC Page 3 of 9 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 32.05 8,296 TABLE 2 �W11.74 3,346 TOTALS: L43.7 - 11,642 AMOUNT OF N PRODUCED: 8,640 'BALANCE -3,002 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres show in each of the preceeding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1408 pounds of plant available nitrogen (PAN) per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. See the attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 5.92 months. In no instance should the volume of waste being stored in your structure be within 1.58 feet of the top of the dike. If surface irrigation is the method of land application for this plan, it is the responsiblity of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. APPLICATION APPLICATION TRACT FIELD SOIL TYPE CROP RATE (Inlhr) AMT (inches) 8558 -1 GILEAD 0-2% SG 0.35 *1 8558 1 GILEAD 0-2% BP 0.35 *1 8820 -2 GILEAD 2-6% WA 0.35 *1 8820 -3.-4 GILEAD 2-6% sG 0.35 *1 8820 3.4 GILEAD 2-6% SP 0.35 *1 682D -1 DOGUE 0-2% WA 0.35 *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because the nitrogen limitation. The maximum application. amount shown can be applied under optimum soil conditions. Page 4 of 9 NARRATIVE OF OPERATION Acreages are based on irrigation designs completed in 2003 and 2007. RYE'S are based on the old Waste Utilization Plan. Fields 1 & 2, tract 8820, are full season matua, grazed or hayed. Page 5 of 9 PLANS & SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility, It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance.) *7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: the outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other that an irrigation ditch or canal. Animal waste Page 6 of 9 other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those owned by the landownwer. 14. Waste shall be applied in a manner not to reach other property and public right - of ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted croplands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. *16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. *17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. *1 B. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. *19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied as a preemergence with no other applications of animal waste during the crop season. *21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume fpr waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production amd maintained. Soil and waste analysis records shall be kept for five (5) years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina Department of Agriculture regulations. * Liquid Systems Page 7 of 9 NAME OF FARM: Sandy Ridge Sow Farm 51-41 OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance procedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. (we) understand that I must own or have acres to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FAMLIDWN R: hitley Stephenson SIGNATURE: DATE: �` 1 NAME OF MANAGER 'different from owner): please print SIGNATURE: DATE: NAME OF TECHNICAL SPECIALIST: Curtis Barwick AFFILIATION: Pit J/Afa, ADDRESS (AGENCY): rd3 CcNNrgy c.L146 cl W Clinton, NC 28328 (910) 592--qn i o SIGNATURE: DATE: Page 9of9 5 -TOY Aw i H E L r'� w � E L ,; H E L 2.97 : 4r3 4.2yiI Y 4 � 1 a n +•t ' kY� . IF H r 'I' .a-Y WETTED ACREAGE FOR SANDY RIDGE FARM (EXISTING FIELD, NEW UNDERGROUND & LAYOUT) PULL TYPE PULL LENGTH EFFECT. WIDTH MIDDLE ACRES START END TOTAL 8 EE70 536.0 180.0 2.21 0.36 0.00 2.57 9 EE70 551.0 180.0 2.28 0.36 0.00 2.64 10 E90+ 417.0 189.0 1.81 0.32 0.00 2.13 11 EE70 520.0 180.0 2.15 0.36 0.00 2.51 12 EE70 527.0 114.0 Wrd 1.38 0.36 0.15 1.89 TOTAL EFFECTIVE WETTED ACREAGE: 11.74 ACRES NOTES: 1. DIMENSIONS BASED ON GPS-GENERATED MAP BY OTHERS. 2. WETTED ACREAGE FOR START ENDS AND STOP ENDS ARE TAKEN FROM CAWMP WETTED ACREAGE SYSTEMS TABLES FOR APPROPRIATE LANE SPACING (150' LANE SPACING & 210' WETTED DIA.) 3. ALL CALCULATIONS BASED ON 0.77" RING IN SR100 GUN AND USING CALIBRATED WETTED DIA OF 210, Q 48 psi, 80 gpm. . 4.4" UNDERGROUND CL200 PVC AND HYDRANTS TO BE INSTALLED. 15.OPERATOR MUST TAKE PRECAUTIONS AND OBSERVE IRRIGATION EVENTS TO PREVENT RUNOFF FROM OVERAPPLICATION, SPRAY DRIFT, ETC. APPLICATION SHOULD NOT OCCUR IN OVER 5 mph WINDS OR ON FROZEN OR SATURATED SOILS. SPRAY ARCS MUST BE ADJUSTED AS SHOWN IN PLAN 6.OPERATOR MUST VERIFY REQUIRED SETBACKS AND MARK TRAVELER LANES TO ENSURE ACCURATE APPL. 7. SYSTEM SHOULD BE CALIBRATED AND OPERATED TO DESIGN SPECIFICATIONS, OR DESIGN MUST BE MODIFIF❑ TO ACCOMMODATE CHANGES: CALCULATIONS BY: R. Gregory Swain, P.E. Swain Consulting Services, Inc. 503 Underwood St Clinton, NC 28328 (910) 590-2703 �.• o�ESSO SEAL 16415 0 % 'GIN c ••.N �Po pd yam" i ` "WELD _- - I Existi -g PVC Und erground v12 L New14" C 00 PVC 0°, 1\5 ' 5 150' Lane Spacing m � NOTES: 1. IRRIGATMON LAYOUT BASED ON MAPPING BY OTHERS 2. LAYOUT AND SPACING BASED ON 0.77' RING OPERATED O 48 psi, AND USING CAUBRATED PERFORMANCE WETTED DW-21O', LANE SPACING 150' FOR 71S [AN€ SPACING. 3. OPERATOR MUST MANAGE APPLICATIONS TO REMAIN IN ACM CROP AREAS. NO LAID APPUCATION DURING RAINFALL, FROZEN GROUND, DR WIND > 5 mph. LEGEND 210' DIA. SPRAY PATTERN O NEW HYDRANT r THRUST BLOCK i AIR VENT TRAVEL LANE -- -- --- — DITCH, SURFACE WATER — -- — FIELD BORDER — — — — BUFFER OR SETBACK SEAL 16415 SWAIN CONSULTING SERVICES, INC. 150 CABIN CREEK LN. CLINTON, NC 910-590-2703 Sandy Ridge Farm I lrrig Design— —Existing Fld DATE: 2/6/07 1 SCALE: 1" = 200' Sheet2 TABLE 2 - Travelling Irrigation Gun Settings Make, Model and Type of Equipment: Cadman 3" w1600' hose Field No. Travel Application TRAVEL LANE Wetted Nozzle Operating Operating and Speed Rate Effective Effective Diameter Diameter Pressure Pressure Arc Hvdrant No. (ftlmin) (in/hr.) Width(ft.) Lenath(ft) (feet) (Inches) at Gun(Dsi) at reel(Dsi) Pattern Comments - Acres ner null Cr' �'a■w��t� i�'' a'���r f Sheets IRRIGATION SYSTEM DESIGN PARAMETERS Landowner/Operator Name: Whitley Stephenson Address: 2350 Wilson Mills Rd. Smithfield, NC 27577 Telephone: (919) 934 2109 Table 1 - Field Specifications . Approximate Maximum Useable Size Field of Field Number (acres) Soil TVAe Slooe % Crop(s) County: Johnston Date: 04101 /2003 Maximum Maximum Application Application per Irrigation Rate Cycle (Inlhr) (inches) Comments 'Hydrants 16-32 "0,+4G8 Acres Bentonville Farm. Scale: 1 "=300' Hog Houses aQ) Lagoon 0a Qom M f-1cld Y x' 06 V .nar .n..i '7 r SPRING MEADOW FARMS 2080 WILSON MILLS ROAD SMITHFIELD, NC 27577 March 27, 2007 North Carolina Division of Water Quality Raleigh Regional Office Water Quality Section 3800 Barrett Drive Raleigh, NC 27609 Dear Sir or Madam; Please find enclosed updated Waste Utilization Plans for Spring Meadow Farms Unit 1 (5141) and Sandy Ridge Pork (51-46). A new irrigation system is being installed on fields 8 and 8A at Spring Meadow Farms Unit 1. A new irrigation system is being installed on field 1, tract 8558, at Sandy Ridge Pork. If you need further information regarding this, please call Whitley Stephenson at (919) 989- 8878. Thank you for your attention to this matter. Sincerely, Curtis Barwick Technical Specialist I RZ 6z�w Ill August 19, 2005 CERTIFIED MAIL RETURN RECEIPT REQUESTED RECEIPT # 7002 2410 0003 0274 7027 Whitley Stephenson Sandy Ridge Pork 2080 Wilson Mills Rd. Smithfield, NC 27577 RE: Sludge Survey Testing Dates Facility # 51-46 Johnston County Dear Whitley Stephenson: Michael F. Easley, Governor William G, Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality Itl 1 r The Division of Water Quality (DWQ) received your request for a sludge survey extension on July 25, 2005. Due to the amount of treatment volume available, DWQ agrees that a sludge survey is not needed until 2009. Thank you for your attention to this matter. If you have any questions, please call me at (919) 715-6185. Sincerely, Keith Larick Animal Feeding Operations Unit cc: File# 51-46 John Hunt, Raleigh Regional Office One rCaina urura �ly Aquifer Protection Section 1636 Mail Service Center Raleigh, NC 27699-1636 Phone (919) 733-3221 Customer Service Internet: http://h2o.enr.state.nc.us 2728 Capital Boulevard Raleigh, NC 27604 Fax (919) 715-0588 1-877-623-6748 Fax (919)715-6048 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Whitley Stephenson 2080 Wilson's Mills Road Smithfield, NC 27577 June 28, 2005 Enclosed is a copy of recent changes made to the waste plan for farm #51-46. I am unsure if these changes are revisions or amendments so I have sent your office a copy to be on the safe side. Owner, Sandy Ridge Pork PRODUCER: LOCATION: TELEPHONE: TYPE OPERATION: NUMBER OF ANIMALS: (Design Capacity) '`W/1S E-lJT'LIZ/ "�j` N LOW "MIy" i W' � 11 Whitley Stephenson - Bentonville Farm 2350 Wilson Mills Rd. Smithfield, NC 27577 (919) 934 2109 Farrow -wean 1600 JUL6 2005 ,y off i11'. �D�hNR RALEI� REv1g��,. _. The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special precautions, waste may be applied to land eroding at up to 10 tons per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in .runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility, Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Page 1 Amount of Waste Produced Per Year (gallons, ft, tons. etc.) 1,600 animals X 6_1 (tons) waste/animal/year = Amount of Plant Available Nitrogen (PAN) Produced Per Year 1,600 animals X 5_4 lbs. PAN/animal/year = Guide Std. 633) 9,760 (tons) waste/year. 8,640 lbs. PANlyear. (PAN from N.C. Tech Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner The following acreage will be needed for waste application based on the crop to be grown and surface application: Table 1: ACRES OWNED BY PRODUCER Tract Field Soil Crop Lbs. N Acres Lbs. N Month of # No. Tvpe Per Acre Utilized Application T8820 1 DoA Matua G 2351 9.87 2319.45 Sept. - August T8820 2 GeB Matua G 235 6.89 1619.15 Sept. - August T8820 3 GeB Bermuda G 235 6.61 1553.35 March - Sept. T8820 --3 GeB Small Grain H 50 6.61 330.5 Sept. - April T8820 4 GeB Bermuda G 235 8.68 2039.8 March - Sept. T8820 -4 GeB