Loading...
HomeMy WebLinkAbout310585_Plan of Action_20181012PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 31-586 County. Sa pson b Facility Name, Newkirk Sow Farm ,. Certified Operator Name Glen Norris Operator Number 27446 1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways Lagoon Name/ID Spillway(Y or N) Level(inches) Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 18 2 Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day Plan of Action is attached Agronomic balance is within acceptable range Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste 9/21/2018 I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ernest Smith Farms Phone 910-529-1129 Facility Owner/Manager (print) Date 10/12/2018 Facility Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID 1 line m = 353.3 lb PAN 2 Structure ID: line m = lb PAN 3 Structure ID: line m = lb PAN 4 Structure ID y line m = lb PAN 5 Structure ID. line m = lb PAN 6 Structure ID. line m = lb PAN n.lines 1+2+3+4+5+6= 353.3lbPAN III: TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o tract # p. field # q. crop r acres s remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column rx s u application window' 610 1 small grain overseed 370 5000 1850 SEP-APR 610 2 small grain overseed 450 50.00 225.0 SEP-APR 610 4 small grain overseed 570 5000 2850 SEP-APR 610 5 small grain overseed 843, 50.00 421.5 SEP-APR 610 7 small grain overseed 3901 50.00 1950 SEP-APR 610 7A small grain overseed 0.20 5000 10.0 SEP-APR 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period v. Total PAN available for all fields (sum of column t) = 1321 5 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 353 3 lb. PAN PoA (30 Day) 2/21100 x. Crop's remaining PAN balance (line v from section III) = 1321 5 lb. PAN y. Overall PAN balance (w-x)= -968 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/ldentifier (ID): 11 2. Current liquid volume in 25 yr /24 hr storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr storm & structural freeboard c line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e line c/12 x line d x 7 48 gallons/W 3 Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 18.0 inches 19 0 inches 1.0 inches 61913 ft2 38592 gallons 180 days g. volume of waste produced according to structural design 126890 ft3 h. current herd # 1200 certified herd # 1200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j excess rainfall over evaporation according to design k (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I current waste analysis dated 9/25/2018 m ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 126890 W 0 ft3 37625 ft3 205095 gallons 1.45 Ibs/1000 gal 353.3 Ibs PAN PoA (30 Day) 2/21/00 BARWICK AG SERVICES, LLC 103 COUNTRY CLUB CIRCLE CLINTON, NC 28328 October 12. 2018 North Carolina Division of Aquifer Protection Mrs Kristen Miguez Mr Bill Dunlap Dear Kristin & Bill, Please find enclosed Plans of Action for the farms listed below owned/managed by Ernest Smith Farms. All farms were pumped down prior to Hurricane Florence but due to 25-30" of rain, these lagoons got in the red. Post -storm levels were as follow: 31-585 Newkirk Sow Farm: 18" post 82-114 Williamson Farm: #1- 6" post, #2- 3" post 82-156 Elwell Lake: 15" post We have had an extremely wet 2018 and lagoons have been more difficult to manage than usual. If you need further information regarding these please call me at 910-385-1000 Thank you for your attention to this matter Sincerely, Curtis Barwick