Loading...
HomeMy WebLinkAbout510040_PERMIT FILE_20171231-/5 -Iq 15 Type of Visit: ;6Com 'ance inspection U Operation Review Q Structure Evaluation CWchnical Assistance sit: Rouj Reason for Vitine 0 Complaint 0 Follow-up 0 Referral 0 Emer2enev 0 Other 0 Denied Access I Date of Visit: —ry Arrival Time: Departure Time: County: Region: Farm Name: S[ 5. _ rq t�pf 2-n. Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Onsite Representative: �, �i^ ; �. takHe S Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Latitude: Wean to Finish Wean to Feeder Pederto Finish Farrow to Wean Farrow to Feeder Farrow to Finish Mits Boars Other Non - Non -Layers Pullets Turkeys Turkey Poults Other Certification Number: Longitude: Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef feeder Beef Brood Cow Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DW R) ❑ Yes No ❑ NA [] NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ N E 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of3 21412015 Continued (Facility Number: S( - Zld I jDate of Inspection: ( Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes N ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 's (D Spillway?: Designed Freeboard (in): Observed Freeboard (in):�7 I 'I 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental rest, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit'? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ❑ NE maintenance or improvement'? t 1. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > t0% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): (3ar M &,f A-/ d$ /-'N q r /111-7 1 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16, Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment'? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes �N:o � ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes gNo °❑ NA [] NE Yes ❑ NA ❑ NE ❑Yes g;N�o °NA ❑NE Yes ❑ NA ❑ NE ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes V ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Trans ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E2 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes t Page 2 of 3 gD NA ❑ NE Weather Code udge Survey NA ❑NE No ❑ NA ❑ NE 21412015 Continued FAcility Number: -410 Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27, Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33, Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments, (refer. to„question ft Explain y any. YES answers and/or any additional recommendations or:any other. comments. ,•< Use=drawings.of facility to better,explain situations (useadditional pages as necessary).". % Cs- Z 9-1 `% � �— .o 4-1, q . 7 Reviewer/Inspector Name: Phone: '7V — ZyZ© 0 Reviewer/Inspector Signature: 13 6c S �� CL`z✓ �� C Page 3 of 3 Date: )_— I q' l 2 21412015 w Type of Visit: f0 Compliance Inspection U Operation Review U Structure Evaluation U Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: -�'� Arrival Time: Departure Time: County: �3 Uh A6+Or\/Region: 00 D 1 Farm Name: —L� Favc rn5 L _ L-0 _(DUI)f�)L__Owner Email: Owner Name: J 1, VY\ Fa <, mzj (_L.0 - Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. C►attle C•apaclty Pop. Wean to Finish La er Dairy Cow Wean to Feeder on -Layer Daia Calf Feeder to Finish Daia Heiler Farrow to Wean Design Current Dry Cow Farrow to Feeder. Drr P.oultr, Ca acit P,o P. Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turkey Pouits Other Other Discharges and Stream impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes 9 No ❑ NA ❑ NE ❑ Yes] No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes �Z o ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation`? ❑ Yes XNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes VNo ❑ NA ❑ NE of the State other than from a discharge`? Page l of 3 21412015 Continued F'acilit Number: Date of Ins ection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ZNo ❑ NA ❑ NE a. if yes, is waste level into the structural freeboard? ❑ Yes 210'No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: - Spillway?: Designed Freeboard (in): Observed Freeboard (in): L� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ONo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes LJ No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ZNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit`? ❑ Yes XNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ZNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [XNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes &No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): St.— n r1) 0,5(15 _ 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ;ZNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes EfNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes eNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes ff No ❑ Yes Vr No ❑ NA ❑ NE ❑ NA ❑ NE Re uired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 6 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes P� No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? Ifyes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 10"No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �Z No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [,2rNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ZNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 6 No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes E� No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes LZ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes Z No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ILJ No ❑ NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes Ej No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency'? ❑ Yes dNo ❑ NA ❑ NE jComments (refer to question #): Explain, any YES answers and/or any additional recommendations or any other comments: . Use;drawings Of facility to better explain situations (use additional pages as necessary). n �Io(a�Jrto LOop-5i-a I oon t 01 0 0 A a 191/J�o wo0LL''59 Boni o Darn a y<g tc)050(c) 3 tv0068 ( 1DO(\1 a� PL)r\g d�a-R q DL)nl 4) a� ouna n 1 M 5 p0ti ti, 1.3 QL) o -.a3 �lyjr� �00ti3cr-f OOnt oRq a r m &Ltx (� �,cRyya" 3 �, a 0► t, CUU Reviewer/Inspector Name Reviewer/Inspector Signat Page 3 of 3 Phone: 9l9 g91 Date: 21412015 y rype of visit: RTompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: © County: Nsta Region: (IROL Farm Name , N e t_ y 0"N Fa C 1M S C_ C_ C _ Owner Email: Owner Name: I I I I Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Integrator: Phone: Certified Operator: -_Kamea � "]OS Certification Number: R29 g05 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: MMW"_%A1 Swine Wean to Finish Capacity Current Design Current Pop. Wet Poultry Capacity Pop. Layer I Cattle Dairy Cow Design Capacity C►urrent Pop. Wean to Feeder I jNon-Layer I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design C««urrent Du P,oult , Ca aci P,o Layers Dry Cow Farrow to Feeder Farrow to Finish Non -Dairy Beef Stocker Beef Feeder Gilts (j Non -Layers Boars Pullets Beef Brood Cow Other Other Turke s Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes No ❑ Yes No ❑NA ❑NE ❑NA ❑NE ❑ Yes [Z No ❑ NA ❑ NE [3 Yes Z] No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA [] NE Page 1 of 3 21412014 Continued r Facili Number: Date of inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ,t3 ) Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? T If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes T No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes V] No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes rn No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes CZ No ❑ NA ❑ NE Re uired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes n No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [—]Yes P No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes JZ] No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes )E!rN ❑NA ❑NE ❑ Weather Code El Sludge Survey ❑NA ❑NE o ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliancewithpermit S o ditions related to sludge? If yes, check CD Yes No ❑ NA ❑ NE s the appropriate box(es) below. {� ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ,�f 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes I /I No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes T �No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. TT 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE :omments (refer to question #):Explain any YES answers and/or any additional recommendations or any other comments.' Jse drawings of facility to better explain situations (use additional pages as necessary). ca"UtLeeftu otjuj a U L�� H �U m f 6- 01-90 IS N o- (� 5 �j 3 9-01-co1s r?2, 0 47 Co- t5 C' N: 01,33 15 110a 0 11't a = C(,'7 -p . S, s 1►_s Reviewer/Inspector Name: ReviewerAnspector Signature Page 3 of 3 Phone: q199 9 r✓ (4 93C2 Date: 11'rz'g I / '�. 21412011 Type of Visit: )27Compliance Inspection U Operation Review U Structure Evaluation Q Technical Assistance j Reason for Visit: APrRoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: h n c)yVegion: Farm Name:; L YY\ , F tr^„5 L L.!� _ Owner Email: Owner Name: - Phone Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: ' jQ M,,C S Back-up Operator: Title: Phone: Integrator: Certification Number: jBWf) C I1' 8 Z Certification Number: Location of Farm: Latitude: Longitude: Design Current' � a Design Current Design Current Swline Capacity Pop. Wet Poultry@opacity X., Pop. Cattle Capacity Pop. Wean to Finish FTLayer Dairy Cow Wean to Feeder I INon-Layer I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean caXo Dry Cow Farrow to Feeder D I;oultr Ca .aci P,o , Non -Dairy Farrow to Finish Layers Beef Stocker Gilts 0 Non -Layers Beef Feeder Boars I IPUIlets Beef Brood Cow Turkeys Othe ITurkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes PNo ❑ NA ❑ NE [—]Yes [—]No [:]Yes [:]No ❑ Yes ❑ No []Yes ZNo ❑ Yes ONo ❑NA ❑NE ❑NA ❑NE ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE Page I of 3 21412011 Continued Faeilit Number: 51 jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ;—ZNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: so Spillway?;AA `r Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes dNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the pen -nit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) ,�/' 9. Does any part of the waste management system other than the waste structures require ❑ Yes j /I No ❑ NA ❑ NE maintenance or improvement? T Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [ No ❑ NA [] NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s); 13. Soil Type(s): l4. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Feno ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ZrNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ;ZNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? ❑ Yes [%�'No ❑ NA ❑ NE ❑ Yes E;rNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes .E� No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 5rNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? if yes, check the appropriate box below. ❑ Yes LZINo ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes f o 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ID Yes ] Nlo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued . Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes JZ No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. 9 0 1 y 6 Q- ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes � No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes m No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 3 I. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [;Z No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ff No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [Z No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes V No ❑ NA ❑ NE Comments (refer to question #): Explain`any YES answers and/or any additional recommendations, or.any other comments:: Use drawings of facility to better explain, situations (use additional pages as necessary). i r- j Lj rN ' Do fN 01 Lo gI i ry Doi 1 N I oN Ut a 01S( tp ja j 1) to I 03 D)o t (o(e DoVti Il o,��-# DjA of � 620 0 =� L4 :3j q d-�$ i��3'�f 3]Wfiy 3q07o dqF)J)9M CeTfkokOft tLv\Ok Lk� &7qEAVfd) Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 7 7 "7 Off✓ Date: 21412011 Type of Visit: RJCompliance Inspection O Operation Review p Structure Evaluation p Technical Assistance Reason for Visit: 101ioutine O Complaint O Follow-up O Referral Q Emergency Q Other Q Denied Access Date of Visit: Arrival Time: Departure Time: County: ion: Farm Name: 7 L �C"m1.A _ -„ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Title: Phone: Phone: Integrator: Certification Number: Q`5 Back-up Operator: Certification Number: Location of Farm: Latitude: av C a 7 Longitude: Design Current W Design Current Design Current Swine @a aci Po P tY P• at Poultr Ca aci Po .wY p tY p• Cattle C►a aci Po p tY p• Wean to Finish Layer Dairy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean A r urrent Dry Cow Farrow to Feeder D P.oult4 Ca aci P,o P. Non -Dairy Farrow to Finish F Layers Beef Stocker Gilts ti Non -Layers I 113eefFeeder Boars Pullets Beef Brood Cow Turke s Other Turkey Puults Other I 10ther r s ! Discharees and Stream Imoacts — / 1. Is any discharge observed from any part of the operation? ❑ Yes I XNo TTT ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? []Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ZrNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ;?�`No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facili Number: - l Date of inspection: Waste Collection & Treatment �/ 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes f/fNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes 0 No ❑ NA ❑ NE cStructure S eture 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [—]Yes Z No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �/No ❑ NA ❑ NE maintenance or improvement? Waste Application W. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 6 No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs, ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 36,29 13. Soil Type(s): \` 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18, is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑ Yes PrNo ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ILJ No ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. 1 ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ S 0 �aI is Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and/" R`ai'nfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [ o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: jDate of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permi t4 D Yes �No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes 'VNo the appropriate box(es) below. -44 1 (JI.L2 a © 13 ,=# a &-,A 'a[) i L( ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ❑ NA ❑ NE ❑ NA ❑ NE 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes JNo ❑ NA D NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes J�fNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ;yNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 3 I. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: [] Yes VNo ❑ Yes P"No [:]Yes VNO ❑ NA ❑ NE ❑NA ❑NE [DNA ❑NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ONo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [� o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments'. Use drawings of facility to better explain situations {use additional ages as necessary).,': VT c7t,�,cu� Cl� 10-1- 1 3 W 00 '�Ld4'If I) I W000')gq U30(0)$(S /yy �,{{ 13 b j Reviewer/Inspector Name: Reviewerllnspector Signature: 1,3 a T)una 0,q4, i 'ao ©.o$r ') \(0d a,0a. Oral r , r ► �� �VA Page 3 of 3 4\acJ_ V d e 0, c- - �A rJy Ul)c&.\ Ckt� Phone: 9 (9 9) Li 3k Date: /4/ 111 O� i ype of visit: )o t ompuunce inspection v operation iceview v ntructnre Gvatuanon V i eennicai Assistance Reason for Visit: ORoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access I Date of Visit: Arrival Time: Departure Time: County: ��� t�S�UrRegion• Farm Name: :K L r\ Fes. (` Y-Y\ Owner Email: i t Owner Name: t Phone: Mailing Address: Physical Address: I Facility Contact: `T 1 iY1 (. t� yl (`_ h Title: Phone: Onsite Representative: Integrator: 6a le4s be 1-0 Certified Operator: - (S so pJ Rto hb Certification Number: as g q (a Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: Swine Wean to Finish Design Capacity Current Pop. Design Current Design Current Wet Poultry Capacity Pop. Cattle Capacity Pop. Layer DairyCow Wean to Feeder -Layer DairyCalf Feeder to Finish DairyHeifer Design C►urrent D Cow Farrow to Wean Farrow to Feeder D F P,oultr, C*_a aci i;o Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets I Beef Brood Cow Ot Other Turke s key Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: - a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? [:]Yes NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No [:]Yes ❑ No ❑ Yes eNo ❑ Yes Z No ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page 1 of 3 21412011 Continued r t Facilit Number: - Date of Ins ection:43 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o ❑ NA ❑ NE 9'�' 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes; ] No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other Issues 28, Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Z No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �No ❑ NA ONE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [7fNo ❑ NA ❑ NE permit? (i.e., discharge, Freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ,,,___,,,((( I/' No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: X 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE JG i l 5 �•��� 0 3 1 2) - a 1 # GL (v 'a. "� i 1 n-O .1�imQ �4,C.e�c,n ��c.Q,c,n�ar�t G" . ��� Qt*paj fJ�ti�Ct �� Wt.lti-en t� 'P_ `.-C.( t f&L x= _ M m (9 e.�-cnr� r 3 r -13 _*4- a &LAe corn c) 'IV++ r.cxu (s- r 3 - i y umcu affjp'� 0 Gjv\'J� Lm" Reviewer/inspector Name: Reviewer/inspector Signatur Page 3 of 3 Phone: ).1- Q91-:,& Date: / 0 - I3 21412011 -- - -- -. - - .`... — - Q J Facility Number: - Date of Ins ection• Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ONo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [] No ❑ NA ❑ NE Structure i Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier:^ Spillway?: Designed Freeboard (in): Observed Freeboard (in): � � 3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2"No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes eEfrNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ;?r�4o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) J�a 9. Does any part of the waste management system other than the waste structures require ❑ Yes Flo ❑ NA ❑ NE maintenance or improvement? Waste ApRlication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes j2rNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ET -No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 342, C>�n o 1J 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E2No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? D Yes__4E!'No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes .e"No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application'? ❑ Yes�No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes LD'Ao ❑ NA ❑ NE Reauired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes_. F:�"'No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes J2<o ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ErNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes )ro ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Z�- 4 Type of Visit: erCoroutine ce Inspection O Operation Review O Structure Evaluation O Technical Assistance I Reason for Visit: O Complaint O Follow-up 0 Referral O Emergency O Other () Denied Access Date of Visit: / rriva] Time: Departure Time: O County: Region: Farm Name: 3 L Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: 6t,55r �L �Gf Integrator: Certified Operator: Phone: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pap. Wean to Finish Layer I Dai Cow Wean to Feeder Non -La er I Dairy Calf F o Finish Dairy Heifer Farrow to Wean pip Design Current Dry Cow Farrow to Feeder D . P,oulfr, Ca aci l;a Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Nan -La ers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [—]Yes o ❑ NA ❑ NE Discharge originated at. ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412011 Continued Facili Number: - tQDate of Inspection: Ir j Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes N ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: f" Spillway?: Designed Freeboard (in): Observed Freeboard (in): S. Are there any immediate throats to the integrity of any of the structures observed? ❑Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not property addressed and/or managed through a ❑ Yes IQ 0 ❑ NA ❑ NE waste management or closure plan? eat, notify DWQ If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmrNo 7. Do any of the structures need maintenance or improvement? ❑Yes❑ NA [] NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application — / 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �O ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [—,� ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): UZ rN.14 dA I S q-. 4 r q" t c 13. Soil Type(s): / 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes El No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Vo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE 18. is there a lack of properly operating waste application equipment? ❑ Yes g7N[:] NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps [] Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfer Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspectio3041() Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes CrNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ YesVNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 36. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the pen -nit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes [:]No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Cornitients {refer to Fquestion,#) Explain any YES�answers andlorlany addrtiona3 recommendatansorxany;other.canaments. i � :�...:� _.a=: Use drawrpgs otzfacyhE to he'eir ezpl 3nr uat�gns�(u5etaddyt�onRi pqg" as necessarY�).� _ :..' .. ; Reviewer/Inspector Name: Phone: 7 61—y zo o Reviewerllnspector Signature: Page 3 of 3 Date: 1 1 f h (2� T�� 21412011 12( 2-11 rb Type of Visit glcom ' nce Inspection O Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit Routine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: p Arrival Time: �. �C7 Departure Time: County: Farm Name: L Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: /' Title: �* Phone No: Onsite Representative: ) falc rC l�'C'i77 �3" Integrator: Certified Operator: Back-up Operator: Operator Certification Number: Back-up Certification Number: Region: Location of Farm: Latitude: = o = 4 = longitude: = ° = 1 = 1{ Design aacit Current Poulation Im", Dgn Current Wetul Cap�a&%ty Population Cattle Design CurrentSwine Capzaciitty Population ❑ Wean to Finish ❑ Layer ❑ DairyCow ❑ Wean to Feeder ❑ Non -Layer ❑ DairyCalf ❑ DairyHeifer Dry Poultry ❑ D Cow Non -Dairy ❑ Layers ❑ Beef Stocker ❑ Non -Layers ❑ Pullets ❑ Beef Feeder ❑ Beef Broad Cow ❑ Turkeys ❑ Turkey Poults ❑ Other Number of Structures: Y� ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Giits ❑ Boars Other ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ONo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made`? ❑ Yes �❑ NA VNo El b. Did the discharge reach waters of the State? (If yes, notify DWQ) El Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ElNA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes ❑ No ❑ NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued Facility Number:fZ Date of Inspection L f Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier:1� OJT C� Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes .�❑ NA ❑ NE ❑ Yes�`N[:INA ❑ NE Structure 5 ' Structure 6 ❑ Yes �❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental three ,.notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ZfNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes o ❑ NA ElNE maintenance/improvement? 11, Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ;No❑ NA ❑ NE ❑ Excessive Pond ing [:]Hydraulic Overload ❑ Frozen Ground [:]Heavy Metals (Cu, Zn, etc.) [:]PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) & ✓'n 4 C=14 4 !fA- a 13. Soil type(s) f 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ;rNo ' NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes N NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Reviewer/Inspector Name -- Phone: --) J —yZot Reviewer/Inspector Signature: �r Date: / Z J Z 3 % / 0 Page 2 of 3 12128104 Continued r Facility Number: - Date of Inspection Re uired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No . ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the approprrate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps El Other 21. Does record keeping need improvement'? If yes, check the appropriate box below. ❑ Yes P<O ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes N NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes r NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? El Yes NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit'? ❑Yes NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? El Yes ll ;. o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ElYes ❑ No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30, At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or. Drawing's: ' t Page 3 of 3 12128104 AV Type of Visit l'Co ante Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Farm Name: If .�`& w Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Phone: Title: Phone No: Onsite Representative: e. IPe_4f"_r Certified Operator: J i`►? mJZ I' n 'a Al _ Back-up Operator: Location of Farm: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: = o = I 0 « Longitude: 0 ° = I = Design Current ine C►apacity Population Design Wet Poultry Capacity Current Desigu Curren# Population Cattle Capacity Population LWean to Finish ❑ Layer ❑ DairyCow ❑ Wean to Feeder ❑ Non -Layer ❑ DairyCalf ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish Dry Poultry ❑ Layers ❑ DairyHeifer ❑ D Cow ❑ Non -Dairy ❑ Beef Stocker Beef Feeder ❑El ❑ Beef Brood Cow Number of Structures: ElNon-La ers Gilts Pullets P[--] Boars Other, ❑ Other ❑ Turkeys ❑Turke Poults ❑ Other Discharp-es & Stream impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes �NoO NA ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes A ❑ NE ElYesPNEI NA ❑ NE ElYes NA ❑ NE 12128104 Continued Facility Number:,p Date of Inspection i o Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: iY` " 'l Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Po A El NE El Yes ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr , notify DWQ 7. Do any of the structures need maintenance or improvement? El Yes No NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [] Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes "NoDNA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crap types)145 19 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes N NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes El NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes � ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes❑ NA ❑ NE 18. is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE ?'=,l •i'i#1 t:a 3� �s. �k�$��t�� Comments (refer to question #) Explain any YES ansWers and/or any recommendationsffia-py,omments. s;; �ft� g.s !€t Use drawings of facility fo abetter explain situ a rions:j(use,actd1ttonal pages,ias neeessary): Reviewer/Inspector Name i ���� G �. .5 .., a. Phone: %]l'-/ j Zd c7 Reviewer/Inspector Signature: t.. s Date: It (i g/ 09 12128104 Continued Facility Number:./ —/ p, I Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes o A ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. Cl Yes ONo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes FNO"�[01 NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ YesNA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ YesNA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additidnal=Coimments and/o�tDrawingsa'�'s�; ��'��,4'`��t� `:�� ��� ' � t 12128104 12128104 f 6l of --- Type of Visit O'Compl a Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visi Routine O Complaint O Foltow up O Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: /i Arrival Time: ►� f��' Departure Time: County: Farm Name: rd n P-7 J OL-t .1 E4e.4^L, Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: � �_� 1 Title: Onsite Representative: 6fj �'�C- Certified Operator: Back-up Operator: Location of Farm: Phone: Phone No: Integrator: Operator Certification Number: Region: Back-up Certification Number: Latitude: ❑ c 0 i 0 « Longitude: ❑ ° 0 ' = fl Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity Population ❑ Wean to Finish ❑ Layer I airy Cow ❑ Wean to Feeder 10 Non -Layer I ai Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ Dry Cow ❑ Farrow to Feeder ElNon-Dairy El Farrow to Finish ❑ Layers ❑ Beef Stocker ❑ Gilts ❑ Non -Layers ❑Beef Feeder ❑ Boars ❑ Pullets ❑ Beef Brood Co ❑ Turke s Other ❑ Other E] urkey Pouets ❑Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Yes NA PNo ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWQ) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) r[3Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? o ❑ NA ❑ NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ❑ Yes ❑ No ❑ NA ❑ NE other than from a discharge? Page I of 3 12128104 Continued r- 1 Facility Number: tj — Date of Inspection 1f/ Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No NA ❑ NE a. If yes, is waste level into the structural freeboard? [IYes No ❑ NA ❑ NE Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 9 Spillway?: Designed Freeboard (in): Observed Freeboard (in}: t Jy 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No A ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan'? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta=0;NA ify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes NoA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑Yes o ❑ NA [:IN E maintenance or improvement? Waste Application "NoNA 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NE maintenance/improvement? I I. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop types) _�ca4 S-3- L_ S'nl�riy ► 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes •VETNo NA ❑ NE 15, Does the receiving crop and/or land application site need improvement? ❑ Yes NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes❑ NA ❑ NE a �. :,� ;3,�.: Cj tf" Comments#efer to'questioh #) Explain,an YES answers and/or; u'y ecommepdatinnsTor,;any other cgmment . #U`se drawings of facilityJo better explarn,situations, (usefadditional pages as; necessu � gfl e g i T Reviewer/Inspector Name � phone: Reviewer/Inspector Signature: C e--Date: / (% Page 2 of 3 12128104 Continued Facility Number: S — Date of Inspection ( / Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No I "NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check El Yes o ❑ NA ❑ NE the appropirate box. ❑ WUP ❑Checklists ❑Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No_E NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? El Yes'rN;' ❑ NA ElNE 25. Did the facility fail to conduct a sludge survey as required by the permit? El Yes❑ NA El NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes❑ NA ❑ NE 27, Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Dra°ry ngs :'i,< Page 3 of 3 12128104 Page 3 of 3 12128104 �t R• a Facility Number •Division of Water Quality O Division of Soil and Water Conservation 0 Other Agency Type of Visit comp ' ce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: /(� Arrival Time: Departure Time: County: Region: Farm Name: c� L w� lr, '� rq `` ` Owner Email: Owner Name: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Phone: Title: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: �o Latitude: Design Current Design Current Capacity Population Wet Poultry Capacity Population ------- 7_❑ Layer I❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Longitude: = o = Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifej ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes NA El El Yes;�0�01:1 NA ❑ NE ❑ Yes No NA ❑ NE ❑ Yes No NA ❑ NE ❑ Yes o ❑ NA ❑ NE 12128104 Continued Facility'Number:,5 — Date of Inspection C 112 D Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Ef No I NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 JS Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 2_ t 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 0<o ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes UrNo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or 7. Do improvement? environmental thre , notify DWQ ❑ ElNE any of the structures need maintenance or Yes ElNA 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ;XNo []NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ElNE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �`N[] NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ YesjN A ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes eN A ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yeso ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: G ReviewerlInspector Signature: (m 1 Date: 12128104 Continued Y- Facility Number:-ZI Date of Inspection 2 0 Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WI P ❑ Checklists ❑ Design ❑Maps ❑Other ❑ Yes Rio ❑ NA ❑ NE ❑ Waste Transfers ❑ Annual Certification 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Yes No ❑ NA ❑ NE ❑ Yes ZfNo ❑ NA ❑ NE ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections eather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? al Comments and/or Drawings: ❑ YesZNo,,E- NA ❑ NE ❑ Yes NA ❑ NE ❑ Yes 9NNZOEI / ❑ NA ❑ NE ❑ Yes NA ❑ NE ❑ Yes 'NA ❑ NE ❑ Yes o ❑ A ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 12128104 ■ Division of Water Quality ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 510040 Facility Status: Active Permit: AWS510040 ❑ Denied Access Inspection Type: Compliance Inspection Inactive or Closed Date: Reason for Visit: Routine County: Johnston Region: Raleigh Date of Visit: 06/121,2007 Entry Time:0140 PM Exit Time: Incident #: Farm Name: J.L.M. Farms LLC Owner Email: Owner: ,J L M Farms LLC Phone, 000-778-3130 Mailing Address: PO Box 10009 Goldsboro NC 27532 Physical Address: Facility Status: N Compliant ❑ Not Compliant Location of Farm: Integrator: Latitude:55'20'15" Longitude:78°14'35" NCSR 1199, 5 miles west of NCSR 1008 North side of NCSR 1008 Question Areas: Discharges & Stream Impacts Waste Collection & Treatment Waste Application Records and Documents Other Issues Certified Operator: Jimmy R Vinson Secondary OIC(s): On -Site Representative(s): Name Primary Inspector: Patrick A Towell Inspector Signature: Secondary Inspector(s): Inspection Summary: Operator Certification Number: 20303 Title Phone: Date: Phone Page: 1 Permit: AWS510040 Owner -Facility: J L M Farms LLC Facility Number : 510040 Inspection Date: 06/12/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Waste Structures Type Identifier Closed Date Start Date Designed Freeboard Observed Freeboard Lagoon ISOLATION UNIT 48.00 Lagoon SOW FARM 42.00 Page: 2 Permit: AWS510040 Owner - Facility: J L M Farms LLC Facility Number: 510040 Inspection Date: 06/1212007 Inspection Type: Compliance Inspection Reason for VlsIt: Routine Discharges & Stream Impacts Yes No NA NE 1. Is any discharge observed from any part of the operation? ❑ ■ ❑ ❑ Discharge originated at: Structure ❑ Application Field ❑ Other ❑ a. Was conveyance man-made? ❑ ❑ ❑ b. Did discharge reach Waters of the State? (if yes, notify DWQ) ❑ ■ ❑ ❑ c. Estimated volume reaching surface waters? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ ■ ❑ ❑ 2. Is there evidence of a past discharge from any part of the operation? ❑ ■ ❑ ❑ 3. Were there any adverse impacts or potential adverse impacts to Waters of the State other than from a ❑ ■ ❑ ❑ discharge? Waste Collection, Storage & Treatment Yes No NA NE 4. Is storage capacity less than adequate? ❑ ■ ❑ ❑ If yes, is waste level into structural freeboard? ❑ 5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large trees, severe ❑ ■ ❑ ❑ erosion, seepage, etc.)? B. Are there structures on -site that are not properly addressed and/or managed through a waste management ❑ ■ ❑ ❑ or closure plan? 7. Do any of the structures need maintenance or improvement? ❑ ■ ❑ ❑ 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, ❑ ■ ❑ ❑ dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or ❑ ■ ❑ ❑ improvement? Waste Application Yes No NA NE 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or ❑ ■ ❑ ❑ improvement? 11. Is there evidence of incorrect application? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Excessive Ponding? ❑ Hydraulic Overload? ❑ Frozen Ground? ❑ Heavy metals (Cu, Zn, etc)? ❑ Page: 3 Permit: AWS510040 Owner - Facillty: J L M Farms LLC Facility Number : 510040 Inspection Date: 06/12/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Waste Application Yes No NA NE PAN? ❑ Is PAN > 10%/10 lbs.? ❑ Total P205? ❑ Failure to incorporate manure/sludge into bare soil? ❑ Outside of acceptable crop window? ❑ Evidence of wind drift? ❑ Application outside of application area? ❑ Crop Type 1 Coastal Bermuda Grass (Hay) Crop Type 2 Small Grain Overseed Crop Type 3 Crop Type 4 Crop Type 5 Crop Type 6 Soil Type 1 Soil Type 2 Soil Type 3 Soil Type 4 Soil Type 5 Soil Type 6 14. Do the receiving crops differ from those designated in the Certified Animal Waste Management ❑ ■ ❑ ❑ Plan(CAWMP)? 15. Does the receiving crop and/or land application site need improvement? ❑ ■ ❑ ❑ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination? ❑ ■ ❑ ❑ 17. Does the facility lack adequate acreage for land application? ❑ ■ ❑ ❑ 18. Is there a lack of properly operating waste application equipment? ❑ ■ ❑ ❑ Records and Documents Yes No NA NE 19. Did the facility fail to have Certificate of Coverage and Permit readily available? ❑ ■ ❑ ❑ 20. Does the facility fail to have all components of the CAWMP readily available? ❑ ■ ❑ ❑ If yes, check the appropriate box below. WUP? ❑ Page: 4 Permit: AWS610040 Owner - Facility: J L M Farms LLC Facility Number: 510040 Inspection Date: 06/12/2007 Inspection Type: Compliance Inspection Reason for Visit: Routine Records and Documents Yes No NA NE Checklists? ❑ Design? ❑ Maps? ❑ Other? ❑ 21. Does record keeping need improvement? ❑ ■ ❑ ❑ If yes, check the appropriate box below. Waste Application? ❑ 120 Minute inspections? ❑ Weather code? ❑ Weekly Freeboard? ❑ Transfers? ❑ Rainfall? ❑ Inspections after > 1 inch rainfall $ monthly? ❑ Waste Analysis? ❑ Annual soil analysis? ❑ Crop yields? ❑ Stocking? ❑ Annual Certification Form (NPDES only)? ❑ 22. Did the facility fail to install and maintain a rain gauge? ❑ ■ ❑ ❑ 23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment (NPDES only)? ❑ ■ ❑ ❑ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ ■ ❑ ❑ 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ ■ Cl ❑ 26. Did the facility fail to have an actively certified operator in charge? ❑ ■ ❑ ❑ 27, Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ■ ❑ ❑ Ywn Nn NO NF 28. Were any additional problems noted which cause non-compliance of the Permit or CAWMP? ❑ ■ ❑ ❑ 28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report those ❑ ■ ❑ ❑ mortality rates that exceed normal rates? 30. At the time of the inspection did the facility pose an air quality concern? If yes, contact a regional Air ❑ ■ ❑ ❑ Quality representative immediately. Page: 5 Permit: AWS510040 Owner - Facility: J L M Farms LLC Inspection Date: 06/12/2007 Inspection Type: Compliance Inspection Otherlissues 31. Did the facility fail to notify regional DWQ of emergency situations as required by Permit? 32. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 33. Does facility require a follow-up visit by same agency? Facility Number: 510040 Reason for Visit: Routine Yes No NA NE ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ Page: 6 ri,4_. Facllety„yNumber � � i � �e Division of Water: ,. 0 Division d.Soil.an Other Agency r�ptton , Type of Visit O Comp ' ce Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit Routine O Complaint O Follow up Q Referral Q Emergency Q Other ❑ Denied Access Date of Visit: ZV Arrival Time: Departure Time: County: Farm Name: n h i1I ♦ " n-- Owner Email: Owner Name: Phone: _ Mailing Address: Physical Address: Region: Facility Contact: Title: //�� Phone No: Onsite Representative: Integrator: 60 Certified Operator: �f h^�^ `—.�riSo� Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = o = 4 =41 Longitude: 0 ° = 1 = 4f Design C Swine Capacity,'Po ❑ Wean to Finish ie ❑ Wean to Feeder ❑ F & to Finish Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other i Current;' ty. Populatton;; Cattle ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkex Poults ❑ Other ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number,of Discharees & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ❑ NA ONo [I NE ❑ Yes NA ❑ NE ❑ Yes o NA ❑ NE ❑ Yes o ❑ NA ❑ NE ❑Yes El No ❑NA El NE 12128104 Continued .a Facility Number: Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ;oO NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier:SO Spillway?: Designed Freeboard (in): Observed Freeboard (in): o It 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA El NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thr , notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes N NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ❑ NE maintenance/improvement? 11, Is there evidence of incorrect application? If yes, check the appropriate box below. El Yes ❑ No El ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [-]PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 3� m4sc�4 1 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑-fV ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes F/O ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ YesA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations ar,any other comments Use drawings of facility to better explain situations. (use additional pages as necessary):';. Reviewer/Inspector Name �W Phone: Reviewer/Inspector Signature: Li,.5 Date: / :;?) Page 2 of 3 12128104 Continued Facility Number: t.Sr — Date of Inspection a • Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes �No[03 NA El 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [I Yes NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design El Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspection�N�o eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ YesNA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ YesrXo/ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or Drawings.' Page 3 of 3 12128104 ---- T � �ivision of Water Quality Facility Number S {ME - - O Division of Soil and Water Canservatian '`` �t 0 Other Agencyt2 Type of Visit 'Compliance Inspection O Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit ^Routine O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date o1' Visit: 7 2$ v Arrival Time: e Departure Time: County: �'�^ts���! Region: Farm Name: � t- K Owner Email: Owner Name: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: C V- -C & 7E't��S Certified Operator: Back-up Operator: Location of Farm: Title: Phone: Phone No: Integrator: Gro t_. > s 6S ras Operator Certification Number: �-� 3CT 3 Back-up Certification Number: Latitude: ❑ o ❑ j ❑ Longitude: = o ❑ 1 Design Current Design Current Design Current Swine Capacity Population Wet Poultry Capacity Population Cattle Capacity. Population u wean to rccuor ❑ Feeder to Finish ❑ Farrow to Wean It t, 'z 195I S i ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts . ❑Boars _ Other �� ❑ Other - ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Points ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? ❑ Dai Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stockei ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ?No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes WNo ❑ NA ❑ NE ❑ Yes VNo ❑ NA ❑ NE 12128104 Continued Facility Number: S — a Date of Inspection % Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: ! Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3Z 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes PrNo ❑ Yes ❑ No Structure 5 El NA El NE ❑NA ❑NE Structure 6 ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes E2rNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 4 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes FfNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes KNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No [INA ❑ NE maintenance/improvement? ` 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes Jj No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of ind Drifl ❑ Application Outside of Area 12. Crop type(s) G - f� vP.p�'1._ (y- 13. Soil type(s) Qf't-G V-Af"�' 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes to No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 6No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination%❑ Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes 7No No [XNo ❑NA El NE ❑ NA ❑ NE ❑ NA ❑ NE ReviewerlIns ector Name �''dV 't jai] nl'.1 srr p r , Mgt.. by ., . Phone: 112 .S l C)O : Reviewerllnspector Signature: w Date: 12/28/04 Continued Facility Number: St✓ — o Date of Inspection , Required r Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes,O'No ❑ NA ❑ NE 20. -ZJ.7,5-1 o 0 Does the facility fail to have all components of the CAWN4P readily available? If yes, check ❑ Yes )2rNo ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design [I Maps El Other 21. Does record keeping need improvem t? If yes c ck the a ro riate o below. ❑ Yes JZNo tz�s 1 y l• ,.s ,.� S Ls i 1,( y/9 ❑ NA ❑ NE ❑ Wast pplication ❑ Weekly Freeboard Was alysis ❑ SoilMa'lysis El Waste Transfers El Annual Certification ❑ RAfall ❑ Soing ❑ Cr field ❑ 120 Min Inspections ❑Monthly and 1" Rain Inspections ❑ We#er Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes r a No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ONo ❑ NA ❑ NE 24, Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes P No ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes )ZNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge'? ❑ Yes KNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes PNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes �No El NA [I NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �_e`No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately r 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes PKo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes Jz No ❑ NA ❑ NE '$ `-5v '.- x �✓ 7' & AdditionM C6tnments:anDrjd/or,awJngs � }.N} .4 f � �� Y n5 t�IM1•ii. � � ..1�.i� Y � If S3Z L f ?-�Lf f fz 6 o LOS?, �, >� 0 6 + 1000 '7 1 rr 1 6 1? -.i'J� C CLC✓A TSZ� ZH r C', !) "r VCH N r4 t I CC U3L LW :L- 02 > ��L; �Prl�4- s -t v U-AL- TQ PeP� F�►<~� zoo r qZ ``c v MEr t•Lo Tj tll f E C _ 5�i4P,ntiJa.+� '�v 12128104 111-1 7q I — y-7Z-b k Type of Visit /" Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit xRoutine O Complaint O Follow up 0 Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: 3 o Time: va D Not O erational Below Threshold Permitted Certified Conditionally Certified ❑ Re41Mistered Date Last Operated or Above Threshold: Farm Name: _L_.__A EA'L5 LLC Count: Owner Name: Mailing Address: Facility Contact: Title: Phone No: -771a 3 130 Onsite Representative: ("1MQx=F— ?r-TrAr,S Integrator: Certified Operator: Location of Farm: Phone No; Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude a 4 0 µ Longitude ' • K Design Current Design Current Design Current Swine Ca acih, Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder EEE ❑ Laver I I I[] Dairy ❑ Feeder to Finish JE1 Non -Layer I 1 10 Non-Dain ❑ Farrow to Wean ZI D ❑ Farrow to Feeder ❑Other ❑ Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boats Total SSLW Number of Lagoons : Holding Ponds I Solid Traps 1❑ Subsurface Drains Present iio Lagoon Area 10 Spray Field Area ❑ No Liquid Waste Management System Discharges S Stream Impacts 1. Is any discharge observed from any pan of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. if discharge is obsen-ed, was the conveyance man-made? b. if discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any pan of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection 8 Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: & Freeboard (inches): 05103101 ❑ Yes �zNo ❑ Yes P No ❑ Yes PNo ❑ Yes �A No ❑ Yes Z No ❑ Yes No ❑ Yes No Structure Continued Facility Number: — d Date of Inspection 3 0 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenancelimprovement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc .1b'J�.2.S• aa4h 12. Crop type C gE� JQpr UeXLA 13. Do the receiving crops differ with those designated in the Certified Animal W to anagement Plan (CAWMP)? UD 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. ❑ Yes ZNo ❑ Yes ❑&o ❑ Yes [2'No ❑ Yes j2To ❑ Yes J0 No ❑ Yes To ❑ Yes No ❑ Yes 2No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes -Ofqo ❑ Yes eNo ❑ Yes ZNo ❑ Yes ❑ Yes 7No ❑ Yes ,E(No Facility Number: _ 7J Date of Inspection 3 a o Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes id No 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? ❑ Yes No (ie/ WUP, checklists, design, maps, etc.) 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ,3'f10 Was Application ❑Freeboard1 Waste Analysis ❑ Soil Sampling /0/z%a5 ��i//''�� �3 c 24. 1 is acili y of l corYipliance witKany arplicable setback criteria in effect at the time of design? ❑ Yes �O`No 25. Did the facility fail to have a actively certified operator in charge? ❑ Yes ';�o '26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes dNo 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes A!KNo 28. Does facility require a follow-up visit by same agency? ❑ Yes V 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes Vo NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 3I-35) ❑ Yes ;dNo 3I. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ❑ No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall ❑ Inspection After 1" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 -3]31 o3 Type of Visit J6Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit Routine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other Facility Number Date of Visit: 1-54 Permitted 20 Certified El Conditionally Certified ©Registered Farm Name: L _PJ.'j rj MPFK t.0'P-1,4— Sov ............ ........ ... Owner Name: J u,A L UC Mailing Address: ❑ Denied Access Time: � ! 1 is - Date Last Operated or Above Threshold: _ County: _jo 1�.NJ'C�r-a 4 Phone No: Facility Contact: Title: Phone No: Onsite Representative: Integrator: Certified Operator: Location of Farm: Operator Certification Number: �Z' e --;-a 3 ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude �' �6 " Longitude �' �6 Design Current Design Current Design Current Swine CapacitV Population Poultry Capacity Po ulation Cattle Ca aci Population ❑ Wean to Feeder ❑ Layer El Dairy El Feeder to Finish ❑Non -Layer L❑ Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Other ElFarrow to Finish Total Design Capacity °g ❑ Gilts ❑ Soars Total SSLW Discharges & Stream lmimets 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge. bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: 7s� n = Freeboard (inches): 3 05103101 ❑ Yes �dNo ❑ Yes P No ❑ Yes 0 No ❑ Yes 10 No ❑ Yes ONo ❑ Yes XNo ❑ Yeso Structure Continued „J Facility Number: S i — = Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4_6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11, Is there evidence of over application? Excessive Ponding ❑ PAN ❑ Hydraulic Overload Z-7 22 12. Crop type C-1 , Q C- • B . 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 1.6. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? yjj rS 'ae 18. Does the facility fail to have all components of the Certifidd Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) r1Z• I.3 a��� ad e-y 19. Does record keeping need improvement? (ie/ irrigation, freeboard,ib me analys s & soil spte reports) 20, Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes PNo ❑ Yes ["No ❑ Yes No ❑ Yes No ❑ Yes PNo ❑ Yes �No ❑ Yes PNo ❑ Yes ONo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes No El ❑ Yes No ❑ Yes �No ❑ Yes [INo ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes No 113 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Commerits (i eferto,question #)f-Explai,ES a swers and/or'an recommendationsiianyither comments. drawings ARMY,',+ . , f Use of facility to better explaisons..(use-addldonal pages as necessary) 9 Field Copy ❑ Final Notes s y s j,,•M� APPc.r`>:.p / �/.��. e1 z -r/.+-�. �� �P Ia.,r,..�s Zs� ._ ��7 2— PqA9 F-S ReviewerAnspector Name Reviewer/Inspector Signature:^ Date: 05103101 Continued .1 r Facility Number: — o Date of Inspection o Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27, Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e, residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ;9 No ❑ Yes �NO ❑ Yes );!fNo ❑ Yes gNo ❑ Yes YJ No ❑ Yes ff No ZrNo u r , #A4ditl6ha 9...ommentsran ory _ra p s• r,r �. „'� � ,. n„ �: a.T 05103101 05103101 Type of Visit ,0 Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit VRoutine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number i Date of Visit: 7.1 U Time: ' �a Nat O erational Below Threshold �ermitted Certified [3 Conditionally Certified 0 Registered Date Last Operated or Above Threshold: Farm Name: - ___-- �)u 'it✓ Alme County: is So .4 S 7'0A Owner Name: Mailing Address: Facility Contact: Onsite Representative: Certified Operator: Location of Farm: Title: Phone No: Phone No: Integrator: *-bfr' Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude 0 06 « Longitude 0' 0` 0 LL UADesign in Ca aci ❑ Wean to Feeder Current Design P,o ulation Poultrye Ca aci ❑ La er Current P,o ulEft ion Cattle ❑Dai Des€gn Current Ca aci P.o ulation Er ❑ Feeder to Finish ❑Non -La er ❑ Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder 1 ❑Other Total Design Capacity .' Total SSLW `k. ❑ Farrow to Finish ❑ Gilts ❑ Boars Number of Lagoons I� ❑ Subsurface Drains Present ❑ La oon Area Hald€ng Ponds /Solid Traps ❑ No Liquid Waste Management System ❑ Spray Field Area Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes i! (No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes No b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) ❑ Yes PNo c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? El Yes Waste Collyction & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure Identifier: // / S�L�0) Freeboard (inches): �b 05103101 Continued r Facility Number: 51 Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (iel trees, severe erosion, ❑ Yes Z No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Yes No (If (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes rN, 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes No Waste Xplication 10. Are there any buffers that need maintenance/improvement? ❑ Yes ZNo 11, is there evidence of over application9 ❑ Excessive Pending ❑ PAN ❑ Hydraulic Overload Z7V 7-z5 ❑ Yes EI'No 12. Crop type M - S - G-- 13, Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes 01 16. Is there a lack of adequate waste application equipment? ❑ Yes ��o Reauired Records & DecumentF / ¢� 17. Fail to have Certificate CoveQ Bi &ncral Permit Permit ❑ of oy oth r readily available? Yes o zoI all 18. Does the facility fail to have all components of the Cc fie(fAnimal rV aste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) / % o'yf 4lr� 19. Does record keeping need improvement? (ie/ irri ton, fre ard, t?�'tC7analSS ysis & soil sample+yreports�) ❑ YesZfl ❑ YesrN 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ErNo 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes ONo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ic/ discharge, freeboard problems, over application) ❑ Yes - O No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ONo 24. Does facility require a follow-up visit by same agency? ❑ Yes T,3No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes F tvo No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. 3'-�' � i�:ir a�ti.Lv-:." ." �:J"5 '�ili•Yn� .tA' r5' Comments (refer�to,question''#) kEzplam tiny;Y S auswers:.andlar ony recommeudations nr any other,°comments:+ t+ Use drawrngs of facility to better explain situattons..(use aildtttonal'pages. as necessary),�B'1 field CoPv ❑Final Notest `: F ti X. s , l W .V Reviewer/Inspector Name -1a.tJ,- Reviewer/Inspector Signature: Date: c 05103101 ' Continued Facility Number: !s-I — q d 1 Date of Inspection �1 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge actor below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29, Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes O] No ❑ Yes No ❑ Yes o ❑ Yes dNo ❑ Yes ;No ❑ Yes ❑ Yes;�Noo Additional Comments'andlor Dcawin x, ,.., A. 05103101 Type of Visit OCompliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit 94outine Q Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: 8 D Time: 3a Q Not Operational Q Below Threshold "Permitted ,6certified [3 Conditionally Certified 13 Registered Date Last Operated or Above Threshold: Farm Name: D.3 A!3.--.....nlzu -........................................................ County:.......... -Tz 0'.A S r-1. d.... OwnerName:........................................................................................... Phone No: ................................ FacilityContact: .............................................................................. Title:................................................................ Phone No:................................................... MailingAddress: .................................... ............................ I ................................ ...........................................................................I......... ........................... OnsiteRepresentative: ....... -6....'..,u.... ........................................... Integrator: .................................................................................... Certified Operator:.... 1n;P¢;. S„ CAUA�/.�.c,....t;•.EV—Ls . Operator Certification Number: Z-Z- ate ,,,,.,,,,,. Location of Farm: - kA ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude • 6 64 Longitude • 4 " Design ' Current Design Current. Design Cnrreiut' ` �. Swine Ga aci Po ulation Poultry Ca aci Po" utation Cattle Ca p aar ;: 3Po ulati[oil pElFarrow ean to Feeder ❑Layer ❑ Dairy eeder to Finish ❑ Non -Layer ❑ Non Dairy 'arrow to Wean "` { to Feeder :. ❑Other i ❑Farrow to Finish Total Design Capacity ❑ Gilts ❑ Boars Total SS LW Number''of La Dons ❑Subsurface Drains Present ❑Lagoon Area ❑ Spray Field Area r= HoldingPonds'`/ Solid,Traps` i ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State'? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in galhnin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Struct�yrc 1 Structure,2 Structure 3 Structure 4 Structure 5 Identifier: �. of ......�5.� LA �l.. a�............... ......................... Freeboard (inches): - 3 S ZI 5100 If ❑ Yes g No ❑ Yes Ef No ❑ Yes UNo ❑ Yes ffNo ❑ Yes &No ❑ Yes �No ❑ Yes YNo Structure 6 Continued on back Facility Number: 5 — q_fl Date of Inspection 3 7 Printed on: 1 /9/2001 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes gNo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes PNo (If any of questions 4.6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes �No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes , dNo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes >G?(N o Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes N5 0 11, Is there evidence of over application? []Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes ❑ No 12. Crop type G nr . G►i..f 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documentsy//� 17. Fail to have Certificate of Cole oGeneral Permit readily available? 2a 9D 18. Does the facility fail to have all components of the Certified Animal Waste,lwlan"'ent Plan readily available? (ie/ WUP, checklists, design, maps, etc.) t�,:/q ���/ 19. Does record keeping need improvement? (ie/ irrigatrbn, freeboard, wzaf AN%rialysis & soillsadnpTe reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23, Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24, Does facility require a follow-up visit by same agency? 25, Were any additional problems noted which cause noncompliance of the Certified AWMP? �Y� yiQi lfignjs :o d�f c�en i lr ...his; ........ � •lre;e ... fu�t�gr i�oriesiknitieike. abvtif this visit. .. :..:......:........:....:...::... . f Cyz-C i Z„L-/Je-�&r), C,, Shy-?7? ❑ Yes 12,1 o ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes �o ❑ Yes ,0"fio ❑ Yes R14 ❑ Yes, 0 0 ❑ Yes ZrNo ❑ Yes 21'No ❑ Yes ZNo ❑ Yes �No ❑ Yes 0'1�0 ❑ Yes 'o-KO ❑ Yes j No ❑ Yes 2�10 Reviewer/Inspector Name f ' .fj �.1 ..l J : ;4� �r [ 71 7�� 1. �! ..,.. � >>>. � ,3. :. �r b :�,,.r. ,. ., w .> _: ,- Reviewer/Inspector Signature: ,r77P Date: - / 7 %o / 5/00 'acility Number: j — c,1Z Date of Inspection Printed on: 1/9/2001 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below ❑ Yes ONO liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? []Yes 'ffNo 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes �Vo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes XNo 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes dNO 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes VNO 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ONO ona omments'an or rawings 3 _ ,, s 'S.l� .il 3i �. ,, s 1I 3. ii. a i.3i.f3 Ek.. li A. 5100 'Routine O Complaint .Q Follow-up of DWQ inspection O Follow-up of DSWC review O Other Facility Number Date of Inspection 1 S f A- Time of Inspection Iq , a 24 hr. (hh:mm) Permitted p Certified 0 Conditionally Certified [3Registered 113 Not O erational Date Last Operated: Farm Name. 0.�1 �1`ivt,�?5 LE` . Sb c,.l Owner Name: ...... c2s...... �z)-.-z....... .... .... t!..1.......... Facility Contact: ...:�.................... . sr.b. /Ljg .............Title:......................... MailingAddress: ...................................... .............................................................................. .. County:.........:G.�Si:�J�X raIf ......................................... Phone No: Phone No: Onsite Representative: : . ... DER u,. t.............. .. Integrator: 6aC.QS6 a1'a M i LU Nr(-- .......................... Certified Operator:..........-........................ ` *_x...... ............................................................. Operator Certification Number:...... . `t` 3.r�............ Location of Farm: I& ............................................................ Latitude Longitude 5 8 • /©4 4« 9 ,e De51gn� E €�CUrTents i DeC_ 1.lrrent., r nz�iDeslgtl 1°� E�CUI'Letlt �I b Poult Cattle �;'s. u ,;awene , Capacity -Population . _ t3' Gapacity,..Populatioa' ,w . _. - ..:'. ...Capaci _ ;Population; F.zS ❑ Wean to Feeder r' ❑ Feeder to Finish Farrow to Wean Zi cr) -L i6'o ❑ Farrow to Feeder Farrow to Finish ❑ Gilts ❑ Boars �❑ Non -Layer �'• ❑ Other E, 3Tota1 Des>Ig ,aG,t �t Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? Non b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gat/min'? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): .... .................................................. ............... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 3/23/99 ❑ Yes No ❑ Yes 116No ❑ Yes )Z(No ❑ Yes N ❑ Yes ❑ Yes T-r _ _ - ❑ Yes �Io Structure 6 ❑ Yes O'No Continued on back Facility Number: — 3 Date of Inspection b Od 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes JZNo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes Fr, No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes �No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes eNo _Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes �No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes VNo 12. Crop type C , /3 Eawtc W h fJ. n r _ - R� J 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ,�rNo b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes ,ff'No 16. Is there a lack of adequate waste application equipment? ❑ Yes ❑'No Renuired Records & Documents�r��I�$ 17. Fail to have Certificate of Coverage & General erniit readily available? ❑ Yes �o 18. 'Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) El Yes XJ -No rr 19. Does record keeping need improvement? (ie/ irrigation, fre be oard, waste anfitysis & soil same el reports) ❑ Yes [2No 20: Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 21f4o 21, Did the facility fail to have a actively certified operator in charge? ❑ Yes JZINo 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ;31No 23. Did. Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ,❑ No 24. Does facility require a follow-up visit by same agency? ❑ Yes/El"N o 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes J o Iio •violatioi>ls'or- deficiencies wig re jiQte#• Oojog i�ls•visit! • Yoh 'Wiii•teet'iye 06 fu cor'res' 6fidence' abaiif this' isit: • Pr ?) So.0 TP Irl*j CeLLEcT-,%r!G ..r L+�(J �++�;NTAid F-E.Go t>42 cc `4`j Our- Plz.df,kAA.", Reviewer/Inspector Name Reviewer/Inspector Signature: Date: <C 1 r I Facility Number: �J — c�! a Date of Inspection S I tm Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes ZNO 28. Is there any evidence of wind drift during land application? (i.e..residue on neighboring. vegetation, asphalt, ❑ Yes )dNo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes JC3/No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes 54,o 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ��No Al K 0 Division of Soil and Water Conservation - Operation Review 0 Divisiion of Soil and Water Conservation'. Compliance Inspection 0 Dtvisioiti of Water Quality - Compliance Inspection. �. 0 Other Agency -Operation Review y.. _ . � ' 10 Routine 0 Complaint 0 Follow-up of DW2 inspection Q Follaw-up of DSWC review 0 Other Facility'Number Date of Inspection _ lime of Inspection 2.4 hr. (hh:mm) 0 Permitted 17 Certified © Conditionally Certified © Registered JE3 Not Operational Date Last Operated: Farm Name: ..1L�1.1t1............. .G.:}.............. i:...L�7n�h.............. ........... ............. (:aunty: • .... �1....N...!�%. f..i.. rL 1.......... O%% ner N:amc:......... ......................................... .............. .... .............................. ........................ Phone No:................................................................................ Facility Contact: ..............................................................................Title: ................... Phone No: .viaiiin" Address: ....................................... .............................. 14 Orrsite kepresentatiye:....✓ ..�'.......... } r �4 ./ ]nte-ratnr:...... =.:` .:� �Z/'.J=....,:.'.................................... .........�.�.......................... ...... ................... Certified Operator:................................................................................................................ Operator Certification Number:......................................... Location of farm: Latitude Lannittade �• �: W11ir ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current ronulatron Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Laver ❑ Dairy ❑ Non -Layer I I 1E3 Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area Holding Ponds / Solid Traps I I[] No Liquid Waste Management System Dischar.,es & Stream Imttacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance tnan-made? h. If discharge is observed, did it reach Water of the State? (If yes, notify DW Q) c. if discharge is obscrvcal. what is the cslitnated flow in galhnifl? d. Dees discharge bypass a lagoon system'? (If ycs, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Ii'aste Collection & Treatment 4. Is storage capacity (Freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Slruclurc 2 SrrUeture 3 Structure 4 Structure 5 T ❑ Yes 710 ❑ Yes A No ❑ Yes 0 No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes ❑ No StruLtUrc f/ [duttificr: ........L I:r•cchnard (inches}:.................................................................................................................................................................... 5. Are there any immediate threats to the integrity of any of the structures observed'? (ic/ trees, severe erosion, ❑yes jNo seepage, etc.) 1'_;19y Continued on hack ' Facility IN timhcr: SC D'.It-c of 111"pi;i'tlf ll ti, Ai-c there structures on -site which are not properly addressed and/or nianaged through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need tmtinlenance/improvement:' S. Does any part of the waste managlenunt system other than waste structures require maintenance/improverent? 9. Do any stuctures lack adequate, gouged markers with required maxinutm and minimum liquid level elevation markings? %N rite Application I O. Are there any buffers that need maintenance/improvement'? 1. is there evidence of over application•? ❑ Excessivc flonding ❑ PAN 12, Crop type �� A) L"— ❑ Yes 1Na /] Yes ❑ No ❑ Yes ?'No ❑ Yes No ❑ Yes;3/No ❑ Yes ❑ No Du the receiving crops differ with those dCSi<<natCLl in the Certified Animal Waste Management Plan (CAWMP)'' ❑ Yes ;21�0 ! 4. ai Does the facility iack adcquatc arrca,,c for land application'.' ❑ Yes ❑ No hI Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wcttahle Acre determination'.' ❑ Yes ❑ No 15. Does the receiving crop need improvenicill? ❑ Yes P"o 16. Is there a lacy of adequate .waste application equipment'' ❑ Yes ❑-NO 1{vguir•er_1 Records & Doc•umcnls 17. Fail to have Certificate of Coveracc & Gcncr.rl Permit readily available'? ❑ Yes ❑ o I5. Does the facility fail to have al: components of the Certified Animal Waste Management Plan readily availahle? / (ic/ WUP, checklists. desiyrt, mapti. e(c.) ❑ Yes No 19. Does record keeping need improvement? (ic/ irrigation, freehoard, waste analysis & soil sample reports) ❑ Yes dNo ,(i. Is facility not in compliance with any applicable setback criteria in cl'fect at the time of design? ❑ Yes [ io 21. Did the facility fail to have a actively certified operator in charloc;? ❑ Yes WNo / Fail to notify regional DWQ of' crner�aency situations its required by General Permit? (ic/ discharge. freeboard problems. over application) ❑ Yes No 73. Did Reviewer/lnspector fail to discuss review/inspection with on -site representative? ❑ Yes ;No 24. Does facility require a follow-up visit by same agency'? ❑ Yes Ca'No f 74;. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes [�o 0:?�10 yiolaiiforis:o:r cleficienc�. .were. . . . iiuririK this visit; Yoi>F;w'iil receive Rio. #'tt. . . .. , . 'or,respondence.abotit.thes visit.:•.•.•:-:..•.•.•.-.-.-.•.•.•..,•.•.•.-.•.•.•.•.•.•.-.•.•.•.•.•.,.•.•.-.•. Comments (refer to question ##): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): 7 rU i mR o v e� C 7w a / % X�6 r' b4�7"f r e l `r G,I. L Elk5 /—z;,# �w i U rL �5�j iJ �5li,L I �SP�Y Tr'd•ti K���>~�N-�- rr� Reviewer/Inspector Name O v LC Reviewer Anspector Signature: ZIMMm 6 Date: nn I Facility Number: T) - A Date (if Inspection Odor issues ?4. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes [fi" No liquid level of lagoon or storage pond with no agitation? Are there any dead animals not disposed of properly within 24 hours? ❑ Yes (j No Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes No roads, building structure, and/or public property) f Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes QiNo Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes P''No :. Do the animals feed storage bins fail to have.appropriate cover? ❑ Yes 91NO 3/23/99 ;r[��Dtvrsron fSoil a is Watc"r` 'Conservation=`Operaiion Revitw 3 i - - •- 0 Division of Soil 'and Water Comervation - Compliance Inspection biviAon of Water Quality -,Cum pliance Ins ection , l , [] Other 'Agency - Operation Review ° 3 LU Routine 0 Complaint 0 Follow-up of DWO inspection Q Follow -rip of I)SWC review 0 Outer Facility Number Daw of Inspection I3 i, ___j I •firm° of 111spectiort 24 hr. (hh:mm) © Permitted © Certified 0 Conditionally Certified Q Registered JE3 Not O er:rtional Date Last Operated: Farm Name: ...-..,�11.+f�!....5. ''�...-..l- .f`�"�........... county:........R�..G� n�,�i.T'i!� A�Ll_......................................................................................... OwnerName: ................................................... ........................................................................ Phone No:..........................................................................,.,.......... Facility Contact: "Title: Phone No: Nlailing Address: Onsite Representative: �' 4 T cJIntegrator:i i -- JL-�S S� Certified Operator:............................................................................................... Operator Ccr•tification Number:...' z.s Location of Farm: ............................................. ............................................................ ............................................. Latitude �'�' �" Longitude �• �� ��� Design Current Swine Capacity Population ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean p -2.7:, ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts $b'� ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer I ❑ Dairy ❑ Non -Layer I JE1 Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons 10 Subsurface Drains Present ❑ Lagoon Area JEI Spray Field Area Holding Ponds / Solid Traps ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation (If yes, notify DWQ)? ❑ Yes 21No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-madc'? ❑Yes ONO b. If discharge is observed, did it reach: ❑ Surface Waters ❑ Waters of the State ❑ Yes PMo c. if discharge is observed. what is the estimated flow in gal/ruin'? d. Does discharge hypass a lagoon system? ❑ Yes ONo 2. Is there evidence of past discharge from any part of (lie operation`? Cl Yes gr�lo 1 Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes plf TO Waste Collection & Treatment 4. Is storage capacity (Freeboard plus storm storage) lessrthan adequate? ❑ Yes '40 Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Ie 4 Freeboard (inches): ........... ...ca .....................Y-3..,.........................I................................................................ 1/5/99 Continued on back Facility Number: 1!3 j — Date of inspection 3 - Y 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑Yes No seepage, etc.) 6. Are there structures on -site which are. not properly addressed and/or managed through a waste management or closure plan? Yes � No (if any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) T Do any of the structures need maintenancelirnproverncnt? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ElYes �No 9. Do any stuctures lack adequate, gauged markers with required top of dike, maximum and minimum liquid level elevation markings? ❑ Yes VNo Waste Application �No 10. Are there any buffers that need maintenance/improvemenI? ElYes 11. is there evidence of over application? ❑ Ponding ❑ Nitrogen ❑ Yes 0 12. Crop type ................................................................................. 13. Do the receiving crops differ with those designated in the Certified Animal aste Management Plan (CAWMP)? ❑ Yes INO 14. Does the facility lack wettable acreage for land application? (footprint) ❑ Yes �No 15. Does the receiving crop need improvement'? ❑ Yes P"No 16, Is there a lack of adequate waste application equipment? ❑ Yes VfNo Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes 7No 13. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? / (ie/ WUP, checklists, design, maps, etc.) ❑ Yes ZI No 19, Does record keeping need improvement? (ie/ irrigation, Freeboard, waste analysis & soil sample reports) ❑ Yes No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design'? ❑ Yes XNo 21. Did the facility fail to have a certified operator in responsible charge? ❑ Yes IN 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 0 24. Does facility require a follow-up visit by same agency? ❑ Yes XNO NDAIolations .or. deticien' de's .were noted during fh' is.visii:. V-6u raTiIfreeeiive nQ further .. ' eorrespoaidenee: about: this Asit.. . ... ... . .. . comments (refer to question #): Explain any YES answers and/or'anyirecommendations or any oilfer comments ':I # Y Use drawings of facility, to:betterrezplain' situations. (use additional pages as necessary):A4 Y f SaOZ- ,.sL_.Cbt<r..n.'P-A- MIL cATi 11� t , C)441 tE-O W61mm 'us ri jAc- � Cvr � f►�JAt�a�s �i �6�1`ri.� AAfAeo- To" Tj•r-_v:o.S� �JHs ALROV-9 PA`T-s cbr�PAT, ISc.Q,_tf k Reviewer/inspector Name ,3`:) �w 4. S17 } ._L12 t'6 ' Reviewer/Inspector Signature: �1�_ .1 . JC#--,q^ Date: 3 izi 99 1 /6/99 of Soil and Water Conservation ❑ Other Agency of Water Quality Facility Number I of DS W C review Date of Inspection Time of Inspection 24 hr. (hh:mtn) 13 Registered 13 Certified U Applied for Permit 2rPermitted 113 Not Operationally Date Last Operated: Farm Name:...�5 N.^/K/f!..1 .4t G_��.....70../✓....f►rr.................. County: JQj�?.............................................. Owner Name: ... r�..a.l. S..S..�1[.'� �..... 1..�Y....%...................................... Phone No:..../.......77..�. 3 �.j. ..?............................. r�a Facility Contact: ............................ _-s............. Title............/............... Mailing Address:f .R,......b...ii._..f.4...e..4................�.P../ J 17(it ti Onsite Representative... ..g9.� l�J ......................................................... Certified Operator:....... ...._:.......L....... �o.............................................................. Location of Farm: ... Phone No: .* C . ;V-75`t z Integrator:G9./%.1�:.U.Y Operator Certification Number: Latitude =• 0` Di1 Longitude 0• =` =1{ Design =* Current a Design Current Design, - Current ` ` Swine> - v Ca acit Po ulation Poultry Capacity..Popplation w Cattle P Y PCapacity Population ❑ Wean to Feeder 10 Layer I Dairy \ []Feeder to Finish JLJ Non -Layer I on-Dairy ❑Farrow to Wean DDD y ❑Farrow to Feeder ❑ OChert, ❑ Farrow to Finish Total Design;Capacity ❑ Gilts ❑ Boars Total SS) W �� Numbe` r agoons , Holding Ponds ®"❑ Subsurface Drai—n—s—Pres—emID Lagoon Area ❑ Spray Field Area ❑ No Liquid Waste Management System General 1. Are there any buffers that need maintenance/improvement? 2. Is any discharge observed from any part of the operation? Discharge originated at ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated Flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes e Noo ❑ Yes o ❑ Yes !�'1V0 ❑ Yes No ❑ Yes Pn, ❑ Yes ElYes R1Il ❑ Yes ❑ Yes N ❑ Yes No 7/25/97 Facility Number: j" j t� 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Laeoons,Holdine Ponds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes o ❑ Yes o Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: . W J:.?�.�'!g:: �.!!:.k'�:..................................... ......................................................................................................... Freeboard(ft): ....... .....u.......................�.2.-V.................................................. ..................... ............... .................................... .................................... 10. Is seepage observed from any of the structures? ❑ Yes o 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes 12. Do any of the structures need maintenance/improvement? ❑ Yes No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes No Waste Application 14. Is there physical evidence of over application? ❑ Yes o (If in excess oof+ �WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type L,r•�r• ..1... f:... 1�.�.rH.!..'?....5.......... .. 16. Do the receiving crops differ with thane designated in the Animal Waste Management Plan (AWMP)? ❑Yes o 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes 18. Does the receiving crop need improvement? ElYes No 19. Is there a lack of available waste application equipment? ❑ Yes 20. Does facility require a follow-up visit by same agency? ❑ Yes No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes o 22. Does record keeping need improvement? El Yes o For Certified or Permitted Facilities Only 23. Does the facility-fiil to have a copy of the Animal Waste Management Plan readily available? ❑ Yes 24. Were a additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes N 25. W re any additional problems noted which cause noncompliance of the Permit? ❑ Yes No E3No.violations.or. rleFicieRcies:were.natid-during this:visit.' Yousr'iil receive;n6.fur#h'er-: ;I • cgrresp#ladeitee about this. visit'.• " P . N 0 Division of Soil and Water Conservation 0 Other Agency &115ivision of Water Quality jGrUoutine O Complaint O Fallow -up of DWQ inspection O Follow-up of DSWC review O Other I�_�•'I' Date of Inspection ip Facility Number / o Time of Inspection � 0 24 hr. (hh:mm) Registered Certified © Applied for Permit © Permitted 113 Not O erational Date Last Operated:....... Harm Name: o'*.Mz±!.......... County: a I n1 N Owner Name:1�5 (�►o ... m' �r,r�!�.•....•s7..,..•........................... Phone No:...:.1...•.......•.......%•.(......,...30......••..................... ............•.. ...f......................... ..........r.... / a 401 Facility Contact:..... ...... &.. tk_5................... Title :................................... I............................ Phone No. ...... r? Mailing Address: ...... .pD box / bd�l.9........................................................ ... C� ( S.bof»............................................... ... Z 1/t�,, ........• ............ Onsite Representative: ............:(.:, P-Vxly ........ .............................. Integrator: .......... 04dske1'.v........ .......... Certified Operator ......... Jo .N............ 2...Q .,u..�.L':........................................... Operator Certification Number ;.....,trAPLZ..? ................ Location of Farm: ••...................•.....................................•.....•••......•... ........................................................................•................................................................................•.................................. A _ ,p y l ..........................................55.°.'4:f.....1�.:.......1..^'.c..e.......... d.......I.'.�p��...�4.A+5.�..... ............................................................... r Latitude '=1=11 Longitude =* =, ={f Destgn Current Design Current- Q DesignCurrent =Swore , ,' Gapactty Population ❑ Wean to Feeder :Poultry a y Capacity populationry Cattle Capacity ❑ Layer Ma: Population ; ❑ Feeder to Finish Farrow to Wean 2 c&6x ❑ Non -Layer ❑Non-Dairy po a rs l i ;', tt��Qt A �� El Farrow to Feeder ❑ Other r Q ' ❑Farrow to Finish ❑ Gilts Total Design Capacity z, T t oars �:� � �Numberrof [ agoons jUding Ponds ©' 10 Spray Field Area J ❑ Subsurface Drains Present ❑ Lagoon Area ❑ No Liquid Waste Management S stem �€ x e4' t �. : Ru R, General 1. Are there any buffers that need maintenance/improvement? Cl Yes L.D- o 2. Is any discharge observed from any part of the operation? ❑ Yes EKO Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes L 1<0 Water? b. If discharge is observed, did it reach Surface (If yes, notify DWQ) ❑ Yes 0<0 c, if discharge is observed, what is the estimated flo%v in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes i 1-<0 3. Is there evidence of past discharge from any part of the operation? ❑ Yes M'No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes ff< 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes P'No \ maintenance/improvement? \ 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 24 \\\ 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes G-<.` 7/25I97 Continued on back Facility Number: ,S- — U 8. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons.tiolding Ponds, Flush Pits, etc.) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Structure I Structure 2 Structure 3 Structure 4 A Identifier: S.A.w J�Ff..F...�'v: ......................... Freeboard(ft):........3................................0............................. 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste Application 14.. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) J , 15. Crop type O.SL.... .................. ❑ Yes WINO ❑ Yes 9<0 Structure 5 Structure 6 ...................................................................... ......................................................................... ❑ Yes l.2YNo ❑ Yes M- o_ ❑ Yes �-No ❑ Yes 2To ❑ Yes L+1No 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? L.I Yes tl No 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 22. Does record keeping need improvement? For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 24. Were any additional problems noted which cause noncompliance of the Certified AWMP? 25. )Vere any additional problems noted which cause noncompliance of the Permit? ❑ Yes E No ❑ Yes [:X�O� � Noo ❑ Yes ❑ Yes ❑ Yes 0'No ❑ Yes Fl-go r ❑ Yes Bo ❑ Yes M1<01 ❑ Yes 0 0 No.violations,or. delFiciencies were noted during this, visit.:You:will receiveno• tirther •:•correspondeinceal3outthis:visit:"•�,.;.�.;•'. • .'•:.:.:,�,.; �..�.:.-'.:.;.�.;•�.:•'.•;.:•;.".'.;.:.�,•:. Reviewer/Inspector Name x� x /f<' 1 @5. fl i, k W1 RQY. tra Z. Reviewer/Inspector Signature: ��Q_ - ��� Date: 1 211, h d Division of Soil and Water Conservation ❑ Other Agency Division of Water Quality Routine O Complaint 0 Follow-up of DNVQ ins t•ction O Follow-u taf DSWC review O Other Date of Inspection 7 :FAOber 1. Timeof Inspection ` ') e 24 hr. (hh:mm) 0 Registered [3 Certified 13 Applied for Permit [3 Permitted JE3 Not Operational Date Last Operated:., Farm fume: .......... `� ' 'fi-4— cn,' f County:........ �` '� Jt/� .......................... OwnerDame .. ..... . Phone No:....................................................................................... FacilityContact: .............................................................................. Title:................................................................ Phone No:................................................... 1liailinbAddress : ..................... ................................................................................................ . Onsite Representative:... U ..........&.7FU7....`.,,,................................... Integrator . ...................................... Certified Operator�............................................................................................................... Operator Certification Number.......................................... Location of Farm: Latitude �' �� ��� Longitude Design Current Design Current Design Current Swine Capacity Popiilatton . :Poultry Capacity Population Cattle,: ;, Capacity: Population ❑ Wean to Feeder ❑ Feeder to Finish Farrow to Wean f a; ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars General 1. Are there any buffers that need maintenance/improvement? ❑ Yes 4o 2. Is any discharge observed from any part of the operation? ElYes A No Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance. man-made? ❑ Yes ( No b. If discharoe is observed, did it reach Surface: Water? (If yes, notify DWQ) ❑ Yes No c. If dischar<ue is observed, what is the estimated flow in gaUrnin? d. Does discharge bypass a lagoon system? (If yes, notifv DWQ) ❑ Yes No 3. Is there evidence of past discharge from any part of the operation'? ❑ Yes /No 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes Pio 5. Does any part of the waste management system (other than lagoonslholding ponds) require ❑ Yes No maintenance/improvement? b. Is facility not in compliance with any applicable setback criteria in effect at the time ol'design? ❑ Yes �f kQ No / 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes No M 5197 Guitt►rucrf nn hack Facility Number: -5,— 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 7. Did the facility fail to have a certified operator in responsible charge? S. Are there lagoons or storage ponds on site which need to be properly closed? Structures (Latioons and/or Holding Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? Freeboard (ft): Structure 1 Structure 2 Structure 3 Structure 4 ........... I......................�... '......................................................................................... .. 10. Is seepage observed from any of the structures? 11. Is erosion, or any other threats to the integrity of any of the structures observed? 12, Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? Waste AVpiication 14. Is there physical evidence of over application'? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) ❑ Yes �] No ❑ Yes , No ❑ Yes tlJ No ❑ Yes 4 No Structure 5 Structure 6 15. Crop type ......54....................................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? 17. Does the facility have a lack of adequate acreage for land application? 18. Does the receiving crop need improvement? 19. Is there a lack of available waste application equipment? 20. Does facility require a follow-up visit by same agency? 21. Did Reviewer/inspector fail to discuss review/inspection with on -site representative? For Certified Facilities Onit 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? 24. Does record keeping need improvement? Reviewer/Inspector Name ❑ Yes 0 No ❑ Yes EINo fO Yes ❑ No ❑ Yes [IPo ❑ Yes P(No ...................................... ❑ Yes Clo ❑ Yes ❑ No ❑ Yes ONo ❑ Yes ANo ❑ Yes [INo ❑ Yes [X No ❑ Yes &No P,Yes ❑ No ❑ Yes lJ No Reviewer/Inspector Date: 30 cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 Facility Number:,.Q_- 70 Division of Environmental Management Animal Feedlot Operations Site Visitation Record Date: 7 G Time: Z :ob General Information: Farm Name: W r County: d ,-� c 4") Owner Name: f`;!gPhone No: On Site Representative: - Integrator: -d sbery Mailing Address: 2 1 r-j t_. Physical Address/Location: S !.' :,s�r+'3�e-f��� W r Latitude: /__ Longitude: I I Operation Description: (based on design characteristics) Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals &sow �4 cW a ❑ Layer U Dairy ❑ Nursery ❑ Non -Layer ❑ Beef ❑ Feeder OtherType of Livestock. Number of Animals: Number of Lagoons: (include in the Drawings and Observations the freeboard ofLeach7agoon) FaciIity_Inspection: Lagoon Is lagoon(s) freeboard Iess than 1 foot + 25 year 24 hour storm storage?: Yes ❑ No ❑ Is seepage observed from the lagoon?: Yes ❑ No ❑ Is erosion observed?: Yes ❑ No ❑ Is any discharge observed? Yes ❑ No ❑ ❑ Man-made ❑ Not Man-made Co ver Crop Does the facility need more acreage for spraying?: Yes ❑ No 0 Does the cover crop need improvement?: Yes ❑ No ❑ ( list the crops which need improvement) Crop type: Acreage: Setback Criteria Is a dwelling located within 200 feet of waste application? Yes ❑ No ❑ Is a well located within 100 feet of waste application? Yes ❑ No ❑ Is animal waste stockpiled within 100 feet of USGS Blue Line Stream? Yes ❑ No ❑ Is animal waste land applied or spray irrigated .within 25 feet of Blue Line Stream? Yes ❑ No ❑ AOI -- January 17,1996 Maintenance Does the facility maintenance need improvement? Yes ❑ No ❑ Is there evidence -of past discharge from any part of the operation? Yes ❑ No ❑ Does record keeping need improvement? Yes ❑ No ❑ Did the facility fail to have a copy of the Animal Waste Management Plan on site? Yes ❑ No ❑ Explain any Yes answers: Signature: i �` 1 / _ Dater cc: Facility Assessment Unit Use Attachments if Needed Drawings or --Observations: A01-- January 17,1996 •. .T:.L-14-1995 15= 26 FROM DEN WATER OUPL I TY SECTION TO P . 02/02 Site Requires Immediate- A rccnrinn Facility No.1� DIVISION OF'ENVMONNENTAL MANAGEMENT ANl•MAL FEEDLOT OPERATIONS S= VISITATION RECORD DATE: / b,, 1995 Time: !3, 0 - Farm Name/Owner) G(h o - k47 J� ,6 W %A Mailing Address: Z .a- Ct S• /y'` 5 -. County:._ 20A &5 _ - --� - - -- - --- - - - Iateg=r: �2 a i Lq h ar D Phone: -71 3 / 3 V On Site Reoresentativc: r -e Phone: Physical Address/Location: S 1i 9 Type of Operation: Swine Poultry Cattle Design Capacity: Za o s Number of Animals on Sire: Y DEM Certification Number- ACE DEM Ccrtifieadon Number: ACNEW� � _ Latitude: ' Zo !S LongirudZ Y ' ./!Z -4Z'—" Elevation: Feet Circle `des or No Does the Animal Waste Lagoon have sufficiear freeboard of 1 Foot + 25 year 24 hour stow event (approximately 1 Foot + 7 incises) Gor No Acrual Freeboard: j-�t. Inches Was any seepage observed from the lagoon(s)? Yes So Was any erosion observed? �10 o is adequate land available for spray`? orNo Is croPbate? or No Crop(s) being utilized: Does the facility meet SCS minimum setback criteria'? 200 Feet from Dwelfingo cOar No 100 Feet from Wells? (Q or No �Ze animal waste stockpiled within 100 Fect of USGS D lue Linc• S trcam? Yes or a-dMat waste land applied or spray irrigated within 25 Feet of a USGS Map Blue .Line'? Yes No animal waste discharged inro waters o he state by man-made ditch, flushing system, or ether ,imi:ar man-made- devices'? I'es if Yes. Please Expiazrs_ "sf,�:5 itic Facility maistrain adequate waste matsdgeracar.records (volumes of ruanure, land applied. spray irrigated on specific acreage with cover crop)'' or No ?Additional Comments: F ''- a �i?.