Matua Overseed 50 8.68 434 Sept, - A ril Total 1 32.051 8,296.25 1 *This N is from animal waste only. If nutrients from other sources such as commercial fertilizer are applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Caroline to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached) (Required only if operator does not own adequate land [see Required Specification 21j Tract Field Soil Crop Lbs. N Acres Lbs. N Month of # No. Type Per Acre* Utilized Application Leased 5 GeB Corn 110 6.50 715 March - June Wheat 96 6.50 624 Sept. - April Soybeans 120 6.50 780 April - August Small Grain 50 6.50 325 Sept. - April Cotton 75 6.50 487.5 April - Jul Millet 120 6.50 780 April - Sept. Bermuda G 235 6.50 1527.5 March - Sept. Matua G - full season 235 6.50 1527.5 Aug. - Jul OPTIONAL LAND - any crop may be used *either wheat, soybeans, millet, corn, or cotton must be grown each G - grazed 1year * See footnote for Table 1. Total Totals from above Tables Acres Lbs. N Utilized Table 1 32.05 8,296 Table 2 6.50 624 Total 38.55 8,920 Amount of N Produced 8,640 Surplus or Deficit 280 I 624.00 NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrient or other elements. Page 3 See attached map showing the fields to be used for the utilization of waste water. Field Soil Type No. Application of Waste by Irrigation Crop Application Application Rate (InlHr) Amount (In.) 1 DoA Matua 0.3 .5-1 2-4 GeB Bermuda/Matua 0.35 .5-1 5 GeB Row Crops 0.35 .5-1 THIS TABLE IS NOT NEEDED IF WASTE IS NOT BEING APPLIED BY IRRIGATION, HOWEVER A SIMILAR TABLE WILL BE NEEDED FOR DRY LITTER OR SLURRY. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 MONTHS. In no instance should the volume of waste being stored in your structure exceed Elevation *see lagoon design. Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. Narrative of operation: Fields 1 and 2 are full season matua. It may be grazed or cut for ha Fields 3 and 4 must be cut for hay. Small grain on Feld 3 requires that application windows shown be followed, and it must be removed by April 15, _ 50# rate for overseed may be used for field 3, with revised application windows as shown for. field 4. Field 1 will be in millet during the Spring/Summer of 2003 only. Matua will be Planted in the Fall of 2003. Millet rate is 120 lbs. of PAN/ acre, with an application window of April - Sept. Field 5 added to the plan as optional, leased land. Any crop listed may be used. SB515 setbacks apply to this field. At a minimum, either corn, so beans, wheat, cotton, or millet must be grown each year to balance the plan. Page 4 VT II " t ° VSiAST' °l T REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 - Filter Strip). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6 When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. Page 5 REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. Page 6 INAgT ?1ILI� T Ii]N P REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced as necessary to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied pre -plant with no further applications animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining element. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metal approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. Page 7 r�. �+t t�+ !#5S'yk?p L�_ ``` s. ,w� WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Bentonville Farm Owner/ Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environment Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner: Whitley Stephenson (Please print) Signature: V Date: ` 4 Name of Manager (if different from owner): Signature: Date: Name of Technical Specialist: (Please print) Kraig Westerbeek Affiliation: Private Address (Agency): 1635 W. Wards Bridge Rd. Signature: Warsaw, NC 2839 Date: a C-)r Page 8 tMAL WASTE IUTIL.IZMIQN AGREEMEN:[ (Needed only if adddona! (end has to be leased, etc.) i, 1 L� Q , hereby giveA I,- I, 1_1��w permission to appf animal waste from his Waste Utilizat n Sy tern on acres of.my land for the duration of time shown below. I understand that thls waste contalns nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my needed for commercial fertilizer. Adjacent Landown r: Date: Waste Producer Date: AA Technical Representative: Date: SIIUCD Represen a v , ` Date Tenn of Agreement: `1` ,19 to 2fl (M(n(mum of Ten yeera on Cost Shared Items) (see Requkvd SpedAcadon No. 2) Page 9 o f W A rFR Michael F. Easley, Governor CA, Q - William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources co j r Alan W. Klimek, P. E., Director Division of Water Quality October 1, 2004 Whitley Stephenson Spring Meadow Farm, Inc. Sandy Ridge Pork 2350 Wilson Mills Rd Smithfield NC 27577 Subject: Certificate of Coverage No. AWS510046 Sandy Ridge Pork - Swine Waste Collection, Treatment, Storage and Application System Johnston County Dear Whitley Stephenson Spring Meadow Farm, Inc.: On June 11, 2004, the North Carolina Division of Water Quality (Division) issued a revised State General Permit for swine facilities. The General Permit was issued in accordance with the directive of Senate Bill 733 (Session Law 2003-28). In accordance with your application received on February 24, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Whitley Stephenson Spring Meadow Farm, Inc., authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supercedes and terminates your previous COC Number AWS510046 which expires October 1, 2004. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Sandy Ridge Pork, located in Johnston County, with an animal capacity of no greater than an annual average of 1600 Farrow to Wean swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until September 30, 2009. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Aquifer Protection Section — Animal Feeding Operations Unit 1636 Mail Service Cenler, Raleigh, North Carolina 27699-1638 Phone: 919-733-3221 1 FAX: 919-715-05881 Internet: h2o.enr.state.nc.us An Equal Opportunity/Affirmative Action Employer — 50% Recycledl10% Post Consumer Paper NorthCarolina ,Vaturjally Please carefully read this COC and the enclosed State General Permit. Since this is a revised State General Permit, it contains new requirements in addition to most of the conditions contained in the previous State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please pay careful attention to the record kee in and monitoring conditions in this permit. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per 15A NCAC 2H .0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per MRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Duane Leith at (919) 715-6186. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Raleigh Regional Office, Aquifer Protection Section Johnston County Health Department Johnston County Soil and Water Conservation District Permit File AWS510046 APS Central Files Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality May 1, 2003 Whitley Stephenson Spring Meadow Farm, Inc. Sandy Ridge Pork 2350 Wilson Mills Rd Smithfieid NC 27577 Subject: Certificate of Coverage No. AWS510046 Sandy Ridge Pork Swine Waste Collection, Treatment, Storage and Application System Johnston County Dear Whitley Stephenson Spring Meadow Farm, Inc.: On April 28, 2003, the North Carolina General Assembly ratified Senate Bill 733 which directs the Division of Water Quality (Division) to extend the expiration date of the Swine Waste Operation General Permit AWG100000. Therefore, the General Permit has been re -issued by the Division to extend the expiration date to October 1, 2004. During the period of this extension the Division will be working with all interested parties on the development of a new version of the Non -Discharge General Permit. In accordance with your application received on February 24, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Whitley Stephenson Spring Meadow Farm, Inc., authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWGI00000. The issuance of this COC supersedes and terminates your previous COC Number AWS510046 which expired on April 30, 2003. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Sandy Ridge Pork, located in Johnston County, with an animal capacity of no greater than an annual average of 1600 Farrow to Wean swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean .or . Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until October 1, 2004. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. M MENER Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 Customer Service Center An Equal Opportunity Action Employer Internet httpJ/h2o.enr.state.nc.us/ndpu Telephone (919) 733-5083 Fax (919)715-6048 Telephone 1-877-623-6748 50% recycled/10% post -consumer paper The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current MRCS standards are met prior to restocking of the facility. Per MRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. . If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the..staff member.... listed. -below --for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Michelle Barnett at (919) 733-5083 ext. 544. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWGI00000) CC' (Certificate of Coverage only for all cc's) Raleigh Regional Office, Water Quality Section Johnston County Health Department _. . . Johnston County Soil and Water Conservation- District Permit File AWS510046 NDPU Files 'i ANIMAL WASTE UTILIZATION PLAN Producer: Location: Telephone: Type Operation: Number of Animals: (Design Capacity) STORAGE STRUCTURE: APPLICATION METHOD: WHITLEY STEPHENSON 2350 WILSON MILLS ROAD SMITHFIELD NC 27577 919-934-2109 Existing Farrow to Weanling Swine 1600.00 sows Anaerobic Waste Treatment Lagoon Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to Land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the -waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 1600 sows x 6.1 tons waste/sows/year = 9760 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 1600 sows x 5.4 lbs PAN/sows/year = 8640 lbs. PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER z TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM Ni** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ------ or ------- APPLY RESID. APPLIC METH N TIME 8820 1 GeB BH 5.5 275 0 5.6 1540 I APR.SEP 8820 SG 1-1 lGeB 12 1100 10 15.6 1560 AR 8820 2 BH 5.5 0 jGeB li I �275 16.69 11839.75 APR.SEP 8820 SG 2 0 1-2 jGe13 I 1100 16.69 1669 OCT.MAR 8820 3 DOA 7.08 IC I 1125.01136.2510 I 1964.65 MAR-JUN 8820 0 1-3 jDoA JW I 160.0 �144 17.08 11019.52 OCT.MAR '9' / 5:N) r Ito 5' 8820 1-3 jDoA SB 38 1 2 0 I 17.08 11076.16 JUN.SEP 8820 4 jGeB BH 5.5 0 I 1275 13.61 1992.75 MAR.SEP 8$20 �-4 jGeB SG 2 0 I 1100 13.61 1361 OCT.MAR 8820 5 lGell BH 5.5 0 1948,75 I I 1275 1:3.45 IMAR.SEP 8820 1-5 jGeB SG 2 d I 1100 13.45 1345 OCT.MAR END I d 7 TOTAL I -kV_ Tr--S Page: 3 ANIMAL WASTE UTILIZATION PLAN V - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 4 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED or --------- APPLY RESID. APPLIC METH N TIME END TOTAL 10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annualsQ/r G,pa%o In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small. grain, etc, is LG be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. Page: 5 ANIMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AWN (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH HYBRID BERMUDAGRASS-HAY 50 C CORN BUSHELS 1.09 SB SOYBEANS BUSHELS 4 SG SMALL GRAIN OVERSEEDED 50 W WHEAT BUSHELS 2.4 TABLE 1 TABLE 2 TOTAL TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 26.43 8 7 fs 0 0 26.43 .5 * BALANCE *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 6 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1408 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 7040 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 23.4666666667 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 1--)G.32 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 7 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract I l Field [ Soil Type i [ Crop 8820 I I l 1 l GeB I BH 8820 I I l 2 l GeB I BH 8820 I I 1 3 l I DoA l C 8820 1 [ 4 I GeB I BH 8820 15 [ GeB I BH 8820 i I -1 I GeB I SG 8820 1 I -2 l GeB l SG 8820 l -3 l DOA 8820 I -3 1 l DOA 8820 l -4 .I I GeB SB W SG Application RatelApplic. Amount ,(in/hr) [ (inches) 0.35 I l 0.35 I l 0.3 0.35 [ 0.35 [ 0.35 I l 0.35 I [ 0.3 I I 0.3 0.35 Page: 8 ANIMAL WASTE UTILIZATION PLAN 18820 I V5 1 GeB SG I 0.35 *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be'removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION (il � a /6s .✓ � r.�'Gc-c-�' ��;""�� �E�/,�" s y:a cries . % 6� 5ay3 / /ELd i"�rrc•ira,✓ � izti. ac i cE C.ti'!i' ��-� 3.9.s� L3.� c� u,• -� � : �n�,� , s i-;..� .� ; �v� yam• -ter- �n-�r-��E--, (31 THE .rl�,- /� / / �s� ��� p;✓4.Y �jrv�'c_y k/.�s7'E "- / �N ��? T"Hrs� C./�c'.d i /t�StT /S. /�) / 4 t'�63 %�� v/✓ S,-�.4a-c, U-���✓ v:�'S ���ac-�, , j,a G � u �7` .�,<.�rc .s.4-�y c di= � h'� l .e r �o rL 7 J-'lEZO 'd�'` s•4�c �n'�..-� /�-c�'s' v � �3' �5z• 'P .✓ !-/�Tr-c'✓rt! /�l�i S i 3k� Ti�� F,v�P f/�:��° U.'��c�°��7r''y. /1?ft/✓Aa-/i✓T.' L / q r� e/i L [c-7lEL 5 / c,y�lfE vl T � ,¢�o.rr✓� ���� T/�E EFA Tv ,��L✓11/rlt�►✓O Tri%%�'/ 1/U4 r3�r�ii✓ /�'•r.if%..rir C✓rfCi✓ i �'4.0.''9���.ySi7J/�/�� /✓� %�T d%Q /11s'7�ja ♦� �LSrJ �GZ.M lll�7✓C! %'r�'� %/J'fC L�°�"�✓ ode... ,✓ Tz/ Tffc ''y!I`$l'X,/rl u /N 5' !"�.P�~ G �✓''t TIfC-� 6ul .v 7'Z�%1' ril c'.✓ T^/w S, ,ll/�S/.5 S �I /.`"�Y�L.<: .�-s•? C �/����-*a __�di'�f'�"%4' - Y� IF+i;.vT-�' rlyd. r"T/t-� tl.r� :ZJ �'i•c',{' Ey,�f's;4:�Tc✓� h�T S'Oi[- Goyt7l7-jr.✓f /= p�'���✓ err« C` -C . Page: 9 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1.. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility,to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) T 5. Odors can be reduced by i►ijecrLiny Lhe waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. when animal waste is to be applied on acres subject .to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a disc barge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 11 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. if animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pII shall be adjuGLed for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 12 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT .'f Name of Farm:SPRING MEADOW (BENTONVILLE FARM) Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be -filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: W ITLEY STEPHENSON (Please print) Signature: Date: Name of Manager(z(different from owner): Signature: Date: Name of Person Preparing Plan: (Please print)Kenneth York Affil.iation:NRCS Phone No. 919-989--5381 Address (Agency): 806 North Street Smithfield NC 27577 Signature: T r G Date: Page: 13 ANIMAL WASTE UTILIZATION PLAN IM ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) I, , hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Waste Producer: Technical Representative: SWCD Representative: Term of Agreement: Date: Date: Date: Date: 19— to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 14 ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF I, Public of said County, do hereby certify that a Notary personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of 19 My commission expires (SEAL) Notary Public. Page: 15 ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Party Receiver Agreement I, hereby agree to apply waste generated by in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division of Water Quality. Third Party Receiver: Date: Term of Agreement: to (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF I, Public of said County, do hereby certify that , a Notary , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of 19 My commission expires (SEAL) Notary Public. Page: 16 North Caroms State Universlty Is a W6 Department of Crop Science VW university and a constnuanl institution of The UrOvemly d North Carolina Callege of AWtulture and UG Sciences Campus Box 7620 Raleigh, NO 27695-7620 019,616.2647 919.616,7959 (tax) Cereal Rye The cereal rye should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling rye into short (less than 3 inches tall) bermudagrass sod. If drilling is not possible, the seeds may be broadcast on short bermuda sod followed by a light cultivation with a disc or tillage implement. The rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The oast application of animal waste is to be applied to the bermuda Qrior to August 31. An application of 50 lbs/acreofPlant Available N (PAN) may be applied between Se tember 15 and OctobEr-W.'additional acre o P may be 1plied in February -March. If rye growth is harvested on tune and does not sign scantly shade the Bermuda, PAN -rates for the subsequent Bermuda crop are based on realistic yields of bermuda. A harvest is required prior to heading or April 7, which ever comes first. This is necessary to minimize the potential for shading Bermuda and reducing its yields. The PAN rate for grazed systems with bermuda overseeded with cereal rye must be reduced in accordance with NRCS Technical Standard #590. Annual Ryegrass Annual ryegrass should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling ryegrass into short (less than 3 inches tall) bermudagrass sod. If drilling is not possible, the seeds may be broadcast on short bermuda sod followed by a light cultivation with a disc or tillage implement. The seeding rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The last application of animal waste is to be applied to the bermuda prior to August 31. An application of 50 lbs/acre of (PAN) may be applied between September 15 and October 30. An additional 50 Ibs/acre of PAN may be applied in February -March. If additional PAN is applied to the ryegrass in April -May, the PAN rate for the bermuda must be reduced by a corresponding amount. This is necessary- because ryegrass growth during April -May will reduce bermuda yields and shorten the time bermuda can fully utilize the N. A harvest is required by heading or April 7, which ever comes first to prevent shading of emerging bermuda during April -May period. To favor the production of the Bermuda, additional harvests of ryegrass will be required when the ryegrass canopy reaches 12 to 15 inches height. The PAN rate for grazed systems with bermuda overseeded with annual ryegrass must be reduced in accordance with NRCS Technical Standard #590. P�Aw 3M1i1' t k N r�' �}. t1 R rD,tjDl (jL :.« yt,Iy;[r`rC+ ✓+ . .-4444��1:i � ! �a. Ra` � I M��', ' �''• . Cj' �+.�csT. l xr. }P{• t � .. 7 �rtR r �i * .� vF.1:,. r r Fk� ■ ,y r 1 � .. 7.1j �r I nil •i1110 �. y 1 F,: t�'''[$ Y%LL. u'>r �"itt l' 0.' 1 i - ¢i• �A �{T�J�A�' ��•• 1�ai r".. '1 is rf ^eW. ' ► f '�#}� '�'ld'4'TI +!•, it ', - • ' 3 'yQ' r \ti ��., �j 11�ri�',-3`4 �'i7� _ /... vy Tubs•�� > •,r � •7,1 :II dt �Yl�.*I.r� �, iy��t1 •' `,�;•��'1.<M•.... !� t44, i 1H�-J �'�3 �. .� 1������$.��� . i 6t+ FS100 $it te7�1, kig ti •:;'1 I t �':;� , ~ tir ' r ka3 'a''10. •,; ' �► ' i'sso rrI b '•' _ _- ^�S-i Z ' r�. �tr:S - ',1 '1-I� Ia TI{ODF,�yoi•,., E T6, �-•�. t � r'{��: `-i` ` � i}° -1r1oo8� Tloodo '_,�i�� - 3,,� j'' t -,";'~ ^ �y � i.• ;, a1l�M ��1�' T5ti3 ,�` a. i ,■ '�X E' 1�'�,•� E ��t t ,�r q4'i �► �{,s�l'�a Y 1 :� }��.+ °'f,, {rl �t�il f .�. w JC � 1" �1 •`5t T •rY S � - . t 1 r }�• , T2�iY y,�;i. .-�f, li`� WI � l..r .t',� I `• ..t •'. jt*�5,k - S 4 � 4��iZdj°� •!1 -st �iy� - i 'f*', in.,l�j►Af j f i •' 7!'�',. L 5� � 1 T � ''.�1 �4 {I i3�rl. - +- , •1"'�, ` .,irk,��•�' 9, ,r$M i to •a �"a� � �i'1 �I� ��� ix) .Y +� �� yj `a r�11 its Apt :Il1+A � ' � }� rN(jf r� � yj l +,i �• 1�i4Ir .� . ,y t�y . tr• tea• i �' i. , jF d �. I "' c •'", tC'7`7! -.�� '[ j ire r P, :;: jA t•�,`.k,k+l:z' �' rG f+''i; '# },?7� id '� y rF.,A �.'-� ' Y'j i,y'.'�,5� T S•9� Ist�thnl 7'r�i; 1 i.:�il Y€It nr 3 k+k�r'. a _ `.�" , •y� 7T P !'l� � V-:: UU„"":.� `Ri'1' 1 r r _ _ 1,,� � � i .a l - '1 f , # '�•.. i t3 '� �r y ! � 7' rr y •�r+at a r t ?r'�"' t L�" a :., r TrDb�'� I 31 57rj, h$ q6 r'( I.4 k �+rx'7i�(S_•.�'i" Ih P. � (�t a � ; r�3,1' � f`1,���j�•. qiR• 1�� !d ��� �. t�`. �J '�Y�,• {� �r�'�,���� - wr`�.�5 r4 ,.f Jj ���1�. A. 7 r^•3 .