Loading...
HomeMy WebLinkAbout310580_Inspection_20180613Division of Water Resources Facilily Number F 0 Division of Soil and Water Conservation Other Agency Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access rr11 y� Date of VIslt:EZ Arrival Time: Departure Time: County: I I� Region: vll K Farm Name: �t (� V1 U Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: OnsiteRepresentative: R.V/�,Ti t[h( IA Certified Operator: Back-up Operator: Location of Farm: Swine Wean to I Wean to I Feederto Farrow to Farrow to Farrow to Other Other Integrator: Certification Number: q-1 -� 31 q Certification Number: Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. NNon-- La er Design Current Dry Poultry CaDacity Poo. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d Does the discharge bypass the waste management system? (If yes, notify DWR) 2 Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes k No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [—]Yes [—]No ❑ NA ❑ NE ❑ Yes ❑(JNo ❑ Yes �XyN ❑ 0 Yes���� ❑NA ❑NE ❑NA ❑NE ❑NA ❑NE Page 1 of 3 21412015 Continued Facili Number. - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes A No a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 1 Structure 2 1 2� ❑ NA ❑ NE ❑ NA ❑ NE Structure 3 Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes No ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o ❑ NA I —]NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes *o ❑ NA ❑ NE maintenance or improvement? Waste Application iNo 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes k ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes KNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN> 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evi enee of Wind Drift ❑ Application Outside of Approved Area n 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? Yes N//oo� ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? Yes 7IWy❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes EXNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes W No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 0 No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes gNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a min gauge? ❑ Yes [�No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain minbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: Date of Inspection: 24' Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Lf No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes J?oNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in chargev [—]Yes KNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No EOA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes %ko ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality wncem7 ❑ Yes %Io ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes o ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface file drains exist at the facility? If yes, check the appropriate box below. ❑Yes �No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWNT? ❑ Yes *o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes o ONo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). - sd Ursh �er cr, L a -(, 3r-� n-, 4T op 0( Wa I I . �a✓�i�r m /oz P IQ le Reviewer/Inspector Name: Kfl I k "' 'yr z/ P l y Reviewer/Inspector Signature: Page 3 of 3 Phone- g t v l ei (a ` l Date: 2A2015