�-► S(Slnit P-rs s, I �,. !n a+11J IT" �+'sr.d IAIY.J-I1 01" JI Vee - m OV , cc: Facibry Assessment Unit Use Atmchsnems if iNeed.ed. l � o��F W a rF9Q� 0 � r O � August 30, 2007. George H. Pettus Environmental Management Maxwell Foods, Inc. 943 Millers Chapel Road P.O. Box 10009 Goldsboro, North Carolina 27532 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coteen H. Sullins, Director Division of Water Quality Subject; Sludge Survey Testing Dates Maxwell Foods, Inc. Animal Waste Management System Dear Mr. Pettus: The Division of Water Quality (Division) received your sludge surveys information on July 31, 2007. With your results, you requested that sludge surveys for the numerous lagoons not be required until 2009. Due to the amounts of treatment volume available, the Division agrees that sludge surveys are not needed until 2009. The results of the 2009 sludge surveys are to be submitted by March 1, 2010. The farm lagoons that are granted an extension are listed on the attached Maxwell Farms Sludge Survey Extensions. If yqu have any questions, please call me at (919) 715-6185. Sincerely, Dennis G Lund Environmental Engineer cc: Washington Regional Office, Aquifer Protection Section Wilmington Regional Office, Aquifer Protection Section RaleiglPZe— anal•tOffice, Aquifer Protection Section `'�. •} t Central Files Aquifer Protection Section 1636 Mail Service Center Internet: www.newaterauality.orit Location: 2728 Capital Boulevard An Equal OpportunitylAffirmative Action Employer— 50% Recycled110% Post Consumer Paper Nam'' Carolina Naturally Raleigh. NC 27699-1636 Telephone: (919) 733-3221 Raleigh, NC 27604 Fax l: (919) 7t5-0588 Fax 2: (919)715-6048 Customer Service: (877) 623-6748 MAXWELL FARMS SLUDGE SURVEY EXTENSIONS FARM NO. FARM NAME LAGOON ID COUNTY REGIONAL OFFICE SURVEY EXTENSION DATE 1 07-0011 Wilmar Farm 1 Beaufort Wash 2009 2 07-0011 Wilmar Farm 2 Beaufort Wash 2009 3 31-0212 Houston Farm 1 Duplin Wilm 2009 4 31-0212 Houston Farm 2 Duplin Wilm 2009 5 31-0402 Benson Sow Farm 1 Duplin Wilm 2009 6 31-0402 Benson Sow Farm 2 Duplin Wilm 2009 7 31-0847 Coyote Nurseries 1 Duplin Wilm 2009 8 33-0020 Blount Bros. Farm 1 Edgecomb Ral 2009 9 33-0020 Blount Bros. Farm 2 Edgecomb Ral 2009 10 40-0063 JLM Parker Farms 1 Greene Wash 2009 11 40-0063 JLM Parker Farms 2 Greene Wash 2009 12 40-0075 Cross Creek Farm 1 Greene Wash 2009 13 40-0097 Bullhead Farm 1 Greene Wash 2009 14 42-0005 Perry Nursea 1 Halifax Rai 2009 15 42-0013 Per Sow Farm 1 Halifax Rai 2009 16 42-0013 1 Perry Sow Farm 2 Halifax Rai 2009 17 51-0040 Dunn Farm 1 Johnston Ral 2009 18 51-0040 Dunn Farm 2 Johnston Ral 2009 19 52-0018 Potters Hill Farm 1 Jones Wash 2009 20 52-0018 Potters Hill Farm 2 Jones Wash 2009 21 54-0023 Moody Farm 1 Lenoir Wash 2009 22 96-0020 Roberts Nursery 1 Wayne Wash 2009 23 96-0021 Sasser Nurse 1 Wayne Wash 2009 24 96-0096 Pig ybank Farm 1 Wayne Wash 2009 25 96-0096 Pig bank Farm 2 Wayne Wash 2009 26 96-0097 Horsepen Farm 1 'Wayne Wash 2009 27 96-0097 Horsepen Farm 2 Wayne Wash 2009 28 96-0099 Grant Farm 1 Wayne Wash 2009 29 96-0099 Grant Farm 2 Wa ne Wash 2009 30 96-0100 Eagles Nest Farm 1 Wayne Wash 2009 31 96-0100 Eagles Nest Farm 2 Wayne Wash 2009 32 96-0100 Eagles Nest Farm 3 Wayne Wash 2009 33 96-0103 Collie Farm 1 Wayne Wash 2009 34 96-0103 Collie Farm 2 Wayne Wash 2009 35 96-0162 Sanderson Farm 1 Wayne Wash 2009 36 96-0164 Boardhead Al Farm 1 Wash 2009 37 96-0164 Boardhead Al Farm _Wayne 2 Wayne Wash 2009 38 96-0165 Best Al Boar 1 Wayne Wash 2009 39 96-0178 Indian Springs 1 Wayne Wash 2009 40 96-0203 Joyner Daniels 1 Wayne Wash 2009 41 96-0203 Joyner Daniels 2 Wa ne Wash 2009 8/30/2007 dgl Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources October 1, 2004 J.L.M. Farms LLC J.L.M. Farms LLC PO Box 10009 Goldsboro NC 27532 t' r' ':Subject: .j OCR a Dear J.L.M. Farms LLC: Alan W. Klimek, P. E., Director Division of Water Quality Certificate of Coverage No. AWS510040 J.L.M. Farms LLC Swine Waste Collection, Treatment, Storage and Application System Johnston County On June 1 I, 2004, the North Carolina Division of Water Quality (Division) issued a revised State General Permit for swine facilities. The General Permit was issued in accordance with the directive of Senate Bill 733 (Session Law 2003-28). In accordance with your application received on February 25, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to J.L.M. Farms LLC, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supercedes and terminates your previous COC Number AWS510040 which expires October 1, 2004. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the J.L.M. Farms LLC, located in Johnston County, with an animal capacity of no greater than an annual average of 2000 Farrow to Wean, 160 Gilts swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are nneccessary, f'Ciey"nnfay`,be�l�ap-laced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts,lfor every 3 sows The COC shall be ef�ective from the date of issuance until September 30, 2009. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. Please carefully read this COC and the enclosed State General Permit. Since this is a revised State General Permit, it contains new requirements in addition to most of the conditions contained in the previous State General Permit. Enclosed for your convenience is a package containing the new and revised forms used for record keeping and reporting. Please nay careful attention to the record keeping and monitoring conditions in this permit. Aquifer Protection Section —Animal Feeding Operations Unit 1636 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-3221 1 FAX: 919-715-05881 Internet: h2o.enr.state. nc.us An Equal Opportunity/Affirmative Action Employer —50% Recycled110% Post Consumer Paper NorthCarolina Naturally If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property. Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of -the facility. Per 15A NCAC 2H .0225(c) a compliance boundary is provided for the facility and no new water supply wells shall be constructed within the compliance boundary. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon, storage pond, or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified_in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Paul Sherman at (919) 715-6697. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Raleigh Regional Office, Aquifer Protection Section Johnston County Health Department Johnston County Sail and Water Conservation District Permit File AWS510040 APS Central Files Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality May 1, 2003 J.L.M. Farms LLC J.L.M. Farms LLC PO Box 10009 Goldsboro NC 27532 Subject: Certificate of Coverage No. AWS510040 J.L.M. Farms LLC Swine Waste Collection, Treatment, Storage and Application System Johnston County Dear J.L.M. Farms LLC: On April 28, 2003, the North Carolina General Assembly ratified Senate Bill 733 which directs the Division of Water Quality (Division) to extend the expiration date of the Swine Waste Operation General Permit AWG100000. Therefore, the General Permit has been re -issued by the Division to extend the expiration date to October 1, 2004. During the period of this extension the Division will be working with all interested parties on the development of a new version of the Non -Discharge General Permit. In -accordance with your application received on February 25, 2003 and in accordance with the directive of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to J.L.M. Farms LLC, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supersedes and terminates your previous COC Number AWS510040 which expired on April 30, 2003. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the J.L.M. Farms LLC, located in. Johnston County,.,with.-an .animal capacity of no greater than an annual average of 2000 Farrow toWean, 160 Gilts swine and the application to land as specified in the facility's Certified Animal Waste Management PIan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until October 1, "2004. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization PIan developed. The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to operate under this permit convey any property rights in either real or personal property., {fib. rN—R Non -Discharge Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699.1617 Customer Service Center An Equal Opportunity Action Employer Intemet httpJlh2o.enr.state.nc.us/ndpu Telephone (919)733.5063 Fax (919)715-6048 Telephone 1-877-623.6748 50% recycled/10% post -consumer paper Upon abandonment or depopulation for a period of four years or more, the Permittee must submit documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions. specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this Process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff maybe reached at (919) 5714700. If you need additional information concerning this COC or the General Permit, please contact Michelle Barnett at (919) 733-5083 ext. 544. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Raleigh Regional Office, Water Quality Section Johnston County Health Department Johnston County Soil and Water Conservation District Permit File AWS510040 NDPU Files WASTE UTILIZATION PLAN Goldsboro Hog Farms, Inc. Friday, February 25, 2000 Producer: J.L.M. Farms LLC Farm Name: J.L.M. Farms LLC PO Box 10009 Goldsboro,NC 27532 Telephone # : (919) 778-3130 Type of Operation : Farrow to Weanling Swine Number of Animals : 2160 sows design capacity Application Method: irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and avaialable water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special pre -cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for.this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Page 1 of 1 Vk AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2160 sows X 6.1 tons wastelsowslyear = 13176 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2160 sows X 5.4 Ibs PAN/sows/year = 11664 PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and suface application. TABLE 1 : ACRES OWNED BY PRODUCE TRACT FIELD SOIL TYPE &CLASS- CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE NIACRE NIACRE USED TIME 1598 - 1A WAGRAM 0-6% SG 1 100 6 5.63 583 SEP-MAR 1598 1A WAGRAM 0-6% BH 5.5 275 0 5.83 1603.25 MAR-SEP 1598 - 1 B WAGRAM 0-6% SG . 1 100 0 4.96 496 SEP-MAR 1598 18 WAGRAM 0-6% BH 5.5 275 0 4.96 1364 MAR-SEP 1598 -- 1C WAGRAM 0-6% SG 1 100 0 4.74 474 SEP-MAR 1598 1c WAGRAM 0-6% BH 5.5 275 0 4.74 1303.5 MARSEP 1598 - 1D BLANTON 0-5% SG. 1 100 0 2.2 220 SEP-MAR 1598 ' 1 D ' BLANTON 0-5% BH' 4.5 225 0 2.2 495 MAR-SEP 1598 2A BLANTON 0-5% BH 4.5 225 0 3.41 767.25 MAR-SEP 1598 - 2A BLANTON 0-5% SG 1 100 0 3.41 341 SEP-MAR 1598 - 2B BLANTON 0-5% SG 1 100 0 5.2 520j SEP-MAR 1598 2B BLANTON 0-5% BH 4.5 225 0 5.2 1170 MAR-SEP 1598 3A BLANTON 0-5% SG 1 100 0 2,38 238 SEP-MAR 1598 3A BLANTON 0-5% BH 4.5 225 0 2.38 535.5 MAR-SEP 1598 - 3B BLANTON 0-5% SG 1 100 0 1.61 161 SEP-MAR 1598 3B BLANTON 0-5% SH 4.51 225. 0 1.61 362.25 MAR-SEP TOTALS: 10633.8 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. " Indicates a Crop Rotation NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. TABLE 2 : ACRES WITH AGREEMENT OR LONG TERM LEAS (Agreement with adjacent landowners must be attached.) (Required only it operator does not own adequate land. See fequired. specifications 2.) TRACT FIELD SOIL TYPE &CLASS- CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE N/ACRE NIACRE USED TIME 394 J 3C IWAGRAM 0-6% BH 1 5.51 275 0 6.41 1762.75 MAR-SEP TOTALS: 1762.75 Indicates that this field .is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation * Acreage figures may exceed total acreage in field due to overseeding. **Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in TABLES .1. and 2. above:. CROP CODE CROP UNITS LBS NIUNIT BH I HYBRID BERMUDAGRASS-HAY TONS 50 SG I SMALL GRAIN OVERSEEDED AC 50 TOTALS FROM TABLES 1 AND ACRES LBS AW N USED -. TABLE 1 30.33 10,634 TABLE 2 6.41 1.763 TOTALS: 36.741 12,397 AMOUNT OF N PRODUCED: 11,664 -BALANCE -733 .This number must be less than or equal to 0 in order to fully utilize the a_ himal waste N produced. Acres show in each of the preceeding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1900.8 pounds of plant available nitrogen (PAN) per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may needed when, you remove this. sludge. See the attached map showing the fields to' be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited_ by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on -the average of once every 5.92 months. In no instance should the volume of waste being stored in your structure be within 1.58 feet of the top of the dike. If surface irrigation is the method of land application for this plan, it is the responsiblity of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. APPLICATION APPLICATION TRACT FIELD SOIL TYPE CROP RATE (inlhr) AMT jinchei) 1598 -]A,-IB.-IC WAGRAM0-6% SG 0.60 '1 1598 IA, IB, IC WAGRAM 0-6% BH 0,60 •1 1598 -ID,-2A--2B,-3A,-3B BLANTON 0-5% SG 0.75 '1 1598 1D, 2A, 213, 3A, 3B BLANTON 0-5% BH 0.75 •1 394 3C WAGRAM 0-6% BH 0.60 '1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. NARRATIVE OF OPERATION This Wup has been revised to reflect wettable acres utilizing the most current FSA map at scale (1 "=660'). The irrigation pulls are drawn on the map and correspond to the WUP.. Computations and a D-1 are provided. The 100# overseed option is utilized with the following conditions: (1) no animal waste may be applied on the coastal after August 31, (2) an application of 50# may be applied between Sep 15 and Oct 30. The remaining 50# may be applied in Feb or Mar, and (3) the small grain must be taken off by April 7 either by harvesting or grazing. J. PLANS & SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application..Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste . Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System. (ACS). If an ACS is used the soil loss shall be. no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland.. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather.and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance.) *7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: the outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other that an irrigation ditch or canal_ Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those owned by the landownwer. 14. Waste shall be applied in a manner not to reach other property and public right - of ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted croplands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. *16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. J. *17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.): If needed, special vegetation shall be . provided for these areas and shall be fenced, as necessary., to protect the. vegetation. Vegetation such as trees, shrubs, and other woody species, -etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and. structures should be inspected regularly for evidence of erosion, leakage or discharge. *18" If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. *19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied as a preemergence with no other applications of animal waste during the crop season. *21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume fpr waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production amd maintained. Soil and waste analysis records shall be kept for five (5) years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will he disposed of in a manner that meets North Carolina Department of Agriculture regulations. * Liquid Systems ra NAME OF FARM: J.L.M. Farms LLC OWNER I MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. (we) understand that I must own or have acces to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: J.L.M. Farms LLC SIGNATUR! �,�, M . rQ,,.s / 4r _ +'3 DATE: c�) 1,,,,2S/40 NAME OF MANAGER (if different from owner): SIGNATURE: DATE: NAME OF TECHNICAL SPECIALIST: George H. Pettus AFFILIATION: Goldsboro Hog Farms, Inc. ADDRESS (AGENCY): PO Box 10009 Goldsboro, NC 27532 (919) 778-3130 SIGNATURE: please print DATE: �5 rfY,2000 Page 9 of 9 M ANIMAL WASTE UTILISATION AGREEMENT I, Oft-c- "wrs , hereby give 6v"75 mw "oo r*mMs permission to apply animal waste from his Waste Utilization System on `}'sr acres of my land for the duration of time shown below. The-field(s) on which waste can be applied are shown on the attached map. I understand that this waste.contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should'not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner: • A:m* Date:-�o-apco Waste Produce —Date:,i,�aG Technical Rep esentative: Date: 3-,;D-L9000 SWCD Representative: Date: Term of Agreement: ,19— to Go4j;4TIe,�K DF Tea►q Op (I) /Q{r eme"PJr 15 Fort OWL- YO*K IHTWIPWALS 1NIrM /4uToivts�-rrCr M�+I14L (2) V(fT+CT_ ?AvzTY ChN TrIz, p4A-ry rites AomsFu cwr W,na 34a&`i morrc6 . tary hn� coi+ewl+�fronl �PIR�s: � �7, 2003 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Goldsboro Hog Farms Dunn/Maxwell Sow Farm PO Box 10009 Goldsboro NC 27532 Dear Goldsboro Hog Farms: 1 � • 10 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND, NATURAL RESOURCES r December 30, 1999'rj , �j��' DEkNR RAC-- - �--�._ . �., EIGH RFcr�f � C OFF1Ct Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number`5,1:-7 ' Johnston-C65fity This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRRI, IRR2, DRY1, DRY2, DRY3, SLUR], SLUR2, SLD1, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincerel , Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Johnston County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper •x. FACILITY NUMBER FARM NAME: REVIEWER: -T. 14 0,JT" DATE: z TYPE NUMBER # ANIMALS LAGOON- PAN POND - PAN Farrow/Wean sow 2.5= . 5.4= 19= Farrow/Feeder sow 4= 6.5= 22= Farrow/Finish sow 10= 26= 91= Wean/Feeder head 1= 0.48= 1.6= Feeder/Finish head 1 = 2.3= 7.9= Gilt Developer head 1= 2.5= Boar Stud head 1= 3.7= DESIGNIVOLUME CALCULATIONS: Top of dike elevation: Elev, below structural & storm storage: Normal operating water level elevation: (top of permanent storage): Bottom elevation: Permanent storage volume ibft3 Temporary storage volume 3bz ft:' IRRIGATION: Operating Pressure (psi) Flow (gpm): Application Rate (in/hr): Nozzle/Ring Size(s): Design Recorded Design Recorded Design Design Design Design WUP - Days of temporary storage: f � Calcs - Days of temporary storage: 5z� ft. 1' 25 yr./24 hr. storm in. ft. 2nd 25 yr./24 hr. storm in. ft. Structural freeboard in. 3 6 ft. Actua Actual Actual Actual Actual Actual Exceeds required volume?, Exceeds required volume? FREEBOARD CK. 1 2 3 4 .5 Water level reading Top of dike reading Difference Marker reading CAWMP Components Permitted Facility; Date: 6�1'7 3 Completed Certification Form, ate: 1 Waste Utilization Plan; Date: f Amount of plant available nitrogen pr ddldfused annually ( $ Ibs) Dominant soil series: LJz g (8,� A Crops to be grown: Field Maps r Based on usable (Total= Usable= ) Present day format w/RYES or actual records; application windows 2/1/93; Standard #633 required specifications �G Emergency Action Plan Odor Control Checklists (effective 1/97) Insect Control Checklist (effective 1/97) Mortality Checklist (effective 1/97) Type of irrigation; T eling un Solid -Set Small Gun Center Pivot Linear Move Other (description): NRCS irrigation parameters usable field size, max. application rate, max. application rate per cycle (effective 9/1/96) or Calibration information or Land application system design information (after 9/1/96) including parameters, equipment type, system layout and settings Show design needs (storage & treatment calculations) Operation & Maintenance Plan Site schematic Site evaluation, after 2/96 (NRCS NC-CPA-1.7) includes wetlands determination Hazard classification Construction inspection notes, including liner inspection & observation trench (after 9/1196) Consideration for emergency spillway (after 6/21/96) REQUIRED RECORDS effective 9/1/96 PERMITTED FACILITIES Waste application records (IRR 1 &2) General Permit & COC on site IiIR Annual soil sample reports for 1999__---� weekly lagoon level records (Cu index- z�w 7� +8 ) �� - .. �� (Zn index: 231 -- 9 161 ) P 3ZY — liSZ Waste analysis - date last taken- 9 2 PAN Ibs/1000 gals. for struc ure # lsa . 17 PAN lbs/1000 gals. for structure #2 DRAFT Draft - Revised January 20, 1999 JUSTIFICATION & DOCUMENTATION FOR M NDATORY WA DETERMINATION Facility Number St . ' _ Operation is flagged fora wettable Farm Name: %3,Aa_ semis acre determination due to failure of On -Site Representative: A - �'_ d Part 1l eligibility item(s) F1 F2 F3 F4 Inspector/Reviewer's Name: a Operation not required to secure WA determination at this time based on Date of site visit: 3 Z-`t exemption E1 E2 E3 E4 Date of most recent WUP: Annual farm PAN deficit Eg' pounds Irrigation System(s).- circl :1. and -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system w permanent pipe; 5. stationary sprinkler system wlportable pipe; 6. stationary gun system wlpermanent pipe; 7. stationary gun system wlportable pipe PART 1. WA Determination Exemptions (Eligibility failure, Part II, overrides Part I exemption.).. E1 Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I. or PE. E2 Adequate D, and D21D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or.PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule exemption as verified in Part Ill. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part II. Complete eligibility checklist, Part II - F1 F2 F3, before completing computational table in Part III). PART 11. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in over application of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation records. F2 Unclear, illegible, or lack of information/map. nit AVPIkR F3 Obvious field limitations (numerous ditches; failure to deduct required buffer/setback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres fortravelers or less than 2 acres for stationary sprinklers). ✓ F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part Ill. DRAFT Draft - Revised January 20, ] 999 Facility Number Part 111. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER'°Z TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS3 i s ,t a•. Z7.13 1 3s 6 (a N 7. S? 7.� rr 1 FIELD NUMBER' - hydrant, pull, zone, or point numbers may be used in place of field numbers depending on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption if possible; otherwise operation will be subject to WA determination. FIELD NUMBER - must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1997 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director June 26, 1998 Goldsboro Hog Farms Dunn/Maxwell Sow Farm PO Box 10009 Goldsboro NC 27532 I TF ?e NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT ANI) NATURAL RESOURCES Subject: Reissuance of Certificate of Coverage No.AWS510040 Dunn/Maxwell Sow Farm Swine Waste Collection, Treatment, Storage and Application System Johnston County Dear Goldsboro Hog Farms: The Division of Water Quality modified the Swine Waste Operation General Permit originally issued to this facility on July 14, 1997. In accordance with the issuance of the revised General Permit, we are forwarding this Certificate of Coverage (COC) to Goldsboro Hog Farms, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Dunn/Maxwell Sow Farm, located in Johnston County, with an animal capacity of no greater than 2000 Farrow to Wean and 80 Gilts and the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003, and shall hereby void COC No AWS510040 dated July 14, 1997. The COC shall hereby incorporate by reference any specific conditions of the previous COC issued to this facility. The purpose of this COC is to allow coverage under the revised General Permit. Please review the revised General Permit (enclosed) and pay particular attention to Condition II.10 regarding tree removal from lagoon embankments, Condition III.1 regarding inspection frequency of the waste treatment, storage and collection system and Condition II1.6 regarding notification requirements for system failures, spills and emergencies. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS510040 Dunn/Maxwell Sow Farm Page 2 Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Katharine Keaton at (919) 733-5083 ext. 533. Sincerely, for A. Preston oward, Jr., P.E. cc: (Certificate of Coverage only for all cc's) Johnston County Health Department Raleigh Regional Office, Water Quality Section Johnston County Soil and Water Conservation District Permit File I \� State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director July 14, 1997 George Pettus Dunn/Maxwell Sow Farm PO Box 10009�,- Goldsboro NC 27532 JUL 11 g 1991 Certificate of Coverage No. AWS510040 Dunn/Maxwell Sow Farm Swine Waste Collection, Treatment, Storage and Application System Johnston County Dear George Pettus: In accordance with your application received on June 25, 1997, we are forwarding this Certificate of Coverage (COC) to Farm No. 51-40, authorizing the operation of an animal waste collection, treatment, storage and land application system in accordance with the State's General Permit (attached). This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Dunn/Maxwell Sow Farm, located in Johnston County, with an animal capacity of no greater than 2000 Farrow to Wean and 80 isolation gilts and the application to a minimum of 37 acres of land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until December 31, 2001. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact J R Joshi at (919) 733-5083 ext. 363. Sincerely, i ,1�-A. Preston Howard, Jr., P.E. cc: (Certificate of Coverage only for all cc's) Johnston County Health Department Raleigh Regional Office, Water Quality Section Johnston County Soil and Water Conservation District Permit File SI'`+D State of North Carolina ako Department of Environment, Health and Natural Resources Division of Water Quality Non -Discharge Permit Application Form / Survey (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Liquid Animal Waste Operations The following questions have been completed utilizing .i 1 Cn%n� I�,tr,� he Division. Please review the information for completenes �i make any corre d ns which areappropriate. If a uestton has not been com 1 b IIlli� e vision se q P �ion , y''iY ,i complete as best as possible. Do not leave any q a s 'ered. Application Date: 23 TW46 a7 I. REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. 1. One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; 2. Two copies of ageneral location map indicating the location of the animal waste facilities and R+~irn field locations where animal waste is disposed; �'ry 3. Two copies of the Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, one must be completed prior to submittal of a general permit application �! for animal waste operations. II. GENERAL INFORMATION: ::.._ .. . 1. Farm's name: Dlmn/Maxwell_Sow Farm 2. Print Land Owner's name: Goldsboro H R Farms 3. Land Owner's Mailing address: PO Box 10009 City: Goldsboro NC Zip: 27532 Telephone Number: 778-3130 4. County where farm is located: _Zohnston _ 5. Farm Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): NQSR 1199, smiles west of NCSR 1008 North side�f NCSR 1008 6. Print Farm Manager's name (if different from Land Owner): 7. 'Lessee's / Integrator's name (if applicable; please circle which type is listed): "eeg�TGoldsboro Hog Farms 51 - 40 FORM: AWO-G-E 2/26/97 Page 1 of 3 f. 4 III. OPERATION INFORMATION: 1. Farm No.: _.-4Q 2. Operation Description: Swine operation Farrow to Wean - Certified Design Capacity Is the above information c ect? yes; � no. If no, correct below using the design capacity of the facility Tyne of Swine o. of A0imal4 Type of Poull[y AnimalsTyne of Cattle No. of Animals 0 Wean to Feeder 0 Layer 0 Dairy 0 Feeder to Finish 0 Non -Layer 0 Beef 0 Farrow to Wean (# sow) 0 Turkey 0 Farrow to Feeder (# sow) Cs co rG,c.. Qef �.. a s (c E-k tu.�....-L.r 0 Farrow to Finish (# sow) Other Type of Livestock on the farfn: No. of AnimalsL 3. Acreage cleared and available for application:4 Required Acreage (as listed in the CAWMP): ,37 .4. Number of Lagoons: 2 ;Total Capacity: 1,283, bx b Cubic Feet (ft3) Number of Storage Ponds: ; Total Capacity: Cubic Feet (ft3) 5. is animal waste being applied on any field which has subsurface drains? YES or O (please circle one) 6. Are subsurface drains present in the vicinity of or under the lagoon? YES or NO (please circle one) IV. APPLICANT'S CERTIFICATION: 1, 6V L*41' ~ t-koG PA1zM S (Land Owner's name listed in question II.2), attest that this application for W4NN j&AAxW6L L SOW _ (Farm name listed in question 1I.1) has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Signature ew;/ M&R. Date V6 ENE 41 V . MANkGEWS CERTIFICATION: (complete only if different from the Land Owner) [, (Manager's name listed in question 11.6), attest that this application for (Farm name listed in question I1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. i understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION PERMITS AND ENGINEERING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUNIBER: (919) 733-5083 FORM: AWO-G-E 2/26/97 Page 2 of 3 ANIMAL WASTE MANAGEMENT PLAN CERTIFICATION FOR EXISTING FEEDLOTS 1, Please return the completed form to the Division of Environmental Management at the address on the reverse side of this form. Name of farm (Please print) 2yt4bI epow pAgm - -- —T Mailing Address: f90!-Dh'Rww N G Fitwcvt�me • g4• Box l 000g &vLp!4M W, 7-702 Phone No.: qlq- 77L3-3130 County (of farm):-;Tn�,4N Farm location: Latitude and Longitude: ZO' 15" �° 35(required)• Also, please attach a COPY of a county road map with location identtT Type of operation (swine, layer, dairy, etc.) _ _ 5Wt Design capacity (number of animals) : 2160 Average size of operation (12 month population avg,): 2080 Average acreage needed for land application of waste (acres) 37 Acvvs Technical Specialist Certification As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005, I certify that the existing animal waste management system for the farm named above has an animal waste management plan that meets the operation and maintenance standards and specifications of the Division of Environmental Management and the USDA - Soil Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001 - .0005. The following elements and their corresponding minimum criteria have been verified by me or other designated technical specialists and are included in the plan as applicable: minimum separations (buffers); adequate quantity and amount of land for waste utilization (or use of third party); access or ownership of proper waste application equipment; schedule for timing of applications; application rates; loading rates; and the control of the discharge of pollutants from stormwater runoff events less severe than the 25 - year, 24 - hour storm. When checked, see reverse side of form for conditions/exceptions. Name of Technical Specialist (Please Print): 61rORlyir 14 . e `ys, Affiliation (Agency): &0vr w ►av& flu i Nc . — Address (Agency): 4 F01 WA 1000 o N lli3Z Phone No.: PI(q.778-3(so Signature: , _ ti Date: 07 Dfcg5; owner/Manager Agreement I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state either directly through a man-made conveyance or through runoff from a storm event less severe that the 25-year, 24-hour storm. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. Name of Signature: Name of 1 Signature: r, ease Date: !� ,__S i ice.. Note: A change in land ownership inquires notification or a new certification (if the approved plan is changed) within 60 days of a title transfer. DEM USE ONLY: ACE# ,� ==vy '•: i.a r7v1 i7 + � 77\ � �� � Ur0 0 r )77e us , .PCc , me`µ/ � � f ., '„B,�_•...r:, ; J ' e4 , Z 7s]• �;� : Sr � 4 r t y `4 to ti. [. 1 ^ F �°J _ ' II . J -, r. r'!'f J - T�1 tea r •. 7tf• h ! �� R - _ J\b Atli `�,. �- �F � ` x 175r 5 '. \ A\s• b, i. ] rit7s e � ^ ,r► n ? ` `� --A�, ;; i .rti� � / r .....IN '� � y 1. _ neie 17a f t+ x='= � A e''••^%/� /`j�Jf '� r: �. G lain •/} .P ale � R ...ri J '� .^Lr/ �_�� ��JJ • w v tr' j � •�_��. h y-�F� !_]., Y.'. }1. A ~`1 1 .". 1.M1-\� f S.Y •, �f% '� / '� \� 1r. ,731, ,nl xsai•'- I �! \ ;fir _ .^ \ [LT ��' .' '� � `� 2171 y M _ spar �• >, n L }. ?t / /tlf 1r1 ^ J�. � t3 . ?•1 '> : 317- 111 1' A S/-, •% �p �L - .' \ } / ' ' //% •4„e, �rsa•• .e ` „; `!]}'T3j}y ] ].s,.•z, FhS^/ 4 t.�. e*)'r- , . . �'� "1- _ � ``' - ��.` `� 1///. �\ e/ � `� � s ram, c � �I�..r / • .o t .a � ., h .\' ` ,� 4,��,\ ^; t \�i `� • �'=.'�'f- } + n7x z'DC B,. 7a A P¢INCCiDN` ] A ; ' ` nr` 7730 .� A a 131 ._ Ri. / ° 7Si� __ k'w, - 4 ` ` 4T„�.. •f `t. , 1 ]7]�, ''� '"x' 7133. !=�1V �- ! 1:• _ - _� !. `A is., 1 ` a ., � fu.'I ir.rrn � =1.r �]• ` 1,f,A3. ,� O t: ! � �/ / \ Ira ,S ////JJJ/ 6 ->n• � y ]r., `[ ]0 Ci rP _� J P �} �,l`�•✓��, .I ��,/ `\ y". 0771 }� :}I.a� �►- _ i71� `_ i1�� � ��e 4'-� � \/ - / { 1- a „g];�9 ''• 711P +-! a �315 � 75s 75. s C. y'` n " Ra:�v n �oa� � t { ' 73J..'