� F1p�e +.~,+� 1 1'�.11j��, .>�4.'.r tL. Y'•� � "j�, ��'VP4 y.,r� 1 '- N 'fir r.� , r 3t ) •G -�k;. � 5 „ s � � 7At N � .1 s,_ °N'_,' �,. •�. � r • IV F. x 15`! \ 4, M �\ 11 MJ�f[y�}y 1I y r 'f • �l "" rr�t • t '�' � 1��' �� ! - 1' 1 i :, 1,� � F�' tl e��,l � t�r T � �+� ,•�� 4 S� Aa � ,, F /r� t. x,i �r + z ��,� �r � cf �Ji,�1 �yg /y I � +i *r ir' �� 1 [{� � �i 3;4'i rl'��F•1 ( � 3 -F� x ��d �a •t r' •� .t,! r7.yt f' ^•ii!+i1Q.w�FR:' 1'- r 1'IM( 'h. y }1. ,_ !! -i.,• - rAh r I ` •,��t� ;, Yt i� i;t'�4�+llf!'� ;��{ �i,l� 4'�}, +�.,1 j.• F3r�, �+,� w /, hil,'JA + ,�i�tl•.� •'`M:.I;�f 1 �1�1�"• :, '1 ft :1�i i ��� t �^i[ 1, r 'E i`.�+2 � t 'I{� �4D�r.3 'f' �.e i `I'ti' ��ti.r ; �-13 •,t : i.;. �yor�} �t,�.,,�iFt ����' 2(3,IR� �;h G1•"�'Sr �k�r '.'a ° HV' ���y-� .:, `!; k6Lr�rs- ��� {} �+ ! r ';f�?.• 1 ,_i(r��b'`+ 1 ^!h l,' � � r4 r ,''"•' 7 -.' f31��•r a - �,-i! t, 4 n j-+��' �� " ',./; t •5i r - IS ,� L,•. .4'.r'-T$� •''a' +� i"1: YJ.#1. •^^ l li AJ 'li�`'I } F -. a � v"'f , %t 'C r _,� _ • ,... _ . � i'"`,'1 1' � fFl. K ti S! 1 1 jv'l% S'�iS�T{ ��.�A1 ^ �,1� � � . � �;e�ll:G#t_ .. _ y57.r,� i 1 i''`t'.1 r♦' t .JI "f' ' {,.- .'��t.#S11.d .�� S-'�,r 1 4 ;:.It _ � _ .. ..6:r 1 .y• flit 4 "}"i— { t'L'y ,� d , ^ > . `� '#�,{ :`� , ti� t�,`F��-Itl�i�``" �}�,,,rr� -. c+77 �'-� •r r r j#k4 f fa 1 t � tiit 1 ♦:� fc�� F•','- r{{• ••'�^ ' -j' - 5 �• . 1 5 L Yytr• � 1 V T11 Now � �• 1 ,��y�r � - j~��•`�+ #., t, + fl it `lei F to F`•rry hr'Tn' r Llf_ ,.. !r {?•'^�� ` 1 �' ••�: i x # tt14 t.,l 1 ' .e_ i .F.L�•' r rY ehb1,r�1. �5�+t?$'1'.* lEL r_ 1 1_� - �' `�y iiJ F��: ` ei �. '•irr�'�?,i�Sr•....r t, 3Ir r,.� { ynKa✓•;'p' trite � �h h h 1��i'k ':�fi i+ +..,,�e #,�-. �l'r � k,'!'J .� �:' S f p, �lri �..�„° •i- �y[ y�!�ryr�s�{4;`M,.1` �i"-''li r { � } 7�11'� �/t�tA��,7+y'rh ,t, i,�. s% • 1 2 ]y- �y{�.�� 1 r :.? ki��1�}-tij>, T; f'h.t�i�'�i •5°VI�1'A�. 1 _ ry s>I 'I.rC %�nJ15 ll. ti' 2"TTy tr"I ( r::.{r `Y4 Ir , P� • C��M"'r�l - 11 $ jl;i• ' A „ GPM •erf lFr } s _ +� 'rl� ; k,� L„�c rltil. tX t•, .3 Lr �j / t' wv ,! r-<7 ik t it f � r F v 'T' �r - 1 r +� 11 f dth; �� �� ?;i �., 1.:' I.,N yftx i I ' i r �{4 {I i • - 'ti 'r,>wx •!"� .�. *d it ;� a rt +rf� i' IY.•rl7 � '�{ , i'1`: �. F' 1 i1 {.r t �} k � 1 -S � r •,, C,- i }�'rs�•Jf? ,t/' , r rt(,�r. r ,•ri r,� 1,;,T•', {,�f?;i r1YAlry�t�E- � J e.• _•. Fry.- 1 � ! .�i 1.� r rI ' ' f r t t 4f. w f -�5{`t .yam i- ,r f i .`y�� rirY� y,,1, x � Yf�WW �� r; 1 , �• r ' f y�37 iI , 'S. Lti.F1•'A� J� ' r 5 ' S, 'i3f �'�' T 7 I< vv11'/i i'�• ¢I++',,L,,,,rFf :7. �.� �li .� u.�V .� all .1�?]4 �rr- J 7-t`^1t-.,,f r A r �!.e a1./'i �' o-.i .>-ir>~• ;: t -i^ 4 y�JLr 3 ;. �'t, lw 1,. �yy, t� •�lr Ht � ��Y> !'�i�',��i u,r.,. ply ES r„,�Fnk .� L�.i'f-,y r'�� Y: 3!1.�: �1*1 A'A!}"�•s}y�',h a S'�'-�r�7�aa �' �7}+�` � i �- �1a ^ • IF'r: F, - i i•+g�ff(r:.� i - ��� 7F, 'E� ;1�F;�'�'1��'Y''� Z .�F[ ,fir T 5 s� `� ' �r, ;'jr, L:. 1 d •7r, ' i rt it • d �. h yL`r� iv 17, R r3 ,�•' � �� �.��Fj,.�^� 1 � �� r i s S �SJ*,,�3,! � � i - `F 1, i(r. . , '9 71��F,I,{•. r�.( 'r'� ; . .3.;' .! I `'?,:- m`#.i,rkt�*+'r`"A�?e i "t*-' s^ Yfjtr t M 1 rfi.-�•�., 1 Jd., ,x.y -�7,. t,, � � �r , y�•„ "M 'a ':�� .t`%'� t �s;Fl r � Ir, , � � � ,•`�'I�a rti, sK•�•+�` r 3 � 7 �,� � � -.1, � :£,I . r�. " Y � 1 .�' t '� t• r a i 3 ��I .���� s �Iri t +4�tT- �•'�..?"E"1 ��.��"'!y`�. 1r!)t"4 FK'tt�'t.-: Ft�' " ...T1'C���`� +-'�!.•.^,^,. ^h�,.. f,..,.. M 1�.#'Itj�„ .���'FY.� r .. � . ,: ,i„k. .i5 -_1... ,'P - +- - K1r� •'i ...._i�••-i:l�L'•• ' Wettable Acres Determination Certification Name of Facility:-'ti'�����x+� ��f� ���'`'"L acility Number: S1 Owner(s) Name: h//-1177-&-y _Phone No:!719- 93V-�/U j Mailing Address: fVC eg 75-717 By signing this form, the facility owner and Technical Specialist acknowledge the completion of the Wettable Acres Determination. All necessary Wettable Acre, Determination Field Data Sheets and calculations were completed to conduct a Wettable Acre Determination. The facility's Waste Utilization Plan has been amended as necessary to reflect actual wetted acreage. A copy of all worksheets, calculations, and other Wettable Acres Determination documents, along with the applicable Waste Utilization. Plan and Wettable Acre Determination Certification will be filed with the local Soil and Water Conservation District. A copy will also be kept on site with the Certified Animal Waste Management Plan. Any futuremodifications must be approved by a technical specialist and. filed with the Soil and Water Conservation District prior to implementation. If any modifications to the existing irrigation system or any new irrigation equipment was required to adequately address the waste management needs of this facility, an Irrigation Specialist or Professional Engineer has certified the design and installation below. Owner N Owner Signature: Date: Technical Specialist Name: , G+rP Technical Specialist Signature: Date: If assisted by an Irrigation Specialist or Professional Engineer please read and sign below: Animal waste application equipment has been designed or modified to apply waste as necessary to accommodate the waste management plan and according to NRCS Standards.' Animal waste application equipment has been installed according to MRCS Standards and is ready for use. Irrigation Specialist/PE Name: Irrigation Specialist/PE Signature: Submit this form to: Attn: Sonya Avant Non -Discharge Compliance Unit Division of Water Quality 16I7 Mail Service Center Raleigh, NC 27699-1617 NVADC - 7199 Date: "-,V E -1; A I•b 6?-7 3 - �o -c,& Producer: Location: Telephone: ANIMAL WASTE UTILIZATION PLAN �-C* WHITLEY STEPHENSON 2350 WILSON MILLS ROAD SMITHFIELD NC 27577 919-934-2109 Type Operation: Existing Farrow to Weanling Swine -._- Number of Animals: 1600.00 sows (Design Capacity) �v STORAGE STRUCTURE: Anaerobic Waste Treatment Lagoon;;' ... APPLICATION METHOD: Irrigation+r N�1 The waste from your animal facility must be land applied at -a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 1600 sows x 6.1 tons waste/sows/year = 9760 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 1600 sows x 5.4 lbs PAN/sows/year = 8640 lbs. PAN/year Applying the.above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------- APPLY RESID. APPLIC METH N TIME 8820 1 DoA C 125.0 136.25 20 8.20 1117.25 I MAR-JUN 8820 60.0 8.20 1-1 IDOA iw II 1144 10 FE80.8d -MAR r ,. 8820 1 SB 38 152 8.20 11246.4 IDOA T IAPR.SEP.15 8820 2 BH 5.50 50 11237.5 lGeB I 1275 10- 14. IMAR.00T.15 8820 SG 2 1450 1-2 lGeB T lioo lb 14.50 ISEP.MAY. 8820 3A GeB BH 5.50 0 J495 T 1275 11.80 IMAR.00T15 8820 -3A SG 2 100 0 1.80 1180 jGeB I ISEP.MAY. 8820 3 BH 5.5 0 13080 jGeB I 1275 111.2 IMAR.00T.15 8820 SG 2 0 11.20 1120 1-3 lGeB I 1100 ISEP.MAY. 8820 5 BH 5.5 275 0 1.$ 1495 jGeB I IMAR.00T.15 8820 --5 lGeB ISG 12 1100 10 11.80 1180 Page: 3 ANIMAL WASTE UTILIZATION PLAN I ISEP.MAY. 8820 7 5.50 0 11237.5 jGeB JBH I 1275 14.50 IMAR.00T.15 8820 SG 2 0 1450 1-7 jGeB I 1100 14.50 ISEP.MAY. , 8820 8 BH 5.50 0 1495 jGeB I 1275 11.80 IMAR.00T.15 8820 SG 2 0 1180 1-8 jGeB I 1100 11.80 ISEP.MAY. 8820 9 BH 5.50 0 1577.5 jGeB I 1275 12-10 IMAR.00T.15 8820 SG 2 0 2.10 1210 1-9 jGeB i 1100 ISEP.MAY. END I TOTAL 113�3- ,9 IVSq, 7 Indicates that this field is being overseeded (i.e. interplanted)-, r winter annuals follow summer annuals. O►' L'r© ro Ip �loqs NOTE: PP The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page: 4 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED --- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL10 - Indicates that this field -is being overseeded (i.e. interplanted) or winter annuals fo low summer annuals. ©r' e roP )-, JA77,0. In inter:+planted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. Page: 5 ANIMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH HYBRID BERMUDAGRASS-HAY 50 C CORN BUSHELS 1.25 SB SOYBEANS BUSHELS 4 SG SMALL GRAIN OVERSEEDED 50 W WHEAT BUSHELS 2.40 TABLE 1 TABLE 2 TOTAL TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 35.9 1-13 9 9-IV4& 0 0 35.9 1-34 31-9 * BALANCE 529 .95 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 6 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1408 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 7040 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 23.4666666667 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 56.32 acres of land. Please be aware that these are only estimates of the PAN and land needed. Actual requirements could vary by 25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 7 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. jApplication RatelApplic. Amount Tract f Field Soil Type ' crop- (in/hr) (inches) 8820 11 I DoA I C .30 *1 8820 2 GeB BH .35 *1 8820 3 GeB BH .35 *1 8820 3A GeB BH .35 *1 8820 5 GeB f BH i .35 *1 8820 7 GeB BH .35 *1 8820 j 8 I GeB BH I .35 *1 8820 9 GeB BH .35 *1 8820 -1 I DoA + SB I .30 *1 8820 -1 DoA W .30 j *1 Page: a ANIMAL WASTE UTILIZATION PLAN 1 1 1 1 SG I I GeB 8820 1 -2 8820 1 1 -3 ! I l 1 SG 1 GeB 8820 1 -3A I 1 SG 1 I GeB 8820 1 -5 1 SG 1 GeB 8820 --7 1 1 SG I GeB 8820 I -8 I I SG 1 1 GeB 8820 1 1 -9 I 1 1 1 SG 1 1 GeB .35 .35 .35 .35 .35 .35 .35 *1 *1 *1 *1 *1 *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply Page: 9 ANIMAL WASTE UTILIZATION PLAN the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. 