. o i.r .D � A ' t•' �' ' r _�' i]av sle � `.•/ = T714 a 4. �, 1 N 7f10- e ; \.1t I ..Or y `rye } / � / \Yry •y :559 CO, ` -. / u r ti Iaa! Ili` .A , ^e1 a e. . //•\1 \ •1009 I n.,/, / �8enlrnr'il {. 11 ,�11 P9 ,A4: �o S � .�' ] 1 51 }{'1 orr x • 16 47 51 �. .. I19),r Yy S.I^ r � / jC- �•, ..` �,, Ch rove �•`:`'� ` iq0? Ilv.. Ch. ff+tr.S nn.� „3 f-IS Mtiah �t Ch.:4 e = - S�a'•�'�''.'y ':L7.7 ii.e bea,]Ij � . .. ..y / ^ ewT7LEFlf� � a �_� i� n Y� 1 ` ParLe•1 IISC t 11) e '- p. q Sn.cxhlnd ch 1,31 fff�11� i�1 sle' -' aya.`�' 791 .�-i1, I Liarpe Ilga ry� ! 1l B tanl 'l o�]j!; " r l '• / : 'll,, � 4n .9 r .i+' r Y ,•' ve �4 1� L �, , = c ��f !=s-: -`� — - \,y '�'` r i.l 11f1' ^ '�., ] 4 it'41 `I" J � L !' V I err' 1 / ,,r—� `• % ., �\ -:1 ram), l ''� /I ANIMAL WASTE UTILIZATION PLAN Producer: J.L. MAXWELL Location: P.O. BOX 10009 GOLDSBORO NC 27532 Telephone: 919-778--3130 Type Operation: Existing Combination swine Farm Number of Animals:8'0.00 swine �� STORAGE STRUCTURE: APPLICATION METHOD: irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that -all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in.an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Page: 1 r ti ANIMAL WASTE UTILIZATION PLAN 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will'conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirement's for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2080 swine x 5.93846153846 tons waste/swine/year = 12352 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2080 swine x 5.28076923077 lbs PAN/swine/year = 10984 lbs. PAN/year N R.GS^.{e. }ate,. d, Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and surface application. Page: 2 r � ANIMAL WASTE UTILIZATION PLAN TABLE 1: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE & CLASS- ICROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW.N PER ACRES AW N PER AC AC USED ----- or ------ APPLY RESID. APPLIC METH N TIME 1598 18.63 1 WaB BC 5 250 Q 4657.5 I APR-SEP 1598 1-1 IWaB 1SG I 11 150 IO 118.631931.5 SEP-MAY 1598 2 BC 5 250 0 jBnA I I I 110.4312607.5 APR-SEP 1598 SG 1 0 1-2 1BnA T �50 110.431521.5 SEP-MAY 1598 3 BC 5 0 jBnA I �250 17.57 11892.5 APR-SEP 1598 SG 1 0 1-3 jBnA I 150 17.57 1378.5 SEP-MAY END . I TOTAL110989 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. Page:.._..3 ANIMAL WASTE UTILIZATION PLAN TABLE 2: ACRES WITH NOTARIZED AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specification 2.) TRACT FIELD SOIL TYPE & CLASS- CROP YIELD LBS COMM N ** * LBS DETERMINING PHASE CODE AW N PER ACRES AW N PER AC AC USED ----- or ------- APPLY RESID. APPLIC METH N TIME END TOTAL10 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. In interplanted fields (i.e. small grain, etc, interseeded in bermudagrass), forage must be removed through grazing, hay and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. - Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on time small grain is planted in' the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. Page: 4 r ti ANIMAL WASTE UTILIZATION PLAN ** Acreage figures may exceed total acreage in fields due to overseeding. * lbs AW N (animal waste nitrogen) equals total required -.nitrogen less any commercial nitrogen (COMM N) supplied. The .following legend explains the crop codes used in tables 1 and 2 above: CROP CODE CROP UNITS PER UNIT BC SG HYBRID BERMUDAGRASS-CONTROLLED GRAZED SMALL GRAIN OVERSEEDED TONS 50 50 TABLE 1 TABLE 2 TOTAL TOTALS FROM TABLES LAND 2 ACRES LBS AW N USED 36.63 10989 0 0 36.63 10989 * BALANCE -5 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Page: 5 I I ANIMAL WASTE UTILIZATION PLAN * This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres shown in each of the preceding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or'ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen.needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2.' Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract I Field I Soil Type 1598 1 I WaB 1598 12 I BnA Crop I BC BC Application RatefApplic. Amount *1 *1 (inches) Page: 6 ANIMAL WASTE UTILIZATION PLAN 1598 1 3 i I BnA i I BC I I .5 1598 I I --1 I WaB I I SG I I .5 1598 ! I •-2 I I BnA I I SG f f .5 1598 I I -3 I I BnA I I SG I f .5 f *I *1 *1 *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180.00 days of temporary storage and the temporary storage must btu removed on the average of once every 6.00 months. In no instance should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION PAge: 7 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters' of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer -either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than to tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 -Filter Strip) 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor .or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall -comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 --- Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved'as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways; waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. �.__ _.._ ....._.. _ .. ....._......._...._......_ _.._r�_.__....,..,.....,.. _ __...._._...w . - ag.e: WASTE UTILIZATION PLAN REOUIREDSPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be ipstalled to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall'be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. ANIMAL WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm:DUNN SOW FARM Owner/Manager Agreement I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina. Division of Environmental Management (NCDEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface wasters of the state from a storm event less severe than the 25- year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDEM upon request. Name of Facility Owner: J.L. MAXWELL (Please print) Signature_'___�_ Date: _ �3/d. 7/7 Name of g��If dif'ament from owner) : Signature: Date: Name of Person Preparing Plan: (Please print)Jerry Raynor Affiliation:Johnston SWCD Phone No. 919-989-5381 Address (Agency): 806 North Street Smithfield NC 27577 Signature: v� %u, (� Date: _ J%y �r"•\ L'nlfeC Mares l;� � ;r Oeoar.r^en� of So 11 Consorvafkon Service C?_RATOR: GI,fP1r? ?lease review the attached plan and specifications eare5ully. Recain cnis plan for your use and records. it is strongly recommended that you, your contractor, and Soil Conservation Service personnel are in agreement as 'co how the waste lagoon is to be constructed. The Soil Conservation Service personnel will meet with all concerned parties and walk over the site to explain all flags and markings. It is important that everyone •.nderstand -,,hat is expeczea so that final censtruction meets plans and specification and the '-ob can be certified for payment (if cost -sharing is involved). The pad dimensions and grades are the best estimate. The BUILDER or CONTRACTOR is RESPONSIBLE for final layout and design of the pads. The Soil Conservation Service personnel will assist in a limited capacity, as its major concern is the proper design and construction of the waste tr_aCmenC lagoon. The actual amount of material required for pads and dam may vary from the estimates. The design.will attempt to balance cuts and fills as close as possible. If additional material is required after construction is complete on the lagoon, the contractor and owner will negotiate on the price and location of borrow area. . tIOTc: Design Requirement: l:'.��,fsl6 cu.fC. cu. yds. Estimate of Excavation: cu.ft. - 36.rr`7 cu.yds. Estimate of Pad L Like: cu. f t. - z�w4. cu.yds. 1.2h i ' Ration Job Class mate Designed BY ,Name Design Approval C-(�Q.,.,._ f4_C T rl Name 3 Date O.". sc, C:Cn1/Ir 6j,QA sir .C• —.nl JI �y;i'�Ilylf ' UZ.C.A! Soil Conservation Service (June 91) SCS-CPA-026 I. Name and Address of Person HIGHLY ERODIBLE LAND AND WETLAND . r,1..., S't ,.<<, , %Cw , l ; �;�1 CONSERVATION DETERMINATION 1. Name of USDA Agency or Person Requesting Determination 5. Farm No. and Tract No. SECTION I - HIGHLY ERODIBLE LAND 2. Date of Request 3. County 'Q FIELD NO.(s) TOTAL ACHES ,�/ i. Is soil survey now available for making a highly erodible land determination? Yes Ed No ❑ i?f 4i,+.;' t:,; ;:- tt•`_ f ;y; 1. Are there highly erodible soil map units on this farm? Yes [21 No ❑ ? ? ig '' ", 'S'< ' K List highly erodible fields that, according to ASCS records, were used to produce an agricultural commodity in any crop year during 1981.1985. ). List highly erodible fields that have been or will be converted for the production of agricultural commodities and, according to ASCS records. were not used for this purpose in any crop year during 1981.1985; and were not enrolled in a USDA set -aside or diversion program. i o. This Hiohly Erodible Land determination was oom ed in the: Office Field ❑' Y' ` :9: :;. ' `r�fiy SFCTIAM 0 _ VJFTLANn FIELD NO-W TOTAL ACRES 11. Are there h dric soils on this farm? Yes ❑ No ❑ q� '! :'o«;?a +,# w P+ 12. Wetlands (W), including abandoned wetlands, or Farmed Wetlands (FW) or Farmed Wetlands Pasture (FWP). Wetlands may be farmed under natural conditions. Farmed Wetlands and Farmed Wetlands Pasture may be farmed and maintained in the same manner as they were prior to December 23, 1985, as long as they are not abandoned. 13. Prior Converted Cropland (PC). Wetlands that were converted prior to December 23, 1985. The use, management, drainage, and alteration of prior converted cropland (PC) are not subject to the wetland conservation provisions uAless the area reverts to wetland as a result of abandonment. 14. Artificial Wetlands (AW). Artificial wetlands includes irrkption4induced wetlands. These wetlands are not subject to the wetland conservation provisions. 15. Minimal Effect Wetlands (MW). These wetlands are to be farmed according to the minimaFeffect agreement signed at the time the minimal -effect determination was made. 16. Mitigation Wetlands (MIW). Wetlands on which a person is actively mipgating a frequently trapped area or a wetland convened between December 23, 1985 and November 28, 1990. 17. Restoration with Violation (RVWyear). A restored wetland that was in violation as a result of conversion after November 28, 1990, or the planting of an agricultural commodity or forage crop. 18. Restoration without Violation (RSW), A restored wetland converted between December 23, 1985 and November 28, 1990, on which an agricultural commodity has not been planted. 19. Replacement Wetlands (RPW). Wetlands which are converted for purposes other than to increase production, where the wetland values are being replaced at a second site. T. Good Faith Wetlands (GFW+year). Wetlands on which ASCS has determined a violation to be in good faith and the wetland has been restored. '1. Converted Wetlands (CW). Wetlands converted after December 23, 1985 and prior to November 28, 1990. In any year that an agricultural commodity is planted on these Converted Wetlands, you will be ineligible for USDA benefits. '2. Converted Wetland (C W+year). Wetlands converted after November 28, 1990. You will be ineligible for USDA program benefits until this wetland Is restored. 13. Converted Wetland Non -Agricultural use (CWNA). Wetlands that are converted for trees, fish production, shrubs, cranberries, vineyards or building and road construction. ?4. Converted Wetland Technical Error (CWTE). Wetlands that were converted as a result of incorrect determination by SCS. 15. The planned alteration measures on wetlands in fields are considered maintenartra and are in rmm�lGantys wan r•JA. .'.6. The planned alteration measures on wetlands in fields are not considered to be maintenance and it installed will cause the area to become a Converted Welland (CW). See item 22 for information on CW+year. '7. The wetland determination was completed in the office halo and was delivered[:] malted to the person on 18. Remarks. _. ; - 'H_•r s_`. �' -.: �1 �. i-,t ,--U '- •t:_ l. i...-, i `.� . il•. L?• f ('�. ..�'h.:c T�f•.?•, �J�.� �`r-1 'E'���-_„ 1`.1. .9. 1 cern,fv that the ahewe doernrinotion is correct and adequnie for use in determining 30. Signature. of SCS Di vrict Conservationist 31. Dale eli,kihiht'i for USDA program henefirs', and that K-edand hydrology, hydricsoils, and ='�• _ h vdr'ophytic vegeration under normal circumstances exist on all areas txulined m Wetlarulr Farmed It'erlunds. and Farmed Warlords Pauurr. +• "' �� � �`��"t Apsistance and programs of the Soil Conservation Servke rvaHebk Wj",0# logo 1p --, eubr aer a or 4ndicap. PcrsU11 Copy ...1� 7,' �N �, �, ,��' ���L i y�� � f ,4�''•f'"' S�;7. � 'il::�,,�}.(' �.,r_.Y�Y ����1�r. , Y •Lc� ji ��•y � fad ��i�f�� ,l'��s�'� � �4 r.� ��'�*+��:r� �� •�YdJ's�` �ii:.:�•.��.. jo :f.fj ,+ '4 i i�jam! \T _ M� �(L�•y' ��7'rq '� 'Sa ,(, r i / a �1 •. • • ? :'J4f'' o, - -f r QrP4 'i � . � f •'K' � _.� �i' �'� ir'� 3 S jl' , '' t�.� � ���+] + K' . � y + �•,.��'r" ' !4w �„�[ ,jdiq. � I. Ail �,�T. lam+ Y`•a. r�, , 'r°!,'��% j 'f 7 r' •r`�� 7r, � •�,i•C ;e,,.Y ..1 'S • 1a. ;;.r'Y;r.-. .;};� "°+�t .rl+` .,y•t.�- i^ ti •Y f k•� �4` yy;� 9� y�C rrt'S`� +t '"�y 'Sr'jd1 � � t L-.�+i,�. 1�. ti• r� w �1� `��,q 'is -a+ .�.' rL Y k5R8 ,_. 1 ► rid°'!" �Yax"!� ;► �'At �i+7", ': ] � I• � I� , � ` � �1� ^ ' I�.i>��,%[ �L' 1 �„�. r yTll`+���f4�� ti41 .1':i „fy� J {�ii 44r�ty 'yr i r !'r" ..ee��/- ai �' � k•'i i. 'y _�+1�y+�b1�� /� -� '� ����� '� ` dam• a` 'y } -�� rs�3a ��..� �.� !';. VA^ S.•} r ly �$44 t�� 4.53 1 . �� 7f; ;)6 �. 11, YU r' 3 Lilco AC) nt >, r,• { fV".i � r. L ^r+y�,Z.r � x w�''r� hr ! �•]�v jY','C`' + _ �•,•,t ��� 3 / y 1'eq r•7, i i t g , � �7 /r ^ � ti . �� \� � +rl 'ts .4 , � '�J's'1�'r :.: ^" �y.4d� t' � �t r �r • ;" ` •�' '4 y�l,' � _ Sri/ _� � 8 �'.t• t • ��� w�•"' fir•"�-s r d� �i :, v. fir. ��� �wT{,''r�t��'wr C5- q, .•�YF.,p?'� n h�r',V �,'� '.r, ,e i.�,, .�tii 'j�,•bn • ;YfNr R•1 �'.. ^nY�'l•�S.\'� 14,Ri 4!:w r w r,r �Pt i..3V 75'�!'!..,«iY�..'ti a.. k2r.} •. :�'4�i.�1.�. .. .. Isb a �- }36�'�M1 a a,a 'ati �- . ' `,'f ] • ti' x:S } }o •lN f 1,g y:13V .3IE •l \ J _ 733i ' - ♦ I t:7#+ fir.:+ l � ,y c -: f •'� o .ry . 1f _ J ,v=: a r _ �' _ ... tsr• - �` + � ` nF' i : 7`4 r, - _ a ,2]1 f e, �:3<I I� *-'t. 1„ l %�.v]' 5! _ l '} ]S3a `r �r �• � � _ n n a lrr+'; � • ' 7sxr }3n .v ) � -a F :�•'� nv . Y j 5tir� �. .ti r. Sli Qall '►tc _ _ :- p 2s]a' _ ... ;. . ",•'- _ _ - .��3': '._, /!J r30s - ?s4• 3108 ♦ f�l xf:e � _ ` } _, 5 �l y,e - F � � .i ♦� St ..„ ice- -.' � � •r. '� P `b��. ` 1. 3 ,. (! / „.a 4II� � __ _ , L � � — - t }7 gaol � �_`'•. f ¢ i:r 17•}' ] ra+ ^,x,,. �lis Nop�ell ", t' l—'y� ', - - _ - ^ev c :S ! ./ __ r �a i P`a - ON t SSS } .� / ,♦ I SDI ,} .oe H9L75 . �_ ' r •a I _ ~ 17e y �_J� T �yt� � r ,lm,n .3 • hr: ��0' 1 T' 4J YI 1 e _ �'t'1� „�a. - . �ti a". ' � � � : ., <. • ;. r.9 tr SENT SATTWAC �.: a o0a%5 -I ,?.�� a +ter Hare• ,56\� �.ry _ _l ]]a -- rt�-- -� 3 s 1 .a ��•.Gl. 'tl .g 5., - .. t,b] 1)7• p Svnvl.md .13] Croocd5 au n .. 51s]� • sry^{ � l- ], •R '.—� � 1 � a IS}5 IIb} - 1 P9rLt' ♦ ' 11➢d � � U. S. Department of Agriculture Soil Conservation Service NC-ENG-34 September 1980 HAZARD CLASSIFICATION DATA SHEET FOR DAMS Landowner County '7 0 �! /1 Community or Group No. Conservation Plan No. Estimated Depth of Water to Top of Dam__2_Ft. Length of Flood Pool 4 Ft. Date of Field Hazard Investigation /Z - G - 9 3 Evaluation by reach of flood plain downstream to the point of estimated minor effect from sudden dam failure. Est. Elev. :Est. evation Kind of :Improvements: of Breach Reach: Length: Width: Slope: Land Use ; Improvements Above :Floodwater Above Flood Plain: Flood Plain Ft. Ft. Ft. Ft. / L(I fJ n rY I I Spp 3oo -7 °o ' 2 2000 3 o a /o : 7cr, G� • r.-r Describe potential for loss of life and damage to existing or probable future downstream improvements from a sudden breach^ fs I =rcr: r-�..� �•/ ,9) 4-v Y- Hazard Classification of Dam (a, b, c) (see NEM-Part 520.21) Dam Classification (I, II, III, IV, V) 7' - ,Cf)f) "/�r� By na 7- it e Concurred By,/ - name title NOTE: 1. Instructions on reverse side. 2. Attach additional sheets as needed. Date /a 6 -- 9 3 Date /a1 -- /n3 DEPAPTMENT OF THE INTERIOR DEPA-RTME; . GEOLOGICAL SURVEY G A) 7;q U OqD )50mk- E. 151 152 12'30" 154 87 X@7 N X67 11 16 ffiv� rsidI, 01 1A 12001 lim y 2_1 cem, Cem em e,1 I los J it / JIni ) SCS-ENG-S38 k0i. S-70 U. S. DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE SOIL INVESTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE FARMER'S NAME ra_,,-) >>�.f� i}; r__�teJ4 DISTREGT_.,���t>'r/..ir�,r/ DATE t ? ' -- 9 COUNTY _ : �-� Fl .is � / - - S. C. S. PHOTO SHEET NO. — WORK UNIT WATERSHED WATERSHED AREA MEASMEMENTS 2,X r �� J CROPLAND —ACRES PASTURE; ACRES WOODLAND ACRES TOTAL ACRES POND CLASS WORK UNIT CONSERVATIO.AST SKI ICii OF PROPOSED POND SHOWING WHERE BORINGS WERE MADE (Approx. Scala l feet) Lmod• rvierrncr pnml in cenlcr lint of dam and ldmlily on sAnch. I ILE ME N 0 ONEENEE MIN mom MEN ME ■ MEMO on IN mom ME MEMMINMEM 0 NJ so 0 I mom 0 BORING NUMBER AND PROFII.E Make a nJ 1. 11 do —so or and Spf11wUV b0nni;j hr5f - then pan ded a rea a rid bum)w Pit bonnof Jqr,,futd vlltp verftca I rvd line. ml Ku► I.��.�.I�IW� �1 • C,!�J • i I�I I�I I�I I I IIMMUNE I 11 1 I I I I I■I I I ICI I III I I I IC I I l I i I �I I I lul I Ell i i NIN i I I I ININ III imimi I I I I II 0 I INS E !I EI 101 Mimi loll. _- I 601 !- E: EI lNC5 hIAl1Y �^F�`� `��I<r-J •� SIGNATURE & TI'I'i.i?.�-'<.,,.-! _��,-.,:' SCS-iNG-538 Ile- 5-70 U. S. DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE SOIL INVESTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE FA.RMER'S NAME reL�.S DISTRICT DATF 13 r COUNTY 3o S", _ S. C. S. PHOTO SIIFL'T NO. WORK UNIT _ WATERSHED AREA MEASUREMENT'S CROPLAND ACRES PASTURE•. ACRES , WOODLAND ACRES TOTAL ACRES I POND CLASS WORK UNIT CONSE:RVAT[u.:[ST SI:FTCH OF PROPOSED POND SHOWING WHERE BORINGS WERE MADE (Approx, scale l'r= fee[} LrKafr relerrnc'e Donn, to center line o/ dam and Identity on slerch. KFFr - � rz 1 I I ,I., SHOW DF.PT[i SCALE I10RING NLJ.MBF.R Ati[1 PROFILE H'jee ,1.1 1.11 d.,m nee qnd wilt —ay Gunny, /ref/ then swnded c.r., Jnd Our.uw Pit Nmn„1 • 1et.4.ule u,th rert,:.,f rr.1 tine. f C'on tniucd on GJ[I[ where necesWry, Sh,- w1.1t, f.7DN elewnvnf on dary "ee honnyf. 1 ` — -- 12---1 44 b 13— — -t9 -- - - - -- C 17- — - i Eiilitl.ti'Gti ns:i[�I Iit�rr I/crr'�-- SIGNAll IItr: i 1rll.N^ ��cxK�==� cove pc� TYPES OF MATERIAL ENCOUNTERED IN BORINGS (Use one of system.; below) UNIFIED CLASSIFICATION GW -Well grded gravels; gravel, sand mix GP -Poorly graded gravels GM -Silty gravels; gravel -sand -silt mix GC -Clayey travels; gravel -sand -clay mix SW -Well graded sands; sand -gravel mix SP - Poorly graded sands SM - Silty sand SC -Clayey sands; sand -clay mixtures ML- Silts; silty, v. fine sands; sandy orclayey silt CL-Clays of love to medium plasticity CH -Inorganic clays of high plasticity MH -Elastic silts OL-Organic silts and silty clays, low plasticity OH -Organic clays, medium to high plasticity USDA CLASSIFICATION g- gravel s - sand vfs- very fine sand sl- sandy loam fsl - fine sandy loam I - loam gl - gravelly loam si - silt sil -silt loam cl-clay loam sicl - silty clay loam scl - sandy clay loam sic -silty clay c-clay 1. Suitable mntcrial for embankment is available C 'vis [�] No (lndicale where hm.rrea on rh. skerch on nnrrrae s+.rdl lu'NiMZKS:: 0D-A_(X.3 etr.t�. rA�a-�eYake,tit YYLr`CL�ce� do yt'e_czt�a. 4 st 5 w c} - � �`� a -�.C'Gr�",� .�r,. -•- i��Zi'�'.] �xY--�� -v... R�t,.�e..Pltri�. 1 f ` � � ��-j C.'L� -.� Ct_o--i'C.Cr�. �- �A--=•�- 1"s1--,Tr- �^.:1.t1-�. a*-��_!e ���C� y��,t ri►r�-,rL..l-_�.Sr',�. ct��/t-et ✓1wP-tT v�-tcr� C G 2 Explain hazerda requiring bpecial attention in deaign tserwue, ayrrrw.., k err_] S�„-c-�}- ! C'`[�� I,{-3 C'.o����1,}, .2,-r-t-r� �an��...nd~'•�_, �/��.fC_�vtci�_a /'n i�C�"-its,' L.l%-7'�`-: �"� 4'..�L � A 8 ••S�o-.. �•�/'"�..L�:.9':e%'-f.ri � r1.^n.� t�'Qi"r-� (.V-!'Gtl �Z.`-aQ-ram � 'Lz._.e - .t-•c'..l'n'-e _ r.c G�r/tc�/�►� r`rp-1 ��/ti�Y�.. 4 r GENERAL REMAliKS. f y r� c:jg., # , GV•s•ti4s.� . ILa. s�- t a.,�.eR et ^e �: < •; . Cr .-�.s_ f � rn a.�aw� - �,_��. � �} �'r-y' e� >�p t C r.Y-'1a _si. UUM:.-ref- •• e�t-Gt�. .%� /Lt/�+'-�ti Gz-?c_.� �•Q-- 4V��t'_ b_� L' Y ` �•, r7 i1 u'i LI t� W ��6! �I w /t'_.t ei c t r;• "l r �« 11��_. t � _t u ►"LU�.. J — - ,— - - r - - -- - �� �4P La f� - P 10, - rr '�-' I � i II—� � S •� a ) i /o S _71--i ji Ll I Operator:Jim Maxwell County: Johnston Distance to nearest residence (other than owner): 1. STEADY STATE LIVE WEIGHT 0 sows (farrow to finish) 0 sows (farrow to feeder) 0 head (finishing only) 2000 sows (farrow to wean) 0 head (wean to feeder) Date: 11/17/93 1500.0 feet x 1417 lbs. = 0 lbs x 522 lbs. = 0 lbs x 135 lbs - 0 lbs x 433 lbs.. - 866000 lbs x 30 lbs. = 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) = 866000 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 866000 lbs. SSLW x Treatment Volume(CF)/lb. SSLW Treatment Volume(CF)/lb. SSLW= 1 CF/lb. SSLW Volume = 866000 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic fee " Owner requests no sludge storage. Sludge will be removed as needed. " 4. TOTAL DESIGN VOLUME Inside top length 660.0 feet ; Inside top width 200.0 feet Top of dike at elevation 52.0 feet Freeboard 1.0 feet ; Side slopes 3.0 : 1 (Inside lagoon) Total design Lagoon liquid level at elevation 51.0 feet Bottom of lagoon elevation 38.0 feet Seasonal high water table elevation 43.4 40.-O feet Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0. 3.0 654.0 194.0 13.00 AREA OF TOP LENGTH * WIDTH = 654.,0 194.0 126876 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH 576.0 116.0 66816 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 615.0 155.0 381300 (AREA OF MIDSECTION * 4) CU. FT. _ [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 126876.0 381300.0 66816.0 2.2 VOLUME OF LAGOON AT TOTAL DE�TO,T TTnTTTn TrrsrrT - 12456'16 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 660.0 200.0 132000.0 square feet Buildings (roof and lot water) Length * Width = 0.0 0.0 0.0 square feet TOTAL DA 132000.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0.00136 Volume = 866000 Lbs. SSLW * CF of Waste/Lb./Day * 180 days Volume = 211997 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 77000.0 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 6.7 inches / 12 inches per foot * DA Volume 73700.0 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 211997 cubic feet 5B. 0 cubic feet 5c. 77000 cubic feet 5D. 73700 cubic feet TOTAL 362697 cubic feet 6. SUMMARY Total required volume 1228697 cubic feet Total design volume avail. 1245816 cubic feet Min. req. treatment volume plus sludge accumulation 866000 cu feet At elev. 47.9 feet ; Volume is 876591 cubic feet (end pumping) Total design volume less 25yr-24hr storm is. 1172116 cubic feet At elev. 50.3 feet ; Volume is 1158245 cubic feet (start pumping) Seasonal high water table elevation 13444wQ-feet 7. DESIGNED BY: (�lf� APPROVED BY: L'au.,��-ia.r.. �C-C•T_ DATE: 1 �a�N �3 DATE • E 3 NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: -kk-N tJ W G-n1,1Z4 u uH+1 • SPECIFICATIONS FOR CONSTRUCTION OF WASTE TREATMENT LAGOONS ---------------------------------------------------------- Clearing: All trees and brush shall be removed from the construction area before any excavating or fill is started. Stumps will -be removed within the area of the foundation of the embankment and fill areas and all excavated areas. All stumps and roots exceeding one (1) inch in diameter shall be removed to a minimum depth of one (1) foot. Satisfactory disposition will be made of all debris. The foundation area shall be loosened thoroughly before placement of embankment material. Lagoon site (and pad site if needed) to be stripped of topsoil (3") and stockpiled for use on dike and pad slopes (2-3"). The topsoiling quantity is in excess of amounts specified on page one (1). Cut-off Trench: --------------- A cut-off trench (when specified) shall be installed as shown in the plans. Construction: ------------- Construction of excavated and earthfill areas shall be performed to the neat lines and grades as planned. Deviations from this will require prior approval of the SCS. Earthfill shall be placed in max. of 6" lifts and not placed in standing water. Compaction shall be performed by shee s-foot roller during placement. The embankment of the lagoon shall be installed using the more impervious materials. Construction of fill heights shall include ten (10) percent for settlement. To protect against seepage, when areas of unsuitable material are_. encountered, they will need to be excavated a minimum of -I wo 0feet - below grade and backfilled and compacted with a SCS approved material (ie-CL,SC,CH). Refer to the soil investigation information in the plans for special considerations. Precautions should be taken during construction to prevent excessive erosion and sedimentation. t,s-nRc_ iNTVRroR- aF LA60M -M t3ELINeD WITH Sc,&L r"ArEiz,AL Fok#4v A-T- S+re #2, 8�m+ube, 67,7,88'7, , u &" r.AyC-RS a F-OLLER • 4vEQUA7E MArC-RiAL I AVAit. 4F5tc[DfT�. IF ► C-ca-1SAR-(,AAAT�M+AL CA-W PEE 9BrkiW6Da €0r21N&4 LDGAT►PN Vegetation; All exposed embankment and other bare constructed areas shall be seeded to the planned type of vegetation as soon'as possible after construction according to seeding specifications sheet. SEEDING RECOMMENDATIONS ----------------------- AREA TO BE SEEDED: 3.5 ACRES USE THE SEED MIXTURE INDICATED: 0 LBS. FESCUE GRASS @ 60 LBS./ACRE (BEST SUITED ON CLAYEY OR WET SOIL CONDITIONS) SEEDING DATES: SEPTEMBER 15 TO NOVEMBER 30 0 LBS. 'PENSACOLA' BAHIA GRASS @ 60 LBS./ACRE (SEE FOOTNOTE NO. 1) SEEDING DATES: MARCH 15 TO JUNE 30 28 LBS. HULLED BERMUDA GRASS @ 8 LBS./AC. (SUITED FOR MOST SOIL CONDITIONS) SEEDING DATES: APRIL 1 TO JULY 31 0 LBS. RYE GRAIN @ 30 LBS./ACRE (NURSERY FOR FESCUE) 140 LBS. RYE GRASS @ 40 LBS./ACRE (TEMPORARY VEGETATION) SEEDING DATES: DECEMBER 1 TO MARCH 30 LBS. APPLY THE FOLLOWING: 3500 LBS. OF 10-10-10 FERTILIZER (1000 LBS./ACRE) 7 TONS OF DOLOMITIC LIME (2 TONS/ACRE) 350 BALES OF SMALL GRAIN STRAW (100 BALES/ACRE) ALL SURFACE DRAINS SHOULD BE INSTALLED PRIOR TO SEEDING. SHAPE ALL DISTURBED AREA IMMEDIATELY AFTER EARTH MOVING IS COMPLETED. APPLY LIME AND FERTILIZER THEN DISK TO PREPARE A 3 TO 4 INCH SMOOTH SEEDBED. APPLY SEED AND FIRM SEEDBED WITH A CULTIPACKER OR SIMILAR EQUIPMENT. APPLY MULCH AND SECURE WITH A MULCH ANCHORING TOOL OR NETTING. 1. PENSACOLA BAHIAGRASS IS SLOWER TO ESTABLISH THAN COMMON OPERATION AND MAINTENANCE PLAN ------------------------------ This lagoon is designed for waste treatment (permanent storage) with min. odor control. The time required for the planned fluid level to be reached (permanent + temporary storage) may vary due to soil conditions flushing operations, and the amount of fresh water added to the system. The designed 6 months temporary'storage is an estimated volume based on: 1) waste from animals; 2) excess rainfall after evaporation; and 3) the largest 24 hour (one day) rainfall that occurs on the average of once every 25 years. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year. This estimate is based on 7 inches of excess rainfall which is equal to or exceeds the highest 6 months excess in a year. The average annual excess rainfall is approximately 8 inches. Therefore, an average of 8 inches of excess rainfall will need to be pumped each year. The 25 year rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building(s). If the outlet pipe is not installed on the elevation to begin pumping, a permanent marker must be installed on this elevation to indicate when pumping should begin. An elevation must be established to stop pumping to maintain minimum treatment depth (6 feet). Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out: 1. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin pump -out of the lagoon when fluid level reaches eleva- tion 50.3 as marked by permanent marker. Stop pump -out when the fluid level reaches elevation 47.9 or before the fluid depth is less than 6 feet deep (this prevents the loss of favorable bacteria). The design temporary storage, less 25 year storm is 288997 cubic feet or 2161696 gallons. As stated before, this volume will vary considerably from year to year. 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. Total Volumes Grid cell size: 4.01 by 4.00 Original drawing scale: 50.00 ft/in Project: Jim Maxwell Drawing: Drawing 2 Number: GHF018 Location: Johnston Co. Bid Date: Engineer: G. Pettus Owner: Estimator: Prepared by: GOLDSBORO HOG FARM using SITEWORK Date: 11/16/93 Time: 19:45:58 Final surface: Proposed Initial surface: Existing Tight Volumes Expansion Expanded Volumes Cut 36806.83 0.00 36806.83 Fill 28724.26' 25.00 35905.32 Difference 8082.57 Net Export : 901.51 All volumes are in cubic yards. Site Balance Report Grid cell size: 4.01 by 4.00 Original drawing scale: 50.00 £t/in Project: Jim Maxwell Drawing: Drawing 2 Number: CHF018 Location: Johnston Co. Bid Date: Engineer: G. Pettus Owner: Estimator: Prepared by: GOLDSBORO HOG FARM using SITEWORK Date: 11/16/93 Time: 19:47:17 Final surface: Proposed Initial surface:,Existing There are no "Proposed" structures. Fill shrink/swell percent: 25.00 Cut shrink/swell percent: 0.00 Balancing to 0.0 +/- 10.0 cubic yards delta Cut Fill Cut - Fill 0.000 36806.83 35905.32 901.51 0.066 36524.91 36679.58 -154.68 0.057 36566.41 36566.31 0.10 Raise "Proposed" by 0.057 feet. Orientation: -45.0 Lower Left Z..Magnification: 12.8 Inclination: 28.0-- � F -r•Jii P r. J'jrrl Pi I�r'Cr�j �ii'j f I� � � r �!!ljp�, r' i �h� it Tl, hTij�� ��;,;�•�.... _ iA fr- �/fl,/! _' .ra..,fn,ulul:.:_ fiirfli t,... l+r�]�fru,r..._ h�l�jnr,Jc r lJf,-Fi�l.. `. 3D Mesh Surface Proposed Protect: Jim Maxwell Drawing: Drawing 2 NuAber: GHF818 Location: Johnston Co. Bid Date: Engineer: 0. Pettus Owner: Estimator: Prepared bw: GOLDSBORO HOG FARM using SITEMORK Date: 11/16/93 Time: 20:54:22 3D Mesh Surface 45.80 :............ I -- 48.00 49.00 47.00 i sales_ 38.BD 38. 48.08 I i I ' 3B.0B WAS t. 52 @0 .0o--•-------------- ----•- 31.00 Report: Plan View Cross-section Locations Project: Jim Maxwell Drawing: Drawing 2 Surface: Proposed Prepared by: GOLDSBtW HN FAW using S1TEWORK Date: 11/16,193 Time: 19:29:04 Scale: 120 ftiin Cross -Section Plots Digitized Points Project: Jim Maxwell Drawing: Drawing 2 Number, GHF018 ILocation: Johnston Co. Did Date: Engineer: G. Pettus Prepared by: GOLDSBORO HOG FARM using SITEWORK Date: llzl6,e93 Time: 19:32:25 A — A' ............................... -------'--' Proposed ----------' ............................... --.^—~~'..'.~~~' ............................................ Ex i st i ......................................................... ........... ................................ ...... ................ -- ^—' -------'-------' ------^-----------------'—^-------'----- ---- --' --------------- ` —.---------------------------'^---''-----'....... ---'...... ' --------^------'' orx«-1maL� .............................................................. ........................ —...................................................... ---------------- � L--.--_'--_--.,___............... ............................................... ...... 0.",r?"""°",""",=,=................................................. .j 0 57.6 55.6 53.6 51.6 49.6 47.6 45.6 43.6 41.6 39.6 37.6 35.6 Cross -Section Plots Digitized Points Horiz. scale: 90 +t/in Vert. scale: 4 ft/in Project: Jim Maxwell Drawing: Drawing 2 Number: GHFOIS Location: Johnston Co. Bid Date: Engineer: G. Pettus Owner: Estimator: Prepared by: GCILDSBORO HOG FARM using SITEWORK Date: 11/16/93 Time: 19:36:35 B - B, ........................... ....... :::::: .......................................................................................... ............................................... ....................................... .......................... ............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . op5sed .............................. I ....... ...... I—, ......Pr........... ....................... .................................................. .......................... : ............................................................................. : ............................... ............. .................. --------------------- .... .................... . ................ . .......................................................................... ................... .............................. ...... ............... Exis ................ ing .............. ......................... ..................................................................... ............ .... .................... ............................................ ...................................................................................................... ....... ...... ................... ............ .............. ............................................................................................................. ....... ............................................... Origin -,-I ......................................................................................................... .............................................. ............ .............. .................................. .................................... ..................................................................................................................................................................... 540.0 T= Cross -Section Plots Digitized Points Project' Jim Maxwell Drawing: Drawing 2 Number: GHFeis Location: Johnston Co. Bid Date: Engineer: 6. Pettus Prepared bqj: GOLDSBORO HOG FARM using SITEWORK Date: lIzI6193 Time: 19:40:38 -------------------~--. .................. ^ .........Prop, ned ........ - --------.--��-----. '-------.......... ---------. --------.-------.. ---.. -------------. ------------. -------- ------. Exisinm --------'--------- ---------~.---------.--------.. —.---------..----'-- --------- -------'' ----------------------------' --------^' ------- ` ---------'. -------''—^---------^--~---------------T--'^-----''�-----'--' original L---^-----.7,,77 7 7��,�����,��7 ...,. :..r..... 7�7 --------] WASTE UTILIZATION PLAN VvNN mow fAwmn Plm m4wr-LO Owners name--: Gac..aS'daPa IV06- F�County: Mail Address-:/04.4OX /000q 6-.04d.S610�f''0, H G. A 75.314- Type of production unit---- :StVI-If rr,v'T a00a Sows ra c✓&*w Type of waste facility-----: 1A4�A5Y416/c. Z-4;?e­40A✓ Your animal waste management facility has been designed for a given storage capacity. When the waste reaches the designed level, it must be land applied at a specified rate to prevent pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle and annual soil tests are encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates and leaching potential. Waste shall not be applied to land eroding at greater than 5 tons per acre per year. Do not apply waste on saturated soils or an land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements may be more or less based on the waste analysis report from your waste management facility. The design of your waste management facility is based on the following: Amount of Waste Produced Per Year: � "145- animals x tons waste/animal/yr= /­?/1r8`stons total waste 02 00U Saw F .Qa�. 7v We79 ✓ 5/ 3.3 /3�� G S//y• S' Amount of Plant Available Nitrogen Produced Per Year: ,1600 animals x lbs. N/animal/year = 101?0O lbs./yr Avai cable' N Applying the above amount of waste is a big job. You should- - plan time and have appropriate equipment to apply the waste in a timely manner. Your facility is designed for 180 days of storage. Therefore, it will need to be pumped every 6 months - Tract Field Soil Crop Yield Lbs. N Acres Lbs.' N Month to No. No. Type Per Ac..., Used Apply, .6 WW 6 � 3oa %�•�' SS'�9 A�°�'� oar. !s k 9 o*1170IIv 300 59 f 3 &4,, . v GU ONr-V 4,4,,rwe 6 rov/W -3 0'0 7. 5' 7 ;Z .2 71-------------- Total 36.63 /d9�9 Available Nitrogen / O 8oU Surplus ❑r.Deficit /99 Narrative Of Operation" OipE7�,� � ,� 7-h`,5tr fV �.EyEL OF M�4+✓ l /S Oe2Q0, 4Er7 7V ^oSTiyii✓ !v Tv vs/� yl.-'Lds ..+, 4!Wr4ry6If rx ee 4450 .¢fr ff r 7-,V 47- JVtJ5rA!'- ��c, c.pTiu.✓ y�T.�T ,�, ..tea ,fc,P skdOld-r-T rd- G„l,�PwaC, ( °ir+v�'.pc .SiG.f��9� 6 C JW d47 c &Ar;pWZ2,5' ti0 .-sr/%d4/t,s4ff27 7V e49•s L u ^/ 7 IS s,rZ- of ..-AWV�� sew 9rn�-� f*&6zr Fo'p .Q�GGMNJE�✓O�?7'/l�.ciS Gov Call the Soil and Water Conservation District Office after you receive waste analysis report to obtain the amount per acre to apply and the irrigation application rate prior to applying waste. Prepared by: G- Id-(JrVIf-T G""--7- Name Title Concurred in by: _ 6,0 ) or& r±gwv; Producer (Copy to producer and copy to case file) Date 23 wy,13 Date Operator is applying waste using a Nelson 150 Big Gun with a 1.41 inch ring nozzle. Gun operates at a 65-70 PSI and is op- erated in a 330 degree circle mode. The application rate cal- culates out to be approximately 0.78 inches per hour. Soils where waste is being applied is Blanton sand and Wagram loamy sand. Suggested application rates for Blanton sand is 0.75 inches per hour. Suggested rates for Wagram loamy sand is 0.6 inches per hour. Based on this information I am making the following recommend- ations: 1) Use a travelling speed compensator to assure even distri- bution as the reel winds in. 2) Switch to taper bore nozzles. Taper bore nozzles provide more uniform distribution. Uniform distribution is much more important when applying waste rather than plain water. 3) Reduce application rate to 0.6 inches per hour or less. Application rate for Wagram loamy sand is 0.6 inches per hour. Generally speaking as the slope of the land in- creases the application rate should decrease to reduce the possibility of runoff. Changes in pressure and nozzle size will probably be needed to achieve this reduction in application rate. 4) Waste application should be performed in a manner to avoid drift. This usually means when winds are less than 5 mph. 5) Do not apply waste during wet or rainy periods when soils are saturated or when the soil is frozen. 6) Do not apply waste during periods when the grass is dor- mant. For coastal bermuda, applications can usually be made between April 15 and October 15. If coastal bermuda is the only grass to be used.for waste application then the waste water level in the lagoon must be managed so that maximum storage is available going into the fall and winter months. 7) Do not apply waste closer than 100 feet from water wells for human comsumption. 8) Do not apply waste closer than 200 feet to dwellings other than those owned by the landowner. 9) Do not apply waste in any manner that would result in waste reaching other property and/or public right of ways. j tiL' +.+ 7 � r �- .. w.- 9 � �-. �• r�� s- tic+.%+^,i�. :- A w�i��-�{� / +r"j: ' ',r r�� ,:- a � 5 •,".'f r'•a4. - i��% ;^, ii �s s `' 1 .+ i Ar�. bi.3. 1e'J...ii-by�'..;+cCS•�. !X 5 7��' ',yy} '6•a tt/f^•:"•.....w , ��: /,y�r: T. o. y,=r / S. r+ _ f�' ��yLY • 7d',.e / I* ^� s`,t!Li 'w`Y�„y�t.Y.`&tY�.r.-.�rt.' � ''<As. fi f %" • �� er ��� x�`tf'.�. P„) t f- %.'Or, e!!3 $,,; y% k',l,}pt�� ,�.- �. , -{' � il''r'��y.�7A.fL,�.iLl,t'•y., .v . r�ir �y ����i rr:,r s,�,j. 'p'•},�s 71' +• M. �h��irr`��Y,��'•lr�'�Tt�' '�,r`. $lai..1"b �Nt a I•x'� �� �r �r~J.+1�1�T���r` �-� e+' V Fr'� ,��{�• I�Fp;iYlty, I;yR J��'-k�'• %'. a7.•�� .7 jlr« `�� . , 44 {dfi�gr�•'tJy�fi6 r +z! ` . iv t�yxali�+"ir' + A; 7�f�,.r•^w x �F �' 11 � l�y . � ' -F .fi"'kC .�' f� S, / ( -C�`::' ~ r •` -+ a' A- �rT�F}'q ; 1'ii/ �3`y „ _ . 1hhh ?.t ti �}-..,� ;/,,yiirA' " ;�,"(4C' i` ' '• ''J�}.-�'j%'�`// t :A l'�p ���i �` � sty � f � r :yO ��Y_ �.�/may {'� �' ��� �,�' `.i�T .� �i'\y, :�•�J�`'�j �+1i l�l �'��-'�•/,1 "—r�`3•�y �j/ I� 3 ^ r� !�} ♦ �ik,rC rYii��.� �(_SCv '�y b ,9 itll:Si.'-1�'}y'� -'ii T'��` 'I� I �•� / ; ..ri, ;'1♦i!' F�fS -,(�Vr ,F �� l�• 1JV ,l�,}•�~4`l' !� I �"k2 l^ ��,f'�, i' i� ti .R i'.'a•"+L2'T r. .aZ � 5�,`,��1- .rt. � i :i.,• •� +''+ r.% / n °" �,.� . -,r. r'�a ��}.j�ral t' r��� 3.,S�j- 4�." '�+'„'�" .. i ��� y'a�5� /'if++�..�j r7'F,�'� Y7 j 4'Ae � 4� i.7�l��<.�:�!'�.. �. "'� ,�Jf+y'�7,r'r':•t'•'_ ra - ksrr�K r': .�' �'•���' �'�::7� "k" I +;.% +'��Y'}`%. ; �r ' ,;�� r�� �i'a', � ��r;?.r rlgy� ��i' Ff��' - �.i, 1 !��q Sj • 15gg W0`s:71,_j ,"+�: -.�� ,".•7_jr {•�C�:' ri•r. yyn-rl•'Sr.rti^.�`+ `y• �':'►�j�'Fr i' •�i h�yr,�L �!l' SI 9 i r4Yi �r 'Y dr 4.'r r..ly.�. _ �>.l � �y I + C► " 8� •d4 �%+" t its ,;fir/�; t 4 [Y'J'Mr?�, r+•�1� i�. r f �i�r �1 f tee, � er +•r'7 /�' x�'�r �!`i � k ' i ,�7C���,j� 'tG{ tij ayrs% tat. yl �,jV� 1t 7 �� �' `.i4 y'�1"' .� � i �„ n..lf�' .�:7` "j� �r/•J+•'�.''��;,�y� � �'�:• �-i �`+�'(� y{,/"',(,, +� k:���%�!� ,r I S ✓~ .r�''��• tiY'c. Y"���•���N f"wH,i-,{.��'r�.'rCp'1�:. `anu,y„y f. S'�.-�C,� t�� .,rAC�;'. t��` I '� •�I .1�'.-,��'.�i ���'tµ'�' !y' �: �,�r''' � x -�, `�r `,�•j 4-' e., .rry ' {£�, �,.�1..'. ` - - i �"' y��. r953 '1 �{ it 5,' •h;� rf.Yy�'.-y��'t'f.t+;.f'la��':('''�j�:`3 .i,/. tJ�i, 5 �X"""� fF,:�f . � �?:J',j If"1';�''�fy Y' ,� r, ��i.►".a.?.yt . r'�Y al`n�'rY-,7� .i;'� /�4 � ,-:1 (Y:1-: rim �i a-+I� � i:�,j��..,, ; I'.;� f� � �•�.� r' Fr '�}�'r�;, .�i '��� ��T" . -`�. mot• f�*; t�.1 +j3`►'YO `+4r,t 51 Ale L. r T39Y yS.W /-'mot s '.► r : + *' �'.,[,K:,"t A � r ti .ft / � i �,1 1 '�'� r s'�✓, �.zt:..�.. ,�+ir W'`{:'�.;r a,,,�. y '' 1 F ter 77f+Y�p��NK �.. A..✓ 4re_ 3Lr j x� :rf f:s'L {� t'j A r vp~,jy -' g l�r T' pre., .r(ya, 'Nt� iyr S ` • r". �STS 4' 1 r., �. 1".""}. #� rr 4"y(��:+.'• rl g ti/ P ��'rlrtitrr �/.�1�*k.7 VN i ; 1 1 i ' -�� 1b ti. ( t '.�i. !ti *r ►r'�'Y yy'�( _ \ hr� y�..•" t 'r r �'�� x�i J�p`�1, r���Yr�•.� � 'j-... �i�� �-,�� .+r iy �;"�. ry11. r' �i. .. 45 47, x f ' w-:.:; �� } ''� �'Ll, ,�S fs`�*r. Y ''#A/ � _�` ' 'j � � f .L'v'!al.� Y' '`%i'.• ��r•b{ � � . . ;'• r � ��h:t • +A • I�� / � r�G i�� �`��`. • / i. 1 � f sLt'v+ ��.ti7r• .'ryf3J},I _ �v Traa J� �5 r . se+NS�'`5tf�t�rl r t. f , �'t1 (� s rr ' 7103 r t l •11 w N. 'V. 5 't T` �•X r � ti ✓ %Ky. r-a< S: n� �`L� ' larZ- ��' ";MA ✓ 4rc i r J]1 f + d'_ .��*„'.+� �'!' rl'aly�i.7'�s7s i��y� le,` 7 ��r+�y�fs[,i�, F+ ,l •s� ��11 r�: L '' �e K' e�, - �i`�/? r iG 't�����ir1<ih[,����.t•:l'Mr 4' i ���kJ��x�"�'�F�;�'. - 7.1� .. _ ., - ..rr.a :C!1L'�.�i . - - ATTACiTMiENT E - 1 of 3 Agri -Waste Ma-mageme.nt Biological andAgricultural Engineering North Carolina State University LIVESTOCK WASTE SAMPLING ANALYSIS AND CALCULATION OF LAND APPLICATION RATES James C. Barker* I. SAMPLE COLLECTION A. Semi -Solid Lot:Hanure i. Scraped directly from lot into spreader a. From loaded spreader, collect about 2 lbs of manure from different locations using nonmetallic collectors. ii. From storage a. Collect about 2 lbs of manure from under the surface crust avoiding bedding materials and using nonmetallic collectors. B..Liquid.Manure Slurry i. Under -slotted -floor pit a. Extend a 1/2" nonmetallic conduit open on both ends into manure to pit floor. b. Seal upper end of conduit (e.g.. by placing a thumb over end of conduit) trapping manure that has entered lover end, remove and empty slurry into plastic bucket or nonmetallic container. c. Take subsamples frog 5 or more locations or at least l quart. d. Mix and add about 3/4 pint to nonmetallic sample container. ii. Exterior storage basin or tank a. ,Make sure manure has been well mixed with a liquid manure chopper -agitator pumpor propeller agitator. b. Take subsamp les from about 5 pit locations, from agitator pump or from manure spreader and place in a plastic bucket. * Professor and Extension Specialist, Biological and Agricultural Engineering Department. North Carolina State University, Raleigh. NC. 2 of 3 e. Mix and add 3/4 pint to a nonmetallic sample container. C. Lagoon Liquid i. Collect about 3/4 pint of recycled lagoon liquid from inflow pipe to flush tanks in a nonmetallic sample container. ii. From lagoon a. Place a small bottle (1/2 pint or less) on end of 10-15' pole. b. Extend bottle 10-15' away from bank edge. c. Brush away floating scum or debris. d. Submerge bottle within l' of -liquid surface. e. Empty into a plastic bucket, repeat about 5 times around lagoon, mix, ,and add 3/4 pint to nonmetallic sample container. D. Broiler or Turkey Litter i. House litter a. Visually inspect litter for areas of varying quality, e.g., areas around feeders and waterers, and estimate percent of floor surface in each area. b. Take about 5 litter subsamples at locations proportionate to item a. E.g., if 20% of litter of similar visual quality is around feeders and waterers. take 1 subsample there and the other 4 subsamples from remainder of floor surface. c..At each location, collect litter from a 6" by 6" area down to earth floor and place in a plastic bucket. d. After 5 subsamples have been added to the bucket, mix, and add about-2-3 lbs litter to a'nonmetallic sample container such as a 1-gallon freezer bag and seal. ii. From dcockpile a. 'rake subsamples from about 5-locations at least 18" into p1le. b. Kix, add 2-3 lbs to nonmetallic sample container and seal. ATTACH:• ENT b 3 of 3- "D II. SAMPLE PREPARATION AND TRANSFER A. Place sample into an expandable container that can be sealed. Rinse residues from container with clean water but do not use disinfectants, soaps, or treat in any other way. B. Pack sample in ice, refrigerate, freeze, or transfer to lab quickly. C. Hand -delivery is most reliable way of sample transfer. D. If mailed, protect sample container with packing material such as newspaper, box or package with wrapping paper, and tape. E. Commercial sample containers and mailers are also available. Contacts: i. A&L Eastern Agricultural Lab, Inc. iii. Polyfoam Packers Corp. 7621 Vhitepine Road 2320 S. Foster Avenue Richmond. VA 23237 G'heeling, IL 60090 Ph: (804)743-9401 Ph: (312)398-0110 ii. Fisher Scientific Co. 3315 Winton Road Raleigh, NC 27604 Ph: (919)876-2351 iv. NASCO 901 Janesville Avenue Fort Atkinson, WI 53538 Ph: (414)563-2446 F. Private analytical labs are available, but sample analyses are costly. G. The NCDA provides this service for North Carolina residents. i. Address: North Carolina Department of Agriculture Agronomic Division Plant/Vaste/Solution Advisory Section Blue Ridge Road Center P.O. Box 27647 Raleigh, NC 27611 Ph: (919)733-2655 Attn: Dr. Ray Campbell ii. Forward $4 along with the sample. iii. Include the following identification information with sample: a. Livestock species (dairy, swine, turkey, etc.) b. Livestock usage (swine -nursery, finishing; turkey -breeders, brooderhouse, grower, number flocks grown on litter; etc.) c. Waste type (dairy -lot scraped manure, liquid slurry; swine -pit slurry, lagoon liquid, sludge; broiler -house litter, stockpile iv. Routine analyses performed on all samples: N, P, K, Ca, Mg, Na, S, Fe, Mn, Zn, Cu, B v. Additional analyses performed upon request: DM, Mo, Cd, Ni, Pb prc 11 I I 1 # : , i ! ' i i , - sS7 tT.�__. 1 I F � , I � • I I I I !77 • r I I ! 1 ! ; I , I I 1 -i _�_i_-�i_.`. ; i i I ;`.i -i _;.-v�--I - I - r : f ! I L i j� ' '-Yil•yT..`1 NI .�J _ . f--�•iFrvl;-?IIi�S(I�1!}3 I I 1 ! ! ! .'l�S'.'!v3 i �� '. �i -� I I I I tl i I ; ! I i I I J�, i ! f ! ! ' - -- ' I -------- --- -- ---- ! �I— I I I I I I I ! ! I ! I I i l ll l i l Li -}- i! I !' i N— i 1 i l l I? I I I L !+ I! I I!! I it l I t 1 i i I f! ! 1• I( 1 1; i! I I 1! I I: I! IL -- I I 777 7 I l 1 - -- �i!} 11T 551:a`£J I ' ! + t ! I I_' 4�'1�3t3 �tN_ I I I— ! iI! i 1 1- ILLY j! i k i f j! !! € i 1 I h•4� i I ! ! I! !; I I! I { I I i I ' f I I I ! I �' !! !! ! --- + j I I!! I ' - I -i� !!--� i 1 1 i! I I ' t I r i I�I-{----�---I I i I i I I I rl i i --- i -I I! �f ! I! 1 11!! 1 -- 1 i! I I I I 1 I i I i I! 1 I# i I I 1 : i j i r_I i i-I I I ' I I I ! �I I I _I ! I!� I I! i I I i v I 1 C---i ; !! I 1 i I; !+ I I! --�---- --, ,-------- ! - I. _—I --•--'-- - L 11 i i L 1 I 1I! ! I ! _ 1 I ! ! 1_ ! ! �I ! L I _I E ! 1 !_! 1 ! I I I LI ! 1 I. ! 1 I I I I ! i ? ! ! I! I I -I i I i i i--- -➢ —1 -- -- i- -- - -- _ -'- _ I I ! i �i�l LL_-_�_ ! ' 1 4 i.l_!�I I I I ! i ! I_i_' s l ! €_' ! " I-�-i � I }--= �~ - -- —•- !_ N97a 7 7 '7Q7Gi' iy�L 9r�fl�Q7� E fr0111�5_=fia37 r7V]I I ! I I _L_�I I I f i I -�-i- i I! I I I I !1 ! 1! I I I 11 i I �—rL I _I—!�� L,;—� I -- I -- � Li_—? 1--.--! -.I '. I i L �_,_I I I IIiI 1 I wl I _ h I I I I I' r I I 1 1 E I! I I! I 11 j 1 1 I I I . �i i1 1 1 ' ! I I .__I I 4 i I I I! k i I I J11a�-�,��� I ! —__.--! FITI I I I I! l i U. m MCI ;/ a ,Desr� n ge14,1 Ire mop -r EX ca✓c< Tiah 1/a/u -n cJ r /oJ,/ to ��vcC/ yn �u�►�e. 4 'c � 4o-1 c/esi urn �� � t cla,5s 71 37elD LAGOON DESIGN CHECK LIST A J J To., I Copy of 026 and supporting maps included if clearing involved. Play (including access roads and waste application system sites) 2 Dana Safety Exclusion /✓A a. Dike not over 15 feet high to down stream slope and not over to acre feet storage to top of dike. 3. Storage Volumes designed volume exceeds needs all temporary storage is designed above the seasonable high water table. -d. minimum of 6 feet treatment volume depth available �. no sludge storage statement included if landowner so requests 4. Operation & Maintenance Plan (sheet included) a'� begin and end pump -out elevations shown 5. Location Sketch (included) �a'! distance and direction to nearest residence shown �b:�road numbers shown /c.�north arrow shown Sin/r�.+•a�6. Hazard Classification Sheet (NC-ENG-34 included) Shed a f/" distance .to nearest stream in event of dike failure shown b ✓ distance to nearest public road in event of failure shown c � topo map of area to support a & b above included / 7. Waste Utilization Plan (included) a. all tracts, field numbers, field acreage, (available acres excluding buffers for ditches, roads, homes, property line, etc.) crops shown A To P%a,� b. signatures of producer &: person preparing plan c. pumping agreement signed by adjoining landowner showing tract use - SaK, Fa,. �, numbers, f ield numbers, acres, etc. if needed d. legible ASCS maps of effluent disposal fields included Plan e. legible soil survey sheets showing all effluent disposal fields included f. suitability of soils for crops planned assured g.-'attachment "B" on sampling procedure included 8. Soil Investigation Sheet (SCS-ENG-538 included) 4 a.✓ minimum of three borings on Class IV & V lagoons b borin5s 2.0/ below designed bottom of lagoon c.✓ location & elevation of borings in relation to grid survey d:� seasonal high water table at highest elevation e ✓ borrow area location shown Operator:J L Maxwell, III County: Johnson Date: 06/22/94 lJ Distance to nearest residence (other than owner): 89�8.0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. = 0 lbs 0 sows (farrow to feeder) x 522 lbs. = 0 lbs .0 head (finishing only) x 135 lbs. = 0 lbs 0 sows (farrow to wean) x 433 lbs. - 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs Describe other : 21600 Total Average Live Weight = 21600 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 21600 lbs. ALW x Treatment Volume(CF)/lb. ALW Treatment Volume(CF)/lb. ALW = 1 CF/lb: ALW Volume = 21600 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION l Nej si�;d�t A � isc Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet)--------------------- 95.0 Inside top width (feet)---------------------- 95.0 Top of dike elevation ( feet) -------------------- 50.0 Bottom of lagoon elevation (feet)------------- 39.0 Freeboard (feet)----------------------------- 1.0 Side slopes (inside lagoon)------------------ 3.0 1 Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 89.0 89.0 10.0 AREA OF TOP LENGTH * WIDTH = 89.0 89.0 AREA OF BOTTOM LENGTH * WIDTH = 29.0 29.0 7921 (AREA OF TOP) 841 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 59.0 59.0 13924 (AREA OF MIDSECTION * 4) CU. FT. _ [AREA TOP.* (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 7921.0 13924.0 841.0 1.7 Total Designed Volume Available = 37810 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 95.0 95.0 9025.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL DA 9025.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Feces & urine production in gal./day per 135 lb. ALW 1.37 Volume = 21600 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days Volume = 39456 gals. or 5274.9 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons Per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 5264.6 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 7.0 inches / 12 inches per foot * DA Volume = 5264.6 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 5275 cubic feet 5B. 0 cubic feet 5c. 5265 cubic feet 5D. 5265 cubic feet TOTAL 15804 cubic feet 6. SUMMARY Temporary storage period____________________> 180 days Rainfall in excess of evaporation=====_=____> 7.0 inches 25 year - 24 hour rainfall__________________> 7.0 inches Freeboard=======------=_______________-_____> 1.0 feet Side slopes=====____________________________> 3.0 . 1 Inside top length==_________________________> 95.0 feet Inside top width____________________________> 95.0 feet Top of dike elevation=====__________________> 50.0 feet Bottom of lagoon elevation=====__===========> 39.0 feet Total required volume=====__________________> 37404 cu. ft. Actual design volume=______________________ _> 37810 cu. ft. Seasonal high watertable elevation (SHWT)===> 46.0 feet Stop pumping 46.6 feet Must be > or = to the SHWT elev.====__=___> 46.0 feet Must be > or = to min. req. treatment el.=> 45.0 feet Required minimum treatment volume=====______> 21600 cu. ft. Volume at stop pumping elevation=====_______> 21710 cu. ft. Start pumping 48.3 feet Must be at bottom of freeboard & 25 yr.,rainfall Actual volume less 25 yr.- 24 hr. rainfall==> 32545 cu. ft. Volume at start pumping elevation=====______> 32523 cu. ft. Required volume to be pumped________________> 10539 cu. ft. Actual volume planned to be pumped=====_____> 10813 cu. ft. Min. thickness of soil liner when required==> 1.6 feet 7. DESIGNED BY: � '� "� (&J- j-- APPROVED BY: e� DATE: E f 3 9 DATE: 7 NOTE: SEE ATTACHED WASTE UTILIZATION PLAN / COMMENTS: V-0j CCrnscar ��c�rt Gh S�r,�FS and r_IAV f �laF :mod - ti{ . . This lagoon is designed for waste treatment.with minimum odor control. The time required for the planned fluid level to be reached may vary due_to soil conditions,flushing operations, the amount of fresh water added to the system. CPEPAIT IONANDMAINTENANCE PLAN - - and Land application of waste water is recognized as an acceptable method of disposal. Methods of application include -solid set,.. center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent runoff from the field or damage to crops. The following items are to be carried out: I. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity,.to,prevent excessive odors during start-up. Pre -charging 'reduces;: the.. con centra_t`ion of the initial waste entering the lagoon thereby reducing odors:- Solids should be covered with effluent at all times.. 2. The attached waste utilization plan shall;'`be'_-eoliowed - This plan recommends sampling and testing of waste (see Attachment B). before land application. 3. Begin pump -out of the lagoon when fluid.:level''reaches eleva tionCjg, 3 as marked by permanent markers.' Stop pump --out when the fluid level reaches elevationor before fluid depth is less than 6 feet deep (this prevents the loss of favorable bacteria) . 4. The recommended maximum amount to apply.per irrigation is one (1) inch and the recommended maximum application rate is 0.4 inch per hour. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or are damaged by rodents and establish in vegetation. 7. All' surface runoff is to be diverted from the lagoon to stable outlets. B. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing. this law. SEEDING SPECIFICATIONS ---------------------- AREA TO BE SEEDED: 0.5 ACRES USE THE SEED MIXTURE INDICATED AS FOLLOWS: 0.0 LBS_ FESCUE GRASS AT 60 LBS./ACRE (BEST SUITED ON CLAYEY OR WET SOIL CONDITIONS) SEEDING DATES: SEPTEMBER 1 TO NOVEMBER 30 FEBRUARY 1 TO MARCH 30 0.0 LBS. RYE GRAIN AT 30 LBS./ACRE (NURSERY FOR FESCUE) 0.0 LBS. 'PENSACOLA' BAHIA GRASS AT 60 LBS./ACRE (SEE FOOTNOTE NO. 1) SEEDING DATES: MARCH 15 TO JUNE 15 0.0 LBS. HULLED COMMON BERMUDA GRASS AT 8 LBS./ACRE (SUITED FOR MOST SOIL CONDITIONS) SEEDING DATES: APRIL 1 TO JULY 31 5.0 LBS. UNHULLED COMMON BERMUDA GRASS AT 10 LBS./ACRE SEEDING DATES: JANUARY 1'TO MARCH 30 0.0 LBS. RYE GRASS AT 40 LBS./ACRE (TEMPORARY VEGETATION) SEEDING DATES: DECEMBER 1 TO MARCH 30 LBS. APPLY THE FOLLOWING: 500.0 LBS. OF 10-10-10 FERTILIZER (1000 LBS./ACRE) 1.0 TONS OF DOLOMITIC LIME (2 TONS/ACRE) 50.0 BALES OF SMALL GRAIN STRAW (100 BALES/ACRE) ALL SURFACE DRAINS SHOULD BE INSTALLED PRIOR TO SEEDING. SHAPE ALL DISTURBED AREA IMMEDIATELY AFTER EARTH MOVING IS COMPLETED. APPLY LIME AND FERTILIZER THEN DISK TO PREPARE A 3 TO 4 INCH SMOOTH SEEDBED. APPLY SEED AND FIRM SEEDBED WITH A CULTIPACKER OR SIMILAR EQUIPMENT. APPLY MULCH AND SECURE WITH A MULCH ANCHORING TOOL OR NETTING. 1. PENSACOLA BAHIAGRASS IS SLOWER TO ESTABLISH THAN COMMON BERMUDA GRASS. WHEN USING BAHIA, IT IS -RECOMMENDED THAT 8 LBS./ACRE OF COMMON BERMUDA BE INCLUDED TO PROVIDE COVER UNTIL BAHIAGRASS IS ESTABLISHED. • ' {. r'• ( Al ! +�.•��~��I + `• ; •,/" \I " � � , .ti` / i n , 5; .•,l ( �� . •1 ♦ ' 1' �.\ �•� I 4a( �'� � I `� _ i tVIS • `ti - .yl`'< `' • : '=�Q*,•�f * \' �• .{J`^.�j% .j} uyi J �✓�•�' i ' •i'/�•��-. ` \ �1 �t � f '�� •.: * _ _ r r fr�_: • J ';' 1�t .:ram 1�� l! Ll rr i� is ;'•� V (�. •}( ,;1 r� ! �'y1 �� �r .:�' :.•T ,%�.-. J �i . " - ,1r /_��r` i •�J' 1 �\ !� t.- .:- c,1js`� �fr::_-�:•.•/ � 1)' ..Fr('- ,�;aC •• ••if, - �:c r � ' �; 'r`.I ,• �ra�''��� is�' ' .."r ` l / -. ram.... -- �',', - ` J�.. i •'. .��` _ j•'• �'._ 'ell _'1 / `t. Lai �� rr /j � �` -.•'. �:!.~ ' rn41 �4 -• l+. ' • as ��,'+� D� __�\ . i �" r * . I1i21 I s'r ♦ � / Ae r ..in� : c _, ap. u fir;.. ' . a, - _..._> •ter , . ar. •ar ,�- f, 1 5 r16 ri S -I D 100-1 OD C) OPERATION AND MAINTENANCE PLAN ------------------------------ This lagoon is designed for waste treatment (permanent storage) and 180 days of temporary storage. The time required for the planned fluid level (permanent and temporary storage) to be reached may vary due to site conditions, weather, flushing operations, and the amount of fresh water added to the system. The designed temporary storage consists of 180 days storage for: (1) waste from animals and (2) excess rainfall after evaporation. Also included is storage for the 25 year - 24 hour storm for the location. The volume of'waste generated from a given number of animals will be fairly constant throughout the year and from year to year, but excess rainfall will vary from year to year. The 25 year rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building(s). If the outlet pipe is not installed at the elevation to begin pumping, a permanent marker must be installed at this elevation to indicate when pumping should begin. An elevation must be established to stop pumping to maintain lagoon treatment depth. Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out: I. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the -concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin temporary storage pump -out of the lagoon when fluid level reaches the elevation 48.3 as marked by permanent marker. Stop pump - out when the fluid level reaches elevation 46.6 .. This temporary storage, less 25 yr- 24 hr storm, contains 10539 cubic feet or 78835 gallons. SHEET 2 OF 2 - 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. Refer to the waste utilization plan for further details. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. Waste shall be applied in a manner not to reach other property and public right-of-ways. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. U. S. Department of Agriculture Soil Conservation Service NC-ENG-34 September 1980 HAZARD CLASSIFICATION DATA SHEET FOR DAMS _/ Landowner (i — County :1 a k, 0' 2c , _• _ Community or Group No. Conservation Plan No. Estimated Depth of Water to Top of Dam .3 Ft. Length of Flood Pool 9.5 • Ft. Date of Field Hazard Investigation .E—.2 - 91 Evaluation by reach of flood plain downstream to the point of estimated minor effect from sudden dam failure. Est. Elev. :Est. Elevation Kind of :Improvements: of Breach Reach: Length: Width: Slope:, Land Use ; Improvements : Above :Floodwater Above Flood Plain: Flood Plain Ft. Ft. Ft. Ft. Wore— - 1 woe :3aa • Waad 1"2;/l CO3e,A 2 3 :boo i J Describe potential for loss of life and damage to existing or probablp futur owntream improvements from a sudden breach Hazard Classification of Dam (a, b, c) (see NEM-Part 520.21) 6-- Dam Classification (I, II, III, IV, V) Sara C' 7 �Q)1-- By name e Concurred By C' 1W 4 - C- name title NOTE: 1. Instructions on reverse side. 2. Attach additional sheets as needed. Date Date 7 //— WASTE UT 1L:_7ATI01N Owners name--: % r County: rJ.i J'544 Mai 1 Address-: SL 171 9 0, /0009 6-'ods �o,,o INC- Type of production unit----- S�;ne- .�s�,laho, _L"" Type of waste facility - - - - - _AnZ?Crchfc X aQ0 Your animal waste management facility has been designed for a given storage capacity. When the waste reaches the designed level, it must be land applied at a specified rate to prevent Pollution of surface and/or ground water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the.iimiting nutrient. Waste should be analyzed before each application cycle and annual soil tests are encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be 'grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they. have different infiltration rates and leaching potential. Waste shall not be applied to land eroding at greater than S tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of these conditions may result in runoff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize -the value of nutrients for crop production and to reduce the potential for pollution, .the waste should be applied to a growing crop or not more than 30'-days prior to planting. injecting the waste or disking will conserve nutrients and reduce odor problems. The acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements may be more or less based on the waste analysis report from your waste management facility. The design of your waste management facility is based on the following: Amount of Waste Produced Per Year: 135- animals x p tons was te/animal/yr= t,c�/ tons total waste 80 -animals x �.3 1b5. N/cnima:/year - I- �% - lbs./yr 1 rN on �s �n / �� 1�c co) aJvlk� Ava.labie N rzC 7cp .� i.r. / IC' Applying the above.amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. Your facility is designed for 160 days of storage. Therefore, it will need to be pumped every 6 months. Tract Field Soil Crop Yield Ub5. N Acres Ubs. N Month to No. No. Type Fer Ac. Used Apply Total Available Nitrogen Surplus Or Deficit Narrative of Operation:— Call the Soil and Water Conservation District Office after you receive waste analysis. report to obtain the amount per acre to apply and the irrigation application rate prior to applying waste. / /f Zi Prepared by: Name Title Concurred in by: - ----. -_- Producer (Copy to producer and copy to case file) Date Date c WASTE UTILIZATION PLAN i14N SaW kuM (�t,t� MAytUEit, Owners name--: lyv6-- F/��rnS County: J_V/r­� 7-04�- Mai l Addre5s--:/40•30X /0009 6-04-e.s64rd/ 4-' G. A 7.53^;- 'l y p e of production unit---- : S cyi.•'E 4 A/ i T a D 00 Sa "s r4f t✓F-g.�� Type of waste facility-----: /�N�,�U.{3�c LAG -Doi✓ Your animal waste management facility has been designed for a given storage capacity. when the waste reaches the designed level, it must be land applied at a specified rate to prevent pollution of surface and/or around water. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops on the fields where the waste is to -be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle and annual soil tests are encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be arown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates and leaching potential. Waste shall not be applied to land eroding at greater than 5 tons per acre per year. Do not apply waste on saturated soils or on land when the surface is frozen. Either of.these conditions may result in runoff to surface waters. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or not more than 30 days prior to. planting. injecting the waste or disking will conserve nutrients and reduce odor.prcblems. The acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements may be more or less based on the waste analysis report from your waste management facility. The design of your waste management facili-t-1-y- is based on the following: Amount of Waste Produced Per Year: 4/!S animals x /• 9 tons waste/animal/yr=!-7/gT-`stons total waste a0l}D animals x _� lbs. R/ar,irral/year /O�� lbs./yr Avai lable' N Applying the above amount of waste is a big job. You should7/-9 plan time and have appropriate equipment to apply -.the waste in a timely manner. Your facility is designed for 1e0 days of storage. Therefore, it will need to be pumped every 6, months.. Tract Field Soil Crop Yield Lb5. N Acres Lbs. N Nonth to No. No . Type Per Ac . Used Apply" /S9 � 1 � �. Q�frr ua9 �� � 340 %�• b 3 SSA 9. ,g�°?.= aGT !Sq � ,�, G�¢�7•ov ca�s'i�G G �/� 300 /p. y3 3 / a � ' 5s9' GG�'3T7QL 7.S7 . Total Available Nitrogen /D B Surplus O r .Deficit m.?.r ,�,9 �. .✓Er>c� Narrative of Operation: O�ET��rTQ� ,c4ps EyE� 0 �` �'�✓9s is-P��i��4E1� Tb O�°��i ix'� /s Acso q�.9•QE Thar t•��¢ yr� �f+��U w97'iv.✓ .A.¢T�x fzi �''a �c.P�•E E&�f/i�`'+�3 •��E xk6T�y- TJ Gh�✓aC. (/�°.rYw-.�� qu(a9�� cq..� 6E c..c�� ,gyp Es7-,j4d4itAA:5v 7 , e-a n 4 �3 ' v�� v .✓ Their s.r� �F .f-er�6a� sc� �A .s � Call the Soil and Water Conservetion District Office after you receive waste analysis report to obtain the amount per acre to apply and the irrigation application rate prior to applying waste. Prepared by: �ftT��c,T e'e-3-7. //-Ag-93 ame Title Date Concurred in by: 13VPVg3 Producer Dale (Copy to -producer and copy to case file) Operator is applying waste using a Nelson 150 Big Gun with a 1.41 inch ring nozzle. Gun operates at a 65-70 PSI and is op- erated in a 330 degree circle mode. The application rate cal- culates out to be approximately 0.78 inches per hour. Soils where waste is being applied is Blanton sand and Wagram loamy sand. Suggested application rates for Blanton sand is 0.75 inches per hour. Suggested rates for Wagram loamy sand is 0.6 inches per hour. Based on this information I am making the following recommend- ations: 1) use a travelling speed compensator to assure even distri- bution as the reel winds in. 2) Switch to taper bore nozzles. Taper bore nozzles provide more uniform distribution. uniform distribution is much more important when applying waste rather than plain water. 3) Reduce application rate to 0.6 inches per hour or less. Application rate for Wagram loamy sand is 0.6 inches per hour. Generally speaking as the slope of the land in- creases the application rate should decrease to reduce the possibility of runoff. Changes in pressure and nozzle size will -probably be needed to achieve this reduction in application rate. 4) waste application should be performed in a manner to avoid drift. This usually means when winds are less than 5 mph. 5) Do not apply waste during wet or rainy periods when soils are saturated or when the soil is frozen. 6) Do not apply waste during periods when the grass is dor- mant. For coastal bermuda, applications can usually be made between April 15 and October 15. If coastal bermuda is the only grass to be used for waste application then the waste water level in the lagoon must be managed so that maximum storage is available going into the fall and winter months. 7) Do not apply waste closer than 100 feet from water wells for human comsumption. 8) Do not apply waste closer than 200 feet to dwellings other than those owned by the landowner. 9) Do not apply waste in any manner that would result in waste reaching other property and/or public right of ways. ATTAC1-T"`fEN 1 L Y Agri - Taste Ma--n-a' eme t Biological and AgriCultural Engineering North Carolina State Llriiversity LIVESTOCK WASTE SA .FLING,' ANALYSIS AND CALCULATION- ' OF LAND APPLICATION RATES James C. Barker-* 1. Sk%'.PLE COLLECTION F. A. Semi- Solid --l-cc lSanure i. Scraped directly from lot into spreader a. From loaded spreader, collect about 2 lbs of manure from different locations using nonmetallic collectors.;"' ii. From storage a. Collect about 2 lbs of manure from under .the- surface''crust avoiding bedding materials and using nor=ecallic-coll.ectors. B. .Liquid .iianure Slurry - i. Under -slotted -floor pit a. Extend a 1/2- nonmetallic conduit open on.'bor-h ends'ineo manure to pit.•floor. b. Seal upper end -of conduit (e.g.. by"placing a'thumb•over end. of conduit) trapping manure that has entered lower' 'end, •remove and.em-'ty slurry into plastic bucket or nonmetallic -container. c. Take subsarmples from 5 or more locations or at least I quart. d. Kix.and add about 3/4 pint to nonmetallic sample container. ii. Exterior storage basin or -tank a. :lake sure manure has been well mixed with a liquid manure . chopper-agizacor pump. or propeller agitator. .;;.. b. Take subsaroles from about 5 pit locations, from agitator P P =- or from manure. spreader and place in a plastic bucket. t Professor and Extension Specialist, Biological and Agricultural EngineeringZr- i s f Department, North Carolina State University, Raleigh, NC. c. Mix and add 3/4 pint to a nonmetallic sample container. C. Lagoon Liquid i. Collect about 3/4 pint of recycled lagoon liquid from inflow pipe to flush tanks in a nonmetallic sample container. ii. From lagoon a. Place a small bottle (1/2 pint or less) on end of 10-15' pole. b.. Extend bottle 10-15` away from bank edge. c. Brush away floating scum or debris. d. Submerge bottle within 1' of -liquid surface. e.-Empty into a plastic bucket, repeat about 5 times around lagoon, mix. ,and add 3/4 pint to nonmetallic sample container. D. Broiler or Turkey Litter i. House litter a. Visually inspect litter for areas of varying quality, e.g.. areas around feeders and waterers, and estimate percent of floor surface in each area. b. Take about 5 litter subsamples at locations proportionate co item a. E.g.. if 20% of litter of similar visual quality is around feeders and waterers, take 1 subsample there and the ocher 4 subsamples from remainder of floor surface. c. At each location, collect litter from a 6- by 6" area do%.-n to earth floor and place in a plastic bucket. d. After 5 subsamples have been added to the bucket, nix, and add about-2-3 -lbs litter to a'nonaetallie sample container such as a 1,�gallon freezer bag and seal. ii. From stockpile a. Take subsamples from about 5 locations at least 18" into pile. b. Kix, add 2-3 lbs to nonmetallic sample container and seal. Ii. SA.�S.PLE PREPARATION AND TRANSFER A. Place sample into an expandable container that can be sealed. Rinse residues from container with clean water but do not use disinfectants, soaps, or treat in any other way. B. Pack sample in ice, refrigerate, freeze, or transfer to lab quickly, C. Hand -delivery is most reliable way of sample transfer. D. If nailed, protect sample container with packing material such as newspaper, box or package with wrapping paper, and tape. E. Commercial sample containers and mailers are also available. Contacts: i. A&L Eastern Agricultural Lab, Inc. iii. Polyfoam Packers Corp. . 7621 Vhitepine Road 2320 S. Foster Avenue Richmond, VA 23237 - Wheeling, IL 60090 Ph: (804)743-9401 Ph: (312)398-0110 ii. Fisher Scientific Co. iv. NASCO 3315 Winton Road 901 Janesville Avenue Raleigh, NC 27604 Fort Atkinson, WI 53538 Ph: (919)876-2351 Ph: (414)563-2446 F. Private analytical labs are available, but sample analyses are costly. G. The NCDA provides this service for North Carolina residents. i. Address: North Carolina Department of Agriculture Agronomic Division Plant/Waste/Solution Advisory Section Blue Ridge Road Center P.O. Box 27647 Raleigh, NC 27611 Ph: (919)733-2655 Attn: Dr. Ray Campbell ii. Forward $4 along with the sample. iii. Include the following identification information with sample: a. Livestock species (dairy, swine, turkey, etc.) b. Livestock usage (swine -nursery, finishing: turkey -breeders, brooderhouse, grower, number flocks grown on litter: etc.) c. Waste type (dairy -lot scraped manure, liquid slurry; swine -pit slurry, lagoon liquid; sludge; broiler -house litter, stockpile iv. Routine analyses performed on all samples: N, P, K, Ca, Mg. Na. S, Fe, Yn, Zn. Cu. B V. Additional analyses performed upon request: Dh, Ho, Cd, Ni. Pb prc UNITED 5:.:,TES SOIL DEPARTMENT OF CONSERVATION AGRICULTURE SERVICE ------------------------------------------------------------ W.ISTE M NAGErlEN?' FACILITY SITE EVALUATION GENERAL INFORMATION 3�orRQ�1!�2 11.�Jr. F2r1n _ --------- TELEPHONE-------------------- LOCATION-E. SIZE OPERATION - 3 �l� f o„ LOCATION DATA DISTANCE FROM NEAREST RESIDENCE NOT OWNED BY PRODUCER Z�20-Q-FT.s� ¢ 4)" /�' ,y�,J ,/ IS SITE WITHIN IGO-YEAR FLOOD PLAIN? YES------- NO-" -- If yes, Scs cannot provide assistance. IS SITE AT LEAST 100 FT. FROM A "BLUE LINE" PERENNIAL STREF.!'S? YES--z- NO ---- If no, site must be relocated. IS SITE WITHIN 1 MILE ZONING JURISDICTION OF A MUNICIPALITY? YES------- NO- Z If yes, landowner should consult with Local zoning board about required permits. Permits Must be obtained prior to design approval. Are utilities in, construction area? YES----- NO-L""- If yes, see Part 503 of the National Engineering Manual and follow policy. (Copies of naps or other reference materials may be attached to site evaluation.) 0 11 Page 1 AC. NQ J,,� / Gal o- -'Prrn i�w7 /1C WETLANDS . ^/ ILL SITE INVOLVE CLE.-.-:NC •=OCELAND l:RR /volt S5 e cLf rJ)rS f.,n NC: -CROPLAND? YES ----- NO ---- if yes, producer rust complete a Fornr.D-J,026. WILL ACTION RESULT IN S', ...:.?BUSTING? YES---- NCO-Z.- YET_`NDS ARE. INVOLVED, IT IS THE RESPONSIBILITY OF THE PRODUCER TO CONTACT THE US ARMY CORP OF ENGINEERS AND THE DIVISION OF ENVIRONMENT4-L I-IANA GEMENT TO DETERMINE IF ADDITIONAL PERMITS ARE REQUIRED. NO WETLANDS SHOULD BE ALTERED UNTIL PRODUCER RECEIVES WRITTEN APPROVAL FROM SCS, j US ART•i'r CORP OF ENGINEERS AND NC DIVISION OF ENVIRONMENTAL MANAGEMENT. (A copy of AD-1026 and CPA-026 should be attached to site evaluation.) OTHER ENVIRONMENTAL FACTORS IS ENDANGERED AND/OR THREATENED SPECIES HABITAT PRESENT? YES---- NO-• 1S A DESIGNATED NATURAL SCENIC AREA INCLUDED IN THE PLANNING AREA OR WILL PLANNED ACTIONS IMPACT ON AN ADJACENT NATURAL SCENIC AREA.? YES---- NO-z IS AN ARCHAEOLOGICAL OR HISTORICAL SITE LOCATED IN THE PLANNED AREA? YES----- NO-h .ARE THERE PRIME, UNIQUE, STATE OR LOCALLY IMP TANT FARMLANDS IN THE OPERATING UNIT? YES---- NO--- yjIi L THE ACTION RESULT IN SODBUSTING? YES----- NO - If yes to any of these questions, refer to form NC-CPA--16 for policy sources. The form does not need to be completed. ODOR CONTROL HAS ODOR CONTROL BEEN DISCUSSED WITH PRODUCER.......... ........ PREDOMINANT WAND DIRECTION? YES---- NO ---- ........POSSIBLE EXPANSION OF TREATMENT VOLUME FROM 1 CU.FT. UPWARDS TO / 3 CU . FT./LB. OF ANIMAL? YES-✓ - NO---- ........PRECHARGING LAGOON.WITH FRESH WATER TO AT LEAST 1/2 OF THE CAPACITY? ........USING GOOD SOUND JUDGMENT IN YES-- NO ------ LAND APPLICATION OF WASTE? YES---- No ---- Page 2 • 17..,} u.�P � O� ! i'ASTE HANI;-tGZ.I: v 1 APPLY HASTE? Ir NO, DOES 0RDUCER HAVE ACCESS _C MORE LAND? YES---- ---- ZP .i.;D 1c NOT J; NED BY PRODUCE. , CAN PRODUCER GE _ -.C•REEMEN T ON LAND ON WHICH TO APPLY WASTE? YES----- rNO--_---. (Attach Waste Utilization Plan to site evaluation.) SOIL INVESTIGATION VALID SHEET ATTACHED 1S SOIL SUITABLE FOR LAGOON? IS A CLAY LINER REQUIRED? r F YES, IS CLAY AVAILABLE ONLY IF SOIL INVESTIGATION ONSIT£? IS A CORE TRENCH REQUIRED? (Attach soil investigation sheet to YES- - NO----- -_ NO ------ Y£S-- NO------ QU£STIONABLE----- --- Y£S------ NO- -`--- site evaluation.) SITE APPROVED YES-K---- NO------ CONDITIONAL eco+'dc Geoe CONDITIO,N5AL� ---�--%--_- LlC0_ £NTS !r_ yf SC CC C'��_J4�✓;c�____;L?.-1^__L Lc,i LeIi_Q� _2�1��'G/c_ 7— T --- --------------------------------------------------------- THIS SITE INVE,StICA. T ION IS VALID AS LONG AS THE DESIGN AND CONSTRUCTION OF LAGOON CONTINUES IN REASONABLE TIME PERIOD. UNDUE DELAYS OR HESITANCY IN CONSTRUCTION 14AY REQUIRE THAT SITE LUATION ALIDATED. SIGNATURE_ ------- DATE_"1J____ S Page 3 Orientation: -45.0 52.00 48.00 46.00 44.00 ' 42.00 40.00 ' 30.00 .irk: Kr \\\.�i.'�.!5.--�i:�:�':N<•�", �� -.:•„III._ _ 'a(*► :�!;�rlirrrrr . Ji'==�::::;:.. _"Sr(J�iljf,..; tti,�.��°�_ •• -•.,, iu:: : rr+r+ • it+ij- •=-r=�.:-_ �a��(J/r►�aaii':..�.?- _. -_ - - ;�111.'�- 1����aa�y�� •:i ..- -:.: �• - r. _h�'•i . � �I ++1 t7/ Kam' - %�'at"-==-�-� ��. --, a ,�• �y- �-.. _..• r�:�-.;.;. ie.�..t��Arru►IH!/�f�r''��•-'+'-=__.�aa���-�_r__3'3::::-' ..�rs3 .:r..:'` { � �'"'�� - �'yi !. ��q�►�U�W% _-'"_'� a �.: • .� .��` _ ,•�'� r+i+rr� Hirl�y ••� ;: i:�••- ` it . ;,:: {errUq+► ` �sr_,�{' � aaZ`�� !! :if+i; r+irrf!►r ,wE �+�'''�r4�i,�yry.4jnlilrf Q.".Ra=•�:+r';u„'la�r!+ij�1V/ w y�� �44�l4�f1 I;�qS iI1�=�►r�r�r 4� Lower Left A' 3D Mesh Surface 3D Mesh Surface Proposed Protect: Dunn Isolation Drawing: Drawing 1 Number: Location: Bid Date: Engineer: Owner: Estimator: Prepared by: GOLDSBORO HOG FARM using SITEWORK Date: 06/22/94 Time: 19:44:51 41.00 '. 00 00 Report: Plan View Cross-section Locations Project: Dunn Isolation Drawing: Drawing 1 Surfaco: Proposed Prepared by: GOLDSBORO HOG FARM using SITEWORK Date: 06/22/94 Time: 19:35:29 Scale: 30 ftiin 51.2 48.2 45.2 42.2 39.2 50.6 47.6 44.6 41.6 38.6 Cross -Section Plots Digitized Points Horiz. scale: 25 +t/in Vert. scale: 6 ft/in Project: Dunn Isolation Drawing: Drawing I Number: Location, Bid Date: Engineer: Owner. Estimator: prepared by: GOLDSBORO HOG FARM using SITEWORK Date: 06/22/94 Time: 19:38:41 A - A' -- - - - - - - - - - - - :::::,.-..2 f- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Proposed .............................. ........... ...................................... . ..................................... ............ ExiA ing ........... ....... % .......................................... .......... ................. 202:FA ------------------------- 225.0 b - b- - - - - - - - - --- -- - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -- - - - - - - ----------------- ............................. ............................... ........... ............ ...................... ........... PropDsed ............................. ........................................... ........................... ....... .......... ... ................................................... Exis ing ........................... .............................................. .......... ....................... ................................................................................ ---------- 144-.-1•---------- F. S•70 ,. SOIL CONSERVATION SERVICE sm INVFSTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE �oc pied a TUPo 11?cy 0 • . • lr�� .. WATERSHED AREA MEASUREMENTS :. CROPLAND —ACRES ...-.. .. -. •. . •• .. low,:.. ■■■�i����.■■■■■■■�i�■■■®SEES ■SS ■■E■■NEE■N►15NN■NEMN ■■■■,�■ ■ ■� SEES■■' NOES EN/�■■■■Sri■■■■■■■■ SEEN■ EmmaENENMENNEE■NNS ■EMMSNE ■■■ NHESN■E■N■N■■■ ■SEES■■■■■■�■■■■■■■■■■■■E■ E-MM WMEME I ■NE■E■■■EE■■■ ■RNM. NEN■EN INMEMEIS©. EN000 MENE M■■■■■■ i5■NE■■ SEES■ ■■1000000000 0000000000=0 :..,PROFILE Nake and l;Sl dam -slit end spill"Al bofnes first- Men ponded area and borroto pit borines -stpercte waA mTecat rdd line. (Continued on bae-k wAre nec&ss,ory) SAow tooter t4bie elevations an dam -site 6arings. ©I©I Q�k��l�li©(ill®@Sim ml!►' ®l�[© �N�7�■l■� ■ ■!v ■[E[■1=1M OMMI■ ■1M �1�;■+■i■�� ■i■��i7{�i■I■�i���i�i■SfE �J��i■I■;�1�'i�ll■ ■'N��il,�71�;�■■SI��I�i■S �vN!■l■�■t■■l■�■�I■I■i■I■�■l■I■�I■I■I■i■ ■■1■■■�■1■ '.NCI■1■�I■;■{■I■'■{ ': {■ �® 1■�Molm ■■i■!■OMMI■INMEMMIN BORLNGSMA.DE13Y—eL.-bdy!L—SIGNA�TURE&7= 02S C�eo�Ja c t E�7� SGl �`eZ -yS� (Usc one of system, below) UNIFIED CLASSIFICATION USDA CLASSIFICATION GW - Well graded gravels: gravel, sand mix g - gravel GP -Poorly graded gravels s-sand GM -Silty gravels; gravel -sand -silt mix vfs-very fine sand GC -Clayey gravels; gravel -sand -clay mix sl- sandy loam SW -Well graded sands: sand-grtivel mix fsl-fine sandy loam SP -Poorly graded sands I - loam SM -Silty sand gl - gravelly loam SC -Clayey sands; sand -clay mixtures si - silt, ML- Silts; silty, v. fine sands; sandy or clayey silt sil - silt loam CL-Clays of low to medium plasticity cl-clay loam CH -Inorganic clays of high plasticity sicl-silty clay loam MH-Elastic silts scl- sandy clay loam OL-Organic silts and silty clays, low plasticity sic -silty clay OH -Organic clays, medium to high plasticity c -clay 1. Suitable material for embanimsent is available Yea 0 No (Indreare ruhere lorcrea an rh. sker[h on r.crra.e side) + + JJ RE��M,,{IARKSPTry cr_n4 /&C LJr_ /470n bG'Tulery, ft�f Pr 7s 0..,ci 3J So;�3 %oo� 711, beef / 2T 7frs 1Dc`r. 4 e 1 1 stoc r'c Qood ma7eiiG' Ts'r C/ay �i�r✓ qnd do '06 we �rJcifP��a/ 00J 6C Ckfi)4. bQ;Jd,-Z 2. Explain baxards requiring special atteatioa in design (Secnaae. sarina..rock etc.) GENERAL REMARKS: 24 25 ll 26 127 12sl 23 1 301131 32 33 34 35 36113738 '39 1401141 42 43 144 45 46 47 48 49 150 1611 f I 1 1 I U. S. DEPARTMENT OF AGRICULTURE APPROX. SCALE 1tt '" 1320' SOIL CONSERVATION SERVICE C OO P ED T I rJ G WITH � VSI)..SCS.OR r WpRrH 11145 STATE AGRICULTURAL EXPERIMENT STATION - sy, •; ,4.yrCr ti�tl: ti Tk � / f � - ' ` S ;* S.s4 . , `' >,- :, :'' 1 �� :� 1-• ,; ► 7 �' T;*..e�r; ..�• .r •4�t L'+' , i`i '�• TL1'•i:'F �''••1^;'i��.I• �Y '�+�1►', 11 ty r �' 'r y yt' I I t�.� tr r ' T ,,I �'Z.h M �..c,�,�S',:.{��` jr. t•;�� 1. ,� r1yJ,iti , i��t�s.� t. ,r* '1t.,s1"F.f �'i�i l •.izM `��RL,�aIr,�r�aZ': ' WO.,;`J r • L _rt S r h .i 4'i R.�.j.Y .."r�j 2 1 v t' �'i•. /' l �4 1 ;: t , , i '�' ,y.�t't. .i;' `tin•.; l r�i�: ' gc�I��' x Oro •� �:L r� 4. ;.'••: �• 1¢t V`��T; �': ��? Silk'-Y��'S���'�t'•t .SI r�ti �=' 1 .4�.t�'iM + S tii• ��. ��.'•y$': t+4�1 1. : i4 ' :L R �'� c- f4�'•.. 7, 'h .`1v'S�L- r `L•ah�^!, ' �a F.hy `v.'... �• i ia; �.S�_ r -ri `"�, �'•.� {k. �'t �: 4 �9J-t •yj .' -�'% + 4%0 . in, tiR 4` �i a� .'; • ` J, f ,��,�5 ,y�'1 •t��i�,x�! +� v. :"� v �" sr'` tk Y .� h � y�Y } ' y� �'•`••i �%(-?{,��,� M ii'`` Yy��i' ' `;'�.y�r c�` 1 i � "lt�,:S�Y�' ` •� v �.�i`�` v: ;��' t �.'.;,,�r'C'}�, �'�' w tiT '"! 'N` •�'i �j i.'{,. �4�, .!i ^'��` - 'J` yr. ti�s,,� ,��,,s; ^`��y�, �r'S +,{'r+3i'' ff� ry 1 ,7 ,r5 } ''p . lt;�, f=�a�i�?.a`�,rL }+„`•�� .+.fi;yl�:, �, c<:,�t.+�'t,A ii ; ,.t7h#�+v.�`'y {} . ., ••,.x'i� 3 1 : "r'i[ j-� ,:,rror r::�5 r.�L.TU s- � '� f, �.�tih? �x+.�� •Y�FJY� �.+:T"[r _. �, r } � � ._� v4, �^: ,,.•i jr r1 ��' �rt+� R1,4 '� � it * � T � r"�'"r ' R'Sfiw ,��l7tay`�l'f�' �..tii} �r•r.�! �' r r• . . •` 1, � , i` i ;� ti T.}a ., 7.�� ,Y ',�,, r.:1' t�,,f � t, why '� � f�� � +-`nr.L;�L�'. .•. �vm x'ti�rii, � �'r�'.�^l ',i' n. tiy1 5'1,.,, v �E� 1 �•• t�„F t r Xt. �i'+�i'1+1fU ,>t. t` Ai ���►`, Alm Tt :�.t•j'.rt.'' '•''C ��+py ' :� fk 'i' ' ' ^•... • �, `� ', '�- S. � }0l y � y(/�}!d ,t� a�f�t�S �{tC.j�''� i - � ,, �yy w tY + �• I. �'' %S �. I.{.t �+, ,�1�� Iilir� �tSJ Yxi�fi 'rfini'��` t}415���� x'��F'Z!iR1 �_ � T �• , •� . y i �, qr��' •' '`� � ,tV�T � �•,+1,�. ���I , k�� �'(i((3y�.k�-rp:4 �� A�<� <7i; �'.;�y."+�'-u '`xi� y - . 1 �+ t�2� '. t,• yy} -. t,.• i �,v ,' Yr�.i" `ttifti••,h � L �I` ±a � r%' ++,�• � i ! .�� r � M, "3 • •� rf� : ` '.,.{=7 �i �..f * r ~' ; �t ,.rr.. �.� .r.L i { • Cry r � •���i ;..'�. �' .;�4 :;''e �• .`S'..li �T.`�,i''T -. ir�4ii�r � 3r1{1 'ts4�{`i;/7'a!• •!•~,- _ .v ` L'h r... ➢nY�r; .' "� _ '� '`DTI-'f-.hl�'.f'7y'a y'. .v .i �,i•: ..`l' , 'i 1. rr •,: �'y �• 7306 iOD'Mr �h! at,� r WQ�fr .r r '�. `+" r•.' s ,�;4' '. �i' . i'�+ >rn � •:w' t . t �'_ tv, *. ' • `! �720�3 � R �,'�,, � r�,a.r, } ..R: �� �'. ��� 4 � � t''•r ,� `�({fi3�,r [ ;. p r ye• �.{ �_ r • PTf' I �50 G F r �'tvr•rr• .r J�.e �; 4'i+' �; rf. /'ruy �yi'`,Ty'i ''}+ ',S .f �y. •r �.. 1... .. .: - `� 4• �,. �.., �� r ''; � 1. i, r � ,`, -.' l�1,' Y;� !' _�i�;�- [ _,r,��• r� IS ��rr-'R�rrrf�;i .v�lr[•.a is "�} 1r1 ';. � ,� �� eh'' *` ,� Sy Imo, .:.S , ti s• t: :.: •y, -; ! f , t + +i� f. ., ', � [NSF ,. .r.�i�S'•'''' "�ai� '�I'1!"' ,,-,. ' Jyj�'�--.i�, _ 'r+ *.�.,sx ' :ix I . � � �• .tif"'��r ,`,. rt + � per , ���' 1�-(�' '�f!•ry.,�`�t ''J�r ti. �, '::+iis. a�l� ��/r' • aTr it •, t 'i F syr { �¢,I _ w •r�p , ' �',. '� d1�:, �yCr ��lt'. +•�?'a 'v .s 'G� %3ip 9jJ. A �`r� :�e,� b „J :�:' ;r'+7: rat. `f . �. •.Trf f`., r, i73a�:. •! ,�1iu � ; � x.� . 1y . �y �"� ,Sn`."t:•4'e..:.. � �k�j. ! - ../rF1•' '; £+. ah. • r i i`° +� to-- +{i:. � , �f �lr f �. r +<. '.s�� �f � �8�~�a< j � + �: r' 3 `61 • } 'xl � y x� - , �� 3 7o g / .J . ° ...fF�t ♦j 7p' J �� � Mrl u {♦ 15`�' 1 .. .. �� fir' �¢ a� .�r7.7ja.:, •.t f- `, Ir i4 t •�t hi(�730 S .1,£��� �' �,�,::'..�i; :� .yfl ", � C. �� �' � ti Q �. `•47.y y PI�.t`� `` ri,, ti �£•..}rF,+�� `-;y: Site Balance report Grid cell size: 1.40 by 1.40 Original drawing scale: 50.00 ft/in Project: Dunn Isolation Drawing: Drawing 1 Number: Location: Bid Date: Engineer: Owner: Estimator: Prepared by: GOLDSBORO HOG FARM using SITEWORK Date: 06/22/94 Time: 19:30:55 Final surface: Proposed Initial surface: Existing There are no "Proposed" structures. Fill shrink/swell percent: 25.00 Cut shrink/swell percent: 0.00 Balancing to 0.0 */- 10.0 cubic yards delta Cut Fill Cut - Fill 0.000 1858.93 815.53 1043.41 1.099 1342.03 1475.19 -133.16 0.974 1390.13 1387.53 2.60 Raise "Proposed" by 0.974 feet. SHEET 1 OF 2 SPECIFICATIONS FOR CONSTRUCTION OF WASTE TREATMENT LAGOONS ---------------------------------------------------------- FOUNDATION PREPARATION: The foundation area of the lagoon embankment and building pad shall be cleared of trees, logs, stumps, roots, brush, boulders,sod and rubbish. Satisfactory disposition will be made of all debris. The topsoil from the lagoon and pad area should be stripped and stockpiled for use on the dike and pad areas. After stripping, the foundation area of the lagoon embankment and building pad shall be thoroughly loosened prior to placing the first lift of fill material to get a good bond. EXCAVATION AND EARTHFILL PLACEMENT: ----------------------------------- The completed excavation and earthfill shall conform to the lines, grades, and elevations shown on the plans. Earthfill material shall - be free of material such as sod, roots, frozen soil, -stones over 6 inches in diameter, and other objectionable material. To the extent they are suitable, excavated materials can be used as fill. The fill shall be brought up in approximately horizontal layers not to exceed 9 inches in thickness when loose and prior to compaction. Each.layer will be compacted by complete coverage with the hauling and spreading equipment or standard tamping roller or other equivalent method. Compaction will be considered adequate when fill material is observed to consolidate to the point that settlement is not readily detectible. NOTE THE SPECIAL REQUIREMENTS FOR PLACEMENT OF LINERS IN THE LINER SECTION OF THIS SPECIFICATION. The embankment of the lagoon shall be installed using the more impervious materials from the required excavations. Construction of fill heights shall include 5 percent for settlement., Dikes over 15 feet in height and with an impoundment capacity of 10 acre-feet or more fall under the jurisdiction of the NC Dam Safety Law. The height is defined as the difference in elevation from the constructed height to the downstream toe of the dike. Precautions shall be taken during construction to prevent excessive erosion and sedimentation. LINER: THE MINIMUM REQUIRED THICKNESS SHALL BE 1.6 ft. NOTE: LINERS (PARTIAL OR FULL) ARE REQUIRED WHEN THE ATTACHED SOILS INVESTIGATION REPORT SO INDICATES OR WHEN UNSUITABLE MATERIAL IS ENCOUNTERED DURING CONSTRUCTION. A TYPICAL CROSS SECTION OF THE LINER IS INCLUDED IN THE DESIGN WHEN LINERS ARE REQUIRED BY THE SOILS REPORT. When areas of unsuitable material are encountered, they will be over - excavated below finish grade to the specified depth as measured perpendicular to the finish grade. The foundation shall be backfilled as specified to grade with a SCS approved material (ie - CL,SC,CH). REFER TO THE SOILS INVESTIGATION INFORMATION IN THE PLANS FOR SPECIAL CONSIDERATIONS. SHEET 2 OF 2 Soil liner material shall come from an approved borrow area. The minimum water content of the liner material shall be optimum moisture content which relates to that moisture content when the soil is kneaded in the hand it will form a ball which does not readily separate. Water shall be added to borrow as necessary to insure proper moisture content during placement of the liner. The moisture content of the liner material shall not be less than optimum water content during placement. The maximum water content relates to the soil material being too wet for efficient use of hauling equipment and proper compaction. Proper compaction of the liner includes placement in 9 inch lifts and compacted to at least 90 percent of the maximum ASTM D698 Dry Unit Weight of the liner material. When smooth or hard, the previous lift shall be scarified and moistened as needed before placement of the next lift. The single most important factor affecting the overall compacted perme- ability of a clay liner, other than the type of clay used for the liner, is the efficient construction processing of the compacted liner. The sequence of equipment use and the routing of equipment in an estab- lished pattern helps assure uniformity in the whole placement and compaction process. For most clay soils, a tamping or sheepsfoot roller is the preferable type of compaction equipment. The soil liner shall be protected from the discharge of waste outlet pipes. This can be done by using some type of energy dissipator(rocks) or using flexible outlets on waste pipes. Alternatives to soil liners are synthetic liners and bentonite sealant. When these are specified, additional construction specifications are included with this Construction Specification. CUTOFF TRENCH: _ Cla A; i.x r�A adle� (o4erL 1;eea,*� v A cutoff trench shall be constructed shown on a typical cross section in cutoff trench shall be determined by materials. VEGETATION: under the embankment area when the plans. The final depth of the observation of the foundation All exposed embankment and other bare constructed areas shall be seeded to the planned type of vegetation as soon as possible after construc- tion according to the seeding specifications. Topsoil should be placed on areas of the dike and pad to be seeded. Temporary seeding or mulch shall. be used if the recommended permanent vegetation is out of season dates for seeding. Permanent vegetation should be established as soon as possible during the next period of approved seeding dates. REMOVAL OF EXISTING TILE DRAINS ------------------------------- When the drains are encountered, the the will be removed to a minimum of 10 feet beyond the outside toe.of slope of the dike. The tile trench shall be backfilled and compacted with good material such as. SC, CL, or CH. r f a � °r -I I � , � i R - � � �d!f'► u � 4 r r . a 7 ka ^ 1 � I ti ya I V /l nATF : 07-nS_g4 to A D _10 _2 61 P A G E ____�_________ 1 ,(E:NORTH CAROLINA 37-2. COUNTY: JOHZlSTOV--___i(it _31 CfiUF'_YEAR ?a4. ID NO. 241-7(-9770_—__—_—_ 'FtODUCEF,TNAME 'h ADDRfSS TELEPHONE 6. COUNTY OFFICE NAME h ADDRESS TELEPHTT H G MAXWELL III JOHNSTON COUNTY A.TS OFFICE (919) 934-7156 PO BOX 10009 BOX too GOLDSBORO, NC 275320009 SMITHFIELD NC 27577-0180 FARMING INTEREST (Completed A�producer)__ Circle each tractrfor which a 'YES' answer applies to the tract far Items 10, 11, 12, OR f? on AD-i026. (OF' = Operator, OW = Owner, OO = Owner -Operator). FARM OP/ TRACT CROPLAND OWNER 00 OW/ NO 00 B292 OW t598 45.0 H G MAXWELL III B292 OW 1599 .F H G MAXWELL III E02 OW 1600 26.8 H G MAXWELL III F'HOTO/GRIT) -SCS DETERMINATIONS- 3. 9. t0. 11. HEL 027 A027 Wetland N16/1B N N N Y, t 5/3C N N N 015/1B N N H 12. You are recorded as a tenant or sharecropper on the farm numbers listed below, Please specify the tracts that apply to you by completing items (a) and (b). (a) Circle 'YES' or 'NO' in the 'FARMING INTEREST' column beside each tract number below to indicate whether you have a farming interest in the tract. The HELC and WC provisions will apply to all land in which you have a farmiDj interest. (b) If any 'YES' answer to questions 10,11,t2,or 13 on AD-1026 applies to your land listed below, circle the applicable tract in the 'Tract No' coluain. FARM TRACT FARMING CROPLAND OWNER NO NO INTEREST NONE FOUND t3. MULTIPLE COUNTY INTERUT:(CONTROL COUNTY:WAYNE—___________ NCB OTHER CMTIES 6 STATES BLADEN NC; DUPLIN NC; GREENE JONES NC; LENOIR HC FINAL PAGE PHOTO/GRID -SCS DETERMINATIONS- 8. 9. 10. 11. HEL 027 P327 Wetland NC; JOHNSTON NC 1 - AD-1026 oz m g,i UNITED STATES DEPARTMENT OF AGRICULTURE Form Approved - OMB No.0560-0004 . HIGHLY ERODIBLE LAND CONSERVATION (HELC) AND WETLAND CONSERVATION (WC) CERTIFICATION - 1. Name of Producer: }..:. ?..Identification Number - _ 3.. Crop:'Year n.:'; �} 4. Do the attached AD-1026A(s) list all your famling interests by county, and show current YE NO " SCS determinations? If "Nn", i r�rrlurl rrxu' Crxtrrlr ASCS Or e hcfi�re crrnrpletin�� this fnrnr. 5. Are you now, applying. for, or. -do you have a FrnHA insured or guaranteed loan? / 6::- Do'you have a crop ins6rance'6ontract issued or reinsured by the Federal Crop` n r Insurance Corporation? "7. .Are you a ,landlord - on any farim, listed on AD-1026A that wilL.,not be :in."co_mpliance with HELC and WC provisions? = 8. Has a HELC exerription been approved on any 1;anms listed on AD-1026A because the landlord refuses to comply? 9. List here or attach a list of affiliated persons with farming interests. See reverse for -an explanation. Enter "Norte",.if applicable. If items 7 or 8 are answered "YES", circle the applicable farm number on AD-1026A. During either the crop year entered in item 3 above, or the term of a requested USDA --loan - 10. Will you plant or produce an agricultural commodiryon land -for which'alhighly erodible-' '!r- YES NO land determination has -not -been made? .-- . .. _ __. _ _..._ _✓ 11. Will you plant or produce an agricultural commodity on any land that is or was a vvet area on which planting was made possible b- draining, dredging. filling, or leveling or any other' 4 =-• _ ' means after December 23, 1985'? ✓ 12. Will you, or have you since November 28. 1990. made possible the planting of any crop, pasture, agricultural commodity, or other such crop by: la) converting any wet areas by draining, dreogino filling, leveling, or an)- oalIer means, or. (b) improying off- modif . y g- drainage system" 13. Will, you convert any,.wet areas for.fish production, trees,.vipeyards, shrubs, building consEruc60n, or other non-agricultural use? "YES" -`for any one of these items, sign, and date inItem 14 below.Circle the applicable ::,If answers to items I 0, 111 .tractnumber on AD-1026A, or list'in item'12 on'AD=1026A. ASCSWII refer this A4)(526 12 ' or'13 pare'. .::::.: ,:.�. .:� to SCS` for a determination. DO NOT sign in item 16 until SCS determination is complete. "NO" for all of these items or SCS determinations are complete, complete item 16. 