1'y NARRATIVE OF OPERATIOe4 ;v 1- e ck e- /-j �1'b ol o li 3� le- J � AM � y y Oct JAI K :5 / Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 11 WASTE UTILIZATION PLAN REQUIRED_ SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or.by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 12 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 13 ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:SANDY RIDGE PORK Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: WHITLEY STEPHENSON (Please print) `� l Signature: i Date: d'1 Name of Manager(I different from owner): Signature: Date: Name of Person Preparing Plan: (Please print)Chris W. Smith Affiliation:NRCS Phone No. 919-989-5381 Address (Agency): 806 North Street Smithfield NC 27577 Signature: Date:���`�L/ Page: 14 ANIMAL WASTE UTILIZATION PLAN I, ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: Date: Waste Producer: Date: Technical Representative: Date: SWCD Representative: Date: Term of Agreement: , 19_ to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Page: 15 ANIMAL WASTE UTILIZATION PLAN STATE OF NORTH CAROLINA COUNTY OF I, , a Notary Public of said County, do hereby certify that , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this , 19 My commission expires (SEAL) day of Notary Public. Page: 16 ANIMAL WASTE UTILIZATION PLAN Waste Utilization - Third Party Receiver Agreement I, hereby agree to apply waste generated by in a manner that meets the Waste Utilization Standard (633), or use an alternative waste utilization system that has been accepted in writing by the Division of Water Quality. Third Party Receiver: Term of Agreement: (Minimum Ten Years on Cost -Shared Items) STATE OF NORTH CAROLINA COUNTY OF I, Public of said County, do hereby certify that Date: to a Notary , personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and official seal this day of 19 My commission expires ( SEAL) Notary Public. Page: 17 North Caroltm slate university is a mho- Department of Crop Science grant ur riersNy and a cowiluerd Ir ddLdlon of The U*ersily of North Carolina College of Agriculture and Life Sciences Campus Box 7620 Raleigh, NC 27695.7620 919.515.2647 019.515.7958 (fax) Cereal Rye The cereal rye should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling rye into short (less than 3 inches tall) bernwdagrass sod. If drilling is not possible, the seeds may be broadcast on short bermuda sod followed by a light cultivation with a disc or tillage implement. The seeding rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The last application of animal waste is to be applied to the bermuda. prior to August 31._ An application of 50 lbs/acre of Plant Available N (PAN) may be ap lied between Se tember 15 an to er30. Ann additional 5 acre o PAN may be a pli in February -March. If rye growth is harvested on time an does not significantly s e the bermuda, PAN -rates for the subsequent bermuda crop are based on realistic yields of bermuda. A harvest is required ptior to heading or April 7, which ever comes first. This is necessary to minimize the potential for shading bermuda and reducing its yields. The PAN rate for grazed systems with Bermuda overseeded with cereal rye. must be reduced in accordance with NRCS Technical Standard #590. Annual Ryegrass Annual ryegrass should be planted by October 15 to provide the best opportunity to get winter growth. The most consistent stands are obtained from drilling ryegrass into short (less than 3 inches tall) berm'udagrass sod. If drilling is not possible, the seeds may be broadcast on short bermuda sod followed by a light cultivation with a disc or tillage implement. The seeding rate for broadcast planting of seeds should be 1.5 times the rate for drilled seeds. The last application of animal waste is to be applied to the Bermuda prior to August 31. An application of 50 lbs/acre of (PAN) may be applied between September 15 and October 30. An additional 50 lbs/acre of PAN may be applied in February -March. If additional PAN is applied to the ryegrass in April -May, the PAN rate for the bermuda must be reduced by a corresponding amount. This is necessary, because ryegrass growth during April -May will reduce bermuda yields and shorten the time Bermuda can fully utilize the N. A harvest is required by heading or April 7, which ever comes first to prevent shading of emerging bermuda during April -May period. To favor the production of the Bermuda, additional harvests of ryegrass will be required wblln the ryegrass canopy reaches 12 to 15 inches height. The PAN rate for grazed systems with bermuda overseeded with annual ryegrass must be reduced in accordance with NRCS Technical Standard #590. To 4t 13 AV 3. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Whitley Stephenson Spring Meadow Farm, Inc. Sandy Ridge Pork 2350 Wilson Mills Rd Smithfield NC 27577 Dear Whitley Stephenson Spring Meadow Farm, Inc.: 4 IT • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL REsouRcEs December 30, 1999 rZ f� r ..,,,t j 4; �R RAI Subject: Fertilizer Application Recordkeeping Fict Animal Waste Management System Facility Number 5,1,746, Johnston County This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, iRR2, DRY1, DRY2, DRY3, SLURI, SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincerely, r Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Johnston County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper JAN 06 100 03:14PM JOHNSTON CO. COOP EX P.3/4 'ge'.t cv7 c-t , Plan Amendment to Include S&WCC Chronic Rainfall Practices and Standards through, March 31, 20( 1. If this facility can comply with its existinn permit and CAWYIP it must do so. ---- 2. Temporary AdditiorLo6Ncw SprAyf (Y) (Chcck appropriate b xcs.) [J A. ��acres of cropland. List crop types used; T _ - f] B. U acres of hardwood woodland @ 100 lbs PAN / acre added. (J C. =acres of pine woodland added @ 60 lbs PAN I acre added_ 3. Summer Perennial Grass (Check appropri to box.) [] A. Application window extended for acres of perennial grass until first killintr frost. l] B. An additional 50 lbs of PAN applied to (teacres of perennial grass prior to killing frost. 4. PAN Application Increased for Small Grains & Winter Grzssr� to be harvested. (Check appropriate box.) [J A. PAN application 'increased up to 200 lbs per acrz iur acres of small grains or wmLer grasses to be harvests [] B. PAN application increased up to 150 lbs per acre forhaw acres of oversecdcd summer perennial included in 3. 5. Waste Analysis (Check appropriate box.) [J A. Prior to December 1", 1999 the calculation of PAN will be based on a 35170 reduction of the last analysis taken prior Lathe first 25 year 24 hour storm event. (Currant waste analysis must be uscd aft.-r Dec.I" .) . Use current waste analysis to deurrninc P,&N. 6. Required - Maximum Nitroeen Utilization Measures for Small Grains and 'vVintcr Grasses. A. Use of higher seeding rates. B. Timely harvest of fora-c to iocrcasc yield, ant C. L-rigatina during periods of warrn:r wcathc.-. 7. Reouired - Irrigation Mangemrnt Techniqu--s to Reduce Runnff , nd Ponding Pat^ -mist. A. Making frequent, light irrigation applications. and B. Not irrigating immdlaic]y b.-forc predicted rainfall. S. The owner / manager is required to mana_c the mo-crnent of animals to and from the facility to minimize cnvironmcn impacts, crsure compiiancc'-Vith rite Cacilit�''s permit and arnendcd CAWNIP. and at'oid _is;:har,c to surftce w:ztcrs. 9. Authorization to use the'additional pra_:; :cs in this amcndmcnt exair.s if a faeai_c dis;haraes to surface tvau Any discharg: is a violation and ma%, result in an eniorcerncnt action. 10. The owner / operator is required to keep rc.-ords of ail %Vzitc applications. 11. This revision must include a ;nap or sketch of n.u` land application areas. Facility Number � \ Facility Naar_ Facili y Ow 'r / Inacer Namc (PRTNT) Technical Special' Name PRIN I') i �Tlll� n r Faciliay,Owncr / N62-cr Signature: Technical Spz iaiist Signature r Date ��-\ _ _ _ Date -•z '�� This document must he filed at the SWCD office and be attached to the facilities CAWINIP and be available for inspection at the facility. Ncw temporary sprzy ieWs must meet applicntsle 'puffer and setback rcquircrn,-nLS. t;'::,te muS1 nt,t be applied to wctlstnds: 1 I/12J199Y State of North Carolina Department of Environment, Health and Natural Resources • • Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary p E H N F=?k A. Preston Howard, Jr., P.E., Director September 8, 1997 Whitley Stephenson Sandy Ridge Pork 2350 Wilson Mills Rd Smithfield NC 27577 Subject: Certificate of Coverage No. AWS510046 Sandy Ridge Pork Swine Waste Collection, Treatment, Storage and Application System Johnston County Dear Whitley Stephenson: In accordance with your application received on August 28, 1997, we are forwarding this Certificate of Coverage (COC) to Farm No. 51-46, authorizing the operation of an animal waste collection, treatment, storage and land application system -in accordance with the State's General Permit (attached). This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Sandy Ridge Pork Farm, located in Johnston County, with'an animal capacity of no greater than 1600 Farrow to Wean and the application to a minimum of 48.96 acres of land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from -the date of issuance until December 31, 2001. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of . wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may -result in the revocation of this COC.- Upon notification by the'.Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWO.prior to a name change or change in ownership. P.O. Box 29535, Raleigh, North Carolina.27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the . engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact J R Joshi at (919) 733-5083 ext. 363. Sincerely, . Preston Howard, Jr., P.E. cc: (Certificate of Coverage only for all cc's) Johnston County Health Department rRaleighRegional"Office;-Water Quality Section, Johnston County Soil and Water Conservation District Permit File Uu �6�� r� s� � o �s� lUi DRAFT Draft - Revised January 20, 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION Facility Number - q C. Operation is flagged fora wettable Farm Name: U,3oU ►Q0(;E fcw- acre determination due to failure of On -Site Representative: wg � r-Lc,� Part 1l eligibility item(s) F1 F2 F3 Inspector/Reviewer's Name ,4 AX j` T- Date of site visit - Operation not required to secure WA determination at this time based on exemption E1 E2 E3 E4 Date of most recent WUP: ?_ Annual farm PAN deficit: S pounds Ir igation System(s) - circl . 1: and -hose traveler; 2. center -pivot system; 3. linear -move system; tationary sprinkler system w/permanent pipe; 5. stationary sprinkler system wlportable pipe; 6 stationary gun system wlpermanent pipe; 7. stationary gun system wlportable pipe PART I. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D)D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part 111. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part 11. Complete eligibility checklist, Part it - F1 F2 F3, before completing computational table in Part III). - PART II. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation records. F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure to deduct required buffer/setback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres for travelers or less than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part 111. DRAFT Draft - Revised January 20, 1999 Facility Number S) Part lll. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER'.2 TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS3 'r)?,4,t.c-(-- II_ 13 ! 1. 13 Z b_2( G • -Z 3 A- 1 iJL-r i4t+- a� (�i�i.D USAd 5�_ -� _Q7 L( Z -5 Y ,tea FIELD NUMBER' - hydrant, pull, zone, or point numbers may be used in place of field numbers depending on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption if possible; otherwise operation will be subject to WA determination. FIELD NUMBER Z - must be clearly delineated on map. COMMENTS3 - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1997 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. CAWMP Components Permitted Facility; Date: Completed Certification Form; Date: /1 r7 /tS Waste Utilization Plan; Date:' 4frolzed/used4*. Amount of plant available nitrogen annually ( 13 7%3 7 Ibs) Dominant soil series: �D, Gig Crops to be grown: �.-�.rw+ sue-, �,r� e.�•.�Q�� aa� s Field Maps Based on usable (Total= Usable= ) Present day format w/RYES or actual records; application windows 2/1/93; Standard #633 required specifications Emergency Action Plan ^T, Odor Control Checklists (effective 1/97) Insect Control Checklist (effective 1/97) Mortality Checklist (effective 1/97) Type of irrigation: T v un of -Se ma Gu Center Pivot Linear Move Other (description): NRCS irrigation parameters usable field size, max. application rate, max. application rate per cycle (effective 9/1/96) or Calibration information or Land application system design information (after 9/1 /96) including parameters, equipment type, system layout and settings Show design needs (storage & treatment calculations) Operation & Maintenance Plan Site schematic Site evaluation, after 2/96 (NRCS NC-CPA-17) includes wetlands determination Hazard classification Construction inspection notes, including liner inspection & observation trench (after 9/1 /96) Consideration for emergency spillway (after 6/21/96) REQ ED RECORDS effective 9/1 /96 PERM D FACILITIES Waste application records IRR 1 &2 eral Permit & COC on site PP ( } 3r�a[ Annual soil sample reports for 1999 weekly lagoon level records (Cu index: 37 — rr c ) (Zn index: ?a - -09 _) Waste analysis - date last taken iZ r 7(9 (, 2 PAN Ibs/1000 gals. for structu a #1 PAN Ibs/1000 gals. for structure #2 FACILITY NUMBER ( - Jb FARM NAME: sAt4�s>y Dcr dzq� REVIEWER: A - DATE: F ZA 4, TYPE NUMBER # ANIMALS LAGOON - PAN POND -PAN FarrowAlVean CE:> sow 2.5= 5.4= 19= Farrow/Feeder sow 4= 6.5= 22= Farrow/Finish sow 10= 26= 91= Wean/Feeder head 1= 0.48= 1.6= Feeder/Finish head 1= 2.3= 7.9= Gilt Developer head 1= 2.5= Boar Stud it head 1= I 3.7= DESIGNIVOLUME CALCULATIONS: fJaF alts S`nr Top of dike elevation: Elev. below structural & storm storage: Normal operating water level elevation (top of permanent storage): Bottom elevation: Permanent storage volume W Temporary storage volume W IRRIGATION: Operating Pressure (psi): Flow (gpm): Application Rate (in/hr) Nozzle/Ring Size(s): Design Recorded Design Recorded Design . Design Design Design WUP - Days of temporary storage: i8D Calcs - Days of temporary storage: ft. 1 ' 25 yr./24 hr. storm in. ft. 2"d 25 yr./24 hr. storm in. ft. Structural freeboard in. ft. Exceeds required volume? Exceeds required volume? Actual Actual Actual Actual Actual Actual FREEBOARD CK. 1 2 3 4 .5 Water level reading Top of dike reading Difference Marker reading PRICE POWER Rt. 3, Box 486 SR 1003 (Buffaloe Rd.) SmitlifieId, NC 27577 (MOBILE) 919-965-0833 (919) 934-5264 FAX (919) 934-0859 S�E�i{t>1�lSoN F40G- TRR�G�naa 0 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director June 26, 1998 Whitley Stephenson. Sandy Ridge Pork 2350 Wilson Mills Rd Smithfield NC 27577 1 � • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Reissuance of Certificate of Coverage No.AWS510046 Sandy Ridge Pork Swine Waste Collection, Treatment, Storage and Application System Johnston County Dear Whitley Stephenson: The Division of Water Quality modified the Swine Waste Operation General Permit originally issued to this facility on September 8, 1997. In accordance with the issuance of the revised General Permit, we are forwarding this Certificate of Coverage (COC) to Whitley Stephenson, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Sandy Ridge Pork, located in Johnston County, with an animal capacity of no greater than 1600 Farrow to Wean and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003, and shall hereby void COC No AWS510046 dated September 8, 1997. The COC shall hereby incorporate by reference any specific conditibns of the previous COC issued to this facility. The purpose of this COC is to allow coverage under the revised General Permit. Please review the revised General Permit (enclosed) and pay particular attention to Condition I1.10 regarding tree removal from lagoon embankments, Condition 11I.1 regarding inspection frequency of the waste treatment, storage and collection system and Condition 11I.6 regarding notification requirements for system failures, spills and emergencies. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS510046 Sandy Ridge Pork Page 2 Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact J. R. Joshi at (919) 733-5083 ext. 363. Sincerely, for A. res on oward, Jr., cc: (Certificate of Coverage only for all cc's) Johnston County Health Department Raleigh Regional Office, Water Quality Section Johnston County Soil and Water Conservation District Permit File State of North Carolina Department of Environment, Health and Natural Resources �O Division of Water Quality Non -Discharge Permit Application Form / Survey (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Liquid Animal Waste Operations The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please_, complete as best as possible. Do not leave any question unanswered. u� ;v Application Date: I. REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each' item. , Armlicants Initials 1. One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 2. Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is disposed; 3. Two copies of the Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, one must be completed prior to submittal of a general permit application for animal waste operations. II. GENERAL INFORMATION: 1. Farm's name: 2. Print Land Owner's name: Whitley Stephenson 3. Land Owner's Mailing address: 2350 Wilson Mills R City: Smithfield NO_ Zip: 27577 Telephone Number: 4- 4. County where farm is located: Johnston _ 5. Farm Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): 2 miles south of Junction of Joyner's l3n ge Road and Strickland's — Crossroads in lhe Bentonville Community. 6. Print Farm Manager's name (if different from Land Owner): `\to,( hfMA ' 7. Lessee's / Integrator' name (if applicable; please circle which type is listed): 51 - 46 FORM: AWO-G-E 2/26/97 Page 1 of 3 III. OPERATION INFORMATION: 1, Farm No.: 51-46 2. Operation Description: Swine operation Farrow to Wean 1600 - Certified Design Capacity Is the above information correct? M yes; 0 no. If no, correct below using the design capacity of the facility Tvoe of Swine No. of Animals 'Tyne of Poultry No of Animals Tyne of Cattle No. of Animals 0 Wean to Feeder 0 Feeder to Finish 0 Farrow to Wean (# sow) 0 Farrow to Feeder (# sow) 0 Farrow to Finish (# sow) 0 Layer 0 Dairy 0 Non -Layer 0 Beef 0 Turkey Other Type of Livestock on the farm: _ No. of Animals: 3. Acreage cleared and available for application: 95 ; Required Acreage (as listed in the CAWMP): 4. Number of Lagoons: fN 6, ; Total Capacity: Cubic Feet (ft3) Number of Storage Ponds: ; Total Capacity: Cubic Feet (ft3) 5. Is animal waste being applied on any field which has subsurface drains? YES or (please circle one) 6. Are subsurface drains present in the vicinity of or under the lagoon? YES or NO (please circle one) IV. APPLICANT'S CERTIFICATION: I, (Land Owners name listed in question II.2), attest that this application for �a _ N EV\ _ . (Farm name listed in question II.1) has been reviewed by me and is acc ate Ad complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomolett:. Signature V . MANAGER I, 1� 0_t41s.4_ Date Vk �� CERTIFICATION: (complete only if different from the Land Owner) (Manager's name listed in question I1.6), attest that this application for _ 1 .l �A, 140,2 U4r`p- (Farm name listed in question ILI) has been reviewed by me and is ac rate and Anplete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature THE Date APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION PERMITS AND ENGINEERING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FORM: AWO-G-E 2/26197 Page 2 of 3 UNITED STATES 1-O"J' Ajc 78' zoo ZS ' DEPARTMENT OF THE INTERIOR � �` � d GEOLOGICAL SURVEY 35° 22730 2�' 30' t39" E 7 M1 Ta dYTF M rr 05' 740 741 742 20' C , % ITS mi to '� �'•'! I 3170maN G gm at so .m I Ira ku 0 A M14 '- reek 20' •,z _ �jt 1' � � 'e,i��` � �s, r, f .1 w'.. .t w UOF, t za.? dux. 'r �''�'"��a, � [�,�ie 2 i• a � ��f Ali �tt�y'V$:�e�,�, t; 38a a i 4r1YS T317• 106 r�f't' ` �rrsi� �• ,�� r.[, tO `� ..1.. �'A ''1.�� r f~yyt 'I}'J�`' 1/J Y G'X 'y� �:,.t �� .ar� ,r�-f' 1. 71�,/- ,• r. :/� •`Ik ��-l��,��..��� ' ['' lSc� , +1.4-,' �,l, i'Eh Ti4.�S�:; ,�E� §'.:: 4'r, ti. ek�� +��i J,� �� •� �t �},' � �''��+ r. �` �'�: .et INS[ - '-1, !' tG Y SOa'• 7CFS r 1;i F alL:i '`}� � c�„ ��-[�4 r�, f Via_ i� ��'• .�" . .. .,, :x1 4 �r t WI Iry �,#j�6.s �G'`;. fu{�.' �: �..r ^•e. 1'L z k r. [ 1 f i. -• s 'to y tt .* } y r+� r!+ti i . �4 F'' '1 'al �G., � • 'j']08B%+ S ,S i4'` ''r^ r Q�.y,_ i •� 'li,'� F wr!¢� ')'LY � f"'� '. M� S3�kt..Fv' Dig`i, .74 Ic� r���,� ri ra�+:..{ �, ^=;'a' .l��fp. +. �- •��� �If' ��.i b y. �S�! �' F. �1 +, _y 1i Olt '�1 .3 r +. F,\ �rr ri l �" i)i •Sr r1 /1 �a a 'fi ss � t 130 � � �1y,amr 61 p:.��� .,l''�.,�„p ��#. � r .! ! .,3 x^ - PS �{`: � � •\ �' �.. � -� ,� . �+ t A 1 y�T`,e- Vitj'�C''r��.,,♦� {• �rI �� "�`�4 i+g '�. S'�'( R CrODiW�.,QQ �fi .Y�-J`t. / F ?• u- t,,i "Ani R,'�- L h s'f,' '` i1� + •'; i;r'„ _ �'�..��rgr. r it .y�• ate.. .� { �',r:.�' r �1 �• Y.1 �'r f �. S �+�ri-•' S - !'r f� r dJ i�✓_ r •_6' ,� '. � D 7�"" �*.�Y,� G«� rise ���4� „k t,�-'•` ►f .� S75_rs�l �'�''�`�'$- ��tr�{�jfJw r- A.i� ��r'`�K.' i} ,. - ' �^ j�F, r. it..- F Y.;.r's*'•.�* ,iii�rtf�y��� �� �{'r k s°[ -`�' .L.. �,,J '� •'� 1� r' .' �i. Y u7g$SS)f �..-.�.{ n ' t r -.-�, i'.r`r �"1[t ". xs .Y�'r'i ',x +'� �f�io, ��'��r�-ti r•'— � _-�i''�%}` k �•.� � r2 r � ' r.i.•'ll/.. ck 14�i M ` 4 44'[R'..t�1 +. , .us!• r. �1 �`�1t r + w xR }T�i • ♦�.J 1 �'.y.w $n S� ! t- �F, t - 9i*� r is :s�i y. .f �� 1 n i`11:1�`' �. 1 •..,�+o i1. .�.�� .�'•' ,1 �''�v '� _ ,�� t���., �.d�v�A/�R- •1•H?�� ,• '\P �� � I�r?� ��� 1 t �_ �� "2 .. .'�t��•S' 1_ 41 � � 7 e •,r � a �•� i �,� # �..r jar '1;.,e " 1. I..i 1^W .y,\��i R��?•_�R nr I rA � � � ECG:.#f I.f F� iry *' YI rF � ar•�[ „• 7 r t � r' SA/i.s.y R'.1 j e-. WASTE hANAGMIZNT PI "N CSATIFICATION FOR D I:W OR F.SPAb1L1ED FEEDLOTS Please return the ca- Isted -foaa to the Divinioa of Environmental Hnaagams.nt at" tho add-aaa an the reverma Aida of thin fora. Name of Address: Phone No.: 'y v Z County:_ T _n.s 7Wh Farm location: Latitude and Longitude:`-` lQ� ./�Z .2-&-' (required) . Also, please attach a copy of a county road map with location identified. Type of operation (swine, layer, dairy, etc.): ;n Design capacity (number of animals) : 900 Boa 64us 7,0. D; 77 Average size of operation {I2 month population avg_}: DO Sows a Average acreage needed For land application of waste (acres): s a ccaacnaaesnca,ccssaaaaw=aenaeuncracexcaaa'rac-�seaa ccccccawersstssass ssaere �cccssacaan�ecaeeaa 42-�Qa0OR3 Technical Specialist Certification As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005, I certify that the new or expanded animal waste management system as installed for the farm named above has an animal waste management plan that meets the design, construction, operation and maintenance standard and specifications of. the Division of Environmental management and the USDA -Soil Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001-.0005_ The following•e'le_ments and their corresponding minimum criteria-haua been verified by me or other designated technical specialists and are included in the plan as applicable: minimum separations (buffers); liners or , equivalent for lagoons or waste storage ponds; waste storage. capacity; -adequate quantity and amount of land for waste utilization (or use of third paxty) ; access or ownership of proper waste application equipment; schedule for timing of applications; applicatioa rates; loading- rates; -and the control of the discharge of pollutants from stormwater runoff events less severe -than the 25-year, 24-hour storm. Nara of Technics SvacialiB (Please Print) i�17r15TUQhir._ _Gy, 511Z Affiliation: C0 .s r o. .$ v<< Address (Agency)kB06 Alor____r NC. Phone No. .- - --S_ _ i signature: Date: xxcc-ca=aaaaQaccgvwaareccic c,a:awwwwwwca:w wanecacAwwrecswt: ar i7 PisG�acw en ear st t:wvaw Owner/ISanager Agraanant I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any additional expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state either through a man-made conveyance or through runoff from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be. filed at the farza and at the office of the local Soil and Water Conservation District. 2:asa of Land OwILI' lease Print) : r // Signature • A4Date:_• ,_•_ Yi of Xanagar, if different from owner (Please print): Signature: Date: Yotn: A Change in land ownership requires notification or a new certification (if the approved plan is changed) to be submitted to the Division of Environmental Management within 60 days of a title transfer. DEM USE ONL• Y:ACNrEW# r'7ineAje-cl CcJSee elC!/0IArV ,,�A�1 �ro�)e4jr ` ANIMAL WASTE UTILIZATION PLAN Producer: Location: .Tel.ephone : Type operation: Number of Animals: (Design Capacity.) STORAGE STRUCTURE: APPLICATION METHOD: WHITLEY STEPHENSON 2350 WILSON MILLS ROAD SMITHFIELD NC 27577 919-934-2109 Existing Farrow to Weanling Swine sows 16 Q0 Anaerobic Waste Treatment Lagoon Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in, an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under.DRQ regulations. Page: 1 ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, ate.) /6J)Q sows x 6.1 tons waste/sows/year = 0 tons /76 Q AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 1�06 sows x 5.4 lbs FAN/sows/year = 0 lbs. PAN/year 86y D Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS ICOMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID.1 APPLIC METH N TIME 8 8 2 0 1 D oA C 12 5. 0 136.25 2 0 11, 13' L5-16 .-4-6 I MAR-JUN 8'820 1 lDoA W 60.0 120 0 11.13' 1335� I. a FEB-MAR cli R+ 9r o ,l0 � .AV /.51 .Gc, 8820 1 DoA SB 38 152 0 1 11. 13"-16.94,7- ' I AFRr. SEP . 8'82,0. 2 GeB BH 7 0 F I 1350 iiII AIP,R..SEP. SG 1 150---7 1-2 8$20 3A GeB BH 7 1350---T I 8820 -3A SG 1 50 0 8820 3 GeB BH 3.2 160 0 `a2;0 -3 GeB SG 1 50 0 I $$2.0 5 GeB BH I SEP �$820 5 SG • I BH �I`8'�;O r 7 GeB 7 1350 10 .21-12173.5 6.21'� 310.5 SEP-MAY 2.5 1875 APR. SEP 6—.2-r a±a.5 /2, .:W.SO SEP-MAY 15.07 2411.2 15.07. 753.5 SEP- . 2.5 875 1 50 0 I2.5 j125 1 ISEP-MAY 7 1350 10 16.07' 2124.5 Pag6: 3 i� ANIMAL WASTE UTILIZATION PLAN IAPR. SEP. 8'8 2:0 7 882'0 $ APR.SEP. S2 st 7 n 9 �APR,SEP. 8�82 0-1-9 G 1 I e BH 7 I SG 1 I BH 7 I SG 1 I 50 0 350 10 E 6.07 1303.5 SEP-MAY 12 . 54 1889 50 IO 12.54 1127 SEP-MAY 350 10 12.94 11029 50 IO I2`94 `147 SEP-MAY f TEND �I TOTAL�lb38:6 I3�83.3 -- - Indicates that this field is being overseeded (i.e. interplanted), or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while -meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. _„ page: 4 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ---- or ------ APPLY RESID.11 APPLIC METH N TIME ` END TOTAL Indicates that this field is being overseeded (i.e. interplanted) or yg, •. �. -- .M2ra r wInter3,-annuals follow summer annuals. In`~lnterplant.ed fields (i.e. small grain, etc, interseeded in.bermudagxass), forage must be removed through grazing, hayY.r;anci%or si�.age. Where grazing, plants should be grazed wlien they" reach a' height of six to nine inches. Cattle shoulc3:,be rei�Qved.`when plants are grazed to a height of four Inches: ' In fields where small grain,' etc, is to be removed for; hay or`'silage; care•should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or Mays''° Shading may result if small grain gets too high' a'nd th�a s : wili• r definitely ' interfere with stand of berinudagrass This lo's of stand will result in reduced yields and 'less4 nitrogen being' utilized. Rather than �tting sma3 l g,rain ;for; hayor silage just before heading as is the normal,..s, ion, you are encouraged to;.' cut the small grain earlier. You may want to consider,"harvesting.hay or silage two to ;three, takes during'',.the season, depending on time small ' grain is planted'' In the fall. The ideal time to interplant small grain, etc,.,is late September or early October. 'Dri:ll ,hg° is .recommended over broadcasting. Bermudagrass should bQ grazed orNmowed to a height of ;about two inches before drilling, -for' best results. �� q� zy''.,.=Grp `� +4�•}h��'mh �.i Y � � y .i r . h ANhMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseed ,n:g. * lbs AW N (animal waste nitrogen), equals total required nitrogen Less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BH HYBRID BERMUDAGRASS-HAY 50 C CORN BUSHELS 1.25 SB SOYBEANS BUSHELS 4 SG SMALL GRAIN OVERSEEDED 50 ;W WHEAT BUSHELS 2 $;r7,, ` TOTALS FROM TABLES 1 AND 2 i i't TAI+E `2 TOTAL;", ACRES LBS AW N USED 83.3 0 0 0 _71. 2.2 Q 16948-. 0-2 * BALANCE -1-6-9-95- 42-2-5- *** This number must be less than or equal to 0 in order to r fully'•utilize the animal' waste N produced.. tt ,Y •F.� ' l Page: 6 ANIMAL WASTE UTILIZATION PLAN *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in -the tables. See attached map -showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 0 pounds of plant available nitrogen per year in the sludge. If you remove the sludge every 5 years, you will have approximately 0 pounds of PAN to utilize. Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 pounds of nitrogen per acre, you will need 0 acres of land. If you apply the sludge to corn at the rate of 125 pounds of nitrogen per acre, you will need 0 acres of land. Please be aware that, these are only estimates of the PAN and land needed. Actual requirements could vary by 25% depending on your sludge waste analysis, soil types, realistic yields, and application methods. r APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding.capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and Page: 7 ANIMAL WASTE UTILIZATION PLAN amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application ..rates and a -mounts.. i I I (Application RatefApplic. Amount 'Tract 'I Field I l Soil Type Crop (in/hr) I (inches) R8'2'0 1 I DoA I + C I I .30 1 I *1 8820 1 I DoA I SB I .30 *1 ,8820 1 I DOA I W I .30 I *1 88,20. i 2 I GeB I I BH 1 I .35 I *1 -.8,820 3 I GeB I + BH I .35 *1 z 882.0 3A I GeB I BH I .35 I *1 I '8820 1 I 5 I GeB I I BH I I .35, *1 8 8,2 0 k 7 1 GeB ! I BH I j .35 I ;.818 2;0 8 I GeB I BH I .35 I I * 1 I 882.0 i� 9 I GeB I BH I .35 ' *1 Page: 8 ANIMAL WASTE UTILIZATION PLAN 8'8210 I -2 I I SG I .35 I * 1 818210 I -3 I GeB I SG I .35 I *1 8820 I --3A I I I SG I .35 I *1 8820 I• I I --5. I I I SG I I .35 I *1 88.20 ( -7 I I SG I .35 I *1 8'82'0 I I I -8 I f I SG I I .35 I I *1 882.0 I -9 I I I I SG I I .35 I I *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many si.tuations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and. the temporary storage must be removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the as a.o� tscmw to trig acran shown iii Tablas 4 end 2. Failure• to apply Page: 9 ANIMAL WASTE UTILIZATION PLAN the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Page: 10 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of .animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5.• Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. S. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered.with waste to a depth that wio"& � .,,I vih-1,0 �'t� VV ft'Vth k v%o �:hetont.isi1 for malt damage from animal waste •should also be considered. Page: 11 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10.. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See. Standard 3�93 - Filter Strips) . 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. ^� 15,.'An.imal waste shall not be discharged into surface waters, drinageways, or wetlands by a discharge or by over -spraying. Anim4_1, waste may be applied to prior converted cropland provided they'. have been approved as a land application site by a ' !'technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and. on 'other grassed waterways, waste shall be applied at agronomic', rates in a manner that causes no runoff or drift from tY 6 s t6'. r. 16.; Domestic and industrial waste from washdown facilities, showers; toilets, sinks, etc., shall not be discharged into the r . animal waste management system. 17. Ay protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. 12 WASTE UTILIZATION PLAN REOIIhRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and imp16menting a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping,. pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance_ checklist should be kept on site .5 . 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste -during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume)'of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage -ponds . 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals, approach excessive levels. pH shall be adjusted for optimum .crop production and maintained. Soil and waste analysis records shall'be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. .Waste application records for all other waste shall be maintained 'for. five (5) years. 23. Dead animals will be disposed of in a manner that meets North Caroli-na ,re,gulations. cV Paget 13 r, ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:BENT-ONVILLE FARM WHITLEY STEPHENSON Owner/(Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste trea-tment and' storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality (NCDWQ) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan,will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of F;acilltly Owner': WHITLEY STEPHENSON (Plea'sef"prLnt Siq.nature: Date; Name of Manager (,If different fr m owner): — Signature: ate: �- a G-9`7 Name of. Per on P ,parinq Plan: (Please print)ChriS W. Smith Af-filiAtion:NRCS Phone No. 919-989-5381 l►ddresa (Agency) SG6 North Street signature: - L + Smithfield NC 7577 Z [t). Date: ' ,,'. d C! EMERGENCY ACTION PLAN PHONE NUMBERS DWQ 919—•33 -9919 EMERGENCY MANAGEMENT SYSTEM 919-9V --!05G SWCD 919—W — 535/ NRCS 919-9fq —533/ This plan will'be implemented in the event that wastes from your operation are leaking, overflowing, or running off - site. You should not wait dntil wastes reach surface waters or leave your property to consider that you have a pr.oblem., You shbu-ld make every effort to ensure that this does not happen. This plan shouldbe posted in an accessible location for Ill employees at the facility. The following are some action items you should take. I. Stop the release of wastes. Depending on the situation, this may or may not be possible. suggested responses .to some possible problems are listed below. 'A. Lagoon overflow —possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. C. Stop all flows to -the —lagoon immediately. d. Call a pumping contractor. S. Make sure no surface water is entering lagoon. B: Runoff from waste application field —actions include: a. Immediately stop waste application. b. Create a temporary diversion -to contain waste. C. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) thaz caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C.: Leakage from the waste pipes and sprinklers—acticn include:: a. Stop recycle pump. ^, stop irrigation pump. C. Close valves no eliminata furiher discharge. d. Repair all leaks prior to restarting pumps. W Leakage from flush systems, houses, solid separators —action include: a. Stop recycle pump. b. Stop irrigation pump. C. -Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. M Leakage from base or sidewall of lagoon. 'often this is seepage as opposed to flowing leaks -- possible action: a. Dig a small well or ditch to catch all seepage, put in a submersible pump, and pump back to lagoon. b. if holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. C. Have a professional evaluate the condition of the side *Halls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. approximately how much was released and for what duration? c. any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill tc _each surface waters? g. are potable water wells -in danger (either an cr off of the property) ? How ppch ruched surface waters? 3: Contact appropriate agencies. a. During normal- business hours, call 'cur Mr, (Division, of water Quality) regicnal office; hcne 919- - after hours, emergency number. 919- 733-3942. Your phone call should include: your name, facility, telephone number, the details of f b. C. d. the incident from item ? above, the exact locat.icn of the facilit_/, the location or direction of movement of the spill, weather and wind c^ndi-ices. The corrective measures that have been under taken, and the seriousness of the situation. If spill leaves property or enters surface waters, call 'local �4S Phone number, 919- - Instruct cM-S to contact local Health Deuar--ment. Contact CES, phone. number 919- - local SWCD office phone number 919- - and local MRCS office for advice/technical assistance phone number 919- - 4: If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a . Contractors Name: b. Contractors Address: C. Contractors Phone: 6: Contact the technical specialist who certified the lagoon (MRCS, Consulting Engineer, etc.) Name b . Phone:- 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. ei�..a�rn�snrwarvr.rnawls��n.�ga Beat 1.1�24 -Mortality Ianazement )Methods (check which Me:hcd(s) are being implemented) =i Burial three fee: beneath the surface of the ground within ?' heurs after knowledzt of the death. The burial must be at least 300 feet from anv rlowins strearn or,publlc bodv of water. Renderine at arenderinz plant licensed under G.S. 106-163.7 .�. ComoIem incineration In the case of dead poultry only, placing in a disuosal pit of a size and design approved by the Department of Agriculture Any method %vhich in.the professional opinion of the State Veterinarian 'would make possible the saivage of part of a dead animal's value %vithout endangering human or animal health. (Written approval of the State Veterinarian must be attached) Insect Control Checklist for Animal Operations Sour i c Guaise Y - UNIRs 141 Control lusects- - Site Slrcrifir. I'rarlirta --- ----- _ Liquid Syslenls ------ ---------- lu�li l iullCrs • Accumulation of solids — 0 Flush system is desigted and operated sufficiently to remove accunitilated solids from gutters as designed. Itemove bridging of accumulated solids at j discharge l.al ut,u; .uul I'ils T • C'rusled Sul it IS I:acc»iL•e �li�l�etaii�c 1lccaymg VCgelilllUll it i,LL'lll t�r.r.J�i:. ------._�_ • l:cc,l S1rillaLc Fec,1 `�a„r,�t -T--� Accurnulalious of feed residues 0 Maintain lagoons, scaling basins and pin where pest breeding is apparent to minin ive the crusting of solids to a deptdt of no more Than 6 - R inches over more than 30% of surface. fo Maintain vegetalive control altiug banks (if' lagoons and other impnitnlments to prevent accunualalinn of decaying vegetative matter along waler's edge an impoundment's perimeter. Dry Sysletus 1)csign, 011MI143 and rnainlain fccd syslctIIS (e.g., hunkers and Irout;hs) In miilintice the acctuulthuinn of dcc.iying w.Islage. Clean aap spillage on a routine basis (e.g., 7 - 10 day interval diving silmnier. 15-30 thy interval duritil; winter). VI Iteduce moisture ;IMMILdiuiun Lvilhin Mid urn►rod inunediale perimeter of fced sloralvs n-CiIs by insninl; drainal;t: away I1-0111 silt anti/or liroviding adetimile coul:lillmenl (c.l;., covered hill lilt brewer's grain and similar hi1;11 Itloislalre grain prndllCts). fl Glspecl liar and i'eI111We ur break nli acciunulatt:d Solids in filler strips around Iced Storage :Is needed. At.111' - P141VI ni11,a 11. [996. hike I i 5��urce Cause IRAM's to (_onirol Insects - Site Specific Practices Animal I luliliul; Arcas Accnlnllladons of animal wastes 121 Eliminate low areas That Irap moisture along and feed wastage fences and other locations where waste accumnlales and disturbance by anini-als is minimal. C7 Maintain fence rows and filler strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break sip accumulated solids as needed). Dl y Klislitife I landling • ACCllllltIkiliOFIS of illllflUll WilStCS n Remove spillage an a roullnC hasis (e.g.. 7 - I{) SySt�nls day interval during summer; 15-30 day interval during winter) where manure is loaded for land application or disposal. C7 Provide for adeclltate drainage around mamire stockpiles. n Inspect for and remove or break up accumalawd wastes in Ether strips around stockpiles and manure handling areas as needed. Fur 1111hre inl,lnnaliuu colitacl the Cooperative Exlension Service, Department of Entomology, fiox 7613, Marlh Carolina Slate I Iniversily, kidcigh. NC, 2-160)-7613. AMIC - tl11vcJIllicc1 1 1, 19N1i, Page 2