1Vcerfifyhe above information, and the information on attached AD-1026A's, is true and correct to'thebest of my 14. Signature of Producer �'%Date 0?p,�114q15. Referral To SCS SCS determination is needed becaus Daie Referred Signa f ASGS Repre rive(Corrrpleted by Awered in item 10, 11, t 2 or 13. - 5 - � � NOIL:-,�t3etore,signing in item'l8, Rea0':A1J-it}ztJ Appendix. I hereby certify that the above information, and the Information on attached AD-i026A's,' is true, arid_Correct fo the best of my knowledge and belief. It is my responsibility to file; a new AD-i026 in the event there are any changes in rimy farming operation(s). In signing this form, I also certify that I have received and will comply with the compliance requirements on 16. Signature of AD-1026 Appendix. Producer � Dale 17. Remarks: Sr e+L' ho r, e p f - S.D.;'. � 26 1. Name anti Aoo(ess or Person 2. Date of Request SO 'I Cor;s rvation Service tJune 91) y G- lncv HIGHLY ERODIBLE LAND AND WETLAND 3. County 1 I / .s/ I CONSERVATION DETERMINATION ��/as h�'`"D A" e�,,�,3,z°DO9 �a has ioar 4. Name of USDA Agency or Per s n Requesting Determination 5. Farm No. and Tract No. /I 5 !14 A -r r '1--, 1 P72 Q:7 -g�'90 SECTION I - HIGHLY ERODIBLE LAND . 6. Is soil survey now available for making a highly erodible land determination? Yes 03" No FIELD NO,(s) TOTAL ACRES ��;`� �� � � IWAMt "= 7. Are there hi hly erodible soil map units on this farm? Yes No ❑ 8. List highly erodible fields that, according to ASCS records, were used to produce an agricultural commodity in any crop year during 1981-1985. 9. List highly erodible fields that have been or will be converted for the production of agricultural commodities and, according to ASCS records, were not used for this purpose in any crop year during 1981-1985; and were not enrolled in a USDA set -aside or diversion program. 10. This Highly Erodible Land determination was com feted in the: Office © Field ❑ `.���� �;<` ; '��t�€:� :. SECTION II - WETLAND FIELD NO.(s) TOTAL ACRES 11. Are there h dric sails on this farm? Yes No ❑ -' ...: 'r i 12, Wetlands (W), including abandoned wetlands, or Farmed Wetlands (FW) or Farmed Wetlands Pasture (FWP). Wetlands may be farmed under natural conditions. Farmed Wetlands and Farmed Wetlands Pasture may be farmed and maintained in the same manner as they were prior to December 23, 1985, as long as they are not abandoned. 13. Prior Converted Cropland (PC). Wetlands that were converted prior to December 23. 1985. The use, management, drainage, and alteration of prior converted cropland (PC) are not subject to the wetland conservation provisions unless the area reverts to wetland as a result of abandonment. 14. Artificial Wetlands (AW). Artificial wetlands includes irrigation -induced wetlands. These wetlands are not subject to the wetland conservation provisions. 15. Minimal Effect Wetlands (MW). These wetlands are to be farmed according to the minimal -effect agreement signed at the time the minimal -effect determination was made. 16. Mitigation Wetlands (MIW). Wetlands on which a person is actively mitigating a frequently cropped area or a wetland converted between December 23, 1985 and November 28, 1990. 17. Restoration with Violation (RVW-year). A restored wetland that was in violation as a result of conversion after November 28, 1990, or the planting of an agricultural commodity or forage crop. 18. Restoration without Violation (RSW). A restored wetland converted between December 23, 1985 and November 28,1990, on which an agricultural commodity has not been planted. 19. Replacement Wetlands (RPW). Wetlands which are converted for purposes other than to increase production, where the wetland values are being replaced at a second site. 20. Good Faith Wetlands (GFW+year). Wetlands on which ASCS has determined a violation to be In good faith and the wetland has been restored. 21. Converted Wetlands (CW). Wetlands converted after December 23, 1985 and prior to November 28, 1990. In any year that an agricultural commodity is planted on these Converted Wetlands, you will be ineligible for USDA benefits. 22. Converted Wetland (CW+year), Wetlands converted after November 28, 1990. You will be ineligible for USDA program benefits until this wetland is restored. 23. Converted Wetland Non -Agricultural use (CWNA). Wetlands that are converted for trees, fish production, shrubs, cranberries, vineyards or building and road construction. 24. Converted Wetland Technical Error (CWTE). Wetlands that were converted as a result of incorrect determination by SCS. 25. The planned alteration measures on wetlands In fields are considered maintenance and are in compliance with FSA. 26. The planned alteration measures on wetlands in fields are not considered to be maintenance and if installed will cause the area to become a Converted Wetland (CW). See item 22 for information on CW+year. ,! t. i ne wetiana oetermination was compietea in the otfice fieldFlanowasoeuvereaLj mailedU2rio the person on 28. Remarks. 7�C, cLre-a- 7 5 /pG4iec J 42.aC �j Pn C r�7� is f7o � or GG/ ah 14reit 1s 1i9C ar �esS� po pot" CQ,, Ct �Yea.f`v<, arvea- 7ya� is /rx4.,c� oo,, rn C w5 -Sr 29. 1 ce ify that the above determination is car et and adequare for use in determining 311. Signature of SCS District Conservationist 31. Date eligibility for USDA program benefirs, and that wetland hydrology, hydric sons, and hpdraphytic vegetation under normal circumstanres exist on all areas ourlined as Werlaads: Farmed Wedands, and Farmed Wetlands Pasture. Assistance and programs of the Soil Conservation Service available without regard to race, religion, color, sex, age, or h6ndicap. SCS Copy " 1 united States Soil Deparimenl of conservation Agriculture Service 806 North Street Smithfield, NC 27577 Tract r j '� C( S Dear i�ri 1.`fl�a'L- -UA' In compliance with the provisions of the Food Security Act of 1985 and the Food Agriculture Conservation and Trade Act of 1990, 1 am enclosing a copy of the Highly Erodible Land and Wetland Conservation Determination Work Sheet (SCS-CPA- 026) and a photo copy of your farmland. Determinations have been made on this tract as you requested. Fields listed in item 8 or item 9 on Form SCS-CPA-026, and shown on the enclosed map, have been classified as highly erodible under the current definition. Fields listed under 12 of Form SCS-CPA-026 and marked "Wit, are considered wetlands. You may lose all USDA program benefits if you clear or drain these areas. Potential wetlands are marked "PW" on the attached photograph. Soils in these areas are not normally wetland soils, but could have some small areas of wetland contained within them. You should contact SCS for an onsite check before clearing these areas. If you do not agree with this determination, you may request a redetermination within 15 days of the date of this letter. Your request must be made in writing and should state the reason for the request for reconsideration. Requests are to be made to the above address. If you have any questions, you may call this office at (919) 989--5381. Yours truly, � // r Kenneth C. York District Conservationist O The Sod Conservation ServiCe is an agency of the Qeoertment of Apricuhure 1 Total Volumes Grid cell size: 1.40 by 1.40 Original drawing scale: 50.00 ft/in Project: Dunn Isolation Drawing: Drawing 1 Number: Location: Bid Date: Engineer: Owner: Estimator: Prepared by: GOLDSBORO HOG FARM using SITEWORK Date: 06/22/94 Time: 19:31:52 Final surface: Proposed Initial surface: Existing Cut . Fill Difference : Tight Volumes 1858.93 652.42 1206.51 All volumes are in cubic yards. Expansion (%) 0.00 25.00 Net Export : Expanded Volumes 1858.93 815.53 1043.40 06/23/97 09:27 FAX WASTE UTILIZATION PLAN 19003 REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations•that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (see FOTG Standard 393 -Filter Strip) 5. 'Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding,, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina', for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. Page: 9 06/23/97 09:27 FAX 004 WASTE UTILIZATION PLAN ItEQUIRED SPECIFICATIONS 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips). 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharges directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. Page: 10 06/23/97 09:27 FAX 10005 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption it should only be applied preplant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production and maintained. Soil and waste analysis records shall be kept for five years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page: 11 Swine Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices • Swine production Q Vegetative or wooded buffers; Q Recommended best management practices; U Good judgment and common sense Animal body surfaces • Dirty manure -covered animals R Dry floors Floor surfaces • Wet manure -covered floors 3' Slotted floors; IT Waterers located over slotted floors; f3 Feeders at high end of solid floors; W Scrape manure buildup from floors; ❑ Underfloor ventilation for drying Manure collection pits • Urine; ❑ Frequent manure removal by flush, pit recharge, • Partial microbial decomposition or scrape; Cl Underfloor ventilation Ventilation exhaust fans • Volatile gases; Ca' Fan maintenance; Dust L7 Efficient air movement Indoor surfaces • Dust ff Washdown between groups of animals; 5V Feed additives; D Feeder covers; Ca Feed delivery downspout extenders to feeder eeyem Flush tanks • Agitation of recycled lagoon ❑ Flush lank covers; liquid while tanks are filling IT Extend fill lines to near bottom of tanks with anti -siphon vents Flush alleys • Agitation during wastewater ❑ Underfloor flush with underfloor ventilation conveyance Pit recharge points • Agitation of recycled lagoon a Extend recharge lines to near bottom of pits liquid while pits are filling with anti -siphon vents Lift stations • Agitation during sump tank ❑ Sump tank covers filling and drawdown Outside drain collection • Agitation during wastewater ❑ Box covers . or junction boxes conveyance - Nnvcniher 11. 1996, Page 3 Source Cause BMPs to Minimize Odor Site Specific Practices End of drainpipes at • Agitation during wastewater ❑ Extend discharge point of pipes underneath lagoon conveyance lagoon liquid level Lagoon surfaces • Volatile gas emissions; GY Proper lagoon liquid capacity; • Biological mixing; W Correct lagoon startup procedures; • Agitation Gr Minimum surface area -to -volume ratio; IT Minimum agitation when.pumping; ❑ Mechanical aeration; er Proven biological additives — wrt PA Irrigation sprinkler • High pressure agitation-, Gr irrigate on dry days with little or no wind; nozzles • Wind drift EY Minimum recommended operating pressure; 19" Pump intake near lagoon liquid surface; ❑ Pump from second -stage lagoon Storage tank or basin • Partial microbial decomposition; ❑ Bottom or midlevel loading; surface Mixing while filling; ❑ Tank covers; • Agitation when emptying ❑ Basin surface mats of solids; ❑ Proven biological additives or oxidants Settling basin surface • Partial microbial decomposition; ❑ Extend drainpipe outlets underneath liquid • Mixing while filling; level; • Agitation when emptying ❑ Remove settled solids regularly Manure, slurry or sludge • Agitation when spreading; ❑ Soil injection of slurry/sludges; spreader outlets . Volatile gas emissions ❑ Wash residual manure from spreader after use; ❑ Proven biological additives or oxidants Uncovered manure, 9 Volatile gas emissions while ❑ Soil injection of slurry/sludges slurry or sludge on field drying ❑ Soil incorporation within 48 hrs.; surfaces ❑ Spread in thin uniform Iayers for rapid drying; ❑ Proven biological additives or oxidants Dead animals • Carcass decomposition 0 Proper disposition of carcasses Dead animal disposal • Carcass decomposition ❑ Complete covering of carcasses in burial pits; pits ❑ Proper location/construction of disposal pits Incinerators • Incomplete combustion ❑ Secondary stack burners AW - November 11, 1996, Page 4 Source Cause BMPs to Minimize Odor Site Specific Practices Standing water around • improper drainage; IN Grade and landscape such that water drains facilities . Microbial decomposition of away from facilities organic matter Manure tracked onto . Poorly maintained access roads gr Farm access road maintenance public roads from farm access .i Additional information : Available From Swine Manure Management; 0200 Rule/BMP Packet Swine Production Farm Potential Odor Sources and Remedies ; EBAE Fact Sheet Swine Production Facility Manure Management: Pit Recllarge - Lagoon Treatment; EBAE 128-98 Swine Production Facility Manure Management: Underfloor Flush - Lagoon Treatment ; EBAE 129-88 Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE I03-93 Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet Controlling Odors from Swine Buildings; PIH-33 Environmental Assurance Program ; NPPC Manual Options for Managing Odor; a report from the Swine Odor Task Force Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings NCSU, County Extension Center NCSU -BAE NCSU - BAE NCSU - BAE NCSU - BAE NCSU - BAE NCSU - Swine Extension NC Pork Producers Assoc NCSU Agri Communications Florida Cooperative Extension AMOC - November If, 1996, Page 5 Insect Control Checklist for Animal Operations Source Cause BNWs to Control Insects Site Specific Practices Liquid Systems Flush Gutters • Accumulation of solids ❑ Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed ❑ Remove bridging of accumulated solids at discharge Lagoons and Pits Crusted Solids 9 Maintain Iagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 - 8 inches over more than 30°/a of surface. Excessive Vegetative • Decaying vegetation EY Maintain vegetative control along banks of Growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along watces edge on impoundment's perimeter. Dry Systems Feeders • Feed Spillage ❑ Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage. Or Clean up spillage on a routine basis (e.g., 7 - 10 day interval during summer; 15-30 day interval during winter). Feed Storage • Accumulations of feed residues ❑ Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). ❑ Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. AMir -November 11, 1996, Page 1 Source Cause Animal Holding Areas • Accumulations of animal wastes Q and feed wastage O Dry Manure Handling • Accumulations of animal wastes Q Systems a O BIVIPs to Control Insects- Site Specific Practices Eliminate low areas that trap moisture along fences and other locations where "waste accumulates and disturbance by animals is minimal. Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (Le., inspect for and remove or break up accumulated solids as needed). Remove spillage on a routine basis (e.g., 7 - 10 day interval during summer, 15-30 day interval during winter) where manure is loaded for land application or disposal. Provide for adequate drainage around manure stockpiles. Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC, 27695-7613. " AMIC - November 11, 1996, Page 2 ., Mortality Management Methods (check which method(s) are being implemented) ❑ Burial three feet beneath the surface of the ground within 24 hours after knowledge of the death. The burial must be at least 300 feet from any flowing stream or public body of water. Rendering at a rendering plant licensed under G.S. 106-168.7 C! Complete incineration ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the Department of Agriculture (I' Any method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) December 18, 1996 State of North Carolina Department of Environment, Health and Natural Resources MIA Raleigh Regional Office James B. Hunt, Jr., Governor PEHNJonathan B. Howes, SecretaryDivision of Soil and Water Conse June 20, 1997 George Pettis Goldsboro Hog Farms PO Box 10009 Q Goldsboro, NC 27532 SUBJECT: Operation Review Summary Dunn/Maxwell Sow Farm Facility Na. 51-40 . �jji Johnson County Dear Mr. Pettis, On June,V, an Operation Review was conducted of Dunn/Maxwell Sow Farm, facility no. 51-40. This Review, undertaken in accordance with G.S. 143-215.1OD, is one of two visits scheduled for all registered livestock operations during the 1997 calendar year. The Division of Water Quality will conduct a second site inspection. During the Review, it was determined that waste was not being discharged to the waters of the State, and the animal waste collection, treatment, storage and disposal systems were properly maintained and operated under the responsible charge of a certified operator. A copy of the completed review form is enclosed for your information. The following observation was discovered and noted for response. This was not required at the time of review but in preparation for the upcoming general permit, you will need to secure and maintain the following record on your farm: an Operation and Maintenance Plan for the waste management system. The Division of Soil and Water Conservation appreciates your cooperation with this Operation Review. Please do not hesitate to call me at 919/571-4700 ext. 208 if you have any questions, concerns or need additional information. S O'Keefe Environmental Engineer I cc: Johnson Soil and Water Conservation District Judy Garrett,-Water'Quality Regional -Supervisor DSWC Regio`nal'Files 3800 Barrett Drive, Suite 101, 4M FAX 919-571-4718 Raleigh, North Carolina 27609 N%A C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources James B, Hunt, Jr., Governor Jonathan B. Howes, Secretary November 12, 1996 Goldsboro Hog Farms Dunn/Maxwell Sow Farm PO Box 10009 Goldsboro NC 27532 SUBJECT: Operator In Charge Designation Facility: Goldsboro Hog Farm-Dunn/Maxwell Sow Farm Facility ID#: 51-40 Johnston County Dear Farm Owner: Senate Bill 1217, An Act to Implement Recommendations of the Blue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator. The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date. Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycutt of our staff at 919C733-0026. Sincerely i A. Preston Howard, Jr., irector Division of Water Quality Enclosure cc: Raleigh Regional Office Water Quality Files P.O. Sox 27687. Nf ���C FAX 919-715-3060 Raleigh, North Carolina 2761 1-7687 An Equal FAX Actlon Employer Voice 919-715-4100 W% recycled/10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B, Howes, Secretary �EHNR DIVISION OF ENVIRONMENTAL MANAGEMENT November 9, 1995 Mr. Eddie Rowe Dunn -Maxwell Sow Farm 2125 Scout Road Four Oaks, North Carolina 27524 Subject: Compliance Evaluation Inspection swine Operation SR 1199 Facility No. 51-40 Johnston County Dear Mr. Rowe: On October 17, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine potential problems associated with animal waste disposal systems. Mr. Toweil's site visit determined that wastewater from your facility was not discharging to the surface waters of the state. In addition, no manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) were observed. As a result, your facility was found to be in compliance during this visit. Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 1997. This plan must be Certified by a designated technical. specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding your inspection please call Buster Towell at (919) 571-4700. Sincerely, &�' 'i� J y E. Garrett Water Quality Supervisor cc: Johnston County Health Department Johnston County Soil and Water Conservation District Steve Bennett -Regional Coordinator, Division of Soil and Water Conservation 38W Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 60% recycled/ 10% post -consumer paper f . ' e+ "", ",-, '", '''*' , , �� . . ., -., . - , .. I , , . . . .. .. .. . � � , . f. I -.1.11-1. .I .11 - i � . " . . i , . %, � .1 . . 6 I . � , , 7 . . .. . . . . ��",.­,., , ..... "- .._,_ .'�.. - , . . . . . .. - . .. . � . , . " . . . , . ., � - .. .� . 1. . . " , . , . � . I . . � . . . . . 1. i '. o f z 3 Lr s 607 Y,Nay:Y.;G'•+ CIA z:'_: . Y' sI ,J:�.0 ; AiA. '..11 _ , ... _ I -,'.,-'..I osa�seraalaci i�9� r4 +s c' �:,+Aaxrr artarmac,yr x�sZ .� a�^cs Mewl i H tom;" �_ I , �a ; .W:rr..; rI "I r ?_ _ i �., I' ! I I ! ! I i I!, I I i I I fat .. I I! I ' 1 9 I i 11 1 1 I � t. }.1 I I a I I, I 1 I I i 1 ;I� I' I I i I' I I I 111 I a . i ' i -, ,�. i I 1 I I' ' ! { i -' I ' - � ' Y CIN.1 , I.I- , ! , ' . � i i I i 11 I-, ! , ° . ,. .I i,.�.� I ✓YY1 i.i ! I : ` ..i r ' j I i i I .i �� r` i .I � i - I I ,- --- _ _- - rJ '-`•._T_'- _Y' , I i _ {� r"t. _I _-"__i_'Y--t i �-^r' _ ._ I I + `, i 'p .i ' I- I 1 + I 1 . f i. I .i .I ' I }7, ; ' _. -I I I i- 'i" i I -! -I. I !-! ; I i I I' I , �' S .I ;�V :i V7 . I., t I 1 1. e- I I i! �iJEAFfliT I r : A 1 I' I I �I ', NI C �L , t, l�l .. I I iiESIQ�IJCCIJUQ�' �.. ..1 .1 - I i . ;1,. -W k, I -.i I Ii,.I. .I i;;+,: 1. II I 11; I IIIi' 3 f-I I., ! : t I 1,, 1 r! i �'I'' !'I I I ,-1-i I i I! l,i.I i Z ! u v_ i --, ; I_ �_ , .i I. I_ i. i�. ' ,. 1 I ;. i , I E , ! I I , V.. V� ! S- - 1 1 { , 'i' I1 I 7 'M i I i 1 j �}�{�.� 1 1 i I .. I I I 4,I�'e{ I i w ' ,__,__,- ' r l�!_.._•{ ___ ., I ...I_i. 1'��__ `j_i I ' r -f-I '; 'IO i'.i"'_'�_' �.I_,-w.7..- ! ,-,- r-'-I .41.....•.., 1 i - .-. "� -, -i , i 3-1 I ,. , -i i I . I i! _1 I ? I , 1.. i �! I j l it k I~ :'I'1'? L I..I i I I! i I'! I i I 1 ! i I.,' ` I i .� Y ill i I I! i I i 1 •' 11 li i.( r I. I i t i! I! I, I 1 i M G t j +. I. r? ! ! i. 1 I I II I -� I I „I l I ., I, I j I i I 1 y . r-i' 1 t i, 1. . i ,_ 1 I! ! ' i i I JT�!!1/t� IY'LI I I 1 E !'" "`r 1 I. I 1 1 I 1 , y i , I 'i ! , ; ' ; i I Q' � L I ;T�� F't v' 52.o -r,A: 20,'�o,l i ; ' �"' t, c; + I' I 1 f I I I } I- I f I E! i I ! I. I ' E' I �' \t 9i _I -.�._ I .l , I_ I . I ! i -I I '1- I..L- I I i I ' U Z•I �: �1. ! _� _ I I- 1 ; I.,L� - { I , -, ; I _ � !- I i 3 i 1 .I Z S _� _I -i x `I . 4 j 1 1 I ' i- I I , ,; S I 1 7-�--r ! T i ! r i t , i! i - .. p i- 1 i_{.I. I 1_L.I_' I' 1-i ,..}. I I f I- -.i- I. r t i ! I E ~I I ; ; ' ! i �! . I' 1 } ; i I,- I } �s�•� I I --I I I -I :. :_ } j I I? I �. I- 1. I .I t-i.. r I I i I I 1 I I 1� i 1 I. '- i k° I 1 i! r 1' j �. y i__r. .� I i-I— , I i 1 I i' I �{ r I.I ! I -I I I I I � r 1 •! I I I I C�� , /r 1 �' �1 `' f- t i 1 i I-f1 .i - fy¢dr�ev,�b'�.; I I i t�°�.�ie+r,.;z,51 ; 7 IQ,S ? 'h7.Q . I r, .}I i 11 I -;- i -7 10 ! a ! I I I -I - I I I I i�.1.1 I , 1 .1 I. I I -I 1 � { I I e � � I :. 1 I - �'I .�- I i. !.-I -! �i.4 `�O'bRADB. I I �•s•', it ! "I I j-I"-1 ' 14 i ! i ? I fyr,,;, :� , , r-.T•-r.l:_...•, __.,.,.r' �,"..I.aL� I T ! - I r I' R ; I ,ICI I 1 I I I 1 I -fS/,I�I_ -' 1�6;- -.-- _'/7� L�l 7 I i- _ - _•'. . .,..i J.^•l•,•T_f�_....... ._.}-- L.. .. . _.._ t -y_, _ _ __r tAt .I _1_ ! .I i� SREEV MG %GE ;TAT 0M ��16�k Z4{ 73i' �i j-�i .��- i_ i .i._..-T.,�,...', I , I I ! ! 1 ! � } I i t I r � - 1I R �.f i i i-+ i ! I i I i I^ �i�'I'I ~r?. i _I I I ; i' I i I i I I i E i : I. I I 1 .1 ; ! I I t I j I _ I {. 1 ! 1 i r. i '- ? I f ;PAv' �a6J: 55.( I I .I .16v �,,dv.i62:f i ' ! I- - I --I + . , , + I ! ' { { i ! ! I ; ' 1 I i -I-I 1 I i 11 I„ I L1 i I i I �f IL. I V_ i j i I r- I P I i I I I I-! i;;,; j ! l I i! I !: , lq 1 ! ; -t } ' -i 'I i '. I .,- I . ; I...; ,� .i j -I- 1 l I- ' - I1 I. i I ' I_ I I ' I I` -I I I - ,i- 1 I'.I_" I- -- ; � . ! i ! I I , A. { i i 1, , 1 I! ! j I �ESTATIIONI &0 7, ZOIq' .I- I} E I i I j I- . I I ! 1• I I i I �i I i.. } ,. j , ' I I , j1.';'Y. �',T'A C' -- --I •ir i �;-,I I ..I._I .I I -I .' h- ! j I I "-I 'F _ } t I i I i ! , I ! I I 4, y' �� I I �f `I�._...,-t-- r` #11-i-1-�-�- -� !f@ ;_ I yBhl ' _-} � 7�Fll k� I I_ L .._� _ __ ._ - _ I 1 I s.s_ 1_, � *-I I iI I' 1 �`!� -I I{ -I..'. I I! i I I I j i I i I I # ; ! ,.. ; 1 ...1 1 I ;: .i _f-; I ''I ,-I- I' i I I i' I I. �_I .I-, L._I. _ I I I I I I I f I ! 1 i., i. I } f , Ii ! .1 ! I .1 :. I_ I- . I i, I. I I I i .i - I -I-f •I I -, 'I' . , I ! I ! ` i t j ' I f. I I i I ; i , `. ' I r� l I j I I f i I' i I a! j�l�'ei- Sz�I i -, -{ I -i I Il l: far ; I I _, _I. j I r -I { .; I i .,. I.' I I .: j r '- {II I I I_ _; II.. I- �. I F � j _.. _ -� _ K T Z II_ �_}}.��, I !, �t6Y. _� I _.} .1 j i i i s ..I. -I I i i! i I I i I ;' i g�► I j I i I I I I 4` I I7 I I �1�,II— 53,0 _ -f130 MElf. �l�+Di..4 .l I. E_{._ -�,.� ; I . � T' I., I I 1., I ,I i ' ' I i .1, I I I FJ11LKp�F!!Nk_646 K fey _!4 _fj { ! 1 Il .# t jj1 I ' i! 1 I I I{ I i : ' ' ' ! . . I I I ' i- I' I}! i, ' I l i E'' I I'-`TS7i !.! .-,._I r l _j !_ i. i i I I I I I! I' ! I I ! I ) _, I I ! I I f !i i I i 31 1 �.._ i....,...h-T. .�__ 1✓ �-!- 1 ' _'t�'_,. ". _•-r __ ,-. F. . .-.---,.. - , .. ..-.- , D Y. J. r..r.r.... 4-,--a_.IL 1�t -_ -�--, 1-.i-.V�I`�' _ ,.IV ' �+'T_ - {-T- - I I !� -•' IT� _ "�`� ' . VVVlll 1! 1.111. j! 1- i. i i 1S�2f'1-' s! I I I i I 'I. I 'I' ! I- i I, - I ,: _ I 1 1' I ! 1 !- j -i i i I i I -1 i,i I. i r 1 I i iN I q 1 -�_1 1. i- �{4I41 Ir 11 t IiA9i_Lei.52 _! I tLL i. I I I I ., i j'.i 1' i k I i {- �,_I.L_I I I I I,, 'I ' I` ; ! i I I I }4 I "I _I ' I I I i-I I'' I I ! ! i ' !' I I I . I ! t I 1 I I I- I. jj I i r 1 I 'i _ { �(nt �ip ' ' I . I I I ' , i -I 1 ! I ! I` I i I 1 ' , ' I -I ! !�! " ' I I r I , . ' I j ' . •Ip „s (r[� -I -I ! 4 I ! i' i -{- I #- I I 11 I ? Slii _ i T i i I -, ' I e ' ' I ? , 11%�n Ur I - _ 1 1 _ {'AB CbGY•,5 I I _.1- IFE � 1 1 � ilo�yil -i ; i I. r. I . I , I f _ I '1 1 i 1 I I j i- I I I I �.f I { �1 f..r I II-1 -� }--� }t{ 1- t I11t 0� ,! { I I i i I ! j , i ! , . ! , S i , ! ' Q�} 1 I + I t ! i r...-.-..: .�.... I I !, ' ' ,' -i- �� ' ' ' I i , ' S i i j 1 ! j '0 1 !' i I i r i 'ol I i I t i rpv! ', ? ? 1 I I I I -I �1�. _ i i i I � (bl i k�7 _ ._' :_ I ?- G I i i I I I I i l! ili I j �ARRO�V+ NCI i { i1 i; ' Q !f I I._ i I r I I. ; j 1 i. I !' ij ! I' i}1lI ! ! _ft, I ` 1 _.I ! ! { ' I I.. I I I :, !• I ij +-1 !- _i ! I r I•I' 'I I 1- j' I"1, i I' _`_ -� I �•_# -1 j -.!- -I I"I I- I I -I_I I" ; _ t ' { I i I 1 ' } I ! i i r ! I - 1 1 ; I i ! I i 1 's-l` I - irl !! . - I - -.I. -1 . i I . I , ! i Ii I ! i ! I! i- SI 1 i E .�-- I i!' I- I 11 1 I !. I i I ; •} i . E ! � 11'' I I ,! ! I I i A e�€v. ;, l.. t 1 'I 1 I I 1 1. I I F r._I 11 ,. I; , , I , r 1° I I i I! I t! 1i i 1 I I f I 1 I I I! I I I i a I i I I I I ! I I , ; I I . I.. I I I, ; - i_..I _ I , I s I j I I i y is I i I' i I, PA idk 55.4 i I FIV,pLC,Y, .I 1 .I- i I i I,. I.. I I i I v t .i i.. E I I I I! '� II 1{ 1,.E I I- �..I I f I' } I -i r{ i I I I i .! I i r I• t I n i i I 6 1_ 1 - �-� 1 ' f _'_r4i`Tfi ' �{ 'r NSF!_ _;..' ! i .0. r ; �: . -. - T --r- I r 11 L I I I I-I...ST t, i r j I �i l i i i{ i t -I ! ` V I 1 1 1 1 1 i i i- Ii I r L. �_ I 1 I I i 1 I I I I I _ _1.f I i 11 i I I I i I r I I_I ! I I :+1' ` I i! IGp�rjA1f01j I Ij ! +�,I 1 1 i 1.. 11 I i IIII k` I i T! j I ;. 1 L, _I I I! I I -I 1' i -I_I I1 i k i I:I I I I 'I I ! 1 _., i I' ; r .I•i .-1 iII I,i1.! , 1_11 -,_' ' i.li, ,+ : .1i -,. Ii'1..,11i1i ' ,II_ 1 ,1 1: ji+ i.. .1` �1I , i "} i I I I I I i i_ {. 1_ �, I I L r - I j r I I 1I 1 4 i I I I i . I I'1,..I.1. f 'I CY�V.;3k,1! i i I 1 I' I rAly L s2. L.!i _j i ' I I. i. I I LL I I i I I i i 11 �' 1 , T L' I_ I I I ° I i I I I I ! I j ! i. I I J I I I I 1_ ._. _ r 66Off•I I .. I ,. I..1- I ,! 1 ! i ! ! i j I I' G ..i 111.�{ 1 '_ i� �:_. t I �- !. I i i ' _ lfl' ! 'i I ' 1 I f�. 1 I !-_ -1�LiQ �.:_T s-1 r.�' _� 'fa 5' f- -• : . I ;._: I I III I , w", ; -j-1 - . I. 1 _i._ -. + yi !� ;4 I I _ I i - i.I_I !.-I. I ' I I I'-j c�REEDI'NG,�ICiE�iiliTfdnl..I I i _i } i __! _! ' L.I ! r f ;..i..� I I'I I I I I I i E 1 i' ; i I.I ! I. i t I i l I i !? ,.i I i 1 q, I l l ! i _I.-j ! i' I' �.1 __ I I ! I -1 l i ' !'f I+ 1 i I ! ! i i �_ .� I 1 i f -I I I 1' r 1 I I! .I.: +- i E ; I I -i t-'+' I I I!, I- I I i -IA.� ¢ �Q G1 I I i I I i' r} I_II I I I II I_ Fes• I.I I i E �� I i` i l I I I i l l`-!.i l I r I i I'1 1 I , I • 'a I-.! I -'I I i 11 .I i..f r� , j i r I. -I I i i I I! I -I I i ..! i -.{ I r i. , I i 11 i I:,. 1 ' I ' I` , _ 1 ., - I I r I i I I I' 1! I i! 1, 1' 1 1 .+ .I' j r4 11113t 7p �p 1 I i 1 i I I I I t 1 r I! I I 1 1 ! ! i I i I hf. I I I I l -L. I I I I.. '' ! I i. ! I i, I I r !' r-' I 1.4 i - I I . -I ., t i' I I I I•` I 1 i I_ �..I_,I, I ' I 1 1 I, I I I ;,,! „ �; _ Z .. I.. 2 2! ; ' _ 32.b! ! -' SZIS _ ''Z �,. i i ! 'I T!„ 31� i ka, ; ' _I_"`•ttt777"' t :-= I I ! I r I-! , i _ („� r.�; I . I.� -•-1., • I • I I _ ! I I 1 .,_.i - 1 , I.. I __I , ii_. ` i i 1 1 --r-' I I `_. _ ..I I - �! i I - I 1 i -i 1, I I' `- I! , 1 ,..I 1 r -+-- i i I i I I ii l! i -_I' _1I. I I I. i I I + I! I i -1 .i . I _.; ' I L, ; I i ., i I ! i -i I! ! I i i S ' , 1 I , I .1 ; I . i I- ? . l I' I - I 1 ' I` I- ! 1 I 1. 1 ..�. i I { , 1 i I _ . I . - ! 1. I • ; I , ' , ; 1 r I 1._ .r �. I ' i I' i i , {I 1 i I ! I! I ! I i, 1 L.I ! l_- 1 1 i I {" 1 I. i I --;' ! I I !; I I I! I i I g '�i-►1.1,�;!',;! I ;`;i -IT-...--il liI i}..1 !.'.i I $ l i ., I I 1 I, I.I. i -! j I!, ' I i I I: I- I I.. I ! I I 1 i i' I i{ i' I I I 1' I - 1 I I I r ' ' . i I I , i l '' j I. .1- I ! t I I d I .i i I_ 4 I --.1-.1 _ - - .1 i !.. ,-! 1- I + i i ` ' ! I I 1 E FI I, I i i i...E ' 1 I - I I I '.. .-I ' • -I i. i , . 1 - I -1 -I' -, •. .I. -I. -I i 'I y 1 1 I I I' , ,I r i I j I ( jjjll I Iy[ ! } ' 1 ! ' I , I I r_I 1 S I I! I I f = I i I{ �- - I--.-I_I ..I , I Z0� I I I I' I_ i i QI ' I _- _ �� f i t i pp 1 , 'f"rt I � ! ! � 1 ' -+-y- I -I ... .j_.I_�...,_ I -T-�4 - 771-' _- '_ -^y --t-. I- Z Irl�1 i �..;; 1 I I`�+j -r-' :� I - -illi I �.i I..I-_i_�..._.iI :,:,-.,_�.' II;jI-; .t_L.I.I" II;.; :t , I,,,;iI.I�.L. Ii I'! II II I I IliIII� Ii I I IT II I11 1 Ilii ;! i .I.E. I .. ' i. -I I i E I ! ; i I F �.I L .I -I ; i i N� g77 II -I' 'I-, _A ;`� : Pjl 14',Ixr :Irpoq . i I M 1 IW,` i} t.- --III1 i IIirI 'I" I iijI I"i '. I .� ! - i!�RIR � I' �1:t I . 1._ ' ' ! I. !..' I 1 , I I I 'I --I _!�-�_. _ 1 i 1�-i : I L I'I ' ! 1. PI I I , !I 1. �11 ..I�' I i:I -! 1-s i I 11 1 I i1 •i I I I I !; I I I I i I_ i 1�Y I ' 1,::,4- ' ��i.c1�! ; i- I ? i I I i I ? I I' I I 1 I I.. I'I I.I I. I'I 1 i I f I !-I ;, I I"I I I I I I; -f I ! I I I�frIQ4'vt� �b I I '� !� - I; %-/_'/ . I '_I I I_ "` - -�� -•-I �t-I �` _y . _r1 r-I�_�.� . _. �j�.-7- r +. . �. _. ...._:�-ty. « _...r W.. _�-..-..--,- I I I E,� .._.i i I 1' I I I ' I i i j' 11 i +' I F I I I- _ I G7vE`''01 r1J 09/T 11 r i I'! 1 ! I I i I. ...1-I i l I I ' j I i i - • ' , I I . I 11 I , I I 1 _�- - _ .1 .� '. . i ti ' ..i I. IV I _I ! ! h { ! 1 I t 1 i i-I ", I I+"'i I I I I 1; i" I I I I I I ' I .I -I - i y{ I I' , ..1. I i., ! i-.I.... I, i I-' i 1 r i I 'I I' I'r` '1 • I I I 11 i j I �'�-i-.1 I I �.i._I I I I I I i 11 I I,._,.F._�..._, I ! j - I.I ' I, 4 I! I,I I I_I. I I �I ' I I I I I 1 �.1. I I .'.i _ i-i I 11 i r I$ r i I I,.,I..i. -- I! I!. 11 I' I E-I I I i I ....t 1 'j I_.I I ' -i i I i I. I I I F I I i i i .I I ..�... - I' 1.1 I I 1. I I I I I. ' I I { t I-L I I. I ! "I I '{ I i I I I' I I j f �-_ r i r. ... I J. ! i .i .; , I r ' I i„ , . , ,- Ir 1 1� 1 ! , I ` -.I_ .� _I..1 .r_' 4 { I I i I- : 1- ' ; i" _L� I - _ I... 1 _ .i _'., i ; l I -i. < I 1 I .I 1 { ! . 1 _i ; I_.. I , S t - i� I I . .1 I I i 1' -1 - i I. .I .I ! i } i 1..; 1 ! f I ! I -4- i. . { 1 . , ; . I I j i - 1 j-- `: I ! _ i . L. I ., 1 i + `. } 1 1 , - . . y'.i.i--T i I. - i. ! I • ! I ! .! ' I ! 1--I! III- { i. -.I_I 1! ! I 1 !_: I I i I ' . { .1,_ - i I i I ' ! I .!.. , --!. I I -I -I - ! I I ! I S i yI I r �'! , ' ; I ! I ..i I -i j. I I I 1 I ' I .L. _I. I- .,.1 1. .! 1 I•Ir , I I 1. {�. I, I ]] i i 'I I. I I JJ I - ' -f I . i _ 1=1 flri ;:. j I 1. -I- I 1r t',;- ,. ! I t I ;_ - I1 I -i' I i .1 1 -i ; I E 1 !. 1 I_ I-.I_l 1 _.r. I.. .!..I l' i L. -; I o, .. 1 , I ;•i&M%6. S.rt■.L: tiL,aIyoaII A%* �M -'-'a" l r•dli9 ::171t1st7L�9Na�t_xa llll .. :.+.r a.:.:a,!t 4YA7:Ydd:..i': �lar�:.{.:_ v::.: sir. •,.':r.Gaf:.".s.'tirst t':�'.sii•,